ML080080297: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/01/2008
| issue date = 02/01/2008
| title = G20070540/LTR-07-0459 - Sherwood Martinelli Ltr from J. E. Dyer 2.202, 2.206, and 2.802 Petitions Regarding Indian Point, Units 2 and 3
| title = G20070540/LTR-07-0459 - Sherwood Martinelli Ltr from J. E. Dyer 2.202, 2.206, and 2.802 Petitions Regarding Indian Point, Units 2 and 3
| author name = Dyer J E
| author name = Dyer J
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name = Martinelli S
| addressee name = Martinelli S
Line 9: Line 9:
| docket = 05000247, 05000286
| docket = 05000247, 05000286
| license number = DPR-026, DPR-064
| license number = DPR-026, DPR-064
| contact person = Pickett D V, NRR/DORL, 415-1364
| contact person = Pickett D, NRR/DORL, 415-1364
| case reference number = G20070540, LTR-07-0459
| case reference number = G20070540, LTR-07-0459
| package number = ML080140342
| package number = ML080140342
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:February 1, 2008 Mr. Sherwood Martinelli Friends United for Sustainable Energy 351 Dyckman Street Peekskill, NY 10566  
{{#Wiki_filter:February 1, 2008 Mr. Sherwood Martinelli Friends United for Sustainable Energy 351 Dyckman Street Peekskill, NY 10566


==Dear Mr. Martinelli:==
==Dear Mr. Martinelli:==


On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your letter dated June 25, 2007. Friends United for Sustainable Energy (FUSE) submitted a petition pursuant to Title 10, Sections 2.202, 2.206, and 2.802 of the Code of Federal Regulations (10 CFR 2.202, 10 CFR 2.206, and 10 CFR 2.802) to Chairman Dale Klein, Mr. Richard Barkley, and Dr. Pao-Tsin Kuo of the NRC regarding the Indian Point Nuclear Generating Unit Nos. 2 and 3.  
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your letter dated June 25, 2007. Friends United for Sustainable Energy (FUSE) submitted a petition pursuant to Title 10, Sections 2.202, 2.206, and 2.802 of the Code of Federal Regulations (10 CFR 2.202, 10 CFR 2.206, and 10 CFR 2.802) to Chairman Dale Klein, Mr. Richard Barkley, and Dr. Pao-Tsin Kuo of the NRC regarding the Indian Point Nuclear Generating Unit Nos. 2 and 3.
 
The FUSE petition included a request for rulemaking concerning 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, and requested that the NRC not consider any new license renewal applications until NRC regulations are revised. The petition asserts that the current regulations found in 10 CFR Part 54 are prejudiced and biased, presume that license renewal is a foregone conclusion for all licensees, usurp stakeholder rights protected under the First Amendment of the Constitution, and abridge citizens rights to due process and equal protection. This request for rulemaking was denied.
The FUSE petition included a request for rulemaking concerning 10 CFR Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants," and requested that the NRC not consider any new license renewal applications until NRC regulations are revised. The petition asserts that the current regulations found in 10 CFR Part 54 are prejudiced and biased, presume that license renewal is a foregone conclusion for all licensees, usurp stakeholder rights protected under the First Amendment of the Constitution, and abridge citizens' rights to due process and equal protection. This request for rulemaking was denied. This denial was published in the Federal Register on November 8, 2007 (72 FR 63141).
This denial was published in the Federal Register on November 8, 2007 (72 FR 63141).
The FUSE petition also requested that the NRC refrain from taking any actions relative to the license renewal of Indian Point until NRC amends 10 CFR Part 54 as requested. Because this request is for a licensing action, and not for an enforcement-related action, it does not meet the criteria for acceptance in the 10 CFR 2.206 process (see NRC Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions"). Ms. Susan Shapiro of FUSE was notified of this decision on September 4, 2007, via e-mail from Mr. Douglas Pickett of my staff.  
The FUSE petition also requested that the NRC refrain from taking any actions relative to the license renewal of Indian Point until NRC amends 10 CFR Part 54 as requested. Because this request is for a licensing action, and not for an enforcement-related action, it does not meet the criteria for acceptance in the 10 CFR 2.206 process (see NRC Management Directive (MD) 8.11, Review Process for 10 CFR 2.206 Petitions). Ms. Susan Shapiro of FUSE was notified of this decision on September 4, 2007, via e-mail from Mr. Douglas Pickett of my staff.
 
Finally, FUSE requested that, pursuant to 10 CFR 2.206, the NRC immediately suspend the Indian Point licenses until the issues described in the petition at Indian Point are remedied to full compliance with all local, State, and Federal laws. The NRCs Petition Review Board (PRB) met expeditiously to consider the request for immediate suspension of the Indian Point licenses.
Finally, FUSE requested that, pursuant to 10 CFR 2.206, the NRC immediately suspend the Indian Point licenses until the issues described in the petition at Indian Point are remedied to full compliance with all local, State, and Federal laws. The NRC's Petition Review Board (PRB) met expeditiously to consider the request for immediate suspension of the Indian Point licenses.
The PRB concluded that the FUSE petition did not set forth facts sufficient to constitute a basis for the requested actions. Specifically, the petition did not identify any significant safety issues that would justify an immediate shutdown. Therefore, this request has been denied. Ms. Susan Shapiro of FUSE was notified of this decision on September 4, 2007.
The PRB concluded that the FUSE petition did not set forth facts sufficient to constitute a basis for the requested actions. Specifically, the petition did not identify any significant safety issues that would justify an immediate shutdown. Therefore, this request has been denied. Ms. Susan Shapiro of FUSE was notified of this decision on September 4, 2007.
The issues identified by FUSE include radiological contamination through groundwater leakage from the Indian Point Unit 2 spent fuel pool, the licensee's failure to implement a new emergency notification siren system as required by NRC Orders, and various other safety, security, and enforcement issues identified over the past 6 years of plant operations
The issues identified by FUSE include radiological contamination through groundwater leakage from the Indian Point Unit 2 spent fuel pool, the licensees failure to implement a new emergency notification siren system as required by NRC Orders, and various other safety, security, and enforcement issues identified over the past 6 years of plant operations.
 
On December 21, 2007, a conference call was held with you, the PRB, and a representative of Entergy Nuclear Operations, Inc., the licensee for Indian Point Nuclear Generating Unit Nos. 2 and 3. During this conference call, you provided additional details regarding, among other things, underground leakage of contaminated water at the Indian Point facility and the failure to implement the new emergency notification siren system in a timely manner. A transcript of this discussion, which is enclosed for your information, can be found at Agencywide Documents Access and Management Systems, Accession No. ML080140267.
 
The PRB's final recommendation is to accept for review pursuant to 10 CFR 2.206, FUSE's concerns regarding the underground leakage of contaminated water at the Indian Point facility and the failure to implement the new emergency notification siren system in a timely manner. The PRB has taken the further step of consolidating the concern regarding the failure to implement the siren system in a timely manner with a similar issue raised in the FUSE petition of September 28, 2007. This step is being taken due to the similarity of the issues, because both petitions were submitted at approximately the same time, and because you are the principal external stakeholder for both petitions. Therefore, the underground leakage of contaminated water will be addressed through the FUSE petition of June 25, 2007, and the failure to implement the new emergency notification siren system in a timely matter will be addressed through the FUSE petition of September 28, 2007.
 
The FUSE petition of June 25, 2007, raised a multitude of other concerns which do not meet the criteria for acceptance in the 10 CFR 2.206 process (see MD 8.11). The listing below provides a few examples of specific concerns that do not meet the above criteria. This list is not exhaustive, but is illustrative.  


S. Martinelli                                On December 21, 2007, a conference call was held with you, the PRB, and a representative of Entergy Nuclear Operations, Inc., the licensee for Indian Point Nuclear Generating Unit Nos. 2 and 3. During this conference call, you provided additional details regarding, among other things, underground leakage of contaminated water at the Indian Point facility and the failure to implement the new emergency notification siren system in a timely manner. A transcript of this discussion, which is enclosed for your information, can be found at Agencywide Documents Access and Management Systems, Accession No. ML080140267.
The PRBs final recommendation is to accept for review pursuant to 10 CFR 2.206, FUSEs concerns regarding the underground leakage of contaminated water at the Indian Point facility and the failure to implement the new emergency notification siren system in a timely manner.
The PRB has taken the further step of consolidating the concern regarding the failure to implement the siren system in a timely manner with a similar issue raised in the FUSE petition of September 28, 2007. This step is being taken due to the similarity of the issues, because both petitions were submitted at approximately the same time, and because you are the principal external stakeholder for both petitions. Therefore, the underground leakage of contaminated water will be addressed through the FUSE petition of June 25, 2007, and the failure to implement the new emergency notification siren system in a timely matter will be addressed through the FUSE petition of September 28, 2007.
The FUSE petition of June 25, 2007, raised a multitude of other concerns which do not meet the criteria for acceptance in the 10 CFR 2.206 process (see MD 8.11). The listing below provides a few examples of specific concerns that do not meet the above criteria. This list is not exhaustive, but is illustrative.
The request does not ask for an enforcement-related action or fails to provide sufficient facts to support the petition but simply alleges wrongdoing, violations of NRC regulations, or existence of safety concerns:
The request does not ask for an enforcement-related action or fails to provide sufficient facts to support the petition but simply alleges wrongdoing, violations of NRC regulations, or existence of safety concerns:
* Page 7. On September 21, 2001, the NRC admits uncertainty that the nation's 103 plants could withstand the same kind of impact that leveled the World Trade Center.
* Page 7. On September 21, 2001, the NRC admits uncertainty that the nations 103 plants could withstand the same kind of impact that leveled the World Trade Center.
* Page 9. On September 8, 2003, the Union of Concerned Scientists and Riverkeeper formally petition the NRC to order the immediate shutdown of both nuclear power reactors because the plant's containment sumps are almost certain to be blocked with debris during an accident.
* Page 9. On September 8, 2003, the Union of Concerned Scientists and Riverkeeper formally petition the NRC to order the immediate shutdown of both nuclear power reactors because the plants containment sumps are almost certain to be blocked with debris during an accident.
* Page 10. On June 2, 2004, Dr. Erik Larsen, medical director of the STAT Flight emergency helicopter operation at the Westchester Medical Center, raises concerns that the Westchester Medical Center could "fall apart" with as few as 50 people seeking treatment after an accident at Indian Point.  
* Page 10. On June 2, 2004, Dr. Erik Larsen, medical director of the STAT Flight emergency helicopter operation at the Westchester Medical Center, raises concerns that the Westchester Medical Center could fall apart with as few as 50 people seeking treatment after an accident at Indian Point.
 
The request addresses deficiencies within existing NRC rules. This type of request is more appropriately addressed as a petition for rulemaking:
The request addresses deficiencies within existing NRC rules. This type of request is more appropriately addressed as a petition for rulemaking:
* Page 6. The Design Basis Threat is woefully inadequate to protect the spent fuel pools in the case of a nuclear incident.
* Page 6. The Design Basis Threat is woefully inadequate to protect the spent fuel pools in the case of a nuclear incident.
* Page 14. Title 10 of the Code of Federal Regulations Part 54, which outlines regulations for license renewal, fails to meet the requirements of the Atomic Energy Act of 1946 and 1954. The request raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and resolution is applicable to the facility in question:
 
S. Martinelli
* Page 14. Title 10 of the Code of Federal Regulations Part 54, which outlines regulations for license renewal, fails to meet the requirements of the Atomic Energy Act of 1946 and 1954.
The request raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and resolution is applicable to the facility in question:
* Page 8. On November 16, 2002, a failed circuit breaker caused the automatic shutdown of Indian Point Nuclear Generating Unit No. 3.
* Page 8. On November 16, 2002, a failed circuit breaker caused the automatic shutdown of Indian Point Nuclear Generating Unit No. 3.
* Page 10. On September 2, 2004, Indian Point Nuclear Generating Unit No. 2 was shut down because of problems maintaining proper water levels in one of the plant's four steam generators.
* Page 10. On September 2, 2004, Indian Point Nuclear Generating Unit No. 2 was shut down because of problems maintaining proper water levels in one of the plants four steam generators.
* Page 11. On August 1, 2005, the NRC issued a "White Finding" to Entergy for their failed response to a nitrogen gas leak first discovered in April 2005.
* Page 11. On August 1, 2005, the NRC issued a White Finding to Entergy for their failed response to a nitrogen gas leak first discovered in April 2005.
* Page 16. The Petitioner states that the decommissioning fund for Indian Point is inadequate as it is not properly adjusted for inflation and not properly adjusted for newly discovered underground leakage of contaminated water.
* Page 16. The Petitioner states that the decommissioning fund for Indian Point is inadequate as it is not properly adjusted for inflation and not properly adjusted for newly discovered underground leakage of contaminated water.
As provided by Section 2.206, we will take action on the FUSE concern regarding underground leakage of contaminated water within a reasonable time. I have assigned Mr. Douglas Pickett to be the petition manager for this petition. Mr. Pickett can be reached at 301-415-1364. Your petition is being reviewed by the Office of Nuclear Reactor Regulation. Included in your petition are several assertions that the NRC has failed to fulfill its responsibility as a regulator, and is not enforcing its regulations with respect to Indian Point. Therefore, I have referred to the NRC Office of the Inspector General those allegations of NRC wrongdoing contained in your petition.  
As provided by Section 2.206, we will take action on the FUSE concern regarding underground leakage of contaminated water within a reasonable time. I have assigned Mr. Douglas Pickett to be the petition manager for this petition. Mr. Pickett can be reached at 301-415-1364. Your petition is being reviewed by the Office of Nuclear Reactor Regulation. Included in your petition are several assertions that the NRC has failed to fulfill its responsibility as a regulator, and is not enforcing its regulations with respect to Indian Point. Therefore, I have referred to the NRC Office of the Inspector General those allegations of NRC wrongdoing contained in your petition.


Enclosed for your information is a copy of the notice that is being filed with the Office of the Federal Register for publication. Also enclosed for your information is a copy of MD 8.11, along with the associated brochures NUREG/BR-0200, "Public Petition Process," and NUREG/BR-0215, "Public Involvement in the Nuclear Regulatory Process," prepared by the NRC Office of Public Affairs.
S. Martinelli                              Enclosed for your information is a copy of the notice that is being filed with the Office of the Federal Register for publication. Also enclosed for your information is a copy of MD 8.11, along with the associated brochures NUREG/BR-0200, Public Petition Process, and NUREG/BR-0215, Public Involvement in the Nuclear Regulatory Process, prepared by the NRC Office of Public Affairs.
Sincerely,
Sincerely,
      /RA/       J. E. Dyer, Director       Office of Nuclear Reactor Regulation  
                                              /RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation


==Enclosures:==
==Enclosures:==
: 1. Transcript of December 21, 2007, telephone conference call  
: 1. Transcript of December 21, 2007, telephone conference call
: 2. Federal Register Notice 3. Management Directive 8.11 4. NUREG/BR-0200 5. NUREG/BR-0215  
: 2. Federal Register Notice
: 3. Management Directive 8.11
: 4. NUREG/BR-0200
: 5. NUREG/BR-0215 cc w/encl 2: See next page.


cc w/encl 2: See next page.  
ML080140342 (package)
ML080080297 (Acknowledgement Letter and Federal Register Notice)
ML072190190 (Incoming petition)
ML080140267 (Transcript)
ML041770328 (Management Directive 8.11)
ML050900248 (NUREG/BR-0200)
ML003762531 (NUREG/BR-0215)                    *Concurred via email OFFICE      PM/LPL1-1        PM/LPL1-1        LA/LPL1-1        Tech Editor*
NAME        DPickett        JBoska            SLittle          HChang (MOBrien for)
DATE        1 / 24 /08        1 / 17 / 08      1 / 16 / 08      1 / 18 / 08 OFFICE      BC/LPL1-1        DD/DPR            D/DORL            D/NRR NAME        MKowal          HNieh            CHaney            JDyer DATE        1 / 18 / 08      1 / 23 / 08      1 / 29 / 08      2/01/ 08 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Michael R. Kansler                          Mr. John A. Ventosa President & CEO / CNO                          GM, Engineering Entergy Nuclear Operations, Inc.                Entergy Nuclear Operations, Inc.
1340 Echelon Parkway                            440 Hamilton Avenue Jackson, MS 39213                              White Plains, NY 10601 Mr. John T. Herron                              Mr. John F. McCann Sr. Vice President                              Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.                Entergy Nuclear Operations, Inc.
1340 Echelon Parkway                            440 Hamilton Avenue Jackson, MS 39213                              White Plains, NY 10601 Sr. Vice President                              Ms. Charlene D. Faison Engineering & Technical Services                Manager, Licensing Entergy Nuclear Operations, Inc.                Entergy Nuclear Operations, Inc.
1340 Echelon Parkway                            440 Hamilton Avenue Jackson, MS 39213                              White Plains, NY 10601 Mr. Fred R. Dacimo                              Mr. Ernest J. Harkness Site Vice President                            Director, Oversight Entergy Nuclear Operations, Inc.                Entergy Nuclear Operations, Inc.
Indian Point Energy Center                      1340 Echelon Parkway 450 Broadway, GSB                              Jackson, MS 39213 P.O. Box 249 Buchanan, NY 10511-0249                        Mr. Patric W. Conroy Director, Nuclear Safety Assurance Mr. Anthony Vitale - Acting                    Entergy Nuclear Operations, Inc.
General Manager, Plant Operations              Indian Point Energy Center Entergy Nuclear Operations, Inc.                450 Broadway, GSB Indian Point Energy Center                      P.O. Box 249 450 Broadway, GSB                              Buchanan, NY 10511-0249 P.O. Box 249 Buchanan, NY 10511-0249                        Mr. Robert Walpole Manager, Licensing Mr. Oscar Limpias                              Entergy Nuclear Operations, Inc.
Vice President Engineering                      Indian Point Energy Center Entergy Nuclear Operations, Inc.                450 Broadway, GSB 1340 Echelon Parkway                            P. O. Box 249 Jackson, MS 39213                              Buchanan, NY 10511-0249 Mr. Joseph P. DeRoy                            Mr. William C. Dennis Vice President, Operations Support              Assistant General Counsel Entergy Nuclear Operations, Inc.                Entergy Nuclear Operations, Inc.
1340 Echelon Parkway                            440 Hamilton Avenue Jackson, MS 39213                              White Plains, NY 10601


ML080140342 (package)    ML080080297 (Acknowledgement Letter and Federal Register Notice)    ML072190190 (Incoming petition)
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
ML080140267 (Transcript)    ML041770328 (Management Directive 8.11)    ML050900248 (NUREG/BR-0200)    ML003762531 (NUREG/BR-0215)  *Concurred via email OFFICE  PM/LPL1-1 PM/LPL1-1 LA/LPL1-1 Tech Editor*
Mr. Paul Tonko                                  Mr. Raymond L. Albanese President and CEO                               Four County Coordinator New York State Energy, Research, and           200 Bradhurst Avenue Development Authority                         Unit 4 Westchester County 17 Columbia Circle                             Hawthorne, NY 10532 Albany, NY 12203-6399 Mayor, Village of Buchanan Mr. John P. Spath                               236 Tate Avenue New York State Energy, Research, and           Buchanan, NY 10511 Development Authority 17 Columbia Circle                             Mr. William DiProfio Albany, NY 12203-6399                           PWR SRC Consultant 48 Bear Hill Road Mr. Paul Eddy                                   Newton, NH 03858 New York State Department of Public Service                             Mr. Garry Randolph 3 Empire State Plaza                           PWR SRC Consultant Albany, NY 12223-1350                           1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Regional Administrator, Region I U.S. Nuclear Regulatory Commission             Mr. William T. Russell 475 Allendale Road                             PWR SRC Consultant King of Prussia, PA 19406                       400 Plantation Lane Stevensville, MD 21666-3232 Senior Resident Inspector=s Office Indian Point 2                                 Mr. Jim Riccio U. S. Nuclear Regulatory Commission             Greenpeace P.O. Box 59                                     702 H Street, NW Buchanan, NY 10511                             Suite 300 Washington, DC 20001 Senior Resident Inspector=s Office Indian Point 3                                 Mr. Phillip Musegaas U. S. Nuclear Regulatory Commission             Riverkeeper, Inc.
 
P.O. Box 59                                     828 South Broadway Buchanan, NY 10511                             Tarrytown, NY 10591 Mr. Charles Donaldson, Esquire                 Mr. Mark Jacobs Assistant Attorney General                     IPSEC New York Department of Law                     46 Highland Drive 120 Broadway                                   Garrison, NY 10524 New York, NY 10271
NAME  DPickett  JBoska  SLittle (MO'Brien for)
HChang DATE  1 /  24  /08 1 /  17  / 08 1 /  16  / 08 1 /  18  / 08
 
OFFICE  BC/LPL1-1 DD/DPR  D/DORL  D/NRR NAME  MKowal  HNieh  CHaney  JDyer DATE  1 /  18  / 08 1 /  23  / 08 1 /  29  / 08 2/01/ 08 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc: Mr. Michael R. Kansler President & CEO / CNO Entergy Nuclear Operations, Inc. 1340 Echelon Parkway Jackson, MS 39213
 
Mr. John T. Herron Sr. Vice President Entergy Nuclear Operations, Inc. 1340 Echelon Parkway Jackson, MS 39213 Sr. Vice President Engineering & Technical Services Entergy Nuclear Operations, Inc. 1340 Echelon Parkway Jackson, MS 39213
 
Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Anthony Vitale - Acting General Manager, Plant Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
 
Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc. 1340 Echelon Parkway Jackson, MS 39213
 
Mr. Joseph P. DeRoy Vice President, Operations Support Entergy Nuclear Operations, Inc. 1340 Echelon Parkway Jackson, MS 39213
 
Mr. John A. Ventosa GM, Engineering Entergy Nuclear Operations, Inc. 440 Hamilton Avenue White Plains, NY 10601
 
Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc. 440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc. 440 Hamilton Avenue White Plains, NY 10601
 
Mr. Ernest J. Harkness Director, Oversight Entergy Nuclear Operations, Inc. 1340 Echelon Parkway Jackson, MS 39213
 
Mr. Patric W. Conroy Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Robert Walpole Manager, Licensing Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P. O. Box 249 Buchanan, NY 10511-0249
 
Mr. William C. Dennis Assistant General Counsel Entergy Nuclear Operations, Inc. 440 Hamilton Avenue White Plains, NY 10601 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:  Mr. Paul Tonko President and CEO New York State Energy, Research, and   Development Authority 17 Columbia Circle Albany, NY 12203-6399  
 
Mr. John P. Spath New York State Energy, Research, and   Development Authority 17 Columbia Circle Albany, NY 12203-6399  
 
Mr. Paul Eddy New York State Department   of Public Service 3 Empire State Plaza Albany, NY 12223-1350  
 
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406  
 
Senior Resident Inspector
=s Office Indian Point 2 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Senior Resident Inspector
=s Office Indian Point 3 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271  
 
Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532
 
Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. William DiProfio PWR SRC Consultant 48 Bear Hill Road Newton, NH 03858 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.
828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524


7590-01-P U.S. NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC.
7590-01-P U.S. NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC.
ENTERGY NUCLEAR INDIAN POINT 2, LLC ENTERGY NUCLEAR INDIAN POINT 3, LLC INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 DOCKET NOS. 50-247 AND 50-286 LICENSE NOS. DPR-26 AND DPR-64 RECEIPT OF REQUEST FOR ACTION UNDER 10 CFR 2.206 Notice is hereby given that by petition dated June 25, 2007, Friends United for Sustainable Energy (FUSE, the Petitioner) has requested that pursuant to 10 CFR 2.206, the NRC take action with regard to the Indian Point Nuclear Generating Unit Nos. 2 and 3 (Indian Point). The petition requested that the NRC issue orders, effective immediately, to suspend the Indian Point licenses until such time as the issues described in the petition can be remedied to a point of full compliance with all local, State, and Federal laws.
ENTERGY NUCLEAR INDIAN POINT 2, LLC ENTERGY NUCLEAR INDIAN POINT 3, LLC INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 DOCKET NOS. 50-247 AND 50-286 LICENSE NOS. DPR-26 AND DPR-64 RECEIPT OF REQUEST FOR ACTION UNDER 10 CFR 2.206 Notice is hereby given that by petition dated June 25, 2007, Friends United for Sustainable Energy (FUSE, the Petitioner) has requested that pursuant to 10 CFR 2.206, the NRC take action with regard to the Indian Point Nuclear Generating Unit Nos. 2 and 3 (Indian Point). The petition requested that the NRC issue orders, effective immediately, to suspend the Indian Point licenses until such time as the issues described in the petition can be remedied to a point of full compliance with all local, State, and Federal laws.
The request is being treated pursuant to 10 CFR 2.206 of the Commission's regulations.
The request is being treated pursuant to 10 CFR 2.206 of the Commissions regulations.
The request has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). On September 4, 2007, the Petitioner was notified that its request for immediate action is denied. The Petitioner participated in a conference call with the NRR Petition Review Board (PRB) on December 21, 2007, to discuss the petition. The additional information provided by the Petitioner was considered by the PRB before making its final recommendation. By letter dated February 1, 2008, the Director accepted for review pursuant to 10 CFR 2.206 the Petitioner's concerns regarding the licensee's failure to implement the new emergency notification siren system in a timely manner and the underground leakage of contaminated water at the Indian Point facility. As provided by Section 2.206, appropriate action will be taken on this petition within a reasonable time. A copy of the petition can be located at Agencywide Documents Access and Management Systems, Accession No. ML072140693, and is available for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland.
The request has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). On September 4, 2007, the Petitioner was notified that its request for immediate action is denied. The Petitioner participated in a conference call with the NRR Petition Review Board (PRB) on December 21, 2007, to discuss the petition. The additional information provided by the Petitioner was considered by the PRB before making its final recommendation. By letter dated February 1, 2008, the Director accepted for review pursuant to 10 CFR 2.206 the Petitioners concerns regarding the licensees failure to implement the new emergency notification siren system in a timely manner and the underground leakage of contaminated
FOR THE NUCLEAR REGULATORY COMMISSION
 
      /RA/      J. E. Dyer, Director      Office of Nuclear Reactor Regulation


Dated at Rockville, Maryland this 1st day of February 2008.  
water at the Indian Point facility. As provided by Section 2.206, appropriate action will be taken on this petition within a reasonable time.
A copy of the petition can be located at Agencywide Documents Access and Management Systems, Accession No. ML072140693, and is available for inspection at the Commissions Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland.
FOR THE NUCLEAR REGULATORY COMMISSION
                                        /RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Dated at Rockville, Maryland this 1st day of February 2008.


Enclosure 1 Transcript of December 21, 2007, Teleconference ADAMS Accession No. ML080140267  
Enclosure 1 Transcript of December 21, 2007, Teleconference ADAMS Accession No. ML080140267


Enclosure 3 Management Directive 8.11 Review Process for 10 CFR 2.206 Petitions ADAMS Accession No. ML041770328  
Enclosure 3 Management Directive 8.11 Review Process for 10 CFR 2.206 Petitions ADAMS Accession No. ML041770328


Enclosure 4 NUREG/BR-0200 Public Petition Process ADAMS Accession No. ML050900248  
Enclosure 4 NUREG/BR-0200 Public Petition Process ADAMS Accession No. ML050900248


Enclosure 5 NUREG/BR-0215 Public Involvement in the Nuclear Regulatory Process ADAMS Accession No. ML003762531}}
Enclosure 5 NUREG/BR-0215 Public Involvement in the Nuclear Regulatory Process ADAMS Accession No. ML003762531}}

Latest revision as of 08:13, 13 March 2020

G20070540/LTR-07-0459 - Sherwood Martinelli Ltr from J. E. Dyer 2.202, 2.206, and 2.802 Petitions Regarding Indian Point, Units 2 and 3
ML080080297
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/01/2008
From: Dyer J
Office of Nuclear Reactor Regulation
To: Martinelli S
Friends United for Sustainable Energy (FUSE)
Pickett D, NRR/DORL, 415-1364
Shared Package
ML080140342 List:
References
G20070540, LTR-07-0459
Download: ML080080297 (13)


Text

February 1, 2008 Mr. Sherwood Martinelli Friends United for Sustainable Energy 351 Dyckman Street Peekskill, NY 10566

Dear Mr. Martinelli:

On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your letter dated June 25, 2007. Friends United for Sustainable Energy (FUSE) submitted a petition pursuant to Title 10, Sections 2.202, 2.206, and 2.802 of the Code of Federal Regulations (10 CFR 2.202, 10 CFR 2.206, and 10 CFR 2.802) to Chairman Dale Klein, Mr. Richard Barkley, and Dr. Pao-Tsin Kuo of the NRC regarding the Indian Point Nuclear Generating Unit Nos. 2 and 3.

The FUSE petition included a request for rulemaking concerning 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, and requested that the NRC not consider any new license renewal applications until NRC regulations are revised. The petition asserts that the current regulations found in 10 CFR Part 54 are prejudiced and biased, presume that license renewal is a foregone conclusion for all licensees, usurp stakeholder rights protected under the First Amendment of the Constitution, and abridge citizens rights to due process and equal protection. This request for rulemaking was denied.

This denial was published in the Federal Register on November 8, 2007 (72 FR 63141).

The FUSE petition also requested that the NRC refrain from taking any actions relative to the license renewal of Indian Point until NRC amends 10 CFR Part 54 as requested. Because this request is for a licensing action, and not for an enforcement-related action, it does not meet the criteria for acceptance in the 10 CFR 2.206 process (see NRC Management Directive (MD) 8.11, Review Process for 10 CFR 2.206 Petitions). Ms. Susan Shapiro of FUSE was notified of this decision on September 4, 2007, via e-mail from Mr. Douglas Pickett of my staff.

Finally, FUSE requested that, pursuant to 10 CFR 2.206, the NRC immediately suspend the Indian Point licenses until the issues described in the petition at Indian Point are remedied to full compliance with all local, State, and Federal laws. The NRCs Petition Review Board (PRB) met expeditiously to consider the request for immediate suspension of the Indian Point licenses.

The PRB concluded that the FUSE petition did not set forth facts sufficient to constitute a basis for the requested actions. Specifically, the petition did not identify any significant safety issues that would justify an immediate shutdown. Therefore, this request has been denied. Ms. Susan Shapiro of FUSE was notified of this decision on September 4, 2007.

The issues identified by FUSE include radiological contamination through groundwater leakage from the Indian Point Unit 2 spent fuel pool, the licensees failure to implement a new emergency notification siren system as required by NRC Orders, and various other safety, security, and enforcement issues identified over the past 6 years of plant operations.

S. Martinelli On December 21, 2007, a conference call was held with you, the PRB, and a representative of Entergy Nuclear Operations, Inc., the licensee for Indian Point Nuclear Generating Unit Nos. 2 and 3. During this conference call, you provided additional details regarding, among other things, underground leakage of contaminated water at the Indian Point facility and the failure to implement the new emergency notification siren system in a timely manner. A transcript of this discussion, which is enclosed for your information, can be found at Agencywide Documents Access and Management Systems, Accession No. ML080140267.

The PRBs final recommendation is to accept for review pursuant to 10 CFR 2.206, FUSEs concerns regarding the underground leakage of contaminated water at the Indian Point facility and the failure to implement the new emergency notification siren system in a timely manner.

The PRB has taken the further step of consolidating the concern regarding the failure to implement the siren system in a timely manner with a similar issue raised in the FUSE petition of September 28, 2007. This step is being taken due to the similarity of the issues, because both petitions were submitted at approximately the same time, and because you are the principal external stakeholder for both petitions. Therefore, the underground leakage of contaminated water will be addressed through the FUSE petition of June 25, 2007, and the failure to implement the new emergency notification siren system in a timely matter will be addressed through the FUSE petition of September 28, 2007.

The FUSE petition of June 25, 2007, raised a multitude of other concerns which do not meet the criteria for acceptance in the 10 CFR 2.206 process (see MD 8.11). The listing below provides a few examples of specific concerns that do not meet the above criteria. This list is not exhaustive, but is illustrative.

The request does not ask for an enforcement-related action or fails to provide sufficient facts to support the petition but simply alleges wrongdoing, violations of NRC regulations, or existence of safety concerns:

  • Page 7. On September 21, 2001, the NRC admits uncertainty that the nations 103 plants could withstand the same kind of impact that leveled the World Trade Center.
  • Page 9. On September 8, 2003, the Union of Concerned Scientists and Riverkeeper formally petition the NRC to order the immediate shutdown of both nuclear power reactors because the plants containment sumps are almost certain to be blocked with debris during an accident.
  • Page 10. On June 2, 2004, Dr. Erik Larsen, medical director of the STAT Flight emergency helicopter operation at the Westchester Medical Center, raises concerns that the Westchester Medical Center could fall apart with as few as 50 people seeking treatment after an accident at Indian Point.

The request addresses deficiencies within existing NRC rules. This type of request is more appropriately addressed as a petition for rulemaking:

  • Page 6. The Design Basis Threat is woefully inadequate to protect the spent fuel pools in the case of a nuclear incident.

S. Martinelli

  • Page 14. Title 10 of the Code of Federal Regulations Part 54, which outlines regulations for license renewal, fails to meet the requirements of the Atomic Energy Act of 1946 and 1954.

The request raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and resolution is applicable to the facility in question:

  • Page 8. On November 16, 2002, a failed circuit breaker caused the automatic shutdown of Indian Point Nuclear Generating Unit No. 3.
  • Page 10. On September 2, 2004, Indian Point Nuclear Generating Unit No. 2 was shut down because of problems maintaining proper water levels in one of the plants four steam generators.
  • Page 11. On August 1, 2005, the NRC issued a White Finding to Entergy for their failed response to a nitrogen gas leak first discovered in April 2005.
  • Page 16. The Petitioner states that the decommissioning fund for Indian Point is inadequate as it is not properly adjusted for inflation and not properly adjusted for newly discovered underground leakage of contaminated water.

As provided by Section 2.206, we will take action on the FUSE concern regarding underground leakage of contaminated water within a reasonable time. I have assigned Mr. Douglas Pickett to be the petition manager for this petition. Mr. Pickett can be reached at 301-415-1364. Your petition is being reviewed by the Office of Nuclear Reactor Regulation. Included in your petition are several assertions that the NRC has failed to fulfill its responsibility as a regulator, and is not enforcing its regulations with respect to Indian Point. Therefore, I have referred to the NRC Office of the Inspector General those allegations of NRC wrongdoing contained in your petition.

S. Martinelli Enclosed for your information is a copy of the notice that is being filed with the Office of the Federal Register for publication. Also enclosed for your information is a copy of MD 8.11, along with the associated brochures NUREG/BR-0200, Public Petition Process, and NUREG/BR-0215, Public Involvement in the Nuclear Regulatory Process, prepared by the NRC Office of Public Affairs.

Sincerely,

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Transcript of December 21, 2007, telephone conference call
2. Federal Register Notice
3. Management Directive 8.11
4. NUREG/BR-0200
5. NUREG/BR-0215 cc w/encl 2: See next page.

ML080140342 (package)

ML080080297 (Acknowledgement Letter and Federal Register Notice)

ML072190190 (Incoming petition)

ML080140267 (Transcript)

ML041770328 (Management Directive 8.11)

ML050900248 (NUREG/BR-0200)

ML003762531 (NUREG/BR-0215) *Concurred via email OFFICE PM/LPL1-1 PM/LPL1-1 LA/LPL1-1 Tech Editor*

NAME DPickett JBoska SLittle HChang (MOBrien for)

DATE 1 / 24 /08 1 / 17 / 08 1 / 16 / 08 1 / 18 / 08 OFFICE BC/LPL1-1 DD/DPR D/DORL D/NRR NAME MKowal HNieh CHaney JDyer DATE 1 / 18 / 08 1 / 23 / 08 1 / 29 / 08 2/01/ 08 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Michael R. Kansler Mr. John A. Ventosa President & CEO / CNO GM, Engineering Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. John F. McCann Sr. Vice President Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Sr. Vice President Ms. Charlene D. Faison Engineering & Technical Services Manager, Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. Fred R. Dacimo Mr. Ernest J. Harkness Site Vice President Director, Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

Indian Point Energy Center 1340 Echelon Parkway 450 Broadway, GSB Jackson, MS 39213 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric W. Conroy Director, Nuclear Safety Assurance Mr. Anthony Vitale - Acting Entergy Nuclear Operations, Inc.

General Manager, Plant Operations Indian Point Energy Center Entergy Nuclear Operations, Inc. 450 Broadway, GSB Indian Point Energy Center P.O. Box 249 450 Broadway, GSB Buchanan, NY 10511-0249 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Robert Walpole Manager, Licensing Mr. Oscar Limpias Entergy Nuclear Operations, Inc.

Vice President Engineering Indian Point Energy Center Entergy Nuclear Operations, Inc. 450 Broadway, GSB 1340 Echelon Parkway P. O. Box 249 Jackson, MS 39213 Buchanan, NY 10511-0249 Mr. Joseph P. DeRoy Mr. William C. Dennis Vice President, Operations Support Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Paul Tonko Mr. Raymond L. Albanese President and CEO Four County Coordinator New York State Energy, Research, and 200 Bradhurst Avenue Development Authority Unit 4 Westchester County 17 Columbia Circle Hawthorne, NY 10532 Albany, NY 12203-6399 Mayor, Village of Buchanan Mr. John P. Spath 236 Tate Avenue New York State Energy, Research, and Buchanan, NY 10511 Development Authority 17 Columbia Circle Mr. William DiProfio Albany, NY 12203-6399 PWR SRC Consultant 48 Bear Hill Road Mr. Paul Eddy Newton, NH 03858 New York State Department of Public Service Mr. Garry Randolph 3 Empire State Plaza PWR SRC Consultant Albany, NY 12223-1350 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. William T. Russell 475 Allendale Road PWR SRC Consultant King of Prussia, PA 19406 400 Plantation Lane Stevensville, MD 21666-3232 Senior Resident Inspector=s Office Indian Point 2 Mr. Jim Riccio U. S. Nuclear Regulatory Commission Greenpeace P.O. Box 59 702 H Street, NW Buchanan, NY 10511 Suite 300 Washington, DC 20001 Senior Resident Inspector=s Office Indian Point 3 Mr. Phillip Musegaas U. S. Nuclear Regulatory Commission Riverkeeper, Inc.

P.O. Box 59 828 South Broadway Buchanan, NY 10511 Tarrytown, NY 10591 Mr. Charles Donaldson, Esquire Mr. Mark Jacobs Assistant Attorney General IPSEC New York Department of Law 46 Highland Drive 120 Broadway Garrison, NY 10524 New York, NY 10271

7590-01-P U.S. NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC.

ENTERGY NUCLEAR INDIAN POINT 2, LLC ENTERGY NUCLEAR INDIAN POINT 3, LLC INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 DOCKET NOS. 50-247 AND 50-286 LICENSE NOS. DPR-26 AND DPR-64 RECEIPT OF REQUEST FOR ACTION UNDER 10 CFR 2.206 Notice is hereby given that by petition dated June 25, 2007, Friends United for Sustainable Energy (FUSE, the Petitioner) has requested that pursuant to 10 CFR 2.206, the NRC take action with regard to the Indian Point Nuclear Generating Unit Nos. 2 and 3 (Indian Point). The petition requested that the NRC issue orders, effective immediately, to suspend the Indian Point licenses until such time as the issues described in the petition can be remedied to a point of full compliance with all local, State, and Federal laws.

The request is being treated pursuant to 10 CFR 2.206 of the Commissions regulations.

The request has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). On September 4, 2007, the Petitioner was notified that its request for immediate action is denied. The Petitioner participated in a conference call with the NRR Petition Review Board (PRB) on December 21, 2007, to discuss the petition. The additional information provided by the Petitioner was considered by the PRB before making its final recommendation. By letter dated February 1, 2008, the Director accepted for review pursuant to 10 CFR 2.206 the Petitioners concerns regarding the licensees failure to implement the new emergency notification siren system in a timely manner and the underground leakage of contaminated

water at the Indian Point facility. As provided by Section 2.206, appropriate action will be taken on this petition within a reasonable time.

A copy of the petition can be located at Agencywide Documents Access and Management Systems, Accession No. ML072140693, and is available for inspection at the Commissions Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Dated at Rockville, Maryland this 1st day of February 2008.

Enclosure 1 Transcript of December 21, 2007, Teleconference ADAMS Accession No. ML080140267

Enclosure 3 Management Directive 8.11 Review Process for 10 CFR 2.206 Petitions ADAMS Accession No. ML041770328

Enclosure 4 NUREG/BR-0200 Public Petition Process ADAMS Accession No. ML050900248

Enclosure 5 NUREG/BR-0215 Public Involvement in the Nuclear Regulatory Process ADAMS Accession No. ML003762531