ML20084Q485: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:. _ _ - - - _ _ _ _ - - _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _
Wisconsin Electnc POWER COMPANY 231 W MchoytPo Bos 2046.Mdwovkee.WI 53201-2046                                                                                        (414)221-2345 VPNPD 52                                                                                10CFR50.4 10DFR50.90 June 1, 1995 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Ladies / Gentlemen:
DOCKETS 50-266 AND 50-301 ADDENDUM 2 TO TECHNICAL SPECIFICATIONS CHANGE REOUEST 176 ADMINISTRATIVE CHANGES POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 On January 24, 1995, we submitted Technical Specifications Change Request 176, " Administrative Changes." The proposed changes                                                                                        !
modified Technical Specifications Section 15.6.5, " Review and                                                                                      !
Audit," and Section 15.7.8, " Administrative Controls," by                                                                                          j removing Quality Assurance audit frequencies, removing Section                                                                                      I 15.6.5.4, " Emergency Plan Reviews," and extending the radioactive                                                                                ;
effluent reporting period from semiannual to annual. Included in this submittal was the removal of fire protection program audit frequencies. On February 24 and May 24, 1995, we modified our request due to comments by NRC staff and made several administrative changes.
Upon review of our Technical Specifications, we identified an additional reference to the Semiannual Monitoring Report that should have been included in our original submittal and changed to " Annual" Monitoring Report.                  Therefore, a marked-up Technical Specifications page is enclosed with the appropriate revision.
We have reviewed the No Significant Hazards Consideration and Safety Evaluation forwarded to you in our January 24, 1995, 95060B0615 950601 PDR      ADOCK 05000266 p                        PDR A mbukuyaf%wsm Enem Gepvade                                                                                h
 
l 1
Document Control Clerk June 1,    1995 Page 2 l
submittal.      Because the enclosed revision does not increase the                                  !
scope or change the intent of the original submittal, we believe the conclusions contained therein remain valid.
Please contact us if you have any questions.
Sincerely, Bob L    k Vice . resident Nuclear Power DAW /kmc Enclosure cc:  NRC Resident Inspector NRC Regional Administrator Public Service Commission of Wisconsin
_ _ _ - - - _ _ - _ - _ _ _ _ - - - _ _ - _ -}}

Latest revision as of 18:25, 13 May 2020

Submits Addendum 2 to TS Change Request 176,consisting of Encl marked-up TS Page Reflecting Change to Annual Monitoring Rept
ML20084Q485
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/01/1995
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20084Q488 List:
References
VPNPD-95-52, NUDOCS 9506080615
Download: ML20084Q485 (2)


Text

. _ _ - - - _ _ _ _ - - _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _

Wisconsin Electnc POWER COMPANY 231 W MchoytPo Bos 2046.Mdwovkee.WI 53201-2046 (414)221-2345 VPNPD 52 10CFR50.4 10DFR50.90 June 1, 1995 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 ADDENDUM 2 TO TECHNICAL SPECIFICATIONS CHANGE REOUEST 176 ADMINISTRATIVE CHANGES POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 On January 24, 1995, we submitted Technical Specifications Change Request 176, " Administrative Changes." The proposed changes  !

modified Technical Specifications Section 15.6.5, " Review and  !

Audit," and Section 15.7.8, " Administrative Controls," by j removing Quality Assurance audit frequencies, removing Section I 15.6.5.4, " Emergency Plan Reviews," and extending the radioactive  ;

effluent reporting period from semiannual to annual. Included in this submittal was the removal of fire protection program audit frequencies. On February 24 and May 24, 1995, we modified our request due to comments by NRC staff and made several administrative changes.

Upon review of our Technical Specifications, we identified an additional reference to the Semiannual Monitoring Report that should have been included in our original submittal and changed to " Annual" Monitoring Report. Therefore, a marked-up Technical Specifications page is enclosed with the appropriate revision.

We have reviewed the No Significant Hazards Consideration and Safety Evaluation forwarded to you in our January 24, 1995, 95060B0615 950601 PDR ADOCK 05000266 p PDR A mbukuyaf%wsm Enem Gepvade h

l 1

Document Control Clerk June 1, 1995 Page 2 l

submittal. Because the enclosed revision does not increase the  !

scope or change the intent of the original submittal, we believe the conclusions contained therein remain valid.

Please contact us if you have any questions.

Sincerely, Bob L k Vice . resident Nuclear Power DAW /kmc Enclosure cc: NRC Resident Inspector NRC Regional Administrator Public Service Commission of Wisconsin

_ _ _ - - - _ _ - _ - _ _ _ _ - - - _ _ - _ -