05000368/LER-1994-001, Forwards Rev 1 to LER 94-001 Re Excore Nuclear Instrumentation.Rev Revises Commitment Re Future post-maint Testing Method Used to Verify Continuity of Cable Connectors: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 32: Line 32:


=text=
=text=
{{#Wiki_filter:
{{#Wiki_filter:..  .      . _          ._            _                    _        _      _
c imu one              .. .c.
e ENTERGY                                                                  "e sa m Ra,dv5c. AR 72dO1                          !
Tcl 501 E5 5000                            [
f November 21,1994                                                                                                  !
2CANI19405 i
U. S. Nuclear Regulatory Commission                                                                              ,
Document Control Desk                                                                                            i Mail Station P1-137                                                                                              l Washington, DC 20555 i
 
==Subject:==
Arkansas Nuclear One - Unit 2                                                                        i Docket No. 50-368                                                                                    :
License No. NPF-6 Licensee Event Report 50-368/94-001-01 Gentlemen:
In accordance with 10CFR50.73(a)(2)(i)(B), enclosed is the subject report concerning excore nuclear instrumentation. This supplement is being submitted to revise the commitment regarding the future post-maintenance testing method used to verify continuity of cable connectors.                                                                                    i Very truly yours, b      AfC.W/i Dwight C. Mims Director, Licensing DCM/TFS/mmg enclosure l
l 1
1 280024 9411300290 941121                                                                                ;
PDR S
ADOCK 05000368 PDR
                                                                                                                'h" ,  Ii i
i
 
U. S. NRC November 21,1994                                      l 2CANI19405 Page 2 cc:    Mr. Leonard J. Callan Regional Administrator                        i U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400                ,
Arlington, TX 76011-8064                      I i
l Institute ofNuclear Power Operations          :
700 Galleria Parkway                          l Atlanta, GA 30339-5957                        j i
i I
                                                              )
I I
l
_ _ _ _ -
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 01:21, 20 May 2020

Forwards Rev 1 to LER 94-001 Re Excore Nuclear Instrumentation.Rev Revises Commitment Re Future post-maint Testing Method Used to Verify Continuity of Cable Connectors
ML20078L594
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/21/1994
From: Mims D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078L597 List:
References
2CAN119405, NUDOCS 9411300290
Download: ML20078L594 (2)


LER-2094-001, Forwards Rev 1 to LER 94-001 Re Excore Nuclear Instrumentation.Rev Revises Commitment Re Future post-maint Testing Method Used to Verify Continuity of Cable Connectors
Event date:
Report date:
3682094001R00 - NRC Website

text

.. . . _ ._ _ _ _ _

c imu one .. .c.

e ENTERGY "e sa m Ra,dv5c. AR 72dO1  !

Tcl 501 E5 5000 [

f November 21,1994  !

2CANI19405 i

U. S. Nuclear Regulatory Commission ,

Document Control Desk i Mail Station P1-137 l Washington, DC 20555 i

Subject:

Arkansas Nuclear One - Unit 2 i Docket No. 50-368  :

License No. NPF-6 Licensee Event Report 50-368/94-001-01 Gentlemen:

In accordance with 10CFR50.73(a)(2)(i)(B), enclosed is the subject report concerning excore nuclear instrumentation. This supplement is being submitted to revise the commitment regarding the future post-maintenance testing method used to verify continuity of cable connectors. i Very truly yours, b AfC.W/i Dwight C. Mims Director, Licensing DCM/TFS/mmg enclosure l

l 1

1 280024 9411300290 941121  ;

PDR S

ADOCK 05000368 PDR

'h" , Ii i

i

U. S. NRC November 21,1994 l 2CANI19405 Page 2 cc: Mr. Leonard J. Callan Regional Administrator i U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 ,

Arlington, TX 76011-8064 I i

l Institute ofNuclear Power Operations  :

700 Galleria Parkway l Atlanta, GA 30339-5957 j i

i I

)

I I

l

_ _ _ _ -