{{#Wiki_filter:1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC July 12, 2005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
 
==Subject:==
Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very truly yours,
                                                *g4f      A h,        4 Thomas A. Marlow TAM/jdw xc:    U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):
FIG Index FIG-9.0, Rev 2
 
c                                                                C                                                            (          10 NPSP0200                                                      Ginna Nuclear Power Plant                            Tue 7/12/2005 8:50:24 am  it E66429                                                          PROCEDURE INDE)                                                  Page 1 of 1 INPUT PARAMETERS: TYPE:          PRFIG                      STATUSVALUE(S):  EF QU          5 YEARS ONLY:
PRFIG          EOP FIGURE PROCEDURES PROCEDURE                                                                                  EFFECT          LAST          NEXT NUMBER            PROCEDURE TITE                                                      REV    DATE        REVIEW          REVIEW      0 FIG-1.0              FIGURE MIN SUBCOOUNG                                              000 0510111998    03/27/2003      03/27/2008      EF FIG-2.0              FIGURE SDM                                                        005 0411012005    03/27/2003      03/27/2008      EF FIG-3.0              FIGURE NAT CIRC CID WTH SHROUD FANS                                000 05101/1998    03127/2003      03/27/2008      EF FIG-3.1              FIGURE NAT CIRC C/D WITHOUT SHROUD FANS                            001 02108/2001    03127/2003      03/27/2008      EF FIG-3.2              FIGURE NC CD WITH VOID INUPPER HEAD                                000 05101/1998    0312712003      03/27/2008      EF FIG-4.0              FIGURE RCP SEAL LEAKOFF                                            002 02/28/2001    03/27/2003      03127/2008      EF FIG-5.0              FIGURE RHR INJECTlON                                              000 05/01/1998    03/2712003      03/27/2008      EF FIG-6.0              FIGURE MIN RCS INJECTION                                          000 05101/1998    03127/2003      03127/2008'. EF FIG-7.0              FIGURE INTACT S/G PRESSURE                                        001 05)18/1998    03/27/2003      03127/2008      EF FIG-8.0              FIGURE TSAT                                                        000 05/01/1998    03/27/2003      03/27/2008      EF FIG-9.0              FIGURE TECH SPEC CID                                              002 07/1122005    03/27/2003      03/27/2008      EF FIG-9.1              FIGURE CID UMUrS                                                  000 05/01/1998    0312712003      03127/2008      EF    -
FIG-10.0            FIGURE UMITA                                                      000 05/0111998    03127/2003      0312712008      EF FIG-11.0            FIGURE SOAK UMITS                                                  000 05/01/1998    03127/2003      03127/2008      EF FIG-12.0            FIGURE CNMT HYDROGEN                                                000 05/01/1998    03/27/2003      03/2712008      EF FIG-13.0            FIGURE BACK PRESSURE                                              000 05/01/1998    03/27/2003      03/27/2008-    EF FIG-14.0            FIGURE IA ISOL                                                    002 10/1012003    03/27/2003      03/27/2008      EF PRFIG        TOTAL      17 GRAND TOTAL      17 LAJ
 
I ,i ' . ; *1 ~;j t
1; I,
:.1 I
                                                ;., I  5-.      -r-      s
.--.  '1                                        !- i A                                                  REV: 2
                                              .FIGURE TECH SPEC C/D PAGE 1 of 1 Responsible Manager.i                                                        Date  ______        °_
FIGURE TECH SPEC C/D RCS PRESSURE (PSIG) 2500 LIMITING MATERIAL---
CIRCUMFERENTIAL WELD                  _-_
2250      LIMITING 1/4T RTndt=241°F          t _ __
LIMITING 3/4T RTndt=20 7 °F            _
2000 1750 1500
            -                  1111UNACCEPTABLE-
_  I I      I            OPERATION T_
I-  I  I 1250 1000 3COOLDOWN RAES
______                      _:g ___,____
ACCEPTABLE 750
_ l 0  OPERATION 500      __2uOF/H~Rdr3RL<llL
_OO40F/HR            m                                          lT                l 406DF/HR L 5 E f r 250 60      1X 0
0        50        100      150          200            250      300    350    400          450  500 RCS COLD LEG TEMPERATURE (OF)}}

Latest revision as of 18:06, 14 March 2020

Emergency Operating Procedures
ML052070706
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/12/2005
From: Marlow T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML052070706 (3)


Text

1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC July 12, 2005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours,

  • g4f A h, 4 Thomas A. Marlow TAM/jdw xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

FIG Index FIG-9.0, Rev 2

c C ( 10 NPSP0200 Ginna Nuclear Power Plant Tue 7/12/2005 8:50:24 am it E66429 PROCEDURE INDE) Page 1 of 1 INPUT PARAMETERS: TYPE: PRFIG STATUSVALUE(S): EF QU 5 YEARS ONLY:

PRFIG EOP FIGURE PROCEDURES PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITE REV DATE REVIEW REVIEW 0 FIG-1.0 FIGURE MIN SUBCOOUNG 000 0510111998 03/27/2003 03/27/2008 EF FIG-2.0 FIGURE SDM 005 0411012005 03/27/2003 03/27/2008 EF FIG-3.0 FIGURE NAT CIRC CID WTH SHROUD FANS 000 05101/1998 03127/2003 03/27/2008 EF FIG-3.1 FIGURE NAT CIRC C/D WITHOUT SHROUD FANS 001 02108/2001 03127/2003 03/27/2008 EF FIG-3.2 FIGURE NC CD WITH VOID INUPPER HEAD 000 05101/1998 0312712003 03/27/2008 EF FIG-4.0 FIGURE RCP SEAL LEAKOFF 002 02/28/2001 03/27/2003 03127/2008 EF FIG-5.0 FIGURE RHR INJECTlON 000 05/01/1998 03/2712003 03/27/2008 EF FIG-6.0 FIGURE MIN RCS INJECTION 000 05101/1998 03127/2003 03127/2008'. EF FIG-7.0 FIGURE INTACT S/G PRESSURE 001 05)18/1998 03/27/2003 03127/2008 EF FIG-8.0 FIGURE TSAT 000 05/01/1998 03/27/2003 03/27/2008 EF FIG-9.0 FIGURE TECH SPEC CID 002 07/1122005 03/27/2003 03/27/2008 EF FIG-9.1 FIGURE CID UMUrS 000 05/01/1998 0312712003 03127/2008 EF -

FIG-10.0 FIGURE UMITA 000 05/0111998 03127/2003 0312712008 EF FIG-11.0 FIGURE SOAK UMITS 000 05/01/1998 03127/2003 03127/2008 EF FIG-12.0 FIGURE CNMT HYDROGEN 000 05/01/1998 03/27/2003 03/2712008 EF FIG-13.0 FIGURE BACK PRESSURE 000 05/01/1998 03/27/2003 03/27/2008- EF FIG-14.0 FIGURE IA ISOL 002 10/1012003 03/27/2003 03/27/2008 EF PRFIG TOTAL 17 GRAND TOTAL 17 LAJ

I ,i ' . ; *1 ~;j t

1; I,

.1 I
., I 5-. -r- s

.--. '1  !- i A REV: 2

.FIGURE TECH SPEC C/D PAGE 1 of 1 Responsible Manager.i Date ______ °_

FIGURE TECH SPEC C/D RCS PRESSURE (PSIG) 2500 LIMITING MATERIAL---

CIRCUMFERENTIAL WELD _-_

2250 LIMITING 1/4T RTndt=241°F t _ __

LIMITING 3/4T RTndt=20 7 °F _

2000 1750 1500

- 1111UNACCEPTABLE-

_ I I I OPERATION T_

I- I I 1250 1000 3COOLDOWN RAES

______ _:g ___,____

ACCEPTABLE 750

_ l 0 OPERATION 500 __2uOF/H~Rdr3RL<llL

_OO40F/HR m lT l 406DF/HR L 5 E f r 250 60 1X 0

0 50 100 150 200 250 300 350 400 450 500 RCS COLD LEG TEMPERATURE (OF)