A Subsidiary of RGS Energy Group, Inc.

ROCHtESIERGASANDELECTRICCORPORATION

  • 69EASTAVENUEROCHESTERNY. 146490001 716-771-3250 wwwrge.com JOSEPH A. WIDAY VICE PRESIDENT&PLANT MANAGER GINNA STATION February 4, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, fi~ephlA. Widay JAW/jdw xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415-Ginna USNRC Senior Resident Inspector Enclosure(s):

ATT Index AT-8.O, Rev 7

$OD2z

NPSP0200 Ginna Nuclear Power Plant Wed 2/4/2004 12:43:43 pm WRIGHTJ PROCEDURE INDEX Page 1 of 2 INPUT PARAMETERS: TYPE: PRATT STATUSVALUE(S): EF.,U 5 YEARS ONLY:

PRATT EOP ATTACHMENTS PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE REV DATE REVIEW - REVIEW ST ATT-1.0 ATTACHMENT AT POWER CCW ALIGNMENT 003 02112V2003 0211212003 0211212008 EF ATT-1.1 ATTACHMENT NORMAL CCW FLOW 000 05/18/2000 05/18/2000 05/18/2005 EF ATT-2.1 ATTACHMENT MIN SW 005 02V01/2001 02V03/2003 02103/2008 EF ATT-2.2 ATTACHMENT SW ISOLATION 008 03/06/2002 03127/2003 03/27/2008 EF ATT-2.3 ATTACHMENT SW LOADS IN CNMT 004 03/06/2002 12/31/1999 12131/2004 EF ATT-2.4 ATTACHMENT NO SW PUMPS 002 05/30/2003 10/31/2001 10/31/2006 EF ATT-2.5 ATTACHMENT SPLIT SW HEADERS 000 06/26/2002 06/26/2002 06/26/2007 EF ATT-3.0 ATTACHMENT Cl/CVI 006 03/0612002 01106/1999 01/0612004 EF ATT-3.1 ATTACHMENT CNMT CLOSURE 004 03106/2002 01/25/1999 01/25/2004 EF ATT-4.0 ATTACHMENT CNMT RECIRC FANS 003 07/26/1994 03/27/2003 03/27/2008 EF ATT-5.0 ATTACHMENT COND TO S/G 006 10/10/2003 12/31/1999 12/31/2004 EF ATT-5.1 ATTACHMENT SAFW 008 05/30/2002 12/31/1999 12131/2004 EF ATT-5.2 ATTACHMENT FIRE WATER COOUNG TO TDAFW PUMP 003 01/14/1999 01/28/2004 01/2812009 EF ATT-6.0 ATTACHMENT COND VACUUM 003 12V18/1996 02103/2003 02V03/2008 EF ATT-7.0 ATTACHMENT CR EVAC 006 03106/2002 02103/2003 02V03/2008 EF ATT-8.0 ATTACHMENT DC LOADS 007 02104/2004 02104/2004 02V04/2009 EF ATT-8.1 ATTACHMENT DIG STOP 005 03/06/2002 02103/2003 02V03/2008 EF ATT-8.2 ATTACHMENT GEN DEGAS 008 06/20/2002 08117/1999 08117/2004 EF ATT-8.3 ATTACHMENT NONVITAL 004 03/0612002 0210312003 02103/2008 EF ATT-8.4 ATTACHMENT SUUV 005 03/06/2002 02103/2003 02V03/2008 EF ATT-8.5 ATTACHMENT LOSS OF OFFSITE POWER 001 08/26/2003 05/0212002 05/0212007 EF ATT-9.0 ATTACHMENT LETDOWN 009 01/07/2004 03106/2002 03106/2007 EF ATT-9.1 ATTACHMENT EXCESS LAD 005 03106/2002 10/31/2001 10/31/2006 EF ATT-10.0 ATTACHMENT FAULTED SIG 006 03106/2002 03/27/2003 03127/2008 EF ATT-11.0 ATTACHMENT IA CONCERNS 003 06/26/2003 03/27/2003 03/27/2008 EF ATT-11.1 ATTACHMENT IA SUPPLY 003 03/06/2002 03/27/2003 03/27/2008 EF ATT-11.2 ATTACHMENT DIESEL AIR COMPRESSOR 004 11/18/2002 03110/2003 03/10/2008 EF ATT-12.0 ATTACHMENT N2 PORVS 005 0211/2003 0211212003 0211212008 EF ATT-13.0 ATTACHMENT NC 003 0211212003 0211212003 0211212008 EF ATT.14.0 ATTACHMENT NORMAL RHR COOLING 003 03/0612002 09123/1999 09/23/2004 EF

(.1~

NPSP0200 Ginna Nuclear Power Plant Wed 2/4/2004 12:43:43 pm WRIGHTJ PROCEDURE INDEX Page 2 of 2 INPUT PARAMETERS: TYPE: PRATT STATUS VALUE(S): EF. OU 5 YEARS ONLY:

PRATr EOP ATTACHMENTS PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST ATT-14.1 ATTACHMENT RHR COOL 006 04/30/2003 01/08/2002 01/08/2007 EF ATT-14.2 ATTACHMENT RHR ISOL 003 02/12)2003 02/12/2003 02)12)2008 EF ATT-14.3 ATTACHMENT RHR NPSH 003 03/06/2002 01/28/2004 01/28/2009 EF ATT-14.5 ATTACHMENT RHR SYSTEM 003 03/20/2003 02103/2003 02/03/2008 EF ATT-14.6 ATTACHMENT RHR PRESS REDUCTION 002 03/06/2002 01/28/2004 01/28/2009 EF ATT-15.0 ATTACHMENT RCP START 009 03/06/2002 03/17/2000 03/17/2005 EF ATT-15.1 ATTACHMENT RCP DIAGNOSTICS 003 04/2411997 02/03/2003 02V03/2008 EF ATT-15.2 ATTACHMENT SEAL COOLING 005 03/06/2002 02/03/2003 02V03/2008 EF ATT-16.0 ATTACHMENT RUPTURED S/G 011 07/18/2001 01/11/2000 01/11/2005 EF ATT-16.1 ATTACHMENT SGTL 002 03/06/2002 09/08/2000 09/08/2005 EF ATT-16.2 ATTACHMENT RCS BORON FOR SGTL 003 11/26/2003 09/08/2000 09/08/2005 EF ATT-17.0 ATTACHMENT SD-i 016 10/10/2003 02129/2000 02/28/2005 EF ATT-17.1 ATTACHMENT SD-2 006 03/06/2002 01/30/2001 01/30/2006 EF EF ATT-18.0 ATTACHMENT SFP - RWST 005 03/06/2002 02V03/2003 02V03/2008 EF ATT-20.0 ATTACHMENT VENT TIME 003 07/26/1994 02/03/2003 02/03/2008 EF ATT-21.0 ATTACHMENT RCS ISOLATION 002 03/06/2002 02/03/2003 02)03/2008 EF ATT-22.0 ATTACHMENT RESTORING FEED FLOW 003 05/02V2002 01/22/2002 01/22/2007 EF ATT-23.0 ATTACHMENT TRANSFER 4160V LOADS 000 02126/1999 01/28/2004 01/2872009 EF ATT-24.0 ATTACHMENT TRANSFER BATTERY TO TSC 000 09/08/2000 09/08/2000 09/08/2005 EF ATT-26.0 ATTACHMENT RETURN TO NORMAL OPERATIONS 000 10/31/2001 10/31/2001 10/31/2006 PRATT TOTAL 50 GRAND TOTAL: 50

.. I, 123 EOP: TITLE: REV: 7 ATT-8.0 ATTACHMENT DC LOADS PAGE 1 of 1 Responsible Manager __ A __ _ Date A) The A and B MFP DC oil pumps should be automatically shed within 12 minutes to reduce battery load to guarantee design battery life. Manually secure pumps if auto shed does not occur.

B) The following DC loads could be shed from the A and B DC busses, if necessary (obtain DC panel key from SS):

MAIN DC DISTRIBUTION PANEL A (DCPDPCB03A) (A battery room): I o Rod drive MG set control panel, position 4 o Iso phase control, position 5 o Exciter equipment panel, position 6 MAIN DC DISTRIBUTION PANEL B (DCPDPCB03B) (B battery room): I o Rod drive MG set control panel, position 3 AUX BLDG DC DIST PANEL 1B (DCPDPABO1B) (south end bus 16 1 on column near SI pump recirc valves) o Aux Bldg Heat & Vent cont panel, position 1 SCREENHOUSE DC DISTRIBUTION PANEL B (DCPDPSHO1B) (screenhouse near MCC G) o Traveling screen control, position 1 TURB BLDG DC DISTRIBUTION PANEL B (DCPDPTBO1B) (TURB BLDG I basement near fire water storage tank) o Hydrogen panel, position 3 (after degassification) o MCC F, position 5 o Water treatment panel, position 6