ML14316A390: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(12 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14316A390
| number = ML14316A390
| issue date = 11/14/2014
| issue date = 11/14/2014
| title = Beaver Valley Power Station, Units 1 and 2 - Request for Additional Information Review of Licensee Security Plans (TAC Nos. MF5008 and MF5009)
| title = Request for Additional Information Review of Licensee Security Plans
| author name = Whited J A
| author name = Whited J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Larson E A
| addressee name = Larson E
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000334, 05000412
| docket = 05000334, 05000412
Line 13: Line 13:
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
| page count = 2
| page count = 2
| project = TAC:MF5008, TAC:MF5009
| stage = RAI
}}
}}
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION November 14, 2014 Mr. Eric A. Larson, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
==SUBJECT:==
BEAVER VALLEY POWER STATION, UNITS 1 AND 2- REQUEST FOR ADDITIONAL INFORMATION RE: REVIEW OF LICENSEE SECURITY PLANS (TAC NOS. MF5008 AND MF5009)
==Dear Mr. Larson:==
By letter dated June 24, 2014, FirstEnergy Nuclear Operating Company (the licensee) submitted Revision 18 to its security plans (Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan), under the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(p)(2). To complete its review, the Nuclear Regulatory Commission staff requests a response to the enclosed questions.
The draft questions were sent to Mr. Phil Lashley, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. Please respond to the enclosed questions within 30 days of the date of this letter.
If you have any questions regarding this matter, please contact me at 301-415-4090.
Sincerely,
                                              /RA/
Jeffrey Whited, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412                        Enclosure transmitted herewith contains security-
==Enclosure:==
related information. When separated from Request for Additional Information                  enclosure, this document is decontrolled.
cc w/out encl: Listserv OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
ML14316A390                *via memo dated        **via e-mail OFFICE      NRR/LPLI-2/PM  NRR/LPLI-2/LA**    NSIR/RSLB/BC*    NRR/LPLI-2/BC      NRR/LPLI-2/PM NAME        JWhited        ABaxter            DHuyck            MKhanna            JWhited DATE        11/13/14        11/13/14          10/27/14          11/13/14          11/14/14}}

Latest revision as of 18:13, 19 March 2020

Request for Additional Information Review of Licensee Security Plans
ML14316A390
Person / Time
Site: Beaver Valley
Issue date: 11/14/2014
From: Jeffrey Whited
Plant Licensing Branch 1
To: Emily Larson
FirstEnergy Nuclear Operating Co
Jefferey Whited, NRR/DORL 415-4090
References
TAC MF5008, TAC MF5009
Download: ML14316A390 (2)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION November 14, 2014 Mr. Eric A. Larson, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2- REQUEST FOR ADDITIONAL INFORMATION RE: REVIEW OF LICENSEE SECURITY PLANS (TAC NOS. MF5008 AND MF5009)

Dear Mr. Larson:

By letter dated June 24, 2014, FirstEnergy Nuclear Operating Company (the licensee) submitted Revision 18 to its security plans (Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan), under the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(p)(2). To complete its review, the Nuclear Regulatory Commission staff requests a response to the enclosed questions.

The draft questions were sent to Mr. Phil Lashley, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. Please respond to the enclosed questions within 30 days of the date of this letter.

If you have any questions regarding this matter, please contact me at 301-415-4090.

Sincerely,

/RA/

Jeffrey Whited, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 Enclosure transmitted herewith contains security-

Enclosure:

related information. When separated from Request for Additional Information enclosure, this document is decontrolled.

cc w/out encl: Listserv OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML14316A390 *via memo dated **via e-mail OFFICE NRR/LPLI-2/PM NRR/LPLI-2/LA** NSIR/RSLB/BC* NRR/LPLI-2/BC NRR/LPLI-2/PM NAME JWhited ABaxter DHuyck MKhanna JWhited DATE 11/13/14 11/13/14 10/27/14 11/13/14 11/14/14