ML061420470: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML061420470
| number = ML061420470
| issue date = 06/29/2006
| issue date = 06/29/2006
| title = Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-001, TAC No. MC8299)
| title = Relief Request No. PIL-05-R-001, TAC No. MC8299)
| author name = Laufer R J
| author name = Laufer R
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| addressee name = Kansler M R
| addressee name = Kansler M
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000293
| docket = 05000293
| license number = DPR-035
| license number = DPR-035
| contact person = SHea J J, NRR/DLPM, 415-1388
| contact person = SHea J, NRR/DLPM, 415-1388
| case reference number = PIL-05-R-001, TAC MC8299
| case reference number = PIL-05-R-001, TAC MC8299
| document type = Letter, Safety Evaluation
| document type = Letter, Safety Evaluation
| page count = 9
| page count = 9
| project = TAC:MC8299
| project = TAC:MC8299
| stage = Approval
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:June 29, 2006Mr. Michael R. Kansler, PresidentEntergy Nuclear Operations, Inc.
{{#Wiki_filter:June 29, 2006 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
440 Hamilton Avenue White Plains, NY 10601


==SUBJECT:==
==SUBJECT:==
PILGRIM NUCLEAR POWER STATION - RELIEF REQUEST NO. PIL-05-R-001 (TAC NO. MC8299)
PILGRIM NUCLEAR POWER STATION - RELIEF REQUEST NO.
PIL-05-R-001 (TAC NO. MC8299)


==Dear Mr. Kansler:==
==Dear Mr. Kansler:==


By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee), requested relieffrom the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, 1998 Edition with the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Class 1, 2 and 3 items. The licensee proposed an alternative to use the ASME Code, Section XI, 2001 Edition through 2003 Addendum in lieu of the Code of Record for the fourth 10-year inservice inspection (ISI) program.The Nuclear Regulatory Commission staff has concluded that the alternative proposed for thefourth 10-year ISI interval will provide an acceptable level of quality and safety. The bases ofgranting the relief are provided in the enclosed safety evaluation. Therefore, pursuant to Title10 of the Code of Federal Regulations (10CFR) 50.55a(a)(3)(i), the proposed alternative is authorized for the Pilgrim's fourth 10-year ISI interval, which ends on June 30, 2015.If you have any questions regarding this approval, please contact the Pilgrim Project Manager,James Shea, at 301-415-1388. Sincerely,/RA/Richard J. Laufer, ChiefPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-293
By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee), requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, 1998 Edition with the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Class 1, 2 and 3 items. The licensee proposed an alternative to use the ASME Code, Section XI, 2001 Edition through 2003 Addendum in lieu of the Code of Record for the fourth 10-year inservice inspection (ISI) program.
The Nuclear Regulatory Commission staff has concluded that the alternative proposed for the fourth 10-year ISI interval will provide an acceptable level of quality and safety. The bases of granting the relief are provided in the enclosed safety evaluation. Therefore, pursuant to Title 10 of the Code of Federal Regulations (10CFR) 50.55a(a)(3)(i), the proposed alternative is authorized for the Pilgrims fourth 10-year ISI interval, which ends on June 30, 2015.
If you have any questions regarding this approval, please contact the Pilgrim Project Manager, James Shea, at 301-415-1388.
Sincerely,
                                              /RA/
Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293


==Enclosure:==
==Enclosure:==
As statedcc w/encl:  See next page


ML061420470                                  *See SE dated 05/16/06OFFICELPL1-1/PMLPL1-1/PMLPL1-1/LACFEBOGCLPL1-1/BCNAMEBSingalJSheaSLittleKAGruss*HWedewerRLaufer DATE5/19/066/19/066/15/065/16/066/28/066/29/06 Pilgrim Nuclear Power Station cc:Regional Administrator, Region IU. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA  19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA  02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA  02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA  02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA  02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA  02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA  02108Director, Radiation Control ProgramCommonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA  02114Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA  02108 Director, Massachusetts EmergencyManagement Agency Attn:  James Muckerheide 400 Worcester Road Framingham, MA  01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company
As stated cc w/encl: See next page


P.O. Box 426 Ludlow, MA 01056-0426Mr. Kevin H. BronsonGeneral Manager, Plant Operations Entergy Nuclear Operations, Inc.
ML061420470                                    *See SE dated 05/16/06 OFFICE LPL1-1/PM LPL1-1/PM LPL1-1/LA                    CFEB          OGC          LPL1-1/BC NAME      BSingal        JShea          SLittle        KAGruss*      HWedewer RLaufer DATE      5/19/06        6/19/06        6/15/06        5/16/06      6/28/06      6/29/06 Pilgrim Nuclear Power Station cc:
Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.
Regional Administrator, Region I    Secretary of Public Safety U. S. Nuclear Regulatory Commission  Executive Office of Public Safety 475 Allendale Road                  One Ashburton Place King of Prussia, PA 19406-1415      Boston, MA 02108 Senior Resident Inspector            Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission  Management Agency Pilgrim Nuclear Power Station        Attn: James Muckerheide Post Office Box 867                  400 Worcester Road Plymouth, MA 02360                  Framingham, MA 01702-5399 Chairman, Board of Selectmen        Mr. William D. Meinert 11 Lincoln Street                    Nuclear Engineer Plymouth, MA 02360                  Massachusetts Municipal Wholesale Electric Company Chairman                            P.O. Box 426 Nuclear Matters Committee            Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street                    Mr. Kevin H. Bronson Plymouth, MA 02360                  General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall                            600 Rocky Hill Road 878 Tremont Street                  Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Michael A. Balduzzi Office of the Commissioner          Site Vice President Massachusetts Department of          Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.
Environmental Protection            Pilgrim Nuclear Power Station One Winter Street                    600 Rocky Hill Road Boston, MA 02108                    Plymouth, MA 02360-5508 Office of the Attorney General      Mr. Stephen J. Bethay One Ashburton Place                  Director, Nuclear Safety Assurance 20th Floor                          Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508
Boston, MA 02108                    Pilgrim Nuclear Power Station 600 Rocky Hill Road Director, Radiation Control Program  Plymouth, MA 02360-5508 Commonwealth of Massachusetts Executive Offices of Health and      Mr. Bryan S. Ford Human Services                      Manager, Licensing 174 Portland Street                  Entergy Nuclear Operations, Inc.
Boston, MA 02114                    Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 cc:


cc:
Pilgrim Nuclear Power Station Mr. Gary J. Taylor                 Manager, Licensing Chief Executive Officer           Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power StationMr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
Entergy Operations                 440 Hamilton Avenue 1340 Echelon Parkway               White Plains, NY 10601 Jackson, MS 39213 Mr. Michael J. Colomb Mr. John T. Herron                Director of Oversight Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue               White Plains, NY 10601 White Plains, NY 10601 Assistant General Counsel Mr. Oscar Limpias                  Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.
Vice President, Engineering       440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601            Ms. Stacey Lousteau Treasury Department Mr. Christopher Schwarz            Entergy Services, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Vice President, Operations Support 639 Loyola Avenue Entergy Nuclear Operations, Inc. New Orleans, LA 70113 440 Hamilton Avenue White Plains, NY 10601            Mr. James Sniezek 5486 Nithsdale Drive Mr. John F. McCann                Salisbury, MD 21801-2490 Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc. Mr. Michael D. Lyster 440 Hamilton Avenue               5931 Barclay Lane White Plains, NY 10601             Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 Ms. Charlene D. Faison
440 Hamilton Avenue White Plains, NY 10601


Ms. Charlene D. FaisonManager, LicensingEntergy Nuclear Operations, Inc.
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NO. PIL-05-R-001 PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293
440 Hamilton Avenue White Plains, NY  10601Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY  10601Assistant General CounselEntergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA  70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD  21801-2490Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Garrett D. Edwards814 Waverly Road Kennett Square, PA  19348 EnclosureSAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELIEF REQUEST NO. PIL-05-R-001PILGRIM NUCLEAR POWER STATIONDOCKET NO. 50-29


==31.0INTRODUCTION==
==1.0      INTRODUCTION==
By letter dated June 29, 2005, Agencywide Documents Access and Management System(Accession No. ML051920157), Entergy Nuclear Operations, Inc (the licensee) submitted Relief Request No. PIL-05-R-001, related to the fourth 10-year interval inservice inspection (ISI) program for the Pilgrim Nuclear Power Station (Pilgrim). The licensee requested the Nuclear Regulatory Commission (NRC) authorization to use the American Society of MechanicalEngineers Boiler and Pressure Vessel Code (ASME Code), Section XI, 2001 Edition through the 2003 Addendum, in lieu of the 1998 Edition through the 2000 Addendum in regard to Subsection IWA-4540, "Pressure Testing of Class 1, 2, and 3 items."  The licensee's proposed use of portions of subsequent edition and addenda to the ASME Code, Section XI, that is incorporated by reference in 10 CFR 50.55a(b)(2), is in accordance with Title 10 of the Code ofFederal Regulations (10 CFR) 50.55a(g)(4)(iv). The NRC staff's review focused on whether therelated requirements of the 2001 Edition ASME Code, Section XI through the 2003 Addendum are being met. The licensee's request applies to the fourth 10-year ISI interval of Pilgrim. The licensee's request would be applicable during Pilgrim's fourth 10-year ISI interval, which ends on June 30, 2015.


==2.0REGULATORY EVALUATION==
By letter dated June 29, 2005, Agencywide Documents Access and Management System (Accession No. ML051920157), Entergy Nuclear Operations, Inc (the licensee) submitted Relief Request No. PIL-05-R-001, related to the fourth 10-year interval inservice inspection (ISI) program for the Pilgrim Nuclear Power Station (Pilgrim). The licensee requested the Nuclear Regulatory Commission (NRC) authorization to use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, 2001 Edition through the 2003 Addendum, in lieu of the 1998 Edition through the 2000 Addendum in regard to Subsection IWA-4540, Pressure Testing of Class 1, 2, and 3 items. The licensees proposed use of portions of subsequent edition and addenda to the ASME Code, Section XI, that is incorporated by reference in 10 CFR 50.55a(b)(2), is in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4)(iv). The NRC staffs review focused on whether the related requirements of the 2001 Edition ASME Code, Section XI through the 2003 Addendum are being met. The licensees request applies to the fourth 10-year ISI interval of Pilgrim. The licensees request would be applicable during Pilgrims fourth 10-year ISI interval, which ends on June 30, 2015.
Section 50.55a(g) of 10 CFR requires that ISI of ASME Code Class 1, 2, and 3 components beperformed in accordance with Section XI of the ASME Code and applicable addenda, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). According to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph 50.55a(g) may be used, when authorized by the NRC, if an applicant demonstratesthat the proposed alternatives would provide an acceptable level of quality and safety or if the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (includingsupports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code, Section XI, "Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that ISI of components and system pressure tests conducted during the first  10-year interval and subsequent intervals comply with the requirements in the latest edition andaddenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ISI Code of Record for the fourth 10-year inspection interval for Pilgrim is the 1998 Edition through the 2000 Addendum of the ASME Code, Section XI.
Pursuant to 10 CFR 50.55a(g)(4)(iv), inservice examination of component s and systempressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of this section, subject to the limitations and modifications listed in paragraph (b) of this section, and subject to Commission approval.
Portions of editions and addenda may be used provided that all related requirements of the respective editions or addenda are met.Regulatory Issue Summary 2004-16, "Use of Later Editions and Addenda to ASME CodeSection XI for Repair/Replacement Activities," provides additional information regarding the use of editions and addenda of the ASME Code subsequent to the Code of Record.2.1Code Requirements for Which Relief is RequestedPursuant to 10 CFR 50.55a(g)(4)(iv), the licensee has proposed an alternative to the 2000Addendum for  pressure testing of Class 1, 2, and 3 items by implementing the requirements of subsection IWA-4540 of the ASME Code, Section XI, 2001 Edition through the 2003 Addendum which states the following:(a)The repair/replacement activities performed by welding or brazing on a pressure-retaining boundary shall include a hydrostatic or system leakage test in accordance withIWA-5000, prior to, or as part of, return to service. The changes to the ASME Code, Section XI, subparagraph IWA-4540(a) for pressure testing of class 1, 2, and 3 items following repair/replacement activities performed by welding or brazing on a pressure-retaining boundary do not affect other parts of the ASME Code. The 2001 Edition through the 2003 Addendum of the ASME Code, Section XI requires that brazed joints and welds made in the course of a repair/replacement activity require pressurization and a VT-2 visual examination during the test. This added requirement would also be followed under the Pilgrim Repair/Replacement Program. 2.2ASME Code RequirementsFor repair/replacement activities performed by welding or brazing on pressure-retainingboundary, the ASME Code, Section XI, 1998 Edition through the 2000 Addendum, Subsection IWA-4540, "Pressure Testing of Classes 1, 2, and 3 Items" requires performance of either a system hydrostatic test in accordance with Subsection IWA-5000 or performance of thefollowing prior to, or as part of, return to service:a.Non-destructive examination (NDE) of the repair in accordance with the 1992 Edition orlater ASME Code, Section III.b.Owner's requirement prior to return to service.
c.A system leakage test in accordance with IWA-5000. 2.3Licensee's Basis for Requesting Relief  The licensee's proposed alternative to use a portion of the later edition ASME Code, Section XIis in accordance with 10 CFR 50.55a(g)(4)(iv), and the NRC staff noted that the proposedASME Code has been incorporated by reference in 10 CFR 50.55a(b)(2). However, since the ISI Code of Record is the 1998 Edition through the 2000 Addendum of the ASME Code, the licensee has requested relief from a portion of its ISI Code of Record and is required to meet the related requirements of the proposed later Code. 3.0NRC STAFF EVALUATIONThe NRC staff's review focused on whether all related requirements pertaining to the portion ofthe ASME Code in regard to repair/replacement activities performed by welding or brazing on a pressure retaining boundary in the proposed edition and addenda to the Code are being met.
The staff, therefore, reviewed Subsection IWA-4540 pertaining to pressure testing of Class 1, 2, and 3 items repaired by welding or brazing in the 2001 Edition through the 2003 Addendum of the ASME Code, Section XI. The staff noted that the later Code offers more flexibility t han the1998 ASME Code, Section XI through 2000 Addendum while providing the same level of assurance of quality and safety in regard to the pressure testing of components repaired by welding or brazing as identified below. Test Requirement for Repairas stated in IWA-45401998 ASME Code Section XI through 2000 Addendum 2001 ASME Code Section XI through 2003 Addendum Required Pressure testSystem hydrostatic test perSubsection  IWA-5000 or System hydrostatic orsystem l eakage test perSubsection  IWA-5000 andAlternative Pressure testSystem leakage test withNDE to 1992 Edition or laterof ASME Code, Section III  Pressurization and VT-2visual examination of thewelded/brazed joint only There is no other related requirement in regard to pressure testing of repaired componentsaddressed in Subsection IWA-4540 which would be applicable for the licensee in adopting to the later edition of the ASME Code and its Addenda. The licensee has stated that it wouldcomply with the related requirements of the 2001 ASME Code, Section XI through the 2003 Addendum for pressure testing of Class 1, 2, and 3 items repaired by welding or brazing. Since the 2001 Edition through 2003 Addendum of ASME Code, Section XI, was incorporated by reference in 10 CFR 50.55a(b)(2) and the licensee complies with the related requirements of this Code, the proposed alternative in Relief Request No. PIL-05-R-001 is authorized pursuant to 10 CFR 50.55a(a)(3)(i). The use of the later ASME Code and Addenda will provide anacceptable level of quality and safety.  


==4.0CONCLUSION==
==2.0      REGULATORY EVALUATION==
The licensee's proposed alternative in Relief Request No. PIL-05-R-001 pertains to the use ofSubsection IWA-4540 of the 2001 ASME Code, Section XI including the 2003 Addendum in lieu of the applicable 1998 ASME Code Section XI including the 2000 Addendum. The later ASME Code and its Addenda has been incorporated by reference in 10 CFR 50.55a(b)(2), and the  licensee stated that it would meet the related requirements of the ASME Code in regard topressure testing components repaired by welding or brazing. The NRC staff has determinedthat the proposed alternative in Relief Request No. PIL-05-R-001 will provide an acceptablelevel of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the alternative for the fourth 10-year ISI interval for Pilgrim. All other ASME Code, Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including a third party review by the Authorized Nuclear Inservice Inspector.


Principal Contributor:   P. PatnaikDate: June 29, 2006}}
Section 50.55a(g) of 10 CFR requires that ISI of ASME Code Class 1, 2, and 3 components be performed in accordance with Section XI of the ASME Code and applicable addenda, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). According to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph 50.55a(g) may be used, when authorized by the NRC, if an applicant demonstrates that the proposed alternatives would provide an acceptable level of quality and safety or if the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that ISI of components and system pressure tests conducted during the first Enclosure
 
10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ISI Code of Record for the fourth 10-year inspection interval for Pilgrim is the 1998 Edition through the 2000 Addendum of the ASME Code, Section XI.
Pursuant to 10 CFR 50.55a(g)(4)(iv), inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of this section, subject to the limitations and modifications listed in paragraph (b) of this section, and subject to Commission approval.
Portions of editions and addenda may be used provided that all related requirements of the respective editions or addenda are met.
Regulatory Issue Summary 2004-16, Use of Later Editions and Addenda to ASME Code Section XI for Repair/Replacement Activities, provides additional information regarding the use of editions and addenda of the ASME Code subsequent to the Code of Record.
2.1    Code Requirements for Which Relief is Requested Pursuant to 10 CFR 50.55a(g)(4)(iv), the licensee has proposed an alternative to the 2000 Addendum for pressure testing of Class 1, 2, and 3 items by implementing the requirements of subsection IWA-4540 of the ASME Code, Section XI, 2001 Edition through the 2003 Addendum which states the following:
(a)    The repair/replacement activities performed by welding or brazing on a pressure-retaining boundary shall include a hydrostatic or system leakage test in accordance with IWA-5000, prior to, or as part of, return to service.
The changes to the ASME Code, Section XI, subparagraph IWA-4540(a) for pressure testing of class 1, 2, and 3 items following repair/replacement activities performed by welding or brazing on a pressure-retaining boundary do not affect other parts of the ASME Code. The 2001 Edition through the 2003 Addendum of the ASME Code, Section XI requires that brazed joints and welds made in the course of a repair/replacement activity require pressurization and a VT-2 visual examination during the test. This added requirement would also be followed under the Pilgrim Repair/Replacement Program.
2.2    ASME Code Requirements For repair/replacement activities performed by welding or brazing on pressure-retaining boundary, the ASME Code, Section XI, 1998 Edition through the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Classes 1, 2, and 3 Items requires performance of either a system hydrostatic test in accordance with Subsection IWA-5000 or performance of the following prior to, or as part of, return to service:
: a.      Non-destructive examination (NDE) of the repair in accordance with the 1992 Edition or later ASME Code, Section III.
: b.      Owners requirement prior to return to service.
: c.      A system leakage test in accordance with IWA-5000.
2.3    Licensees Basis for Requesting Relief
 
The licensees proposed alternative to use a portion of the later edition ASME Code, Section XI is in accordance with 10 CFR 50.55a(g)(4)(iv), and the NRC staff noted that the proposed ASME Code has been incorporated by reference in 10 CFR 50.55a(b)(2). However, since the ISI Code of Record is the 1998 Edition through the 2000 Addendum of the ASME Code, the licensee has requested relief from a portion of its ISI Code of Record and is required to meet the related requirements of the proposed later Code.
3.0    NRC STAFF EVALUATION The NRC staffs review focused on whether all related requirements pertaining to the portion of the ASME Code in regard to repair/replacement activities performed by welding or brazing on a pressure retaining boundary in the proposed edition and addenda to the Code are being met.
The staff, therefore, reviewed Subsection IWA-4540 pertaining to pressure testing of Class 1, 2, and 3 items repaired by welding or brazing in the 2001 Edition through the 2003 Addendum of the ASME Code, Section XI. The staff noted that the later Code offers more flexibility than the 1998 ASME Code, Section XI through 2000 Addendum while providing the same level of assurance of quality and safety in regard to the pressure testing of components repaired by welding or brazing as identified below.
Test Requirement for Repair    1998 ASME Code Section XI        2001 ASME Code Section XI as stated in IWA-4540        through 2000 Addendum          through 2003 Addendum Required Pressure test          System hydrostatic test per        System hydrostatic or Subsection IWA-5000 or            system leakage test per Subsection IWA-5000 and Alternative Pressure test          System leakage test with        Pressurization and VT-2 NDE to 1992 Edition or later      visual examination of the of ASME Code, Section III          welded/brazed joint only There is no other related requirement in regard to pressure testing of repaired components addressed in Subsection IWA-4540 which would be applicable for the licensee in adopting to the later edition of the ASME Code and its Addenda. The licensee has stated that it would comply with the related requirements of the 2001 ASME Code, Section XI through the 2003 Addendum for pressure testing of Class 1, 2, and 3 items repaired by welding or brazing. Since the 2001 Edition through 2003 Addendum of ASME Code, Section XI, was incorporated by reference in 10 CFR 50.55a(b)(2) and the licensee complies with the related requirements of this Code, the proposed alternative in Relief Request No. PIL-05-R-001 is authorized pursuant to 10 CFR 50.55a(a)(3)(i). The use of the later ASME Code and Addenda will provide an acceptable level of quality and safety.
 
==4.0    CONCLUSION==
 
The licensees proposed alternative in Relief Request No. PIL-05-R-001 pertains to the use of Subsection IWA-4540 of the 2001 ASME Code, Section XI including the 2003 Addendum in lieu of the applicable 1998 ASME Code Section XI including the 2000 Addendum. The later ASME Code and its Addenda has been incorporated by reference in 10 CFR 50.55a(b)(2), and the
 
licensee stated that it would meet the related requirements of the ASME Code in regard to pressure testing components repaired by welding or brazing. The NRC staff has determined that the proposed alternative in Relief Request No. PIL-05-R-001 will provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the alternative for the fourth 10-year ISI interval for Pilgrim. All other ASME Code, Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including a third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: P. Patnaik Date: June 29, 2006}}

Latest revision as of 04:43, 14 March 2020

Relief Request No. PIL-05-R-001, TAC No. MC8299)
ML061420470
Person / Time
Site: Pilgrim
Issue date: 06/29/2006
From: Richard Laufer
NRC/NRR/ADRO/DORL/LPLI-1
To: Kansler M
Entergy Nuclear Operations
SHea J, NRR/DLPM, 415-1388
References
PIL-05-R-001, TAC MC8299
Download: ML061420470 (9)


Text

June 29, 2006 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PILGRIM NUCLEAR POWER STATION - RELIEF REQUEST NO.

PIL-05-R-001 (TAC NO. MC8299)

Dear Mr. Kansler:

By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee), requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, 1998 Edition with the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Class 1, 2 and 3 items. The licensee proposed an alternative to use the ASME Code,Section XI, 2001 Edition through 2003 Addendum in lieu of the Code of Record for the fourth 10-year inservice inspection (ISI) program.

The Nuclear Regulatory Commission staff has concluded that the alternative proposed for the fourth 10-year ISI interval will provide an acceptable level of quality and safety. The bases of granting the relief are provided in the enclosed safety evaluation. Therefore, pursuant to Title 10 of the Code of Federal Regulations (10CFR) 50.55a(a)(3)(i), the proposed alternative is authorized for the Pilgrims fourth 10-year ISI interval, which ends on June 30, 2015.

If you have any questions regarding this approval, please contact the Pilgrim Project Manager, James Shea, at 301-415-1388.

Sincerely,

/RA/

Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page

ML061420470 *See SE dated 05/16/06 OFFICE LPL1-1/PM LPL1-1/PM LPL1-1/LA CFEB OGC LPL1-1/BC NAME BSingal JShea SLittle KAGruss* HWedewer RLaufer DATE 5/19/06 6/19/06 6/15/06 5/16/06 6/28/06 6/29/06 Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Kevin H. Bronson Plymouth, MA 02360 General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Michael A. Balduzzi Office of the Commissioner Site Vice President Massachusetts Department of Entergy Nuclear Operations, Inc.

Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Stephen J. Bethay One Ashburton Place Director, Nuclear Safety Assurance 20th Floor Entergy Nuclear Operations, Inc.

Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road Director, Radiation Control Program Plymouth, MA 02360-5508 Commonwealth of Massachusetts Executive Offices of Health and Mr. Bryan S. Ford Human Services Manager, Licensing 174 Portland Street Entergy Nuclear Operations, Inc.

Boston, MA 02114 Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 cc:

Pilgrim Nuclear Power Station Mr. Gary J. Taylor Manager, Licensing Chief Executive Officer Entergy Nuclear Operations, Inc.

Entergy Operations 440 Hamilton Avenue 1340 Echelon Parkway White Plains, NY 10601 Jackson, MS 39213 Mr. Michael J. Colomb Mr. John T. Herron Director of Oversight Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Assistant General Counsel Mr. Oscar Limpias Entergy Nuclear Operations, Inc.

Vice President, Engineering 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Mr. Christopher Schwarz Entergy Services, Inc.

Vice President, Operations Support 639 Loyola Avenue Entergy Nuclear Operations, Inc. New Orleans, LA 70113 440 Hamilton Avenue White Plains, NY 10601 Mr. James Sniezek 5486 Nithsdale Drive Mr. John F. McCann Salisbury, MD 21801-2490 Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc. Mr. Michael D. Lyster 440 Hamilton Avenue 5931 Barclay Lane White Plains, NY 10601 Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 Ms. Charlene D. Faison

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NO. PIL-05-R-001 PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293

1.0 INTRODUCTION

By letter dated June 29, 2005, Agencywide Documents Access and Management System (Accession No. ML051920157), Entergy Nuclear Operations, Inc (the licensee) submitted Relief Request No. PIL-05-R-001, related to the fourth 10-year interval inservice inspection (ISI) program for the Pilgrim Nuclear Power Station (Pilgrim). The licensee requested the Nuclear Regulatory Commission (NRC) authorization to use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, 2001 Edition through the 2003 Addendum, in lieu of the 1998 Edition through the 2000 Addendum in regard to Subsection IWA-4540, Pressure Testing of Class 1, 2, and 3 items. The licensees proposed use of portions of subsequent edition and addenda to the ASME Code,Section XI, that is incorporated by reference in 10 CFR 50.55a(b)(2), is in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4)(iv). The NRC staffs review focused on whether the related requirements of the 2001 Edition ASME Code,Section XI through the 2003 Addendum are being met. The licensees request applies to the fourth 10-year ISI interval of Pilgrim. The licensees request would be applicable during Pilgrims fourth 10-year ISI interval, which ends on June 30, 2015.

2.0 REGULATORY EVALUATION

Section 50.55a(g) of 10 CFR requires that ISI of ASME Code Class 1, 2, and 3 components be performed in accordance with Section XI of the ASME Code and applicable addenda, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). According to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph 50.55a(g) may be used, when authorized by the NRC, if an applicant demonstrates that the proposed alternatives would provide an acceptable level of quality and safety or if the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that ISI of components and system pressure tests conducted during the first Enclosure

10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ISI Code of Record for the fourth 10-year inspection interval for Pilgrim is the 1998 Edition through the 2000 Addendum of the ASME Code,Section XI.

Pursuant to 10 CFR 50.55a(g)(4)(iv), inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of this section, subject to the limitations and modifications listed in paragraph (b) of this section, and subject to Commission approval.

Portions of editions and addenda may be used provided that all related requirements of the respective editions or addenda are met.

Regulatory Issue Summary 2004-16, Use of Later Editions and Addenda to ASME Code Section XI for Repair/Replacement Activities, provides additional information regarding the use of editions and addenda of the ASME Code subsequent to the Code of Record.

2.1 Code Requirements for Which Relief is Requested Pursuant to 10 CFR 50.55a(g)(4)(iv), the licensee has proposed an alternative to the 2000 Addendum for pressure testing of Class 1, 2, and 3 items by implementing the requirements of subsection IWA-4540 of the ASME Code,Section XI, 2001 Edition through the 2003 Addendum which states the following:

(a) The repair/replacement activities performed by welding or brazing on a pressure-retaining boundary shall include a hydrostatic or system leakage test in accordance with IWA-5000, prior to, or as part of, return to service.

The changes to the ASME Code,Section XI, subparagraph IWA-4540(a) for pressure testing of class 1, 2, and 3 items following repair/replacement activities performed by welding or brazing on a pressure-retaining boundary do not affect other parts of the ASME Code. The 2001 Edition through the 2003 Addendum of the ASME Code,Section XI requires that brazed joints and welds made in the course of a repair/replacement activity require pressurization and a VT-2 visual examination during the test. This added requirement would also be followed under the Pilgrim Repair/Replacement Program.

2.2 ASME Code Requirements For repair/replacement activities performed by welding or brazing on pressure-retaining boundary, the ASME Code,Section XI, 1998 Edition through the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Classes 1, 2, and 3 Items requires performance of either a system hydrostatic test in accordance with Subsection IWA-5000 or performance of the following prior to, or as part of, return to service:

a. Non-destructive examination (NDE) of the repair in accordance with the 1992 Edition or later ASME Code,Section III.
b. Owners requirement prior to return to service.
c. A system leakage test in accordance with IWA-5000.

2.3 Licensees Basis for Requesting Relief

The licensees proposed alternative to use a portion of the later edition ASME Code,Section XI is in accordance with 10 CFR 50.55a(g)(4)(iv), and the NRC staff noted that the proposed ASME Code has been incorporated by reference in 10 CFR 50.55a(b)(2). However, since the ISI Code of Record is the 1998 Edition through the 2000 Addendum of the ASME Code, the licensee has requested relief from a portion of its ISI Code of Record and is required to meet the related requirements of the proposed later Code.

3.0 NRC STAFF EVALUATION The NRC staffs review focused on whether all related requirements pertaining to the portion of the ASME Code in regard to repair/replacement activities performed by welding or brazing on a pressure retaining boundary in the proposed edition and addenda to the Code are being met.

The staff, therefore, reviewed Subsection IWA-4540 pertaining to pressure testing of Class 1, 2, and 3 items repaired by welding or brazing in the 2001 Edition through the 2003 Addendum of the ASME Code,Section XI. The staff noted that the later Code offers more flexibility than the 1998 ASME Code,Section XI through 2000 Addendum while providing the same level of assurance of quality and safety in regard to the pressure testing of components repaired by welding or brazing as identified below.

Test Requirement for Repair 1998 ASME Code Section XI 2001 ASME Code Section XI as stated in IWA-4540 through 2000 Addendum through 2003 Addendum Required Pressure test System hydrostatic test per System hydrostatic or Subsection IWA-5000 or system leakage test per Subsection IWA-5000 and Alternative Pressure test System leakage test with Pressurization and VT-2 NDE to 1992 Edition or later visual examination of the of ASME Code,Section III welded/brazed joint only There is no other related requirement in regard to pressure testing of repaired components addressed in Subsection IWA-4540 which would be applicable for the licensee in adopting to the later edition of the ASME Code and its Addenda. The licensee has stated that it would comply with the related requirements of the 2001 ASME Code,Section XI through the 2003 Addendum for pressure testing of Class 1, 2, and 3 items repaired by welding or brazing. Since the 2001 Edition through 2003 Addendum of ASME Code,Section XI, was incorporated by reference in 10 CFR 50.55a(b)(2) and the licensee complies with the related requirements of this Code, the proposed alternative in Relief Request No. PIL-05-R-001 is authorized pursuant to 10 CFR 50.55a(a)(3)(i). The use of the later ASME Code and Addenda will provide an acceptable level of quality and safety.

4.0 CONCLUSION

The licensees proposed alternative in Relief Request No. PIL-05-R-001 pertains to the use of Subsection IWA-4540 of the 2001 ASME Code,Section XI including the 2003 Addendum in lieu of the applicable 1998 ASME Code Section XI including the 2000 Addendum. The later ASME Code and its Addenda has been incorporated by reference in 10 CFR 50.55a(b)(2), and the

licensee stated that it would meet the related requirements of the ASME Code in regard to pressure testing components repaired by welding or brazing. The NRC staff has determined that the proposed alternative in Relief Request No. PIL-05-R-001 will provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the alternative for the fourth 10-year ISI interval for Pilgrim. All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including a third party review by the Authorized Nuclear Inservice Inspector.

Principal Contributor: P. Patnaik Date: June 29, 2006