ML111640274: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML111640274 | | number = ML111640274 | ||
| issue date = 07/15/2011 | | issue date = 07/15/2011 | ||
| title = Issuance of Amendment Nos. 210 and 212, License Amendment Request to Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule | | title = Issuance of Amendment Nos. 210 and 212, License Amendment Request to Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule | ||
| author name = Wang A | | author name = Wang A | ||
| author affiliation = NRC/NRR/DORL/LPLIV | | author affiliation = NRC/NRR/DORL/LPLIV | ||
| addressee name = Conway J | | addressee name = Conway J | ||
| addressee affiliation = Pacific Gas & Electric Co | | addressee affiliation = Pacific Gas & Electric Co | ||
| docket = 05000275, 05000323 | | docket = 05000275, 05000323 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 15, 2011 Mr. John T. Conway Senior Vice President | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 15, 2011 Mr. John T. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105 SUB~IECT: DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - ISSUANCE OF AMENDMENTS RE: APPROVAL OF CYBER SECURITY PLAN (TAC NOS. ME4290 AND ME4291) | ||
-Energy Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105 DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 -ISSUANCE OF AMENDMENTS RE: APPROVAL OF CYBER SECURITY PLAN (TAC NOS. ME4290 AND ME4291) | |||
==Dear Mr. Conway:== | ==Dear Mr. Conway:== | ||
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 210 to Facility Operating License No. DPR-80 and Amendment No. 212 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively. | |||
The amendments consist of changes to the facility operating licenses in response to your application dated July 22, 2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011. The amendments approve the cyber security plan and associated implementation schedule, and revise Paragraph 2.E of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively, to provide a license condition to require the licensee to fully implement and maintain in effect all provisions of the NRC-approved Cyber Security Plan. The proposed change is consistent with Nuclear Energy Institute (NEI) 08-09, Revision 6, "Cyber Security Plan for Nuclear Power Reactors." | The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 210 to Facility Operating License No. DPR-80 and Amendment No. 212 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively. The amendments consist of changes to the facility operating licenses in response to your application dated July 22, 2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011. | ||
J. Conway -A copy of the related Safety Evaluation is enclosed. | The amendments approve the cyber security plan and associated implementation schedule, and revise Paragraph 2.E of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively, to provide a license condition to require the licensee to fully implement and maintain in effect all provisions of the NRC-approved Cyber Security Plan. The proposed change is consistent with Nuclear Energy Institute (NEI) 08-09, Revision 6, "Cyber Security Plan for Nuclear Power Reactors." | ||
The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice. Sincerely, II fl... | |||
J. Conway - 2 A copy of the related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice. | |||
Sincerely, II fl... IVi . , / | |||
LJvU1;v{ V CL'l'U1V Alan B. Wang, Project ~nager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Amendment No. 210 to DPR-80 2. Amendment No. 212 to DPR-82 3. Safety Evaluation cc w/encls: Distribution via Listserv UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC DOCKET NO. DIABLO CANYON NUCLEAR POWER PLANT, UNIT AMENDMENT TO FACILITY OPERATING Amendment No. 210 License No. DPR*80 The Nuclear Regulatory Commission (the Commission) has found that: The application for amendment by Pacific Gas and Electric Company (the licensee), dated July 22, 2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. | : 1. Amendment No. 210 to DPR-80 | ||
Enclosure 1 | : 2. Amendment No. 212 to DPR-82 | ||
-2 Accordingly, the license is amended as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows: Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 210, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions. In addition, Paragraph 2.E of Facility Operating License No. DPR-80 is hereby amended with additional text to read as follows: PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | : 3. Safety Evaluation cc w/encls: Distribution via Listserv | ||
The PG&E CSP was approved by License Amendment No. 210. This license amendment is effective as of the date of its issuance. | |||
The implementation of the cyber security plan (CSP), including the key intermediate milestone dates and the full implementation date, shall be in accordance with the implementation schedule submitted by the licensee on April 4, 2011, and approved by the NRC staff with this license amendment. | UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-275 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 210 License No. DPR*80 | ||
All subsequent changes to the NRC-approved CSP implementation schedule will require prior NRC approval pursuant to 10 CFR 50.90. FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | : 1. The Nuclear Regulatory Commission (the Commission) has found that: | ||
A. The application for amendment by Pacific Gas and Electric Company (the licensee), dated July 22, 2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. | |||
Enclosure 1 | |||
-2 | |||
: 2. Accordingly, the license is amended as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows: | |||
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 210, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions. | |||
: 3. In addition, Paragraph 2.E of Facility Operating License No. DPR-80 is hereby amended with additional text to read as follows: | |||
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | |||
The PG&E CSP was approved by License Amendment No. 210. | |||
: 4. This license amendment is effective as of the date of its issuance. The implementation of the cyber security plan (CSP), including the key intermediate milestone dates and the full implementation date, shall be in accordance with the implementation schedule submitted by the licensee on April 4, 2011, and approved by the NRC staff with this license amendment. All subsequent changes to the NRC-approved CSP implementation schedule will require prior NRC approval pursuant to 10 CFR 50.90. | |||
FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==Attachment:== | ==Attachment:== | ||
Changes to the Facility Operating License No. DPR-80 and Technical Specifications Date of Issuance: | Changes to the Facility Operating License No. DPR-80 and Technical Specifications Date of Issuance: July 15,2011 | ||
July 15,2011 UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC DOCKET NO. DIABLO CANYON NUCLEAR POWER PLANT, UNIT AMENDMENT TO FACILITY OPERATING Amendment No. 212 License No. DPR-82 The Nuclear Regulatory Commission (the Commission) has found that: The application for amendment by Pacific Gas and Electric Company (the licensee), dated July 22,2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011, complies with the standards and reqUirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regUlations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. | |||
Enclosure 2 | UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 212 License No. DPR-82 | ||
-Accordingly, the license is amended as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows: Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 212, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions. In addition, Paragraph 2.E of Facility Operating License No. DPR-80 is hereby amended with additional text to read as follows: PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | : 1. The Nuclear Regulatory Commission (the Commission) has found that: | ||
The PG&E CSP was approved by License Amendment No. 212. This license amendment is effective as of the date of its issuance. | A. The application for amendment by Pacific Gas and Electric Company (the licensee), dated July 22,2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011, complies with the standards and reqUirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regUlations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. | ||
The implementation of the cyber security plan (CSP), including the key intermediate milestone dates and the full implementation date, shall be in accordance with the implementation schedule submitted by the licensee on April 4, 2011, and approved by the NRC staff with this license amendment. | Enclosure 2 | ||
All subsequent changes to the NRC-approved CSP implementation schedule will require prior NRC approval pursuant to 10 CFR 50.90. FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
- 2 | |||
: 2. Accordingly, the license is amended as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows: | |||
(2) Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 212, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions. | |||
: 3. In addition, Paragraph 2.E of Facility Operating License No. DPR-80 is hereby amended with additional text to read as follows: | |||
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | |||
The PG&E CSP was approved by License Amendment No. 212. | |||
: 4. This license amendment is effective as of the date of its issuance. The implementation of the cyber security plan (CSP), including the key intermediate milestone dates and the full implementation date, shall be in accordance with the implementation schedule submitted by the licensee on April 4, 2011, and approved by the NRC staff with this license amendment. All subsequent changes to the NRC-approved CSP implementation schedule will require prior NRC approval pursuant to 10 CFR 50.90. | |||
FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==Attachment:== | ==Attachment:== | ||
Changes to the Facility Operating License No. DPR-82 and Technical Specifications Date of Issuance: | Changes to the Facility Operating License No. DPR-82 and Technical Specifications Date of Issuance: Ju 1y 1 5. 2011 | ||
Ju | |||
Major modifications are defined as: Elimination of any test identified in Section 14 of PG&E's Final Safety Analysis Report as amended as being essential; Amendment No. 210 E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54 (p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, by Training and Qualification Plan, and Safeguards Contingency Plan," submitted by letter dated May 16, 2006. PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | ATTACHMENT TO LICENSE AMENDMENT NO. 210 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 212 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323 Replace the following pages of the Facility Operating License Nos. DPR-80 and DPR-82, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. | ||
The PG&E CSP was approved by License Amendment No. 210. F. Deleted. G. Deleted. H. Financial Protection PG&E shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. I. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas: (a) Fire fighting response strategy with the following elements: | Facility Operating License No. DPR-80 REMOVE INSERT | ||
: 1. Pre-defined coordinated fire response strategy and guidance 2. Assessment of mutual aid fire fighting assets 3. Designated staging areas for equipment and materials | -3 -3 | ||
: 4. Command and control 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following: 1 . Protection and use of personnel assets 2. Communications | -9 -9 Facility Operating License No. DPR-82 REMOVE INSERT | ||
: 3. Minimizing fire spread 4. Procedures for implementing integrated fire response strategy 5. Identification of readily-available pre-staged equipment | -3 | ||
: 6. Training on integrated fire response strategy 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of: 1. Water spray scrubbing | -6 Technical Specifications REMOVE INSERT | ||
: 2. Dose to onsite responders Amendment No. 210 Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein. Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix 8, as revised through Amendment No. 212, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions. Initial Test Program (SSER 31, Section 4.4.1) Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change. *The | |||
Amendment No. 212 (10) Pipeway Structure DE and DDE Analysis (SSER 32, Section 4) Prior to start-up following the first refueling outage PG&E shall complete a confirmatory analysis for the pipeway structure to further demonstrate the adequacy of the pipeway structure for load combinations that include the design earthquake (DE) and double design earthquake (DDE). (11) Sent Fuel Pool Modification The licensee is authorized to modify the spent fuel pool as described in the application dated October 30, 1985 (LAR 8S-13) as supplemented. | -3 (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. | ||
C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: | |||
(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein. | |||
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix S, as revised through Amendment No. 210, are hereby incorporated in the license. | |||
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions. | |||
(3) Initial Test Program The Pacific Gas and Electric Company shall conduct the post-fuel-Ioading initial test program (set forth in Section 14 of Pacific Gas and Electric Company's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as: | |||
: a. Elimination of any test identified in Section 14 of PG&E's Final Safety Analysis Report as amended as being essential; Amendment No. 210 | |||
-9 E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54 (p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, by Training and Qualification Plan, and Safeguards Contingency Plan," submitted by letter dated May 16, 2006. | |||
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The PG&E CSP was approved by License Amendment No. 210. | |||
F. Deleted. | |||
G. Deleted. | |||
H. Financial Protection PG&E shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. | |||
I. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas: | |||
(a) Fire fighting response strategy with the following elements: | |||
: 1. Pre-defined coordinated fire response strategy and guidance | |||
: 2. Assessment of mutual aid fire fighting assets | |||
: 3. Designated staging areas for equipment and materials | |||
: 4. Command and control | |||
: 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following: | |||
: 1. Protection and use of personnel assets | |||
: 2. Communications | |||
: 3. Minimizing fire spread | |||
: 4. Procedures for implementing integrated fire response strategy | |||
: 5. Identification of readily-available pre-staged equipment | |||
: 6. Training on integrated fire response strategy | |||
: 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of: | |||
: 1. Water spray scrubbing | |||
: 2. Dose to onsite responders Amendment No. 210 | |||
-3 (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. | |||
C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: | |||
(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein. | |||
(2) Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix 8, as revised through Amendment No. 212, are hereby incorporated in the license. | |||
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions. | |||
(3) Initial Test Program (SSER 31, Section 4.4.1) | |||
Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change. | |||
*The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. | |||
Amendment No. 212 | |||
-6 (10) Pipeway Structure DE and DDE Analysis (SSER 32, Section 4) | |||
Prior to start-up following the first refueling outage PG&E shall complete a confirmatory analysis for the pipeway structure to further demonstrate the adequacy of the pipeway structure for load combinations that include the design earthquake (DE) and double design earthquake (DDE). | |||
(11) Sent Fuel Pool Modification The licensee is authorized to modify the spent fuel pool as described in the application dated October 30, 1985 (LAR 8S-13) as supplemented. | |||
Amendment NO.6 issued on May 30, 1986 and stayed by the U.S. Court of Appeals for the Ninth Circuit pending completion of NRC hearings is reinstated. | Amendment NO.6 issued on May 30, 1986 and stayed by the U.S. Court of Appeals for the Ninth Circuit pending completion of NRC hearings is reinstated. | ||
Prior to final conversion to the modified rack design, fuel may be stored, as needed, in either the modified storage racks described in Technical Specification S.6.1.1 or in the unmodified storage racks (or both) which are designed and shall be maintained with a nominal 21-inch center distance between fuel assemblies placed in the storage racks. (12) Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 202, are hereby incorporated into this license. Pacific Gas and Electric Company shall operate the facility in accordance with the Additional Conditions. | Prior to final conversion to the modified rack design, fuel may be stored, as needed, in either the modified storage racks described in Technical Specification S.6.1.1 or in the unmodified storage racks (or both) which are designed and shall be maintained with a nominal 21-inch center-to center distance between fuel assemblies placed in the storage racks. | ||
D. Exemption (SSER 31, Section 6.2.6) An exemption from certain requirements of Appendix J to 10 CFR Part SO is described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement NO.9. This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. | (12) Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 202, are hereby incorporated into this license. Pacific Gas and Electric Company shall operate the facility in accordance with the Additional Conditions. | ||
Therefore, this exemption previously granted in Facility Operating License No. DPR-81 pursuant to 10 CFR SO.12 is hereby reaffirmed. | D. Exemption (SSER 31, Section 6.2.6) | ||
The facility will operate, with the exemption authorized, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission. | An exemption from certain requirements of Appendix J to 10 CFR Part SO is described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement NO.9. This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. Therefore, this exemption previously granted in Facility Operating License No. DPR-81 pursuant to 10 CFR SO.12 is hereby reaffirmed. The facility will operate, with the exemption authorized, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission. | ||
E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.SS (S1 FR 27817 and 27822) and to the authority of 10 CFR SO.90 and 10 CFR SO.S4(p). | E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.SS (S1 FR 27817 and 27822) and to the authority of 10 CFR SO.90 and 10 CFR SO.S4(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan," submitted by letter dated May 16, 2006. | ||
The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan," submitted by letter dated May 16, 2006. PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR SO.90 and 10 CFR SO.S4(p). | PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR SO.90 and 10 CFR SO.S4(p). The PG&E CSP was approved by License Amendment No. 212. | ||
The PG&E CSP was approved by License Amendment No. 212. Amendment No. 212 | Amendment No. 212 | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 210 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 212 TO FACILITY OPERATING LICENSE NO. DPR-82 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-275 AND 50-323 | |||
==1.0 INTRODUCTION== | |||
By application dated July 22,2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML102150081, ML102350061, ML102740381, ML103490367, ML110400126, and ML111020451, respectively), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment request. Included in that license amendment request was a request for approval of the licensee's Cyber Security Plan (CSP) and Implementation Schedule for the Diablo Canyon Power Plant (DCPP), Unit Nos. 1 and 2, as required by Section 73.54, "Protection of Digital Computer and Communication Systems and Networks," of Title 10 of the Code of Federal Regulations (10 CFR). The U.S. | |||
Nuclear Regulatory Commission (NRC) staff provided the licensee requests for additional information (RAls) regarding the staffs concerns with the CSP. By letter dated February 8, 2011, the licensee submitted its response to these RAls. Additionally, on April 4, 2011, the licensee supplemented its CSP to address: 1) scope of systems in response to the October 21, 2010, Commission decision (Reference 1); 2) records retention; and 3) implementation schedule. The licensee submitted a Revision 0 of the CSP incorporating all of the changes and/or additional information as referenced in the RAI responses. Portions of the letters dated July 22, 2010, and April 4, 2011, contain sensitive unclassified non-safeguards information (security-related) and, accordingly, those portions are withheld from public disclosure. | |||
The supplemental letters dated August 19, September 29, and November 30,2010, and February 8 and April 4, 2011, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register on October 12, 2010 (75 FR 62605). | |||
The amendments would approve the CSP and associated implementation schedule, and revise Paragraph 2.E of Facility Operating License Nos. DPR-80 and DPR-82 for DCPP, Unit Nos. 1 Enclosure 3 | |||
2.1 General Requirements Consistent with 10 CFR 73.54(a), the licensee must provide high assurance that digital computer and communication systems, and networks are adequately protected against cyber attacks, up to and including the design-basis threat (DBT), as described in 10 CFR 73.1. The licensee shall protect digital computer and communication systems and networks associated with: 0) safety-related and important-to-safety functions; Oi) security functions; (iii) emergency preparedness functions, including offsite communications; and (iv) support systems and equipment which, if compromised, would adversely impact safety, security, or emergency preparedness (SSEP) functions. | -2 and 2, respectively, to provide a license condition to require the licensee to fully implement and maintain in effect all provisions of the NRC-approved Cyber Security Plan. The proposed amendment is generally consistent with Nuclear Energy Institute (NEI) 08-09, Revision 6, "Cyber Security Plan for Nuclear Power Reactors." | ||
The rule specifies that digital computer and communication systems and networks associated with these functions must be protected from cyber attacks that would adversely impact the integrity or confidentiality of data and software; deny access to systems, services, or data; or provide an adverse impact to the operations of systems, networks, and associated equipment. | |||
==2.0 REGULATORY EVALUATION== | |||
2.1 General Requirements Consistent with 10 CFR 73.54(a), the licensee must provide high assurance that digital computer and communication systems, and networks are adequately protected against cyber attacks, up to and including the design-basis threat (DBT), as described in 10 CFR 73.1. The licensee shall protect digital computer and communication systems and networks associated with: 0) safety-related and important-to-safety functions; Oi) security functions; (iii) emergency preparedness functions, including offsite communications; and (iv) support systems and equipment which, if compromised, would adversely impact safety, security, or emergency preparedness (SSEP) functions. The rule specifies that digital computer and communication systems and networks associated with these functions must be protected from cyber attacks that would adversely impact the integrity or confidentiality of data and software; deny access to systems, services, or data; or provide an adverse impact to the operations of systems, networks, and associated equipment. | |||
In the Staff Requirements Memorandum (SRM) COMWCO-10-0001, "Regulation of Cyber Security at Nuclear Power Plants," dated October 21,2010 (Reference 1), the Commission stated that the NRC's cyber security rule at 10 CFR 73.54 should be interpreted to include structures, systems, and components (SSCs) in the balance of plant (BOP) that have a nexus to radiological health and safety. The NRC staff determined that SSCs in the BOP that have a nexus to radiological health and safety are those that could directly or indirectly affect reactivity of a nuclear power plant (NPP), and are therefore within the scope of important-to-safety functions described in 10 CFR 73.54(a)(1). | In the Staff Requirements Memorandum (SRM) COMWCO-10-0001, "Regulation of Cyber Security at Nuclear Power Plants," dated October 21,2010 (Reference 1), the Commission stated that the NRC's cyber security rule at 10 CFR 73.54 should be interpreted to include structures, systems, and components (SSCs) in the balance of plant (BOP) that have a nexus to radiological health and safety. The NRC staff determined that SSCs in the BOP that have a nexus to radiological health and safety are those that could directly or indirectly affect reactivity of a nuclear power plant (NPP), and are therefore within the scope of important-to-safety functions described in 10 CFR 73.54(a)(1). | ||
2.2 Elements of a CSP As stated in 10 CFR 73.54(e), the licensee must establish, implement, and maintain a CSP that satisfies the Cyber Security Program requirements of this regulation. | 2.2 Elements of a CSP As stated in 10 CFR 73.54(e), the licensee must establish, implement, and maintain a CSP that satisfies the Cyber Security Program requirements of this regulation. In addition, the CSP must describe how the licensee will implement the requirements of the regulation and must account for the site-specific conditions that affect implementation. One method of complying with this regulation is to describe within the CSP how the licensee will achieve high assurance that all SSEP functions are protected from cyber attacks. | ||
In addition, the CSP must describe how the licensee will implement the requirements of the regulation and must account for the site-specific conditions that affect implementation. | 2.3 Regulatory Guide 5.71 and NEI OB-09. Revision 6 NRC Regulatory Guide (RG) 5.71, "Cyber Security Programs for Nuclear Facilities" (Reference 2), describes a regulatory position that promotes a defensive strategy consisting of a defensive architecture and a set of security controls based on standards provided in the National Institute of Standards and Technology (NIST) Special Publication (SP) BOO-53, "Recommended Security Controls for Federal Information Systems and Organizations," and NIST SP BOO-B2, "Guide to Industrial Control Systems Security," dated September 29, 200B. | ||
One method of complying with this regulation is to describe within the CSP how the licensee will achieve high assurance that all SSEP functions are protected from cyber attacks. 2.3 Regulatory Guide 5.71 and NEI OB-09. Revision 6 NRC Regulatory Guide (RG) 5.71, "Cyber Security Programs for Nuclear (Reference 2), describes a regulatory position that promotes a defensive strategy consisting of defensive architecture and a set of security controls based on standards provided in National Institute of Standards and Technology (NIST) Special Publication (SP) "Recommended Security Controls for Federal Information Systems and Organizations," NIST SP BOO-B2, "Guide to Industrial Control Systems Security," dated September 29, | |||
-NIST SP 800-53 and NIST SP 800-82 are based on well-understood cyber threats, risks, and vulnerabilities, coupled with equally well-understood countermeasures and protective techniques. | - 3 NIST SP 800-53 and NIST SP 800-82 are based on well-understood cyber threats, risks, and vulnerabilities, coupled with equally well-understood countermeasures and protective techniques. RG 5.71 divides the above-noted security controls into three broad categories: | ||
RG 5.71 divides the above-noted security controls into three broad categories: | |||
technical, operational, and management. | technical, operational, and management. | ||
The organization of RG 5.71 reflects the steps necessary to meet the requirements of 10 CFR 73.54. Section C.3 of RG 5.71 describes an acceptable method for implementing the security controls, as detailed in Appendix B, "Technical Controls," and Appendix C, "Operational and Management Controls." Section CA of RG 5.71 discusses the need to maintain the established cyber security program, including comprehensive monitoring of the CDAs and the effectiveness of their security protection measures, ensuring that changes to the CDAs or the environment are controlled, coordinated, and periodically reviewed for continued protection from cyber attacks. Section C.5 of RG 5.71 provides licensees and applicants with guidance for retaining records associated with their cyber security programs. | The organization of RG 5.71 reflects the steps necessary to meet the requirements of 10 CFR 73.54. Section C.3 of RG 5.71 describes an acceptable method for implementing the security controls, as detailed in Appendix B, "Technical Controls," and Appendix C, "Operational and Management Controls." Section CA of RG 5.71 discusses the need to maintain the established cyber security program, including comprehensive monitoring of the CDAs and the effectiveness of their security protection measures, ensuring that changes to the CDAs or the environment are controlled, coordinated, and periodically reviewed for continued protection from cyber attacks. | ||
Appendix A to RG 5.71 provides a template for a generic cyber security plan which licensees may use to comply with the licensing requirements of 10 CFR 73.54. Appendices Band C provide an acceptable set of security controls, which are based on well-understood threats, vulnerabilities, and attacks, coupled with equally understood and vetted countermeasures and protective techniques. | Section C.5 of RG 5.71 provides licensees and applicants with guidance for retaining records associated with their cyber security programs. Appendix A to RG 5.71 provides a template for a generic cyber security plan which licensees may use to comply with the licensing requirements of 10 CFR 73.54. Appendices Band C provide an acceptable set of security controls, which are based on well-understood threats, vulnerabilities, and attacks, coupled with equally well understood and vetted countermeasures and protective techniques. | ||
NEI 08-09, Revision 6, closely maps with RG 5.71; Appendix A of NEI 08-09, Revision 6, contains a cyber security plan template that is comparable to Appendix A of RG 5.71. Appendix 0 of NEI 08-09, Revision 6, contains technical cyber security controls that are comparable to Appendix B of RG 5.71. Appendix E of NEI 08-09, Revision 6, contains operational and management cyber security controls that are comparable to Appendix C of RG 5.71. RG 5.71 provides a framework to aid in the identification of those digital assets that licensees must protect from cyber attacks. These identified digital assets are referred to as "critical digital assets" (CDAs). Licensees should address the potential cyber security risks to CDAs by applying the defensive architecture and addressing the collection of security controls identified in RG 5.71. RG 5.71 includes a CSP template that provides one method for preparing an acceptable CSP. In its letter to the Nuclear Energy Institute dated May 5, 2010 (Reference 3), the NRC stated that the licensees may use the template in NEI 08-09, Revision 6 (Reference 4), to prepare an acceptable CSP, with the exception of the definition of "cyber attack." The NRC staff subsequently reviewed and approved, by letter dated June 7, 2010 (Reference 5), a definition for "cyber attack" to be used in submissions based on NEI 08-09, Revision 6. The licensee submitted a CSP for DCPP that was based on the template provided in NEI 08-09, Revision 6, and included a definition of cyber attack acceptable to the NRC staff (in the referenced NRC letter dated June 7,2010), within Enclosure 1 of the licensee's letter dated July 22,2010. Additionally, the licensee submitted a supplement to its CSP on April 4, 2011, to include information on SSCs in the BOP that, if compromised, could affect NPP reactivity. | NEI 08-09, Revision 6, closely maps with RG 5.71; Appendix A of NEI 08-09, Revision 6, contains a cyber security plan template that is comparable to Appendix A of RG 5.71. | ||
RG 5.71 and NEI 08-09, Revision 6, are comparable documents; both are based on essentially the same general approach and the same set of technical, operational, and management security controls. | Appendix 0 of NEI 08-09, Revision 6, contains technical cyber security controls that are comparable to Appendix B of RG 5.71. Appendix E of NEI 08-09, Revision 6, contains operational and management cyber security controls that are comparable to Appendix C of RG 5.71. | ||
The licensee's submitted CSP was reviewed against the corresponding sections in RG 5.71. | RG 5.71 provides a framework to aid in the identification of those digital assets that licensees must protect from cyber attacks. These identified digital assets are referred to as "critical digital assets" (CDAs). Licensees should address the potential cyber security risks to CDAs by applying the defensive architecture and addressing the collection of security controls identified in RG 5.71. RG 5.71 includes a CSP template that provides one method for preparing an acceptable CSP. | ||
-4 3.0 TECHNICAL The NRC staff performed a technical evaluation of the licensee's submittal. | In its letter to the Nuclear Energy Institute dated May 5, 2010 (Reference 3), the NRC stated that the licensees may use the template in NEI 08-09, Revision 6 (Reference 4), to prepare an acceptable CSP, with the exception of the definition of "cyber attack." The NRC staff subsequently reviewed and approved, by letter dated June 7, 2010 (Reference 5), a definition for "cyber attack" to be used in submissions based on NEI 08-09, Revision 6. The licensee submitted a CSP for DCPP that was based on the template provided in NEI 08-09, Revision 6, and included a definition of cyber attack acceptable to the NRC staff (in the referenced NRC letter dated June 7,2010), within Enclosure 1 of the licensee's letter dated July 22,2010. | ||
The licensee's submittal, with the exception of deviations described in Section 4.0, generally conformed to the guidance in NEI 08-09, Revision 6, which was found to be acceptable by the NRC staff and comparable to RG 5.71 to satisfy the requirements contained in 10 CFR 73.54. The staff reviewed the licensee's submittal against the requirements of 10 CFR 73.54 following the guidance contained in RG 5.71. The NRC staff's evaluation of each section of the licensee's submittal is discussed below. Scope and Purpose The licensee's CSP establishes a means to achieve high assurance that digital computer and communication systems and networks associated with the following functions are adequately protected against cyber attacks up to and including the DBT: Safety-related and important-to-safety functions; Security functions; | Additionally, the licensee submitted a supplement to its CSP on April 4, 2011, to include information on SSCs in the BOP that, if compromised, could affect NPP reactivity. | ||
The licensee's submitted CSP describes achievement of high assurance of adequate protection of systems associated with the above functions from cyber attacks by: Implementing and documenting the "baseline" security controls as described in Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 described in RG 5.71; and Implementing and documenting a Cyber Security Program to maintain the established cyber security controls through a comprehensive life cycle approach as described in Section 4 of NEI 08-09, Revision 6, which is comparable to Appendix A, Section A.2.1 of RG 5.71. Thus, the licensee's CSP, as originally submitted, is comparable to the CSP in NEI-08-09, Revision 6. However, in its submittal dated April 4, 2011, the licensee clarified its original submission and indicated that the scope of systems includes those BOP SSCs that have an impact on NPP reactivity if compromised. | RG 5.71 and NEI 08-09, Revision 6, are comparable documents; both are based on essentially the same general approach and the same set of technical, operational, and management security controls. The licensee's submitted CSP was reviewed against the corresponding sections in RG 5.71. | ||
This is in response to and consistent with SRM COMWCO-1 0-0001, in which the Commission stated that the NRC's cyber security rule at 10 CFR 73.54 should be interpreted to include SSCs in the BOP that have a nexus to radiological health and safety. The NRC staff determined that this is defined as those systems that have a nexus to radiological health and safety are those that could directly or indirectly affect reactivity of an NPP, and are therefore within the scope of important-to-safety functions described in 10 CFR 73.54(a)(1). | |||
-The NRC staff reviewed the CSP and the supplemental information submitted by the licensee and found no deviation from Regulatory Position C.3.3 in RG 5.71 and Appendix A, Section A.2.1 of RG 5.71. The NRC staff concludes that the licensee established adequate measures to implement and document the Cyber Security Program, including baseline security controls. | -4 | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately establishes the Cyber Security Program, including baseline security controls. Analyzing Digital Computer Systems and Networks and Applying Cyber Security Controls The licensee's CSP describes that the Cyber Security Program is established, implemented, and maintained as described in Section 3.1 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1 described in RG 5.71 to: Analyze digital computer and communications systems and networks, and Identify those assets that must be protected against cyber attacks to satisfy 10 CFR 73.54(a). | |||
The licensee's submitted CSP describes how the cyber security controls in Appendices D and E of NEI 08-09, Revision 6, which are comparable to Appendices Band C in RG 5.71, are addressed to protect CDAs from cyber attacks. This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1 in RG 5.71 without deviation. | ==3.0 TECHNICAL EVALUATION== | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately addresses security controls. Cyber Security Assessment and Authorization The licensee provided information addressing the creation of a formal, documented, cyber security assessment and authorization policy. This included a description concerning the creation of a formal, documented procedure comparable to Section 3.1.1 of NEI 08-09, Revision 6. The NRC staff concludes that the licensee established adequate measures to define and address the purpose, scope, roles, responsibilities, management commitment, and coordination, and facilitates the implementation of the cyber security assessment and authorization policy. The NRC staff requested that the licensee clarify that it has a formal, documented policy or procedure covering the listed topics under cyber security assessment and authorization because the licensee's original submittal referred to a "program" rather than a policy or procedure. | |||
The licensee subsequently revised the DCPP CSP Section 3.1.1 to replace the term "program" with "procedure" consistent with Regulatory Position C.3.1.1 in RG 5.71 and Appendix A, Section A.3.1.1 of RG 5.71. The NRC staff has reviewed the revised CSP. Based on the above, the NRC staff concludes that the licensee's CSP adequately established controls to develop, disseminate, and periodically update the cyber security assessment and authorization policy and implementing procedure. | The NRC staff performed a technical evaluation of the licensee's submittal. The licensee's submittal, with the exception of deviations described in Section 4.0, generally conformed to the guidance in NEI 08-09, Revision 6, which was found to be acceptable by the NRC staff and comparable to RG 5.71 to satisfy the requirements contained in 10 CFR 73.54. The staff reviewed the licensee's submittal against the requirements of 10 CFR 73.54 following the guidance contained in RG 5.71. The NRC staff's evaluation of each section of the licensee's submittal is discussed below. | ||
3.4 Cyber Security Assessment Team The Cyber Security Assessment Team (CSAT) responsibilities include conducting the cyber security assessment, documenting key 'findings during the assessment, and evaluating assumptions and conclusions about cyber security threats. The licensee's submitted CSP outlines the requirements, roles, and responsibilities of the CSAT comparable to Section 3.1.2 of NEI 08-09, Revision 6. It also describes that the CSAT has the authority to conduct an independent assessment. | 3.1 Scope and Purpose The licensee's CSP establishes a means to achieve high assurance that digital computer and communication systems and networks associated with the following functions are adequately protected against cyber attacks up to and including the DBT: | ||
The licensee's submitted CSP states that the CSAT will consist of individuals with knowledge about information and digital systems technology; NPP operations, engineering, and plant technical specifications; and physical security and emergency preparedness systems and programs. | : 1. Safety-related and important-to-safety functions; | ||
The CSAT description in the CSP is comparable to Regulatory Position C.3.1.2 in RG 5.71. The licensee's submitted CSP lists the roles and responsibilities for the CSAT which included performing and overseeing the cyber security assessment process; documenting key observations; evaluating information about cyber security threats and vulnerabilities; confirming information obtained during tabletop reviews, walk-downs, or electronic validation of CDAs; and identifying potential new cyber security controls. | : 2. Security functions; | ||
: 3. Emergency preparedness functions, including offsite communications; and | |||
: 4. Support systems and equipment which, if compromised, would adversely impact SSEP functions. | |||
The licensee's submitted CSP describes achievement of high assurance of adequate protection of systems associated with the above functions from cyber attacks by: | |||
* Implementing and documenting the "baseline" security controls as described in Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 described in RG 5.71; and | |||
* Implementing and documenting a Cyber Security Program to maintain the established cyber security controls through a comprehensive life cycle approach as described in Section 4 of NEI 08-09, Revision 6, which is comparable to Appendix A, Section A.2.1 of RG 5.71. | |||
Thus, the licensee's CSP, as originally submitted, is comparable to the CSP in NEI-08-09, Revision 6. However, in its submittal dated April 4, 2011, the licensee clarified its original submission and indicated that the scope of systems includes those BOP SSCs that have an impact on NPP reactivity if compromised. This is in response to and consistent with SRM COMWCO-1 0-0001, in which the Commission stated that the NRC's cyber security rule at 10 CFR 73.54 should be interpreted to include SSCs in the BOP that have a nexus to radiological health and safety. The NRC staff determined that this is defined as those systems that have a nexus to radiological health and safety are those that could directly or indirectly affect reactivity of an NPP, and are therefore within the scope of important-to-safety functions described in 10 CFR 73.54(a)(1). | |||
- 5 The NRC staff reviewed the CSP and the supplemental information submitted by the licensee and found no deviation from Regulatory Position C.3.3 in RG 5.71 and Appendix A, Section A.2.1 of RG 5.71. The NRC staff concludes that the licensee established adequate measures to implement and document the Cyber Security Program, including baseline security controls. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately establishes the Cyber Security Program, including baseline security controls. | |||
3.2 Analyzing Digital Computer Systems and Networks and Applying Cyber Security Controls The licensee's CSP describes that the Cyber Security Program is established, implemented, and maintained as described in Section 3.1 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1 described in RG 5.71 to: | |||
* Analyze digital computer and communications systems and networks, and | |||
* Identify those assets that must be protected against cyber attacks to satisfy 10 CFR 73.54(a). | |||
The licensee's submitted CSP describes how the cyber security controls in Appendices D and E of NEI 08-09, Revision 6, which are comparable to Appendices Band C in RG 5.71, are addressed to protect CDAs from cyber attacks. | |||
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1 in RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately addresses security controls. | |||
3.3 Cyber Security Assessment and Authorization The licensee provided information addressing the creation of a formal, documented, cyber security assessment and authorization policy. This included a description concerning the creation of a formal, documented procedure comparable to Section 3.1.1 of NEI 08-09, Revision 6. | |||
The NRC staff concludes that the licensee established adequate measures to define and address the purpose, scope, roles, responsibilities, management commitment, and coordination, and facilitates the implementation of the cyber security assessment and authorization policy. | |||
The NRC staff requested that the licensee clarify that it has a formal, documented policy or procedure covering the listed topics under cyber security assessment and authorization because the licensee's original submittal referred to a "program" rather than a policy or procedure. The licensee subsequently revised the DCPP CSP Section 3.1.1 to replace the term | |||
-6 "program" with "procedure" consistent with Regulatory Position C.3.1.1 in RG 5.71 and Appendix A, Section A.3.1.1 of RG 5.71. The NRC staff has reviewed the revised CSP. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately established controls to develop, disseminate, and periodically update the cyber security assessment and authorization policy and implementing procedure. | |||
3.4 Cyber Security Assessment Team The Cyber Security Assessment Team (CSAT) responsibilities include conducting the cyber security assessment, documenting key 'findings during the assessment, and evaluating assumptions and conclusions about cyber security threats. The licensee's submitted CSP outlines the requirements, roles, and responsibilities of the CSAT comparable to Section 3.1.2 of NEI 08-09, Revision 6. It also describes that the CSAT has the authority to conduct an independent assessment. | |||
The licensee's submitted CSP states that the CSAT will consist of individuals with knowledge about information and digital systems technology; NPP operations, engineering, and plant technical specifications; and physical security and emergency preparedness systems and programs. The CSAT description in the CSP is comparable to Regulatory Position C.3.1.2 in RG 5.71. | |||
The licensee's submitted CSP lists the roles and responsibilities for the CSAT which included performing and overseeing the cyber security assessment process; documenting key observations; evaluating information about cyber security threats and vulnerabilities; confirming information obtained during tabletop reviews, walk-downs, or electronic validation of CDAs; and identifying potential new cyber security controls. | |||
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2 in RG 5.71 without deviation. | This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2 in RG 5.71 without deviation. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately establishes the requirements, roles and responsibilities of the | Based on the above, the NRC staff concludes that the licensee's CSP adequately establishes the requirements, roles and responsibilities of the CSAT. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the process to identify CDAs. | 3.5 Identification of CDAs The licensee's submitted CSP states that the licensee will identify and document CDAs and critical systems (CSs), including a general description, the overall function, the overall consequences if a compromise were to occur, and the security functional requirements or specifications as described in Section 3.1.3 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.3 of RG 5.71. | ||
-7 3.6 Examination of Cyber Security Practices The licensee's submitted CSP describes how the CSAT will examine and document the existing cyber security policies, procedures, and practices; existing cyber security controls; detailed descriptions of network and communication architectures (or network/communication architecture drawings); | This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.3 in RG 5.71 without deviation. | ||
information on security devices; and any other information that may be helpful during the cyber security assessment process as described in Section 3.1.4 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.2 of RG 5.71. The examinations will include an analysis of the effectiveness of the existing Cyber Security Program and cyber security controls. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the process to identify CDAs. | ||
The CSAT will document the collected cyber security information and the results of their examination of the collected information. | |||
-7 3.6 Examination of Cyber Security Practices The licensee's submitted CSP describes how the CSAT will examine and document the existing cyber security policies, procedures, and practices; existing cyber security controls; detailed descriptions of network and communication architectures (or network/communication architecture drawings); information on security devices; and any other information that may be helpful during the cyber security assessment process as described in Section 3.1.4 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.2 of RG 5.71. The examinations will include an analysis of the effectiveness of the existing Cyber Security Program and cyber security controls. The CSAT will document the collected cyber security information and the results of their examination of the collected information. | |||
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2 in RG 5.71 without deviation. | This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2 in RG 5.71 without deviation. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the examination of cyber security practices. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the examination of cyber security practices. | ||
3.7 Tabletop Reviews and Validation Testing The licensee's submitted CSP describes tabletop reviews and validation testing, which confirm the direct and indirect connectivity of each COA and identify direct and indirect pathways to COAs. The CSP states that validation testing will be performed electronically or by physical walkdowns. | 3.7 Tabletop Reviews and Validation Testing The licensee's submitted CSP describes tabletop reviews and validation testing, which confirm the direct and indirect connectivity of each COA and identify direct and indirect pathways to COAs. The CSP states that validation testing will be performed electronically or by physical walkdowns. The licensee's plan for tabletop reviews and validation testing is comparable to Section 3.1.5 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.4 of RG 5.71. | ||
The licensee's plan for tabletop reviews and validation testing is comparable to Section 3.1.5 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.4 of RG 5.71. This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.4 in RG 5.71 without deviation. | This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.4 in RG 5.71 without deviation. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes tabletop reviews and validation testing. 3.8 Mitigation of Vulnerabilities and Application of Cyber Security Controls The licensee's submitted CSP describes the use of information collected during the cyber security assessment process (e.g., disposition of cyber security controls, defensive models, defensive strategy measures, site and corporate network architectures) to implement security controls in accordance with Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 and Appendix A.3.1.6 to RG 5.71. The CSP describes the process that will be applied in cases where security controls cannot be implemented. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes tabletop reviews and validation testing. | ||
The licensee's submitted CSP notes that before the licensee can implement security controls on a COA, it will assess the potential for adverse impact in accordance with Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 of RG 5.71. | 3.8 Mitigation of Vulnerabilities and Application of Cyber Security Controls The licensee's submitted CSP describes the use of information collected during the cyber security assessment process (e.g., disposition of cyber security controls, defensive models, defensive strategy measures, site and corporate network architectures) to implement security controls in accordance with Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 and Appendix A.3.1.6 to RG 5.71. The CSP describes the process that will be applied in cases where security controls cannot be implemented. | ||
-8 This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3 in RG 5.71 and Appendix A, Section A.3.1.6 without deviation. | The licensee's submitted CSP notes that before the licensee can implement security controls on a COA, it will assess the potential for adverse impact in accordance with Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 of RG 5.71. | ||
This section is also comparable to Regulatory Position C.3.3 in RG 5.71 without deviation. | |||
-8 This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3 in RG 5.71 and Appendix A, Section A.3.1.6 without deviation. This section is also comparable to Regulatory Position C.3.3 in RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes mitigation of vulnerabilities and application of security controls. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes mitigation of vulnerabilities and application of security controls. | ||
3.9 Incorporating the Cyber Security Program into the Physical Protection Program The licensee's submitted CSP states that the Cyber Security Program will be reviewed as a component of the Physical Security Program in accordance with the requirements of 10 CFR 73.55(m). | 3.9 Incorporating the Cyber Security Program into the Physical Protection Program The licensee's submitted CSP states that the Cyber Security Program will be reviewed as a component of the Physical Security Program in accordance with the requirements of 10 CFR 73.55(m). This is comparable to Section 4.1 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.4 of RG 5.71. | ||
This is comparable to Section 4.1 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.4 of RG 5.71. This section of the CSP submitted by the licensee is comparable to Appendix A, Section A.3.2 in RG 5.71 without deviation. | This section of the CSP submitted by the licensee is comparable to Appendix A, Section A.3.2 in RG 5.71 without deviation. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes review of the CSP as a component of the physical security program. 3.10 Cyber Security Controls The licensee's submitted CSP describes how the technical, operational, and management cyber security controls contained in Appendices 0 and E of NEI 08-09, Revision 6, that are comparable to Appendices Band C in RG 5.71, are evaluated and dispositioned based on specific conditions during all phases of the Cyber Security Program. The CSP states that many security controls have actions that are required to be performed on specific frequencies and that the frequency of a security control is satisfied if the action is performed within 1.25 times the frequency specified in the control, as applied, and as measured from the previous performance of the action as described in Section 4.2 of NEI 08-09, Revision 6. This section of the CSP submitted by the licensee is comparable to Appendix A, Section A.3.1.6 in RG 5.71 without deviation. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes review of the CSP as a component of the physical security program. | ||
3.10 Cyber Security Controls The licensee's submitted CSP describes how the technical, operational, and management cyber security controls contained in Appendices 0 and E of NEI 08-09, Revision 6, that are comparable to Appendices Band C in RG 5.71, are evaluated and dispositioned based on site specific conditions during all phases of the Cyber Security Program. The CSP states that many security controls have actions that are required to be performed on specific frequencies and that the frequency of a security control is satisfied if the action is performed within 1.25 times the frequency specified in the control, as applied, and as measured from the previous performance of the action as described in Section 4.2 of NEI 08-09, Revision 6. | |||
This section of the CSP submitted by the licensee is comparable to Appendix A, Section A.3.1.6 in RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes implementation of cyber security controls. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes implementation of cyber security controls. | ||
3.11 Defense-in-Depth Protective Strategies The licensee's submitted CSP describes the implementation of defensive strategies that ensure the capability to detect, respond to, and recover from a cyber attack. The CSP specifies that the defensive strategies consist of security controls, defense-in-depth measures, and the defensive architecture. | 3.11 Defense-in-Depth Protective Strategies The licensee's submitted CSP describes the implementation of defensive strategies that ensure the capability to detect, respond to, and recover from a cyber attack. The CSP specifies that the defensive strategies consist of security controls, defense-in-depth measures, and the defensive architecture. The submitted CSP notes that the defensive architecture establishes the logical and physical boundaries to control the data transfer between these boundaries. | ||
The submitted CSP notes that the defensive architecture establishes the logical and physical boundaries to control the data transfer between these boundaries. | The licensee established defense-in-depth strategies by: implementing and documenting a defensive architecture as described in Section 4.3 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.2 in RG 5.71; a physical security program, including | ||
The licensee established defense-in-depth strategies by: implementing and documenting a defensive architecture as described in Section 4.3 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.2 in RG 5.71; a physical security program, including | |||
-9 physical barriers; the operational and management controls described in Appendix E of NEI 08-09, Revision 6, which is comparable to Appendix C to RG 5.71; and the technical controls described in Appendix D of NEI 08-09, Revision 6, which is comparable to Appendix B to RG 5.71. This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.2 and Appendix A, Section A.3.1.5 in RG 5.71 without deviation. | -9 physical barriers; the operational and management controls described in Appendix E of NEI 08-09, Revision 6, which is comparable to Appendix C to RG 5.71; and the technical controls described in Appendix D of NEI 08-09, Revision 6, which is comparable to Appendix B to RG 5.71. | ||
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.2 and Appendix A, Section A.3.1.5 in RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes implementation of defense-in-depth protective strategies. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes implementation of defense-in-depth protective strategies. | ||
3.12 Ongoing Monitoring and Assessment The licensee's submitted CSP describes how ongoing monitoring of cyber security controls to support CDAs is implemented comparable to Appendix E of NEI 08-09, Revision 6, which is comparable to Regulatory Positions C.4.1 and C.4.2 of RG 5.71. The ongoing monitoring program includes configuration management and change control; cyber security impact analysis of changes and changed environments; ongoing assessments of cyber security controls; effectiveness analysis (to monitor and confirm that the cyber security controls are implemented correctly, operating as intended, and achieving the desired outcome) and vulnerability scans to identify new vulnerabilities that could affect the security posture of CDAs. This section of the CSP submitted by the licensee is comparable to Regulatory Positions C.4.1 and C.4.2 of RG 5.71 without deviation. | 3.12 Ongoing Monitoring and Assessment The licensee's submitted CSP describes how ongoing monitoring of cyber security controls to support CDAs is implemented comparable to Appendix E of NEI 08-09, Revision 6, which is comparable to Regulatory Positions C.4.1 and C.4.2 of RG 5.71. The ongoing monitoring program includes configuration management and change control; cyber security impact analysis of changes and changed environments; ongoing assessments of cyber security controls; effectiveness analysis (to monitor and confirm that the cyber security controls are implemented correctly, operating as intended, and achieving the desired outcome) and vulnerability scans to identify new vulnerabilities that could affect the security posture of CDAs. | ||
This section of the CSP submitted by the licensee is comparable to Regulatory Positions C.4.1 and C.4.2 of RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes ongoing monitoring and assessment. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes ongoing monitoring and assessment. | ||
3.13 Modification of Digital Assets The licensee's submitted CSP describes how cyber security controls are established, implemented, and maintained to protect CDAs. These security controls ensure that modifications to CDAs are evaluated before implementation, the cyber security performance objectives are maintained, and acquired CDAs have cyber security requirements in place to achieve the site's Cyber Security Program objectives. | 3.13 Modification of Digital Assets The licensee's submitted CSP describes how cyber security controls are established, implemented, and maintained to protect CDAs. These security controls ensure that modifications to CDAs are evaluated before implementation, the cyber security performance objectives are maintained, and acquired CDAs have cyber security requirements in place to achieve the site's Cyber Security Program objectives. This is comparable to Section 4.5 of NEI 08-09, Revision 6, which is comparable to Appendix A, Sections A.4.2.5 and A.4.2.6 of RG 5.71. | ||
This is comparable to Section 4.5 of NEI 08-09, Revision 6, which is comparable to Appendix A, Sections A.4.2.5 and A.4.2.6 of RG 5.71. This section of the CSP submitted by the licensee is comparable to Appendix A, Sections A.4.2.5 and A.4.2.6 of RG 5.71 without deviation. | This section of the CSP submitted by the licensee is comparable to Appendix A, Sections A.4.2.5 and A.4.2.6 of RG 5.71 without deviation. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes modification of digital assets. 3.14 Attack Mitigation and Incident Response The licensee's submitted CSP describes the process to ensure that SSEP functions are not adversely impacted due to cyber attacks in accordance with Section 4.6 of NEI 08-09, | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes modification of digital assets. | ||
-Revision 6, which is comparable to Appendix C, Section C.8 of RG 5.71. The CSP includes a discussion about creating incident response policy and procedures, and addresses training, testing and drills, incident handling, incident monitoring, and incident response assistance. | 3.14 Attack Mitigation and Incident Response The licensee's submitted CSP describes the process to ensure that SSEP functions are not adversely impacted due to cyber attacks in accordance with Section 4.6 of NEI 08-09, | ||
It also describes identification, detection, response, containment, eradication, and recovery activities comparable to Section 4.6 of NEI 08-09, Revision 6. This section of the CSP submitted by the licensee is comparable to Appendix C, Section C.8 of RG 5.71 without deviation. | |||
- 10 Revision 6, which is comparable to Appendix C, Section C.8 of RG 5.71. The CSP includes a discussion about creating incident response policy and procedures, and addresses training, testing and drills, incident handling, incident monitoring, and incident response assistance. It also describes identification, detection, response, containment, eradication, and recovery activities comparable to Section 4.6 of NEI 08-09, Revision 6. | |||
This section of the CSP submitted by the licensee is comparable to Appendix C, Section C.8 of RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes attack mitigation and incident response. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes attack mitigation and incident response. | ||
3.15 Cyber Security Contingency Plan The licensee's submitted CSP describes the creation of a Cyber Security Contingency Plan and policy that protects CDAs from the adverse impacts of a cyber attack described in Section 4.7 of NEI 08-09. Revision 6, which is comparable to Regulatory Position C.3.3.2.7 and Appendix C.9 of RG 5.71. The licensee describes the Cyber Security Contingency Plan that would include the response to events. The plan includes procedures for operating CDAs in a contingency, roles and responsibilities of responders, processes and procedures for backup and storage of information, logical diagrams of network connectivity, current configuration information, and personnel lists for authorized access to CDAs. This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3.2.7 of RG 5.71 without deviation. | 3.15 Cyber Security Contingency Plan The licensee's submitted CSP describes the creation of a Cyber Security Contingency Plan and policy that protects CDAs from the adverse impacts of a cyber attack described in Section 4.7 of NEI 08-09. Revision 6, which is comparable to Regulatory Position C.3.3.2.7 and Appendix C.9 of RG 5.71. The licensee describes the Cyber Security Contingency Plan that would include the response to events. The plan includes procedures for operating CDAs in a contingency, roles and responsibilities of responders, processes and procedures for backup and storage of information, logical diagrams of network connectivity, current configuration information, and personnel lists for authorized access to CDAs. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the cyber security contingency plan. 3.16 Cyber Security Training and Awareness The licensee's submitted CSP describes a program that establishes the training requirements necessary for the licensee's personnel and contractors to perform their assigned duties and responsibilities in implementing the Cyber Security Program in accordance with Section 4.8 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3.2.8 of RG 5.71. The CSP states that individuals will be trained with a level of cyber security knowledge commensurate with their assigned responsibilities in order to provide high assurance that individuals are able to perform their job functions in accordance with Appendix E of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3.2.8 of RG 5.71 and describes three levels of training: | This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3.2.7 of RG 5.71 without deviation. | ||
awareness training, technical training, and specialized cyber security training. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the cyber security contingency plan. | ||
3.16 Cyber Security Training and Awareness The licensee's submitted CSP describes a program that establishes the training requirements necessary for the licensee's personnel and contractors to perform their assigned duties and responsibilities in implementing the Cyber Security Program in accordance with Section 4.8 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3.2.8 of RG 5.71. | |||
The CSP states that individuals will be trained with a level of cyber security knowledge commensurate with their assigned responsibilities in order to provide high assurance that individuals are able to perform their job functions in accordance with Appendix E of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3.2.8 of RG 5.71 and describes three levels of training: awareness training, technical training, and specialized cyber security training. | |||
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3.2.8 of RG 5.71 without deviation. | This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3.2.8 of RG 5.71 without deviation. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the cyber security training and awareness program. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the cyber security training and awareness program. | ||
-11 3.17 Evaluate and Manage Cyber Risk The licensee's submitted CSP describes how cyber risk is evaluated and managed utilizing site programs and procedures comparable to Section 4.9 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.4 and Appendix C, Section C.13 of RG 5.71. The CSP describes the Threat and Vulnerability Management Program, Risk Mitigation, Operational Experience Program; and the Corrective Action Program and how each will be used to evaluate and manage risk. This section of the CSP submitted by the licensee is comparable to Regulatory Position C.4 and Appendix C, Section C.13 of RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes evaluation and management of cyber risk. 3.18 Policies and Implementing Procedures The CSP describes development and implementation of policies and procedures to meet security control objectives in accordance with Section 4.10 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.5 and Appendix A, Section A.3.3 of RG 5.71. This includes the process to document, review, approve, issue, use, and revise policies and procedures. | - 11 3.17 Evaluate and Manage Cyber Risk The licensee's submitted CSP describes how cyber risk is evaluated and managed utilizing site programs and procedures comparable to Section 4.9 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.4 and Appendix C, Section C.13 of RG 5.71. The CSP describes the Threat and Vulnerability Management Program, Risk Mitigation, Operational Experience Program; and the Corrective Action Program and how each will be used to evaluate and manage risk. | ||
The CSP also describes the licensee's procedures to establish specific responsibilities for positions described in Section 4.11 of NEI 08-09, Revision 6, which is comparable to Appendix C, Section C.10.10 of RG 5.71. This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.5, Appendix A, Section A.3.3, and Appendix C, Section C.10.10 of RG 5.71 without deviation. | This section of the CSP submitted by the licensee is comparable to Regulatory Position C.4 and Appendix C, Section C.13 of RG 5.71 without deviation. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes evaluation and management of cyber risk. | |||
3.18 Policies and Implementing Procedures The CSP describes development and implementation of policies and procedures to meet security control objectives in accordance with Section 4.10 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.5 and Appendix A, Section A.3.3 of RG 5.71. This includes the process to document, review, approve, issue, use, and revise policies and procedures. | |||
The CSP also describes the licensee's procedures to establish specific responsibilities for positions described in Section 4.11 of NEI 08-09, Revision 6, which is comparable to Appendix C, Section C.10.10 of RG 5.71. | |||
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.5, Appendix A, Section A.3.3, and Appendix C, Section C.10.10 of RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes cyber security policies and implementing procedures. | Based on the above, the NRC staff concludes that the licensee's CSP adequately describes cyber security policies and implementing procedures. | ||
3.19 Roles and Responsibilities The licensee's submitted CSP describes the roles and responsibilities for the qualified and experienced personnel, including the Cyber Security Program Sponsor, the Cyber Security Program Manager, Cyber Security Specialists, the Cyber Security Incident Response Team (CSIRT), and other positions as needed. The CSIRT initiates in accordance with the Incident Response Plan and initiates emergency action when required to safeguard CDAs from cyber security compromise and to assist with the eventual recovery of compromised systems. Implementing procedures establish roles and responsibilities for each of the cyber security roles in accordance with Section 4.11 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.2, Appendix A, Section A.3.1.2, and Appendix C, Section C.1 0.1 0 of RG 5.71. This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2, Appendix A, Section A.3.1.2, and Appendix C, Section C.1 0.1 0 of RG 5.71, without deviation. | 3.19 Roles and Responsibilities The licensee's submitted CSP describes the roles and responsibilities for the qualified and experienced personnel, including the Cyber Security Program Sponsor, the Cyber Security Program Manager, Cyber Security Specialists, the Cyber Security Incident Response Team (CSIRT), and other positions as needed. The CSIRT initiates in accordance with the Incident Response Plan and initiates emergency action when required to safeguard CDAs from cyber security compromise and to assist with the eventual recovery of compromised systems. | ||
-12 Based on the above, the NRC staff concludes that the licensee's CSP adequately describes cyber security roles and responsibilities. | Implementing procedures establish roles and responsibilities for each of the cyber security roles in accordance with Section 4.11 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.2, Appendix A, Section A.3.1.2, and Appendix C, Section C.1 0.1 0 of RG 5.71. | ||
3.20 Cyber Security Program Review The licensee's submitted CSP describes how the Cyber Security Program establishes the necessary procedures to implement reviews of applicable program elements in accordance with Section 4.12 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.4.3 and Appendix A, Section A.4.3 of RG 5.71. This section of the CSP submitted by the licensee is comparable to Regulatory Position C.4.3 and Appendix A, Section A.4.3 of RG 5.71 without deviation. | This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2, Appendix A, Section A.3.1.2, and Appendix C, Section C.1 0.1 0 of RG 5.71, without deviation. | ||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes Cyber Security Program review. 3.21 Document Control and Records Retention and Handling The licensee's submitted CSP states that the licensee has established the necessary measures and governing procedures to ensure that sufficient records of items and activities affecting cyber security are developed, reviewed, approved, issued, used, and revised to reflect completed work. The CSP states that superseded portions of certain records will be retained for at least 3 years after the record is superseded, while audit records will be retained for no less than 12 months in accordance with Section 4.13 of NEI 08-09, Revision 6. However, this guidance provided by industry to licensees did not fully comply with the requirements of 10 CFR 73.54 and a generic RAI was issued. In a letter dated February 28, 2011 (ADAMS Accession No. | |||
- 12 Based on the above, the NRC staff concludes that the licensee's CSP adequately describes cyber security roles and responsibilities. | |||
3.20 Cyber Security Program Review The licensee's submitted CSP describes how the Cyber Security Program establishes the necessary procedures to implement reviews of applicable program elements in accordance with Section 4.12 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.4.3 and Appendix A, Section A.4.3 of RG 5.71. | |||
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.4.3 and Appendix A, Section A.4.3 of RG 5.71 without deviation. | |||
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes Cyber Security Program review. | |||
3.21 Document Control and Records Retention and Handling The licensee's submitted CSP states that the licensee has established the necessary measures and governing procedures to ensure that sufficient records of items and activities affecting cyber security are developed, reviewed, approved, issued, used, and revised to reflect completed work. The CSP states that superseded portions of certain records will be retained for at least 3 years after the record is superseded, while audit records will be retained for no less than 12 months in accordance with Section 4.13 of NEI 08-09, Revision 6. However, this guidance provided by industry to licensees did not fully comply with the requirements of 10 CFR 73.54 and a generic RAI was issued. | |||
In a letter dated February 28, 2011 (ADAMS Accession No. ML110600204), NEI sent to the NRC proposed language for licensees' use to respond to the generic records retention RAI, to which the NRC had no technical objection ( | |||
==Reference:== | ==Reference:== | ||
Letter from NRC dated March 1, 2011, ADAMS Accession No. ML110490337). The proposed language clarified the requirement by providing examples (without providing an all-inclusive list) of the records and supporting technical documentation that are needed to satisfy the requirements of 10 CFR 73.54. All records will be retained until the Commission terminates the license, and the licensee shall maintain superseded portions of these records for at least 3 years after the record is superseded, unless otherwise specified by the Commission. By retaining accurate and complete records and technical documentation until the license is terminated, inspectors, auditors, or assessors will have the ability to evaluate incidents, events, and other activities that are related to any of the cyber security elements described, referenced, and contained within the licensee's NRC-approved CSP. It will also allow the licensee to maintain the ability to detect and respond to cyber attacks in a timely manner, in the case of an event. In its letter dated April 4, 2011, the licensee responded to the records retention RAI using the language proposed by NEI in its letter dated February 28, 2011. Therefore, the NRC staff concludes this deviation from NEI 08-09, Revision 6, to be acceptable. | |||
Based on the above, the NRC staff concludes that the language the licensee proposes to adopt provides for adequate records retention and will support the licensee's ability to detect and | |||
- 13 respond to cyber attacks. The NRC staff further concludes that this section is comparable to Regulatory Position C.5 and Appendix A, Section A.5 of RG 5.71 without deviation. | |||
Accordingly, the NRC staff concludes that the licensee's CSP adequately describes cyber security document control and records retention and handling. | |||
3.22 Implementation Schedule The licensee's submitted CSP provides a proposed implementation schedule for the Cyber Security Program. In a letter dated February 28,2011 (ADAMS Accession No. ML110600206), | |||
NEI sent to the NRC a template for licensees to use to submit their CSP implementation schedules, to which the NRC had no technical objection ( | |||
-13 respond to cyber attacks. The NRC staff further concludes that this section is comparable to Regulatory Position C.5 and Appendix A, Section A.5 of RG 5.71 without deviation. | |||
Accordingly, the NRC staff concludes that the licensee's CSP adequately describes cyber security document control and records retention and handling. Implementation Schedule The licensee's submitted CSP provides a proposed implementation schedule for the Cyber Security Program. In a letter dated February 28,2011 (ADAMS Accession No. | |||
==Reference:== | ==Reference:== | ||
Letter from NRC dated March 1, 2011, ADAMS Accession No. ML110070348). These key milestones include: | |||
* Establish the CSAT; | |||
* Identify CSs and CDAs; | |||
* Install a deterministic one-way device between lower level devices and higher level devices; | |||
* Implement the security control uAccess Control For Portable And Mobile Devices"; | |||
* Implement observation and identification of obvious cyber related tampering to existing insider mitigation rounds by incorporating the appropriate elements; | |||
* Identify, document, and implement cyber security controls as per "Mitigation of Vulnerabilities and Application of Cyber Security Controls" for CDAs that could adversely impact the design function of physical security target set equipment; | |||
* Commence ongoing monitoring and assessment activities for those target set CDAs whose security controls have been implemented. | |||
In its letter dated April 4, 2011, the licensee provided a revised implementation schedule using the NEI template. The NRC staff considers this April 4, 2011, supplement the approved schedule as required by 10 CFR 73.54. Based on the provided schedule ensuring timely implementation of those protective measures that provide a higher degree of protection against radiological sabotage, the NRC staff concludes that the Cyber Security Program implementation schedule is satisfactory. | |||
The NRC staff acknowledges that, in its submittal dated July 22, 2010, PG&E proposed several CSP milestone implementation dates as regulatory commitments. The NRC staff does not regard the CSP milestone implementation dates as regulatory commitments that can be changed unilaterally by the licensee, particularly in light of the regulatory requirement at 10 CFR 73.54, that "[i]mplementation of the licensee's cyber security program must be consistent with the approved schedule." As the NRC staff explained in its letter to all operating reactor licensees dated May 9, 2011 (ADAMS Accession No. ML110980538), the implementation of the plan, including the key intermediate milestone dates and the full implementation date, shall be in | |||
- 14 accordance with the implementation schedule submitted by the licensee and approved by the NRC. All subsequent changes to the NRC-approved CSP implementation schedule thus will require prior NRC approval pursuant in 10 CFR 50.90. | |||
3.23 Revision to License Condition 2.E By letter dated July 22, 2010, the licensee proposed to add a paragraph to Paragraph 2.E of Facility Operating License Nos. DPR-80 and DPR-82 for DCPP, Unit Nos. 1 and 2, respectively, to provide a license condition to require the licensee to fully implement and maintain in effect all provisions of the NRC-approved CSP. The NRC staff modified the proposed wording of the license condition described in the licensee's submittal dated July 22,2010, and the licensee agreed with the revised license condition proposed by the NRC staff. | |||
The following paragraph is added to Paragraph 2.E of Facility Operating License No. DPR-80 for DCPP, Unit 1: | |||
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | |||
The PG&E CSP was approved by License Amendment No. 210. | |||
The following paragraph is added to Paragraph 2.E of Facility Operating License No. DPR-82 for DCPP, Unit 2: | |||
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | |||
The PG&E CSP was approved by License Amendment No. 212. | |||
Based on the information in Section 3.0 of this safety evaluation and the modified license condition described above, the NRC concludes this is acceptable. | |||
4.0 DIFFERENCES FROM NEI 08-09, REVISION 6 The NRC staff notes the following additional differences between the licensee's submission and NEI 08-09, Revision 6: | |||
* In Section 3.1, "Scope and Purpose," the licensee clarified the definition of important-to-safety functions, consistent with SRM COMWCO-10-0001. | |||
* In Section 3.21, "Document Control and Records Retention and Handling," the licensee clarified the definition of records and supporting documentation that will be retained to conform to the requirements of 10 CFR 73.54. | |||
* In Section 3.22, "Implementation Schedule," the licensee submitted a revised implementation schedule, specifying the interim milestones and the final implementation date, including supporting rationale. | |||
- 15 | |||
* In Section 3.3, "Cyber Security Assessment and Authorization," the licensee revised the CSP to replace the term "program" with "procedure," consistent with 10 CFR 73.55(m). | |||
The NRC staff concludes that all of these deviations are acceptable as discussed in the respective sections of this safety evaluation. | |||
The NRC staff concludes that all of these deviations are acceptable as discussed in the respective sections of this safety evaluation. | |||
== | ==5.0 STATE CONSULTATION== | ||
: 1. | |||
In accordance with the Commission's regulations, the California State official was notified of the proposed issuance of the amendments. The State official had no comments. | |||
*SE memo dated **via e-mail | |||
BMizuno -NLO** MMarkley AWang DATE 6/19/11 6/17/11 5/26/11 7/11/11 7/15/11 7/15/11 - | ==6.0 ENVIRONMENTAL CONSIDERATION== | ||
The amendments change a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on October 12, 2010 (75 FR 62605). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). | |||
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments. | |||
==7.0 CONCLUSION== | |||
The NRC staff's review and evaluation of the licensee's CSP was conducted using the NRC staff positions established in the relevant sections of RG 5.71. Based on the NRC staff's review, the NRC concludes that the licensee addressed the relevant information necessary to satisfy the requirements of 10 CFR 73.54, 10 CFR 73.55(a)(1), 10 CFR 73.55(b)(8), and 10 CFR 73.55(m), as applicable, and that the licensee's Cyber Security Program provides high assurance that digital computer and communication systems and networks associated with the following are adequately protected against cyber attacks, up to and including the design basis threat as described in 10 CFR 73.1. This includes protecting digital computer and communication systems and networks associated with: (i) safety-related and important-to safety functions; (ii) security functions; (iii) emergency preparedness functions, including offsite communications; and (iv) support systems and equipment which, if compromised, would adversely impact SSEP functions. | |||
Therefore, the NRC staff concludes the information contained in this CSP to be acceptable and upon successful implementation of this program, operation of DCPP, Unit Nos. 1 and 2, will not be inimical to the common defense and security. The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the | |||
- 16 issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public. | |||
==8.0 REFERENCES== | |||
: 1. Vietti-Cook, A. L., memorandum to R W. Borchardt, U.S. Nuclear Regulatory Commission, "Staff Requirements - COMWCO-10-000 - Regulation of Cyber Security at Nuclear Power Plants," dated October 21, 2010 (ADAMS Accession No. ML102940009). | |||
: 2. U. S. Nuclear Regulatory Commission, Regulatory Guide 5.71, "Cyber Security Programs for Nuclear Facilities," dated January 2010 (ADAMS Accession No. ML090340159). | |||
: 3. Correia, R, U.S. Nuclear Regulatory Commission, letter to Jack Roe, Nuclear Energy Institute, "Nuclear Energy Institute 08-09, 'Cyber Security Plan Template; Revision 6,'" | |||
dated May 5,2010 (ADAMS Accession No. ML101190371). | |||
: 4. Roe, J., Nuclear Energy Institute, letter to Scott Morris, U.S. Nuclear Regulatory Commission, "NEI 08-09, Revision 6, 'Cyber Security Plan for Nuclear Power Reactors; April 2010,'" dated April 28, 2010 (ADAMS Accession No. ML101180434). | |||
: 5. Correia, R, U.S. Nuclear Regulatory Commission, letter to Christopher E. Earls, Nuclear Energy Institute, "Nuclear Energy Institute 08-09, 'Cyber Security Plan Template; Rev. 6, '" dated June 7, 2010 (ADAMS Accession No. ML101550052). | |||
Principal Contributor: Roberta Spitzberg, NSIR Date: July 15, 2011 | |||
M L 111640274 *SE memo - | |||
dated **via e-mail OFFICE NRR/LPL4/PM NRR/LPL4/LA NSIRIDSP/ISCPB/BC OGC NRR/LPL4/BC NRR/LPL4/PM NAME AWang JBurkhardt CErlanger* BMizuno - NLO** MMarkley AWang DATE 6/19/11 6/17/11 5/26/11 7/11/11 7/15/11 7/15/11 | |||
-}} |
Latest revision as of 23:37, 20 March 2020
ML111640274 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 07/15/2011 |
From: | Wang A Plant Licensing Branch IV |
To: | Conway J Pacific Gas & Electric Co |
Wang, A B, NRR/DORL/LPLIV, 415-1445 | |
References | |
TAC ME4290, TAC ME4291 | |
Download: ML111640274 (28) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 15, 2011 Mr. John T. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105 SUB~IECT: DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - ISSUANCE OF AMENDMENTS RE: APPROVAL OF CYBER SECURITY PLAN (TAC NOS. ME4290 AND ME4291)
Dear Mr. Conway:
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 210 to Facility Operating License No. DPR-80 and Amendment No. 212 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively. The amendments consist of changes to the facility operating licenses in response to your application dated July 22, 2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011.
The amendments approve the cyber security plan and associated implementation schedule, and revise Paragraph 2.E of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively, to provide a license condition to require the licensee to fully implement and maintain in effect all provisions of the NRC-approved Cyber Security Plan. The proposed change is consistent with Nuclear Energy Institute (NEI) 08-09, Revision 6, "Cyber Security Plan for Nuclear Power Reactors."
J. Conway - 2 A copy of the related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely, II fl... IVi . , /
LJvU1;v{ V CL'l'U1V Alan B. Wang, Project ~nager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
- 1. Amendment No. 210 to DPR-80
- 2. Amendment No. 212 to DPR-82
- 3. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-275 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 210 License No. DPR*80
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Pacific Gas and Electric Company (the licensee), dated July 22, 2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
-2
- 2. Accordingly, the license is amended as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 210, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
- 3. In addition, Paragraph 2.E of Facility Operating License No. DPR-80 is hereby amended with additional text to read as follows:
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The PG&E CSP was approved by License Amendment No. 210.
- 4. This license amendment is effective as of the date of its issuance. The implementation of the cyber security plan (CSP), including the key intermediate milestone dates and the full implementation date, shall be in accordance with the implementation schedule submitted by the licensee on April 4, 2011, and approved by the NRC staff with this license amendment. All subsequent changes to the NRC-approved CSP implementation schedule will require prior NRC approval pursuant to 10 CFR 50.90.
FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License No. DPR-80 and Technical Specifications Date of Issuance: July 15,2011
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 212 License No. DPR-82
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Pacific Gas and Electric Company (the licensee), dated July 22,2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011, complies with the standards and reqUirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regUlations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 2
- 2
- 2. Accordingly, the license is amended as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:
(2) Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 212, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
- 3. In addition, Paragraph 2.E of Facility Operating License No. DPR-80 is hereby amended with additional text to read as follows:
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The PG&E CSP was approved by License Amendment No. 212.
- 4. This license amendment is effective as of the date of its issuance. The implementation of the cyber security plan (CSP), including the key intermediate milestone dates and the full implementation date, shall be in accordance with the implementation schedule submitted by the licensee on April 4, 2011, and approved by the NRC staff with this license amendment. All subsequent changes to the NRC-approved CSP implementation schedule will require prior NRC approval pursuant to 10 CFR 50.90.
FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License No. DPR-82 and Technical Specifications Date of Issuance: Ju 1y 1 5. 2011
ATTACHMENT TO LICENSE AMENDMENT NO. 210 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 212 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323 Replace the following pages of the Facility Operating License Nos. DPR-80 and DPR-82, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Operating License No. DPR-80 REMOVE INSERT
-3 -3
-9 -9 Facility Operating License No. DPR-82 REMOVE INSERT
-3
-6 Technical Specifications REMOVE INSERT
-3 (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix S, as revised through Amendment No. 210, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Initial Test Program The Pacific Gas and Electric Company shall conduct the post-fuel-Ioading initial test program (set forth in Section 14 of Pacific Gas and Electric Company's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:
- a. Elimination of any test identified in Section 14 of PG&E's Final Safety Analysis Report as amended as being essential; Amendment No. 210
-9 E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54 (p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, by Training and Qualification Plan, and Safeguards Contingency Plan," submitted by letter dated May 16, 2006.
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The PG&E CSP was approved by License Amendment No. 210.
F. Deleted.
G. Deleted.
H. Financial Protection PG&E shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
I. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders Amendment No. 210
-3 (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.
(2) Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix 8, as revised through Amendment No. 212, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Initial Test Program (SSER 31, Section 4.4.1)
Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 212
-6 (10) Pipeway Structure DE and DDE Analysis (SSER 32, Section 4)
Prior to start-up following the first refueling outage PG&E shall complete a confirmatory analysis for the pipeway structure to further demonstrate the adequacy of the pipeway structure for load combinations that include the design earthquake (DE) and double design earthquake (DDE).
(11) Sent Fuel Pool Modification The licensee is authorized to modify the spent fuel pool as described in the application dated October 30, 1985 (LAR 8S-13) as supplemented.
Amendment NO.6 issued on May 30, 1986 and stayed by the U.S. Court of Appeals for the Ninth Circuit pending completion of NRC hearings is reinstated.
Prior to final conversion to the modified rack design, fuel may be stored, as needed, in either the modified storage racks described in Technical Specification S.6.1.1 or in the unmodified storage racks (or both) which are designed and shall be maintained with a nominal 21-inch center-to center distance between fuel assemblies placed in the storage racks.
(12) Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 202, are hereby incorporated into this license. Pacific Gas and Electric Company shall operate the facility in accordance with the Additional Conditions.
D. Exemption (SSER 31, Section 6.2.6)
An exemption from certain requirements of Appendix J to 10 CFR Part SO is described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement NO.9. This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. Therefore, this exemption previously granted in Facility Operating License No. DPR-81 pursuant to 10 CFR SO.12 is hereby reaffirmed. The facility will operate, with the exemption authorized, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.
E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.SS (S1 FR 27817 and 27822) and to the authority of 10 CFR SO.90 and 10 CFR SO.S4(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan," submitted by letter dated May 16, 2006.
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR SO.90 and 10 CFR SO.S4(p). The PG&E CSP was approved by License Amendment No. 212.
Amendment No. 212
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 210 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 212 TO FACILITY OPERATING LICENSE NO. DPR-82 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-275 AND 50-323
1.0 INTRODUCTION
By application dated July 22,2010, as supplemented by letters dated August 19, September 29, and November 30, 2010, and February 8 and April 4, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML102150081, ML102350061, ML102740381, ML103490367, ML110400126, and ML111020451, respectively), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment request. Included in that license amendment request was a request for approval of the licensee's Cyber Security Plan (CSP) and Implementation Schedule for the Diablo Canyon Power Plant (DCPP), Unit Nos. 1 and 2, as required by Section 73.54, "Protection of Digital Computer and Communication Systems and Networks," of Title 10 of the Code of Federal Regulations (10 CFR). The U.S.
Nuclear Regulatory Commission (NRC) staff provided the licensee requests for additional information (RAls) regarding the staffs concerns with the CSP. By letter dated February 8, 2011, the licensee submitted its response to these RAls. Additionally, on April 4, 2011, the licensee supplemented its CSP to address: 1) scope of systems in response to the October 21, 2010, Commission decision (Reference 1); 2) records retention; and 3) implementation schedule. The licensee submitted a Revision 0 of the CSP incorporating all of the changes and/or additional information as referenced in the RAI responses. Portions of the letters dated July 22, 2010, and April 4, 2011, contain sensitive unclassified non-safeguards information (security-related) and, accordingly, those portions are withheld from public disclosure.
The supplemental letters dated August 19, September 29, and November 30,2010, and February 8 and April 4, 2011, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register on October 12, 2010 (75 FR 62605).
The amendments would approve the CSP and associated implementation schedule, and revise Paragraph 2.E of Facility Operating License Nos. DPR-80 and DPR-82 for DCPP, Unit Nos. 1 Enclosure 3
-2 and 2, respectively, to provide a license condition to require the licensee to fully implement and maintain in effect all provisions of the NRC-approved Cyber Security Plan. The proposed amendment is generally consistent with Nuclear Energy Institute (NEI) 08-09, Revision 6, "Cyber Security Plan for Nuclear Power Reactors."
2.0 REGULATORY EVALUATION
2.1 General Requirements Consistent with 10 CFR 73.54(a), the licensee must provide high assurance that digital computer and communication systems, and networks are adequately protected against cyber attacks, up to and including the design-basis threat (DBT), as described in 10 CFR 73.1. The licensee shall protect digital computer and communication systems and networks associated with: 0) safety-related and important-to-safety functions; Oi) security functions; (iii) emergency preparedness functions, including offsite communications; and (iv) support systems and equipment which, if compromised, would adversely impact safety, security, or emergency preparedness (SSEP) functions. The rule specifies that digital computer and communication systems and networks associated with these functions must be protected from cyber attacks that would adversely impact the integrity or confidentiality of data and software; deny access to systems, services, or data; or provide an adverse impact to the operations of systems, networks, and associated equipment.
In the Staff Requirements Memorandum (SRM) COMWCO-10-0001, "Regulation of Cyber Security at Nuclear Power Plants," dated October 21,2010 (Reference 1), the Commission stated that the NRC's cyber security rule at 10 CFR 73.54 should be interpreted to include structures, systems, and components (SSCs) in the balance of plant (BOP) that have a nexus to radiological health and safety. The NRC staff determined that SSCs in the BOP that have a nexus to radiological health and safety are those that could directly or indirectly affect reactivity of a nuclear power plant (NPP), and are therefore within the scope of important-to-safety functions described in 10 CFR 73.54(a)(1).
2.2 Elements of a CSP As stated in 10 CFR 73.54(e), the licensee must establish, implement, and maintain a CSP that satisfies the Cyber Security Program requirements of this regulation. In addition, the CSP must describe how the licensee will implement the requirements of the regulation and must account for the site-specific conditions that affect implementation. One method of complying with this regulation is to describe within the CSP how the licensee will achieve high assurance that all SSEP functions are protected from cyber attacks.
2.3 Regulatory Guide 5.71 and NEI OB-09. Revision 6 NRC Regulatory Guide (RG) 5.71, "Cyber Security Programs for Nuclear Facilities" (Reference 2), describes a regulatory position that promotes a defensive strategy consisting of a defensive architecture and a set of security controls based on standards provided in the National Institute of Standards and Technology (NIST) Special Publication (SP) BOO-53, "Recommended Security Controls for Federal Information Systems and Organizations," and NIST SP BOO-B2, "Guide to Industrial Control Systems Security," dated September 29, 200B.
- 3 NIST SP 800-53 and NIST SP 800-82 are based on well-understood cyber threats, risks, and vulnerabilities, coupled with equally well-understood countermeasures and protective techniques. RG 5.71 divides the above-noted security controls into three broad categories:
technical, operational, and management.
The organization of RG 5.71 reflects the steps necessary to meet the requirements of 10 CFR 73.54. Section C.3 of RG 5.71 describes an acceptable method for implementing the security controls, as detailed in Appendix B, "Technical Controls," and Appendix C, "Operational and Management Controls." Section CA of RG 5.71 discusses the need to maintain the established cyber security program, including comprehensive monitoring of the CDAs and the effectiveness of their security protection measures, ensuring that changes to the CDAs or the environment are controlled, coordinated, and periodically reviewed for continued protection from cyber attacks.
Section C.5 of RG 5.71 provides licensees and applicants with guidance for retaining records associated with their cyber security programs. Appendix A to RG 5.71 provides a template for a generic cyber security plan which licensees may use to comply with the licensing requirements of 10 CFR 73.54. Appendices Band C provide an acceptable set of security controls, which are based on well-understood threats, vulnerabilities, and attacks, coupled with equally well understood and vetted countermeasures and protective techniques.
NEI 08-09, Revision 6, closely maps with RG 5.71; Appendix A of NEI 08-09, Revision 6, contains a cyber security plan template that is comparable to Appendix A of RG 5.71.
Appendix 0 of NEI 08-09, Revision 6, contains technical cyber security controls that are comparable to Appendix B of RG 5.71. Appendix E of NEI 08-09, Revision 6, contains operational and management cyber security controls that are comparable to Appendix C of RG 5.71.
RG 5.71 provides a framework to aid in the identification of those digital assets that licensees must protect from cyber attacks. These identified digital assets are referred to as "critical digital assets" (CDAs). Licensees should address the potential cyber security risks to CDAs by applying the defensive architecture and addressing the collection of security controls identified in RG 5.71. RG 5.71 includes a CSP template that provides one method for preparing an acceptable CSP.
In its letter to the Nuclear Energy Institute dated May 5, 2010 (Reference 3), the NRC stated that the licensees may use the template in NEI 08-09, Revision 6 (Reference 4), to prepare an acceptable CSP, with the exception of the definition of "cyber attack." The NRC staff subsequently reviewed and approved, by letter dated June 7, 2010 (Reference 5), a definition for "cyber attack" to be used in submissions based on NEI 08-09, Revision 6. The licensee submitted a CSP for DCPP that was based on the template provided in NEI 08-09, Revision 6, and included a definition of cyber attack acceptable to the NRC staff (in the referenced NRC letter dated June 7,2010), within Enclosure 1 of the licensee's letter dated July 22,2010.
Additionally, the licensee submitted a supplement to its CSP on April 4, 2011, to include information on SSCs in the BOP that, if compromised, could affect NPP reactivity.
RG 5.71 and NEI 08-09, Revision 6, are comparable documents; both are based on essentially the same general approach and the same set of technical, operational, and management security controls. The licensee's submitted CSP was reviewed against the corresponding sections in RG 5.71.
-4
3.0 TECHNICAL EVALUATION
The NRC staff performed a technical evaluation of the licensee's submittal. The licensee's submittal, with the exception of deviations described in Section 4.0, generally conformed to the guidance in NEI 08-09, Revision 6, which was found to be acceptable by the NRC staff and comparable to RG 5.71 to satisfy the requirements contained in 10 CFR 73.54. The staff reviewed the licensee's submittal against the requirements of 10 CFR 73.54 following the guidance contained in RG 5.71. The NRC staff's evaluation of each section of the licensee's submittal is discussed below.
3.1 Scope and Purpose The licensee's CSP establishes a means to achieve high assurance that digital computer and communication systems and networks associated with the following functions are adequately protected against cyber attacks up to and including the DBT:
- 1. Safety-related and important-to-safety functions;
- 2. Security functions;
- 3. Emergency preparedness functions, including offsite communications; and
- 4. Support systems and equipment which, if compromised, would adversely impact SSEP functions.
The licensee's submitted CSP describes achievement of high assurance of adequate protection of systems associated with the above functions from cyber attacks by:
- Implementing and documenting the "baseline" security controls as described in Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 described in RG 5.71; and
- Implementing and documenting a Cyber Security Program to maintain the established cyber security controls through a comprehensive life cycle approach as described in Section 4 of NEI 08-09, Revision 6, which is comparable to Appendix A, Section A.2.1 of RG 5.71.
Thus, the licensee's CSP, as originally submitted, is comparable to the CSP in NEI-08-09, Revision 6. However, in its submittal dated April 4, 2011, the licensee clarified its original submission and indicated that the scope of systems includes those BOP SSCs that have an impact on NPP reactivity if compromised. This is in response to and consistent with SRM COMWCO-1 0-0001, in which the Commission stated that the NRC's cyber security rule at 10 CFR 73.54 should be interpreted to include SSCs in the BOP that have a nexus to radiological health and safety. The NRC staff determined that this is defined as those systems that have a nexus to radiological health and safety are those that could directly or indirectly affect reactivity of an NPP, and are therefore within the scope of important-to-safety functions described in 10 CFR 73.54(a)(1).
- 5 The NRC staff reviewed the CSP and the supplemental information submitted by the licensee and found no deviation from Regulatory Position C.3.3 in RG 5.71 and Appendix A, Section A.2.1 of RG 5.71. The NRC staff concludes that the licensee established adequate measures to implement and document the Cyber Security Program, including baseline security controls.
Based on the above, the NRC staff concludes that the licensee's CSP adequately establishes the Cyber Security Program, including baseline security controls.
3.2 Analyzing Digital Computer Systems and Networks and Applying Cyber Security Controls The licensee's CSP describes that the Cyber Security Program is established, implemented, and maintained as described in Section 3.1 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1 described in RG 5.71 to:
- Analyze digital computer and communications systems and networks, and
- Identify those assets that must be protected against cyber attacks to satisfy 10 CFR 73.54(a).
The licensee's submitted CSP describes how the cyber security controls in Appendices D and E of NEI 08-09, Revision 6, which are comparable to Appendices Band C in RG 5.71, are addressed to protect CDAs from cyber attacks.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately addresses security controls.
3.3 Cyber Security Assessment and Authorization The licensee provided information addressing the creation of a formal, documented, cyber security assessment and authorization policy. This included a description concerning the creation of a formal, documented procedure comparable to Section 3.1.1 of NEI 08-09, Revision 6.
The NRC staff concludes that the licensee established adequate measures to define and address the purpose, scope, roles, responsibilities, management commitment, and coordination, and facilitates the implementation of the cyber security assessment and authorization policy.
The NRC staff requested that the licensee clarify that it has a formal, documented policy or procedure covering the listed topics under cyber security assessment and authorization because the licensee's original submittal referred to a "program" rather than a policy or procedure. The licensee subsequently revised the DCPP CSP Section 3.1.1 to replace the term
-6 "program" with "procedure" consistent with Regulatory Position C.3.1.1 in RG 5.71 and Appendix A, Section A.3.1.1 of RG 5.71. The NRC staff has reviewed the revised CSP.
Based on the above, the NRC staff concludes that the licensee's CSP adequately established controls to develop, disseminate, and periodically update the cyber security assessment and authorization policy and implementing procedure.
3.4 Cyber Security Assessment Team The Cyber Security Assessment Team (CSAT) responsibilities include conducting the cyber security assessment, documenting key 'findings during the assessment, and evaluating assumptions and conclusions about cyber security threats. The licensee's submitted CSP outlines the requirements, roles, and responsibilities of the CSAT comparable to Section 3.1.2 of NEI 08-09, Revision 6. It also describes that the CSAT has the authority to conduct an independent assessment.
The licensee's submitted CSP states that the CSAT will consist of individuals with knowledge about information and digital systems technology; NPP operations, engineering, and plant technical specifications; and physical security and emergency preparedness systems and programs. The CSAT description in the CSP is comparable to Regulatory Position C.3.1.2 in RG 5.71.
The licensee's submitted CSP lists the roles and responsibilities for the CSAT which included performing and overseeing the cyber security assessment process; documenting key observations; evaluating information about cyber security threats and vulnerabilities; confirming information obtained during tabletop reviews, walk-downs, or electronic validation of CDAs; and identifying potential new cyber security controls.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately establishes the requirements, roles and responsibilities of the CSAT.
3.5 Identification of CDAs The licensee's submitted CSP states that the licensee will identify and document CDAs and critical systems (CSs), including a general description, the overall function, the overall consequences if a compromise were to occur, and the security functional requirements or specifications as described in Section 3.1.3 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.3 of RG 5.71.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.3 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the process to identify CDAs.
-7 3.6 Examination of Cyber Security Practices The licensee's submitted CSP describes how the CSAT will examine and document the existing cyber security policies, procedures, and practices; existing cyber security controls; detailed descriptions of network and communication architectures (or network/communication architecture drawings); information on security devices; and any other information that may be helpful during the cyber security assessment process as described in Section 3.1.4 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.2 of RG 5.71. The examinations will include an analysis of the effectiveness of the existing Cyber Security Program and cyber security controls. The CSAT will document the collected cyber security information and the results of their examination of the collected information.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the examination of cyber security practices.
3.7 Tabletop Reviews and Validation Testing The licensee's submitted CSP describes tabletop reviews and validation testing, which confirm the direct and indirect connectivity of each COA and identify direct and indirect pathways to COAs. The CSP states that validation testing will be performed electronically or by physical walkdowns. The licensee's plan for tabletop reviews and validation testing is comparable to Section 3.1.5 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.4 of RG 5.71.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.4 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes tabletop reviews and validation testing.
3.8 Mitigation of Vulnerabilities and Application of Cyber Security Controls The licensee's submitted CSP describes the use of information collected during the cyber security assessment process (e.g., disposition of cyber security controls, defensive models, defensive strategy measures, site and corporate network architectures) to implement security controls in accordance with Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 and Appendix A.3.1.6 to RG 5.71. The CSP describes the process that will be applied in cases where security controls cannot be implemented.
The licensee's submitted CSP notes that before the licensee can implement security controls on a COA, it will assess the potential for adverse impact in accordance with Section 3.1.6 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3 of RG 5.71.
-8 This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3 in RG 5.71 and Appendix A, Section A.3.1.6 without deviation. This section is also comparable to Regulatory Position C.3.3 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes mitigation of vulnerabilities and application of security controls.
3.9 Incorporating the Cyber Security Program into the Physical Protection Program The licensee's submitted CSP states that the Cyber Security Program will be reviewed as a component of the Physical Security Program in accordance with the requirements of 10 CFR 73.55(m). This is comparable to Section 4.1 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.4 of RG 5.71.
This section of the CSP submitted by the licensee is comparable to Appendix A, Section A.3.2 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes review of the CSP as a component of the physical security program.
3.10 Cyber Security Controls The licensee's submitted CSP describes how the technical, operational, and management cyber security controls contained in Appendices 0 and E of NEI 08-09, Revision 6, that are comparable to Appendices Band C in RG 5.71, are evaluated and dispositioned based on site specific conditions during all phases of the Cyber Security Program. The CSP states that many security controls have actions that are required to be performed on specific frequencies and that the frequency of a security control is satisfied if the action is performed within 1.25 times the frequency specified in the control, as applied, and as measured from the previous performance of the action as described in Section 4.2 of NEI 08-09, Revision 6.
This section of the CSP submitted by the licensee is comparable to Appendix A, Section A.3.1.6 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes implementation of cyber security controls.
3.11 Defense-in-Depth Protective Strategies The licensee's submitted CSP describes the implementation of defensive strategies that ensure the capability to detect, respond to, and recover from a cyber attack. The CSP specifies that the defensive strategies consist of security controls, defense-in-depth measures, and the defensive architecture. The submitted CSP notes that the defensive architecture establishes the logical and physical boundaries to control the data transfer between these boundaries.
The licensee established defense-in-depth strategies by: implementing and documenting a defensive architecture as described in Section 4.3 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.2 in RG 5.71; a physical security program, including
-9 physical barriers; the operational and management controls described in Appendix E of NEI 08-09, Revision 6, which is comparable to Appendix C to RG 5.71; and the technical controls described in Appendix D of NEI 08-09, Revision 6, which is comparable to Appendix B to RG 5.71.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.2 and Appendix A, Section A.3.1.5 in RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes implementation of defense-in-depth protective strategies.
3.12 Ongoing Monitoring and Assessment The licensee's submitted CSP describes how ongoing monitoring of cyber security controls to support CDAs is implemented comparable to Appendix E of NEI 08-09, Revision 6, which is comparable to Regulatory Positions C.4.1 and C.4.2 of RG 5.71. The ongoing monitoring program includes configuration management and change control; cyber security impact analysis of changes and changed environments; ongoing assessments of cyber security controls; effectiveness analysis (to monitor and confirm that the cyber security controls are implemented correctly, operating as intended, and achieving the desired outcome) and vulnerability scans to identify new vulnerabilities that could affect the security posture of CDAs.
This section of the CSP submitted by the licensee is comparable to Regulatory Positions C.4.1 and C.4.2 of RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes ongoing monitoring and assessment.
3.13 Modification of Digital Assets The licensee's submitted CSP describes how cyber security controls are established, implemented, and maintained to protect CDAs. These security controls ensure that modifications to CDAs are evaluated before implementation, the cyber security performance objectives are maintained, and acquired CDAs have cyber security requirements in place to achieve the site's Cyber Security Program objectives. This is comparable to Section 4.5 of NEI 08-09, Revision 6, which is comparable to Appendix A, Sections A.4.2.5 and A.4.2.6 of RG 5.71.
This section of the CSP submitted by the licensee is comparable to Appendix A, Sections A.4.2.5 and A.4.2.6 of RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes modification of digital assets.
3.14 Attack Mitigation and Incident Response The licensee's submitted CSP describes the process to ensure that SSEP functions are not adversely impacted due to cyber attacks in accordance with Section 4.6 of NEI 08-09,
- 10 Revision 6, which is comparable to Appendix C, Section C.8 of RG 5.71. The CSP includes a discussion about creating incident response policy and procedures, and addresses training, testing and drills, incident handling, incident monitoring, and incident response assistance. It also describes identification, detection, response, containment, eradication, and recovery activities comparable to Section 4.6 of NEI 08-09, Revision 6.
This section of the CSP submitted by the licensee is comparable to Appendix C, Section C.8 of RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes attack mitigation and incident response.
3.15 Cyber Security Contingency Plan The licensee's submitted CSP describes the creation of a Cyber Security Contingency Plan and policy that protects CDAs from the adverse impacts of a cyber attack described in Section 4.7 of NEI 08-09. Revision 6, which is comparable to Regulatory Position C.3.3.2.7 and Appendix C.9 of RG 5.71. The licensee describes the Cyber Security Contingency Plan that would include the response to events. The plan includes procedures for operating CDAs in a contingency, roles and responsibilities of responders, processes and procedures for backup and storage of information, logical diagrams of network connectivity, current configuration information, and personnel lists for authorized access to CDAs.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3.2.7 of RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the cyber security contingency plan.
3.16 Cyber Security Training and Awareness The licensee's submitted CSP describes a program that establishes the training requirements necessary for the licensee's personnel and contractors to perform their assigned duties and responsibilities in implementing the Cyber Security Program in accordance with Section 4.8 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3.2.8 of RG 5.71.
The CSP states that individuals will be trained with a level of cyber security knowledge commensurate with their assigned responsibilities in order to provide high assurance that individuals are able to perform their job functions in accordance with Appendix E of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.3.2.8 of RG 5.71 and describes three levels of training: awareness training, technical training, and specialized cyber security training.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.3.2.8 of RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes the cyber security training and awareness program.
- 11 3.17 Evaluate and Manage Cyber Risk The licensee's submitted CSP describes how cyber risk is evaluated and managed utilizing site programs and procedures comparable to Section 4.9 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.4 and Appendix C, Section C.13 of RG 5.71. The CSP describes the Threat and Vulnerability Management Program, Risk Mitigation, Operational Experience Program; and the Corrective Action Program and how each will be used to evaluate and manage risk.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.4 and Appendix C, Section C.13 of RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes evaluation and management of cyber risk.
3.18 Policies and Implementing Procedures The CSP describes development and implementation of policies and procedures to meet security control objectives in accordance with Section 4.10 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.5 and Appendix A, Section A.3.3 of RG 5.71. This includes the process to document, review, approve, issue, use, and revise policies and procedures.
The CSP also describes the licensee's procedures to establish specific responsibilities for positions described in Section 4.11 of NEI 08-09, Revision 6, which is comparable to Appendix C, Section C.10.10 of RG 5.71.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.5, Appendix A, Section A.3.3, and Appendix C, Section C.10.10 of RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes cyber security policies and implementing procedures.
3.19 Roles and Responsibilities The licensee's submitted CSP describes the roles and responsibilities for the qualified and experienced personnel, including the Cyber Security Program Sponsor, the Cyber Security Program Manager, Cyber Security Specialists, the Cyber Security Incident Response Team (CSIRT), and other positions as needed. The CSIRT initiates in accordance with the Incident Response Plan and initiates emergency action when required to safeguard CDAs from cyber security compromise and to assist with the eventual recovery of compromised systems.
Implementing procedures establish roles and responsibilities for each of the cyber security roles in accordance with Section 4.11 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.3.1.2, Appendix A, Section A.3.1.2, and Appendix C, Section C.1 0.1 0 of RG 5.71.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.3.1.2, Appendix A, Section A.3.1.2, and Appendix C, Section C.1 0.1 0 of RG 5.71, without deviation.
- 12 Based on the above, the NRC staff concludes that the licensee's CSP adequately describes cyber security roles and responsibilities.
3.20 Cyber Security Program Review The licensee's submitted CSP describes how the Cyber Security Program establishes the necessary procedures to implement reviews of applicable program elements in accordance with Section 4.12 of NEI 08-09, Revision 6, which is comparable to Regulatory Position C.4.3 and Appendix A, Section A.4.3 of RG 5.71.
This section of the CSP submitted by the licensee is comparable to Regulatory Position C.4.3 and Appendix A, Section A.4.3 of RG 5.71 without deviation.
Based on the above, the NRC staff concludes that the licensee's CSP adequately describes Cyber Security Program review.
3.21 Document Control and Records Retention and Handling The licensee's submitted CSP states that the licensee has established the necessary measures and governing procedures to ensure that sufficient records of items and activities affecting cyber security are developed, reviewed, approved, issued, used, and revised to reflect completed work. The CSP states that superseded portions of certain records will be retained for at least 3 years after the record is superseded, while audit records will be retained for no less than 12 months in accordance with Section 4.13 of NEI 08-09, Revision 6. However, this guidance provided by industry to licensees did not fully comply with the requirements of 10 CFR 73.54 and a generic RAI was issued.
In a letter dated February 28, 2011 (ADAMS Accession No. ML110600204), NEI sent to the NRC proposed language for licensees' use to respond to the generic records retention RAI, to which the NRC had no technical objection (
Reference:
Letter from NRC dated March 1, 2011, ADAMS Accession No. ML110490337). The proposed language clarified the requirement by providing examples (without providing an all-inclusive list) of the records and supporting technical documentation that are needed to satisfy the requirements of 10 CFR 73.54. All records will be retained until the Commission terminates the license, and the licensee shall maintain superseded portions of these records for at least 3 years after the record is superseded, unless otherwise specified by the Commission. By retaining accurate and complete records and technical documentation until the license is terminated, inspectors, auditors, or assessors will have the ability to evaluate incidents, events, and other activities that are related to any of the cyber security elements described, referenced, and contained within the licensee's NRC-approved CSP. It will also allow the licensee to maintain the ability to detect and respond to cyber attacks in a timely manner, in the case of an event. In its letter dated April 4, 2011, the licensee responded to the records retention RAI using the language proposed by NEI in its letter dated February 28, 2011. Therefore, the NRC staff concludes this deviation from NEI 08-09, Revision 6, to be acceptable.
Based on the above, the NRC staff concludes that the language the licensee proposes to adopt provides for adequate records retention and will support the licensee's ability to detect and
- 13 respond to cyber attacks. The NRC staff further concludes that this section is comparable to Regulatory Position C.5 and Appendix A, Section A.5 of RG 5.71 without deviation.
Accordingly, the NRC staff concludes that the licensee's CSP adequately describes cyber security document control and records retention and handling.
3.22 Implementation Schedule The licensee's submitted CSP provides a proposed implementation schedule for the Cyber Security Program. In a letter dated February 28,2011 (ADAMS Accession No. ML110600206),
NEI sent to the NRC a template for licensees to use to submit their CSP implementation schedules, to which the NRC had no technical objection (
Reference:
Letter from NRC dated March 1, 2011, ADAMS Accession No. ML110070348). These key milestones include:
- Establish the CSAT;
- Install a deterministic one-way device between lower level devices and higher level devices;
- Implement the security control uAccess Control For Portable And Mobile Devices";
- Implement observation and identification of obvious cyber related tampering to existing insider mitigation rounds by incorporating the appropriate elements;
- Identify, document, and implement cyber security controls as per "Mitigation of Vulnerabilities and Application of Cyber Security Controls" for CDAs that could adversely impact the design function of physical security target set equipment;
- Commence ongoing monitoring and assessment activities for those target set CDAs whose security controls have been implemented.
In its letter dated April 4, 2011, the licensee provided a revised implementation schedule using the NEI template. The NRC staff considers this April 4, 2011, supplement the approved schedule as required by 10 CFR 73.54. Based on the provided schedule ensuring timely implementation of those protective measures that provide a higher degree of protection against radiological sabotage, the NRC staff concludes that the Cyber Security Program implementation schedule is satisfactory.
The NRC staff acknowledges that, in its submittal dated July 22, 2010, PG&E proposed several CSP milestone implementation dates as regulatory commitments. The NRC staff does not regard the CSP milestone implementation dates as regulatory commitments that can be changed unilaterally by the licensee, particularly in light of the regulatory requirement at 10 CFR 73.54, that "[i]mplementation of the licensee's cyber security program must be consistent with the approved schedule." As the NRC staff explained in its letter to all operating reactor licensees dated May 9, 2011 (ADAMS Accession No. ML110980538), the implementation of the plan, including the key intermediate milestone dates and the full implementation date, shall be in
- 14 accordance with the implementation schedule submitted by the licensee and approved by the NRC. All subsequent changes to the NRC-approved CSP implementation schedule thus will require prior NRC approval pursuant in 10 CFR 50.90.
3.23 Revision to License Condition 2.E By letter dated July 22, 2010, the licensee proposed to add a paragraph to Paragraph 2.E of Facility Operating License Nos. DPR-80 and DPR-82 for DCPP, Unit Nos. 1 and 2, respectively, to provide a license condition to require the licensee to fully implement and maintain in effect all provisions of the NRC-approved CSP. The NRC staff modified the proposed wording of the license condition described in the licensee's submittal dated July 22,2010, and the licensee agreed with the revised license condition proposed by the NRC staff.
The following paragraph is added to Paragraph 2.E of Facility Operating License No. DPR-80 for DCPP, Unit 1:
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The PG&E CSP was approved by License Amendment No. 210.
The following paragraph is added to Paragraph 2.E of Facility Operating License No. DPR-82 for DCPP, Unit 2:
PG&E shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The PG&E CSP was approved by License Amendment No. 212.
Based on the information in Section 3.0 of this safety evaluation and the modified license condition described above, the NRC concludes this is acceptable.
4.0 DIFFERENCES FROM NEI 08-09, REVISION 6 The NRC staff notes the following additional differences between the licensee's submission and NEI 08-09, Revision 6:
- In Section 3.1, "Scope and Purpose," the licensee clarified the definition of important-to-safety functions, consistent with SRM COMWCO-10-0001.
- In Section 3.21, "Document Control and Records Retention and Handling," the licensee clarified the definition of records and supporting documentation that will be retained to conform to the requirements of 10 CFR 73.54.
- In Section 3.22, "Implementation Schedule," the licensee submitted a revised implementation schedule, specifying the interim milestones and the final implementation date, including supporting rationale.
- 15
- In Section 3.3, "Cyber Security Assessment and Authorization," the licensee revised the CSP to replace the term "program" with "procedure," consistent with 10 CFR 73.55(m).
The NRC staff concludes that all of these deviations are acceptable as discussed in the respective sections of this safety evaluation.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the California State official was notified of the proposed issuance of the amendments. The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on October 12, 2010 (75 FR 62605). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
7.0 CONCLUSION
The NRC staff's review and evaluation of the licensee's CSP was conducted using the NRC staff positions established in the relevant sections of RG 5.71. Based on the NRC staff's review, the NRC concludes that the licensee addressed the relevant information necessary to satisfy the requirements of 10 CFR 73.54, 10 CFR 73.55(a)(1), 10 CFR 73.55(b)(8), and 10 CFR 73.55(m), as applicable, and that the licensee's Cyber Security Program provides high assurance that digital computer and communication systems and networks associated with the following are adequately protected against cyber attacks, up to and including the design basis threat as described in 10 CFR 73.1. This includes protecting digital computer and communication systems and networks associated with: (i) safety-related and important-to safety functions; (ii) security functions; (iii) emergency preparedness functions, including offsite communications; and (iv) support systems and equipment which, if compromised, would adversely impact SSEP functions.
Therefore, the NRC staff concludes the information contained in this CSP to be acceptable and upon successful implementation of this program, operation of DCPP, Unit Nos. 1 and 2, will not be inimical to the common defense and security. The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the
- 16 issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
8.0 REFERENCES
- 1. Vietti-Cook, A. L., memorandum to R W. Borchardt, U.S. Nuclear Regulatory Commission, "Staff Requirements - COMWCO-10-000 - Regulation of Cyber Security at Nuclear Power Plants," dated October 21, 2010 (ADAMS Accession No. ML102940009).
- 2. U. S. Nuclear Regulatory Commission, Regulatory Guide 5.71, "Cyber Security Programs for Nuclear Facilities," dated January 2010 (ADAMS Accession No. ML090340159).
- 3. Correia, R, U.S. Nuclear Regulatory Commission, letter to Jack Roe, Nuclear Energy Institute, "Nuclear Energy Institute 08-09, 'Cyber Security Plan Template; Revision 6,'"
dated May 5,2010 (ADAMS Accession No. ML101190371).
- 4. Roe, J., Nuclear Energy Institute, letter to Scott Morris, U.S. Nuclear Regulatory Commission, "NEI 08-09, Revision 6, 'Cyber Security Plan for Nuclear Power Reactors; April 2010,'" dated April 28, 2010 (ADAMS Accession No. ML101180434).
- 5. Correia, R, U.S. Nuclear Regulatory Commission, letter to Christopher E. Earls, Nuclear Energy Institute, "Nuclear Energy Institute 08-09, 'Cyber Security Plan Template; Rev. 6, '" dated June 7, 2010 (ADAMS Accession No. ML101550052).
Principal Contributor: Roberta Spitzberg, NSIR Date: July 15, 2011
M L 111640274 *SE memo -
dated **via e-mail OFFICE NRR/LPL4/PM NRR/LPL4/LA NSIRIDSP/ISCPB/BC OGC NRR/LPL4/BC NRR/LPL4/PM NAME AWang JBurkhardt CErlanger* BMizuno - NLO** MMarkley AWang DATE 6/19/11 6/17/11 5/26/11 7/11/11 7/15/11 7/15/11
-