R M A Subsidiary of RGS Energy Group, Inc.

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001 ° 716-771-3250 www.rge.com JOSEPH A. WIDAY VICE PRESIDENT & PLANT MANAGER GINNA STATION August 20, 2002 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I Washington, D.C.

20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, bsphA.Wida 3 JAW/jdw xc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

ATT Index ATT-11.2, Rev 3

(

REPORT NO.

01 REPORT:

NPSP0200 DOC TYPE:

PRATT PARAMETERS:

DOC TYPES PRATT PROCEDURE NUMBER PROCEDURI ATT-1.0 ATTACHME1 ATT-1.1 ATTACHME1 ATT-2.1 ATTACHMEl ATT-2.2 ATTACHMEl ATT-2.3 ATTACHMEl GINNA NUCLEAR POWER PLANT PROCEDURES INDEX EOP ATTACHMENTS PRER E TITLE 4T AT POWER CCW ALIGNMENT 4T NORMAL CCW FLOW 4T MIN SW NT SW ISOLATION 4T SW LOADS IN CNMT ATTACHMENT NO SW PUMPS ATTACHMENT SPLIT SW HEADERS ATTACHMENT CI/CVI ATT-2.4 ATT-2.5 ATT-3. 0 ATT-3.1 ATT-4.0 ATT-5. 0 ATT-5.1 ATT-5.2 ATT-6.0 ATT-7.0 ATT-8. 0 ATT-8.1 ATT-8.2 ATT-8.3 ATT-8.4 ATT-8.5 ATT-9.0 ATT-9.1 ATT-10.0 ATTACHMENT CNMT CLOSURE ATTACHMENT CNMT RECIRC FANS ATTACHMENT COND TO S/G ATTACHMENT SAFW ATTACHMENT FIRE WATER COOLING TO TDAFW PUMP ATTACHMENT COND VACUUM ATTACHMENT CR EVAC ATTACHMENT DC LOADS ATTACHMENT D/G STOP ATTACHMENT GEN DEGAS ATTACHMENT NONVITAL ATTACHMENT SI/UV ATTACHMENT LOSS OF OFFSITE POWER ATTACHMENT LETDOWN ATTACHMENT EXCESS L/D ATTACHMENT FAULTED S/G

(

STATUS:

EF QU 5 YEARS REV 002 000 005 008 004 001 000 006 004 003 005 008 003 003 006 006 005 008 004 005 000 008 005 006 08/20/02 PAGE:

1 ONLY:

EFFECT DATE 05/02/02 05/18/00 02/01/01 03/06/02 03/06/02 01/08/02 06/26/02 03/06/02 03/06/02 07/26/94 03/06/02 05/30/02 01/14/99 12/18/96 03/06/02 03/22/99 03/06/02 06/20/02 03/06/02 03/06/02 o5/02/02 03/06/02 03/06/02 03/06/02 LAST REVIEW 02/10/98 05/18/00 02/10/98 08/11/98 12/31/99 10/31/01 06/26/02 01/06/99 01/25/99 05/13/98 12/31/99 12/31/99 01/14/99 02/10/98 02/10/98 01/14/99 02/10/98 08/17/99 02/10/98 02/10/98 05/02/02 03/06/02 10/31/01 05/13/98 NEXT REVIEW 02/10/03 05/18/05 02/10/03 08/11/03 12/31/04 10/31/06 06/26/07 01/06/04 01/25/04 05/13/03 12/31/04 12/31/04 01/14/04 02/10/03 02/10/03 01/14/04 02/10/03 08/17/04 02/10/03 02/10/03 05/02/07 03/06/07 10/31/06 05/13/03 ST EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF

(

REPORT NO.

01 REPORT: NPSP0200 DOC TYPE: PRATT PARAMETERS:

DOC PROCEDURE NUMBER ATT-11.0 ATT-11.1 ATT-11.2 ATT-12.0 ATT-13.0 ATT-14.0 ATT-14.1 ATT-14.2 ATT-14.3 ATT-14.5 ATT-14.6 ATT-15.0 ATT-15.1 ATT-15.2 ATT-16.0 ATT-16.1 ATT-16.2 ATT-17.0 ATT-17.1 ATT-18.0 ATT-20.0 ATT-21.0 ATT-22.0 ATT-23.0 GINNA NUCLEAR POWER PLANT PROCEDURES INDEX EOP ATTACHMENTS CYPES -

PRATT PRER

(

STATUS: EF QU 5 YEARS PROCEDURE TITLE ATTACHMENT IA CONCERNS ATTACHMENT IA SUPPLY ATTACHMENT DIESEL AIR COMPRESSOR ATTACHMENT N2 PORVS ATTACHMENT NC ATTACHMENT NORMAL RHR COOLING ATTACHMENT RHR COOL ATTACHMENT RHR ISOL ATTACHMENT RHR NPSH ATTACHMENT RHR SYSTEM ATTACHMENT RHR PRESS REDUCTION ATTACHMENT RCP START ATTACHMENT RCP DIAGNOSTICS ATTACHMENT SEAL COOLING ATTACHMENT RUPTURED S/G ATTACHMENT SGTL ATTACHMENT RCS BORON FOR SGTL ATTACHMENT SD-i ATTACHMENT SD-2 ATTACHMENT SFP -

RWST ATTACHMENT VENT TIME ATTACHMENT RCS ISOLATION ATTACHMENT RESTORING FEED FLOW ATTACHMENT TRANSFER 4160V LOADS REV 002 003 003 004 002 003 005 002 003 002 002 009 003 005 011 002 002 014 006 005 003 002 003 000 08/20/02 PAGE:

2 ONLY:

EFFECT DATE 04/07/97 03/06/02 08/20/02 03/06/02 07/26/94 03/06/02 01/08/02 03/06/02 03/06/02 07/26/94 03/06/02 03/06/02 04/24/97 03/06/02 07/18/01 03/06/02 04/09/02 06/20/02 03/06/02 03/06/02 07/26/94 03/06/02 05/02/02 02/26/99 LAST REVIEW 08/11/98 08/11/98 04/03/98 02/10/98 02/10/98 09/23/99 01/08/02 02/10/98 01/06/99 02/10/98 01/14/99 03/17/00 02/10/98 02/10/98 01/11/00 09/08/00 09/08/00 02/29/00 01/30/01 02/10/98 02/10/98 02/10/98 01/22/02 02/26/99 NEXT REVIEW 08/11/03 08/11/03 04/03/03 02/10/03 02/10/03 09/23/04 01/08/07 02/10/03 01/06/04 02/10/03 01/14/04 03/17/05 02/10/03 02/10/03 01/11/05 09/08/05 09/08/05 02/28/05 01/30/06 02/10/03 02/10/03 02/10/03 01/22/07 02/26/04 ST EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF

(

REPORT NO.

01 REPORT: NPSP0200 DOC TYPE: PRATT PARAMETERS:

DOC TYPES PRATT PROCEDURE NUMBER PROCEDURF ATT-24.0 ATT-26. 0 GINNA NUCLEAR POWER PLANT PROCEDURES INDEX EOP ATTACHMENTS PRER C

08/20/02 PAGE:

3 STATUS: EF QU 5 YEARS ONLY:

TITLE ATTACHMENT TRANSFER BATTERY TO TSC ATTACHMENT RETURN TO NORMAL OPERATIONS EFFECT REV DATE 000 09/08/00 000 10/31/01 TOTAL FOR PRATT so C

LAST REVIEW 09/08/oo 10/31/01 S.

NEXT REVIEW ST 09/08/05 EF 10/31/06 EF

EOP:

TITLE:

REV: 3 ATT-11.2 ATTACHMENT DIESEL AIR COMPRESSOR PAGE 1 of 2 Responsible Manager

(\\

Date To supply Instrument Air System using the Diesel Air Compressor perform the following:

1. -Verify hose installed between Diesel Compressor discharge (located on compressor) and service air connection (at V-7203C) by Turbine Building overhead door #10.
2.

Start the portable Diesel Driven Air Compressor using instructions mounted locally on the compressor.

NOTE:

Blowdown portable Diesel Air Compressor Discharge Filter hourly after initial system start until oil and water are sufficiently removed from header, THEN blowdown the Discharge Filter once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

3.

Blowdown portable Diesel Air Compressor Discharge Filter by cycling open and closed Service Air Yard inlet drain/trap drain valve V-7203B until only air escapes.

(Next to Door #10, Column A-7 Turbine Building Basement North)

4.

Check closed Breathing Air Compressor discharge isolation valve V-14007Y (next to Door #10, Column A-7 Turbine Building Basement North).

5.

Check closed Backup Air Compressor discharge drain valve V-14007X (next to Door #10, Column A-7 Turbine Building Basement North).

6.

Open Service Air isolation valve to Turbine Building from Yard, V-7203.

(Next to Door #10, Column A-7 Turbine Building Basement North)

7.

Blowdown residue in line by throttling open Backup Air Compressor discharge drain valve V-14007X until residue is

removed, THEN close drain valve V-14007X.
8.

Open Back-up Air Compressors discharge inner isolation valve to Service Air header, V-7195A.

(Next to Door #10, Column A-7 Turbine Building Basement Northwest).

9.

Slowly open V-7002D (at TSA02 Service Air Compressor Wet Tank).

EOP:

TITLE:

REV: 3 ATT-11.2 ATTACHMENT DIESEL AIR COMPRESSOR PAGE 2 of 2

10.

Open V-7000A, IA/SA cross connect valve (above B IA receiver, 8 ft.

above floor).

11.

Notify Control/Shift Supervisor that Diesel Air Compressor is lined up and supplying all air systems.

12. --Notify Maintenance to maintain proper fuel oil level in portable Diesel Driven Air Compressor.