A Subsidiary of RGS Energy Group, Inc.
ROCHtESIERGASANDELECTRICCORPORATION
- 69EASTAVENUEROCHESTERNY. 146490001 716-771-3250 wwwrge.com JOSEPH A. WIDAY VICE PRESIDENT PLANT MANAGER GINNA STATION February 4, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very truly yours, fi~ephlA. Widay JAW/jdw xc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415-Ginna USNRC Senior Resident Inspector Enclosure(s):
ATT Index AT-8.O, Rev 7
$OD2z
NPSP0200 WRIGHTJ Ginna Nuclear Power Plant PROCEDURE INDEX Wed 2/4/2004 12:43:43 pm Page 1 of 2 INPUT PARAMETERS: TYPE:
PRATT STATUSVALUE(S):
EF.,U 5 YEARS ONLY:
PRATT EOP ATTACHMENTS PROCEDURE NUMBER ATT-1.0 ATT-1.1 ATT-2.1 ATT-2.2 ATT-2.3 ATT-2.4 ATT-2.5 ATT-3.0 ATT-3.1 ATT-4.0 ATT-5.0 ATT-5.1 ATT-5.2 ATT-6.0 ATT-7.0 ATT-8.0 ATT-8.1 ATT-8.2 ATT-8.3 ATT-8.4 ATT-8.5 ATT-9.0 ATT-9.1 ATT-10.0 ATT-11.0 ATT-11.1 ATT-11.2 ATT-12.0 ATT-13.0 ATT.14.0 PROCEDURE TITLE ATTACHMENT AT POWER CCW ALIGNMENT ATTACHMENT NORMAL CCW FLOW ATTACHMENT MIN SW ATTACHMENT SW ISOLATION ATTACHMENT SW LOADS IN CNMT ATTACHMENT NO SW PUMPS ATTACHMENT SPLIT SW HEADERS ATTACHMENT Cl/CVI ATTACHMENT CNMT CLOSURE ATTACHMENT CNMT RECIRC FANS ATTACHMENT COND TO S/G ATTACHMENT SAFW ATTACHMENT FIRE WATER COOUNG TO TDAFW PUMP ATTACHMENT COND VACUUM ATTACHMENT CR EVAC ATTACHMENT DC LOADS ATTACHMENT DIG STOP ATTACHMENT GEN DEGAS ATTACHMENT NONVITAL ATTACHMENT SUUV ATTACHMENT LOSS OF OFFSITE POWER ATTACHMENT LETDOWN ATTACHMENT EXCESS LAD ATTACHMENT FAULTED SIG ATTACHMENT IA CONCERNS ATTACHMENT IA SUPPLY ATTACHMENT DIESEL AIR COMPRESSOR ATTACHMENT N2 PORVS ATTACHMENT NC ATTACHMENT NORMAL RHR COOLING EFFECT LAST REV DATE REVIEW 003 02112V2003 0211212003 000 05/18/2000 05/18/2000 005 02V01/2001 02V03/2003 008 03/06/2002 03127/2003 004 03/06/2002 12/31/1999 002 05/30/2003 10/31/2001 000 06/26/2002 06/26/2002 006 03/0612002 01106/1999 004 03106/2002 01/25/1999 003 07/26/1994 03/27/2003 006 10/10/2003 12/31/1999 008 05/30/2002 12/31/1999 003 01/14/1999 01/28/2004 003 12V18/1996 02103/2003 006 03106/2002 02103/2003 007 02104/2004 02104/2004 005 03/06/2002 02103/2003 008 06/20/2002 08117/1999 004 03/0612002 0210312003 005 03/06/2002 02103/2003 001 08/26/2003 05/0212002 009 01/07/2004 03106/2002 005 03106/2002 10/31/2001 006 03106/2002 03/27/2003 003 06/26/2003 03/27/2003 003 03/06/2002 03/27/2003 004 11/18/2002 03110/2003 005 0211/2003 0211212003 003 0211212003 0211212003 003 03/0612002 09123/1999 NEXT REVIEW 0211212008 05/18/2005 02103/2008 03/27/2008 12131/2004 10/31/2006 06/26/2007 01/0612004 01/25/2004 03/27/2008 12/31/2004 12131/2004 01/2812009 02V03/2008 02V03/2008 02V04/2009 02V03/2008 08117/2004 02103/2008 02V03/2008 05/0212007 03106/2007 10/31/2006 03127/2008 03/27/2008 03/27/2008 03/10/2008 0211212008 0211212008 09/23/2004 ST EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF
(.1~
NPSP0200 WRIGHTJ Ginna Nuclear Power Plant PROCEDURE INDEX Wed 2/4/2004 12:43:43 pm Page 2 of 2 INPUT PARAMETERS: TYPE:
PRATT STATUS VALUE(S):
EF. OU 5 YEARS ONLY:
PRATr EOP ATTACHMENTS PROCEDURE NUMBER ATT-14.1 ATT-14.2 ATT-14.3 ATT-14.5 ATT-14.6 ATT-15.0 ATT-15.1 ATT-15.2 ATT-16.0 ATT-16.1 ATT-16.2 ATT-17.0 ATT-17.1 ATT-18.0 ATT-20.0 ATT-21.0 ATT-22.0 ATT-23.0 ATT-24.0 ATT-26.0 PRATT PROCEDURE TITLE ATTACHMENT RHR COOL ATTACHMENT RHR ISOL ATTACHMENT RHR NPSH ATTACHMENT RHR SYSTEM ATTACHMENT RHR PRESS REDUCTION ATTACHMENT RCP START ATTACHMENT RCP DIAGNOSTICS ATTACHMENT SEAL COOLING ATTACHMENT RUPTURED S/G ATTACHMENT SGTL ATTACHMENT RCS BORON FOR SGTL ATTACHMENT SD-i ATTACHMENT SD-2 ATTACHMENT SFP - RWST ATTACHMENT VENT TIME ATTACHMENT RCS ISOLATION ATTACHMENT RESTORING FEED FLOW ATTACHMENT TRANSFER 4160V LOADS ATTACHMENT TRANSFER BATTERY TO TSC ATTACHMENT RETURN TO NORMAL OPERATIONS EFFECT LAST REV DATE REVIEW 006 04/30/2003 01/08/2002 003 02/12)2003 02/12/2003 003 03/06/2002 01/28/2004 003 03/20/2003 02103/2003 002 03/06/2002 01/28/2004 009 03/06/2002 03/17/2000 003 04/2411997 02/03/2003 005 03/06/2002 02/03/2003 011 07/18/2001 01/11/2000 002 03/06/2002 09/08/2000 003 11/26/2003 09/08/2000 016 10/10/2003 02129/2000 006 03/06/2002 01/30/2001 005 03/06/2002 02V03/2003 003 07/26/1994 02/03/2003 002 03/06/2002 02/03/2003 003 05/02V2002 01/22/2002 000 02126/1999 01/28/2004 000 09/08/2000 09/08/2000 000 10/31/2001 10/31/2001 NEXT REVIEW 01/08/2007 02)12)2008 01/28/2009 02/03/2008 01/28/2009 03/17/2005 02V03/2008 02V03/2008 01/11/2005 09/08/2005 09/08/2005 02/28/2005 01/30/2006 02V03/2008 02/03/2008 02)03/2008 01/22/2007 01/2872009 09/08/2005 10/31/2006 ST EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF TOTAL 50 GRAND TOTAL:
50
.. I, 123 EOP:
TITLE:
REV: 7 ATT-8.0 ATTACHMENT DC LOADS PAGE 1 of 1 Responsible Manager A
Date A)
The A and B MFP DC oil pumps should be automatically shed within 12 minutes to reduce battery load to guarantee design battery life. Manually secure pumps if auto shed does not occur.
B)
The following DC loads could be shed from the A and B DC busses, if necessary (obtain DC panel key from SS):
MAIN DC DISTRIBUTION PANEL A (DCPDPCB03A) (A battery room):
I o Rod drive MG set control panel, position 4 o Iso phase control, position 5 o Exciter equipment panel, position 6 MAIN DC DISTRIBUTION PANEL B (DCPDPCB03B) (B battery room):
I o Rod drive MG set control panel, position 3 AUX BLDG DC DIST PANEL 1B (DCPDPABO1B) (south end bus 16 1
on column near SI pump recirc valves) o Aux Bldg Heat & Vent cont panel, position 1 SCREENHOUSE DC DISTRIBUTION PANEL B (DCPDPSHO1B) (screenhouse near MCC G) o Traveling screen control, position 1 TURB BLDG DC DISTRIBUTION PANEL B (DCPDPTBO1B) (TURB BLDG I
basement near fire water storage tank) o Hydrogen panel, position 3 (after degassification) o MCC F, position 5 o Water treatment panel, position 6