ML061420470: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML061420470 | | number = ML061420470 | ||
| issue date = 06/29/2006 | | issue date = 06/29/2006 | ||
| title = | | title = Relief Request No. PIL-05-R-001, TAC No. MC8299) | ||
| author name = Laufer R | | author name = Laufer R | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1 | | author affiliation = NRC/NRR/ADRO/DORL/LPLI-1 | ||
| addressee name = Kansler M | | addressee name = Kansler M | ||
| addressee affiliation = Entergy Nuclear Operations, Inc | | addressee affiliation = Entergy Nuclear Operations, Inc | ||
| docket = 05000293 | | docket = 05000293 | ||
| license number = DPR-035 | | license number = DPR-035 | ||
| contact person = SHea | | contact person = SHea J, NRR/DLPM, 415-1388 | ||
| case reference number = PIL-05-R-001, TAC MC8299 | | case reference number = PIL-05-R-001, TAC MC8299 | ||
| document type = Letter, Safety Evaluation | | document type = Letter, Safety Evaluation | ||
| page count = 9 | | page count = 9 | ||
| project = TAC:MC8299 | | project = TAC:MC8299 | ||
| stage = | | stage = Other | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:June 29, | {{#Wiki_filter:June 29, 2006 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc. | ||
440 Hamilton Avenue White Plains, NY 10601 | 440 Hamilton Avenue White Plains, NY 10601 | ||
==SUBJECT:== | ==SUBJECT:== | ||
PILGRIM NUCLEAR POWER STATION - RELIEF REQUEST NO. PIL-05-R-001 (TAC NO. MC8299) | PILGRIM NUCLEAR POWER STATION - RELIEF REQUEST NO. | ||
PIL-05-R-001 (TAC NO. MC8299) | |||
==Dear Mr. Kansler:== | ==Dear Mr. Kansler:== | ||
By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee), requested | By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee), requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, 1998 Edition with the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Class 1, 2 and 3 items. The licensee proposed an alternative to use the ASME Code, Section XI, 2001 Edition through 2003 Addendum in lieu of the Code of Record for the fourth 10-year inservice inspection (ISI) program. | ||
The Nuclear Regulatory Commission staff has concluded that the alternative proposed for the fourth 10-year ISI interval will provide an acceptable level of quality and safety. The bases of granting the relief are provided in the enclosed safety evaluation. Therefore, pursuant to Title 10 of the Code of Federal Regulations (10CFR) 50.55a(a)(3)(i), the proposed alternative is authorized for the Pilgrims fourth 10-year ISI interval, which ends on June 30, 2015. | |||
If you have any questions regarding this approval, please contact the Pilgrim Project Manager, James Shea, at 301-415-1388. | |||
Sincerely, | |||
/RA/ | |||
Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated cc w/encl: See next page | |||
P.O. Box 426 Ludlow, MA | ML061420470 *See SE dated 05/16/06 OFFICE LPL1-1/PM LPL1-1/PM LPL1-1/LA CFEB OGC LPL1-1/BC NAME BSingal JShea SLittle KAGruss* HWedewer RLaufer DATE 5/19/06 6/19/06 6/15/06 5/16/06 6/28/06 6/29/06 Pilgrim Nuclear Power Station cc: | ||
Pilgrim Nuclear Power Station 600 Rocky Hill | Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Kevin H. Bronson Plymouth, MA 02360 General Manager, Plant Operations Entergy Nuclear Operations, Inc. | ||
Pilgrim Nuclear Power Station 600 Rocky Hill | Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Michael A. Balduzzi Office of the Commissioner Site Vice President Massachusetts Department of Entergy Nuclear Operations, Inc. | ||
Pilgrim Nuclear Power Station 600 Rocky Hill | Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Stephen J. Bethay One Ashburton Place Director, Nuclear Safety Assurance 20th Floor Entergy Nuclear Operations, Inc. | ||
Pilgrim Nuclear Power Station 600 Rocky Hill | Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road Director, Radiation Control Program Plymouth, MA 02360-5508 Commonwealth of Massachusetts Executive Offices of Health and Mr. Bryan S. Ford Human Services Manager, Licensing 174 Portland Street Entergy Nuclear Operations, Inc. | ||
Boston, MA 02114 Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 cc: | |||
Pilgrim Nuclear Power Station Mr. Gary J. Taylor Manager, Licensing Chief Executive Officer Entergy Nuclear Operations, Inc. | |||
Pilgrim Nuclear Power | Entergy Operations 440 Hamilton Avenue 1340 Echelon Parkway White Plains, NY 10601 Jackson, MS 39213 Mr. Michael J. Colomb Mr. John T. Herron Director of Oversight Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc. | ||
440 Hamilton Avenue White Plains, NY | Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Assistant General Counsel Mr. Oscar Limpias Entergy Nuclear Operations, Inc. | ||
440 Hamilton Avenue White Plains, NY | Vice President, Engineering 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Mr. Christopher Schwarz Entergy Services, Inc. | ||
440 Hamilton Avenue White Plains, NY | Vice President, Operations Support 639 Loyola Avenue Entergy Nuclear Operations, Inc. New Orleans, LA 70113 440 Hamilton Avenue White Plains, NY 10601 Mr. James Sniezek 5486 Nithsdale Drive Mr. John F. McCann Salisbury, MD 21801-2490 Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc. Mr. Michael D. Lyster 440 Hamilton Avenue 5931 Barclay Lane White Plains, NY 10601 Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 Ms. Charlene D. Faison | ||
440 Hamilton Avenue White Plains, NY | |||
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NO. PIL-05-R-001 PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 | |||
== | ==1.0 INTRODUCTION== | ||
By letter dated June 29, 2005, Agencywide Documents Access and Management System (Accession No. ML051920157), Entergy Nuclear Operations, Inc (the licensee) submitted Relief Request No. PIL-05-R-001, related to the fourth 10-year interval inservice inspection (ISI) program for the Pilgrim Nuclear Power Station (Pilgrim). The licensee requested the Nuclear Regulatory Commission (NRC) authorization to use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, 2001 Edition through the 2003 Addendum, in lieu of the 1998 Edition through the 2000 Addendum in regard to Subsection IWA-4540, Pressure Testing of Class 1, 2, and 3 items. The licensees proposed use of portions of subsequent edition and addenda to the ASME Code, Section XI, that is incorporated by reference in 10 CFR 50.55a(b)(2), is in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4)(iv). The NRC staffs review focused on whether the related requirements of the 2001 Edition ASME Code, Section XI through the 2003 Addendum are being met. The licensees request applies to the fourth 10-year ISI interval of Pilgrim. The licensees request would be applicable during Pilgrims fourth 10-year ISI interval, which ends on June 30, 2015. | |||
== | ==2.0 REGULATORY EVALUATION== | ||
Principal Contributor: | Section 50.55a(g) of 10 CFR requires that ISI of ASME Code Class 1, 2, and 3 components be performed in accordance with Section XI of the ASME Code and applicable addenda, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). According to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph 50.55a(g) may be used, when authorized by the NRC, if an applicant demonstrates that the proposed alternatives would provide an acceptable level of quality and safety or if the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. | ||
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that ISI of components and system pressure tests conducted during the first Enclosure | |||
10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ISI Code of Record for the fourth 10-year inspection interval for Pilgrim is the 1998 Edition through the 2000 Addendum of the ASME Code, Section XI. | |||
Pursuant to 10 CFR 50.55a(g)(4)(iv), inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of this section, subject to the limitations and modifications listed in paragraph (b) of this section, and subject to Commission approval. | |||
Portions of editions and addenda may be used provided that all related requirements of the respective editions or addenda are met. | |||
Regulatory Issue Summary 2004-16, Use of Later Editions and Addenda to ASME Code Section XI for Repair/Replacement Activities, provides additional information regarding the use of editions and addenda of the ASME Code subsequent to the Code of Record. | |||
2.1 Code Requirements for Which Relief is Requested Pursuant to 10 CFR 50.55a(g)(4)(iv), the licensee has proposed an alternative to the 2000 Addendum for pressure testing of Class 1, 2, and 3 items by implementing the requirements of subsection IWA-4540 of the ASME Code, Section XI, 2001 Edition through the 2003 Addendum which states the following: | |||
(a) The repair/replacement activities performed by welding or brazing on a pressure-retaining boundary shall include a hydrostatic or system leakage test in accordance with IWA-5000, prior to, or as part of, return to service. | |||
The changes to the ASME Code, Section XI, subparagraph IWA-4540(a) for pressure testing of class 1, 2, and 3 items following repair/replacement activities performed by welding or brazing on a pressure-retaining boundary do not affect other parts of the ASME Code. The 2001 Edition through the 2003 Addendum of the ASME Code, Section XI requires that brazed joints and welds made in the course of a repair/replacement activity require pressurization and a VT-2 visual examination during the test. This added requirement would also be followed under the Pilgrim Repair/Replacement Program. | |||
2.2 ASME Code Requirements For repair/replacement activities performed by welding or brazing on pressure-retaining boundary, the ASME Code, Section XI, 1998 Edition through the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Classes 1, 2, and 3 Items requires performance of either a system hydrostatic test in accordance with Subsection IWA-5000 or performance of the following prior to, or as part of, return to service: | |||
: a. Non-destructive examination (NDE) of the repair in accordance with the 1992 Edition or later ASME Code, Section III. | |||
: b. Owners requirement prior to return to service. | |||
: c. A system leakage test in accordance with IWA-5000. | |||
2.3 Licensees Basis for Requesting Relief | |||
The licensees proposed alternative to use a portion of the later edition ASME Code, Section XI is in accordance with 10 CFR 50.55a(g)(4)(iv), and the NRC staff noted that the proposed ASME Code has been incorporated by reference in 10 CFR 50.55a(b)(2). However, since the ISI Code of Record is the 1998 Edition through the 2000 Addendum of the ASME Code, the licensee has requested relief from a portion of its ISI Code of Record and is required to meet the related requirements of the proposed later Code. | |||
3.0 NRC STAFF EVALUATION The NRC staffs review focused on whether all related requirements pertaining to the portion of the ASME Code in regard to repair/replacement activities performed by welding or brazing on a pressure retaining boundary in the proposed edition and addenda to the Code are being met. | |||
The staff, therefore, reviewed Subsection IWA-4540 pertaining to pressure testing of Class 1, 2, and 3 items repaired by welding or brazing in the 2001 Edition through the 2003 Addendum of the ASME Code, Section XI. The staff noted that the later Code offers more flexibility than the 1998 ASME Code, Section XI through 2000 Addendum while providing the same level of assurance of quality and safety in regard to the pressure testing of components repaired by welding or brazing as identified below. | |||
Test Requirement for Repair 1998 ASME Code Section XI 2001 ASME Code Section XI as stated in IWA-4540 through 2000 Addendum through 2003 Addendum Required Pressure test System hydrostatic test per System hydrostatic or Subsection IWA-5000 or system leakage test per Subsection IWA-5000 and Alternative Pressure test System leakage test with Pressurization and VT-2 NDE to 1992 Edition or later visual examination of the of ASME Code, Section III welded/brazed joint only There is no other related requirement in regard to pressure testing of repaired components addressed in Subsection IWA-4540 which would be applicable for the licensee in adopting to the later edition of the ASME Code and its Addenda. The licensee has stated that it would comply with the related requirements of the 2001 ASME Code, Section XI through the 2003 Addendum for pressure testing of Class 1, 2, and 3 items repaired by welding or brazing. Since the 2001 Edition through 2003 Addendum of ASME Code, Section XI, was incorporated by reference in 10 CFR 50.55a(b)(2) and the licensee complies with the related requirements of this Code, the proposed alternative in Relief Request No. PIL-05-R-001 is authorized pursuant to 10 CFR 50.55a(a)(3)(i). The use of the later ASME Code and Addenda will provide an acceptable level of quality and safety. | |||
==4.0 CONCLUSION== | |||
The licensees proposed alternative in Relief Request No. PIL-05-R-001 pertains to the use of Subsection IWA-4540 of the 2001 ASME Code, Section XI including the 2003 Addendum in lieu of the applicable 1998 ASME Code Section XI including the 2000 Addendum. The later ASME Code and its Addenda has been incorporated by reference in 10 CFR 50.55a(b)(2), and the | |||
licensee stated that it would meet the related requirements of the ASME Code in regard to pressure testing components repaired by welding or brazing. The NRC staff has determined that the proposed alternative in Relief Request No. PIL-05-R-001 will provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the alternative for the fourth 10-year ISI interval for Pilgrim. All other ASME Code, Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including a third party review by the Authorized Nuclear Inservice Inspector. | |||
Principal Contributor: P. Patnaik Date: June 29, 2006}} |
Latest revision as of 04:43, 14 March 2020
ML061420470 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 06/29/2006 |
From: | Richard Laufer NRC/NRR/ADRO/DORL/LPLI-1 |
To: | Kansler M Entergy Nuclear Operations |
SHea J, NRR/DLPM, 415-1388 | |
References | |
PIL-05-R-001, TAC MC8299 | |
Download: ML061420470 (9) | |
Text
June 29, 2006 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - RELIEF REQUEST NO.
PIL-05-R-001 (TAC NO. MC8299)
Dear Mr. Kansler:
By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee), requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, 1998 Edition with the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Class 1, 2 and 3 items. The licensee proposed an alternative to use the ASME Code,Section XI, 2001 Edition through 2003 Addendum in lieu of the Code of Record for the fourth 10-year inservice inspection (ISI) program.
The Nuclear Regulatory Commission staff has concluded that the alternative proposed for the fourth 10-year ISI interval will provide an acceptable level of quality and safety. The bases of granting the relief are provided in the enclosed safety evaluation. Therefore, pursuant to Title 10 of the Code of Federal Regulations (10CFR) 50.55a(a)(3)(i), the proposed alternative is authorized for the Pilgrims fourth 10-year ISI interval, which ends on June 30, 2015.
If you have any questions regarding this approval, please contact the Pilgrim Project Manager, James Shea, at 301-415-1388.
Sincerely,
/RA/
Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
As stated cc w/encl: See next page
ML061420470 *See SE dated 05/16/06 OFFICE LPL1-1/PM LPL1-1/PM LPL1-1/LA CFEB OGC LPL1-1/BC NAME BSingal JShea SLittle KAGruss* HWedewer RLaufer DATE 5/19/06 6/19/06 6/15/06 5/16/06 6/28/06 6/29/06 Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Kevin H. Bronson Plymouth, MA 02360 General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Michael A. Balduzzi Office of the Commissioner Site Vice President Massachusetts Department of Entergy Nuclear Operations, Inc.
Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Stephen J. Bethay One Ashburton Place Director, Nuclear Safety Assurance 20th Floor Entergy Nuclear Operations, Inc.
Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road Director, Radiation Control Program Plymouth, MA 02360-5508 Commonwealth of Massachusetts Executive Offices of Health and Mr. Bryan S. Ford Human Services Manager, Licensing 174 Portland Street Entergy Nuclear Operations, Inc.
Boston, MA 02114 Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 cc:
Pilgrim Nuclear Power Station Mr. Gary J. Taylor Manager, Licensing Chief Executive Officer Entergy Nuclear Operations, Inc.
Entergy Operations 440 Hamilton Avenue 1340 Echelon Parkway White Plains, NY 10601 Jackson, MS 39213 Mr. Michael J. Colomb Mr. John T. Herron Director of Oversight Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Assistant General Counsel Mr. Oscar Limpias Entergy Nuclear Operations, Inc.
Vice President, Engineering 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Mr. Christopher Schwarz Entergy Services, Inc.
Vice President, Operations Support 639 Loyola Avenue Entergy Nuclear Operations, Inc. New Orleans, LA 70113 440 Hamilton Avenue White Plains, NY 10601 Mr. James Sniezek 5486 Nithsdale Drive Mr. John F. McCann Salisbury, MD 21801-2490 Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc. Mr. Michael D. Lyster 440 Hamilton Avenue 5931 Barclay Lane White Plains, NY 10601 Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 Ms. Charlene D. Faison
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NO. PIL-05-R-001 PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293
1.0 INTRODUCTION
By letter dated June 29, 2005, Agencywide Documents Access and Management System (Accession No. ML051920157), Entergy Nuclear Operations, Inc (the licensee) submitted Relief Request No. PIL-05-R-001, related to the fourth 10-year interval inservice inspection (ISI) program for the Pilgrim Nuclear Power Station (Pilgrim). The licensee requested the Nuclear Regulatory Commission (NRC) authorization to use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, 2001 Edition through the 2003 Addendum, in lieu of the 1998 Edition through the 2000 Addendum in regard to Subsection IWA-4540, Pressure Testing of Class 1, 2, and 3 items. The licensees proposed use of portions of subsequent edition and addenda to the ASME Code,Section XI, that is incorporated by reference in 10 CFR 50.55a(b)(2), is in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4)(iv). The NRC staffs review focused on whether the related requirements of the 2001 Edition ASME Code,Section XI through the 2003 Addendum are being met. The licensees request applies to the fourth 10-year ISI interval of Pilgrim. The licensees request would be applicable during Pilgrims fourth 10-year ISI interval, which ends on June 30, 2015.
2.0 REGULATORY EVALUATION
Section 50.55a(g) of 10 CFR requires that ISI of ASME Code Class 1, 2, and 3 components be performed in accordance with Section XI of the ASME Code and applicable addenda, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). According to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph 50.55a(g) may be used, when authorized by the NRC, if an applicant demonstrates that the proposed alternatives would provide an acceptable level of quality and safety or if the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that ISI of components and system pressure tests conducted during the first Enclosure
10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ISI Code of Record for the fourth 10-year inspection interval for Pilgrim is the 1998 Edition through the 2000 Addendum of the ASME Code,Section XI.
Pursuant to 10 CFR 50.55a(g)(4)(iv), inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of this section, subject to the limitations and modifications listed in paragraph (b) of this section, and subject to Commission approval.
Portions of editions and addenda may be used provided that all related requirements of the respective editions or addenda are met.
Regulatory Issue Summary 2004-16, Use of Later Editions and Addenda to ASME Code Section XI for Repair/Replacement Activities, provides additional information regarding the use of editions and addenda of the ASME Code subsequent to the Code of Record.
2.1 Code Requirements for Which Relief is Requested Pursuant to 10 CFR 50.55a(g)(4)(iv), the licensee has proposed an alternative to the 2000 Addendum for pressure testing of Class 1, 2, and 3 items by implementing the requirements of subsection IWA-4540 of the ASME Code,Section XI, 2001 Edition through the 2003 Addendum which states the following:
(a) The repair/replacement activities performed by welding or brazing on a pressure-retaining boundary shall include a hydrostatic or system leakage test in accordance with IWA-5000, prior to, or as part of, return to service.
The changes to the ASME Code,Section XI, subparagraph IWA-4540(a) for pressure testing of class 1, 2, and 3 items following repair/replacement activities performed by welding or brazing on a pressure-retaining boundary do not affect other parts of the ASME Code. The 2001 Edition through the 2003 Addendum of the ASME Code,Section XI requires that brazed joints and welds made in the course of a repair/replacement activity require pressurization and a VT-2 visual examination during the test. This added requirement would also be followed under the Pilgrim Repair/Replacement Program.
2.2 ASME Code Requirements For repair/replacement activities performed by welding or brazing on pressure-retaining boundary, the ASME Code,Section XI, 1998 Edition through the 2000 Addendum, Subsection IWA-4540, Pressure Testing of Classes 1, 2, and 3 Items requires performance of either a system hydrostatic test in accordance with Subsection IWA-5000 or performance of the following prior to, or as part of, return to service:
- a. Non-destructive examination (NDE) of the repair in accordance with the 1992 Edition or later ASME Code,Section III.
- b. Owners requirement prior to return to service.
- c. A system leakage test in accordance with IWA-5000.
2.3 Licensees Basis for Requesting Relief
The licensees proposed alternative to use a portion of the later edition ASME Code,Section XI is in accordance with 10 CFR 50.55a(g)(4)(iv), and the NRC staff noted that the proposed ASME Code has been incorporated by reference in 10 CFR 50.55a(b)(2). However, since the ISI Code of Record is the 1998 Edition through the 2000 Addendum of the ASME Code, the licensee has requested relief from a portion of its ISI Code of Record and is required to meet the related requirements of the proposed later Code.
3.0 NRC STAFF EVALUATION The NRC staffs review focused on whether all related requirements pertaining to the portion of the ASME Code in regard to repair/replacement activities performed by welding or brazing on a pressure retaining boundary in the proposed edition and addenda to the Code are being met.
The staff, therefore, reviewed Subsection IWA-4540 pertaining to pressure testing of Class 1, 2, and 3 items repaired by welding or brazing in the 2001 Edition through the 2003 Addendum of the ASME Code,Section XI. The staff noted that the later Code offers more flexibility than the 1998 ASME Code,Section XI through 2000 Addendum while providing the same level of assurance of quality and safety in regard to the pressure testing of components repaired by welding or brazing as identified below.
Test Requirement for Repair 1998 ASME Code Section XI 2001 ASME Code Section XI as stated in IWA-4540 through 2000 Addendum through 2003 Addendum Required Pressure test System hydrostatic test per System hydrostatic or Subsection IWA-5000 or system leakage test per Subsection IWA-5000 and Alternative Pressure test System leakage test with Pressurization and VT-2 NDE to 1992 Edition or later visual examination of the of ASME Code,Section III welded/brazed joint only There is no other related requirement in regard to pressure testing of repaired components addressed in Subsection IWA-4540 which would be applicable for the licensee in adopting to the later edition of the ASME Code and its Addenda. The licensee has stated that it would comply with the related requirements of the 2001 ASME Code,Section XI through the 2003 Addendum for pressure testing of Class 1, 2, and 3 items repaired by welding or brazing. Since the 2001 Edition through 2003 Addendum of ASME Code,Section XI, was incorporated by reference in 10 CFR 50.55a(b)(2) and the licensee complies with the related requirements of this Code, the proposed alternative in Relief Request No. PIL-05-R-001 is authorized pursuant to 10 CFR 50.55a(a)(3)(i). The use of the later ASME Code and Addenda will provide an acceptable level of quality and safety.
4.0 CONCLUSION
The licensees proposed alternative in Relief Request No. PIL-05-R-001 pertains to the use of Subsection IWA-4540 of the 2001 ASME Code,Section XI including the 2003 Addendum in lieu of the applicable 1998 ASME Code Section XI including the 2000 Addendum. The later ASME Code and its Addenda has been incorporated by reference in 10 CFR 50.55a(b)(2), and the
licensee stated that it would meet the related requirements of the ASME Code in regard to pressure testing components repaired by welding or brazing. The NRC staff has determined that the proposed alternative in Relief Request No. PIL-05-R-001 will provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the alternative for the fourth 10-year ISI interval for Pilgrim. All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including a third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: P. Patnaik Date: June 29, 2006