(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML060950637 | | | number = ML060950637 |
| | issue date = 03/22/2006 | | | issue date = 03/22/2006 |
| | title = 2006/03/22-GALL AMP: XI.M36, External Surfaces Monitoring (Audit Worksheet GALL Report AMP) | | | title = GALL AMP: XI.M36, External Surfaces Monitoring (Audit Worksheet GALL Report AMP) |
| | author name = Morgan M J | | | author name = Morgan M |
| | author affiliation = NRC/NRR/ADRO/DLR/RLRC | | | author affiliation = NRC/NRR/ADRO/DLR/RLRC |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000271 | | | docket = 05000271 |
| | license number = | | | license number = |
| | contact person = morgan M J NRR/NRC/DLR/RLRC, 415-2232 | | | contact person = morgan M NRR/NRC/DLR/RLRC, 415-2232 |
| | case reference number = %dam200611, TAC MC9668 | | | case reference number = %dam200611, TAC MC9668 |
| | package number = ML060950189 | | | package number = ML060950189 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:XI.M36 External Surfaces Monitoring 1 AUDIT W ORKSHEET GALL R EPORT AMP PLANT: ______________________________ | | {{#Wiki_filter:AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________ |
| LRA AMP: __________________________ | | LRA AMP: __________________________ REVIEWER: ______________________ |
| R EVIEWER: ______________________
| | GALL AMP: XI.M36, External Surfaces Monitoring DATE: __________________________ |
| GALL AMP: XI.M36, External Surfaces Monitoring DATE: __________________________ | | Program Auditable GALL Criteria Documentation of Audit Finding Element Program A. The External Surfaces Monitoring program is based on Consistent with GALL AMP: Yes No Description system inspections and walkdowns. This program consists of Document(s) used to confirm Criteria: |
| Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. The External Surfaces Monitoring program is based on system inspections and walkdowns. This program consists of periodic visual inspections of steel components such as piping, piping components, ducting, and other components within the scope of license renewal and subject to AMR in order to manage aging effects. The program manages aging effects through visual inspection of external surfaces for evidence of material loss. Loss of material due to boric acid corrosion is managed by the Boric Acid Corrosion Program. Consistent with GALL AMP: | | periodic visual inspections of steel components such as piping, piping components, ducting, and other components within the scope of license renewal and subject to AMR in order to manage aging effects. The program manages aging effects Comment: |
| Yes No Document(s) used to confirm Criteria: | | through visual inspection of external surfaces for evidence of material loss. Loss of material due to boric acid corrosion is managed by the Boric Acid Corrosion Program. |
| | : 1. Scope of A. This program visually inspects the external surface of in- Consistent with GALL AMP: Yes No Program scope components and monitors external surfaces of steel Document(s) used to confirm Criteria: |
| | components in systems within the scope of license renewal and subject to AMR for loss of material and leakage. Visual inspections are expected to identify loss of material due to general corrosion in accessible steel components. Loss of Comment material due to pitting and crevice corrosion may not be detectable through these same visual inspections, however, general corrosion is expected to be present and detectable such that, should pitting and crevice corrosion exist, general corrosion will manifest itself as visible rust or rust byproducts (e.g., discoloration or coating degradation) and be detectable prior to any loss of intended function. Therefore, this program is acceptable for use in inspecting for loss of material for general, pitting and crevice corrosion. |
| | B. Surfaces that are inaccessible or not readily visible during Consistent with GALL AMP: Yes No XI.M36 External Surfaces Monitoring 1 |
|
| |
|
| Comment: 1. Scope of Program A. This program visually inspects the external surface of in-scope components and monitors external surfaces of steel components in systems within the scope of license renewal and subject to AMR for loss of material and leakage. Visual inspections are expected to identify loss of material due to general corrosion in accessible steel components. Loss of material due to pitting and crevice corrosion may not be detectable through these same visual inspections, however, general corrosion is expected to be present and detectable such that, should pitting and crevice corrosion exist, general corrosion will manifest itself as visible rust or rust byproducts (e.g., discoloration or coating degradation) and be detectable prior to any loss of intended function. Therefore, this program is acceptable for use in inspecting for loss of material for general, pitting and crevice corrosion. Consistent with GALL AMP:
| | Program Auditable GALL Criteria Documentation of Audit Finding Element plant operations are inspected during refueling outages. Document(s) used to confirm Criteria: |
| Yes No Document(s) used to confirm Criteria:
| | Surfaces that are inaccessible or not readily visible during both plant operations and refueling outages are inspected at such intervals that would provide reasonable assurance that the effects of aging will be managed such that applicable Comment: |
| Comment " B. Surfaces that are inaccessible or not readily visible during Consistent with GALL AMP:
| | components will perform their intended function during the period of extended operation. |
| Yes No XI.M36 External Surfaces Monitoring 2 Program Element Auditable GALL Criteria Documentation of Audit Finding plant operations are inspected during refueling outages. Surfaces that are inaccessible or not readily visible during both plant operations and refueling outages are inspected at such intervals that would provide reasonable assurance that the effects of aging will be managed such that applicable components will perform their intended function during the period of extended operation. Surfaces that are insulated may be inspected when the external surface is exposed (i.e., maintenance) at such intervals that would provide reasonable assurance that the effects of aging will be managed such that applicable components will perform their intended function during the period of extended operation. Document(s) used to confirm Criteria:
| | Surfaces that are insulated may be inspected when the external surface is exposed (i.e., maintenance) at such intervals that would provide reasonable assurance that the effects of aging will be managed such that applicable components will perform their intended function during the period of extended operation. |
| Comment: " C. The program may also be credited with managing loss of material from internal surfaces, for situations in which material and environment combinations are the same for internal and external surfaces such that external surface condition is representative of internal surface condition. When credited, the program should describe the component internal environment and the credited similar external component environment inspected. Consistent with GALL AMP:
| | C. The program may also be credited with managing loss of Consistent with GALL AMP: Yes No material from internal surfaces, for situations in which material Document(s) used to confirm Criteria: |
| Yes No Document(s) used to confirm Criteria: | | and environment combinations are the same for internal and external surfaces such that external surface condition is representative of internal surface condition. When credited, the program should describe the component internal environment Comment: |
| Comment: 2. Preventive Actions A. The External Surfaces Monitoring Program is a visual monitoring program that does not include preventive actions. Consistent with GALL AMP: | | and the credited similar external component environment inspected. |
| Yes No Document(s) used to confirm Criteria: | | : 2. Preventive A. The External Surfaces Monitoring Program is a visual Consistent with GALL AMP: Yes No Actions monitoring program that does not include preventive actions. Document(s) used to confirm Criteria: |
| | Comment: |
| | : 3. Parameters A. The External Surfaces Monitoring Program utilizes periodic Consistent with GALL AMP: Yes No Monitored/ plant system inspections and walkdowns to monitor for material Document(s) used to confirm Criteria: |
| | Inspected degradation and leakage. This program inspects components such as piping, piping components, ducting and other components. Coatings deterioration is an indicator of possible underlying degradation. Comment: |
| | Examples of inspection parameters include: |
| | * corrosion and material wastage (loss of material); |
| | XI.M36 External Surfaces Monitoring 2 |
|
| |
|
| Comment: 3. Parameters Monitored/ Inspected A. The External Surfaces Monitoring Program utilizes periodic plant system inspections and walkdowns to monitor for material degradation and leakage. This program inspects components such as piping, piping components, ducting and other components. Coatings deterioration is an indicator of possible underlying degradation. Examples of inspection parameters include:
| | Program Auditable GALL Criteria Documentation of Audit Finding Element |
| * corrosion and material wastage (loss of material); Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
| Comment:
| |
| XI.M36 External Surfaces Monitoring 3 Program Element Auditable GALL Criteria Documentation of Audit Finding
| |
| * leakage from or onto external surfaces; | | * leakage from or onto external surfaces; |
| * worn, flaking, or oxide-coated surfaces; | | * worn, flaking, or oxide-coated surfaces; |
| * corrosion stains on thermal insulation; | | * corrosion stains on thermal insulation; |
| * protective coating degradation (cracking and flaking) | | * protective coating degradation (cracking and flaking) |
| : 4. Detection of Aging Effects A. Degradation of steel surfaces cannot occur without the degradation of the paint or coating. Confirmation of the integrity of the paint or coating is an effective method for managing the effects of corrosion on the steel surface. A visual inspection is conducted for component surfaces at least once per refueling cycle. This frequency accommodates inspections of components that may be in locations that are normally only accessible during outages. System walkdowns are normally performed on a frequency that exceeds once per fuel cycle. Surfaces that are inaccessible or not readily visible during plant operations and refueling outages are inspected at such intervals that would ensure the components intended function is maintained. The intervals of inspections may be adjusted as necessary based on plant-specific inspection results and industry experience. | | : 4. Detection of A. Degradation of steel surfaces cannot occur without the Consistent with GALL AMP: Yes No Aging Effects degradation of the paint or coating. Confirmation of the integrity Document(s) used to confirm Criteria: |
| This program is credited with managing the loss of material for external surfaces and the loss of material for internal surfaces exposed to the same environment as the external surface. Consistent with GALL AMP: | | of the paint or coating is an effective method for managing the effects of corrosion on the steel surface. A visual inspection is conducted for component surfaces at least once per refueling cycle. This frequency accommodates inspections of Comment: |
| Yes No Document(s) used to confirm Criteria: | | components that may be in locations that are normally only accessible during outages. System walkdowns are normally performed on a frequency that exceeds once per fuel cycle. |
| | Surfaces that are inaccessible or not readily visible during plant operations and refueling outages are inspected at such intervals that would ensure the components intended function is maintained. The intervals of inspections may be adjusted as necessary based on plant-specific inspection results and industry experience. |
| | This program is credited with managing the loss of material for external surfaces and the loss of material for internal surfaces exposed to the same environment as the external surface. |
| | : 5. Monitoring A. Visual inspection activities are performed and associated Consistent with GALL AMP: Yes No and Trending personnel are qualified in accordance with site controlled Document(s) used to confirm Criteria: |
| | procedures and processes. The External Surfaces Monitoring Program uses standardized monitoring and trending activities to track degradation. Deficiencies are documented using approved processes and procedures such that results can be trended. Comment: |
| | However, the program does not include formal trending. |
| | Inspections are performed at frequencies identified in Detection of Aging Effects. |
| | XI.M36 External Surfaces Monitoring 3 |
|
| |
|
| Comment: 5. Monitoring and Trending A. Visual inspection activities are performed and associated personnel are qualified in accordance with site controlled procedures and processes. The External Surfaces Monitoring Program uses standardized monitoring and trending activities to track degradation. Deficiencies are documented using approved processes and procedures such that results can be trended. However, the program does not include formal trending. Inspections are performed at frequencies identified in Detection of Aging Effects. Consistent with GALL AMP: | | Program Auditable GALL Criteria Documentation of Audit Finding Element |
| Yes No Document(s) used to confirm Criteria: | | : 6. Acceptance A. For each component/aging effect combination, the Consistent with GALL AMP: Yes No Criteria acceptance criteria are defined to ensure that the need for Document(s) used to confirm Criteria: |
| | corrective actions will be identified before loss of intended functions. Acceptance criteria include design standards, procedural requirements, current licensing basis, industry codes or standards, and engineering evaluation. Comment: |
| | : 7. Corrective A. Site quality assurance (QA) procedures, review and approval Consistent with GALL AMP: Yes No Actions processes, and administrative controls are implemented in Document(s) used to confirm Criteria: |
| | accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions, confirmation process, and Comment: |
| | administrative controls. |
| | : 8. A. See Item 7, above. Consistent with GALL AMP: Yes No Confirmation Document(s) used to confirm Criteria: |
| | Process Comment: |
| | : 9. A. See Item 7, above. Consistent with GALL AMP: Yes No Administrative Document(s) used to confirm Criteria: |
| | Controls Comment: |
| | : 10. Operating A. External surfaces inspections via system inspections and Consistent with GALL AMP: Yes No Experience walkdowns have been in effect at many utilities since the mid Document(s) used to confirm Criteria: |
| | 1990's in support of the Maintenance Rule (10 CFR 50.65) and have proven effective in maintaining the material condition of plant systems. The elements that comprise these inspections (e.g., the scope of the inspections and inspection techniques) Comment: |
| | are consistent with industry practice. |
| | XI.M36 External Surfaces Monitoring 4 |
|
| |
|
| Comment:
| | EXCEPTIONS Item Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed Number (Identifier, Para.# and/or Page #) |
| XI.M36 External Surfaces Monitoring 4 Program Element Auditable GALL Criteria Documentation of Audit Finding 6. Acceptance Criteria A. For each component/aging effect combination, the acceptance criteria are defined to ensure that the need for corrective actions will be identified before loss of intended functions. Acceptance criteria include design standards, procedural requirements, current licensing basis, industry codes or standards, and engineering evaluation. Consistent with GALL AMP:
| | 1. |
| Yes No Document(s) used to confirm Criteria:
| | 2. |
| Comment: 7. Corrective Actions A. Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions, confirmation process, and administrative controls. Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
| Comment: 8. Confirmation Process A. See Item 7, above. Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
|
| |
|
| Comment: 9.
| | ENHANCEMENTS Item Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed Number (Identifier, Para.# and/or Page #) |
| Administrative Controls A. See Item 7, above. Consistent with GALL AMP:
| | 1. |
| Yes No Document(s) used to confirm Criteria:
| | 2. |
|
| |
|
| Comment: 10. Operating Experience A. External surfaces inspections via system inspections and walkdowns have been in effect at many utilities since the mid 1990's in support of the Maintenance Rule (10 CFR 50.65) and have proven effective in maintaining the material condition of plant systems. The elements that comprise these inspections (e.g., the scope of the inspections and inspection techniques) are consistent with industry practice. Consistent with GALL AMP:
| | DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number) Title Revision and/or Date 1. |
| Yes No Document(s) used to confirm Criteria:
| | 2. |
| | | 3. |
| Comment:
| | 4. |
| XI.M36 External Surfaces Monitoring 5 EXCEPTIONS Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -
| | XI.M36 External Surfaces Monitoring 5}} |
| ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -
| |
| DOCUMENT REVIEWED D URING A UDIT Document Number Identifier (number) Title Revision and/or Date 1. 2. 3. 4. -.}} | |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-009, 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E, BVY 06-076, 2006/08/10-Vermont Yankee - License Renewal Application, Amendment 8, BVY 06-079, 2006/08/22-Vermont Yankee License Renewal Application, Amendment 11, BVY 06-083, 2006/09/05-Vermont Yankee License Renewal Application, Amendment 12, BVY 06-095, E-mail: (PA-LR) Copy of SAMA Response, BVY 06-096, 2006/10/20-Vermont Yankee - License Renewal Application, Amendment No. 17, BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19, BVY 06-098, E-mail: (PA-LR) Copy of Vhs RAI Response, BVY 07-003, Email: (PA-LR) Vermont Yankee Nuclear Power Station License Renewal Commitment List, Rev. 5, BVY 07-009, License Renewal Application, Amendment 24, BVY 07-018, License Renewal Application, Amendment 26, BVY 07-034, License Renewal Application Annual Update, BVY 07-035, (PA-LR) Bvy 07-035 VY Lr SER Comments, BVY 07-047, License Renewal Application, Amendment 27, Submitted on January 25, 2006, BVY 07-058, License Renewal Application, Amendment 29, BVY 07-062, License Renewal Application, Amendment 30, BVY 07-066, License Renewal Application, Amendment 31, BVY 08-016, (PA-LR) Emailing Bvy 08-016 Final SER Review Comments, BVY 10-069, License Renewal Application Annual Update Information, ML060950195, ML060950215, ML060950218, ML060950220, ML060950224, ML060950235, ML060950250, ML060950258, ML060950262, ML060950269, ML060950271, ML060950277, ML060950279, ML060950284, ML060950290, ML060950301, ML060950311, ML060950323, ML060950328, ML060950331, ML060950347, ML060950351, ML060950356, ML060950364, ML060950370, ML060950372, ML060950375, ML060950540, ML060950549, ML060950559, ML060950567... further results
|
MONTHYEARML0629203681987-12-31031 December 1987 VY Annual Ecological Studies of the CT River Report 16-final.pdf Project stage: Other ML0629203651989-12-31031 December 1989 VY Annual Ecological Reports from the 1980's (1989) Project stage: Other ML0609503511998-02-28028 February 1998 GALL AMP: XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other BVY 06-009, 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E2006-01-25025 January 2006 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E Project stage: Other ML0609506372006-03-22022 March 2006 GALL AMP: XI.M36, External Surfaces Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503642006-03-22022 March 2006 GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506322006-03-22022 March 2006 GALL AMP: XI.M34, Buried Piping and Tanks Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506292006-03-22022 March 2006 GALL AMP: XI.M33, Selective Leaching of Materials (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506202006-03-22022 March 2006 GALL AMP: XI.M31, Reactor Vessel Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502792006-03-22022 March 2006 GALL AMP: XI.M3, Reactor Head Closure Studs (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505962006-03-22022 March 2006 GALL AMP: XI.M27, Fire Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505872006-03-22022 March 2006 GALL AMP: XI.M26, Fire Protection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505822006-03-22022 March 2006 GALL AMP: XI.M25, BWR Reactor Water Cleanup System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505792006-03-22022 March 2006 GALL AMP: XI.M24, Compressed Air Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505592006-03-22022 March 2006 GALL AMP: XI.M20, Open-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505402006-03-22022 March 2006 GALL AMP: XI.M18, Bolting Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503702006-03-22022 March 2006 GALL AMP: XI.M15, Neutron Noise Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502182006-03-22022 March 2006 GALL AMP: X.M1, Metal Fatigue of Reactor Coolant Pressure Boundary (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609501952006-03-22022 March 2006 GALL AMP: Plant-Specific (Audit Worksheet - GALL Report AMP) Project stage: Other ML0610001472006-03-22022 March 2006 GALL AMP: XI.S8, Protective Coating Monitoring and Maintenance Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001432006-03-22022 March 2006 GALL AMP: XI.S7, Rg 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001382006-03-22022 March 2006 GALL AMP: XI.S6, Structures Monitoring Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001342006-03-22022 March 2006 GALL AMP: XI.S5, Masonry Wall Progam (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001262006-03-22022 March 2006 GALL AMP: XI.S4, 10 CFR 50, Appendix J (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001012006-03-22022 March 2006 GALL AMP: XI.S2, ASME Section XI, Subsection Iwl (Audit Worksheet GALL Report AMP) Project stage: Other ML0610000962006-03-22022 March 2006 GALL AMP: XI.S1, ASME Section XI, Subsection IWE (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503232006-03-22022 March 2006 GALL AMP: XI.M8, BWR Penetrations (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503112006-03-22022 March 2006 GALL AMP: XI.M7, BWR Stress Corrosion Cracking (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503012006-03-22022 March 2006 GALL AMP: XI.M6, BWR Control Rod Drive Return Line Nozzle (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502902006-03-22022 March 2006 GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503472006-03-22022 March 2006 GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors Project stage: Other ML0609503722006-03-22022 March 2006 GALL AMP: XI.M16, PWR Vessel Internals (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503752006-03-22022 March 2006 GALL AMP: XI.M17, Flow-Accelerated Corrosion (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505492006-03-22022 March 2006 GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502772006-03-22022 March 2006 GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505672006-03-22022 March 2006 GALL AMP: XI.M21, Closed-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505702006-03-22022 March 2006 GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505732006-03-22022 March 2006 GALL AMP: XI.M23, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506062006-03-22022 March 2006 GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506102006-03-22022 March 2006 GALL AMP: XI.M29, Aboveground Steel Tanks (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506242006-03-22022 March 2006 GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506342006-03-22022 March 2006 GALL AMP: XI.M35, One-Time Inspection of ASME Code Class 1 Small Bore Piping (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503562006-03-22022 March 2006 GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502502006-03-22022 March 2006 GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0610000782006-03-22022 March 2006 GALL AMP: XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502152006-03-22022 March 2006 GALL AMP: X.E1. Environmental Qualification (EQ) of Electric Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502202006-03-22022 March 2006 GALL AMP: X.S1, Concrete Containment Tendon Prestress (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502242006-03-22022 March 2006 GALL AMP: XI.E1, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502352006-03-22022 March 2006 GALL AMP: XI.E2, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502692006-03-22022 March 2006 GALL AMP: XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet, GALL Report AMP) Project stage: Other 1998-02-28
[Table View] |
|
---|
Category:Report
MONTHYEARML21075A1772021-03-15015 March 2021 Response to Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request BVY 20-026, Defueled Safety Analysis Report, Revision 22020-09-23023 September 2020 Defueled Safety Analysis Report, Revision 2 BVY 19-020, 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 20192019-06-20020 June 2019 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 2019 ML19198A2522019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML15266A4302015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 24, Flow Diagram Instrument Air System. Sheet 2 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M. ML15266A4452015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191163, Rev. 51, Flow Diagram Fire Protection System Inner Loop. Sheet 2 ML15266A4442015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191163, Rev. 51, Flow Diagram Fire Protection System Inner Loop. Sheet 1 ML15266A4402015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 8 ML15266A4362015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 7 ML15266A4352015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 6 ML15266A4342015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 5 ML15266A4332015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 4 ML15266A4322015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 31, Flow Diagram Instrument Air System. Sheet 3 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 22015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 2 ML15266A4292015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 37, Flow Diagram Instrument Air System. Sheet 1 ML15266A4282015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191159, Rev. 100, Flow Diagram Service Water System. Sheet 2 ML15266A4272015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191159, Rev. 92, Flow Diagram Service Water System. Sheet 1 ML15266A4262015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191152, Rev. 14, General Arrangement Radwaste Building Section. ML15266A4252015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191151, Rev 19, General Arrangement Radwaste Building Plans. ML15266A4242015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191150, Rev. 20, General Arrangement Reactor Building Section. ML15266A4232015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191149, Rev. 27, General Arrangement Reactor Building Plans Sheet 2. ML15266A4222015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191148, Rev. 23, General Arrangement Reactor Building Plans Sheet 1. ML15266A2722015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report - List of Effective Pages BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 52015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 5 ML15266A2832015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, DSAR Drawing List BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R. ML15266A2712015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, DSAR Changes ML15266A2732015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, UFSAR to DSAR Conversion Matrix ML15267A6092015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 3 BVY 15-046, Rev. 0 to Defueled Safety Analysis Report, Drawing G-200347, Circulating Water System Aerating Structure-MAS & Reinf.2015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-200347, Circulating Water System Aerating Structure-MAS & Reinf. ML15267A6612015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M. ML15267A6592015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191592, Control Room Building Fl Plan El 248.50 & Fdn Plan-R, Sheet 1 ML15267A6562015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R. ML15267A6542015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R. ML15267A6512015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191463, Circulating Water System Discharge Structure Reinf, Sheet 2 ML15267A6492015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 1 ML15267A6472015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191453, Circulating Water System Intake Structure-M, Sheet 3 ML15267A6452015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191452, Circulating Water System Intake Structure-V, Sheet 2 ML15267A6412015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191451, Circulating Water System Intake Structure-M, Sheet 1 ML15267A6112015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 5 ML15267A6102015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 120/240V Vital AC and Instrument AC One Line Diagram, Sheet 4 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 1 ML15267A6082015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 2 ML15267A6072015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 1 ML15267A6062015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 2 ML15267A6052015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 30, 480V Aux. One Line Diagram Swgr BUS-9, MCC-9A, 9C. Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R. 2021-03-15
[Table view] Category:Miscellaneous
MONTHYEARML21075A1772021-03-15015 March 2021 Response to Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request BVY 19-020, 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 20192019-06-20020 June 2019 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 2019 ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum BVY 15-049, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-08-19019 August 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask BVY 15-018, Transmittal of Biennial 10 CFR 50.59 Report2015-03-0202 March 2015 Transmittal of Biennial 10 CFR 50.59 Report BVY 14-085, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2014-12-19019 December 2014 Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) BVY 14-011, Revision to Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima ...2014-02-25025 February 2014 Revision to Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima ... BVY 13-090, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2013-10-0202 October 2013 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask BVY 12-081, Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2012-11-21021 November 2012 Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML12160A3732012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Daichii Nuclear Plant Accident TAC No. ME8747) ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants BVY 07-079, Update of Aging Management Program Audit Q&A Database2007-11-14014 November 2007 Update of Aging Management Program Audit Q&A Database BVY 07-004, Emergency Response Data System (ERDS) Data Point Library Update2007-06-21021 June 2007 Emergency Response Data System (ERDS) Data Point Library Update ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 20062007-02-28028 February 2007 Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 L-87-005, Various CRS 08/09/2005 to 02/08/20072007-02-0808 February 2007 Various CRS 08/09/2005 to 02/08/2007 ML0706703802007-02-0101 February 2007 NDE Reports 07-001 Thru 07-008 ML0701705912007-01-0909 January 2007 VYNPS - SEIS Web Reference - Us Census Glossary ML0701701982006-12-15015 December 2006 VYNPS - SEIS Web Reference - Connecticut River Migratory Fish Counts 1967-2005 ML0629204232006-10-0303 October 2006 (E-Mail) Cooling Tower Report for VY ML0629203422006-09-18018 September 2006 (E-Mail) Air Emissions Inventory Report for 2005 and MSDS for Nalco H-550 ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 20062006-08-29029 August 2006 Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 BVY 06-068, Cycle 25 Startup Test Report Following Power Ascension and Testing2006-08-0101 August 2006 Cycle 25 Startup Test Report Following Power Ascension and Testing CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee ML0618803852006-05-22022 May 2006 Windham Regional Plan Draft, May 22, 2006 ML0704404852006-05-12012 May 2006 AMRM-16, Revision 0, Aging Management Review of the Instrument Air System. ML0704404832006-05-12012 May 2006 AMRM-15, Revision 0, Aging Management Review of the Fuel Oil System. ML0704404782006-05-12012 May 2006 AMRM-15, Aging Management Review of the Fuel Oil System ML0704404742006-05-12012 May 2006 AMRM-12, Aging Management Review of the Reactor Building Closed Cooling Water System ML0704404862006-05-11011 May 2006 AMRM-30, Rev. 01, Aging Management Review of Ns Systems Affecting Safety Systems BVY 06-033, Cycle 24 10 CFR 50.59 Report2006-04-24024 April 2006 Cycle 24 10 CFR 50.59 Report BVY 06-031, Revision 1 to Steam Dryer Monitoring Plan2006-03-26026 March 2006 Revision 1 to Steam Dryer Monitoring Plan ML0609503562006-03-22022 March 2006 GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) ML0609503642006-03-22022 March 2006 GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP) ML0609502712006-03-22022 March 2006 GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections Iwb, Iwc, and Iwd (Audit Worksheet, GALL Report AMP) ML0609505492006-03-22022 March 2006 GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP) ML0609502772006-03-22022 March 2006 GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP) ML0609502152006-03-22022 March 2006 GALL AMP: X.E1. Environmental Qualification (EQ) of Electric Components (Audit Worksheet GALL Report AMP) ML0609505702006-03-22022 March 2006 GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP) ML0609502202006-03-22022 March 2006 GALL AMP: X.S1, Concrete Containment Tendon Prestress (Audit Worksheet GALL Report AMP) ML0609502502006-03-22022 March 2006 GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) ML0609502582006-03-22022 March 2006 GALL AMP: XI.E4, Metal Enclosed Bus (Audit Worksheet GALL Report AMP) ML0609502622006-03-22022 March 2006 GALL AMP: XI.E5, Fuse Holder (Audit Worksheet GALL Report AMP) ML0609503472006-03-22022 March 2006 GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors ML0609506062006-03-22022 March 2006 GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP) ML0609506242006-03-22022 March 2006 GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP) ML0609502902006-03-22022 March 2006 GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) ML0610000902006-03-22022 March 2006 GALL AMP: XI.M39, Lubricating Oil Analysis Program (Audit Worksheet GALL Report AMP) ML0609503312006-03-22022 March 2006 GALL AMP: XI.M10, Boric Acid Corrosion (Audit Worksheet GALL Report AMP) 2021-03-15
[Table view] |
Text
AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________
LRA AMP: __________________________ REVIEWER: ______________________
GALL AMP: XI.M36, External Surfaces Monitoring DATE: __________________________
Program Auditable GALL Criteria Documentation of Audit Finding Element Program A. The External Surfaces Monitoring program is based on Consistent with GALL AMP: Yes No Description system inspections and walkdowns. This program consists of Document(s) used to confirm Criteria:
periodic visual inspections of steel components such as piping, piping components, ducting, and other components within the scope of license renewal and subject to AMR in order to manage aging effects. The program manages aging effects Comment:
through visual inspection of external surfaces for evidence of material loss. Loss of material due to boric acid corrosion is managed by the Boric Acid Corrosion Program.
- 1. Scope of A. This program visually inspects the external surface of in- Consistent with GALL AMP: Yes No Program scope components and monitors external surfaces of steel Document(s) used to confirm Criteria:
components in systems within the scope of license renewal and subject to AMR for loss of material and leakage. Visual inspections are expected to identify loss of material due to general corrosion in accessible steel components. Loss of Comment material due to pitting and crevice corrosion may not be detectable through these same visual inspections, however, general corrosion is expected to be present and detectable such that, should pitting and crevice corrosion exist, general corrosion will manifest itself as visible rust or rust byproducts (e.g., discoloration or coating degradation) and be detectable prior to any loss of intended function. Therefore, this program is acceptable for use in inspecting for loss of material for general, pitting and crevice corrosion.
B. Surfaces that are inaccessible or not readily visible during Consistent with GALL AMP: Yes No XI.M36 External Surfaces Monitoring 1
Program Auditable GALL Criteria Documentation of Audit Finding Element plant operations are inspected during refueling outages. Document(s) used to confirm Criteria:
Surfaces that are inaccessible or not readily visible during both plant operations and refueling outages are inspected at such intervals that would provide reasonable assurance that the effects of aging will be managed such that applicable Comment:
components will perform their intended function during the period of extended operation.
Surfaces that are insulated may be inspected when the external surface is exposed (i.e., maintenance) at such intervals that would provide reasonable assurance that the effects of aging will be managed such that applicable components will perform their intended function during the period of extended operation.
C. The program may also be credited with managing loss of Consistent with GALL AMP: Yes No material from internal surfaces, for situations in which material Document(s) used to confirm Criteria:
and environment combinations are the same for internal and external surfaces such that external surface condition is representative of internal surface condition. When credited, the program should describe the component internal environment Comment:
and the credited similar external component environment inspected.
- 2. Preventive A. The External Surfaces Monitoring Program is a visual Consistent with GALL AMP: Yes No Actions monitoring program that does not include preventive actions. Document(s) used to confirm Criteria:
Comment:
- 3. Parameters A. The External Surfaces Monitoring Program utilizes periodic Consistent with GALL AMP: Yes No Monitored/ plant system inspections and walkdowns to monitor for material Document(s) used to confirm Criteria:
Inspected degradation and leakage. This program inspects components such as piping, piping components, ducting and other components. Coatings deterioration is an indicator of possible underlying degradation. Comment:
Examples of inspection parameters include:
- corrosion and material wastage (loss of material);
XI.M36 External Surfaces Monitoring 2
Program Auditable GALL Criteria Documentation of Audit Finding Element
- leakage from or onto external surfaces;
- worn, flaking, or oxide-coated surfaces;
- corrosion stains on thermal insulation;
- protective coating degradation (cracking and flaking)
- 4. Detection of A. Degradation of steel surfaces cannot occur without the Consistent with GALL AMP: Yes No Aging Effects degradation of the paint or coating. Confirmation of the integrity Document(s) used to confirm Criteria:
of the paint or coating is an effective method for managing the effects of corrosion on the steel surface. A visual inspection is conducted for component surfaces at least once per refueling cycle. This frequency accommodates inspections of Comment:
components that may be in locations that are normally only accessible during outages. System walkdowns are normally performed on a frequency that exceeds once per fuel cycle.
Surfaces that are inaccessible or not readily visible during plant operations and refueling outages are inspected at such intervals that would ensure the components intended function is maintained. The intervals of inspections may be adjusted as necessary based on plant-specific inspection results and industry experience.
This program is credited with managing the loss of material for external surfaces and the loss of material for internal surfaces exposed to the same environment as the external surface.
- 5. Monitoring A. Visual inspection activities are performed and associated Consistent with GALL AMP: Yes No and Trending personnel are qualified in accordance with site controlled Document(s) used to confirm Criteria:
procedures and processes. The External Surfaces Monitoring Program uses standardized monitoring and trending activities to track degradation. Deficiencies are documented using approved processes and procedures such that results can be trended. Comment:
However, the program does not include formal trending.
Inspections are performed at frequencies identified in Detection of Aging Effects.
XI.M36 External Surfaces Monitoring 3
Program Auditable GALL Criteria Documentation of Audit Finding Element
- 6. Acceptance A. For each component/aging effect combination, the Consistent with GALL AMP: Yes No Criteria acceptance criteria are defined to ensure that the need for Document(s) used to confirm Criteria:
corrective actions will be identified before loss of intended functions. Acceptance criteria include design standards, procedural requirements, current licensing basis, industry codes or standards, and engineering evaluation. Comment:
- 7. Corrective A. Site quality assurance (QA) procedures, review and approval Consistent with GALL AMP: Yes No Actions processes, and administrative controls are implemented in Document(s) used to confirm Criteria:
accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions, confirmation process, and Comment:
administrative controls.
- 8. A. See Item 7, above. Consistent with GALL AMP: Yes No Confirmation Document(s) used to confirm Criteria:
Process Comment:
- 9. A. See Item 7, above. Consistent with GALL AMP: Yes No Administrative Document(s) used to confirm Criteria:
Controls Comment:
- 10. Operating A. External surfaces inspections via system inspections and Consistent with GALL AMP: Yes No Experience walkdowns have been in effect at many utilities since the mid Document(s) used to confirm Criteria:
1990's in support of the Maintenance Rule (10 CFR 50.65) and have proven effective in maintaining the material condition of plant systems. The elements that comprise these inspections (e.g., the scope of the inspections and inspection techniques) Comment:
are consistent with industry practice.
XI.M36 External Surfaces Monitoring 4
EXCEPTIONS Item Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed Number (Identifier, Para.# and/or Page #)
1.
2.
ENHANCEMENTS Item Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed Number (Identifier, Para.# and/or Page #)
1.
2.
DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number) Title Revision and/or Date 1.
2.
3.
4.
XI.M36 External Surfaces Monitoring 5