ML031500158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Date of Issue: EMERGENCY PLAN IMPLEMENTING PROCEDURESfVOLUME 3 UPDATE LIST CONTROLLED COPY #MAY 19, 2003 re ~ ~ ~ r cedu'r'e Usp of "A~Dte o Procedure Procedure Revision ~~~~~ ~~Last Ueo Nu ber Title um er Procedure Review , ______LE_X_.
{{#Wiki_filter:EMERGENCY PLAN IMPLEMENTING PROCEDURESfVOLUME 3 UPDATE LIST         CONTROLLED COPY #
N/A TABLE OF CONTENTS REV. 23 12/98 N/A EAP-26 PLANT DATA ACQUISITION SYSTEM REV. 12 11/02 Infornational
Date of Issue:                MAY 19, 2003 re r~cedu'r'e Procedure
___ ___ __ ACCESS _ _ _ _ _ESTIMATION OF POPULATION DOSE EAP-27 WITHIN I 0 MILE EMERGENCY PLANNING REV. I 0 06/02 Informational
                                            ~~
____ ____ ZONE _ _ _ _EAP-28 EMERGENCY RESPONSE DATA SYSTEM REV. 6 07/00 Reference________(ERDS)
Procedure o          Usp of "A~Dte Revision     ~~~~~         ~~Last Ueo Nu ber                                 Title                     um er                     Procedure Review   , ______LE_X_.
ACTIVATION EAP-29 EOF VENTILATION ISOLATION DURING REV. 5 02/98 Informational
N/A                     TABLE OF CONTENTS                   REV. 23             12/98         N/A EAP-26                 PLANT DATA ACQUISITION SYSTEM       REV. 12             11/02         Infornational
________AN EMERGENCY EAP-30 ERNCY T ER T REV. 1 05/03 Informational
___ ___     __   ACCESS                                                               _   _   _   _   _
________TRANSITION TO RECOVERY*EAP-31 RECOVERY MANAGER* REV. 2 05/03 Informational EAP-32 RECOVERY SUPPORT GROUP* REV. 8 02/02 Informational DEVELOPMENT OF A RECOVERY ACTION EAP-33 PA*REV. 1 05/03 Informational ACCEPTANCE OF ENVIRONMENTAL EAP-34 SAMPLES AT THE EOF/EL DURING AN RE. 05/03 Informational EMERGENCY EAP-35 EOF TLD ISSUANCE DURING AN REV. ~0/3 nomtoa EAP-35____
ESTIMATION OF POPULATION DOSE EAP-27                 WITHIN I 0 MILE EMERGENCY PLANNING REV. I 0           06/02         Informational
EMERGENCY 05/03 Informational EAP-36 ENVIRONMENTAL LABORATORY USE REV. 45 05/03 Informational DURING AN EMERGENCY SECURITY OF THE EOF AND EL DURING EAP-37 DRILLS, EXERCISES AND ACTUAL RE. 02/03 Informational EVENTS EAP-39 DELETED (02/95)EAP-40 DELETED (02/98)EAP-41 DELETED (12/85)EAP-42 OBTAINING METEOROLOGICAL DATA REV. 19 05/03 Informational EAP-43 EMERGENCY FACILITIES LONG TERM REV. 60 05/03 Informational STAFFING EAP-44 CORE DAMAGE ESTIMATION REV. 4 06/02 Informational EMERGENCY RESPONSE DATA SYSTEM EAP-45 (ERDS CONFIGURATION CONTROL REV. 6 07/00 Informational PROGRAM)SAP-I MAINTAINING EMERGENCY REV. 17 02/03 Informational PREPAREDNESS SAP-2 EMERGENCY EQUIPMENT INVENTORY REV. 35 01/03 Reference SAP-3 EMERGENCY COMMUNICATIONS REV. 73 02/03 Reference SAP____3 _ TESTING 1 ofr2 Page of 2 EMERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 3 UPDATE LIST Date of Issue: MAY 19, 2003 I: .. iL T E I .'-I Procedure.Number, Procedure Title`- Revision; 0 Number.II Date of',L R1 -aist i~Review,.% I , seof .t Procedure;M ,~ irr !i'.t2 ; <5C?SAP4 NYS/OSWEGO COUNTY EMERGENCY Informational PREPAREDNESS PHOTO IDENTIFICATION REV. 10 05/03 CARDS SAP-5 DELETED (3/98)SAP-6 DRILL/EXERCISE CONDUCT REV. 19 03/03 Informational SAP-7 MONTHLY SURVEILLANCE PROCEDURE Infonnational FOR ON-CALL EMPLOYEES REV. 36 08/02 SAP-8 PROMPT NOTIFICATION SYSTEM Informational FAILURE/SIREN SYSTEM FALSE REV. 13 12/02 ACTIVATION SAP-9 DELETED (02/94)SAP-10 METEOROLOGICAL MONITORING REV 11 03/02 Informational SYSTEM SURVEILLANCE REV.II_3_0 SAP-l1 EOF DOCUMENT CONTROL REV. 11 06/02 Informational SAP-13 EOF SECURITY AND FIRE ALARM Informational SYSTEMS DURING NORMAL OPERATIONS REV. 4 06/02 SAP-14 DELETED (02/95)SAP-15 DELETED (11/92)SAP-16 UTILIZING EPIC IDT TERMINALS FROM Informational DESTINY SYSTEM REV. 4 06/02 SAP-17 EMERGENCY RESPONSE DATA SYSTEM Continuous (ERDS) QUARTERLY TESTING REV. 7 07/00 SAP-19 SEVERE WEATHER REV. 4 01/01 Informational SAP-20 EMERGENCY PLAN ASSIGNMENTS REV. 21 08/02 Informational SAP-21 DELETED (04/01)SAP-22 EMERGENCY PLANNING PROGRAM SELF REV. 2 05/03 Informational ASSESSM ENT -_R_.____________0/0 Page 2 of 2  
____   ____       ZONE                                                   _  _ _   _
~- d.N ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN MPLEMENTING PROCEDURE EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 REVISION 6 APPROVED BY: I EFFECTIVE DATE: DATE: RESPONSIBI,rPROCEDURE0
EAP-28                 EMERGENCY RESPONSE DATA SYSTEM     REV. 6             07/00         Reference
~Q 0 62Q 0-FIRST ISSUE FULL REVISION LIMITED REVISION 0 PERIODIC REVIEW DUE DATE:*****************************
________(ERDS)           ACTIVATION EAP-29                 EOF VENTILATION ISOLATION DURING   REV. 5             02/98         Informational
*****************************
________AN           EMERGENCY EAP-30                 ERNCY       T     ER T             REV. 1             05/03         Informational
* * * ** INFORMATIONAL USE *
________TRANSITION             TO RECOVERY*
* TSR ** * * ******************************
EAP-31                 RECOVERY MANAGER*                   REV. 2             05/03         Informational EAP-32                 RECOVERY SUPPORT GROUP*             REV. 8             02/02         Informational DEVELOPMENT OF A RECOVERY ACTION EAP-33                 PA*REV.                                   1             05/03         Informational ACCEPTANCE OF ENVIRONMENTAL EAP-34                 SAMPLES AT THE EOF/EL DURING AN     RE.                 05/03         Informational EMERGENCY EAP-35           EOF TLD ISSUANCE DURING AN         REV.           ~0/3               nomtoa EAP-35____             EMERGENCY                                               05/03         Informational EAP-36                 ENVIRONMENTAL LABORATORY USE       REV. 45             05/03         Informational DURING AN EMERGENCY SECURITY OF THE EOF AND EL DURING EAP-37                 DRILLS, EXERCISES AND ACTUAL       RE.                 02/03         Informational EVENTS EAP-39                 DELETED (02/95)
*****************************
EAP-40                 DELETED (02/98)
*****************'****  
EAP-41                 DELETED (12/85)
********.U
EAP-42                 OBTAINING METEOROLOGICAL DATA       REV. 19             05/03         Informational EAP-43                 EMERGENCY FACILITIES LONG TERM     REV. 60             05/03         Informational STAFFING EAP-44                 CORE DAMAGE ESTIMATION             REV. 4             06/02         Informational EMERGENCY RESPONSE DATA SYSTEM EAP-45                 (ERDS CONFIGURATION CONTROL         REV. 6             07/00         Informational PROGRAM)
*
SAP-I                   MAINTAINING EMERGENCY               REV. 17             02/03         Informational PREPAREDNESS SAP-2                   EMERGENCY EQUIPMENT INVENTORY       REV. 35             01/03         Reference SAP-3                   EMERGENCY COMMUNICATIONS           REV. 73             02/03         Reference SAP____3           _   TESTING                                                                             1 ofr2 Page       of 2
* CONTROLLED COPY* ADMINISTRATIVE  
 
** *.-, f~~~~~~~~~
EMERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 3 UPDATE LIST Date of Issue:         MAY 19, 2003 I: .. T I E'-.
.0 e/ ..Indi')-Mdu r2zoo 1 EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 REVISION  
iL                                                                    IIDate of' % I I Procedure                      Procedure                           Revision
                                                                              ,LR1
                                                                                -aist i
                                                                                            ,    seof
  . Number,                       Title`-                       ;0 Number.             .tProcedure
                                                                                ~Review,. irr;M ,~ !i'.t2
                                                                                                      ; <5C?
SAP4             NYS/OSWEGO COUNTY EMERGENCY                                             Informational PREPAREDNESS PHOTO IDENTIFICATION       REV. 10               05/03 CARDS SAP-5           DELETED (3/98)
SAP-6           DRILL/EXERCISE CONDUCT                 REV. 19               03/03   Informational SAP-7           MONTHLY SURVEILLANCE PROCEDURE                                         Infonnational FOR ON-CALL EMPLOYEES                   REV. 36               08/02 SAP-8           PROMPT NOTIFICATION SYSTEM                                             Informational FAILURE/SIREN SYSTEM FALSE             REV. 13                 12/02 ACTIVATION SAP-9           DELETED (02/94)
SAP-10           METEOROLOGICAL MONITORING               REV 11                 03/02   Informational SYSTEM SURVEILLANCE                     REV.II_3_0 SAP-l1           EOF DOCUMENT CONTROL                   REV. 11               06/02   Informational SAP-13           EOF SECURITY AND FIRE ALARM                                             Informational SYSTEMS DURING NORMAL OPERATIONS       REV. 4                 06/02 SAP-14           DELETED (02/95)
SAP-15           DELETED (11/92)
SAP-16           UTILIZING EPIC IDT TERMINALS FROM                                       Informational DESTINY SYSTEM                         REV. 4                 06/02 SAP-17           EMERGENCY RESPONSE DATA SYSTEM                                         Continuous (ERDS) QUARTERLY TESTING               REV. 7                 07/00 SAP-19           SEVERE WEATHER                         REV. 4                 01/01   Informational SAP-20           EMERGENCY PLAN ASSIGNMENTS             REV. 21               08/02   Informational SAP-21           DELETED (04/01)
SAP-22           EMERGENCY PLANNING PROGRAM SELF         REV. 2                 05/03   Informational ASSESSM ENT               -_R_.____________0/0 Page 2 of 2
 
~-d.N ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN           MPLEMENTING PROCEDURE EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 REVISION 6 APPROVED BY:                                                                                 DATE:
                                                                                                                .0e/ ..
IRESPONSIBI,rPROCEDURE0 EFFECTIVE DATE:                     Indi')
0 f~~~~~~~~~62Q
                                                              ~Q                 0-FIRST ISSUE                                   FULL REVISION                               LIMITED REVISION 0
* INFORMATIONAL USE                       *
* TSR           *
        *****************'****                   ********.U
        *
* CONTROLLED COPY
* ADMINISTRATIVE
* PERIODIC REVIEW DUE DATE:                              -Mdu r2zoo 1
 
EOF VENTILATION ISOLATION DURING AN EMERGENCY               EAP-29 REVISION  


==SUMMARY==
==SUMMARY==
SHEET REV. NO. CHANGE AND REASON FOR CHANGE 6
SHEET REV. NO.       CHANGE AND REASON FOR CHANGE 6
* Name change on cover sheet to Entergy Nuclear Operations, Inc.* Revised Section 5.0 to add steps for JNC and revise wording for EOF.* Changed NRC office to JAF IT/Tech Assessment Room in Section 5.1.1.5
* Name change on cover sheet to Entergy Nuclear Operations, Inc.
* Change to the designation of Recovery Manager office to NRC office due to reorganization of the EOF for joint use.4
* Revised Section 5.0 to add steps for JNC and revise wording for EOF.
* Reformat per AP-02.01, Rev. 5.* Change description that was part of a procedure step into a NOTE for better clarity.I.'Page 2 of 5-Rev. No. 6 EO. VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 TABLE OF CONTENTS SECTION 1.0 2.0 2.1 2.2 3.0 4.0 5.0 6.0 PAGE PURPOSE .............................
* Changed NRC office to JAF IT/Tech Assessment Room in Section 5.1.1.
4 REFERENCES  
5
.............................
* Change to the designation of Recovery Manager office to NRC office due to reorganization of the EOF for joint use.
4 Performance References  
4
.............................
* Reformat per AP-02.01, Rev. 5.
4 Developmental References  
* Change description that was part of a procedure step into a NOTE for better clarity.
.............................
I.'
4 INITIATING EVENTS ..............................
-Rev. No. 6                                         Page  2  of  5
4 RESPONSIBILITIES  
 
..............................
:t EO. VENTILATION ISOLATION DURING AN EMERGENCY                 EAP-29 EOF VENTILATION ISOLATION DURING AN EMERGENCY                 EAP-29 TABLE OF CONTENTS SECTION                                                         PAGE 1.0     PURPOSE .............................                     4
4 PROCEDURE  
 
......................
==2.0      REFERENCES==
4 ATTACHMENTS  
.............................                   4 2.1      Performance References .............................       4 2.2      Developmental References ............................. 4 3.0      INITIATING EVENTS ..............................           4 4.0      RESPONSIBILITIES ..............................           4 5.0      PROCEDURE               ......................             4 6.0      ATTACHMENTS ..............................                 5 Rev. No. 6                                           Page 3  of  5
..............................
 
5 Page 3 of 5:t Rev. No. 6 EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29''1.0 PURPOSE The purpose of this procedure is to provide instruction necessary to shut down the ventilation system during use of the Emergency Operation Facility (EOF) in an emergency.
EOF VENTILATION ISOLATION DURING AN EMERGENCY               EAP-29 1.0 PURPOSE                                                         '
The purpose of this procedure is to provide instruction necessary to shut down the ventilation system during use of the Emergency Operation Facility (EOF) in an emergency.
 
==2.0  REFERENCES==
 
2.1  Performance References None 2.2  Developmental References 2.2.1    NUREG-0696, FUNCTIONAL CRITERIA FOR EMERGENCY RESPONSE FACILITIES 2.2.2    IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS 2.2.3    EAP-14.2, EOF ACTIVATION 2.2.4    EAP-14.6, HABITABILITY OF THE EMERGENCY FACILITIES 3.0  INITIATING EVENTS I
A decision has been made by the Radiological Support Coordinator to implement this procedure.
4.0  RESPONSIBILITIES 4.1  The EOF Manager will have the ultimate responsibility to ensure that this procedure is enacted, if necessary.
4.2  As EOF personnel arrive, they shall ascertain if the EOF is being activated per the EOF activation procedure, currently EAP-14.2. If necessary, the EOF Manager will instruct personnel to initiate this procedure.
5.0  PROCEDURE NOTE: The EOF and Environmental Lab, located approximately 11 miles from JAFNPP, are considered in this procedure two separate facilities. Each has its own separate ventilation system and controls.
J-Rev. No. 6                                        Page  4  of  5


==2.0 REFERENCES==
EOF VENTILATION ISOLATION DURING AN EMERGENCY              EAP-29 5.1  If radiological conditions warrant isolation of EOF ventilation, perform the -following:
5.1.1    Manually turn the EOF ventilation system to the OFF position using the thermostat located in the JAF IT/Tech Assessment Room.
5.1.2    Manually turn the Environmental Lab ventilation system to the OFF position using the thermostat located in the Environmental Supervisor's office.
5.1.3    The Environmental Lab fume exhaust hoods should normally be turned off to minimize the infiltration of outside air into the building.
5.1.4    Consider securing the ventilation system of the adjacent JNC in a similar manner.
NOTE:    NUREG-0696, Functional Criteria For Emergency Response Facilities (Table 2, pg. 18) does not require ventilation isolation past 10 miles from JAFNPP.
6.0 ATTACHMENTS NONE Rev. No. 6                                      Page  5  of  5


2.1 Performance References None 2.2 Developmental References 2.2.1 2.2.2 2.2.3 2.2.4 NUREG-0696, FUNCTIONAL CRITERIA FOR EMERGENCY RESPONSE FACILITIES IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS EAP-14.2, EOF ACTIVATION EAP-14.6, HABITABILITY OF THE EMERGENCY FACILITIES 3.0 INITIATING EVENTS A decision has been made by the Radiological Support Coordinator to implement this procedure.
ENTERGY NUCLEAR OPERATIONS, INC.
4.0 RESPONSIBILITIES 4.1 The EOF Manager will have the ultimate responsibility to ensure that this procedure is enacted, if necessary.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EMERGENCY TERMINATION AND TRANSITION TO RECOVERY EAP-30 REVISION 1 APPROVED BY:                     ,,      _                                                DATE: 4Z2 t 2 IkESPONSIBtE PROCEDURE OWNER EFFECTIVE DATE:                        -94140      /,           Oa3 FIRST ISSUE 0                                   FULL REVISION                         LIMITED REVISION
4.2 As EOF personnel arrive, they shall ascertain if the EOF is being activated per the EOF activation procedure, currently EAP-14.2.
* INFORMATIONAL USE                         *
If necessary, the EOF Manager will instruct personnel to initiate this procedure.
* TSR*
5.0 PROCEDURE NOTE: The EOF and Environmental Lab, located approximately 11 miles from JAFNPP, are considered in this procedure two separate facilities.
ADMINISTRATIVE PERIODIC REVIEW DUE DATE:                             <.o:j1             90C             ~,
Each has its own separate ventilation system and controls.J-Page 4 of 5 I Rev. No. 6 EOF VENTILATION ISOLATION DURING AN EMERGENCY 5.1 If radiological conditions warrant isolation of EOF ventilation, perform the -following:
 
5.1.1 Manually turn the EOF ventilation system to the OFF position using the thermostat located in the JAF IT/Tech Assessment Room.5.1.2 Manually turn the Environmental Lab ventilation system to the OFF position using the thermostat located in the Environmental Supervisor's office.5.1.3 The Environmental Lab fume exhaust hoods should normally be turned off to minimize the infiltration of outside air into the building.5.1.4 Consider securing the ventilation system of the adjacent JNC in a similar manner.NOTE: NUREG-0696, Functional Criteria For Emergency Response Facilities (Table 2, pg. 18) does not require ventilation isolation past 10 miles from JAFNPP.6.0 ATTACHMENTS NONE Page 5 of 5 EAP-29 Rev. No. 6 ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EMERGENCY TERMINATION AND TRANSITION EAP-30 REVISION 1 TO RECOVERY APPROVED BY: I EFFECTIVE DATE: kESPONSIBtE PROCEDURE OWNER/, Oa3 FIRST ISSUE 0 FULL REVISION LIMITED REVISION *****************************
EMERGENCY TERMINATION AND TRANSITION TO RECOVERY             EAP-30 REVISION  
*****************************
* * * ** INFORMATIONAL USE *
* TSR** * * ******************************  
*****************************
** ***** * * * ******* *ADMINISTRATIVE
*** *** *** * * ** ******** *PERIODIC REVIEW DUE DATE:<.o:j1 90C ~, DATE: t 4Z2 2**,, _-94140 EMERGENCY TERMINATION AND TRANSITION TO RECOVERY REV. NO.1 0 REVISION  


==SUMMARY==
==SUMMARY==
SHEET CHANGE AND REASON FOR CHANGE* Change company to on cover sheet to Entergy Nuclear Northeast.
SHEET                       It REV. NO.      CHANGE AND REASON FOR CHANGE 1
* Periodic Review* New procedure., Rev. No 1 It EAP-30 Page 2 of 5 EMERGENCY TERMINATION AND.TRANSITION TO RECOVERY --EAP-30 TABLE OF CONTENTS -SECTION 1.0 2.0 2.1 2.2 3.0 4.0 5.0 PAGE PURPOSE ................................
* Change company to on cover sheet to Entergy Nuclear Northeast.
4 REFERENCES  
* Periodic Review 0
................................., 4 Performance References  
* New procedure Rev. No   1                                       Page 2 of   5
................................
 
4 Developmental References  
EMERGENCY TERMINATION AND.TRANSITION TO RECOVERY                 -   - EAP-30 TABLE OF CONTENTS                   -
...............................
SECTION                                                                   PAGE 1.0     PURPOSE ................................                             4
4 INITIATING EVENTS ................................
 
4 PROCEDURE  
==2.0    REFERENCES==
.................................
.................................           ,             4 2.1    Performance References ................................             4 2.2    Developmental References ............................... 4 3.0    INITIATING EVENTS ................................ 4 4.0    PROCEDURE .................................                         4 5.0    ATTACHMENTS ................................                         4
4 ATTACHMENTS  
: 1. EMERGENCY DIRECTOR TO RECOVERY MANAGER TURNOVER CHECKLIST ..                                                 5 Rev. No    1                                                Page   3 of   5
................................
 
4 1. EMERGENCY DIRECTOR TO RECOVERY MANAGER TURNOVER CHECKLIST  
i EMERGENCY TERMINATION AND TRANSITION TO RECOVERY             EAP-30 1.0   PURPOSE The purpose of this procedure is to provide the Emergency Director with guidance for performing actions following the termination of a classified emergency and for the transition to recovery.
.. ............................
 
5 Page 3 of 5..Rev. No 1 EMERGENCY TERMINATION AND TRANSITION TO RECOVERY EAP-30 1.0 PURPOSE The purpose of this procedure is to provide the Emergency Director with guidance for performing actions following the termination of a classified emergency and for the transition to recovery.
==2.0  REFERENCES==


==2.0 REFERENCES==
2.1  Performance References 2.1.1    IAP-2, Classification of Emergency Conditions 2.2  Developmental References 2.2.1    10 CFR 50, Appendix E, Part H, Recovery 3.0  INITIATING EVENTS 3.1  Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions, and entry into the Recovery phase is required.
4.0  PROCEDURE                                                      L NOTE:  The steps in this procedure are not required to be performed in sequential order, and all steps may not be required as determined by the scope of the emergency.
4.1  When the termination criteria of IAP-2, Classification of Emergency Conditions, have been met, the Emergency Director DECLARES that the emergency is terminated.
4.2  If a Recovery phase is required based on the scope of the event, TURNOVER recovery responsibilities to the Recovery Manager using Attachment 1.
5.0   ATTACHMENTS
: 1. Emergency Director to Recovery Manager Turnover Checklist Rev. No    1                                        Page  4 of  5


2.1 Performance References 2.1.1 IAP-2, Classification of Emergency Conditions 2.2 Developmental References 2.2.1 10 CFR 50, Appendix E, Part H, Recovery 3.0 INITIATING EVENTS 3.1 Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions, and entry into the Recovery phase is required.4.0 PROCEDURE L NOTE: The steps in this procedure are not required to be performed in sequential order, and all steps may not be required as determined by the scope of the emergency.
EMERGENCY DIRECTOR TO RECOVERY MANAGER TURNOVER CHECKLIST Page 1 of 1 When the Emergency Director is relieved by the Recovery Manager, the following checklist should be used to effectively turnover responsibilities:
4.1 When the termination criteria of IAP-2, Classification of Emergency Conditions, have been met, the Emergency Director DECLARES that the emergency is terminated.
Emergency Director:
4.2 If a Recovery phase is required based on the scope of the event, TURNOVER recovery responsibilities to the Recovery Manager using Attachment 1.5.0 ATTACHMENTS
Recovery Manager:
: 1. Emergency Director to Recovery Manager Turnover Checklist Rev. No 1 Page 4 of 5 i EMERGENCY DIRECTOR TO RECOVERY MANAGER TURNOVER CHECKLIST Page 1 of 1 When the Emergency Director is relieved by the Recovery Manager, the following checklist should be used to effectively turnover responsibilities:
Date:                         Time:
Emergency Director: Recovery Manager: Date: Time: The following items should be discussed:
The following items should be discussed:
: 1. Summary of Event 2. Current Status of: A. Corrective Actions B. Plant Conditions and Plant Equipment C. Radiological Conditions In Plant Onsite Offsite Status of Release 3. Protective Action Recommendations Made to Local Authorities
: 1. Summary of Event
: 2. Current Status of:
A. Corrective Actions B. Plant Conditions and Plant Equipment C. Radiological Conditions In Plant Onsite Offsite Status of Release
: 3. Protective Action Recommendations Made to Local Authorities
: 4. Protective Actions Taken by Local Authoritie
: 4. Protective Actions Taken by Local Authoritie
: 5. Status of Communications with Offsite Organizations:
: 5. Status of Communications with Offsite Organizations:
A. NYS/Oswego County B. NRC C. INPO D. ANI 6. Security Readiness 7. Current Facility Readiness A. Current/Expected Level of Staffing B. Shift Schedules 8. Status of Offsite Support and Contractual Information EAP-30 EMERGENCY TERMINATION AND ATTACHMENT 1 Rev. No. 1 TRANSITION TO RECOVERY Page 5 of 5 ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE RECOVERY MANAGER EAP-31 REVISION 2 APPROVED BY: DATE: RESPOfqSRlfV  
A. NYS/Oswego County B. NRC C. INPO D. ANI
'IPOCEDURE  
: 6. Security Readiness
-&#xa2;OE EFFECTIVE DATE: RR, RoOT FIRST ISSUE FULL REVISION LIMITED REVISION PERIODIC REVIEW DUE DATE: (&sect;*****************************
: 7. Current Facility Readiness A. Current/Expected Level of Staffing B. Shift Schedules
*****************************
: 8. Status of Offsite Support and Contractual Information EAP-30               EMERGENCY TERMINATION AND       ATTACHMENT 1 Rev. No. 1         TRANSITION TO RECOVERY   Page   5   of 5
* * * ** INFORMATIONAL USE *
 
* TSR ** * * ******************************
ENTERGY NUCLEAR OPERATIONS, INC.
*****************************
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE RECOVERY MANAGER EAP-31 REVISION 2 APPROVED BY:                       AI/
CONTROLLED COPY #* ADMINISTRATIVE  
RESPOfqSRlfV 'IPOCEDURE-&#xa2;OE 0~,                        DATE:    ! -i /o 3 EFFECTIVE DATE:                         _m"  p RR,     RoOT q
** ******** ** *************
FIRST ISSUE                                 FULL REVISION                           LIMITED REVISION
p q A I / 0~, ! -i /o 3_m" 9 0?
* INFORMATIONAL USE                   *
RECOVERY MANAGER REVISION  
* TSR
* CONTROLLED COPY #
* ADMINISTRATIVE
* PERIODIC REVIEW DUE DATE:                          W/"fj                    90?
(&sect;
 
RECOVERY MANAGER                                             EAP-31 REVISION  


==SUMMARY==
==SUMMARY==
SHEET REV. NO.2 .Title changes* Added Emergency Plant Manager* Editorial Corrections 1
SHEET REV. NO.
* Updated title page to reflect the company's new name.* Updated titles in sections 1.0, 4.1.2, and 4.3.3 -4.3.5&deg;
2   . Title changes
* New Procedure.,I 1t Page 2 of 7 EAP-31 Rev. No. 2 RECOVERY MANAGER EAP-31 TABLE OF CONTENTS SECTION 1.0 2.0 2.1 2.2 3.0 4.0 4.1 4.2 4.3 4.4 5. 0 Rev. No.PAGE PURPOSE .......................................
* Added Emergency Plant Manager
4 REFERENCES  
* Editorial Corrections 1
.......................................
* Updated title page to reflect the company's new name.
4 Performance References  
* Updated titles in sections 1.0, 4.1.2, and 4.3.3 -
.................................
4.3.5
4 Developmental References  
    &deg;
...............................
* New Procedure
4 INITIATING EVENTS ......................................
                                                                    .,I 1t Rev. No. 2                                         Page  2 of  7
4 PROCEDURE  
 
.......................................
I RECOVERY MANAGER                                               EAP-31 TABLE OF CONTENTS SECTION                                                         PAGE 1.0     PURPOSE .......................................             4
5 Notifications  
 
........................................
==2.0      REFERENCES==
5 Activation  
.......................................         4 2.1      Performance References ................................. 4 2.2      Developmental References ............................... 4 3.0      INITIATING EVENTS ...................................... 4 4.0      PROCEDURE .......................................           5 4.1      Notifications ........................................     5 4.2      Activation .......................................         5 4.3      Recovery Operations .................................... 6 4.4      Termination Recovery Operations ........................ 7
.......................................
: 5. 0    ATTACHMENTS .......................................         7 Rev. No..2                                           Page 3 of   7
5 Recovery Operations  
 
....................................
RECOVERY MANAGER                                             EAP-31 1.0 PURPOSE The purpose of this procedure is to provide instruction to the Recovery Manager. The Recovery Manager provides the overall planning, direction, and coordination of Recovery operations.
6 Termination Recovery Operations  
This procedure is implemented by the corporate Director -
........................
Oversight or alternate in the event of an emergency at the plant, which requires the coordination of corporate resources during the EMERGENCY PHASE, and/or activation of the Recovery Organization during the RECOVERY PHASE.
7 ATTACHMENTS  
The Recovery Manager is responsible for:
.......................................
* Notifying the Chief Nuclear Officer of emergencies and keeping him informed of the emergency status.
7.2 Page 3 of 7 I RECOVERY MANAGER 1.0 PURPOSE The purpose of this procedure is to provide instruction to the Recovery Manager. The Recovery Manager provides the overall planning, direction, and coordination of Recovery operations.
* Providing coordination between the plant and ENN corporate organization.
This procedure is implemented by the corporate Director -Oversight or alternate in the event of an emergency at the plant, which requires the coordination of corporate resources during the EMERGENCY PHASE, and/or activation of the Recovery Organization during the RECOVERY PHASE.The Recovery Manager is responsible for:* Notifying the Chief Nuclear Officer of emergencies and keeping him informed of the emergency status.* Providing coordination between the plant and ENN corporate organization.
* Providing overall planning and direction of Recovery operations.
* Providing overall planning and direction of Recovery operations.


==2.0 REFERENCES==
==2.0 REFERENCES==
 
2.1  Performance References 2.1.1    Section 9, Recovery 2.1.2    EAP-30 Emergency Termination and Transition of Recovery 2.1.3    EAP-33, Development of a Recovery Action Plan 2.2  Developmental References NONE 3.0  INITIATING EVENTS 3.1  Emergency conditions have been declared as per IAP-2, Classification of Emergency Conditions (FOR STEPS 4.1 AND 4.2).
Rev. No. 2                                        Page  4 of  7


2.1 Performance References 2.1.1 Section 9, Recovery 2.1.2 EAP-30 Emergency Termination and Transition of Recovery 2.1.3 EAP-33, Development of a Recovery Action Plan 2.2 Developmental References NONE 3.0 INITIATING EVENTS 3.1 Emergency conditions have been declared as per IAP-2, Classification of Emergency Conditions (FOR STEPS 4.1 AND 4.2).Rev. No. 2 Page 4 of 7 EAP-31 RECOVERY MANAGER EAP-31<_~ 3.2 Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions, and entry into the Recovery phase is required (FOR STEPS 4.3 AND 4.4).4.0 PROCEDURE 4.1 Notifications 4.1.1 4.1.2 Receive notification of any emergency from the Recovery Support Group Manager (RSGM) or plant staff.Notify the Chief Operating Officer of SITE AREA OR GENERAL EMERGENCIES, at a minimum.4.2 Activation 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 Rev. No. 2 Establish and maintain communications as appropriate with the Emergency Plant Manager and/or Emergency Director during the EMERGENCY PHASE.Provide support to the Emergency Plant Manager and Emergency Director during the EMERGENCY PHASE as requested.
RECOVERY MANAGER                                           EAP-31
Direct the Recovery Support Group Manager (RSGM)to coordinate corporate resources to support the plant during the EMERGENCY PHASE.IF RECOVERY OPERATIONS ARE REQUIRED, request that EAP-30, Emergency Termination and Transition to Recovery, be implemented by the Emergency Director.Determine location of the Recovery Center.Page 5 of 7 I RECOVERY MANAGER 4.3 Recovery Operations 4.3.1 Develop Initial Recovery Organization.
<_~ 3.2 Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions, and entry into the Recovery phase is required (FOR STEPS 4.3 AND 4.4).
4.0 PROCEDURE 4.1 Notifications 4.1.1     Receive notification of any emergency from the Recovery Support Group Manager (RSGM) or plant staff.
4.1.2    Notify the Chief Operating Officer of SITE AREA OR GENERAL EMERGENCIES, at a minimum.
4.2 Activation 4.2.1     Establish and maintain communications as appropriate with the Emergency Plant Manager and/or Emergency Director during the EMERGENCY PHASE.
4.2.2    Provide support to the Emergency Plant Manager and Emergency Director during the EMERGENCY PHASE as requested.
4.2.3    Direct the Recovery Support Group Manager (RSGM)   I to coordinate corporate resources to support the plant during the EMERGENCY PHASE.
4.2.4    IF RECOVERY OPERATIONS ARE REQUIRED, request that EAP-30, Emergency Termination and Transition to Recovery, be implemented by the Emergency Director.
4.2.5    Determine location of the Recovery Center.
Rev. No. 2                                        Page 5 of   7
 
RECOVERY MANAGER                                           EAP-31 4.3 Recovery Operations 4.3.1   Develop Initial Recovery Organization.
A. Select Recovery Organization members based on need, availability, and expertise.
A. Select Recovery Organization members based on need, availability, and expertise.
B. Assign a Shift Onsite Recovery Coordinator to manage onsite recovery actions and, if needed, a Recovery Support Group Manager to manage offsite recovery actions.C. Determine corporate capabilities required for Recovery Support Group (see JAFNPP Plan section 9).D. Request that the Recovery Support Group Manager coordinate corporate resources to support Recovery operations and also coordinate request for personnel, equipment and materials, and support services.E. Lead discussion with Recovery organization members to determine assignment of functions.
B. Assign a Shift Onsite Recovery Coordinator to manage onsite recovery actions and, if needed, a Recovery Support Group Manager to manage offsite recovery actions.
F. Develop shift-rotation schedule.4.3.2 Implement EAP-33, Development of a Recovery Action Plan.4.3.3 Maintain communications with Site VP-Operations regarding plant-related aspects of the emergency.
C. Determine corporate capabilities required for Recovery Support Group (see JAFNPP Plan section 9).
4.3.4 Establish and maintain communications with the Entergy Spokesperson.
D. Request that the Recovery Support Group Manager coordinate corporate resources to support Recovery operations and also coordinate request for personnel, equipment and materials, and support services.
4.3.5 Continue to update the Chief Operating Officer on the status of Recovery operations.
E. Lead discussion with Recovery organization members to determine assignment of functions.
4.3.6 Monitor progress of Recovery Organization and Recovery Action Plan and provide direction where appropriate.
F. Develop shift-rotation schedule.
Rev. No. 2 Page 6 of 7 EAP-31 RECOVERY MANAGER EAP-31 4.3.7 Determine resource requirements for Recovery functions considering the following:
4.3.2   Implement EAP-33, Development of a Recovery Action Plan.
A. Need for additional personnel required for long-term recovery efforts.B. Need for offsite technical assistance.
4.3.3   Maintain communications with Site VP-Operations regarding plant-related aspects of the emergency.
C. Need for supplies, equipment, parts, and other material.4.4 Termination Recovery Operations 4.4.1 Determine that normal plant organization can manage remaining restoration activities.
4.3.4   Establish and maintain communications with the Entergy Spokesperson.
4.4.2 Consult with Federal, State, and local authorities regarding the termination of recovery.4.4.3 Provide final status report on recovery operations to the news media.4.4.4 Review and document actions taken during recovery.5.0 ATTACHMENTS NONE Rev. No. 2 Page 7 of 7 ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE DEVELOPMENT OF A RECOVERY ACTION PLAN EAP-33 REVISION 1 RESPONSIBLE PROCEDURE OWNER APPROVED BY: -EFFECTIVE DATE: F -ST ISSUE DATE: g <--LZZIA-FULL REVISION LIMITED REVISION *****************************
4.3.5   Continue to update the Chief Operating Officer on the status of Recovery operations.
*****************************
4.3.6   Monitor progress of Recovery Organization and Recovery Action Plan and provide direction where appropriate.
* * * ** INFORMATIONAL USE *
Rev. No. 2                                       Page 6 of   7
* TSR ** * * ******************************
 
*****************************
RECOVERY MANAGER                                           EAP-31 4.3.7   Determine resource requirements for Recovery functions considering the following:
******** **********
A. Need for additional personnel required for long-term recovery efforts.
** **********ADMINISTRATIVE
B. Need for offsite technical assistance.
** **** **********
C. Need for supplies, equipment, parts, and other material.
*************
4.4 Termination Recovery Operations 4.4.1   Determine that normal plant organization can manage remaining restoration activities.
***PERIODIC REVIEW DUE DATE: (Looa ,Xo&03_m" DEVELOPMENT OF A RECOVERY ACTION PLAN REVISION  
4.4.2   Consult with Federal, State, and local authorities regarding the termination of recovery.
4.4.3   Provide final status report on recovery operations to the news media.
4.4.4   Review and document actions taken during recovery.
5.0 ATTACHMENTS NONE Rev. No. 2                                       Page 7 of   7
 
ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE DEVELOPMENT OF A RECOVERY ACTION PLAN EAP-33 REVISION 1 APPROVED BY: -                                                                                     DATE:     g    <
RESPONSIBLE PROCEDURE OWNER EFFECTIVE DATE:                     - -LZZIA-                     ,Xo&03 F -ST ISSUE                                              FULL REVISION                           LIMITED REVISION
* INFORMATIONAL USE                             *
* TSR
* ADMINISTRATIVE PERIODIC REVIEW DUE DATE:                                   _m"              (Looa
 
DEVELOPMENT OF A RECOVERY ACTION PLAN                       EAP-33 REVISION  


==SUMMARY==
==SUMMARY==
SHEET REV. NO.1
SHEET REV. NO.
* Name change on cover sheet to Entergy Nuclear Operations, Inc.* Change Site Executive Officer to Site VP -Operations in Section 1.0.* Change NYPA to Entergy in Step 4.1.15.* Add Step 4.4.B.0
1
* New procedure Page 2 of S EAP-33 I Rev. No. 1 DEVELOPMENT OF A RECOVERY ACTION PLAN. EAP-33 TABLE OF CONTENTS SECTION I ''1.0 2.0 2.1 2.2 3.0 4.0 5.0 PAGE PURPOSE .... ..............................
* Name change on cover sheet to Entergy Nuclear Operations, Inc.
4 REFERNCES  
* Change Site Executive Officer to Site VP - Operations in Section 1.0.
.............................
* Change NYPA to Entergy in Step 4.1.15.
4 Performance References  
* Add Step 4.4.B.
.............................
0
4 Developmental References  
* New procedure I
..........................
Rev. No. 1                                         Page  2 of  S
4 INITIATING EVENTS .............................
 
4 PROCEDURE  
DEVELOPMENT OF A RECOVERY ACTION PLAN.                                   EAP-33 TABLE OF CONTENTS SECTION                                                                     PAGE I ''
.............................
1.0     PURPOSE ....     .       .............................               4 2.0      REFERNCES .............................                               4 2.1      Performance References .               ............................ 4 2.2      Developmental References ..........................                   4 3.0      INITIATING EVENTS .............................                       4 4.0      PROCEDURE .............................                               4 5.0      ATTACHMENTS ..............................                           5 Rev. No. 1                                                       Page  3 of  5
4 ATTACHMENTS  
 
..............................
DEVELOPMENT OF A RECOVERY ACTION PLAN                       EAP-33 1 .O PURPOSE The purpose of this procedure is to provide guidance to the Recovery Manager and the Recovery Organization on the development of a Recovery Action Plan.
5 Page 3 of 5 Rev. No. 1 DEVELOPMENT OF A RECOVERY ACTION PLAN 1 .O PURPOSE The purpose of this procedure is to provide guidance to the Recovery Manager and the Recovery Organization on the development of a Recovery Action Plan.The Recovery Manager, in coordination with the Site VP -Operations and the Recovery Organization, is responsible for the development of a Recovery Action Plan to address the consequences of an emergency requiring recovery.
The Recovery Manager, in coordination with the Site VP -
This Recovery Action Plan will be reviewed and revised to reflect additional recovery actions, additional resources requirements, and any changes in the schedule for completion of recovery action(s) as conditions change.
Operations and the Recovery Organization, is responsible for the development of a Recovery Action Plan to address the consequences of an emergency requiring recovery. This Recovery Action Plan will be reviewed and revised to reflect additional recovery actions, additional resources requirements, and any changes in the schedule for completion of recovery action(s) as conditions change.


==2.0 REFERENCES==
==2.0 REFERENCES==


2.1 Performance References 2.1.1 Section 9, Recovery 2.2 Developmental References 2.2.1 JAF Administrative Procedure AP-03.12, Action Plans.3.0 INITIATING EVENTS 3.1 Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions, and entry into the Recovery phase is required.4.0 PROCEDURE 4.1 Develop a Recovery Action Plan following the guidance of appropriate plant procedures and consider the following (include appropriate tasks in Action Plan): 4.1.1 Coordination with government agency(s) interface.
2.1 Performance References 2.1.1     Section 9, Recovery 2.2 Developmental References 2.2.1     JAF Administrative Procedure AP-03.12, Action Plans.
4.1.2 Coordination with media interface.
3.0 INITIATING EVENTS 3.1 Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions,   and entry into the Recovery phase is required.
4.1.3 Identification of areas (within site boundary)requiring immediate re-entry.4.1.4 Isolation, control and minimization of hazards.4.1.5 Identification of components/equipment needing repair.4.1.6 Prioritization of equipment needing repair.4.1.7 Development of task schedule.  
4.0 PROCEDURE 4.1 Develop a Recovery Action Plan following the guidance of appropriate plant procedures and consider the following (include appropriate tasks in Action Plan):
-1 Rev. No. 1 Page 4 of 5 EAP-33 DEVELOPMENT OF A RECOVERY ACTION PLAN EAP-33 4.1.8 Identification of material and personnel resources.
4.1.1     Coordination with government agency(s) interface.
4.1.9 Initiation of event cause investigation.
4.1.2     Coordination with media interface.
4.1.10 Initiation of damage assessment.
4.1.3     Identification of areas (within site boundary) requiring immediate re-entry.
4.1.11 Initiation of comprehensive radiological surveillance plan.4.1.12 Evaluation of controlled releases that may result from recovery operations prior to release initiation and remain cognizant of offsite consequences.
4.1.4     Isolation, control and minimization of hazards.
4.1.13 Initiation of estimates of total population exposure.4.1.14 Compliance with radiation limits.4.1.15 Development of support program for Entergy employees and their families (see JAFNPP Plan section 9).4.1.16 Determination of criteria for termination of recovery.4.2 Review and revise Recovery Action Plan as required.Consider changes in onsite and/or offsite conditions.
4.1.5     Identification of components/equipment needing repair.
4.3 Finalize and schedule for recovery actions.4.4 Modify Recovery Action Plan as appropriate for Extended Recovery Operations.
4.1.6     Prioritization of equipment needing repair.
4.1.7     Development of task schedule.                       -1 Rev. No. 1                                         Page   4 of 5
 
DEVELOPMENT OF A RECOVERY ACTION PLAN                       EAP-33 4.1.8   Identification of material and personnel resources.
4.1.9   Initiation of event cause investigation.
4.1.10   Initiation of damage assessment.
4.1.11   Initiation of comprehensive radiological surveillance plan.
4.1.12   Evaluation of controlled releases that may result from recovery operations prior to release initiation and remain cognizant of offsite consequences.
4.1.13   Initiation of estimates of total population exposure.
4.1.14   Compliance with radiation limits.
4.1.15   Development of support program for Entergy employees and their families (see JAFNPP Plan section 9).
4.1.16   Determination of criteria for termination of recovery.
4.2 Review and revise Recovery Action Plan as required.
Consider changes in onsite and/or offsite conditions.
4.3 Finalize and schedule for recovery actions.
4.4 Modify Recovery Action Plan as appropriate for Extended Recovery Operations.
A. Institute long-term recovery organization.
A. Institute long-term recovery organization.
B. Provide for extended administrative controls.C. Update recovery task list and schedule.D. Develop schedule for periodic recovery organization briefings.
B. Provide for extended administrative controls.
5.0 ATTACHMENTS NONE Rev. No. 1 Page 5 of 5 ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY-EAP-34 REVISION 4 APPROVED BY: EFFECTIVE DATE: 4 DATE: ______RESPONSIBLE PROCEDURE OWNER iu2. V~2,03 (j FIRST ISSUE FULL REVISION LIMITED REVISION PERIODIC REVIEW DUE DATE:z%O g0, *****************************
C. Update recovery task list and schedule.
*****************************
D. Develop schedule for periodic recovery organization briefings.
* * * ** INFORMATIONAL USE *
5.0 ATTACHMENTS NONE Rev. No. 1                                       Page   5 of 5
* TSR ** * * ***************************
 
*************
* **********
***********
********************
.211*
* CONTROLLED COPY* ADMINISTRATIVE
** ,******** **********************
-1.
-1.
ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY REVISION  
ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY-EAP-34 REVISION 4 APPROVED BY:                    4 RESPONSIBLE PROCEDURE OWNER DATE:        ______
EFFECTIVE DATE:                  -X            iu2. V~2,03 FIRST ISSUE (j  FULL REVISION                        LIMITED REVISION
* INFORMATIONAL USE                    *
* TSR                      *
      *********          ********************                .211
      *
* CONTROLLED COPY
* ADMINISTRATIVE
* PERIODIC REVIEW DUE DATE:                        *z%O            g0,
 
ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY                               EAP-34 REVISION  


==SUMMARY==
==SUMMARY==
SHEET REV. NO.4 3 CHANGE AND REASON FOR CHANGE* Reworded Section 7.2 and 7.5 to remove survey criteria -now refers to EAP-5.3.* Reformat per AP-02.01, Rev. 5.* Added >1 mR/hr to Sections 7.2 and 7.5 to clarify"high" readings.* Deleted reference 2.2.2 -this has been deleted by Oswego County.IJL Page 2 of 6 EAP-34 Rev. No. 4 ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY EAP-34 TABLE OF CONTENTS SECTION 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 PAGE PURPOSE.............
SHEET REV. NO.       CHANGE AND REASON FOR CHANGE 4
I ........ 4 REFERENCES  
* Reworded Section 7.2 and 7.5 to remove survey criteria - now refers to EAP-5.3.
.......................
3
4 PREREQUISITES  
* Reformat per AP-02.01, Rev. 5.
.......................
* Added >1 mR/hr to Sections 7.2 and 7.5 to clarify "high" readings.
4 PRECAUTIONS  
* Deleted reference 2.2.2 - this has been deleted by Oswego County.
.......................
IJL Rev. No. 4                                         Page  2  of  6
4 MATERIALS/EQUIPMENT  
 
.......................
ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY                               EAP-34 TABLE OF CONTENTS SECTION                                                         PAGE 1.0     PURPOSE............. I                           ........ 4
4 INITIATING EVENTS .......................
 
4 PROCEDURE  
==2.0      REFERENCES==
.......................
.......................                       4 3.0      PREREQUISITES .......................                     4 4.0      PRECAUTIONS .......................                       4 5.0      MATERIALS/EQUIPMENT .......................               4 6.0      INITIATING EVENTS .......................                 4 7.0      PROCEDURE .......................                         5 8.0      ATTACHMENTS .......................                       5
5 ATTACHMENTS  
: 1. FORMAT OF PAGES IN ENVIRONMENTAL SAMPLE LOGBOOK.... 6 Rev. No. 4                                         Page  3  of   6
.......................
5 1. FORMAT OF PAGES IN ENVIRONMENTAL SAMPLE LOGBOOK....
6 Page 3 of 6 Rev. No. 4 ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY EAP-34 JL, 1.0 PURPOSE This procedure provides instruction for the acceptance, identification and logging of environmental samples received at the Emergency Operations Facility/Environmental Laboratory during an emergency.


==2.0 REFERENCES==
ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY                              EAP-34 JL, 1.0 PURPOSE This procedure provides instruction for the acceptance, identification and logging of environmental samples received at the Emergency Operations Facility/Environmental Laboratory during an emergency.


2.1 Performance References 2.1.1 EAP-5.3, ONSITE/OFFSITE DOWNWIND SURVEYS AND ENVIRONMENTAL MONITORING 2.2 Developmental References 2.2.1 EAP-5.3, ONSITE/OFFSITE DOWNWIND SURVEYS AND ENVIRONMENTAL MONITORING 3.0 PREREQUISITES 3.1 The EOF Radiological Support Coordinator, the TSC Radiological Support Coordinator, or designee has requested the collection of environmental samples and, 3.2 The samples have been properly packaged and labeled by the persons responsible for their collection.
==2.0  REFERENCES==
4.0 PRECAUTIONS Samples collected during a radiological emergency may contain radioactivity and should be handled with care to insure that the sample contents do not spill or leak from the sample container.
 
Care should also be taken when receiving or handling samples to prevent sample cross-contamination.
2.1 Performance References 2.1.1   EAP-5.3, ONSITE/OFFSITE DOWNWIND SURVEYS AND ENVIRONMENTAL MONITORING 2.2 Developmental References 2.2.1   EAP-5.3, ONSITE/OFFSITE DOWNWIND SURVEYS AND ENVIRONMENTAL MONITORING 3.0 PREREQUISITES 3.1 The EOF Radiological Support Coordinator, the TSC Radiological Support Coordinator, or designee has requested the collection of environmental samples and, 3.2 The samples have been properly packaged and labeled by the persons responsible for their collection.
5.0 MATERIALS/EQUIPMENT 5.1 Environmental Sample Logbook 5.2 Sample tags/labels 5.3 Permanent marker 6.0 INITIATING EVENTS None Page 4 of 6 Rev. No. 4
4.0 PRECAUTIONS Samples collected during a radiological emergency may contain radioactivity and should be handled with care to insure that the sample contents do not spill or leak from the sample container. Care should also be taken when receiving or handling samples to prevent sample cross-contamination.
_1 I3 ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY EAP-34:'~~~ ' ',: AQ, ~4. -j 7.0 PROCEDURE 7.1 On receipt of environmental samples, the integrity of sample containers will be checked. If the sample is bagged, it is examined for rips or punctures.
5.0 MATERIALS/EQUIPMENT 5.1 Environmental Sample Logbook 5.2 Sample tags/labels 5.3 Permanent marker 6.0 INITIATING EVENTS None Rev. No. 4                                       Page  4  of  6
If the sample is a liquid, it is examined for leakage. If the integrity of the sample container has been compromised or is in questionable condition, notify supervising personnel.
 
7.2 All samples are to be screened for radioactivity and redirected as needed per EAP-5.3, Onsite/Offsite Downwind Surveys and Environmental Monitoring.
_1 I3 ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY                                     EAP-34
7.3 Identification numbers will be assigned to each sample. All sample identification and other pertinent information will be recorded in the Environmental Sample Logbook. Attachment 1 shows the format of the pages for the logbook.7.4 All samples will be tagged or labeled with their identification number readily visible and legible. Identification tags or labels will be written in permanent ink; DO NOT use pencil or water-soluble markers to identify samples.7.5 When the identification/logging of samples has been completed, place the samples in designated areas per EAP-5.3.8.0 ATTACHMENTS
:'~~~ '               ~4.
: 1. FORMAT OF PAGES IN ENVIRONMENTAL SAMPLE LOGBOOK Rev. No. 4 Page 5 of 6 Page 1 of 1 FORMAT OF PAGES IN ENVIRONMENTAL SAMPLE LOGBOOK Sample Log-In Sample Collection Sample Sampe Survey Number Date/Time Collector Date/Time olction Type Reading Cmet EAP-34 ACCEPTANCE OF ENVIRONMENTAL SAMPLES ATTACHMENT 1 Rev. No. 4 AT THE EOF DURING AN EMERGENCY Page 6 of 6 ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 REVISION 7 APPROVED BY: DATE: fA/A/RESPOCkSIBLE PROCEDU OWNER EFFECTIVE DATE:-O3 FIRST ISSUE FULL REVISION LIMITED REVISION * ** ** *TSR I * ** INFORMATIONAL USE* ******************************
                                            ',: AQ,- j 7.0 PROCEDURE 7.1 On receipt of environmental samples, the integrity of sample containers will be checked. If the sample is bagged, it is examined for rips or punctures. If the sample is a liquid, it is examined for leakage. If the integrity of the sample container has been compromised or is in questionable condition, notify supervising personnel.
*****************************
7.2 All samples are to be screened for radioactivity and redirected as needed per EAP-5.3, Onsite/Offsite Downwind Surveys and Environmental Monitoring.
** *** ** ** ****** * * * ** *** **** *** **ADMINISTRATIVE
7.3 Identification numbers will be assigned to each sample. All sample identification and other pertinent information will be recorded in the Environmental Sample Logbook. Attachment 1 shows the format of the pages for the logbook.
*PERIODIC REVIEW DUE DATE: CONTROLLED COPY # ___ Y-"'r -Mc 7 4 ia**
7.4 All samples will be tagged or labeled with their identification number readily visible and legible. Identification tags or labels will be written in permanent ink; DO NOT use pencil or water-soluble markers to identify samples.
EOF TLD ISSUANCE DURING AN EMERGENCY REVISION  
7.5 When the identification/logging of samples has been completed, place the samples in designated areas per EAP-5.3.
8.0 ATTACHMENTS
: 1. FORMAT OF PAGES IN ENVIRONMENTAL       SAMPLE LOGBOOK Rev. No. 4                                               Page 5   of 6
 
Page 1 of 1 FORMAT OF PAGES IN ENVIRONMENTAL SAMPLE LOGBOOK Sample     Log-In   Sample     Collection     Sample     Sampe   Survey Number   Date/Time Collector     Date/Time     olction     Type   Reading       Cmet EAP-34                   ACCEPTANCE OF ENVIRONMENTAL SAMPLES                   ATTACHMENT 1 Rev. No. 4                 AT THE EOF DURING AN EMERGENCY                   Page 6 of 6
 
7 ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 REVISION 7 APPROVED BY:                           4 ia RESPOCkSIBLE PROCEDU                  OWNER DATE:   fA/A/
EFFECTIVE DATE:                           - "'r  a        91-)          -O3 FIRST ISSUE                                           FULL REVISION                             LIMITED REVISION I                                                                                                             *
* INFORMATIONAL USE                                                           TSR
* CONTROLLED COPY # ___                Y
* ADMINISTRATIVE
* PERIODIC REVIEW DUE DATE:                                   -Mc Coo,?
 
EOF TLD ISSUANCE DURING AN EMERGENCY                         EAP-35 REVISION  


==SUMMARY==
==SUMMARY==
SHEET REV. NO.7 6 CHANGE AND REASON FOR CHANGE* Added SRD's to Section 4.4.2* Reformat per AP-02.01, Rev. 5.* Editorial changes.* Change level of use to informational from continuous.
SHEET REV. NO.       CHANGE AND REASON FOR CHANGE 7
1 1, Page 2 of 8 EAP-35 Rev. No. 7 "EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 TABLE OF CONTENTS SECTION 1.0 2.0 2.1 2.2 3.0 4.0 4.4 4.5 5.0 5.1 6.0 Rev. No.PAGE PURPOSE ..............................  
* Added SRD's to Section 4.4.2 6
..............
* Reformat per AP-02.01, Rev. 5.
4 REFERENCES  
* Editorial changes.
............................................
* Change level of use to informational from continuous.
4 Performance References  
1 1,
.................................
Rev. No. 7                                       Page  2  of  8
4 Developmental References  
 
...............................
"EOF TLD ISSUANCE DURING AN EMERGENCY                                       EAP-35 TABLE OF CONTENTS SECTION                                                                       PAGE 1.0     PURPOSE ..............................                 .............. 4
4 INITIATING EVENTS ......................................
 
4 PROCEDURE  
==2.0      REFERENCES==
.............................................
............................................                 4 2.1      Performance References .................................                 4 2.2      Developmental References ...............................                 4 3.0      INITIATING EVENTS ......................................                 4 4.0      PROCEDURE .............................................                 4 4.4     TLD ISSUANCE ........................................... 4 4.5      READING TLDs ...........................................                 5 5.0      SURVEILLANCE     OF DOSIMETRY EQUIPMENT                 .     .       6 5.1      TLDs .............................................                       6 Forms ............................................                       6 6.0      ATTACHMENTS ............................................                 6
4 TLD ISSUANCE ...........................................
: 1. EMERGENCY WORKER TLD/SRD ISSUANCE RECORD ...........               7
4 READING TLDs ...........................................
: 2. TLD BADGE IDENTIFICATION LIST .....................                 8 Rev. No. 7                                                  Page   3   of   8
5 SURVEILLANCE OF DOSIMETRY EQUIPMENT  
 
..6 TLDs .............................................
EOF TLD ISSUANCE DURING AN EMERGENCY                       EAP-35 1.0 PURPOSE To describe the method for minimizing radiological exposure to emergency workers entering the 10 mile EPZ through the use of Thermoluminescent Dosimeters (TLDs) and Radiation Exposure Records. Use this procedure within the EOF only if instructed to do so by the Emergency Director
6 Forms ............................................
 
6 ATTACHMENTS  
==2.0  REFERENCES==
............................................
 
6 1. EMERGENCY WORKER TLD/SRD ISSUANCE RECORD ...........
2.1  Performance References None 2.2  Developmental References 2.2.1    10CFR20, STANDARDS FOR PROTECTION AGAINST RADIATION 2.2.2    ICRP-28, PRINCIPALS AND GENERAL PROCEDURES FOR HANDLING EMERGENCY AND ACCIDENTAL EXPOSURES OF WORKERS 2.2.3    NCRP-38, BASIC RADIATION PROTECTION CRITERIA 3.0  INITIATING EVENTS Emergency Director directs issuance of TLDs.
7 2. TLD BADGE IDENTIFICATION LIST .....................
4.0  PROCEDURE 4.1  The Radiological Engineer, under the direction of the Emergency Operations Facility (EOF) Radiation Support Coordinator, is responsible for coordinating the efforts of the EOF Radiation Protection Technician.
8 Page 3 of 8 7 EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 1.0 PURPOSE To describe the method for minimizing radiological exposure to emergency workers entering the 10 mile EPZ through the use of Thermoluminescent Dosimeters (TLDs) and Radiation Exposure Records. Use this procedure within the EOF only if instructed to do so by the Emergency Director  
4.2  The Radiation Protection Technician, under the direction of the Radiological Engineer, is responsible for the implementation of this procedure.
4.3  The Emergency Director is responsible for authorizing radiation exposures to emergency workers in excess of USEPA Protective Action Guidelines (PAGs) for the general public.
4.4  TLD ISSUANCE NOTE: Consideration shall be given to the range of SRD an individual should be issued.
4.4.1    The Dosimetry Issuance Area will be established in the main lobby of the Emergency Operations Facility (EOF).
A Radiation Protection Technician should obtain all needed equipment from the storage area.
Rev. No. 7                                      Page  4  of  8
 
EOF TLD ISSUANCE DURING AN EMERGENCY                        EAP-35 4.4.2    Distribute he TLDs/SRD's to all emergency workers entering the Emergency Planning Zone (EPZ). If immediate action is needed, enlist additional personnel to assist in distribution.
4.4.3    Use Emergency Workers TLD/SRD Issuance Record and TLD Badge Identification List (Attachment 1 and Attachment 2 respectively) for logging TLD issuance.
4.4.4    EOF Issuance Briefing Outline Review the following with each emergency worker before the worker reports for his/her assignment.
A. Briefly instruct emergency workers on how and where the TLD will be read.
B. Inspect the TLD for damage.
C. Handling of TLD.
D. TLD should not be submerged in water.-
E. The TLD records Whole Body Dose.
F. Wear TLD on the upper torso, i.e., in a shirt pocket or clipped-to a shirt in that area. If the area being entered is contaminated or wet, wear the TLD inside the outer clothing. Take care not to contaminate the TLD when removing wet or
                -contaminated clothing.
G. Inform your supervisor immediately if you lose or damage your TLD.
4.4.5    Ensure that all sections of the Attachment 1 are completed and legible.
4.4.6    Direct the emergency worker to keep a copy of the completed form(s). The originals will remain on file at the EOF until the worker's shift is over.
4.5  READING TLDs 4.5.1    Thermoluminescent Dosimeters (TLDs)
A TLD consists of a small,piece of plastic-like crystal.
Due to its intrinsic characteristics, the TLD provides a permanent record of the individual's exposure to radiation. The TLD is an accurate device providing more useful information to the reader than a direct-reading dosimeter and is the device preferred for documenting worker exposure.
Rev. No. 7                                      Page  5  of  8
 
EOF TLD ISSUANCE DURING AN EMERGENCY                        EAP-35 A TLD cannot be read by the emergency worker; it has to be processed to determine the exposure received by the emergency worker.
                                                                      -L A. TLDs measure beta, gamma and X-ray radiation.
B. A TLD reading can be performed only once. The act of reading the TLD eliminates further measurements and the TLD has to be processed in order to be used again.
4.5.2    At the end of each shift, the emergency worker will return to the Emergency Operations Facility (EOF) for monitoring and possible decontamination. At this time, the TLD will be collected by the Radiation Protection Technician and attached to Attachment 1 filed at the EOF.
4.5.3    Check the name and serial number against those on Attachment 2.
4.6  Check the general condition of the TLD and note any abnormalities on Attachment 1.
4.7  When the TLDs have been returned, they will be packaged and returned to the dosimetry group at JAFNPP for processing in accordance with existing dosimetry procedures and station practice.
4.8  The exposure data will be copied and sent to the EOF for use when issuing additional TLDs.
5.0  SURVEILLANCE OF DOSIMETRY EQUIPMENT 5.1  TLDs Approximately 50 TLDs will be stored at the EOF facility, along with associated forms needed for TLD issuance. In accordance with existing dosimetry procedures, the TLDs at the EOF will remain in their current calibration sequence and will be exchanged and replaced with current calibrated TLDs.
5.2  Forms In addition to TLDs, the Issuance Forms that are stored at the EOF will be checked before and after usage. If additional copies are needed, they will be produced at the time of surveillance.
6.0  ATTACHMENTS
: 1. EMERGENCY WORKER TLD/SRD ISSUANCE RECORD
: 2. TLD BADGE IDENTIFICATION LIST Rev. No. 7                                        Page  6  of  8
 
EMERGENCY WORKER TLD/SRD ISSUANCE RECORD Page 1 of 1 i:
Name Social Security Number Date of Birth:
Sex:
Affiliation:
Address:
TLD Number:
Date Issued:
  *-ne Issued:
Date Returned:
Time Returned:
SRD Issued (circle one):    YES    NO    SRD Range:
Date Issued:
Time Issued:
Beginning Reading:                Beginning Reading:
Ending Reading:                  Ending Reading: _
T  -35              EOF TLD ISSUANCE              ATTACHMENT 1 R-1. No. 7        DURING AN EMERGENCY        Page    7. of  8


==2.0 REFERENCES==
TLD BADGE IDENTIFICATION LIST    Page 1 of 1 EMERGENCY WORKER'S                    TLD BADGE NAME                          SERIAL NUMBER 1.
2.
3.
4.
5.
6.
7.
8.
9.
: 10.                                                              11.
Ll.
L2.
L3.
L4.
5.
.6.
.7.
.8.
9.
0.
AP-35              EOF TLD ISSUANCE              ATTACHMENT 2  ,11 ev. No. 7        DURING AN EMERGENCY          Page  8  of  8
 
ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 REVISION 5 APPROVED BY:                _                624I7 I,
RESPONSIBLE PROCEDURE 0WNER DATE:  5  V/0 EFFECTIVE DATE:                                            ?J6C)c)c3 FIRST ISSUE                                  FULL REVISION                              LIMITED REVISION 0
* INFORMATIONAL USE                      *
* TSR          *
  *
* CONTROLLED COPY
* ADMINISTRATIVE
* 11",
PERIODIC REVIEW DUE DATE:                            XfloJ-          2-00?-


2.1 Performance References None 2.2 Developmental References 2.2.1 10CFR20, STANDARDS FOR PROTECTION AGAINST RADIATION 2.2.2 ICRP-28, PRINCIPALS AND GENERAL PROCEDURES FOR HANDLING EMERGENCY AND ACCIDENTAL EXPOSURES OF WORKERS 2.2.3 NCRP-38, BASIC RADIATION PROTECTION CRITERIA 3.0 INITIATING EVENTS Emergency Director directs issuance of TLDs.4.0 PROCEDURE 4.1 The Radiological Engineer, under the direction of the Emergency Operations Facility (EOF) Radiation Support Coordinator, is responsible for coordinating the efforts of the EOF Radiation Protection Technician.
ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY             EAP-36 REVISION  
4.2 The Radiation Protection Technician, under the direction of the Radiological Engineer, is responsible for the implementation of this procedure.
4.3 The Emergency Director is responsible for authorizing radiation exposures to emergency workers in excess of USEPA Protective Action Guidelines (PAGs) for the general public.4.4 TLD ISSUANCE NOTE: Consideration shall be given to the range of SRD an individual should be issued.4.4.1 The Dosimetry Issuance Area will be established in the main lobby of the Emergency Operations Facility (EOF).A Radiation Protection Technician should obtain all needed equipment from the storage area.Page 4 of 8 Rev. No. 7 EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 4.4.2 Distribute he TLDs/SRD's to all emergency workers entering the Emergency Planning Zone (EPZ). If immediate action is needed, enlist additional personnel to assist in distribution.
4.4.3 Use Emergency Workers TLD/SRD Issuance Record and TLD Badge Identification List (Attachment 1 and Attachment 2 respectively) for logging TLD issuance.4.4.4 EOF Issuance Briefing Outline Review the following with each emergency worker before the worker reports for his/her assignment.
A. Briefly instruct emergency workers on how and where the TLD will be read.B. Inspect the TLD for damage.C. Handling of TLD.D. TLD should not be submerged in water.-E. The TLD records Whole Body Dose.F. Wear TLD on the upper torso, i.e., in a shirt pocket or clipped-to a shirt in that area. If the area being entered is contaminated or wet, wear the TLD inside the outer clothing.
Take care not to contaminate the TLD when removing wet or-contaminated clothing.G. Inform your supervisor immediately if you lose or damage your TLD.4.4.5 Ensure that all sections of the Attachment 1 are completed and legible.4.4.6 Direct the emergency worker to keep a copy of the completed form(s). The originals will remain on file at the EOF until the worker's shift is over. 4.5 READING TLDs 4.5.1 Thermoluminescent Dosimeters (TLDs)A TLD consists of a small,piece of plastic-like crystal.Due to its intrinsic characteristics, the TLD provides a permanent record of the individual's exposure to radiation.
The TLD is an accurate device providing more useful information to the reader than a direct-reading dosimeter and is the device preferred for documenting worker exposure.Rev. No. 7 Page 5 of 8 EOF TLD ISSUANCE DURING AN EMERGENCY A TLD cannot be read by the emergency worker; it has to be processed to determine the exposure received by -L the emergency worker.A. TLDs measure beta, gamma and X-ray radiation.
B. A TLD reading can be performed only once. The act of reading the TLD eliminates further measurements and the TLD has to be processed in order to be used again.4.5.2 At the end of each shift, the emergency worker will return to the Emergency Operations Facility (EOF) for monitoring and possible decontamination.
At this time, the TLD will be collected by the Radiation Protection Technician and attached to Attachment 1 filed at the EOF.4.5.3 Check the name and serial number against those on Attachment 2.4.6 Check the general condition of the TLD and note any abnormalities on Attachment 1.4.7 When the TLDs have been returned, they will be packaged and returned to the dosimetry group at JAFNPP for processing in accordance with existing dosimetry procedures and station practice.4.8 The exposure data will be copied and sent to the EOF for use when issuing additional TLDs.5.0 SURVEILLANCE OF DOSIMETRY EQUIPMENT 5.1 TLDs Approximately 50 TLDs will be stored at the EOF facility, along with associated forms needed for TLD issuance.
In accordance with existing dosimetry procedures, the TLDs at the EOF will remain in their current calibration sequence and will be exchanged and replaced with current calibrated TLDs.5.2 Forms In addition to TLDs, the Issuance Forms that are stored at the EOF will be checked before and after usage. If additional copies are needed, they will be produced at the time of surveillance.
6.0 ATTACHMENTS
: 1. EMERGENCY WORKER TLD/SRD ISSUANCE RECORD 2. TLD BADGE IDENTIFICATION LIST EAP-35 Page 6 of 8 Rev. No. 7 EMERGENCY WORKER TLD/SRD ISSUANCE RECORD Page 1 of 1 Name Social Security Number Date of Birth: Sex: Affiliation:
Address: TLD Number: Date Issued: *-ne Issued: Date Returned: Time Returned: SRD Issued (circle one): Date Issued: Time Issued: Beginning Reading: Ending Reading: YES NO SRD Range: Beginning Reading: Ending Reading: _T -35 R-1. No. 7 EOF TLD ISSUANCE DURING AN EMERGENCY ATTACHMENT 1 Page 7. of 8 i:
TLD BADGE IDENTIFICATION LIST EMERGENCY WORKER'S TLD BADGE NAME SERIAL NUMBER 1.2.3.4.5.6.7.8.9.10.Ll.L2.L3.L4.5..6..7..8.9.0.AP-35 EOF TLD ISSUANCE ATTACHMENT 2 ev. No. 7 DURING AN EMERGENCY Page 8 of 8 Page 1 of 1 11.,11 ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 REVISION 5 APPROVED BY: _EFFECTIVE DATE: I, RESPONSIBLE PROCEDURE 0WNER?J6C)c)c3 FIRST ISSUE FULL REVISION LIMITED REVISION 0 PERIODIC REVIEW DUE DATE: DATE: 5 V/0*****************************
*****************************
* * * ** INFORMATIONAL USE *
* TSR ** * * ******************************
*****************************.
*
* CONTROLLED COPY* ADMINISTRATIVE
** *************
**********
*******XfloJ-11", 2-00?-
ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY REVISION  


==SUMMARY==
==SUMMARY==
SHEET .REV. NO. CHANGE AND REASON FOR CHANGE 5
SHEET                         .
* Changed name on cover sheet to Entergy Nuclear Operations, Inc.* Updated procedure names/titles.
REV. NO.       CHANGE AND REASON FOR CHANGE 5
* Changed name on cover sheet to Entergy Nuclear Operations, Inc.
* Updated procedure names/titles.
4
4
* Reformat per AP-02.01, Rev. 5.* Added >1 mR/hr to Section 7.1 to provide guidance and clarification of "high."* In Section 7.4, substituted "contaminated" for "hot" and deleted 7.4.1 "floor covering" as it is unnecessary in that facility.* Added 7.4.8 -step-off pads to control contamination.
* Reformat per AP-02.01, Rev. 5.
* Converted Step 7.5 to 7.5 and 7.6 and added editorial corrections.
* Added >1 mR/hr to Section 7.1 to provide guidance and clarification of "high."
Page 2 of 6'L EAP-36-_1S Rev. No. 5 ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 TABLE OF CONTENTS SECTION 1.0 2.0 2.1 2.2 3.0 4.0 5.0 6.0 7.0 8.0 PURPOSE....................
* In Section 7.4, substituted "contaminated" for "hot" and deleted 7.4.1 "floor covering" as it is unnecessary in that facility.
REFERENCES.................
* Added 7.4.8 - step-off pads to control contamination.
Performance References
* Converted Step 7.5 to 7.5 and 7.6 and added editorial corrections.                                           'L
.....Developmental References...
                                                                    -_1S Rev. No. 5                                       Page  2  of  6
INITIATING EVENTS ..........
 
PREREQUISITES..............
ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY                               EAP-36 TABLE OF CONTENTS SECTION                                                                           PAGE 1.0     PURPOSE.................... . . ... . . ... . . ... . . ... . . ...   ... 4
PRECAUTIONS................
 
CAPABILITIES...............
==2.0      REFERENCES==
PROCEDURE
................. . . ... ..... . . ... . . ... . . ...   ... 4 2.1      Performance References ..... . . ... . . ... . . ... . . ... . . ...   ... 4 2.2      Developmental References... . . ... . . ... . . ... . . ... . . ...   ... 4 3.0      INITIATING EVENTS .......... . . ...         . . ... . . ... . . ...   ... 4 4.0      PREREQUISITES.............. . . ...         . . ... . . ... . . ...   ... 44 5.0      PRECAUTIONS................ . . ...         . . ... . . ... . . ...
..................
6.0      CAPABILITIES............... . . ...         . . ... . . ... . . ...   ... 5 7.0      PROCEDURE .................. . . ...         . . ... . . ... . . ...   ... 5 8.0      ATTACHMENTS ................ . . ...         . . ... . . ... . . ...   ... 6 Rev. No. 5                                                 Page      3      of    6
ATTACHMENTS
 
................
ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY           EAP-36 1.0 PURPOSE This procedure provides a description of the capabilities and operation of the Environmental Laboratory during an emergency.
PAGE...4...4...4...4...4...4...4... 5... 5... 6 Page 3 of 6.....................................................................................................................................................................................................................................................Rev. No. 5 ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY 1.0 PURPOSE This procedure provides a description of the capabilities and operation of the Environmental Laboratory during an emergency.
 
==2.0  REFERENCES==


==2.0 REFERENCES==
2.1  Performance References 2.1.1    EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY 2.1.2    RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE 2.1.3    RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE 2.2  Developmental References 2.2.1    IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS 2.2.2    EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY 2.2.3    RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE 2.2.4    RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE 3.0  INITIATING EVENTS None 4.0 PREREQUISITES 4.1  An Alert, Site Area Emergency or General Emergency has been declared in accordance with IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS, and 4.2  Environmental sampling has been requested by the TSC Radiological Support Coordinator, the EOF Radiological Support Coordinator, or designee.
11 Rev. No. 5                                      Page  4  of  6


2.1 Performance References 2.1.1 EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY 2.1.2 RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE 2.1.3 RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE 2.2 Developmental References 2.2.1 IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS 2.2.2 EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY 2.2.3 RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE 2.2.4 RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE 3.0 INITIATING EVENTS None 4.0 PREREQUISITES 4.1 An Alert, Site Area Emergency or General Emergency has been declared in accordance with IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS, and 4.2 Environmental sampling has been requested by the TSC Radiological Support Coordinator, the EOF Radiological Support Coordinator, or designee.11 Rev. No. 5 Page 4 of 6 EAP-36 ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 5.0 PRECAUTIONS 5.1 Environmental samples collected during a radiological emergency may contain radioactivity and should be handled with care to insure that the sample contents do not spill or leak from the containers.
ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY             EAP-36 5.0 PRECAUTIONS 5.1 Environmental samples collected during a radiological emergency may contain radioactivity and should be handled with care to insure that the sample contents do not spill or leak from the containers. Care should also be taken when receiving or handling samples to prevent cross-contamination.   (Refer to RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE, for specific guidelines.)
Care should also be taken when receiving or handling samples to prevent cross-contamination. (Refer to RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE, for specific guidelines.)
5.2 The risks of cross-contamination of environmental samples can be reduced by insuring that extra, clean supplies (i.e.
5.2 The risks of cross-contamination of environmental samples can be reduced by insuring that extra, clean supplies (i.e.Marinelli flasks, counting vessels, etc.) are on hand.5.3 Accumulation of prepared samples in the counting room or in close proximity to counting equipment should be avoided in order to maintain a stable background for counting samples.(Refer to RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE, for specific guidelines.)
Marinelli flasks, counting vessels, etc.) are on hand.
6.0 CAPABILITIES The Environmental Laboratory has the capability of handling, storing, preparing and analyzing environmental samples received during a radiological emergency.
5.3 Accumulation of prepared samples in the counting room or in close proximity to counting equipment should be avoided in order to maintain a stable background for counting samples.
7.0 PROCEDURE 7.1 All emergency environmental samples will be surveyed and logged on receipt as per procedure EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY.
(Refer to RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE, for specific guidelines.)
6.0 CAPABILITIES The Environmental Laboratory has the capability of handling, storing, preparing and analyzing environmental samples received during a radiological emergency.
7.0 PROCEDURE 7.1 All emergency environmental samples will be surveyed and logged on receipt as per procedure EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY.
Samples showing unexpectedly high radiation measurements
Samples showing unexpectedly high radiation measurements
(>1 mR/hr) will be isolated from the other samples and placed in a designated area for "hot" samples.7.2 Preparation and analyses of emergency environmental samples should be performed in sequence of increasing radioactivity as an effort to avoid contamination of the laboratory or equipment with radioactive material from heavily contaminated samples. However, this routine may be altered by a directive from the TSC Radiological Support Coordinator, the EOF Radiological Support Coordinator or designee if the analyses of emergency environmental samples have been prioritized.
(>1 mR/hr) will be isolated from the other samples and placed in a designated area for "hot" samples.
7.3 The preparation and analyses of emergency environmental samples will take priority over the preparation and analyses of routine environmental samples.Rev. No. 5 Page 5 of 6 ENVIRONMENTAL LA30RATORY USE DURING AN EMERGENCY 7.4 Prior to the preparation of contaminated emergency t,i environmental samples, the following steps should be taken: 7.4.1 cover counter tops, 7.4.2 place absorbent material on counters, 7.4.3 line bottom of fume hood if it is to be used, 7.4.4 place absorbent material in fume hood, 7.4.5 don protective clothing as determined necessary by supervising personnel, 7.4.6 place receptacle for radioactive waste in appropriate position, and 7.4.7 place receptacle for used protective clothing in an appropriate position.7.4.8 Consider the use of step-off pads to control spread of contamination.
7.2 Preparation and analyses of emergency environmental samples should be performed in sequence of increasing radioactivity as an effort to avoid contamination of the laboratory or equipment with radioactive material from heavily contaminated samples. However, this routine may be altered by a directive from the TSC Radiological Support Coordinator, the EOF Radiological Support Coordinator or designee if the analyses of emergency environmental samples have been prioritized.
7.5 Preparation and analyses of emergency environmental samples should be performed in accordance with the appropriate Environmental Laboratory procedure.
7.3 The preparation and analyses of emergency environmental samples will take priority over the preparation and analyses of routine environmental samples.
7.6 Forward results to the TSC or EOF Radiological Support Coordinator.
Rev. No. 5                                       Page 5 of 6
7.7 If the number of emergency environmental samples is such that the capability of the Environmental Laboratory is exceeded, supervising personnel will initiate calls for assistance to those laboratories listed in Appendix C of the JAF Emergency Plan.8.0 ATTACHMENTS NONE I Page 6 of 6 EAP-36 Rev. No. 5 ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE OBTAINING METEOROLOGICAL DATA EAP-42 REVISION 19 APPROVED BY: A RESPONSIfLE PROCEDUlE-eW9ER EFFECTIVE DATE: FIRST ISSUE l F- Y L L R S t .F iL REVISI ON'X LIMITED REVISION 0 PERIODIC REVIEW DUE DATE: DATE:* -- * .* .** INFORMATIONAL USE *
 
* TSR ** * * ******************************  
ENVIRONMENTAL LA30RATORY USE DURING AN EMERGENCY             EAP-36 7.4   Prior to the preparation of contaminated emergency             t,i environmental samples, the following steps should be taken:
*****************************
7.4.1   cover counter tops, 7.4.2   place absorbent material on counters, 7.4.3   line bottom of fume hood if it is to be used, 7.4.4   place absorbent material in fume hood, 7.4.5   don protective clothing as determined necessary by supervising personnel, 7.4.6   place receptacle for radioactive waste in appropriate position, and 7.4.7   place receptacle for used protective clothing in an appropriate position.
*** ** * ** *** ** * *** ** * *** * ** ** ..* .._ _ _ _ _ _ _ _ _* ADMINISTRATIVE
7.4.8   Consider the use of step-off pads to control spread of contamination.
** :
7.5   Preparation and analyses of emergency environmental samples should be performed in accordance with the appropriate Environmental Laboratory procedure.
* CONTROLLED COPY.#i lel 11 I -aq q oo ---'200 -d OBTAINING METEOROLOGICAL DATA REVISION  
7.6   Forward results to the TSC or EOF Radiological Support Coordinator.
7.7   If the number of emergency environmental samples is such that the capability of the Environmental Laboratory   is exceeded, supervising personnel will initiate calls for assistance to those laboratories listed in Appendix   C of the JAF Emergency Plan.
8.0 ATTACHMENTS NONE I
Rev. No. 5                                     Page  6  of  6
 
ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE OBTAINING METEOROLOGICAL DATA EAP-42 REVISION 19 APPROVED BY:                         A       i RESPONSIfLE PROCEDUlE-eW9ER DATE:
11 lel EFFECTIVE DATE:                         I  -aq q oo F-tY. LL R         S FIRST ISSUE              l                        F iL     REVISI ON'X                         LIMITED REVISION     0
* INFORMATIONAL USE                             *
* TSR               *
* ADMINISTRATIVE                            *
  *   :
* CONTROLLED COPY.#
PERIODIC REVIEW DUE DATE:                                                  - -- '200
                                                      -               d
 
OBTAINING METEOROLOGICAL DATA                                   EAP-42 REVISION  


==SUMMARY==
==SUMMARY==
SHEET 11 REV. NO.19
SHEET                       11 REV. NO.
* Updated phone numbers for pages* Added Sigma Theta and Delta to Attachment 6 18
19
* In section 1.0, 4.3.2 and attachment 3 added Security Alarm Station.* In attachment 3 number 5 -added "or EOF" to the direct connect to Met Data.* In section 4.2.2.D added SAS to the menu and added"direct connect OR" to the EOF.17
* Updated phone numbers for pages
* In section 4.4.1, 4.4.5, 4.4.6.A, 4.4.7 & 8.A-D updated the channels with numbers rather than letters.* Replaced attachments 4, 5 and 7 with updated pictures.* Made Attachment 7 posted attachment A.* Added note in section 4.4.7 to make user aware that they may use posted attachment A for notification requirements.
* Added Sigma Theta and Delta to Attachment 6 18
* In section 1.0, 4.3.2 and attachment 3 added Security Alarm Station.
* In attachment 3 number 5 - added "or EOF" to the direct connect to Met Data.
* In section 4.2.2.D added SAS to the menu and added "direct connect OR" to the EOF.
17
* In section 4.4.1, 4.4.5, 4.4.6.A, 4.4.7 & 8.A-D updated the channels with numbers rather than letters.
* Replaced attachments 4, 5 and 7 with updated pictures.
* Made Attachment 7 posted attachment A.
* Added note in section 4.4.7 to make user aware that they may use posted attachment A for notification requirements.
16
16
* Deleted the words Niagara Mohawk due to their company change.* In section 4.4.2 -updated the information to check when attempting to obtain data from the strip chart recorders and deleted the section following 4.4.3. IL* Added Attachment 7 that shows atmospheric stability.
* Deleted the words Niagara Mohawk due to their company change.
* In section 4.4.2 - updated the information to check when attempting to obtain data from the strip chart recorders and deleted the section following 4.4.3.         IL
* Added Attachment 7 that shows atmospheric stability.
15
15
* Added NIMO Mete contact information to sections 4.6.1 and 4.5.3.* An adjustment was made to the cover sheet to reflect the company name change.14
* Added NIMO Mete contact information to sections 4.6.1 and 4.5.3.
* Added the TSC as an alternate location for performing forecasting of mete data.* In section 4.2.2., deleted step G, and changed its test to a NOTE prior to step 4.2.B.13
* An adjustment was made to the cover sheet to reflect the company name change.
* On Attachment 1, in the EDAMS box, changed "F4" for requery to select "Requery" with the mouse. Also in same box deleted If "locked up" or stalled, Attachment 3 for recovery.12
14
* Section 4.2 is changed to incorporate the new windows design of EDAMS and the method to obtain Met data.* Original Attachment 3 was deleted, this attachment is no longer needed with the windows version. It is being replaced with a new Attachment 3 titled "Guide For Using EDAMS Computer To Obtain Meteorology Data".Rev. No. 19 Page 2 of 2 EAP-42 OBTAINING METEOROLOGICAL DATA -P-49 TABLE OF CONTENTS PAGE PURPOSE .................................................
* Added the TSC as an alternate location for performing forecasting of mete data.
4 REFERENCES  
* In section 4.2.2., deleted step G, and changed its test to a NOTE prior to step 4.2.B.
.............................................
13
4 INITIATING EVENTS ......................................
* On Attachment 1, in the EDAMS box, changed "F4" for requery to select "Requery" with the mouse. Also in same box deleted If "locked up" or stalled, Attachment 3 for recovery.
4 PROCEDURE  
12
..............................................
* Section 4.2 is changed to incorporate the new windows design of EDAMS and the method to obtain Met data.
4 Description of Available Methods .......................
* Original Attachment 3 was deleted, this attachment is no longer needed with the windows version. It is being replaced with a new Attachment 3 titled "Guide For Using EDAMS Computer To Obtain Meteorology Data".
4 Obtaining Meteorological Data from EDAMS ... ............
Rev. No. 19                                         Page 2 of 2
5 Obtaining Meteorological Data from Nine Mile ... ........ 6 Obtaining Meteorological Data from Analog Strip Charts .7 Obtaining Meteorological Information From Other Sourcesl2 ATTACHMENTS  
 
.....................  
OBTAINING METEOROLOGICAL DATA                         -                       P-49 TABLE OF CONTENTS SECTION                                                                    PAGE 1.0      PURPOSE .................................................             4
......................
 
13 1. MET DATA ACQUISITION QUICK REFERENCE FLOWCHART  
==2.0      REFERENCES==
..... 14 2. OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT ..............................
.............................................               4 3.0      INITIATING EVENTS ...................................... 4 4.0      PROCEDURE ..............................................               4 4.1      Description of Available Methods .......................               4 4.2      Obtaining Meteorological Data from EDAMS ...             ............ 5 4.3      Obtaining Meteorological Data from Nine Mile ...             ........ 6 4.4      Obtaining Meteorological Data from Analog Strip Charts .7 4.5      Obtaining Meteorological Information From Other Sourcesl2 5.0      ATTACHMENTS     .....................   ...................... 13
15 3. GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA ............................
: 1. MET DATA ACQUISITION QUICK REFERENCE FLOWCHART .....             14
16 4. ANALOG WIND SPEED AND DIRECTION RECORDERS D, G AND J ................................
: 2. OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT .............................. 15
17 5. RECORDER "K" .................  
: 3. GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA ............................ 16
-18 6. CLASSIFICATION OF ATMOSPHERIC STABILITY  
: 4. ANALOG WIND SPEED AND DIRECTION RECORDERS D, G AND J ................................ 17
............
: 5. RECORDER "K" .................                                 -18
19 A. EAP-42 POSTED ATTACHMENT A -- EXAMPLES OF ATMOSPHERIC STABILITY  
: 6. CLASSIFICATION OF ATMOSPHERIC STABILITY ............             19 A. EAP-42 POSTED ATTACHMENT A       -- EXAMPLES OF ATMOSPHERIC STABILITY .......................................... 20 Rev. No. 19                                              Page. 3       of   20
..........................................
 
20 Page. 3 of 20 SECTION 1.0 2.0 3.0 4.0 4.1 4.2 4.3 4.4 4.5 5.0 Rev. No. 19 OBTAINING METEOROLOGICAL DATA 1.0 PURPOSE L This procedure provides instructions for accessing meteorological data in the Control Room, Technical Support Center, Emergency Operations Facility or Secondary Alarm Station and includes provisions for long-term forecasting.
OBTAINING METEOROLOGICAL DATA                                 EAP-42 1.0 PURPOSE                                                             L This procedure provides instructions for accessing meteorological data in the Control Room, Technical Support Center, Emergency Operations Facility or Secondary Alarm Station and includes provisions for long-term forecasting.


==2.0 REFERENCES==
==2.0 REFERENCES==


None 2.1 Developmental References 2.1.1 EAP-4, DOSE ASSESSMENT CALCULATIONS 2.1.2 Emergency Dose Assessment Model System (EDAMS) System Design Specification 3.0 INITIATING EVENTS 3.1.1 An emergency has been declared in accordance with IAP-2, CLASSIFICATION OF EMERGENCY Conditions, or 3.1.2 EAP-4, DOSE ASSESSMENT CALCULATIONS, has been implemented.
None 2.1 Developmental References 2.1.1   EAP-4, DOSE ASSESSMENT CALCULATIONS 2.1.2   Emergency Dose Assessment Model System (EDAMS) System Design Specification 3.0 INITIATING EVENTS 3.1.1   An emergency has been declared in accordance with IAP-2, CLASSIFICATION OF EMERGENCY Conditions, or 3.1.2   EAP-4, DOSE ASSESSMENT CALCULATIONS, has been implemented.
4.0 PROCEDURE t 4.1 Description of Available Methods Meteorological data is available from the following sources: A.Emergency Dose Assessment Modeling System (EDAMS)B.Nine Mile Point Units 1 or 2 Control Rooms C.Analog strip charts in Control Room or Technical Support Center D.Any JAF Networked PC E.National Weather Service Page 4 of 20 EAP-42 Rev. No. 1 9 OBTAINING METEOROLOGICAL DATA EAP-42 The general methodology-involved would concern providing meteorological data dependent on type of release. An elevated release (stack) would utilize 200t level data; and if unavailable, would .progress in decreasing order to 100', 30' and backup tower data (90'). Likewise, a ground release (any other than stack)would utilize 30' level data, and if unavailable, would progress in increasing order to 100', 200' and backup tower data (90').This list does not delineate a required order of priority but provides a listing of resources based on accessibility timeliness and accuracy of 15 minute averaged data.NOTE: Flowchart (Attachment
4.0 PROCEDURE                                                         t 4.1 Description of Available Methods Meteorological data is available from the following sources:
: 1) is provided as a quick reference and may be utilized by the operator familiar with the body of this procedure.
A.Emergency Dose Assessment Modeling System (EDAMS)
B.Nine Mile Point Units 1 or 2 Control Rooms C.Analog strip charts in Control Room or Technical Support Center D.Any JAF Networked PC E.National Weather Service Rev. No. 19                                        Page 4 of   20
 
OBTAINING METEOROLOGICAL DATA                                   EAP-42 The general methodology-involved would concern providing meteorological data dependent on type of release. An elevated release (stack) would utilize 200t level data; and if unavailable, would .progress in decreasing order to 100', 30' and backup tower data (90'). Likewise, a ground release (any other than stack) would utilize 30' level data, and if unavailable, would progress in increasing order to 100', 200' and backup tower data (90').
This list does not delineate a required order of priority but provides a listing of resources based on accessibility timeliness and accuracy of 15 minute averaged data.
NOTE:     Flowchart (Attachment 1) is provided as a quick reference and may be utilized by the operator familiar with the body of this procedure.
It is-optional to record met data on Attachment 2, Obtaining Meteorological Data for Manual Computer Input; this may provide some convenience.
It is-optional to record met data on Attachment 2, Obtaining Meteorological Data for Manual Computer Input; this may provide some convenience.
4.2 Obtaining Meteorological Data from EDAMS 4.2.1 If the EDAMS computer-is on-line: A. The computer will automatically requery the met system and update the data every 15 minutes on the quarter hour (eg. 1300, 1315, 1330, etc.). A beep may be heard when the update occurs.B. When recording data, the operator should confirm the time and date displayed are the most current (ie.within the last 15 minutes of the current time).C. The operator may select "Requery" to ensure the most current data is displayed.
4.2 Obtaining Meteorological Data from EDAMS 4.2.1     If the EDAMS computer-is on-line:
4.2.2 If EDAMS is NOT on-line, log onto the system as follows: NOTE: Attachment 3 may be used to guide the operator through the steps to activate the EDAMS computer and obtain meteorological data.A. Ensure black switch on CR or TSC meteorological panels is positioned to the Niagara Mohawk ("B") position.Page 5 of 20 Rev. No. 19 OBTAINING METEOROLOGICAL DATA NOTE: Select "Continue" at the plant picture screen.B. Energize the EDAMS computer power strip to provide power to the computer, monitor and printer.C. Select the "Login" icon from the EDAMS icons and select "Continue" at the plant picture screen.D. Select the appropriate menu item based on your location as follows: Location: CR TSC EOF SAS SIMULATOR Menu Choice Direct Connect to Met Data Direct Connect to Met Data Direct Connect OR Automatic Dial-in to Met Data Automatic Dial-in to Met Data Automatic Dial-in to Met Data E. When the login routine finishes, close the login screen by selecting "OK".F. From the EDAMS icons, select "Emergency Met Report".G. Select "James A. FitzPatrick" and "Both" for unit and release height, then select "OK". The emergency meteorology data will be displayed.
A. The computer will automatically requery the met system and update the data every 15 minutes on the quarter hour (eg. 1300, 1315, 1330, etc.). A beep may be heard when the update occurs.
H. Ensure that "Continuous Requery?" is enabled..L I. The computer will automatically requery the met system and update the data every 15 minutes on the quarter hour (eg. 1300, 1315, 1330, etc.). A beep may be heard when the update occurs.4.3 Obtaining Meteorological Data from Nine Mile 4.3.1 From the Control Room, use the direct line phone to Unit 1 or 2 Control Room and request latest 15 minute averaged data.If for some reason direct line unavailable, from TSC EOF or SAS, use a commercial phone with one of the following numbers: A. NMPl: 349-2841, 349-2842 or 349-2843 B. NMP2: 349-2168, 349-2169 or 349-2170 Page 6 of 20<1L I, 4.3.2 EAP-42 Rev. No. 19 OBTAINING METEOROLOGICAL DATA EAP-42 4.4 Obtaining Meteorological Data from Analog Strip Charts 4.4.1 Description of analog strip charts and information available.
B. When recording data, the operator should confirm the time and date displayed are the most current (ie.
There are four (4) analog strip chart recorders available in the Control room and TSC to provide meteorological data.Each of the three-recorders (D, G, J) have two channels (1 and 2) to provide wind speed and direction.
within the last 15 minutes of the current time).
Channel l=wind speed in mph (0-100 mph) traced on left Channel 2 = wind-direction in degrees(arc)
C. The operator may select "Requery" to ensure the most current data is displayed.
(5400 range)-traced on right Recorders used for wind speed and direction D Main Tower 200' level G JAF Backup Tower 90' level J Main Tower 30' or 100' level (selector switch provided)Recorder K is provided for stability class determination.
4.2.2     If EDAMS is NOT on-line, log onto the system as follows:
1 Provides temperature in F at 30' level 2 Provides AT in F from 30' to 100' level 3 Provides AT in F from 30' to 200' level 4 Selectable sigma theta (wind direction variation)
NOTE:     Attachment 3 may be used to guide the operator through the steps to activate the EDAMS computer and obtain meteorological data.
Trace 4 has four selectable channels to trace for: A High main tower (200')B Mid main tower (100')C- Low main tower (30')D Backup tower (90')Page 7 of 20 Recorder K has the following four traces: Rev. No. 19 OBTAINING METEOROLOGICAL DATA 4.4.2 Before attempting to obtain data from any of the strip chart recorders, ensure they are functioning by verifyingsl/
A. Ensure black switch on CR or TSC meteorological panels is positioned to the Niagara Mohawk ("B") position.
the date and time on the display is correct. The strip chart runs at "/hr. Time indicated is Eastern Standard Time.4.4.3 When manually retrieving meteorological data, primary concern is given to wind speed and direction, and to the stability class at particular elevations, dependent on the type of release.4.4.4 In order to properly estimate the last 15 minutes on the strip chart, measure the last 1/4" of data for each parameter, if not readily visible, and/or the chart has not already been advanced, do so in order to average the last 15 minutes of data properly.
Rev. No. 19                                         Page  5 of  20
Obtain a minimum of 4 data points within that 1/4" of chart and average.4.4.5 Meteorological data for a Ground or both a Ground and Elevated release are to be determined as follows: A. There are 3 recorders, which record wind speed and direction (Recorders D, G, and J). For each chart, wind speed (the left trace) is labeled Channel 1 and is in MPH (the range is 0 to 100 MPH and spans the left side of the chart) and wind direction (the right trace) is labeled Channel 2 and is in degrees arc (the range is 0 to 540 degrees and spans the right side of the chart). Consult Attachment 4.To obtain wind direction and speed for a ground or ground and elevated release, you must first determine whether the Recorder "J" toggle switch is set for 30 or 100 foot (Main Tower). If it is set for 30 foot (Main), average the wind speed and direction as per step 4.4.5.If the Recorder "J" toggle switch is set for 100 foot (Main Tower) and/or there is no 30 foot data, adhere to the following hierarchy of substeps: 1. Average the wind speed and direction as per step 4.4.5 for Recorder "G", which is meteorological data for the JAF Back-up Tower 90 foot level.Rev. No. 19 Page 8 of 20 EAP-42 OBTAINING METEOROLOGICAL DATA EAP-42 2. If Recorder "G" is inoperable average the wind speed and direction as per step 4.4.5 for Recorder"D", which is meteorological data for the Main Tower 200 foot level.3. If both Recorder "G & D" are inoperable average the wind speed and direction as per step 4.4.5 for Recorder "J" which is meteorological data for either the 30 or 100 foot Main Tower levels, as determined by the toggle switch position.4. If NO strip chart wind speed and direction data is available, proceed to section 4.5 after completing 4.4.8.4.4.6 Meteorological data for an elevated release is to be determined as follows:, A. There are 3 recorders, which record wind speed and direction (Recorders D, G and J). For each chart, wind speed (the left trace) is in MPH (the range is 0 to 100 MPH, and spans the left side of the chart) and wind direction (the right trace) is in degrees arc (the range is 0 to 540 degrees and spans the right side of the chart). Consult Attachment 4.To obtain wind speed and direction for an elevated release, adhere to the following substeps: 1. Average the wind speed and direction as per step 4.4.5 for Recorder "D", which is meteorological data for the Main Tower 200 foot level.Rev. No. 19 Page 9 of 20 OBTAINING METEOROLOGICAL DATA 2. If Recorder "D" is inoperable average the wind speed and direction as per step 4.4.5 for Record,L"G", which is meteorological data for the JAF Back-up Tower 90 foot level.3. If both Recorder "D & G" are inoperable average the wind speed and direction as per step 4.4.5 for Recorder "J" which is meteorological data for either the 30 or 100 foot Main Tower levels, as determined by the toggle switch position.4. If NO strip chart wind speed and direction data is available, proceed to section 4.5 after completing 4.4.8.4.4.7 To determine stability class for either a ground or elevated release, you must utilize Recorder K" information, which contains 4 channels that span the full chart: NOTE: Prior to declaring the TSC Operational, POSTED ATTACHMENT A, EXAMPLES OF ATMOSPHERIC STABILITY may be used in the Control Room and/or TSC to provide quick stability class estimation to meet offsite agency notification requirements.
 
A. Trace labeled "1" provides ambient temperature, on a 40 to +110 scale and indicates the current temperatua lin degrees F at the Main Tower 30 foot level.B. Trace "2" provides temperature difference (delta T)between the 30 and 100 foot level on the Main Tower, and is on the -8 to +20 scale in degrees F.C. Trace "3" provides temperature difference between the 30 and 200 foot level on the Main Tower, and is on the same -8 to +20 scale in degrees F.Rev. No. 19 Page 10 of 20 [EAP-42 OBTAINING METEOROLOGICAL DATA EAP-42 D. Trace "4" provides sigma theta (wind direction variation),, on a scale of 0 to 30 degrees, at a level dependant on the switch position on the front of the TIGRAPH recording panel: Switch Position Level Tower A 200 ft. Main (Primary)B 100 ft. Main (Primary)C 30 ft. Main (Primary)D 90 ft. JAF (Back-up)Consult Attachment 5.4.4.8 To derive stability class for either a ground or elevated release, or both, utilize Attachment 4 and adhere to the following hierarchy of substeps: A. Average the trace "4" (sigma theta) on Recorder "K", utilizing the 0 to 30 scale, as per step 4.4.5, noting the switch position, and consulting Attachment 6 to determine letter stability class.NOTE: If data is invalid, you may want to switch another switch position to get the most representative data (for the next 15 minute average).
OBTAINING METEOROLOGICAL DATA                                     EAP-42 NOTE:     Select "Continue" at the plant picture screen.
For example, for an elevated release you should utilize switch position A, then B, D and finally C, and for a ground release, the progression is C, B, D and then A.B. If Trace "4" is unavailable, average the Trace "3" (temperature difference 30 -200 foot) on Recorder"K", utilizing the -8 to +20 degree F scale as per step 4.4.5 and consulting Attachment 6 to determine letter stability class.C. If Traces "4" and "3" are unavailable, average the Trace "2" (temperature-difference 30 -100 foot) on Recorder "K", utilizing the -8 to +20 degree F scale as per step 4.4.5 and consulting Attachment 6 to determine letter stability class.Rev. No. 19 Page 11 of 20 OBTAINING METEOROLOGICAL DATA D. If Traces "4","3", and "2"" are unavailable, estimate stabilitv by comparing wind direct.ion and speed traceALJ to the samples posted on the side of the TIGRAPH 200 housing and/or utilizing the "Atmospheric Stability Characterization" table on Attachment 6.E. If All Recorders are unavailable for meteorological data, proceed to section 4.5.4.5 obtaining Meteorological Information From Other Sources 4.5.1 If meteorological data is not obtained via the primary method (digital) or secondary method (analog strip charts) information on local wind speed and direction, and stability class can be obtained through other sources.4.5.2 Meteorological data is also available from any JAF networked PC.4.5.3 Nine Mile Meteorological Data A. Telephone the Nine Mile Point Nuclear Station #1 Control Room via the "hot line" or dial phone, and request pertinent meteorological data needed.B. In addition, supplemental information may be obtained through Nine Mile via their Meteorological Building.
I, B. Energize the EDAMS computer power strip to provide power to the computer, monitor and printer.
t Contact one of the following people for assistance:
C. Select the "Login" icon from the EDAMS icons and select "Continue" at the plant picture screen.
Tom Galetta -349-2715 (Office) *Pager # 1193 Joe Blakeley -349-1179 (Office) *Pager # 1040* To access the Constellation pager, call 1-877-472-7874.
D. Select the appropriate menu item based on your location as follows:
4.5.4 National Weather Service Meteorological Data Data may be obtained via telephone on 716-565-0014.
Location:           Menu Choice CR                  Direct Connect to Met Data TSC                  Direct Connect to Met Data EOF                  Direct Connect OR Automatic Dial-in to Met Data SAS                  Automatic Dial-in to Met Data SIMULATOR            Automatic Dial-in to Met Data E. When the login routine finishes, close the login screen by selecting "OK".
F. From the EDAMS icons, select "Emergency Met Report".
G. Select "James A. FitzPatrick" and "Both" for unit and release height, then select "OK". The emergency meteorology data will be displayed.
H. Ensure that "Continuous Requery?" is enabled.
                                                                        .L I. The computer will automatically requery the met system and update the data every 15 minutes on the quarter hour (eg. 1300, 1315, 1330, etc.). A beep may be heard when the update occurs.
4.3 Obtaining Meteorological Data from Nine Mile 4.3.1     From the Control Room, use the direct line phone to Unit 1 or 2 Control Room and request latest 15 minute averaged data.
4.3.2      If for some reason direct line unavailable, from TSC EOF or SAS, use a commercial phone with one of the following numbers:
A. NMPl: 349-2841, 349-2842 or 349-2843 B. NMP2: 349-2168, 349-2169 or 349-2170 Rev. No. 19                                          Page   6 of 20   <1
 
OBTAINING METEOROLOGICAL DATA                                        EAP-42 4.Obtaining Meteorological Data from Analog Strip Charts 4.4.1     Description of analog strip charts and information available.
There are four (4) analog strip chart recorders available in the Control room and TSC to provide meteorological data.
Each of the three-recorders (D, G, J) have two channels (1 and 2) to provide wind speed and direction.
Channel l=wind speed in mph (0-100 mph)   traced on left Channel 2   = wind-direction in degrees(arc)   (5400 range)
                          -   traced on right Recorders used for wind speed and direction D   Main Tower 200' level G   JAF Backup Tower 90' level J   Main Tower 30' or 100' level (selector switch provided)
Recorder K is provided for stability class determination.
Recorder K has the following four traces:
1     Provides temperature in F at 30' level 2     Provides AT in F from 30' to 100' level 3     Provides AT in F from 30' to 200' level 4     Selectable sigma theta (wind direction variation)
Trace 4 has four selectable channels to trace for:
A     High main tower (200')
B     Mid main tower (100')
C-   Low main tower (30')
D     Backup tower (90')
Rev. No. 19                                           Page  7  of  20
 
OBTAINING METEOROLOGICAL DATA                                   EAP-42 4.4.2   Before attempting to obtain data from any of the strip chart recorders, ensure they are functioning by verifyingsl/
the date and time on the display is correct. The strip chart runs at "/hr. Time indicated is Eastern Standard Time.
4.4.3   When manually retrieving meteorological data, primary concern is given to wind speed and direction, and to the stability class at particular elevations, dependent on the type of release.
4.4.4   In order to properly estimate the last 15 minutes on the strip chart, measure the last 1/4" of data for each parameter, if not readily visible, and/or the chart has not already been advanced, do so in order to average the last 15 minutes of data properly. Obtain a minimum of 4 data points within that 1/4" of chart and average.
4.4.5   Meteorological data for a Ground or both a Ground and Elevated release are to be determined as follows:
A. There are 3 recorders, which record wind speed and direction (Recorders D, G, and J). For each chart, wind speed (the left trace) is labeled Channel 1 and is in MPH (the range is 0 to 100 MPH and spans the left side of the chart) and wind direction (the right trace) is labeled Channel 2 and is in degrees arc (the range is 0 to 540 degrees and spans the right side of the chart). Consult Attachment 4.
To obtain wind direction and speed for a ground or ground and elevated release, you must first determine whether the Recorder "J" toggle switch is set for 30 or 100 foot (Main Tower). If it is set for 30 foot (Main), average the wind speed and direction as per step 4.4.5.
If the Recorder "J" toggle switch is set for 100 foot (Main Tower) and/or there is no 30 foot data, adhere to the following hierarchy of substeps:
: 1. Average the wind speed and direction as per step 4.4.5 for Recorder "G", which is meteorological data for the JAF Back-up Tower 90 foot level.
Rev. No. 19                                       Page 8   of 20
 
OBTAINING METEOROLOGICAL DATA                                   EAP-42
: 2. If Recorder "G" is inoperable average the wind speed and direction as per step 4.4.5 for Recorder "D", which is meteorological data for the Main Tower 200 foot level.
: 3. If both Recorder "G & D" are inoperable average the wind speed and direction as per step 4.4.5 for Recorder "J" which is meteorological data for either the 30 or 100 foot Main Tower levels, as determined by the toggle switch position.
: 4. If NO strip chart wind speed and direction data is available, proceed to section 4.5 after completing 4.4.8.
4.4.6   Meteorological data for an elevated release is to be determined as follows:,
A. There are 3 recorders, which record wind speed and direction (Recorders D, G and J). For each chart, wind speed (the left trace) is in MPH (the range is 0 to 100 MPH, and spans the left side of the chart) and wind direction (the right trace) is in degrees arc (the range is 0 to 540 degrees and spans the right side of the chart). Consult Attachment 4.
To obtain wind speed and direction for an elevated release, adhere to the following substeps:
: 1. Average the wind speed and direction as per step 4.4.5 for Recorder "D", which is meteorological data for the Main Tower 200 foot level.
Rev. No. 19                                         Page 9 of 20
 
OBTAINING METEOROLOGICAL DATA                                 EAP-42
: 2. If Recorder "D" is inoperable average the wind speed and direction as per step 4.4.5 for Record,L "G", which is meteorological data for the JAF Back-up Tower 90 foot level.
: 3. If both Recorder "D & G" are inoperable average the wind speed and direction as per step 4.4.5 for Recorder "J" which is meteorological data for either the 30 or 100 foot Main Tower levels, as determined by the toggle switch position.
: 4. If NO strip chart wind speed and direction data is available, proceed to section 4.5 after completing 4.4.8.
4.4.7   To determine stability class for either a ground or elevated release, you must utilize Recorder K" information, which contains 4 channels that span the full chart:
NOTE:   Prior to declaring the TSC Operational, POSTED ATTACHMENT A, EXAMPLES OF ATMOSPHERIC STABILITY may be used in the Control Room and/or TSC to provide quick stability class estimation to meet offsite agency notification requirements.
A. Trace labeled "1" provides ambient temperature, on a 40 to +110 scale and indicates the current temperatua l in degrees F at the Main Tower 30 foot level.
B. Trace "2" provides temperature difference (delta T) between the 30 and 100 foot level on the Main Tower, and is on the -8 to +20 scale in degrees F.
C. Trace "3" provides temperature difference between the 30 and 200 foot level on the Main Tower, and is on the same -8 to +20 scale in degrees F.
Rev. No. 19                                       Page 10 of 20   [
 
OBTAINING METEOROLOGICAL DATA                                   EAP-42 D. Trace "4" provides sigma theta (wind direction variation),, on a scale of 0 to 30 degrees, at a level dependant on the switch position on the front of the TIGRAPH recording panel:
Switch Position     Level           Tower A           200 ft.       Main (Primary)
B           100 ft.       Main (Primary)
C           30 ft.       Main (Primary)
D           90 ft.       JAF (Back-up)
Consult Attachment 5.
4.4.8   To derive stability class for either a ground or elevated release, or both, utilize Attachment 4 and adhere to the following hierarchy of substeps:
A. Average the trace "4" (sigma theta) on Recorder "K",
utilizing the 0 to 30 scale, as per step 4.4.5, noting the switch position, and consulting Attachment 6 to determine letter stability class.
NOTE:   If data is invalid, you may want to switch another switch position to get the most representative data (for the next 15 minute average). For example, for an elevated release you should utilize switch position A, then B, D and finally C, and for a ground release, the progression is C, B, D and then A.
B. If Trace "4" is unavailable, average the Trace "3" (temperature difference 30 - 200 foot) on Recorder "K", utilizing the -8 to +20 degree F scale as per step 4.4.5 and consulting Attachment 6 to determine letter stability class.
C. If Traces "4" and "3" are unavailable, average the Trace "2" (temperature-difference 30 - 100 foot) on Recorder "K", utilizing the -8 to +20 degree F scale as per step 4.4.5 and consulting Attachment 6 to determine letter stability class.
Rev. No. 19                                       Page   11 of   20
 
OBTAINING METEOROLOGICAL DATA                                     EAP-42 D. If Traces "4","3", and "2"" are unavailable, estimate stabilitv by comparing wind direct.ion and speed traceALJ to the samples posted on the side of the TIGRAPH 200 housing and/or utilizing the "Atmospheric Stability Characterization" table on Attachment 6.
E. If All Recorders are unavailable for meteorological data, proceed to section 4.5.
4.5 obtaining Meteorological   Information From Other Sources 4.5.1   If meteorological data is not obtained via the primary method (digital) or secondary method (analog strip charts) information on local wind speed and direction, and stability class can be obtained through other sources.
4.5.2   Meteorological data is   also available from any JAF networked PC.
4.5.3   Nine Mile Meteorological Data A. Telephone the Nine Mile Point Nuclear Station #1 Control Room via the "hot line" or dial phone, and request pertinent meteorological data needed.
B. In addition, supplemental information may be obtained through Nine Mile via their Meteorological Building. t Contact one of the following people for assistance:
Tom Galetta   - 349-2715 (Office)     *Pager # 1193 Joe Blakeley - 349-1179   (Office)     *Pager # 1040
* To access the Constellation pager,   call 1-877-472-7874.
4.5.4   National Weather Service Meteorological Data Data may be obtained via telephone on 716-565-0014.
Indicate what meteorological data is needed and note the source of the information.
Indicate what meteorological data is needed and note the source of the information.
4.5.5 Stability Estimation Consult Attachment 6 and estimate stability class via a characterization of the local meteorological conditions.
4.5.5   Stability Estimation Consult Attachment 6 and estimate stability     class via a characterization of the local meteorological conditions.
Rev. No. 19 Page 12 of 20 EAP-42 OBTAINING METEOROLOGICAL DATA 4.6 Meteorological Forecasting Meteorological forecasting capabilities during an emergency at JAF will be handled from the EOF (primary) or TSC- (alternate) by assigned personnel using the Internet or an on-line service.4.6.1 For assistance in forecasting, contact one of the following people:-Tom Galetta -349-2715 (Office) *Pager # 1193 Joe Blakeley -349-1179 (Office) *Pager # 1040* To access the Constellation pager call 1-877-472-7874 4.6.2 Assigned personnel will establish a connection with the Internet or on-line service to become familiar with the current and forecast weather situation.
Rev. No. 19                                         Page 12   of 20
4.6.3 Assigned personnel will provide JAF Dose Assessment Group a weather forecast.4.6.4 Provide weather condition and forecast updates until the event requiring support is formally terminated.
 
The frequency of updates will be based upon factors such as the variability of weather conditions and the needs of JAF emergency personnel.
OBTAINING METEOROLOGICAL DATA                                      EAP-42 4.6   Meteorological Forecasting Meteorological forecasting capabilities during an emergency at JAF will be handled from the EOF (primary) or TSC- (alternate) by assigned personnel using the Internet or an on-line service.
5.0 ATTACHMENTS
4.6.1     For assistance in forecasting, contact one of the following people:
: 1. MET DATA ACQUISITION-QUICK-REFERENCE FLOWCHART 2. OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT-3. GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA 4. ANALOG WIND SPEED AND DIRECTION, RECORDERSD, G AND J 5. RECORDER "K" 6. CLASSIFICATION OF ATMOSPHERIC STABILITY A. POSTED ATTACHMENT A -EXAMPLES OF ATMOSPHERIC STABILITY Page- 13 of 20 EAP-42 Rev. No. l19 OBTAINING METEOROLOGICAL DATA ATTACHMENT 1 MET DATA ACQUISITION QUICK REFERENCE FLOWCHART EDAMS* Select "Requery" with the mouse.Nine Mile* Direct phone line to Unit 1 CR: 349-2841 Unit 1 or 2 Control Room 349-2842 349-2843 Commercial phone Unit 2 CR: 349-2168 349-2169 349-2170 Analog Strip Charts Any JAF Networked PC Other Resources* Nine Mile Meteorological Building* National Weather Service (716-565-0014)
                -Tom Galetta - 349-2715   (Office)   *Pager # 1193 Joe Blakeley - 349-1179 (Office)   *Pager # 1040
Page 14 of 20 ]L:."L EAP-42 Rev. No. 19 OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT Page 1 of 1 Date: Release Type: Time: Meteorology Wind Speed: MPH _ ft. level on -" Tower Other (Specify)  
* To access the Constellation pager call 1-877-472-7874 4.6.2     Assigned personnel will establish a connection with the Internet or on-line service to become familiar with the current and forecast weather situation.
-- _E Wind Direction:
4.6.3     Assigned personnel will provide JAF Dose Assessment Group a weather forecast.
_ deg. _ ft level- on Tower Other (Specify)Stability Class: _ (A -G)Method: (Sigma Theta -wind variation)
4.6.4       Provide weather condition and forecast updates until the event requiring support is formally terminated. The frequency of updates will be based upon factors such as the variability of weather conditions and the needs of JAF emergency personnel.
-____ (Temp. Difference 200 ft)-__-_ (Temp. Difference  100 ft)Estimation Other (Specify)Additional information EAP-42 Rev. No. 19 OBTAINING METEOROLOGICAL DATA Page 15 of 20 OBTAINING METEOROLOGICAL DATA ATTACHMENT 3 Page 1 of GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA L 1. If in the CR or TSC, then ensure black switch on met panels is set to Niagara Mohawk "B" position.2. Ensure power to computer, monitor, and printer.3. Select the "Login" icon from the EDAMS icons.4. Select "Continue" at the plant picture screen.5. For the CR, TSC or EOF select "Direct Connect to Met Data".For SAS or simulator, select "Automatic Dial-in to Met Data".6. When prompted, following login, select "Ok".7. From the EDAMS icons select "Emergency Met Report".8. Select "Continue" at the plant picture screen.9. Select "James A. FitzPatrick" and "Both", then select "Ok".10. If a stack release is occurring, or projected, then utilize: Elevated data.11. If a release from any source other than the stack is occurring, or projected, then utilize Ground data.12. If no release is occurring, or projected, then utilize Elevated data.13. If no data is available from the EDAMS computer, then utilize EAP-42 to obtain meteorological data from other sources.II>EAP-42 Page 16 of 20 Rev. No. 19 OBTAINING METEOROLOGICAL DATA ATTACHMENT 4 ANALOG WIND SPEED AND DIRECTION RECORDERS D, G AND J Page 1 of 1*. .-+/-.19: Pe: .....I .. .3.3t.I. .I I].7:e I.-: :-2 a IS ,..........
5.0   ATTACHMENTS
1 8 9 188s....I ....I ....2 ..I ....I-. 1. -1.3.I.1. 1. .1 I. M I 1. .1. 1. ..1.1 u3 68 88 188.I ...I ....I ..-.I ....I ...9B. IB: '.,. -, I 8 8 I 1 8 , .8 .I...1~ id 3E8-36a 9 183 98 183 Page 17 of 20....I ....I E-AP-42.,I. I. I. P. -. -..I. P F. .........d.... ...I ...... ... ....RI.I I I I'-1I- 'I ....l ........Rev. No.19 OBTAINING METEOROLOGICAL DATA ATTACHMENT 5 RECORDER "K" Page of 1! a' 6 5... I ....j.~ j I I .....I-53 .3 : 88 : 5.... I..0. 0. 0. 0. , .0. *3-2.1-8..... 3. .I ....I ...* 12 ., ....... I.. .1.~~~~~~~F I 3.2 .....I... .3....IF..t.I.o..,.... ..1~~~..... .. .3. ] 2.. I .... I.. .FIR I.12e .88 110...I ....I ... .., .I...,...  
: 1. MET DATA ACQUISITION-QUICK-REFERENCE FLOWCHART
.I0 .. .., ......i8 30 4K Page 18 of 20* t I
: 2. OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT
* I
    -3. GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA
* t
: 4. ANALOG WIND SPEED AND DIRECTION, RECORDERSD, G AND J
* 2I I
: 5. RECORDER   "K"
* I
: 6. CLASSIFICATION OF ATMOSPHERIC STABILITY A. POSTED ATTACHMENT A   - EXAMPLES OF ATMOSPHERIC STABILITY Rev. No. l19                                        Page- 13 of   20
* I
 
* I
OBTAINING METEOROLOGICAL DATA                                  EAP-42 ATTACHMENT 1 MET DATA ACQUISITION QUICK REFERENCE FLOWCHART EDAMS
* A I , I , I , * , a I 2 30 I. .I I ...0 ...8.8 I..... ... I ...14.4...I I. I .20..... I 20...I 8.8 t -I- -I-I fILI-I ---- I 1.111 .1. 8 I.....I* I-I- s t --I.....I ........I- I. I 6 I 0. ., ., .I ., DI a'EAP-42 I .. .I.I ....I.I 5 <,S...J :00 :Z .5 Rev. No. 19 OBTAINING METEOROLOGICAL DATA EAP-42 ATTACHMENT 6 CLASSIFICATION OF ATMOSPHERIC STABILITY Page 1 of 1 CLASSIFICATION OF ATMOSPHERIC STABILITY BY THE VERTICAL TEMPERATURE DIFFERENCE AND BY THE STANDARD DEVIATION OF THE HORIZONTAL WIND DIRECTION TYPING SCHEMES STABILITY CLASSIFICATION PASQUILL CATEGORIES Temperature Change with height c/10Om*Sigma Theta-6 degrees'e degrees Median Value Extremely unstable Moderately unstable Slightly unstable Neutral Slightly stable Moderately stable Extremely stable STABILITY CLASSIFICATION A B C D E F G AT/AZ S -1.9-1.9 < AT/AZ S -1.7-1.7 < AT/AZ S -1.5-1.5 < AT/AZ S -0.5-0.5 < AT/AZ S 1.5 1.5 AT/AZ S 4.0 4.0 AT/AZ Delta T 100'PASQUILL, Temperature Change with CATEGORIES height F/70 Feet**aO , 22.5 > O 2 17.5 > O 12.5 > O 7.5 > o 22.5 17.5 12.5 7.5 3.8 3.8 > O 2.1 2.1 > 25. 0 20.0 15. 0 10. 0 5.0 2.5 1.7 Delta T 100'Temperature Change with heiaht F/170 Feet t Extremely unstable Moderately unstable Slightly unstable Neutral Slightly stable Moderately stable Extremely stable A AT/AZ S -0.73 B -0.73 AT/AZ S -0.65 C -0.65 < AT/AZ 5 -0.58 D -0.58 < AT/AZ S -0.19 E -0.19 < AT/Az S 0.58 F 0.58 < AT/Az 5 1.53 G 1.53 < AT/AZ-1.77-1.59-1.40-0.47 1.40 AT/AZ 5< AT/AZ < AT/AZ S< AT/Az 5< AT/Az 5< AT/AZ 5-1.77-1. 5 9-1.40-0.47 1.40 3.73 ATMOSPHERIC STABILITY CHARACTERIZATION A MID-AFTERNOON ONLY, WITH CLEAR SKIES OR SKIES WITH VERY FEW THIN CLOUDS; LATE SPRING TO EARLY FALL, WINDS USUALLY ARE BELOW 6 MILES PER HOUR.B LATE MORNING TO MID-AFTERNOON ONLY, WITH CLEAR OR PARTLY CLOUDY SKIES; MID-SPRING TO MID-FALL, WINDS ARE USUALLY BELOW 9 MILES PER HOUR.C LATE MORNING TO LATE AFTERNOON ONLY, WITH PARTLY CLOUDY SKIES; SPRING THROUGH FALL, WINDS ARE USUALLY BELOW 11 MILES PER HOUR.D ALL DAYTIME, WITH OVERCAST OR PARTLY CLOUDY SKIES OR EARLY MORNING AND LATE AFTERNOON WITH CLEAR OR PARTLY CLOUDY SKIES, ALL NIGHT TIME WITH OVERCAST SKIES OF PARTLY CLOUDY, YEAR AROUND, WINDS ARE MODERATE TO HIGH (GREATER THAN 6 MILES PER HOUR).E NIGHT TIME ONLY, WITH THIN OVERCAST OR PARTLY CLOUDY SKIES ALL YEAR AROUND, WINDS LESS THAN 10 MILES PER HOUR.F NIGHT TIME ONLY, WITH CLEAR TO PARTLY CLOUDY SKIES, ALL YEAR AROUND, WINDS LESS THAN 7 MILES PER HOUR.G NIGHT TIME ONLY, WITH CLEAR SKIES OR VERY FEW THIN CLOUDS, ALL YEAR AROUND, WINDS LESS THAN 5 MILES PER HOUR.* PER NRC REGULATORY GUIDE 1.123** ADJUSTED TO CORRESPOND TO THE AT MEASURED BETWEEN THE 30-FOOT AND 100-FOOT LEVELS.t ADJUSTED TO CORRESPOND TO THE AT MEASURED BETWEEN THE 30-FOOT AND 200-FOOT LEVELS.Page 19 of 20 3.73 < AT/AZ Rev. No. 19 PASQUILL:
* Select "Requery" with the mouse.
A VERY UNSTABLE BROOKIAVEN CLASS I March 20.2002 aa_. 27a 36 53 188'I ...........
Nine Mile
.. ..1. I. .I.... P.~~~~~~~~~~~~~
* Direct phone line to   Unit 1 CR: 349-2841 Unit 1 or 2 Control Room                               349-2842 349-2843 Commercial phone       Unit 2 CR: 349-2168 349-2169 349-2170 Analog Strip Charts
a -. .PASQUILL:
                                                                      ."L Any JAF Networked PC Other Resources
B.C UNSTABLE BROOKHAVEN CLASS 2.I MP I1.. , 1. ..168~I! ?__March 20. 2002>3 276 36 se ise 3...- ... ...lo-...... ...-Hr! bi ;,,,,;,,,,;,,,,;.,..
* Nine Mile Meteorological Building
..I .18 ]PASQUILL:
* National Weather Service (716-565-0014)
D,E NEUTRAL BROOKHAVEN CLASS 3 March 20. 2002..... ............  
Rev. No. 19                                        Page 14 of 20   ]L:
..l 1e 27e 368 96 180-;1!...................
 
lee.S.~~~~~~~~
OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT Page 1 of 1 Date:                                       Time:
..99 .66 2?1 368 99 ISO MPS4 lee.I. 1. .........
Release Type:
-ea PASQL'ILL:
Meteorology Wind Speed:             MPH     _     ft. level on     -"               Tower Other   (Specify)                     --   _E Wind Direction:         _     deg.       _ ft level- on                 Tower Other (Specify)
F, G STABLE BROOKHAVEN CLASS 4 March 20.2002 s6 186 276 66 96 18B.. ,,, .* ....... ......I..S..,..,. ..I....MP ,,c,,,,;,.
Stability Class:     _       (A - G)
;,,,,.. I. ...... NOTE: Recorders D, G, J: Wind speed increments----(trace 1, left side) Each dot ( = 2 units, Each vertical line ()- 4 units Wind direction increment-(trace 2, right side) Each dot (C) 9 units, Each vertical line (). 18 units Recorder K: Air temperature increment-(trace 1)Delta T increment--- (Trace 2 and 3)Each dot (1) -1.5 units, Each vertical line (I) -3 units Each dot (1 , 0.28 units, Each vertical line (C) -0.56 units Sigma Theta 50 increment--- (Trace 4)Each dot ) = 0.3 units, Each vertical line(i) 0.6 units Page 20 of 20 L., Rev. No. A ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4.REVISION 10 APPROVED BY: 4)A DATE: 02 RESPONSI3LE PROCEDU`Rt-WtER EFFECTIVE DATE: FIRST ISSUE 0 3 F R I FULL REVISION LIMITED REVISION PERIODIC REVIEW DUE DATE:*****************************
Method:               (Sigma Theta - wind variation)
*****************************
              - ____       (Temp. Difference - 30  -  200 ft)
* * * ** INFORMATIONAL USE *
              -__-_       (Temp. Difference  -  30 -  100 ft)
* TSR ** * * ******************************-
Estimation Other (Specify)
*****************************
Additional information EAP-42                     OBTAINING METEOROLOGICAL DATA       Page 15   of   20 Rev. No. 19
*******************  
 
**********
OBTAINING METEOROLOGICAL DATA                                 EAP-42 ATTACHMENT 3                 Page 1 of GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA                     L
: 1. If in the CR or TSC, then ensure black switch on met panels is set to Niagara Mohawk "B" position.
: 2. Ensure power to computer, monitor, and printer.
: 3. Select the "Login" icon from the EDAMS icons.
: 4. Select "Continue" at the plant picture screen.
: 5. For the CR, TSC or EOF select "Direct Connect to Met Data".
For SAS or simulator, select "Automatic Dial-in to Met Data".
: 6. When prompted, following login, select "Ok".
: 7. From the EDAMS icons select "Emergency Met Report".
: 8. Select "Continue" at the plant picture screen.
: 9. Select "James A. FitzPatrick" and "Both", then select "Ok".
: 10. If a stack release is occurring, or projected, then utilize:
Elevated data.
: 11. If a release from any source other than the stack is occurring, or projected, then utilize Ground data.
: 12. If no release is occurring, or projected, then utilize Elevated data.
: 13. If no data is available from the EDAMS computer, then utilize EAP-42 to obtain meteorological data from other sources.
Rev. No. 19                                   Page  16  of  20 II>
 
OBTAINING METEOROLOGICAL DATA                                                                                                                             E-AP-42 ATTACHMENT 4                                                                   Page 1 of 1 ANALOG WIND SPEED AND DIRECTION RECORDERS D, G AND J
        -+/-.19: Pe:
                                            .,I. I. I. P.         -. -.        .I. P F. . . .                     ......
d              1 98                188s                          3E8              9            183
                                                .  . . . .   . . . . .   .   . 2 .           . I     .   . .   .... . . . I . . . ...      .....
I  ..      .3.3t.
I.                  .
                                    .I-.         1.     - 1.3.I.1. 1.     .1   I. M         I   1.
                                                                                                      .     1.1.     . .1.1 u3     68               88             188 I                  I]
        .7:e
                                  . I           . . . I   .   . . . I   . . - . I.   .   . .       I   .     .
                                  .                                                  . RI.I        I  I I'-1I-      'I
                                                                                            .9B.             IB:                       - 36a                98            183 I.                                                                                                                         .     . . . I    . . . . I
        -2
        -:    aIS:        ,
                                    .........
                                                        ,. - ,          I 88I .I           188 , .
                                                              .         .                 id .1~
Rev. No.                   19                                                                                                Page          17        of      20
 
OBTAINING METEOROLOGICAL DATA                                                                                                                                        EAP-42 ATTACHMENT 5                                                                      Page                      of 1 RECORDER "K"
                                                                                                                        *t    I *I *t
* 2I I *I *I *I *A I ,I ,I , *,a I
  ! a'                                             6                      12
* 2                                        30 5...               I      ....             j. ........                       I..         .                   I       ..         .
I.               .
1.~~~~~~~
F j ~ I I.      .   .     .       .I                            I                                                  I    I. .
                                                                                                            .0 ...                   ...       ...
I    ... I.       I.
    -53                                        -2.1                      3.2                            8.8                                14.4                                        20
          . 3 : 88 :                  5
        .       ...         I..                         .   ....           I...         .3....            I..
I
                                                                                                                                      . .     . I
: 0. 0. 0. 0. , .0.               *3 IF
                                                                                      .. t.I.o..,.                   t -I-          -I-I          fILI-I        ----I          .....       I
    -8                                                                                                    8.8                                1.                                           20
    .....                       3. .
I   .   .   .  . I         .   ..                                         .   ..     ..                   . I     . .   .   . I.
I .           .   . I 111      .1.     8 I* I-I- s        t    - -I.
1~~~
5<                              .   .
                                                                          ]2 .   ..     ..    . 3.
88                                    110
                          ,S I.....                      . . . .            I .              .. I   ....        I..       .                              . . .         I  .   . .   . I       .
0.
I      ., ., . .,
I FIR            I.
DI                            ....... I- I. I
                                                                                                                  .. .. , .I...,...       . I0    ..     . .,    .     .....
a'                                              6                    12e                .             i8                                                                              30
    ... J        :00 :Z      .5 4K Rev. No.                             19                                                                                        Page                18        of                  20
 
OBTAINING METEOROLOGICAL DATA                                                            EAP-42 ATTACHMENT 6                             Page 1 of 1 CLASSIFICATION OF ATMOSPHERIC STABILITY CLASSIFICATION OF ATMOSPHERIC STABILITY BY THE VERTICAL TEMPERATURE DIFFERENCE AND BY THE STANDARD DEVIATION OF THE HORIZONTAL WIND DIRECTION TYPING SCHEMES Sigma Temperature Change with STABILITY                                                    Theta            'e degrees PASQUILL          height c/10Om*
CLASSIFICATION      CATEGORIES                                -6 degrees          Median Value Extremely unstable          A                  AT/AZ S -1.9          , aO    22.5         25. 0 Moderately unstable          B          -1.9 < AT/AZ S -1.7    22.5 >    O 2 17.5          20.0 Slightly unstable            C          -1.7  < AT/AZ S -1.5  17.5 >    O    12.5        15. 0 Neutral                     D         -1.5 < AT/AZ S -0.5    12.5 >    O    7.5         10. 0 Slightly stable              E          -0.5 < AT/AZ S     1.5 7.5 >  o      3.8          5.0 Moderately stable            F          1.5    AT/AZ S   4.0 3.8 >    O    2.1          2.5 Extremely stable            G                    4.0   AT/AZ   2.1 >                        1.7 Delta T 100'                 Delta T 100' STABILITY        PASQUILL,   Temperature Change with     Temperature Change with CLASSIFICATION      CATEGORIES       height F/70 Feet**         heiaht      F/170 Feet t Extremely unstable          A                  AT/AZ S -0.73                  AT/AZ 5 -1.77 Moderately unstable          B      -0.73      AT/AZ S  -0.65    -1.77 < AT/AZ        - 1. 5 9 Slightly unstable            C      -0.65 < AT/AZ 5 -0.58        -1.59    < AT/AZ S -1.40 Neutral                      D      -0.58  < AT/AZ S  -0.19    -1.40    < AT/Az 5 -0.47 Slightly stable              E      -0.19 < AT/Az S      0.58    -0.47    < AT/Az 5     1.40 Moderately stable            F        0.58 < AT/Az 5     1.53      1.40 < AT/AZ 5        3.73 Extremely stable             G                  1.53 < AT/AZ                   3.73 < AT/AZ ATMOSPHERIC STABILITY                                  CHARACTERIZATION A        MID-AFTERNOON ONLY, WITH CLEAR SKIES OR SKIES WITH VERY FEW THIN CLOUDS; LATE SPRING TO EARLY FALL, WINDS USUALLY ARE BELOW 6 MILES PER HOUR.
B        LATE MORNING TO MID-AFTERNOON ONLY, WITH CLEAR OR PARTLY CLOUDY SKIES; MID-SPRING TO MID-FALL, WINDS ARE USUALLY BELOW 9 MILES PER HOUR.
C        LATE MORNING TO LATE AFTERNOON ONLY, WITH PARTLY CLOUDY SKIES; SPRING THROUGH FALL, WINDS ARE USUALLY BELOW 11 MILES PER HOUR.
D        ALL DAYTIME, WITH OVERCAST OR PARTLY CLOUDY SKIES OR EARLY MORNING AND LATE AFTERNOON WITH CLEAR OR PARTLY CLOUDY SKIES, ALL NIGHT TIME WITH OVERCAST SKIES OF PARTLY CLOUDY, YEAR AROUND, WINDS ARE MODERATE TO HIGH (GREATER THAN 6 MILES PER HOUR).
E        NIGHT TIME ONLY, WITH THIN OVERCAST OR PARTLY CLOUDY SKIES ALL YEAR AROUND, WINDS LESS THAN 10 MILES PER HOUR.
F        NIGHT TIME ONLY, WITH CLEAR TO PARTLY CLOUDY SKIES, ALL YEAR AROUND, WINDS LESS THAN 7 MILES PER HOUR.
G        NIGHT TIME ONLY, WITH CLEAR SKIES OR VERY FEW THIN CLOUDS, ALL YEAR AROUND, WINDS LESS THAN 5 MILES PER HOUR.
* PER NRC REGULATORY    GUIDE 1.123
  **    ADJUSTED TO  CORRESPOND    TO THE AT MEASURED BETWEEN THE 30-FOOT AND 100-FOOT          LEVELS.
t    ADJUSTED  TO CORRESPOND TO THE AT MEASURED BETWEEN THE 30-FOOT AND 200-FOOT            LEVELS.
Rev. No.     19                                                Page      19    of    20
 
PASQUILL: A                                                                        PASQUILL: B.C VERY UNSTABLE                                                                                    UNSTABLE BROOKIAVEN CLASS I                                                                    BROOKHAVEN CLASS 2 March 20.2002                                                                    __March            20. 2002                                  L aa_. 27a                36    53        188'                                      >3              276            36        se  ise I ...........
                                                                                                  . I MP      I1
                                        ... .1.            I.  .          I....                    1. , ..                                                                   ..
3...-              ...      .    ..
168~
                                                                                                    ? I!
P.~~~~~~~~~~~~~
a -.                  .
                                                                                                        .            I lo Hr!  bi        ;,,,,;,,,,;,,,,;.,..
18        ]
PASQUILL: D,E NEUTRAL                                                                PASQL'ILL: F, G STABLE BROOKHAVEN CLASS 3 BROOKHAVEN CLASS 4 l 1e March 20. 2002 March 20.2002 27e      368    96 180                          s6          186              276              66      96 18B
                                  -                ;1!..
                                                                        .S.~~~~~~~~
lee S..,..,. .. I....             I                ..
ea 99          .66 2?1                 368    99 ISO MP
                                                                                                ,,c,,,,;,.                                       I.
MPS4 lee.I. -                                1.    .........
NOTE:
Recorders D, G, J:
Wind speed increments----(trace 1, left side)                                      Each dot  (    =      2 units, Each vertical line                                    ()- 4 units Wind direction increment-(trace 2, right side)                                    Each dot  (C)        9 units, Each vertical line                                    (). 18 units Recorder K:
Air temperature increment-(trace 1)                                      Each dot (1)  - 1.5 units,             Each vertical line (I) - 3 units Delta T increment--- (Trace 2 and 3)                                      Each dot (1    , 0.28 units, Each vertical line (C) - 0.56 units Sigma Theta 50 increment--- (Trace 4)Each dot                                    ) = 0.3 units, Each vertical line(i)                                            0.6 units Rev. No.           A                                                                                                                      Page              20    of  20
 
ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4.
REVISION 10 APPROVED BY:                          4)            A RESPONSI3LE PROCEDU`Rt-WtER DATE:      02 EFFECTIVE DATE:
F      R 3
I FIRST ISSUE 0                                        FULL REVISION                          LIMITED REVISION
* INFORMATIONAL USE                          *
* TSR            *
* ADMINISTRATIVE
* ADMINISTRATIVE
* CONROLLED COPYi X****** *******************
* CONROLLED COPYi                     X PERIODIC REVIEW DUE DATE:                                    June 2007
****June 2007 OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 REVISION  
 
OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD                                     SAP-4 REVISION  


==SUMMARY==
==SUMMARY==
SHEET REV. NO.10
SHEET I
* Changed the title.* Deleted NYS ID cards.* Changed Emergency Planning Coordinator to Emergency Planning Manager.9
REV. NO.
* Changed Power Authority title to Entergy throughout entire procedure due to company name change.* In section 4.1 changed Form SAP-4.1 to Attachment 1.* Deleted attachment 3 -ID System Control Cards and reference to it (section 4.2).8
10
* Updated the Oswego County Emergency Management Office photo ID card,* Added Drill and Walkthrough dates to attachment 1.7
* Changed the title.
* Section 4.1 deleted sentence stating that Personnel Dept. will collect the ID cards and will forward them to the E-Plan Coord.* Section 4.4 deleted sentence stating forms for original card will be returned to the E-Plan Dept.6
* Deleted NYS ID cards.
* Editorial corrections in section 4.2. 6 Reformat per AP-02.01, Rev. 5.* Editorial corrections to the following sections:
* Changed Emergency Planning Coordinator to Emergency Planning Manager.
4.1, 4.2 and 5.0.Page 2 of 7 I I Rev. No. 1 0 OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 TABLE OF CONTENTS SECTION 1.0 2.0 3.0 4.0 5.0 Rev. No.PA GE PURPOSE ....................................
9
4...........4 REFERENCES  
* Changed Power Authority title to Entergy throughout entire procedure due to company name change.
.............................................
* In section 4.1 changed Form SAP-4.1 to Attachment 1.
4 INITIATING EVENTS ......................................
* Deleted attachment 3 - ID System Control Cards and reference to it (section 4.2).
4 PROCEDURE  
8
..............................................
* Updated the Oswego County Emergency Management Office photo ID card,
4 ATTACHMENTS  
* Added Drill and Walkthrough dates to attachment 1.
............................................
I 7
5 1. AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD ....6 2. OSWEGO COUNTY PHOTO IDENTIFICATION CARD .............
* Section 4.1 deleted sentence stating that Personnel Dept. will collect the ID cards and will forward them to the E-Plan Coord.
7 10 Page 3 of 7 OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 1.0 PURPOSE This procedure describes the process to be followed for the issuance and control of Oswego County Emergency Prepared-ness Photo Identification Cards. The identification cards are to be used to provide a means of identification for Entergy personnel and vendors who may be called upon to cross police or military barriers during an emergency at the JAFNPP.
* Section 4.4 deleted sentence stating forms for original card will be returned to the E-Plan Dept.
6
* Editorial corrections in section 4.2. 6 Reformat per AP-02.01, Rev. 5.
* Editorial corrections to the following sections: 4.1, 4.2 and 5.0.
Rev. No. 10                                      Page 2 of 7
 
OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD                                     SAP-4 TABLE OF CONTENTS SECTION                                                       PA GE 1.0     PURPOSE ....................................               4..........
 
==2.0      REFERENCES==
............................................. 4 3.0      INITIATING EVENTS ...................................... 4 4.0      PROCEDURE .............................................. 4 5.0      ATTACHMENTS     ............................................
5
: 1. AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD .... 6
: 2. OSWEGO COUNTY PHOTO IDENTIFICATION CARD ............. 7 Rev. No. 10                                       Page 3 of   7
 
OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD                                   SAP-4 1.0 PURPOSE This procedure describes the process to be followed for the issuance and control of Oswego County Emergency Prepared-ness Photo Identification Cards. The identification cards are to be used to provide a means of identification for Entergy personnel and vendors who may be called upon to cross police or military barriers during an emergency at the JAFNPP.


==2.0 REFERENCES==
==2.0 REFERENCES==


None 3.0 INITIATING EVENTS None 4.0 PROCEDURE 4.1 Authorization and Control of ID Cards ID cards will be issued after the completion of Attachment 1, Authorization for Issuance of the Oswego County Emergency Preparedness Photo Identification Card. Forms require the signature of a Training Department representative and the Emergency Planning Manager or designee before cards can be issued. The completed Attachment 1 will be maintained by the Security Department.
None 3.0 INITIATING EVENTS None 4.0 PROCEDURE 4.1 Authorization and Control of ID Cards ID cards will be issued after the completion of Attachment 1, Authorization for Issuance of the Oswego County Emergency Preparedness Photo Identification Card. Forms require the signature of a Training Department representative and the Emergency Planning Manager or designee before cards can be issued. The completed Attachment 1 will be maintained by the Security Department.
4.2 Issuance of Identification Cards Identification cards, as illustrated on Attachment 2, will be issued by the Security Department.
4.2 Issuance of Identification Cards Identification cards, as illustrated on Attachment 2, will be issued by the Security Department. Photographs will be taken, and cards produced upon security receiving Attachment 1.
Photographs will be taken, and cards produced upon security receiving Attachment 1.4.3 Display of Identification Cards Cards are issued to Emergency Team Members to allow emergency access through Military and/or Police Control Points throughout Oswego County during an emergency at the JAFNPP. Cards should be used only for this purpose.Rev. No. 10 Page 4 of 7 OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 4.4 Replacement of Identification Cards If a photo identification card is lost or becomes unusable through damage or contamination, a replacement photo identification card shall be issued following the same procedure listed above.5.0 ATTACHMENTS
4.3 Display of Identification Cards Cards are issued to Emergency Team Members to allow emergency access through Military and/or Police Control Points throughout Oswego County during an emergency at the JAFNPP. Cards should be used only for this purpose.
: 1. AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD 2. OSWEGO COUNTY PHOTO IDENTIFICATION CARD Page 5 of 7 Rev. No. 1 0 AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD Page 1 of 1 Authorization Request for NAME 1t SOCIAL SECURITY NO.Date of Issuance Identification  
Rev. No. 10                                     Page   4 of   7
# from Card Expiration Date The above designated individual has completed all pertinent Emergency Plan Training, and I request that an Identification Card be issued for his/her use.Training Dept. Representative Training Dept. Representative Training Dept. Representative Date Training Received Date of Last Drill Date of Walkthrough The above individual is authorized to receive an Identification Card.Emergency Planning Manager Date This form will be retained by the Security Department.
 
A copy will be forwarded to the Training Manager.Date of Card Returned , SAP-4 OSWEGO COUNTY EMERGENCY PREPAREDNESS ATTACHMENT 1 Rev. No. 10 PHOTO IDENTIFICATION CARD Page 6 of 7 OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 ATTACHMENT 2 OSWEGO COUNTY PHOTO IDENTIFICATION CARD (Sample)AUTHORIZED ACCESS CONTROL IDENTIFICATION CARD (Example)-: ;e Oueti?)Emeicer-y
OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD                                   SAP-4 4.4 Replacement of Identification Cards If a photo identification card is lost or becomes unusable through damage or contamination, a replacement photo identification card shall be issued following the same procedure listed above.
-. i. ~~~Ph(.! -w_ iY2; oto!re ERGY New Yorkr Executlt Law ART. 2-F TMs ard will be displayed a atl teme tI d Neu nate Dite Issued iD urnb,er Eur Daztr Black on Light Green Page 7 of 7 Rev. No. 1 0 ENTERGY NUCLEAR OPERATIONS, INC.JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 REVISION 2 APPROVED BY: 44 DATE: </ /1 RESPONSIBLE PROCEDURE bWNER EFFECTIVE DATE: FIRST ISSUE /212k, 99, R 9 03 WULL REVISION LIMITED REVISION PERIODIC REVIEW DUE DATE: 6*****************************
5.0 ATTACHMENTS
*****************************
: 1. AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD
* * * ** INFORMATIONAL USE *
: 2. OSWEGO COUNTY PHOTO IDENTIFICATION CARD Rev. No. 10                                      Page 5 of   7
* TSR ** * * ******************************  
 
*****************************
AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD Page 1 of 1 Authorization Request for 1t NAME                                   SOCIAL SECURITY NO.
** ******* * ****** *** ******* ADMINISTRATIVE
Date of Issuance           Identification # from Card Expiration Date The above designated individual has completed all pertinent Emergency Plan Training, and I request that an Identification Card be issued for his/her use.
* CONTROLLED COPY # >* *~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~oo L?
Training Dept. Representative     Date Training Received Training Dept. Representative     Date of Last Drill Training Dept. Representative      Date of Walkthrough The above individual is authorized to receive an Identification Card.
EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 REVISION  
Emergency Planning Manager             Date This form will be retained by the Security Department. A copy will be forwarded to the Training Manager.
Date of Card Returned SAP-4             OSWEGO COUNTY EMERGENCY PREPAREDNESS       ATTACHMENT 1 Rev. No. 10           PHOTO IDENTIFICATION CARD         Page 6 of 7
 
OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD                                                           SAP-4 ATTACHMENT 2 OSWEGO COUNTY PHOTO IDENTIFICATION CARD (Sample)
AUTHORIZED ACCESS CONTROL IDENTIFICATION CARD                       (Example)
                              -: ;e           Oueti?)Emeicer-y
                                      -.                   i.   ~~~Ph(.
oto
                                                                    !re
                                    !   -w_       iY2; ERGY New Yorkr Executlt     Law ART. 2-F TMs ard will be displayed a atl teme tI d Neu nate Dite Issued       iD   urnb,er   Eur Daztr Black on Light Green Rev. No. 10                                                            Page 7 of   7
 
ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 REVISION 2 APPROVED BY:                   44                                                     DATE:   </ /1 RESPONSIBLE PROCEDURE bWNER EFFECTIVE DATE:                   /212k,       99, R           9 03 FIRST ISSUE                                WULL REVISION                         LIMITED REVISION
* INFORMATIONAL USE                   *
* TSR           *
* ADMINISTRATIVE
* CONTROLLED COPY #                   >
                              *                   *~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
PERIODIC REVIEW DUE DATE:                      -Mw                ;    oo         L?
6
 
II EMERGENCY PLANNING PROGRAM SELF ASSESSMENT                   SAP-22 REVISION  


==SUMMARY==
==SUMMARY==
SHEET REV. NO.2
SHEET                     1.,
* Added criteria for senior management participation in critique process.* Changed NYPA to Entergy.* Updated References.
REV. NO.
* Changed Emergency Planning Coordinator to Emergency Planning Manager.1
2
* Added the word Example to 5.1 Performance Measures and Criteria.* Changed formatting in section 5.2.1, so staff complies with AP-03.07 0
* Added criteria for senior management participation in critique process.
* Changed NYPA to Entergy.
* Updated References.
* Changed Emergency Planning Coordinator to Emergency Planning Manager.
1
* Added the word Example to 5.1 Performance Measures and Criteria.
* Changed formatting in section 5.2.1, so staff complies with AP-03.07 0
* New procedure to perform the following:
* New procedure to perform the following:
* To provide a methodology for conducting periodic Emergency Planning self assessment.
* To provide a methodology for conducting periodic Emergency Planning self assessment.
Page 2 of 8 II 1., Rev. No. 2 EMERGENCY PLANNING PROGRAM SELF ASSESSMENT TABLE OF CONTENTS PURPOSE ...................................
Rev. No. 2                                         Page of 8
REFERENCES................................
INITIATING EVENTS .........................
SPECIAL INSTRUCTIONS
......................
PROCEDURE
.................................
Performance Measures and Criteria Examples Format and Special Information............
ATTACHMENTS
................................
PAGE..............
4...............
4..............
4.............
4..............
4..............
4..............
8..............
8 Page 3 of 8 SECTION 1.0 2.0 3.0 4.0 5.0 5.1 5.2 6.0---SAP-22 Rev. No. 2 EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 1.0 PURPOSE To provide direction for performing Emergency Planning self assessment.
This document provides attributes of an effective Emergency Planning program. It also provides objective criteria to consider when conducting EP self assessments using a "questioning" format.


==2.0 REFERENCES==
EMERGENCY PLANNING PROGRAM SELF ASSESSMENT                  SAP-22 TABLE OF CONTENTS SECTION                                                        PAGE 1.0     PURPOSE ...................................                4


2.1 ENN-LI-104 Self-Assessment and Benchmark Process.3.0 INITIATING EVENTS None 4.0 SPECIAL INSTRUCTIONS The following documents may also be utilized for guidance in the performance of self assessment.
==2.0      REFERENCES==
4.1 INPO 85-014, Generic Guidance for Emergency Preparedness Program Review.4.2 NRC Inspection Modules.4.3 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.5.0 PROCEDURE 5.1 Performance Measures and Criteria Examples 5.1.1 The Emergency Response Organization can provide a quality response to actual plant events and drill/exercise scenarios.
................................                4 3.0      INITIATING EVENTS .........................                4 4.0      SPECIAL INSTRUCTIONS ......................                4 5.0      PROCEDURE .................................                4 5.1     Performance Measures and Criteria Examples                4 5.2      Format and Special Information............                8 6.0      ATTACHMENTS ................................              8 Rev. No. 2                                        Page  3 of  8
Criteria: A. Were plant events correctly diagnosed?
 
EMERGENCY PLANNING PROGRAM SELF ASSESSMENT                  SAP-22 1.0  PURPOSE To provide direction for performing Emergency Planning self assessment. This document provides attributes of an effective Emergency Planning program. It also provides objective criteria to consider when conducting EP self assessments using a "questioning" format.
 
==2.0  REFERENCES==
 
2.1  ENN-LI-104 Self-Assessment and Benchmark Process.
3.0 INITIATING EVENTS None 4.0 SPECIAL INSTRUCTIONS The following documents may also be utilized for guidance in the performance of self assessment.
4.1 INPO 85-014, Generic Guidance for Emergency Preparedness Program Review.
4.2 NRC Inspection Modules.
4.3 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
5.0 PROCEDURE 5.1 Performance Measures and Criteria Examples 5.1.1     The Emergency Response Organization can provide a quality response to actual plant events and drill/
exercise scenarios.
Criteria:
A. Were plant events correctly diagnosed?
B. Were timely offsite notifications performed?
B. Were timely offsite notifications performed?
C. Were Emergency Response Facilities staffed in a timely manner?D. Were correct recommendations made to offsite agencies?Rev. No. 2 Page 4 of 8 EMERGENCY PLANNING PROGRAM SELF ASSESSMENT.
C. Were Emergency Response Facilities staffed in a timely manner?
E. Were plant repair and radiological field teams 3rapidly deployed?F. Was all needed information available from logs and records?G. Is industry experience used in resolution of problems?H. Are causes of plant events correctly identified to prevent recurrence?
D. Were correct recommendations made to offsite agencies?
5.1.2 Senior management is supportive and involved in EP activities.
Rev. No. 2                                       Page 4 of 8
Criteria: A. Are management expectations clearly communicated to Emergency Response Organization members?B. Are personnel held accountable for emergency preparedness activities?
 
C. Do senior staff and managers participate in drills on a periodic basis?D. Is senior plant staff kept current on the status of EP program activities?
EMERGENCY PLANNING PROGRAM SELF ASSESSMENT.                 SAP-22 E. Were plant repair and radiological field teams 3rapidly deployed?
E. Do senior staff managers attend EP, QA and NRC entrance and exit meetings?F. Do senior staff members attend required EP training without last minute cancellations or causing special classes to be offered?G. Do senior staff and managers participate in the drill critique process?5.1.3 Plant departments are involved in, and display strong support for, the EP program.Criteria: A. Do plant departments suggest topics or continuing training needs for their ERO members?Rev. No. 2 Page 5 of 8 SAP-22 EMERGENCY PLANNING PROGRAM SELF ASSESSMENT B. Do managers participate in drills/exercises?
F. Was all needed information available from logs and records?
i C. Do plant personnel exhibit a positive attitude toward drills and exercises (good drillsmanship)?
G. Is industry experience used in resolution of problems?
H. Are causes of plant events correctly identified to prevent recurrence?
5.1.2   Senior management is supportive and involved in EP activities.
Criteria:
A. Are management expectations clearly communicated to Emergency Response Organization members?
B. Are personnel held accountable for emergency preparedness activities?
C. Do senior staff and managers participate in drills on a periodic basis?
D. Is senior plant staff kept current on the status of EP program activities?
E. Do senior staff managers attend EP, QA and NRC entrance and exit meetings?
F. Do senior staff members attend required EP training without last minute cancellations or causing special classes to be offered?
G. Do senior staff and managers participate in the drill critique process?
5.1.3   Plant departments are involved in, and display strong support for, the EP program.
Criteria:
A. Do plant departments suggest topics or continuing training needs for their ERO members?
Rev. No. 2                                     Page   5 of 8
 
EMERGENCY PLANNING PROGRAM SELF ASSESSMENT                 SAP-22 B. Do managers participate in drills/exercises?     i C. Do plant personnel exhibit a positive attitude toward drills and exercises (good drillsmanship)?
D. Are plant departments willing to participate in scenario development?
D. Are plant departments willing to participate in scenario development?
5.1.4 EP training develops and maintains the knowledge and skills necessary for ERO personnel to effectively respond to an emergency.
5.1.4   EP training develops and maintains the knowledge and skills necessary for ERO personnel to effectively respond to an emergency.
Criteria: A. Is EP training an ongoing function and not limited to preparing for observed exercises?
Criteria:
B. Are only trained and qualified personnel assigned to the ERO? Is training tracked?C. Is training integrated into the drill/exercise corrective action/improvement program?D. Is training feedback effectively used to improve the EP program?5.1.5 A strong state and local interface builds and maintains trust in JAF's capability to effectively operate the plant and emphasizes Entergy's concern for the protection of the general public.Criteria: A. Is there an atmosphere of trust and cooperation between key plant staff and offsite officials?
A. Is EP training an ongoing function and not limited to preparing for observed exercises?
B. Are there an excessive number of unresolved offsite issues?C. Are there any 10CFR50.54(t) review offsite issues? Is this number excessive?
B. Are only trained and qualified personnel assigned to the ERO? Is training tracked?
C. Is training integrated into the drill/exercise corrective action/improvement program?
D. Is training feedback effectively used to improve the EP program?
5.1.5   A strong state and local interface builds and maintains trust in JAF's capability to effectively operate the plant and emphasizes Entergy's concern for the protection of the general public.
Criteria:
A. Is there an atmosphere of trust and cooperation between key plant staff and offsite officials?
B. Are there an excessive number of unresolved offsite issues?
C. Are there any 10CFR50.54(t) review offsite issues? Is this number excessive?
D. Are significant offsite issues resolved using formal methods of communication/correspondence?
D. Are significant offsite issues resolved using formal methods of communication/correspondence?
E. Are State and local agencies involved in media L training?
E. Are State and local agencies involved in media training? Is the media responsive to this L
Is the media responsive to this method?Page 6 of 8 SAP-22 Rev. No. 2 EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 5.1.6 EP open items are effectively resolved.Criteria: A. Is there a procedure for the generation and resolution of open items?B. Are requests for extensions of due dates processed in accordance with procedures?
method?
C. Are-methods in place to track and resolve: 1. significant issues (NRC, QA, FEMA findings)2. areas for improvement
Rev. No. 2                                       Page 6  of  8
: 3. significant recurring issues?5.1.7 A strong ongoing improvement program is being maintained.
 
Criteria: A. Are NRC, QA and FEMA inspections/audits given appropriate attention?
EMERGENCY PLANNING PROGRAM SELF ASSESSMENT                 SAP-22 5.1.6   EP open items are effectively resolved.
B. Is EP integrated into the JAF Business Plan?C. Are "lessons learned" developed and distributed to appropriate personnel?
Criteria:
D. Is feedback from internal and external sources factored back into the program?E. Is the resolution of open items formally assigned to staff members?5.1.8 Emergency facility and equipment adequately support emergency response operations.
A. Is there a procedure for the generation and resolution of open items?
Criteria: A. Is a scheduled periodic review of ERFs performed to ensure operational readiness?
B. Are requests for extensions of due dates processed in accordance with procedures?
B. Is verification of equipment operability during drills or actual events documented and resolved?Rev. No. 2 Page 7 of 8 EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 C. Is surveillance/maintenance of emergency equipment given to departments normally responsible for similar equipment?
C. Are-methods in place to track and resolve:
5.1.9 Administrative procedures are in effect for handling administrative details associated with the routine maintenance of the program.Criteria: A. Have feedback comments, received from training or other activities regarding the need to change the procedures, been incorporated into the plan or procedures?
: 1. significant issues (NRC, QA, FEMA findings)
: 2. areas for improvement
: 3. significant recurring issues?
5.1.7   A strong ongoing improvement program is being maintained.
Criteria:
A. Are NRC, QA and FEMA inspections/audits given appropriate attention?
B. Is EP integrated into the JAF Business Plan?
C. Are "lessons learned" developed and distributed to appropriate personnel?
D. Is feedback from internal and external sources factored back into the program?
E. Is the resolution of open items formally assigned to staff members?
5.1.8   Emergency facility and equipment adequately support emergency response operations.
Criteria:
A. Is a scheduled periodic review of ERFs performed to ensure operational readiness?
B. Is verification of equipment operability during drills or actual events documented and resolved?
Rev. No. 2                                       Page 7   of 8
 
I-EMERGENCY PLANNING PROGRAM SELF ASSESSMENT                 SAP-22 C. Is surveillance/maintenance of emergency equipment given to departments normally responsible for similar equipment?
5.1.9   Administrative procedures are in effect for handling administrative details associated with the routine maintenance of the program.
Criteria:
A. Have feedback comments, received from training or other activities regarding the need to change the procedures, been incorporated into the plan or procedures?
B. Are actual event reports, surveillances, corrective actions and drill reports processed in accordance with procedures?
B. Are actual event reports, surveillances, corrective actions and drill reports processed in accordance with procedures?
5.2 Format and Special Information 5.2.1 Assessments will be conducted in accordance with ENN-LI-104, Self Assessment and Benchmark Process.5.2.2 The self assessment shall be performed by the Emergency Planning Manager or an individual(s) assigned.5.2.3 The performance measure(s) should be benchmarked with another utility, that has been recognized for excellence in the designated area.6.0 ATTACHMENTS None Page 8 of 8 I-Rev. No. 2}}
5.2 Format and Special Information 5.2.1   Assessments will be conducted in accordance with ENN-LI-104, Self Assessment and Benchmark Process.
5.2.2   The self assessment shall be performed by the Emergency Planning Manager or an individual(s) assigned.
5.2.3   The performance measure(s) should be benchmarked with another utility, that has been recognized for excellence in the designated area.
6.0 ATTACHMENTS None Rev. No. 2                                     Page  8  of  8}}

Latest revision as of 11:32, 22 March 2020

Revisions to Emergency Plan Implementing Procedures, Including Rev 6 to EAP-29, EOF Ventilation Isolation During an Emergency & Rev 1 to EAP-30, Emergency Termination & Transition to Recovery.
ML031500158
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/19/2003
From:
Entergy Nuclear Northeast
To:
Office of Nuclear Reactor Regulation
References
-RFPFR
Download: ML031500158 (80)


Text

EMERGENCY PLAN IMPLEMENTING PROCEDURESfVOLUME 3 UPDATE LIST CONTROLLED COPY #

Date of Issue: MAY 19, 2003 re r~cedu'r'e Procedure

~~

Procedure o Usp of "A~Dte Revision ~~~~~ ~~Last Ueo Nu ber Title um er Procedure Review , ______LE_X_.

N/A TABLE OF CONTENTS REV. 23 12/98 N/A EAP-26 PLANT DATA ACQUISITION SYSTEM REV. 12 11/02 Infornational

___ ___ __ ACCESS _ _ _ _ _

ESTIMATION OF POPULATION DOSE EAP-27 WITHIN I 0 MILE EMERGENCY PLANNING REV. I 0 06/02 Informational

____ ____ ZONE _ _ _ _

EAP-28 EMERGENCY RESPONSE DATA SYSTEM REV. 6 07/00 Reference

________(ERDS) ACTIVATION EAP-29 EOF VENTILATION ISOLATION DURING REV. 5 02/98 Informational

________AN EMERGENCY EAP-30 ERNCY T ER T REV. 1 05/03 Informational

________TRANSITION TO RECOVERY*

EAP-31 RECOVERY MANAGER* REV. 2 05/03 Informational EAP-32 RECOVERY SUPPORT GROUP* REV. 8 02/02 Informational DEVELOPMENT OF A RECOVERY ACTION EAP-33 PA*REV. 1 05/03 Informational ACCEPTANCE OF ENVIRONMENTAL EAP-34 SAMPLES AT THE EOF/EL DURING AN RE. 05/03 Informational EMERGENCY EAP-35 EOF TLD ISSUANCE DURING AN REV. ~0/3 nomtoa EAP-35____ EMERGENCY 05/03 Informational EAP-36 ENVIRONMENTAL LABORATORY USE REV. 45 05/03 Informational DURING AN EMERGENCY SECURITY OF THE EOF AND EL DURING EAP-37 DRILLS, EXERCISES AND ACTUAL RE. 02/03 Informational EVENTS EAP-39 DELETED (02/95)

EAP-40 DELETED (02/98)

EAP-41 DELETED (12/85)

EAP-42 OBTAINING METEOROLOGICAL DATA REV. 19 05/03 Informational EAP-43 EMERGENCY FACILITIES LONG TERM REV. 60 05/03 Informational STAFFING EAP-44 CORE DAMAGE ESTIMATION REV. 4 06/02 Informational EMERGENCY RESPONSE DATA SYSTEM EAP-45 (ERDS CONFIGURATION CONTROL REV. 6 07/00 Informational PROGRAM)

SAP-I MAINTAINING EMERGENCY REV. 17 02/03 Informational PREPAREDNESS SAP-2 EMERGENCY EQUIPMENT INVENTORY REV. 35 01/03 Reference SAP-3 EMERGENCY COMMUNICATIONS REV. 73 02/03 Reference SAP____3 _ TESTING 1 ofr2 Page of 2

EMERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 3 UPDATE LIST Date of Issue: MAY 19, 2003 I: .. T I E'-.

iL IIDate of' % I I Procedure Procedure Revision

,LR1

-aist i

, seof

. Number, Title`- ;0 Number. .tProcedure

~Review,. irr;M ,~ !i'.t2

<5C?

SAP4 NYS/OSWEGO COUNTY EMERGENCY Informational PREPAREDNESS PHOTO IDENTIFICATION REV. 10 05/03 CARDS SAP-5 DELETED (3/98)

SAP-6 DRILL/EXERCISE CONDUCT REV. 19 03/03 Informational SAP-7 MONTHLY SURVEILLANCE PROCEDURE Infonnational FOR ON-CALL EMPLOYEES REV. 36 08/02 SAP-8 PROMPT NOTIFICATION SYSTEM Informational FAILURE/SIREN SYSTEM FALSE REV. 13 12/02 ACTIVATION SAP-9 DELETED (02/94)

SAP-10 METEOROLOGICAL MONITORING REV 11 03/02 Informational SYSTEM SURVEILLANCE REV.II_3_0 SAP-l1 EOF DOCUMENT CONTROL REV. 11 06/02 Informational SAP-13 EOF SECURITY AND FIRE ALARM Informational SYSTEMS DURING NORMAL OPERATIONS REV. 4 06/02 SAP-14 DELETED (02/95)

SAP-15 DELETED (11/92)

SAP-16 UTILIZING EPIC IDT TERMINALS FROM Informational DESTINY SYSTEM REV. 4 06/02 SAP-17 EMERGENCY RESPONSE DATA SYSTEM Continuous (ERDS) QUARTERLY TESTING REV. 7 07/00 SAP-19 SEVERE WEATHER REV. 4 01/01 Informational SAP-20 EMERGENCY PLAN ASSIGNMENTS REV. 21 08/02 Informational SAP-21 DELETED (04/01)

SAP-22 EMERGENCY PLANNING PROGRAM SELF REV. 2 05/03 Informational ASSESSM ENT -_R_.____________0/0 Page 2 of 2

~-d.N ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN MPLEMENTING PROCEDURE EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 REVISION 6 APPROVED BY: DATE:

.0e/ ..

IRESPONSIBI,rPROCEDURE0 EFFECTIVE DATE: Indi')

0 f~~~~~~~~~62Q

~Q 0-FIRST ISSUE FULL REVISION LIMITED REVISION 0

  • INFORMATIONAL USE *
  • TSR *
                                  • '**** ********.U
  • CONTROLLED COPY
  • ADMINISTRATIVE
  • PERIODIC REVIEW DUE DATE: -Mdu r2zoo 1

EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 REVISION

SUMMARY

SHEET REV. NO. CHANGE AND REASON FOR CHANGE 6

  • Name change on cover sheet to Entergy Nuclear Operations, Inc.
  • Revised Section 5.0 to add steps for JNC and revise wording for EOF.
  • Changed NRC office to JAF IT/Tech Assessment Room in Section 5.1.1.

5

  • Change to the designation of Recovery Manager office to NRC office due to reorganization of the EOF for joint use.

4

  • Change description that was part of a procedure step into a NOTE for better clarity.

I.'

-Rev. No. 6 Page 2 of 5

t EO. VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE ............................. 4

2.0 REFERENCES

............................. 4 2.1 Performance References ............................. 4 2.2 Developmental References ............................. 4 3.0 INITIATING EVENTS .............................. 4 4.0 RESPONSIBILITIES .............................. 4 5.0 PROCEDURE ...................... 4 6.0 ATTACHMENTS .............................. 5 Rev. No. 6 Page 3 of 5

EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 1.0 PURPOSE '

The purpose of this procedure is to provide instruction necessary to shut down the ventilation system during use of the Emergency Operation Facility (EOF) in an emergency.

2.0 REFERENCES

2.1 Performance References None 2.2 Developmental References 2.2.1 NUREG-0696, FUNCTIONAL CRITERIA FOR EMERGENCY RESPONSE FACILITIES 2.2.2 IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS 2.2.3 EAP-14.2, EOF ACTIVATION 2.2.4 EAP-14.6, HABITABILITY OF THE EMERGENCY FACILITIES 3.0 INITIATING EVENTS I

A decision has been made by the Radiological Support Coordinator to implement this procedure.

4.0 RESPONSIBILITIES 4.1 The EOF Manager will have the ultimate responsibility to ensure that this procedure is enacted, if necessary.

4.2 As EOF personnel arrive, they shall ascertain if the EOF is being activated per the EOF activation procedure, currently EAP-14.2. If necessary, the EOF Manager will instruct personnel to initiate this procedure.

5.0 PROCEDURE NOTE: The EOF and Environmental Lab, located approximately 11 miles from JAFNPP, are considered in this procedure two separate facilities. Each has its own separate ventilation system and controls.

J-Rev. No. 6 Page 4 of 5

EOF VENTILATION ISOLATION DURING AN EMERGENCY EAP-29 5.1 If radiological conditions warrant isolation of EOF ventilation, perform the -following:

5.1.1 Manually turn the EOF ventilation system to the OFF position using the thermostat located in the JAF IT/Tech Assessment Room.

5.1.2 Manually turn the Environmental Lab ventilation system to the OFF position using the thermostat located in the Environmental Supervisor's office.

5.1.3 The Environmental Lab fume exhaust hoods should normally be turned off to minimize the infiltration of outside air into the building.

5.1.4 Consider securing the ventilation system of the adjacent JNC in a similar manner.

NOTE: NUREG-0696, Functional Criteria For Emergency Response Facilities (Table 2, pg. 18) does not require ventilation isolation past 10 miles from JAFNPP.

6.0 ATTACHMENTS NONE Rev. No. 6 Page 5 of 5

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EMERGENCY TERMINATION AND TRANSITION TO RECOVERY EAP-30 REVISION 1 APPROVED BY: ,, _ DATE: 4Z2 t 2 IkESPONSIBtE PROCEDURE OWNER EFFECTIVE DATE: -94140 /, Oa3 FIRST ISSUE 0 FULL REVISION LIMITED REVISION

  • INFORMATIONAL USE *
  • TSR*

ADMINISTRATIVE PERIODIC REVIEW DUE DATE: <.o:j1 90C ~,

EMERGENCY TERMINATION AND TRANSITION TO RECOVERY EAP-30 REVISION

SUMMARY

SHEET It REV. NO. CHANGE AND REASON FOR CHANGE 1

  • Change company to on cover sheet to Entergy Nuclear Northeast.
  • Periodic Review 0
  • New procedure Rev. No 1 Page 2 of 5

EMERGENCY TERMINATION AND.TRANSITION TO RECOVERY - - EAP-30 TABLE OF CONTENTS -

SECTION PAGE 1.0 PURPOSE ................................ 4

2.0 REFERENCES

................................. , 4 2.1 Performance References ................................ 4 2.2 Developmental References ............................... 4 3.0 INITIATING EVENTS ................................ 4 4.0 PROCEDURE ................................. 4 5.0 ATTACHMENTS ................................ 4

1. EMERGENCY DIRECTOR TO RECOVERY MANAGER TURNOVER CHECKLIST .. 5 Rev. No 1 Page 3 of 5

i EMERGENCY TERMINATION AND TRANSITION TO RECOVERY EAP-30 1.0 PURPOSE The purpose of this procedure is to provide the Emergency Director with guidance for performing actions following the termination of a classified emergency and for the transition to recovery.

2.0 REFERENCES

2.1 Performance References 2.1.1 IAP-2, Classification of Emergency Conditions 2.2 Developmental References 2.2.1 10 CFR 50, Appendix E, Part H, Recovery 3.0 INITIATING EVENTS 3.1 Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions, and entry into the Recovery phase is required.

4.0 PROCEDURE L NOTE: The steps in this procedure are not required to be performed in sequential order, and all steps may not be required as determined by the scope of the emergency.

4.1 When the termination criteria of IAP-2, Classification of Emergency Conditions, have been met, the Emergency Director DECLARES that the emergency is terminated.

4.2 If a Recovery phase is required based on the scope of the event, TURNOVER recovery responsibilities to the Recovery Manager using Attachment 1.

5.0 ATTACHMENTS

1. Emergency Director to Recovery Manager Turnover Checklist Rev. No 1 Page 4 of 5

EMERGENCY DIRECTOR TO RECOVERY MANAGER TURNOVER CHECKLIST Page 1 of 1 When the Emergency Director is relieved by the Recovery Manager, the following checklist should be used to effectively turnover responsibilities:

Emergency Director:

Recovery Manager:

Date: Time:

The following items should be discussed:

1. Summary of Event
2. Current Status of:

A. Corrective Actions B. Plant Conditions and Plant Equipment C. Radiological Conditions In Plant Onsite Offsite Status of Release

3. Protective Action Recommendations Made to Local Authorities
4. Protective Actions Taken by Local Authoritie
5. Status of Communications with Offsite Organizations:

A. NYS/Oswego County B. NRC C. INPO D. ANI

6. Security Readiness
7. Current Facility Readiness A. Current/Expected Level of Staffing B. Shift Schedules
8. Status of Offsite Support and Contractual Information EAP-30 EMERGENCY TERMINATION AND ATTACHMENT 1 Rev. No. 1 TRANSITION TO RECOVERY Page 5 of 5

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE RECOVERY MANAGER EAP-31 REVISION 2 APPROVED BY: AI/

RESPOfqSRlfV 'IPOCEDURE-¢OE 0~, DATE:  ! -i /o 3 EFFECTIVE DATE: _m" p RR, RoOT q

FIRST ISSUE FULL REVISION LIMITED REVISION

  • INFORMATIONAL USE *
  • TSR
  • CONTROLLED COPY #
  • ADMINISTRATIVE
  • PERIODIC REVIEW DUE DATE: W/"fj 90?

RECOVERY MANAGER EAP-31 REVISION

SUMMARY

SHEET REV. NO.

2 . Title changes

  • Added Emergency Plant Manager
  • Editorial Corrections 1
  • Updated title page to reflect the company's new name.
  • Updated titles in sections 1.0, 4.1.2, and 4.3.3 -

4.3.5

°

  • New Procedure

.,I 1t Rev. No. 2 Page 2 of 7

I RECOVERY MANAGER EAP-31 TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE ....................................... 4

2.0 REFERENCES

....................................... 4 2.1 Performance References ................................. 4 2.2 Developmental References ............................... 4 3.0 INITIATING EVENTS ...................................... 4 4.0 PROCEDURE ....................................... 5 4.1 Notifications ........................................ 5 4.2 Activation ....................................... 5 4.3 Recovery Operations .................................... 6 4.4 Termination Recovery Operations ........................ 7

5. 0 ATTACHMENTS ....................................... 7 Rev. No..2 Page 3 of 7

RECOVERY MANAGER EAP-31 1.0 PURPOSE The purpose of this procedure is to provide instruction to the Recovery Manager. The Recovery Manager provides the overall planning, direction, and coordination of Recovery operations.

This procedure is implemented by the corporate Director -

Oversight or alternate in the event of an emergency at the plant, which requires the coordination of corporate resources during the EMERGENCY PHASE, and/or activation of the Recovery Organization during the RECOVERY PHASE.

The Recovery Manager is responsible for:

  • Notifying the Chief Nuclear Officer of emergencies and keeping him informed of the emergency status.
  • Providing coordination between the plant and ENN corporate organization.
  • Providing overall planning and direction of Recovery operations.

2.0 REFERENCES

2.1 Performance References 2.1.1 Section 9, Recovery 2.1.2 EAP-30 Emergency Termination and Transition of Recovery 2.1.3 EAP-33, Development of a Recovery Action Plan 2.2 Developmental References NONE 3.0 INITIATING EVENTS 3.1 Emergency conditions have been declared as per IAP-2, Classification of Emergency Conditions (FOR STEPS 4.1 AND 4.2).

Rev. No. 2 Page 4 of 7

RECOVERY MANAGER EAP-31

<_~ 3.2 Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions, and entry into the Recovery phase is required (FOR STEPS 4.3 AND 4.4).

4.0 PROCEDURE 4.1 Notifications 4.1.1 Receive notification of any emergency from the Recovery Support Group Manager (RSGM) or plant staff.

4.1.2 Notify the Chief Operating Officer of SITE AREA OR GENERAL EMERGENCIES, at a minimum.

4.2 Activation 4.2.1 Establish and maintain communications as appropriate with the Emergency Plant Manager and/or Emergency Director during the EMERGENCY PHASE.

4.2.2 Provide support to the Emergency Plant Manager and Emergency Director during the EMERGENCY PHASE as requested.

4.2.3 Direct the Recovery Support Group Manager (RSGM) I to coordinate corporate resources to support the plant during the EMERGENCY PHASE.

4.2.4 IF RECOVERY OPERATIONS ARE REQUIRED, request that EAP-30, Emergency Termination and Transition to Recovery, be implemented by the Emergency Director.

4.2.5 Determine location of the Recovery Center.

Rev. No. 2 Page 5 of 7

RECOVERY MANAGER EAP-31 4.3 Recovery Operations 4.3.1 Develop Initial Recovery Organization.

A. Select Recovery Organization members based on need, availability, and expertise.

B. Assign a Shift Onsite Recovery Coordinator to manage onsite recovery actions and, if needed, a Recovery Support Group Manager to manage offsite recovery actions.

C. Determine corporate capabilities required for Recovery Support Group (see JAFNPP Plan section 9).

D. Request that the Recovery Support Group Manager coordinate corporate resources to support Recovery operations and also coordinate request for personnel, equipment and materials, and support services.

E. Lead discussion with Recovery organization members to determine assignment of functions.

F. Develop shift-rotation schedule.

4.3.2 Implement EAP-33, Development of a Recovery Action Plan.

4.3.3 Maintain communications with Site VP-Operations regarding plant-related aspects of the emergency.

4.3.4 Establish and maintain communications with the Entergy Spokesperson.

4.3.5 Continue to update the Chief Operating Officer on the status of Recovery operations.

4.3.6 Monitor progress of Recovery Organization and Recovery Action Plan and provide direction where appropriate.

Rev. No. 2 Page 6 of 7

RECOVERY MANAGER EAP-31 4.3.7 Determine resource requirements for Recovery functions considering the following:

A. Need for additional personnel required for long-term recovery efforts.

B. Need for offsite technical assistance.

C. Need for supplies, equipment, parts, and other material.

4.4 Termination Recovery Operations 4.4.1 Determine that normal plant organization can manage remaining restoration activities.

4.4.2 Consult with Federal, State, and local authorities regarding the termination of recovery.

4.4.3 Provide final status report on recovery operations to the news media.

4.4.4 Review and document actions taken during recovery.

5.0 ATTACHMENTS NONE Rev. No. 2 Page 7 of 7

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE DEVELOPMENT OF A RECOVERY ACTION PLAN EAP-33 REVISION 1 APPROVED BY: - DATE: g <

RESPONSIBLE PROCEDURE OWNER EFFECTIVE DATE: - -LZZIA- ,Xo&03 F -ST ISSUE FULL REVISION LIMITED REVISION

  • INFORMATIONAL USE *
  • TSR
  • ADMINISTRATIVE PERIODIC REVIEW DUE DATE: _m" (Looa

DEVELOPMENT OF A RECOVERY ACTION PLAN EAP-33 REVISION

SUMMARY

SHEET REV. NO.

1

  • Name change on cover sheet to Entergy Nuclear Operations, Inc.
  • Change Site Executive Officer to Site VP - Operations in Section 1.0.
  • Change NYPA to Entergy in Step 4.1.15.
  • Add Step 4.4.B.

0

  • New procedure I

Rev. No. 1 Page 2 of S

DEVELOPMENT OF A RECOVERY ACTION PLAN. EAP-33 TABLE OF CONTENTS SECTION PAGE I

1.0 PURPOSE .... . ............................. 4 2.0 REFERNCES ............................. 4 2.1 Performance References . ............................ 4 2.2 Developmental References .......................... 4 3.0 INITIATING EVENTS ............................. 4 4.0 PROCEDURE ............................. 4 5.0 ATTACHMENTS .............................. 5 Rev. No. 1 Page 3 of 5

DEVELOPMENT OF A RECOVERY ACTION PLAN EAP-33 1 .O PURPOSE The purpose of this procedure is to provide guidance to the Recovery Manager and the Recovery Organization on the development of a Recovery Action Plan.

The Recovery Manager, in coordination with the Site VP -

Operations and the Recovery Organization, is responsible for the development of a Recovery Action Plan to address the consequences of an emergency requiring recovery. This Recovery Action Plan will be reviewed and revised to reflect additional recovery actions, additional resources requirements, and any changes in the schedule for completion of recovery action(s) as conditions change.

2.0 REFERENCES

2.1 Performance References 2.1.1 Section 9, Recovery 2.2 Developmental References 2.2.1 JAF Administrative Procedure AP-03.12, Action Plans.

3.0 INITIATING EVENTS 3.1 Emergency conditions have been controlled and/or corrected and the emergency terminated as per IAP-2, Classification of Emergency Conditions, and entry into the Recovery phase is required.

4.0 PROCEDURE 4.1 Develop a Recovery Action Plan following the guidance of appropriate plant procedures and consider the following (include appropriate tasks in Action Plan):

4.1.1 Coordination with government agency(s) interface.

4.1.2 Coordination with media interface.

4.1.3 Identification of areas (within site boundary) requiring immediate re-entry.

4.1.4 Isolation, control and minimization of hazards.

4.1.5 Identification of components/equipment needing repair.

4.1.6 Prioritization of equipment needing repair.

4.1.7 Development of task schedule. -1 Rev. No. 1 Page 4 of 5

DEVELOPMENT OF A RECOVERY ACTION PLAN EAP-33 4.1.8 Identification of material and personnel resources.

4.1.9 Initiation of event cause investigation.

4.1.10 Initiation of damage assessment.

4.1.11 Initiation of comprehensive radiological surveillance plan.

4.1.12 Evaluation of controlled releases that may result from recovery operations prior to release initiation and remain cognizant of offsite consequences.

4.1.13 Initiation of estimates of total population exposure.

4.1.14 Compliance with radiation limits.

4.1.15 Development of support program for Entergy employees and their families (see JAFNPP Plan section 9).

4.1.16 Determination of criteria for termination of recovery.

4.2 Review and revise Recovery Action Plan as required.

Consider changes in onsite and/or offsite conditions.

4.3 Finalize and schedule for recovery actions.

4.4 Modify Recovery Action Plan as appropriate for Extended Recovery Operations.

A. Institute long-term recovery organization.

B. Provide for extended administrative controls.

C. Update recovery task list and schedule.

D. Develop schedule for periodic recovery organization briefings.

5.0 ATTACHMENTS NONE Rev. No. 1 Page 5 of 5

-1.

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY-EAP-34 REVISION 4 APPROVED BY: 4 RESPONSIBLE PROCEDURE OWNER DATE: ______

EFFECTIVE DATE: -X iu2. V~2,03 FIRST ISSUE (j FULL REVISION LIMITED REVISION

  • INFORMATIONAL USE *
  • TSR *
                  • ******************** .211
  • CONTROLLED COPY
  • ADMINISTRATIVE
  • PERIODIC REVIEW DUE DATE: *z%O g0,

ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY EAP-34 REVISION

SUMMARY

SHEET REV. NO. CHANGE AND REASON FOR CHANGE 4

  • Reworded Section 7.2 and 7.5 to remove survey criteria - now refers to EAP-5.3.

3

  • Added >1 mR/hr to Sections 7.2 and 7.5 to clarify "high" readings.
  • Deleted reference 2.2.2 - this has been deleted by Oswego County.

IJL Rev. No. 4 Page 2 of 6

ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY EAP-34 TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE............. I ........ 4

2.0 REFERENCES

....................... 4 3.0 PREREQUISITES ....................... 4 4.0 PRECAUTIONS ....................... 4 5.0 MATERIALS/EQUIPMENT ....................... 4 6.0 INITIATING EVENTS ....................... 4 7.0 PROCEDURE ....................... 5 8.0 ATTACHMENTS ....................... 5

1. FORMAT OF PAGES IN ENVIRONMENTAL SAMPLE LOGBOOK.... 6 Rev. No. 4 Page 3 of 6

ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY EAP-34 JL, 1.0 PURPOSE This procedure provides instruction for the acceptance, identification and logging of environmental samples received at the Emergency Operations Facility/Environmental Laboratory during an emergency.

2.0 REFERENCES

2.1 Performance References 2.1.1 EAP-5.3, ONSITE/OFFSITE DOWNWIND SURVEYS AND ENVIRONMENTAL MONITORING 2.2 Developmental References 2.2.1 EAP-5.3, ONSITE/OFFSITE DOWNWIND SURVEYS AND ENVIRONMENTAL MONITORING 3.0 PREREQUISITES 3.1 The EOF Radiological Support Coordinator, the TSC Radiological Support Coordinator, or designee has requested the collection of environmental samples and, 3.2 The samples have been properly packaged and labeled by the persons responsible for their collection.

4.0 PRECAUTIONS Samples collected during a radiological emergency may contain radioactivity and should be handled with care to insure that the sample contents do not spill or leak from the sample container. Care should also be taken when receiving or handling samples to prevent sample cross-contamination.

5.0 MATERIALS/EQUIPMENT 5.1 Environmental Sample Logbook 5.2 Sample tags/labels 5.3 Permanent marker 6.0 INITIATING EVENTS None Rev. No. 4 Page 4 of 6

_1 I3 ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY EAP-34

'~~~ ' ~4.

',: AQ,- j 7.0 PROCEDURE 7.1 On receipt of environmental samples, the integrity of sample containers will be checked. If the sample is bagged, it is examined for rips or punctures. If the sample is a liquid, it is examined for leakage. If the integrity of the sample container has been compromised or is in questionable condition, notify supervising personnel.

7.2 All samples are to be screened for radioactivity and redirected as needed per EAP-5.3, Onsite/Offsite Downwind Surveys and Environmental Monitoring.

7.3 Identification numbers will be assigned to each sample. All sample identification and other pertinent information will be recorded in the Environmental Sample Logbook. Attachment 1 shows the format of the pages for the logbook.

7.4 All samples will be tagged or labeled with their identification number readily visible and legible. Identification tags or labels will be written in permanent ink; DO NOT use pencil or water-soluble markers to identify samples.

7.5 When the identification/logging of samples has been completed, place the samples in designated areas per EAP-5.3.

8.0 ATTACHMENTS

1. FORMAT OF PAGES IN ENVIRONMENTAL SAMPLE LOGBOOK Rev. No. 4 Page 5 of 6

Page 1 of 1 FORMAT OF PAGES IN ENVIRONMENTAL SAMPLE LOGBOOK Sample Log-In Sample Collection Sample Sampe Survey Number Date/Time Collector Date/Time olction Type Reading Cmet EAP-34 ACCEPTANCE OF ENVIRONMENTAL SAMPLES ATTACHMENT 1 Rev. No. 4 AT THE EOF DURING AN EMERGENCY Page 6 of 6

7 ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 REVISION 7 APPROVED BY: 4 ia RESPOCkSIBLE PROCEDU OWNER DATE: fA/A/

EFFECTIVE DATE: - "'r a 91-) -O3 FIRST ISSUE FULL REVISION LIMITED REVISION I *

  • INFORMATIONAL USE TSR
  • CONTROLLED COPY # ___ Y
  • ADMINISTRATIVE
  • PERIODIC REVIEW DUE DATE: -Mc Coo,?

EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 REVISION

SUMMARY

SHEET REV. NO. CHANGE AND REASON FOR CHANGE 7

  • Added SRD's to Section 4.4.2 6
  • Editorial changes.
  • Change level of use to informational from continuous.

1 1,

Rev. No. 7 Page 2 of 8

"EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE .............................. .............. 4

2.0 REFERENCES

............................................ 4 2.1 Performance References ................................. 4 2.2 Developmental References ............................... 4 3.0 INITIATING EVENTS ...................................... 4 4.0 PROCEDURE ............................................. 4 4.4 TLD ISSUANCE ........................................... 4 4.5 READING TLDs ........................................... 5 5.0 SURVEILLANCE OF DOSIMETRY EQUIPMENT . . 6 5.1 TLDs ............................................. 6 Forms ............................................ 6 6.0 ATTACHMENTS ............................................ 6

1. EMERGENCY WORKER TLD/SRD ISSUANCE RECORD ........... 7
2. TLD BADGE IDENTIFICATION LIST ..................... 8 Rev. No. 7 Page 3 of 8

EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 1.0 PURPOSE To describe the method for minimizing radiological exposure to emergency workers entering the 10 mile EPZ through the use of Thermoluminescent Dosimeters (TLDs) and Radiation Exposure Records. Use this procedure within the EOF only if instructed to do so by the Emergency Director

2.0 REFERENCES

2.1 Performance References None 2.2 Developmental References 2.2.1 10CFR20, STANDARDS FOR PROTECTION AGAINST RADIATION 2.2.2 ICRP-28, PRINCIPALS AND GENERAL PROCEDURES FOR HANDLING EMERGENCY AND ACCIDENTAL EXPOSURES OF WORKERS 2.2.3 NCRP-38, BASIC RADIATION PROTECTION CRITERIA 3.0 INITIATING EVENTS Emergency Director directs issuance of TLDs.

4.0 PROCEDURE 4.1 The Radiological Engineer, under the direction of the Emergency Operations Facility (EOF) Radiation Support Coordinator, is responsible for coordinating the efforts of the EOF Radiation Protection Technician.

4.2 The Radiation Protection Technician, under the direction of the Radiological Engineer, is responsible for the implementation of this procedure.

4.3 The Emergency Director is responsible for authorizing radiation exposures to emergency workers in excess of USEPA Protective Action Guidelines (PAGs) for the general public.

4.4 TLD ISSUANCE NOTE: Consideration shall be given to the range of SRD an individual should be issued.

4.4.1 The Dosimetry Issuance Area will be established in the main lobby of the Emergency Operations Facility (EOF).

A Radiation Protection Technician should obtain all needed equipment from the storage area.

Rev. No. 7 Page 4 of 8

EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 4.4.2 Distribute he TLDs/SRD's to all emergency workers entering the Emergency Planning Zone (EPZ). If immediate action is needed, enlist additional personnel to assist in distribution.

4.4.3 Use Emergency Workers TLD/SRD Issuance Record and TLD Badge Identification List (Attachment 1 and Attachment 2 respectively) for logging TLD issuance.

4.4.4 EOF Issuance Briefing Outline Review the following with each emergency worker before the worker reports for his/her assignment.

A. Briefly instruct emergency workers on how and where the TLD will be read.

B. Inspect the TLD for damage.

C. Handling of TLD.

D. TLD should not be submerged in water.-

E. The TLD records Whole Body Dose.

F. Wear TLD on the upper torso, i.e., in a shirt pocket or clipped-to a shirt in that area. If the area being entered is contaminated or wet, wear the TLD inside the outer clothing. Take care not to contaminate the TLD when removing wet or

-contaminated clothing.

G. Inform your supervisor immediately if you lose or damage your TLD.

4.4.5 Ensure that all sections of the Attachment 1 are completed and legible.

4.4.6 Direct the emergency worker to keep a copy of the completed form(s). The originals will remain on file at the EOF until the worker's shift is over.

4.5 READING TLDs 4.5.1 Thermoluminescent Dosimeters (TLDs)

A TLD consists of a small,piece of plastic-like crystal.

Due to its intrinsic characteristics, the TLD provides a permanent record of the individual's exposure to radiation. The TLD is an accurate device providing more useful information to the reader than a direct-reading dosimeter and is the device preferred for documenting worker exposure.

Rev. No. 7 Page 5 of 8

EOF TLD ISSUANCE DURING AN EMERGENCY EAP-35 A TLD cannot be read by the emergency worker; it has to be processed to determine the exposure received by the emergency worker.

-L A. TLDs measure beta, gamma and X-ray radiation.

B. A TLD reading can be performed only once. The act of reading the TLD eliminates further measurements and the TLD has to be processed in order to be used again.

4.5.2 At the end of each shift, the emergency worker will return to the Emergency Operations Facility (EOF) for monitoring and possible decontamination. At this time, the TLD will be collected by the Radiation Protection Technician and attached to Attachment 1 filed at the EOF.

4.5.3 Check the name and serial number against those on Attachment 2.

4.6 Check the general condition of the TLD and note any abnormalities on Attachment 1.

4.7 When the TLDs have been returned, they will be packaged and returned to the dosimetry group at JAFNPP for processing in accordance with existing dosimetry procedures and station practice.

4.8 The exposure data will be copied and sent to the EOF for use when issuing additional TLDs.

5.0 SURVEILLANCE OF DOSIMETRY EQUIPMENT 5.1 TLDs Approximately 50 TLDs will be stored at the EOF facility, along with associated forms needed for TLD issuance. In accordance with existing dosimetry procedures, the TLDs at the EOF will remain in their current calibration sequence and will be exchanged and replaced with current calibrated TLDs.

5.2 Forms In addition to TLDs, the Issuance Forms that are stored at the EOF will be checked before and after usage. If additional copies are needed, they will be produced at the time of surveillance.

6.0 ATTACHMENTS

1. EMERGENCY WORKER TLD/SRD ISSUANCE RECORD
2. TLD BADGE IDENTIFICATION LIST Rev. No. 7 Page 6 of 8

EMERGENCY WORKER TLD/SRD ISSUANCE RECORD Page 1 of 1 i:

Name Social Security Number Date of Birth:

Sex:

Affiliation:

Address:

TLD Number:

Date Issued:

  • -ne Issued:

Date Returned:

Time Returned:

SRD Issued (circle one): YES NO SRD Range:

Date Issued:

Time Issued:

Beginning Reading: Beginning Reading:

Ending Reading: Ending Reading: _

T -35 EOF TLD ISSUANCE ATTACHMENT 1 R-1. No. 7 DURING AN EMERGENCY Page 7. of 8

TLD BADGE IDENTIFICATION LIST Page 1 of 1 EMERGENCY WORKER'S TLD BADGE NAME SERIAL NUMBER 1.

2.

3.

4.

5.

6.

7.

8.

9.

10. 11.

Ll.

L2.

L3.

L4.

5.

.6.

.7.

.8.

9.

0.

AP-35 EOF TLD ISSUANCE ATTACHMENT 2 ,11 ev. No. 7 DURING AN EMERGENCY Page 8 of 8

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 REVISION 5 APPROVED BY: _ 624I7 I,

RESPONSIBLE PROCEDURE 0WNER DATE: 5 V/0 EFFECTIVE DATE: ?J6C)c)c3 FIRST ISSUE FULL REVISION LIMITED REVISION 0

  • INFORMATIONAL USE *
  • TSR *
  • CONTROLLED COPY
  • ADMINISTRATIVE
  • 11",

PERIODIC REVIEW DUE DATE: XfloJ- 2-00?-

ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 REVISION

SUMMARY

SHEET .

REV. NO. CHANGE AND REASON FOR CHANGE 5

  • Changed name on cover sheet to Entergy Nuclear Operations, Inc.
  • Updated procedure names/titles.

4

  • Added >1 mR/hr to Section 7.1 to provide guidance and clarification of "high."
  • In Section 7.4, substituted "contaminated" for "hot" and deleted 7.4.1 "floor covering" as it is unnecessary in that facility.
  • Added 7.4.8 - step-off pads to control contamination.
  • Converted Step 7.5 to 7.5 and 7.6 and added editorial corrections. 'L

-_1S Rev. No. 5 Page 2 of 6

ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE.................... . . ... . . ... . . ... . . ... . . ... ... 4

2.0 REFERENCES

................. . . ... ..... . . ... . . ... . . ... ... 4 2.1 Performance References ..... . . ... . . ... . . ... . . ... . . ... ... 4 2.2 Developmental References... . . ... . . ... . . ... . . ... . . ... ... 4 3.0 INITIATING EVENTS .......... . . ... . . ... . . ... . . ... ... 4 4.0 PREREQUISITES.............. . . ... . . ... . . ... . . ... ... 44 5.0 PRECAUTIONS................ . . ... . . ... . . ... . . ...

6.0 CAPABILITIES............... . . ... . . ... . . ... . . ... ... 5 7.0 PROCEDURE .................. . . ... . . ... . . ... . . ... ... 5 8.0 ATTACHMENTS ................ . . ... . . ... . . ... . . ... ... 6 Rev. No. 5 Page 3 of 6

ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 1.0 PURPOSE This procedure provides a description of the capabilities and operation of the Environmental Laboratory during an emergency.

2.0 REFERENCES

2.1 Performance References 2.1.1 EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY 2.1.2 RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE 2.1.3 RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE 2.2 Developmental References 2.2.1 IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS 2.2.2 EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY 2.2.3 RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE 2.2.4 RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE 3.0 INITIATING EVENTS None 4.0 PREREQUISITES 4.1 An Alert, Site Area Emergency or General Emergency has been declared in accordance with IAP-2, CLASSIFICATION OF EMERGENCY CONDITIONS, and 4.2 Environmental sampling has been requested by the TSC Radiological Support Coordinator, the EOF Radiological Support Coordinator, or designee.

11 Rev. No. 5 Page 4 of 6

ENVIRONMENTAL LABORATORY USE DURING AN EMERGENCY EAP-36 5.0 PRECAUTIONS 5.1 Environmental samples collected during a radiological emergency may contain radioactivity and should be handled with care to insure that the sample contents do not spill or leak from the containers. Care should also be taken when receiving or handling samples to prevent cross-contamination. (Refer to RT-04.02, ENVIRONMENTAL LABORATORY SAFETY PROCEDURE, for specific guidelines.)

5.2 The risks of cross-contamination of environmental samples can be reduced by insuring that extra, clean supplies (i.e.

Marinelli flasks, counting vessels, etc.) are on hand.

5.3 Accumulation of prepared samples in the counting room or in close proximity to counting equipment should be avoided in order to maintain a stable background for counting samples.

(Refer to RT-04.11, ENVIRONMENTAL LABORATORY SAMPLE RECEIPT AND STORAGE, for specific guidelines.)

6.0 CAPABILITIES The Environmental Laboratory has the capability of handling, storing, preparing and analyzing environmental samples received during a radiological emergency.

7.0 PROCEDURE 7.1 All emergency environmental samples will be surveyed and logged on receipt as per procedure EAP-34, ACCEPTANCE OF ENVIRONMENTAL SAMPLES AT THE EOF DURING AN EMERGENCY.

Samples showing unexpectedly high radiation measurements

(>1 mR/hr) will be isolated from the other samples and placed in a designated area for "hot" samples.

7.2 Preparation and analyses of emergency environmental samples should be performed in sequence of increasing radioactivity as an effort to avoid contamination of the laboratory or equipment with radioactive material from heavily contaminated samples. However, this routine may be altered by a directive from the TSC Radiological Support Coordinator, the EOF Radiological Support Coordinator or designee if the analyses of emergency environmental samples have been prioritized.

7.3 The preparation and analyses of emergency environmental samples will take priority over the preparation and analyses of routine environmental samples.

Rev. No. 5 Page 5 of 6

ENVIRONMENTAL LA30RATORY USE DURING AN EMERGENCY EAP-36 7.4 Prior to the preparation of contaminated emergency t,i environmental samples, the following steps should be taken:

7.4.1 cover counter tops, 7.4.2 place absorbent material on counters, 7.4.3 line bottom of fume hood if it is to be used, 7.4.4 place absorbent material in fume hood, 7.4.5 don protective clothing as determined necessary by supervising personnel, 7.4.6 place receptacle for radioactive waste in appropriate position, and 7.4.7 place receptacle for used protective clothing in an appropriate position.

7.4.8 Consider the use of step-off pads to control spread of contamination.

7.5 Preparation and analyses of emergency environmental samples should be performed in accordance with the appropriate Environmental Laboratory procedure.

7.6 Forward results to the TSC or EOF Radiological Support Coordinator.

7.7 If the number of emergency environmental samples is such that the capability of the Environmental Laboratory is exceeded, supervising personnel will initiate calls for assistance to those laboratories listed in Appendix C of the JAF Emergency Plan.

8.0 ATTACHMENTS NONE I

Rev. No. 5 Page 6 of 6

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE OBTAINING METEOROLOGICAL DATA EAP-42 REVISION 19 APPROVED BY: A i RESPONSIfLE PROCEDUlE-eW9ER DATE:

11 lel EFFECTIVE DATE: I -aq q oo F-tY. LL R S FIRST ISSUE l F iL REVISI ON'X LIMITED REVISION 0

  • INFORMATIONAL USE *
  • TSR *
  • ADMINISTRATIVE *
  • :
  • CONTROLLED COPY.#

PERIODIC REVIEW DUE DATE: - -- '200

- d

OBTAINING METEOROLOGICAL DATA EAP-42 REVISION

SUMMARY

SHEET 11 REV. NO.

19

  • Updated phone numbers for pages
  • Added Sigma Theta and Delta to Attachment 6 18
  • In section 1.0, 4.3.2 and attachment 3 added Security Alarm Station.
  • In attachment 3 number 5 - added "or EOF" to the direct connect to Met Data.
  • In section 4.2.2.D added SAS to the menu and added "direct connect OR" to the EOF.

17

  • In section 4.4.1, 4.4.5, 4.4.6.A, 4.4.7 & 8.A-D updated the channels with numbers rather than letters.
  • Replaced attachments 4, 5 and 7 with updated pictures.
  • Made Attachment 7 posted attachment A.
  • Added note in section 4.4.7 to make user aware that they may use posted attachment A for notification requirements.

16

  • Deleted the words Niagara Mohawk due to their company change.
  • In section 4.4.2 - updated the information to check when attempting to obtain data from the strip chart recorders and deleted the section following 4.4.3. IL
  • Added Attachment 7 that shows atmospheric stability.

15

  • Added NIMO Mete contact information to sections 4.6.1 and 4.5.3.
  • An adjustment was made to the cover sheet to reflect the company name change.

14

  • Added the TSC as an alternate location for performing forecasting of mete data.
  • In section 4.2.2., deleted step G, and changed its test to a NOTE prior to step 4.2.B.

13

  • On Attachment 1, in the EDAMS box, changed "F4" for requery to select "Requery" with the mouse. Also in same box deleted If "locked up" or stalled, Attachment 3 for recovery.

12

  • Section 4.2 is changed to incorporate the new windows design of EDAMS and the method to obtain Met data.
  • Original Attachment 3 was deleted, this attachment is no longer needed with the windows version. It is being replaced with a new Attachment 3 titled "Guide For Using EDAMS Computer To Obtain Meteorology Data".

Rev. No. 19 Page 2 of 2

OBTAINING METEOROLOGICAL DATA - P-49 TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE ................................................. 4

2.0 REFERENCES

............................................. 4 3.0 INITIATING EVENTS ...................................... 4 4.0 PROCEDURE .............................................. 4 4.1 Description of Available Methods ....................... 4 4.2 Obtaining Meteorological Data from EDAMS ... ............ 5 4.3 Obtaining Meteorological Data from Nine Mile ... ........ 6 4.4 Obtaining Meteorological Data from Analog Strip Charts .7 4.5 Obtaining Meteorological Information From Other Sourcesl2 5.0 ATTACHMENTS ..................... ...................... 13

1. MET DATA ACQUISITION QUICK REFERENCE FLOWCHART ..... 14
2. OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT .............................. 15
3. GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA ............................ 16
4. ANALOG WIND SPEED AND DIRECTION RECORDERS D, G AND J ................................ 17
5. RECORDER "K" ................. -18
6. CLASSIFICATION OF ATMOSPHERIC STABILITY ............ 19 A. EAP-42 POSTED ATTACHMENT A -- EXAMPLES OF ATMOSPHERIC STABILITY .......................................... 20 Rev. No. 19 Page. 3 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 1.0 PURPOSE L This procedure provides instructions for accessing meteorological data in the Control Room, Technical Support Center, Emergency Operations Facility or Secondary Alarm Station and includes provisions for long-term forecasting.

2.0 REFERENCES

None 2.1 Developmental References 2.1.1 EAP-4, DOSE ASSESSMENT CALCULATIONS 2.1.2 Emergency Dose Assessment Model System (EDAMS) System Design Specification 3.0 INITIATING EVENTS 3.1.1 An emergency has been declared in accordance with IAP-2, CLASSIFICATION OF EMERGENCY Conditions, or 3.1.2 EAP-4, DOSE ASSESSMENT CALCULATIONS, has been implemented.

4.0 PROCEDURE t 4.1 Description of Available Methods Meteorological data is available from the following sources:

A.Emergency Dose Assessment Modeling System (EDAMS)

B.Nine Mile Point Units 1 or 2 Control Rooms C.Analog strip charts in Control Room or Technical Support Center D.Any JAF Networked PC E.National Weather Service Rev. No. 19 Page 4 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 The general methodology-involved would concern providing meteorological data dependent on type of release. An elevated release (stack) would utilize 200t level data; and if unavailable, would .progress in decreasing order to 100', 30' and backup tower data (90'). Likewise, a ground release (any other than stack) would utilize 30' level data, and if unavailable, would progress in increasing order to 100', 200' and backup tower data (90').

This list does not delineate a required order of priority but provides a listing of resources based on accessibility timeliness and accuracy of 15 minute averaged data.

NOTE: Flowchart (Attachment 1) is provided as a quick reference and may be utilized by the operator familiar with the body of this procedure.

It is-optional to record met data on Attachment 2, Obtaining Meteorological Data for Manual Computer Input; this may provide some convenience.

4.2 Obtaining Meteorological Data from EDAMS 4.2.1 If the EDAMS computer-is on-line:

A. The computer will automatically requery the met system and update the data every 15 minutes on the quarter hour (eg. 1300, 1315, 1330, etc.). A beep may be heard when the update occurs.

B. When recording data, the operator should confirm the time and date displayed are the most current (ie.

within the last 15 minutes of the current time).

C. The operator may select "Requery" to ensure the most current data is displayed.

4.2.2 If EDAMS is NOT on-line, log onto the system as follows:

NOTE: Attachment 3 may be used to guide the operator through the steps to activate the EDAMS computer and obtain meteorological data.

A. Ensure black switch on CR or TSC meteorological panels is positioned to the Niagara Mohawk ("B") position.

Rev. No. 19 Page 5 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 NOTE: Select "Continue" at the plant picture screen.

I, B. Energize the EDAMS computer power strip to provide power to the computer, monitor and printer.

C. Select the "Login" icon from the EDAMS icons and select "Continue" at the plant picture screen.

D. Select the appropriate menu item based on your location as follows:

Location: Menu Choice CR Direct Connect to Met Data TSC Direct Connect to Met Data EOF Direct Connect OR Automatic Dial-in to Met Data SAS Automatic Dial-in to Met Data SIMULATOR Automatic Dial-in to Met Data E. When the login routine finishes, close the login screen by selecting "OK".

F. From the EDAMS icons, select "Emergency Met Report".

G. Select "James A. FitzPatrick" and "Both" for unit and release height, then select "OK". The emergency meteorology data will be displayed.

H. Ensure that "Continuous Requery?" is enabled.

.L I. The computer will automatically requery the met system and update the data every 15 minutes on the quarter hour (eg. 1300, 1315, 1330, etc.). A beep may be heard when the update occurs.

4.3 Obtaining Meteorological Data from Nine Mile 4.3.1 From the Control Room, use the direct line phone to Unit 1 or 2 Control Room and request latest 15 minute averaged data.

4.3.2 If for some reason direct line unavailable, from TSC EOF or SAS, use a commercial phone with one of the following numbers:

A. NMPl: 349-2841, 349-2842 or 349-2843 B. NMP2: 349-2168, 349-2169 or 349-2170 Rev. No. 19 Page 6 of 20 <1

OBTAINING METEOROLOGICAL DATA EAP-42 4.4 Obtaining Meteorological Data from Analog Strip Charts 4.4.1 Description of analog strip charts and information available.

There are four (4) analog strip chart recorders available in the Control room and TSC to provide meteorological data.

Each of the three-recorders (D, G, J) have two channels (1 and 2) to provide wind speed and direction.

Channel l=wind speed in mph (0-100 mph) traced on left Channel 2 = wind-direction in degrees(arc) (5400 range)

- traced on right Recorders used for wind speed and direction D Main Tower 200' level G JAF Backup Tower 90' level J Main Tower 30' or 100' level (selector switch provided)

Recorder K is provided for stability class determination.

Recorder K has the following four traces:

1 Provides temperature in F at 30' level 2 Provides AT in F from 30' to 100' level 3 Provides AT in F from 30' to 200' level 4 Selectable sigma theta (wind direction variation)

Trace 4 has four selectable channels to trace for:

A High main tower (200')

B Mid main tower (100')

C- Low main tower (30')

D Backup tower (90')

Rev. No. 19 Page 7 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 4.4.2 Before attempting to obtain data from any of the strip chart recorders, ensure they are functioning by verifyingsl/

the date and time on the display is correct. The strip chart runs at "/hr. Time indicated is Eastern Standard Time.

4.4.3 When manually retrieving meteorological data, primary concern is given to wind speed and direction, and to the stability class at particular elevations, dependent on the type of release.

4.4.4 In order to properly estimate the last 15 minutes on the strip chart, measure the last 1/4" of data for each parameter, if not readily visible, and/or the chart has not already been advanced, do so in order to average the last 15 minutes of data properly. Obtain a minimum of 4 data points within that 1/4" of chart and average.

4.4.5 Meteorological data for a Ground or both a Ground and Elevated release are to be determined as follows:

A. There are 3 recorders, which record wind speed and direction (Recorders D, G, and J). For each chart, wind speed (the left trace) is labeled Channel 1 and is in MPH (the range is 0 to 100 MPH and spans the left side of the chart) and wind direction (the right trace) is labeled Channel 2 and is in degrees arc (the range is 0 to 540 degrees and spans the right side of the chart). Consult Attachment 4.

To obtain wind direction and speed for a ground or ground and elevated release, you must first determine whether the Recorder "J" toggle switch is set for 30 or 100 foot (Main Tower). If it is set for 30 foot (Main), average the wind speed and direction as per step 4.4.5.

If the Recorder "J" toggle switch is set for 100 foot (Main Tower) and/or there is no 30 foot data, adhere to the following hierarchy of substeps:

1. Average the wind speed and direction as per step 4.4.5 for Recorder "G", which is meteorological data for the JAF Back-up Tower 90 foot level.

Rev. No. 19 Page 8 of 20

OBTAINING METEOROLOGICAL DATA EAP-42

2. If Recorder "G" is inoperable average the wind speed and direction as per step 4.4.5 for Recorder "D", which is meteorological data for the Main Tower 200 foot level.
3. If both Recorder "G & D" are inoperable average the wind speed and direction as per step 4.4.5 for Recorder "J" which is meteorological data for either the 30 or 100 foot Main Tower levels, as determined by the toggle switch position.
4. If NO strip chart wind speed and direction data is available, proceed to section 4.5 after completing 4.4.8.

4.4.6 Meteorological data for an elevated release is to be determined as follows:,

A. There are 3 recorders, which record wind speed and direction (Recorders D, G and J). For each chart, wind speed (the left trace) is in MPH (the range is 0 to 100 MPH, and spans the left side of the chart) and wind direction (the right trace) is in degrees arc (the range is 0 to 540 degrees and spans the right side of the chart). Consult Attachment 4.

To obtain wind speed and direction for an elevated release, adhere to the following substeps:

1. Average the wind speed and direction as per step 4.4.5 for Recorder "D", which is meteorological data for the Main Tower 200 foot level.

Rev. No. 19 Page 9 of 20

OBTAINING METEOROLOGICAL DATA EAP-42

2. If Recorder "D" is inoperable average the wind speed and direction as per step 4.4.5 for Record,L "G", which is meteorological data for the JAF Back-up Tower 90 foot level.
3. If both Recorder "D & G" are inoperable average the wind speed and direction as per step 4.4.5 for Recorder "J" which is meteorological data for either the 30 or 100 foot Main Tower levels, as determined by the toggle switch position.
4. If NO strip chart wind speed and direction data is available, proceed to section 4.5 after completing 4.4.8.

4.4.7 To determine stability class for either a ground or elevated release, you must utilize Recorder K" information, which contains 4 channels that span the full chart:

NOTE: Prior to declaring the TSC Operational, POSTED ATTACHMENT A, EXAMPLES OF ATMOSPHERIC STABILITY may be used in the Control Room and/or TSC to provide quick stability class estimation to meet offsite agency notification requirements.

A. Trace labeled "1" provides ambient temperature, on a 40 to +110 scale and indicates the current temperatua l in degrees F at the Main Tower 30 foot level.

B. Trace "2" provides temperature difference (delta T) between the 30 and 100 foot level on the Main Tower, and is on the -8 to +20 scale in degrees F.

C. Trace "3" provides temperature difference between the 30 and 200 foot level on the Main Tower, and is on the same -8 to +20 scale in degrees F.

Rev. No. 19 Page 10 of 20 [

OBTAINING METEOROLOGICAL DATA EAP-42 D. Trace "4" provides sigma theta (wind direction variation),, on a scale of 0 to 30 degrees, at a level dependant on the switch position on the front of the TIGRAPH recording panel:

Switch Position Level Tower A 200 ft. Main (Primary)

B 100 ft. Main (Primary)

C 30 ft. Main (Primary)

D 90 ft. JAF (Back-up)

Consult Attachment 5.

4.4.8 To derive stability class for either a ground or elevated release, or both, utilize Attachment 4 and adhere to the following hierarchy of substeps:

A. Average the trace "4" (sigma theta) on Recorder "K",

utilizing the 0 to 30 scale, as per step 4.4.5, noting the switch position, and consulting Attachment 6 to determine letter stability class.

NOTE: If data is invalid, you may want to switch another switch position to get the most representative data (for the next 15 minute average). For example, for an elevated release you should utilize switch position A, then B, D and finally C, and for a ground release, the progression is C, B, D and then A.

B. If Trace "4" is unavailable, average the Trace "3" (temperature difference 30 - 200 foot) on Recorder "K", utilizing the -8 to +20 degree F scale as per step 4.4.5 and consulting Attachment 6 to determine letter stability class.

C. If Traces "4" and "3" are unavailable, average the Trace "2" (temperature-difference 30 - 100 foot) on Recorder "K", utilizing the -8 to +20 degree F scale as per step 4.4.5 and consulting Attachment 6 to determine letter stability class.

Rev. No. 19 Page 11 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 D. If Traces "4","3", and "2"" are unavailable, estimate stabilitv by comparing wind direct.ion and speed traceALJ to the samples posted on the side of the TIGRAPH 200 housing and/or utilizing the "Atmospheric Stability Characterization" table on Attachment 6.

E. If All Recorders are unavailable for meteorological data, proceed to section 4.5.

4.5 obtaining Meteorological Information From Other Sources 4.5.1 If meteorological data is not obtained via the primary method (digital) or secondary method (analog strip charts) information on local wind speed and direction, and stability class can be obtained through other sources.

4.5.2 Meteorological data is also available from any JAF networked PC.

4.5.3 Nine Mile Meteorological Data A. Telephone the Nine Mile Point Nuclear Station #1 Control Room via the "hot line" or dial phone, and request pertinent meteorological data needed.

B. In addition, supplemental information may be obtained through Nine Mile via their Meteorological Building. t Contact one of the following people for assistance:

Tom Galetta - 349-2715 (Office) *Pager # 1193 Joe Blakeley - 349-1179 (Office) *Pager # 1040

  • To access the Constellation pager, call 1-877-472-7874.

4.5.4 National Weather Service Meteorological Data Data may be obtained via telephone on 716-565-0014.

Indicate what meteorological data is needed and note the source of the information.

4.5.5 Stability Estimation Consult Attachment 6 and estimate stability class via a characterization of the local meteorological conditions.

Rev. No. 19 Page 12 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 4.6 Meteorological Forecasting Meteorological forecasting capabilities during an emergency at JAF will be handled from the EOF (primary) or TSC- (alternate) by assigned personnel using the Internet or an on-line service.

4.6.1 For assistance in forecasting, contact one of the following people:

-Tom Galetta - 349-2715 (Office) *Pager # 1193 Joe Blakeley - 349-1179 (Office) *Pager # 1040

  • To access the Constellation pager call 1-877-472-7874 4.6.2 Assigned personnel will establish a connection with the Internet or on-line service to become familiar with the current and forecast weather situation.

4.6.3 Assigned personnel will provide JAF Dose Assessment Group a weather forecast.

4.6.4 Provide weather condition and forecast updates until the event requiring support is formally terminated. The frequency of updates will be based upon factors such as the variability of weather conditions and the needs of JAF emergency personnel.

5.0 ATTACHMENTS

1. MET DATA ACQUISITION-QUICK-REFERENCE FLOWCHART
2. OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT

-3. GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA

4. ANALOG WIND SPEED AND DIRECTION, RECORDERSD, G AND J
5. RECORDER "K"
6. CLASSIFICATION OF ATMOSPHERIC STABILITY A. POSTED ATTACHMENT A - EXAMPLES OF ATMOSPHERIC STABILITY Rev. No. l19 Page- 13 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 ATTACHMENT 1 MET DATA ACQUISITION QUICK REFERENCE FLOWCHART EDAMS

  • Select "Requery" with the mouse.

Nine Mile

  • Direct phone line to Unit 1 CR: 349-2841 Unit 1 or 2 Control Room 349-2842 349-2843 Commercial phone Unit 2 CR: 349-2168 349-2169 349-2170 Analog Strip Charts

."L Any JAF Networked PC Other Resources

  • Nine Mile Meteorological Building
  • National Weather Service (716-565-0014)

Rev. No. 19 Page 14 of 20 ]L:

OBTAINING METEOROLOGICAL DATA FOR MANUAL COMPUTER INPUT Page 1 of 1 Date: Time:

Release Type:

Meteorology Wind Speed: MPH _ ft. level on -" Tower Other (Specify) -- _E Wind Direction: _ deg. _ ft level- on Tower Other (Specify)

Stability Class: _ (A - G)

Method: (Sigma Theta - wind variation)

- ____ (Temp. Difference - 30 - 200 ft)

-__-_ (Temp. Difference - 30 - 100 ft)

Estimation Other (Specify)

Additional information EAP-42 OBTAINING METEOROLOGICAL DATA Page 15 of 20 Rev. No. 19

OBTAINING METEOROLOGICAL DATA EAP-42 ATTACHMENT 3 Page 1 of GUIDE FOR USING EDAMS COMPUTER TO OBTAIN METEOROLOGY DATA L

1. If in the CR or TSC, then ensure black switch on met panels is set to Niagara Mohawk "B" position.
2. Ensure power to computer, monitor, and printer.
3. Select the "Login" icon from the EDAMS icons.
4. Select "Continue" at the plant picture screen.
5. For the CR, TSC or EOF select "Direct Connect to Met Data".

For SAS or simulator, select "Automatic Dial-in to Met Data".

6. When prompted, following login, select "Ok".
7. From the EDAMS icons select "Emergency Met Report".
8. Select "Continue" at the plant picture screen.
9. Select "James A. FitzPatrick" and "Both", then select "Ok".
10. If a stack release is occurring, or projected, then utilize:

Elevated data.

11. If a release from any source other than the stack is occurring, or projected, then utilize Ground data.
12. If no release is occurring, or projected, then utilize Elevated data.
13. If no data is available from the EDAMS computer, then utilize EAP-42 to obtain meteorological data from other sources.

Rev. No. 19 Page 16 of 20 II>

OBTAINING METEOROLOGICAL DATA E-AP-42 ATTACHMENT 4 Page 1 of 1 ANALOG WIND SPEED AND DIRECTION RECORDERS D, G AND J

-+/-.19: Pe:

.,I. I. I. P. -. -. .I. P F. . . . ......

d 1 98 188s 3E8 9 183

. . . . I . . . . I . . . . 2 . . I . . . .... . . . I . . . ... .....

I .. .3.3t.

I. .

.I-. 1. - 1.3.I.1. 1. .1 I. M I 1.

. 1.1. . .1.1 u3 68 88 188 I I]

.7:e

. I . . . I . . . . I . . - . I. . . . I . .

. . RI.I I I I'-1I- 'I

.9B. IB: - 36a 98 183 I. . . . . I . . . . I

-2

-: aIS: ,

.l ........

,. - , I 88I .I 188 , .

. . id .1~

Rev. No. 19 Page 17 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 ATTACHMENT 5 Page of 1 RECORDER "K"

  • t I *I *t
  • 2I I *I *I *I *A I ,I ,I , *,a I

! a' 6 12

  • 2 30 5... I .... j. ., ....... I.. . I .. .

I. .

1.~~~~~~~

F j ~ I I. . . . .I I I I. .

.0 ... ... ...

I ... I. I.

-53 -2.1 3.2 8.8 14.4 20

. 3 : 88 : 5

. ... I.. . .... I... .3.... I..

I

. . . I

0. 0. 0. 0. , .0. *3 IF

.. t.I.o..,. t -I- -I-I fILI-I ----I ..... I

-8 8.8 1. 20

..... 3. .

I . . . . I . .. . .. .. . I . . . . I.

I . . . I 111 .1. 8 I* I-I- s t - -I.

1~~~

5< . .

]2 . .. .. . 3.

88 110

,S I..... . . . . I . .. I .... I.. . . . . I . . . . I .

0.

I ., ., . .,

I FIR I.

DI ....... I- I. I

.. .. , .I...,... . I0 .. . ., . .....

a' 6 12e . i8 30

... J :00 :Z .5 4K Rev. No. 19 Page 18 of 20

OBTAINING METEOROLOGICAL DATA EAP-42 ATTACHMENT 6 Page 1 of 1 CLASSIFICATION OF ATMOSPHERIC STABILITY CLASSIFICATION OF ATMOSPHERIC STABILITY BY THE VERTICAL TEMPERATURE DIFFERENCE AND BY THE STANDARD DEVIATION OF THE HORIZONTAL WIND DIRECTION TYPING SCHEMES Sigma Temperature Change with STABILITY Theta 'e degrees PASQUILL height c/10Om*

CLASSIFICATION CATEGORIES -6 degrees Median Value Extremely unstable A AT/AZ S -1.9 , aO 22.5 25. 0 Moderately unstable B -1.9 < AT/AZ S -1.7 22.5 > O 2 17.5 20.0 Slightly unstable C -1.7 < AT/AZ S -1.5 17.5 > O 12.5 15. 0 Neutral D -1.5 < AT/AZ S -0.5 12.5 > O 7.5 10. 0 Slightly stable E -0.5 < AT/AZ S 1.5 7.5 > o 3.8 5.0 Moderately stable F 1.5 AT/AZ S 4.0 3.8 > O 2.1 2.5 Extremely stable G 4.0 AT/AZ 2.1 > 1.7 Delta T 100' Delta T 100' STABILITY PASQUILL, Temperature Change with Temperature Change with CLASSIFICATION CATEGORIES height F/70 Feet** heiaht F/170 Feet t Extremely unstable A AT/AZ S -0.73 AT/AZ 5 -1.77 Moderately unstable B -0.73 AT/AZ S -0.65 -1.77 < AT/AZ - 1. 5 9 Slightly unstable C -0.65 < AT/AZ 5 -0.58 -1.59 < AT/AZ S -1.40 Neutral D -0.58 < AT/AZ S -0.19 -1.40 < AT/Az 5 -0.47 Slightly stable E -0.19 < AT/Az S 0.58 -0.47 < AT/Az 5 1.40 Moderately stable F 0.58 < AT/Az 5 1.53 1.40 < AT/AZ 5 3.73 Extremely stable G 1.53 < AT/AZ 3.73 < AT/AZ ATMOSPHERIC STABILITY CHARACTERIZATION A MID-AFTERNOON ONLY, WITH CLEAR SKIES OR SKIES WITH VERY FEW THIN CLOUDS; LATE SPRING TO EARLY FALL, WINDS USUALLY ARE BELOW 6 MILES PER HOUR.

B LATE MORNING TO MID-AFTERNOON ONLY, WITH CLEAR OR PARTLY CLOUDY SKIES; MID-SPRING TO MID-FALL, WINDS ARE USUALLY BELOW 9 MILES PER HOUR.

C LATE MORNING TO LATE AFTERNOON ONLY, WITH PARTLY CLOUDY SKIES; SPRING THROUGH FALL, WINDS ARE USUALLY BELOW 11 MILES PER HOUR.

D ALL DAYTIME, WITH OVERCAST OR PARTLY CLOUDY SKIES OR EARLY MORNING AND LATE AFTERNOON WITH CLEAR OR PARTLY CLOUDY SKIES, ALL NIGHT TIME WITH OVERCAST SKIES OF PARTLY CLOUDY, YEAR AROUND, WINDS ARE MODERATE TO HIGH (GREATER THAN 6 MILES PER HOUR).

E NIGHT TIME ONLY, WITH THIN OVERCAST OR PARTLY CLOUDY SKIES ALL YEAR AROUND, WINDS LESS THAN 10 MILES PER HOUR.

F NIGHT TIME ONLY, WITH CLEAR TO PARTLY CLOUDY SKIES, ALL YEAR AROUND, WINDS LESS THAN 7 MILES PER HOUR.

G NIGHT TIME ONLY, WITH CLEAR SKIES OR VERY FEW THIN CLOUDS, ALL YEAR AROUND, WINDS LESS THAN 5 MILES PER HOUR.

  • PER NRC REGULATORY GUIDE 1.123
    • ADJUSTED TO CORRESPOND TO THE AT MEASURED BETWEEN THE 30-FOOT AND 100-FOOT LEVELS.

t ADJUSTED TO CORRESPOND TO THE AT MEASURED BETWEEN THE 30-FOOT AND 200-FOOT LEVELS.

Rev. No. 19 Page 19 of 20

PASQUILL: A PASQUILL: B.C VERY UNSTABLE UNSTABLE BROOKIAVEN CLASS I BROOKHAVEN CLASS 2 March 20.2002 __March 20. 2002 L aa_. 27a 36 53 188' >3 276 36 se ise I ...........

. I MP I1

... .1. I. . I.... 1. , .. ..

3...- ... . ..

168~

? I!

P.~~~~~~~~~~~~~

a -. .

. I lo Hr! bi  ;,,,,;,,,,;,,,,;.,..

18 ]

PASQUILL: D,E NEUTRAL PASQL'ILL: F, G STABLE BROOKHAVEN CLASS 3 BROOKHAVEN CLASS 4 l 1e March 20. 2002 March 20.2002 27e 368 96 180 s6 186 276 66 96 18B

- ;1!..

.S.~~~~~~~~

lee S..,..,. .. I.... I ..

ea 99 .66 2?1 368 99 ISO MP

,,c,,,,;,. I.

MPS4 lee.I. - 1. .........

NOTE:

Recorders D, G, J:

Wind speed increments----(trace 1, left side) Each dot ( = 2 units, Each vertical line ()- 4 units Wind direction increment-(trace 2, right side) Each dot (C) 9 units, Each vertical line (). 18 units Recorder K:

Air temperature increment-(trace 1) Each dot (1) - 1.5 units, Each vertical line (I) - 3 units Delta T increment--- (Trace 2 and 3) Each dot (1 , 0.28 units, Each vertical line (C) - 0.56 units Sigma Theta 50 increment--- (Trace 4)Each dot ) = 0.3 units, Each vertical line(i) 0.6 units Rev. No. A Page 20 of 20

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4.

REVISION 10 APPROVED BY: 4) A RESPONSI3LE PROCEDU`Rt-WtER DATE: 02 EFFECTIVE DATE:

F R 3

I FIRST ISSUE 0 FULL REVISION LIMITED REVISION

  • INFORMATIONAL USE *
  • TSR *
  • ADMINISTRATIVE
  • CONROLLED COPYi X PERIODIC REVIEW DUE DATE: June 2007

OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 REVISION

SUMMARY

SHEET I

REV. NO.

10

  • Changed the title.
  • Deleted NYS ID cards.
  • Changed Emergency Planning Coordinator to Emergency Planning Manager.

9

  • Changed Power Authority title to Entergy throughout entire procedure due to company name change.
  • In section 4.1 changed Form SAP-4.1 to Attachment 1.
  • Deleted attachment 3 - ID System Control Cards and reference to it (section 4.2).

8

  • Added Drill and Walkthrough dates to attachment 1.

I 7

  • Section 4.1 deleted sentence stating that Personnel Dept. will collect the ID cards and will forward them to the E-Plan Coord.
  • Section 4.4 deleted sentence stating forms for original card will be returned to the E-Plan Dept.

6

  • Editorial corrections in section 4.2. 6 Reformat per AP-02.01, Rev. 5.
  • Editorial corrections to the following sections: 4.1, 4.2 and 5.0.

Rev. No. 10 Page 2 of 7

OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 TABLE OF CONTENTS SECTION PA GE 1.0 PURPOSE .................................... 4..........

2.0 REFERENCES

............................................. 4 3.0 INITIATING EVENTS ...................................... 4 4.0 PROCEDURE .............................................. 4 5.0 ATTACHMENTS ............................................

5

1. AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD .... 6
2. OSWEGO COUNTY PHOTO IDENTIFICATION CARD ............. 7 Rev. No. 10 Page 3 of 7

OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 1.0 PURPOSE This procedure describes the process to be followed for the issuance and control of Oswego County Emergency Prepared-ness Photo Identification Cards. The identification cards are to be used to provide a means of identification for Entergy personnel and vendors who may be called upon to cross police or military barriers during an emergency at the JAFNPP.

2.0 REFERENCES

None 3.0 INITIATING EVENTS None 4.0 PROCEDURE 4.1 Authorization and Control of ID Cards ID cards will be issued after the completion of Attachment 1, Authorization for Issuance of the Oswego County Emergency Preparedness Photo Identification Card. Forms require the signature of a Training Department representative and the Emergency Planning Manager or designee before cards can be issued. The completed Attachment 1 will be maintained by the Security Department.

4.2 Issuance of Identification Cards Identification cards, as illustrated on Attachment 2, will be issued by the Security Department. Photographs will be taken, and cards produced upon security receiving Attachment 1.

4.3 Display of Identification Cards Cards are issued to Emergency Team Members to allow emergency access through Military and/or Police Control Points throughout Oswego County during an emergency at the JAFNPP. Cards should be used only for this purpose.

Rev. No. 10 Page 4 of 7

OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 4.4 Replacement of Identification Cards If a photo identification card is lost or becomes unusable through damage or contamination, a replacement photo identification card shall be issued following the same procedure listed above.

5.0 ATTACHMENTS

1. AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD
2. OSWEGO COUNTY PHOTO IDENTIFICATION CARD Rev. No. 10 Page 5 of 7

AUTHORIZATION FOR ISSUANCE OF THE OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD Page 1 of 1 Authorization Request for 1t NAME SOCIAL SECURITY NO.

Date of Issuance Identification # from Card Expiration Date The above designated individual has completed all pertinent Emergency Plan Training, and I request that an Identification Card be issued for his/her use.

Training Dept. Representative Date Training Received Training Dept. Representative Date of Last Drill Training Dept. Representative Date of Walkthrough The above individual is authorized to receive an Identification Card.

Emergency Planning Manager Date This form will be retained by the Security Department. A copy will be forwarded to the Training Manager.

Date of Card Returned SAP-4 OSWEGO COUNTY EMERGENCY PREPAREDNESS ATTACHMENT 1 Rev. No. 10 PHOTO IDENTIFICATION CARD Page 6 of 7

OSWEGO COUNTY EMERGENCY PREPAREDNESS PHOTO IDENTIFICATION CARD SAP-4 ATTACHMENT 2 OSWEGO COUNTY PHOTO IDENTIFICATION CARD (Sample)

AUTHORIZED ACCESS CONTROL IDENTIFICATION CARD (Example)

-: ;e Oueti?)Emeicer-y

-. i. ~~~Ph(.

oto

!re

! -w_ iY2; ERGY New Yorkr Executlt Law ART. 2-F TMs ard will be displayed a atl teme tI d Neu nate Dite Issued iD urnb,er Eur Daztr Black on Light Green Rev. No. 10 Page 7 of 7

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 REVISION 2 APPROVED BY: 44 DATE: </ /1 RESPONSIBLE PROCEDURE bWNER EFFECTIVE DATE: /212k, 99, R 9 03 FIRST ISSUE WULL REVISION LIMITED REVISION

  • INFORMATIONAL USE *
  • TSR *
  • ADMINISTRATIVE
  • CONTROLLED COPY # >
  • *~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

PERIODIC REVIEW DUE DATE: -Mw  ; oo L?

6

II EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 REVISION

SUMMARY

SHEET 1.,

REV. NO.

2

  • Added criteria for senior management participation in critique process.
  • Changed NYPA to Entergy.
  • Updated References.
  • Changed Emergency Planning Coordinator to Emergency Planning Manager.

1

  • Added the word Example to 5.1 Performance Measures and Criteria.
  • Changed formatting in section 5.2.1, so staff complies with AP-03.07 0
  • New procedure to perform the following:
  • To provide a methodology for conducting periodic Emergency Planning self assessment.

Rev. No. 2 Page 2 of 8

EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE ................................... 4

2.0 REFERENCES

................................ 4 3.0 INITIATING EVENTS ......................... 4 4.0 SPECIAL INSTRUCTIONS ...................... 4 5.0 PROCEDURE ................................. 4 5.1 Performance Measures and Criteria Examples 4 5.2 Format and Special Information............ 8 6.0 ATTACHMENTS ................................ 8 Rev. No. 2 Page 3 of 8

EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 1.0 PURPOSE To provide direction for performing Emergency Planning self assessment. This document provides attributes of an effective Emergency Planning program. It also provides objective criteria to consider when conducting EP self assessments using a "questioning" format.

2.0 REFERENCES

2.1 ENN-LI-104 Self-Assessment and Benchmark Process.

3.0 INITIATING EVENTS None 4.0 SPECIAL INSTRUCTIONS The following documents may also be utilized for guidance in the performance of self assessment.

4.1 INPO 85-014, Generic Guidance for Emergency Preparedness Program Review.

4.2 NRC Inspection Modules.

4.3 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

5.0 PROCEDURE 5.1 Performance Measures and Criteria Examples 5.1.1 The Emergency Response Organization can provide a quality response to actual plant events and drill/

exercise scenarios.

Criteria:

A. Were plant events correctly diagnosed?

B. Were timely offsite notifications performed?

C. Were Emergency Response Facilities staffed in a timely manner?

D. Were correct recommendations made to offsite agencies?

Rev. No. 2 Page 4 of 8

EMERGENCY PLANNING PROGRAM SELF ASSESSMENT. SAP-22 E. Were plant repair and radiological field teams 3rapidly deployed?

F. Was all needed information available from logs and records?

G. Is industry experience used in resolution of problems?

H. Are causes of plant events correctly identified to prevent recurrence?

5.1.2 Senior management is supportive and involved in EP activities.

Criteria:

A. Are management expectations clearly communicated to Emergency Response Organization members?

B. Are personnel held accountable for emergency preparedness activities?

C. Do senior staff and managers participate in drills on a periodic basis?

D. Is senior plant staff kept current on the status of EP program activities?

E. Do senior staff managers attend EP, QA and NRC entrance and exit meetings?

F. Do senior staff members attend required EP training without last minute cancellations or causing special classes to be offered?

G. Do senior staff and managers participate in the drill critique process?

5.1.3 Plant departments are involved in, and display strong support for, the EP program.

Criteria:

A. Do plant departments suggest topics or continuing training needs for their ERO members?

Rev. No. 2 Page 5 of 8

EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 B. Do managers participate in drills/exercises? i C. Do plant personnel exhibit a positive attitude toward drills and exercises (good drillsmanship)?

D. Are plant departments willing to participate in scenario development?

5.1.4 EP training develops and maintains the knowledge and skills necessary for ERO personnel to effectively respond to an emergency.

Criteria:

A. Is EP training an ongoing function and not limited to preparing for observed exercises?

B. Are only trained and qualified personnel assigned to the ERO? Is training tracked?

C. Is training integrated into the drill/exercise corrective action/improvement program?

D. Is training feedback effectively used to improve the EP program?

5.1.5 A strong state and local interface builds and maintains trust in JAF's capability to effectively operate the plant and emphasizes Entergy's concern for the protection of the general public.

Criteria:

A. Is there an atmosphere of trust and cooperation between key plant staff and offsite officials?

B. Are there an excessive number of unresolved offsite issues?

C. Are there any 10CFR50.54(t) review offsite issues? Is this number excessive?

D. Are significant offsite issues resolved using formal methods of communication/correspondence?

E. Are State and local agencies involved in media training? Is the media responsive to this L

method?

Rev. No. 2 Page 6 of 8

EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 5.1.6 EP open items are effectively resolved.

Criteria:

A. Is there a procedure for the generation and resolution of open items?

B. Are requests for extensions of due dates processed in accordance with procedures?

C. Are-methods in place to track and resolve:

1. significant issues (NRC, QA, FEMA findings)
2. areas for improvement
3. significant recurring issues?

5.1.7 A strong ongoing improvement program is being maintained.

Criteria:

A. Are NRC, QA and FEMA inspections/audits given appropriate attention?

B. Is EP integrated into the JAF Business Plan?

C. Are "lessons learned" developed and distributed to appropriate personnel?

D. Is feedback from internal and external sources factored back into the program?

E. Is the resolution of open items formally assigned to staff members?

5.1.8 Emergency facility and equipment adequately support emergency response operations.

Criteria:

A. Is a scheduled periodic review of ERFs performed to ensure operational readiness?

B. Is verification of equipment operability during drills or actual events documented and resolved?

Rev. No. 2 Page 7 of 8

I-EMERGENCY PLANNING PROGRAM SELF ASSESSMENT SAP-22 C. Is surveillance/maintenance of emergency equipment given to departments normally responsible for similar equipment?

5.1.9 Administrative procedures are in effect for handling administrative details associated with the routine maintenance of the program.

Criteria:

A. Have feedback comments, received from training or other activities regarding the need to change the procedures, been incorporated into the plan or procedures?

B. Are actual event reports, surveillances, corrective actions and drill reports processed in accordance with procedures?

5.2 Format and Special Information 5.2.1 Assessments will be conducted in accordance with ENN-LI-104, Self Assessment and Benchmark Process.

5.2.2 The self assessment shall be performed by the Emergency Planning Manager or an individual(s) assigned.

5.2.3 The performance measure(s) should be benchmarked with another utility, that has been recognized for excellence in the designated area.

6.0 ATTACHMENTS None Rev. No. 2 Page 8 of 8