ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCUMENT TRANSMITTAL AND RECEIPT ACKNOWLEDGEMENT FORM TO:
EP Admin DEPT.:
Emergency Planning LOCATION:
USNRC Document Control Center, Washington DC/RockvilleMD SPECIAL NOTES:
JAFP Memo & EN-LI-106 form required.
Include 10CFR50.54(q) Screen and Eval~ation (EN-EP-305 Attach 9.1 & 9.2)
CONTROL MANUAL NUMBER 34 FROM:
DEPT.:
LOCATION :
DATE:
PATTI PONZI ADMINISTRATIVE SERVICES JAF June 21, 2016 APPLICABLE MANUAL: EP PROCEDURES
- PERIODIC REVIEW UPDATE ONLY***
DOCUMENT DOCUMENT TITLE REV EFFECTIVE NUMBER DATE VOLUME 2 VOLUME 2 UPDATE LIST 6/21/2016 EAP-13
- PAGES 1 & 2 ONLY***
~
N/A INSTRUCTIONS:
- 1.
Insert the attached revised documents, and withdraw any noted WITHDRAWN documents from your controlled copy.
- 2.
DISCARD ALL SUPERCEDED DOCUMENTS, as applicable. DISCARD THIS TRANSMITTAL.
NOTE Failure to incorporate these documents into your controlled manual will result in cancellation of the subject controlled documents.
EMERGENCY PLAN IMPLEMENTING PROCEDURESNOLUME 2 UPDATE LIST Date of Issue:
6/21/2016
~~--=-'-=-'"-'-=..;....;.."--~
Procedure Procedure Revision Date of Last Use of Number Title Number Review Procedure NIA TABLE OF CONTENTS REV. 23 06/16 Informational IAP-1 EMERGENCY PLAN IMPLEMENTATION REV. 47 02/16 Informational CHECKLIST CLASSIFICATION OF EMERGENCY REV. 34 IAP-2 FLOWCHART 07115 Informational CONDITIONS REV. 10 EAP-1.1 OFFSITE NOTIFICATIONS REV. 72 I 0/ 15 Informational EAP-2 PERSONNEL INJURY REV. 33 05115 Informational EAP-3 FIRE REV. 26 01/13 Informational EAP-4 WITHDRAWN (12/14)
EAP-4A ONSHIFT DOSE ASSESSMENT REV. 0 12/ 14 Informational EAP-48 DETAILED DOSE ASSESSMENT REV. I 12/14 Informational EAP-4C PROTECTIVE ACTION RECOMMENDATIONS REV. I 12/ 14 Informational EAP-4.1 RELEASE RATE DETERMINATION REV. 24 12/ 14 Informational EAP-5.1 DELETED (02/94)
EAP-5.2 DELETED (04/9 I)
EAP-5.3 ONSITE/OITSITE DOWNWIND SURVEYS AND REV.21 06/ 12 Informational ENVIRONMENTAL MONITORING EAP-6 IN-PLANT EMERGENCY SURVEY/ENTRY REV. 19 02/ 14 Informational EAP-7.1 DELETED (02/94)
EAP-7.2 DELETED (02/94)
EAP-8 PERSONNEL ACCOUNTABILITY REV. 74 09/ 13 Informational EAP-9 SEARCH AND RESCUE OPERATIONS REV. 13 08/ 13 Informational EAP-10 PROTECTED AREA EVACUATION REV. 22 10/13 Informational EAP-1 1 SITE EVACUATION REV. 23 I 0/13 Informational DOSE ESTIMATED FROM AN ACCIDENTAL EAP-12 RELEASE OF RADIOACTIVE MATERIAL TO REV. 13 02/ 14 Informational LAKE ONTARIO EAP-13 DAMAGE CONTROL REV. 22 06116 Informational Page 1 of2 C
EMERGENCY PLAN IMPLEMENTING PROCEDURESNOLUME 2 UPDATE LIST Date of Issue: --~6/_2_1
/_2~0~16~-
Procedure Procedure Revision Date of Last Use of Number Title Number Review Procedure EAP-14.1 WITHDRAWN (02/23/05)
EAP-14.2 WITHDRAWN (02/23/15)
EAP-14.5 WITHDRAWN (02/23/ 15)
EAP-14.6 HABIT ABILITY OF THE EMERGENCY REV. 18 04/14 Informational FACILITIES EAP-14.7 REMOTE ASSEMBLY AREA ACTIVATION REV. 3 12/14 Reference EAP-14.8 ALTERNATE TSC/SC ACTIVATION AND REV. I 12/14 Reference OPERATION EAP-15 EMERGENCY RADIATION EXPOSURE REV. 14 03/16 Informational CRITERIA AND CONTROL EAP-16 PUBLIC INFORMATION PROCEDURE REY. 9 03/14 Informational EAP-16.2 JOINT INFORMATION CENTER OPERATION REY. 16 12/15 Informational EAP-17 EMERGENCY ORGANIZATION STAFFING REV. 124 09115 Informational EAP-18 DELETED (12/93)
EAP-19 EMERGENCY USE OF POTASSIUM IODINE (Kl)
REV. 29 10/11 Informational EAP-20 POST ACCIDENT SAMPLE, OFFSITE SHIPMENT REY. I I 04/14 Informational AND ANALYSIS EAP-21 DELETED (12/85)
EAP-22 DELETED (02/98)
EAP-23 EMERGENCY ACCESS CONTROL REV. 15 04/14 Informational EAP-24 EOF VEHICLE AND PERSONNEL REV. 11 12/14 Informational DECONTAMINATION EAP-25 DELETED (02/94)
Page 2 of2
ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EFFECTIVE DATE:
DAMAGE CONTROL EAP-13 REVISION 22 T
I INFORMATIONAL USE QUALITY RELATED
_.- ADMINISTRATIVE PERIODIC REVIEW DUE DATE:
c JYL¥ 20 16 OZ< nc:.. 20 n c..f'v lPf 21 / flo
DAMAGE CONTROL EAP-13 REVISION
SUMMARY
SHEET REV. NO.
22 LIMITED REVISION THIS LIMITED REVISION IS BEING MADE TO PROVIDE ENHANCEMENTS TO THE PROCEDURE WITH RESPECT TO ADDITIONAL CONSIDERATIONS DURING A HOSTILE ACTION BASED EVENT. THESE INCLUDE:
- 1. Added to step 4.1 note for the emergency director. JAF PERSONNEL BEING DISPATCHED TO THE SITE FROM THE AOSC ARE REQUIRED TO HAVE INCIDENT COMMAND POST PERMISSION AND PASS THROUGH THE COUNTY STAGING AREA ENROUTE TO THE SITE. ESCORTING TO ASSURE PERSONNEL SAFETY IF NECESSARY IS ARRANGED AT THE STAGING AREA. PROVIDES A REMINDER TO THE ED.
- 2. Revised step 4.3.5 and step 4.4.7 to state:... the appropriate coordinator (Mech, Elect/IC, Rad/Chem)Damage Control Team Supervisor to: (changed titles consistent with new fleet guidance).
- 3. Added a note to step 4.3.5.B2, JAF.personnel being dispatched to the site from the AOSC are required to pass through the county staging area enroute to the site.
- 4. Added new to 4.3.5.B step 3, stating IF the emergency is a HAB and JAF personnel will be dispatched from the AOSC to the site:
THEN: In addition to Attachment 1, complete an Attachment 4, ADDITIONAL ACTIONS FOR HO'STILE ACTION BASED EVENTS, for each team dispatched.
Provide a copy of this attachment to the team and retain a copy of this attachment with the Emergency Damage Control Summary Form. Ensure appropriate communications are completed. Renumbered followon steps.
- 5. Deleted information regarding hostile action based events as this is not contained in Attachment 4.
- 6. Added Under section 5.0 reference to Attachment 4. ADDITIONAL ACTIONS FOR HOSTILE ACTION BASED EVENTS
- 7. ADDED TO ATTACHMENT 1 STEP 2-REFERENCE TO ATTACHMENT 4.
- 8. Added Note On DCT Mission Guide Attachment 3, Step 7, indicating: JAF Personnel being dispatched to the site from the AOSC are required to have Incident Command Post permission and pass through the county staging area enroute to the site.
Escorting, to assure personnel safety if necessary is arranged at the staging area. Provides a reminder to the briefer.
Rev. No......22_