| | issue date = 04/17/2009 | | | issue date = 04/17/2009 |
| | title = Request for Additional Information Regarding TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation | | | title = Request for Additional Information Regarding TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation |
| | author name = Williams J F | | | author name = Williams J |
| | author affiliation = NRC/NRR/DPR/PSPB | | | author affiliation = NRC/NRR/DPR/PSPB |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = PROJ0753 | | | docket = PROJ0753 |
| | license number = | | | license number = |
| | contact person = Williams J F, NRR/DPR, 415-1470 | | | contact person = Williams J, NRR/DPR, 415-1470 |
| | case reference number = TAC MD9433, TSTF-448, TSTF-508, Rev 0 | | | case reference number = TAC MD9433, TSTF-448, TSTF-508, Rev 0 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:April 17, 2009 Technical Specification Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852 | | {{#Wiki_filter:April 17, 2009 Technical Specification Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUEST FOR ADDITIONAL INFORMATION REGARDING TSTF-508, REVISION 0, "REVISE CONTROL ROOM HABITABILITY ACTIONS TO ADDRESS LESSONS LEARNED FROM TSTF-448 IMPLEMENTATION" (TAC NO. MD9433) | | REQUEST FOR ADDITIONAL INFORMATION REGARDING TSTF-508, REVISION 0, REVISE CONTROL ROOM HABITABILITY ACTIONS TO ADDRESS LESSONS LEARNED FROM TSTF-448 IMPLEMENTATION (TAC NO. MD9433) |
|
| |
|
| ==Dear Members of the TSTF,== | | ==Dear Members of the TSTF,== |
| By letter dated July 3, 2008, the Pressurized Water Reactors Owners Group (PWROG) submitted TSTF-508, Revision 0, "Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation." The staff has determined that additional information is needed to complete the review. Enclosure 1 is the NRC staff's request for additional information (RAI). Please contact me at (301)415-1470 or by electronic mail at joseph.williams@nrc.gov if you have any questions on this topic. | | |
| Sincerely, /RA/ | | By letter dated July 3, 2008, the Pressurized Water Reactors Owners Group (PWROG) submitted TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation. The staff has determined that additional information is needed to complete the review. Enclosure 1 is the NRC staffs request for additional information (RAI). Please contact me at (301)415-1470 or by electronic mail at joseph.williams@nrc.gov if you have any questions on this topic. |
| Joseph F. Williams, Senior Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation | | Sincerely, |
| | /RA/ |
| | Joseph F. Williams, Senior Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Request for Additional Information cc: See next page
| |
|
| |
| ML090680813 NRR-106 OFFICE PSPB:PM PSPB: LA ITSB:DIRS SCVB:DSS AADB:DRA NAME JWilliams DBaxley (GLappert For) MHamm RDennig RTaylor DATE 04/15/09 04/16/09 03/10/09 03/10/09 03/12/09 OFFICE ITSB:DIRS BC PSPB:BC NAME RElliott SRosenberg DATE 03/24/09 04/17/09 Technical Specifications Task Force Mailing List cc: Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Donald Hoffman Telephone: 301-984-4400 E-mail: donaldh@excelservices.com
| |
|
| |
| Kenneth Schrader Diablo Canyon Power Plant Building 104/5/21A P.O. Box 56 Avila Beach, CA 93424 Telephone: 805-545-4328 E-mail: kjse@pge.com John Messina First Energy Nuclear Operating Company 76 South Main Street Mail Stop: Akron-GO-14 Akron, OH 44308 Telephone: 330-384-5878 E-mail: jmessina@firstenergycorp.com Thomas Raidy Southern California Edison Mail Stop D-3-E P.O. Box 128 San Clemente, CA 92672 Telephone: (949) 368-7582 E-mail: Tom.Raidy@sce.com Reene' V. Gambrell Duke Energy Mailcode: ON03RC 7800 Rochester Highway Seneca, SC 29672 Telephone: 864-885-3364 E-mail: RVGambrell@duke-energy.com Brian Mann EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Telephone: 301-984-4400 E-mail: brianm@excelservices.com ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION TASK FORCE (TSTF) TRAVELER 508, REVISION 0 "REVISE CONTROL ROOM HABITABILITY ACTIONS TO ADDRESS LESSONS LEARNED FROM TSTF-448 IMPLEMENTATION" (TAC NO. MD9433)
| |
| By letter dated July 3, 2008, the Pressurized Water Reactors Owners Group (PWROG) submitted TSTF-508, Revision 0, "Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation." As discussed below, the NRC staff has determined that additional information is needed to complete the review.
| |
| The Standard Technical Specifications (STS), as amended by TSTF-448, require immediate suspension of movement of irradiated fuel and immediate suspension of Operations with a Potential for Draining the Reactor Vessel (OPDRVs) for boiling water reactors (BWRs) when one or more Control Room Emergency Ventilation System/Control Room Emergency Filtration System/Control Room Emergency Air Cleanup System/Main Control Room Environmental Control/Control Room Fresh Air [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable control room envelope (CRE) boundary.
| |
|
| |
| TSTF-508 contains 3 basic changes to the STS, as amended by TSTF-448. The changes are described on page 2 of TSTF-508 (Agencywide Documents Access and Management System (ADAMS) accession number ML081850420). This request for additional information pertains to the change described in paragraph "a" on page 2 of TSTF-508. Among other things, those changes provide a relaxation of the restrictions on movement of irradiated fuel and OPDRVs when one or more [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary. The proposed changes allow operators to continue movement of irradiated fuel and continue OPDRVs for up to 90 days when one or more [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary.
| |
|
| |
|
| The second paragraph on page 5 of TSTF-508 (Technical Analysis) provides justification for the relaxation of the restrictions on fuel movement and OPDRVs. The first justification states: "First, suspension of fuel movement is unnecessary if Required Action B.2 verifies that the required mitigating actions protect the CRE occupants, just as is required in the operating Modes." When one or more [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary, the proposed changes to the STS as written allow movement of irradiated fuel and OPDRVs to continue for up to 24 hours prior to completion of Required Action B.2. This appears to conflict with the justification given in the second paragraph on page 5 of TSTF-508, in that the justification seems to imply that fuel movement would be suspended until Required Action B.2 is complete. The NRC staff also believes that it is prudent to immediately suspend fuel handling operations or OPDRVs until after Required Action B.2 is complete. The characteristic risk of a Fuel Handling Accident (FHA), and the dynamic nature of plant maintenance, repair, testing, and other ongoing operations that could be taking place during Modes 5 and 6 is of primary concern.
| | Request for Additional Information cc: See next page |
|
| |
|
| In TSTF-448, rev. 3, Required Action B.2 is applicable to MODES 1 through [4](hot shutdown). "The 24-hour Completion Time of new Required Action B.2 is reasonable based on the low probability of a DBA occurring during this time period, and the use of mitigating actions as directed by Required Action B.1." Generally, the plant would be expected to remain in a steady state condition during the 24-hour verification time. However, there is the possibility of a fuel handling accident each time a fuel assembly is moved. TSTF-508 would permit continued movement of fuel, and therefore, continued risk of a fuel handling accident, for up to 24-hours before completing the verification that mitigating actions protect CRE occupants from chemical and smoke hazards and that radiological limits will not be exceeded. The NRC staff believes TSTF-508 did not provide sufficient justification based on safety for continued movement of irradiated fuel assemblies or performing OPDRVS before completion of Required Action B.2.
| | ML090680813 NRR-106 OFFICE PSPB:PM PSPB: LA ITSB:DIRS SCVB:DSS AADB:DRA NAME JWilliams DBaxley MHamm RDennig RTaylor (GLappert For) |
| : 1. Explain how the proposed change in TSTF-508 will ensure CRE occupant radiological exposures will not exceed limits, and CRE occupants will be protected from chemical and smoke hazards during the period of time between the discovery of one or more [CREVS/CREFS/CREACS/MCREC/CRFA] | | DATE 04/15/09 04/16/09 03/10/09 03/10/09 03/12/09 OFFICE ITSB:DIRS BC PSPB:BC NAME RElliott SRosenberg DATE 03/24/09 04/17/09 Technical Specifications Task Force Mailing List cc: |
| subsystems inoperable due to an inoperable CRE and the completion of Required Action B.2 while moving irradiated fuel or performing OPDRVs.
| | Technical Specifications Task Force Brian Mann 11921 Rockville Pike EXCEL Services Corporation Suite 100 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Rockville, MD 20852 Attention: Donald Hoffman Telephone: 301-984-4400 Telephone: 301-984-4400 E-mail: brianm@excelservices.com E-mail: donaldh@excelservices.com Kenneth Schrader Diablo Canyon Power Plant Building 104/5/21A P.O. Box 56 Avila Beach, CA 93424 Telephone: 805-545-4328 E-mail: kjse@pge.com John Messina First Energy Nuclear Operating Company 76 South Main Street Mail Stop: Akron-GO-14 Akron, OH 44308 Telephone: 330-384-5878 E-mail: jmessina@firstenergycorp.com Thomas Raidy Southern California Edison Mail Stop D-3-E P.O. Box 128 San Clemente, CA 92672 Telephone: (949) 368-7582 E-mail: Tom.Raidy@sce.com Reene' V. Gambrell Duke Energy Mailcode: ON03RC 7800 Rochester Highway Seneca, SC 29672 Telephone: 864-885-3364 E-mail: RVGambrell@duke-energy.com |
|
| |
|
| On page 6 of TSTF-508, the response to the question "Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?" is No. Since the STS, as amended by TSTF-448, do not allow movement of irradiated fuel while a plant's CRE boundary is inoperable, the probability of a FHA when moving irradiated fuel while a plant's CRE boundary is inoperable is essentially zero. As stated above, TSTF-508 would allow irradiated fuel movement and OPDRVs to occur while a plant's CRE boundary is inoperable. This causes the probability of a FHA when moving irradiated fuel while a plant's CRE boundary is inoperable to be greater than zero.
| | REQUEST FOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION TASK FORCE (TSTF) TRAVELER 508, REVISION 0 REVISE CONTROL ROOM HABITABILITY ACTIONS TO ADDRESS LESSONS LEARNED FROM TSTF-448 IMPLEMENTATION (TAC NO. MD9433) |
| Similarly, STS as amended by TSTF-448 cause the consequences of a FHA while a plant's CRE boundary is inoperable to be essentially zero. Using the STS proposed by TSTF-508 could cause the consequences of a FHA while a plant's CRE boundary is inoperable to be significantly greater than the consequences of a FHA when using the STS as amended by TSTF-448.
| | By letter dated July 3, 2008, the Pressurized Water Reactors Owners Group (PWROG) submitted TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation. As discussed below, the NRC staff has determined that additional information is needed to complete the review. |
| | The Standard Technical Specifications (STS), as amended by TSTF-448, require immediate suspension of movement of irradiated fuel and immediate suspension of Operations with a Potential for Draining the Reactor Vessel (OPDRVs) for boiling water reactors (BWRs) when one or more Control Room Emergency Ventilation System/Control Room Emergency Filtration System/Control Room Emergency Air Cleanup System/Main Control Room Environmental Control/Control Room Fresh Air [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable control room envelope (CRE) boundary. |
| | TSTF-508 contains 3 basic changes to the STS, as amended by TSTF-448. The changes are described on page 2 of TSTF-508 (Agencywide Documents Access and Management System (ADAMS) accession number ML081850420). This request for additional information pertains to the change described in paragraph a on page 2 of TSTF-508. Among other things, those changes provide a relaxation of the restrictions on movement of irradiated fuel and OPDRVs when one or more [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary. The proposed changes allow operators to continue movement of irradiated fuel and continue OPDRVs for up to 90 days when one or more |
| | [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary. |
| | The second paragraph on page 5 of TSTF-508 (Technical Analysis) provides justification for the relaxation of the restrictions on fuel movement and OPDRVs. The first justification states: First, suspension of fuel movement is unnecessary if Required Action B.2 verifies that the required mitigating actions protect the CRE occupants, just as is required in the operating Modes. When one or more [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary, the proposed changes to the STS as written allow movement of irradiated fuel and OPDRVs to continue for up to 24 hours prior to completion of Required Action B.2. This appears to conflict with the justification given in the second paragraph on page 5 of TSTF-508, in that the justification seems to imply that fuel movement would be suspended until Required Action B.2 is complete. The NRC staff also believes that it is prudent to immediately suspend fuel handling operations or OPDRVs until after Required Action B.2 is complete. The characteristic risk of a Fuel Handling Accident (FHA), and the dynamic nature of plant maintenance, repair, testing, and other ongoing operations that could be taking place during Modes 5 and 6 is of primary concern. |
| | ENCLOSURE |
|
| |
|
| Therefore, the staff does not agree with the justification or the response to the question "Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?" proposed in TSTF-508. | | In TSTF-448, rev. 3, Required Action B.2 is applicable to MODES 1 through [4](hot shutdown). |
| : 2. Explain or provide further justification for the response to the question "Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?"}} | | The 24-hour Completion Time of new Required Action B.2 is reasonable based on the low probability of a DBA occurring during this time period, and the use of mitigating actions as directed by Required Action B.1. Generally, the plant would be expected to remain in a steady state condition during the 24-hour verification time. However, there is the possibility of a fuel handling accident each time a fuel assembly is moved. TSTF-508 would permit continued movement of fuel, and therefore, continued risk of a fuel handling accident, for up to 24-hours before completing the verification that mitigating actions protect CRE occupants from chemical and smoke hazards and that radiological limits will not be exceeded. The NRC staff believes TSTF-508 did not provide sufficient justification based on safety for continued movement of irradiated fuel assemblies or performing OPDRVS before completion of Required Action B.2. |
| | : 1. Explain how the proposed change in TSTF-508 will ensure CRE occupant radiological exposures will not exceed limits, and CRE occupants will be protected from chemical and smoke hazards during the period of time between the discovery of one or more [CREVS/CREFS/CREACS/MCREC/CRFA] |
| | subsystems inoperable due to an inoperable CRE and the completion of Required Action B.2 while moving irradiated fuel or performing OPDRVs. |
| | On page 6 of TSTF-508, the response to the question Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? is No. |
| | Since the STS, as amended by TSTF-448, do not allow movement of irradiated fuel while a plants CRE boundary is inoperable, the probability of a FHA when moving irradiated fuel while a plants CRE boundary is inoperable is essentially zero. As stated above, TSTF-508 would allow irradiated fuel movement and OPDRVs to occur while a plants CRE boundary is inoperable. This causes the probability of a FHA when moving irradiated fuel while a plants CRE boundary is inoperable to be greater than zero. |
| | Similarly, STS as amended by TSTF-448 cause the consequences of a FHA while a plants CRE boundary is inoperable to be essentially zero. Using the STS proposed by TSTF-508 could cause the consequences of a FHA while a plants CRE boundary is inoperable to be significantly greater than the consequences of a FHA when using the STS as amended by TSTF-448. |
| | Therefore, the staff does not agree with the justification or the response to the question Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? proposed in TSTF-508. |
| | : 2. Explain or provide further justification for the response to the question Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?}} |
Letter Sequence RAI |
---|
TAC:MD9433, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) |
|
MONTHYEARML0827504932008-10-0707 October 2008 Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation Project stage: Acceptance Review ML0906808132009-04-17017 April 2009 Request for Additional Information Regarding TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation Project stage: RAI TSTF-10-18, Response to NRC Request for Additional Information on TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation2010-10-11011 October 2010 Response to NRC Request for Additional Information on TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation Project stage: Response to RAI ML1104205302011-02-0909 February 2011 ITSB Resolution of Excel Services Corporation Proposed TSTF-426 Wording Project stage: Other ML1105606302011-03-23023 March 2011 February 9, 2011, Summary of NRC Meeting with the Technical Specifications Task Force Discussed the Topics as Presented on the Agenda Project stage: Request ML1103803112011-03-23023 March 2011 2/9/11 Meeting Handout - NRC Staff'S Draft LCO 3.0.X Project stage: Request ML1108908172011-04-12012 April 2011 Request for Additional Information Regarding TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation Project stage: RAI 2010-10-11
[Table View] |
|
---|
Category:Letter
MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24249A1482024-09-11011 September 2024 Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A3162024-09-0606 September 2024 Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24106A2762024-08-0101 August 2024 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, Extend Shield Building Completion Time After Refueling ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML23222A2272023-08-10010 August 2023 Request for Additional Information Traveler TSTF-592, Revision 1, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22235A7382022-08-19019 August 2022 NRR E-mail Capture - Draft RAIs for TSTF-591 (L-2022-PMP-0003) ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML21109A1352021-04-12012 April 2021 TSTF-576 NRC Comments on Draft Rev 1 and Draft RAI Response ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement ML20065J9902020-03-0505 March 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Iiib - Generic RAIs for LARs to Adopt TSTF-505 Rict ML19323D5342019-11-19019 November 2019 Draft RAIs TSTF-554, Revise Reactor Coolant Leakage ML18134A0752018-05-21021 May 2018 Request for Additional Information (RAI) Technical Specifications Task Force (TSTF) Traveler TSTF-569, Revise Response Time Testing Definition ML18127A4052018-05-0707 May 2018 Draft RAI TSTF-569, Revise Response Time Testing Definition. ML18122A1662018-04-27027 April 2018 Draft RAIs TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3. ML18095A2292018-04-12012 April 2018 Request for Additional Information Traveler TSTF-564, Safety Limit MCPR ML18085A0252018-03-20020 March 2018 Traveler TSTF-564, Safety Limit MCPR, Draft RAIs ML18100A0942018-01-29029 January 2018 Draft RAIs from Apla TSTF-563, Revise Instrument Testing Definitions to Incorporate SFCP ML16215A1252016-08-0202 August 2016 Request for Additional Information for Technical Specifications Task Force TSTF-553, Revision 0, Add Action for Two Inoperable Control Room Emergency Air Temperature Control System Trains, CAC No. MF7061 ML16028A4532016-02-23023 February 2016 Request for Additional Information TSTF-553, Add Action for Two Inoperable Creatcs (Control Room Emergency Air Temperature Control System) Trains. ML15322A2842016-02-0404 February 2016 Request for Additional Information TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373. ML15322A2702016-01-12012 January 2016 Request for Additional Information Regarding Traveler TSTF-454, Revision 3, Extend PCIV Completion Times (NEDC-33046). ML15293A1612015-12-0808 December 2015 Request for Additional Information (RAI) TSTF 542, Rev. 1, Reactor Pressure Vessel Water Inventory Control, ML15281A2912015-11-18018 November 2015 Request for Additional Information Regarding TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. ML15208A2872015-08-13013 August 2015 Request for Additional Information Traveler TSTF-541, Rev 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed ML15033A1082015-06-0202 June 2015 Draft Request for Additional Information Traveler TSTF-529, Revision 2, Clarify Use and Application Rules TSTF-14-17, Technical Specification Task Force - Response to NRC Request for Additional Information Regarding TSTF-454, Revision, Extend PCIV Completion Times (NEDC-33046) and Submittal of TSTF-454, Revision 32015-03-31031 March 2015 Technical Specification Task Force - Response to NRC Request for Additional Information Regarding TSTF-454, Revision, Extend PCIV Completion Times (NEDC-33046) and Submittal of TSTF-454, Revision 3 ML15057A2482015-02-26026 February 2015 Notice of Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force TSTF-551 ML14310A3442014-11-0606 November 2014 Draft RAI from Srxb TSTF-547, Clarification of Rod Position Requirements. ML14196A4142014-07-0707 July 2014 TSTF Handout from 7/10/14 Meeting TSTF Concerns with TSTF-505 RAIs ML13045A8602013-03-0404 March 2013 Request for Additional Information Traveler TSTF-537, Revision 0, Increase CIV (Containment Isolation Valve) Completion Time; Update of TSTF-373 ML12279A2082012-10-19019 October 2012 TSTF-531 RAIs ML12279A1342012-10-19019 October 2012 TSTF-454, Rev 2, RAIs ML12158A5472012-06-13013 June 2012 TSTF-523 Acceptance Letter and RAIs ML1108908172011-04-12012 April 2011 Request for Additional Information Regarding TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation ML1020402322010-07-27027 July 2010 Request for Additional Information Regarding TSTF-505, Revision 0, on Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML1015304012010-07-0707 July 2010 Acceptance for Review and Request for Additional Information for TSTF-432, Revision 0, Change in Technical Specifications End States (WCAP-16294). ML0914704322009-06-11011 June 2009 Request for Additional Information Regarding TSTF-514 on Reactor Coolant System Leakage Detection ML0906808132009-04-17017 April 2009 Request for Additional Information Regarding TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation ML0828004842008-11-0404 November 2008 Evaluation of TSTF Responses to NRC Staff Request for Additional Information (RAI) Regarding Traveler TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. ML0820406052008-08-13013 August 2008 RAI for Review of TSTF-506, Rev 0 ML0812101752008-06-0404 June 2008 Request for Additional Information Regarding TSTF-500, Rev. 0, DC Electrical Rewrite - Update to TSTF-360. ML0810400032008-05-0505 May 2008 Request for Additional Information Regarding TSTF-501, Revision 0, Relocate Stored Fuel Oil and Lube Oil Values to Licensee Control ML0721206302007-10-0202 October 2007 Request for Additional Information (RAI) Regarding TSTF Traveler 425, Revision 1, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5. ML0627700892006-11-0909 November 2006 Request for Additional Information Regarding TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control 2024-09-20
[Table view] |
Text
April 17, 2009 Technical Specification Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING TSTF-508, REVISION 0, REVISE CONTROL ROOM HABITABILITY ACTIONS TO ADDRESS LESSONS LEARNED FROM TSTF-448 IMPLEMENTATION (TAC NO. MD9433)
Dear Members of the TSTF,
By letter dated July 3, 2008, the Pressurized Water Reactors Owners Group (PWROG) submitted TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation. The staff has determined that additional information is needed to complete the review. Enclosure 1 is the NRC staffs request for additional information (RAI). Please contact me at (301)415-1470 or by electronic mail at joseph.williams@nrc.gov if you have any questions on this topic.
Sincerely,
/RA/
Joseph F. Williams, Senior Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
Enclosure:
Request for Additional Information cc: See next page
ML090680813 NRR-106 OFFICE PSPB:PM PSPB: LA ITSB:DIRS SCVB:DSS AADB:DRA NAME JWilliams DBaxley MHamm RDennig RTaylor (GLappert For)
DATE 04/15/09 04/16/09 03/10/09 03/10/09 03/12/09 OFFICE ITSB:DIRS BC PSPB:BC NAME RElliott SRosenberg DATE 03/24/09 04/17/09 Technical Specifications Task Force Mailing List cc:
Technical Specifications Task Force Brian Mann 11921 Rockville Pike EXCEL Services Corporation Suite 100 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Rockville, MD 20852 Attention: Donald Hoffman Telephone: 301-984-4400 Telephone: 301-984-4400 E-mail: brianm@excelservices.com E-mail: donaldh@excelservices.com Kenneth Schrader Diablo Canyon Power Plant Building 104/5/21A P.O. Box 56 Avila Beach, CA 93424 Telephone: 805-545-4328 E-mail: kjse@pge.com John Messina First Energy Nuclear Operating Company 76 South Main Street Mail Stop: Akron-GO-14 Akron, OH 44308 Telephone: 330-384-5878 E-mail: jmessina@firstenergycorp.com Thomas Raidy Southern California Edison Mail Stop D-3-E P.O. Box 128 San Clemente, CA 92672 Telephone: (949) 368-7582 E-mail: Tom.Raidy@sce.com Reene' V. Gambrell Duke Energy Mailcode: ON03RC 7800 Rochester Highway Seneca, SC 29672 Telephone: 864-885-3364 E-mail: RVGambrell@duke-energy.com
REQUEST FOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION TASK FORCE (TSTF) TRAVELER 508, REVISION 0 REVISE CONTROL ROOM HABITABILITY ACTIONS TO ADDRESS LESSONS LEARNED FROM TSTF-448 IMPLEMENTATION (TAC NO. MD9433)
By letter dated July 3, 2008, the Pressurized Water Reactors Owners Group (PWROG) submitted TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation. As discussed below, the NRC staff has determined that additional information is needed to complete the review.
The Standard Technical Specifications (STS), as amended by TSTF-448, require immediate suspension of movement of irradiated fuel and immediate suspension of Operations with a Potential for Draining the Reactor Vessel (OPDRVs) for boiling water reactors (BWRs) when one or more Control Room Emergency Ventilation System/Control Room Emergency Filtration System/Control Room Emergency Air Cleanup System/Main Control Room Environmental Control/Control Room Fresh Air [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable control room envelope (CRE) boundary.
TSTF-508 contains 3 basic changes to the STS, as amended by TSTF-448. The changes are described on page 2 of TSTF-508 (Agencywide Documents Access and Management System (ADAMS) accession number ML081850420). This request for additional information pertains to the change described in paragraph a on page 2 of TSTF-508. Among other things, those changes provide a relaxation of the restrictions on movement of irradiated fuel and OPDRVs when one or more [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary. The proposed changes allow operators to continue movement of irradiated fuel and continue OPDRVs for up to 90 days when one or more
[CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary.
The second paragraph on page 5 of TSTF-508 (Technical Analysis) provides justification for the relaxation of the restrictions on fuel movement and OPDRVs. The first justification states: First, suspension of fuel movement is unnecessary if Required Action B.2 verifies that the required mitigating actions protect the CRE occupants, just as is required in the operating Modes. When one or more [CREVS/CREFS/CREACS/MCREC/CRFA] subsystems is inoperable due to an inoperable CRE boundary, the proposed changes to the STS as written allow movement of irradiated fuel and OPDRVs to continue for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to completion of Required Action B.2. This appears to conflict with the justification given in the second paragraph on page 5 of TSTF-508, in that the justification seems to imply that fuel movement would be suspended until Required Action B.2 is complete. The NRC staff also believes that it is prudent to immediately suspend fuel handling operations or OPDRVs until after Required Action B.2 is complete. The characteristic risk of a Fuel Handling Accident (FHA), and the dynamic nature of plant maintenance, repair, testing, and other ongoing operations that could be taking place during Modes 5 and 6 is of primary concern.
ENCLOSURE
In TSTF-448, rev. 3, Required Action B.2 is applicable to MODES 1 through [4](hot shutdown).
The 24-hour Completion Time of new Required Action B.2 is reasonable based on the low probability of a DBA occurring during this time period, and the use of mitigating actions as directed by Required Action B.1. Generally, the plant would be expected to remain in a steady state condition during the 24-hour verification time. However, there is the possibility of a fuel handling accident each time a fuel assembly is moved. TSTF-508 would permit continued movement of fuel, and therefore, continued risk of a fuel handling accident, for up to 24-hours before completing the verification that mitigating actions protect CRE occupants from chemical and smoke hazards and that radiological limits will not be exceeded. The NRC staff believes TSTF-508 did not provide sufficient justification based on safety for continued movement of irradiated fuel assemblies or performing OPDRVS before completion of Required Action B.2.
- 1. Explain how the proposed change in TSTF-508 will ensure CRE occupant radiological exposures will not exceed limits, and CRE occupants will be protected from chemical and smoke hazards during the period of time between the discovery of one or more [CREVS/CREFS/CREACS/MCREC/CRFA]
subsystems inoperable due to an inoperable CRE and the completion of Required Action B.2 while moving irradiated fuel or performing OPDRVs.
On page 6 of TSTF-508, the response to the question Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? is No.
Since the STS, as amended by TSTF-448, do not allow movement of irradiated fuel while a plants CRE boundary is inoperable, the probability of a FHA when moving irradiated fuel while a plants CRE boundary is inoperable is essentially zero. As stated above, TSTF-508 would allow irradiated fuel movement and OPDRVs to occur while a plants CRE boundary is inoperable. This causes the probability of a FHA when moving irradiated fuel while a plants CRE boundary is inoperable to be greater than zero.
Similarly, STS as amended by TSTF-448 cause the consequences of a FHA while a plants CRE boundary is inoperable to be essentially zero. Using the STS proposed by TSTF-508 could cause the consequences of a FHA while a plants CRE boundary is inoperable to be significantly greater than the consequences of a FHA when using the STS as amended by TSTF-448.
Therefore, the staff does not agree with the justification or the response to the question Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? proposed in TSTF-508.
- 2. Explain or provide further justification for the response to the question Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?