p-RSe Always at Your Service Joseph A. Widay Vice President and Plant Manager November 26, 2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, JAW/jdw xc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

ATT Index A1T-16.2, Rev 3 An equal opportunity employer 89 East Avenue I Rochester, NY 14649 tel (585) 546-2700 www.rge.com En t

An Energy East Company

c C

I f

t

NPSP0200 WRtGHTJ INPUT PARAMETERS: TYPE:

PRATT 1XrT -

OageN.-I ;

T-. -

PRATT EOP ATTACHMENTS Ginna Nuclear Power Plant PROCEDURE INDEX T.S..

A

. L...)

E. O STATUS VALUE(S):

EF, QU Wed 11/26/2003 3:18:48 pm Page 1 of 2 5 YEARS ONLY:

.. I.

I....

.1 a I ~. -.e-,

I I... -...

X.

b....

I. -

PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST ATT-1.0 ATTACHMENT AT POWER CCW ALIGNMENT 003 02/122003 02/1212003 02/1212008 EF ATT-1.1 ATT-2.1 ATT-2.2 ATT-2.3 ATT-2.4 ATT-2.5 ATT-3.0 ATT-3.1 ATT-4.0 ATT-5.0 ATT-5.1 ATT-5.2 ATT-6.0 ATT-7.0 ATT-8.0 ATT-8.1 ATT-8.2 ATT-8.3 ATT-8.4 ATT-8.5 ATT-9.0 ATT-9.1 ATT-10.0 ATT-11.0 ATT-11.1 ATT-1 1.2 ATT-12.0 ATT-13.0 ATT-14.0 ATTACHMENT NORMAL CCW FLOW ATTACHMENT MIN SW ATTACHMENT SW ISOLATION ATTACHMENT SW LOADS IN CNMT ATTACHMENT NO SW PUMPS ATTACHMENT SPLIT SW HEADERS ATTACHMENT CI/CVI ATTACHMENT CNMT CLOSURE ATTACHMENT CNMT RECIRC FANS ATTACHMENT COND TO SIG ATTACHMENT SAFW ATTACHMENT FIRE WATER COOLING TO TDAFW PUMP ATTACHMENT COND VACUUM ATTACHMENT CR EVAC ATTACHMENT DC LOADS ATTACHMENT DIG STOP ATTACHMENT GEN DEGAS ATTACHMENT NONVITAL ATTACHMENT SIUV ATTACHMENT LOSS OF OFFSITE POWER ATTACHMENT LETDOWN ATTACHMENT EXCESS L/D ATTACHMENT FAULTED S/G ATTACHMENT IA CONCERNS ATTACHMENT IA SUPPLY ATTACHMENT DIESEL AIR COMPRESSOR ATTACHMENT N2 PORVS ATTACHMENT NC ATTACHMENT NORMAL RHR COOLING 000 05/18/2000 05/18/2000 005 02/01/2001 02/03/2003 008 03/06/2002 03/27/2003 004 03/06/2002 12/3111999 002 05/30/2003 10/31/2001 000 06/26/2002 06/26/2002 006 03/06/2002 01/06/1999 004 03/06/2002 01/25/1999 003 07/26/1994 03/27/2003 006 10/10/2003 12/31/1999 008 05/30/2002 12/31/1999 003 01/14/1999 01/14/1999 003 12/18/1996 02/03/2003 006 03/06/2002 02/03/2003 006 03/2211999 01/14/1999 005 0310612002 02/03/2003 008 06/20/2002 08/17/1999 004 03/06/2002 02/0312003 005 0310612002 0210312003 001 08/26/2003 05/0212002 008 03/06/2002 03/06/2002 005 03/06/2002 10/31/2001 006 03106/2002 03/27/2003 003 06/2612003 03/27/2003 003 03/06/2002 03/27/2003 004 11/18/2002 03/10/2003 005 02/1212003 02/12/2003 003 02/12/2003 02/12/2003 003 03/06/2002 09123/1999 05/18/2005 02/03/2008 03/27/2008 12/31/2004 10131/2006 06/26/2007 01/06/2004 01/25/2004 03/27/2008 12/31/2004 12/31/2004 01/14/2004 02/03/2008 02/03/2008 01/14/2004 02103/2008 08/17/2004 02/03/2008 02/03/2008 05/0212007 03106/2007 10/31/2006 03/27/2008 03/27/2008 03/27/2008 03/10/2008 02/1212008 02/1212008 09/23/2004

(

c IT I

NPSP0200 WRIGHTJ INPUT PARAMETERS: TYPE:

PRATT PRATT E6P ATTACHMENTS Ginna Nuclear Power Plant PROCEDURE INDEX Wed 11/26/2003 3:18:48 pm Page 2 of 2 5 YEARS ONLY:

II STATUS VALUE(S):

EF, QU PROCEDURE NUMBER ATT-14.1 ATT-14.2 ATT-14.3 ATT-14.5 ATT-14.6 ATT-15.0 ATT-15.1 ATT-15.2 ATT.-16.0 ATT-16.1 ATT-16.2 ATT-17.0 ATT-17.1 ATT-18.0 ATT-20.0 ATT-21.0 ATT-22.0 ATT-23.0 ATT-24.0 ATT-26.0 PROCEDURE TITLE ATTACHMENT RHR COOL ATTACHMENT RHR ISOL ATTACHMENT RHR NPSH ATTACHMENT RHR SYSTEM ATTACHMENT RHR PRESS REDUCTION ATTACHMENT RCP START ATTACHMENT RCP DIAGNOSTICS ATTACHMENT SEAL COOLING ATTACHMENT RUPTURED S/G ATTACHMENT SGTL ATTACHMENT RCS BORON FOR SGTL ATTACHMENT SD-i ATTACHMENT SD-2 ATTACHMENT SFP - RWST ATTACHMENT VENT TIME ATTACHMENT RCS ISOLATION ATTACHMENT RESTORING FEED FLOW ATTACHMENT TRANSFER 4160V LOADS ATTACHMENT TRANSFER BATTERY TO TSC ATTACHMENT RETURN TO NORMAL OPERATIONS EFFECT LAST REV DATE REVIEW 006 04/30/2003 01/08/2002 003 02/12/2003 02/1122003 003 0310612002 01/06/1999 003 03/2012003 02103/2003 002 03/06/2002 01/14/1999 009 03/06/2002 03/17/2000 003 04/24/1997 02/03/2003 005 03/06/2002 02103/2003 011 07/18/2001 01/11/2000 002 03/06/2002 09/08/2000 003 11/26/2003 09/08/2000 016 10/10/2003 02/29/2000 006 03/06/2002 01/30/2001 005 03/06/2002 02/03/2003 003 07/26/1994 02/03/2003 002 03/06/2002 02/03/2003 003 0510212002 01/2212002 000 02/26/1999 02/26/1999 000 09/08/2000 09108/2000 000 10/31/2001 10/31/2001 NEXT REVIEW 01/08/2007 02/1212008 0t/06/2004 02/03/2008 01/14/2004 03/17/2005 02/03/2008 02/03/2008 01/11/2005 09108/2005 09/08/2005 02/28/2005 01/30/2006 02/03/2008 02/03/2008 02/03/2008 01/22/2007 02/26/2004 09108/2005 10/31/2006 ST EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF PRATT TOTAL:

50 GRAND TOTAL:

50

EOP:

TITLE:

ATT-16.2 cZ3 REV: 3 PAGE 1 of 2 ATTACHMENT RCS BORON FOR SGTL ii Responsible Manager --

Date /1-d CWQ 003 NOTE:

Boron calculations below assume most conservative values for temperature coefficient and boron worth.

Determine desired RCS boron concentration using attached figure as follows:

1.

Find boron concentration for current cycle burnup.

ppm

2. Add 130 ppm to the value of step 1.

+130 ppm

3. Total is desired RCS boron concentration for cooldown from 547 0F to 5000F.

Total (5000F)

4. Add 140 ppm to the value of step 3.

+140 ppm 5.

Total is desired RCS boron concentration for cooldown from 500'F to 450'F.

Total (4500F)

.l-EOP:

TITLE:

REV: 3 ATT-16.2 ATTACHMENT RCS BORON FOR SGTL PAGE 2 of 2 Ginna Cycle 31 Boron Concentration vs. Cycle Burnup at HZP, No Xenon Conditions 1800 1600 1400 1200 Ea.

C 1000 0

C 0

Q 800 0

0 600 400 200 0

t I

l i

i i

j

.i, i l

i i

i l t

~~~~~I

.II 1

I j, I I I j l

I I I.

i ' ' I i I I, ' @, I HZP, ARI, less worst stuck rod, Xenon free,

____,__i

______'_ii___i_

minimum shutdown margin required per COLR,

.1.,.

j 3

8 j l

l i, t

~~~~~Figure 1.

i____it4!.>

!i 100 PMALLOWANCE HAS BEEN ADDED TO't I

ja.

s.

.L PP

ALLVALUES,.

. ~

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

a

~~

~

~~~~

I a~~~

~

~

'i I I

,_QI j

j 0

2000 4000 6000 8000 10000 12000 14000 16000 18000 Cycle Bumup (MWDIMTU)

Two Loop Flow Single Loop Flow