R. E. Ginna Emergency Operating Procedures, ATT-24.0, Rev 2
ML052920048
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/28/2005
From: Holm D
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
E66429, NPSP0200 ATT-24.0, Rev 2
Download: ML052920048 (6)


Text

1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC September 28, 2005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, Dave A. Holm DAH/jdw xc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

ALT Index ATT-24.0, Rev 2

.e

(,..

NPSP0200 E66429

(.

Ginna Nuclear Power Plant PROCEDURE INDEX Wed 9/28/2005 10:26:21 am Page 1 of 2 INPUT PARAMETERS: T PRATT EOP PROCEDURE NUMBER ATT-1.0 ATT-1.1 ATT-2.1 ATT-2.2 ATT-2.3 ATT-2.4 ATT-2.5 ATT-3.0 ATT-3.1 ATT-4.0 ATT-5.0 ATT-5.1 ATT-5.2 ATT-6.0 ATT-7.0 ATT-8.0 ATT-8.1 ATT-8.2 ATT-8.3 ATT-8.4 ATT-8.5 ATT-9.0 ATT-9.1 ATT-10.0 ATT-1 1.0 ATT-1 1.1 ATT-11.2 ATT-12.0 ATT-13.0 ATT-14.0 YPE:

PRATT ATTACHMENTSl STATUS VALUE(S):

EF, QU 5 YEARS ONLY:

PROCEDURE TITLE ATTACHMENT AT POWER CCW AUGNMENT ATTACHMENT NORMAL CCW FLOW ATTACHMENT MIN SW ATTACHMENT SW ISOLATION ATTACHMENT SW LOADS IN CNMT ATTACHMENT NO SW PUMPS ATTACHMENT SPLIT SW HEADERS ATTACHMENT CVCVI ATTACHMENT CNMT CLOSURE ATTACHMENT CNMT RECIRC FANS ATTACHMENT COND TO S/G ATTACHMENT SAFW ATTACHMENT FIRE WATER COOUNG TO TDAFW PUMP ATTACHMENT COND VACUUM ATTACHMENT CR EVAC ATTACHMENT DC LOADS ATTACHMENT D/G STOP ATTACHMENT GEN DEGAS ATTACHMENT NONVITAL ATTACHMENT SI/UV ATTACHMENT LOSS OF OFFSITE POWER ATTACHMENT LETDOWN ATTACHMENT EXCESS LID ATTACHMENT FAULTED SIG ATTACHMENT IA CONCERNS ATTACHMENT IA SUPPLY ATTACHMENT DIESEL AIR COMPRESSOR ATTACHMENT N2 PORVS ATTACHMENT NC ATTACHMENT NORMAL RHR COOUNG EFFECT LAST REV DATE REVIEW 003 02/12/2003 02/12/2003 000 05/18/2000 0312512005 005 02/01/2001 02/0312003 008 03/06/2002 03127/2003 004 03106/2002 04/06/2004 002 05/30/2003 10/3112001 000 06/26/2002 06/26/2002 008 12101/2004 02/17/2004 005 02/17/2004 02/17/2004 003 07/26/1994 03/27/2003 006 10/10/2003 04/0612004 008 05/3012002 04106/2004 004 10/07/2004 81120/51/2 003 1211811996 02/0312003 006 03106/2002 02/03/2003 007 02/04/2004 02104/2004 005 03/06/2002 02/0312003 008 06/20/2002 05/28/2004 004 03/06/2002 02103/2003 005 03/0612002 02103/2003 001 08126/2003 05102/2002 009 0110712004 03/0612002 006 07128/2004 10/31/2001 006 03106/2002 03127/2003 004 09/01/2004 03/2712003 003 03/06/2002 03/27/2003 004 11118/2002 03/10/2003 005 02/12/2003 02/12/2003 003 02112/2003 0211212003 003 03/06/2002 04/06/2004 NEXT REVIEW 02/12/2008 03/25/2010 02/03/2008 03/2712008 04/06/2009 10/31/2006 06/26/2007 02/17/2009 02/17/2009 03/27/2008 04/06/2009 04/06/2009 01/28/2009 02/03/2008 02103/2008 02/04/2009 02/03/2008 05/28/2009 02/03/2bo8 02103/2008 05/02/2007 03/06/2007 10/31/2006 03/27/2008 03/27/2008 03/27/2008 03/10/2008 02/12/2008 02112/2008 04/06/2009 ST EF EF EF EF EF EF EF EF EF EF EF EF.

EF EF EF EF EF EF EF EF EF EF EF EF EF-EF EF EF EF EF

(

(

NPSP0200 E66429 Ginna Nuclear Power Plant PROCEDURE INDE)

Wed 9/28/2005 10:26:21 am Page 2 of 2 INPUT PARAMETERS: TYPE:

PRATT STATUS VALUE(S):

EF, QU 5 YEARS ONLY:

p RAT EOP ATTACHMENTS PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST ATT-14.1 ATTACHMENT RHR COOL 008 04/10/2005 01108/2002 01108/2007 EF ATT-14.2 ATTACHMENT RHR ISOL 003 02V12/2003 0211212003 02/1212008 EF ATT-14.3 ATTACHMENT RHR NPSH 003 03/06/2002 01/28/2004 01/28/2009 EF ATT-14.5 ATTACHMENT RHR SYSTEM 003 03/2012003 0210312003 0210312008 EF ATT-14.6 ATTACHMENT RHR PRESS REDUCTION 002 03/06/2002 01128/2004 01/2812009 EF ATT-14.7 ATTACHMENT ADJUST RHR FLOW 001 02/1712005 0211712004 02V17/2009 EF ATT-15.0 ATTACHMENT RCP START 010 01/11/2005 01111/2005 01/11/2010 EF ATT-15.1 ATTACHMENT RCP DIAGNOSTICS 003 04/24/1997 02103/2003 02103/2008 EF ATT-15.2 ATTACHMENT SEAL COOUNG 005 03/0612002 02103/2003 02103/2008 EF ATT-16.0 ATTACHMENT RUPTURED SG 013 01/11/2005 01/11/2005 01/11/2010 EF ATT-16.1 ATTACHMENT SGTL 003 09/01/2004 06/2712005 06/27/2010 EF ATT-16.2 ATTACHMENT RCS BORON FOR SGTL 004 04/10/2005 06127/2005 06/27/2010 EF ATT-17.0 ATTACHMENT SD-1 020 04/10/2005 01/21/2005 01/21/2010 EF ATT-17.1 ATTACHMENT SD-2 007 09/01/2004 01/30/2001 01/30/2006 EF ATT-18.0 ATTACHMENT SFP -RWST 005 03/06/2002 02/03/2003 02103/2008 EF ATT-20.0 ATTACHMENT VENT TIME 004 09/01/2004 02/03/2003 0V203/2008 EF ATT-21.0 ATTACHMENT RCS ISOLATION 002 03/06/2002 02V03/2003 02/03/2008 EF ATT-22.0 ATTACHMENT RESTORING FEED FLOW 004 11/17/2004 01/22/2002 01/2212007 EF ATT-23.0 ATTACHMENT TRANSFER 4160V LOADS 000 02126/1999 01/28/2004 01/28/2009 EF ATT-24.0 ATTACHMENT TRANSFER BATTERY TO TSC 002 09/28/2005 09/28/2005 09/28/2010 EF ATT-26.0 ATTACHMENT RETURN TO NORMAL OPERATIONS 000 10/31/2001 10/31/2001 10/31/2006 EF PRATT TOTAL 51 GRAND TOTAL 51

EOP:

hTITE:

REV: 2 ATT-24.0 ATTACHMENT TRANSFER BATTERY TO TSC

]

PAGE I of 3 Responsible Manager ____Date___-____-_iat A. BATTERY A

1. Notify Control Room to declare AMSAC inoperable.
2. Obtain.key to TSC/BATTERY A FUSED DISCONNECT PANEL switch, DCPDPCB05A, from Shift Manager (Locked Valve Key).
3. Obtain key to A TSC/BATTERY A/B MANUAL THROWOVER PANEL switch, DCPDPTBO2, from Shift Manager (Key #23 in SM key cabinet).
4. Notify Control Room they will receive TSC INVERTER BATTERY I

CHARGER alarm on PPCS (PPCS PID TSC PWR2).

5. IF TSC Battery is on equalizing charge, THEN remove TSC Battery I

from equalizing charge by placing the TSC BATTERY CHARGER I

EQUALIZE/FLOAT switch in the FLOAT position.

l

6. OPEN AC INPUT breaker on TSC BATTERY CHARGER.
7. Verify TSC Battery voltage is greater than 120 VDC on Tech I

Center Battery Monitoring Cabinet.

I

8. IF TSC Battery voltage is less than 120 VDC, THEN evaluate condition of TSC Battery before proceeding.
9. CLOSE AC INPUT breaker on TSC BATTERY CHARGER.
10. Verify TSC Battery System is NORMAL.

NOTE:

ITS LCO 3.8.5 requirements state TSC Battery Charger voltage will be maintained less than or equal to 140 VDC when tying to the A or B battery.

11. Ensure TSC Battery Charger output voltage less than 140 VDC I

before tying to A Battery.

IF output voltage adjustment is necessary, THEN adjust using FLOAT potentiometer on front of l

TSC Battery Charger.

I

12. Unlock and CLOSE TSC/BATTERY A FUSED DISCONNECT PANEL switch, DCPDPCBO5A, located in south west corner of Battery Room A.
13. Ensure CLOSED TSC BATT A/B FUSED DISCONNECT SWITCH, DCPDPCDO1, located in TSC Battery Room.
14. Unlock and CLOSE A BATTERY switch on TSC/BATTERY A/B MANUAL THROWOVER PANEL switch, DCPDPTBO2, located in Turbine Building Basement east wall.
15. Hold open Battery Chargers BYCA (MCC C Pos 4HH) AND BYCA1 (MCC C Pos 5D).

EOP:

TITLE:

REV: 2 ATT-24.0 ATTACHMENT TRANSFER BATTERY TO TSC PAGE 2 of 3 NOTE:

Steps 16 -

17 isolate Battery A and PA Inverter from MCB alarm J-15 to allow monitoring Battery B alarm conditions.

16. Disconnect the following wires inside BYCA Battery Charger to isolate inputs to MCB Alarm J-15:
  • red wire terminal 9 (LR4 top) ckt E302
  • gray wire terminal 9 (LR4 bottom)
  • white wire terminal 9 (LR4 bottom)
17. Disconnect alarm wire marked TB4-1, located in A Battery Load Flow Cabinet.

B. BATTERY B

1. Notify Control Room to declare AMSAC inoperable.
2. Obtain key to TSC/BATTERY B FUSED DISCONNECT PANEL switch, DCPDPCB05B, from Shift Manager (Locked Valve Key).
3. Obtain key to TSC/BATTERY A/B MANUAL THROWOVER PANEL switch, DCPDPTBO2, from Shift Manager (Key #23 in SM key cabinet).
4. Notify Control Room they will receive TSC INVERTER BATTERY CHARGER alarm on PPCS (PPCS PID TSC PWR2).
5. IF TSC Battery is on equalizing charge, THEN remove TSC Battery from equalizing charge by placing the TSC BATTERY CHARGER EQUALIZE/FLOAT switch in the FLOAT position.
6. OPEN AC INPUT breaker on TSC BATTERY CHARGER.
7. Verify TSC Battery voltage is greater than 120 VDC on Tech Center Battery Monitoring Cabinet.
8. IF TSC Battery voltage is less than 120 VDC, THEN evaluate condition of TSC Battery before proceeding.
9. CLOSE AC INPUT breaker on TSC BATTERY CHARGER.
10. Verify TSC Battery System is NORMAL.

NOTE:

ITS LCO 3.8.5 requirements state TSC Battery Charger voltage will be maintained less than or equal to 140 VDC when tying to the A or B battery.

11. Ensure TSC Battery Charger output voltage less than 140 VDC before tying to B Battery.

IF output voltage adjustment is necessary, THEN adjust using Float Potentiometer on front of TSC Battery Charger.

EOP:

TITLE:

REV: 2 ATT-24.0 ATTACHMENT TRANSFER BATTERY TO TSC PAGE 3 of 3

12. Unlock and CLOSE TSC/BATTERY B FUSED DISCONNECT PANEL switch, DCPDPCB05B, located in south east corner of Battery Room B.
13. Ensure CLOSED TSC BATT A/B FUSED DISCONNECT SWITCH, DCPDPCDO1, located in TSC Battery Room.
14. Unlock and CLOSE B BATTERY switch on TSC/BATTERY A/B MANUAL THROWOVER PANEL switch, DCPDPTBO2, located in Turbine Building Basement east wall.
15. Hold open Battery Charger BYCB (MCC D Pos 4MM) and BYCB1 (MCC D Pos 16F).

NOTE:

Steps 16 and 17 isolate-Battery B from MCB alarm J-15 to allow monitoring Battery A and PA Inverter conditions.

16. Disconnect two alarm wires marked LR4 located on Terminal Block TB Terminal 9 Bottom in Battery Charger BYCB.
17. Disconnect alarm wire marked TB4-1 in B BATTERY LOAD FLOW MONITORING CABINET.