ML042170305
ML042170305 | |
Person / Time | |
---|---|
Site: | Ginna ![]() |
Issue date: | 07/28/2004 |
From: | Widay J Constellation Energy Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
E66429, NPSP0200 | |
Download: ML042170305 (4) | |
Text
- i-1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC July 28, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very truly yours, sepU A. Widay JAW/jdw xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):
ATT Index ATT-9. 1, Rev 6 4(BoA
( C C1'~..
4'IeI<
NPSP0200 Ginna Nuclear Power Plant Wed 7/28/2004 10:28:32 am E66429 PROCEDURE INDE) Page 1 of 2
-_C r '.fP t*1t Z ' n7 7N r I t, "- :; -. . - - s.- z s,- z 11=r':.w-TT .I .'- M*
. -. . -. q INPUT PARAMETERS: TYPE: PRATT STATUSVALUE(S): EF.QU 5 YEARS ONLY:
PRATT EOP`ATTACHMENTS --- --- -.-
PROCEDURE EFFECT LAST NEXT NUMBER PROCEOURE TITLE REV DATE REVIEW REVIEW ST ATT-1.0 ATTACHMENT AT POWER CCW ALIGNMENT 003 02112/2003 02112/2003 02/12/2008 Ef ATT-1.1 ATTACHMENT NORMAL CCW FLOW 000 05118/2000 05118/2000 05/18/2005 EF ATT-2.1 ATTACHMENT MIN SW 005 02101/2001 0210312003 02/03/2008 EF ATT-2.2 ATTACHMENT SW ISOLATION 008 0310612002 03127/2003 03/27/2008 EF ATT-2.3 ATTACHMENT SW LOADS IN CNMT 004 03/06/2002 04/06/2004 04/06/2009 EF ATT-2.4 ATTACHMENT NO SW PUMPS 002 05/30/2003 10/31/2001 10/31/2006 EF ATT-2,s ATTACHMENT SPUT SW HEADERS 000 06/26/2002 06n26n2002 06/26/2007 EF ATT-3.0 ATTACHMENT CVCVI 007 02/17/2004 02/17/2004 02/17/2009 EF ATT-3.1 ATTACHMENT CNMT CLOSURE 005 02117/2004 02)17/2004 02o17/2009 EF ATT-4.0 ATTACHMENT CNMT RECIRC FANS 003 07/2611994 03/27/2003 03/27/2008 EF ATT-5.0 ATTACHMENT COND TO SIG 006 10110/2003 04/06/2004 04/06/2009 EF ATT-5.1 ATTACHMENT SAFW 008 05130/2002 0410612004 04/06/2009 EF ATT-5.2 ATTACHMENT FIRE WATER COOUNG TO TDAFW PUMP 003 0111411999 01/28/2oo4 01/28/2009 EF ATT-6.0 ATTACHMENT COND VACUUM 003 12/18/1996 02103/2003 02/3/2008 EF ATT-7.0 ATTACHMENT CR EVAC 006 03/06/2002 02/03/2003 02/03/2008 EF ATT-8.0 ATTACHMENT DC LOADS 007 02/04/2004 02/04/2004 02104/2009 EF ATT-8.1 ATTACHMENT D/G STOP 005 03/06/2002 02103/2003 02/03/2008 EF ATT-8.2 ATTACHMENT GEN DEGAS 008 06/20/2002 o/8/2004 05/28/2(09 EF' ATT-8.3 ATTACHMENT NONVITAL 004 03/06/2002 02103/2003 02/03/2008 EF ATT-8.4 ATTACHMENT S!JW . 1. . . .; .. 1 005 03/06/2002 02103/2003 02/03/2008 EF ATT-8.5 ATTACHMENT LOSS OF OFFSITE POWER -; 7 001 08/26/2003 05/02/2002 05/0212007 EF ATT-9.0 ATTACHMENT LEUDOVWN 009 01/07/2004 03/06/2002 03/06/2007 EF ATT-9.1 ATTACHMENT EXCESS LID 006 07/28/2004 10131/2001 10/31/2006 Ef ATT-10.0 ATTACHMENT FAULTED SIG 006 03/0612002 03/27/2003 03/27/2008 EF ATT-I 1.0 ATTACHMENT IA CONCERNS 003 06n6/2003 03/27/2003 03/27/2008 EF ATT-1 1.1 ATTACHMENT IA SUPPLY 003 03/06/2002 03/27/2003 03/27/2008 EF ATT-1 1.2 ATTACHMENT DIESEL AIR COMPRESSOR 004 11/18/2002 03/10/2003 03/10/2008 EF ATT-12.0 ATTACHMENT N2 PORVS 005 02112/2003 02/12/2003 02/12/2008 EF ATU-13.0 ATTACHMENT NC 003 02112/2003 02/12/2003 02/12/2008 EF ATT-14.0 ATTACHMENT NORMAL RHR COOUNG 003 03/06/2002 04/06/2004 04/06/2009 EF
.0 1-" , ,
C (! C NPSP0200 Ginna Nuclear Power Plant Wed 7/28/2004 10:28:32 am 1k E66429 PROCEDURE INDE) Page 2 of 2 INPUT PARAMETERS: TYPE: PRATT STATUSVALUE(S): EFQU 5 YEARS ONLY:
PRATT EOP ATTACHMENTS PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURENTRRLE REV DATE REVIEW REVIEW ST ATT-14.1 ATTACHMENT RHR COOL 006 04130/2003 01108/2002 01/08/2007 EF ATT-14.2 ATTACHMENT RHR ISOL 003 02V1212003 02V12/2003 02V1212008 EF ATT-14.3 ATTACHMENT RHR NPSH 003 03106/2002 01128/2004 01/2812009 EF ATT-14.5 ATTACHMENT RHR SYSTEM 003 03120/2003 02V0312003 02/0312008 EF ATT-14.6 ATTACHMENT RHR PRESS REDUCT7ON 002 031062002 01/28/2004 01/28/2009 EF ATT-14.7 ATTACHMENT ADJUST RHR FLOW 000 0211712004 02117/2004 02/17/2009:'- EF ATT-15.0 ATTACHMENT RCP START 009 0310612002 0311712000 03/1712005 EF ATT-15.1 ATTACHMENT RCP DIAGNOSTICS 003 0412411997 0210312003 02103/2008. EF ATT-15.2 ATTACHMENT SEAL COOUNG 005 0310612002 02/0312003 02/0312008 EF ATT-16.0 ATTACHMENT RUPTURED SG 012 0412912004 01/1112000 01/1112005 EF ATT-16.1 ATTACHMENT SGTL 002 03106/2002 0910812000 0910812005 EF ATT-16.2 ATTACHMENT RCS BORON FOR SGTL 003 11126/2003 09108/2000 09/0812005 EF ATT-17.0 ATTACHMENT SD-1 018 10110/2003 02/29/2000 02V2812005 EF ATT-17.1 ATTACHMENT SD-2 006 0310612002 0113012001 01/3012006 EF ATT-18.0 ATTACHMENT SFP - RWST 005 0310612002 02/03/2003 02/0312008 EF ATT-20.0 ATTACHMENT VENT TIME 003 07/26/1994 02/0312003 02/03/2008 EF ATT-21.0 ATTACHMENT RCS ISOLATION 002 0310612002 02103/2003 02/03/2008 EF ATT-22.0 ATTACHMENT RESTORING FEED FLOW 003 05102/2002 01122/2002 0112212007 EF ATT-23.0 ATTACHMENT TRANSFER 4160V LOADS 000 02126/1999 01/28/2004 01/28/2009 EF ATT-24.0 ATTACHMENT TRANSFER BATTERY TO TSC 000 09/08/2000 0910812000 09/0812005 EF ATT-26.0 ATTACHMENT RETURN TO NORMAL OPERATIONS 000 1013112001 10/3112001 10/3112006 EF PRATT TOTAl: 51 GRAND TOTAL: 51
EOP: TITLE:
REV: 6 ATT-9.1 ATTACHMENT EXCESS :L/D PAGE 1 of 1 Responsible Manager_ Date ________
A) The following conditions must be met to place excess letdown in service:
o IA to CNMT - ESTABLISHED o CCW - IN SERVICE o PRZR level - GREATER THAN 139%
B) Establish excess letdown:
- 1. Ensure EXCESS LTDN LOOP A COLD TO Hx, AOV-310 is closed.
- 2. Ensure EXCESS LTDN flow control valve, HCV-123 is closed, demand at 0.
- 3. Ensure SEAL OR EXCESS LTDN RETURN ISOL VALVE, MOV-313, is open.
- 4. Place excess letdown divert valve, AOV-312, to DIVERT.
- 5. Ensure CCW FROM EX LTDN Hx, AOV-745 - OPEN.
i
- a. Slowly open EXCESS LTDN flow control valve, HCV-123, to maintain excess letdown temperature less than 1950 F and pressure less than 100 psig.
- b. Ensure approximately 10 gallons is flushed to the RCDT.
CAUTION DIVERTING EXCESS LETDOWN TO RCDT WILL RESULT IN CVCS HUT LEVEL INCREASE OF APPROXIMATELY 4% PER HOUR.
- c. IF RCP seal return has been established, THEN place EXCESS LTDN HX DIVERT TO VCT OR RCDT VALVE, AOV-312, to NORMAL. IF NOT, THEN leave AOV-312 in DIVERT.
- 8. Adjust charging pump speed to control PRZR level and labyrinth seal D/P.