Line 44: Line 44:
Region V to provide the status of the review of WPPSS response on CAT issues. Input from NRR/DE needed to close two isses - rebar placement and welding requirement deviations, is expected December 14, 1983.
Region V to provide the status of the review of WPPSS response on CAT issues. Input from NRR/DE needed to close two isses - rebar placement and welding requirement deviations, is expected December 14, 1983.
2.206 Petition (IE)
2.206 Petition (IE)
On October 18, 1983, the Coalition for Safe Power filed with the Commission a petition requesting revocation of the CP and denial of an OL for WNP-2. NRC staff acknowledged receipt of the petition in a letter dated November 9, 1983. Interim response to 2.206 has been drafted supporting operation to 5%. IE memo to NRR supporting 5% power is expected 12/14/83.
On October 18, 1983, the Coalition for Safe Power filed with the Commission a petition requesting revocation of the CP and denial of an OL for WNP-2. NRC staff acknowledged receipt of the petition in a {{letter dated|date=November 9, 1983|text=letter dated November 9, 1983}}. Interim response to 2.206 has been drafted supporting operation to 5%. IE memo to NRR supporting 5% power is expected 12/14/83.
Design Verification (DE/IE/ Region V)
Design Verification (DE/IE/ Region V)
The final design verification program report is currently under staff review. An NRC staff interim evaluation supports operation to 5% power. No license condition is necessary. Final evaluation will be reported in a future SSER.
The final design verification program report is currently under staff review. An NRC staff interim evaluation supports operation to 5% power. No license condition is necessary. Final evaluation will be reported in a future SSER.

Latest revision as of 21:43, 8 December 2021

Identifies Fire Protection,Hydrodynamic Load & Equipment qualification-seismic Issues That Require NRC Resolution to Support Licensing Action
ML20197G163
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/14/1983
From: Novak T
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
CON-WNP-0706, CON-WNP-706 NUDOCS 8312230111
Download: ML20197G163 (2)


Text

r .

.: p' *

  • Geir,'o, UNITED STATES

! 't. NUCLEAR REGULATORY COMMISSION 5 .(di[hI)'~ e., ., j WASHINGTON, D. C. 20555

. %,t' ** 0 /i December 14, 1983

.....f e

f1Ef40RAflDUM FOR: Darrell G. Eisenhut, Director Division cf Licensing FROM: Thomas i:. foovak. Assistant Director for Licensing Division of Licensing

SUBJECT:

WT4P-2 LICEfiSE This memorandum is an update of cur December 1,1983, status report.

WT4P-2 is projected by Region V to be ready to load fuel December 16, 1983, at the earliest.

The following list identifies issues that require staff resolution to support this licensing action:

Fire Protection (DE)

CEB provided a list of acceptable fire protection deviations from BTP Cf4EB 9.5-1. These have been incorporated into Attachment 4 of the license.

Hydrodynamic Loads (DE)

MEB provided SSER =4 input for the effect of hydrodynanic loads on its piping and components inside the containment justifying operation to Si.. The license has been conditioned to require resolution prior to Si;.

Equipment Qualification - Seismic (DE) -

Justification has been provided for interim operation. Final qualification is being required prior to startup following first refueling as a license condition.

8312230111 831214 N e ADOCK 05000397 )

I

w NRC Verification of Control Room Design Improvements -

, Human Factors (DHFS)

Following the site visit the week of December 5, 1983. DHFS provided SSER input approving WPPSS program completion schedule which is reflected in Attachment 2 to the license.

CAT Inspection Issues (Region V)

Region V to provide the status of the review of WPPSS response on CAT issues. Input from NRR/DE needed to close two isses - rebar placement and welding requirement deviations, is expected December 14, 1983.

2.206 Petition (IE)

On October 18, 1983, the Coalition for Safe Power filed with the Commission a petition requesting revocation of the CP and denial of an OL for WNP-2. NRC staff acknowledged receipt of the petition in a letter dated November 9, 1983. Interim response to 2.206 has been drafted supporting operation to 5%. IE memo to NRR supporting 5% power is expected 12/14/83.

Design Verification (DE/IE/ Region V)

The final design verification program report is currently under staff review. An NRC staff interim evaluation supports operation to 5% power. No license condition is necessary. Final evaluation will be reported in a future SSER.

Region V is preparing Attachmert 1 to the license identifying carry-over items to be made license conditions. A partial draft is expected December 13, 1983.

'"-81041sie .g q ,

Thomas M. Novak, Assistant Director

for Licensing Division of Licensing cc
R. J. Mattson H. L. Thompson DISTRIBUTION:

J. G. Partlow E. L. Jordan -

J. Martin, R-V DL:LB#2/ DL: L 'A t$A ASchwencer:pt SB a - TF1Novak 12 83 12 '/83 12/ /83