Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23250A082 | 19 September 2023 | Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 | High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX |
ML23209A769 | 14 June 2023 | Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) | High winds Tornado Missile FLEX |
ML18120A320 | 7 May 2018 | Independent Spent Fuel Storage Installation; Nine Mile Point 1 and 2; and R. E. Ginna Regulatory Audit Summary for License Amendment Request to Revise Emergency Action Level Schemes (CAC Nos. MF9836, MF9840; EPID L-2017-LLA-02) | |
ML17299A781 | 30 October 2017 | Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109 to Modify Licenses with Regard to Hardened Containment Vents | Tornado Missile FLEX Fukushima Dai-Ichi Battery sizing Earthquake |
ML17286A263 | 17 October 2017 | EA-13-109 Vent Order Audit Report | FLEX Tornado Generated Missile Fukushima Dai-Ichi Battery sizing Earthquake Weak link |
ML17194B082 | 18 July 2017 | Independent Spent Fuel Storage Installation; Nine Mile Point, Units 1 and 2; and R. E. Ginna - Regulatory Audit for License Amendment Request to Revise Emergency Action Level Schemes (CAC Nos. MF9836-MF9840) | |
ML16146A211 | 24 June 2016 | Redacted Summary Report of Audit Regarding the Steam Dryer Inspection Report Results | |
ML16006A213 | 4 February 2016 | Report for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 | FLEX |
ML15110A026 | 28 April 2015 | Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 | FLEX Spent Fuel Pool Instrumentation |
ML13225A584 | 19 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake Pressure Boundary Leakage GOTHIC |
ML12235A254 | 31 August 2012 | Audit of the Licensee'S Management of Regulatory Commitments | Enforcement Discretion Cyber Security License Renewal Power Uprate |
ML12041A161 | 23 February 2012 | Aging Management Programs Audit at the Nine Mile Point Nuclear Station, Unit 1 | Aging Management |
ML081210539 | 5 May 2008 | Audit of the Licensee'S Management of Regulatory Commitments | |
ML060110119 | 5 January 2006 | 1/5/06 - Audit and Review Report for Plant Aging Management Reviews and Programs, Nine Mile Point Nuclear Station, Units 1 and 2, Docket Nos: 50-220 and 50-410, January 5, 2006 | Ultimate heat sink Non-Destructive Examination Fire Barrier Weld Overlay Hydrostatic Coatings Nondestructive Examination Zebra Mussel Aging Management Moisture barrier License Renewal Control of Heavy Loads Biofouling EVT-1 Liquid penetrant Through Wall Leak Fire Protection Program Dissimilar Metal Weld Grace period Flow Induced Vibration |
ML052970275 | 20 October 2005 | E-mail from Ngoc Le of NRC to David Dellario Regarding the Audit and Review Plan for Plant Aging Management Programs and Reviews for Nine Mile Point Nuclear Station, Units 1 and 2 | Safe Shutdown Coatings Aging Management Liquid penetrant Fire Protection Program Grace period |
ML043100570 | 20 September 2004 | Site Audit References from Nine Mile Point Nuclear Station, Units 1 and 2 - Vegetation Management List | |
ML043100234 | 22 April 2004 | References from Nine Mile Point Nuclear Station, Units 1 and 2 Site Audit - State Pollutant Discharge Elimination System Renewal Application and Approval | Grab sample Zebra Mussel Incorporated by reference |
ML043100594 | 1 March 2004 | Information Relating to Other Federal Projects from the Nine Mile Point Nuclear Station, Units 1 and 2 Site Audit | |
ML043100232 | 18 February 2004 | References from Nine Mile Point Nuclear Station, Units 1 and 2 Site SUDIT- State Pollutant Discharge Elimination System Permit - Annual Report for 2003 | |
ML043130295 | 1 November 2003 | Site Audit References from Nine Mile Point Nuclear Station, Units 1 and 2 - Transmission RIGHT-OF-WAY Management Program | |
ML043100578 | 1 January 2003 | References from Nine Mile Point Nuclear Station, Units 1 and 2 Site Audit - Informal Training Materials for Vegetation Management Subcontractors | |
ML043100564 | 1 January 2003 | Site Audit References from Nine Mile Point Nuclear Station, Units 1 and 2 - Portion from 2003 Annual Radiological Environmental Operating Report (Distance to Nearest Residence) | Annual Radiological Environmental Operating Report |
ML043100314 | 1 January 2003 | References from Nine Mile Point Nuclear Station, Units 1 and 2 Site Audit - LRA Er Reference 4.3-31, Rg&E Population Estimates for Alewife and Rainbow Smelt in Lake Ontario (1982-2001) | |
ML043100223 | 28 February 2002 | References from Nine Milepoint Nuclear Station, Units 1 and 2 Site Audit - Radwaste Reports Sent to New York State | |
ML043100227 | 7 January 2002 | References from Nine Mile Point Nuclear Station, Units 1 and 2 Site Audit - SEMI-ANNUAL Sludge Report (Last Two Years) | Zebra Mussel |
ML043130181 | 31 December 2000 | Site Audit References from Nine Mile Point Nuclear Station, Units 1 and 2 - Oswego County Comprehensive Plan | Zebra Mussel Weak link |