ML052070706

From kanterella
Jump to navigation Jump to search
Emergency Operating Procedures
ML052070706
Person / Time
Site: Ginna 
Issue date: 07/12/2005
From: Marlow T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML052070706 (3)


Text

1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC July 12, 2005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours,

  • g4f A h, 4

Thomas A. Marlow TAM/jdw xc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

FIG Index FIG-9.0, Rev 2

c C

(

10 NPSP0200 E66429 Ginna Nuclear Power Plant PROCEDURE INDE)

Tue 7/12/2005 8:50:24 am it Page 1 of 1 INPUT PARAMETERS: TYPE:

PRFIG STATUSVALUE(S):

EF QU 5 YEARS ONLY:

PRFIG EOP FIGURE PROCEDURES PROCEDURE EFFECT LAST NEXT NUMBER FIG-1.0 FIG-2.0 FIG-3.0 FIG-3.1 FIG-3.2 FIG-4.0 FIG-5.0 FIG-6.0 FIG-7.0 FIG-8.0 FIG-9.0 FIG-9.1 FIG-10.0 FIG-11.0 FIG-12.0 FIG-13.0 FIG-14.0 PROCEDURE TITE FIGURE MIN SUBCOOUNG FIGURE SDM FIGURE NAT CIRC CID WTH SHROUD FANS FIGURE NAT CIRC C/D WITHOUT SHROUD FANS FIGURE NC CD WITH VOID IN UPPER HEAD FIGURE RCP SEAL LEAKOFF FIGURE RHR INJECTlON FIGURE MIN RCS INJECTION FIGURE INTACT S/G PRESSURE FIGURE TSAT FIGURE TECH SPEC CID FIGURE CID UMUrS FIGURE UMITA FIGURE SOAK UMITS FIGURE CNMT HYDROGEN FIGURE BACK PRESSURE FIGURE IA ISOL REV DATE REVIEW REVIEW 0

000 0510111998 03/27/2003 005 0411012005 03/27/2003 000 05101/1998 03127/2003 001 02108/2001 03127/2003 000 05101/1998 0312712003 002 02/28/2001 03/27/2003 000 05/01/1998 03/2712003 000 05101/1998 03127/2003 001 05)18/1998 03/27/2003 000 05/01/1998 03/27/2003 002 07/1122005 03/27/2003 000 05/01/1998 0312712003 000 05/0111998 03127/2003 000 05/01/1998 03127/2003 000 05/01/1998 03/27/2003 000 05/01/1998 03/27/2003 002 10/1012003 03/27/2003 03/27/2008 03/27/2008 03/27/2008 03/27/2008 03/27/2008 03127/2008 EF EF EF EF EF EF 03/27/2008 EF 03127/2008'.

EF 03127/2008 EF 03/27/2008 EF 03/27/2008 EF 03127/2008 EF 0312712008 EF 03127/2008 EF 03/2712008 EF 03/27/2008-EF 03/27/2008 EF PRFIG TOTAL 17 GRAND TOTAL 17 LAJ

I,i '

  • 1 ~;j t

1; I,

.1 I

'1

., I 5-.

-r-s

!- i A

.FIGURE TECH SPEC C/D REV: 2 PAGE 1 of 1 Responsible Manager.i Date

°_

FIGURE TECH SPEC C/D RCS PRESSURE (PSIG) 2500 2250 2000 1750 1500 1250 1000 750 500 250 0

LIMITING MATERIAL---

CIRCUMFERENTIAL WELD LIMITING 1/4T RTndt=241°F t _ _ _

LIMITING 3/4T RTndt=20 7°F 1111 UNACCEPTABLE-

_ I I I

OPERATION T_

I-I I

3COOLDOWN

_:g ___,____

RAES ACCEPTABLE

_ l 0 OPERATION

_OO40F/HR m

_ 2uOF/H~Rdr3RL<llL lT l

406D F/HR L 5 E f r 60 1X 0

50 100 150 200 250 300 RCS COLD LEG TEMPERATURE (OF) 350 400 450 500