ML062620238: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = 05000247, 05000286
| docket = 05000247, 05000286
| license number = DPR-026, DPR-064
| license number = DPR-026, DPR-064
| contact person = Boska J P,  NRR, 301-415-2901
| contact person = Boska J,  NRR, 301-415-2901
| case reference number = TAC MD2400, TAC MD2401
| case reference number = TAC MD2400, TAC MD2401
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 26, 2006Mr. Michael R. KanslerPresident Entergy Nuclear Operations, Inc.
{{#Wiki_filter:September 26, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
440 Hamilton Avenue White Plains, NY 10601


==SUBJECT:==
==SUBJECT:==
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 - ACCEPTANCEOF TEST PLAN FOR INDIAN POINT EMERGENCY NOTIFICATION SYSTEM IN ACCORDANCE WITH NRC ORDER EA-05-190 (TAC NOS. MD2400 ANDMD2401)
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 - ACCEPTANCE OF TEST PLAN FOR INDIAN POINT EMERGENCY NOTIFICATION SYSTEM IN ACCORDANCE WITH NRC ORDER EA-05-190 (TAC NOS. MD2400 AND MD2401)


==REFERENCES:==
==REFERENCES:==
 
: 1. NRC letter to Entergy regarding Confirmatory Order EA-05-190 for the Indian Point Emergency Notification System, dated January 31, 2006 (ML060090405).
1.NRC letter to Entergy regarding Confirmatory Order EA-05-190 for the Indian PointEmergency Notification System, dated January 31, 2006 (ML060090405).2. Entergy letter (NL-06-054) to New York State Emergency Management Office, "Indian PointEnergy Center Prompt Alert and Notification System Design Report," dated April 27, 2006.3. Entergy letter (NL-06-076) to NRC, "Test Plan for Indian Point Emergency Notification System in accordance with NRC Order EA-05-190," dated July 5, 2006 (ML062090118).
: 2. Entergy letter (NL-06-054) to New York State Emergency Management Office, "Indian Point Energy Center Prompt Alert and Notification System Design Report," dated April 27, 2006.
: 3. Entergy letter (NL-06-076) to NRC, "Test Plan for Indian Point Emergency Notification System in accordance with NRC Order EA-05-190," dated July 5, 2006 (ML062090118).


==Dear Mr. Kansler:==
==Dear Mr. Kansler:==
The Nuclear Regulatory Commission (NRC) Confirmatory Order EA-05-190 (Reference 1)required Entergy to install backup power for the prompt notification system, which is used toalert the public of an event at Indian Point, by January 30, 2007. The Order also required Entergy to submit a test plan which would demonstrate the satisfactory performance of all (100%) of the proposed notification system components, including the ability of the backuppower supply to meet its design requirements. Entergy submitted a test plan to the New York State Emergency Management Office in conjunction with the initial design report on April 27, 2006 (Reference 2), and subsequently submitted a revised test plan to the NRC on July 5, 2006(Reference 3).The NRC staff has reviewed the revised test plan and has approved it as meeting therequirements as stated in the Confirmatory Order. It is expected that Entergy shall conduct and document testing of the notification system components as stated in the test plan prior todeclaring the system operable. The test results shall be made available to NRC staff andDepartment of Homeland Security staff when requested.
M. Kansler- 2 -Please contact me at (301) 415-2901 if you have any questions on this issue.Sincerely,/RA/John P. Boska, Senior Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-247 and 50-286 cc:  See next page
ML062620238OFFICELPL1-1/PMLPL1-1/LANSIR/ICBNSIR/ICB/BCLPL1-1/BCNAMEJBoskaSLittleRKahlerAMcMurtrayRLauferDATE9/21/069/21/069/21/069/25/069/26/06 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Gary J. TaylorChief Executive Officer Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213Mr. John T. HerronSenior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY  10601Mr. Fred R. DacimoSite Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB
P.O. Box 249 Buchanan, NY 10511-0249Mr. Paul RubinGeneral Manager, Plant Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway
P.O. Box 249 Buchanan, NY 10511-0249Mr. Oscar LimpiasVice President Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY  10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. John F. McCannDirector, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Michael J. ColumbDirector of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. James ComiotesDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB


P.O. Box 249 Buchanan, NY 10511-0249Mr. Patric ConroyManager, Licensing Entergy Nuclear Operations, Inc.
The Nuclear Regulatory Commission (NRC) Confirmatory Order EA-05-190 (Reference 1) required Entergy to install backup power for the prompt notification system, which is used to alert the public of an event at Indian Point, by January 30, 2007. The Order also required Entergy to submit a test plan which would demonstrate the satisfactory performance of all (100%) of the proposed notification system components, including the ability of the backup power supply to meet its design requirements. Entergy submitted a test plan to the New York State Emergency Management Office in conjunction with the initial design report on April 27, 2006 (Reference 2), and subsequently submitted a revised test plan to the NRC on July 5, 2006 (Reference 3).
Indian Point Energy Center 450 Broadway, GSB
The NRC staff has reviewed the revised test plan and has approved it as meeting the requirements as stated in the Confirmatory Order. It is expected that Entergy shall conduct and document testing of the notification system components as stated in the test plan prior to declaring the system operable. The test results shall be made available to NRC staff and Department of Homeland Security staff when requested.


P. O. Box 249 Buchanan, NY 10511-0249Assistant General CounselEntergy Nuclear Operations, Inc.
M. Kansler                                  Please contact me at (301) 415-2901 if you have any questions on this issue.
440 Hamilton Avenue White Plains, NY 10601Mr. Peter R. Smith, PresidentNew York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY  12203-6399Mr. Paul EddyNew York State Department of Public Service 3 Empire State Plaza Albany, NY 12223 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Sincerely,
Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406Senior Resident Inspector's OfficeIndian Point 2 U. S. Nuclear Regulatory Commission
                                          /RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: See next page


P.O. Box 59 Buchanan, NY 10511Senior Resident Inspector's OfficeIndian Point 3 U. S. Nuclear Regulatory Commission
ML062620238 OFFICE LPL1-1/PM          LPL1-1/LA      NSIR/ICB        NSIR/ICB/BC      LPL1-1/BC NAME JBoska                SLittle        RKahler          AMcMurtray      RLaufer DATE    9/21/06          9/21/06        9/21/06          9/25/06          9/26/06 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Gary J. Taylor                              Ms. Charlene D. Faison Chief Executive Officer                        Manager, Licensing Entergy Operations, Inc.                        Entergy Nuclear Operations, Inc.
1340 Echelon Parkway                            440 Hamilton Avenue Jackson, MS 39213                              White Plains, NY 10601 Mr. John T. Herron                              Mr. Michael J. Columb Senior Vice President and                      Director of Oversight Chief Operating Officer                      Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.                440 Hamilton Avenue 440 Hamilton Avenue                            White Plains, NY 10601 White Plains, NY 10601 Mr. James Comiotes Mr. Fred R. Dacimo                              Director, Nuclear Safety Assurance Site Vice President                            Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.                Indian Point Energy Center Indian Point Energy Center                      450 Broadway, GSB 450 Broadway, GSB                              P.O. Box 249 P.O. Box 249                                    Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Patric Conroy Mr. Paul Rubin                                  Manager, Licensing General Manager, Plant Operations              Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.                Indian Point Energy Center Indian Point Energy Center                      450 Broadway, GSB 450 Broadway                                    P. O. Box 249 P.O. Box 249                                    Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Assistant General Counsel Mr. Oscar Limpias                              Entergy Nuclear Operations, Inc.
Vice President Engineering                      440 Hamilton Avenue Entergy Nuclear Operations, Inc.                White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601                          Mr. Peter R. Smith, President New York State Energy, Research, and Mr. Christopher Schwarz                          Development Authority Vice President, Operations Support              17 Columbia Circle Entergy Nuclear Operations, Inc.                Albany, NY 12203-6399 440 Hamilton Avenue White Plains, NY 10601                          Mr. Paul Eddy New York State Department Mr. John F. McCann                                of Public Service Director, Licensing                            3 Empire State Plaza Entergy Nuclear Operations, Inc.                Albany, NY 12223 440 Hamilton Avenue White Plains, NY 10601


P.O. Box 59 Buchanan, NY  10511Mr. Charles Donaldson, EsquireAssistant Attorney General New York Department of Law 120 Broadway New York, NY 10271Mayor, Village of Buchanan236 Tate Avenue Buchanan, NY 10511Mr. Raymond L. AlbaneseFour County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532Mr. William DiProfioPWR SRC Consultant 139 Depot Road East Kingston, NH 03827Mr. Garry RandolphPWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236Mr. William T. RussellPWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232Mr. Jim RiccioGreenpeace 702 H Street, NW Suite 300 Washington, DC 20001Mr. Phillip Mus egaasRiverkeeper, Inc.
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
828 South Broadway Tarrytown, NY 10591Mr. Mark JacobsIPSEC 46 Highland Drive Garrison, NY 10524ATTN: IP/CNPPD/Vanessa E. Quinn, ChiefMail Stop #8610 Department of Homeland Security Washington, DC 20528-8610Rebecca Thomson,Radiological Emergency Preparedness New York Field Office Federal Emergency Management Agency 26 Federal Plaza, Suite 1337 New York, NY 10278-0002}}
Regional Administrator, Region I                Mr. William T. Russell U.S. Nuclear Regulatory Commission              PWR SRC Consultant 475 Allendale Road                             400 Plantation Lane King of Prussia, PA 19406                      Stevensville, MD 21666-3232 Senior Resident Inspectors Office              Mr. Jim Riccio Indian Point 2                                  Greenpeace U. S. Nuclear Regulatory Commission            702 H Street, NW P.O. Box 59                                    Suite 300 Buchanan, NY 10511                              Washington, DC 20001 Senior Resident Inspectors Office              Mr. Phillip Musegaas Indian Point 3                                  Riverkeeper, Inc.
U. S. Nuclear Regulatory Commission            828 South Broadway P.O. Box 59                                    Tarrytown, NY 10591 Buchanan, NY 10511 Mr. Mark Jacobs Mr. Charles Donaldson, Esquire                  IPSEC Assistant Attorney General                      46 Highland Drive New York Department of Law                      Garrison, NY 10524 120 Broadway New York, NY 10271                              ATTN: IP/CNPPD/Vanessa E. Quinn, Chief Mail Stop #8610 Mayor, Village of Buchanan                      Department of Homeland Security 236 Tate Avenue                                Washington, DC 20528-8610 Buchanan, NY 10511 Rebecca Thomson, Mr. Raymond L. Albanese                        Radiological Emergency Preparedness Four County Coordinator                        New York Field Office 200 Bradhurst Avenue                            Federal Emergency Management Agency Unit 4 Westchester County                      26 Federal Plaza, Suite 1337 Hawthorne, NY 10532                            New York, NY 10278-0002 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236}}

Latest revision as of 00:42, 14 March 2020

Acceptance of Test Plan for Indian Point Emergency Notification System in Accordance with NRC Order EA-05-190 (TAC Nos. MD2400 and MD2401)
ML062620238
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/26/2006
From: Boska J
NRC/NRR/ADRO/DORL/LPLI-1
To: Kansler M
Entergy Nuclear Operations
Boska J, NRR, 301-415-2901
References
TAC MD2400, TAC MD2401
Download: ML062620238 (6)


Text

September 26, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 - ACCEPTANCE OF TEST PLAN FOR INDIAN POINT EMERGENCY NOTIFICATION SYSTEM IN ACCORDANCE WITH NRC ORDER EA-05-190 (TAC NOS. MD2400 AND MD2401)

REFERENCES:

1. NRC letter to Entergy regarding Confirmatory Order EA-05-190 for the Indian Point Emergency Notification System, dated January 31, 2006 (ML060090405).
2. Entergy letter (NL-06-054) to New York State Emergency Management Office, "Indian Point Energy Center Prompt Alert and Notification System Design Report," dated April 27, 2006.
3. Entergy letter (NL-06-076) to NRC, "Test Plan for Indian Point Emergency Notification System in accordance with NRC Order EA-05-190," dated July 5, 2006 (ML062090118).

Dear Mr. Kansler:

The Nuclear Regulatory Commission (NRC) Confirmatory Order EA-05-190 (Reference 1) required Entergy to install backup power for the prompt notification system, which is used to alert the public of an event at Indian Point, by January 30, 2007. The Order also required Entergy to submit a test plan which would demonstrate the satisfactory performance of all (100%) of the proposed notification system components, including the ability of the backup power supply to meet its design requirements. Entergy submitted a test plan to the New York State Emergency Management Office in conjunction with the initial design report on April 27, 2006 (Reference 2), and subsequently submitted a revised test plan to the NRC on July 5, 2006 (Reference 3).

The NRC staff has reviewed the revised test plan and has approved it as meeting the requirements as stated in the Confirmatory Order. It is expected that Entergy shall conduct and document testing of the notification system components as stated in the test plan prior to declaring the system operable. The test results shall be made available to NRC staff and Department of Homeland Security staff when requested.

M. Kansler Please contact me at (301) 415-2901 if you have any questions on this issue.

Sincerely,

/RA/

John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: See next page

ML062620238 OFFICE LPL1-1/PM LPL1-1/LA NSIR/ICB NSIR/ICB/BC LPL1-1/BC NAME JBoska SLittle RKahler AMcMurtray RLaufer DATE 9/21/06 9/21/06 9/21/06 9/25/06 9/26/06 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Gary J. Taylor Ms. Charlene D. Faison Chief Executive Officer Manager, Licensing Entergy Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Michael J. Columb Senior Vice President and Director of Oversight Chief Operating Officer Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. James Comiotes Mr. Fred R. Dacimo Director, Nuclear Safety Assurance Site Vice President Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. Indian Point Energy Center Indian Point Energy Center 450 Broadway, GSB 450 Broadway, GSB P.O. Box 249 P.O. Box 249 Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Patric Conroy Mr. Paul Rubin Manager, Licensing General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. Indian Point Energy Center Indian Point Energy Center 450 Broadway, GSB 450 Broadway P. O. Box 249 P.O. Box 249 Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Assistant General Counsel Mr. Oscar Limpias Entergy Nuclear Operations, Inc.

Vice President Engineering 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Mr. Peter R. Smith, President New York State Energy, Research, and Mr. Christopher Schwarz Development Authority Vice President, Operations Support 17 Columbia Circle Entergy Nuclear Operations, Inc. Albany, NY 12203-6399 440 Hamilton Avenue White Plains, NY 10601 Mr. Paul Eddy New York State Department Mr. John F. McCann of Public Service Director, Licensing 3 Empire State Plaza Entergy Nuclear Operations, Inc. Albany, NY 12223 440 Hamilton Avenue White Plains, NY 10601

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Regional Administrator, Region I Mr. William T. Russell U.S. Nuclear Regulatory Commission PWR SRC Consultant 475 Allendale Road 400 Plantation Lane King of Prussia, PA 19406 Stevensville, MD 21666-3232 Senior Resident Inspectors Office Mr. Jim Riccio Indian Point 2 Greenpeace U. S. Nuclear Regulatory Commission 702 H Street, NW P.O. Box 59 Suite 300 Buchanan, NY 10511 Washington, DC 20001 Senior Resident Inspectors Office Mr. Phillip Musegaas Indian Point 3 Riverkeeper, Inc.

U. S. Nuclear Regulatory Commission 828 South Broadway P.O. Box 59 Tarrytown, NY 10591 Buchanan, NY 10511 Mr. Mark Jacobs Mr. Charles Donaldson, Esquire IPSEC Assistant Attorney General 46 Highland Drive New York Department of Law Garrison, NY 10524 120 Broadway New York, NY 10271 ATTN: IP/CNPPD/Vanessa E. Quinn, Chief Mail Stop #8610 Mayor, Village of Buchanan Department of Homeland Security 236 Tate Avenue Washington, DC 20528-8610 Buchanan, NY 10511 Rebecca Thomson, Mr. Raymond L. Albanese Radiological Emergency Preparedness Four County Coordinator New York Field Office 200 Bradhurst Avenue Federal Emergency Management Agency Unit 4 Westchester County 26 Federal Plaza, Suite 1337 Hawthorne, NY 10532 New York, NY 10278-0002 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236