ML102390099

From kanterella
Jump to navigation Jump to search

Acceptance Review Email, License Amendment Request for Cyber Security Plan
ML102390099
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/27/2010
From: Wang A
Plant Licensing Branch IV
To: Baldwin T, Grozan T, Parker L
Pacific Gas & Electric Co
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME4290, TAC ME4291
Download: ML102390099 (1)


Text

From:

Wang, Alan Sent:

Friday, August 27, 2010 10:24 AM To:

'Larry Parker'; 'Baldwin, Thomas (DCPP)'; 'Grozan, Thomas C' Cc:

Lent, Susan; Burkhardt, Janet

Subject:

Acceptance Review for Diablo Canyon License Amendment Request For Cyber Security Plan (ME4290 and ME4291)

Tom and Tom:

By letter dated July 22, 2010, as supplemented on August 19, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102150079 and ML102350061, respectively), Pacific Gas and Electric Company (PG&E) requested an amendment to the Facility Operating License for Diablo Canyon Power Plant, Unit Nos. 1 and 2 (DCPP). PG&E stated that it withdraws the previous request dated January 20, 2010, regarding the Cyber Security Plan and that this request supersedes its previous request in its entirety. The proposed License Amendment Request includes the cyber security plan, proposed changes to Section 2.E of the Facility Operating License, and a proposed Cyber Security Plan Implementation Schedule. The proposed cyber security plan has been submitted in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 73.54. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1445.

Alan Wang Project Manager (Diablo Canyon)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445

Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F7B9973E836)

Subject:

Acceptance Review for Diablo Canyon License Amendment Request For Cyber Security Plan (ME4290 and ME4291)

Sent Date: 8/27/2010 10:23:32 AM Received Date: 8/27/2010 10:23:32 AM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients:

LMP1@pge.com ('Larry Parker')

Tracking Status: None TRB1@pge.com ('Baldwin, Thomas (DCPP)')

Tracking Status: None TCG5@pge.com ('Grozan, Thomas C')

Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)

Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 10876 8/27/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: