ML060950570: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML060950570
| number = ML060950570
| issue date = 03/22/2006
| issue date = 03/22/2006
| title = 2006/03/22-GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP)
| title = GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP)
| author name = Morgan M J
| author name = Morgan M
| author affiliation = NRC/NRR/ADRO/DLR/RLRC
| author affiliation = NRC/NRR/ADRO/DLR/RLRC
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000271
| docket = 05000271
| license number =  
| license number =  
| contact person = morgan M J NRR/NRC/DLR/RLRC, 415-2232
| contact person = morgan M NRR/NRC/DLR/RLRC, 415-2232
| case reference number = %dam200611, TAC MC9668
| case reference number = %dam200611, TAC MC9668
| package number = ML060950189
| package number = ML060950189
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:XI.M22 Boraflex Monitoring 1 AUDIT W ORKSHEET  GALL R EPORT AMP PLANT: ______________________________
{{#Wiki_filter:AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________
LRA AMP: __________________________
LRA AMP: __________________________                                                         REVIEWER: ______________________
R EVIEWER: ______________________
GALL AMP: XI.M22, Boraflex Monitoring                                                       DATE: __________________________
GALL AMP: XI.M22, Boraflex Monitoring DATE: __________________________
Program               Auditable GALL Criteria                                               Documentation of Audit Finding Element Program               A. A Boraflex monitoring program for the actual Boraflex panels       Consistent with GALL AMP:      Yes  No Description          is implemented in the spent fuel racks to assure that no               Document(s) used to confirm Criteria:
Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. A Boraflex monitoring program for the actual Boraflex panels is implemented in the spent fuel racks to assure that no unexpected degradation of the Boraflex material would compromise the criticality analysis in support of the design of spent fuel storage racks. The applicable aging management program (AMP), based on manufacturer's recommendations, relies on periodic inspection, testing, monitoring, and analysis of the criticality design to assure that the required 5% subcriticality margin is maintained. The frequency of the inspection and testing depends on the condition of the Boraflex, with a maximum of five years. Certain accelerated samples are tested every two years. Results based on test coupons have been found to be unreliable in determining the degree to which the actual Boraflex panels have been degraded. Therefore, this AMP includes: (1) performing neutron attenuation testing, called blackness testing, to determine gap formation in Boraflex panels; (2) completing sampling and analysis for silica levels in the spent fuel pool water and trending the results by using the EPRI RACKLIFE predictive code or its equivalent on a monthly, quarterly, or annual basis (depending on Boraflex panel condition); and (3) measuring boron areal density by techniques such as the BADGER device. Corrective actions are initiated if the test results find that the 5% subcriticality margin cannot be maintained because of current or projected future Boraflex Consistent with GALL AMP:
unexpected degradation of the Boraflex material would compromise the criticality analysis in support of the design of spent fuel storage racks. The applicable aging management program (AMP), based on manufacturers recommendations,               Comment:
Yes  No Document(s) used to confirm Criteria:
relies on periodic inspection, testing, monitoring, and analysis of the criticality design to assure that the required 5% subcriticality margin is maintained. The frequency of the inspection and testing depends on the condition of the Boraflex, with a maximum of five years. Certain accelerated samples are tested every two years. Results based on test coupons have been found to be unreliable in determining the degree to which the actual Boraflex panels have been degraded. Therefore, this AMP includes: (1) performing neutron attenuation testing, called blackness testing, to determine gap formation in Boraflex panels; (2) completing sampling and analysis for silica levels in the spent fuel pool water and trending the results by using the EPRI RACKLIFE predictive code or its equivalent on a monthly, quarterly, or annual basis (depending on Boraflex panel condition); and (3) measuring boron areal density by techniques such as the BADGER device. Corrective actions are initiated if the test results find that the 5% subcriticality margin cannot be maintained because of current or projected future Boraflex XI.M22 Boraflex Monitoring                                                                 1
Comment:
XI.M22 Boraflex Monitoring 2 Program Element Auditable GALL Criteria Documentation of Audit Finding  degradation. 1. Scope of Program A. The AMP manages the effects of aging on sheets of neutron-absorbing materials affixed to spent fuel racks. For Boraflex panels, gamma irradiation and long-term exposure to the wet pool environment cause shrinkage resulting in gap formation, gradual degradation of the polymer matrix, and the release of silica to the spent fuel storage pool water. This results in the loss of boron carbide in the neutron absorber sheets. Consistent with GALL AMP:
Yes  No Document(s) used to confirm Criteria:


Comment: 2. Preventive Actions A. For Boraflex panels, monitoring silica levels in the storage pool water, measuring gap formation by blackness testing, periodically measuring boron areal density, and applying predictive codes, are performed. These actions ensure that degradation of the neutron-absorbing material is identified and corrected so the spent fuel storage racks will be capable of performing their intended functions during the period of extended operation, consistent with current licensing basis (CLB) design conditions. Consistent with GALL AMP:
Program              Auditable GALL Criteria                                              Documentation of Audit Finding Element degradation.
Yes  No Document(s) used to confirm Criteria:
: 1. Scope of          A. The AMP manages the effects of aging on sheets of neutron-        Consistent with GALL AMP:      Yes  No Program              absorbing materials affixed to spent fuel racks. For Boraflex        Document(s) used to confirm Criteria:
 
panels, gamma irradiation and long-term exposure to the wet pool environment cause shrinkage resulting in gap formation, gradual degradation of the polymer matrix, and the release of silica to the spent fuel storage pool water. This results in the    Comment:
Comment: 3. Parameters Monitored/ Inspected A. The parameters monitored include physical conditions of the Boraflex panels, such as gap formation and decreased boron areal density, and the concentration of the silica in the spent fuel pool. These are conditions directly related to degradation of the Boraflex material. When Boraflex is subjected to gamma radiation and long-term exposure to the spent fuel pool environment, the silicon polymer matrix becomes degraded and silica filler and boron carbide are released into the spent fuel pool water. As indicated in the Nuclear Regulatory Commission (NRC) Information Notice (IN) 95-38 and NRC Generic Letter (GL) 96-04, the loss of boron carbide (washout) from Boraflex is characterized by slow dissolution of silica from the surface of the Boraflex and a gradual thinning of the material. Because Boraflex contains about 25% silica, 25% polydimethyl siloxane polymer, and 50% boron carbide, sampling and analysis of the presence of silica in the spent fuel pool provide an indication of depletion of boron carbide from Boraflex; however, the degree Consistent with GALL AMP:
loss of boron carbide in the neutron absorber sheets.
Yes  No Document(s) used to confirm Criteria:
: 2. Preventive         A. For Boraflex panels, monitoring silica levels in the storage     Consistent with GALL AMP:      Yes  No Actions              pool water, measuring gap formation by blackness testing,           Document(s) used to confirm Criteria:
periodically measuring boron areal density, and applying predictive codes, are performed. These actions ensure that degradation of the neutron-absorbing material is identified and corrected so the spent fuel storage racks will be capable of         Comment:
performing their intended functions during the period of extended operation, consistent with current licensing basis (CLB) design conditions.
: 3. Parameters         A. The parameters monitored include physical conditions of the       Consistent with GALL AMP:      Yes  No Monitored/            Boraflex panels, such as gap formation and decreased boron           Document(s) used to confirm Criteria:
Inspected            areal density, and the concentration of the silica in the spent fuel pool. These are conditions directly related to degradation of the Boraflex material. When Boraflex is subjected to gamma radiation and long-term exposure to the spent fuel pool             Comment:
environment, the silicon polymer matrix becomes degraded and silica filler and boron carbide are released into the spent fuel pool water. As indicated in the Nuclear Regulatory Commission (NRC) Information Notice (IN) 95-38 and NRC Generic Letter (GL) 96-04, the loss of boron carbide (washout) from Boraflex is characterized by slow dissolution of silica from the surface of the Boraflex and a gradual thinning of the material. Because Boraflex contains about 25% silica, 25% polydimethyl siloxane polymer, and 50% boron carbide, sampling and analysis of the presence of silica in the spent fuel pool provide an indication of depletion of boron carbide from Boraflex; however, the degree XI.M22 Boraflex Monitoring                                                              2


Program              Auditable GALL Criteria                                                Documentation of Audit Finding Element to which Boraflex has degraded is ascertained through measurement of the boron areal density.
: 4. Detection of      A. The amount of boron carbide released from the Boraflex              Consistent with GALL AMP:      Yes  No Aging Effects        panel is determined through direct measurement of boron areal          Document(s) used to confirm Criteria:
density and correlated with the levels of silica present with a predictive code. This is supplemented with detection of gaps through blackness testing and periodic verification of boron loss through areal density measurement techniques such as the                Comment:
BADGER device.
: 5. Monitoring        A. The periodic inspection measurements and analysis are to be          Consistent with GALL AMP:      Yes  No and Trending          compared to values of previous measurements and analysis to            Document(s) used to confirm Criteria:
provide a continuing level of data for trend analysis.
Comment:
: 6. Acceptance        A. The 5% subcriticality margin of the spent fuel racks is to be        Consistent with GALL AMP:      Yes  No Criteria              maintained for the period of extended operation.                        Document(s) used to confirm Criteria:
Comment:
Comment:
XI.M22 Boraflex Monitoring 3 Program Element Auditable GALL Criteria Documentation of Audit Finding  to which Boraflex has degraded is ascertained through measurement of the boron areal density. 4. Detection of Aging Effects A. The amount of boron carbide released from the Boraflex panel is determined through direct measurement of boron areal density and correlated with the levels of silica present with a predictive code. This is supplemented with detection of gaps through blackness testing and periodic verification of boron loss through areal density measurement techniques such as the BADGER device. Consistent with GALL AMP:
: 7. Corrective        A. Corrective actions are initiated if the test results find that the   Consistent with GALL AMP:       Yes   No Actions              5% subcriticality margin cannot be maintained because of the            Document(s) used to confirm Criteria:
Yes No Document(s) used to confirm Criteria:
current or projected future degradation. Corrective actions consist of providing additional neutron-absorbing capacity by Boral or boron steel inserts, or other options, which are available to maintain a subcriticality margin of 5%. As discussed      Comment:
Comment: 5. Monitoring and Trending A. The periodic inspection measurements and analysis are to be compared to values of previous measurements and analysis to provide a continuing level of data for trend analysis. Consistent with GALL AMP:
in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions.
Yes  No Document(s) used to confirm Criteria:
: 8.                   A. Site quality assurance (QA) procedures, site review and              Consistent with GALL AMP:       Yes   No Confirmation          approval processes, and administrative controls are                    Document(s) used to confirm Criteria:
Comment: 6. Acceptance Criteria A. The 5% subcriticality margin of the spent fuel racks is to be maintained for the period of extended operation. Consistent with GALL AMP:
Process              implemented in accordance with the requirements of 10 CFR XI.M22 Boraflex Monitoring                                                                  3
Yes No Document(s) used to confirm Criteria:  


Comment: 7. Corrective Actions A. Corrective actions are initiated if the test results find that the 5% subcriticality margin cannot be maintained because of the current or projected future degradation. Corrective actions consist of providing additional neutron-absorbing capacity by Boral or boron steel inserts, or other options, which are available to maintain a subcriticality margin of 5%. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions. Consistent with GALL AMP:
Program              Auditable GALL Criteria                                              Documentation of Audit Finding Element Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process          Comment:
Yes No Document(s) used to confirm Criteria:  
and administrative controls.
: 9.                    A. See item 8, above.                                               Consistent with GALL AMP:      Yes  No Administrative                                                                            Document(s) used to confirm Criteria:
Controls Comment:
: 10. Operating        A. The NRC IN 87-43 addresses the problems of development            Consistent with GALL AMP:      Yes   No Experience            of tears and gaps (average 1-2 in., with the largest 4 in.) in      Document(s) used to confirm Criteria:
Boraflex sheets due to gamma radiation-induced shrinkage of the material. NRC INs 93-70 and 95-38 and NRC GL 96-04 address several cases of significant degradation of Boraflex test coupons due to accelerated dissolution of Boraflex caused by        Comment:
pool water flow through panel enclosures and high accumulated gamma dose. Two spent fuel rack cells with about 12 years of service have only 40% of the Boraflex remaining. In such cases, the Boraflex may be replaced by boron steel inserts or by a completely new rack system using Boral. Experience with boron steel is limited; however, the application of Boral for use in the spent fuel storage racks predates the manufacturing and use of Boraflex. The experience with Boraflex panels indicates that coupon surveillance programs are not reliable. Therefore, during the period of extended operation, the measurement of boron areal density correlated, through a predictive code, with silica levels in the pool water is verified. These monitoring programs provide assurance that degradation of Boraflex sheets is monitored, so that appropriate actions can be taken in a timely manner if significant loss of neutron-absorbing capability is occurring. These monitoring programs ensure that the Boraflex sheets will maintain their integrity and will be effective in performing its intended function.
XI.M22 Boraflex Monitoring                                                              4


Comment: 8. Confirmation Process A. Site quality assurance (QA) procedures, site review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Consistent with GALL AMP:
EXCEPTIONS Item          Program Elements      LRA Exception Description  Basis for Accepting Exception  Documents Reviewed Number                                                                                            (Identifier, Para.# and/or Page #)
Yes  No Document(s) used to confirm Criteria:
1.
2.


XI.M22 Boraflex Monitoring 4 Program Element Auditable GALL Criteria Documentation of Audit Finding  Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls.
ENHANCEMENTS Item          Program Elements      LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed Number                                                                                            (Identifier, Para.# and/or Page #)
Comment: 9. Administrative Controls A. See item 8, above. Consistent with GALL AMP:
1.
Yes  No Document(s) used to confirm Criteria:
2.


Comment: 10. Operating Experience A. The NRC IN 87-43 addresses the problems of development of tears and gaps (average 1-2 in., with the largest 4 in.) in Boraflex sheets due to gamma radiation-induced shrinkage of the material. NRC INs 93-70 and 95-38 and NRC GL 96-04 address several cases of significant degradation of Boraflex test coupons due to accelerated dissolution of Boraflex caused by pool water flow through panel enclosures and high accumulated gamma dose. Two spent fuel rack cells with about 12 years of service have only 40% of the Boraflex remaining. In such cases, the Boraflex may be replaced by boron steel inserts or by a completely new rack system using Boral. Experience with boron steel is limited; however, the application of Boral for use in the spent fuel storage racks predates the manufacturing and use of Boraflex. The experience with Boraflex panels indicates that coupon surveillance programs are not reliable. Therefore, during the period of extended operation, the measurement of boron areal density correlated, through a predictive code, with silica levels in the pool water is verified. These monitoring programs provide assurance that degradation of Boraflex sheets is monitored, so that appropriate actions can be taken in a timely manner if significant loss of neutron-absorbing capability is occurring. These monitoring programs ensure that the Boraflex sheets will maintain their integrity and will be effective in performing its intended function. Consistent with GALL AMP:
DOCUMENT REVIEWED DURING AUDIT Document Number             Identifier (number)       Title                                                 Revision and/or Date 1.
Yes  No Document(s) used to confirm Criteria:
2.
 
3.
Comment:
4.
XI.M22 Boraflex Monitoring 5 EXCEPTIONS  Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed  (Identifier, Para.# and/or Page #) 1. 2.    -
XI.M22 Boraflex Monitoring                                                  5}}
ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed  (Identifier, Para.# and/or Page #) 1. 2.    -
DOCUMENT REVIEWED D URING A UDIT  Document Number Identifier (number) Title Revision and/or Date 1. 2. 3. 4.   -.}}

Latest revision as of 07:49, 14 March 2020

GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP)
ML060950570
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/22/2006
From: Morgan M
NRC/NRR/ADRO/DLR/RLRC
To:
Office of Nuclear Reactor Regulation
morgan M NRR/NRC/DLR/RLRC, 415-2232
Shared Package
ML060950189 List: ... further results
References
%dam200611, TAC MC9668
Download: ML060950570 (5)


Text

AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________

LRA AMP: __________________________ REVIEWER: ______________________

GALL AMP: XI.M22, Boraflex Monitoring DATE: __________________________

Program Auditable GALL Criteria Documentation of Audit Finding Element Program A. A Boraflex monitoring program for the actual Boraflex panels Consistent with GALL AMP: Yes No Description is implemented in the spent fuel racks to assure that no Document(s) used to confirm Criteria:

unexpected degradation of the Boraflex material would compromise the criticality analysis in support of the design of spent fuel storage racks. The applicable aging management program (AMP), based on manufacturers recommendations, Comment:

relies on periodic inspection, testing, monitoring, and analysis of the criticality design to assure that the required 5% subcriticality margin is maintained. The frequency of the inspection and testing depends on the condition of the Boraflex, with a maximum of five years. Certain accelerated samples are tested every two years. Results based on test coupons have been found to be unreliable in determining the degree to which the actual Boraflex panels have been degraded. Therefore, this AMP includes: (1) performing neutron attenuation testing, called blackness testing, to determine gap formation in Boraflex panels; (2) completing sampling and analysis for silica levels in the spent fuel pool water and trending the results by using the EPRI RACKLIFE predictive code or its equivalent on a monthly, quarterly, or annual basis (depending on Boraflex panel condition); and (3) measuring boron areal density by techniques such as the BADGER device. Corrective actions are initiated if the test results find that the 5% subcriticality margin cannot be maintained because of current or projected future Boraflex XI.M22 Boraflex Monitoring 1

Program Auditable GALL Criteria Documentation of Audit Finding Element degradation.

1. Scope of A. The AMP manages the effects of aging on sheets of neutron- Consistent with GALL AMP: Yes No Program absorbing materials affixed to spent fuel racks. For Boraflex Document(s) used to confirm Criteria:

panels, gamma irradiation and long-term exposure to the wet pool environment cause shrinkage resulting in gap formation, gradual degradation of the polymer matrix, and the release of silica to the spent fuel storage pool water. This results in the Comment:

loss of boron carbide in the neutron absorber sheets.

2. Preventive A. For Boraflex panels, monitoring silica levels in the storage Consistent with GALL AMP: Yes No Actions pool water, measuring gap formation by blackness testing, Document(s) used to confirm Criteria:

periodically measuring boron areal density, and applying predictive codes, are performed. These actions ensure that degradation of the neutron-absorbing material is identified and corrected so the spent fuel storage racks will be capable of Comment:

performing their intended functions during the period of extended operation, consistent with current licensing basis (CLB) design conditions.

3. Parameters A. The parameters monitored include physical conditions of the Consistent with GALL AMP: Yes No Monitored/ Boraflex panels, such as gap formation and decreased boron Document(s) used to confirm Criteria:

Inspected areal density, and the concentration of the silica in the spent fuel pool. These are conditions directly related to degradation of the Boraflex material. When Boraflex is subjected to gamma radiation and long-term exposure to the spent fuel pool Comment:

environment, the silicon polymer matrix becomes degraded and silica filler and boron carbide are released into the spent fuel pool water. As indicated in the Nuclear Regulatory Commission (NRC) Information Notice (IN) 95-38 and NRC Generic Letter (GL) 96-04, the loss of boron carbide (washout) from Boraflex is characterized by slow dissolution of silica from the surface of the Boraflex and a gradual thinning of the material. Because Boraflex contains about 25% silica, 25% polydimethyl siloxane polymer, and 50% boron carbide, sampling and analysis of the presence of silica in the spent fuel pool provide an indication of depletion of boron carbide from Boraflex; however, the degree XI.M22 Boraflex Monitoring 2

Program Auditable GALL Criteria Documentation of Audit Finding Element to which Boraflex has degraded is ascertained through measurement of the boron areal density.

4. Detection of A. The amount of boron carbide released from the Boraflex Consistent with GALL AMP: Yes No Aging Effects panel is determined through direct measurement of boron areal Document(s) used to confirm Criteria:

density and correlated with the levels of silica present with a predictive code. This is supplemented with detection of gaps through blackness testing and periodic verification of boron loss through areal density measurement techniques such as the Comment:

BADGER device.

5. Monitoring A. The periodic inspection measurements and analysis are to be Consistent with GALL AMP: Yes No and Trending compared to values of previous measurements and analysis to Document(s) used to confirm Criteria:

provide a continuing level of data for trend analysis.

Comment:

6. Acceptance A. The 5% subcriticality margin of the spent fuel racks is to be Consistent with GALL AMP: Yes No Criteria maintained for the period of extended operation. Document(s) used to confirm Criteria:

Comment:

7. Corrective A. Corrective actions are initiated if the test results find that the Consistent with GALL AMP: Yes No Actions 5% subcriticality margin cannot be maintained because of the Document(s) used to confirm Criteria:

current or projected future degradation. Corrective actions consist of providing additional neutron-absorbing capacity by Boral or boron steel inserts, or other options, which are available to maintain a subcriticality margin of 5%. As discussed Comment:

in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions.

8. A. Site quality assurance (QA) procedures, site review and Consistent with GALL AMP: Yes No Confirmation approval processes, and administrative controls are Document(s) used to confirm Criteria:

Process implemented in accordance with the requirements of 10 CFR XI.M22 Boraflex Monitoring 3

Program Auditable GALL Criteria Documentation of Audit Finding Element Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process Comment:

and administrative controls.

9. A. See item 8, above. Consistent with GALL AMP: Yes No Administrative Document(s) used to confirm Criteria:

Controls Comment:

10. Operating A. The NRC IN 87-43 addresses the problems of development Consistent with GALL AMP: Yes No Experience of tears and gaps (average 1-2 in., with the largest 4 in.) in Document(s) used to confirm Criteria:

Boraflex sheets due to gamma radiation-induced shrinkage of the material. NRC INs 93-70 and 95-38 and NRC GL 96-04 address several cases of significant degradation of Boraflex test coupons due to accelerated dissolution of Boraflex caused by Comment:

pool water flow through panel enclosures and high accumulated gamma dose. Two spent fuel rack cells with about 12 years of service have only 40% of the Boraflex remaining. In such cases, the Boraflex may be replaced by boron steel inserts or by a completely new rack system using Boral. Experience with boron steel is limited; however, the application of Boral for use in the spent fuel storage racks predates the manufacturing and use of Boraflex. The experience with Boraflex panels indicates that coupon surveillance programs are not reliable. Therefore, during the period of extended operation, the measurement of boron areal density correlated, through a predictive code, with silica levels in the pool water is verified. These monitoring programs provide assurance that degradation of Boraflex sheets is monitored, so that appropriate actions can be taken in a timely manner if significant loss of neutron-absorbing capability is occurring. These monitoring programs ensure that the Boraflex sheets will maintain their integrity and will be effective in performing its intended function.

XI.M22 Boraflex Monitoring 4

EXCEPTIONS Item Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed Number (Identifier, Para.# and/or Page #)

1.

2.

ENHANCEMENTS Item Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed Number (Identifier, Para.# and/or Page #)

1.

2.

DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number) Title Revision and/or Date 1.

2.

3.

4.

XI.M22 Boraflex Monitoring 5