MONTHYEARML19162A1752019-06-0606 June 2019 10 CFR 50.54(q)(5) Procedure Change Summary Analysis JAFP-18-0027, Emergency Plan Updates. Includes SAP-2, Revision 63 and SAP-3, Revision 932018-02-0505 February 2018 Emergency Plan Updates. Includes SAP-2, Revision 63 and SAP-3, Revision 93 JAFP-17-0122, Revision 76 to Emergency Plan Implementing Procedure EAP-1.12017-11-16016 November 2017 Revision 76 to Emergency Plan Implementing Procedure EAP-1.1 JAFP-17-0109, Emergency Plan Implementing Procedures EAP-2, Rev. 35, Personnel Injury and SAP-2, Rev. 63, Emergency Equipment Inventory.2017-11-10010 November 2017 Emergency Plan Implementing Procedures EAP-2, Rev. 35, Personnel Injury and SAP-2, Rev. 63, Emergency Equipment Inventory. ML17128A4782017-04-25025 April 2017 Transmittal of Emergency Plan Updates JAFP-17-0036, Emergency Plan Implementing Procedure Updates2017-04-25025 April 2017 Emergency Plan Implementing Procedure Updates JAFP-17-0036, James A. FitzPatrick, Transmittal of Emergency Plan Updates2017-04-25025 April 2017 James A. FitzPatrick, Transmittal of Emergency Plan Updates JAFP-17-0008, Transmittal of Emergency Plan Updates2017-02-17017 February 2017 Transmittal of Emergency Plan Updates JAFP-17-0001, Transmittal of Emergency Plan Updates2017-01-10010 January 2017 Transmittal of Emergency Plan Updates JAFP-16-0162, Transmittal of Emergency Plan Updates2016-11-17017 November 2016 Transmittal of Emergency Plan Updates ML16291A5102016-10-11011 October 2016 Transmittal of Four Emergency Plan Updates JAFP-16-0157, James A. Fitzpatrick - Transmittal of Four Emergency Plan Updates2016-10-11011 October 2016 James A. Fitzpatrick - Transmittal of Four Emergency Plan Updates JAFP-16-0157, Enclosures to JAFP-16-0157: Revision 2 to EAP-4C, Revision 5 to EAP-30, Revision 59 to SAP-2, and Revision 88 to SAP-32016-10-11011 October 2016 Enclosures to JAFP-16-0157: Revision 2 to EAP-4C, Revision 5 to EAP-30, Revision 59 to SAP-2, and Revision 88 to SAP-3 JAFP-16-0109, Transmittal of Emergency Plan Updates2016-06-21021 June 2016 Transmittal of Emergency Plan Updates ML16188A1632016-06-21021 June 2016 Emergency Plan Procedures/Volume 2, Update List ML16188A1642016-06-20020 June 2016 Emergency Plan/Volume 1, Update List JAFP-16-0084, James a Fitzpatrick - Transmittal of Emergency Plan Updates, Including Revision 6 to EAP-36, Environmental Laboratory Use During an Emergency2016-05-20020 May 2016 James a Fitzpatrick - Transmittal of Emergency Plan Updates, Including Revision 6 to EAP-36, Environmental Laboratory Use During an Emergency JAFP-16-0065, Transmittal of Emergency Plan Updates, Including Revision 57 to SAP-2, Emergency Equipment Inventory2016-04-22022 April 2016 Transmittal of Emergency Plan Updates, Including Revision 57 to SAP-2, Emergency Equipment Inventory JAFP-16-0058, Transmittal of Emergency Plan Updates2016-04-0707 April 2016 Transmittal of Emergency Plan Updates JAFP-16-0053, Transmittal of Emergency Plan Updates, Including Revision 13 to EN-EP-801, Emergency Response Organization2016-04-0505 April 2016 Transmittal of Emergency Plan Updates, Including Revision 13 to EN-EP-801, Emergency Response Organization JAFP-16-0052, Transmittal of Emergency Plan Updates2016-04-0505 April 2016 Transmittal of Emergency Plan Updates JAFP-16-0044, James a Fitzpatrick - Transmittal of Emergency Plan Updates2016-03-10010 March 2016 James a Fitzpatrick - Transmittal of Emergency Plan Updates JAFP-16-0038, Transmittal of Emergency Plan Updates, Including Revision 56 to SAP-2 and Revision 21 to SAP-82016-03-0101 March 2016 Transmittal of Emergency Plan Updates, Including Revision 56 to SAP-2 and Revision 21 to SAP-8 JAFP-16-0025, Transmittal of Emergency Plan Updates2016-02-23023 February 2016 Transmittal of Emergency Plan Updates JAFP-16-0024, Transmittal of Emergency Plan Updates, Including, Revision 20 to SAP-82016-02-10010 February 2016 Transmittal of Emergency Plan Updates, Including, Revision 20 to SAP-8 JAFP-16-0009, Transmittal of Emergency Plan Updates, Including Revision 2 to EN-EP-609, Revision 2 to EN-EP-610, Revision 2 to EN-EP-6112016-01-27027 January 2016 Transmittal of Emergency Plan Updates, Including Revision 2 to EN-EP-609, Revision 2 to EN-EP-610, Revision 2 to EN-EP-611 JAFP-16-0003, Transmittal of Emergency Plan Updates, Including Revision 28 to Section 1, Revision 27 to Section 27 and Revision 27 to Section 42016-01-12012 January 2016 Transmittal of Emergency Plan Updates, Including Revision 28 to Section 1, Revision 27 to Section 27 and Revision 27 to Section 4 JAFP-15-0152, Transmittal of Emergency Plan Updates2015-12-18018 December 2015 Transmittal of Emergency Plan Updates JAFP-13-0074, Emergency Plan and Implementing Procedures2013-05-30030 May 2013 Emergency Plan and Implementing Procedures ML0410700502004-03-29029 March 2004 Revised Copy of the James A. Fitzpatrick Emergency Plan and Implementing Procedures ML0407204212004-02-17017 February 2004 Revised Emergency Plan Implementing Procedures ML0334905642003-12-0101 December 2003 Volume 2, Revision 34 to EAP-4, Dose Assessment Calculations, and Volume 3, Revision 21 to EAP-42, Obtaining Meteorological Data. ML0532604872003-11-25025 November 2003 Enclosure J, Entergy Nuclear Operations, Inc., James A. FitzPatrick Nuclear Power Plant Emergency Plan Implementing Procedure, Dose Assessment Calculations EAP-4, Effective December 3, 2003 ML0329506302003-10-0202 October 2003 Revision 32 to EAP-1, Revision 24 to EAP-14.1, Revision 22 to EAP-14.2, and Revision 15 to EAP-14.5 ML0330002122003-09-29029 September 2003 Revision 16 to EAP-14.6, Habitability of the Emergency Facilities and Revision 23 to EAP-19, Emergency Use of Potassium Iodine (Ki). ML0326902022003-09-16016 September 2003 Emergency Plan and Implementing Procedures ML0532604832003-08-31031 August 2003 Enclosure I, Appendix F Evacuation Time Estimates for the James A. Fitzpatrick/Nine Mile Point Emergency Planning Zone (Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Station Are Collocated Therefore, This Evaluation Is Id ML0325503822003-08-29029 August 2003 Emergency Plan Implementing Procedures IAP-1, Rev. 31 and SAP-6, Rev. 20 ML0330000642003-08-20020 August 2003 Transmittal of Emergency Plan Implementing Procedure Revisions to EAP-1.1, EAP-8, EAP-17 and EAP-43 ML0323101632003-08-13013 August 2003 Emergency Plan and Implementing Procedures, Revision 24 to IAP-2, Vol. 2, Revision 10 to EAP-32 and Revision 37 to SAP-7 ML0323101732003-07-24024 July 2003 Emergency Plan and Implementing Procedures, Revision 36 to SAP-2 ML0317503162003-06-0909 June 2003 Emergency Plan and Implementing Procedures ML0314906822003-05-19019 May 2003 4 to Emergency Plan Implementing Procedure IAP-2, Classification of Emergency Conditions. ML0315001572003-05-19019 May 2003 Revisions to Emergency Plan Implementing Procedures, Including Rev 17 to EAP-6, In-Plant Emergency Survey/Entry, Rev 11 to EAP-9, Search & Rescue Operations & Rev 15 to EAP-14.6, Habitability of the Emergency Facilities. ML0315001582003-05-19019 May 2003 Revisions to Emergency Plan Implementing Procedures, Including Rev 6 to EAP-29, EOF Ventilation Isolation During an Emergency & Rev 1 to EAP-30, Emergency Termination & Transition to Recovery. ML0315702022003-05-19019 May 2003 Revised Emergency Plan and Implementing Procedures ML0307900172003-03-0707 March 2003 Emergency Plan & Implementing Procedures ML0305600932003-02-14014 February 2003 Emergency Plan and Implementing Procedures ML0304203272003-02-0505 February 2003 Emergency Plan & Implementing Procedures ML0303400432003-01-24024 January 2003 Submittal of Revisions to Emergency Plan and Implementing Procedures 2019-06-06
[Table view] |
Text
ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCUMENT TRANSMITTAL AND RECEIPT ACKNOWLEDGEMENT FORM TO: EP Admin DEPT.: Emergency Planning LOCATION: USNRC Document Control Center, Washington DC/RockvilleMD SPECIAL NOTES: JAFP Memo & EN-LI-106 form required.
Include 10CFR50.54(q) Screen and Eval~ation (EN-EP-305 Attach 9.1 & 9.2)
CONTROL MANUAL NUMBER 34 FROM: PATTI PONZI DEPT.: ADMINISTRATIVE SERVICES LOCATION : JAF DATE: June 21, 2016 APPLICABLE MANUAL: EP PROCEDURES
- PERIODIC REVIEW UPDATE ONLY***
DOCUMENT DOCUMENT TITLE REV EFFECTIVE NUMBER DATE VOLUME 2 VOLUME 2 UPDATE LIST -- 6/21/2016 EAP-13 ***PAGES 1 & 2 ONLY*** ~ N/A INSTRUCTIONS:
- 1. Insert the attached revised documents, and withdraw any noted WITHDRAWN documents from your controlled copy.
- 2. DISCARD ALL SUPERCEDED DOCUMENTS, as applicable. DISCARD THIS TRANSMITTAL.
NOTE Failure to incorporate these documents into your controlled manual will result in cancellation of the subject controlled documents.
EMERGENCY PLAN IMPLEMENTING PROCEDURESNOLUME 2 UPDATE LIST Date of Issue: 6/21/2016
~~--=-'-=-'"-'-=..;....;.."--~
Procedure Procedure Revision Date of Last Use of Number Title Number Review Procedure NIA TABLE OF CONTENTS REV . 23 06/16 Informational EMERGENCY PLAN IMPLEMENTATION IAP-1 REV. 47 02/ 16 Informational CHECKLIST REV. 34 CLASSIFICATION OF EMERGENCY IAP-2 FLOWCHART 07115 Informational CONDITIONS REV . 10 EAP-1.1 OFFSITE NOTIFICATIONS REV. 72 I 0/ 15 Informational EAP-2 PERSONNEL INJURY REV. 33 05115 Information al EAP-3 FIRE REV . 26 01/13 Informational EAP-4 WITHDRAWN (12/14)
EAP-4A ONSHIFT DOSE ASSESSMENT REV. 0 12/ 14 Informational EAP-48 DETAILED DOSE ASSESSMENT REV . I 12/14 Informational EAP-4C PROTECTIVE ACTION RECOMMENDATIONS REV. I 12/ 14 Informational EAP-4. 1 RELEAS E RATE DETERMINATION REV . 24 12/ 14 Informat ional EAP-5 .1 DELETED (02/94)
EAP-5.2 DELETED (04/9 I)
ONSITE/OITSITE DOWNWIND SURVEYS AND EAP-5.3 REV.21 06/ 12 Informational ENVIRONMENTAL MONITORING EAP-6 IN-PLANT EMERGENCY SURVEY/ENTRY REV. 19 02/ 14 Information al EAP-7.1 DELETED (02/94)
EAP-7.2 DELETED (02/94)
EAP-8 PERSONNEL ACCOUNTABILITY REV. 74 09/ 13 Informational EAP-9 SEARCH AND RESCUE OPERATIONS REV. 13 08/ 13 Informational EAP-10 PROTECTED AREA EVACUATION REV. 22 10/13 Informational EAP-1 1 SITE EVACUATION REV . 23 I 0/13 Informat ional DOSE ESTIMATED FROM AN ACCIDENTAL EAP-12 RELEASE OF RADIOACTIVE MATERIAL TO REV. 13 02/ 14 Informational LAKE ONTARIO EAP-13 DAMAGE CONTROL REV. 22 06116 Informational Page 1 of2 C
EMERGENCY PLAN IMPLEMENTING PROCEDURESNOLUME 2 UPDATE LIST Date of Issue: --~6/_2_1/_2~0~16~-
Procedure Procedure Revision Date of Last Use of Number Title Number Review Procedure EAP-14 .1 WITHDRAWN (02/23/05)
EAP-14 .2 WITHDRAWN (02/23/15)
EAP-14 .5 WITHDRAWN (02/23/ 15)
HABIT ABILITY OF THE EMERGENCY EAP-14 .6 REV. 18 04/ 14 Informational FACILITIES EAP-14 .7 REMOTE ASSEMBLY AREA ACTIVATION REV. 3 12/14 Reference ALTERNATE TSC/SC ACTIVATION AND EAP-14 .8 REV . I 12/14 Reference OPERATION EMERGENCY RADIATION EXPOSURE EAP-15 REV. 14 03/16 Informationa l CRITERIA AND CONTROL EAP-16 PUBLIC INFORMATION PROCEDURE REY. 9 03/14 Informational EAP-16 .2 JOINT INFORMATION CENTER OPERATION REY . 16 12/15 Informational EAP-17 EMERGENCY ORGANIZATION STAFFING REV . 124 09115 Informational EAP-18 DELETED (12/93)
EAP-19 EMERGENCY USE OF POTASSIUM IODINE (Kl) REV. 29 10/11 Informational POST ACCIDENT SAMPLE, OFFSITE SHIPMENT EAP-20 REY. I I 04/14 Informational AND ANALYSIS EAP-21 DELETED (12/85)
EAP-22 DELETED (02/98)
EAP-23 EMERGENCY ACCESS CONTROL REV . 15 04/14 Informational EOF VEHICLE AND PERSONNEL EAP-24 REV. 11 12/14 Informational DECONTAMINATION EAP-25 DELETED (02/94)
Page 2 of2
ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE DAMAGE CONTROL EAP-13 REVISION 22 EFFECTIVE DATE:
T I
- c PERIODIC REVIEW DUE DATE: JYL¥ 20 1 6 OZ< nc:.. 20 n c..f'v lPf 21 / flo
DAMAGE CONTROL EAP-13 REVISION
SUMMARY
SHEET REV. NO.
22 LIMITED REVISION THIS LIMITED REVISION IS BEING MADE TO PROVIDE ENHANCEMENTS TO THE PROCEDURE WITH RESPECT TO ADDITIONAL CONSIDERATIONS DURING A HOSTILE ACTION BASED EVENT. THESE INCLUDE:
- 1. Added to step 4.1 note for the emergency director. JAF PERSONNEL BEING DISPATCHED TO THE SITE FROM THE AOSC ARE REQUIRED TO HAVE INCIDENT COMMAND POST PERMISSION AND PASS THROUGH THE COUNTY STAGING AREA ENROUTE TO THE SITE. ESCORTING TO ASSURE PERSONNEL SAFETY IF NECESSARY IS ARRANGED AT THE STAGING AREA. PROVIDES A REMINDER TO THE ED.
- 2. Revised step 4.3.5 and step 4.4.7 to state: ... the appropriate coordinator (Mech, Elect/IC, Rad/Chem)Damage Control Team Supervisor to: (changed titles consistent with new fleet guidance).
- 3. Added a note to step 4.3.5.B2, JAF .personnel being dispatched to the site from the AOSC are required to pass through the county staging area enroute to the site.
- 4. Added new to 4.3.5.B step 3, stating IF the emergency is a HAB and JAF personnel will be dispatched from the AOSC to the site:
THEN: In addition to Attachment 1, complete an Attachment 4, ADDITIONAL ACTIONS FOR HO'STILE ACTION BASED EVENTS, for each team dispatched.
- Provide a copy of this attachment to the team and retain a copy of this attachment with the Emergency Damage Control Summary Form. Ensure appropriate communications are completed. Renumbered followon steps.
- 5. Deleted information regarding hostile action based events as this is not contained in Attachment 4.
- 6. Added Under section 5.0 reference to Attachment 4. ADDITIONAL ACTIONS FOR HOSTILE ACTION BASED EVENTS
- 7. ADDED TO ATTACHMENT 1 STEP 2- REFERENCE TO ATTACHMENT 4.
- 8. Added Note On DCT Mission Guide Attachment 3, Step 7, indicating: JAF Personnel being dispatched to the site from the AOSC are required to have Incident Command Post permission and pass through the county staging area enroute to the site.
Escorting, to assure personnel safety if necessary is arranged at the staging area. Provides a reminder to the briefer.
Rev. No . .....22_ Page ~2- of _JJL_