ML20155G665: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.    ..      ..-      .    ..        _ . . - _ _ . _ . _ . _ . _ _ _ . -                                    _ _    _ - _ _ . - . _ . _ _
                    Dr. Joszph Czechi
                                                                                            October 30, 1998
    g
    L
                  ' Chair, Ch:mical cnd Nucinar Enginsering Dzpartmsnt
                    University of Nsw Mexico                                                                                                          l
                    Albuquerque, NM 87131-1341
      .
                    SUBJECT: NRC INSPECTION REPORT NO. 50-252/98-202
                    Dear Dr. Cecchi:
                    This refers to the inspection conducted on October 5-8,1998, at your AGN Research
                    Reactor Facility. The inspection included a review of activities authorized for your facility.
                    The enclosed report presents the results of that inspection.
                    Various aspects of your safety program were inspected incliding selective examinations of
                    procedures and representative records, and interviews with personnel. Based on the-
                  .results of this inspection, no significant safety issues were identified.
                    in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
                    and its enclosure will be placed in the NRC Public D'o cument Room.
                    Should you have any' questions concerning this letter, please contact us.
                                                                                    Sincerely,
                                                                                                                                                      l
                                                                                                                                                      ,
                                                                                    original Signed By:
                                                                                    Seymour H. Weiss, Director
                                                                                    Non Power Reactors and Decommissioning
                                                                                      Project Directorate
                                                                                    Division of Reactor Program Management
                                                                                    Office of Nuclear Reactor Regulation
-
                    Docket No. 50-252                                                                                                                I
                    License No. R-102
                    Enclosure:      NRC inspection Report No. 50-252/98-202                                                                    ,
                    cc w/enci:                                                                                                                    j
                    Dr. Robert D. Busch, Chief Reactor Supervisor
                    Dr. Norman Roderick, Reactor Administrator
                    Dr.' William Vernetson, TRTR-                                                                                                    ,
                    Mr. Ralph Becker, interim Radiation Protection Officer                                                                        O
        R    a Radiation Control Program Director, State of New Mexico                                                                      h
    '
                                                                                                      : J                      k
                                  y <.y            -
                                                      , ,
                                                                                                                      .
*
      fg4-          Distribution: w'/eEcidufe
      j            E-MAIL                                                                  HARD COPl
        Eo      . TBurdick                        TDragoun                  Pisaac          Docket File 50 252      JRos
      -ng          PDoyle                        TMichaels                                PUBLIC                SWeiss
'    -Q        - CBassett                        WEresian
                                                  SHolmes
                                                                                            EHylton
                                                                                            MMendonca
                                                                                                                    PDND r/f
                                                                                                                    Region IV
          $      : AAdams
            o    - PDND:PM                        PD              1              P
                                                                                          -
                                                                                                              L
                    MMendonca                      CBassett                        E        n            [niss
                                                                                                          S)
                    10/                            10/y/98                        10dd/98                10/39 /98
                    OFI,20/98    -
                        ICIAL RECORD            COPY DOCUMENT NAME: G:\SECY\MENDONCA\UNM98202
                                  .. . - - .                                                                        .
                                                                                                                                                    '
 
                                                                                                ~ ~^~~~~                              ^ ~ ~ ~ ~~ ^ ^ '
        2.i,--.C1: L....:::L-                        :..:::.:::~ ~ '~ : " ~
  .
                Dr. Josrph Cecchi
    *
      .
                                                                              October 30, 1998
  *
                Chair, Chsmical and Nuclear Engineering Department
                University of New Mexico
    '
                Albuquerque, NM 87131-1341
                SUBJECT: NRC INSPECTION REPORT NO. 50 252/98-202
                Dear Dr. Cecchi:
                This refers to the inspection conducted on October 5-8,1998, at your AGN Research
                Reactor Facility. The inspection included a review of activities authorized for your facility.
                The enclosed report presents the results of that inspection.
                Various aspects of your safety program were inspected including selective examinations of
                procedures and representative records, and interviews with personnel. Based on the
                results of this inspection, no significant safety issues were identified,
                in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
                and its enclosure will be placed in the NRC Public Document Room.
                Should you have any questions concerning this letter, please contact us.
                                                                  Sincerely,
                                                                  original Signed By:
                                                                  Seymour H. Weiss, Director
                                                                  Non Power Reactors and Decommissioning
                                                                      Project Directorate
                                                                  Division of Reactor Program Management
                                                                  Office of Nuclear Reactor Regulation
                Docket No, 50-252
                License No. R-102
                Enclosure:      NRC Inspection Report No. 50 252/98-202
                cc w/ encl:
                Dr. Robert D. Busch, Chief Reactor Supervisor
                Dr. Norman Roderick, Reactor Administrator
                Dr. William Vernetson, TRTR
                Mr. Ralph Becker, interim Radiation Protection Officer
                Radiation Control Program Director, State of New Mexico
;-              Dio.tribuilgol
                    r          w/ enclosure
                E-MAIL                                                        HARD COPY
                TBurdick                TDragoun          Plsaac            Docket File 50-252          JRoe
                PDoyle                  TMichaels                            PUBLIC                      SWeiss
                CBassett                WEresian                            EHylton                    PDND r/f
                AAdams                  SHolmes                              MMendonca                  Region IV
,
                            ns            c,. j . -
                                                                              !
                PDND:PM                  PDND:RI                  PD{D'fLA
                MMendonca                CBassett                        tt6n
                                                                  Ekly%498.
                                                                                            [SiMhiss
                10/ g/98                10/1 /98                  10!                      10/P /98
                necicias ncenon enov nnriiucM r Mauc. n.mcrvuucMnnMrau iMuamon?
                                    ,_,          _.    .        ,    ,      , _ _ - . .  _
                                                                                                      . .      - _ . _ _ _ . . . . ~ . , - ,            __ _
 
                .                                              - .- .    . - . .
  .
    .
          v a arig
  '
'
    -  [            t
                      j
                                                    UNITED STATES
      s*                          NUCLEAR REGULATORY COMMISSION
                      *                          WASHINGTON, D.C. 20M1
        \, ,,,,,/                                October 30, 1998
          Dr. Joseph Cecchi
          Chair, Chemical and Nuclear Engineering Department
          University of New Mexico
          Albuquerque, NM 87131-1341
          SUBJECT: NRC INSPECTION REPORT NO. 50-252/98-202
          Dear Dr. Cecchi:
          This refers to the inspection conducted on October 5-8,1998, at your AGN Research
          Reactor Facility. The inspection included a review of activities authorized for your facility.
          The enclosed report presents the results of that inspection.
          Various aspects of your safety program were inspected including selective examinations of
          procedures and representative records, and interviews with personnel. Based on the
          results of this inspection, no significant safety issues were identified.
          In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
          and its enclosure will be placed in the NRC Public Document Room.
          Should you have any questions concerning this letter, please contact us.
                                                        Sincerely,
                                                          '/
                                                                                  s
                                                        Seymour H. Weiss, Director
                                                        Non Power Reactors and Decommissioning
                                                            Project Directorate
                                                        Division of Reactor Program Management
                                                        Office of Nuclear Reactor Regulation
          Docket No. 50-252
          License No. R-102
          Enclosure:      NRC Inspection Report No. 50-252/98-202
          cc w/ encl:
          Dr. Robert D. Busch, Chief Reactor Supervisor
:          Dr. Norman Roderick, Reactor Administrator
l          Dr. William Vernetson, TRTR
l          Mr. Ralph Becker, Interim Radiation Protection Officer
'
          Radiation Control Program Director, State of New Mexico
l
t
 
                        .            - - ._
                                          .
    ,
      .
    .
l    .
        University of New Mexico            Docket No. 50-252
                                                                :
                                                                l
  -
                                                                1
        CC:
        City Manager
        City of Albuquerque
        City Hall                                              l
                                                                !
        Albuquerque, New Mexico 87101
                                                                l
                                                                l
                                                                l
l
!
!
}}
}}

Latest revision as of 08:05, 17 December 2020

Forwards Insp Rept 50-252/98-202 on 981005-08.No Violations Noted.Various Aspects of Safety Program Inspected Including Selective Exams of Procedures & Representative Records & Interviews with Personnel
ML20155G665
Person / Time
Site: University of New Mexico
Issue date: 10/30/1998
From: Weiss S
NRC (Affiliation Not Assigned)
To: Cecchi J
NEW MEXICO, UNIV. OF, ALBUQUERQUE, NM
Shared Package
ML20155G669 List:
References
50-252-98-202, NUDOCS 9811090143
Download: ML20155G665 (4)


See also: IR 05000252/1998202

Text

. .. ..- . .. _ . . - _ _ . _ . _ . _ . _ _ _ . - _ _ _ - _ _ . - . _ . _ _

Dr. Joszph Czechi

October 30, 1998

g

L

' Chair, Ch:mical cnd Nucinar Enginsering Dzpartmsnt

University of Nsw Mexico l

Albuquerque, NM 87131-1341

.

SUBJECT: NRC INSPECTION REPORT NO. 50-252/98-202

Dear Dr. Cecchi:

This refers to the inspection conducted on October 5-8,1998, at your AGN Research

Reactor Facility. The inspection included a review of activities authorized for your facility.

The enclosed report presents the results of that inspection.

Various aspects of your safety program were inspected incliding selective examinations of

procedures and representative records, and interviews with personnel. Based on the-

.results of this inspection, no significant safety issues were identified.

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public D'o cument Room.

Should you have any' questions concerning this letter, please contact us.

Sincerely,

l

,

original Signed By:

Seymour H. Weiss, Director

Non Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

-

Docket No. 50-252 I

License No. R-102

Enclosure: NRC inspection Report No. 50-252/98-202 ,

cc w/enci: j

Dr. Robert D. Busch, Chief Reactor Supervisor

Dr. Norman Roderick, Reactor Administrator

Dr.' William Vernetson, TRTR- ,

Mr. Ralph Becker, interim Radiation Protection Officer O

R a Radiation Control Program Director, State of New Mexico h

'

J k

y <.y -

, ,

.

fg4- Distribution: w'/eEcidufe

j E-MAIL HARD COPl

Eo . TBurdick TDragoun Pisaac Docket File 50 252 JRos

-ng PDoyle TMichaels PUBLIC SWeiss

' -Q - CBassett WEresian

SHolmes

EHylton

MMendonca

PDND r/f

Region IV

$  : AAdams

o - PDND:PM PD 1 P

-

L

MMendonca CBassett E n [niss

S)

10/ 10/y/98 10dd/98 10/39 /98

OFI,20/98 -

ICIAL RECORD COPY DOCUMENT NAME: G:\SECY\MENDONCA\UNM98202

.. . - - . .

'

~ ~^~~~~ ^ ~ ~ ~ ~~ ^ ^ '

2.i,--.C1: L....:::L-  :..:::.:::~ ~ '~ : " ~

.

Dr. Josrph Cecchi

.

October 30, 1998

Chair, Chsmical and Nuclear Engineering Department

University of New Mexico

'

Albuquerque, NM 87131-1341

SUBJECT: NRC INSPECTION REPORT NO. 50 252/98-202

Dear Dr. Cecchi:

This refers to the inspection conducted on October 5-8,1998, at your AGN Research

Reactor Facility. The inspection included a review of activities authorized for your facility.

The enclosed report presents the results of that inspection.

Various aspects of your safety program were inspected including selective examinations of

procedures and representative records, and interviews with personnel. Based on the

results of this inspection, no significant safety issues were identified,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

original Signed By:

Seymour H. Weiss, Director

Non Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No, 50-252

License No. R-102

Enclosure: NRC Inspection Report No. 50 252/98-202

cc w/ encl:

Dr. Robert D. Busch, Chief Reactor Supervisor

Dr. Norman Roderick, Reactor Administrator

Dr. William Vernetson, TRTR

Mr. Ralph Becker, interim Radiation Protection Officer

Radiation Control Program Director, State of New Mexico

- Dio.tribuilgol

r w/ enclosure

E-MAIL HARD COPY

TBurdick TDragoun Plsaac Docket File 50-252 JRoe

PDoyle TMichaels PUBLIC SWeiss

CBassett WEresian EHylton PDND r/f

AAdams SHolmes MMendonca Region IV

,

ns c,. j . -

!

PDND:PM PDND:RI PD{D'fLA

MMendonca CBassett tt6n

Ekly%498.

[SiMhiss

10/ g/98 10/1 /98 10! 10/P /98

necicias ncenon enov nnriiucM r Mauc. n.mcrvuucMnnMrau iMuamon?

,_, _. . , , , _ _ - . . _

. . - _ . _ _ _ . . . . ~ . , - , __ _

. - .- . . - . .

.

.

v a arig

'

'

- [ t

j

UNITED STATES

s* NUCLEAR REGULATORY COMMISSION

\, ,,,,,/ October 30, 1998

Dr. Joseph Cecchi

Chair, Chemical and Nuclear Engineering Department

University of New Mexico

Albuquerque, NM 87131-1341

SUBJECT: NRC INSPECTION REPORT NO. 50-252/98-202

Dear Dr. Cecchi:

This refers to the inspection conducted on October 5-8,1998, at your AGN Research

Reactor Facility. The inspection included a review of activities authorized for your facility.

The enclosed report presents the results of that inspection.

Various aspects of your safety program were inspected including selective examinations of

procedures and representative records, and interviews with personnel. Based on the

results of this inspection, no significant safety issues were identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

'/

s

Seymour H. Weiss, Director

Non Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No. 50-252

License No. R-102

Enclosure: NRC Inspection Report No. 50-252/98-202

cc w/ encl:

Dr. Robert D. Busch, Chief Reactor Supervisor

Dr. Norman Roderick, Reactor Administrator

l Dr. William Vernetson, TRTR

l Mr. Ralph Becker, Interim Radiation Protection Officer

'

Radiation Control Program Director, State of New Mexico

l

t

. - - ._

.

,

.

.

l .

University of New Mexico Docket No. 50-252

l

-

1

CC:

City Manager

City of Albuquerque

City Hall l

!

Albuquerque, New Mexico 87101

l

l

l

l

!

!