R. E. Ginna - Emergency Operating Procedures
ML042170305
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/28/2004
From: Widay J
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
E66429, NPSP0200
Download: ML042170305 (4)


Text

- i-1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC July 28, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, sepU A. Widay JAW/jdw xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

ATT Index ATT-9. 1, Rev 6 4(BoA

( C C1'~..

4'IeI<

NPSP0200 Ginna Nuclear Power Plant Wed 7/28/2004 10:28:32 am E66429 PROCEDURE INDE) Page 1 of 2

-_C r '.fP t*1t Z ' n7 7N r I t, "- :; -. . - - s.- z s,- z 11=r':.w-TT .I .'- M*

. -. . -. q INPUT PARAMETERS: TYPE: PRATT STATUSVALUE(S): EF.QU 5 YEARS ONLY:

PRATT EOP`ATTACHMENTS --- --- -.-

PROCEDURE EFFECT LAST NEXT NUMBER PROCEOURE TITLE REV DATE REVIEW REVIEW ST ATT-1.0 ATTACHMENT AT POWER CCW ALIGNMENT 003 02112/2003 02112/2003 02/12/2008 Ef ATT-1.1 ATTACHMENT NORMAL CCW FLOW 000 05118/2000 05118/2000 05/18/2005 EF ATT-2.1 ATTACHMENT MIN SW 005 02101/2001 0210312003 02/03/2008 EF ATT-2.2 ATTACHMENT SW ISOLATION 008 0310612002 03127/2003 03/27/2008 EF ATT-2.3 ATTACHMENT SW LOADS IN CNMT 004 03/06/2002 04/06/2004 04/06/2009 EF ATT-2.4 ATTACHMENT NO SW PUMPS 002 05/30/2003 10/31/2001 10/31/2006 EF ATT-2,s ATTACHMENT SPUT SW HEADERS 000 06/26/2002 06n26n2002 06/26/2007 EF ATT-3.0 ATTACHMENT CVCVI 007 02/17/2004 02/17/2004 02/17/2009 EF ATT-3.1 ATTACHMENT CNMT CLOSURE 005 02117/2004 02)17/2004 02o17/2009 EF ATT-4.0 ATTACHMENT CNMT RECIRC FANS 003 07/2611994 03/27/2003 03/27/2008 EF ATT-5.0 ATTACHMENT COND TO SIG 006 10110/2003 04/06/2004 04/06/2009 EF ATT-5.1 ATTACHMENT SAFW 008 05130/2002 0410612004 04/06/2009 EF ATT-5.2 ATTACHMENT FIRE WATER COOUNG TO TDAFW PUMP 003 0111411999 01/28/2oo4 01/28/2009 EF ATT-6.0 ATTACHMENT COND VACUUM 003 12/18/1996 02103/2003 02/3/2008 EF ATT-7.0 ATTACHMENT CR EVAC 006 03/06/2002 02/03/2003 02/03/2008 EF ATT-8.0 ATTACHMENT DC LOADS 007 02/04/2004 02/04/2004 02104/2009 EF ATT-8.1 ATTACHMENT D/G STOP 005 03/06/2002 02103/2003 02/03/2008 EF ATT-8.2 ATTACHMENT GEN DEGAS 008 06/20/2002 o/8/2004 05/28/2(09 EF' ATT-8.3 ATTACHMENT NONVITAL 004 03/06/2002 02103/2003 02/03/2008 EF ATT-8.4 ATTACHMENT S!JW . 1. . . .; .. 1 005 03/06/2002 02103/2003 02/03/2008 EF ATT-8.5 ATTACHMENT LOSS OF OFFSITE POWER -; 7 001 08/26/2003 05/02/2002 05/0212007 EF ATT-9.0 ATTACHMENT LEUDOVWN 009 01/07/2004 03/06/2002 03/06/2007 EF ATT-9.1 ATTACHMENT EXCESS LID 006 07/28/2004 10131/2001 10/31/2006 Ef ATT-10.0 ATTACHMENT FAULTED SIG 006 03/0612002 03/27/2003 03/27/2008 EF ATT-I 1.0 ATTACHMENT IA CONCERNS 003 06n6/2003 03/27/2003 03/27/2008 EF ATT-1 1.1 ATTACHMENT IA SUPPLY 003 03/06/2002 03/27/2003 03/27/2008 EF ATT-1 1.2 ATTACHMENT DIESEL AIR COMPRESSOR 004 11/18/2002 03/10/2003 03/10/2008 EF ATT-12.0 ATTACHMENT N2 PORVS 005 02112/2003 02/12/2003 02/12/2008 EF ATU-13.0 ATTACHMENT NC 003 02112/2003 02/12/2003 02/12/2008 EF ATT-14.0 ATTACHMENT NORMAL RHR COOUNG 003 03/06/2002 04/06/2004 04/06/2009 EF

.0 1-" , ,

C (! C NPSP0200 Ginna Nuclear Power Plant Wed 7/28/2004 10:28:32 am 1k E66429 PROCEDURE INDE) Page 2 of 2 INPUT PARAMETERS: TYPE: PRATT STATUSVALUE(S): EFQU 5 YEARS ONLY:

PRATT EOP ATTACHMENTS PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURENTRRLE REV DATE REVIEW REVIEW ST ATT-14.1 ATTACHMENT RHR COOL 006 04130/2003 01108/2002 01/08/2007 EF ATT-14.2 ATTACHMENT RHR ISOL 003 02V1212003 02V12/2003 02V1212008 EF ATT-14.3 ATTACHMENT RHR NPSH 003 03106/2002 01128/2004 01/2812009 EF ATT-14.5 ATTACHMENT RHR SYSTEM 003 03120/2003 02V0312003 02/0312008 EF ATT-14.6 ATTACHMENT RHR PRESS REDUCT7ON 002 031062002 01/28/2004 01/28/2009 EF ATT-14.7 ATTACHMENT ADJUST RHR FLOW 000 0211712004 02117/2004 02/17/2009:'- EF ATT-15.0 ATTACHMENT RCP START 009 0310612002 0311712000 03/1712005 EF ATT-15.1 ATTACHMENT RCP DIAGNOSTICS 003 0412411997 0210312003 02103/2008. EF ATT-15.2 ATTACHMENT SEAL COOUNG 005 0310612002 02/0312003 02/0312008 EF ATT-16.0 ATTACHMENT RUPTURED SG 012 0412912004 01/1112000 01/1112005 EF ATT-16.1 ATTACHMENT SGTL 002 03106/2002 0910812000 0910812005 EF ATT-16.2 ATTACHMENT RCS BORON FOR SGTL 003 11126/2003 09108/2000 09/0812005 EF ATT-17.0 ATTACHMENT SD-1 018 10110/2003 02/29/2000 02V2812005 EF ATT-17.1 ATTACHMENT SD-2 006 0310612002 0113012001 01/3012006 EF ATT-18.0 ATTACHMENT SFP - RWST 005 0310612002 02/03/2003 02/0312008 EF ATT-20.0 ATTACHMENT VENT TIME 003 07/26/1994 02/0312003 02/03/2008 EF ATT-21.0 ATTACHMENT RCS ISOLATION 002 0310612002 02103/2003 02/03/2008 EF ATT-22.0 ATTACHMENT RESTORING FEED FLOW 003 05102/2002 01122/2002 0112212007 EF ATT-23.0 ATTACHMENT TRANSFER 4160V LOADS 000 02126/1999 01/28/2004 01/28/2009 EF ATT-24.0 ATTACHMENT TRANSFER BATTERY TO TSC 000 09/08/2000 0910812000 09/0812005 EF ATT-26.0 ATTACHMENT RETURN TO NORMAL OPERATIONS 000 1013112001 10/3112001 10/3112006 EF PRATT TOTAl: 51 GRAND TOTAL: 51

EOP: TITLE:

REV: 6 ATT-9.1 ATTACHMENT EXCESS :L/D PAGE 1 of 1 Responsible Manager_ Date ________

A) The following conditions must be met to place excess letdown in service:

o IA to CNMT - ESTABLISHED o CCW - IN SERVICE o PRZR level - GREATER THAN 139%

B) Establish excess letdown:

1. Ensure EXCESS LTDN LOOP A COLD TO Hx, AOV-310 is closed.
2. Ensure EXCESS LTDN flow control valve, HCV-123 is closed, demand at 0.
3. Ensure SEAL OR EXCESS LTDN RETURN ISOL VALVE, MOV-313, is open.
4. Place excess letdown divert valve, AOV-312, to DIVERT.
5. Ensure CCW FROM EX LTDN Hx, AOV-745 - OPEN.
6. Open EXCESS LTDN LOOP A COLD TO HX, AOV-310.

i

7. Flush approximately 10 gallons to RCDT as follows (3.2 gal/%, PPCS Point ID LI003).
a. Slowly open EXCESS LTDN flow control valve, HCV-123, to maintain excess letdown temperature less than 1950 F and pressure less than 100 psig.
b. Ensure approximately 10 gallons is flushed to the RCDT.

CAUTION DIVERTING EXCESS LETDOWN TO RCDT WILL RESULT IN CVCS HUT LEVEL INCREASE OF APPROXIMATELY 4% PER HOUR.

c. IF RCP seal return has been established, THEN place EXCESS LTDN HX DIVERT TO VCT OR RCDT VALVE, AOV-312, to NORMAL. IF NOT, THEN leave AOV-312 in DIVERT.
8. Adjust charging pump speed to control PRZR level and labyrinth seal D/P.