Independent Spent Fuel Storage Installation; Nine Mile Point, Units 1 and 2; and R. E. Ginna - Regulatory Audit for License Amendment Request to Revise Emergency Action Level Schemes (CAC Nos. MF9836-MF9840)
ML17194B082
Person / Time
Site: Calvert Cliffs, Nine Mile Point, Ginna  Constellation icon.png
Issue date: 07/18/2017
From: Blake Purnell
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Generation Co
Marshall M, NRR/DORL/LPLI, 415-2871
References
CAC MF9836, CAC MF9837, CAC MF9838, CAC MF9839, CAC MF9840
Download: ML17194B082 (6)


Text

Mr. Bryan C. Hanson Senior Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2017 Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2; CALVERT CLIFFS INDEPENDENT SPENT FUEL STORAGE INSTALLATION; NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2; AND R. E. GINNA NUCLEAR POWER PLANT -

REGULA TORY AUDIT FOR LICENSE AMENDMENT REQUEST TO REVISE EMERGENCY ACTION LEVEL SCHEMES (CAC NOS. MF9836-MF9840)

Dear Mr. Hanson:

By application dated May 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17164A149), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request (LAR) for Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant. The amendments would revise the emergency plans by changing the emergency action level schemes for these facilities. The proposed changes are based on the Nuclear Energy lnstitute's (NEl's) guidance in NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," which was endorsed by the U.S. Nuclear Regulatory Commission (NRC) by letter dated March 28, 2013 (ADAMS Accession No. ML12346A463).

The NRC staff will perform a regulatory audit to support its review of the LAR in accordance with the enclosed audit plan. A regulatory audit is a planned activity that includes the examination and evaluation of primarily non-docketed information. The audit will be conducted to gain understanding, verifying information, and/or identifying information that will require docketing to support the basis for the licensing decision regarding the LAR.

The audit will be performed using an online reference portal that will allow the NRC staff limited read-only access to licensee documents. Use of the on line reference portal is acceptable, as long as the following conditions are met:

The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis; The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and Conditions of use of the on line reference portal will be displayed on the login screen and will require concurrence by each user.

The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation that Exelon agrees to the terms and conditions set forth in this letter. Please provide NRC staff access to the portal and provide the information needed to access the portal, such as username and password, as soon as possible.

The enclosed audit plan identifies the documents which should uploaded to the portal. The NRC staff will request additional information that is needed to support the staff's regulatory decision using its normal process. If you have any questions, please contact me by e-mail at Blake.Purnell@nrc.gov or by phone at (301) 415-1380.

Docket Nos. 50-317, 50-318, 72-8, 50-220, 50-410, 72-1036, 50-244, and 72-67

Enclosure:

Audit Plan cc: Distribution via Listserv Sincerely,

~

yo-<

Blake Purnell, Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

REGULA TORY AUDIT PLAN RELATED TO LICENSE AMENDMENT REQUEST TO REVISE EMERGENCY ACTION LEVEL SCHEMES CALVERT CLIFFS NUCLEAR POWER STATION, UNITS 1 AND 2 CALVERT CLIFFS INDEPENDENT SPENT FUEL STORAGE INSTALLATION

Background

NINE MILE POINT NUCLEAR POWER STATION, UNITS 1 AND 2 R. E. GINNA NUCLEAR POWER PLANT By application dated May 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17164A149), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request (LAR) for Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant. The amendments would revise the emergency plans by changing the emergency action level (EAL) schemes for these facilities.

Regulatory Basis The audit will support the review of the LAR. The purpose of the audit is to verify assumptions and input used to calculate specific monitor thresholds in the proposed EALs.

Audit Scope The scope of this audit is to review calculations, analysis, and supporting documentations related to radiological effluent and containment radiation monitor thresholds in the proposed EALs. The following is the initial list of documents that may be reviewed during the audit:

Calculations used to establish the thresholds for radiological effluent monitors in EALs RU1, RA1, RS1, and RG1.

Calculations used to establish the thresholds for containment radiation monitors in EALs FC3, RC3, CS6, and CG6.

Additional documents may be reviewed as part of the audit.

Enclosure Team The U.S. Nuclear Regulatory Commission (NRC) staff participation is expected to include the following individuals. These assignments may change.

Blake Purnell, Project Manager Raymond Hoffman, Technical Reviewer Michael Norris, Technical Team Lead David Wrona, Branch Chief Joseph Anderson, Branch Chief Logistics The audit will be conducted primarily using an online electronic information portal. If necessary, the NRC staff will make arrangements to review hard-copies at a location to be determined.

Meetings and teleconferences will be held as necessary for clarification of information. As necessary, public meetings will be used for technical discussions.

The audit will begin once the initial list of documents is made available to the NRC technical reviewer on the online electronic information portal. The audit will end before the NRC staff makes a final regulatory decision on the LAR.

Special Requests Exelon should establish an on line reference portal that allows the NRC staff to access documents remotely. The following conditions associated with the online reference portal must be maintained throughout the duration of the review process:

The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis; The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and Conditions of use of the on line reference portal will be displayed on the login screen and will require concurrence by each user.

The initial list of documents above should be made available as soon as possible to ensure timely completion of the audit. Username and password information should be provided directly to the NRC staff member. All other communications should be coordinated with the NRC project manager, Exelon should provide access to the electronic portal to Raymond Hoffman, who may be contacted by e-mail to Raymond.Hoffman@nrc.gov or by phone at 301-287-3764. The NRC project manager will inform Exelon if any additional staff members need access to the electronic portal.

Deliverables The NRC staff will inform Exelon when the audit has concluded, and will hold an exit meeting as needed. The staff will complete an audit summary to document its observations and conclusions within 30 days of the completion of the audit. The audit summary will be made public once the review of the LAR has been completed. Should the staff identify information during the audit that is needed to support its regulatory decision on the LAR, the staff will issue a request for additional information using its normal process.

ML171948082 OFFICE LPL3/PM LPL3/LA NAME BPurnell (BVaidya for)

SRohrer DATE 7/17/17 7/17/17 RidsRgn1 MailCenter Resource RidsNrrPMCalvertCliffs Resource RidsNrrPMNineMilePoint Resource RidsNrrPMREGinna Resource RidsNsirDpr Resource RidsNmssDsfmSflb Resource JAnderson, NSIR MNorris, NSIR RHoffman, NSIR

  • via email NSIR/DPR/RLB/BC LPL3/BC LPL3/PM JAnderson*

DWrona BPurnell (BVaidya for) 7/14/17 7/17/17 7/18/17