Responds to Violations Noted in Insp Rept 50-252/88-01 on 880328-31.Corrective actions:1987 Annual Rept Completed & Submitted on 880331 & Staff Made Aware That Rept Must Be Submitted Before Sept 30 of Each Yr
ML20154J678
Person / Time
Site: University of New Mexico
Issue date: 05/16/1988
From: Williams F
NEW MEXICO, UNIV. OF, ALBUQUERQUE, NM
To: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8805270096
Download: ML20154J678 (2)


Text

.. _-

.Jy1 PPP)lig M ] @ @ 3M b_,

The University of New Mexico -

Ikpartment of Chemical and Nuclear lingineering g l9M Albuquerque, NM 87131 Telephone 505: 277-5431 .

May 16, 1988 Blaine Murray Chief, Radiological Protection and Sareguards Branch US Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76001 Ref: Docket 252/88-01 Gentlemen:

Enclosed is a reply to the Notices of Violation from the inspection conducted at our facility during the period March 28-31, 1988. The reply provides the following information for  ;

the violation noted:

1. Reason for violation,
2. Corrective steps taken to dhte and results, l
3. Corrective steps to be taken in the future, and, j
4. Date when full compliance is expected.

We believe we have responded to the violation and indicated corrective action which will bring our facility into full compliance with the applicable NRC requirements.

Sincerely,

$ff U ""

l Frank L. Williams Reactor Administ.rator FLW:mlo cc: NM Environmental Improvement Division R.D. Busch, Chief Reactor Supervisor, UNM  !

W.L. Tabor, Director, Occupational Safety, UNM I  !

i 8

' \

A Place in Your Future i

((h I

'8805270096 880516 PDR Q

ADOCK 05000252 DCD i

i

. c;.=

FAILURE TO SUBMIT ANNUAL OPERATING REPORT

1. We had a change in staff in June last year and the Reactor Technician and Administrative Secretary are new in these positions. In the process of providing training, the submittal of the 1987 annual report got lost in the shuffle.
2. While the NRC inspector was present for the review and identified the violation, the 1987 annual report was completed and submitted on March 31, 1988.
3. All of the staff (Reactor Administrator, Chief Reactor Supervisor, Administrative Secretary, and Reactor Technician) are now aware that the report milst be prepared and submitted before Sept. 30 each year.

These four people will provide checks and balances on each other the insure that the process is completed as required.

4. Full compliance has been achieved as of May 13, 1988.