ML20065S329: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
(No difference)

Latest revision as of 04:07, 6 January 2021

Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 90-22,incorporating Overtime Limit Requirements Provided in Generic Ltr 82-16
ML20065S329
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/14/1990
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065S332 List:
References
TASK-1.A.1.3, TASK-TM GL-82-16, NUDOCS 9012200211
Download: ML20065S329 (2)


Text

/

y TENNESSEE VALLEY AUTHORITY 5B Lookout Place DEC 141990 TVA-SQN-TS-90-22 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATIN Docume nt Control Desk Washington, 2.C. 20555 Gentlemen d

Its the Matter of ) Docket Nos.59-327 Tennessee Valtey Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (5QN) - TECHNICAL SPECIFICATION (TS) CHANGE 90-22 Reference NRC letter to TVA dated October 18, 1990, " Technical l Specifications to Limit Overtime (TMI Item I.A.1.3) -

Sequoyah Nuclear Plant, Onits 1 and 2" In accordance with 10 CFR 50.90, we are enclosing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2. In response to the referenced letter, the proposed change incorporates the overtime limit requirements provided in Generic Letter 82-16. The change also includes position title changes and approval authority changes for procedures and modifications to Section 6.0 of the TSs and corrects oversights from previous changes. The oversight corrections include the deletion of the Operations Superintendent from the composition of the Plant Operations Review Committeo and the deletion of the requirement to report changes to the Offsite Dose Calculation Manual in the Monthly Operating Report. Other generic changes to Section 6.0 are being held pending NRC issuance of generie. guidance on the administrative section of TSs.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

Please direct questions concerning this issue to J. D. Strith at (615) 843-6172.

Very truly yours.

TENNESSEE VALLEY AUTHORITY g a

$$ E. G. Wallace Manager Nuclear Licensing and QQ-g Regulatory Affairs oso a Sworn to gnd subscribed before me

-' u this , W day of l b 4 tr 1990 MtA.4 -

N Notary Public j /

8$ My Commission Expires ///Y/ 9c2 o~ o. h.

Enclosures Q\

U cc See page 2 An Equal Opportunity Employer lg i I

i' i 2

U.S. Nuclear Regulatory Comission DEC 141990 i

cc (Enclosures):

American Nuclear Insurers Attention: Librarian The exchange, suite 245 270 Farmington Avenue Farmington, Connecticut 06032 Ms. S. C. Black, Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Comission ,

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852  ;

Mr.'J. N. Donohew Project Manager U.S. Nuclear Regulatory Comission

. -One^ White Flint, North 11555 Rockville Pike .

Rockville:, Maryland 20852 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N-- '

, Nashville, Tennessee .37203 NRC Resident--Inspector

-i- Sequoyah N *1 ear Plant 2600 Igou Terry Road Soddy Daisy, Tennessee 37379 Mr. B. A. Wilson,. Project Chief I U.S. Nuclear Regulatory. Comission Region II-101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-

- - - . . - _ = _