ML13112A857: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13112A857
| number = ML13112A857
| issue date = 05/02/2013
| issue date = 05/02/2013
| title = Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 (TAC Nos. ME7538 and ME7539)
| title = Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
| author name = Ennis R B
| author name = Ennis R
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Nuclear, Exelon Generation Co, LLC
| addressee affiliation = Exelon Nuclear, Exelon Generation Co, LLC
| docket = 05000277, 05000278
| docket = 05000277, 05000278
| license number =  
| license number =  
| contact person = Lamb J G
| contact person = Lamb J
| case reference number = TAC ME7538, TAC ME7539
| case reference number = TAC ME7538, TAC ME7539
| document type = Letter, Proprietary Information Review
| document type = Letter, Proprietary Information Review
| page count = 3
| page count = 3
| project = TAC:ME7539, TAC:ME7538
| project = TAC:ME7538, TAC:ME7539
| stage = Withholding Request
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. ME7538 AND ME7539)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. ME7538 AND ME7539)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
By Exelon Generation Company, LLC (Exelon) letter to the Nuclear Regulatory Commission (NRC) dated April 18, 2013, and Global Nuclear Fuel -Americas, LLC (GNF-A) affidavit dated April 16, 2013, executed by Mr. Atul A. Karve, Exelon requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: Enclosure 1 of letter CFL-EXN-HEO-13-036 Revision 1, from C. Lamb (GNF-A) to T. Loomis (Exelon), "Revised GNF Response to NRC RAI [Request for Additional Information] 44 for the License Amendment Request for Use of Neutron Absorbing Spent Fuel Rack Inserts for Peach Bottom Atomic Power Station Units 2 and 3," dated April 16, 2013. A non-proprietary copy of the document has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
 
M. -2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-1420. Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 Mr. Atul A. Karve Engineering Manager, Methods Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv M. Pacilio -2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have Signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-1420. Sincerely, Ira! Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: Mr. Atul A. Karve Engineering Manager, Methods Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv DISTRIBUTION: PUBLIC RidsAcrsAcnw_MailCTR Resource LPL 1-2 RlF RidsRgn1 MailCenter Resource RidsNrrDorlLpl1-2 Resource RidsNrrDssSrxb Resource RidsNrrLAABaxter Resource RidsNrrPMPeachBottom Resource ADAMS Accession No.: ML13112A857 OFFICE NAME DATE LPL 1-2/PM REnnis 4/23/13 LPL1-2/LA ABaxter 4/30/13 LPL1-2/BC MKhanna 5/2113 OFFICIAL RECORD 
By Exelon Generation Company, LLC (Exelon) letter to the Nuclear Regulatory Commission (NRC) dated April 18, 2013, and Global Nuclear Fuel - Americas, LLC (GNF-A) affidavit dated April 16, 2013, executed by Mr. Atul A. Karve, Exelon requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
}}
Enclosure 1 of letter CFL-EXN-HEO-13-036 Revision 1, from C. Lamb (GNF-A) to T. Loomis (Exelon), "Revised GNF Response to NRC RAI [Request for Additional Information] 44 for the License Amendment Request for Use of Neutron Absorbing Spent Fuel Rack Inserts for Peach Bottom Atomic Power Station Units 2 and 3," dated April 16, 2013.
A non-proprietary copy of the document has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
 
M. Pacilio                                        -2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1420.
Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc:     Mr. Atul A. Karve Engineering Manager, Methods Global Nuclear Fuel - Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv
 
ML13112A857 OFFICE      LPL 1-2/PM        LPL 1-2/LA        LPL1-2/BC NAME        REnnis           ABaxter          MKhanna DATE        4/23/13           4/30/13           5/2113}}

Latest revision as of 07:28, 20 March 2020

Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML13112A857
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/02/2013
From: Richard Ennis
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
Lamb J
References
TAC ME7538, TAC ME7539
Download: ML13112A857 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. ME7538 AND ME7539)

Dear Mr. Pacilio:

By Exelon Generation Company, LLC (Exelon) letter to the Nuclear Regulatory Commission (NRC) dated April 18, 2013, and Global Nuclear Fuel - Americas, LLC (GNF-A) affidavit dated April 16, 2013, executed by Mr. Atul A. Karve, Exelon requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:

Enclosure 1 of letter CFL-EXN-HEO-13-036 Revision 1, from C. Lamb (GNF-A) to T. Loomis (Exelon), "Revised GNF Response to NRC RAI [Request for Additional Information] 44 for the License Amendment Request for Use of Neutron Absorbing Spent Fuel Rack Inserts for Peach Bottom Atomic Power Station Units 2 and 3," dated April 16, 2013.

A non-proprietary copy of the document has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

M. Pacilio -2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1420.

Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: Mr. Atul A. Karve Engineering Manager, Methods Global Nuclear Fuel - Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv

ML13112A857 OFFICE LPL 1-2/PM LPL 1-2/LA LPL1-2/BC NAME REnnis ABaxter MKhanna DATE 4/23/13 4/30/13 5/2113