Line 62: |
Line 62: |
| : c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R | | : c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R |
| and quantitative criteria specified on Form ES-301-4 and described in Appendix D. | | and quantitative criteria specified on Form ES-301-4 and described in Appendix D. |
| -
| |
| : 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2: | | : 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2: |
| (1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test(s) | | (1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test(s) |
Line 80: |
Line 79: |
| : c. NRC Chief Examiner (#) | | : c. NRC Chief Examiner (#) |
| : d. NRC Supervisor Note: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required. | | : d. NRC Supervisor Note: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required. |
| * Not applicable for NRC-prepared examination outlines}}
| | Not applicable for NRC-prepared examination outlines}} |
|
---|
Category:Letter
MONTHYEARML24319A2552024-11-14014 November 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000373/2025001 and 05000374/2025001 IR 05000373/20240032024-11-0606 November 2024 County Station - Integrated Inspection Report 05000373/2024003 and 05000374/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 IR 05000373/20244042024-10-23023 October 2024 County Station – Security Baseline Inspection Report 05000373/2024404 and 05000374/2024404 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000373/LER-2023-001-01, Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate2024-10-0909 October 2024 Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000373/20244012024-09-27027 September 2024 County Station – Security Baseline Inspection Report 05000373/2024401 and 05000374/2024401 RS-24-094, Request to Recategorize an Indeterminate Exercise2024-09-20020 September 2024 Request to Recategorize an Indeterminate Exercise ML24263A2062024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000373/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Lasalle County Station (Report 05000373/2024005; 05000374/2024005) IR 05000373/20244022024-08-28028 August 2024 County Station - Cyber Security Inspection Report 05000373/2024402 and 05000374/2024402 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 05000373/LER-2024-004-01, Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer2024-08-22022 August 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer IR 05000373/20240022024-08-13013 August 2024 County Station - Integrated Inspection Report 05000373/2024002 and 05000374/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000373/20244202024-08-0505 August 2024 County Station - Security Baseline Inspection Report 05000373 2024420 and 05000374 2024420 05000373/LER-2024-003-01, Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-07-31031 July 2024 Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions ML24178A2522024-06-27027 June 2024 County Station – Acknowledgement of Response to NRC Inspection Report 05000373/2024001 and 05000374/2024001 and Disputed Non-Cited Violation 05000373/LER-2024-004, Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer2024-06-19019 June 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations 05000373/LER-2024-003, Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-06-0606 June 2024 Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded IR 05000373/20240102024-05-29029 May 2024 County Station - Commercial Grade Dedication Inspection Report 05000373/2024010 and 05000374/2024010 ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes 05000373/LER-2024-002, Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip2024-05-17017 May 2024 Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24131A1512024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 IR 05000373/20240012024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000373/LER-2024-001, Core Operating Limits Report Thermal Limits Exceeded2024-04-26026 April 2024 Core Operating Limits Report Thermal Limits Exceeded ML24108A1562024-04-15015 April 2024 Updated Final Safety Analysis Report (Ufsar), Revision 26 and Fire Protection Report (Fpr), Revision 11 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24071A2122024-03-12012 March 2024 County Station - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000373/20230062024-02-28028 February 2024 Annual Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373/2023006; 05000374/2023006) RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24018A0682024-02-0909 February 2024 Issuance of Amendment Nos. 262 and 247 Revised Design Bases of Lower Downcomer Braces ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 2024-09-06
[Table view] Category:License-Operator
MONTHYEARIR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A0922020-12-0101 December 2020 Sim JPM ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A3692020-12-0101 December 2020 ES-401-4 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A3652020-12-0101 December 2020 ES-301-7 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0222020-12-0101 December 2020 ES-301-1 SRO ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21005A0882020-12-0101 December 2020 Scenarios ML21005A3842020-12-0101 December 2020 ES-403-1 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0462020-12-0101 December 2020 ES-301-5 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A3692020-12-0101 December 2020 ES-401-4 ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0922020-12-0101 December 2020 Sim JPM ML21005A3652020-12-0101 December 2020 ES-301-7 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21005A0462020-12-0101 December 2020 ES-301-5 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A3842020-12-0101 December 2020 ES-403-1 2024-09-16
[Table view] |
Text
2010 LASALLE COUNTY STATION INITlAL EXAMINATION OUTLINE SUBMITTAL
LaSalle Generating Station www.exeloncorp.com Exel 2601 North zist Road Nuclear Marseilles, IL 61341-9757 RAIO-033 10 CFR 55.40 May 5,2010 United States Nuclear Regulatory Commission Attention: NRC Region I l l Administrator 2443 Warrenville Rd.
Suite 210 Lisle, IL 60532-4352 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373/50-374
Subject:
Submittal of Initial Operator Licensing Examination Outline Enclosed are the examination outlines supporting the Initial License Examination scheduled for September 13 through September 24, 2010 at LaSalle County Station.
This submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG -1 021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.
In accordance with NUREG -1021, Revision 9, Supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are complete.
Should you have any questions concerning this letter, please contact Mr. Terrence Simpkin, Regulatory Assurance Manager, at (815 ) 415-2800. For questions concerning examination outlines, please contact Mr. Michael Entwistle at (815 ) 415-4025.
David B. Wozniak Site Vice President LaSalle County Station MAY 0 5 2010
Enclosures:
(Hand delivered to Carl M. Moore, Chief Examiner, NRC Region Ill)
Examination Security Agreements (Form ES-201-3)
Administrative Topics Outline(s) (Form ES-301-1)
Control Room/ln-Plant Systems Outline (Form ES-301-2)
BWR Examination Outline (Forms ES-401-1)
Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)
Statement Detailing Method of Written Exam Outline Generation Scenario Outlines (Form ES-D-1)
Record of Rejected WAS (Form ES-401-4)
Completed Checklists:
Examination Outline Quality Checklist (Form ES-201-2)
Transient and Event Checklist (Form ES-301-5) cc: (wlo enclosures)
Chief, NRC Operator Licensing Branch Senior Resident Inspector - LaSalle County Station bcc: (without enclosures)
LaSalle County Station Project Manager, NRR Site Vice President - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Director, Licensing - Midwest Regional Operating Group Manager, Licensing - LaSalle County Station Nuclear Licensing Administrator - LaSalle County Station Exelon Document Control Desk Licensing (Hard Copy)
Exelon Document Control Desk Licensing (Electronic Copy)
Human Resources - LaSalle County Station Training Manager - LaSalle County Station
ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: LaSalle County Station Date of Examination: 09/13/2010 Initials Item Task Description
- a b*
- 1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401. W &
W R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D . l of ES-401 and whether all WA cateqories are appropriately sampled.
T
~
T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
E
- N d. Assess whether the justifications for deselected or rejected WA statements are appropriate. mi!! dzL
- 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number S
of normal evolutions, instrument and component failures, technical specifications, and major transients.
Nit bu-I M b. Assess whether there are enough scenario sets (and spares) to test the projected number U
L A
T 0
- c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R
and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
- 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test(s)
(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
- b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified d+
(31 no more than one task is reDeated from the last two NRC licensina examinations
- c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
- a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections. W#
- b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
- c. Ensure that K/A irnuortance ratinas (exceut for Dlant-sDecific uriorities) are at least 2.5. INWF- h
- d. Check for duplication and overlap among exam sections. Ay
- e. Check the entire exam for balance of coveraae. w 1M
- f. Assess whether the exam fits the appropriate job level (RO or SRO). h 5 I#
- a. Author Michael A. Entwistle /
- b. Facility Reviewer (*) John P. Keenan
- c. NRC Chief Examiner (#)
- d. NRC Supervisor Note: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
Not applicable for NRC-prepared examination outlines