|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML070860887 | | | number = ML070860887 |
| | issue date = 03/27/2007 | | | issue date = 03/27/2007 |
| | title = 04/24/2007 Notice of Public Meeting to Discuss the NRC Reactor Oversight Process Annual Assessment of North Anna Power Station Units 1 and 2 | | | title = Notice of Public Meeting to Discuss the NRC Reactor Oversight Process Annual Assessment of North Anna Power Station Units 1 and 2 |
| | author name = Guthrie E F | | | author name = Guthrie E |
| | author affiliation = NRC/RGN-II/DRP/RPB5 | | | author affiliation = NRC/RGN-II/DRP/RPB5 |
| | addressee name = Christian D A | | | addressee name = Christian D |
| | addressee affiliation = Virginia Electric & Power Co (VEPCO) | | | addressee affiliation = Virginia Electric & Power Co (VEPCO) |
| | docket = 05000338, 05000339, 07200016, 07200056 | | | docket = 05000338, 05000339, 07200016, 07200056 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 27, 2007Virginia Electric and Power CompanyATTN:Mr. David A. ChristianSr. Vice President and Chief Nuclear OfficerInnsbrook Technical Center - 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | | {{#Wiki_filter:March 27, 2007 Virginia Electric and Power Company ATTN: Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Innsbrook Technical Center - 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 - ANNUALASSESSMENT OF NORTH ANNA POWER STATION, DOCKET NOS. 50-338, 50-339, 72-016 AND 72-056 | | MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 - ANNUAL ASSESSMENT OF NORTH ANNA POWER STATION, DOCKET NOS. 50-338, 50-339, 72-016 AND 72-056 |
|
| |
|
| ==Dear Mr. Christian:== | | ==Dear Mr. Christian:== |
|
| |
|
| This letter confirms the telephone conversation between Mr. Page Kemp of your staff andMr. James Reece of this office on March 14, 2007, concerning a Category 1 public meeting which has been scheduled for April 24, 2007, at 1:30 p.m. The meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your North Anna Power Station.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Should you have any questions concerning this meeting, please contact me at (404) 562-4662.Sincerely,/RA/Eugene F. Guthrie, ChiefReactor Projects Branch 5 Division of Reactor ProjectsDocket Nos.:50-338, 50-339, 72-016 & 72-056License Nos.:NPF-4, NPF-7 & SNM-2507 | | This letter confirms the telephone conversation between Mr. Page Kemp of your staff and Mr. James Reece of this office on March 14, 2007, concerning a Category 1 public meeting which has been scheduled for April 24, 2007, at 1:30 p.m. The meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your North Anna Power Station. |
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Should you have any questions concerning this meeting, please contact me at (404) 562-4662. |
| | Sincerely, |
| | /RA/ |
| | Eugene F. Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-338, 50-339, 72-016 & 72-056 License Nos.: NPF-4, NPF-7 & SNM-2507 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As statedcc w/encl.:See page 2 | | As stated cc w/encl.: See page 2 |
|
| |
|
| _________________________OFFICERII:DRPRII:DRPSIGNATURELXGGXGNAMELGarnerEGuthrieDATE03/27/200703/27/2007 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO VEPCO2cc w/encl:Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail DistributionD. G. Stoddard, Site Vice PresidentNorth Anna Power Station Electronic Mail DistributionExecutive Vice PresidentOld Dominion Electric Cooperative Electronic Mail DistributionCounty AdministratorLouisa County P. O. Box 160 Louisa, VA 23093Lillian M. Cuoco, Esq.Senior Counsel Dominion Resources Services, Inc.
| | OFFICE RII:DRP RII:DRP SIGNATURE LXG GXG NAME LGarner EGuthrie DATE 03/27/2007 03/27/2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 2 cc w/encl: |
| Electronic Mail DistributionAttorney GeneralSupreme Court Building 900 East Main Street Richmond, VA 23219Distribution w/encl: (See page 3) | | Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail Distribution D. G. Stoddard, Site Vice President North Anna Power Station Electronic Mail Distribution Executive Vice President Old Dominion Electric Cooperative Electronic Mail Distribution County Administrator Louisa County P. O. Box 160 Louisa, VA 23093 Lillian M. Cuoco, Esq. |
| VEPCO3Letter to David A. Christian from Eugene F. Guthrie dated March 27, 2007
| | Senior Counsel Dominion Resources Services, Inc. |
| | Electronic Mail Distribution Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution w/encl: (See page 3) |
| | |
| | VEPCO 3 Letter to David A. Christian from Eugene F. Guthrie dated March 27, 2007 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 - ANNUALASSESSMENT OF NORTH ANNA POWER STATION, DOCKET NOS. 50-338, 50-339, 72-016 AND 72-056Distribution w/encl | | MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 - ANNUAL ASSESSMENT OF NORTH ANNA POWER STATION, DOCKET NOS. 50-338, 50-339, 72-016 AND 72-056 Distribution w/encl: |
| :Region II Administrator's Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS S. Lingham, NRR L. Slack, RII EICS RIDSNRRDIRS RIDSNRRDIRSIPAB OE Mail PUBLIC Enclosure
| | Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS S. Lingham, NRR L. Slack, RII EICS RIDSNRRDIRS RIDSNRRDIRSIPAB OE Mail PUBLIC |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PUBLIC MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANYFACILITY:North Anna Power Station DOCKETS:50-338 and 50-339 DATE & TIME: Tuesday, April 24, 2007, at 1:30 p.m. to 3:30 p.m. | | PUBLIC MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY FACILITY: North Anna Power Station DOCKETS: 50-338 and 50-339 DATE & TIME: Tuesday, April 24, 2007, at 1:30 p.m. to 3:30 p.m. |
| LOCATION:North Anna Nuclear Information Center, Main AuditoriumOn the site of the North Anna Nuclear Plant 1022 Haley Drive Mineral, VAPURPOSE:The purpose of the meeting is to discuss the NRC Reactor OversightProcess Annual Assessment of North Anna Power Station Units 1 and 2. | | LOCATION: North Anna Nuclear Information Center, Main Auditorium On the site of the North Anna Nuclear Plant 1022 Haley Drive Mineral, VA PURPOSE: The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of North Anna Power Station Units 1 and 2. |
| The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) | | The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) |
| (ML070600472) or http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/na_2006q4.pdf The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and containsinformation regarding conduct of NRC meetings.CATEGORY:This is a Category 1 meeting. The public is invited to observe this meetingand will have one or more opportunities to communicate with the NRC afterthe business portion, but before the meeting is adjourned.NRC OFFICEPARTICIPATING:Region IIPARTICIPANTS: | | (ML070600472) or http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/na_2006q4.pdf The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings. |
| NRCE. Guthrie, Chief, Reactor Projects Branch 5J. Reece, Senior Resident Inspector, North AnnaLICENSEE (partial list)Dan Stoddard, Site Vice President, North Anna Larry Lane, Manager of Operations and Maintenance, North Anna Mark Sartain, Director of Safety and Licensee, North Anna Tom Huber, Director of Engineering, North AnnaMEETINGCONTACT: Eugene F. Guthrie404-562-4662 gxg@nrc.gov AUDIO TELE-CONFERENCINGNot AvailableVIDEO TELE-CONFERENCINGNot Available}}
| | CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. |
| | NRC OFFICE Region II PARTICIPATING: |
| | PARTICIPANTS: NRC E. Guthrie, Chief, Reactor Projects Branch 5 J. Reece, Senior Resident Inspector, North Anna LICENSEE (partial list) |
| | Dan Stoddard, Site Vice President, North Anna Larry Lane, Manager of Operations and Maintenance, North Anna Mark Sartain, Director of Safety and Licensee, North Anna Tom Huber, Director of Engineering, North Anna MEETING Eugene F. Guthrie CONTACT: 404-562-4662 gxg@nrc.gov AUDIO TELE- Not Available CONFERENCING VIDEO TELE- Not Available CONFERENCING Enclosure}} |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Meeting Notice
MONTHYEARPMNS20240052, Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application2024-01-16016 January 2024 Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application PMNS20240058, Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application2024-01-12012 January 2024 Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application PMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220318, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station2022-04-0707 April 2022 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station PMNS20220349, Assessment Meetingsurry Power Station Annual Assessment Meeting2022-04-0404 April 2022 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20211316, Public Meeting to Discuss Proposed Revisions to Regulatory Guide (RG) 1.201, an Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities2021-10-0707 October 2021 Public Meeting to Discuss Proposed Revisions to Regulatory Guide (RG) 1.201, an Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities PMNS20211125, Preliminary Results of the NRC Staff'S Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2021-08-27027 August 2021 Preliminary Results of the NRC Staff'S Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.62021-08-26026 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6 PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue2021-08-13013 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue PMNS20210778, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-23023 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined PMNS20210777, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-15015 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined PMNS20210781, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-06-10010 June 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20210669, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-06-0101 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application PMNS20210666, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-27027 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application PMNS20210548, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-12012 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 PMNS20210079, Closed Meeting with Dominion Nuclear to Discuss Force on Force Exercises2021-01-22022 January 2021 Closed Meeting with Dominion Nuclear to Discuss Force on Force Exercises PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML14065A4932014-03-0606 March 2014 March 20, 2014 - Notice of Category 3 Public Meeting/Open House Regarding North Anna Power Station, Units 1 and 2, Annual Assessment ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13109A1992013-04-19019 April 2013 Notice of Public Meeting/Open House Regarding North Anna Power Station, Units 1 and 2, Annual Assessment ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12100A1892012-04-0909 April 2012 Notice of Meeting to Provide an Open Forum to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the North Anna Power Station for the Calendar Year 2011 ML12093A2282012-04-0202 April 2012 Notice of Regulatory Conference with Virginia Electric Power Company (VEPCO) to Discuss One Apparent Violation (AV) of Technical Specification (TS) 5.4.1.A Associated with the Unit 2 H (2H) Emergency Diesel Generator Gasket Failure ML12018A2282012-01-19019 January 2012 G20110757/EDATS: OEDO-2011-0701 - Forthcoming Meeting with the Petitioners, Beyond Nuclear Et Al., Requesting Action Under 10 CFR 2.206 Regarding Suspension of the Operating Licenses for North Anna Power Station (NAPS) Due to Concerns About ML11326A0172011-11-28028 November 2011 Notice of Meeting with the Petitioners, Beyond Nuclear Et Al., Requesting Action Under 10 CFR 2.206 Regarding Suspension of the Operating Licenses for Naps Due to Concerns About Damage to the NAPS Reactors from the August 23, 2011, Earthqua ML1129911352011-10-26026 October 2011 Updated Meeting Announcement - Public Meeting North Anna Power Station ML1129305342011-10-20020 October 2011 Meeting Announcement - Public Meeting - North Anna Power Station ML1125800092011-09-14014 September 2011 Announcement of Public Meeting to Discuss the Results of an Augmented Team Inspection of an Earthquake Event on August 23, 2011 at the North Anna Power Station ML12047A2202011-09-0707 September 2011 Email from R. Martin, NRR to L. Lund, NRR Et Al. FW: North Anna Meeting on Seismic ML11249A1562011-09-0707 September 2011 Notice of Forthcoming Meeting with Virginia Electric and Power Company (Vepco), on the August 23, 2011 Earthquake Near the North Anna Power Station, Unit Nos. 1 and 2 ML12047A2222011-09-0707 September 2011 Email From. S. Burnell, OPA to R. Martin, NRR North Anna Meeting on Seismic ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML1107006992011-03-11011 March 2011 Notice of Category 3 Public Meeting Regarding Annual Assessment of North Anna Power Station ML1030903552010-11-0505 November 2010 Meeting Announcement - Public Meeting - North Anna, to Provide Open Public Forum to Discuss Recent Discovery and Remediation of Containment Insulation Issues ML1023100152010-08-18018 August 2010 Notice of Meeting with Virginia Electric & Power to Discuss Proposed Addition of Analytical Methodology to Core Operating Limits Report ML1017304812010-06-22022 June 2010 Forthcoming Meeting with Virginia Electric and Power Company (Vepco), Regarding North Anna Power Station, Unit Nos. 1 and 2 to Discuss Fuel Transition Licensing Approach, Schedule of Submittals, Alignment of Resources and Key Deliverables ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1012600302010-05-0505 May 2010 Summary of Public Meeting to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the North Anna Power Station ML1010501482010-04-15015 April 2010 Notice of Public/Open House Meeting with Virginia Electric and Power Company to Discuss Reactor Oversight Process and the Annual Assessment of North Anna Power Station ML0918004532009-06-29029 June 2009 Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop ML0915605552009-06-0808 June 2009 Notice of Meeting with Virginia Electric and Power Co. (Dominion) to Discuss a Proposed License Amendment Regarding the Emergency Core Cooling System (ECCS) Pump Room Exhaust Air Cleanup System ML0908302472009-03-23023 March 2009 Notice of Category 1 Public Meeting Public Meeting with North Anna, Units 1 & 2 to Discuss Annual Assessment ML0819600282008-07-11011 July 2008 08/05-06/2008-Notice of Meeting - 2008 Us Nuclear Regulatory Commission Initial Examination Development Workshop ML0818402822008-07-0202 July 2008 Public Meeting Announcement NAPS ML0726900152007-09-26026 September 2007 Notice of Forthcoming Meeting with Dominion Nuclear to Discuss Proposed Chemical Testing Methods Related to GSI-191, Assessment of Debris Accumulation on PWR Sump Performance, as Proposed by Its Vendor ML0713706072007-05-17017 May 2007 Notice of Meeting for NRC Training Managers' Conference Hosting by Rgn II ML0708608872007-03-27027 March 2007 Notice of Public Meeting to Discuss the NRC Reactor Oversight Process Annual Assessment of North Anna Power Station Units 1 and 2 2024-01-16
[Table view] |
Text
March 27, 2007 Virginia Electric and Power Company ATTN: Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Innsbrook Technical Center - 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 - ANNUAL ASSESSMENT OF NORTH ANNA POWER STATION, DOCKET NOS. 50-338, 50-339,72-016 AND 72-056
Dear Mr. Christian:
This letter confirms the telephone conversation between Mr. Page Kemp of your staff and Mr. James Reece of this office on March 14, 2007, concerning a Category 1 public meeting which has been scheduled for April 24, 2007, at 1:30 p.m. The meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your North Anna Power Station.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4662.
Sincerely,
/RA/
Eugene F. Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-338, 50-339,72-016 & 72-056 License Nos.: NPF-4, NPF-7 & SNM-2507
Enclosure:
As stated cc w/encl.: See page 2
OFFICE RII:DRP RII:DRP SIGNATURE LXG GXG NAME LGarner EGuthrie DATE 03/27/2007 03/27/2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 2 cc w/encl:
Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail Distribution D. G. Stoddard, Site Vice President North Anna Power Station Electronic Mail Distribution Executive Vice President Old Dominion Electric Cooperative Electronic Mail Distribution County Administrator Louisa County P. O. Box 160 Louisa, VA 23093 Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution w/encl: (See page 3)
VEPCO 3 Letter to David A. Christian from Eugene F. Guthrie dated March 27, 2007
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 - ANNUAL ASSESSMENT OF NORTH ANNA POWER STATION, DOCKET NOS. 50-338, 50-339,72-016 AND 72-056 Distribution w/encl:
Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS S. Lingham, NRR L. Slack, RII EICS RIDSNRRDIRS RIDSNRRDIRSIPAB OE Mail PUBLIC
SUBJECT:
PUBLIC MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY FACILITY: North Anna Power Station DOCKETS: 50-338 and 50-339 DATE & TIME: Tuesday, April 24, 2007, at 1:30 p.m. to 3:30 p.m.
LOCATION: North Anna Nuclear Information Center, Main Auditorium On the site of the North Anna Nuclear Plant 1022 Haley Drive Mineral, VA PURPOSE: The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of North Anna Power Station Units 1 and 2.
The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS)
(ML070600472) or http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/na_2006q4.pdf The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.
CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRC OFFICE Region II PARTICIPATING:
PARTICIPANTS: NRC E. Guthrie, Chief, Reactor Projects Branch 5 J. Reece, Senior Resident Inspector, North Anna LICENSEE (partial list)
Dan Stoddard, Site Vice President, North Anna Larry Lane, Manager of Operations and Maintenance, North Anna Mark Sartain, Director of Safety and Licensee, North Anna Tom Huber, Director of Engineering, North Anna MEETING Eugene F. Guthrie CONTACT: 404-562-4662 gxg@nrc.gov AUDIO TELE- Not Available CONFERENCING VIDEO TELE- Not Available CONFERENCING Enclosure