| number = ML081210539
| number = ML081210539
| issue date = 05/05/2008
| issue date = 05/05/2008
| title = Nine Mile Point Nuclear Station Unit Nos. 1 and 2 - Audit of the Licensee'S Management of Regulatory Commitments (TAC Nos. MD8494 and MD8495)
| title = Audit of the Licensee'S Management of Regulatory Commitments
| author name = Guzman R V
| author name = Guzman R
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| addressee name = Polson K J
| addressee name = Polson K
| addressee affiliation = Nine Mile Point Nuclear Station, LLC
| addressee affiliation = Nine Mile Point Nuclear Station, LLC
| docket = 05000220, 05000410
| docket = 05000220, 05000410
| license number = NPF-063, NPF-069
| license number = NPF-063, NPF-069
| contact person = Guzman R V
| contact person = Guzman R
| case reference number = TAC MD8494, TAC MD8495
| case reference number = TAC MD8494, TAC MD8495
| document type = Audit Report, Letter
| document type = Audit Report, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Enclosure
{{#Wiki_filter:May 5, 2008 Mr. Keith J. Polson Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093
 
May 5, 2008 Mr. Keith J. Polson Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093  


==SUBJECT:==
==SUBJECT:==
NINE MILE POINT NUCLEAR STATION, UNIT NOS. 1 AND 2 - AUDIT OF THE LICENSEE'S MANAGEMENT OF REGULATORY COMMITMENTS (TAC NOS.
NINE MILE POINT NUCLEAR STATION, UNIT NOS. 1 AND 2 - AUDIT OF THE LICENSEES MANAGEMENT OF REGULATORY COMMITMENTS (TAC NOS.
MD8494 AND MD8495)  
MD8494 AND MD8495)


==Dear Mr. Polson:==
==Dear Mr. Polson:==


An audit of the commitment management program for Nine Mile Point Nuclear Station (NMPNS), Unit Nos. 1 and 2 was performed onsite and in the Nuclear Regulatory Commission (NRC) office on April 21 - 24, 2008. The NRC staff concludes that, based on the audit, (1) NMPNS had implemented NRC commitments on a timely basis; and (2) NMPNS's program for managing NRC commitment changes is effective. Details of the audit are set forth in the enclosed audit report.  
An audit of the commitment management program for Nine Mile Point Nuclear Station (NMPNS), Unit Nos. 1 and 2 was performed onsite and in the Nuclear Regulatory Commission (NRC) office on April 21 - 24, 2008. The NRC staff concludes that, based on the audit, (1)
 
NMPNS had implemented NRC commitments on a timely basis; and (2) NMPNSs program for managing NRC commitment changes is effective. Details of the audit are set forth in the enclosed audit report.
The NRC staff appreciates the resources that were made available by your staff for performing the audit. If you have any questions, I may be reached at (301) 415-1030.
The NRC staff appreciates the resources that were made available by your staff for performing the audit. If you have any questions, I may be reached at (301) 415-1030.
Sincerely,  
Sincerely,
  /RA/ Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-220 and 50-410  
                                            /RA/
Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-220 and 50-410


==Enclosure:==
==Enclosure:==


As stated cc w/encl: See next page  
As stated cc w/encl: See next page Enclosure


ML081210539 OFFICE NRR/LPLI-1/PM NRR/LPLI-1/LA NRR/LPLI-1/BC NAME RGuzman SLittle MKowal DATE 5/02/08 5/05/08 5/05/08 Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 cc: Mr. Michael J. Wallace, Chairman and CEO Constellation Energy Nuclear Group, LLC 750 East Pratt Street, 18th Floor Baltimore, MD 21202 Mr. Henry B. Barron, Chief Nuclear Officer Constellation Energy Nuclear Group, LLC 111 Market Place Baltimore, MD 21202 Mr. Terry F. Syrell Director, Licensing Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 Regional Administrator, Region I U.S. Nuclear Regulatory Commission  
ML081210539 OFFICE           NRR/LPLI-1/PM         NRR/LPLI-1/LA       NRR/LPLI-1/BC NAME             RGuzman               SLittle             MKowal DATE             5/02/08               5/05/08             5/05/08 Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 cc:
Mr. Michael J. Wallace, Chairman and CEO           Mark J. Wetterhahn, Esquire Constellation Energy Nuclear Group, LLC           Winston & Strawn 750 East Pratt Street, 18th Floor                 1700 K Street, NW Baltimore, MD 21202                               Washington, DC 20006 Mr. Henry B. Barron, Chief Nuclear Officer         Carey W. Fleming, Esquire Constellation Energy Nuclear Group, LLC           Sr. Counsel - Nuclear Generation 111 Market Place                                   Constellation Energy Nuclear Group, LLC Baltimore, MD 21202                                750 East Pratt Street, 17th Floor Baltimore, MD 21202 Mr. Terry F. Syrell Director, Licensing                               Mr. John P. Spath Nine Mile Point Nuclear Station                   New York State Energy, Research, and P.O. Box 63                                         Development Authority Lycoming, NY 13093                                 17 Columbia Circle Albany, NY 12203-6399 Regional Administrator, Region I U.S. Nuclear Regulatory Commission                 Mr. Paul Tonko 475 Allendale Road                                President and CEO King of Prussia, PA 19406                          New York State Energy, Research, and Development Authority Resident Inspector                                17 Columbia Circle U.S. Nuclear Regulatory Commission                Albany, NY 12203-6399 P.O. Box 126 Lycoming, NY 13093                                Mr. James R. Evans LIPA Supervisor                                        P.O. Box 129 Town of Scriba                                    Lycoming, NY 10393 Route 8, Box 382 Oswego, NY 13126 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223


475 Allendale Road King of Prussia, PA  19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY  13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY  13126 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY  10271 Mr. Paul D. Eddy New York State Department of    Public Service 3 Empire State Plaza, 10th Floor Albany, NY  12223 Mark J. Wetterhahn, Esquire Winston & Strawn 1700 K Street, NW Washington, DC  20006 Carey W. Fleming, Esquire Sr. Counsel - Nuclear Generation Constellation Energy Nuclear Group, LLC 750 East Pratt Street, 17th Floor Baltimore, MD 21202 Mr. John P. Spath New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY  12203-6399 Mr. Paul Tonko President and CEO New York State Energy, Research, and  Development Authority 17 Columbia Circle Albany, NY  12203-6399
AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
 
Mr. James R. Evans LIPA P.O. Box 129 Lycoming, NY 10393
 
Enclosure AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
REGULATORY COMMITMENTS MADE BY THE LICENSEE TO THE NUCLEAR REGULATORY COMMISSION (NRC)
REGULATORY COMMITMENTS MADE BY THE LICENSEE TO THE NUCLEAR REGULATORY COMMISSION (NRC)
NINE MILE POINT NUCLEAR STATION (NMPNS), UNIT NOS. 1 AND 2 DOCKET NOS. 50-220 AND 50-410
NINE MILE POINT NUCLEAR STATION (NMPNS), UNIT NOS. 1 AND 2 DOCKET NOS. 50-220 AND 50-410


==1.0 INTRODUCTION==
==1.0     INTRODUCTION AND BACKGROUND==
AND BACKGROUND


In SECY-00-045, "Acceptance of NEI [Nuclear Energy Institute] 99-04, 'Guidelines for Managing NRC [U.S. Nuclear Regulatory Commission] Commitments,'" dated February 22, 2000, the NRC staff informed the Commission that it had found that NEI 99-04, "Guidelines for Managing NRC Commitment Changes," contains acceptable guidance for controlling regulatory commitments made by power reactor licensees to the NRC. A "regulatory commitment," as defined in NEI 99-04, is an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC.
In SECY-00-045, Acceptance of NEI [Nuclear Energy Institute] 99-04, Guidelines for Managing NRC [U.S. Nuclear Regulatory Commission] Commitments, dated February 22, 2000, the NRC staff informed the Commission that it had found that NEI 99-04, Guidelines for Managing NRC Commitment Changes, contains acceptable guidance for controlling regulatory commitments made by power reactor licensees to the NRC. A regulatory commitment, as defined in NEI 99-04, is an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC.
The NRC staff has agreed that NEI 99-04 provides acceptable guidance to licensees for the control of regulatory commitments made to the NRC staff. See Regulatory Issue Summary 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated September 21, 2000. The commitments will be controlled in accordance with the licensee's Commitment Management Program (CMP) in accordance with NEI 99-04. Any change to the regulatory commitments is subject to licensee management approval and subject to the procedural controls established at the plant for commitment management in accordance with NEI 99-04, which include appropriate notification of the NRC. In accordance with NEI 99-04, the NRC is informed of any regulatory commitment change that has safety or regulatory significance.
The NRC staff has agreed that NEI 99-04 provides acceptable guidance to licensees for the control of regulatory commitments made to the NRC staff. See Regulatory Issue Summary 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated September 21, 2000. The commitments will be controlled in accordance with the licensee's Commitment Management Program (CMP) in accordance with NEI 99-04. Any change to the regulatory commitments is subject to licensee management approval and subject to the procedural controls established at the plant for commitment management in accordance with NEI 99-04, which include appropriate notification of the NRC. In accordance with NEI 99-04, the NRC is informed of any regulatory commitment change that has safety or regulatory significance.
NEI 99-04 provides the NRC staff and its stakeholders with a common reference for handling regulatory commitments made by the licensees for commercial nuclear reactors to the NRC staff. The NRC's NRR Project Managers audit the licensee's commitment management program by assessing the adequacy of the licensee's implementation of a sample of commitments made to the NRC in past licensing actions (e.g., amendments, reliefs, exemptions), and activities (e.g., bulletins, generic letters).  
NEI 99-04 provides the NRC staff and its stakeholders with a common reference for handling regulatory commitments made by the licensees for commercial nuclear reactors to the NRC staff. The NRCs NRR Project Managers audit the licensees commitment management program by assessing the adequacy of the licensees implementation of a sample of commitments made to the NRC in past licensing actions (e.g., amendments, reliefs, exemptions), and activities (e.g., bulletins, generic letters).
2.0      AUDIT PROCEDURE AND RESULTS The audit was performed onsite on April 24, 2008; in-office work was performed before and after the audit. The audit examined the NMPNS regulatory commitment management program and its commitment tracking system, since completion of the prior 3-year audit in December 2003 (Agencywide Document Access and Management System (ADAMS) Accession No. ML033070402).
Enclosure


===2.0 AUDIT===
2.1     Verification of Licensees Implementation of NRC Commitments The primary focus of this part of the audit is to confirm that the licensee has implemented those commitments made to the NRC as part of past licensing actions/activities. For commitments that had not yet been implemented, the NRC staff aimed to ascertain that those commitments had been captured in an effective program for future implementation.
PROCEDURE AND RESULTS The audit was performed onsite on April 24, 2008; in-office work was performed before and after the audit. The audit examined the NMPNS regulatory commitment management program and its commitment tracking system, since completion of the prior 3-year audit in December 2003 (Agencywide Document Access and Management System (ADAMS) Accession No. ML033070402).   
2.1.1   Audit Scope NRR Office Procedure LIC-105, Managing Regulatory Commitments Made By Licensees to the NRC, limits the audit of regulatory commitments to those made in writing to the NRC as a result of past licensing actions (amendments, reliefs, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.). Accordingly, the commitments integrated into the final safety analysis report (FSAR), quality assurance program, site security plan, emergency plan, or other documents governed by a change-control mechanism contained in regulations such as Title 10 of the Code of Federal Regulations (10 CFR), 10 CFR 50.59 or 50.54 are excluded from the scope of the audit.
 
Before the audit, the NRC staff searched ADAMS for the licensees licensing actions and licensing activity submittals in the last 3 years. The NRC staff used this source and the criteria in LIC-105 to select from regulatory commitments contained in this population for the audit.
===2.1 Verification===
of Licensee's Implementation of NRC Commitments The primary focus of this part of the audit is to confirm that the licensee has implemented those commitments made to the NRC as part of past licensing actions/activities. For commitments that had not yet been implemented, the NRC staff aimed to ascertain that those commitments had been captured in an effective program for future implementation.  
 
====2.1.1 Audit====
Scope  
 
NRR Office Procedure LIC-105, "Managing Regulatory Commitments Made By Licensees to the NRC," limits the audit of regulatory commitments to those made in writing to the NRC as a result of past licensing actions (amendments, reliefs, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.). Accordingly, the commitments integrated into the final safety analysis report (FSAR), quality assurance program, site security plan, emergency plan, or other documents governed by a change-control mechanism contained in regulations such as Title 10 of the Code of Federal Regulations (10 CFR), 10 CFR 50.59 or 50.54 are excluded from the scope of the audit.
Before the audit, the NRC staff searched ADAMS for the licensee's licensing actions and licensing activity submittals in the last 3 years. The NRC staff used this source and the criteria in LIC-105 to select from regulatory commitments contained in this population for the audit.
These regulatory commitments are shown on Table 1 (attached). The scope of regulatory commitments selected for the audit, along with various source documents, was provided to NMPNS a few days in advance of the site visit to facilitate an effective audit.
These regulatory commitments are shown on Table 1 (attached). The scope of regulatory commitments selected for the audit, along with various source documents, was provided to NMPNS a few days in advance of the site visit to facilitate an effective audit.
NMPNS commitments are computerized under the title "Nuclear Commitment Tracking System (NCTS).The NCTS database can be sorted to produce a variety of commitment listings. The NRC staff accessed a listing of an estimate of hundreds of commitments made over the last several years and selected a number of items to be audited. However, LIC-105 limits the audit of commitments to those made in writing to the NRC as a result of past licensing actions (amendments, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.).
NMPNS commitments are computerized under the title Nuclear Commitment Tracking System (NCTS). The NCTS database can be sorted to produce a variety of commitment listings. The NRC staff accessed a listing of an estimate of hundreds of commitments made over the last several years and selected a number of items to be audited. However, LIC-105 limits the audit of commitments to those made in writing to the NRC as a result of past licensing actions (amendments, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.).
Accordingly, the overwhelming majority of the "commitments" listed in NMPNS's NCTS do not qualify as commitments as defined in LIC-105, and were thus not audited for one or more of the following reasons:  
Accordingly, the overwhelming majority of the commitments listed in NMPNSs NCTS do not qualify as commitments as defined in LIC-105, and were thus not audited for one or more of the following reasons:
(1) Commitments as a result of Licensee Event Reports (LER)s - These commitments are controlled by the licensee's LER process, which is imposed by 10 CFR 50.73.
(1)     Commitments as a result of Licensee Event Reports (LER)s - These commitments are controlled by the licensees LER process, which is imposed by 10 CFR 50.73.
 
(2)     Commitments made on the licensees own initiative among internal organizational components.
(2) Commitments made on the licensee's own initiative among internal organizational components.  
(3)     Commitments that pertain to milestones of licensing actions/activities (e.g., respond to an NRC request for additional information by a certain date). Fulfillment of these commitments was indicated by the fact that the subject licensing action/activity was completed.
(3) Commitments that pertain to milestones of licensing actions/activities (e.g., respond to an NRC request for additional information by a certain date). Fulfillment of these commitments was indicated by the fact that the subject licensing action/activity was completed.  
(4)     Commitments made as an internal reminder to take actions to comply with existing regulatory requirements such as regulations, Technical Specifications, and Updated Final Safety Analysis Reports (UFSARs). Fulfillment of these commitments was
(4) Commitments made as an internal reminder to take actions to comply with existing regulatory requirements such as regulations, Technical Specifications, and Updated Final Safety Analysis Reports (UFSARs). Fulfillment of these commitments was indicated by the licensee having taken timely action in accordance with the subject requirements.
(5) Commitments made as part of Condition Reports. These commitments are controlled by the licensee's corrective action process which is a separate licensee-controlled management program than the NCTS.
The NRC staff searched the licensee's licensing action and licensing activity submittals dated in the last 4 years. The NRC staff found that commitments meeting the definition in LIC-105 are few in number. Table 1 lists most, if not all, of the licensee's commitments.
NMPNS manages their regulatory commitments through its "Constellation Nuclear Generation [CNG] Fleet Administrative Procedure - Commitment Management," CNG-NL-1.01-1006, Revision 0. The fleet procedure became effective on September 19, 2007, and is also applicable to Calvert Cliffs and R.E. Ginna Nuclear Power Plants as well as for corporate offices of CNG. The procedure describes the process and establishes the controls for identifying, implementing, closing, changing, and managing regulatory commitments in correspondence between CNG and the NRC or other regulatory agencies.
 
====2.1.2 Audit====
Results
 
The NRC staff reviewed reports generated by the tracking program for the commitments listed in Table 1 to evaluate the status of completion. The NRC staff found that the licensee's commitment tracking program had captured all the regulatory commitments that were identified by the NRC staff before the audit.


The NRC staff reviewed reports generated by the tracking program for the commitments listed in Table 1 to evaluate the status of completion. The NRC staff found that the licensee's commitment tracking program had adequately captured all of the audited regulatory commitments.  
indicated by the licensee having taken timely action in accordance with the subject requirements.
 
(5)      Commitments made as part of Condition Reports. These commitments are controlled by the licensees corrective action process which is a separate licensee-controlled management program than the NCTS.
The licensee's NCTS can produce a report on each commitment. Each report is identified by a commitment number. The NRC staff reviewed the reports for each of the commitments listed in Table 1 to evaluate the status of completion of various components of each commitment. In general, each commitment comprises multiple tasks and components, such as revising appropriate plant procedures, revising appropriate sections of the UFSAR, revising training manuals, and training personnel. The NRC staff reviewed the information associated with each commitment to determine the status of completion. The NRC staff found that the licensee's NCTS captured all the regulatory commitments that were identified by the NRC staff before the audit. The NRC staff also reviewed other sources of information, in particular licensee submittals, to verify implementation of commitments. The review results are shown in the last column on the right of Table 1, where appropriate. Table 1 also summarizes what the NRC staff observed as the current status of licensee commitments. The NRC staff has no basis to dispute the implementation status of these regulatory commitments.
The NRC staff searched the licensees licensing action and licensing activity submittals dated in the last 4 years. The NRC staff found that commitments meeting the definition in LIC-105 are few in number. Table 1 lists most, if not all, of the licensees commitments.
 
NMPNS manages their regulatory commitments through its Constellation Nuclear Generation
===2.2 Verification===
[CNG] Fleet Administrative Procedure - Commitment Management, CNG-NL-1.01-1006, Revision 0. The fleet procedure became effective on September 19, 2007, and is also applicable to Calvert Cliffs and R.E. Ginna Nuclear Power Plants as well as for corporate offices of CNG. The procedure describes the process and establishes the controls for identifying, implementing, closing, changing, and managing regulatory commitments in correspondence between CNG and the NRC or other regulatory agencies.
of the Licensee's Program for Managing NRC Commitment Changes The primary focus of this part of the audit is the licensee's performance related to implementing controls for modifying or deleting commitments made to the NRC in order to ensure that changes to regulatory commitments are evaluated in accordance with the licensee's programs and procedures, that the licensee's technical evaluations adequately justify the change, and that the NRC is informed of regulatory commitment changes that have safety or regulatory significance in accordance with NEI 99-04.  
2.1.2    Audit Results The NRC staff reviewed reports generated by the tracking program for the commitments listed in Table 1 to evaluate the status of completion. The NRC staff found that the licensees commitment tracking program had captured all the regulatory commitments that were identified by the NRC staff before the audit.
The NRC staff reviewed reports generated by the tracking program for the commitments listed in Table 1 to evaluate the status of completion. The NRC staff found that the licensees commitment tracking program had adequately captured all of the audited regulatory commitments.
The licensees NCTS can produce a report on each commitment. Each report is identified by a commitment number. The NRC staff reviewed the reports for each of the commitments listed in Table 1 to evaluate the status of completion of various components of each commitment. In general, each commitment comprises multiple tasks and components, such as revising appropriate plant procedures, revising appropriate sections of the UFSAR, revising training manuals, and training personnel. The NRC staff reviewed the information associated with each commitment to determine the status of completion. The NRC staff found that the licensees NCTS captured all the regulatory commitments that were identified by the NRC staff before the audit.
The NRC staff also reviewed other sources of information, in particular licensee submittals, to verify implementation of commitments. The review results are shown in the last column on the right of Table 1, where appropriate. Table 1 also summarizes what the NRC staff observed as the current status of licensee commitments. The NRC staff has no basis to dispute the implementation status of these regulatory commitments.


2.2      Verification of the Licensees Program for Managing NRC Commitment Changes The primary focus of this part of the audit is the licensees performance related to implementing controls for modifying or deleting commitments made to the NRC in order to ensure that changes to regulatory commitments are evaluated in accordance with the licensees programs and procedures, that the licensees technical evaluations adequately justify the change, and that the NRC is informed of regulatory commitment changes that have safety or regulatory significance in accordance with NEI 99-04.
The NRC staff selected a sample of individual and unrelated regulatory commitments that were approved by the NRC to justify a licensing action or resolve a licensing activity. This sample emphasized regulatory commitments encompassing a variety of systems, engineering disciplines, and licensing actions. There was one commitment change found in the sample (Item No. 6 in Table 1).
The NRC staff selected a sample of individual and unrelated regulatory commitments that were approved by the NRC to justify a licensing action or resolve a licensing activity. This sample emphasized regulatory commitments encompassing a variety of systems, engineering disciplines, and licensing actions. There was one commitment change found in the sample (Item No. 6 in Table 1).
The NRC staff reviewed the licensee's procedure entitled, "Constellation Nuclear Generation Fleet Administrative Procedure - Commitment Management," CNG-NL-1.01-1006, Revision 0, against NEI 99-04. Section 5.4 and Attachments 1 and 2 provide details regarding making changes to a commitment. In general, CNG-NL-1.01-1006, Revision 0, is consistent with the guidance of NEI-99-04: it sets forth the need for identifying, tracking, and reporting commitments, and it provides a mechanism for changing commitments which includes notifying the NRC. The effectiveness of a procedure can be indicated by the products that are produced by the procedure. As set forth in Section 2.1 above, the NRC staff found that the licensee had properly addressed each regulatory commitment selected for this audit. As a result of review of the licensee's information, as well as information from other sources, the NRC staff found no reason to differ from the licensee's reported status of the audited commitments. Thus, the NRC staff surmises that the procedure used by the licensee to manage commitments is appropriate and effective.  
The NRC staff reviewed the licensees procedure entitled, Constellation Nuclear Generation Fleet Administrative Procedure - Commitment Management, CNG-NL-1.01-1006, Revision 0, against NEI 99-04. Section 5.4 and Attachments 1 and 2 provide details regarding making changes to a commitment. In general, CNG-NL-1.01-1006, Revision 0, is consistent with the guidance of NEI-99-04: it sets forth the need for identifying, tracking, and reporting commitments, and it provides a mechanism for changing commitments which includes notifying the NRC.
The effectiveness of a procedure can be indicated by the products that are produced by the procedure. As set forth in Section 2.1 above, the NRC staff found that the licensee had properly addressed each regulatory commitment selected for this audit. As a result of review of the licensees information, as well as information from other sources, the NRC staff found no reason to differ from the licensees reported status of the audited commitments. Thus, the NRC staff surmises that the procedure used by the licensee to manage commitments is appropriate and effective.


==3.0 CONCLUSION==
==3.0     CONCLUSION==


The NRC staff concludes that, based on the above audit, (1) the licensee had implemented NRC commitments on a timely basis; and (2) the licensee had implemented an effective program to manage regulatory commitment changes.  
The NRC staff concludes that, based on the above audit, (1) the licensee had implemented NRC commitments on a timely basis; and (2) the licensee had implemented an effective program to manage regulatory commitment changes.
4.0      LICENSEE PERSONNEL CONTACTED FOR THIS AUDIT John Dosa Dennis Vandeputte


===4.0 LICENSEE===
==Attachment:==
PERSONNEL CONTACTED FOR THIS AUDIT John Dosa Dennis Vandeputte


==Attachment:==
Table 1, Audited: Written Commitments and Related Information Principal Contributor: R. Guzman Date: May 5, 2008


Table 1, Audited:  Written Commitments and Related Information Principal Contributor:  R. Guzman Date:  May 5, 2008 TABLE 1 AUDITED: WRITTEN COMMITMENTS AND RELATED INFORMATION Page 1 of 3 Item Number NMPNS Submittal /Source Document(s)
TABLE 1                                                             Page 1 of 3 AUDITED: WRITTEN COMMITMENTS AND RELATED INFORMATION Licensee NMPNS                                                                                                     Implementation Submittal   NRC                                                                                          Status (Documents Item    /Source   TAC                                                                                          listed are in NCTS Number Document(s)   No. NRC Issuance                          Summary of Commitment                                 Database) 1   12/14/2006, MD3896 Amendment      Complete activities associated with implementation of LAR, these      Completed NMP1L 2106         No. 194, letter are activities:                                                      (Commitment No.
NRC TAC No. NRC IssuanceSummary of Commitment Licensee Implementation Status (Documents listed are in NCTS Database) 1 12/14/2006, NMP1L 2106 MD3896 Amendment No. 194, letter dated 12/19/07 for Unit 1 Complete activities associated with implementation of LAR, these are activities:
dated 12/19/07                                                                       504627) for Unit 1
* Specify that during fuel handling/core alterations, the ability to filter and monitor any release should be maintained; ability to restore secondary containment capability during fuel handling/core alterations should be maintained; specify that the Shift Manager will ensure that the necessary actions are taken to close all external openings in the secondary containment
* Specify that during fuel handling/core alterations, the ability to filter and monitor any release should be maintained; ability to restore secondary containment capability during fuel handling/core alterations should be maintained; specify that the Shift Manager will ensure that the necessary actions are taken to close all external openings in the secondary containment
* Environmental qualification for the LPS components located in a harsh environment will be established in accordance with the station design change process prior to completing implementation of the AST LAR
* Environmental qualification for the LPS components located in a harsh environment will be established in accordance with the station design change process prior to completing implementation of the AST LAR
* The Emergency Operating Procedures and Severe Accident Procedures will be revised, as appropriate, to reflect the post-LOCA function of the LPS and to assure that, once initiated, the entire contents of LPS storage tank are injected to accomplish suppression pool pH control function
* The Emergency Operating Procedures and Severe Accident Procedures will be revised, as appropriate, to reflect the post-LOCA function of the LPS and to assure that, once initiated, the entire contents of LPS storage tank are injected to accomplish suppression pool pH control function
* Training will be provided to licensed operators and shift technical advisors for the procedure revisions that specifically address sodium pentaborate solution injection for pH control following LOCA Completed (Commitment No. 504627)
* Training will be provided to licensed operators and shift technical advisors for the procedure revisions that specifically address sodium pentaborate solution injection for pH control following LOCA Attachment
 
Attachment TABLE 1  AUDITED:  WRITTEN COMMITMENTS AND RELATED INFORMATION Page 2 of 3 Item Number NMPNS Submittal /Source Document(s)
NRC TAC No. NRC IssuanceSummary of Commitment Licensee Implementation Status (Documents listed are in NCTS Database) 2 3/30/2007, NMP2L 2151 MD5233 Amendment No. 123, letter dated 2/27/08 for Unit 2 Raise the standby liquid control (SLC) system pump discharge relief valve set pressure to 1400 psig. 
 
Completed (Commitment No.
504631) 3 3/8/2007, NMP2L 2149 MD4703 Amendment No. 118, letter dated 7/30/07 for Unit 2 NMPNS, LLC will establish the Technical Specification Bases for LCO 3.0.8 as adopted with the applicable LAR Completed (Commitment No.
504629) 4 5/11/2006, NMP2L 2127 MD1859 Amendment No. 117, letter dated 12/14/06 for Unit 2 Raise the standby liquid control (SLC) system pump discharge relief valve set pressure to 1394 psig. Completed (Commitment No. 504614) 5 12/16/2005 NMP1L 2000 MC9626 Amendment No. 192, letter dated 1/31/07 for Unit 1 NMPNS will relocate the surveillance testing requirements for the core spray header P instrumentation to licensee-controlled documents which are controlled under the provisions of 10 CFR 50.59 Completed (Commitment No.
504604) 6 03/22/2005, 11/1/2005 NMP1L 1939 NMP1L 1997 MC5973MC5974 Bulletin 2005-01 issued on 2/11/05
 
Completion letter dated 5/31/06 for Units 1 and 2 Implementation of actions associated with Bulleting 2005-01, "Material Control and Accounting at Reactors and Wet Spent Fuel Storage Facilities."
 
Original commitment was made by NMPNS letter dated 3/22/05. By letter dated 11/1/05, NMPNS submitted a change to its original commitment involving exceptions to visual confirmation of special nuclear material items due to physical/view obstructions and restricted visual access. 


Completed (Commitment No.
TABLE 1                                                         Page 2 of 3 AUDITED: WRITTEN COMMITMENTS AND RELATED INFORMATION Licensee NMPNS                                                                                                 Implementation Submittal   NRC                                                                                      Status (Documents Item    /Source   TAC                                                                                      listed are in NCTS Number Document(s)   No. NRC Issuance                        Summary of Commitment                               Database) 2    3/30/2007,  MD5233 Amendment       Raise the standby liquid control (SLC) system pump discharge      Completed NMP2L 2151          No. 123, letter relief valve set pressure to 1400 psig.                          (Commitment No.
504572)
dated 2/27/08                                                                    504631) for Unit 2 3    3/8/2007,  MD4703 Amendment      NMPNS, LLC will establish the Technical Specification Bases for  Completed NMP2L 2149          No. 118, letter LCO 3.0.8 as adopted with the applicable LAR                      (Commitment No.
TABLE 1 AUDITED: WRITTEN COMMITMENTS AND RELATED INFORMATION Page 3 of 3 Item Number NMPNS Submittal /Source Document(s)
dated 7/30/07                                                                    504629) for Unit 2 4    5/11/2006,  MD1859 Amendment      Raise the standby liquid control (SLC) system pump discharge      Completed NMP2L 2127          No. 117, letter relief valve set pressure to 1394 psig.                          (Commitment No.
NRC TAC No. NRC IssuanceSummary of Commitment Licensee Implementation Status (Documents listed are in NCTS Database) 7 4/19/2004 NMP1L 1828 MC2734 Amendment No. 186, letter dated 1/25/05 for Unit 1
dated 12/14/06                                                                    504614) for Unit 2 5    12/16/2005        Amendment      NMPNS will relocate the surveillance testing requirements for the Completed NMP1L 2000  MC9626 No. 192, letter core spray header P instrumentation to licensee-controlled      (Commitment No.
* NMPNS will enhance the existing NMP1 surveillance program to include monitoring and assessing the effects of the 24-month (30-month maximum) IRM calibration frequency on instrument drift and its effect on safety.
dated 1/31/07  documents which are controlled under the provisions of 10 CFR    504604) for Unit 1      50.59 6    03/22/2005, MC5973 Bulletin 2005-  Implementation of actions associated with Bulleting 2005-01,      Completed 11/1/2005  MC5974 01 issued on    Material Control and Accounting at Reactors and Wet Spent Fuel  (Commitment No.
* Relocate Control Rod Withdrawal Block Limiting Conditions for Operation and Surveillance Requirements for specified instrument parameters Completed (Commitment No. 504529) 8 8/22/2003 1/12/2004 NMP2L 2108 MC0594 Amendment No. 113, letter dated 5/7/04 for Unit 2 Complete activities associated with implementation of LAR; update existing calculations to formally incorporate the 84 degrees Fahrenheit change after license amendment is issued by NRC
NMP1L 1939          2/11/05        Storage Facilities.                                              504572)
NMP1L 1997 Completion      Original commitment was made by NMPNS letter dated 3/22/05.
letter dated    By letter dated 11/1/05, NMPNS submitted a change to its original 5/31/06 for     commitment involving exceptions to visual confirmation of special Units 1 and 2   nuclear material items due to physical/view obstructions and restricted visual access.


Completed (Commitment No.
TABLE 1                                                            Page 3 of 3 AUDITED: WRITTEN COMMITMENTS AND RELATED INFORMATION Licensee NMPNS                                                                                                    Implementation Submittal  NRC                                                                                        Status (Documents Item    /Source    TAC                                                                                        listed are in NCTS Number Document(s)  No. NRC Issuance                          Summary of Commitment                                Database) 7  4/19/2004  MC2734 Amendment
504522) 9 7/30/2007 NMP2L 2169 MD6280 Amendment No. 122, letter dated 2/11/08 for Unit 2 To reduce the potential for corrosion product generation, the method for stroke testing the drywell spray system isolation valves will be revised to ensure that the drywell spray system remains dry Completed (Commitment No.
* NMPNS will enhance the existing NMP1 surveillance program to      Completed NMP1L 1828        No. 186, letter include monitoring and assessing the effects of the 24-month (30-  (Commitment No.
504637) 10 4/10/08 NMP1L 2209 MD7848 Generic Letter 2008-01 issued on 1/11/08.
dated 1/25/05  month maximum) IRM calibration frequency on instrument drift and    504529) for Unit 1      its effect on safety.
* Perform and complete required plant walkdowns and inspections associated with NRC Generic Letter 2008-01 that cannot be completed with plant online for Nine Mile Point Unit 1.
* Relocate Control Rod Withdrawal Block Limiting Conditions for Operation and Surveillance Requirements for specified instrument parameters 8  8/22/2003  MC0594 Amendment       Complete activities associated with implementation of LAR; update  Completed 1/12/2004        No. 113, letter existing calculations to formally incorporate the 84 degrees        (Commitment No.
* Submit written response to the NRC informing them of the activities performed consistent with the requested actions and information required by Generic Letter 2008-01 Ongoing  (Commitment No.
NMP2L 2108        dated 5/7/04    Fahrenheit change after license amendment is issued by NRC          504522) for Unit 2 9  7/30/2007  MD6280 Amendment      To reduce the potential for corrosion product generation, the       Completed NMP2L 2169        No. 122, letter method for stroke testing the drywell spray system isolation valves (Commitment No.
504641)}}
dated 2/11/08  will be revised to ensure that the drywell spray system remains dry 504637) for Unit 2 10     4/10/08 MD7848 Generic Letter
* Perform and complete required plant walkdowns and inspections     Ongoing NMP1L 2209        2008-01 issued associated with NRC Generic Letter 2008-01 that cannot be           (Commitment No.
on 1/11/08. completed with plant online for Nine Mile Point Unit 1.             504641)
* Submit written response to the NRC informing them of the activities performed consistent with the requested actions and information required by Generic Letter 2008-01}}

Latest revision as of 11:05, 22 March 2020

Audit of the Licensee'S Management of Regulatory Commitments
ML081210539
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 05/05/2008
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLI-1
To: Polson K
Nine Mile Point
Guzman R
References
TAC MD8494, TAC MD8495
Download: ML081210539 (10)


Text

May 5, 2008 Mr. Keith J. Polson Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT NOS. 1 AND 2 - AUDIT OF THE LICENSEES MANAGEMENT OF REGULATORY COMMITMENTS (TAC NOS.

MD8494 AND MD8495)

Dear Mr. Polson:

An audit of the commitment management program for Nine Mile Point Nuclear Station (NMPNS), Unit Nos. 1 and 2 was performed onsite and in the Nuclear Regulatory Commission (NRC) office on April 21 - 24, 2008. The NRC staff concludes that, based on the audit, (1)

NMPNS had implemented NRC commitments on a timely basis; and (2) NMPNSs program for managing NRC commitment changes is effective. Details of the audit are set forth in the enclosed audit report.

The NRC staff appreciates the resources that were made available by your staff for performing the audit. If you have any questions, I may be reached at (301) 415-1030.

Sincerely,

/RA/

Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-220 and 50-410

Enclosure:

As stated cc w/encl: See next page Enclosure

ML081210539 OFFICE NRR/LPLI-1/PM NRR/LPLI-1/LA NRR/LPLI-1/BC NAME RGuzman SLittle MKowal DATE 5/02/08 5/05/08 5/05/08 Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 cc:

Mr. Michael J. Wallace, Chairman and CEO Mark J. Wetterhahn, Esquire Constellation Energy Nuclear Group, LLC Winston & Strawn 750 East Pratt Street, 18th Floor 1700 K Street, NW Baltimore, MD 21202 Washington, DC 20006 Mr. Henry B. Barron, Chief Nuclear Officer Carey W. Fleming, Esquire Constellation Energy Nuclear Group, LLC Sr. Counsel - Nuclear Generation 111 Market Place Constellation Energy Nuclear Group, LLC Baltimore, MD 21202 750 East Pratt Street, 17th Floor Baltimore, MD 21202 Mr. Terry F. Syrell Director, Licensing Mr. John P. Spath Nine Mile Point Nuclear Station New York State Energy, Research, and P.O. Box 63 Development Authority Lycoming, NY 13093 17 Columbia Circle Albany, NY 12203-6399 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Paul Tonko 475 Allendale Road President and CEO King of Prussia, PA 19406 New York State Energy, Research, and Development Authority Resident Inspector 17 Columbia Circle U.S. Nuclear Regulatory Commission Albany, NY 12203-6399 P.O. Box 126 Lycoming, NY 13093 Mr. James R. Evans LIPA Supervisor P.O. Box 129 Town of Scriba Lycoming, NY 10393 Route 8, Box 382 Oswego, NY 13126 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223

AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION (NRR)

REGULATORY COMMITMENTS MADE BY THE LICENSEE TO THE NUCLEAR REGULATORY COMMISSION (NRC)

NINE MILE POINT NUCLEAR STATION (NMPNS), UNIT NOS. 1 AND 2 DOCKET NOS. 50-220 AND 50-410

1.0 INTRODUCTION AND BACKGROUND

In SECY-00-045, Acceptance of NEI [Nuclear Energy Institute] 99-04, Guidelines for Managing NRC [U.S. Nuclear Regulatory Commission] Commitments, dated February 22, 2000, the NRC staff informed the Commission that it had found that NEI 99-04, Guidelines for Managing NRC Commitment Changes, contains acceptable guidance for controlling regulatory commitments made by power reactor licensees to the NRC. A regulatory commitment, as defined in NEI 99-04, is an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC.

The NRC staff has agreed that NEI 99-04 provides acceptable guidance to licensees for the control of regulatory commitments made to the NRC staff. See Regulatory Issue Summary 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated September 21, 2000. The commitments will be controlled in accordance with the licensee's Commitment Management Program (CMP) in accordance with NEI 99-04. Any change to the regulatory commitments is subject to licensee management approval and subject to the procedural controls established at the plant for commitment management in accordance with NEI 99-04, which include appropriate notification of the NRC. In accordance with NEI 99-04, the NRC is informed of any regulatory commitment change that has safety or regulatory significance.

NEI 99-04 provides the NRC staff and its stakeholders with a common reference for handling regulatory commitments made by the licensees for commercial nuclear reactors to the NRC staff. The NRCs NRR Project Managers audit the licensees commitment management program by assessing the adequacy of the licensees implementation of a sample of commitments made to the NRC in past licensing actions (e.g., amendments, reliefs, exemptions), and activities (e.g., bulletins, generic letters).

2.0 AUDIT PROCEDURE AND RESULTS The audit was performed onsite on April 24, 2008; in-office work was performed before and after the audit. The audit examined the NMPNS regulatory commitment management program and its commitment tracking system, since completion of the prior 3-year audit in December 2003 (Agencywide Document Access and Management System (ADAMS) Accession No. ML033070402).

Enclosure

2.1 Verification of Licensees Implementation of NRC Commitments The primary focus of this part of the audit is to confirm that the licensee has implemented those commitments made to the NRC as part of past licensing actions/activities. For commitments that had not yet been implemented, the NRC staff aimed to ascertain that those commitments had been captured in an effective program for future implementation.

2.1.1 Audit Scope NRR Office Procedure LIC-105, Managing Regulatory Commitments Made By Licensees to the NRC, limits the audit of regulatory commitments to those made in writing to the NRC as a result of past licensing actions (amendments, reliefs, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.). Accordingly, the commitments integrated into the final safety analysis report (FSAR), quality assurance program, site security plan, emergency plan, or other documents governed by a change-control mechanism contained in regulations such as Title 10 of the Code of Federal Regulations (10 CFR), 10 CFR 50.59 or 50.54 are excluded from the scope of the audit.

Before the audit, the NRC staff searched ADAMS for the licensees licensing actions and licensing activity submittals in the last 3 years. The NRC staff used this source and the criteria in LIC-105 to select from regulatory commitments contained in this population for the audit.

These regulatory commitments are shown on Table 1 (attached). The scope of regulatory commitments selected for the audit, along with various source documents, was provided to NMPNS a few days in advance of the site visit to facilitate an effective audit.

NMPNS commitments are computerized under the title Nuclear Commitment Tracking System (NCTS). The NCTS database can be sorted to produce a variety of commitment listings. The NRC staff accessed a listing of an estimate of hundreds of commitments made over the last several years and selected a number of items to be audited. However, LIC-105 limits the audit of commitments to those made in writing to the NRC as a result of past licensing actions (amendments, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.).

Accordingly, the overwhelming majority of the commitments listed in NMPNSs NCTS do not qualify as commitments as defined in LIC-105, and were thus not audited for one or more of the following reasons:

(1) Commitments as a result of Licensee Event Reports (LER)s - These commitments are controlled by the licensees LER process, which is imposed by 10 CFR 50.73.

(2) Commitments made on the licensees own initiative among internal organizational components.

(3) Commitments that pertain to milestones of licensing actions/activities (e.g., respond to an NRC request for additional information by a certain date). Fulfillment of these commitments was indicated by the fact that the subject licensing action/activity was completed.

(4) Commitments made as an internal reminder to take actions to comply with existing regulatory requirements such as regulations, Technical Specifications, and Updated Final Safety Analysis Reports (UFSARs). Fulfillment of these commitments was

indicated by the licensee having taken timely action in accordance with the subject requirements.

(5) Commitments made as part of Condition Reports. These commitments are controlled by the licensees corrective action process which is a separate licensee-controlled management program than the NCTS.

The NRC staff searched the licensees licensing action and licensing activity submittals dated in the last 4 years. The NRC staff found that commitments meeting the definition in LIC-105 are few in number. Table 1 lists most, if not all, of the licensees commitments.

NMPNS manages their regulatory commitments through its Constellation Nuclear Generation

[CNG] Fleet Administrative Procedure - Commitment Management, CNG-NL-1.01-1006, Revision 0. The fleet procedure became effective on September 19, 2007, and is also applicable to Calvert Cliffs and R.E. Ginna Nuclear Power Plants as well as for corporate offices of CNG. The procedure describes the process and establishes the controls for identifying, implementing, closing, changing, and managing regulatory commitments in correspondence between CNG and the NRC or other regulatory agencies.

2.1.2 Audit Results The NRC staff reviewed reports generated by the tracking program for the commitments listed in Table 1 to evaluate the status of completion. The NRC staff found that the licensees commitment tracking program had captured all the regulatory commitments that were identified by the NRC staff before the audit.

The NRC staff reviewed reports generated by the tracking program for the commitments listed in Table 1 to evaluate the status of completion. The NRC staff found that the licensees commitment tracking program had adequately captured all of the audited regulatory commitments.

The licensees NCTS can produce a report on each commitment. Each report is identified by a commitment number. The NRC staff reviewed the reports for each of the commitments listed in Table 1 to evaluate the status of completion of various components of each commitment. In general, each commitment comprises multiple tasks and components, such as revising appropriate plant procedures, revising appropriate sections of the UFSAR, revising training manuals, and training personnel. The NRC staff reviewed the information associated with each commitment to determine the status of completion. The NRC staff found that the licensees NCTS captured all the regulatory commitments that were identified by the NRC staff before the audit.

The NRC staff also reviewed other sources of information, in particular licensee submittals, to verify implementation of commitments. The review results are shown in the last column on the right of Table 1, where appropriate. Table 1 also summarizes what the NRC staff observed as the current status of licensee commitments. The NRC staff has no basis to dispute the implementation status of these regulatory commitments.

2.2 Verification of the Licensees Program for Managing NRC Commitment Changes The primary focus of this part of the audit is the licensees performance related to implementing controls for modifying or deleting commitments made to the NRC in order to ensure that changes to regulatory commitments are evaluated in accordance with the licensees programs and procedures, that the licensees technical evaluations adequately justify the change, and that the NRC is informed of regulatory commitment changes that have safety or regulatory significance in accordance with NEI 99-04.

The NRC staff selected a sample of individual and unrelated regulatory commitments that were approved by the NRC to justify a licensing action or resolve a licensing activity. This sample emphasized regulatory commitments encompassing a variety of systems, engineering disciplines, and licensing actions. There was one commitment change found in the sample (Item No. 6 in Table 1).

The NRC staff reviewed the licensees procedure entitled, Constellation Nuclear Generation Fleet Administrative Procedure - Commitment Management, CNG-NL-1.01-1006, Revision 0, against NEI 99-04. Section 5.4 and Attachments 1 and 2 provide details regarding making changes to a commitment. In general, CNG-NL-1.01-1006, Revision 0, is consistent with the guidance of NEI-99-04: it sets forth the need for identifying, tracking, and reporting commitments, and it provides a mechanism for changing commitments which includes notifying the NRC.

The effectiveness of a procedure can be indicated by the products that are produced by the procedure. As set forth in Section 2.1 above, the NRC staff found that the licensee had properly addressed each regulatory commitment selected for this audit. As a result of review of the licensees information, as well as information from other sources, the NRC staff found no reason to differ from the licensees reported status of the audited commitments. Thus, the NRC staff surmises that the procedure used by the licensee to manage commitments is appropriate and effective.

3.0 CONCLUSION

The NRC staff concludes that, based on the above audit, (1) the licensee had implemented NRC commitments on a timely basis; and (2) the licensee had implemented an effective program to manage regulatory commitment changes.

4.0 LICENSEE PERSONNEL CONTACTED FOR THIS AUDIT John Dosa Dennis Vandeputte

Attachment:

Table 1, Audited: Written Commitments and Related Information Principal Contributor: R. Guzman Date: May 5, 2008

TABLE 1 Page 1 of 3 AUDITED: WRITTEN COMMITMENTS AND RELATED INFORMATION Licensee NMPNS Implementation Submittal NRC Status (Documents Item /Source TAC listed are in NCTS Number Document(s) No. NRC Issuance Summary of Commitment Database) 1 12/14/2006, MD3896 Amendment Complete activities associated with implementation of LAR, these Completed NMP1L 2106 No. 194, letter are activities: (Commitment No.

dated 12/19/07 504627) for Unit 1

  • Specify that during fuel handling/core alterations, the ability to filter and monitor any release should be maintained; ability to restore secondary containment capability during fuel handling/core alterations should be maintained; specify that the Shift Manager will ensure that the necessary actions are taken to close all external openings in the secondary containment
  • Environmental qualification for the LPS components located in a harsh environment will be established in accordance with the station design change process prior to completing implementation of the AST LAR
  • The Emergency Operating Procedures and Severe Accident Procedures will be revised, as appropriate, to reflect the post-LOCA function of the LPS and to assure that, once initiated, the entire contents of LPS storage tank are injected to accomplish suppression pool pH control function
  • Training will be provided to licensed operators and shift technical advisors for the procedure revisions that specifically address sodium pentaborate solution injection for pH control following LOCA Attachment

TABLE 1 Page 2 of 3 AUDITED: WRITTEN COMMITMENTS AND RELATED INFORMATION Licensee NMPNS Implementation Submittal NRC Status (Documents Item /Source TAC listed are in NCTS Number Document(s) No. NRC Issuance Summary of Commitment Database) 2 3/30/2007, MD5233 Amendment Raise the standby liquid control (SLC) system pump discharge Completed NMP2L 2151 No. 123, letter relief valve set pressure to 1400 psig. (Commitment No.

dated 2/27/08 504631) for Unit 2 3 3/8/2007, MD4703 Amendment NMPNS, LLC will establish the Technical Specification Bases for Completed NMP2L 2149 No. 118, letter LCO 3.0.8 as adopted with the applicable LAR (Commitment No.

dated 7/30/07 504629) for Unit 2 4 5/11/2006, MD1859 Amendment Raise the standby liquid control (SLC) system pump discharge Completed NMP2L 2127 No. 117, letter relief valve set pressure to 1394 psig. (Commitment No.

dated 12/14/06 504614) for Unit 2 5 12/16/2005 Amendment NMPNS will relocate the surveillance testing requirements for the Completed NMP1L 2000 MC9626 No. 192, letter core spray header P instrumentation to licensee-controlled (Commitment No.

dated 1/31/07 documents which are controlled under the provisions of 10 CFR 504604) for Unit 1 50.59 6 03/22/2005, MC5973 Bulletin 2005- Implementation of actions associated with Bulleting 2005-01, Completed 11/1/2005 MC5974 01 issued on Material Control and Accounting at Reactors and Wet Spent Fuel (Commitment No.

NMP1L 1939 2/11/05 Storage Facilities. 504572)

NMP1L 1997 Completion Original commitment was made by NMPNS letter dated 3/22/05.

letter dated By letter dated 11/1/05, NMPNS submitted a change to its original 5/31/06 for commitment involving exceptions to visual confirmation of special Units 1 and 2 nuclear material items due to physical/view obstructions and restricted visual access.

TABLE 1 Page 3 of 3 AUDITED: WRITTEN COMMITMENTS AND RELATED INFORMATION Licensee NMPNS Implementation Submittal NRC Status (Documents Item /Source TAC listed are in NCTS Number Document(s) No. NRC Issuance Summary of Commitment Database) 7 4/19/2004 MC2734 Amendment

  • NMPNS will enhance the existing NMP1 surveillance program to Completed NMP1L 1828 No. 186, letter include monitoring and assessing the effects of the 24-month (30- (Commitment No.

dated 1/25/05 month maximum) IRM calibration frequency on instrument drift and 504529) for Unit 1 its effect on safety.

  • Relocate Control Rod Withdrawal Block Limiting Conditions for Operation and Surveillance Requirements for specified instrument parameters 8 8/22/2003 MC0594 Amendment Complete activities associated with implementation of LAR; update Completed 1/12/2004 No. 113, letter existing calculations to formally incorporate the 84 degrees (Commitment No.

NMP2L 2108 dated 5/7/04 Fahrenheit change after license amendment is issued by NRC 504522) for Unit 2 9 7/30/2007 MD6280 Amendment To reduce the potential for corrosion product generation, the Completed NMP2L 2169 No. 122, letter method for stroke testing the drywell spray system isolation valves (Commitment No.

dated 2/11/08 will be revised to ensure that the drywell spray system remains dry 504637) for Unit 2 10 4/10/08 MD7848 Generic Letter

  • Perform and complete required plant walkdowns and inspections Ongoing NMP1L 2209 2008-01 issued associated with NRC Generic Letter 2008-01 that cannot be (Commitment No.

on 1/11/08. completed with plant online for Nine Mile Point Unit 1. 504641)

  • Submit written response to the NRC informing them of the activities performed consistent with the requested actions and information required by Generic Letter 2008-01