UNIVERSITY OF MASSACHUSETFS LOWELL 1 UNIVERSITY AVENUE LOWELL,MA 01854                                          q (508) 934-3280                                        l 1
March 17,1994 Docket No. 50-223 License No. R-125                                                                    l US Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555                                                            1 Gentlemen:
The attachment to this letter provides clarifications and changes to the " Proposed Technical Specifications for the University of Massachusetts Lowell (UML) Reactor with Low Enrichment Fuel" submitted by letter dated May 21. 1993. These changes correct editorial oversights and provide clarifications resulting from discussions with the NRC Staff. The changes are identified by bars in the right margin.
As we noted in the May 21, 1993 letter, 6_ kilograms of U235 will be involved with the receipt of low enriched uranium (LEU) fuel.
A current inventory of 4 kilograms of U235 in high enriched uranium (IIEU) fuel elements is within the possession limits of the current license. The possession limits would need to be changed to 10 kg on a temporary basis until the shipment of HEU fuel from Lowell is completed. The new permanent possession limit would then be 6 kg of U235, The detailed planning for LEU receipt, interim storage, fuel loading, operator training, and experience of involved individuals has just begun. Specific details will be provided in a later communication. Communication with the LEU fuel supplier, EG & G Idaho, Inc., indicates that the earliest date for. LEU arrival at UML is December, 1994.
Sincerely ' yours,
                                                        .vCG\%y(
10010                        0[Gunter Kegel, Director Radiation Lab.
cc:    Region I Administrator T. Michaels, Sr. Project Manager, NRR/ONDB                                  1 S. Weiss, Director, Non Power Reactors Directorate, NRR I
9403220176 940317 PDR  ADOCK 05000223
                                                                            $~0  i p                  PDR
                                                            ,}}

Revision as of 14:20, 6 January 2021

Forwards Proposed TS for Univ of Ma Lowell Reactor W/Low Enrichment Fuel,Correcting Editorial Oversights & Providing Clarification Resulting from Discussions W/Nrc
ML20064K024
Person / Time
Site: University of Lowell
Issue date: 03/17/1994
From: Kegel G
MASSACHUSETTS, UNIV. OF, LOWELL, MA (FORMERLY LOWELL
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064K027 List:
References
NUDOCS 9403220176
Download: ML20064K024 (1)


Text

.

UNIVERSITY OF MASSACHUSETFS LOWELL 1 UNIVERSITY AVENUE LOWELL,MA 01854 q (508) 934-3280 l 1

March 17,1994 Docket No. 50-223 License No. R-125 l US Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 1 Gentlemen:

The attachment to this letter provides clarifications and changes to the " Proposed Technical Specifications for the University of Massachusetts Lowell (UML) Reactor with Low Enrichment Fuel" submitted by letter dated May 21. 1993. These changes correct editorial oversights and provide clarifications resulting from discussions with the NRC Staff. The changes are identified by bars in the right margin.

As we noted in the May 21, 1993 letter, 6_ kilograms of U235 will be involved with the receipt of low enriched uranium (LEU) fuel.

A current inventory of 4 kilograms of U235 in high enriched uranium (IIEU) fuel elements is within the possession limits of the current license. The possession limits would need to be changed to 10 kg on a temporary basis until the shipment of HEU fuel from Lowell is completed. The new permanent possession limit would then be 6 kg of U235, The detailed planning for LEU receipt, interim storage, fuel loading, operator training, and experience of involved individuals has just begun. Specific details will be provided in a later communication. Communication with the LEU fuel supplier, EG & G Idaho, Inc., indicates that the earliest date for. LEU arrival at UML is December, 1994.

Sincerely ' yours,

.vCG\%y(

10010 0[Gunter Kegel, Director Radiation Lab.

cc: Region I Administrator T. Michaels, Sr. Project Manager, NRR/ONDB 1 S. Weiss, Director, Non Power Reactors Directorate, NRR I

9403220176 940317 PDR ADOCK 05000223