ML20148L638

From kanterella
Jump to navigation Jump to search
Confirms Commitments Made in Telcon Discussions to Determine Void Coefficient in Low Enriched U (LEU) Core,Installed & Tested at Univ of Ma Lowell,Research Reactor
ML20148L638
Person / Time
Site: University of Lowell
Issue date: 06/06/1997
From: Bettenhausen L
MASSACHUSETTS, UNIV. OF, LOWELL, MA (FORMERLY LOWELL
To: Michaels T
NRC (Affiliation Not Assigned)
References
NUDOCS 9706190321
Download: ML20148L638 (3)


Text

.. ... _ - . . - _ - -. . . _ . . - . . _ . . .. . .

l g UNIVERSITY OF MASSACHUSETTS LOWELL

'; ONE UNIVERSITY AVE.

LOWELL, M A 01854-2881 ,

June 6,1997 Theodore S. Michaels, Senior Project Manager PDND/DRPM/NRR Mail Stop 11B20 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Docket No. 50-223 License No. R-125 l

Dear Mr. Michaels,

l This letter confirms commitments made in telephone discussions to j determine void coefficient in the Low Enriched Uranium (LEU) core when it is being installed and tested at the University of Massachusetts Lowell, Research Reactor. A revised LEU Conversion Plan is attached. The methodology will be to introduce a void of known volume in the central flux trap and measure the reactivity change. This will then be related to the analytical determination of void coefficient of reactivity 1

\

Lee H. Bettenhausen f Reactor Supervisor t

Enclosures:

As Stated i {l cc w/ enclosures: See Nsxt Page i = .hllh fllf 9706190321 970606 ie -

, PDR ADOCK 05000223.

P i 13UU31

_. - __ _ . _ _ . _ . _ . . . . . . _ . _ _ . _ _ _ _ _ ~ _ _ . _ _ . . _ _ _ _ _ _ . . _ _ _ - _

7 U.S. Nuclear Regulatory Commission Docket No. 50-223 cc:

. Desk Copy

.U.S. Nuclear Regulatory Commission Mail Stop llB20

. Washington, D.C. 20555-0001 Mayor of Lowell City Hall Lowell, Massachusetts 08152 Office of Attorney General Environmental Protection Division 19th Floor One Ashburton Place l

Boston, M A 02108 l l REACTOR SAFETY SUBCOMMITTEE MEMBERS University of Massachusetts Lowell:

John White Warren Church Mary Montesalvo .

George Chabot Gunter Kegel Lee Bettenhausen Kanti Prasad David R. Medich i

i i

)

4 4

}

CONVERSION FROM HEU FUEL TO LEU FUEL i y

, ' UNIVERSITY OF M ASSACHUSETTS LOWELL RESEARCH REACTOR

. Table 12.6.1 LEU CONVERSION PL AN PROPOSED SEQUENCE OF WORK LEU NORMAL

1. REGULATING BLADE FINAL CONSTRUCTION AND APPROVAL X
2. PLAN REVIEW AND APPROVAL X i
3. SAFETY AND DECON EQUIPMENT X 1
4. SCHEDULE FOR FINAL REACTOR SHUTDOWN X
5. HEU FUEL C00LDOWN REVIEW X
6. HEU FUEL STORAGE SEQUENCE X 4
7. M AKE-UP DEMINERALIZER CAPACITY CHECK / l RESIN CHANGE X l
8. CLEAN-UP DEMINERALIZER CAPACITY CHECK / l RESIN CH ANGE >

X

9. RECEIPT 0F GRAPHITE REFLECTORS X
10. STORAGE SEQUENCE FOR GRAPHITE REFLECTORS X
11. RECEIPT 0F LEU FUEL X
12. STORAGE OF LEU FUEL X  !

! 3. GRAPHITE TEST FIT X,

14. LEU FUEL TEST FIT X
15. POOL GATE INSTALLATION X
16. POOL DRAIN X 17, GRID BOX RADI ATION SURVEY X
18. GRID BOX INSPECTION X
19. REGULATING BLADE REMOVAL AND STORAGE X
20. NEW REGULATING BLADE INSTALLATION X
21. NEW REGULATING BLADE TESTING X
22. GATE REMOVAL AND POOL REFILL X
23. GRAPHITE LOADING X
24. SAFETY BLADE WITHDRAW AL CHECKS X j
25. RESET ALARM AND SCRAM SETPOINTS X  :
26. LEU FUEL LOAD AND CRITICALITY DETERMINATION X
27. PRIM ARY SYSTEM FLOW CHECK WITH FULL CORE X
28. BLADE WORTH DETERMINATIONS X
29. EXCESS REACTIVITY DETERMINATION X
30. VOID COEFFICIENT DETERMINATION X
31. NEG ATIVE TEMPERATURE COEF. DETERMINATION X
32. THERM AL FLUX M APPING X
33. LOW POWER CALIBRATION-CALORIMETRIC X
34. N-16 MONITOR CALIBRATION X
35. HIGH POWER CALIBRATION - CALORIMETRIC X
36. RADI ATION MONITORING LEVELS CHECK X
37. PHYSICS BEAMPORT PARAMETERS CHECK X
38. XENON MEASUREMENTS X
39. NRC AND DOE FINAL REPORTS X REV 1 6/6/97