ML103090745: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML103090745
| number = ML103090745
| issue date = 11/02/2010
| issue date = 11/02/2010
| title = 2010/11/02 Watts Bar 2 OL - FW: Update NRC RAI Matrix
| title = OL - FW: Update NRC RAI Matrix
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Poole, Justin Sent: Tuesday, November 02, 2010 5:08 PM To: Garg, Hukam; Carte, Norbert; Darbali, Samir; Singh, Gursharan; Marcus, Barry Cc: WBN2HearingFile Resource
{{#Wiki_filter:WBN2Public Resource From:                     Poole, Justin Sent:                     Tuesday, November 02, 2010 5:08 PM To:                       Garg, Hukam; Carte, Norbert; Darbali, Samir; Singh, Gursharan; Marcus, Barry Cc:                       WBN2HearingFile Resource


==Subject:==
==Subject:==
FW: Update NRC RAI Matrix Attachments:
FW: Update NRC RAI Matrix Attachments:               20101028 Open Item List and Count TVA Update 11-2 R1.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Clark, Mark Steven [mailto:msclark0@tva.gov]
20101028 Open Item List and Count TVA Update 11-2 R1.docx JustinC.PooleProjectManagerNRR/DORL/LPWBU.S.NuclearRegulatoryCommission(301)4152048email:Justin.Poole@nrc.gov From: Clark, Mark Steven [mailto:msclark0@tva.gov]
Sent: Tuesday, November 02, 2010 5:06 PM To: Crouch, William D; Hilmes, Steven A Cc: Poole, Justin
Sent: Tuesday, November 02, 2010 5:06 PM To: Crouch, William D; Hilmes, Steven A Cc: Poole, Justin  


==Subject:==
==Subject:==
Update NRC RAI Matrix Bill:
Update NRC RAI Matrix Bill:
Attached is the updated matrix for distribution to the NRC.  
Attached is the updated matrix for distribution to the NRC.
: Regards, Steve Steve Clark Bechtel Power Corp.
Control Systems Watts Bar 2 Completion Project Phone: 865.632.6547 Fax: 865.632.2524 e-mail: msclark0@tva.gov 1


Regards,  Steve  Steve Clark Bechtel Power Corp.Control SystemsWatts Bar 2 Completion ProjectPhone: 865.632.6547Fax: 865.632.2524e-mail: msclark0@tva.gov Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 146   Mail Envelope Properties   (19D990B45D535548840D1118C451C74D6FD376F71C)
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           146 Mail Envelope Properties     (19D990B45D535548840D1118C451C74D6FD376F71C)


==Subject:==
==Subject:==
FW: Update NRC RAI Matrix Sent Date:   11/2/2010 5:08:12 PM Received Date: 11/2/2010 5:08:22 PM From:   Poole, Justin Created By:   Justin.Poole@nrc.gov Recipients:     "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
FW: Update NRC RAI Matrix Sent Date:             11/2/2010 5:08:12 PM Received Date:         11/2/2010 5:08:22 PM From:                   Poole, Justin Created By:             Justin.Poole@nrc.gov Recipients:
Tracking Status: None "Garg, Hukam" <Hukam.Garg@nrc.gov>
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov> Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov> Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>
Tracking Status: None "Garg, Hukam" <Hukam.Garg@nrc.gov>
Tracking Status: None "Marcus, Barry" <Barry.Marcus@nrc.gov> Tracking Status: None  
Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>
Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>
Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>
Tracking Status: None "Marcus, Barry" <Barry.Marcus@nrc.gov>
Tracking Status: None Post Office:            HQCLSTR02.nrc.gov Files                          Size                  Date & Time MESSAGE                        667                  11/2/2010 5:08:22 PM 20101028 Open Item List and Count TVA Update 11-2 R1.docx                  345273 Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:  HQCLSTR02.nrc.gov Files    Size      Date & Time MESSAGE    667      11/2/2010 5:08:22 PM  20101028 Open Item List and Count TVA Update 11-2 R1.docx    345273 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                       rad12E8A.docx                                                                           Open Items to be Resolved for SER Approval SE     FSAR     NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B (The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (AgencywideDocumentsAccessandManagement12/15/2009 Presentation Slides
: 1. Y Closed Closed EICB RAI ML0932303433/12/2010 NNC 11/19/09: The FSAR containsmostlydescriptionof002 All All B (Are there I&C components and systems that have changedtoanewordifferentdigitaltechnology12/15/2009 Presentation Slides
: 2. Y Closed Closed EICB RAI ML0932303433/12/2010 NNC 11/19/09: The FSAR containsmostlydescriptionof003 All All B (Because a digital I&C platform can be configured and programmedfordifferentapplicationsthereview12/15/2009 Presentation Slides
: 3. Y Closed Closed EICB RAI ML0932303433/12/2010 NNC 11/19/09: The FSAR containsmostlydescriptionof004 All All B (Please identify the information that will be submitted foreachunrevieweddigitalI&CsystemandResponder: Webb        1/13/10 Public Meeting
: 4. Y Closed Closed EICB RAI ML093230343January 13, 2010NNC 11/19/09: LIC-110 Rev. 1 Section622states:
"Design005 7.1.3.1  (GBy letter date February 28, 2008 (Agencywide DocumentsAccessandManagementSystemResponder: Craig/Webb
: 5. Y Closed Closed EICB RAI ML093431118 TVA Letter dated2/5/10 006    (GAmendment 95 of the FSAR, Chapter 7.3, shows that change73-1consistsofupdatingareferencefromBy letter dated February 5, 2010: TVA provided theUnit2setpointmethodology(WCAP
-177044-6. Y Closed Closed EICB RAI ML093431118 TVA Letter dated2/5/10NNC: WCAP-12096 Rev. 7 (ML073460281)isinADAMS007 7.1.3.1  (GThe setpoint methodology has been reviewed and approvedbytheNRCstaffinSection7131ofTVA Letter Dated March 12, 2010 (Enclosure 1, ItemNo7onPage7of15):TVArespondedto
: 7. Y Closed ThisitemisreviewedinClosed EICB RAI ML093431118 TVA Letter dated3/12/10 TVA to provide Rev. 8 of the Unit 1document(whichisthecurrent008 7.3  (GThere are several staff positions that provide guidance onsetpointmethodology(egRegGuide1105BTPTVA Letter Dated March 12, 2010 (Enclosure 1, ItemNo8onPage7of15):TVArespondedto
: 8. Y Closed Closed EICB RAI ML093431118 TVA Letter dated3/12/10 009 7.3.2 5.6, 635 (D aChange 7.3-2, identified in Watts Bar Nuclear Plant FSARred-lineforUnit2(ADAMSAccessionNumberTVA Letter Dated March 12, 2010 (Enclosure 1, ItemNo9onPage8of15):TVArespondedto
: 9. Y Closed Closed EICB RAI ML093431118 3/12/10, ML101680598 010 7.3 7.3 (D aThe original SER on Watts Bar (NUREG-0847) documentsthatthescopeofthereviewofFSARTVA Letter Dated March 12, 2010 (Enclosure 1, ItemNo10onPage8of15):TVArespondedto10.Closed Closed EICB RAI ML093431118 3/12/10, ML101680598 011 7.3.2 5.6, 635 (D aNUREG-0847 Supplement No. 2 Section 7.3.2 includesanevaluationofachangeincontainmentTVA Letter Dated March 12, 2010 (Enclosure 1, ItemNo11onPage13of15):TVAresponded11.Closed Closed EICB RAI ML093431118ML101680598, Item9 012 7.4 7.4 (D aThe original SER on Watts Bar (NUREG-0847) documentsthatthescopeofthereviewofFSARTVA Letter Dated March 12, 2010 (Enclosure 1, ItemNo12onPage13of15):TVAresponded12.Closed Closed EICB RAI ML093431118 TVA Letter dated3/12/10 013 7.1.3.1  (GChapter 7 and Chapter 16 of Amendment 95 to the FSARdonotincludeanysetpointvaluesPleaseTVA Letter Dated March 12, 2010 (Enclosure 1, ItemNo13onPage14of15):TVAresponded13.Closed Closed EICB RAI ML093431118 TVA Letter dated3/12/10TS have been docketed. 014 All All B (Provide the justification for any hardware and software changesthathavebeenmadesincethepreviousUSDate: 4/27/10 Responder:TVA14.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10 015    (GVerify that the refurbishment of the power range nuclearinstrumentationdrawersresultedinonlylike
-Date: 4/27/10 Responder:TVA15.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10 016  B (C aIdentify the precedents in license amendment requests (LARs)ifanyforsourcerangemonitorsorDate: 4/27/10 Responder:TVA16.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10 017 7.3.1 7.3.1, 555 (D aIdentify precedents in LARs, if any, for the solid state protectionsystemAlsoidentifyanyhardwareDate: 4/27/10 17.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10 018    (GIdentify any changes made to any instrumentation and control(I&C)systembasedonpriorknowledgeofDate: 4/27/10 Responder:TVA18.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10 019    (GVerify that the containment purge isolation radiation monitoristhesameasusedinWattsBarUnit1orDate: 4/27/10 19.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10 020    (GProvide environmental qualification information pursuanttoSection5049ofTitle10oftheCodeofDate: 4/27/10 Responder:TVA20.Closed Closed NRC Meeting Summar y TVA Letter dated4/27/10NNC 4/30/10:
SRP Section 7.0 states: "Theorganization021  7.3  (GFor the Foxboro Spec 200 platform, identify any changesinhardwarefromtheprecedentsystemsDate: 5/25/10 21.Closed TheresolutionofthisitemClosed NRC Meeting Summary TVA Letter dated6/18/10The resolution of this item will be coveredbyOI#288 022 7.3.2 5.6, 635 (D a Verify the auxiliary feedwater control refurbishment resultsinali ke-for-likereplacementandidentifyanyDate: 4/27/10 22.Closed Closed  NRC Meeting Summary TVA Letter dated4/27/10 023    (GProvide environmental qualification (10 CFR 50.49) informationforsafety
-relatedcontroltransmittersandDate: 4/27/10 Responder:TVA23.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10NNC 4/30/10:
SRP Section 7.0 states: "Theorganization024    (CProvide a schedule by the January 13, 2010, meeting forprovidinginformationinaccordancewithI&CDuring the January 13, 2010 meeting, TVA presentedascheduleforcompletingvarious24.Closed Closed  NRC Meeting SummaryN/A - Request forscheduleNNC 4/30/10: Carte to address responsewithrespecttoPAMS025 7.5.2 7.5.1  (S iFor the containment radiation high radiation monitor, verifythattheinformationprovidedbyTVAisDate: 4/27/10 25.Closed Closed NRC Meeting SummaryML101230248, Item12 026    (GProvide environmental qualification (10 CFR 50.49) informationforsafety
-relatedmonitoringtransmittersDate: 4/27/10 Responder:TVA26.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10NNC 4/30/10:
SRP Section 7.0 states: "Theorganization027 7.7.1.4  (CFor Foxboro I/A provide information regarding safety/non
-safety-relatedinteractioncommoncauseDate: 4/27/10 Responder:TVA27.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10 028    (GFor the turbine control AEH system, verify that the refurbishmentresultsinalike
-for-likereplacementResponder: Mark Scansen Date:4/27/1028.Closed Closed NRC Meeting Summary TVA Letter dated10/5/10 029    (CFor the rod control system, verify that the refurbishmentresultsinalike
-for-likereplacementDate: 4/27/10 Responder:TVA29.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 030   (GRegarding the refurbishment of I&C equipment, identifyanycomponentdigitalupgradesandifsoResponder: Clark 30.Closed Closed NRC Meeting Summary TVA Letter dated10/5/10 031   (CFor the rod position indication system (CERPI), provideinformationinaccordancewithISG4NeedtoDate: 4/27/10 Responder:TVA31.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10CERPI is non-safety related. Note:Theissueofinterlockwith032   (CFor the process computer, need to consider cyber securityissuesandemergencyresponsedatasystemDate: 4/27/10 Responder:TVA32.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10EICB will no longer consider cyberissues033    (CFor the loose parts monitoring system, provide informationregardinginteractionswithsafetyrelatedDate: 4/27/10 Responder:TVA33.Closed Closed NRC Meeting Summary TVA Letter dated4/27/10The loose parts monitoring systemisnotconnectedtoany034    (G2/4/2010 Responder: TVA 34.Closed AwaitingNRCevaluationofClosed N/A TVA Letter dated4/27/10 034.1  a r g  Chapter 7.1 - Introduction ReactorCoolantSystemFlowRateMeasurement 35.Close Closed N/A N/A  034.2   (G  Chapter 7.2 - Reactor Trip System DeletionofNeutronFluxNegativeRateTrip 36.Close Closed N/A N/A  034.3 7.3 7.3 (D a  Chapter 7.3 - ESFAS DesignBasisAnalysisParameters 37.ClosedClosed N/A N/A 034.4 7.5.1.1 7.5.2 (M a  Chapter 7.5 - Instrumentation Systems Important to Safety 38.Closed Closed  N/A N/A Closed  034.5 7.5.1.1 7.5.2 767 r c u  Chapter 7.6 - All Other Systems Required for Safety PlantProcessComputerReplacement 39.Closed Closed N/A  N/A Closed  034.6  n g h  Chapter 7.7 Control Systems AlternateMeansforMonitoringControlor 40.ClosedClosed  N/A N/A  035    (S i2/18/2010 Responder: Clark 41.Closed Closed RAI No. 1 ML102980005 TVA Letter dated3/12/10LIC-110 Section 6.2.2 states:
===Response===
"Designfeaturesand036 7.5.2 7.5.1 (CFebruary 18, 2010 Date: 5/25/10 Responder:Clark42.Closed Closed NRC Meeting Summary NNC: Unit 2 FSAR Section 751"PostAccidentMonitoring037 7.5.1.1 7.5.2 (M a2/18/2010 Responder: Clark                      Date: 5/25/10 43.Closed Closed 09/16/10 N/A TVA Letter dated10/5/10FSAR Amendment 100 provides information038 7.5.1.1 7.5.2 (M a2/18/2010 Responder: Clark                Date: 5/25/10 44.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10The slides presented at the December152010meeting039   (GJanuary 13, 2010 Responder: Clark                                Date:
Acceptable                                                                      RAI Resp.
5/25/1045.Closed Closed EICB RAI ML102910008 FSAR amendment98The equation for the calculation oftheestimatedaveragehotleg040    (GJanuary 13, 2010 Responder: Clark                              Date:
No.                   POC                             Issue                                             TVA Response(s)                   Y/N           Status/ Current Actions     Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                           Date 001   All    All    B  (   The Watts Bar Nuclear Plant FSAR red-line for Unit 2      12/15/2009 Presentation Slides                  1. Y          Closed                        Closed            EICB RAI        3/12/2010      NNC 11/19/09: The FSAR (Agency wide Documents Access and Management                                                                                                                              ML093230343                      contains mostly description of 002    All    All    B  (  Are there I&C components and systems that have            12/15/2009 Presentation Slides                  2. Y          Closed                       Closed             EICB RAI        3/12/2010      NNC 11/19/09: The FSAR changed to a new or different digital technology                                                                                                                          ML093230343                      contains mostly description of 003   All    All    B  (   Because a digital I&C platform can be configured and      12/15/2009 Presentation Slides                  3. Y          Closed                       Closed             EICB RAI        3/12/2010      NNC 11/19/09: The FSAR programmed for different applications the review                                                                                                                          ML093230343                      contains mostly description of 004   All    All    B  (   Please identify the information that will be submitted    Responder: Webb      1/13/10 Public Meeting    4. Y          Closed                       Closed             EICB RAI        January 13,    NNC 11/19/09: LIC-110 Rev. 1 for each unreviewed digital I&C system and                                                                                                                                ML093230343      2010            Section 6 2 2 states: "Design 005 7.1.3.                (
5/25/1046.Closed Closed EICB RAI EICB RAI FSAR amendment98The equation for the calculation ofthepowerfractiononpage042 All All B (February 25, 2010:  Telecom Date: 5/25/10 Responder:Clark47.Closed Closed EICB RAI ML102910002 TVA Letter dated6/18/10The drawing provided did not havetheidentificationnumbers044 7.5.2 7.5.1 (CFebruary 25, 2010 Date: 5/25/10 Responder:Clark48.Closed Closed EICB RAI ML102910002 TVA Letter dated6/18/10 045    (CFebruary 25, 2010 Date: 5/25/10 Responder:Clark49.Closed Closed EICB RAI ML102910002 TVA Letter dated7/30/10 046    (CFebruary 25, 2010 Date: 5/25/10 Responder:Clark50.Closed Closed N/A - Request forhelpfinding N/A  047 7.5.2 7.5.1  (C4/8/2010 Responder: WEC/Hilmes                Date: 5/25/10 51.Closed Closed EICB RAI ML102910002 TVA Letter dated7/30/10 048 7.5.2 7.5.1  (CApril 8, 2010 Date: 5/25/10 Responder:WEC52.Closed Closed EICB RAI ML102910002 TVA Letter dated6/18/10 049 7.5.2 7.5.(C4/8/2010 Responder: WEC              Date: 5/25/10 53.Closed Closed EICB RAI ML102910002 TVA Letter dated6/18/10 051    (GApril 15, 2010 Date: 5/25/10 Responder:Craig/Webb54.Closed Closed N/A N/A Review addressed by another OpenItem052 7.5.2 7.5.1 (S iApril 19, 2010 Date: 5/25/10 Responder:Slifer55.Closed Closed RAI No. 12 ML102980005 053 7.5.2 7.5.(S iApril 19, 2010 Date: 5/25/10 Responder:Slifer56.Closed Closed RAI No. 13 ML102980005 056    (S iApril 19, 2010 Date: 5/25/10 Responder:Slifer57.Closed Closed RAI No. 16 ML102980005 TVA Letter dated6/18/10Sorrento Radiation Monitoring 057 7.5.2 7.5.1  (S i4/19/2010 Responder: TVA I&C Staff                    Date:
G  By letter date February 28, 2008 (Agencywide              Responder: Craig/Webb                            5. Y          Closed                       Closed             EICB RAI        TVA Letter 1                        Documents Access and Management System                                                                                                                                    ML093431118      dated 2/5/10 006                        (
5/25/1058.Closed Closed RAI No. 17 ML102980005 TVA Letter dated6/18/10
G  Amendment 95 of the FSAR, Chapter 7.3, shows that          By letter dated February 5, 2010: TVA provided  6. Y          Closed                       Closed            EICB RAI        TVA Letter     NNC: WCAP-12096 Rev. 7 change 7 3-1 consists of updating a reference from        the Unit 2 setpoint methodology (WCAP-177044-                                                                  ML093431118      dated 2/5/10   (ML073460281) is in ADAMS 007 7.1.3.                 (
G   The setpoint methodology has been reviewed and            TVA Letter Dated March 12, 2010 (Enclosure 1,    7. Y          Closed                        Closed             EICB RAI        TVA Letter      TVA to provide Rev. 8 of the Unit 1                        approved by the NRC staff in Section 7 1 3 1 of            Item No 7 on Page 7 of 15): TVA responded to                  This item is reviewed in                        ML093431118      dated 3/12/10  1 document (which is the current 008 7.3                  (
G  There are several staff positions that provide guidance    TVA Letter Dated March 12, 2010 (Enclosure 1,    8. Y          Closed                        Closed            EICB RAI        TVA Letter on setpoint methodology (e g Reg Guide 1 105 BTP          Item No 8 on Page 7 of 15): TVA responded to                                                                   ML093431118      dated 3/12/10 009  7.3.5.6,    (
D a      Change 7.3-2, identified in Watts Bar Nuclear Plant        TVA Letter Dated March 12, 2010 (Enclosure 1,    9. Y          Closed                       Closed             EICB RAI        3/12/10, 635              FSAR red-line for Unit 2 (ADAMS Accession Number          Item No 9 on Page 8 of 15): TVA responded to                                                                    ML093431118      ML101680598 010  7.3      7.3    (
D a      The original SER on Watts Bar (NUREG-0847)                TVA Letter Dated March 12, 2010 (Enclosure 1,    10.           Closed                       Closed             EICB RAI         3/12/10, documents that the scope of the review of FSAR            Item No 10 on Page 8 of 15): TVA responded to                                                                  ML093431118      ML101680598 011  7.3.2   5.6,    (
D a      NUREG-0847 Supplement No. 2 Section 7.3.2                  TVA Letter Dated March 12, 2010 (Enclosure 1,   11.           Closed                       Closed             EICB RAI        ML101680598, 635              includes an evaluation of a change in containment          Item No 11 on Page 13 of 15): TVA responded                                                                    ML093431118      Item 9 012  7.4      7.4    (
D a      The original SER on Watts Bar (NUREG-0847)                TVA Letter Dated March 12, 2010 (Enclosure 1,    12.           Closed                       Closed             EICB RAI        TVA Letter documents that the scope of the review of FSAR            Item No 12 on Page 13 of 15): TVA responded                                                                    ML093431118      dated 3/12/10 013 7.1.3.                 (
G  Chapter 7 and Chapter 16 of Amendment 95 to the            TVA Letter Dated March 12, 2010 (Enclosure 1,    13.           Closed                       Closed             EICB RAI         TVA Letter     TS have been docketed.
1                        FSAR do not include any setpoint values Please            Item No 13 on Page 14 of 15): TVA responded                                                                    ML093431118      dated 3/12/10 014  All      All    B  (  Provide the justification for any hardware and software   Date: 4/27/10                                    14.           Closed                       Closed             NRC Meeting      TVA Letter changes that have been made since the previous U S        Responder: TVA                                                                                                  Summary          dated 4/27/10 015                        (
G  Verify that the refurbishment of the power range          Date: 4/27/10                                    15.           Closed                       Closed             NRC Meeting      TVA Letter nuclear instrumentation drawers resulted in only like-    Responder: TVA                                                                                                  Summary          dated 4/27/10 016                  B C
a(       Identify the precedents in license amendment requests      Date: 4/27/10                                   16.           Closed                       Closed             NRC Meeting      TVA Letter (LARs) if any for source range monitors or                Responder: TVA                                                                                                  Summary          dated 4/27/10 017  7.3.7.3.1(
D a      Identify precedents in LARs, if any, for the solid state  Date: 4/27/10                                   17.           Closed                       Closed             NRC Meeting      TVA Letter 555              protection system Also identify any hardware                                                                                                                              Summary          dated 4/27/10 018                        (
G  Identify any changes made to any instrumentation and      Date: 4/27/10                                   18.           Closed                       Closed             NRC Meeting      TVA Letter control (I&C) system based on prior knowledge of          Responder: TVA                                                                                                  Summary          dated 4/27/10 019                        (
G  Verify that the containment purge isolation radiation      Date: 4/27/10                                   19.           Closed                       Closed             NRC Meeting      TVA Letter monitor is the same as used in Watts Bar Unit 1 or                                                                                                                        Summary          dated 4/27/10 020                        (
G  Provide environmental qualification information            Date: 4/27/10                                   20.           Closed                       Closed             NRC Meeting      TVA Letter     NNC 4/30/10: SRP Section 7.0 pursuant to Section 50 49 of Title 10 of the Code of      Responder: TVA                                                                                                  Summary          dated 4/27/10  states: "The organization 021            7.3        (
G  For the Foxboro Spec 200 platform, identify any            Date: 5/25/10                                   21.           Closed                       Closed             NRC Meeting      TVA Letter     The resolution of this item will be changes in hardware from the precedent systems                                                                            The resolution of this item                      Summary          dated 6/18/10   covered by OI#288 022  7.3.2   5.6,    (
D a      Verify the auxiliary feedwater control refurbishment      Date: 4/27/10                                   22.           Closed                       Closed             NRC Meeting      TVA Letter 635              results in a like-for-like replacement and identify any                                                                                                                    Summary          dated 4/27/10 023                        (
G  Provide environmental qualification (10 CFR 50.49)        Date: 4/27/10                                    23.          Closed                        Closed            NRC Meeting      TVA Letter      NNC 4/30/10: SRP Section 7.0 information for safety-related control transmitters and    Responder: TVA                                                                                                  Summary          dated 4/27/10  states: "The organization 024                        (
C  Provide a schedule by the January 13, 2010, meeting        During the January 13, 2010 meeting, TVA        24.           Closed                       Closed             NRC Meeting      N/A - Request  NNC 4/30/10: Carte to address for providing information in accordance with I&C          presented a schedule for completing various                                                                    Summary          for schedule    response with respect to PAMS 025  7.5.2   7.5.1   (
Si      For the containment radiation high radiation monitor,     Date: 4/27/10                                    25.          Closed                        Closed            NRC Meeting      ML101230248, verify that the information provided by TVA is                                                                                                                            Summary          Item 12 026                        (
G  Provide environmental qualification (10 CFR 50.49)        Date: 4/27/10                                   26.           Closed                       Closed             NRC Meeting      TVA Letter      NNC 4/30/10: SRP Section 7.0 information for safety-related monitoring transmitters    Responder: TVA                                                                                                  Summary          dated 4/27/10  states: "The organization 027 7.7.1.                 (
C  For Foxboro I/A provide information regarding              Date: 4/27/10                                   27.           Closed                       Closed             NRC Meeting      TVA Letter 4                        safety/non-safety-related interaction common cause        Responder: TVA                                                                                                  Summary          dated 4/27/10 028                        (
G  For the turbine control AEH system, verify that the        Responder: Mark Scansen                          28.           Closed                       Closed             NRC Meeting      TVA Letter refurbishment results in a like-for-like replacement      Date: 4/27/10                                                                                                  Summary          dated 10/5/10 029                        (
C   For the rod control system, verify that the                Date: 4/27/10                                    29.           Closed                       Closed             NRC Meeting      TVA Letter refurbishment results in a like-for-like replacement      Responder: TVA                                                                                                  Summary          dated 4/27/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 058 7.5.0 7.5  (S iApril 19, 2010 Date: 5/25/10 Responder:Slifer59.Closed Closed RAI No. 18 ML102980005 TVA Letter dated6/18/10 059 7.5.2 7.5.1  (S iApril 19, 2010 Date:  Responder:Slifer60.Closed Closed RAI No. 19 ML102980005 TVA Letter dated6/18/10 060 7.5.2 7.5.1  (CApril 19, 2010 Date:  5/25/10 Responder:Clark61.Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1  (CApril 19, 2010 Date:  5/25/10 Responder:Clark62.Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1  (CApril 19, 2010 Date:  5/25/10 Responder:Clark63.Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1  (CApril 19, 2010 Date:  5/25/10 Responder:Clark64.Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1  (CBy letter dated March 12, 2010 TVA stated that the targetsubmittaldatefortheD3AnalysiswasApril2Responder: Webb     Date: 4/8/2010 65.Closed Closed N/A - No questionwas TVA Letter dated10/5/10 066 7.5.2 7.5.1  (CBy letter dated March 12, 2010 TVA stated that the targetsubmittaldateforthe "WattsBar2PAMSResponder: WEC                          Date: 5/25/10 66.Closed Closed N/A - No questionwas TVA Letter dated6/18/10 076 7.5.2 7.5.1  (CBy letter dated March 12, 2010 TVA stated that the targetsubmittaldateforthe "WattsBar2PAMSResponder: Clark                      Date: 5/25/10 67.Closed Closed  N/A - No questionwas N/A  077 7.5.2 7.5.1  (CBy letter dated March 12, 2010 TVA stated that the targetsubmittaldateforsevenotherdocumentswasResponder: WEC                          Date: 5/25/10 68.Closed  Closed N/A - No questionwas TVA Letter dated6/18/10 078    (G4/26/2010 Responder: Clark                          Date: 5/25/10 69.Closed  Closed  EICB RAI ML102910008 TVA Letter dated10/5/10 079    (G4/26/2010 Responder: Clark                              Date: 5/25/1070.Closed Closed EICB RAI ML102910008 TVA Letter dated10/5/10Reviewed under Item 154 080    (S i4/26/2010 Responder: WEC 71.Closed Closed RAI No. 2 ML102980005 TVA Letter dated7/30/10 083 7.5.2 7.5.1  (CMay 6, 2010 Date:  6/18/10 Responder:WEC72.Closed Closed EICB RAI ML102910002 TVA Letter dated7/30/10 084 7.5.2 7.5.1 B (C aMay 6, 2010 Date:  6/18/10 Responder:Clark73.Closed Closed EICB RAI ML102910002 TVA Letter dated6/18/10 087 7.5.2 7.5.1  (S iMay 6, 2010 Date:  5/24/10 Responder:Slifer74.Closed Closed RAI No. 20 ML102980005 TVA Letter dated6/18/10 088 7.5.2 7.5.1 B (S inMay 6, 2010 Date:  5/24/10 Responder:Slifer75.Closed Closed RAI No. 21 ML102980005 TVA Letter dated6/18/10 089    (C5/6/2010 Responder: Clark 76.Closed Closed EICB RAI ML102910002 TVA Letter dated3/12/10NNC:  Docketed response states thattheapplicableFSAR090    (C5/6/2010 Responder: Clark                        Date: 5/25/10 77.Closed Closed EICB RAI ML102910002 TVA Letter dated3/12/10 091 7.4 7.4 (D aMay 20, 2010 Date:  5/25/10 Responder:Clark78.Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated6/18/10 093    (GMay 20, 2010 Date:  5/25/10 Responder:Knuettel79.Closed Closed N/A N/A Will be reviewed under item 154 094    (G5/20/2010 Responder: Clark                          Date: 5/25/10 80.Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, 784 XX (D aMay 20, 2010 Date:  Responder:81.Closed Closed EICB RAI No. 2 ML102910017 TVA Letter dated7/30/10 096 7.7.5 XX (D a5/20/2010 Responder: 82.Closed Closed  EICB RAI No.3 ML102910017 TVA Letter dated7/30/10 097 7.4.2 7.4 (D aMay 20, 2010 Date:  Responder:83.Closed Closed EICB RAI No.4 ML102910017 TVA Letter dated7/30/10 098 7.4.2 7.4 (D aMay 25, 2010 Date:  Responder:84.Closed Closed EICB RAI No.5 ML102910017 TVA Letter dated7/30/10 099  L (BApril 12, 2010 Date:  Responder:WEC85.Closed Closed  Closed to Item 129 100   (C5/20/2010 Responder: WEC 86.Closed Closed N/A - No questionwas N/A  102    (CMay 24, 2010 Date:  5/24/10 Responder:WEC87.Closed Closed N/A TVA Letter dated6/18/10Request for schedule not information105    (GApril 29, 2010 Date:  Responder:Langley88.Closed Closed N/A N/A Will be reviewed under item 154.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                     rad12E8A.docx                                                                       Open Items to be Resolved for SER Approval SE      FSAR    NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 106  B (S inMay 6, 2010 Date:  5/25/10 Responder:Davies89.Closed Closed RAI No. 9 ML102980005 TVA Letter dated6/18/10 107  B (S inMay 6, 2010 Date:  5/28/10 Responder:Clark90.Closed Closed RAI No. 22 ML102980005 TVA Letter dated6/18/10 108    (GMay 6, 2010 Date:  5/25/10 Responder:Webb/Hilmes91.Closed Closed N/A N/A Will be reviewed under OI#154 109.b  (C5/6/2010 Responder: N/A 92.Closed Closed N/A N/A Duplicate of another open Item.
109.a 7.8 XX (D a5/6/2010 Responder: N/A 93.Closed Closed N/A N/A  110    (GMay 6, 2010 Date:  Responder:Clark94.Closed Closed N/A N/A Information was found. 111  B (C aMay 6, 2010 Date:  5/28/10 Responder:Clark95.Closed Closed N/A TVA Letter dated6/18/10Request to help find, not a requestforinformation 112  B (G aJune 1, 2010 Date:  Responder:Clark96.Closed Closed N/A N/A Information was received 113    (G6/1/2010 Responder: Clark 97.Closed Closed EICB RAI ML102910008 TVA Letter dated6/18/10 115    (C2/25/2010 Responder: Clark 98.Closed Closed EICB RAI ML102910002 TVA Letter dated6/18/10 116    (G6/3/2010 Responder: WEC 99.Closed Closed EICB RAI ML102910008 TVA Letter dated10/5/10Letter sent to Westinghouse requestingthebasisinformation 119    (S iJune 10, 2010 Date:  Responder:100.Closed Closed RAI No. 23 ML102980005 TVA Letter dated7/30/10 120    (C5/6/2010 Responder: Hilmes/Merten/Costley 101.Closed Closed EICB RAI ML102910002 TVA Letter dated7/30/10 121    (C5/6/2010 Responder: Webb/Webber 102.Closed Closed EICB RAI ML102980066 TVA Letter dated7/30/10 122    (CJune 14, 2010 Date:  Responder:WEC103.Closed Closed N/A - Request forschedulenot N/A  123 7.7.3 7.4.1, 9 34 (D a6/14/2010 Responder: 104.Closed Closed ML101720589, RAIs21and22 TVA Letter dated7/30/10 124 7.7.5 XX (D a6/14/2010 Responder: 105.Closed Closed ML101720589, ItemNo23 TVA Letter dated7/30/10 125 7.7.8 7.7.1.12 (D a6/14/2010 Responder: 106.Closed Closed ML101720589, ItemNos 24 TVA Letter dated7/30/10 126 7.8 7.8 (D aJune 14, 2010 Date:  Responder:107.Closed Closed ML101720589, ItemNo26 TVA Letter dated7/30/10 127 7.2 7.2  (G6/16/2010 Responder: WEC/Clark 108.Closed Closed EICB RAI ML102910008 TVA Letter dated6/18/10 128 7.2 7.2  (G6/18/2010 Responder: WEC Drake /TVA Craig 109.Closed Closed EICB RAI ML102910008 Track through SE open item 129  (P o6/12/2010 Responder: WEC 110.Closed Closed N/A TVA Letter dated10/5/10 130  (P o6/28/2010 Responder: Clark 111.Closed Closed N/A TVA Letter dated10/5/10 131  (P o6/28/2010 Responder: Clark 112.Closed Closed N/A TVA Letter dated10/5/10 132  (P o6/28/2010 Responder: Clark 113.Closed Closed N/A TVA Letter dated10/5/10 133  (P o6/28/2010 Responder: Clark 114.Closed Closed  TVA Letter dated10/5/10 134  (P o6/28/2010 Responder: Clark 115.Closed Closed  TVA Letter dated10/5/10 135 7.3.1 7.3.1 (D a6/30/2010 Responder: Clark 116.Closed Closed RAI not necessary TVA Letter dated10/5/10 136 7.3.2, 74 7.4, 56 (D a6/30/2010 Responder: Clark 117.Closed Closed RAI not necessary TVA Letter dated10/5/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 137    (CSeveral WBN2 PAMS documents contain a table titled, "DocumentTraceability&Compliance "Responder: WEC 118.Closed Closed ML101650255, ItemNo1 TVA Letter dated10/5/10 139    (CThe WBN2 PAMS System Requirements Specification (WBN2PAMSSysRS)containsatable(seepageiii)Responder: WEC 119.Closed Closed ML101650255, ItemNo3 TVA Letter dated10/5/10WBN2 PAMS System RequirementsSpecification 141    (CDeleted by DORL Date:   Responder:120.Closed Closed ML101650255, ItemNo5 WBN2 PAMS System RequirementsSpecification 146    (C6/17/2010 Responder: 121.Closed Closed ML101650255, ItemNo10 PAMS System Requirements Specifications 147    (C6/17/2010 Responder: 122.Closed Closed ML101650255, ItemNo11 PAMS System Requirements Specifications 148    (C6/17/2010 Responder: 123.Closed Closed ML101650255, ItemNo12 PAMS System Requirements Specifications 149 7.2 7.2  (GFSAR Section 7.1.1.2(2), Overtemperature delta T and OverpressuredeltaTequationshavebeensimplifiedResponder: Tindell 124.Close Closed ML101720589, ItemNo1 TVA Letter dated10/5/10 150 7.2 7.2  (GMany of the changes were based on the WestinghousedocumentN3 4003ProvidethisResponder: Clark 125.Close ResponseprovidedinletterClosed ML101720589, ItemNo2 TVA Letter dated10/5/10 151 7.2 7.2 (GProvide the EDCR 52378 and 54504 which discusses thebasisformanychangestothisFSARsectionResponder: Clark 126.Close Closed ML101720589, ItemNo3 TVA Letter dated10/5/10 152 7.2 7.(GDeleted portion of FSAR section 7.2.3.3.4 and moved toFSARsection72115HowevertheFSARResponder: Merten/Clark 127.Close Closed ML101720589, ItemNo4 TVA Letter dated10/5/10 153 7.2 7.2 (GFSAR section 7.2.1.1.7 added the reference to FSAR section10443forexceptiontoP
===Response===
-12HoweverResponder: Craig/Webb 128.Close Closed ML101720589, ItemNo5 TVA Letter dated10/21/10 155 7.2 7.(GSummary of FSAR change document section 7.2 statesthatsections72119and7222(4)are Date:  Responder:Stockton129.Closed Closed ML101720589, ItemNo7  157 7.2 7.2  (GFSAR section 7.2.2.1.1, fifth paragraph was deleted exceptforthelastsentenceThelastsentencestatesResponder: Tindell 130.Close Closed ML101720589, ItemNo9 TVA Letter dated10/5/10 158 7.2 7.2 (GFSAR section 7.2.2.1.1, paragraph six was changed to statethatthedesignmeetstherequirementsofResponder: Tindell 131.Closed Closed ML101720589, ItemNo10 TVA Letter dated10/5/10 159 7.2 7.2  (GFSAR section 7.2.2.1.2 discusses reactor coolant flow measurementbyelbowtapsHoweveritfurtherResponder: Craig 132.Close closed ML101720589, ItemNo11 TVA Letter dated10/5/10 160 7.2 7.2  (GFSAR section 7.2.2.2(7) deleted text which has references12and14ThesereferencesarenotResponder: Tindell 133.Close Closed ML101720589, ItemNo12 TVA Letter dated10/5/10 161 7.2 7.2  (GFSAR section 7.2.2.3 states that changes to the controlfunctiondescriptioninthissectionareexpectedResponder: Clark 134.Closed Closed ML101720589, ItemNo13 TVA Letter dated10/5/10 162 7.2 7.2 (GFSAR section 7.2.2.2(14) states that bypass of a protectionchannelduringtestingisindicatedbyanResponder: Tindell 135.Closed Closed ML101720589, ItemNo14 TVA Letter dated10/5/10 163 7.2 7.2  (GDeleted by DORL Date:   Responder:136.Closed Closed ML101720589, ItemNo15  164 7.2 751 7.2 a r glFSAR section 7.2.2.2(20) has been revised to include theplantcomputerasameanstoprovideinformationResponder: Perkins 137.Closed Closed ML101720589, ItemNo16and TVA Letter dated10/5/10Item No. 8 sent to DORL 165 7.2 7.2 (GFSAR section 7.2.2.3.2, last paragraph of this section hasbeendeletedThebasisforthisdeletionisthatResponder: Clark 138.Closed Closed ML101720589, ItemNo17 TVA Letter dated10/5/10 166 7.2 7.2 (GChanges to FSAR section 7.2.2.2(20) are justified basedonthestatementthattheintegratedcomputerResponder: Clark 139.Closed Closed ML101720589, ItemNo18 TVA Letter dated10/5/10 167 7.2 7.2 (GFSAR section 7.2.2.4, provide an analysis or reference tochapter15analysiswhichdemonstratethatfailureResponder: Clark 140.Close closed ML101720589, ItemNo19 TVA Letter dated10/5/10 168 7.2 7.(GFSAR table 7.2-4, item 9 deleted loss of offsite power tostationauxiliaries(stationblackout)basedontheResponder: Clark 141.Close ResponseprovidedinletterClosed ML101720589, ItemNo20 TVA Letter dated10/5/10 169    (G6/18/2010 Responder: Clark 142.Closed Closed   170    (G6/17/2010 Responder: Clark 143.Closed Closed    171 7.2 7.(G6/17/2010 Responder: Craig 144.Closed Closed EICB RAI ML102910008 TVA Letter dated10/21/10Closed to SE Open Item 172   (G6/17/2010 Responder: Craig 145.Closed Closed EICB RAI ML102910008 173 7.1 7.1  (G6/17/2010 Responder: Craig/Webb/Powers 146.Closed Closed  EICB RAI ML102910008
Acceptable                                                                    RAI Resp.
No.                   POC                             Issue                                         TVA Response(s)                     Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                     Date 030                      (
G  Regarding the refurbishment of I&C equipment,           Responder: Clark                                30.           Closed                     Closed             NRC Meeting      TVA Letter identify any component digital upgrades and if so                                                                                                                    Summary          dated 10/5/10 031                      (
C  For the rod position indication system (CERPI),          Date: 4/27/10                                  31.           Closed                     Closed             NRC Meeting      TVA Letter     CERPI is non-safety related.
provide information in accordance with ISG 4 Need to    Responder: TVA                                                                                              Summary          dated 4/27/10  Note: The issue of interlock with 032                      (
C  For the process computer, need to consider cyber        Date: 4/27/10                                  32.           Closed                     Closed             NRC Meeting      TVA Letter      EICB will no longer consider security issues and emergency response data system      Responder: TVA                                                                                              Summary          dated 4/27/10  cyber issues 033                      (
C  For the loose parts monitoring system, provide          Date: 4/27/10                                  33.           Closed                     Closed             NRC Meeting      TVA Letter      The loose parts monitoring information regarding interactions with safety related  Responder: TVA                                                                                              Summary          dated 4/27/10  system is not connected to any 034                      (
G  2/4/2010                                                 Responder: TVA                                  34.           Closed                     Closed             N/A              TVA Letter Awaiting NRC evaluation of                                      dated 4/27/10 034.                 a r
g        Chapter 7.1 - Introduction                                                                              35.           Close                     Closed              N/A              N/A 1                              Reactor Coolant System Flow Rate Measurement 034.                     (
G    Chapter 7.2 - Reactor Trip System                                                                      36.           Close                       Closed             N/A              N/A 2                              Deletion of Neutron Flux Negative Rate Trip 034. 7.3      7.3    (
D a        Chapter 7.3 - ESFAS                                                                                    37.           Closed                      Closed            N/A              N/A 3                               Design Basis Analysis Parameters 034. 7.5.1. 7.5.2   (
M a        Chapter 7.5 - Instrumentation Systems Important to                                                      38.           Closed                      Closed            N/A              N/A            Closed 4    1                     Safety 034. 7.5.1. 7.5.2  r c
u        Chapter 7.6 - All Other Systems Required for Safety                                                    39.           Closed                      Closed             N/A              N/A            Closed 5    1      767                Plant Process Computer Replacement 034.                  n g
h        Chapter 7.7 Control Systems                                                                            40.           Closed                      Closed            N/A              N/A 6                              Alternate Means for Monitoring Control or 035                  (
Si      2/18/2010                                                Responder: Clark                                41.           Closed                     Closed             RAI No. 1        TVA Letter    LIC-110 Section 6.2.2 states:
ML102980005      dated 3/12/10 Design features and 036  7.5.2   7.5.1       (
C  February 18, 2010                                        Date: 5/25/10                                  42.           Closed                     Closed             NRC Meeting                    NNC: Unit 2 FSAR Section Responder: Clark                                                                                            Summary                        7 5 1 Post Accident Monitoring 037 7.5.1. 7.5.2   (
M a      2/18/2010                                                Responder: Clark              Date: 5/25/10    43.           Closed                      Closed            N/A              TVA Letter   FSAR Amendment 100 provides 1                                                                                                                                                                          09/16/10                            dated 10/5/10 information 038 7.5.1. 7.5.2   (
M a      2/18/2010                                                Responder: Clark            Date: 5/25/10      44.           Closed                      Closed             EICB RAI        TVA Letter   The slides presented at the 1                                                                                                                                                                                            ML102861885 dated 10/5/10 December 15 2010 meeting 039                      (
G  January 13, 2010                                        Responder: Clark                    Date:      45.           Closed                      Closed            EICB RAI        FSAR          The equation for the calculation 5/25/10                                                                                                      ML102910008 amendment 98 of the estimated average hot leg 040                      (
G  January 13, 2010                                        Responder: Clark                   Date:      46.           Closed                     Closed             EICB RAI EICB FSAR            The equation for the calculation 5/25/10                                                                                                      RAI              amendment 98 of the power fraction on page 042    All    All    B  (  February 25, 2010: Telecom                              Date: 5/25/10                                  47.          Closed                      Closed            EICB RAI        TVA Letter   The drawing provided did not Responder: Clark                                                                                            ML102910002 dated 6/18/10 have the identification numbers 044  7.5.2   7.5.1      (
C  February 25, 2010                                        Date: 5/25/10                                  48.           Closed                     Closed             EICB RAI        TVA Letter Responder: Clark                                                                                            ML102910002 dated 6/18/10 045                      (
C  February 25, 2010                                        Date: 5/25/10                                   49.           Closed                      Closed            EICB RAI        TVA Letter Responder: Clark                                                                                            ML102910002 dated 7/30/10 046                      (
C  February 25, 2010                                        Date: 5/25/10                                  50.           Closed                     Closed             N/A - Request N/A Responder: Clark                                                                                            for help finding 047  7.5.2   7.5.1      (
C  4/8/2010                                                Responder: WEC/Hilmes            Date: 5/25/10 51.           Closed                     Closed             EICB RAI        TVA Letter ML102910002 dated 7/30/10 048  7.5.2   7.5.1      (
C  April 8, 2010                                            Date: 5/25/10                                  52.           Closed                     Closed             EICB RAI        TVA Letter Responder: WEC                                                                                              ML102910002 dated 6/18/10 049  7.5.2   7.5.1      (
C  4/8/2010                                                Responder: WEC            Date: 5/25/10        53.           Closed                     Closed             EICB RAI        TVA Letter ML102910002 dated 6/18/10 051                      (
G  April 15, 2010                                          Date: 5/25/10                                   54.          Closed                      Closed            N/A              N/A          Review addressed by another Responder: Craig/Webb                                                                                                                      Open Item 052  7.5.2   7.5.1  (
Si      April 19, 2010                                          Date: 5/25/10                                   55.          Closed                      Closed            RAI No. 12 Responder: Slifer                                                                                            ML102980005 053  7.5.2   7.5.1  (
Si      April 19, 2010                                          Date: 5/25/10                                   56.           Closed                     Closed             RAI No. 13 Responder: Slifer                                                                                            ML102980005 056                  (
Si      April 19, 2010                                          Date: 5/25/10                                  57.           Closed                     Closed             RAI No. 16      TVA Letter   Sorrento Radiation Monitoring Responder: Slifer                                                                                            ML102980005 dated 6/18/10 057  7.5.2   7.5.1  (
Si      4/19/2010                                               Responder: TVA I&C Staff              Date:   58.           Closed                     Closed             RAI No. 17      TVA Letter 5/25/10                                                                                                      ML102980005 dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 174    (G6/28/2010 Responder: H ilmes/Craig 147.Closed Closed EICB RAI ML102910008 175    (GJune 28, 2010 Responder:  148.Closed Closed EICB RAI ML102910008 176 7.1 7.1  (G6/28/2010 Responder: Craig/Webb 149.Closed Closed  EICB RAI ML102910008 177 7.5.2.1 7.5.1 (M a7/15/2010 Responder: Clark 150.Closed Closed N/A TVA Letter dated10/5/10RAI not required 178 7.5.2.1 7.5.1 (M a7/15/2010 Responder: Clark 151.Closed Closed N/A TVA Letter dated10/5/10RAI not required 179    (CAn emphasis is placed on traceability in System RequirementsSpecificationsintheSRPintheResponder: WEC 152.Closed  Closed N/A - Closed to ItemNo142 NA  180    (CThe SRP, BTP 7-14, Section B.3.3.1 states that RegulatoryGuide1172endorseswithafewnotedResponder: WEC 153.Closed Closed N/A - Closed to ItemNo142 NA  181    (CAn emphasis is placed on traceability in System RequirementsSpecificationsintheSRPintheResponder: WEC 154.Closed Closed N/A - Closed to ItemNo142 NA  182   (CCharacteristics that the SR P states that a Software RequirementsSpecificationsshouldhaveincludeResponder: WEC 155.Closed Closed N/A - Closed to ItemNo142 NA  184    (C7/15/2010 Responder: WEC 156.Closed Closed N/A - Closed to ItemNo142 N/A  188    (CBy letter dated June 30, 2010, TVA docketed, "TennesseeValleyAuthority(TVA)WattsBarUnit2Responder: Clark 157.Closed Closed  ML101970033, ItemNo 3&4 TVA Letter dated10/5/10 189  7.6.7  (S i7/20/2010 Responder: Clark 158.Closed Closed RAI No. 3 ML102980005 TVA Letter dated10/5/10 190 7.9  (S iFSAR Table 7.1-1 states: "Regulatory Guide 1.133, May1981"Loose-PartDetectionProgramfortheResponder: Clark 159.Closed Closed  RAI No. 4 ML102980005 TVA Letter dated10/5/10Closed to OI-331.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                   rad12E8A.docx                                                                         Open Items to be Resolved for SER Approval SE     FSAR    NRC
191 7.9  (CNUREG-0800 Chapter 7, Section 7.9, "Data CommunicationSystems "containsreviewcriteriaforResponder: Jimmie Perkins 160.Closed  Closed ML10197016, ItemNos1-3 TVA Letter dated10/5/10 192 7.5.1.1 7.5.2 (M aThe NRC Staff is using SRP (NUREG-0800) Chapter 7 Section75"InstrumentationSystemsImportanttoResponder: Clark 161.Closed Closed Item No. 1 sent toDORL TVA Letter dated10/5/10EICB RAI ML1028618855 sent toDORL 193 7.5.1.1 7.5.2 (M aThe WBU2 FSAR, Section 7.5.2, "Plant Computer System"containsthreesubsectionsResponder: Clark 162.Closed Closed Item No. 2 sent toDORL TVA Letter dated10/5/10EICB RAI ML1028618855 sent toDORL 194 7.5.1.11 7.5.2.1 (M aThe WBU2 FSAR Section 7.5.2.1, "Safety Parameter DisplaySystem "containsadescriptionoftheSafetyResponder: Costley/Norman 163.Closed Closed Item No. 3 sent toDORL TVA Letter dated10/5/10EICB RAI ML1028618855 sent toDORL 195 7.5.1.12 7.5.2.2 (M aBypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 164.Closed Closed Item No. 4 sent toDORL TVA Letter dated10/5/10EICB RAI ML1028618855 sent toDORL 196 7.5.1.12 7.5.2.2 (M aBypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 165.Closed Closed Item No. 5 sent toDORL TVA Letter dated10/5/10EICB RAI ML1028618855 sent toDORL 197  X Open Item 197 was never issued.
166.Closed Closed    198 7.5.1.12 7.5.2.2 (M aSRP Section 7.5, Subsection III, "Review Procedures" states:RecommendedreviewemphasisforBISIResponder: Costley/Norman 167.Closed Closed Item No. 6 sent toDORL TVA Letter dated10/5/10EICB RAI ML1028618855 sent toDORL 199 7.5.1.13 7.5.2.3 (M aThe WBU2 FSAR Section 7.5.2.3, "Technical Support CenterandNuclearDataLinks "containsadescriptionResponder: Costley/Norman 168.Closed Closed Item No. 7 sent toDORL TVA Letter dated10/5/10Related SE Section 7.5.5.3 EICB RAIML1028618855sentto203 7.5.1.1 7.5.2 (M a7/26/2010 Responder: Clark 169.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL204 7.5.1.1 7.5.2 (M a7/26/2010 Responder: Costley/Norman 170.Closed Closed NRCto issue EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL205    (G7/26/2010 Responder: Clark 171.Closed Closed EICB RAI ML102910008 TVA Letter dated10/5/10Question B related to prior NRC approvalofthissystemor5059206 7.5.1.1 7.5.2 (M a7/27/2010 Responder: Clark 172.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL207    (CJuly 27, 2010 Date:  Responder:173.Closed Closed    208 7.5.2.1 7.5.1 (M a7/27/2010 Responder: Clark 174.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL209 7.5.2.1 7.5.1 (M a7/27/2010 Responder: Clark 175.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 210 7.5.2.1 7.5.1 (M a7/27/2010 Responder: Clark 176.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL 215  (P o7/29/2010 Responder: WEC 177.Closed Closed    216 7.5.1.1 7.5.2 (M a7/29/2010 Responder: Clark 178.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL 217    (G7/6/2010 Responder: Clark 179.Close Closed EICB RAI ML102910008 TVA Letter dated7/30/10 218    (G7/6/2010 Responder: Clark 180.Closed Closed EICB RAI ML102910008 TVA Letter dated7/30/10 219    (G8/4/2010 Responder: TVA Licensing 181.Closed Closed EICB RAI ML102910008 220    (G8/4/2010 Responder: Ayala 182.Closed Closed EICB RAI ML102910008 TVA Letter dated10/5/10 221 7.7.1.2 7.7.1.3 (M a8/4/2010 Responder: Trelease 183.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL 222    (G8/4/2010 Responder: Clark 184.Close Closed EICB RAI ML102910008 TVA Letter dated10/5/10 223    (G8/4/2010 Responder: Clark 185.Closed Closed EICB RAI ML102910008 224 7.5.1.1 7.5.2 (M a8/4/2010 Responder: Norman (TVA CEG) 186.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL 225    (G8/4/2010 Responder: Scansen 187.Close Closed EICB RAI ML102910008 TVA Letter dated10/5/10 226    (C8/4/2010 Responder: TVA Licensing 188.Closed Closed N/A - Information TVA Letter dated8/11/10See also Open Item Nos. 41 &
270 227    (G8/4/2010 Responder: Clark 189.Close Closed EICB RAI ML102910008 TVA Letter dated10/5/10 228    (C8/4/2010 Responder: Clark 190.Closed  Closed EICB RAI ML102980066 TVA Letter dated10/5/10 229    (C8/4/2010 Responder: Clark 191.Closed Closed EICB RAI ML102980066 TVA Letter dated10/5/10 230    (C8/4/2010 Responder: Webb 192.Closed Closed EICB RAI ML102980066 TVA Letter dated10/5/10 231    (G8/4/2010 Responder: Clark 193.Closed Closed EICB RAI ML102910008 TVA Letter dated10/5/10 232    (S i8/4/2010 Responder: Clark 194.Closed Closed RAI No. 5 ML102980005 TVA Letter dated10/5/10 233    (C8/4/2010 Responder: Clark 195.Closed Closed EICB RAI ML102980066 TVA Letter dated10/5/10 234    (C8/4/2010 Responder: 196.Closed Closed N/A - Duplicate Item N/A  235    (G8/4/2010 Responder: TVA Licensing 197.Closed Closed EICB RAI ML102910008 236    (G8/4/2010 Responder: Clark 198.Close Closed EICB RAI ML102910008 TVA Letter dated10/5/10 237    (C8/4/2010 Responder: Clark 199.Closed Closed EICB RAI ML102980066 TVA Letter dated10/5/10 238    (C8/4/2010 Responder: Webb/Hilmes 200.Closed Closed N/A - Duplicate Item N/A  239    (C8/4/2010 Responder: Hilmes 201.Closed Closed N/A - Meeting request N/A  240    (G8/4/2010 Responder: Clark 202.Close Closed Ml102910008 Item#29 TVA Letter dated10/5/10 241    (S i8/4/2010 Responder: Davies 203.Closed Closed RAI No. 10 ML102980005 TVA Letter dated10/5/10 242    (G8/4/2010 Responder: Hilmes 204.Close Closed EICB RAI ML102910008 TVA Letter dated10/5/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 243   (C8/3/2010 Responder: WEC 205.Closed Closed N/A - Closed to ItemNo142 N/A  249   (C8/8/2010 Responder: WEC 206.Closed  Closed  LIC-101 Rev. 3 Appendix B Section4"SafetyEvaluat ion" 253    (C8/8/2010 Responder: Clark 207.Closed Closed TVA Letter dated10/5/10Related to Open Item no. 83.
===Response===
254   (C8/10/2010 Responder: WEC 208.Closed Closed N/A - Request tomake TVA Letter dated10/21/10 255    (C8/10/2010 Responder: WEC 209.Closed Closed N/A - Request tomake TVA Letter dated10/21/10 256    (C8/10/2010 Responder: WEC 210.Closed Closed N/A - Request tomake TVA Letter dated10/21/10 257    (C8/10/2010 Responder: WEC 211.Closed Closed N/A - Request tomake N/A 258    (C8/10/2010 Responder: WEC 212.Closed Closed N/A - Request tomake N/A 259    (C8/10/2010 Responder: WEC 213.Closed Closed N/A - Request tomake TVA Letter dated10/21/10 260    (C8/10/2010 Responder: WEC 214.Closed Closed N/A - Request tomake N/A 261    (C8/10/2010 Responder: WEC 215.Closed Closed N/A - Closed to ItemNo142 TVA Letter dated8/20/10LIC-110 Rev. 1 Section 6.2.2 states: "Designfeaturesand 262    (C8/10/2010 Responder: WEC 216.Closed Closed N/A - Request tomake N/A  263    (C8/11/2010 BasedonanexaminationofdocumentavailableattheResponder: WEC 217.Closed Closed ML101650255, ItemNo2  264    (C8/11/2010 Responder: WEC 218.Closed Closed ML101650255, ItemNo2  265    (C8/11/2010 Responder: WEC 219.Closed Closed ML101650255, ItemNo2  270    (C8/23/2010 Responder: Clark 220.Closed Closed  See also Open Item Nod. 41 &
Acceptable                                                                    RAI Resp.
245 271    (C8/23/2010 Responder: WEC 221.Closed Closed N/A - Closed to ItemNo142 NA  272 7.5.2.1 7.5.1 (M a8/26/2010 Responder: Clark 222.Closed Closed EICB RAI ML102861885 TVA Letter dated10/21/10EICB RAI ML102861885 sent to DORL 273 7.5.2.1 7.5.1 (M a8/26/2010 Responder: Clark 223.Closed Closed EICB RAI ML102861885 TVA Letter dated10/5/10EICB RAI ML102861885 sent to DORL 274.a 7.5.2.1 7.5.1 (M a8/26/2010 Responder: Clark 224.Closed Closed EICB RAI ML102861885 TVA Letter dated10/21/10EICB RAI ML102861885 sent to DORL 275   (S i8/27/2010 Responder: Clark 225.Closed Closed Not Required  Answerexistsin N/A  276 7.6 7.6 (G8/27/2010 Responder: Webb 226.Close Closed EICB RAI ML102910008 TVA Letter dated10/21/10 278 7.6 7.6.6 (G8/27/2010 Responder: Trelease 227.Close Closed EICB RAI ML102910008 TVA Letter dated10/21/10 279 7.6 7.6.6 (G8/27/2010 Responder: Mather 228.Close Closed EICB RAI ML102910008 TVA Letter dated10/21/10 280 7.6 7.6.6 (G8/27/2010 Responder: Trelease 229.Close Closed EICB RAI ML102910008 TVA Letter dated10/21/10 282 7.6 7.6.9  (G8/27/2010 Responder: Trelease 230.Close ResponseisacceptableClosed EICB RAI ML102910008 TVA Letter dated10/21/10 284 7.7.3 7.4.1 (D a8/27/2010 Responder: Webber 231.Closed Closed EICB RAI No.14 ML102910017 TVA Letter dated10/21/10 This item is a follow-up question toitem123 286 7.7.3 9.3.4.24 (D a8/27/2010 Responder: Webber 232.Closed Closed EICB RAI No.16 ML102910017 TVA Letter dated10/21/10 290  7.7  (C9/7/2010 Responder: Clark 233.Closed Closed N/A N/A This item is a duplicate of item 291 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 292 7.2.5 7.2  (G9/7/2010 Responder: Craig 234.Closed Closed EICB RAI ML102910008 TVA Letter dated10/21/10 299    (CProvide Common Q Software Requirements SpecificationPostAccidentMonitoringSystem00000
No.                   POC                           Issue                                         TVA Response(s)                     Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                   Date 058  7.5.0   7.5   (
-Attachment 41 of the 10/5 letter contains the CommonQSoftwareRequirementsSpecification235.Closed Closed TVA Letter dated10/5/10 312  7.(GBy letter dated September 10,2010, TVA provided the summaryevaluationof5059reportswhichwereResponder: Stockton 236.Close Closed EICB RAI ML102910008 TVA Letter dated10/21/10 314 7.3 7.3 (D aThe following 50.59 changes were listed in the March 12RAIresponseletter(item10)butwerenotincludedResponder: Stockton 237.Closed Closed EICB RAI No.
Si    April 19, 2010                                         Date: 5/25/10                                    59.           Closed                     Closed             RAI No. 18      TVA Letter Responder: Slifer                                                                                            ML102980005      dated 6/18/10 059  7.5.2  7.5.1  (
19 TVA Letter dated10/21/10 Related to OI 10 315 7.5.3 7.5.3  (GIE Bulletin 79-27 required that emergency operating procedurestobeusedbycontrolroomoperatorstoResponder: S. Smith (TVA Operations) 238.Close Closed EICB RAI ML102910008 TVA Letter dated10/21/10 316 7.5.2.3 7.(S iTVA has provided various documents in support of RM-1000highrangemonitorsforWBN2Responder: Temples/Mather 239.Closed Closed RAI No. 26 ML102980005 320   Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEYAUTHORITYWATTSBARNUCLEARResponder: Clark 240.Closed Closed N/A N/A Duplicate of item 156 321    For the purposes of measuring reactor coolant flow for ReactorProtectionfunctionselbowtapsareusedforResponder: Clark 241.Closed Closed N/A N/A Duplicate of OI# 157 322  7.7.1.11 (CSection 7.7.1.11 will be added to FSAR Amendment 101toprovideadiscussionoftheDistributedControlResponder: Clark 242.Closed Closed    324  (M aPer the NRC reviewer, the BISI calculation is not requiredtobesubmitted 243.Closed Closed    325  B (G aThe Unit 2 loops in service for Unit 1 that are scheduledtobetransferredtotheFoxboroSpec200Responder: TVA Startup Olson 244.Closed Closed  Closed to open item ? 332 7.5.2.1 7.5.1 EICB (Marcus) 10/26/2010 Related to 302 In response to Open Item 302 TVA provided a diskette that included a draft of Attachment 8 to the proposed 10/29/2010 letter. Attachment 8 included 14 of the 15, 50.59 documents listed in the, "RG 1.97 50.59 Listing."  DCN 52389 was not included on the diskette. Identify the document and date that officially transmitted or will transmit, DCN 52389 to the NRC. If DCN 52389 has not been previously transmitted to NRC please transmit the document to the NRC.
Si   April 19, 2010                                         Date:                                           60.           Closed                     Closed             RAI No. 19      TVA Letter Responder: Slifer                                                                                            ML102980005      dated 6/18/10 060  7.5.2  7.5.1  (
245. N Closed TVA to either officially transmit DCN 52389 or identify the letter that transmitted or will transmit DCN 52389. Closed This item was corrected prior to transmittal of the response to OI 302 in the 10/29 TVA letter.
C    April 19, 2010                                          Date: 5/25/10                                   61.           Closed                     Closed             N/A             N/A            Addressed by Open Item No. 47 Responder: Clark 061  7.5.2  7.5.1  (
TBD TBD RAI is being drafted 333 7.5.2.1 7.5.1 EICB (Marcus) 10/27/2010 Related to 44 and 303 In response to Open Item 303, TVA provided a diskette that included a draft of Attachment 9 to the proposed October 29, 2010 letter. In Attachment 9, the Unit 2 variable source for RG 1.97 variable 37, "CCS Sample Tank Level," was listed as Foxboro Spec 200. However, in response to Open Item 44, in Enclosure 1 to TVA letter dated June 18, 2010 (ML101940236), the Unit 2 variable source for RG 1.97 variable 37 was listed as Foxboro I/A. Determine which is correct and formally issue a correction.
C    April 19, 2010                                         Date: 5/25/10                                   62.           Closed                     Closed             N/A             N/A             Addressed by Open Item No. 48 Responder: Clark 062  7.5.2  7.5.1  (
246. N Closed  TVA to determine the correct information and officially transmit the correct information. Closed  This item was corrected prior to transmittal of the response to OI 302 in the 10/29 TVA letter.
C    April 19, 2010                                          Date: 5/25/10                                   63.           Closed                     Closed             N/A             N/A             Addressed by Open Item No. 49 Responder: Clark 063  7.5.2  7.5.1  (
TBD TBD RAI is being drafted 269  DOR L (Poo le)8/20/2010 DORL to send the Eagle-21 Audit Report to TVA. Responder: NRC
C    April 19, 2010                                         Date: 5/25/10                                   64.           Closed                     Closed             N/A             N/A             Addressed by Open Item No. 50 Responder: Clark 064  7.5.2  7.5.1  (
: 1. Y Open Open-NRC 043 7.5.2 7.5.1 EICB (Carte) 2/19/2010
C    By letter dated March 12, 2010 TVA stated that the      Responder: Webb      Date: 4/8/2010             65.           Closed                     Closed             N/A - No        TVA Letter target submittal date for the D3 Analysis was April 2                                                                                                                question was    dated 10/5/10 066  7.5.2   7.5.(
C    By letter dated March 12, 2010 TVA stated that the      Responder: WEC                   Date: 5/25/10  66.           Closed                     Closed             N/A - No        TVA Letter target submittal date for the "Watts Bar 2 PAMS                                                                                                                      question was    dated 6/18/10 076  7.5.2  7.5.(
C    By letter dated March 12, 2010 TVA stated that the      Responder: Clark             Date: 5/25/10      67.           Closed                     Closed             N/A - No        N/A target submittal date for the "Watts Bar 2 PAMS                                                                                                                      question was 077  7.5.2   7.5.1   (
C    By letter dated March 12, 2010 TVA stated that the      Responder: WEC                  Date: 5/25/10  68.           Closed                     Closed             N/A - No        TVA Letter target submittal date for seven other documents was                                                                                                                  question was    dated 6/18/10 078                  (
G    4/26/2010                                               Responder: Clark                 Date: 5/25/10  69.           Closed                     Closed             EICB RAI         TVA Letter ML102910008      dated 10/5/10 079                  (
G    4/26/2010                                               Responder: Clark                   Date: 5/25/10 70.           Closed                     Closed             EICB RAI         TVA Letter     Reviewed under Item 154 ML102910008      dated 10/5/10 080                  (
Si   4/26/2010                                               Responder: WEC                                  71.           Closed                     Closed             RAI No. 2        TVA Letter ML102980005      dated 7/30/10 083  7.5.2  7.5.1  (
C    May 6, 2010                                            Date: 6/18/10                                    72.           Closed                      Closed             EICB RAI         TVA Letter Responder: WEC                                                                                                ML102910002      dated 7/30/10 084  7.5.2  7.5.1 B C
a(     May 6, 2010                                            Date: 6/18/10                                    73.           Closed                      Closed             EICB RAI         TVA Letter Responder: Clark                                                                                              ML102910002      dated 6/18/10 087  7.5.2  7.5.1  (
Si    May 6, 2010                                            Date: 5/24/10                                    74.           Closed                      Closed             RAI No. 20      TVA Letter Responder: Slifer                                                                                            ML102980005      dated 6/18/10 088  7.5.2  7.5.1  B S
in(    May 6, 2010                                            Date: 5/24/10                                    75.           Closed                     Closed            RAI No. 21      TVA Letter Responder: Slifer                                                                                            ML102980005      dated 6/18/10 089                  (
C    5/6/2010                                               Responder: Clark                                76.           Closed                      Closed            EICB RAI         TVA Letter     NNC: Docketed response states ML102910002      dated 3/12/10   that the applicable FSAR 090                  (
C    5/6/2010                                               Responder: Clark                Date: 5/25/10    77.           Closed                     Closed             EICB RAI         TVA Letter ML102910002      dated 3/12/10 091  7.4      7.4   (
D a    May 20, 2010                                            Date: 5/25/10                                    78.           Closed                     Closed             EICB RAI No.1    TVA Letter Responder: Clark                                                                                              ML102910017      dated 6/18/10 093                  (
G    May 20, 2010                                            Date: 5/25/10                                    79.           Closed                     Closed             N/A             N/A             Will be reviewed under item 154 Responder: Knuettel 094                  (
G    5/20/2010                                               Responder: Clark                Date: 5/25/10   80.           Closed                     Closed             N/A              N/A            Information was found in FSAR 095 7.8.1,    XX    (
D a    May 20, 2010                                           Date:                                           81.           Closed                      Closed             EICB RAI No. 2  TVA Letter 784                                                                            Responder:                                                                                                    ML102910017      dated 7/30/10 096 7.7.5      XX    (
D a    5/20/2010                                              Responder:                                       82.           Closed                     Closed             EICB RAI No.3    TVA Letter ML102910017      dated 7/30/10 097  7.4.2    7.4    (
D a    May 20, 2010                                            Date:                                           83.           Closed                      Closed             EICB RAI No.4    TVA Letter Responder:                                                                                                    ML102910017      dated 7/30/10 098  7.4.2   7.4    (
D a    May 25, 2010                                            Date:                                           84.           Closed                     Closed             EICB RAI No.5    TVA Letter Responder:                                                                                                    ML102910017      dated 7/30/10 099                  L B(   April 12, 2010                                          Date:                                           85.           Closed                     Closed                                             Closed to Item 129 Responder: WEC 100                  (
C    5/20/2010                                              Responder: WEC                                  86.           Closed                     Closed             N/A - No        N/A question was 102                  (
C    May 24, 2010                                            Date: 5/24/10                                   87.           Closed                     Closed             N/A              TVA Letter      Request for schedule not Responder: WEC                                                                                                                dated 6/18/10  information 105                  (
G    April 29, 2010                                         Date:                                            88.           Closed                      Closed            N/A             N/A            Will be reviewed under item 154.
Responder: Langley


The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed. The shortcomings of the first three lines in the matrix are: Responder: WEC                        Date: 5/25/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                      rad12E8A.docx                                                                      Open Items to be Resolved for SER Approval SE      FSAR    NRC


The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed.   
===Response===
: 2. N Open Response is included in letter dated 10/5/10.  
Acceptable                                                                      RAI Resp.
No.                    POC                  Issue                        TVA Response(s)            Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                                Comments Sec. Sec.                                                                                                                                                                      Date 106                    B S
in(    May 6, 2010                Date: 5/25/10                              89.            Closed                      Closed            RAI No. 9          TVA Letter Responder: Davies                                                                                        ML102980005        dated 6/18/10 107                    B S
in(    May 6, 2010                Date: 5/28/10                              90.            Closed                      Closed            RAI No. 22        TVA Letter Responder: Clark                                                                                        ML102980005        dated 6/18/10 108                    (
G    May 6, 2010                Date: 5/25/10                              91.            Closed                      Closed            N/A                N/A            Will be reviewed under OI#154 Responder: Webb/Hilmes 109.                    (
C    5/6/2010                    Responder: N/A                            92.            Closed                      Closed            N/A                N/A            Duplicate of another open Item.
b 109. 7.8      XX      (
D a    5/6/2010                    Responder: N/A                            93.            Closed                      Closed            N/A                N/A a
110                    (
G    May 6, 2010                Date:                                      94.            Closed                      Closed            N/A                N/A            Information was found.
Responder: Clark 111                    B C
a(    May 6, 2010                Date: 5/28/10                              95.            Closed                      Closed            N/A                TVA Letter      Request to help find, not a Responder: Clark                                                                                                            dated 6/18/10  request for information 112                    B G
a(    June 1, 2010                Date:                                      96.            Closed                      Closed            N/A                N/A            Information was received Responder: Clark 113                    (
G    6/1/2010                    Responder: Clark                          97.            Closed                      Closed            EICB RAI          TVA Letter ML102910008        dated 6/18/10 115                    (
C    2/25/2010                  Responder: Clark                          98.            Closed                      Closed            EICB RAI          TVA Letter ML102910002        dated 6/18/10 116                    (
G    6/3/2010                    Responder: WEC                            99.            Closed                      Closed            EICB RAI          TVA Letter      Letter sent to Westinghouse ML102910008        dated 10/5/10  requesting the basis information 119                    (
Si    June 10, 2010              Date:                                      100.          Closed                      Closed            RAI No. 23        TVA Letter Responder:                                                                                              ML102980005        dated 7/30/10 120                    (
C    5/6/2010                    Responder: Hilmes/Merten/Costley          101.          Closed                      Closed            EICB RAI          TVA Letter ML102910002        dated 7/30/10 121                    (
C    5/6/2010                    Responder: Webb/Webber                    102.          Closed                      Closed            EICB RAI          TVA Letter ML102980066        dated 7/30/10 122                    (
C    June 14, 2010               Date:                                      103.          Closed                      Closed            N/A - Request      N/A Responder: WEC                                                                                          for schedule not 123    7.7.3  7.4.1,  (
D a    6/14/2010                  Responder:                                104.          Closed                      Closed            ML101720589,      TVA Letter 934                                                                                                                                                RAIs 21 and 22    dated 7/30/10 124    7.7.5    XX      (
D a     6/14/2010                  Responder:                                105.          Closed                      Closed            ML101720589,      TVA Letter Item No 23        dated 7/30/10 125    7.7.8  7.7.1(
D a    6/14/2010                  Responder:                                106.          Closed                      Closed            ML101720589,      TVA Letter 12                                                                                                                                                Item No s 24      dated 7/30/10 126    7.8      7.8    (
D a    June 14, 2010              Date:                                      107.          Closed                      Closed            ML101720589,      TVA Letter Responder:                                                                                              Item No 26        dated 7/30/10 127    7.2      7.2    (
G    6/16/2010                  Responder: WEC/Clark                      108.          Closed                      Closed            EICB RAI          TVA Letter ML102910008        dated 6/18/10 128    7.2      7.2     (
G    6/18/2010                  Responder: WEC Drake /TVA Craig            109.          Closed                      Closed            EICB RAI                          Track through SE open item ML102910008 129                    (
P o    6/12/2010                  Responder: WEC                            110.           Closed                      Closed            N/A                TVA Letter dated 10/5/10 130                    (
P o    6/28/2010                  Responder: Clark                          111.          Closed                      Closed            N/A                TVA Letter dated 10/5/10 131                    (
P o    6/28/2010                  Responder: Clark                          112.          Closed                      Closed            N/A                TVA Letter dated 10/5/10 132                    (
P o    6/28/2010                  Responder: Clark                          113.          Closed                      Closed            N/A                TVA Letter dated 10/5/10 133                    (
P o    6/28/2010                  Responder: Clark                          114.          Closed                      Closed                                TVA Letter dated 10/5/10 134                    (
P o    6/28/2010                  Responder: Clark                          115.          Closed                      Closed                                TVA Letter dated 10/5/10 135    7.3.1  7.3.1    (
D a    6/30/2010                  Responder: Clark                          116.          Closed                      Closed            RAI not            TVA Letter necessary          dated 10/5/10 136 7.3.2,      7.4,    (
D a    6/30/2010                  Responder: Clark                          117.          Closed                      Closed            RAI not            TVA Letter 74        56                                                                                                                                                necessary          dated 10/5/10


Revised compliance matrix Open-NRC Review Due 12/1/10 EICB RAI ML102910002
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                rad12E8A.docx                                                                      Open Items to be Resolved for SER Approval SE    FSAR    NRC


Item No. 2 TVA Letter dated 2/5/10  
===Response===
Acceptable                                                                    RAI Resp.
No.                  POC                            Issue                                            TVA Response(s)            Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                              Comments Sec. Sec.                                                                                                                                                                                                Date 137                  (
C    Several WBN2 PAMS documents contain a table titled, Responder: WEC                                  118.          Closed                      Closed            ML101650255,    TVA Letter Document Traceability & Compliance                                                                                                                              Item No 1        dated 10/5/10 139                  (
C    The WBN2 PAMS System Requirements Specification Responder: WEC                                      119.          Closed                      Closed            ML101650255,    TVA Letter      WBN2 PAMS System (WBN2 PAMS SysRS) contains a table (see page iii)                                                                                                                  Item No 3        dated 10/5/10    Requirements Specification 141                  (
C    Deleted by DORL                                    Date:                                            120.          Closed                      Closed            ML101650255,                      WBN2 PAMS System Responder:                                                                                                    Item No 5                        Requirements Specification 146                  (
C    6/17/2010                                          Responder:                                      121.          Closed                      Closed            ML101650255,                      PAMS System Requirements Item No 10                        Specifications 147                  (
C    6/17/2010                                                  Responder:                              122.          Closed                      Closed            ML101650255,                      PAMS System Requirements Item No 11                        Specifications 148                  (
C    6/17/2010                                                  Responder:                              123.          Closed                      Closed            ML101650255,                      PAMS System Requirements Item No 12                        Specifications 149  7.2    7.2    (
G    FSAR Section 7.1.1.2(2), Overtemperature delta T and        Responder: Tindell                      124.          Close                      Closed            ML101720589,    TVA Letter Overpressure delta T equations have been simplified                                                                                                                Item No 1        dated 10/5/10 150  7.2    7.2    (
G    Many of the changes were based on the                      Responder: Clark                        125.          Close                      Closed            ML101720589,    TVA Letter Westinghouse document N3-99-4003 Provide this                                                                      Response provided in letter                    Item No 2        dated 10/5/10 151  7.2    7.2    (
G    Provide the EDCR 52378 and 54504 which discusses            Responder: Clark                        126.          Close                      Closed            ML101720589,    TVA Letter the basis for many changes to this FSAR section                                                                                                                    Item No 3        dated 10/5/10 152  7.2    7.2    (
G    Deleted portion of FSAR section 7.2.3.3.4 and moved        Responder: Merten/Clark                  127.          Close                      Closed            ML101720589,    TVA Letter to FSAR section 7 2 1 1 5 However the FSAR                                                                                                                        Item No 4        dated 10/5/10 153  7.2    7.2    (
G    FSAR section 7.2.1.1.7 added the reference to FSAR          Responder: Craig/Webb                    128.          Close                      Closed            ML101720589,    TVA Letter section 10 4 4 3 for exception to P-12 However                                                                                                                    Item No 5        dated 10/21/10 155  7.2    7.2    (
G    Summary of FSAR change document section 7.2                Date:                                    129.          Closed                      Closed            ML101720589, states that sections 7 2 1 1 9 and 7 2 2 2(4) are          Responder: Stockton                                                                                    Item No 7 157  7.2    7.2    (
G    FSAR section 7.2.2.1.1, fifth paragraph was deleted        Responder: Tindell                      130.          Close                      Closed            ML101720589,    TVA Letter except for the last sentence The last sentence states                                                                                                              Item No 9        dated 10/5/10 158  7.2    7.2    (
G    FSAR section 7.2.2.1.1, paragraph six was changed to        Responder: Tindell                      131.          Closed                      Closed            ML101720589,    TVA Letter state that the design meets the requirements of                                                                                                                    Item No 10      dated 10/5/10 159  7.2    7.2    (
G    FSAR section 7.2.2.1.2 discusses reactor coolant flow      Responder: Craig                        132.          Close                      closed            ML101720589,    TVA Letter measurement by elbow taps However it further                                                                                                                      Item No 11      dated 10/5/10 160  7.2    7.2   (
G    FSAR section 7.2.2.2(7) deleted text which has              Responder: Tindell                      133.          Close                      Closed            ML101720589,    TVA Letter references 12 and 14 These references are not                                                                                                                      Item No 12      dated 10/5/10 161  7.2     7.2    (
G    FSAR section 7.2.2.3 states that changes to the            Responder: Clark                        134.          Closed                      Closed            ML101720589,    TVA Letter control function description in this section are expected                                                                                                          Item No 13      dated 10/5/10 162  7.2    7.2    (
G    FSAR section 7.2.2.2(14) states that bypass of a            Responder: Tindell                      135.          Closed                      Closed            ML101720589,    TVA Letter protection channel during testing is indicated by an                                                                                                              Item No 14      dated 10/5/10 163  7.2    7.2    (
G    Deleted by DORL                                        Date:                                        136.          Closed                      Closed            ML101720589, Responder:                                                                                                  Item No 15 164  7.2      7.2  a r
gl    FSAR section 7.2.2.2(20) has been revised to include Responder: Perkins                              137.          Closed                      Closed            ML101720589,    TVA Letter      Item No. 8 sent to DORL 751                    the plant computer as a means to provide information                                                                                                              Item No 16 and  dated 10/5/10 165  7.2      7.2    (
G    FSAR section 7.2.2.3.2, last paragraph of this section Responder: Clark                              138.          Closed                      Closed            ML101720589,    TVA Letter has been deleted The basis for this deletion is that                                                                                                              Item No 17      dated 10/5/10 166  7.2    7.2    (
G    Changes to FSAR section 7.2.2.2(20) are justified      Responder: Clark                              139.          Closed                      Closed            ML101720589,    TVA Letter based on the statement that the integrated computer                                                                                                                Item No 18      dated 10/5/10 167  7.2    7.2    (
G    FSAR section 7.2.2.4, provide an analysis or reference Responder: Clark                              140.          Close                      closed            ML101720589,    TVA Letter to chapter 15 analysis which demonstrate that failure                                                                                                              Item No 19      dated 10/5/10 168  7.2    7.2    (
G    FSAR table 7.2-4, item 9 deleted loss of offsite power Responder: Clark                              141.          Close                      Closed            ML101720589,    TVA Letter to station auxiliaries (station blackout) based on the                                                              Response provided in letter                    Item No 20      dated 10/5/10 169                  (
G    6/18/2010                                              Responder: Clark                              142.          Closed                      Closed 170                  (
G    6/17/2010                                                  Responder: Clark                        143.          Closed                      Closed 171  7.2    7.2    (
G    6/17/2010                                                  Responder: Craig                        144.          Closed                      Closed            EICB RAI        TVA Letter    Closed to SE Open Item ML102910008      dated 10/21/10 172                  (
G    6/17/2010                                                  Responder: Craig                        145.          Closed                      Closed            EICB RAI ML102910008 173  7.1    7.1    (
G    6/17/2010                                                  Responder: Craig/Webb/Powers            146.          Closed                      Closed            EICB RAI ML102910008


TVA Letter dated 5/12/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                            rad12E8A.docx                                                                      Open Items to be Resolved for SER Approval SE    FSAR    NRC


NNC 8/25/10: A CQ PAMS ISG6 compliance matrix was docketed on: (1) February, 5 12010, (2) March 12, 2010, & (3) June 18, 2010. The staff has expressed issued with all of these Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.
===Response===
Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.  
Acceptable                                                                      RAI Resp.
No.                  POC                          Issue                                        TVA Response(s)            Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                              Comments Sec. Sec.                                                                                                                                                                                              Date 174                  (
G    6/28/2010                                              Responder: Hilmes/Craig                147.          Closed                      Closed            EICB RAI ML102910008 175                  (
G    June 28, 2010                                          Responder:                              148.          Closed                      Closed            EICB RAI ML102910008 176  7.1    7.1    (
G    6/28/2010                                              Responder: Craig/Webb                  149.          Closed                      Closed            EICB RAI ML102910008 177 7.5.2. 7.5.1    (
M a    7/15/2010                                              Responder: Clark                        150.          Closed                      Closed            N/A            TVA Letter        RAI not required 1                                                                                                                                                                                                  dated 10/5/10 178 7.5.2. 7.5.1    (
M a    7/15/2010                                              Responder: Clark                        151.          Closed                      Closed            N/A             TVA Letter        RAI not required 1                                                                                                                                                                                                  dated 10/5/10 179                  (
C    An emphasis is placed on traceability in System        Responder: WEC                          152.          Closed                      Closed            N/A - Closed to NA Requirements Specifications in the SRP in the                                                                                                                Item No 142 180                  (
C    The SRP, BTP 7-14, Section B.3.3.1 states that          Responder: WEC                          153.          Closed                      Closed            N/A - Closed to NA Regulatory Guide 1 172 endorses with a few noted                                                                                                              Item No 142 181                  (
C    An emphasis is placed on traceability in System        Responder: WEC                          154.          Closed                      Closed            N/A - Closed to NA Requirements Specifications in the SRP in the                                                                                                                Item No 142 182                  (
C    Characteristics that the SRP states that a Software    Responder: WEC                          155.          Closed                      Closed            N/A - Closed to NA Requirements Specifications should have include                                                                                                              Item No 142 184                  (
C    7/15/2010                                              Responder: WEC                          156.          Closed                      Closed            N/A - Closed to N/A Item No 142 188                  (
C    By letter dated June 30, 2010, TVA docketed,            Responder: Clark                        157.          Closed                      Closed            ML101970033, TVA Letter Tennessee Valley Authority (TVA) Watts Bar Unit 2                                                                                                            Item No 3 & 4 dated 10/5/10 189          7.6.7    (
Si    7/20/2010                                              Responder: Clark                        158.          Closed                      Closed            RAI No. 3       TVA Letter ML102980005 dated 10/5/10 190  7.9            (
Si    FSAR Table 7.1-1 states: Regulatory Guide 1.133,       Responder: Clark                        159.          Closed                      Closed            RAI No. 4      TVA Letter        Closed to OI-331.
May 1981 Loose-Part Detection Program for the                                                                                                                ML102980005 dated 10/5/10 191  7.9            (
C     NUREG-0800 Chapter 7, Section 7.9, "Data                Responder: Jimmie Perkins              160.          Closed                      Closed            ML10197016,    TVA Letter Communication Systems" contains review criteria for                                                                                                          Item Nos 1-3    dated 10/5/10 192 7.5.1. 7.5.2    (
M a    The NRC Staff is using SRP (NUREG-0800) Chapter 7      Responder: Clark                        161.           Closed                      Closed            Item No. 1 sent TVA Letter        EICB RAI ML1028618855 sent 1                    Section 7 5 Instrumentation Systems Important to                                                                                                            to DORL        dated 10/5/10    to DORL 193 7.5.1. 7.5.2    (
M a    The WBU2 FSAR, Section 7.5.2, Plant Computer          Responder: Clark                        162.          Closed                      Closed            Item No. 2 sent TVA Letter        EICB RAI ML1028618855 sent 1                    System  contains three subsections                                                                                                                          to DORL        dated 10/5/10    to DORL 194 7.5.1. 7.5.2.   (
M a    The WBU2 FSAR Section 7.5.2.1, Safety Parameter        Responder: Costley/Norman              163.          Closed                      Closed            Item No. 3 sent TVA Letter        EICB RAI ML1028618855 sent 11        1            Display System  contains a description of the Safety                                                                                                        to DORL        dated 10/5/10    to DORL 195 7.5.1. 7.5.2.  (
M a    Bypassed and Inoperable Status Indication (BISI)       Responder: Costley/Norman              164.          Closed                      Closed            Item No. 4 sent TVA Letter        EICB RAI ML1028618855 sent 12        2                                                                                                                                                                          to DORL        dated 10/5/10    to DORL 196 7.5.1. 7.5.2.  (
M a    Bypassed and Inoperable Status Indication (BISI)        Responder: Costley/Norman              165.          Closed                      Closed            Item No. 5 sent TVA Letter        EICB RAI ML1028618855 sent 12        2                                                                                                                                                                          to DORL        dated 10/5/10    to DORL 197                  X    Open Item 197 was never issued.                                                                166.          Closed                      Closed 198 7.5.1. 7.5.2.  (
M a    SRP Section 7.5, Subsection III, Review Procedures Responder: Costley/Norman                  167.          Closed                      Closed            Item No. 6 sent  TVA Letter      EICB RAI ML1028618855 sent 12        2            states: Recommended review emphasis for BISI                                                                                                                  to DORL          dated 10/5/10  to DORL 199 7.5.1. 7.5.2.  (
M a    The WBU2 FSAR Section 7.5.2.3, Technical Support Responder: Costley/Norman                    168.          Closed                      Closed            Item No. 7 sent  TVA Letter      Related SE Section 7.5.5.3 EICB 13        3            Center and Nuclear Data Links  contains a description                                                                                                        to DORL          dated 10/5/10  RAI ML1028618855 sent to 203 7.5.1. 7.5.2    (
M a    7/26/2010                                              Responder: Clark                        169.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                                                  ML102861885      dated 10/5/10  DORL 204 7.5.1. 7.5.2    (
M a    7/26/2010                                              Responder: Costley/Norman              170.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                                NRC to issue      ML102861885      dated 10/5/10  DORL 205                  (
G    7/26/2010                                              Responder: Clark                        171.          Closed                      Closed            EICB RAI          TVA Letter      Question B related to prior NRC ML102910008      dated 10/5/10  approval of this system or 50 59 206 7.5.1. 7.5.2    (
M a    7/27/2010                                              Responder: Clark                        172.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                                                  ML102861885      dated 10/5/10  DORL 207                  (
C    July 27, 2010                                          Date:                                  173.          Closed                      Closed Responder:
208 7.5.2. 7.5.1    (
M a    7/27/2010                                              Responder: Clark                        174.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                                                  ML102861885      dated 10/5/10  DORL 209 7.5.2. 7.5.1    (
M a    7/27/2010                                              Responder: Clark                        175.           Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                                                  ML102861885      dated 10/5/10  DORL


Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                  rad12E8A.docx                                                                      Open Items to be Resolved for SER Approval SE    FSAR    NRC
NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix. By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.


Attachment 3 contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).
===Response===
By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."      
Acceptable                                                                      RAI Resp.
No.                  POC                    Issue                      TVA Response(s)            Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                              Comments Sec. Sec.                                                                                                                                                                    Date 210 7.5.2. 7.5.1    (
M a    7/27/2010                    Responder: Clark                        176.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                        ML102861885      dated 10/5/10  DORL 215                  (
P o    7/29/2010                    Responder: WEC                          177.          Closed                      Closed 216 7.5.1. 7.5.2    (
M a    7/29/2010                    Responder: Clark                        178.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                        ML102861885      dated 10/5/10  DORL 217                  (
G    7/6/2010                      Responder: Clark                        179.          Close                      Closed            EICB RAI          TVA Letter ML102910008      dated 7/30/10 218                  (
G    7/6/2010                      Responder: Clark                        180.          Closed                      Closed            EICB RAI          TVA Letter ML102910008      dated 7/30/10 219                  (
G    8/4/2010                      Responder: TVA Licensing                181.          Closed                      Closed            EICB RAI ML102910008 220                  (
G    8/4/2010                      Responder: Ayala                        182.          Closed                      Closed            EICB RAI          TVA Letter ML102910008      dated 10/5/10 221 7.7.1. 7.7.1.  (
M a    8/4/2010                      Responder: Trelease                    183.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 2        3                                                                                                                                               ML102861885      dated 10/5/10  DORL 222                  (
G    8/4/2010                      Responder: Clark                        184.          Close                      Closed            EICB RAI          TVA Letter ML102910008      dated 10/5/10 223                  (
G    8/4/2010                      Responder: Clark                        185.          Closed                      Closed            EICB RAI ML102910008 224 7.5.1. 7.5.2    (
M a    8/4/2010                      Responder: Norman (TVA CEG)            186.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                        ML102861885      dated 10/5/10  DORL 225                  (
G    8/4/2010                      Responder: Scansen                      187.          Close                      Closed            EICB RAI          TVA Letter ML102910008      dated 10/5/10 226                  (
C    8/4/2010                      Responder: TVA Licensing                188.          Closed                      Closed            N/A -             TVA Letter      See also Open Item Nos. 41 &
Information      dated 8/11/10  270 227                  (
G    8/4/2010                      Responder: Clark                        189.          Close                      Closed            EICB RAI          TVA Letter ML102910008      dated 10/5/10 228                  (
C    8/4/2010                      Responder: Clark                        190.          Closed                      Closed            EICB RAI          TVA Letter ML102980066      dated 10/5/10 229                  (
C    8/4/2010                      Responder: Clark                        191.          Closed                      Closed            EICB RAI          TVA Letter ML102980066      dated 10/5/10 230                  (
C    8/4/2010                      Responder: Webb                        192.          Closed                      Closed            EICB RAI          TVA Letter ML102980066      dated 10/5/10 231                  (
G    8/4/2010                      Responder: Clark                        193.          Closed                      Closed            EICB RAI          TVA Letter ML102910008      dated 10/5/10 232                  (
Si    8/4/2010                      Responder: Clark                        194.          Closed                      Closed            RAI No. 5        TVA Letter ML102980005      dated 10/5/10 233                  (
C    8/4/2010                     Responder: Clark                        195.          Closed                      Closed            EICB RAI          TVA Letter ML102980066      dated 10/5/10 234                  (
C    8/4/2010                      Responder:                              196.          Closed                      Closed            N/A - Duplicate  N/A Item 235                  (
G    8/4/2010                      Responder: TVA Licensing                197.           Closed                      Closed            EICB RAI ML102910008 236                  (
G    8/4/2010                     Responder: Clark                        198.          Close                      Closed            EICB RAI          TVA Letter ML102910008      dated 10/5/10 237                  (
C    8/4/2010                      Responder: Clark                        199.          Closed                      Closed            EICB RAI          TVA Letter ML102980066      dated 10/5/10 238                  (
C    8/4/2010                      Responder: Webb/Hilmes                  200.          Closed                      Closed            N/A - Duplicate  N/A Item 239                  (
C    8/4/2010                      Responder: Hilmes                      201.          Closed                      Closed            N/A - Meeting    N/A request 240                  (
G    8/4/2010                      Responder: Clark                        202.          Close                      Closed            Ml102910008      TVA Letter Item#29          dated 10/5/10 241                  (
Si    8/4/2010                      Responder: Davies                      203.          Closed                      Closed            RAI No. 10        TVA Letter ML102980005      dated 10/5/10 242                  (
G     8/4/2010                      Responder: Hilmes                      204.          Close                      Closed            EICB RAI          TVA Letter ML102910008      dated 10/5/10


It is TVA's understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC. Westinghouse documents that are not
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                        rad12E8A.docx                                                                      Open Items to be Resolved for SER Approval SE      FSAR    NRC


deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.
===Response===
is unacceptable.
Acceptable                                                                      RAI Resp.
NNC 8/12/10: It is not quite enough to provide all of the documents requested. There are two possible routs to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that  they are commercial grade dedication reports; this apparent deviation should be justified or explained.
No.                    POC                        Issue                                      TVA Response(s)            Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                                Comments Sec. Sec.                                                                                                                                                                                          Date 243                    (
TVA Letter dated 6/18/10  
C    8/3/2010                                          Responder: WEC                          205.           Closed                      Closed            N/A - Closed to N/A Item No 142 249                    (
C    8/8/2010                                          Responder: WEC                          206.          Closed                      Closed                                                LIC-101 Rev. 3 Appendix B Section 4 "Safety Evaluation" 253                    (
C    8/8/2010                                          Responder: Clark                        207.           Closed                      Closed                                TVA Letter      Related to Open Item no. 83.
dated 10/5/10 254                    (
C    8/10/2010                                        Responder: WEC                          208.           Closed                      Closed            N/A - Request      TVA Letter to make            dated 10/21/10 255                    (
C    8/10/2010                                        Responder: WEC                          209.           Closed                      Closed            N/A - Request      TVA Letter to make            dated 10/21/10 256                    (
C    8/10/2010                                        Responder: WEC                          210.           Closed                      Closed            N/A - Request      TVA Letter to make            dated 10/21/10 257                    (
C    8/10/2010                                        Responder: WEC                          211.          Closed                      Closed            N/A - Request      N/A to make 258                    (
C    8/10/2010                                        Responder: WEC                          212.          Closed                      Closed            N/A - Request      N/A to make 259                    (
C    8/10/2010                                        Responder: WEC                          213.           Closed                      Closed            N/A - Request      TVA Letter to make            dated 10/21/10 260                    (
C    8/10/2010                                        Responder: WEC                          214.          Closed                      Closed            N/A - Request      N/A to make 261                    (
C    8/10/2010                                        Responder: WEC                          215.          Closed                      Closed            N/A - Closed to    TVA Letter      LIC-110 Rev. 1 Section 6.2.2 Item No 142        dated 8/20/10    states: "Design features and 262                    (
C    8/10/2010                                        Responder: WEC                          216.           Closed                      Closed            N/A - Request      N/A to make 263                    (
C    8/11/2010                                            Responder: WEC                        217.          Closed                      Closed            ML101650255, Based on an examination of document available at the                                                                                                     Item No 2 264                    (
C    8/11/2010                                            Responder: WEC                        218.          Closed                      Closed            ML101650255, Item No 2 265                    (
C    8/11/2010                                        Responder: WEC                          219.          Closed                      Closed            ML101650255, Item No 2 270                    (
C    8/23/2010                                        Responder: Clark                        220.          Closed                      Closed                                                See also Open Item Nod. 41 &
245 271                    (
C    8/23/2010                                        Responder: WEC                          221.           Closed                      Closed            N/A - Closed to   NA Item No 142 272 7.5.2. 7.5.1    (
M a    8/26/2010                                        Responder: Clark                        222.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                                              ML102861885        dated 10/21/10  DORL 273 7.5.2. 7.5.1    (
M a    8/26/2010                                        Responder: Clark                        223.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to 1                                                                                                                                                                              ML102861885        dated 10/5/10    DORL 274. 7.5.2. 7.5.1    (
M a    8/26/2010                                        Responder: Clark                        224.          Closed                      Closed            EICB RAI          TVA Letter      EICB RAI ML102861885 sent to a    1                                                                                                                                                                              ML102861885        dated 10/21/10  DORL 275                    (
Si    8/27/2010                                        Responder: Clark                        225.          Closed                      Closed            Not Required      N/A Answer exists in 276  7.6      7.6    (
G    8/27/2010                                        Responder: Webb                          226.          Close                      Closed            EICB RAI          TVA Letter ML102910008        dated 10/21/10 278  7.6    7.6.6    (
G    8/27/2010                                        Responder: Trelease                      227.          Close                      Closed            EICB RAI          TVA Letter ML102910008        dated 10/21/10 279  7.6    7.6.6    (
G    8/27/2010                                        Responder: Mather                        228.          Close                      Closed            EICB RAI          TVA Letter ML102910008        dated 10/21/10 280  7.6    7.6.6    (
G    8/27/2010                                        Responder: Trelease                      229.          Close                      Closed            EICB RAI          TVA Letter ML102910008        dated 10/21/10 282  7.6    7.6.9    (
G    8/27/2010                                        Responder: Trelease                      230.          Close                      Closed            EICB RAI          TVA Letter Response is acceptable                        ML102910008        dated 10/21/10 284  7.7.3  7.4.1    (
D a    8/27/2010                                        Responder: Webber                        231.          Closed                      Closed            EICB RAI No.14    TVA Letter    This item is a follow-up question ML102910017        dated 10/21/10 to item 123 286  7.7.3  9.3.4.   (
D a    8/27/2010                                        Responder: Webber                        232.          Closed                      Closed            EICB RAI No.16    TVA Letter 24                                                                                                                                                                    ML102910017        dated 10/21/10 290            7.7    (
C    9/7/2010                                          Responder: Clark                        233.          Closed                      Closed            N/A                N/A            This item is a duplicate of item 291


TVA Letter dated 10/5/10 compliance evaluations. The staff is still waiting for a good compliance evaluation. 050 7.5.2 7.5.1 EICB (Carte) 4/8/2010  How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted? Responder: WEC                        Date: 5/25/10 These sections are descriptive text and not requirements. The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove "shall" from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be provided no later than August 31, 2010.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                  rad12E8A.docx                                                                                Open Items to be Resolved for SER Approval SE      FSAR    NRC


The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.  
===Response===
Acceptable                                                                            RAI Resp.
No.                    POC                                      Issue                                            TVA Response(s)                      Y/N          Status/ Current Actions        Resolution Path    RAI No. & Date                              Comments Sec. Sec.                                                                                                                                                                                                                          Date 292  7.2.5    7.2    (
G              9/7/2010                                                    Responder: Craig                              234.          Closed                            Closed              EICB RAI        TVA Letter ML102910008      dated 10/21/10 299                    (
C              Provide Common Q Software Requirements                      Attachment 41 of the 10/5 letter contains the 235.            Closed                            Closed                                TVA Letter Specification Post Accident Monitoring System 00000-        Common Q Software Requirements Specification                                                                                         dated 10/5/10 312            7.0    (
G              By letter dated September 10,2010, TVA provided the        Responder: Stockton                          236.            Close                            Closed              EICB RAI        TVA Letter summary evaluation of 50 59 reports which were                                                                                                                                  ML102910008      dated 10/21/10 314  7.3      7.3    (
D a              The following 50.59 changes were listed in the March        Responder: Stockton                            237.          Closed                            Closed              EICB RAI No. TVA Letter    Related to OI 10 12 RAI response letter (item 10) but were not included                                                                                                                          19              dated 10/21/10 315  7.5.3  7.5.3    (
G              IE Bulletin 79-27 required that emergency operating        Responder: S. Smith (TVA Operations)          238.          Close                            Closed              EICB RAI        TVA Letter procedures to be used by control room operators to                                                                                                                              ML102910008      dated 10/21/10 316 7.5.2. 7.5    (
S i              TVA has provided various documents in support of            Responder: Temples/Mather                      239.          Closed                            Closed              RAI No. 26 3                                RM-1000 high range monitors for WBN2                                                                                                                                            ML102980005 320                                    Per Westinghouse letter WBT-D-2340, TENNESSEE              Responder: Clark                              240.          Closed                            Closed              N/A              N/A            Duplicate of item 156 VALLEY AUTHORITY WATTS BAR NUCLEAR 321                                    For the purposes of measuring reactor coolant flow for    Responder: Clark                              241.          Closed                            Closed              N/A              N/A            Duplicate of OI# 157 Reactor Protection functions elbow taps are used for 322          7.7.1.  (
C              Section 7.7.1.11 will be added to FSAR Amendment            Responder: Clark                              242.          Closed                            Closed 11                    101 to provide a discussion of the Distributed Control 324                    (
M a              Per the NRC reviewer, the BISI calculation is not                                                          243.          Closed                            Closed required to be submitted 325                  B
(
G a                The Unit 2 loops in service for Unit 1 that are            Responder: TVA Startup Olson                  244.          Closed                            Closed                                                Closed to open item ?
scheduled to be transferred to the Foxboro Spec 200 332 7.5.2. 7.5.1                    10/26/2010                                                                                                245. N        Closed                            Closed              TBD              TBD            RAI is being drafted EICB (Marcus) 1 Related to 302                                                                                                            TVA to either officially          This item was transmit DCN 52389 or            corrected prior to In response to Open Item 302 TVA provided a diskette                                                                      identify the letter that          transmittal of the that included a draft of Attachment 8 to the proposed                                                                    transmitted or will transmit      response to OI 10/29/2010 letter. Attachment 8 included 14 of the 15,                                                                    DCN 52389.                        302 in the 10/29 50.59 documents listed in the, RG 1.97 50.59 Listing.                                                                                                    TVA letter.
DCN 52389 was not included on the diskette. Identify the document and date that officially transmitted or will transmit, DCN 52389 to the NRC. If DCN 52389 has not been previously transmitted to NRC please transmit the document to the NRC.
333 7.5.2. 7.5.1                    10/27/2010                                                                                                246. N        Closed                            Closed              TBD              TBD            RAI is being drafted EICB (Marcus) 1 Related to 44 and 303                                                                                                    TVA to determine the              This item was correct information and          corrected prior to In response to Open Item 303, TVA provided a                                                                              officially transmit the correct  transmittal of the diskette that included a draft of Attachment 9 to the                                                                    information.                      response to OI proposed October 29, 2010 letter. In Attachment 9,                                                                                                          302 in the 10/29 the Unit 2 variable source for RG 1.97 variable 37,                                                                                                        TVA letter.
CCS Sample Tank Level, was listed as Foxboro Spec 200. However, in response to Open Item 44, in Enclosure 1 to TVA letter dated June 18, 2010 (ML101940236), the Unit 2 variable source for RG 1.97 variable 37 was listed as Foxboro I/A. Determine which is correct and formally issue a correction.
269                  DOR              8/20/2010                                                  Responder: NRC                                1. Y      Open                              Open-NRC L
(Poo le)
DORL to send the Eagle-21 Audit Report to TVA.
043  7.5.2  7.5.1                    2/19/2010                                                  Responder: WEC                Date: 5/25/10  2. N      Open                              Open-NRC            EICB RAI        TVA Letter      NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)
Review              ML102910002      dated 2/5/10    compliance matrix was docketed The PAMS ISG6 compliance matrix supplied as            The PAMS ISG6 compliance matrix supplied as                      Response is included in                                Item No. 2                      on: (1) February, 5 12010, (2)
Enclosure 1 to TVA letter dated February 5, 2010 is a Enclosure 1 to TVA letter dated February 5, 2010                    letter dated 10/5/10.            Due 12/1/10                          TVA Letter      March 12, 2010, & (3) June 18, first draft of the information needed. The shortcomings is a first draft of the information needed.                                                                                              dated 5/12/10  2010. The staff has expressed of the first three lines in the matrix are:                                                                              Revised compliance matrix                                                              issued with all of these


TVA Revised Response
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                rad12E8A.docx                                                                            Open Items to be Resolved for SER Approval SE      FSAR    NRC


This item is resolved by submittal of the revised SysRS and SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).  
===Response===
: 3. N Open TVA response is inconsistent (e.g., WNA-DS-01667-WBT Rev. 1 page 1-1, Section 1.3.1 implies that "SysRS Section ###" has requirements. See also SDS4.4.2.1-1 on page 4-32).
Acceptable                                                                      RAI Resp.
Is there a requirement on the shall referenced above?? Response is provided in letter dated 10/29/10. Open-NRC Review  Due 12/31/10 EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10 054 7.5.2 7.5.1 (S i4/19/2010 Responder: Slifer/Clark                   Date: 5/25/10
No.                  POC                                    Issue                                            TVA Response(s)                          Y/N        Status/ Current Actions      Resolution Path  RAI No. & Date                              Comments Sec. Sec.                                                                                                                                                                                                                    Date By letter dated April 8, 2010 TVA provided the                    is unacceptable.                                                  TVA Letter      compliance evaluations. The Line 1: Section 11 of the Common Q topical report did      PAMS Licensing Technical Report provided                                                                                            dated 6/18/10  staff is still waiting for a good include a commercial grade dedication program, but        additional information.                                          NNC 8/12/10: It is not quite                                                      compliance evaluation.
: 4. Y Open Open-NRC RAI No. 14 TVA Letter Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  Please describe all the different environments in which the RM-1000 will be required to operate. Please group these environments into two categories (a) Harsh environment, per 10 CFR 50.49, and (b) Mild Environment.
this program was not approved in the associated SE.                                                                          enough to provide all of the                                      TVA Letter Westinghouse stated that this was the program and it      Attachment 3 contains the revised Common Q                        documents requested.                                              dated 10/5/10 could now be reviewed. The NRC stated that TVA            PAMS ISG-6 Compliance Matrix, dated June 11,                      There are two possible routs should identified what they believe was previously        2010, that addresses these items (Reference 13).                  to review that the NRC can reviewed and approved.                                                                                                      undertake: (1) follow ISG6, By letter Dated June 18, 2010 (see Attachment 3)                  and (2) follow the CQ SPM.
The only safety-related application for the RM-1000 is the Containment High Range radiation monitors. The Containment High Range radiation monitors will be installed in the Main Control Room, a mild environment. The detectors will be installed remotely in the containment.
Line 2: TVA stated the D3 analysis was not applicable      TVA provided a table, "Watts Bar 2 - Common Q                    The TVA response that was to PAMS, but provided no justification. The NRC            PAMS ISG-6 Compliance Matrix."                                    originally pursued was to asked for justification since SRP Chapter 7.5 identified                                                                    follow ISG6, but some of the SRM to SECV-93-087 Item II.Q as being SRP                It is TVAs understanding that this comment is                      compliance items for ISG6 acceptance criteria for PAMS.                            focused on the fact that there are documents that                  were addressed by NRC has requested that are currently listed as                      referencing the SPM. The Line 3: TVA identified that the Design report for        being available for audit at the Westinghouse                      NRC approved the CQ TR computer integrity was completed as part of the          offices. For those Common Q PAMS documents                          and associated SPM; it may common Q topical report. The NRC noted that this        that are TVA deliverable documents from                            be more appropriate to report is applicable for a system in a plant, and the CQ Westinghouse, TVA has agreed to provide those                      review the WBN2 PAMS topical report did no specifically address this PAMS    to NRC. Westinghouse documents that are not                        application to for adherence system at Watts Bar Unit 2.                              deliverable to TVA will be available for audit as                  to the SPM that to ISG6. In stated above. Requirements Traceability Matrix                      either path chosen, the NRC then concluded that TVA should go through and issues will be tracked under NRC RAI Matrix                                applicant should provide provide a more complete and thorough compliance          Items 142 (Software Requirements Specification)                    documents and a matrix.                                                  and 145 (System Design Specification).                              justification for the Commercial Item Dedication issues will be                          acceptability of any tracked under NRC RAI Matrix Item 138. This                        deviation from the path item is considered closed.                                          chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
For WBN Unit 2, a mild environment is defined as:
050  7.5.2  7.5.1                  4/8/2010                                                  Responder: WEC                  Date: 5/25/10      3. N       Open                           Open-NRC          EICB RAI        TVA Letter EICB (Carte)
A defined room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g., temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130&deg;F due to the indirect effects of a DBE (e.g., increased heat loads from electrical equipment), (3) the event radiation dose is less than or equal to 1 x 104 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 104 rads. (Reference 3).
Review            ML102910002      dated 6/18/10 How should the "shall" statements outside of the          These sections are descriptive text and not                      TVA response is                                 Item No. 8 bracketed requirements in Common Q requirements            requirements. The next revision of the Watts Bar                  inconsistent (e.g., WNA-DS- Due 12/31/10 documents be interpreted?                                  Unit 2 PAMS System Requirements Specification                    01667-WBT Rev. 1 page 1-will remove shall from the wording in those                    1, Section 1.3.1 implies that sections. A date for completing the next revision                "SysRS Section ###" has of the System Requirements Specification will be                  requirements. See also provided no later than August 31, 2010.                          SDS4.4.2.1-1 on page 4-32).
The System Requirements Specification will be revised by September 30, 2010 and submitted                      Is there a requirement on within two of receipt from Westinghouse.                          the shall referenced above??
TVA Revised Response Response is provided in This item is resolved by submittal of the revised                letter dated 10/29/10.
SysRS and SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).
(
054   7.5.2   7.5.1                 4/19/2010                                                 Responder: Slifer/Clark             Date: 5/25/10 4.     Y       Open                           Open-NRC         RAI No. 14       TVA Letter S
i


What is Reference 3?
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                  rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE      FSAR    NRC


===Response===
Acceptable                                                                        RAI Resp.
No.                  POC                                      Issue                                            TVA Response(s)                        Y/N            Status/ Current Actions    Resolution Path    RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                        Date Review              ML102980005      dated 6/18/10 Please describe all the different environments in which    The only safety-related application for the RM-                    Revised response is                              10/26/2010 the RM-1000 will be required to operate. Please group      1000 is the Containment High Range radiation                        included in letter dated these environments into two categories (a) Harsh            monitors. The Containment High Range radiation                      10/29/10.(TVA to confirm)    Response environment, per 10 CFR 50.49, and (b) Mild                monitors will be installed in the Main Control                      Design Criteria is WB-DC-    acceptable. TVA Environment.                                                Room, a mild environment. The detectors will be                    40-54 is attached to this    to update on installed remotely in the containment.                              letter.                      issuance of letter to close item.
For WBN Unit 2, a mild environment is defined as:
Due 10/14/10 A defined room or building zone where (1) the temperature, pressure, or relative humidity                                                      Identify source of resulting from the direct effects of a design basis                                              reference 3.
event (DBE) (e.g., temperature rise due to steam release) are no more severe than those which                                                    TVA to identify would occur during an abnormal plant operational                                                when and by what condition, (2) the temperature will not exceed                                                  letter number WB-130&deg;F due to the indirect effects of a DBE (e.g.,                                                DC-40-54 was increased heat loads from electrical equipment),                                                submitted to NRC.
(3) the event radiation dose is less than or equal                                              If not previously to 1 x 104 rads, and (4) the total event plus the 40                                            submitted then year TID (total integrated dose) is less than or                                                please submit this equal to 5 x 104 rads. (Reference 3).                                                            document.
What is Reference 3?
TVA Revised Response:
TVA Revised Response:
Reference 3 is TVA Design Criteria WB-DC 54, Environmental Qualification To 10CFR50.49, which provides the definition of mild and harsh environments. Attachment 13 to TVA letter dated October 29, 2010 contains WB-DC-40-54, Revision 4.
Reference 3 is TVA Design Criteria WB-DC                                                                                                 54, Environmental Qualification To 10CFR50.49, which provides the definition of mild and harsh environments. Attachment 13 to TVA letter dated October 29, 2010 contains WB-DC-40-54, Revision 4.
Revised response is included in letter dated 10/29/10.(TVA to confirm)  Design Criteria is WB-DC-40-54 is attached to this
055  7.5.2   7.5.1                  4/19/2010                                                  Responder: Slifer/Clark            Date: 5/25/10 5.       Y      Open                        Open-NRC             RAI No. 15      TVA Letter EICB (Singh)
 
Review              ML102980005     dated 6/18/10 The "Qualification Test Report Supplement, RM-1000         The detectors for these loops will be located in a                  Revised response is                              10/26/2010 Upgrades," Document No. 04508905-1SP Rev. A                 harsh environment (inside containment). The RM-                    included in letter dated    Response                              10/14/10 states that the qualification was done in accordance       1000 will be located in the main control room,                      10/29/10. (TVA to confirm)  acceptable. TVA with IEEE 323-1974 and -1983. Please describe and           which is a mild environment. The RM-1000 and                       Design Criteria is WB-DC-    to update on justify all differences in this qualification methodology  associated I/F converters have been tested to the                   40-54 is attached to this    issuance of letter and that endorsed by Regulatory Guide 1.209.                requirements present in IEEE Std. 323-1983 and -                   letter.                      to close item.
letter. Review   Response acceptable. TVA to update on issuance of letter to close item.
Specifically address EMI and RFI                            1974, as well as the System Requirements including EPRI TR 102323 (Sept. 94) in the design basis.                                                                                   Due 10/14/10 Electro-Magnetic-Interference and Radio                                                         Identify source of Frequency Interference (EMI-RFI) testing was                                                     reference 3.
Due 10/14/10 Identify source of reference 3.
performed (the results of the testing are included in the Equipment Qualification Test Report submitted under TVA letter dated March 12, 2010, Reference 4). Since RG 1.209 was not issued until 2007, General Atomics test reports do not reference it.
TVA to identify when and by what letter number WB-DC-40-54 was submitted to NRC.
For WBN Unit 2, a harsh environment is defined as:
If not previously submitted then please submit this document. ML102980005 10/26/2010 dated 6/18/10 055 7.5.2 7.5.1 EICB (Singh) 4/19/2010 The "Qualification Test Report Supplement, RM-1000 Upgrades," Document No. 04508905-1SP Rev. A states that the qualification was done in accordance with IEEE 323-1974 and -1983.
A defined room or building zone where either (1)
Please describe and justify all differences in this qualification methodology and that endorsed by Regulatory Guide 1.209.
Specifically address EMI and RFI Responder: Slifer/Clark                  Date: 5/25/10 The detectors for these loops will be located in a harsh environment (inside containment). The RM-1000 will be located in the main control room, which is a mild environment. The RM-1000 and associated I/F converters have been tested to the requirements present in IEEE Std. 323-1983 and -
1974, as well as the System Requirements including EPRI TR 102323 (Sept. 94) in the design basis.
 
Electro-Magnetic-Interference and Radio Frequency Interference (EMI-RFI) testing was performed (the results of the testing are included in the Equipment Qualification Test Report submitted under TVA letter dated March 12, 2010, Reference 4). Since RG 1.209 was not issued until 2007, General Atomics test reports do not reference it.


For WBN Unit 2, a harsh environment is defined as:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                               rad12E8A.docx                                                                          Open Items to be Resolved for SER Approval SE      FSAR    NRC
A defined room or building zone where either (1)  
: 5. Y Open Revised response is included in letter  dated 10/29/10. (TVA to confirm) Design Criteria is WB-DC-40-54 is attached to this letter. Open-NRC Review  Response acceptable. TVA to update on issuance of letter to close item.
Due 10/14/10 Identify source of reference 3. RAI No. 15 ML102980005 10/26/2010 TVA Letter dated 6/18/10


10/14/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments the temperature, pressure, and relative humidity resulting from the direct effects of a DBE (e.g., temperature rise due to steam release) are more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will exceed 130&deg; F due to the indirect effects of DBE (e.g., increased heat loads from electrical equipment), (3) the event radiation dose is greater than 1 x 104 rads, or (4) the total event plus the 40-year TID is greater than 5 x 104 rads. (Reference 3) What is Reference 3?
===Response===
Acceptable                                                                    RAI Resp.
No.                   POC                                     Issue                                         TVA Response(s)                             Y/N       Status/ Current Actions   Resolution Path   RAI No. & Date                               Comments Sec. Sec.                                                                                                                                                                                                                   Date the temperature, pressure, and relative humidity resulting from the direct effects of a DBE (e.g.,
temperature rise due to steam release) are more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will exceed 130&deg;F due to the indirect effects of DBE (e.g., increased heat loads from electrical equipment), (3) the event radiation dose is greater than 1 x 104 rads, or (4) the total event plus the 40-year TID is greater than 5 x 104 rads.
(Reference 3)
What is Reference 3?
TVA Revised Response:
TVA Revised Response:
Reference 3 is TVA Design Criteria WB-DC-40-54, Environmental Qualification To 10CFR50.49, which provides the definition of mild and harsh environments. Attachment 13 to TVA letter dated October 29, 2010 contains WB-DC-40-54, Revision 4.
Reference 3 is TVA Design Criteria WB-DC                                                                                             54, Environmental Qualification To 10CFR50.49, which provides the definition of mild and harsh environments. Attachment 13 to TVA letter dated October 29, 2010 contains WB-DC-40-54, Revision 4.
065 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the FMEA was August 31, 2010. Responder: WEC                Date: 5/25/10 Attachment 37 to letter dated 10/5/10 contains the proprietary version of the Common Q PAMS FMEA and the affidavit for withholding. A non-proprietary version will be provided at a later date.  
065   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the   Responder: WEC              Date: 5/25/10              6. N      Open                        Open-NRC          N/A - No        TVA Letter EICB (Carte) target submittal date for the FMEA was August 31,                                                                                                       Review            question was    dated 10/5/10 2010.                                                Attachment 37 to letter dated 10/5/10 contains the                                                                   asked. Item proprietary version of the Common Q PAMS                                                         Due 12/1/10        was opened to FMEA and the affidavit for withholding. A non-                                                                       track proprietary version will be provided at a later date.                                                                comm8ittment made by applicant.
: 6. N Open Open-NRC Review  Due 12/1/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
101                                    4/12/2010                                            Responder: Slifer                                      7. Y      Open                       Open-NRC           N/A                             TVA is working with the vendor DORL (Poole)
 
Review                                              to meet the 6/30 date, however The non-proprietary versions of the following RM-   The documents, and affidavits for withholding for                      Documents provided in letter                                                    there is the potential this will slip 1000, Containment High Range Post Accident           the listed documents were submitted to the NRC                        dated 07/15/10              Due 10/14/10                                      to 7/14.
TVA Letter dated 10/5/10 101  DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.  
Radiation Monitor documents will be provided by June on TVA letter to the NRC dated July 15, 2010.
: 1. V&V Report 04508006A
30, 2010.                                                                                                                                              Confirm receipt.
: 2. System Description 04508100-1TM 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP  
: 1. V&V Report 04508006A
: 4. Functional Testing Report 04507007-1TR Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
: 2. System Description 04508100-1TM
: 7. Y Open Documents provided in letter dated 07/15/10 Open-NRC Review  Due 10/14/10
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
 
: 4. Functional Testing Report 04507007-1TR 103  7.4      7.4                    5/27/2010                                            Responder: Ayala                Date: 5/27/10          8. Y       Open                       Open-NRC           EICB RAI No.1                    Submittal date is based on EICB (Darbali)
Confirm receipt. N/A  TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14. 103 7.4 7.4 EICB (Darbali) 5/27/2010 TVA to submit excerpts of EDCR 52321 Responder: Ayala                    Date: 5/27/10 Attachment 1 contains excerpts from draft EDCR 52321 (i.e., draft Scope and Intent, Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.  
Review            ML102910017,                    current EDCR scheduled issue TVA to submit excerpts of EDCR 52321                 Attachment 1 contains excerpts from draft EDCR                       Response is included in                        10/19/10                        date.
: 8. Y Open  Response is included in letter dated 10/29/10. Open-NRC Review  Due 10/31/10.
52321 (i.e., draft Scope and Intent, Unit                             letter dated 10/29/10.      Due 10/31/10.
Waiting for docketed version to close item.
Difference and Technical Evaluation). The final                                                   Waiting for excerpts will be submitted within two weeks after                                                 docketed version issuance of the EDCR.                                                                            to close item.
EICB RAI No.1 ML102910017, 10/19/10  Submittal date is based on current EDCR scheduled issue date. 104 7.4 7.4 EICB (Darbali) 5/27/2010
104  7.4      7.4                    5/27/2010                                            Responder: Merten                Date: 5/27/10         9. Y      Open                        Open-NRC           EICB RAI No.1                   Submittal date is based on EICB (Darbali)
 
Review            ML102910017,                    current EDCR scheduled issue TVA to submit excerpts of EDCR 52351                 Attachment 2 contains excerpts from draft EDCR                       Response is included in                        10/19/10                        date.
TVA to submit excerpts of EDCR 52351 Responder: Merten                    Date: 5/27/10 Attachment 2 contains excerpts from draft EDCR 52351 (i.e., draft Scope and Intent, Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.
52351 (i.e., draft Scope and Intent, Unit                             letter dated 10/29/10      Due 10/31/10.
: 9. Y Open  Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10.
Difference and Technical Evaluation). The final                                                   Waiting for excerpts will be submitted within two weeks after                                                 docketed version issuance of the EDCR.                                                                             to close item.
Waiting for docketed version to close item.
EICB RAI No.1 ML102910017, 10/19/10  Submittal date is based on current EDCR scheduled issue
 
date.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 114 7.2 7.2 EICB (Garg) 6/1/2010  Provide the resolution of the Eagle 21 Rack 5 lockup on update issue. Responder: WEC The following non-proprietary response was developed from proprietary Westinghouse letter WBT-D-2027 (Reference 11), which provided the resolution of this issue. Westinghouse approved this non-proprietary response via e-mail from A. Drake to M. Clark on June 15, 2010.
As documented in WBT-D-1917, "Eagle-21 Rack 5 LCP Diagnostic Failures", (Reference 14),
during the factory acceptance testing for the Unit 2 Eagle-21 System, Westinghouse noted an occasional diagnostic failure while performing the parameter update function on Rack 5.
Subsequently, TVA provided to Westinghouse for testing and examination, a Loop Control Processor (LCP) board removed by TVA from Unit 1 Rack 5 for life cycle-based preventive maintenance. TVA personnel familiar with Unit 1 had indicated they had not experienced problems when performing parameter updates on Unit 1 Rack 5. Based on Westinghouse examination and testing, a difference in hardware was identified between the Unit 1 LCP shipped to Westinghouse, the new Unit 2 Rack 5 LCP, and an older LCP (older than the Unit 1 LCP) from the Westinghouse Eagle 21 test bed. Installed on the Unit 1 LCP was a different version of an 80287 math coprocessor chip (80287 XL). 


This version of the 80287 had an improved specification for calculation speed. Use of this chip on both the Unit 2 LCP and the test bed LCP allowed proper performance of the LCP when making parameter updates using the Unit 1/Unit 2 Rack 5 software. Also, use of the slower 80287 on any of the three LCP boards caused failure in parameter update with the Unit 1/Unit 2 Rack 5 software.  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                          rad12E8A.docx                                                                                  Open Items to be Resolved for SER Approval SE    FSAR    NRC


Through investigation of historical records, Westinghouse found that the 80287 XL chip had been evaluated and used by its former Process Control Division (now Emerson) for this application, but the current Westinghouse documentation had not been updated. This part has now been evaluated, and the Westinghouse documentation and drawing have been revised to allow use of the 80287 XL coprocessor. The 80287 XL coprocessor has been installed on the Unit 2 Rack 5 LCP, and the appropriate factory acceptance testing has been successfully conducted using this updated board. Additionally, the LCP boards in the balance of the Unit 2 racks have been updated with the 80287 XL 10. Y Open  TVA to provide justification that there are no more surprises.
===Response===
Acceptable                                                                            RAI Resp.
No.                  POC                                  Issue                                          TVA Response(s)                      Y/N            Status/ Current Actions      Resolution Path      RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                      Date 114  7.2    7.2                  6/1/2010                                              Responder: WEC                                      10. Y        Open                          Open-NRC              EICB RAI        TVA Letter EICB (Garg)
Review                ML102910008      dated 6/18/10 Provide the resolution of the Eagle 21 Rack 5 lockup  The following non-proprietary response was                        TVA to provide justification                          Item#35 on update issue.                                      developed from proprietary Westinghouse letter                    that there are no more        Due 10/31/10 WBT-D-2027 (Reference 11), which provided the                      surprises.
resolution of this issue. Westinghouse approved                                                  The write-up this non-proprietary response via e-mail from A.                                                  shows that there Drake to M. Clark on June 15, 2010.                                Revised response is            was differences included in letter dated      between Unit 1 As documented in WBT-D-1917, Eagle-21 Rack                        10/29/10                      and 2 but was not 5 LCP Diagnostic Failures, (Reference 14),                                                      identified to NRC during the factory acceptance testing for the Unit                                                in earlier 2 Eagle-21 System, Westinghouse noted an                                                          response. Are occasional diagnostic failure while performing the                                                there any more parameter update function on Rack 5.                                                              surprises like this?
Subsequently, TVA provided to Westinghouse for testing and examination, a Loop Control Processor (LCP) board removed by TVA from Unit 1 Rack 5 for life cycle-based preventive maintenance. TVA personnel familiar with Unit 1 had indicated they had not experienced problems when performing parameter updates on Unit 1 Rack 5.
Based on Westinghouse examination and testing, a difference in hardware was identified between the Unit 1 LCP shipped to Westinghouse, the new Unit 2 Rack 5 LCP, and an older LCP (older than the Unit 1 LCP) from the Westinghouse Eagle 21 test bed. Installed on the Unit 1 LCP was a different version of an 80287 math coprocessor chip (80287 XL).
This version of the 80287 had an improved specification for calculation speed. Use of this chip on both the Unit 2 LCP and the test bed LCP allowed proper performance of the LCP when making parameter updates using the Unit 1/Unit 2 Rack 5 software. Also, use of the slower 80287 on any of the three LCP boards caused failure in parameter update with the Unit 1/Unit 2 Rack 5 software.
Through investigation of historical records, Westinghouse found that the 80287 XL chip had been evaluated and used by its former Process Control Division (now Emerson) for this application, but the current Westinghouse documentation had not been updated. This part has now been evaluated, and the Westinghouse documentation and drawing have been revised to allow use of the 80287 XL coprocessor. The 80287 XL coprocessor has been installed on the Unit 2 Rack 5 LCP, and the appropriate factory acceptance testing has been successfully conducted using this updated board. Additionally, the LCP boards in the balance of the Unit 2 racks have been updated with the 80287 XL


Revised response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10 The write-up shows that there was differences between Unit 1 and 2 but was not identified to NRC in earlier response. Are there any more surprises like this?
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                              rad12E8A.docx                                                                                  Open Items to be Resolved for SER Approval SE    FSAR    NRC
EICB RAI ML102910008 Item#35 TVA Letter dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments coprocessor.
===Response===
Acceptable                                                                            RAI Resp.
No.                 POC                                     Issue                                           TVA Response(s)                     Y/N           Status/ Current Actions         Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                         Date coprocessor.
TVA Revised Response:
TVA Revised Response:
The Eagle 21 system is installed and the Site Acceptance Test has been completed. To the best of TVA's knowledge there are no unknown issues with the system.
The Eagle 21 system is installed and the Site Acceptance Test has been completed. To the best of TVAs knowledge there are no unknown issues with the system.
118 7.4 7.4 EICB (Darbali) 6/8/2010 TVA to submit excerpts from EDCR 55385 Responder: Merten Attachment 4 contains excerpts from draft EDCR 55385 (i.e., draft Scope and Intent, Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR. 11. Y Open  Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10.
118   7.4     7.4                     6/8/2010                                                 Responder: Merten                                  11. Y        Open                            Open-NRC          EICB RAI No.1                    Submittal date is based on EICB (Darbali)
Waiting for docketed version to close item.
Review            ML102910017,                    current EDCR scheduled issue TVA to submit excerpts from EDCR 55385                   Attachment 4 contains excerpts from draft EDCR                    Response is included in                            10/19/10                        date. Note: The RVLIS EDCR 55385 (i.e., draft Scope and Intent, Unit                         letter dated 10/29/10           Due 10/31/10.                                       has been split into two EDCRs.
EICB RAI No.1 ML102910017, 10/19/10  Submittal date is based on current EDCR scheduled issue date. Note: The RVLIS EDCR has been split into two EDCRs. The first EDCR is 52601 (Open Item 91) The second EDCR is 55385. 140   EICB (Carte) The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) states: "The PAMS shall be capable of operation during normal and abnormal environments and plant operating modes.The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97.   
Difference and Technical Evaluation). The final                                                    Waiting for                                        The first EDCR is 52601 (Open excerpts will be submitted within two weeks after                                                  docketed version                                    Item 91) The second EDCR is issuance of the EDCR.                                                                              to close item.                                      55385.
140                                   The first requirement in the WBN2 PAMS SysRS (i.e.,     Responder: Clark                                    12. N        Open                            Open-NRC          ML101650255,                    WBN2 PAMS System EICB (Carte)
R2.2-1) states: The PAMS shall be capable of                                                                                                               Review            Item No. 4                      Requirements Specification operation during normal and abnormal environments       WBN Unit 2 FSAR Amendment 100 Section and plant operating modes. The rational for this       7.5.1.8, Post Accident Monitoring System                                                          Due 10/22/10                                        TVA docketed WNA-DS-01617-requirement is that it is necessary to meet Regulatory   (PAMS) specifies the Reg. Guide 1.97 variables                                                                                                        WBT Rev. 1, RRAS Watts Bar 2 Guide (RG) 1.97.                                         implemented in the Common Q based WBN Unit                                                                                                            NSSS Completion Program I&C 2 PAMS                                                                                                                                                Projects Post Accident What document specifies which RG 1.97 variables are                                                                                                                                                            Monitoring System- System implemented in the Common Q based WBN2 PAMS?                                                                                                                                                                    Requirements Specification, dated December 2009.
144                                  The WBN2 PAMS Software Requirements                      Responder: WEC                                      13. N        Open                            Open-NRC          ML101650255, TVA Letter          WBN2 PAMS Software EICB (Carte)
Specification (WBN2 PAMS SRS) contains a table                                                                                                              Review            Item No. 8   dated 10/5/10      Requirements Specification (see page iii) titled, Document Traceability &      (a) The purpose of NABU-DP-00014-GEN                                  Response provided in letter Compliance, which states that the WBN2 PAMS SRS    document is to define the process for system level                    dated 10/5/10              Due 12/1/10                                              By letter dated April 8, 2010 was created to support the three documents identifieddesign, software design and implementation, and                                                                                                            (ML10101050203), TVA (two of these documents have been provided on the    hardware design and implementation for Common                        NRC Review and WEC to            Responses to                                        docketed WNA-SD-00239-WBT, docket).                                            Q safety system development. This document                            complete response.              items a and e                                      Revision 1, "RRAS Watts Bar 2 supplements the Common Q SPM, WCAP-16096-                                                              provided. Need                                      NSSS Completion Program I&C (a) Please describe the third document (i.e., NABU-  NP-A. The scope of NABU-DP-00014-GEN                                  b-d to be addressed at          response to b-d.                                    Projects, Software Requirements DP-00014-GEN Revision 2, Design Process for        includes the design and implementation                                public meeting and audit.                                                            Specification for the Post Common Q Safety Systems).                          processes for the application development. For a                      Will require information to be                                                      Accident Monitoring System, fuller description of the design process described                    docketed.                                                                            dated February 2010 (b) Please describe the flow of information between  in NABU-DP-00014-GEN please refer to the                                                                                                                  (ML101050202).
these three documents.                              Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket.
(c) Does the PAMS SRS implement the requirements Since this is a Westinghouse process document in these three documents?                            that is not specifically referenced in the SRS, it will be removed in the next revision of the (d) Please describe if and how these three documents document.
are used in the development of the PAMS Software Design Description.                                  (b) - Closed to items 142 and 145 (e) Do the WBN2 V&V activities include verification      (c) - Closed 142                                                                                                      (d) N/A -
that the requirements of these three documents have                                                                                                                            Closed to Item been incorporated into the WBN2 PAMS SRS.                (d) - Closed to Item 142                                                                                              No. 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects


What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS? Responder: Clark WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, "Post Accident Monitoring System (PAMS)" specifies the Reg. Guide 1.97 variables implemented in the Common Q  based WBN Unit 2 PAMS  12. N Open Open-NRC Review  Due 10/22/10 ML101650255, Item No. 4  WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                rad12E8A.docx                                                                                Open Items to be Resolved for SER Approval SE    FSAR    NRC
144  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "D ocument Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).  (a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems"). 
(b) Please describe the flow of information between these three documents.
(c) Does the PAMS SRS implement the requirements in these three documents?
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS. Responder: WEC


(a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and implementation for Common Q safety system development. This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.  
===Response===
Acceptable                                                                        RAI Resp.
No.                  POC                                    Issue                                              TVA Response(s)                      Y/N            Status/ Current Actions      Resolution Path      RAI No. & Date                          Comments Sec. Sec.                                                                                                                                                                                                                        Date Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
154  7.2    7.2                  FSAR section 7.2.1.1.10, setpoints: NRC staff has            Responder: Craig/Webb                                14. N        Open                          Open-NRC              ML101720589, TVA Letter        EICB RAI ML102861885 sent to EICB (Garg) issued RIS 2006-17 to provide guidance to the industry                                                                                                        Review                Item No. 6 and dated 10/5/10  DORL regarding the instrument setpoint methodology which          (Q1) Refer to the response to letter item 13, RAI                  Response is not acceptable.                        EICB RAI complies with 10 CFR 50.36 requirements. Provide            Matrix Item 51.                                                    A revised response will be Due 10/31/10            ML102861885 the information on how the WBN2 setpoint                                                                                        submitted in the letter dated                      Item No. 8 methodology meets the guidance of RIS 2006-17 and            (Q2) EEB-TI-28's single sided methodology                          10/29/10.                    FSAR AMD 100.
include this discussion in this section. Also, by letter    conforms with WBN's design basis commitment to                                                  Since all the dated May 13, 2010, TVA provided Rev. 7 of EEB-TI-           ensure that 95% of the analyzed population is                                                    setpoint and 28 to the staff. The staff noted that section 4.3.3.6 of    covered by the calculated tolerance limits as                                                    allowable value EEB-TI-28 discusses the correction for setpoints with a     defined in NRC Reg Guide 1.105, Revision 2,                                                      for Unit 2 is single side of interest. It should be noted that the staff  1986 that was in affect during WBN Unit 1                                                        calculated and has not approved this aspect of setpoint methodology        licensing. The single sided methodology is not                                                  added to TS, TVA for Unit 1. The staff finds this reduction in               used for any TSTF-493 setpoints that use TI-28                                                  needs to address uncertainties is not justified unless it can be              methodology.                                                                                    the latest criteria demonstrated that the 95/95 criteria is met. Therefore,                                                                                                      and that include either remove this reduction factor for single sided        TVA Revised Response:                                                                            95/95 criteria.
uncertainties or justify how you meet the 95/95 criteria                                                                                                      Why the last given in RG 1.105.                                          In order to respond to other NRC comments on                                                    sentence has the setpoint methodology discussion in FSAR                                                      been modified by Amendment 100, TVA reviewed the previous                                                        adding TI-28. It response to this RAI. This resulted in a complete                                                was NRCs rewrite of the responses to this question as shown                                              understanding below. As a result, the response does not                                                        that all setpoints specifically address the NRC Follow-up Request.                                                  have to meet TI-However, the overall responses to all of the NRC                                                28 RAIs on setpoint methodology addresses this item.
(Q1)    WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint


(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e)  WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Tr aceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Re
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                            rad12E8A.docx                                                                            Open Items to be Resolved for SER Approval SE    FSAR    NRC
: v. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects 13. N Open Response provided in letter dated 10/5/10


NRC Review and WEC to complete response.  
===Response===
Acceptable                                                                    RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                        Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                            Comments Sec. Sec.                                                                                                                                                                                                                  Date methodology in FSAR section 7.1.2.1.9.
(Q2)  Electrical Engineering Branch (EEB)
Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
There are some areas where a 95%
confidence level could not be achieved.
Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..
156  7.2    7.2                  FSAR section 7.2.2.1.1 states that dashed lines in      Responder: WEC                                  15. N            Open                        Open-NRC           ML101720589, TVA Letter          Response on hold pending EICB (Garg)
Figure 15.1-1designed to prevent exceeding                                                                                                            Review             Item No. 8  dated 10/5/10        Westinghouse review.
121% of power.The value of 121% is changed            Per Westinghouse letter WBT-D-2340,                                Response is included in from 118%. The justification for this change states that TENNESSEE VALLEY AUTHORITY WATTS                                  letter dated 10/5/10        Amendment 101 this was done to bring the text of this section in      BAR NUCLEAR PLANT UNIT 2 FSAR Markups                                                          Submitted agreement with section 4.3.2.2.5, 4.4.2.2.6 and table Units I and 2 118% vs. 121 % and Correction to                                                    10/29/10.
4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still RAI Response SNPB 4.3.2-7, (Reference 17) the show this value as 118%. Justify the change.            118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a result of the question, Westinghouse reviewed all locations where either 118% or 121% are used and the context of use and provided a FSAR markup to reflect the correct value at the specific location. These changes will be incorporated in a future FSAR amendment.
183                                7/15/2010                                                Responder: WEC                                       16. Y        Open                        Open-NRC          EICB RAI        TVA Letter EICB (Carte)
Review            ML102980066      dated 10/21/10 An emphasis is placed on traceability in System        The generic Software Requirements Specification                      Response provided in letter                    Item No. 9      Enclosure 1 Requirements Specifications in the SRP, in the        applies except as modified by the WBN Unit 2                        dated 10/21/10              Due 12/1/10                        Item No. 4 unmodified IEEE std 830-1993, and even more so        System Requirements Specification.
given the modifications to the standard listed in                                                                                                      NRC to issue RAI Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System


b-d to be addressed at public meeting and audit.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                  rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE      FSAR    NRC
Will require information to be docketed. Open-NRC Review Due 12/1/10


Responses to items a and e provided. Need response to b-d. ML101650255, Item No. 8
===Response===
 
Acceptable                                                                      RAI Resp.
(d) N/A - Closed to Item No. 142 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification
No.                   POC                                       Issue                                           TVA Response(s)                         Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                         Date Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?
 
If there are additional changes, what is their origin?
By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, ""RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System,"
186  7.7.7.7.1.                   7/15/2010                                                Responder: Perkins/Clark                              17. Y        Open                        Open-NRC            EICB RAI No.6 TVA Letter EICB (Darbali) 12                                                                                                                                                                                  Review              ML102910017, dated 10/5/10 Along with Amendment 96, TVA submitted a list of          No. The previous wording reflected operation of                     Response included in letter                    10/19/10 Bechtel changes for each section. Change number 45        the computer based AMSAC system. The                                 dated 10/29/10              Due Date addresses a change to section 7.7.1.12, AMSAC,            change reflects the operation of the relay logic                                                10/31/10. Waiting however, the Justification column states This change    based system that replaced the original computer                                                for docketed is not included. EDCR 52408 installs the AMSAC in        based system in Unit 1. Unit 2 is installing a                      Response is satisfactory. version to close Unit 2. It does not have a trouble alarms. The existing  similar relay logic based system, so the change to                  Issue date of Amendment    item.
dated February 2010 (ML101050202).
words better reflect the operation of the system.        the Unit 1 wording is applicable to Unit 2.                          101 is not yet determined.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1). 
Even thought this change was not included in             EDCR 52408 Summary                                                  Follow-up NRC Amendment 96, will it be included in a future                                                                                  Request:
 
amendment?                                                A Purchase Order was issued to Nutherm International to provide a Unit 2 cabinet with the                  TVA to state that no Also, please submit a summary of EDCR 52408.              same functions as the current Unit 1 AMSAC.                          further FSAR changes are EDCR 52408 will install the cabinet and                              planned.
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-76 9 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0. 
route/install cabling to provide the necessary inputs/outputs for/from the AMSAC cabinet.
 
In the Main Control Room, three cables will be installed for the AMSAC handswitch on 2-M-3 and AMSAC NOT ARMED and AMSAC ACTUATED annunciator windows.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
In the Turbine Building, two pressure transmitters will be installed in two local panels to sense turbine pressure. Cables will be routed to the transmitters to provide the signal and power. Four cables will be routed to a local panel to provide steam generator level signals.
154 7.2 7.2 EICB (Garg) FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS 2006-17 to provide guidance to the industry regarding the instrument setpoint methodology which complies with 10 CFR 50.36 requirements. Provide the information on how the WBN2 setpoint methodology meets the guidance of RIS 2006-17 and include this discussion in this section. Also, by letter dated May 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff noted that section 4.3.3.6 of EEB-TI-28 discusses the correction for setpoints with a single side of interest. It should be noted that the staff has not approved this aspect of setpoint methodology for Unit 1. The staff finds this reduction in uncertainties is not justified unless it can be demonstrated that the 95/95 criteria is met. Therefore, either remove this reduction factor for single sided uncertainties or justify how you meet the 95/95 criteria given in RG 1.105. Responder: Craig/Webb (Q1) Refer to the response to letter item 13, RAI Matrix Item 51.
In the Control Building, three cables will be routed to separation relays which will provide the start signal for the Motor Driven Auxiliary Feedwater Pumps, Turbine Driven Auxiliary Feedwater Pump, and initiate a Turbine Trip. Additionally, a cable will be routed to Unit 2 ICS for AMSAC NOT ARMED and AMSAC ACTUATED log points.
(Q2) EEB-TI-28's single sided methodology conforms with WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 that was in affect during WBN Unit 1 licensing. The single sided methodology is not used for any TSTF-493 setpoints that use TI-28 methodology.
This EDCR is intended to configure Unit 2 AMSAC like Unit 1 when possible.
TVA Revised Response:
TVA Revised Response:
In order to respond to other NRC comments on the setpoint methodology discussion in FSAR Amendment 100, TVA reviewed the previous response to this RAI. This resulted in a complete rewrite of the responses to this question as shown below. As a result, the response does not specifically address the NRC Follow-up Request. However, the overall responses to all of the NRC RAIs on setpoint methodology addresses this item.   (Q1) WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint 14. N Open  Response is not acceptable. 
No further changes to the FSAR associated with AMSAC are planned.
 
200  7.2                               7/21/2010                                                Responder: Clark                                18. Y                Open                        Open-NRC           EICB RAI         TVA Letter 7.3                                                                                         The statement in SER Section 7.5.1 is supported                                                  Review             ML102980066     dated 10/5/10
A revised response will be submitted in the letter dated 10/29/10. Open-NRC Review  Due 10/31/10 FSAR AMD 100.
Since all the setpoint and allowable value for Unit 2 is calculated and added to TS, TVA needs to address the latest criteria and that include 95/95 criteria.
Why the last sentence has been modified by adding TI-28. It was NRC's understanding that all setpoints have to meet TI-28  ML101720589, Item No. 6 and EICB RAI ML102861885 Item No. 8 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments methodology in FSAR section 7.1.2.1.9. 
  (Q2) Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations,  single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as "high."
. 156 7.2 7.2 EICB (Garg) FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-1--designed to prevent exceeding 121% of power--.The value of 121% is changed from 118%. The justification for this change states that this was done to bring the text of this section in agreement with section 4.3.
2.2.5, 4.4.2.2.6 and table 4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still show this value as 118%. Justify the change. Responder: WEC Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Correction to RAI Response SNPB 4.3.2-7, (Reference 17) the 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a result of the question, Westinghouse reviewed all locations where either 118% or 121% are used and the context of use and provided a FSAR markup to reflect the correct value at the specific location. These changes will be incorporated in a future FSAR amendment. 15. N Open  Response is included in letter dated 10/5/10 Open-NRC Review  Amendment 101 Submitted 10/29/10. ML101720589, Item No. 8 TVA Letter dated 10/5/10 Response on hold pending Westinghouse review.
183  EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies" On page 1-2 of the Post Accident Monitoring System's Software Requirements Specification in the background section, is the sentence "Those sections of the above references that require modification from the generic PAMS are defined in the document" referring purely to the changes from WNA-DS-01617-WBT "Post Accident Monitoring System-System Responder: WEC The generic Software Requirements Specification applies except as modified by the WBN Unit 2 System Requirements Specification.
: 16. Y Open  Response provided in letter dated 10/21/10 Open-NRC Review Due 12/1/10 NRC to issue RAI EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Enclosure 1
 
Item No. 4
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Requirements Specification" or is it saying that there are additional changes beyond those and that the SRS defines them?


If there are additional changes, what is their origin?
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                              rad12E8A.docx                                                                        Open Items to be Resolved for SER Approval SE    FSAR    NRC


186 7.7.8 7.7.1.12 EICB (Darbali) 7/15/2010 Along with Amendment 96, TVA submitted a list of Bechtel changes for each section. Change number 45 addresses a change to section 7.7.1.12, AMSAC, however, the Justification column states "This change is not included. EDCR 52408 installs the AMSAC in Unit 2. It does not have a trouble alarms. The existing words better reflect the operation of the system."
===Response===
Even thought this change was not included in Amendment 96, will it be included in a future amendment?
Acceptable                                                                    RAI Resp.
Also, please submit a summary of EDCR 52408. Responder: Perkins/Clark No. The previous wording reflected operation of the computer based AMSAC system. The change reflects the operation of the relay logic based system that replaced the original computer based system in Unit 1. Unit 2 is installing a similar relay logic based system, so the change to the Unit 1 wording is applicable to Unit 2.
No.                 POC                                    Issue                                            TVA Response(s)                    Y/N            Status/ Current Actions  Resolution Path  RAI No. & Date                            Comments Sec. Sec.                                                                                                                                                                                                               Date 7.5                          Amendment 99 of the Watts Bar Unit 2 FSAR Section        by the following:                                                Response provided in letter                  Item No. 2 7.7                          7.5, Instrumentation Systems Important to Safety,
EDCR 52408 Summary A Purchase Order was issued to Nutherm International to provide a Unit 2 cabinet with the same functions as the current Unit 1 AMSAC.
* I&C Systems for Normal Operation FSAR                          dated 10/5/10              Amendment 101 does not include any description of instrumentation for      Section                                                                                  Submitted normal operation; therefore, Section 7.5 of the FSAR
EDCR 52408 will install the cabinet and route/install cabling to provide the necessary inputs/outputs for/from the AMSAC cabinet.
* Eagle 21 7.2                                                                               10/29/10.
In the Main Control Room, three cables will be installed for the AMSAC handswitch on 2-M-3 and "AMSAC NOT ARMED" and "AMSAC ACTUATED" annunciator windows.
does not support statements made in the SER Section
In the Turbine Building, two pressure transmitters will be installed in two local panels to sense turbine pressure. Cables will be routed to the transmitters to provide the signal and power. Four cables will be routed to a local panel to provide steam generator level signals.
* Neutron Monitoring 7.2 7.5; compare SER (ML072060490) Section 7.5.1 and
In the Control Building, three cables will be routed to separation relays which will provide the start signal for the Motor Driven Auxiliary Feedwater Pumps, Turbine Driven Auxiliary Feedwater Pump, and initiate a Turbine Trip. Additionally, a cable will be routed to Unit 2 ICS for 'AMSAC NOT ARMED" and "AMSAC ACTUATED" log points. This EDCR is intended to configure Unit 2 AMSAC like Unit 1 when possible.
* Foxboro Spec 200 7.3 (List of other sections FSAR Amendment 99 Section 7.5. Please identify                in attachment 34) where, in the docketed material, information exists to
TVA Revised Response:
* Foxboro I/A 7.7.11 (new section will be added support the statements in the SER Section 7.5.1.              by amendment 101) (other sections have been previously provided)
No further changes to the FSAR associated with AMSAC are planned. 17. Y Open  Response included in letter dated 10/29/10 Response is satisfactory. Issue date of Amendment 101 is not yet determined.
* Plant Computer 7.5.2
Follow-up NRC Request: TVA to state that no further FSAR changes are planned. Open-NRC Review Due Date 10/31/10. Waiting for docketed version to close item. EICB RAI No.6 ML102910017, 10/19/10 TVA Letter dated 10/5/10 200 7.2 7.3 7/21/2010 Responder: Clark The statement in SER Section 7.5.1 is supported 18. Y Open  Open-NRC Review EICB RAI ML102980066 TVA Letter dated 10/5/10
* Rod Control 7.7.1.2
* CERPI 7.7.1.2
* Control Rod Drive 7.7.1.1
* Incore Neutron Monitoring 7.7.1.9
* Lose Part Detection/Monitoring 7.6.7
* Vibration Monitoring RCP 5.5.1.2
* Control Boards 7.1.1.10
* RVLIS 7.5, 5.6 201 7.7.1. 7.7.11                  7/21/2010                                                Responder: Webb                                    19. Y        Open                        Open-NRC          EICB RAI        TVA Letter EICB (Carte) 1.1                                                                                                                                                                                  Review            ML102980066      dated 10/5/10 Amendment 99, FSAR Section 7.7.1.1.1, "Reactor            These functions are within the scope of the                     Response provided in letter                  Item No. 3 Control Input Signals (Unit 2 Only)," contains a         Foxboro I/A system. Section 7.7.11 will be added                dated 10/5/10              Amendment 101 description of functions performed uniquely for Unit 2. to the FSAR in amendment 101 to provide a                                                    Submitted Please describe the equipment that performs this          discussion of the DCS.                                                                       10/29/10.
function (in sufficient detail to support a regulatory evaluation), and evaluate this equipment against the appropriate regulatory criteria.
211 7.5.1.                          7/27/2010                                                Responder: Clark                                  20. N        Open                        Open-NRC         EICB RAI        TVA Letter      Relates to SE Sections:
EICB (Carte) 1                                                                                                                                                                                    Review           ML102980066      dated 10/5/10   7.5.5, Plant Computer 7.5.2                          FSA Table 7.1-1 shows: "The extent to which the          The WBN 2 FSAR Section 7.5 defines the                          Response included in letter                  Item No. 5                      7.6.10, Loose Part Monitoring 7.6.1                          recommendations of the applicable NRC regulatory          following systems as important to safety                      dated 10/5/10               Amendment 101                                      7.7.1, Control System 7.7.1                          guides and IEEE standards are followed for the Class                                                                                                  Submitted                                          Description 7.7.2                          1E instrumentation and control systems is shown        1. Post Accident Monitoring including:                                                        10/29/10.                                          7.7.2, Safety System Status 7.7.4                          below. The symbol (F) indicates full compliance. Those a. Common Q Post Accident Monitoring System                                                                                                      Monitoring System 7.9                            which are not fully implemented are discussed in the    (Safety-Related)                                                                                                                                  7.7.4, PZR & SG Overfill referenced sections of the FSAR and in the footnotes    i. Reactor Vessel Level                                                                                                                          7.9, Data Communications as indicated."                                          ii. Core Exit Thermocouples iii. Subcooling Margin Monitor Please describe how systems that are important to      b. Eagle 21 indications (Safety-Related) safety, but not 1E, comply with 10 CFR 50.55a(a)1:      c. Foxboro Spec 200 indications (Safety-Related)
                                    "Structures, systems, and components must be            d. Neutron Monitoring (Source and Intermediate designed, fabricated, erected, constructed, tested, and Range) (Safety-Related) inspected to quality standards commensurate with the e. Radiation Monitors (Safety-Related) importance of the safety function to be performed."    f. Unit 1 and Common shared indications (Safety-Related)
: g. Foxboro I/A indications (Non-Safety-Related)
: h. Radiation Monitors (Non-Safety-Related)
: i. CERPI (Non-Safety-Related)
: j. Integrated Computer System (Non-Safety-Related)
: k. Unit 1 and Common shared indications (Non-Safety-Related)
Post Accident Monitoring Instrumentation Design Criteria, WB-DC-30-7, Rev. 22, Appendix A


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 7.5 7.7 Amendment 99 of the Watts Bar Unit 2 FSAR Section 7.5, "Instrumentation Systems Important to Safety," does not include any description of instrumentation for normal operation; therefore, Section 7.5 of the FSAR does not support statements made in the SER Section 7.5; compare SER (ML072060490) Section 7.5.1 and FSAR Amendment 99 Section 7.5. Please identify where, in the docketed material, information exists to support the statements in the SER Section 7.5.1. by the following:  I&C Systems for Normal Operation FSAR Section  Eagle 21 7.2  Neutron Monitoring 7.2  Foxboro Spec 200 7.3 (List of other sections in attachment 34)  Foxboro I/A 7.7.11 (new section will be added by amendment 101) (other sections have been previously provided)  Plant Computer 7.5.2  Rod Control 7.7.1.2  CERPI 7.7.1.2  Control Rod Drive 7.7.1.1  Incore Neutron Monitoring 7.7.1.9  Lose Part Detection/Monitoring 7.6.7  Vibration Monitoring RCP 5.5.1.2  Control Boards 7.1.1.10  RVLIS 7.5, 5.6  Response provided in letter dated 10/5/10 Amendment 101 Submitted 10/29/10.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                     rad12E8A.docx                                                                           Open Items to be Resolved for SER Approval SE     FSAR   NRC
Item No. 2 201 7.7.1.1.1 7.7.11 EICB (Carte) 7/21/2010 Amendment 99, FSAR Section 7.7.1.1.1, "Reactor Control Input Signals (Unit 2 Only)," contains a description of functions performed uniquely for Unit 2. Please describe the equipment that performs this function (in sufficient detail to support a regulatory evaluation), and evaluate this equipment against the appropriate regulatory criteria. Responder: Webb These functions are within the scope of the Foxboro I/A system. Section 7.7.11 will be added to the FSAR in amendment 101 to provide a discussion of the DCS. 19. Y Open  Response provided in letter dated 10/5/10 Open-NRC Review  Amendment 101 Submitted 10/29/10.
EICB RAI ML102980066 Item No. 3 TVA Letter dated 10/5/10 211 7.5.1.1 7.5.2 7.6.1 7.7.1 7.7.2 7.7.4 7.9  EICB (Carte) 7/27/2010 FSA Table 7.1-1 shows: "The extent to which the recommendations of the applicable NRC regulatory guides and IEEE standards are followed for the Class 1E instrumentation and control systems is shown below. The symbol (F) indicates full compliance. Those which are not fully implemented are discussed in the referenced sections of the FSAR and in the footnotes as indicated."
Please describe how systems that are important to safety, but not 1E, comply with 10 CFR 50.55a(a)1: "Structures, systems, and components must be designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the importance of the safety function to be performed." Responder: Clark The WBN 2 FSAR Section 7.5 defines the following systems as "important to safety"
: 1. Post Accident Monitoring including:
: a. Common Q Post Accident Monitoring System (Safety-Related) i. Reactor Vessel Level ii. Core Exit Thermocouples iii. Subcooling Margin Monitor
: b. Eagle 21 indications (Safety-Related) c. Foxboro Spec 200 indications  (Safety-Related)d. Neutron Monitoring (Source and Intermediate Range)  (Safety-Related) e. Radiation Monitors (Safety-Related) f. Unit 1 and Common shared indications (Safety-Related) g. Foxboro I/A indications (Non-Safety-Related) h. Radiation Monitors (Non-Safety-Related)
: i. CERPI (Non-Safety-Related) j. Integrated Computer System (Non-Safety-Related)
: k. Unit 1 and Common shared indications (Non-Safety-Related)


Post Accident Monitoring Instrumentation Design Criteria, WB-DC-30-7, Rev. 22, Appendix A 20. N Open  Response included in letter dated 10/5/10 Open-NRC Review  Amendment 101 Submitted 10/29/10.
===Response===
EICB RAI ML102980066 Item No. 5 TVA Letter dated 10/5/10 Relates to SE Sections: 7.5.5, Plant Computer 7.6.10, Loose Part Monitoring 7.7.1, Control System Description 7.7.2, Safety System Status Monitoring System 7.7.4, PZR & SG Overfill 7.9, Data Communications Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments provides the minimum quality requirements for each Category (1, 2 or 3) of variable. By definition, no Category 1 variable can be non-safety-related. Therefore, non-safety-related variables and the source equipment are limited to category 2 or 3. Since some variables are designated as having more than 1 category, the requirements of the highest category apply. Additional design criteria information for specific systems is contained in:  
Acceptable                                                                    RAI Resp.
: g. Foxboro I/A - Site-Specific Engineering Specification WBN Unit 2 NSSS and BOP Controls Upgrade Specification Rev. 1 (Attachment 23) h. CERPI - Rod Control System Description, N3-85-4003, Rev. 12 Section 2.2, Design Requirements i. Radiation Monitors - Design Criteria Document WB-DC-40-24, Radiation Monitoring - (Unit 1 /
No.                   POC                             Issue                                         TVA Response(s)                       Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                         Date provides the minimum quality requirements for each Category (1, 2 or 3) of variable. By definition, no Category 1 variable can be non-safety-related. Therefore, non-safety-related variables and the source equipment are limited to category 2 or 3. Since some variables are designated as having more than 1 category, the requirements of the highest category apply.
Unit 2), Rev. 21 j. Integrated Computer System - Design Criteria Document WB-DC-30-29 Plant Integrated Computer System (ICS), Rev. 8 (Submitted under TVA to NRC letter dated August __, 2010)  
Additional design criteria information for specific systems is contained in:
: 2. Plant Computer (Integrated Computer System) - See Item j above.
: g. Foxboro I/A - Site-Specific Engineering Specification WBN Unit 2 NSSS and BOP Controls Upgrade Specification Rev. 1 (Attachment 23)
The WBN 2 FSAR Section 7.6, defines the following non-safety-related systems as "other systems required for safety
: h. CERPI - Rod Control System Description, N3-85-4003, Rev. 12 Section 2.2, Design Requirements
: 1. Foxboro I/A - While not specifically described, functions performed by the system are described in this section. The qualify requirements are described above.  
: i. Radiation Monitors - Design Criteria Document WB-DC-40-24, Radiation Monitoring - (Unit 1 /
Unit 2), Rev. 21
: j. Integrated Computer System - Design Criteria Document WB-DC-30-29 Plant Integrated Computer System (ICS), Rev. 8 (Submitted under TVA to NRC letter dated August __, 2010)
: 2. Plant Computer (Integrated Computer System)
                                                                                    - See Item j above.
The WBN 2 FSAR Section 7.6, defines the following non-safety-related systems as other systems required for safety
: 1. Foxboro I/A - While not specifically described, functions performed by the system are described in this section. The qualify requirements are described above.
: 2. Lose Part Monitoring System - Design Criteria Document WB-DC-30-31, Loose Parts Monitoring System, Rev. 4, provides the quality requirements for this system. A description of the distributed control system will be added as FSAR section 7.7.1.11 in FSAR Amendment 101.
: 2. Lose Part Monitoring System - Design Criteria Document WB-DC-30-31, Loose Parts Monitoring System, Rev. 4, provides the quality requirements for this system. A description of the distributed control system will be added as FSAR section 7.7.1.11 in FSAR Amendment 101.
Installation is performed in accordance with the quality requirements of either the Bechtel or TVA work order processes based on the quality classification of the equipment being installed.
Installation is performed in accordance with the quality requirements of either the Bechtel or TVA work order processes based on the quality classification of the equipment being installed.
Vendor testing is performed in accordance with procurement specification requirements which are based on the type and quality classification of the equipment. Preoperational testing is performed in accordance with Chapter 14 of the FSAR.
Vendor testing is performed in accordance with procurement specification requirements which are based on the type and quality classification of the equipment. Preoperational testing is performed in accordance with Chapter 14 of the FSAR.
213 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design 21. N Open Response is included in letter dated 10/25/10 Open-NRC Review    Due 12/31/10 EICB RAI ML102980066 Item No. 18
213   7.5.2                     7/27/2010                                           Responder: WEC                                       21. N         Open                       Open-NRC           EICB RAI EICB                                                                                                                                                        Review            ML102980066 (Carte)  By letter dated June 18, 2010 (ML101940236) TVA         Conformance with IEEE 603 is documented in the                   Response is included in                       Item No. 18 stated (Enclosure 1, Attachment 3, Item No. 3) that the revised Common Q PAMS Licensing Technical                       letter dated 10/25/10 PAMS system design specification and software          Report and the Common Q PAMS System Design                                                  Due 12/31/10
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments requirements specification contain information to address the "Theory of Operation Description."  The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to  evaluate compliance with the Clause of
 
IEEE 603. (1) Please provide the design basis (as described in IEEE 604 Clause 4)  of the Common Q PAMS. (2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation. For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions?
(2) How do the documents identified demonstrate compliance with this clause? Specification.
Attachment 1 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document  "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010. NNC to review and revise this question after LTR R1is received.
 
    . 214   EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 10) that the approved Common Q Topical Report contains information to address the "Safety Analysis."  The Common Q SPM however states that a Preliminary Hazards Analysis Report and the V&V reports document the software hazards analysis. Please Provide these documents. Responder: WEC According to "The Software Program Manual for Common Q Systems," WCAP-16096-NP-1A, the Software Safety Plan only applies to Protection class software and PAMS is classified as Important-to-safety. Exhibit 4-1 of the SPM shows that PAMS is classified as Important-to-Safety 22. N Open  Response provided in letter dated 10/5/10 WEC References Common Q PAMS preliminary hazards analysis is referenced in the SRS.
WEC to delete. Open-NRC Review  Due 12/1/10 EICB RAI ML102980066 Item No. 11 TVA Letter dated 10/5/10 244  EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processes or additional project specific information for the ...SCMP...shall be specified in the PQP.
 
Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202) contains many process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control. 
 
Please explain how the above meets the intent of the approved SPM. Responder: WEC
 
The process related requirements have been removed from revision 2 of the  Software Requirements Specification (SRS).
Attachment 3 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System", WNA-SD-00239-WBT, Revision 2, Dated September 2010.
: 23. N Open Response is provided in letter dated 10/25/10. Open-NRC Review  Due 10/22/10 EICB RAI ML102980066
 
Item No. 14  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the
 
acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 246  EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. M any other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
of letter dated 10/25/10 contains the proprietary version of Westinghouse document  24. N Open Response is provided in letter dated 10/25/10 Open-NRC Review    Due 10/22/10 EICB RAI ML102980066
 
Item No. 15  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments in the PQP. "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" detail to enable the NRC staff to make an independent assessment regarding the
 
acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 247  EICB (Carte) 8/8/2010  As part of the Common Q topical report development effort, Westinghouse developed the Software Program Manual for Common Q Systems (ML050350234) to address software planning documentation. The NRC reviewed the SPM and concluded: "the SPM specifies plans that will provide a quality software life cycle process, and that these plans commit to documentation of life cycle acti vities that will permit the staff or others to evaluate the quality of the design features upon which the safety determination will be based. The staff will review the Implementation of the life cycle process and the software life cycle process design outputs for specific applications on a plant-specific basis."  Please identify the implementation documentation produced as a result of following the SPM, and state what information will be docketed. Responder: WEC The implementation documents required by the SPM are identified in the compliance matrix in revision 1 of the Licensing Technical Report.
Attachment 1 of letter dated 10/25/10 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010"
: 25. N Open  Response is provided in letter dated 10/25/10 Open-NRC Review  Due 10/22/10.
EICB RAI ML102980066 Item No. 16  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 248  EICB (Carte) 8/8/2010  As part of the Common Q topical report development effort, Westinghouse developed the Software Program Manual for Common Q Systems (ML050350234) to address software planning documentation. The NRC reviewed the SPM and concluded: "the SPM specifies plans that will provide a quality software life cycle process, and that these plans commit to documentation of life cycle acti vities that will permit the staff or others to evaluate the quality of the design features upon which the safety determination will be based. The staff will review the Implementation of the life cycle process and the software life cycle process design outputs for specific applications on a plant-specific basis."  Please identify the design outputs produced as a result of following the SPM, and state


when what information will be docketed. Responder: WEC The documents are identified in the compliance matrix in revision 1 of the Licensing Technical Report  Attachment 1 of the letter dated 10/25/10 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010"  26. N Open Response is provided in letter dated 10/25/10 Open-NRC Review  Due 10/22/10. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 251  EICB (Carte) 8/8/2010  The SPM describes the software testing and documents that will be crea ted. The SPM also describes the testing tasks that are to be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished. Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix  contained in Revision 1 of the Licensing Technical Report.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                               rad12E8A.docx                                                                                Open Items to be Resolved for SER Approval SE    FSAR   NRC
Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled:  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010"
: 27. N Open  Response is provided in letter dated 10/25/10 Open-NRC Review   Due 10/22/10.
NOTE:  Samir please check with Norbert to see if the response is complete or partial.
Thanks,  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the


acceptability of the proposal in terms of regulatory requirements Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  Steve and the protection of public health and safety." 266  EICB (Carte) 8/11/2010 Please provide a high level description of the Foxboro IA equipment used at WBN2. This description should be more detailed than a brochure on the product line (or available on the web), and less detailed than a technical manual on each field replaceable unit. It is expected that such literature already exists. Responder: Webb/Webber FSAR section 7.7.1.11 will be added in Amendment 101. In discussions with the NRC reviewer on October 4, 2010 it was agreed that the new FSAR section along with previously submitted documents should be sufficient to address this request. The NRC reviewer will notify TVA if additional documentation is required. 28. Y Open  Response provided in letter dated 10/21/10 Open-NRC Review  Amendment 101 Submitted 10/29/10. TVA Letter dated 10/21/10 Enclosure 1
===Response===
Acceptable                                                                        RAI Resp.
No.                 POC                                     Issue                                             TVA Response(s)                     Y/N           Status/ Current Actions       Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                       Date requirements specification contain information to          Specification.                                                    NNC to review and revise address the "Theory of Operation Description." The                                                                            this question after LTR R1is staff has reviewed these documents, and it is not clear    Attachment 1 contains the proprietary version of                  received.                    .
how this is the case. The docketed material does not      Westinghouse document Tennessee Valley appear to contain the design basis information that is    Authority (TVA), Watts Bar Unit 2 (WBN2), Post-required to evaluate compliance with the Clause of        Accident Monitoring System (PAMS), Licensing IEEE 603.                                                 Technical Report, Revision 1, WNA-LI-00058-(1) Please provide the design basis (as described in      WBT-P, Dated October 2010 IEEE 604 Clause 4) of the Common Q PAMS.
(2) Please provide a regulatory evaluation of how the     Attachment 8 contains the proprietary version of PAMs complies with the applicable regulatory              Westinghouse document Nuclear Automation requirements for the theory of operation.                  Watts Bar 2 NSSS Completion Program I&C For example: Regarding IEEE 603 Clause 5.8.4 (1)          Projects Post Accident Monitoring System -
What are the manually controlled protective actions?      System Design Specification, WNA-DS-01667-(2) How do the documents identified demonstrate            WBT, Rev. 2 dated September 2010.
compliance with this clause?
214                                7/27/2010                                                  Responder: WEC                                      22. N        Open                        Open-NRC              EICB RAI        TVA Letter EICB (Carte)
Review                ML102980066      dated 10/5/10 By letter dated June 18, 2010 (ML101940236) TVA            According to "The Software Program Manual for                      Response provided in letter                        Item No. 11 stated (Enclosure 1, Attachment 3, Item No. 10) that      Common Q Systems," WCAP-16096-NP-1A, the                          dated 10/5/10              Due 12/1/10 the approved Common Q Topical Report contains              Software Safety Plan only applies to Protection information to address the "Safety Analysis." The          class software and PAMS is classified as                          WEC References Common Common Q SPM however states that a Preliminary            Important-to-safety. Exhibit 4-1 of the SPM                        Q PAMS preliminary Hazards Analysis Report and the V&V reports                shows that PAMS is classified as Important-to-                    hazards analysis is document the software hazards analysis. Please            Safety                                                            referenced in the SRS.
Provide these documents.                                                                                                      WEC to delete.
244                                8/3/2010                                                  Responder: WEC                                      23. N        Open                        Open-NRC              EICB RAI                        LIC-101 Rev. 3 Appendix B EICB (Carte)
Review                ML102980066                      Section 4, "Safety Evaluation" Section 8.2.2 of the Common Q SPM (ML050350234)            The process related requirements have been                        Response is provided in                            Item No. 14                      states: "the information relied states that the Software Requirements Specification        removed from revision 2 of the Software                            letter dated 10/25/10.      Due 10/22/10                                          upon in the SE must be (SRS) shall be developed using IEEE 830 and RE            Requirements Specification (SRS).                                                                                                                     docketed correspondence."
1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS            Attachment 3 of letter dated 10/25/10 contains the                                                                                                    LIC-101 Rev. 3 states: "The should address the software product, not the process      proprietary version of Westinghouse document                                                                                                          safety analysis that supports the of producing the software. In addition Section 4.3.2.1    Nuclear Automation, Watts Bar 2 NSSS                                                                                                                  change requested should include of the SPM states "Any alternatives to the SPM            Completion Program, I&C Projects, Software                                                                                                            technical information in sufficient processes or additional project specific information for  Requirements Specification for the Post Accident                                                                                                      detail to enable the NRC staff to the ...SCMP...shall be specified in the PQP.              Monitoring System, WNA-SD-00239-WBT,                                                                                                                  make an independent Revision 2, Dated September 2010.                                                                                                                      assessment regarding the Contrary to these two statements in the SPM, the                                                                                                                                                                  acceptability of the proposal in WBN2 PAMS SRS (ML101050202) contains many                                                                                                                                                                        terms of regulatory requirements process related requirements, for example all                                                                                                                                                                    and the protection of public seventeen requirements in Section 2.3.2,                                                                                                                                                                          health and safety."
                                    "Configuration Control," address process requirements for configuration control.
Please explain how the above meets the intent of the approved SPM.
246                                8/3/2010                                                  Responder: WEC                                      24. N        Open                        Open-NRC             EICB RAI                        LIC-101 Rev. 3 Appendix B EICB (Carte)
Review                ML102980066                      Section 4, "Safety Evaluation" Section 4.3.2.1, "Initiation Phase" of the Common Q        As agreed ISG6 does not apply to the Common Q                      Response is provided in                           Item No. 15                      states: "the information relied SPM (ML050350234) requires that a Project Quality          PAMS platform. The information required to                        letter dated 10/25/10                                                               upon in the SE must be Plan (PQP) be developed. Many other section of the        address this question concerning the PQP and                                                    Due 10/22/10                                           docketed correspondence."
SPM identify that this PQP should contain information      SPM has been added to compliance matrix in required by ISG6. Please provide the PQP. If "PQP"        revision 1 of the Licensing Technical Report.                                                                                                          LIC-101 Rev. 3 states: "The is not the name of the documentation produced,                                                                                                                                                                    safety analysis that supports the please describe the documentation produced and            Attachment 1 of letter dated 10/25/10 contains the                                                                                                    change requested should include provide the information that the SPM states should be      proprietary version of Westinghouse document                                                                                                          technical information in sufficient


Item No. 9 267  EICB (Carte) 8/11/2010
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 rad12E8A.docx                                                                            Open Items to be Resolved for SER Approval SE    FSAR    NRC


By letter dated June 18, 2010 (ML101940236) TVA stated that the software safety plan (SSP) was not applicable to PAMS applications (see Watts Bar 2 -
===Response===
Common Q PAMS ISG-6 Compliance matrix Item No. 10); however, reference No. 30 of the SRS (ML101050202) is: 00000-ICE-37727, Rev. 0, "Post Accident Monitoring System Software Preliminary Hazard Analysis for the Common Q PAMS Project." A Preliminary Hazard Analysis is required by the SSP.
Acceptable                                                                    RAI Resp.
Please explain. Responder: WEC
No.                  POC                                      Issue                                              TVA Response(s)                       Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                          Comments Sec. Sec.                                                                                                                                                                                                                      Date in the PQP.                                                  Tennessee Valley Authority (TVA), Watts Bar                                                                                                   detail to enable the NRC staff to Unit 2 (WBN2), Post-Accident Monitoring System                                                                                                  make an independent (PAMS), Licensing Technical Report, Revision 1,                                                                                                assessment regarding the WNA-LI-00058-WBT-P, Dated October 2010                                                                                                        acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
247                                8/8/2010                                                      Responder: WEC                                      25. N        Open                        Open-NRC          EICB RAI                      LIC-101 Rev. 3 Appendix B EICB (Carte)
Review            ML102980066                  Section 4, "Safety Evaluation" As part of the Common Q topical report development            The implementation documents required by the                      Response is provided in                        Item No. 16                  states: "the information relied effort, Westinghouse developed the Software Program          SPM are identified in the compliance matrix in                    letter dated 10/25/10                                                       upon in the SE must be Manual for Common Q Systems (ML050350234) to                  revision 1 of the Licensing Technical Report.                                                  Due 10/22/10.                                    docketed correspondence."
address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies            Attachment 1 of letter dated 10/25/10 contains the                                                                                              LIC-101 Rev. 3 states: "The plans that will provide a quality software life cycle        proprietary version of Westinghouse document                                                                                                    safety analysis that supports the process, and that these plans commit to                      Tennessee Valley Authority (TVA), Watts Bar                                                                                                    change requested should include documentation of life cycle activities that will permit the  Unit 2 (WBN2), Post-Accident Monitoring System                                                                                                  technical information in sufficient staff or others to evaluate the quality of the design        (PAMS), Licensing Technical Report, Revision 1,                                                                                                detail to enable the NRC staff to features upon which the safety determination will be          WNA-LI-00058-WBT-P, Dated October 2010                                                                                                        make an independent based. The staff will review the Implementation of the                                                                                                                                                        assessment regarding the life cycle process and the software life cycle process                                                                                                                                                        acceptability of the proposal in design outputs for specific applications on a plant-                                                                                                                                                          terms of regulatory requirements specific basis. Please identify the implementation                                                                                                                                                          and the protection of public documentation produced as a result of following the                                                                                                                                                           health and safety."
SPM, and state what information will be docketed.
248                                8/8/2010                                                      Responder: WEC                                      26. N        Open                        Open-NRC                                        LIC-101 Rev. 3 Appendix B EICB (Carte)
Review                                          Section 4, "Safety Evaluation" As part of the Common Q topical report development            The documents are identified in the compliance                    Response is provided in                                                      states: "the information relied effort, Westinghouse developed the Software Program          matrix in revision 1 of the Licensing Technical                    letter dated 10/25/10                                                        upon in the SE must be Manual for Common Q Systems (ML050350234) to                  Report                                                                                        Due 10/22/10.                                    docketed correspondence."
address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies            Attachment 1 of the letter dated 10/25/10 contains                                                                                              LIC-101 Rev. 3 states: "The plans that will provide a quality software life cycle        the proprietary version of Westinghouse                                                                                                        safety analysis that supports the process, and that these plans commit to                      document Tennessee Valley Authority (TVA),                                                                                                    change requested should include documentation of life cycle activities that will permit the  Watts Bar Unit 2 (WBN2), Post-Accident                                                                                                         technical information in sufficient staff or others to evaluate the quality of the design        Monitoring System (PAMS), Licensing Technical                                                                                                  detail to enable the NRC staff to features upon which the safety determination will be          Report, Revision 1, WNA-LI-00058-WBT-P, Dated                                                                                                  make an independent based. The staff will review the Implementation of the        October 2010                                                                                                                                  assessment regarding the life cycle process and the software life cycle process                                                                                                                                                        acceptability of the proposal in design outputs for specific applications on a plant-                                                                                                                                                          terms of regulatory requirements specific basis. Please identify the design outputs                                                                                                                                                          and the protection of public produced as a result of following the SPM, and state                                                                                                                                                          health and safety."
when what information will be docketed.
251                                8/8/2010                                                      Responder: WEC                                      27. N        Open                        Open-NRC                                        LIC-101 Rev. 3 Appendix B EICB (Carte)
Review                                          Section 4, "Safety Evaluation" The SPM describes the software testing and                    The software testing performed and documents                      Response is provided in                                                      states: "the information relied documents that will be created. The SPM also                  created are addressed by the SPM Compliance                        letter dated 10/25/10                                                        upon in the SE must be describes the testing tasks that are to be carried out.      matrix contained in Revision 1 of the Licensing                                                Due 10/22/10.                                    docketed correspondence."
The acceptance criterion for software test                    Technical Report.
implementation is that the tasks in the SPM have been                                                                                                        NOTE: Samir                                      LIC-101 Rev. 3 states: "The carried out in their entirety. Please provide                Attachment 1 of the letter dated 10/25/10 contains                                            please check                                    safety analysis that supports the information that shows that testing been successfully        the Proprietary version of Westinghouses                                                      with Norbert to                                  change requested should include accomplished.                                                 document titled: Tennessee Valley Authority                                                  see if the                                      technical information in sufficient (TVA), Watts Bar Unit 2 (WBN2), Post-Accident                                                  response is                                      detail to enable the NRC staff to Monitoring System (PAMS), Licensing Technical                                                  complete or                                      make an independent Report, Revision 1, WNA-LI-00058-WBT-P, Dated                                                  partial.                                        assessment regarding the October 2010                                                                                                                                  acceptability of the proposal in Thanks,                                          terms of regulatory requirements


This is addressed in the Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE      FSAR   NRC
Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled:  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010"
: 29. N Open Response provided in letter dated 10/25/10 Open-NRC Review    Due 10/22/10    277 7.6 7.6.3 EICB (Garg) 8/27/2010 NUREG 0847, "Safety evaluation report Related to the operation of Watts Bar Nuclear Plant, Units 1 and 2."
has section 7.6.3 which discusses the, "Upper Head Injection Manual Control" system but has been removed from the FSAR. Please provide the information regarding when this system was removed, and the justification for the removal of the system and if the NRC staff has previously reviewed and accepted the removal of the system provide the reference to the staff's SE. Responder: Clark Removal of the Upper Head Injection System was reviewed as part of the WBN Unit 1 original and was reviewed by the staff in SER Supplement 6: 


===1.7 Summary===
===Response===
of Outstanding Issues - PAGE 1-3 "Supplement 7"   (22) Removal of upper head injection system Opened (SSER 7) 6.3.1 (TAC 77195)
Acceptable                                                                      RAI Resp.
When the removal of UHI System was evaluated by the NRC, this should be applied to both sections 6.3.1 and 7.6.3, since the UHI Control System has no function once the UHI System has been removed.  
No.                  POC                                      Issue                                            TVA Response(s)                      Y/N            Status/ Current Actions      Resolution Path  RAI No. & Date                              Comments Sec. Sec.                                                                                                                                                                                                                      Date and the protection of public Steve                                                health and safety."
: 30. Y Open  Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31 EICB RAI ML102910008 Item#61   281 7.6 7.6.8 EICB (Garg) 8/27/2010 For FSAR Section 7.6.8 in amendment 96, redline version has completely rewritten this section of the FSAR, however, the staff is not able to determine any changes made to the section. Explain what changes have been made to this FSAR Section. Responder: Webb Attachment 5 contains the WBN Unit 2 FSAR markup for Section 7.6.8, "Interlocks for RCS Pressure Control During Low Temperature Operation," showing what was changed between Amendments 95 and 96.  
266                                    8/11/2010                                                Responder: Webb/Webber                              28. Y        Open                          Open-NRC                            TVA Letter EICB (Carte)
: 31. N Open Response provided in letter dated 10/29/10 Open-NRC Review  Tva to docket in 10/31 letter EICB RAI ML102910008 Item#65  283 7.7.5 XX EICB (Darbali) 8/27/2010
Review                              dated 10/21/10 Please provide a high level description of the Foxboro    FSAR section 7.7.1.11 will be added in                            Response provided in letter                                      Enclosure 1 IA equipment used at WBN2. This description should        Amendment 101. In discussions with the NRC                        dated 10/21/10              Amendment 101                        Item No. 9 be more detailed than a brochure on the product line      reviewer on October 4, 2010 it was agreed that                                                Submitted (or available on the web), and less detailed than a      the new FSAR section along with previously                                                    10/29/10.
technical manual on each field replaceable unit. It is    submitted documents should be sufficient to expected that such literature already exists.            address this request. The NRC reviewer will notify TVA if additional documentation is required.
267                                    8/11/2010                                                Responder: WEC                                      29. N        Open                          Open-NRC EICB (Carte)
Review By letter dated June 18, 2010 (ML101940236) TVA          This is addressed in the Licensing Technical                      Response provided in letter stated that the software safety plan (SSP) was not        Report, Revision 1, WNA-LI-00058-WBT-P.                            dated 10/25/10 applicable to PAMS applications (see Watts Bar 2 -                                                                                                        Due 10/22/10 Common Q PAMS ISG-6 Compliance matrix Item No.            Attachment 1 of the letter dated 10/25/10 10); however, reference No. 30 of the SRS                contains the Proprietary version of (ML101050202) is: 00000-ICE-37727, Rev. 0, "Post          Westinghouses document titled: Tennessee Accident Monitoring System Software Preliminary          Valley Authority (TVA), Watts Bar Unit 2 (WBN2),
Hazard Analysis for the Common Q PAMS Project." A        Post-Accident Monitoring System (PAMS),
Preliminary Hazard Analysis is required by the SSP.      Licensing Technical Report, Revision 1, WNA-LI-Please explain.                                          00058-WBT-P, Dated October 2010 277  7.6    7.6.3                    8/27/2010                                                Responder: Clark                                    30. Y        Open                          Open-NRC          EICB RAI EICB (Garg)
Review            ML102910008 NUREG 0847, "Safety evaluation report Related to the      Removal of the Upper Head Injection System was                    Response is included in                          Item#61 operation of Watts Bar Nuclear Plant, Units 1 and 2."    reviewed as part of the WBN Unit 1 original and                    letter dated 10/29/10        Due 10/31 has section 7.6.3 which discusses the, "Upper Head        was reviewed by the staff in SER Supplement 6:
Injection Manual Control" system but has been removed from the FSAR. Please provide the                1.7 Summary of Outstanding Issues - PAGE 1-information regarding when this system was removed,      3 "Supplement 7" and the justification for the removal of the system and if the NRC staff has previously reviewed and accepted    (22) Removal of upper head injection system the removal of the system provide the reference to the        Opened (SSER 7) 6.3.1 (TAC 77195) staff's SE.
When the removal of UHI System was evaluated by the NRC, this should be applied to both sections 6.3.1 and 7.6.3, since the UHI Control System has no function once the UHI System has been removed.
281   7.6     7.6.8                   8/27/2010                                                 Responder: Webb                                      31. N        Open                          Open-NRC          EICB RAI EICB (Garg)
Review            ML102910008 For FSAR Section 7.6.8 in amendment 96, redline           Attachment 5 contains the WBN Unit 2 FSAR                          Response provided in letter                      Item#65 version has completely rewritten this section of the     markup for Section 7.6.8, Interlocks for RCS                      dated 10/29/10              Tva to docket in FSAR, however, the staff is not able to determine any     Pressure Control During Low Temperature                                                        10/31 letter changes made to the section. Explain what changes         Operation, showing what was changed between have been made to this FSAR Section.                     Amendments 95 and 96.
283  7.7.5    XX                      8/27/2010                                                Responder: Clark                                    32. N         Open                         Open-NRC          EICB RAI No.13                    This item is a follow-up question EICB (Darbali)
Review            ML102910017,                      to item 96.
Follow-up to item 96                                      1. Steam generator power operated relief valve                    Response is included in                         10/19/10 control system                                                  letter dated 10/29/10         Due 10/31/10 On Open Item 96, regarding the implementation of IEN 79-22, part of TVAs response was:                            The potential scenario for this event is addressed in 15.2.13, Accidental The non-safety-related device/systems within the              Depressurization of the Main Steam System.
scope of IEN 79-22 are:
: 1. Steam generator power operated relief valve control 2. Pressurizer power operated relief valve


Follow-up to item 96 On Open Item 96, regarding the implementation of IEN 79-22, part of TVA's response was:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                               rad12E8A.docx                                                                           Open Items to be Resolved for SER Approval SE     FSAR   NRC
The non-safety-related device/systems within the scope of IEN 79-22 are:  1. Steam generator power operated relief valve control Responder: Clark
: 1. Steam generator power operated relief valve control system The potential scenario for this event is addressed in 15.2.13, Accidental Depressurization of the Main Steam  System.
: 2. Pressurizer power operated relief valve 32. N Open  Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10 EICB RAI No.13 ML102910017, 10/19/10  This item is a follow-up question to item 96.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments system  2. Pressurizer power operated relief valve control system   
: 3. Main feedwater control system 4. Automatic rod control system. 


Failure of these systems/devices due to a high energy line break is fully addressed in Chapter 15, "Accident Analysis" of the WBN Unit 2 FSAR.
===Response===
Please identify the sections of FSAR Chapter 15 that address the failures of these systems. control system The potential scenario for this event is depressurization of the reactor coolant system due to a relief valve failing open. This is addressed in 15.2.12, Accidental Depressurization of the Reactor Coolant System and 15.3.1, Loss Of Reactor Coolant From Small Ruptured Pipes Or From Cracks In Large Pipes Which Actuate The Emergency Core Cooling System.  
Acceptable                                                                    RAI Resp.
: 3. Main feedwater control system The potential scenarios for this event are:  
No.                  POC                                      Issue                                          TVA Response(s)                      Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                              Comments Sec. Sec.                                                                                                                                                                                                                   Date system                                                      control system
: a. A loss of feedwater due a feedwater isolation valve failing closed. This is addressed in 15.2.8, Loss of Normal Feedwater. b. A feedwater regulating valve failing open. This is addressed in 15.2.10, Excessive heat removal due to feedwater system malfunctions.  
: 2. Pressurizer power operated relief valve control system                                                       The potential scenario for this event is
: 3. Main feedwater control system                            depressurization of the reactor coolant
: 4. Automatic rod control system.                            system due to a relief valve failing open.
This is addressed in 15.2.12, Accidental Failure of these systems/devices due to a high energy        Depressurization of the Reactor Coolant line break is fully addressed in Chapter 15, Accident      System and 15.3.1, Loss Of Reactor Coolant Analysis of the WBN Unit 2 FSAR.                            From Small Ruptured Pipes Or From Cracks In Large Pipes Which Actuate The Please identify the sections of FSAR Chapter 15 that        Emergency Core Cooling System.
address the failures of these systems.
: 3. Main feedwater control system The potential scenarios for this event are:
: a. A loss of feedwater due a feedwater isolation valve failing closed. This is addressed in 15.2.8, Loss of Normal Feedwater.
: b. A feedwater regulating valve failing open. This is addressed in 15.2.10, Excessive heat removal due to feedwater system malfunctions.
: 4. Automatic rod control system The potential scenarios are uncontrolled rod withdrawal events that are addressed in 15.2.1, Uncontrolled Rod Cluster Control Assembly Bank Withdrawal From A Subcritical Condition, 15.2.2, Uncontrolled Rod Cluster Control Assembly Bank Withdrawal At Power, and 15.2.3, Rod Cluster Control Assembly Misalignment.
: 4. Automatic rod control system The potential scenarios are uncontrolled rod withdrawal events that are addressed in 15.2.1, Uncontrolled Rod Cluster Control Assembly Bank Withdrawal From A Subcritical Condition, 15.2.2, Uncontrolled Rod Cluster Control Assembly Bank Withdrawal At Power, and 15.2.3, Rod Cluster Control Assembly Misalignment.
285 7.3.3 7.3 EICB (Darbali) 8/27/2010  
285   7.3.3   7.3                     8/27/2010                                               Responder: McNeil                                    33. Y        Open                        Open-NRC          EICB RAI No.15                    This item is a follow-up question EICB (Darbali)
 
Review            ML102910017,                      to item 22 Follow-up to item 22                                     The Foxboro SPEC 200 components are                               Response is included in                        10/19/10 physically arranged in the racks to meet the                      letter dated 10/29/10 Do the control loops meet the requirements of IEEE-      requirements of IEEE-279 and Watts Bar Design                                                 Due 10/31/10.
Follow-up to item 22 Do the control loops meet the requirements of IEEE-279?  If not are they isolated from the circuit which meets the requirements of 279. Responder: McNeil The Foxboro SPEC 200 components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation.
279? If not are they isolated from the circuit which    Criteria WB-DC-30-4, Separation/Isolation.                                                     Waiting for meets the requirements of 279.                                                                                                                          docketed version Foxboro (Invensys) uses two IE analog modules                                                 to close item.
Foxboro (Invensys) uses two IE analog modules to isolate IE to Non-IE signals. These are Contact Output Isolator (Model Number 2A0-L2C-R Relay Output) and Voltage-to-Current Converter (Model Number 2A0-VAI), both of which have the Input and Output signals isolated. 33. Y Open Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10.
to isolate IE to Non-IE signals. These are Contact Output Isolator (Model Number 2A0-L2C-R Relay Output) and Voltage-to-Current Converter (Model Number 2A0-VAI), both of which have the Input and Output signals isolated.
Waiting for docketed version to close item.
289                                    9/2/2010                                                Responder: Faulkner                                  34. N        Open                       Open-NRC           RAI No. 24      TVA Letter EICB (Singh)
EICB RAI No.15 ML102910017, 10/19/10 This item is a follow-up question to item 22 289  EICB (Singh) 9/2/2010   Provide an ISG 2 diversity analysis for the containment high range accident monitors RM-1000.
Review            ML102980005      dated 10/21/10 There are 4 Containment High Range Radiation                        Response provided in letter                    10/26/2010       Enclosure 1 Provide an ISG 2 diversity analysis for the containment Monitors (HRRMs) for WBN2, a pair in upper                         dated 10/21/10              Please refer to                    Item No. 20 high range accident monitors RM-1000.                  containment and a pair in lower containment.                                                   highlighted Each pair completely meets the requirements for                                                 sections of safety related equipment including separation,                                                 response that independence, electrical isolation, seismic                                                     address NRC qualification, quality requirements, etc. Each                                                 comments 1) and monitor channel is a standalone instrument loop                                                 2).
Responder: Faulkner There are 4 Containment High Range Radiation Monitors (HRRMs) for WBN2, a pair in upper containment and a pair in lower containment.
Each pair completely meets the requirements for safety related equipment including separation, independence, electrical isolation, seismic qualification, quality requirements, etc. Each monitor channel is a standalone instrument loop 34. N Open  Response provided in letter dated 10/21/10 Open-NRC Review  Please refer to highlighted sections of response that address NRC comments 1) and 2). RAI No. 24 ML102980005 10/26/2010 TVA Letter dated 10/21/10 Enclosure 1 Item No. 20


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments                      with traditional individual panel readout. They are not a part of a Highly Integrated Control Room (HICR) and there is no diversity question relating to the HRRMs and any HICR infrastructure. Therefore, the response to this RAI will address the functional uses of the HRRMs and the alternate and diverse instrumentation that could be used for those functions should a common mode software issue render both trains of HRRMs non-functional.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                           rad12E8A.docx                                                                   Open Items to be Resolved for SER Approval SE   FSAR   NRC


The Containment HRRMs have no automatic actuation function. They only provide indication as required by RG 1.97R2. They are used at WBN for 2 functions. They are used by the operators in Emergency Operating Instructions (EOI) as one of the indications of abnormal containment conditions indicative of a Loss of Coolant Accident (LOCA) after a Reactor Trip and Safety Injection and they are used in Emergency Plan Implementing Procedures (EPIP) to assist with event classification for events which involve fuel cladding degradation.  
===Response===
Acceptable                                                              RAI Resp.
No.              POC                      Issue                        TVA Response(s)                      Y/N      Status/ Current Actions  Resolution Path    RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                        Date with traditional individual panel readout. They are not a part of a Highly Integrated Control Room                                          Staff has the (HICR) and there is no diversity question relating                                      following to the HRRMs and any HICR infrastructure.                                                comments on the Therefore, the response to this RAI will address                                        proposed TVA the functional uses of the HRRMs and the                                                response per the alternate and diverse instrumentation that could                                        10/21/submittal:
be used for those functions should a common mode software issue render both trains of HRRMs                                          1)Response non-functional.                                                                              addresses upscale failure.
The Containment HRRMs have no automatic                                                     Please explain actuation function. They only provide indication                                             how downscale as required by RG 1.97R2. They are used at                                                   failure of all WBN for 2 functions. They are used by the                                                   HRRM operators in Emergency Operating Instructions                                               channels is (EOI) as one of the indications of abnormal                                                 detected and containment conditions indicative of a Loss of                                               appropriate Coolant Accident (LOCA) after a Reactor Trip and                                             actions taken.
Safety Injection and they are used in Emergency Plan Implementing Procedures (EPIP) to assist                                             2) Please confirm with event classification for events which involve                                           that the fuel cladding degradation.                                                                   location for obtaining the In the EOI procedures, there are several diverse                                            RCS sample is indications of containment conditions that are                                              accessible after used to detect a LOCA and they are Containment                                              an accident.
Pressure, Containment Temperature, and Containment Sump Level. All of these instrument                                          Otherwise, the channels are diverse to the HRRMs in that they                                          response is do not share a software platform or any integrated                                      acceptable.
information or control system features. The HRRMs functional through individual, self                                                Due 10/31/10 contained, microprocessor based instrument loops. Containment Pressure and Sump Level indications are provided through Eagle 21 equipment which is completely diverse from the HRRMs. Containment Temperature is provided through Foxboro Spec 200 instrument channels which are completely diverse from the HRRMs.
All of these readouts are through traditional panel meters and are not part of any HICR infrastructure.
In the EPIPs, the HRRMs are used to indicate loss of fuel clad barrier and the potential loss of a containment barrier. Potential fuel clad damage can also be determined from samples taken from the Reactor Coolant System and from Incore Thermocouple readings. RCS sampling does not rely on plant instrumentation systems and the Incore Thermocouple System uses a Common Q software platform which is diverse from the HRRMs. 2) The accessibility required to obtain post accident samples of RCS has been demonstrated to be a viable post accident action at WBN.
Should all 4 channels of HRRMs fail upscale,


In the EOI procedures, there are several diverse indications of containment conditions that are used to detect a LOCA and they are Containment Pressure, Containment Temperature, and Containment Sump Level. All of these instrument channels are diverse to the HRRMs in that they do not share a software platform or any integrated information or control system features. The HRRMs functional through individual, self contained, microprocessor based instrument loops. Containment Pressure and Sump Level indications are provided through Eagle 21 equipment which is completely diverse from the HRRMs. Containment Temperature is provided through Foxboro Spec 200 instrument channels which are completely diverse from the HRRMs. All of these readouts are through traditional panel meters and are not part of any HICR infrastructure.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                  rad12E8A.docx                                                                          Open Items to be Resolved for SER Approval SE      FSAR    NRC


In the EPIPs, the HRRMs are used to indicate loss of fuel clad barrier and the potential loss of a containment barrier. Potential fuel clad damage can also be determined from samples taken from the Reactor Coolant System and from Incore Thermocouple readings. RCS sampling does not rely on plant instrumentation systems and the Incore Thermocouple System uses a Common Q software platform which is diverse from the HRRMs. 2) The accessibility required to obtain post accident samples of RCS has been demonstrated to be a viable post accident action at WBN. Should all 4 channels of HRRMs fail upscale,  Staff has the following comments on the proposed TVA response per the 10/21/submittal:
===Response===
: 1) Response addresses upscale failure. Please explain how downscale failure of all HRRM channels is detected and appropriate actions taken.
Acceptable                                                                    RAI Resp.
: 2) Please confirm that the location for obtaining the RCS sample is accessible after an accident.
No.                   POC                                     Issue                                           TVA Response(s)                       Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                     Date Annunciator Response Instructions would be followed and they call for evacuation of containment, sampling of RCS, checking other non-accident Radiation Monitors, notification of Radiological Control personnel to investigate, potential transition to Abnormal Operating procedures for management of potential radioactive material release, and evaluation under the Emergency Plan Implementing Procedures for event classification. All of these actions are conservative actions. 1) Should all 4 channels of the HRRMs fail downscale, the operators would turn to diverse indications as noted above before taking any further action.
Otherwise, the response is acceptable.
Due 10/31/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Annunciator Response Instructions would be followed and they call for evacuation of containment, sampling of RCS, checking other non-accident Radiation Mo nitors, notification of Radiological Control personnel to investigate, potential transition to Abnormal Operating procedures for management of potential radioactive material release, and evaluation under the Emergency Plan Implementing Procedures for event classification. All of these actions are conservative actions.
: 1) Should all 4 channels of the HRRMs fail downscale, the operators would turn to diverse indications as noted above before taking any further action.
Therefore, there are diverse methods and equipment sets that can be used for any functions provided by the HRRMs should both channels become nonfunctional.
Therefore, there are diverse methods and equipment sets that can be used for any functions provided by the HRRMs should both channels become nonfunctional.
291 7.7 EICB (Carte) 9/7/2010  The equation at the bottom of Amendment 100 page 7.7-3 is wrong. There are two ways that this equation is inconsistent with the text above it. Responder: Clark The errors in the terms within the equation for total rod speed error [T E] will be corrected in FSAR Amendment 101 as shown below:
291           7.7                     9/7/2010                                                Responder: Clark                                      35. Y        Open                        Open-NRC                            TVA Letter EICB (Carte)
: 35. Y Open  Response provided in letter dated 10/21/10 Open-NRC Review  Amendment 101 Submitted 10/29/10. TVA Letter dated 10/21/10 Enclosure 1  
Review                              dated 10/21/10 The equation at the bottom of Amendment 100 page The errors in the terms within the equation for                            Response provided in letter                                    Enclosure 1 7.7-3 is wrong. There are two ways that this equation total rod speed error [TE] will be corrected in                       dated 10/21/10             Amendment 101                      Item No. 21 is inconsistent with the text above it.              FSAR Amendment 101 as shown below:                                                                Submitted 10/29/10.
 
1                1 1              1        1 1
Item No. 21 293 7.7.4 7.2.2.
293   7.7.4   7.2.2.                   9/8/2010                                                Responder: Craig                                      36. Y        Open                        Open-NRC          EICB RAI        TBD              EICB RAI ML102861885 sent to EICB (Marcus) 3.5                                                                                                                                                                              Review            ML102861885                      DORL FSAR Amendment 100, Section 7.2.2.3.5 discusses         Steam Generator Overfill                                            Response is acceptable                        Item No. 22 Steam Generator Water Level and protection against       FSAR Section 7.2 discusses reactor trip                                                        NRC to issue low water level. However, this section does not         functions. Section 7.2.2.3.5 describes the Low-                    Response is included in    formal RAI to discuss protection against Steam Generator overfill. Low steam generator level reactor trip. The                        letter dated 10/29/10      TVA.
3.5 EICB (Marcus) 9/8/2010 FSAR Amendment 100, Section 7.2.2.3.5 discusses Steam Generator Water Level and protection against low water level. However, this section does not discuss protection against St eam Generator overfill.
Additionally, FSAR Section 7.2.2.3.4 discusses          steam generator High-High level interlock (P-14)
Additionally, FSAR Section 7.2.2.3.4 discusses Pressurizer Water Level and provides minimal information concerning Pressurizer overfill. Please provide a discussion of protection against Pressurizer and Steam Generator overfill. Responder: Craig Steam Generator Overfill FSAR Section 7.2 discusses reactor trip functions. Section 7.2.2.3.5 describes the Low-Low steam generator level reactor trip. The steam generator High-High level interlock (P-14) protects against steam generator overfill by initiating feedwater isolation and a turbine trip. Reactor trip occurs indirectly as a result of the turbine trip if power is above 50%, the P-9 interlock. This function is identified as ESFAS interlock P-14 in FSAR Section 7.3, Table 7.3-3. The High-High level interlock is also discussed in FSAR Section 10.4.7.3. Section 15.2.10 analyzes the feedwater malfunction event which causes one or more feedwater control valves to fail to the fully open position.
Pressurizer Water Level and provides minimal            protects against steam generator overfill by                                                   TVA formal information concerning Pressurizer overfill. Please      initiating feedwater isolation and a turbine trip.                                             response due provide a discussion of protection against Pressurizer  Reactor trip occurs indirectly as a result of the                                               10/31/10 and Steam Generator overfill.                            turbine trip if power is above 50%, the P-9 interlock. This function is identified as ESFAS interlock P-14 in FSAR Section 7.3, Table 7.3-3.
Pressurizer Overfill The High pressurizer water level reactor trip protects against pressurizer overfill. This trip is described in FSAR Section 7.2.1.1.2 (3). Section 7.2.2.3.4 discusses specific control and protection interactions related to pressurizer level control. The high water level trip setpoint provides sufficient margin such that the undesirable condition of discharging liquid coolant through the 36. Y Open  Response is acceptable
The High-High level interlock is also discussed in FSAR Section 10.4.7.3. Section 15.2.10 analyzes the feedwater malfunction event which causes one or more feedwater control valves to fail to the fully open position.
 
Pressurizer Overfill The High pressurizer water level reactor trip protects against pressurizer overfill. This trip is described in FSAR Section 7.2.1.1.2 (3). Section 7.2.2.3.4 discusses specific control and protection interactions related to pressurizer level control.
Response is included in letter dated 10/29/10 Open-NRC Review  NRC to issue formal RAI to TVA. TVA formal response due 10/31/10  EICB RAI ML102861885 Item No. 22 TBD EICB RAI ML102861885 sent to DORL 
The high water level trip setpoint provides sufficient margin such that the undesirable condition of discharging liquid coolant through the
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments safety valves is avoided. Pressurizer level is modeled in various Chapter 15 events to ensure that critical protection functions will function as required. 300  EICB (Singh) Need Radiation Monitoring System Description/Design Criteria Are detectors different from Unit 1. Describe any differences.
Are there any commercially dedicated parts in the RM-1000?  If so, how are they dedicated?
Please confirm that digital communication ports available in RM-1000 are not used. Responder: Temples/Mather (1) The Radiation Monitoring Design Criteria Document, WB-DC-40-24, Revision 21 is contained in Attachment 6 to letter dated October 31, 2010.
(2) Attachment 7 contains the General Atomics detector differences report. The containment high range radiation monitors are loops 271-274.  (3) For safety-related applications, General Atomics Electronic Systems, Inc. supplies the RM-1000 module assembly as a Basic Component. This assembly does contain component parts that are Safety-Related Commercial Grade Items (SRCGI). Because these SRCGI components are assembled into the delivered Basic Component, they are dedicated to the assembly by virtue of the acceptance test of the full RM-1000 assembly. Safety-related commercial grade items are dedicated in accordance with General Atomics approved 10 CFR 50 Appendix B program.
  (4) The digital communications ports on the safety-related RM-1000 radiation monitors are not used. 37. N Open Response is included in letter dated 10/29/10 Open-NRC Review Due 10/31/10 TVA to address the following comments:
 
(1) Is it Att. 5 or Att. 6? (2) Pl. confirm that HRRMs are loops 271-274. (3) TVA to clarify that GA has a commercial dedication program in place and that GA is an approved 10CFR50, App. B supplier. (4) Response acceptable. RAI No. 25 ML102980005 10/26/2010 302 7.5.2.1 7.5.1 EICB (Marcus) 09/17/2010 Item 208 requested a description of the changes that were performed under 10 CFR 50.59 for 16 Unit 1 PAM variables that were identified in Enclosure 1 Item No.6 of the letter dated June 18, 2010 (ML101940236). Please identify the specific 10 CFR 50.59 documentation that applies to each of these 16 variables. Responder: Tindell Attachment 8 contains the requested 50.59 evaluations and the variable table cross referencing the variable to the appropriate DCN. There are two changes to the original table. Variable 9, RCS Pressurizer Level and 10, RCS Pressure Wide Range have been changed from 50.59 Y to N. The original response showed these variables as changed under 10 CFR 50.59. The response was based on the plan to replace all paper recorders in Unit 1. The assumption was that these recorders would be replaced prior to Unit 2 startup. While this may still occur, the recorders have not been replaced at this time. 38. Y Open  Response is included in letter dated 10/29/10 Open-NRC Review  NRC to issue formal RAI to TVA TVA formal response due 10/31/10 EICB RAI ML102861885 Item No. 23 TBD EICB RAI ML102861885 sent to DORL See Item 332 303 7.5.2.1 7.5.1 EICB (Marcus) 09/17/2010 Enclosure 1 Item 6 of the letter dated June 18, 2010 included a column to indicate the Unit 2 variable source for each PAM variable and also if the variable was unique to Unit 2. For each variable that was indicated as unique to Unit 2 and the Unit 2 variable source is (1) Foxboro Spec 200, (2) Common Q PAMS, or (3) Foxboro IA, identify the Unit 1 variable Responder: Tindell Attachment 9 contains the cross reference between the Unit 2 and Unit 1 variable sources for the unique WBN Unit 2 variables within the scope of the Foxboro Spec 200, Common Q PAMS and Foxboro I/A changes.
NOTE: An error was identified during preparation 39. Y Open  Response is included in letter dated 10/29/10 Open-NRC Review  NRC to issue formal RAI to TVA TVA formal response due 10/31/10 EICB RAI ML102861885 Item No. 24 TBD EICB RAI ML102861885 sent to DORL  See Item 333 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments source. of this response. Variable 37 CCS Surge Tank Level was incorrectly identified as being within the scope of the Foxboro I/A system in TVA to NRC letter dated June 18, 2010. Variable 37 will be provided by the Foxboro Spec 200 system for Unit 2.
304 7.5.2.1 7.5.1 EICB (Marcus) 09/17/2010 Item 6 of the letter dated June 18, 2010 indicated that the Unit 2 variable source for 14 PAM variables is Eagle 21. Please confirm that for each of these 14 variables the Unit 1 variable source is also the Eagle 21. Responder: Tindell
 
The source for the Unit 1 variables is the Eagle 21 System. 40. Y Open Response is included in letter dated 10/29/10
 
Response is acceptable Open-NRC Review  NRC to issue formal RAI to TVA TVA formal response due 10/31/10 EICB RAI ML102861885
 
Item No. 25 TBD EICB RAI ML102861885 sent to DORL 305 7.5.2.1 7.5.1 EICB (Marcus) 09/17/2010 Enclosure 1 Item 6 of the letter dated June 18, 2010 indicated that the Unit 2 variable source for 2 PAM variables is the Integrated Computer System. Please confirm that for these 2 variables the Unit 1 variable source was the Unit 1 plant computer system. Responder: Tindell The source for the Unit 1 variables is the Integrated Computer System. 41. Y Open  Response is included in letter dated 10/29/10
 
Response is acceptable Open-NRC Review  NRC to issue formal RAI to TVA TVA formal response due 10/31/10 EICB RAI ML102861885 Item No. 26 TBD EICB RAI ML102861885 sent to DORL    313 7.7.8 7.7.1.12 EICB (Darbali) EDCR 52408 (installation of AMSAC in Unit 2) states that Design Criteria WB-DC-40-57 needs to be modified to reflect AMSAC in Unit 2. 
: 1. Has WB-DC-40-57 been completed for Unit 2?  If so, please submit.
: 2. If WB-DC-40-57 has not been completed for Unit 2, please give an estimated date of completion and submittal.
: 3. Please submit WB-DC-40-57 for Unit 1 and identify any changes to the Unit 2 version. Responder: Ayala (1) The review of WB-DC-40-57 for Unit 2 applicability has been completed and included in Revision 4 of the document. Attachment 10 contains TVA design criteria WB-DC-40-57, Revision 4, Anticipated Transients Without Scram Mitigation System Actuation Circuitry (AMSAC).
  (2) The revision for Unit 2 is complete with open items as identified in item (3) below.
Attachment 10 contains TVA design criteria WB-DC-40-57, Revision 4, Anticipated Transients Without Scram Mitigation System Actuation Circuitry (AMSAC) which is applicable to both WBN Unit 1 and Unit 2. There are 17 open Watts Bar Nuclear Plant Unit 2 Startup Integration Task Equipment List (WITEL) punch list items associated with Revision 4 that require resolution. A list of the punch list items is contained in Attachment 10. 42. Y Open  Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10.
Waiting for docketed version to close item.
EICB RAI No.18 ML102910017, 10/19/10  317 7.5.2.3 7.5 EICB (Singh) TVA has provided a proprietary and a non-proprietary version of Technical Manual for RM-1000 Digital Radiation Processor under ML101680582 and ML101680587).
(i) Are these documents applicable to WBN2 as provided (October 2003 version). (ii) Why is DCN38993-A attached at the back of the proprietary version?  It is for WBN1 Turbine Governor Control Valve. Responder: Temples
: i. These documents are applicable to WBN Unit 2. ii. This was an error in document preparation that occurred when attachments were assembled for a previous letter. iii. The Technical Manual is not intended to include equipment requirements. 43. Y Open  Response is included in letter dated 10/29/10
 
  (iii)  Staff is looking for Open-NRC Review  Proposed response is acceptable. TVA to issue and confirm letter date. RAI No. 27 ML102980005 10/26/2010
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (iii) This document does not state the requirements for RM-1000 units. Please provide a document that states the requirements for the RM-1000 radiation monitors for WBN2. Requirements would be found in the applicable TVA Specifications for the contract.
 
Attachment 11 contains the Material Requisition Specification Revisions 1 and 4 which contain the requested information.
high level requirements for RM-1000 monitors. Pl. provide appropriate documents. Due 10/31/10 318 7.5.2.3 7.5 EICB (Singh) TVA has provided the following documents for  RM-1000 equipment qualification:
(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) (ii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006) (iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008) (iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions?  If with exceptions, then please clarify what those are.
Supplement 3 was issued one month prior to supplement 2. Please explain the reason for the same. Responder: Temples (i) Applicable to WBN Unit 2. 04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.  (ii) Applicable to WBN Unit 2.  (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release time difference.
: 44. Y Open Note check 04508905-1QR or QR. Staff version is QR only.
Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10 Response acceptable. TVA to issue letter and confirm stated (future) dates RAI No. 28 ML102980005 10/26/2010 319 7.5.2.3 7.5 EICB (Singh) TVA provided System Verification Test Results 04507007-1TR (July 1999) for Sequoyah to support test verification. However, the document states (page v) that it is not applicable for high range monitors with an action noted for fixing a problem with the high range RM-1000 monitors on page vi. TVA to respond to the following clarifications:
 
Has the anomaly noted on page vi been resolved for the high range monitors?


Provide the high range verification document for WBN2. Responder: Temples See TVA letter to the NRC dated October 21, 2010, item 26  (RAI Matrix Item 316) for non-applicability of 04507007-1TR. The recorded anomaly was later resolved through the verification of software version 1.2, reported in RM-1000 v1.2 Software Verification Report 04508006.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                               rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE    FSAR   NRC
The high range verification documents are the Sequoyah RM-1000 v1.1 Software Verification Report 04508006 and RM-1000 v1.2 Software Verification Report 04508006. 45. Y Open Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10 Response acceptable. TVA to issue letter and confirm stated (future) dates RAI No. 29 ML102980005 10/26/2010 323  EICB(Gar g) WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and  their acceptability will be submitted to the NRC by November 15, 2010 Responder: Craig Attachment 12 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis. 46. N Open  Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10   328 7.5.2.3 7.5 EICB (Singh) Provide the model number for the four containment high range area monitors, RM-1000 and identify how the software V&V and qualificat ion documents apply to them. If there is no specific model number then how is it ensured that the correct radiation monitor is received at the site and subsequently installed? Responder: Temples The Containment High Range Radiation Monitors are model RM-1000. The monitors are uniquely identified by serial numbers which are assigned when the equipment is assembled. The 47. Y Open  Response is included in letter dated 10/29/10 Open-NRC Review  Response OK. Awaiting TVA ltter to close OI. RAI No. 30 ML102980005 10/26/2010


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments applicability of V&V reports and quality documentation for the RM-1000 model is in accordance with manufacturer's approved 10 CFR 50 Appendix B Quality Program and the requirements of the purchase order.
===Response===
Due 10/31/10 329 7.6.1 7.6.7 EICB (Singh) Section 7.6.7 of the FSAR (Amendment 100) states that, "The DMIMS-DX&#x17d; audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX&#x17d; components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment."
Acceptable                                                                      RAI Resp.
No.                 POC                                     Issue                                             TVA Response(s)                       Y/N           Status/ Current Actions   Resolution Path     RAI No. & Date                         Comments Sec. Sec.                                                                                                                                                                                                                      Date safety valves is avoided. Pressurizer level is modeled in various Chapter 15 events to ensure that critical protection functions will function as required.
300                                  Need Radiation Monitoring System Description/Design Responder: Temples/Mather                          37. N                Open                        Open-NRC              RAI No. 25 Criteria                                                                                                                                                Review                ML102980005 (1) The Radiation Monitoring Design Criteria                          Response is included in                          10/26/2010 Are detectors different from Unit 1. Describe any        Document, WB-DC-40-24, Revision 21 is                              letter dated 10/29/10      Due 10/31/10 differences.                                              contained in Attachment 6 to letter dated                                                      TVA to address October 31, 2010.                                                                              the following Are there any commercially dedicated parts in the RM-                                                                                                    comments:
1000? If so, how are they dedicated?                  (2) Attachment 7 contains the General Atomics detector differences report. The containment                                                  (1) Is it Att. 5 or Please confirm that digital communication ports          high range radiation monitors are loops 271-                                                      Att. 6?
available in RM-1000 are not used.                        274.                                                                                          (2) Pl. confirm that HRRMs (3) For safety-related applications, General                                                        are loops 271-EICB (Singh)
Atomics Electronic Systems, Inc. supplies the                                                  274.
RM-1000 module assembly as a Basic                                                          (3) TVA to clarify Component. This assembly does contain                                                          that GA has a component parts that are Safety-Related                                                        commercial Commercial Grade Items (SRCGI). Because                                                        dedication these SRCGI components are assembled into                                                      program in the delivered Basic Component, they are                                                        place and that dedicated to the assembly by virtue of the                                                      GA is an acceptance test of the full RM-1000                                                             approved assembly. Safety-related commercial grade                                                      10CFR50, items are dedicated in accordance with                                                         App. B General Atomics approved 10 CFR 50                                                             supplier.
Appendix B program.                                                                        (4) Response acceptable.
(4) The digital communications ports on the safety-related RM-1000 radiation monitors are not used.
302 7.5.2. 7.5.1                  09/17/2010                                              Responder: Tindell                                    38. Y        Open                        Open-NRC              EICB RAI        TBD          EICB RAI ML102861885 sent to 1                                                                                                                                                                                      Review                ML102861885                  DORL Item 208 requested a description of the changes that    Attachment 8 contains the requested 50.59                          Response is included in                          Item No. 23 were performed under 10 CFR 50.59 for 16 Unit 1          evaluations and the variable table cross                            letter dated 10/29/10      NRC to issue                                        See Item 332 PAM variables that were identified in Enclosure 1 Item  referencing the variable to the appropriate DCN.                                                formal RAI to TVA EICB (Marcus)
No.6 of the letter dated June 18, 2010                  There are two changes to the original table.
(ML101940236). Please identify the specific 10 CFR      Variable 9, RCS Pressurizer Level and 10, RCS                                                  TVA formal 50.59 documentation that applies to each of these 16    Pressure Wide Range have been changed from                                                      response due variables.                                              50.59 Y to N. The original response showed                                                      10/31/10 these variables as changed under 10 CFR 50.59.
The response was based on the plan to replace all paper recorders in Unit 1. The assumption was that these recorders would be replaced prior to Unit 2 startup. While this may still occur, the recorders have not been replaced at this time.
303 7.5.2. 7.5.1                  09/17/2010                                              Responder: Tindell                                    39. Y        Open                        Open-NRC              EICB RAI        TBD          EICB RAI ML102861885 sent to 1                                                                                                                                                                                      Review                ML102861885                  DORL EICB (Marcus)
Enclosure 1 Item 6 of the letter dated June 18, 2010    Attachment 9 contains the cross reference                          Response is included in                          Item No. 24 included a column to indicate the Unit 2 variable        between the Unit 2 and Unit 1 variable sources for                  letter dated 10/29/10      NRC to issue                                        See Item 333 source for each PAM variable and also if the variable    the unique WBN Unit 2 variables within the scope                                                formal RAI to TVA was unique to Unit 2. For each variable that was        of the Foxboro Spec 200, Common Q PAMS and indicated as unique to Unit 2 and the Unit 2 variable    Foxboro I/A changes.                                                                            TVA formal source is (1) Foxboro Spec 200, (2) Common Q                                                                                                            response due PAMS, or (3) Foxboro IA, identify the Unit 1 variable    NOTE: An error was identified during preparation                                                10/31/10


TVA to clarify the seismic qualification of the loose parts monitoring system and include the appropriate information in Table 3.10 (or another suitable section)  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE      FSAR    NRC


of the FSAR. Responder: Clark The title of FSAR Section 3.10 is Seismic Design of Category I Instrumentation and Electrical Equipment. Since the Loose Part Monitoring System is not a Category 1 system, it is not included in the scope of 3.10. FSAR Section 7.6.7, "Loose Parts Monitoring System (LPMS) System Description," identifies basic system seismic design criteria which are consistent with the requirements of TVA Design Criteria, WB-DC-30-31, Loose Parts Monitoring System. As identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC Regulatory Guide Conformance, the system conforms to Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 identifies the seismic requirements and Note 12 does not contain any exception to the Regulatory Guide seismic requirements. 48. N Open  Response is included in letter dated 10/29/10 Open-NRC Review  Due 10/31/10 TVA to confirm that the equipment has been seismically qualified as required and that TVA reviewed and found the report acceptable. RAI No. 1 ML102980005 10/26/2010 092  DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary. Responder: Hilmes This item will close when we are no longer using this document as a communications tool.  
===Response===
: 1. N Open Open-TVA Continuous review as items are added    117 7.1 7.1 EICB (Garg) 6/3/2010 Does TVA use a single sided or double sided methodology for as-found and as-left instrument setpoint values. (RIS2006-7) Responder: Hilmes Reactor Protection System (RPS) (comprised of Reactor Trip (RPS) and Engineered Safety Features Actuation System (ESFAS)) setpoint values are monitored by periodic performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor Trip and ESFAS trip setpoi nt surveillance tests as described in FSAR amendment 100.
Acceptable                                                                      RAI Resp.
TVA Revised Response:
No.                    POC                                      Issue                                          TVA Response(s)                        Y/N            Status/ Current Actions    Resolution Path    RAI No. & Date                        Comments Sec. Sec.                                                                                                                                                                                                                      Date source.                                                         of this response. Variable 37 CCS Surge Tank Level was incorrectly identified as being within the scope of the Foxboro I/A system in TVA to NRC letter dated June 18, 2010. Variable 37 will be provided by the Foxboro Spec 200 system for Unit 2.
For TSTF-493 parameters WBN Unit 2 uses only double sided correction factors. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
304 7.5.2. 7.5.1                     09/17/2010                                              Responder: Tindell                                    40. Y        Open                        Open-NRC           EICB RAI        TBD          EICB RAI ML102861885 sent to 1                                                                                                                                                                                           Review              ML102861885                  DORL EICB (Marcus)
: 2. Y Open  Revised response is included in letter dated 10/29/10 Open-TVA  Pending FSAR Amendment 102 submittal Due 10/31/10 TVA needs to address that trip setpoint and allowable value uncertainties are not reduced by the reduction factor for the single sided reduction factor. TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide EICB RAI ML102910008 Item#21 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments justifications.
Enclosure 1 Item 6 of the letter dated June 18, 2010    The source for the Unit 1 variables is the Eagle 21                Response is included in                         Item No. 25 indicated that the Unit 2 variable source for 14 PAM    System.                                                            letter dated 10/29/10       NRC to issue variables is Eagle 21. Please confirm that for each of                                                                                                    formal RAI to TVA these 14 variables the Unit 1 variable source is also                                                                        Response is acceptable the Eagle 21.                                                                                                                                             TVA formal response due 10/31/10 305 7.5.2. 7.5.1                    09/17/2010                                               Responder: Tindell                                    41. Y        Open                         Open-NRC            EICB RAI        TBD          EICB RAI ML102861885 sent to 1                                                                                                                                                                                           Review              ML102861885                  DORL EICB (Marcus)
274.b  EICB (Singh) 8/26/2010 Loose Parts Monitoring System: TR 3.3 refers to section 4.4.6 of the FSAR for description of the loose parts monitoring system. However, this section of the FSAR is not available. TVA to check the reference and respond. Responder: Clark The reference will be changed to FSAR section 7.6.7 Loose Part Monitoring System (LPMS) System Description in next revision of the Technical Requirements Manual as shown below:
Enclosure 1 Item 6 of the letter dated June 18, 2010     The source for the Unit 1 variables is the                          Response is included in                          Item No. 26 indicated that the Unit 2 variable source for 2 PAM      Integrated Computer System.                                        letter dated 10/29/10        NRC to issue variables is the Integrated Computer System. Please                                                                                                      formal RAI to TVA confirm that for these 2 variables the Unit 1 variable                                                                      Response is acceptable source was the Unit 1 plant computer system.                                                                                                             TVA formal response due 10/31/10 313  7.7.8  7.7.1.                   EDCR 52408 (installation of AMSAC in Unit 2) states      Responder: Ayala                                      42. Y        Open                        Open-NRC            EICB RAI No.18 12                      that Design Criteria WB-DC-40-57 needs to be                                                                                                             Review              ML102910017, modified to reflect AMSAC in Unit 2.                     (1) The review of WB-DC-40-57 for Unit 2                           Response is included in                         10/19/10 applicability has been completed and                            letter dated 10/29/10
: 1. Watts Bar FSAR, Section 7.6.7, "Lose Part Monitoring System."
: 1. Has WB-DC-40-57 been completed for Unit 2? If          included in Revision 4 of the document.                                                      Due 10/31/10.
  (Note:  Bechtel I&C to submit TRM change package to TVA Licensing.) 
so, please submit.                                      Attachment 10 contains TVA design criteria                                                  Waiting for WB-DC-40-57, Revision 4, Anticipated                                                        docketed version
: 3. Y Open Response provided in letter dated 10/21/10 Open-TVA  Response acceptable. TVA to complete stated action.
: 2. If WB-DC-40-57 has not been completed for Unit            Transients Without Scram Mitigation System                                                  to close item.
Due 10/31/10 RAI No. 6 ML102980005 10/26/2010 TVA Letter dated 10/21/10 Enclosure 1 Item No. 12 287 7.3 7.3-1 EICB (Darbali) 8/27/2010 In Amendment 95 of FSAR section 7.3.2.3 'Further Considerations',  the list of signals that would start the auxiliary feedwater motor driven and turbine driven pumps was moved to table 7.3-1 item 3, Auxiliary Feedwater. However, item (6) 'AMSAC' was not included in table 7.3-1.
2, please give an estimated date of completion            Actuation Circuitry (AMSAC).
Please explain this omission or state your commitment to correct this in a future amendment. Responder: Elton Unit 2 FSAR Section 7.3 addresses Engineered Safety Features (ESF) Actuation System. AMSAC is non-safety, and thus non-ESF. Therefore, it was correct to not include AMSAC when the initiating signals were relocated from Unit 2 FSAR Section 7.3.2.3 to Table 7.3-1.  
EICB (Darbali) and submittal.
: 4. Y Open  Response included in next TVA Licensing Formal RAI Response Letter.
(2) The revision for Unit 2 is complete with open
Open-TVA Due 10/31/10.
: 3. Please submit WB-DC-40-57 for Unit 1 and                  items as identified in item (3) below.
Waiting for docketed version to close item.
identify any changes to the Unit 2 version.
Expected letter issue date is 11/5/10 ML102390538, Item No. 1, 9/10/10 and
Attachment 10 contains TVA design criteria WB-DC-40-57, Revision 4, Anticipated Transients Without Scram Mitigation System Actuation Circuitry (AMSAC) which is applicable to both WBN Unit 1 and Unit 2. There are 17 open Watts Bar Nuclear Plant Unit 2 Startup Integration Task Equipment List (WITEL) punch list items associated with Revision 4 that require resolution.
A list of the punch list items is contained in Attachment 10.
317 7.5.2. 7.5                      TVA has provided a proprietary and a non-proprietary Responder: Temples                            43. Y                     Open                         Open-NRC            RAI No. 27 3                                version of Technical Manual for RM-1000 Digital                                                                                                          Review              ML102980005 Radiation Processor under ML101680582 and              i. These documents are applicable to WBN                            Response is included in                          10/26/2010 EICB (Singh)
ML101680587).                                              Unit 2.                                                          letter dated 10/29/10       Proposed ii. This was an error in document                                                                  response is (i)     Are these documents applicable to WBN2 as          preparation that occurred when                                                                acceptable. TVA provided (October 2003 version).                   attachments were assembled for a                                                              to issue and (ii)   Why is DCN38993-A attached at the back of          previous letter.                                                                               confirm letter the proprietary version? It is for WBN1      iii. The Technical Manual is not intended to                                                       date.
Turbine Governor Control Valve.                   include equipment requirements.                                   (iii) Staff is looking for


EICB RAI No.17 ML102910017, 10/19/10  288 7.3  EICB (Garg) 9/2/2010  Can we add a section to chapter 7 giving a brief overview of the Foxboro Spec 200 in Section 7.3? Responder: McNeil The following new section will be added to the WBN Unit 2 FSAR as part of Amendment 102:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                    rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE    FSAR   NRC
7.3.1.1.3 Analog Instrumentation


The miscellaneous safety-related analog process control and indication loops are a set of discrete analog modules that have been tested and qualified for use in safety related systems. The various components have been qualified to IEEE Standard 323-1983 (R-199
===Response===
: 6) "IEEE Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations", IEEE Standard 344-1987 (R-1993) "IEEE Standard Recommended Practices for Seismic Qualification of Class IE Equipment for Nuclear Power Generating Stations", and IEEE St andard 384-1984 (R-1992)  
Acceptable                                                                      RAI Resp.
"IEEE Standard Criteria for Independence of Class IE Equipment and Circuits". The modules are arranged in instrument loops to provide the safety function as described in the TVA licensing basis for the Emergency Gas Treatment, Auxiliary Feedwater, and Safety-Related Balance of Plant systems. Seismic qualification of the analog modules and racks is addressed in FSAR Section 3.10.
No.                  POC                                        Issue                                              TVA Response(s)                      Y/N            Status/ Current Actions    Resolution Path      RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                          Date (iii)  This document does not state the                            Requirements would be found in the                          high level requirements  Due 10/31/10 requirements for RM-1000 units. Please                      applicable TVA Specifications for the                      for RM-1000 monitors. Pl.
The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation.  
provide a document that states the                          contract.                                                  provide appropriate requirements for the RM-1000 radiation                                                                                  documents.
: 5. N Open   TVA committed to adding a description of the Foxboro Spec 200 hardware at the 10/12 NRC Public Meeting.
monitors for WBN2.                                  Attachment 11 contains the Material Requisition Specification Revisions 1 and 4 which contain the requested information.
Open-TVA Due TBD TVA should include the list of all the functions where Spec 200 is used and discuss differences between unit 1 and unit2. This discussion should also include loop which are currently used for Unit 1 operation  If Spec 200 components have also been
318 7.5.2. 7.5                    TVA has provided the following documents for RM-            Responder: Temples                                    44. Y        Open                        Open-NRC              RAI No. 28 3                              1000 equipment qualification:                                                                                                                              Review                ML102980005 (i)  Applicable to WBN Unit 2. 04508905-1QR                        Note check 04508905-1QR                          10/26/2010 (i)  Qualification Test Report for RM-1000 Processor            is applicable only in regards to the RM-1000,                or QR. Staff version is QR Module and Current-To-Frequency Converter                  with the exception of re-qualification of                    only.                      Due 10/31/10 04508905-QR (January 2001)                                  certain RM-1000 equipment differences (ii) Qualification Test Report Supplement, RM-1000                covered in the -1SP report. The Current-to-                   Response is included in    Response Upgrades 04508905-1SP (June 2006)                          Frequency (I-F) converter module                              letter dated 10/29/10      acceptable. TVA (iii) Qualification Test Report Supplement, RM-1000              qualifications in the base report and the -                                              to issue letter and Upgrades 04508905-2SP (June 2008)                          1SP report are not applicable to the RM-                                                 confirm stated EICB (Singh)
(iv) Qualification Test Report Supplement, RM-1000                1000s, and will be used later as references                                              (future) dates Upgrades 04508905-3SP (May 2008)                           in the WBN Unit 2 specific qualification reports.
Please clarify whether all of these are fully applicable    (ii) Applicable to WBN Unit 2.
to WBN2 or are they applicable with exceptions? If          (iii) Not applicable to WBN Unit 2 with exceptions, then please clarify what those are.        (iv) Not applicable to WBN Unit 2 Supplement 3 was issued one month prior to                 The 04508905-3SP report was prepared for supplement 2. Please explain the reason for the             another TVA plant, as a monitor system-level same.                                                      report, where the system included equipment mostly based on the base report equipment items.
These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -
2SP document review/release process resulted in the release time difference.
319 7.5.2. 7.5                    TVA provided System Verification Test Results              Responder: Temples                                    45. Y        Open                        Open-NRC              RAI No. 29 3                              04507007-1TR (July 1999) for Sequoyah to support                                                                                                            Review                ML102980005 test verification. However, the document states (page      See TVA letter to the NRC dated October 21,                         Response is included in                          10/26/2010 v) that it is not applicable for high range monitors with  2010, item 26 (RAI Matrix Item 316) for non-                       letter dated 10/29/10 an action noted for fixing a problem with the high range    applicability of 04507007-1TR. The recorded                                                    Due 10/31/10 EICB (Singh)
RM-1000 monitors on page vi. TVA to respond to the          anomaly was later resolved through the following clarifications:                                  verification of software version 1.2, reported in                                               Response RM-1000 v1.2 Software Verification Report                                                      acceptable. TVA Has the anomaly noted on page vi been resolved for          04508006.                                                                                       to issue letter and the high range monitors?                                                                                                                                    confirm stated The high range verification documents are the                                                   (future) dates Provide the high range verification document for            Sequoyah RM-1000 v1.1 Software Verification WBN2.                                                      Report 04508006 and RM-1000 v1.2 Software Verification Report 04508006.
323                                  WCAP-13869 revision 1 was previously reviewed          Responder: Craig                                          46. N         Open                        Open-NRC EICB(Gar        under WBN Unit 1 SER SSER 13 (Reference 8). Unit                                                                                                            Review 2 references revision 2. An analysis of the differences Attachment 12 contains the WCAP 13869                                  Response is included in g)            and their acceptability will be submitted to the NRC by Revision 1 to Revision 2 Change Analysis.                              letter dated 10/29/10      Due 10/31/10 November 15, 2010 328 7.5.2. 7.5                    Provide the model number for the four containment          Responder: Temples                                    47. Y        Open                        Open-NRC             RAI No. 30 3                              high range area monitors, RM-1000 and identify how                                                                                                          Review                ML102980005 EICB            the software V&V and qualification documents apply to      The Containment High Range Radiation Monitors                      Response is included in                          10/26/2010 (Singh)          them. If there is no specific model number then how is      are model RM-1000. The monitors are uniquely                        letter dated 10/29/10      Response OK.
it ensured that the correct radiation monitor is received  identified by serial numbers which are assigned                                                Awaiting TVA ltter at the site and subsequently installed?                    when the equipment is assembled. The                                                            to close OI.


qualified to RG 1.209, it should be stated and if not
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                            rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE      FSAR    NRC


why not.
===Response===
EICB RAI ML102910008 Item#67 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Two IE analog modules are used to isolate IE to Non-IE signals. These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.
Acceptable                                                                      RAI Resp.
294 7.3 7.3.1.
No.                   POC                                     Issue                                         TVA Response(s)                           Y/N       Status/ Current Actions   Resolution Path     RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                 Date applicability of V&V reports and quality                                                      Due 10/31/10 documentation for the RM-1000 model is in accordance with manufacturers approved 10 CFR 50 Appendix B Quality Program and the requirements of the purchase order.
1.1 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.1.1 'Function Initiation', item (13) was arranged into paragraph form from what used to be a listing of items (a), (b) and (c).
329  7.6.1  7.6.7                  Section 7.6.7 of the FSAR (Amendment 100) states      Responder: Clark                                    48. N        Open                        Open-NRC            RAI No. 1 EICB (Singh) that, The DMIMS-DX' audio and visual alarm                                                                                                          Review              ML102980005 capability will remain functional after an              The title of FSAR Section 3.10 is Seismic Design                  Response is included in                          10/26/2010 Operating Basis Earthquake (OBE). All of the DMIMS-    of Category I Instrumentation and Electrical                      letter dated 10/29/10 DX' components are qualified                            Equipment. Since the Loose Part Monitoring                                                    Due 10/31/10 for structural integrity during a Safe Shutdown        System is not a Category 1 system, it is not Earthquake (SSE) and will not                          included in the scope of 3.10. FSAR Section                                                   TVA to confirm mechanically impact any safety-related equipment.      7.6.7, Loose Parts Monitoring System (LPMS)                                                  that the System Description, identifies basic system                                                  equipment has TVA to clarify the seismic qualification of the loose  seismic design criteria which are consistent with                                            been seismically parts monitoring system and include the appropriate    the requirements of TVA Design Criteria, WB-DC-                                              qualified as information in Table 3.10 (or another suitable section) 30-31, Loose Parts Monitoring System. As                                                      required and that of the FSAR.                                            identified in FSAR Table 7.1-1, Watts Bar Nuclear                                            TVA reviewed and Plant NRC Regulatory Guide Conformance, the                                                  found the report system conforms to Reg. Guide 1.133 as modified                                              acceptable.
The second bullet under item (c) was omitted in the new paragraph.
by Note 12. Reg. Guide 1.133 identifies the seismic requirements and Note 12 does not contain any exception to the Regulatory Guide seismic requirements.
Initiates Phase B containment isolation of the following:  "Closure of the main steam isolation valves (MSIV) to limit reactor coolant system cooldown for breaks downstream of the MSIV's."
092                                  5/20/2010                                              Responder: Hilmes                                    1. N      Open                        Open-TVA DORL (Poole)        TVA to review Licensee Open Item list and determine    This item will close when we are no longer using                                              Continuous review which items are proprietary.                          this document as a communications tool.                                                       as items are added 117  7.1     7.1                   6/3/2010                                              Responder: Hilmes                                    2. Y       Open                        Open-TVA            EICB RAI EICB (Garg)
Please explain this omission or state your commitment to correct this in a future amendment. Responder: Elton The information provided in Unit 2 FSAR Section 7.3.1.1 is not meant to describe the specific function of each item in detail; the descriptions provided are a summary listing. The omitted information provided information beyond the level of detail provided for the other items in this section. The level of detail contained in item (13) of Unit 2 FSAR Section 7.3.1.1 is consistent with that contained in item 13. of Unit 1 UFSAR Section 7.3.1.1. 6. Y Open Response included in next TVA Licensing Formal RAI Response Letter.
ML102910008 Does TVA use a single sided or double sided            Reactor Protection System (RPS) (comprised of                      Revised response is        Pending FSAR        Item#21 methodology for as-found and as-left instrument        Reactor Trip (RPS) and Engineered Safety                          included in letter dated    Amendment 102 setpoint values. (RIS2006-7)                          Features Actuation System (ESFAS)) setpoint                        10/29/10                    submittal values are monitored by periodic performance of surveillance tests in accordance with Technical                                                Due 10/31/10 Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor                                              TVA needs to Trip and ESFAS trip setpoint surveillance tests as                                            address that trip described in FSAR amendment 100.                                                               setpoint and allowable value TVA Revised Response:                                                                          uncertainties are not reduced by For TSTF-493 parameters WBN Unit 2 uses only                                                  the reduction double sided correction factors. Attachment 3                                                 factor for the contains the revised FSAR section 7.1.2.1.9 that                                              single sided will be included in FSAR Amendment 102 that                                                    reduction factor.
Open-TVA Due 10/31/10.
reflects this change.                                                                         TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 2, 9/10/10  295 7.3 7.3.1.
1.2 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.1.2 'Process Protection Circuitry', item (3), references to sections 7.6 and 7.7 were removed.
Please explain the reason for removal.


Responder: Elton The level of detail is sufficient for this section without the two removed references to other Sections.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                   rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE    FSAR   NRC
The level of detail contained in item (3) of Unit 2 FSAR Section 7.3.1.1.2 is consistent with that contained in item 3. of Unit 1 UFSAR Section 7.3.1.1.2.
: 7. Y Open  Response included in next TVA Licensing Formal RAI Response Letter.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 3, 9/10/10  296 7.3 7.3.1.
2.1 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.2.1 'Generating Station Conditions', the new paragraph was arranged from what used to be a listing of items (1.b), (1.c), and (2.b), leaving out items (1.a) and (2.a). Even if the paragraph contains the word 'include', the breaks in items (1.a) and (2.a) should be listed.
Please explain this omission or state your commitment to correct this in a future amendment. Responder: Elton The information provided in Unit 2 FSAR Section 7.3.1.2.1 is not meant to provide detailed information describing what each condition includes. Deletion of the breaks described in Items (1.a) and (2.a) is justified because they are encompassed by the operating conditions primary system breaks and secondary system breaks, respectively.
The level of detail contained in Unit 2 FSAR Section 7.3.1.2.1 is consistent with that contained in Unit 1 UFSAR Section 7.3.1.2.1.
: 8. Y Open  Response included in next TVA Licensing Formal RAI Response Letter.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 4, 9/10/10  297 7.3 7.3.1.
2.2 EICB (Darbali) 9/9/2010


In Amendment 95 of FSAR section 7.3.1.2.2 'Generating Station Variables', the following sentence was erased:
===Response===
Post accident monitoring requirements and variables are given in Tables 7.5-1 and 7.5-2.  
Acceptable                                                                        RAI Resp.
No.                  POC                                        Issue                                            TVA Response(s)                          Y/N        Status/ Current Actions    Resolution Path      RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                          Date justifications.
274.                                  8/26/2010                                                  Responder: Clark                                    3. Y      Open                        Open-TVA              RAI No. 6        TVA Letter EICB (Singh) b                                                                                                                                                                                                                      ML102980005      dated 10/21/10 Loose Parts Monitoring System: TR 3.3 refers to            The reference will be changed to FSAR section                      Response provided in letter Response              10/26/2010      Enclosure 1 section 4.4.6 of the FSAR for description of the loose      7.6.7 Loose Part Monitoring System (LPMS)                          dated 10/21/10              acceptable. TVA                        Item No. 12 parts monitoring system. However, this section of the      System Description in next revision of the                                                    to complete stated FSAR is not available. TVA to check the reference          Technical Requirements Manual as shown below:                                                  action.
and respond.
: 1. Watts Bar FSAR, Section 7.6.7, Lose Part                                                  Due 10/31/10 Monitoring System.
(Note: Bechtel I&C to submit TRM change package to TVA Licensing.)
287    7.3    7.3-1                    8/27/2010                                                  Responder: Elton                                    4. Y      Open                        Open-TVA        ML102390538, EICB (Darbali)
Item No. 1, In Amendment 95 of FSAR section 7.3.2.3 Further            Unit 2 FSAR Section 7.3 addresses Engineered                      Response included in next  Due 10/31/10. 9/10/10 and Considerations, the list of signals that would start the  Safety Features (ESF) Actuation System.                            TVA Licensing Formal RAI    Waiting for      EICB RAI No.17 auxiliary feedwater motor driven and turbine driven        AMSAC is non-safety, and thus non-ESF.                            Response Letter.            docketed version ML102910017, pumps was moved to table 7.3-1 item 3, Auxiliary            Therefore, it was correct to not include AMSAC                                                to close item. 10/19/10 Feedwater. However, item (6) AMSAC was not                when the initiating signals were relocated from included in table 7.3-1.                                    Unit 2 FSAR Section 7.3.2.3 to Table 7.3-1.                                                    Expected letter issue date is Please explain this omission or state your commitment                                                                                                      11/5/10 to correct this in a future amendment.
288    7.3                            9/2/2010                                                    Responder: McNeil                                    5. N      Open                        Open-TVA              EICB RAI EICB (Garg)
ML102910008 Can we add a section to chapter 7 giving a brief            The following new section will be added to the                                                Due TBD              Item#67 overview of the Foxboro Spec 200 in Section 7.3?            WBN Unit 2 FSAR as part of Amendment 102:                          TVA committed to adding a description of the        TVA should 7.3.1.1.3 Analog Instrumentation                                  Foxboro Spec 200            include the list of hardware at the 10/12 NRC  all the functions The miscellaneous safety-related analog process                    Public Meeting.            where Spec 200 is control and indication loops are a set of discrete                                            used and discuss analog modules that have been tested and                                                      differences qualified for use in safety related systems. The                                              between unit 1 various components have been qualified to IEEE                                                and unit2. This Standard 323-1983 (R-1996) IEEE Standard for                                                  discussion should Qualifying Class IE Equipment for Nuclear Power                                                also include loop Generating Stations, IEEE Standard 344-1987                                                  which are (R-1993) IEEE Standard Recommended                                                            currently used for Practices for Seismic Qualification of Class IE                                                Unit 1 operation If Equipment for Nuclear Power Generating                                                        Spec 200 Stations, and IEEE Standard 384-1984 (R-1992)                                                components have IEEE Standard Criteria for Independence of                                                    also been Class IE Equipment and Circuits. The modules                                                  qualified to RG are arranged in instrument loops to provide the                                                1.209, it should be safety function as described in the TVA licensing                                              stated and if not basis for the Emergency Gas Treatment, Auxiliary                                              why not.
Feedwater, and Safety-Related Balance of Plant systems. Seismic qualification of the analog modules and racks is addressed in FSAR Section 3.10.
The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation.


Please explain the reason for removal. Responder: Elton Unit 2 FSAR Section 7.3 addresses Engineered Safety Features (ESF) Actuation System. Post accident monitoring is not an ESF; thus, a reference to it is not required in 7.3.1.2.2.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                       rad12E8A.docx                                                                         Open Items to be Resolved for SER Approval SE     FSAR     NRC
: 9. Y Open  Response included in next TVA Licensing Formal RAI Response Letter.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 5, 9/10/10  298 7.3 XX B (D ar9/9/2010  Responder: Clark
: 10. Y Open  Open-TVA ML102390538, Item No. 6, Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments IE Bulletin 80-06 calls for review of engineered safety features with the objective of ensuring that no device will change position solely because of the 'reset'


action.
===Response===
In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved the design modifications proposed by the applicant that would allow certain devices to remain unchanged upon an ESF reset. The staff also found acceptable the applicant's justification for some safety-related equipment that does not remain in its emergency mode after an ESF reset.
Acceptable                                                                  RAI Resp.
Please confirm whether or not the equipment that was determined in NUREG-0847 and its supplements to remain unchanged upon an ESF reset will still remain unchanged in Unit 2. A review of the schematic diagrams for the WBN Unit 2 valves listed in SER 3 found the following:  
No.                  POC                                        Issue                                                TVA Response(s)                          Y/N        Status/ Current Actions    Resolution Path  RAI No. & Date                    Comments Sec. Sec.                                                                                                                                                                                                                         Date Two IE analog modules are used to isolate IE to Non-IE signals. These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.
(1) For feedwater isolation valves (FCV-3-33, FCV-3-47, FCV-3-87, and FCV-3-100), feedwater check valve bypass valves (FCV-3-185, FCV-3-186, FCV-3-187, and FCV-3-188), and upper tap main feedwater isolation valves (FCV 3-236, FCV-3-239, FCV-3-242, and FCV-3-245), the Unit 2 equivalent reset switch and a relay have been added for each steam generator loop. When the engineered safety feature (ESF) signal is reset, the individual valve will not change state until both the loop and the ESF train reset switches have been reset.  
294  7.3    7.3.1.                    9/9/2010                                                      Responder: Elton                                      6. Y      Open                        Open-TVA          ML102390538, EICB (Darbali) 1.1                                                                                                                                                                                                       Item No. 2, In Amendment 95 of FSAR section 7.3.1.1.1 Function The information provided in Unit 2 FSAR Section                              Response included in next  Due 10/31/10.      9/10/10 Initiation, item (13) was arranged into paragraph form 7.3.1.1 is not meant to describe the specific                            TVA Licensing Formal RAI    Waiting for from what used to be a listing of items (a), (b) and (c). function of each item in detail; the descriptions                      Response Letter.            docketed version provided are a summary listing. The omitted                                                        to close item.
(2) For steam generator blowdown isolation valves (FCV-43-54D, FCV-43-56D, FCV-43-59D, FCV-43-63D, FCV-43-55, FCV-43-58, FCV-43-61, and FCV-43-64), the ESF signal is sealed in by means of a seal in relay. The individual valve will not change state until a hand switch in the sample room is used to reopen the individual valve.  
The second bullet under item (c) was omitted in the       information provided information beyond the level new paragraph.                                            of detail provided for the other items in this                                                      Expected letter section.                                                                                           issue date is Initiates Phase B containment isolation of the                                                                                                                11/5/10 following:                                                The level of detail contained in item (13) of Unit 2
(3) For residual heat removal heat exchanger outlet flow control valves (FCV-74-16 and FCV-74-28), the ESF signal is sealed in by the limit switch. The Unit 2 equivalent reset switch has been added at the control room control board. When the ESF signal is reset, the individual valve will not change state until the individual reset switch has been reset.
* Closure of the main steam isolation valves (MSIV) FSAR Section 7.3.1.1 is consistent with that to limit reactor coolant system cooldown for breaks contained in item 13. of Unit 1 UFSAR Section downstream of the MSIVs.                          7.3.1.1.
Response included in next TVA Licensing Formal RAI Response Letter.
Please explain this omission or state your commitment to correct this in a future amendment.
Due 10/31/10.
295  7.3    7.3.1.                    9/9/2010                                                      Responder: Elton                                      7. Y      Open                        Open-TVA          ML102390538, EICB (Darbali) 1.2                                                                                                                                                                                                       Item No. 3, In Amendment 95 of FSAR section 7.3.1.1.2 Process The level of detail is sufficient for this section                            Response included in next   Due 10/31/10.     9/10/10 Protection Circuitry, item (3), references to sections without the two removed references to other                              TVA Licensing Formal RAI    Waiting for 7.6 and 7.7 were removed.                              Sections.                                                                Response Letter.            docketed version to close item.
Waiting for docketed version to close item.
Please explain the reason for removal.                        The level of detail contained in item (3) of Unit 2 FSAR Section 7.3.1.1.2 is consistent with that                                                  Expected letter contained in item 3. of Unit 1 UFSAR Section                                                    issue date is 7.3.1.1.2.                                                                                      11/5/10 296  7.3    7.3.1.                    9/9/2010                                                      Responder: Elton                                      8. Y      Open                        Open-TVA          ML102390538, EICB (Darbali) 2.1                                                                                                                                                                                                       Item No. 4, In Amendment 95 of FSAR section 7.3.1.2.1             The information provided in Unit 2 FSAR Section                            Response included in next  Due 10/31/10.      9/10/10 Generating Station Conditions, the new paragraph    7.3.1.2.1 is not meant to provide detailed                                  TVA Licensing Formal RAI    Waiting for was arranged from what used to be a listing of items  information describing what each condition                                  Response Letter.            docketed version (1.b), (1.c), and (2.b), leaving out items (1.a) and (2.a).
Expected letter issue date is 11/5/10 9/10/10 306 7.1 7.1 EICB (Garg) FSAR amendment 100, page 7.1-12 provides the definition of Allowable value which is not consistent with TSTF-493 as allowable value is the value beyond which instrument channel is declared inoperable. Responder: Hilmes The FSAR Allowable Value definition will be revised to be consistent with the TSTF-493 in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. 11. Y Open  Response is included in letter dated 10/29/10 Open-TVA  Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#69  307 7.1 7.1 EICB (Garg) (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Acceptable as found tolerance is not in accordance with TSTF-493 as AAF is the limit beyond which the instrument channel is degraded but may be operable and its operability must be evaluated. (2) Also it states that AAF is based on measurable instrument channel uncertai nties, such as drift, expected during the surveillance interval. These wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided tolerance limits for the AAF. Since AAF is a band it will always be double sided and therefore, this clarification does not mean anything and it clouds the Responder: Hilmes (1) The Acceptable As Found (AAF) definition will be revised to be consistent with TSTF-493 in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
includes. Deletion of the breaks described in                                                           to close item.
Even if the paragraph contains the word include, theItems (1.a) and (2.a) is justified because they are breaks in items (1.a) and (2.a) should be listed. encompassed by the operating conditions primary                                                        Expected letter system breaks and secondary system breaks,                                                              issue date is Please explain this omission or state your commitment respectively.                                                                                          11/5/10 to correct this in a future amendment.
The level of detail contained in Unit 2 FSAR Section 7.3.1.2.1 is consistent with that contained in Unit 1 UFSAR Section 7.3.1.2.1.
297  7.3    7.3.1.                    9/9/2010                                                      Responder: Elton                                      9. Y      Open                        Open-TVA          ML102390538, EICB (Darbali) 2.2                                                                                                                                                                                                        Item No. 5, In Amendment 95 of FSAR section 7.3.1.2.2              Unit 2 FSAR Section 7.3 addresses Engineered                              Response included in next  Due 10/31/10.      9/10/10 Generating Station Variables, the following sentence Safety Features (ESF) Actuation System. Post                              TVA Licensing Formal RAI    Waiting for was erased:                                            accident monitoring is not an ESF; thus, a                                Response Letter.            docketed version reference to it is not required in 7.3.1.2.2.                                                          to close item.
Post accident monitoring requirements and variables are given in Tables 7.5-1 and 7.5-2.                                                                                                                         Expected letter issue date is Please explain the reason for removal.                                                                                                                        11/5/10 298  7.3    XX      B (D                9/9/2010                                                      Responder: Clark                                      10. Y        Open                        Open-TVA          ML102390538, Item No. 6, ar


(2) Additional detail on the AAF methodology was provided in sections 7.1.2.1.9.1, Westinghouse Setpoint Methodology, and 7.1.2.1.9.2, TVA Setpoint Methodology. These sections will be revised to clarify the 12. Y Open  Response is included in letter dated 10/29/10 Open-TVA  Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#70 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments issue. AAF calculations in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                             rad12E8A.docx                                                                           Open Items to be Resolved for SER Approval SE     FSAR   NRC
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section


7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. 308 7.1 7.1 EICB (Garg) (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Acceptable as left tolerance is not in accordance with TSTF-493 as it states that this may take calibration history into consideration. This is very vague and ambiguous. (2) Also it states that RPS functions use double sided tolerance limits. Since ALF is a band it will always be double sided and therefore, this clarification does not mean anything and clouds the issue.
===Response===
Acceptable                                                                    RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                        Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                Date IE Bulletin 80-06 calls for review of engineered safety  A review of the schematic diagrams for the                        Response included in next  Due 10/31/10. 9/10/10 features with the objective of ensuring that no device    WBN Unit 2 valves listed in SER 3 found the                        TVA Licensing Formal RAI    Waiting for will change position solely because of the reset        following:                                                        Response Letter.            docketed version action.                                                                                                                                                  to close item.
(1) For feedwater isolation valves (FCV-3-33, In Supplement 3 of NUREG-0847, section 7.3.5, the            FCV-3-47, FCV-3-87, and FCV-3-100),                                                        Expected letter staff approved the design modifications proposed by          feedwater check valve bypass valves (FCV-                                                  issue date is the applicant that would allow certain devices to            3-185, FCV-3-186, FCV-3-187, and FCV                                                    11/5/10 remain unchanged upon an ESF reset. The staff also            188), and upper tap main feedwater found acceptable the applicants justification for some      isolation valves (FCV 3-236, FCV-3-239, safety-related equipment that does not remain in its          FCV-3-242, and FCV-3-245), the Unit 2 emergency mode after an ESF reset.                            equivalent reset switch and a relay have been added for each steam generator loop.
Please confirm whether or not the equipment that was          When the engineered safety feature (ESF) determined in NUREG-0847 and its supplements to              signal is reset, the individual valve will not remain unchanged upon an ESF reset will still remain          change state until both the loop and the unchanged in Unit 2.                                          ESF train reset switches have been reset.
(2) For steam generator blowdown isolation valves (FCV-43-54D, FCV-43-56D, FCV-43-59D, FCV-43-63D, FCV-43-55, FCV                                                                                                  58, FCV-43-61, and FCV-43-64), the ESF signal is sealed in by means of a seal in relay. The individual valve will not change state until a hand switch in the sample room is used to reopen the individual valve.
(3) For residual heat removal heat exchanger outlet flow control valves (FCV-74-16 and FCV-74-28), the ESF signal is sealed in by the limit switch. The Unit 2 equivalent reset switch has been added at the control room control board. When the ESF signal is reset, the individual valve will not change state until the individual reset switch has been reset.
306  7.1    7.1                  FSAR amendment 100, page 7.1-12 provides the          Responder: Hilmes                                        11. Y        Open                        Open-TVA          EICB RAI definition of Allowable value which is not consistent                                                                                                                      ML102910008 EICB (Garg) with TSTF-493 as allowable value is the value beyond The FSAR Allowable Value definition will be                            Response is included in    Due 10/31/10      Item#69 which instrument channel is declared inoperable.      revised to be consistent with the TSTF-493 in                          letter dated 10/29/10 FSAR Amendment 102. Attachment 3 contains                                                          Pending FSAR the revised FSAR section 7.1.2.1.9 that will be                                                   Amendment 102 included in FSAR Amendment 102 that reflects                                                       submittal this change.
307  7.1     7.1                 (1) FSAR amendment 100, Section 7.1, page 7.1-12, Responder: Hilmes                                      12. Y              Open                        Open-TVA          EICB RAI definition of Acceptable as found tolerance is not in                                                                                                                       ML102910008 accordance with TSTF-493 as AAF is the limit beyond (1) The Acceptable As Found (AAF) definition will                        Response is included in    Due 10/31/10      Item#70 which the instrument channel is degraded but may be        be revised to be consistent with TSTF-493 in                    letter dated 10/29/10 operable and its operability must be evaluated. (2)        FSAR Amendment 102. Attachment 3                                                            Pending FSAR EICB (Garg)
Also it states that AAF is based on measurable              contains the revised FSAR section 7.1.2.1.9                                                  Amendment 102 instrument channel uncertainties, such as drift,            that will be included in FSAR Amendment 102                                                  submittal expected during the surveillance interval. These            that reflects this change.
wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very         (2) Additional detail on the AAF methodology vague. (3) Also it states that RPS functions use double     was provided in sections 7.1.2.1.9.1, sided tolerance limits for the AAF. Since AAF is a         Westinghouse Setpoint Methodology, and band it will always be double sided and therefore, this     7.1.2.1.9.2, TVA Setpoint Methodology.
clarification does not mean anything and it clouds the     These sections will be revised to clarify the


Responder: Hilmes (1) The statement about using calibration history to determine the Acceptable As Left (AAL) will be deleted in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                             rad12E8A.docx                                                                            Open Items to be Resolved for SER Approval SE    FSAR     NRC


===Response===
Acceptable                                                                    RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                        Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                  Date issue.                                                      AAF calculations in FSAR Amendment 102.
Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
308  7.1    7.1                  (1) FSAR Amendment 100, Section 7.1, page 7.1-13, Responder: Hilmes                                          13. Y          Open                        Open-TVA          EICB RAI definition of Acceptable as left tolerance is not in                                                                                                                        ML102910008 accordance with TSTF-493 as it states that this may      (1) The statement about using calibration history                  Response is included in    Due 10/31/10      Item#71 take calibration history into consideration. This is very    to determine the Acceptable As Left (AAL) will                letter dated 10/29/10 EICB (Garg) vague and ambiguous. (2) Also it states that RPS              be deleted in FSAR Amendment 102.                                                          Pending FSAR functions use double sided tolerance limits. Since ALF        Attachment 3 contains the revised FSAR                                                    Amendment 102 is a band it will always be double sided and therefore,      section 7.1.2.1.9 that will be included in FSAR                                            submittal this clarification does not mean anything and clouds          Amendment 102 that reflects this change.
the issue.
(2) See response to letter item 27 (NRC Matrix Item 307).
(2) See response to letter item 27 (NRC Matrix Item 307).
: 13. Y Open  Response is included in letter dated 10/29/10 Open-TVA  Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#71   309 7.1 7.1.2.
309   7.1   7.1.2.                 (1) FSAR amendment 100, Page 7.1-14,                     Responder: Hilmes                                  14. Y          Open                        Open-TVA          EICB RAI 1.9.1                  Westinghouse setpoint methodology, states that AAF                                                                                                                         ML102910008 is the algebraic sum of the .. This is not acceptable. (1) The AAF calculation for Westinghouse                            Response is included in    Due 10/31/10      Item#72 As algebraic sum is non conservative compared to the         setpoint methodology calculations in TI-28 for                  letter dated 10/29/10 EICB (Garg)
1.9.1 EICB (Garg) (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint methodology, states that AAF is the algebraic sum of the -.. This is not acceptable. As algebraic sum is non conservative compared to the SRSS method and will mask the operability of the instrument channel and therefore, it is not acceptable to the staff. (2) It also make the statement that ALT may take calibration history into consideration which is vague and ambiguous. Responder: Hilmes (1) The AAF calculation for Westinghouse setpoint methodology calculations in TI-28 for TSTF-493 will be revised to use the Square Root Sum of the Squares (SRSS) method. 
SRSS method and will mask the operability of the             TSTF-493 will be revised to use the Square                                                  Pending FSAR instrument channel and therefore, it is not acceptable       Root Sum of the Squares (SRSS) method.                                                      Amendment 102 to the staff. (2) It also make the statement that ALT                                                                                                   submittal may take calibration history into consideration which is (2) AAF definition will be revised to be consistent vague and ambiguous.                                        with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
(2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change. 14. Y Open  Response is included in letter dated 10/29/10 Open-TVA  Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#72   310 7.1 7.1.2.
310   7.1   7.1.2.                 (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes                                  15. Y                  Open                        Open-TVA          EICB RAI 1.9.2                  methodology, states that for AAF .and other                                                                                                                               ML102910008 measurable uncertainties as appropriate (i.e., those (1) The statement will be revised to say those                          Response is included in    Due 10/31/10      Item#73 present during calibration.) should be changed to       present during the surveillance interval in                        letter dated 10/29/10 present during normal operation (2) Also on page       FSAR Amendment 102. Attachment 3                                                                Pending FSAR 7.1-15, states that ALT may take calibration history     contains the revised FSAR section 7.1.2.1.9                                                     Amendment 102 EICB (Garg) into consideration which is vague and ambiguous.        that will be included in FSAR Amendment 102                                                     submittal that reflects this change.
1.9.2 EICB (Garg) (1) FSAR amendment 100, Page 7.1-14, TVA setpoint methodology, states that for AAF -.and other measurable uncertainties as appropriate (i.e., those present during calibration-.) should be changed to present during normal operation--  (2) Also on page 7.1-15, states that ALT may take calibration history into consideration which is vague and ambiguous. Responder: Hilmes
(2) The statement about using calibration history to determine the AAL will be deleted in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
 
311   7.1     7.1   EIC             Both Westinghouse and TVA setpoint methodology do Responder: Hilmes                                            16. Y        Open                        Open-TVA          EICB RAI B
(1) The statement will be revised to say those present during the surveillance interval in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(Gar            not have any discussion on single sided calculation.                                                                                                                       ML102910008 g)
(2) The statement about using calibration history to determine the AAL will be deleted in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. 15. Y Open Response is included in letter dated 10/29/10 Open-TVA  Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008
Please confirm that single sided calculation has not A statement that single-sided corrections are not                       Response is included in                       Item#74
 
Item#73   311 7.1 7.1 EIC B (Gar g)Both Westinghouse and TVA setpoint methodology do not have any discussion on single sided calculation. Please confirm that single sided calculation has not Responder: Hilmes A statement that single-sided corrections are not 16. Y Open  Response is included in Open-TVA  EICB RAI ML102910008 Item#74 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments been used for all setpoints with TSTF-493 and provide a statement to that effect in the FSAR. used for TSTF-493 setpoints will be included in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. letter dated 10/29/10 Due 10/31/10 Pending FSAR Amendment 102 submittal 326  EICB(Garg) TVA uses double-sided methodology for as-found and as-left Reactor Trip and ESFAS instrument setpoint values. The FSAR will be revised in a future amendment to reflect this methodology Responder: Webb Attachment 3 contains the revised FSAR section
 
7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. 17. Y Open October 22, 2010 Response is included in letter dated 10/29/10 Open-TVA Due 10/31/10 Pending FSAR Amendment 102 submittal 327  DORL (Poole) Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011. Responder: Webber Non-Prop drawings are available for submittal. 18. N Open    Open-TVA Due 1/31/11    330 7.3 7.3 EICB (Darbali)
Related to Item 298 IE Bulletin 80-06 calls for review of engineered safety features with the objective of ensuring that no device will change position solely because of the 'reset'


action.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                rad12E8A.docx                                                                        Open Items to be Resolved for SER Approval SE    FSAR    NRC
In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved the design modifications proposed by the applicant that would allow certain devices to remain unchanged upon an ESF reset. The staff also found acceptable the applicant's justification for some safety-related equipment that does not remain in its emergency mode after an ESF reset.
Please list for Unit 1 and Unit 2 the safety-related equipment that does not remain in its emergency mode after an ESF reset. 


Responder: Hilmes/Faulkner The original response to IE Bulletin 80-06 for both WBN Unit 1 and 2 was provided on TVA letter to the NRC dated March 11, 1982 (ML073530129) (Reference 4). Subsequent design changes have impacted the original response such that some equipment that originally changed state no longer does so and some equipment has been deleted. The following is the updated list of equipment from the letter that changes state on ESF reset:  
===Response===
: 1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or 2- (Unit 2)  
Acceptable                                                                  RAI Resp.
: a. Auxiliary Feedwa ter Pump Turbine Speed Control Valve, FCV-1-52  
No.                  POC                                        Issue                                          TVA Response(s)                      Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                    Comments Sec. Sec.                                                                                                                                                                                                                  Date been used for all setpoints with TSTF-493 and provide used for TSTF-493 setpoints will be included in                      letter dated 10/29/10      Due 10/31/10 a statement to that effect in the FSAR.              FSAR Amendment 102. Attachment 3 contains                                                        Pending FSAR the revised FSAR section 7.1.2.1.9 that will be                                                  Amendment 102 included in FSAR Amendment 102 that reflects                                                    submittal this change.
: b. Auxiliary Feedwater (AFW) Level Control Valves as listed below:  
326                                    TVA uses double-sided methodology for as-found and Responder: Webb                                          17. Y        Open October 22, 2010      Open-TVA as-left Reactor Trip and ESFAS instrument setpoint EICB(Garg) values. The FSAR will be revised in a future      Attachment 3 contains the revised FSAR section                          Response is included in    Due 10/31/10 amendment to reflect this methodology              7.1.2.1.9 that will be included in FSAR                                letter dated 10/29/10      Pending FSAR Amendment 102 that reflects this change.                                                            Amendment 102 submittal 327                                    Attachment 36 contains Foxboro proprietary drawings Responder: Webber                                        18. N        Open                        Open-TVA DORL            08F802403-SC-2001 sheets 1 through 6. An affidavit (Poole)          for withholding and non-proprietary versions of the Non-Prop drawings are available for submittal.                                                    Due 1/31/11 drawings will be submitted by January 31, 2011.
: i. LCV-3-172 - SG3 - Level Control Valve ii. LCV-3-173 - SG2 - Level Control Valve iii. LCV-3-174 - SG1 - Level Control Valve iv. LCV-3-175 - SG4 - Level Control Valve v. LIC-3-172 - SG3 - Level Indicating Controller vi. LIC-3-173 - SG2 - Level Indicating Controller vii. LIC-3-174 - SG1 - Level Indicating Controller viii. LIC-3-175 - SG4 - Level Indicating Controller ix. LCV-3-148 - SG3 - Level Valve x. LCV-3-156 - SG2 - Level Valve xi. LCV-3-164 - SG1 - Level Valve xii. LCV-3-171 - SG4 - Level Valve xiii. LCV-3-148A - SG3 - Level Bypass 19. N Open Open-TVA Due TBD EICB RAI No.20 ML102910017, 10/19/10 
330  7.3    7.3                      Related to Item 298                                      Responder: Hilmes/Faulkner                         19. N        Open                        Open-TVA          EICB RAI No.20 ML102910017, IE Bulletin 80-06 calls for review of engineered safety The original response to IE Bulletin 80-06 for both                                               Due TBD            10/19/10 features with the objective of ensuring that no device WBN Unit 1 and 2 was provided on TVA letter to will change position solely because of the reset  the NRC dated March 11, 1982 (ML073530129) action.                                            (Reference 4). Subsequent design changes have impacted the original response such that some In Supplement 3 of NUREG-0847, section 7.3.5, the  equipment that originally changed state no longer staff approved the design modifications proposed by does so and some equipment has been deleted.
the applicant that would allow certain devices to  The following is the updated list of equipment remain unchanged upon an ESF reset. The staff also from the letter that changes state on ESF reset:
found acceptable the applicants justification for some safety-related equipment that does not          1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or remain in its emergency mode after an ESF reset.        2- (Unit 2)
Please list for Unit 1 and Unit 2 the safety-related          a. Auxiliary Feedwater Pump Turbine equipment that does not remain in its emergency                  Speed Control Valve, FCV-1-52 mode after an ESF reset.
: b. Auxiliary Feedwater (AFW) Level EICB (Darbali)
Control Valves as listed below:
: i. LCV-3-172   - SG3 - Level Control Valve ii. LCV-3-173   - SG2 - Level Control Valve iii. LCV-3-174   - SG1 - Level Control Valve iv. LCV-3-175     - SG4 - Level Control Valve
: v. LIC-3-172     - SG3 - Level Indicating Controller vi. LIC-3-173     - SG2 - Level Indicating Controller vii. LIC-3-174     - SG1 - Level Indicating Controller viii. LIC-3-175   - SG4 - Level Indicating Controller ix. LCV-3-148     - SG3   - Level Valve
: x. LCV-3-156     - SG2   - Level Valve xi. LCV-3-164     - SG1   - Level Valve xii. LCV-3-171     - SG4   - Level Valve xiii. LCV-3-148A   - SG3   - Level Bypass


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments   
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                         rad12E8A.docx                                                             Open Items to be Resolved for SER Approval SE   FSAR   NRC


Control Valve xiv. LCV-3-156A - SG2 - Level Bypass Control Valve xv. LCV-3-164A - SG1 - Level Bypass Control Valve xvi. LCV-3-171A - SG4 - Level Bypass Control Valve xvii. LIC-3-148 - SG3 - Controller xviii. LIC-3-156 - SG2 - Controller xix. LIC-3-164 - SG1  - Controller xx. LIC-3-171 - SG4  - Controller  
===Response===
: c. Lower and Upper Containment Cooler Fans and Control Rod Drive Mechanism Cooler Fan  
Acceptable                                                        RAI Resp.
: d. Penetration Room Cooler Fans Elevations 737, 692 and 713  
No.              POC                      Issue                          TVA Response(s)                  Y/N      Status/ Current Actions Resolution Path RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                Date Control Valve xiv. LCV-3-156A - SG2       - Level Bypass Control Valve xv. LCV-3-164A - SG1         - Level Bypass Control Valve xvi. LCV-3-171A - SG4       - Level Bypass Control Valve xvii. LIC-3-148       - SG3 - Controller xviii. LIC-3-156       - SG2 - Controller xix. LIC-3-164       - SG1  - Controller xx. LIC-3-171         - SG4  - Controller
: e. Pipe Chase Cooler Fans  
: c. Lower and Upper Containment Cooler Fans and Control Rod Drive Mechanism Cooler Fan
: 2. Common Equipment
: d. Penetration Room Cooler Fans Elevations 737, 692 and 713
: a. Shutdown Board Room A Pressurizing Fans b. Control Building Ventilation Dampers as listed below:  
: e. Pipe Chase Cooler Fans
: i. 0-FCO-31-9  - Spreading Room Supply Fan Damper ii. 0-FCO-31-10 - Spreading Room Supply Fan Damper iii. 0-FCO-31-16 - Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31-17 - Toilet a Locker Room Exhaust Fan Exhaust Damper v. 0-FCO-31-3  - Main Control Room Isolation Damper vi. 0-FCO-31-4  - Main Control Room Isolation Damper vii. 0-FCO-31-36 - Spreading Room Fresh Air Supply Damper viii. 0-FCO-31-37 - Spreading Room Fresh Air Supply Damper  
: 2. Common Equipment
: c. Cask Loading Exhaust Dampers as listed i. 0-FCO-30-122 - Cask Loading Area Exhaust Damper ii. 0-FCO-30-123 -Cask Loading Area Exhaust Damper
: a. Shutdown Board Room A Pressurizing Fans
: d. Auxiliary Building General Supply Exhaust Fans Elevation 737  
: b. Control Building Ventilation Dampers as listed below:
: i. 0-FCO-31 Spreading Room Supply Fan Damper ii. 0-FCO-31-10           - Spreading Room Supply Fan Damper iii. 0-FCO-31-16           - Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31-17           - Toilet a Locker Room Exhaust Fan Exhaust Damper
: v. 0-FCO-31 Main Control Room Isolation Damper vi. 0-FCO-31 Main Control Room Isolation Damper vii. 0-FCO-31-36           - Spreading Room Fresh Air Supply Damper viii. 0-FCO-31-37           - Spreading Room Fresh Air Supply Damper
: c. Cask Loading Exhaust Dampers as listed
: i. 0-FCO-30-122         - Cask Loading Area Exhaust Damper ii. 0-FCO-30-123         -Cask Loading Area Exhaust Damper
: d. Auxiliary Building General Supply Exhaust Fans Elevation 737
: e. CCW and AFT Pump Space Cooler Fans
: e. CCW and AFT Pump Space Cooler Fans


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments f. Spent Fuel Pit Pumps Space Coolers
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 rad12E8A.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR     NRC
: g. EGTS Room Coolers
: h. Turbine Driven AFW and Boric Acid Space Coolers 334 7 7 EICB (Darbal i) FSAR Figure 7A-3 "Mechanical Flow and Control Diagram Symbols" doesn't show the symbols for the first column of valves. Please correct this in a future FSAR amendment. Responder: TBD 20. N Open Open-TVA 
 
Due TBD RAI not required. N/A RAI not required because the figure is not part of any SE section. 335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.
Provide analysis, test, or combined analysis and test for normal operating radi ation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable. Responder: WEC 21. N Open Open-TVA Due TBD    041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents: (1) WNA-DS-01617-WBT Re
: v. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Re
: v. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM: (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA letter dated April 8, 2010.
 
Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review.
Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN
.Due 10/22/10
: 1. N Open  Partial Response is included in letter dated 10/5/10.
The SysRS and SRS incorporate requirements from many other documents by reference.
NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there should be no problem to docket this version.  (4) Per ML091560352, the testing process document does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM. Open-TVA/WEC Due 12/7/10
 
TVA to docket information indentified in
 
ISG6. NRC Meeting Summary NRC Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270. 067 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010. Responder: WEC                          Date: 5/25/10
 
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43: 
: a. AI687, AI688 - Scheduled for September 28, 2010  b. Upgraded PC node box and flat panel displays
- Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office. 
: c. Power supplies - Per Westinghouse letter
: 2. N Open This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC


Due 12/3/10 N/A - No question was  
===Response===
Acceptable                                                                        RAI Resp.
No.                    POC                                      Issue                                          TVA Response(s)                          Y/N        Status/ Current Actions      Resolution Path  RAI No. & Date                            Comments Sec. Sec.                                                                                                                                                                                                                        Date
: f. Spent Fuel Pit Pumps Space Coolers
: g. EGTS Room Coolers
: h. Turbine Driven AFW and Boric Acid Space Coolers 334    7      7                      FSAR Figure 7A-3 Mechanical Flow and Control            Responder: TBD                                      20. N        Open                          Open-TVA          RAI not          N/A            RAI not required because the EICB Diagram Symbols doesnt show the symbols for the                                                                                                                              required.                        figure is not part of any SE (Darbal first column of valves. Please correct this in a future                                                                                                    Due TBD                                            section.
i)
FSAR amendment.
335  7.6.1  7.6.7                    LPMS: Reference to OI-331, sub item 2.                    Responder: WEC                                      21. N        Open                          Open-TVA Provide analysis, test, or combined analysis and test                                                                                                      Due TBD EICB (Singh) for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
041  7.5.2  7.5.1                    2/19/2010                                                Responder: WEC                                      1. N      Open                          Open-TVA/WEC      NRC Meeting      TVA Letter      See also Open Item Nos. 226 &
EICB (Carte)
Summary NRC      dated 6/18/10  270.
Please provide the following Westinghouse                Items (1) and (2) were docketed by TVA letter                      Partial Response is included  Due 12/7/10        Meeting documents:                                                dated April 8, 2010.                                              in letter dated 10/5/10.                          Summary          TVA Letter (1) WNA-DS-01617-WBT Rev. 1, "PAMS System                                                                                    The SysRS and SRS              TVA to docket      ML093560019,    dated 10/5/10 Requirements Specification"                              Item (3) will be addressed by Revision 2 of the                    incorporate requirements      information        Item No. 11 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System                Licensing Technical Report. Due 12/3/10                           from many other documents      indentified in Design Specification"                                                                                                        by reference.                  ISG6.
(3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX                Item (4) will be addressed by Westinghouse version 4.5g"                                            developing a WBN2 Specific Test Plan to                            NNC 8/25/10: (3) An earlier Please provide the following Westinghouse documents      compensate for the fact that the NRC                              version of this report was or pointers to where the material was reviewed and        disapproved WNA-PT-00058-GEN during the                            docketed for the Common Q approved in the CQ TR or SPM:                            original Common Q review. Due 12/7/10                              topical report; therefore, (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for                                                                            there should be no problem Common Q Safety systems"                                  Item (5) Procedures that are listed in the SPM                    to docket this version. (4)
(5) WNA-TP-00357-GEN Rev. 4, "Element Software            compliance table in the Licensing Technical                        Per ML091560352, the Test Procedure"                                          Report revision 1 supersede that test procedure                    testing process document WNA-TP-00357-GEN.Due 10/22/10                                      does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM.
067  7.5.2  7.5.1                    By letter dated March 12, 2010 TVA stated that the    Responder: WEC                    Date: 5/25/10        2. N      Open                          Open-TVA/WEC      N/A - No         TVA Letter EICB (Carte) target submittal date for the "Commercial Grade                                                                                                                                question was     dated 6/18/10 Dedication Instructions for AI687, AI688, Upgraded PC The following status is from the revised WB2                          This item is addressed in      Due 12/3/10        asked. Item node box and flat panels." was September 28, 2010. Common Q PAMS ISG-6 Compliance Matrix                                    Rev. 2 of the Licensing                          was opened to submitted in response to Item 43:                                      Technical Report                                  track comm8ittment
: a. AI687, AI688 - Scheduled for September 28,                                                                        made by 2010                                                                                                                applicant.
: b. Upgraded PC node box and flat panel displays
                                                                                                - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter


asked. Item was opened to track comm8ittment made by applicant.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                            rad12E8A.docx                                                                            Open Items to be Resolved for SER Approval SE      FSAR    NRC
TVA Letter dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
===Response===
To be addressed during 9/20-9/21 audit 068 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010. Responder: WEC                          Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
Acceptable                                                                        RAI Resp.
: a. AI687, AI688 - Scheduled for September 28, 2010
No.                   POC                                     Issue                                         TVA Response(s)                           Y/N       Status/ Current Actions       Resolution Path   RAI No. & Date                     Comments Sec. Sec.                                                                                                                                                                                                                   Date WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office. c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.  
To be addressed during 9/20-9/21 audit 068   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the     Responder: WEC                    Date: 5/25/10      3. N      Open                          Open-TVA/WEC      N/A - No        TVA Letter EICB (Carte) target submittal date for the "Summary Report on                                                                                                                             question was    dated 6/18/10 acceptance of AI687, AI688, Upgraded PC node box,       The following status is from the revised WB2                      This item is addressed in      Due 12/3/10        asked. Item flat panels, and power supplies." was September 28,     Common Q PAMS ISG-6 Compliance Matrix                             Rev. 2 of the Licensing                          was opened to 2010.                                                  submitted in response to Item 43:                                 Technical Report                                  track comm8ittment
: a. AI687, AI688 - Scheduled for September 28,                                                                       made by 2010                                                                                                                 applicant.
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit  
To be addressed during 9/20-9/21 audit 069  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the      Responder: WEC                Date: 5/25/10        4. N       Open                           Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Watts Bar 2 PAMS                                                                                                                              question was Specific FAT Report" was October 2010.                                                                                    Awaiting for document to be Due 2/18/11          asked. Item docketed by TVA.                                  was opened to track comm8ittment made by applicant.
: 3. N Open  This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC Due 12/3/10  
070   7.5.2   7.5.1                  By letter dated March 12, 2010 TVA stated that the     Responder: WEC                Date: 5/25/10        5. N      Open                          Open-TVA/WEC       N/A - No        TVA Letter EICB (Carte) target submittal date for the "Concept and Definition                                                                                                                        question was    dated 6/18/10 Phase V&V Report" was March 31, 2010.                  Per Westinghouse letter WBT-D-1961,                                Partial Response is included Due 12/21/10         asked. Item (Reference 8) this document is available for audit                in letter dated 10/5/10.                          was opened to    TVA Letter at the Westinghouse Rockville office.                                                                                track            dated 8/20/10 Regulations require that the                      comm8ittment WNA-VR- 00283-WBT, Rev 0 was submitted on                          NRC review be based on                            made by          TVA Letter TVA letter to the NRC dated August 20, 2010                        docketed material. Awaiting                      applicant.      dated 10/5/10 (Reference 7).                                                    for document to be docketed by TVA.
The submitted V&V did not address the Requirements Traceability Matrix and did not                      NNC 8/25/10:
summarize anomalies. At the September 15th                        Requirements Phase SVVR public meeting, Westinghouse agreed to include                    provided by TVA letter dated the Concept and Definitions Phase Requirements                    8/20/10.
Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.


N/A - No question was asked. Item was opened to track comm8ittment
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                              rad12E8A.docx                                                                                Open Items to be Resolved for SER Approval SE      FSAR    NRC


made by applicant.
===Response===
TVA Letter dated 6/18/10 069 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010. Responder: WEC                     Date: 5/25/10  
Acceptable                                                                          RAI Resp.
: 4. N Open Awaiting for document to be docketed by TVA. Open-TVA/WEC Due 2/18/11 N/A - No question was  
No.                  POC                                    Issue                                            TVA Response(s)                          Y/N        Status/ Current Actions        Resolution Path  RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                      Date TVA Revised Response:
TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated August 20, 2010 (Reference 6).
The next Independent Verification and Validation (IV&V) report will include the Design Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.
071  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the        Responder: WEC          Date: 5/25/10            6. N      Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Design Phase V&V                                                                                                                                question was Report" was July 30, 2010.                                                                                                Awaiting for document to be Due 12/21/10             asked. Item docketed by TVA.                                    was opened to track commitment made by applicant.
072  7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the        Responder: WEC                Date: 5/25/10        7. N      Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Implementation Phase                                                                                                                            question was V&V Report" was September 30, 2010.                                                                                        Awaiting for document to be Due 12/21/10            asked. Item docketed by TVA.                                    was opened to track commitment made by applicant.
073  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the       Responder: WEC              Date: 5/25/10        8. N      Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Integration Phase V&V                                                                                                                            question was Report" was October 29, 2010.                                                                                             Awaiting for document to be Due 12/31/10            asked. Item docketed by TVA.                                    was opened to track commitment made by applicant.
074  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the        Responder: WEC               Date: 5/25/10         9. N      Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Final V&V Report" was                                                                                                                            question was November 30, 2010.                                                                                                        TVA to provide due date.          Due                asked. Item was opened to track commitment made by applicant.
075  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the        Responder: WEC              Date: 5/25/10        10. N         Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Watts Bar 2 PAMS                                                                                                                                question was Specific FAT Procedure" was September 30, 2010.                                                                            Awaiting for document to be Due 11/24/20            asked. Item docketed by TVA.                                     was opened to track commitment made by applicant.
081  7.5.2  7.5.1                  5/6/2010                                                  Responder: Merten/WEC                              11. N        Open                              Open-TVA/WEC       EICB RAI        TVA Letter EICB (Carte)
ML102910002      dated 6/18/10 The PAMS Licensing Technical Report (WNA-LI-              The codes and standards documents listed in                      ML101600092 Item No.1:            Due 12/31/10      Item No. 9 00058-WBT Rev. 0, Dated April 2010), in Section 7,        Section 7 of the Common Q PAMS Licensing                        There are three sets of lists codes and standards applicable to the Common Q      Technical Report are the documents that the                      regulatory criteria that relate  TVA to provide PAMS. This list contains references to old revisions of  Common Q platform was licensed to when the                      to a Common Q application        requested several regulatory documents, for example:                NRC approved the original topical report and                    (e.g. WBN2 PAMS):                information.


asked. Item was opened to track comm8ittment made by applicant.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                  rad12E8A.docx                                                                    Open Items to be Resolved for SER Approval SE    FSAR  NRC
N/A  070 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Concept and Definition Phase V&V Report" was March 31, 2010. Responder: WEC                      Date: 5/25/10


Per Westinghouse letter WBT-D-1961, (Reference 8) this document is available for audit at the Westinghouse Rockville office.  
===Response===
Acceptable                                                                RAI Resp.
No.              POC                            Issue                                            TVA Response(s)                  Y/N          Status/ Current Actions    Resolution Path RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                Date (1) RG 1.29 - September 1978 vs. March 2007              issued the approved SER. The WBN Unit 2                      (a) Common Q platform (2) RG 1.53 - June 1973 vs. November 2003                Common Q PAMS is designed in accordance with                  components - Common Q (a) IEEE 379-1994 vs. -2000                              the approved Common Q topical report and                      TR (3) RG 1.75 - September 1975 vs. February 2005            approved SER and the codes and standards on                  (b) Application Development (a) IEEE 384-1992 vs. -1992                              which the SER was based. Since the current                    Processes - Common Q (4) RG 1.100 - June 1988 vs. September 2009              versions referenced are not applicable to WBN                SPM (a) IEEE 344-1987 vs. -2004                              Unit 2, there is no basis for a comparison review.            (c) Application Specific -
(5) RG 1.152 - January 1996 vs. January 2006                                                                            current regulatory criteria (a) IEEE 7-4.33.2-1993 vs. -2003                          Bechtel to develop a matrix and work with                    The Common Q Topical (6) RG 1.168 - September 1997 vs. February 2004          Westinghouse to provide justification.                        Report and associated (a) IEEE 1012-1986 vs. -1998                                                                                            appendices primarily (b) IEEE 1028-1988 vs. -1997                                                                                            addressed (a) and (b). The (7) IEEE 279-1991 vs. 603-1991                                                                                          Common Q SER states:
(8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)                                                                                                Appendix 1, Post However, LIC-110, "Watts Bar Unit 2 License                                                                            Accident Monitoring Application Review," states: "Design features and                                                                      Systems, provides the administrative programs that are unique to Unit 2                                                                      functional requirements and should then be reviewed in accordance with the                                                                          conceptual design approach current staff positions." Please identify all differences                                                              for upgrading an existing between the versions referenced and the current staff                                                                  PAMS based on Common Q positions. Please provide a justification for the                                                                       components (page 58, acceptability PAMS with respect to these differences.                                                                  Section 4.4.1.1, Description)On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
The NRC did not approve the proposed PAMS design.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design.
For example IEEE Std. 603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other


WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010 (Reference 7).
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                             rad12E8A.docx                                                                                Open Items to be Resolved for SER Approval SE      FSAR    NRC
The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15 th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM. 5. N Open  Partial Response is included in letter dated 10/5/10.


Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA.
===Response===
NNC 8/25/10: Requirements Phase SVVR provided by TVA letter dated 8/20/10. Open-TVA/WEC Due 12/21/10 N/A - No question was
Acceptable                                                                          RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                        Y/N            Status/ Current Actions      Resolution Path    RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                      Date Systems, contain application specific requirements that must be addressed by a PAMS system.
Awaiting TVA Response.
082  7.5.2  7.5.1                  5/6/2010                                                Responder: WEC                        Date:          12. N        Open                            Open-TVA/WEC        EICB RAI        TVA Letter EICB (Carte) 6/18/10                                                                                                                ML102910002      dated 7/30/10 The PAMS Licensing Technical Report (WNA-LI-                                                                                Regulations require that the Revision 1, Due        Item No. 10 00058-WBT Rev. 0, Dated April 2010), in Section 2.3,    These components can be found in the Summary                        NRC review be based on       10/22/10 lists hardware/software changes to the Common Q        Qualification Report Of Hardware Testing For                        docketed material. Awaiting PAMS previously reviewed by the NRC. However the        Common Q Applications, 00000-ICE-37764, Rev                        for document to be docketed Common Q ISG-6 Compliance Matrix does not contain      3 and                                                              by TVA.
activities that address qualification of all changes    TWICE Qualification Status Report, WNAQR-specifically:                                          00011-SSP Per Westinghouse letter WBT-D-                            NNC 8/9/10: per telephone 2024, (Reference __) dated June 9, 2010, these                      conversation on 8/5/10, it is documents are available for audit at the                            not clear how Westinghouse Westinghouse Rockville Office.                                      Commercial Grade Dedication Plans and TVA provided information by letter dated July 30,                  Reports for Digital I&C.
2010 (ML102160349) - See Enclosure 1 Item No.                      Westinghouse agree to
: 7.                                                                  present to the NRC in a public meeting on August Revision 1 of the Licensing Technical Report                        17, 2010, and explanation of provides additional detail on the platform specific                how their system addresses to WBN2 and references to the evaluation                            regulatory criteria for both documentation.                                                      commercial grade dedication and equipment qualification.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
085  7.5.2  7.5.1                  5/6/2010                                                Responder: WEC                                        13. N        Open                            Open-TVA/WEC       EICB RAI EICB (Carte)
ML102910002 Please provide a detailed description of the PAMS      Is the WEC ISG4 evaluation inadequate?                              A response will be provided Due 11/24/10            Item No. 13 MTP data link to the plant computer. This description                                                                      by 10/31/10 should identify all equipment (model & version) and    Operation of the MTP as a barrier device. MTP                                                      Hardware is in describe the functions that each piece of equipment    Fails as a barrier device. Describe what prevents                  NNC 8/11/10: Design            Rev. 1 of the performs. This description should be of sufficient      a MTP failure from propagating to the AC160?                        information should be          Licensing detail for the NRC to independently evaluate the                                                                            available now. By letter        Technical Report statements made in WNA-LI-00058-WBT Rev. 0,            Node loss on the bus? Bus loss?                                    dated July 30, 2010            due 10/22.
Section 5.3.                                                                                                                (ML102160349) TVA stated Revise the ISG4 section of the Licensing                            that the MTP was connected NNC 8/25/10:
Technical Report (Rev. 2) to provide a more                        to a Red Hat Linux Server      Disagree with detailed description of the MTP as a barrier                        (see Enclosure 1, Item No. path forward input device.                                                            14 part b.). It is presumed by TVA above.
that this server is not safety- An explanation is related. IEEE 603-1991          about the design Clause 5.6.3(1) states,        is needed.
                                                                                                                                                                "Isolation devices used to affect a safety system          FAT test boundary shall be classified procedure to


asked. Item was opened to track comm8ittment made by applicant.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE      FSAR    NRC
TVA Letter dated 6/18/10


TVA Letter dated 8/20/10  
===Response===
Acceptable                                                                        RAI Resp.
No.                  POC                                      Issue                                            TVA Response(s)                      Y/N            Status/ Current Actions      Resolution Path  RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                                                        Date as part of the safety      include data system."                    storm testing of the MTP Please describe how the    interface due MTP serves as the isolation 11/24/10 device.
086  7.5.2  7.5.1                  5/6/2010                                                    Responder: WEC                    Date: 5/24/10 14. N            Open                          Open-TVA/WEC      EICB RAI        TVA Letter EICB (Carte)
ML102910002      dated 6/18/10 The PAMS Licensing Technical Report (WNA-LI-                The regulatory documents listed in the Common                      TVA to address with item      Due 12/31/10      Item No. 14 00058-WBT Rev. 0, Dated April 2010), in Section 6,          Q PAMS Licensing Technical Report are the                          OI 81.
lists references applicable to the Common Q PAMS.          documents that the Common Q platform was This list contains references to old revisions of several  licensed to when the NRC approved the original regulatory documents, for example:                          topical report and issued the approved SER. The (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1            WBN Unit 2 Common Q PAMS is designed in (ML083310185)                                              accordance with the approved Common Q topical However, LIC-110, "Watts Bar Unit 2 License                report and approved SER and the regulatory Application Review," states: "Design features and          documents on which the SER was based. Since administrative programs that are unique to Unit 2          the current versions referenced are not applicable should then be reviewed in accordance with the              to WBN Unit 2, there is no basis for a comparison current staff positions." Please identify all differences  review.
between the versions referenced and the current staff positions. Please provide a justification for the          Rev 0 of the Licensing Technical Report acceptability PAMS with respect to these differences.      references Rev. 1 of ISG4 138                                  By letter dated February 3, 2010, Westinghouse              Responder: WEC                                      15. N        Open                          Open-TVA/WEC      ML101650255, EICB (Carte) informed TVA that certain PAMS documentation has                                                                                                                                Item No. 2 been completed.                                            This item is used to track all Commercial                          TVA agreed to include a        To be addressed Grade Dedication issues.                                          description of the generic    by Rev. 2 of the (a) The draft ISG6 states that a commercial grade                                                                              Westinghouse hardware          Licensing dedication plan should be provided with an application                                                                        commercial grade              Technical Report for a Tier 2 review.                                                                                                                                          due 12/3.
dedication process in the By letter dated February 5, 2010, TVA stated that the                                                                          PAMS licensing technical      Due 12/3/10 commercial grade dedication plan was included in the                                                                          report. (see Common Q Topical Report Section 11, Commercial                                                                                ML102920031 Item No 1)
Grade Dedication Program. Section 11 includes a description of the Common Q Commercial Grade                                                                                  TVA agreed to include (in Dedication Program, and states: A detailed review                                                                            the PAMS licensing plan is developed for each Common Q hardware or                                                                                technical report) an software component that requires commercial grade                                                                              evaluation of WBN2 dedication.                                                                                                                  critical characteristics for commercial Please provide the commercial grade dedication plans for each Common Q hardware or software component                                                                              Westinghouse hardware that has not been previously reviewed and approved                                                                            components against the by the NRC.                                                                                                                    generic critical characteristics. (see (b) The draft ISG6 states that a commercial grade                                                                              ML102920031 Item No 2) dedication report should be provided within 12 months of requested approval for a Tier 2 review.                                                                                    TVA agreed to include a description of the generic (i) Please provide 00000-ICE-37722 Rev. 0,                                                                                    Westinghouse software Commercial Grade Dedication Report for the QNX commercial grade Operating System for Common Q Applications.
dedication process in the (ii) Please provide WNA-CD-00018-GEN Rev. 3,                                                                                  PAMS licensing technical Commercial Dedication Report for QNX 4.25G for                                                                                report. (see Common Q Applications.                                                                                                        ML102920031 Item No 3)


TVA Letter dated 10/5/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                              rad12E8A.docx                                                                          Open Items to be Resolved for SER Approval SE    FSAR    NRC


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Revised Response: TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated August 20, 2010 (Reference 6). The next Independent Verification and Validation (IV&V) report will include the Design Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.
===Response===
071 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Design Phase V&V Report" was July 30, 2010. Responder: WEC              Date: 5/25/10
Acceptable                                                                      RAI Resp.
: 6. N Open Awaiting for document to be docketed by TVA. Open-TVA/WEC
No.                 POC                                     Issue                                             TVA Response(s)                     Y/N           Status/ Current Actions       Resolution Path   RAI No. & Date                         Comments Sec. Sec.                                                                                                                                                                                                                   Date TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 142                                The applicable regulatory guidance for reviewing the      Responder: WEC                                    16. N        Open                          Open-TVA/WEC      ML101650255,                WBN2 PAMS System EICB (Carte)
WBN2 PAMS SysRS would be IEEE 830 as endorsed                                                                                                                                Item No. 6                  Requirements Specification by Regulatory Guide 1.172 and BTP 7-14 Section            This item is used to track all traceability                      TVA/Westinghouse              To be addressed B.3.3.1, Requirements Activities - Software                issues with the Software Requirements                            agreed to include the          by Revision of                                  TVA docketed WNA-DS-01617-Requirements Specifications. IEEE 830-1994 Section        Specification (SRS).                                            V&V evaluation of their        the RTM, SRS,                                  WBT Rev. 1, RRAS Watts Bar 2 4.3.8, Traceable, states: A [requirements                                                                                reusable software              SysRS, and                                      NSSS Completion Program I&C specification] is traceable of the origin of each of its  At the September 15 public meeting in Rockville,                                               SysDS.                                          Projects Post Accident element development requirements is clear                                    the following actions were agreed to. These                                                                                                    Monitoring System- System items address the traceability concerns with the                process in the V&V            Due 12/31/10.                                  Requirements Specification,
: 1. How did TVA ensure the traceability of each            Software Requirements Specification.                            design phase summary                                                          dated December 2009.
requirement in the WBN2 PAMS SysRS.                                                                                      report. This evaluation
: 1. Westinghouse will perform completed a                              would include an
: 2. Explain the source(s) of the requirements present    review of the Requirements Traceability                            evaluation against the in the Post Accident Monitoring Systems Software    Matrix(RT), using the issues identified at the                    development process Requirements Specification. To clarify, many          9/15 public meeting as a guide (documented                        requirements. This documents have requirements that are                  below) and update the RTM as required.                            evaluation would also incorporated by reference into the SRS, but what                                                                        include an evaluation of served to direct the author to include those      2. The next issue of the IV&V report will include how the WBN2 specific various documents in the SRS or, if the              the Requirements phase review of the RTM requirement is based on the System                    and a partial review for the Design phase.                        requirements were Requirements Specification, what directed the                                                                            addressed by the author to include the requirement there?          3. Westinghouse will add a comments column in                        reusable software the Requirements Traceability Matrix (RTM)                        elements. (see
: 3. Clarify whether the unnumbered paragraphs in the      to address items not in the SRS or SysRS.                          ML102920031 Item No 5)
Post Accident Monitoring Systems Software Requirements Specification, such as in the section 4. IEEE 830 says you shouldnt have planning headings, or are all such sections simply            information in the SRS. Westinghouse has considered to be informative?                        agreed to remove this information.
Does the same apply to documents referenced by 5. IEEE 830 says you shouldnt have process the SRS? Such as WCAP-16096-NP-A, Rev. 1A,           requirements in the SRS. Westinghouse has Software Program Manual for Common Q                agreed to remove these requirements.
Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.                    6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance R2.3-2 [The PAMS software shall comply with          with Reg. Guide 1.172 and justify any the requirements and guidelines defined in WCAP-      deviations.
16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]                  7. 25 issues identified by V&V where some requirements have not been included in the If any requirements are expressed in such              SDS (14) and SRS (11) at the revisions unnumbered paragraph form instead of individually      reviewed by V&V. Have these been identified requirements, please list them, describe    addressed? Yes. The next revisions of the why they satisfy the fundamental requirement of        SDS and SRS address these issues.
unambiguity, and describe how they were verified.
: 8. Some hardware requirements are contained
: 4. Are there any sources of requirements in parallel      in the SRS instead of the System Design with the Post Accident Monitoring Systems            Specification (SDS). These will be removed


Due 12/21/10 N/A - No question was
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                    rad12E8A.docx                                                            Open Items to be Resolved for SER Approval SE    FSAR  NRC


asked. Item was opened to track commitment made by applicant.
===Response===
N/A  072 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Implementation Phase V&V Report" was September 30, 2010. Responder: WEC                      Date: 5/25/10
Acceptable                                                        RAI Resp.
: 7. N Open Awaiting for document to be docketed by TVA. Open-TVA/WEC
No.               POC                            Issue                                            TVA Response(s)                    Y/N       Status/ Current Actions Resolution Path RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                         Date Software Requirements Specification? Meaning            from the SRS and incorporated into the next does the SRS contain, explicitly or by reference,        revision of the SDS.
 
all the requirements that were used in the design phase for the application specific software, or do 9. RTM item R4.2-2 protection class software software design phase activities use requirements        set to 0. Needs to be fixed internally write found in any other source or document? If so,            CAPs to revise the application restrictions what are these sources or documents?                    document on AC160.
Due 12/21/10 N/A - No question was
: 5. References 12, 27, 29, and 31-44 in the Post        10. Westinghouse to improve the traceability of Accident Monitoring Systems Software                    the tests that are performed with the function Requirements Specification are various types of          enable (FE) switch in the ENABLE position.
 
Reusable Software Element.
asked. Item was opened to track commitment made by applicant.
: 11. Westinghouse to revise documents to be These references are used in the body of the            consistent with referring to the FE switch in SRS, for example:                                      the ENABLE position R5.3.14-2 [The Addressable Constants CRC error 12. The flow of information is from the SysRS to signal shall be TRUE when any CAL CRC's                  the SDS (hardware) and SRS (software).
N/A  073 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Integration Phase V&V Report" was October 29, 2010. Responder: WEC                    Date: 5/25/10
respective ERROR terminal = TRUE (WNA-DS-                Describe how the documents are used.
: 8. N Open Awaiting for document to be docketed by TVA. Open-TVA/WEC
00315-GEN, "Reusable Software Element                    Describe in 1.1 of the SysRS. Need a good Document CRC for Calibration Data" [Reference            write up of how the process works.
 
12]).]
Due 12/31/10 N/A - No question was
: 13. Westinghouse and TVA will develop a revised They are also included via tables such as found in      schedule for document submittals and requirement R7.1.2-1                                    provide it to the NRC no later than 9/30/10
 
[The Watts Bar 2 PAMS shall use the application- 14. TVA will update the Procurement Requisition specific type circuits and custom PC elements            Resolution Matrix and submit it to show how listed in Table 7.1-1.]                                  the Common Q PAMS design meets the contract requirements.
asked. Item was opened to track commitment made by applicant.
Do the referenced reusable software element documents include requirements not explicitly stated in 15. Westinghouse to add the Software Design the SRS? If so what is their origin?                        Descriptions to the RTM
N/A  074 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Final V&V Report" was November 30, 2010. Responder: WEC                  Date: 5/25/10
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 9. N Open TVA to provide due date. Open-TVA/WEC
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
 
: 18. Westinghouse to resolve the following questions concerning SDDs
Due  N/A - No question was
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
 
: b. What are the SDDs?
asked. Item was opened to track commitment made by applicant.
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
N/A  075 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was September 30, 2010. Responder: WEC                  Date: 5/25/10
For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the
: 10. N Open Awaiting for document to be docketed by TVA. Open-TVA/WEC
 
Due 11/24/20 N/A - No question was
 
asked. Item was opened to track commitment made by applicant.
N/A  081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:  Responder: Merten/WEC


The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and 11. N Open ML101600092 Item No.1:  There are three sets of regulatory criteria that relate to a Common Q application (e.g. WBN2 PAMS): Open-TVA/WEC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                            rad12E8A.docx                                                                        Open Items to be Resolved for SER Approval SE    FSAR    NRC


Due 12/31/10 TVA to provide requested information.
===Response===
EICB RAI ML102910002
Acceptable                                                                  RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                    Y/N            Status/ Current Actions    Resolution Path  RAI No. & Date                        Comments Sec. Sec.                                                                                                                                                                                                              Date SPM and qualified using the Software Elements Test procedure under Appendix B program.
Provide a summary of RSEDs generic WCAP.
Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable.
RSEDs are listed in the SDD References.
143                                The WBN2 PAMS Software Requirements                      Responder: WEC                                    17. N        Open                        Open-TVA/WEC      ML101650255,                WBN2 PAMS System EICB (Carte)
Specification (WBN2 PAMS SRS - ML101050202)                                                                                                                              Item No. 7                  Requirements Specification contains a table (see page iii) titled, Document        Addressed in the 9/15 public meeting and 9/20 -                                            To be addressed Traceability & Compliance, which states that the        9/21 audit. A detailed explanation will be                                                  by Revision of                                  TVA docketed WNA-DS-01617-WBN2 PAMS SRS was created to support the three            provided.                                                                                  the RTM, SRS,                                  WBT Rev. 1, RRAS Watts Bar 2 documents identified (one of which is the WBN2 PAMS                                                                                                  SysRS, and                                      NSSS Completion Program I&C SysRS). Section 1.1, Overview, of the WBN2 PAMS                                                                                                    SysDS.                                          Projects Post Accident SRS states: This document describes requirements                                                                                                                                                    Monitoring System- System for the major software components                                                                                                                  Due 12/31/10.                                  Requirements Specification, dated December 2009.
(a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
(c) What other documents contain the requirements for the other software components?
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
(d) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
145                                The WBN2 PAMS System Design Specification                Responder: WEC                                    18. N        Open                        Open-TVA/WEC      ML101650255,                WBN2 PAMS System Design EICB (Carte)
(WBN2 PAMS SDS) contains a table (see page iii)                                                                                                                          Item No. 9                  Specification titled, Document Traceability & Compliance, which      This item is used to track all traceability                    During the September 20-    To be addressed states that the WBN2 PAMS SDS was created to              issues with the System Design Specification                    21, 2010 audit at          by Revision of                                  TVA docketed WNA-DS-01667-support the WBN2 PAMS SysRS.                              (SDS).                                                          Westinghouse, it was        the RTM, SRS,                                  WBT Rev. 1, RRAS Watts Bar 2 acknowledged that          SysRS, and                                      NSSS Completion Program I&C (a) Does the WBN2 PAMS SDS implement all of the          At the September 15 public meeting in                                                      SysDS.                                          Projects Post Accident TVA/Westinghouse had hardware requirements in the WBN2 PAMS SysRS?            Rockville, the following actions were agreed                                                                                                Monitoring System- System to. These items partially address the                          previously (in September    Due 12/31/10.                                  Design Specification, dated (b) Please briefly describe all of the documents that    traceability concerns with the System Design                    15, 2010 public meeting)                                                    December 2009.
implement the hardware requirements of the WBN2          Specification. This item will be updated with                  stated:
PAMS SysRS.                                              the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM                        TVA would provide the audit.                                                         RSED RTM. (see


Item No. 9 TVA Letter dated 6/18/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                            rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE    FSAR    NRC


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984  endorses 323-1974) However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with resp ect to these differences. issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
===Response===
Bechtel to develop a matrix and work with Westinghouse to provide justification. (a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b). The Common Q SER states:
Acceptable                                                                      RAI Resp.
No.                 POC                                   Issue                                           TVA Response(s)                       Y/N           Status/ Current Actions     Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                 Date ML102920031 Item No 6)
: 1. Westinghouse will perform completed a review of the Requirements Traceability                        TVA would revise and Matrix(RT), using the issues identified at the                  resubmit the PAMS RTM 9/15 public meeting as a guide (documented to address all types of below) and update the RTM as required.
issues identified in the
: 2. Some hardware requirements are contained                        public meeting. (see in the SRS instead of the System Design                        ML102920031 Item No 7)
Specification (SDS). These will be removed from the SRS and incorporated into the next                    TVA would revise and revision of the SDS.                                            resubmit the Software Verification and Validation
: 3. 25 issues identified by V&V where some                          phase summary report for requirements have not been included in the                      the requirements phase SDS (14) and SRS (11) at the revisions to document the reviewed by V&V. Have these been addressed? Yes. The next revisions of the                      completion of the SDS and SRS address these issues.                              requirements phase review. (see
: 4. TVA will update the Procurement Requisition                    ML102920031 Item No 8)
Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software).
Describe how the documents are used.
Describe in 1.1 of the SysRS. Need a good write up of how the process works.
185                                7/15/2010                                              Responder: WEC                                      19. N        Open                          Open-TVA/WEC      EICB RAI EICB (Carte)
ML102980066 An emphasis is placed on the traceability of            Steve Clark to look at how to combine traceability                                              Due 10/22/10      Item No. 17 requirements in Software Requirements Specifications    items.
in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard    Was addressed to during the 9/15 meeting and listed in Regulatory Guide 1.172, which breaks with     9/20 - 9/21 audit.
typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.


'-Appendix 1, "Post Accident Monitoring Systems," provides the functional requirements and conceptual design approach for upgrading an existing PAMS based on Common Q components (page 58, Section 4.4.1.1, "Description")-On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, "PAMS Evaluation")-'
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                rad12E8A.docx                                                                              Open Items to be Resolved for SER Approval SE      FSAR    NRC


The NRC did not approve the proposed PAMS design. Section 6, "References," and Section 7, "Codes and Standards Applicable to the Common Q PAMS," of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
===Response===
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std. 603-1991 Clause 5.6.3, "Independence Between Safety Systems and Other Systems," and Clause 6.3, "Interaction Between the Sense and Command Features and Other
Acceptable                                                                       RAI Resp.
 
No.                   POC                                     Issue                                             TVA Response(s)                     Y/N           Status/ Current Actions       Resolution Path   RAI No. & Date                            Comments Sec. Sec.                                                                                                                                                                                                                     Date References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Systems," contain application specific requirements that must be addressed by a PAMS system.
These references are used in the body of the SRS, for example:
Awaiting TVA Response. 082 7.5.2 7.5.1 EICB (Carte) 5/6/2010  The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically: Responder: WEC                                Date: 6/18/10  These components can be found in the Summary Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP  Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Ro ckville Office.
TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No.
: 7. Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and references to the evaluation documentation. 12. N Open  Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA.
NNC 8/9/10: per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication Plans and Reports for Digital I&C. Westinghouse agree to present to the NRC in a public meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
 
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed. Open-TVA/WEC
 
Revision 1, Due 10/22/10 EICB RAI ML102910002 Item No. 10 TVA Letter dated 7/30/10 085 7.5.2 7.5.1 EICB (Carte) 5/6/2010  Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient
 
detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3. Responder: WEC Is the WEC ISG4 evaluation inadequate?
 
Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from propagating to the AC160? 
 
Node loss on the bus?  Bus loss? 
 
Revise the ISG4 section of the Licensing Technical Report (Rev. 2) to provide a more detailed description of the MTP as a barrier device. 13. N Open  A response will be provided by 10/31/10
 
NNC 8/11/10:  Design information should be available now. By letter dated July 30, 2010 (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux Server (see Enclosure 1, Item No. 14 part b.). It is presumed that this server is not safety-
 
related. IEEE 603-1991 Clause 5.6.3(1) states, "Isolation devices used to affect a safety system boundary shall be classified Open-TVA/WEC Due 11/24/10 Hardware is in Rev. 1 of the Licensing Technical Report due 10/22.
 
NNC 8/25/10:  Disagree with path forward input by TVA above. An explanation is about the design is needed.
FAT test procedure to EICB RAI ML102910002 Item No. 13
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments as part of the safety system."
Please describe how the MTP serves as the isolation device. include data storm testing of the MTP interface due 11/24/10 086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS.
This list contains references to old revisions of several regulatory documents, for example:  (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185) However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the
 
acceptability PAMS with resp ect to these differences. Responder: WEC                             Date: 5/24/10
 
The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review. Rev 0 of the Licensing Technical Report references Rev. 1 of ISG4 14. N Open  TVA to address with item OI 81. Open-TVA/WEC
 
Due 12/31/10 EICB RAI ML102910002
 
Item No. 14 TVA Letter dated 6/18/10 138  EICB (Carte) By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."  Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
 
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
(i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications."
 
(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications." Responder: WEC This item is used to track all Commercial Grade Dedication issues.
: 15. N Open  TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report.  (see ML102920031 Item No 1)
 
TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for
 
commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)
 
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report.  (see ML102920031 Item No 3)
Open-TVA/WEC To be addressed by Rev. 2 of the Licensing Technical Report due 12/3.
Due 12/3/10 ML101650255, Item No. 2
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA agreed to include (in the PAMS licensing technical report) an
 
evaluation of WBN2 critical characteristics for
 
commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 142  EICB (Carte) The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - Software Requirements Specifications
."  IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is traceable of the origin of each of its requirements is clear-"
: 1. How did TVA ensure t he traceability of each requirement in the WBN2 PAMS SysRS.
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Does the same apply to documents referenced by the SRS?  Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification. 
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
: 4. IEEE 830 says you sh ouldn't have planning information in the SRS. Westinghouse has agreed to remove this information.
: 5. IEEE 830 says you sh ouldn't have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
: 6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.
: 7. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the revisions reviewed by V&V. Have these been addressed?  Yes. The next revisions of the SDS and SRS address these issues.
: 8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed 16. N Open  TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element development
 
process in the V&V
 
design phase summary
 
report. This evaluation would include an evaluation against the development process
 
requirements. This
 
evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software
 
elements. (see ML102920031 Item No 5)Open-TVA/WEC To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
Due 12/31/10. ML101650255, Item No. 6  WBN2 PAMS System Requirements Specification
 
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Software Requirements Specification?  Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document?  If so, what are these sources or documents?
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of  
"-Reusable Software Element-".
These references are used in the body of the  
 
SRS, for example:"
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1  
They are also included via tables such as found in requirement R7.1.2-1
 
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?   If so what is their origin? from the SRS and incorporated into the next revision of the SDS.
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
: 9. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
187                                  By letter dated June 18, 2010, TVA docketed                Responder: Merten                                  20. N        Open                          Open-TVA/WEC      ML101970033, TVA Letter          Are these connections already EICB (Carte) responses to NRC requests for information.                                                                                                                                    Item No. 1 & 2 dated 10/5/10    docketed?
: 10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the "ENABLE" position.  
: 1) Please refer to the revised response to letter                    Partial Response provided      Revise Response
: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position
: 1) Enclosure 1, Item No. 33 of the TVA letter dated    dated 10/5/10 Item 18 (RAI Matrix item 115).                         in letter dated 10/5/10 June 18, 2010, did not identify any connection from the                                                                                                     Due 12/31 PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS        2) This is a duplicate of closed RAI Matrix Item                    NNC 8/25/10: Why did TVA System Requirements Specification (WNA-DS-01617- 45.                                                                         not catch this on the review WBT Rev. 1 - ML101680578) shows a TCP                                                                                        of the PAMS SysRS or connection from the OMs to the plant computer and                                                                            SRS? Does TVA check that printer. Please explain.                                                                                                     the CQ PAMS system meets the requirements in its
: 12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
: 2) Please clarify whether any digital safety-related                                                                        purchase specifications?
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10  
systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket.
: 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
202  7.5.2                          7/22/2010                                                  Responder: WEC                                      21. N        Open                           Open-TVA/WEC      EICB RAI        TVA Letter EICB (Carte)
: 15. Westinghouse to add the Software Design Descriptions to the RTM
ML102980066      dated 10/5/10 The letter (ML0003740165) which transmitted the            Revision 1 of the Licensing Technical Report will                Partial Response provided      Licensing          Item No. 4 Safety Evaluation for the Common Q topical report to      provide more detailed information on the changes                  in letter dated 10/5/10        Technical Report Westinghouse stated: "Should our criteria or              to the platform.                                                                                 R2 Due 12/3 regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear    Rev. 2 of the Licensing Technical Report will Power and/or the applicant referencing the topical        include the applicability of guidance.
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
: 17. Westinghouse to review the use of "shall" outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
(
: 18. Westinghouse to resolve the following questions concerning SDDs
212  7.5.2                          7/27/2010                                                  Responder: WEC                                      22. N        Open                          Open-TVA/WEC      EICB RAI C
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
a
: b. What are the SDDs?
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP.
Westinghouse to determine if the WCAP was docketed under the AP1000  RSED concept is not in the SPM. WCAP-15927  AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.
143  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, "Overview," of the WBN2 PAMS SRS states: "This document describes requirements for the major software components -"


(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                               rad12E8A.docx                                                                            Open Items to be Resolved for SER Approval SE    FSAR    NRC


(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
===Response===
 
Acceptable                                                                    RAI Resp.
(c) What other documents contain the requirements for the other software components?
No.                 POC                                   Issue                                             TVA Response(s)                       Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                           Comments Sec. Sec.                                                                                                                                                                                                                   Date ML102980066 By letter dated June 18, 2010 (ML101940236) TVA           Application specific requirements for testing. This                                             Due 12/31/10       Item No. 10 stated (Enclosure 1, Attachment 3, Item No. 3) that the   cannot be addressed in a topical report.
 
PAMS system design specification and software             Evaluation of how the hardware meets the requirements specification contain information to         regulatory requirements.
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this document is to define the hardware design requirements -"
address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these     WEC to provide the information and determine documents, and it is not clear how this is the case.     where the information will be located.
 
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS? 
(d) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS. Responder: WEC Addressed in the 9/15 public meeting and 9/20 -
9/21 audit. A detailed explanation will be provided. 17. N Open Open-TVA/WEC To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
Due 12/31/10
. ML101650255, Item No. 7  WBN2 PAMS System Requirements Specification
 
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification,"
dated December 2009.
145  EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
 
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS. Responder: WEC
 
This item is used to track all traceability issues with the System Design Specification (SDS). At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit. 18. N Open  During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
 
TVA would provide the RSED RTM. (see Open-TVA/WEC
 
To be addressed by Revision of
 
the RTM, SRS, SysRS, and SysDS.
Due 12/31/10. ML101650255, Item No. 9  WBN2 PAMS System Design Specification TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Design Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the revisions reviewed by V&V. Have these been addressed?  Yes. The next revisions of the SDS and SRS address these issues.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications. 
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
ML102920031 Item No 6)
TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the
 
public meeting. (see ML102920031 Item No 7)
 
TVA would revise and
 
resubmit the Software Verification and Validation phase summary report for the requirements phase
 
to document the completion of the
 
requirements phase review. (see ML102920031 Item No 8) 185  EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications  in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies"    Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements. Responder: WEC Steve Clark to look at ho w to combine traceability items. Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit. 19. N Open Open-TVA/WEC Due 10/22/10 EICB RAI ML102980066 Item No. 17
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-". 
 
These references are used in the body of the SRS, for example:"
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).] 
 
They are also included via tables such as found in requirement R7.1.2-1
 
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their origin?
187  EICB (Carte) By letter dated June 18, 2010, TVA docketed responses to NRC requests for information.
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.
: 2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket. Responder: Merten
: 1) Please refer to the revised response to letter dated 10/5/10 Item 18 (RAI Matrix item 115).
: 2) This is a duplicate of closed RAI Matrix Item
: 45. 20. N Open  Partial Response provided in letter dated 10/5/10
 
NNC 8/25/10: Why did TVA not catch this on the review of the PAMS SysRS or SRS?  Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications? Open-TVA/WEC Revise Response
 
Due 12/31 ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed? 202 7.5.2  EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to re vise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."  Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report. Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.
 
Rev. 2 of the Licensing Technical Report will include the applicab ility of guidance. 21. N Open  Partial Response provided in letter dated 10/5/10 Open-TVA/WEC Licensing Technical Report R2 Due 12/3
 
EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 212 7.5.2  (C a7/27/2010 Responder: WEC 22. N Open Open-TVA/WEC  EICB RAI Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.   (1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.  
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
Application specific requirements for testing. This cannot be addressed in a topical report.
245                                8/3/2010                                                  Responder: WEC                                       23. N        Open                        Open-TVA/WEC      EICB RAI                      LIC-101 Rev. 3 Appendix B EICB (Carte)
Evaluation of how the hardware meets the regulatory requirements. 
ML102980066                    Section 4, "Safety Evaluation" Section 5.8 of the Common Q SPM (ML050350234)         Relates to the commitment to provide the test                                                      Due 12/7/10        Item No. 119                  states: "the information relied identifies the required test documentation for systems plan and the SPM compliance matrix                                                                                                                  upon in the SE must be developed using the Common Q SPM. Please provide                                                                                                                                                           docketed correspondence."
 
sufficient information for the NRC staff to independently assess whether the test plan for WBN2                                                                                                                                                         LIC-101 Rev. 3 states: "The PAMS, is as described in the SPM (e.g., Section                                                                                                                                                             safety analysis that supports the 5.8.1).                                                                                                                                                                                                     change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
WEC to provide the information and determine where the information will be located.
250                                 8/8/2010                                                 Responder: WEC                                        24. N        Open                        Open-TVA/WEC                                      LIC-101 Rev. 3 Appendix B EICB (Carte)
Due 12/31/10
Section 4, "Safety Evaluation" The SPM describes the software and documents that         Westinghouse develops Software Release                                                          Due 10/22/10                                      states: "the information relied will be created and placed under configuration control. Reports/Records and a Configuration                                                                                                              upon in the SE must be The SCMP (e.g., SPM Section 6, Software                  Management Release Report. Describe the                                                                                                          docketed correspondence."
 
Configuration Management Plan) describes the             documents and when they will be produced.
ML102980066 Item No. 10 245  EICB (Carte) 8/3/2010  Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1). Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix 23. N Open Open-TVA/WEC Due 12/7/10 EICB RAI ML102980066 Item No. 119  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 250   EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g., SPM Section 6, "Software Configuration Management Plan") describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety. Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group. Responder: WEC
implementation tasks that are to be carried out. The      Summarize guidance on how to produce these                                                                                                        LIC-101 Rev. 3 states: "The acceptance criterion for software CM implementation is   records, focus on project specific requirements in                                                                                                safety analysis that supports the that the tasks in the SCMP have been carried out in       SPM etc.                                                                                                                                          change requested should include their entirety. Documentation should exist that shows                                                                                                                                                       technical information in sufficient that the configuration management tasks for that                                                                                                                                                           detail to enable the NRC staff to activity group have been successfully accomplished.                                                                                                                                                         make an independent Please provide information that shows that the CM                                                                                                                                                           assessment regarding the tasks have been successfully accomplished for each                                                                                                                                                         acceptability of the proposal in life cycle activity group.                                                                                                                                                                                 terms of regulatory requirements and the protection of public health and safety."
 
252                                8/8/2010                                                  Responder: WEC                                        25. N         Open                       Open-TVA/WEC                                     LIC-101 Rev. 3 Appendix B EICB (Carte)
Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc. 24. N Open Open-TVA/WEC
Section 4, "Safety Evaluation" The SPM contain requirements for software                Explain response to AP1000 audit report.                            Read ML091560352            RTM Revision due                                  states: "the information relied requirements traceability analysis and associated        RTM docketed NRC awaiting V&V evaluation of                                                    12/31                                            upon in the SE must be documentation (see Section 5.4.5.3, Requirements        RTM.                                                                                                                                              docketed correspondence."
 
Traceability Analysis). Please provide information that demonstrates that requirements traceability                                                                                                         Check on this                                     LIC-101 Rev. 3 states: "The analysis has been successfully accomplished.                                                                                                             Hilmes                                            safety analysis that supports the change requested should include technical information in sufficient
Due 10/22/10  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 252  EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, "Requirements Traceability Analysis"). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished. Responder: WEC
 
Explain response to AP1000 audit report. RTM docketed NRC awaiting V&V evaluation of RTM. 25. N Open Read ML091560352 Open-TVA/WEC 
 
RTM Revision due 12/31 
 
Check on this  
 
Hilmes  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments detail to enable the NRC staff to make an independent assessment regarding the
 
acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 268  EICB (Carte) 8/19/2010 By letter dated March 12, 2010 (ML101680577), TVA stated that the application specific hardware and software architecture descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).


Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture. Responder: WEC Andy to see what can be done. 26. N Open Open-TVA/WEC Due 12/31/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                    rad12E8A.docx                                                                            Open Items to be Resolved for SER Approval SE    FSAR    NRC


HILMES Check on This   301  EICB (Singh) 1.TVA is requested to address the consequences of software common cause failure including all potential resulting failures (i.e. total loss of CERPI, system fail as-is).  
===Response===
: 2. In addition, address how the actions stipulated in the plant Technical Specifications will be taken when the CERPI system indications are lost. Information notice IN 2010-10 (ML100080281) addresses the need to consider software failures and the actions required to assure that the plant will stay within its licensing basis.  
Acceptable                                                                    RAI Resp.
: 3. Provide FMEA in support of your response.  
No.                  POC                                      Issue                                                TVA Response(s)                        Y/N            Status/ Current Actions    Resolution Path    RAI No. & Date                          Comments Sec. Sec.                                                                                                                                                                                                                        Date detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
: 4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock C-11 to block automatic rod withdrawal when 1/1 Control Bank D rod position is above setpoint. This interlock capability would be lost in case of total loss of CERPI. How is the rod block assured for this event?  
268                                8/19/2010                                                    Responder: WEC                                        26. N        Open                        Open-TVA/WEC EICB (Carte)
: 5. How is automatic rod withdrawal affected in case of total loss of signals from the CERPI to the ICS? Is this interlock fail safe?  
By letter dated March 12, 2010 (ML101680577), TVA Andy to see what can be done.                                                                                Due 12/31/10 stated that the application specific hardware and software architecture descriptions are addressed in the                                                                                                        HILMES Check on WBN2 PAMS System Design Specification                                                                                                                          This (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).
Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE.
Please provide a non-proprietary figure of the architecture.
301                                1.TVA is requested to address the consequences of             Responder: WEC/Davies/Clark                            27. N        Open                        Open-TVA/WEC        RAI No. 11 software common cause failure including all potential                                                                                                                             ML102980005 resulting failures (i.e. total loss of CERPI, system fail     TVA Partial Response:                                                                            Due TBD            10/26/2010 as-is).
For all accidents analyzed in WBN Unit 2 FSAR,                                                  1) Please
: 2. In addition, address how the actions stipulated in the     Chapter 15, no credit is taken for the rod position                                                address how plant Technical Specifications will be taken when the         indication system. For all continuous rod                                                          fail-as-is is CERPI system indications are lost. Information notice         withdrawal accidents analyzed in WBN Unit 2                                                        detected i.e.
IN 2010-10 (ML100080281) addresses the need to               FSAR, Chapter 15, no credit is taken for any rod                                                    alarms, rod consider software failures and the actions required to       stop/block.                                                                                        position assure that the plant will stay within its licensing basis.                                                                                                      deviation (1) Technical Specification 3.1.8, Rod Position                                                    alarms, etc.
: 3. Provide FMEA in support of your response.                    Indication, does not have an action for total                                                2) Response loss of indication; therefore, a total loss of                                                  acceptable.
: 4. FSAR Table 7.7-1, Plant Control System Interlocks             CERPI puts the plant into LCO 3.0.3 which                                                    3) Response lists interlock C-11 to block automatic rod withdrawal           states:                                                                                        acceptable.
EICB (Singh) when 1/1 Control Bank D rod position is above                                                                                                                 4) a. Response setpoint. This interlock capability would be lost in case         When an LCO is not met and the associated                                                      acceptable.
of total loss of CERPI. How is the rod block assured             ACTIONS are not met, an associated                                                              b. Pl. address for this event?                                                   ACTION is not provided, or if directed by the                                                  failure mode associated ACTIONS the unit shall be placed                                                    on fail-as-is.
: 5. How is automatic rod withdrawal affected in case of           in a MODE or other specified condition in                                                      5) Response total loss of signals from the CERPI to the ICS? Is this         which the LCO is not applicable. Action shall                                                  acceptable.
interlock fail safe?                                             be initiated within 1 hour to place the unit, as                                                6) Response applicable, in:                                                                                acceptable.
6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of            MODE 3 within 7 hours; span (7.2 inches). The CERPI system accuracy                          MODE 4 within 13 hours; and specified in the CERPI System requirements                            MODE 5 within 37 hours.
Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 steps or 5.19%. The specified system accuracy                    Exceptions to this Specification are stated in seems to be greater than the accuracy assumed in the              the individual Specifications. Where FSAR Chapter 15. Please clarify this anomaly.                    corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.


6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of span (7.2 inches). The CERPI system accuracy specified in the CERPI System requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 steps or 5.19%. The specified system accuracy seems to be greater than the accuracy assumed in the FSAR Chapter 15. Please clarify this anomaly.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                           rad12E8A.docx                                                            Open Items to be Resolved for SER Approval SE    FSAR   NRC


Responder: WEC/Davies/Clark TVA Partial Response:
===Response===
For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for the rod position indication system. For all continuous rod withdrawal accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for any rod stop/block. 
Acceptable                                                        RAI Resp.
(1) Technical Specification 3.1.8, Rod Position Indication, does not have an action for total loss of indication; therefore, a total loss of CERPI puts the plant into LCO 3.0.3 which states:   When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour to place the unit, as applicable, in:
No.              POC                      Issue                        TVA Response(s)                    Y/N      Status/ Current Actions Resolution Path RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                Date (2) CERPI common mode software failure will be addressed in a future RAI response letter.
MODE 3 within 7 hours;  MODE 4 within 13 hours; and   MODE 5 within 37 hours.
(3) There is no FMEA for the CERPI system.
Exceptions to this Specification are stated in the individual Specifications. Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:
: 27. N Open  Open-TVA/WEC Due TBD  1) Please address how fail-as-is is detected i.e. alarms, rod position deviation alarms, etc. 2) Response acceptable. 3) Response acceptable. 4) a. Response acceptable.  
: a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
: b. Pl. address failure mode on fail-as-is. 5) Response acceptable. 6) Response acceptable. RAI No. 11 ML102980005 10/26/2010
: b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit.
The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal. Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:
The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments   
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                             rad12E8A.docx                                                                         Open Items to be Resolved for SER Approval SE     FSAR   NRC


  (2) CERPI common mode software failure will be addressed in a future RAI response letter. 
===Response===
(3) There is no FMEA for the CERPI system. 
Acceptable                                                                    RAI Resp.
(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods: 
No.                   POC                                     Issue                                         TVA Response(s)                     Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                         Comments Sec. Sec.                                                                                                                                                                                                             Date operable, the operator is required to take action as required by the Technical Specifications.
: a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8. 
: b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are "active low" requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal. Additionally, Annunciator window 64F will annunciate to show "C-11 BANK D AUTO WITHDRAWAL BLOCKED.
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power. 
(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read: 
"The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments operable, the operator is required to take action as required by the Technical Specifications."
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.
331 7.6.1 7.6.7 EICB (Singh) As a follow up of OI 190, Staff has reviewed the proprietary version of the DMIMS-DX system description to verify the conformance claims in the FSAR. Staff has noted the following insufficiencies and discrepancies between the FSAR and the proprietary version of the system description for loose parts monitoring system provided by TVA.  
331   7.6.1   7.6.7                 As a follow up of OI 190, Staff has reviewed the         Responder: WEC/Harless/Clark                      28. N        Open                        Open-TVA/WEC      RAI No. 8                    Follow-up of OI-190.
: 1) FSAR, Amendment 100, page 7.6-5 states, "During baseline testing, the reactor vessel and steam generator are impacted three feet from each sensor with a force of 0.5 ft-lb. Loose parts detection is accomplished at a frequency of 1 kHz to 20 kHz, where background signals from the RCS are acceptable. Spurious alarming from control rod stepping is prevented by a module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.
proprietary version of the DMIMS-DX system                                                                                                                             ML102980005 description to verify the conformance claims in the       TVA Partial Response:                                                                      Pending FSAR      10/26/2010 FSAR. Staff has noted the following insufficiencies                                                                                                 Amendment 102 and discrepancies between the FSAR and the               1) The source of the information is the DMIMS-                                            submittal proprietary version of the system description for loose     DXTM Operations and Maintenance Manual, parts monitoring system provided by TVA.                    TS3176, Revision 0, dated August 2010.
The online sensitivity of the DMIMS-DX&#x17d; is such that the system will detect a loose part that weighs from 0.25 to 30 Ib and impacts with a kinetic  
Attachment 14 contains the revised system
: 1) FSAR, Amendment 100, page 7.6-5 states,                   description, Westinghouse DIMMS-DXTM During baseline testing, the reactor vessel and         Loose Part Detection System Description, steam generator are impacted three feet from             Revision 1.
each sensor with a force of 0.5 ft-lb. Loose parts detection is accomplished at a frequency of 1 kHz 2) The source of the information is the DMIMS-to 20 kHz, where background signals from the             DXTM seismic qualification report, RCS are acceptable. Spurious alarming from               Westinghouse report EQ-QR-33-WBT, control rod stepping is prevented by a module that       Revision 0, Seismic Evaluation of the Digital detects CRDM motion commands and                         Metal Impact Monitoring System (DMIMS-automatically inhibits alarms during control rod         DXTM) for Watts Bar Unit 2. Attachment 14 stepping.                                               contains the revised system description, Westinghouse DIMMS-DXTM Loose Part The online sensitivity of the DMIMS-DX' is such         Detection System Description, Revision 1.
that the system will detect a loose part that weighs from 0.25 to 30 Ib and impacts with a kinetic         3) The entries for the following items in FSAR energy of 0.5 ft-lb on the inside surface of the RCS    Section 7.6.7 will be modified in Amendment pressure boundary within 3 ft of a sensor.              102 as shown in Attachment 3 for draft revision to WBN Unit 2 FSAR Section 7.6.7, The source of this information is not cited nor is it    Loose Part Monitoring System (LPMS) described in the system description. TVA to              System Description.
provide the source of the information and update the system description as needed.                        Sensors (In Containment)
Softline Cable (In Containment)
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory            Preamplifier (In Containment) position C.1.g states that, Operability for Seismic and Environmental Conditions. Components of the          Attachment 3 contains the FSAR Amendment loose-part detection system within containment          102 Change Markups that reflect these should be designed and installed to perform their        changes.
function following all seismic events that do not require plant shutdown, i.e., up to and including    4) The source of the information is the Operating Basis Earthquake (OBE). Recording          Westinghouse Letter WBT-D-2580, equipment need not function without maintenance          Tennessee Valley Authority Watts Bar following the specified seismic event provided the      Nuclear Plant Unit 2 Response to NRC RAIs audio or visual alarm capability remains functional. on LPMS (Reference 5). Attachment 14 The system should also be shown to be adequate          contains Westinghouse DIMMS-DXTM by analysis, test, or combined analysis and test for    Loose Part Detection System Description, the normal operating radiation, vibration,              Revision 1.
temperature, and humidity environment.
EICB (Singh)
In responding to Item 4, conflicting FSAR, Amendment 100, page 7.6-5 states, The            information was found between the DMIMS-DX' audio and visual alarm capability will        Westinghouse-prepared FSAR section and remain functional after an Operating Basis              various Westinghouse technical documents.
Earthquake (OBE). All of the DMIMS-DX'                  To fully respond to this item, a change to the


energy of 0.5 ft-lb on the inside surface of the RCS pressure boundary within 3 ft of a sensor."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                             rad12E8A.docx                                                             Open Items to be Resolved for SER Approval SE   FSAR   NRC
The source of this information is not cited nor is it described in the system description. TVA to provide the source of the information and update the system description as needed.
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g states that, "Operability for Seismic and Environmental Conditions. Components of the loose-part detection system within containment should be designed and installed to perform their function following all seismic events that do not require plant shutdown, i.e., up to and including the Operating Basis Earthquake (OBE). Recording equipment need not function without maintenance following the specified seismic event provided the audio or visual alarm capability remains functional. The system should also be shown to be adequate by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity environment.
FSAR, Amendment 100, page 7.6-5 states, "The DMIMS-DX&#x17d; audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX&#x17d; Responder: WEC/Harless/Clark TVA Partial Response: 
: 1) The source of the information is the DMIMS-DXTM Operations and Maintenance Manual, TS3176, Revision 0, dated August 2010. Attachment 14 contains the revised system description, "Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1. 
: 2) The source of the information is the DMIMS-DXTM seismic qualification report, Westinghouse report EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2. Attachment 14 contains the revised system description, "Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1. 
: 3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in Attachment 3 for draft revision to WBN Unit 2 FSAR Section 7.6.7, "Loose Part Monitoring System (LPMS) System Description."
Sensors (In Containment)  Softline Cable (In Containment)
Preamplifier (In Containment)
Attachment 3 contains the FSAR Amendment 102 Change Markups that reflect these changes. 
: 4) The source of the information is Westinghouse Letter WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS (Reference 5). Attachment 14 contains "Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1.
In responding to Item 4, conflicting information was found between the Westinghouse-prepared FSAR section and various Westinghouse technical documents. To fully respond to this item, a change to the 28. N Open Open-TVA/WEC Pending FSAR Amendment 102 submittal RAI No. 8 ML102980005 10/26/2010  Follow-up of OI-190.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impa ct any safety-related equipment."  Paragraphs 4.c and 4.d of the system description are not consistent with the seismic qualifications described in the FSAR. TVA to provide the source of the information contained in the FSAR and update the system description as needed. 3) The system description clearly describes the "In-containment equipment" and "DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for clarification purposes.
: 4) The information regarding frequency ranges of the sensors is included on page 7.6-6 of Amendment 100 of the FSAR but the system description does not contain this information. Please provide the source of this information and update the system description to reflect the appropriate information.
: 5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG


1.133. FSAR is required to change the minimum flat sensor frequency response from 5 Hz to 10 Hz. Attachment 3 contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the sensor.  
===Response===
: 5) In-containment component qualification for vibration as addressed in regulatory position C.1.g of RG 1.133, will be addressed in a future RAI response letter.}}
Acceptable                                                        RAI Resp.
No.              POC                            Issue                                      TVA Response(s)                  Y/N      Status/ Current Actions Resolution Path RAI No. & Date                      Comments Sec. Sec.                                                                                                                                                                                   Date components are qualified for structural integrity    FSAR is required to change the minimum flat during a Safe Shutdown Earthquake (SSE) and          sensor frequency response from 5 Hz to 10 will not mechanically impact any safety-related      Hz. Attachment 3 contains the FSAR equipment. Paragraphs 4.c and 4.d of the system      Amendment 102 Change Markups that reflect description are not consistent with the seismic      the revised frequency response of the sensor.
qualifications described in the FSAR. TVA to provide the source of the information contained in 5) In-containment component qualification for the FSAR and update the system description as        vibration as addressed in regulatory position needed.                                              C.1.g of RG 1.133, will be addressed in a future RAI response letter.
: 3) The system description clearly describes the In-containment equipment and DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for clarification purposes.
: 4) The information regarding frequency ranges of the sensors is included on page 7.6-6 of Amendment 100 of the FSAR but the system description does not contain this information. Please provide the source of this information and update the system description to reflect the appropriate information.
: 5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG 1.133.}}

Latest revision as of 12:44, 11 March 2020

OL - FW: Update NRC RAI Matrix
ML103090745
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/02/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML103090745 (53)


Text

WBN2Public Resource From: Poole, Justin Sent: Tuesday, November 02, 2010 5:08 PM To: Garg, Hukam; Carte, Norbert; Darbali, Samir; Singh, Gursharan; Marcus, Barry Cc: WBN2HearingFile Resource

Subject:

FW: Update NRC RAI Matrix Attachments: 20101028 Open Item List and Count TVA Update 11-2 R1.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Clark, Mark Steven [1]

Sent: Tuesday, November 02, 2010 5:06 PM To: Crouch, William D; Hilmes, Steven A Cc: Poole, Justin

Subject:

Update NRC RAI Matrix Bill:

Attached is the updated matrix for distribution to the NRC.

Regards, Steve Steve Clark Bechtel Power Corp.

Control Systems Watts Bar 2 Completion Project Phone: 865.632.6547 Fax: 865.632.2524 e-mail: msclark0@tva.gov 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 146 Mail Envelope Properties (19D990B45D535548840D1118C451C74D6FD376F71C)

Subject:

FW: Update NRC RAI Matrix Sent Date: 11/2/2010 5:08:12 PM Received Date: 11/2/2010 5:08:22 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Garg, Hukam" <Hukam.Garg@nrc.gov>

Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>

Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>

Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>

Tracking Status: None "Marcus, Barry" <Barry.Marcus@nrc.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 667 11/2/2010 5:08:22 PM 20101028 Open Item List and Count TVA Update 11-2 R1.docx 345273 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 001 All All B ( The Watts Bar Nuclear Plant FSAR red-line for Unit 2 12/15/2009 Presentation Slides 1. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR (Agency wide Documents Access and Management ML093230343 contains mostly description of 002 All All B ( Are there I&C components and systems that have 12/15/2009 Presentation Slides 2. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR changed to a new or different digital technology ML093230343 contains mostly description of 003 All All B ( Because a digital I&C platform can be configured and 12/15/2009 Presentation Slides 3. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR programmed for different applications the review ML093230343 contains mostly description of 004 All All B ( Please identify the information that will be submitted Responder: Webb 1/13/10 Public Meeting 4. Y Closed Closed EICB RAI January 13, NNC 11/19/09: LIC-110 Rev. 1 for each unreviewed digital I&C system and ML093230343 2010 Section 6 2 2 states: "Design 005 7.1.3. (

G By letter date February 28, 2008 (Agencywide Responder: Craig/Webb 5. Y Closed Closed EICB RAI TVA Letter 1 Documents Access and Management System ML093431118 dated 2/5/10 006 (

G Amendment 95 of the FSAR, Chapter 7.3, shows that By letter dated February 5, 2010: TVA provided 6. Y Closed Closed EICB RAI TVA Letter NNC: WCAP-12096 Rev. 7 change 7 3-1 consists of updating a reference from the Unit 2 setpoint methodology (WCAP-177044- ML093431118 dated 2/5/10 (ML073460281) is in ADAMS 007 7.1.3. (

G The setpoint methodology has been reviewed and TVA Letter Dated March 12, 2010 (Enclosure 1, 7. Y Closed Closed EICB RAI TVA Letter TVA to provide Rev. 8 of the Unit 1 approved by the NRC staff in Section 7 1 3 1 of Item No 7 on Page 7 of 15): TVA responded to This item is reviewed in ML093431118 dated 3/12/10 1 document (which is the current 008 7.3 (

G There are several staff positions that provide guidance TVA Letter Dated March 12, 2010 (Enclosure 1, 8. Y Closed Closed EICB RAI TVA Letter on setpoint methodology (e g Reg Guide 1 105 BTP Item No 8 on Page 7 of 15): TVA responded to ML093431118 dated 3/12/10 009 7.3.2 5.6, (

D a Change 7.3-2, identified in Watts Bar Nuclear Plant TVA Letter Dated March 12, 2010 (Enclosure 1, 9. Y Closed Closed EICB RAI 3/12/10, 635 FSAR red-line for Unit 2 (ADAMS Accession Number Item No 9 on Page 8 of 15): TVA responded to ML093431118 ML101680598 010 7.3 7.3 (

D a The original SER on Watts Bar (NUREG-0847) TVA Letter Dated March 12, 2010 (Enclosure 1, 10. Closed Closed EICB RAI 3/12/10, documents that the scope of the review of FSAR Item No 10 on Page 8 of 15): TVA responded to ML093431118 ML101680598 011 7.3.2 5.6, (

D a NUREG-0847 Supplement No. 2 Section 7.3.2 TVA Letter Dated March 12, 2010 (Enclosure 1, 11. Closed Closed EICB RAI ML101680598, 635 includes an evaluation of a change in containment Item No 11 on Page 13 of 15): TVA responded ML093431118 Item 9 012 7.4 7.4 (

D a The original SER on Watts Bar (NUREG-0847) TVA Letter Dated March 12, 2010 (Enclosure 1, 12. Closed Closed EICB RAI TVA Letter documents that the scope of the review of FSAR Item No 12 on Page 13 of 15): TVA responded ML093431118 dated 3/12/10 013 7.1.3. (

G Chapter 7 and Chapter 16 of Amendment 95 to the TVA Letter Dated March 12, 2010 (Enclosure 1, 13. Closed Closed EICB RAI TVA Letter TS have been docketed.

1 FSAR do not include any setpoint values Please Item No 13 on Page 14 of 15): TVA responded ML093431118 dated 3/12/10 014 All All B ( Provide the justification for any hardware and software Date: 4/27/10 14. Closed Closed NRC Meeting TVA Letter changes that have been made since the previous U S Responder: TVA Summary dated 4/27/10 015 (

G Verify that the refurbishment of the power range Date: 4/27/10 15. Closed Closed NRC Meeting TVA Letter nuclear instrumentation drawers resulted in only like- Responder: TVA Summary dated 4/27/10 016 B C

a( Identify the precedents in license amendment requests Date: 4/27/10 16. Closed Closed NRC Meeting TVA Letter (LARs) if any for source range monitors or Responder: TVA Summary dated 4/27/10 017 7.3.1 7.3.1, (

D a Identify precedents in LARs, if any, for the solid state Date: 4/27/10 17. Closed Closed NRC Meeting TVA Letter 555 protection system Also identify any hardware Summary dated 4/27/10 018 (

G Identify any changes made to any instrumentation and Date: 4/27/10 18. Closed Closed NRC Meeting TVA Letter control (I&C) system based on prior knowledge of Responder: TVA Summary dated 4/27/10 019 (

G Verify that the containment purge isolation radiation Date: 4/27/10 19. Closed Closed NRC Meeting TVA Letter monitor is the same as used in Watts Bar Unit 1 or Summary dated 4/27/10 020 (

G Provide environmental qualification information Date: 4/27/10 20. Closed Closed NRC Meeting TVA Letter NNC 4/30/10: SRP Section 7.0 pursuant to Section 50 49 of Title 10 of the Code of Responder: TVA Summary dated 4/27/10 states: "The organization 021 7.3 (

G For the Foxboro Spec 200 platform, identify any Date: 5/25/10 21. Closed Closed NRC Meeting TVA Letter The resolution of this item will be changes in hardware from the precedent systems The resolution of this item Summary dated 6/18/10 covered by OI#288 022 7.3.2 5.6, (

D a Verify the auxiliary feedwater control refurbishment Date: 4/27/10 22. Closed Closed NRC Meeting TVA Letter 635 results in a like-for-like replacement and identify any Summary dated 4/27/10 023 (

G Provide environmental qualification (10 CFR 50.49) Date: 4/27/10 23. Closed Closed NRC Meeting TVA Letter NNC 4/30/10: SRP Section 7.0 information for safety-related control transmitters and Responder: TVA Summary dated 4/27/10 states: "The organization 024 (

C Provide a schedule by the January 13, 2010, meeting During the January 13, 2010 meeting, TVA 24. Closed Closed NRC Meeting N/A - Request NNC 4/30/10: Carte to address for providing information in accordance with I&C presented a schedule for completing various Summary for schedule response with respect to PAMS 025 7.5.2 7.5.1 (

Si For the containment radiation high radiation monitor, Date: 4/27/10 25. Closed Closed NRC Meeting ML101230248, verify that the information provided by TVA is Summary Item 12 026 (

G Provide environmental qualification (10 CFR 50.49) Date: 4/27/10 26. Closed Closed NRC Meeting TVA Letter NNC 4/30/10: SRP Section 7.0 information for safety-related monitoring transmitters Responder: TVA Summary dated 4/27/10 states: "The organization 027 7.7.1. (

C For Foxboro I/A provide information regarding Date: 4/27/10 27. Closed Closed NRC Meeting TVA Letter 4 safety/non-safety-related interaction common cause Responder: TVA Summary dated 4/27/10 028 (

G For the turbine control AEH system, verify that the Responder: Mark Scansen 28. Closed Closed NRC Meeting TVA Letter refurbishment results in a like-for-like replacement Date: 4/27/10 Summary dated 10/5/10 029 (

C For the rod control system, verify that the Date: 4/27/10 29. Closed Closed NRC Meeting TVA Letter refurbishment results in a like-for-like replacement Responder: TVA Summary dated 4/27/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 030 (

G Regarding the refurbishment of I&C equipment, Responder: Clark 30. Closed Closed NRC Meeting TVA Letter identify any component digital upgrades and if so Summary dated 10/5/10 031 (

C For the rod position indication system (CERPI), Date: 4/27/10 31. Closed Closed NRC Meeting TVA Letter CERPI is non-safety related.

provide information in accordance with ISG 4 Need to Responder: TVA Summary dated 4/27/10 Note: The issue of interlock with 032 (

C For the process computer, need to consider cyber Date: 4/27/10 32. Closed Closed NRC Meeting TVA Letter EICB will no longer consider security issues and emergency response data system Responder: TVA Summary dated 4/27/10 cyber issues 033 (

C For the loose parts monitoring system, provide Date: 4/27/10 33. Closed Closed NRC Meeting TVA Letter The loose parts monitoring information regarding interactions with safety related Responder: TVA Summary dated 4/27/10 system is not connected to any 034 (

G 2/4/2010 Responder: TVA 34. Closed Closed N/A TVA Letter Awaiting NRC evaluation of dated 4/27/10 034. a r

g Chapter 7.1 - Introduction 35. Close Closed N/A N/A 1 Reactor Coolant System Flow Rate Measurement 034. (

G Chapter 7.2 - Reactor Trip System 36. Close Closed N/A N/A 2 Deletion of Neutron Flux Negative Rate Trip 034. 7.3 7.3 (

D a Chapter 7.3 - ESFAS 37. Closed Closed N/A N/A 3 Design Basis Analysis Parameters 034. 7.5.1. 7.5.2 (

M a Chapter 7.5 - Instrumentation Systems Important to 38. Closed Closed N/A N/A Closed 4 1 Safety 034. 7.5.1. 7.5.2 r c

u Chapter 7.6 - All Other Systems Required for Safety 39. Closed Closed N/A N/A Closed 5 1 767 Plant Process Computer Replacement 034. n g

h Chapter 7.7 Control Systems 40. Closed Closed N/A N/A 6 Alternate Means for Monitoring Control or 035 (

Si 2/18/2010 Responder: Clark 41. Closed Closed RAI No. 1 TVA Letter LIC-110 Section 6.2.2 states:

ML102980005 dated 3/12/10 Design features and 036 7.5.2 7.5.1 (

C February 18, 2010 Date: 5/25/10 42. Closed Closed NRC Meeting NNC: Unit 2 FSAR Section Responder: Clark Summary 7 5 1 Post Accident Monitoring 037 7.5.1. 7.5.2 (

M a 2/18/2010 Responder: Clark Date: 5/25/10 43. Closed Closed N/A TVA Letter FSAR Amendment 100 provides 1 09/16/10 dated 10/5/10 information 038 7.5.1. 7.5.2 (

M a 2/18/2010 Responder: Clark Date: 5/25/10 44. Closed Closed EICB RAI TVA Letter The slides presented at the 1 ML102861885 dated 10/5/10 December 15 2010 meeting 039 (

G January 13, 2010 Responder: Clark Date: 45. Closed Closed EICB RAI FSAR The equation for the calculation 5/25/10 ML102910008 amendment 98 of the estimated average hot leg 040 (

G January 13, 2010 Responder: Clark Date: 46. Closed Closed EICB RAI EICB FSAR The equation for the calculation 5/25/10 RAI amendment 98 of the power fraction on page 042 All All B ( February 25, 2010: Telecom Date: 5/25/10 47. Closed Closed EICB RAI TVA Letter The drawing provided did not Responder: Clark ML102910002 dated 6/18/10 have the identification numbers 044 7.5.2 7.5.1 (

C February 25, 2010 Date: 5/25/10 48. Closed Closed EICB RAI TVA Letter Responder: Clark ML102910002 dated 6/18/10 045 (

C February 25, 2010 Date: 5/25/10 49. Closed Closed EICB RAI TVA Letter Responder: Clark ML102910002 dated 7/30/10 046 (

C February 25, 2010 Date: 5/25/10 50. Closed Closed N/A - Request N/A Responder: Clark for help finding 047 7.5.2 7.5.1 (

C 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 51. Closed Closed EICB RAI TVA Letter ML102910002 dated 7/30/10 048 7.5.2 7.5.1 (

C April 8, 2010 Date: 5/25/10 52. Closed Closed EICB RAI TVA Letter Responder: WEC ML102910002 dated 6/18/10 049 7.5.2 7.5.1 (

C 4/8/2010 Responder: WEC Date: 5/25/10 53. Closed Closed EICB RAI TVA Letter ML102910002 dated 6/18/10 051 (

G April 15, 2010 Date: 5/25/10 54. Closed Closed N/A N/A Review addressed by another Responder: Craig/Webb Open Item 052 7.5.2 7.5.1 (

Si April 19, 2010 Date: 5/25/10 55. Closed Closed RAI No. 12 Responder: Slifer ML102980005 053 7.5.2 7.5.1 (

Si April 19, 2010 Date: 5/25/10 56. Closed Closed RAI No. 13 Responder: Slifer ML102980005 056 (

Si April 19, 2010 Date: 5/25/10 57. Closed Closed RAI No. 16 TVA Letter Sorrento Radiation Monitoring Responder: Slifer ML102980005 dated 6/18/10 057 7.5.2 7.5.1 (

Si 4/19/2010 Responder: TVA I&C Staff Date: 58. Closed Closed RAI No. 17 TVA Letter 5/25/10 ML102980005 dated 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 058 7.5.0 7.5 (

Si April 19, 2010 Date: 5/25/10 59. Closed Closed RAI No. 18 TVA Letter Responder: Slifer ML102980005 dated 6/18/10 059 7.5.2 7.5.1 (

Si April 19, 2010 Date: 60. Closed Closed RAI No. 19 TVA Letter Responder: Slifer ML102980005 dated 6/18/10 060 7.5.2 7.5.1 (

C April 19, 2010 Date: 5/25/10 61. Closed Closed N/A N/A Addressed by Open Item No. 47 Responder: Clark 061 7.5.2 7.5.1 (

C April 19, 2010 Date: 5/25/10 62. Closed Closed N/A N/A Addressed by Open Item No. 48 Responder: Clark 062 7.5.2 7.5.1 (

C April 19, 2010 Date: 5/25/10 63. Closed Closed N/A N/A Addressed by Open Item No. 49 Responder: Clark 063 7.5.2 7.5.1 (

C April 19, 2010 Date: 5/25/10 64. Closed Closed N/A N/A Addressed by Open Item No. 50 Responder: Clark 064 7.5.2 7.5.1 (

C By letter dated March 12, 2010 TVA stated that the Responder: Webb Date: 4/8/2010 65. Closed Closed N/A - No TVA Letter target submittal date for the D3 Analysis was April 2 question was dated 10/5/10 066 7.5.2 7.5.1 (

C By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 66. Closed Closed N/A - No TVA Letter target submittal date for the "Watts Bar 2 PAMS question was dated 6/18/10 076 7.5.2 7.5.1 (

C By letter dated March 12, 2010 TVA stated that the Responder: Clark Date: 5/25/10 67. Closed Closed N/A - No N/A target submittal date for the "Watts Bar 2 PAMS question was 077 7.5.2 7.5.1 (

C By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 68. Closed Closed N/A - No TVA Letter target submittal date for seven other documents was question was dated 6/18/10 078 (

G 4/26/2010 Responder: Clark Date: 5/25/10 69. Closed Closed EICB RAI TVA Letter ML102910008 dated 10/5/10 079 (

G 4/26/2010 Responder: Clark Date: 5/25/10 70. Closed Closed EICB RAI TVA Letter Reviewed under Item 154 ML102910008 dated 10/5/10 080 (

Si 4/26/2010 Responder: WEC 71. Closed Closed RAI No. 2 TVA Letter ML102980005 dated 7/30/10 083 7.5.2 7.5.1 (

C May 6, 2010 Date: 6/18/10 72. Closed Closed EICB RAI TVA Letter Responder: WEC ML102910002 dated 7/30/10 084 7.5.2 7.5.1 B C

a( May 6, 2010 Date: 6/18/10 73. Closed Closed EICB RAI TVA Letter Responder: Clark ML102910002 dated 6/18/10 087 7.5.2 7.5.1 (

Si May 6, 2010 Date: 5/24/10 74. Closed Closed RAI No. 20 TVA Letter Responder: Slifer ML102980005 dated 6/18/10 088 7.5.2 7.5.1 B S

in( May 6, 2010 Date: 5/24/10 75. Closed Closed RAI No. 21 TVA Letter Responder: Slifer ML102980005 dated 6/18/10 089 (

C 5/6/2010 Responder: Clark 76. Closed Closed EICB RAI TVA Letter NNC: Docketed response states ML102910002 dated 3/12/10 that the applicable FSAR 090 (

C 5/6/2010 Responder: Clark Date: 5/25/10 77. Closed Closed EICB RAI TVA Letter ML102910002 dated 3/12/10 091 7.4 7.4 (

D a May 20, 2010 Date: 5/25/10 78. Closed Closed EICB RAI No.1 TVA Letter Responder: Clark ML102910017 dated 6/18/10 093 (

G May 20, 2010 Date: 5/25/10 79. Closed Closed N/A N/A Will be reviewed under item 154 Responder: Knuettel 094 (

G 5/20/2010 Responder: Clark Date: 5/25/10 80. Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, XX (

D a May 20, 2010 Date: 81. Closed Closed EICB RAI No. 2 TVA Letter 784 Responder: ML102910017 dated 7/30/10 096 7.7.5 XX (

D a 5/20/2010 Responder: 82. Closed Closed EICB RAI No.3 TVA Letter ML102910017 dated 7/30/10 097 7.4.2 7.4 (

D a May 20, 2010 Date: 83. Closed Closed EICB RAI No.4 TVA Letter Responder: ML102910017 dated 7/30/10 098 7.4.2 7.4 (

D a May 25, 2010 Date: 84. Closed Closed EICB RAI No.5 TVA Letter Responder: ML102910017 dated 7/30/10 099 L B( April 12, 2010 Date: 85. Closed Closed Closed to Item 129 Responder: WEC 100 (

C 5/20/2010 Responder: WEC 86. Closed Closed N/A - No N/A question was 102 (

C May 24, 2010 Date: 5/24/10 87. Closed Closed N/A TVA Letter Request for schedule not Responder: WEC dated 6/18/10 information 105 (

G April 29, 2010 Date: 88. Closed Closed N/A N/A Will be reviewed under item 154.

Responder: Langley

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 106 B S

in( May 6, 2010 Date: 5/25/10 89. Closed Closed RAI No. 9 TVA Letter Responder: Davies ML102980005 dated 6/18/10 107 B S

in( May 6, 2010 Date: 5/28/10 90. Closed Closed RAI No. 22 TVA Letter Responder: Clark ML102980005 dated 6/18/10 108 (

G May 6, 2010 Date: 5/25/10 91. Closed Closed N/A N/A Will be reviewed under OI#154 Responder: Webb/Hilmes 109. (

C 5/6/2010 Responder: N/A 92. Closed Closed N/A N/A Duplicate of another open Item.

b 109. 7.8 XX (

D a 5/6/2010 Responder: N/A 93. Closed Closed N/A N/A a

110 (

G May 6, 2010 Date: 94. Closed Closed N/A N/A Information was found.

Responder: Clark 111 B C

a( May 6, 2010 Date: 5/28/10 95. Closed Closed N/A TVA Letter Request to help find, not a Responder: Clark dated 6/18/10 request for information 112 B G

a( June 1, 2010 Date: 96. Closed Closed N/A N/A Information was received Responder: Clark 113 (

G 6/1/2010 Responder: Clark 97. Closed Closed EICB RAI TVA Letter ML102910008 dated 6/18/10 115 (

C 2/25/2010 Responder: Clark 98. Closed Closed EICB RAI TVA Letter ML102910002 dated 6/18/10 116 (

G 6/3/2010 Responder: WEC 99. Closed Closed EICB RAI TVA Letter Letter sent to Westinghouse ML102910008 dated 10/5/10 requesting the basis information 119 (

Si June 10, 2010 Date: 100. Closed Closed RAI No. 23 TVA Letter Responder: ML102980005 dated 7/30/10 120 (

C 5/6/2010 Responder: Hilmes/Merten/Costley 101. Closed Closed EICB RAI TVA Letter ML102910002 dated 7/30/10 121 (

C 5/6/2010 Responder: Webb/Webber 102. Closed Closed EICB RAI TVA Letter ML102980066 dated 7/30/10 122 (

C June 14, 2010 Date: 103. Closed Closed N/A - Request N/A Responder: WEC for schedule not 123 7.7.3 7.4.1, (

D a 6/14/2010 Responder: 104. Closed Closed ML101720589, TVA Letter 934 RAIs 21 and 22 dated 7/30/10 124 7.7.5 XX (

D a 6/14/2010 Responder: 105. Closed Closed ML101720589, TVA Letter Item No 23 dated 7/30/10 125 7.7.8 7.7.1. (

D a 6/14/2010 Responder: 106. Closed Closed ML101720589, TVA Letter 12 Item No s 24 dated 7/30/10 126 7.8 7.8 (

D a June 14, 2010 Date: 107. Closed Closed ML101720589, TVA Letter Responder: Item No 26 dated 7/30/10 127 7.2 7.2 (

G 6/16/2010 Responder: WEC/Clark 108. Closed Closed EICB RAI TVA Letter ML102910008 dated 6/18/10 128 7.2 7.2 (

G 6/18/2010 Responder: WEC Drake /TVA Craig 109. Closed Closed EICB RAI Track through SE open item ML102910008 129 (

P o 6/12/2010 Responder: WEC 110. Closed Closed N/A TVA Letter dated 10/5/10 130 (

P o 6/28/2010 Responder: Clark 111. Closed Closed N/A TVA Letter dated 10/5/10 131 (

P o 6/28/2010 Responder: Clark 112. Closed Closed N/A TVA Letter dated 10/5/10 132 (

P o 6/28/2010 Responder: Clark 113. Closed Closed N/A TVA Letter dated 10/5/10 133 (

P o 6/28/2010 Responder: Clark 114. Closed Closed TVA Letter dated 10/5/10 134 (

P o 6/28/2010 Responder: Clark 115. Closed Closed TVA Letter dated 10/5/10 135 7.3.1 7.3.1 (

D a 6/30/2010 Responder: Clark 116. Closed Closed RAI not TVA Letter necessary dated 10/5/10 136 7.3.2, 7.4, (

D a 6/30/2010 Responder: Clark 117. Closed Closed RAI not TVA Letter 74 56 necessary dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 137 (

C Several WBN2 PAMS documents contain a table titled, Responder: WEC 118. Closed Closed ML101650255, TVA Letter Document Traceability & Compliance Item No 1 dated 10/5/10 139 (

C The WBN2 PAMS System Requirements Specification Responder: WEC 119. Closed Closed ML101650255, TVA Letter WBN2 PAMS System (WBN2 PAMS SysRS) contains a table (see page iii) Item No 3 dated 10/5/10 Requirements Specification 141 (

C Deleted by DORL Date: 120. Closed Closed ML101650255, WBN2 PAMS System Responder: Item No 5 Requirements Specification 146 (

C 6/17/2010 Responder: 121. Closed Closed ML101650255, PAMS System Requirements Item No 10 Specifications 147 (

C 6/17/2010 Responder: 122. Closed Closed ML101650255, PAMS System Requirements Item No 11 Specifications 148 (

C 6/17/2010 Responder: 123. Closed Closed ML101650255, PAMS System Requirements Item No 12 Specifications 149 7.2 7.2 (

G FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 124. Close Closed ML101720589, TVA Letter Overpressure delta T equations have been simplified Item No 1 dated 10/5/10 150 7.2 7.2 (

G Many of the changes were based on the Responder: Clark 125. Close Closed ML101720589, TVA Letter Westinghouse document N3-99-4003 Provide this Response provided in letter Item No 2 dated 10/5/10 151 7.2 7.2 (

G Provide the EDCR 52378 and 54504 which discusses Responder: Clark 126. Close Closed ML101720589, TVA Letter the basis for many changes to this FSAR section Item No 3 dated 10/5/10 152 7.2 7.2 (

G Deleted portion of FSAR section 7.2.3.3.4 and moved Responder: Merten/Clark 127. Close Closed ML101720589, TVA Letter to FSAR section 7 2 1 1 5 However the FSAR Item No 4 dated 10/5/10 153 7.2 7.2 (

G FSAR section 7.2.1.1.7 added the reference to FSAR Responder: Craig/Webb 128. Close Closed ML101720589, TVA Letter section 10 4 4 3 for exception to P-12 However Item No 5 dated 10/21/10 155 7.2 7.2 (

G Summary of FSAR change document section 7.2 Date: 129. Closed Closed ML101720589, states that sections 7 2 1 1 9 and 7 2 2 2(4) are Responder: Stockton Item No 7 157 7.2 7.2 (

G FSAR section 7.2.2.1.1, fifth paragraph was deleted Responder: Tindell 130. Close Closed ML101720589, TVA Letter except for the last sentence The last sentence states Item No 9 dated 10/5/10 158 7.2 7.2 (

G FSAR section 7.2.2.1.1, paragraph six was changed to Responder: Tindell 131. Closed Closed ML101720589, TVA Letter state that the design meets the requirements of Item No 10 dated 10/5/10 159 7.2 7.2 (

G FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 132. Close closed ML101720589, TVA Letter measurement by elbow taps However it further Item No 11 dated 10/5/10 160 7.2 7.2 (

G FSAR section 7.2.2.2(7) deleted text which has Responder: Tindell 133. Close Closed ML101720589, TVA Letter references 12 and 14 These references are not Item No 12 dated 10/5/10 161 7.2 7.2 (

G FSAR section 7.2.2.3 states that changes to the Responder: Clark 134. Closed Closed ML101720589, TVA Letter control function description in this section are expected Item No 13 dated 10/5/10 162 7.2 7.2 (

G FSAR section 7.2.2.2(14) states that bypass of a Responder: Tindell 135. Closed Closed ML101720589, TVA Letter protection channel during testing is indicated by an Item No 14 dated 10/5/10 163 7.2 7.2 (

G Deleted by DORL Date: 136. Closed Closed ML101720589, Responder: Item No 15 164 7.2 7.2 a r

gl FSAR section 7.2.2.2(20) has been revised to include Responder: Perkins 137. Closed Closed ML101720589, TVA Letter Item No. 8 sent to DORL 751 the plant computer as a means to provide information Item No 16 and dated 10/5/10 165 7.2 7.2 (

G FSAR section 7.2.2.3.2, last paragraph of this section Responder: Clark 138. Closed Closed ML101720589, TVA Letter has been deleted The basis for this deletion is that Item No 17 dated 10/5/10 166 7.2 7.2 (

G Changes to FSAR section 7.2.2.2(20) are justified Responder: Clark 139. Closed Closed ML101720589, TVA Letter based on the statement that the integrated computer Item No 18 dated 10/5/10 167 7.2 7.2 (

G FSAR section 7.2.2.4, provide an analysis or reference Responder: Clark 140. Close closed ML101720589, TVA Letter to chapter 15 analysis which demonstrate that failure Item No 19 dated 10/5/10 168 7.2 7.2 (

G FSAR table 7.2-4, item 9 deleted loss of offsite power Responder: Clark 141. Close Closed ML101720589, TVA Letter to station auxiliaries (station blackout) based on the Response provided in letter Item No 20 dated 10/5/10 169 (

G 6/18/2010 Responder: Clark 142. Closed Closed 170 (

G 6/17/2010 Responder: Clark 143. Closed Closed 171 7.2 7.2 (

G 6/17/2010 Responder: Craig 144. Closed Closed EICB RAI TVA Letter Closed to SE Open Item ML102910008 dated 10/21/10 172 (

G 6/17/2010 Responder: Craig 145. Closed Closed EICB RAI ML102910008 173 7.1 7.1 (

G 6/17/2010 Responder: Craig/Webb/Powers 146. Closed Closed EICB RAI ML102910008

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 174 (

G 6/28/2010 Responder: Hilmes/Craig 147. Closed Closed EICB RAI ML102910008 175 (

G June 28, 2010 Responder: 148. Closed Closed EICB RAI ML102910008 176 7.1 7.1 (

G 6/28/2010 Responder: Craig/Webb 149. Closed Closed EICB RAI ML102910008 177 7.5.2. 7.5.1 (

M a 7/15/2010 Responder: Clark 150. Closed Closed N/A TVA Letter RAI not required 1 dated 10/5/10 178 7.5.2. 7.5.1 (

M a 7/15/2010 Responder: Clark 151. Closed Closed N/A TVA Letter RAI not required 1 dated 10/5/10 179 (

C An emphasis is placed on traceability in System Responder: WEC 152. Closed Closed N/A - Closed to NA Requirements Specifications in the SRP in the Item No 142 180 (

C The SRP, BTP 7-14, Section B.3.3.1 states that Responder: WEC 153. Closed Closed N/A - Closed to NA Regulatory Guide 1 172 endorses with a few noted Item No 142 181 (

C An emphasis is placed on traceability in System Responder: WEC 154. Closed Closed N/A - Closed to NA Requirements Specifications in the SRP in the Item No 142 182 (

C Characteristics that the SRP states that a Software Responder: WEC 155. Closed Closed N/A - Closed to NA Requirements Specifications should have include Item No 142 184 (

C 7/15/2010 Responder: WEC 156. Closed Closed N/A - Closed to N/A Item No 142 188 (

C By letter dated June 30, 2010, TVA docketed, Responder: Clark 157. Closed Closed ML101970033, TVA Letter Tennessee Valley Authority (TVA) Watts Bar Unit 2 Item No 3 & 4 dated 10/5/10 189 7.6.7 (

Si 7/20/2010 Responder: Clark 158. Closed Closed RAI No. 3 TVA Letter ML102980005 dated 10/5/10 190 7.9 (

Si FSAR Table 7.1-1 states: Regulatory Guide 1.133, Responder: Clark 159. Closed Closed RAI No. 4 TVA Letter Closed to OI-331.

May 1981 Loose-Part Detection Program for the ML102980005 dated 10/5/10 191 7.9 (

C NUREG-0800 Chapter 7, Section 7.9, "Data Responder: Jimmie Perkins 160. Closed Closed ML10197016, TVA Letter Communication Systems" contains review criteria for Item Nos 1-3 dated 10/5/10 192 7.5.1. 7.5.2 (

M a The NRC Staff is using SRP (NUREG-0800) Chapter 7 Responder: Clark 161. Closed Closed Item No. 1 sent TVA Letter EICB RAI ML1028618855 sent 1 Section 7 5 Instrumentation Systems Important to to DORL dated 10/5/10 to DORL 193 7.5.1. 7.5.2 (

M a The WBU2 FSAR, Section 7.5.2, Plant Computer Responder: Clark 162. Closed Closed Item No. 2 sent TVA Letter EICB RAI ML1028618855 sent 1 System contains three subsections to DORL dated 10/5/10 to DORL 194 7.5.1. 7.5.2. (

M a The WBU2 FSAR Section 7.5.2.1, Safety Parameter Responder: Costley/Norman 163. Closed Closed Item No. 3 sent TVA Letter EICB RAI ML1028618855 sent 11 1 Display System contains a description of the Safety to DORL dated 10/5/10 to DORL 195 7.5.1. 7.5.2. (

M a Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 164. Closed Closed Item No. 4 sent TVA Letter EICB RAI ML1028618855 sent 12 2 to DORL dated 10/5/10 to DORL 196 7.5.1. 7.5.2. (

M a Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 165. Closed Closed Item No. 5 sent TVA Letter EICB RAI ML1028618855 sent 12 2 to DORL dated 10/5/10 to DORL 197 X Open Item 197 was never issued. 166. Closed Closed 198 7.5.1. 7.5.2. (

M a SRP Section 7.5, Subsection III, Review Procedures Responder: Costley/Norman 167. Closed Closed Item No. 6 sent TVA Letter EICB RAI ML1028618855 sent 12 2 states: Recommended review emphasis for BISI to DORL dated 10/5/10 to DORL 199 7.5.1. 7.5.2. (

M a The WBU2 FSAR Section 7.5.2.3, Technical Support Responder: Costley/Norman 168. Closed Closed Item No. 7 sent TVA Letter Related SE Section 7.5.5.3 EICB 13 3 Center and Nuclear Data Links contains a description to DORL dated 10/5/10 RAI ML1028618855 sent to 203 7.5.1. 7.5.2 (

M a 7/26/2010 Responder: Clark 169. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/5/10 DORL 204 7.5.1. 7.5.2 (

M a 7/26/2010 Responder: Costley/Norman 170. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 NRC to issue ML102861885 dated 10/5/10 DORL 205 (

G 7/26/2010 Responder: Clark 171. Closed Closed EICB RAI TVA Letter Question B related to prior NRC ML102910008 dated 10/5/10 approval of this system or 50 59 206 7.5.1. 7.5.2 (

M a 7/27/2010 Responder: Clark 172. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/5/10 DORL 207 (

C July 27, 2010 Date: 173. Closed Closed Responder:

208 7.5.2. 7.5.1 (

M a 7/27/2010 Responder: Clark 174. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/5/10 DORL 209 7.5.2. 7.5.1 (

M a 7/27/2010 Responder: Clark 175. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/5/10 DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 210 7.5.2. 7.5.1 (

M a 7/27/2010 Responder: Clark 176. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/5/10 DORL 215 (

P o 7/29/2010 Responder: WEC 177. Closed Closed 216 7.5.1. 7.5.2 (

M a 7/29/2010 Responder: Clark 178. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/5/10 DORL 217 (

G 7/6/2010 Responder: Clark 179. Close Closed EICB RAI TVA Letter ML102910008 dated 7/30/10 218 (

G 7/6/2010 Responder: Clark 180. Closed Closed EICB RAI TVA Letter ML102910008 dated 7/30/10 219 (

G 8/4/2010 Responder: TVA Licensing 181. Closed Closed EICB RAI ML102910008 220 (

G 8/4/2010 Responder: Ayala 182. Closed Closed EICB RAI TVA Letter ML102910008 dated 10/5/10 221 7.7.1. 7.7.1. (

M a 8/4/2010 Responder: Trelease 183. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 2 3 ML102861885 dated 10/5/10 DORL 222 (

G 8/4/2010 Responder: Clark 184. Close Closed EICB RAI TVA Letter ML102910008 dated 10/5/10 223 (

G 8/4/2010 Responder: Clark 185. Closed Closed EICB RAI ML102910008 224 7.5.1. 7.5.2 (

M a 8/4/2010 Responder: Norman (TVA CEG) 186. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/5/10 DORL 225 (

G 8/4/2010 Responder: Scansen 187. Close Closed EICB RAI TVA Letter ML102910008 dated 10/5/10 226 (

C 8/4/2010 Responder: TVA Licensing 188. Closed Closed N/A - TVA Letter See also Open Item Nos. 41 &

Information dated 8/11/10 270 227 (

G 8/4/2010 Responder: Clark 189. Close Closed EICB RAI TVA Letter ML102910008 dated 10/5/10 228 (

C 8/4/2010 Responder: Clark 190. Closed Closed EICB RAI TVA Letter ML102980066 dated 10/5/10 229 (

C 8/4/2010 Responder: Clark 191. Closed Closed EICB RAI TVA Letter ML102980066 dated 10/5/10 230 (

C 8/4/2010 Responder: Webb 192. Closed Closed EICB RAI TVA Letter ML102980066 dated 10/5/10 231 (

G 8/4/2010 Responder: Clark 193. Closed Closed EICB RAI TVA Letter ML102910008 dated 10/5/10 232 (

Si 8/4/2010 Responder: Clark 194. Closed Closed RAI No. 5 TVA Letter ML102980005 dated 10/5/10 233 (

C 8/4/2010 Responder: Clark 195. Closed Closed EICB RAI TVA Letter ML102980066 dated 10/5/10 234 (

C 8/4/2010 Responder: 196. Closed Closed N/A - Duplicate N/A Item 235 (

G 8/4/2010 Responder: TVA Licensing 197. Closed Closed EICB RAI ML102910008 236 (

G 8/4/2010 Responder: Clark 198. Close Closed EICB RAI TVA Letter ML102910008 dated 10/5/10 237 (

C 8/4/2010 Responder: Clark 199. Closed Closed EICB RAI TVA Letter ML102980066 dated 10/5/10 238 (

C 8/4/2010 Responder: Webb/Hilmes 200. Closed Closed N/A - Duplicate N/A Item 239 (

C 8/4/2010 Responder: Hilmes 201. Closed Closed N/A - Meeting N/A request 240 (

G 8/4/2010 Responder: Clark 202. Close Closed Ml102910008 TVA Letter Item#29 dated 10/5/10 241 (

Si 8/4/2010 Responder: Davies 203. Closed Closed RAI No. 10 TVA Letter ML102980005 dated 10/5/10 242 (

G 8/4/2010 Responder: Hilmes 204. Close Closed EICB RAI TVA Letter ML102910008 dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 243 (

C 8/3/2010 Responder: WEC 205. Closed Closed N/A - Closed to N/A Item No 142 249 (

C 8/8/2010 Responder: WEC 206. Closed Closed LIC-101 Rev. 3 Appendix B Section 4 "Safety Evaluation" 253 (

C 8/8/2010 Responder: Clark 207. Closed Closed TVA Letter Related to Open Item no. 83.

dated 10/5/10 254 (

C 8/10/2010 Responder: WEC 208. Closed Closed N/A - Request TVA Letter to make dated 10/21/10 255 (

C 8/10/2010 Responder: WEC 209. Closed Closed N/A - Request TVA Letter to make dated 10/21/10 256 (

C 8/10/2010 Responder: WEC 210. Closed Closed N/A - Request TVA Letter to make dated 10/21/10 257 (

C 8/10/2010 Responder: WEC 211. Closed Closed N/A - Request N/A to make 258 (

C 8/10/2010 Responder: WEC 212. Closed Closed N/A - Request N/A to make 259 (

C 8/10/2010 Responder: WEC 213. Closed Closed N/A - Request TVA Letter to make dated 10/21/10 260 (

C 8/10/2010 Responder: WEC 214. Closed Closed N/A - Request N/A to make 261 (

C 8/10/2010 Responder: WEC 215. Closed Closed N/A - Closed to TVA Letter LIC-110 Rev. 1 Section 6.2.2 Item No 142 dated 8/20/10 states: "Design features and 262 (

C 8/10/2010 Responder: WEC 216. Closed Closed N/A - Request N/A to make 263 (

C 8/11/2010 Responder: WEC 217. Closed Closed ML101650255, Based on an examination of document available at the Item No 2 264 (

C 8/11/2010 Responder: WEC 218. Closed Closed ML101650255, Item No 2 265 (

C 8/11/2010 Responder: WEC 219. Closed Closed ML101650255, Item No 2 270 (

C 8/23/2010 Responder: Clark 220. Closed Closed See also Open Item Nod. 41 &

245 271 (

C 8/23/2010 Responder: WEC 221. Closed Closed N/A - Closed to NA Item No 142 272 7.5.2. 7.5.1 (

M a 8/26/2010 Responder: Clark 222. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/21/10 DORL 273 7.5.2. 7.5.1 (

M a 8/26/2010 Responder: Clark 223. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to 1 ML102861885 dated 10/5/10 DORL 274. 7.5.2. 7.5.1 (

M a 8/26/2010 Responder: Clark 224. Closed Closed EICB RAI TVA Letter EICB RAI ML102861885 sent to a 1 ML102861885 dated 10/21/10 DORL 275 (

Si 8/27/2010 Responder: Clark 225. Closed Closed Not Required N/A Answer exists in 276 7.6 7.6 (

G 8/27/2010 Responder: Webb 226. Close Closed EICB RAI TVA Letter ML102910008 dated 10/21/10 278 7.6 7.6.6 (

G 8/27/2010 Responder: Trelease 227. Close Closed EICB RAI TVA Letter ML102910008 dated 10/21/10 279 7.6 7.6.6 (

G 8/27/2010 Responder: Mather 228. Close Closed EICB RAI TVA Letter ML102910008 dated 10/21/10 280 7.6 7.6.6 (

G 8/27/2010 Responder: Trelease 229. Close Closed EICB RAI TVA Letter ML102910008 dated 10/21/10 282 7.6 7.6.9 (

G 8/27/2010 Responder: Trelease 230. Close Closed EICB RAI TVA Letter Response is acceptable ML102910008 dated 10/21/10 284 7.7.3 7.4.1 (

D a 8/27/2010 Responder: Webber 231. Closed Closed EICB RAI No.14 TVA Letter This item is a follow-up question ML102910017 dated 10/21/10 to item 123 286 7.7.3 9.3.4. (

D a 8/27/2010 Responder: Webber 232. Closed Closed EICB RAI No.16 TVA Letter 24 ML102910017 dated 10/21/10 290 7.7 (

C 9/7/2010 Responder: Clark 233. Closed Closed N/A N/A This item is a duplicate of item 291

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 292 7.2.5 7.2 (

G 9/7/2010 Responder: Craig 234. Closed Closed EICB RAI TVA Letter ML102910008 dated 10/21/10 299 (

C Provide Common Q Software Requirements Attachment 41 of the 10/5 letter contains the 235. Closed Closed TVA Letter Specification Post Accident Monitoring System 00000- Common Q Software Requirements Specification dated 10/5/10 312 7.0 (

G By letter dated September 10,2010, TVA provided the Responder: Stockton 236. Close Closed EICB RAI TVA Letter summary evaluation of 50 59 reports which were ML102910008 dated 10/21/10 314 7.3 7.3 (

D a The following 50.59 changes were listed in the March Responder: Stockton 237. Closed Closed EICB RAI No. TVA Letter Related to OI 10 12 RAI response letter (item 10) but were not included 19 dated 10/21/10 315 7.5.3 7.5.3 (

G IE Bulletin 79-27 required that emergency operating Responder: S. Smith (TVA Operations) 238. Close Closed EICB RAI TVA Letter procedures to be used by control room operators to ML102910008 dated 10/21/10 316 7.5.2. 7.5 (

S i TVA has provided various documents in support of Responder: Temples/Mather 239. Closed Closed RAI No. 26 3 RM-1000 high range monitors for WBN2 ML102980005 320 Per Westinghouse letter WBT-D-2340, TENNESSEE Responder: Clark 240. Closed Closed N/A N/A Duplicate of item 156 VALLEY AUTHORITY WATTS BAR NUCLEAR 321 For the purposes of measuring reactor coolant flow for Responder: Clark 241. Closed Closed N/A N/A Duplicate of OI# 157 Reactor Protection functions elbow taps are used for 322 7.7.1. (

C Section 7.7.1.11 will be added to FSAR Amendment Responder: Clark 242. Closed Closed 11 101 to provide a discussion of the Distributed Control 324 (

M a Per the NRC reviewer, the BISI calculation is not 243. Closed Closed required to be submitted 325 B

(

G a The Unit 2 loops in service for Unit 1 that are Responder: TVA Startup Olson 244. Closed Closed Closed to open item ?

scheduled to be transferred to the Foxboro Spec 200 332 7.5.2. 7.5.1 10/26/2010 245. N Closed Closed TBD TBD RAI is being drafted EICB (Marcus) 1 Related to 302 TVA to either officially This item was transmit DCN 52389 or corrected prior to In response to Open Item 302 TVA provided a diskette identify the letter that transmittal of the that included a draft of Attachment 8 to the proposed transmitted or will transmit response to OI 10/29/2010 letter. Attachment 8 included 14 of the 15, DCN 52389. 302 in the 10/29 50.59 documents listed in the, RG 1.97 50.59 Listing. TVA letter.

DCN 52389 was not included on the diskette. Identify the document and date that officially transmitted or will transmit, DCN 52389 to the NRC. If DCN 52389 has not been previously transmitted to NRC please transmit the document to the NRC.

333 7.5.2. 7.5.1 10/27/2010 246. N Closed Closed TBD TBD RAI is being drafted EICB (Marcus) 1 Related to 44 and 303 TVA to determine the This item was correct information and corrected prior to In response to Open Item 303, TVA provided a officially transmit the correct transmittal of the diskette that included a draft of Attachment 9 to the information. response to OI proposed October 29, 2010 letter. In Attachment 9, 302 in the 10/29 the Unit 2 variable source for RG 1.97 variable 37, TVA letter.

CCS Sample Tank Level, was listed as Foxboro Spec 200. However, in response to Open Item 44, in Enclosure 1 to TVA letter dated June 18, 2010 (ML101940236), the Unit 2 variable source for RG 1.97 variable 37 was listed as Foxboro I/A. Determine which is correct and formally issue a correction.

269 DOR 8/20/2010 Responder: NRC 1. Y Open Open-NRC L

(Poo le)

DORL to send the Eagle-21 Audit Report to TVA.

043 7.5.2 7.5.1 2/19/2010 Responder: WEC Date: 5/25/10 2. N Open Open-NRC EICB RAI TVA Letter NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)

Review ML102910002 dated 2/5/10 compliance matrix was docketed The PAMS ISG6 compliance matrix supplied as The PAMS ISG6 compliance matrix supplied as Response is included in Item No. 2 on: (1) February, 5 12010, (2)

Enclosure 1 to TVA letter dated February 5, 2010 is a Enclosure 1 to TVA letter dated February 5, 2010 letter dated 10/5/10. Due 12/1/10 TVA Letter March 12, 2010, & (3) June 18, first draft of the information needed. The shortcomings is a first draft of the information needed. dated 5/12/10 2010. The staff has expressed of the first three lines in the matrix are: Revised compliance matrix issued with all of these

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date By letter dated April 8, 2010 TVA provided the is unacceptable. TVA Letter compliance evaluations. The Line 1: Section 11 of the Common Q topical report did PAMS Licensing Technical Report provided dated 6/18/10 staff is still waiting for a good include a commercial grade dedication program, but additional information. NNC 8/12/10: It is not quite compliance evaluation.

this program was not approved in the associated SE. enough to provide all of the TVA Letter Westinghouse stated that this was the program and it Attachment 3 contains the revised Common Q documents requested. dated 10/5/10 could now be reviewed. The NRC stated that TVA PAMS ISG-6 Compliance Matrix, dated June 11, There are two possible routs should identified what they believe was previously 2010, that addresses these items (Reference 13). to review that the NRC can reviewed and approved. undertake: (1) follow ISG6, By letter Dated June 18, 2010 (see Attachment 3) and (2) follow the CQ SPM.

Line 2: TVA stated the D3 analysis was not applicable TVA provided a table, "Watts Bar 2 - Common Q The TVA response that was to PAMS, but provided no justification. The NRC PAMS ISG-6 Compliance Matrix." originally pursued was to asked for justification since SRP Chapter 7.5 identified follow ISG6, but some of the SRM to SECV-93-087 Item II.Q as being SRP It is TVAs understanding that this comment is compliance items for ISG6 acceptance criteria for PAMS. focused on the fact that there are documents that were addressed by NRC has requested that are currently listed as referencing the SPM. The Line 3: TVA identified that the Design report for being available for audit at the Westinghouse NRC approved the CQ TR computer integrity was completed as part of the offices. For those Common Q PAMS documents and associated SPM; it may common Q topical report. The NRC noted that this that are TVA deliverable documents from be more appropriate to report is applicable for a system in a plant, and the CQ Westinghouse, TVA has agreed to provide those review the WBN2 PAMS topical report did no specifically address this PAMS to NRC. Westinghouse documents that are not application to for adherence system at Watts Bar Unit 2. deliverable to TVA will be available for audit as to the SPM that to ISG6. In stated above. Requirements Traceability Matrix either path chosen, the NRC then concluded that TVA should go through and issues will be tracked under NRC RAI Matrix applicant should provide provide a more complete and thorough compliance Items 142 (Software Requirements Specification) documents and a matrix. and 145 (System Design Specification). justification for the Commercial Item Dedication issues will be acceptability of any tracked under NRC RAI Matrix Item 138. This deviation from the path item is considered closed. chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.

050 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 3. N Open Open-NRC EICB RAI TVA Letter EICB (Carte)

Review ML102910002 dated 6/18/10 How should the "shall" statements outside of the These sections are descriptive text and not TVA response is Item No. 8 bracketed requirements in Common Q requirements requirements. The next revision of the Watts Bar inconsistent (e.g., WNA-DS- Due 12/31/10 documents be interpreted? Unit 2 PAMS System Requirements Specification 01667-WBT Rev. 1 page 1-will remove shall from the wording in those 1, Section 1.3.1 implies that sections. A date for completing the next revision "SysRS Section ###" has of the System Requirements Specification will be requirements. See also provided no later than August 31, 2010. SDS4.4.2.1-1 on page 4-32).

The System Requirements Specification will be revised by September 30, 2010 and submitted Is there a requirement on within two of receipt from Westinghouse. the shall referenced above??

TVA Revised Response Response is provided in This item is resolved by submittal of the revised letter dated 10/29/10.

SysRS and SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).

(

054 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 4. Y Open Open-NRC RAI No. 14 TVA Letter S

i

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date Review ML102980005 dated 6/18/10 Please describe all the different environments in which The only safety-related application for the RM- Revised response is 10/26/2010 the RM-1000 will be required to operate. Please group 1000 is the Containment High Range radiation included in letter dated these environments into two categories (a) Harsh monitors. The Containment High Range radiation 10/29/10.(TVA to confirm) Response environment, per 10 CFR 50.49, and (b) Mild monitors will be installed in the Main Control Design Criteria is WB-DC- acceptable. TVA Environment. Room, a mild environment. The detectors will be 40-54 is attached to this to update on installed remotely in the containment. letter. issuance of letter to close item.

For WBN Unit 2, a mild environment is defined as:

Due 10/14/10 A defined room or building zone where (1) the temperature, pressure, or relative humidity Identify source of resulting from the direct effects of a design basis reference 3.

event (DBE) (e.g., temperature rise due to steam release) are no more severe than those which TVA to identify would occur during an abnormal plant operational when and by what condition, (2) the temperature will not exceed letter number WB-130°F due to the indirect effects of a DBE (e.g., DC-40-54 was increased heat loads from electrical equipment), submitted to NRC.

(3) the event radiation dose is less than or equal If not previously to 1 x 104 rads, and (4) the total event plus the 40 submitted then year TID (total integrated dose) is less than or please submit this equal to 5 x 104 rads. (Reference 3). document.

What is Reference 3?

TVA Revised Response:

Reference 3 is TVA Design Criteria WB-DC 54, Environmental Qualification To 10CFR50.49, which provides the definition of mild and harsh environments. Attachment 13 to TVA letter dated October 29, 2010 contains WB-DC-40-54, Revision 4.

055 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 5. Y Open Open-NRC RAI No. 15 TVA Letter EICB (Singh)

Review ML102980005 dated 6/18/10 The "Qualification Test Report Supplement, RM-1000 The detectors for these loops will be located in a Revised response is 10/26/2010 Upgrades," Document No. 04508905-1SP Rev. A harsh environment (inside containment). The RM- included in letter dated Response 10/14/10 states that the qualification was done in accordance 1000 will be located in the main control room, 10/29/10. (TVA to confirm) acceptable. TVA with IEEE 323-1974 and -1983. Please describe and which is a mild environment. The RM-1000 and Design Criteria is WB-DC- to update on justify all differences in this qualification methodology associated I/F converters have been tested to the 40-54 is attached to this issuance of letter and that endorsed by Regulatory Guide 1.209. requirements present in IEEE Std. 323-1983 and - letter. to close item.

Specifically address EMI and RFI 1974, as well as the System Requirements including EPRI TR 102323 (Sept. 94) in the design basis. Due 10/14/10 Electro-Magnetic-Interference and Radio Identify source of Frequency Interference (EMI-RFI) testing was reference 3.

performed (the results of the testing are included in the Equipment Qualification Test Report submitted under TVA letter dated March 12, 2010, Reference 4). Since RG 1.209 was not issued until 2007, General Atomics test reports do not reference it.

For WBN Unit 2, a harsh environment is defined as:

A defined room or building zone where either (1)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date the temperature, pressure, and relative humidity resulting from the direct effects of a DBE (e.g.,

temperature rise due to steam release) are more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will exceed 130°F due to the indirect effects of DBE (e.g., increased heat loads from electrical equipment), (3) the event radiation dose is greater than 1 x 104 rads, or (4) the total event plus the 40-year TID is greater than 5 x 104 rads.

(Reference 3)

What is Reference 3?

TVA Revised Response:

Reference 3 is TVA Design Criteria WB-DC 54, Environmental Qualification To 10CFR50.49, which provides the definition of mild and harsh environments. Attachment 13 to TVA letter dated October 29, 2010 contains WB-DC-40-54, Revision 4.

065 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 6. N Open Open-NRC N/A - No TVA Letter EICB (Carte) target submittal date for the FMEA was August 31, Review question was dated 10/5/10 2010. Attachment 37 to letter dated 10/5/10 contains the asked. Item proprietary version of the Common Q PAMS Due 12/1/10 was opened to FMEA and the affidavit for withholding. A non- track proprietary version will be provided at a later date. comm8ittment made by applicant.

101 4/12/2010 Responder: Slifer 7. Y Open Open-NRC N/A TVA is working with the vendor DORL (Poole)

Review to meet the 6/30 date, however The non-proprietary versions of the following RM- The documents, and affidavits for withholding for Documents provided in letter there is the potential this will slip 1000, Containment High Range Post Accident the listed documents were submitted to the NRC dated 07/15/10 Due 10/14/10 to 7/14.

Radiation Monitor documents will be provided by June on TVA letter to the NRC dated July 15, 2010.

30, 2010. Confirm receipt.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR 103 7.4 7.4 5/27/2010 Responder: Ayala Date: 5/27/10 8. Y Open Open-NRC EICB RAI No.1 Submittal date is based on EICB (Darbali)

Review ML102910017, current EDCR scheduled issue TVA to submit excerpts of EDCR 52321 Attachment 1 contains excerpts from draft EDCR Response is included in 10/19/10 date.

52321 (i.e., draft Scope and Intent, Unit letter dated 10/29/10. Due 10/31/10.

Difference and Technical Evaluation). The final Waiting for excerpts will be submitted within two weeks after docketed version issuance of the EDCR. to close item.

104 7.4 7.4 5/27/2010 Responder: Merten Date: 5/27/10 9. Y Open Open-NRC EICB RAI No.1 Submittal date is based on EICB (Darbali)

Review ML102910017, current EDCR scheduled issue TVA to submit excerpts of EDCR 52351 Attachment 2 contains excerpts from draft EDCR Response is included in 10/19/10 date.

52351 (i.e., draft Scope and Intent, Unit letter dated 10/29/10 Due 10/31/10.

Difference and Technical Evaluation). The final Waiting for excerpts will be submitted within two weeks after docketed version issuance of the EDCR. to close item.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 114 7.2 7.2 6/1/2010 Responder: WEC 10. Y Open Open-NRC EICB RAI TVA Letter EICB (Garg)

Review ML102910008 dated 6/18/10 Provide the resolution of the Eagle 21 Rack 5 lockup The following non-proprietary response was TVA to provide justification Item#35 on update issue. developed from proprietary Westinghouse letter that there are no more Due 10/31/10 WBT-D-2027 (Reference 11), which provided the surprises.

resolution of this issue. Westinghouse approved The write-up this non-proprietary response via e-mail from A. shows that there Drake to M. Clark on June 15, 2010. Revised response is was differences included in letter dated between Unit 1 As documented in WBT-D-1917, Eagle-21 Rack 10/29/10 and 2 but was not 5 LCP Diagnostic Failures, (Reference 14), identified to NRC during the factory acceptance testing for the Unit in earlier 2 Eagle-21 System, Westinghouse noted an response. Are occasional diagnostic failure while performing the there any more parameter update function on Rack 5. surprises like this?

Subsequently, TVA provided to Westinghouse for testing and examination, a Loop Control Processor (LCP) board removed by TVA from Unit 1 Rack 5 for life cycle-based preventive maintenance. TVA personnel familiar with Unit 1 had indicated they had not experienced problems when performing parameter updates on Unit 1 Rack 5.

Based on Westinghouse examination and testing, a difference in hardware was identified between the Unit 1 LCP shipped to Westinghouse, the new Unit 2 Rack 5 LCP, and an older LCP (older than the Unit 1 LCP) from the Westinghouse Eagle 21 test bed. Installed on the Unit 1 LCP was a different version of an 80287 math coprocessor chip (80287 XL).

This version of the 80287 had an improved specification for calculation speed. Use of this chip on both the Unit 2 LCP and the test bed LCP allowed proper performance of the LCP when making parameter updates using the Unit 1/Unit 2 Rack 5 software. Also, use of the slower 80287 on any of the three LCP boards caused failure in parameter update with the Unit 1/Unit 2 Rack 5 software.

Through investigation of historical records, Westinghouse found that the 80287 XL chip had been evaluated and used by its former Process Control Division (now Emerson) for this application, but the current Westinghouse documentation had not been updated. This part has now been evaluated, and the Westinghouse documentation and drawing have been revised to allow use of the 80287 XL coprocessor. The 80287 XL coprocessor has been installed on the Unit 2 Rack 5 LCP, and the appropriate factory acceptance testing has been successfully conducted using this updated board. Additionally, the LCP boards in the balance of the Unit 2 racks have been updated with the 80287 XL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date coprocessor.

TVA Revised Response:

The Eagle 21 system is installed and the Site Acceptance Test has been completed. To the best of TVAs knowledge there are no unknown issues with the system.

118 7.4 7.4 6/8/2010 Responder: Merten 11. Y Open Open-NRC EICB RAI No.1 Submittal date is based on EICB (Darbali)

Review ML102910017, current EDCR scheduled issue TVA to submit excerpts from EDCR 55385 Attachment 4 contains excerpts from draft EDCR Response is included in 10/19/10 date. Note: The RVLIS EDCR 55385 (i.e., draft Scope and Intent, Unit letter dated 10/29/10 Due 10/31/10. has been split into two EDCRs.

Difference and Technical Evaluation). The final Waiting for The first EDCR is 52601 (Open excerpts will be submitted within two weeks after docketed version Item 91) The second EDCR is issuance of the EDCR. to close item. 55385.

140 The first requirement in the WBN2 PAMS SysRS (i.e., Responder: Clark 12. N Open Open-NRC ML101650255, WBN2 PAMS System EICB (Carte)

R2.2-1) states: The PAMS shall be capable of Review Item No. 4 Requirements Specification operation during normal and abnormal environments WBN Unit 2 FSAR Amendment 100 Section and plant operating modes. The rational for this 7.5.1.8, Post Accident Monitoring System Due 10/22/10 TVA docketed WNA-DS-01617-requirement is that it is necessary to meet Regulatory (PAMS) specifies the Reg. Guide 1.97 variables WBT Rev. 1, RRAS Watts Bar 2 Guide (RG) 1.97. implemented in the Common Q based WBN Unit NSSS Completion Program I&C 2 PAMS Projects Post Accident What document specifies which RG 1.97 variables are Monitoring System- System implemented in the Common Q based WBN2 PAMS? Requirements Specification, dated December 2009.

144 The WBN2 PAMS Software Requirements Responder: WEC 13. N Open Open-NRC ML101650255, TVA Letter WBN2 PAMS Software EICB (Carte)

Specification (WBN2 PAMS SRS) contains a table Review Item No. 8 dated 10/5/10 Requirements Specification (see page iii) titled, Document Traceability & (a) The purpose of NABU-DP-00014-GEN Response provided in letter Compliance, which states that the WBN2 PAMS SRS document is to define the process for system level dated 10/5/10 Due 12/1/10 By letter dated April 8, 2010 was created to support the three documents identifieddesign, software design and implementation, and (ML10101050203), TVA (two of these documents have been provided on the hardware design and implementation for Common NRC Review and WEC to Responses to docketed WNA-SD-00239-WBT, docket). Q safety system development. This document complete response. items a and e Revision 1, "RRAS Watts Bar 2 supplements the Common Q SPM, WCAP-16096- provided. Need NSSS Completion Program I&C (a) Please describe the third document (i.e., NABU- NP-A. The scope of NABU-DP-00014-GEN b-d to be addressed at response to b-d. Projects, Software Requirements DP-00014-GEN Revision 2, Design Process for includes the design and implementation public meeting and audit. Specification for the Post Common Q Safety Systems). processes for the application development. For a Will require information to be Accident Monitoring System, fuller description of the design process described docketed. dated February 2010 (b) Please describe the flow of information between in NABU-DP-00014-GEN please refer to the (ML101050202).

these three documents. Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket.

(c) Does the PAMS SRS implement the requirements Since this is a Westinghouse process document in these three documents? that is not specifically referenced in the SRS, it will be removed in the next revision of the (d) Please describe if and how these three documents document.

are used in the development of the PAMS Software Design Description. (b) - Closed to items 142 and 145 (e) Do the WBN2 V&V activities include verification (c) - Closed 142 (d) N/A -

that the requirements of these three documents have Closed to Item been incorporated into the WBN2 PAMS SRS. (d) - Closed to Item 142 No. 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

154 7.2 7.2 FSAR section 7.2.1.1.10, setpoints: NRC staff has Responder: Craig/Webb 14. N Open Open-NRC ML101720589, TVA Letter EICB RAI ML102861885 sent to EICB (Garg) issued RIS 2006-17 to provide guidance to the industry Review Item No. 6 and dated 10/5/10 DORL regarding the instrument setpoint methodology which (Q1) Refer to the response to letter item 13, RAI Response is not acceptable. EICB RAI complies with 10 CFR 50.36 requirements. Provide Matrix Item 51. A revised response will be Due 10/31/10 ML102861885 the information on how the WBN2 setpoint submitted in the letter dated Item No. 8 methodology meets the guidance of RIS 2006-17 and (Q2) EEB-TI-28's single sided methodology 10/29/10. FSAR AMD 100.

include this discussion in this section. Also, by letter conforms with WBN's design basis commitment to Since all the dated May 13, 2010, TVA provided Rev. 7 of EEB-TI- ensure that 95% of the analyzed population is setpoint and 28 to the staff. The staff noted that section 4.3.3.6 of covered by the calculated tolerance limits as allowable value EEB-TI-28 discusses the correction for setpoints with a defined in NRC Reg Guide 1.105, Revision 2, for Unit 2 is single side of interest. It should be noted that the staff 1986 that was in affect during WBN Unit 1 calculated and has not approved this aspect of setpoint methodology licensing. The single sided methodology is not added to TS, TVA for Unit 1. The staff finds this reduction in used for any TSTF-493 setpoints that use TI-28 needs to address uncertainties is not justified unless it can be methodology. the latest criteria demonstrated that the 95/95 criteria is met. Therefore, and that include either remove this reduction factor for single sided TVA Revised Response: 95/95 criteria.

uncertainties or justify how you meet the 95/95 criteria Why the last given in RG 1.105. In order to respond to other NRC comments on sentence has the setpoint methodology discussion in FSAR been modified by Amendment 100, TVA reviewed the previous adding TI-28. It response to this RAI. This resulted in a complete was NRCs rewrite of the responses to this question as shown understanding below. As a result, the response does not that all setpoints specifically address the NRC Follow-up Request. have to meet TI-However, the overall responses to all of the NRC 28 RAIs on setpoint methodology addresses this item.

(Q1) WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date methodology in FSAR section 7.1.2.1.9.

(Q2) Electrical Engineering Branch (EEB)

Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.

There are some areas where a 95%

confidence level could not be achieved.

Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..

156 7.2 7.2 FSAR section 7.2.2.1.1 states that dashed lines in Responder: WEC 15. N Open Open-NRC ML101720589, TVA Letter Response on hold pending EICB (Garg)

Figure 15.1-1designed to prevent exceeding Review Item No. 8 dated 10/5/10 Westinghouse review.

121% of power.The value of 121% is changed Per Westinghouse letter WBT-D-2340, Response is included in from 118%. The justification for this change states that TENNESSEE VALLEY AUTHORITY WATTS letter dated 10/5/10 Amendment 101 this was done to bring the text of this section in BAR NUCLEAR PLANT UNIT 2 FSAR Markups Submitted agreement with section 4.3.2.2.5, 4.4.2.2.6 and table Units I and 2 118% vs. 121 % and Correction to 10/29/10.

4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still RAI Response SNPB 4.3.2-7, (Reference 17) the show this value as 118%. Justify the change. 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a result of the question, Westinghouse reviewed all locations where either 118% or 121% are used and the context of use and provided a FSAR markup to reflect the correct value at the specific location. These changes will be incorporated in a future FSAR amendment.

183 7/15/2010 Responder: WEC 16. Y Open Open-NRC EICB RAI TVA Letter EICB (Carte)

Review ML102980066 dated 10/21/10 An emphasis is placed on traceability in System The generic Software Requirements Specification Response provided in letter Item No. 9 Enclosure 1 Requirements Specifications in the SRP, in the applies except as modified by the WBN Unit 2 dated 10/21/10 Due 12/1/10 Item No. 4 unmodified IEEE std 830-1993, and even more so System Requirements Specification.

given the modifications to the standard listed in NRC to issue RAI Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?

If there are additional changes, what is their origin?

186 7.7.8 7.7.1. 7/15/2010 Responder: Perkins/Clark 17. Y Open Open-NRC EICB RAI No.6 TVA Letter EICB (Darbali) 12 Review ML102910017, dated 10/5/10 Along with Amendment 96, TVA submitted a list of No. The previous wording reflected operation of Response included in letter 10/19/10 Bechtel changes for each section. Change number 45 the computer based AMSAC system. The dated 10/29/10 Due Date addresses a change to section 7.7.1.12, AMSAC, change reflects the operation of the relay logic 10/31/10. Waiting however, the Justification column states This change based system that replaced the original computer for docketed is not included. EDCR 52408 installs the AMSAC in based system in Unit 1. Unit 2 is installing a Response is satisfactory. version to close Unit 2. It does not have a trouble alarms. The existing similar relay logic based system, so the change to Issue date of Amendment item.

words better reflect the operation of the system. the Unit 1 wording is applicable to Unit 2. 101 is not yet determined.

Even thought this change was not included in EDCR 52408 Summary Follow-up NRC Amendment 96, will it be included in a future Request:

amendment? A Purchase Order was issued to Nutherm International to provide a Unit 2 cabinet with the TVA to state that no Also, please submit a summary of EDCR 52408. same functions as the current Unit 1 AMSAC. further FSAR changes are EDCR 52408 will install the cabinet and planned.

route/install cabling to provide the necessary inputs/outputs for/from the AMSAC cabinet.

In the Main Control Room, three cables will be installed for the AMSAC handswitch on 2-M-3 and AMSAC NOT ARMED and AMSAC ACTUATED annunciator windows.

In the Turbine Building, two pressure transmitters will be installed in two local panels to sense turbine pressure. Cables will be routed to the transmitters to provide the signal and power. Four cables will be routed to a local panel to provide steam generator level signals.

In the Control Building, three cables will be routed to separation relays which will provide the start signal for the Motor Driven Auxiliary Feedwater Pumps, Turbine Driven Auxiliary Feedwater Pump, and initiate a Turbine Trip. Additionally, a cable will be routed to Unit 2 ICS for AMSAC NOT ARMED and AMSAC ACTUATED log points.

This EDCR is intended to configure Unit 2 AMSAC like Unit 1 when possible.

TVA Revised Response:

No further changes to the FSAR associated with AMSAC are planned.

200 7.2 7/21/2010 Responder: Clark 18. Y Open Open-NRC EICB RAI TVA Letter 7.3 The statement in SER Section 7.5.1 is supported Review ML102980066 dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date 7.5 Amendment 99 of the Watts Bar Unit 2 FSAR Section by the following: Response provided in letter Item No. 2 7.7 7.5, Instrumentation Systems Important to Safety,

  • I&C Systems for Normal Operation FSAR dated 10/5/10 Amendment 101 does not include any description of instrumentation for Section Submitted normal operation; therefore, Section 7.5 of the FSAR
  • Eagle 21 7.2 10/29/10.

does not support statements made in the SER Section

  • Neutron Monitoring 7.2 7.5; compare SER (ML072060490) Section 7.5.1 and
  • Foxboro Spec 200 7.3 (List of other sections FSAR Amendment 99 Section 7.5. Please identify in attachment 34) where, in the docketed material, information exists to
  • Foxboro I/A 7.7.11 (new section will be added support the statements in the SER Section 7.5.1. by amendment 101) (other sections have been previously provided)
  • Plant Computer 7.5.2
  • Rod Control 7.7.1.2
  • CERPI 7.7.1.2
  • Incore Neutron Monitoring 7.7.1.9
  • Lose Part Detection/Monitoring 7.6.7
  • Vibration Monitoring RCP 5.5.1.2
  • Control Boards 7.1.1.10
  • RVLIS 7.5, 5.6 201 7.7.1. 7.7.11 7/21/2010 Responder: Webb 19. Y Open Open-NRC EICB RAI TVA Letter EICB (Carte) 1.1 Review ML102980066 dated 10/5/10 Amendment 99, FSAR Section 7.7.1.1.1, "Reactor These functions are within the scope of the Response provided in letter Item No. 3 Control Input Signals (Unit 2 Only)," contains a Foxboro I/A system. Section 7.7.11 will be added dated 10/5/10 Amendment 101 description of functions performed uniquely for Unit 2. to the FSAR in amendment 101 to provide a Submitted Please describe the equipment that performs this discussion of the DCS. 10/29/10.

function (in sufficient detail to support a regulatory evaluation), and evaluate this equipment against the appropriate regulatory criteria.

211 7.5.1. 7/27/2010 Responder: Clark 20. N Open Open-NRC EICB RAI TVA Letter Relates to SE Sections:

EICB (Carte) 1 Review ML102980066 dated 10/5/10 7.5.5, Plant Computer 7.5.2 FSA Table 7.1-1 shows: "The extent to which the The WBN 2 FSAR Section 7.5 defines the Response included in letter Item No. 5 7.6.10, Loose Part Monitoring 7.6.1 recommendations of the applicable NRC regulatory following systems as important to safety dated 10/5/10 Amendment 101 7.7.1, Control System 7.7.1 guides and IEEE standards are followed for the Class Submitted Description 7.7.2 1E instrumentation and control systems is shown 1. Post Accident Monitoring including: 10/29/10. 7.7.2, Safety System Status 7.7.4 below. The symbol (F) indicates full compliance. Those a. Common Q Post Accident Monitoring System Monitoring System 7.9 which are not fully implemented are discussed in the (Safety-Related) 7.7.4, PZR & SG Overfill referenced sections of the FSAR and in the footnotes i. Reactor Vessel Level 7.9, Data Communications as indicated." ii. Core Exit Thermocouples iii. Subcooling Margin Monitor Please describe how systems that are important to b. Eagle 21 indications (Safety-Related) safety, but not 1E, comply with 10 CFR 50.55a(a)1: c. Foxboro Spec 200 indications (Safety-Related)

"Structures, systems, and components must be d. Neutron Monitoring (Source and Intermediate designed, fabricated, erected, constructed, tested, and Range) (Safety-Related) inspected to quality standards commensurate with the e. Radiation Monitors (Safety-Related) importance of the safety function to be performed." f. Unit 1 and Common shared indications (Safety-Related)

g. Foxboro I/A indications (Non-Safety-Related)
h. Radiation Monitors (Non-Safety-Related)
i. CERPI (Non-Safety-Related)
j. Integrated Computer System (Non-Safety-Related)
k. Unit 1 and Common shared indications (Non-Safety-Related)

Post Accident Monitoring Instrumentation Design Criteria, WB-DC-30-7, Rev. 22, Appendix A

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date provides the minimum quality requirements for each Category (1, 2 or 3) of variable. By definition, no Category 1 variable can be non-safety-related. Therefore, non-safety-related variables and the source equipment are limited to category 2 or 3. Since some variables are designated as having more than 1 category, the requirements of the highest category apply.

Additional design criteria information for specific systems is contained in:

g. Foxboro I/A - Site-Specific Engineering Specification WBN Unit 2 NSSS and BOP Controls Upgrade Specification Rev. 1 (Attachment 23)
h. CERPI - Rod Control System Description, N3-85-4003, Rev. 12 Section 2.2, Design Requirements
i. Radiation Monitors - Design Criteria Document WB-DC-40-24, Radiation Monitoring - (Unit 1 /

Unit 2), Rev. 21

j. Integrated Computer System - Design Criteria Document WB-DC-30-29 Plant Integrated Computer System (ICS), Rev. 8 (Submitted under TVA to NRC letter dated August __, 2010)
2. Plant Computer (Integrated Computer System)

- See Item j above.

The WBN 2 FSAR Section 7.6, defines the following non-safety-related systems as other systems required for safety

1. Foxboro I/A - While not specifically described, functions performed by the system are described in this section. The qualify requirements are described above.
2. Lose Part Monitoring System - Design Criteria Document WB-DC-30-31, Loose Parts Monitoring System, Rev. 4, provides the quality requirements for this system. A description of the distributed control system will be added as FSAR section 7.7.1.11 in FSAR Amendment 101.

Installation is performed in accordance with the quality requirements of either the Bechtel or TVA work order processes based on the quality classification of the equipment being installed.

Vendor testing is performed in accordance with procurement specification requirements which are based on the type and quality classification of the equipment. Preoperational testing is performed in accordance with Chapter 14 of the FSAR.

213 7.5.2 7/27/2010 Responder: WEC 21. N Open Open-NRC EICB RAI EICB Review ML102980066 (Carte) By letter dated June 18, 2010 (ML101940236) TVA Conformance with IEEE 603 is documented in the Response is included in Item No. 18 stated (Enclosure 1, Attachment 3, Item No. 3) that the revised Common Q PAMS Licensing Technical letter dated 10/25/10 PAMS system design specification and software Report and the Common Q PAMS System Design Due 12/31/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date requirements specification contain information to Specification. NNC to review and revise address the "Theory of Operation Description." The this question after LTR R1is staff has reviewed these documents, and it is not clear Attachment 1 contains the proprietary version of received. .

how this is the case. The docketed material does not Westinghouse document Tennessee Valley appear to contain the design basis information that is Authority (TVA), Watts Bar Unit 2 (WBN2), Post-required to evaluate compliance with the Clause of Accident Monitoring System (PAMS), Licensing IEEE 603. Technical Report, Revision 1, WNA-LI-00058-(1) Please provide the design basis (as described in WBT-P, Dated October 2010 IEEE 604 Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the Attachment 8 contains the proprietary version of PAMs complies with the applicable regulatory Westinghouse document Nuclear Automation requirements for the theory of operation. Watts Bar 2 NSSS Completion Program I&C For example: Regarding IEEE 603 Clause 5.8.4 (1) Projects Post Accident Monitoring System -

What are the manually controlled protective actions? System Design Specification, WNA-DS-01667-(2) How do the documents identified demonstrate WBT, Rev. 2 dated September 2010.

compliance with this clause?

214 7/27/2010 Responder: WEC 22. N Open Open-NRC EICB RAI TVA Letter EICB (Carte)

Review ML102980066 dated 10/5/10 By letter dated June 18, 2010 (ML101940236) TVA According to "The Software Program Manual for Response provided in letter Item No. 11 stated (Enclosure 1, Attachment 3, Item No. 10) that Common Q Systems," WCAP-16096-NP-1A, the dated 10/5/10 Due 12/1/10 the approved Common Q Topical Report contains Software Safety Plan only applies to Protection information to address the "Safety Analysis." The class software and PAMS is classified as WEC References Common Common Q SPM however states that a Preliminary Important-to-safety. Exhibit 4-1 of the SPM Q PAMS preliminary Hazards Analysis Report and the V&V reports shows that PAMS is classified as Important-to- hazards analysis is document the software hazards analysis. Please Safety referenced in the SRS.

Provide these documents. WEC to delete.

244 8/3/2010 Responder: WEC 23. N Open Open-NRC EICB RAI LIC-101 Rev. 3 Appendix B EICB (Carte)

Review ML102980066 Section 4, "Safety Evaluation" Section 8.2.2 of the Common Q SPM (ML050350234) The process related requirements have been Response is provided in Item No. 14 states: "the information relied states that the Software Requirements Specification removed from revision 2 of the Software letter dated 10/25/10. Due 10/22/10 upon in the SE must be (SRS) shall be developed using IEEE 830 and RE Requirements Specification (SRS). docketed correspondence."

1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS Attachment 3 of letter dated 10/25/10 contains the LIC-101 Rev. 3 states: "The should address the software product, not the process proprietary version of Westinghouse document safety analysis that supports the of producing the software. In addition Section 4.3.2.1 Nuclear Automation, Watts Bar 2 NSSS change requested should include of the SPM states "Any alternatives to the SPM Completion Program, I&C Projects, Software technical information in sufficient processes or additional project specific information for Requirements Specification for the Post Accident detail to enable the NRC staff to the ...SCMP...shall be specified in the PQP. Monitoring System, WNA-SD-00239-WBT, make an independent Revision 2, Dated September 2010. assessment regarding the Contrary to these two statements in the SPM, the acceptability of the proposal in WBN2 PAMS SRS (ML101050202) contains many terms of regulatory requirements process related requirements, for example all and the protection of public seventeen requirements in Section 2.3.2, health and safety."

"Configuration Control," address process requirements for configuration control.

Please explain how the above meets the intent of the approved SPM.

246 8/3/2010 Responder: WEC 24. N Open Open-NRC EICB RAI LIC-101 Rev. 3 Appendix B EICB (Carte)

Review ML102980066 Section 4, "Safety Evaluation" Section 4.3.2.1, "Initiation Phase" of the Common Q As agreed ISG6 does not apply to the Common Q Response is provided in Item No. 15 states: "the information relied SPM (ML050350234) requires that a Project Quality PAMS platform. The information required to letter dated 10/25/10 upon in the SE must be Plan (PQP) be developed. Many other section of the address this question concerning the PQP and Due 10/22/10 docketed correspondence."

SPM identify that this PQP should contain information SPM has been added to compliance matrix in required by ISG6. Please provide the PQP. If "PQP" revision 1 of the Licensing Technical Report. LIC-101 Rev. 3 states: "The is not the name of the documentation produced, safety analysis that supports the please describe the documentation produced and Attachment 1 of letter dated 10/25/10 contains the change requested should include provide the information that the SPM states should be proprietary version of Westinghouse document technical information in sufficient

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date in the PQP. Tennessee Valley Authority (TVA), Watts Bar detail to enable the NRC staff to Unit 2 (WBN2), Post-Accident Monitoring System make an independent (PAMS), Licensing Technical Report, Revision 1, assessment regarding the WNA-LI-00058-WBT-P, Dated October 2010 acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

247 8/8/2010 Responder: WEC 25. N Open Open-NRC EICB RAI LIC-101 Rev. 3 Appendix B EICB (Carte)

Review ML102980066 Section 4, "Safety Evaluation" As part of the Common Q topical report development The implementation documents required by the Response is provided in Item No. 16 states: "the information relied effort, Westinghouse developed the Software Program SPM are identified in the compliance matrix in letter dated 10/25/10 upon in the SE must be Manual for Common Q Systems (ML050350234) to revision 1 of the Licensing Technical Report. Due 10/22/10. docketed correspondence."

address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies Attachment 1 of letter dated 10/25/10 contains the LIC-101 Rev. 3 states: "The plans that will provide a quality software life cycle proprietary version of Westinghouse document safety analysis that supports the process, and that these plans commit to Tennessee Valley Authority (TVA), Watts Bar change requested should include documentation of life cycle activities that will permit the Unit 2 (WBN2), Post-Accident Monitoring System technical information in sufficient staff or others to evaluate the quality of the design (PAMS), Licensing Technical Report, Revision 1, detail to enable the NRC staff to features upon which the safety determination will be WNA-LI-00058-WBT-P, Dated October 2010 make an independent based. The staff will review the Implementation of the assessment regarding the life cycle process and the software life cycle process acceptability of the proposal in design outputs for specific applications on a plant- terms of regulatory requirements specific basis. Please identify the implementation and the protection of public documentation produced as a result of following the health and safety."

SPM, and state what information will be docketed.

248 8/8/2010 Responder: WEC 26. N Open Open-NRC LIC-101 Rev. 3 Appendix B EICB (Carte)

Review Section 4, "Safety Evaluation" As part of the Common Q topical report development The documents are identified in the compliance Response is provided in states: "the information relied effort, Westinghouse developed the Software Program matrix in revision 1 of the Licensing Technical letter dated 10/25/10 upon in the SE must be Manual for Common Q Systems (ML050350234) to Report Due 10/22/10. docketed correspondence."

address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies Attachment 1 of the letter dated 10/25/10 contains LIC-101 Rev. 3 states: "The plans that will provide a quality software life cycle the proprietary version of Westinghouse safety analysis that supports the process, and that these plans commit to document Tennessee Valley Authority (TVA), change requested should include documentation of life cycle activities that will permit the Watts Bar Unit 2 (WBN2), Post-Accident technical information in sufficient staff or others to evaluate the quality of the design Monitoring System (PAMS), Licensing Technical detail to enable the NRC staff to features upon which the safety determination will be Report, Revision 1, WNA-LI-00058-WBT-P, Dated make an independent based. The staff will review the Implementation of the October 2010 assessment regarding the life cycle process and the software life cycle process acceptability of the proposal in design outputs for specific applications on a plant- terms of regulatory requirements specific basis. Please identify the design outputs and the protection of public produced as a result of following the SPM, and state health and safety."

when what information will be docketed.

251 8/8/2010 Responder: WEC 27. N Open Open-NRC LIC-101 Rev. 3 Appendix B EICB (Carte)

Review Section 4, "Safety Evaluation" The SPM describes the software testing and The software testing performed and documents Response is provided in states: "the information relied documents that will be created. The SPM also created are addressed by the SPM Compliance letter dated 10/25/10 upon in the SE must be describes the testing tasks that are to be carried out. matrix contained in Revision 1 of the Licensing Due 10/22/10. docketed correspondence."

The acceptance criterion for software test Technical Report.

implementation is that the tasks in the SPM have been NOTE: Samir LIC-101 Rev. 3 states: "The carried out in their entirety. Please provide Attachment 1 of the letter dated 10/25/10 contains please check safety analysis that supports the information that shows that testing been successfully the Proprietary version of Westinghouses with Norbert to change requested should include accomplished. document titled: Tennessee Valley Authority see if the technical information in sufficient (TVA), Watts Bar Unit 2 (WBN2), Post-Accident response is detail to enable the NRC staff to Monitoring System (PAMS), Licensing Technical complete or make an independent Report, Revision 1, WNA-LI-00058-WBT-P, Dated partial. assessment regarding the October 2010 acceptability of the proposal in Thanks, terms of regulatory requirements

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date and the protection of public Steve health and safety."

266 8/11/2010 Responder: Webb/Webber 28. Y Open Open-NRC TVA Letter EICB (Carte)

Review dated 10/21/10 Please provide a high level description of the Foxboro FSAR section 7.7.1.11 will be added in Response provided in letter Enclosure 1 IA equipment used at WBN2. This description should Amendment 101. In discussions with the NRC dated 10/21/10 Amendment 101 Item No. 9 be more detailed than a brochure on the product line reviewer on October 4, 2010 it was agreed that Submitted (or available on the web), and less detailed than a the new FSAR section along with previously 10/29/10.

technical manual on each field replaceable unit. It is submitted documents should be sufficient to expected that such literature already exists. address this request. The NRC reviewer will notify TVA if additional documentation is required.

267 8/11/2010 Responder: WEC 29. N Open Open-NRC EICB (Carte)

Review By letter dated June 18, 2010 (ML101940236) TVA This is addressed in the Licensing Technical Response provided in letter stated that the software safety plan (SSP) was not Report, Revision 1, WNA-LI-00058-WBT-P. dated 10/25/10 applicable to PAMS applications (see Watts Bar 2 - Due 10/22/10 Common Q PAMS ISG-6 Compliance matrix Item No. Attachment 1 of the letter dated 10/25/10 10); however, reference No. 30 of the SRS contains the Proprietary version of (ML101050202) is: 00000-ICE-37727, Rev. 0, "Post Westinghouses document titled: Tennessee Accident Monitoring System Software Preliminary Valley Authority (TVA), Watts Bar Unit 2 (WBN2),

Hazard Analysis for the Common Q PAMS Project." A Post-Accident Monitoring System (PAMS),

Preliminary Hazard Analysis is required by the SSP. Licensing Technical Report, Revision 1, WNA-LI-Please explain. 00058-WBT-P, Dated October 2010 277 7.6 7.6.3 8/27/2010 Responder: Clark 30. Y Open Open-NRC EICB RAI EICB (Garg)

Review ML102910008 NUREG 0847, "Safety evaluation report Related to the Removal of the Upper Head Injection System was Response is included in Item#61 operation of Watts Bar Nuclear Plant, Units 1 and 2." reviewed as part of the WBN Unit 1 original and letter dated 10/29/10 Due 10/31 has section 7.6.3 which discusses the, "Upper Head was reviewed by the staff in SER Supplement 6:

Injection Manual Control" system but has been removed from the FSAR. Please provide the 1.7 Summary of Outstanding Issues - PAGE 1-information regarding when this system was removed, 3 "Supplement 7" and the justification for the removal of the system and if the NRC staff has previously reviewed and accepted (22) Removal of upper head injection system the removal of the system provide the reference to the Opened (SSER 7) 6.3.1 (TAC 77195) staff's SE.

When the removal of UHI System was evaluated by the NRC, this should be applied to both sections 6.3.1 and 7.6.3, since the UHI Control System has no function once the UHI System has been removed.

281 7.6 7.6.8 8/27/2010 Responder: Webb 31. N Open Open-NRC EICB RAI EICB (Garg)

Review ML102910008 For FSAR Section 7.6.8 in amendment 96, redline Attachment 5 contains the WBN Unit 2 FSAR Response provided in letter Item#65 version has completely rewritten this section of the markup for Section 7.6.8, Interlocks for RCS dated 10/29/10 Tva to docket in FSAR, however, the staff is not able to determine any Pressure Control During Low Temperature 10/31 letter changes made to the section. Explain what changes Operation, showing what was changed between have been made to this FSAR Section. Amendments 95 and 96.

283 7.7.5 XX 8/27/2010 Responder: Clark 32. N Open Open-NRC EICB RAI No.13 This item is a follow-up question EICB (Darbali)

Review ML102910017, to item 96.

Follow-up to item 96 1. Steam generator power operated relief valve Response is included in 10/19/10 control system letter dated 10/29/10 Due 10/31/10 On Open Item 96, regarding the implementation of IEN 79-22, part of TVAs response was: The potential scenario for this event is addressed in 15.2.13, Accidental The non-safety-related device/systems within the Depressurization of the Main Steam System.

scope of IEN 79-22 are:

1. Steam generator power operated relief valve control 2. Pressurizer power operated relief valve

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date system control system

2. Pressurizer power operated relief valve control system The potential scenario for this event is
3. Main feedwater control system depressurization of the reactor coolant
4. Automatic rod control system. system due to a relief valve failing open.

This is addressed in 15.2.12, Accidental Failure of these systems/devices due to a high energy Depressurization of the Reactor Coolant line break is fully addressed in Chapter 15, Accident System and 15.3.1, Loss Of Reactor Coolant Analysis of the WBN Unit 2 FSAR. From Small Ruptured Pipes Or From Cracks In Large Pipes Which Actuate The Please identify the sections of FSAR Chapter 15 that Emergency Core Cooling System.

address the failures of these systems.

3. Main feedwater control system The potential scenarios for this event are:
a. A loss of feedwater due a feedwater isolation valve failing closed. This is addressed in 15.2.8, Loss of Normal Feedwater.
b. A feedwater regulating valve failing open. This is addressed in 15.2.10, Excessive heat removal due to feedwater system malfunctions.
4. Automatic rod control system The potential scenarios are uncontrolled rod withdrawal events that are addressed in 15.2.1, Uncontrolled Rod Cluster Control Assembly Bank Withdrawal From A Subcritical Condition, 15.2.2, Uncontrolled Rod Cluster Control Assembly Bank Withdrawal At Power, and 15.2.3, Rod Cluster Control Assembly Misalignment.

285 7.3.3 7.3 8/27/2010 Responder: McNeil 33. Y Open Open-NRC EICB RAI No.15 This item is a follow-up question EICB (Darbali)

Review ML102910017, to item 22 Follow-up to item 22 The Foxboro SPEC 200 components are Response is included in 10/19/10 physically arranged in the racks to meet the letter dated 10/29/10 Do the control loops meet the requirements of IEEE- requirements of IEEE-279 and Watts Bar Design Due 10/31/10.

279? If not are they isolated from the circuit which Criteria WB-DC-30-4, Separation/Isolation. Waiting for meets the requirements of 279. docketed version Foxboro (Invensys) uses two IE analog modules to close item.

to isolate IE to Non-IE signals. These are Contact Output Isolator (Model Number 2A0-L2C-R Relay Output) and Voltage-to-Current Converter (Model Number 2A0-VAI), both of which have the Input and Output signals isolated.

289 9/2/2010 Responder: Faulkner 34. N Open Open-NRC RAI No. 24 TVA Letter EICB (Singh)

Review ML102980005 dated 10/21/10 There are 4 Containment High Range Radiation Response provided in letter 10/26/2010 Enclosure 1 Provide an ISG 2 diversity analysis for the containment Monitors (HRRMs) for WBN2, a pair in upper dated 10/21/10 Please refer to Item No. 20 high range accident monitors RM-1000. containment and a pair in lower containment. highlighted Each pair completely meets the requirements for sections of safety related equipment including separation, response that independence, electrical isolation, seismic address NRC qualification, quality requirements, etc. Each comments 1) and monitor channel is a standalone instrument loop 2).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date with traditional individual panel readout. They are not a part of a Highly Integrated Control Room Staff has the (HICR) and there is no diversity question relating following to the HRRMs and any HICR infrastructure. comments on the Therefore, the response to this RAI will address proposed TVA the functional uses of the HRRMs and the response per the alternate and diverse instrumentation that could 10/21/submittal:

be used for those functions should a common mode software issue render both trains of HRRMs 1)Response non-functional. addresses upscale failure.

The Containment HRRMs have no automatic Please explain actuation function. They only provide indication how downscale as required by RG 1.97R2. They are used at failure of all WBN for 2 functions. They are used by the HRRM operators in Emergency Operating Instructions channels is (EOI) as one of the indications of abnormal detected and containment conditions indicative of a Loss of appropriate Coolant Accident (LOCA) after a Reactor Trip and actions taken.

Safety Injection and they are used in Emergency Plan Implementing Procedures (EPIP) to assist 2) Please confirm with event classification for events which involve that the fuel cladding degradation. location for obtaining the In the EOI procedures, there are several diverse RCS sample is indications of containment conditions that are accessible after used to detect a LOCA and they are Containment an accident.

Pressure, Containment Temperature, and Containment Sump Level. All of these instrument Otherwise, the channels are diverse to the HRRMs in that they response is do not share a software platform or any integrated acceptable.

information or control system features. The HRRMs functional through individual, self Due 10/31/10 contained, microprocessor based instrument loops. Containment Pressure and Sump Level indications are provided through Eagle 21 equipment which is completely diverse from the HRRMs. Containment Temperature is provided through Foxboro Spec 200 instrument channels which are completely diverse from the HRRMs.

All of these readouts are through traditional panel meters and are not part of any HICR infrastructure.

In the EPIPs, the HRRMs are used to indicate loss of fuel clad barrier and the potential loss of a containment barrier. Potential fuel clad damage can also be determined from samples taken from the Reactor Coolant System and from Incore Thermocouple readings. RCS sampling does not rely on plant instrumentation systems and the Incore Thermocouple System uses a Common Q software platform which is diverse from the HRRMs. 2) The accessibility required to obtain post accident samples of RCS has been demonstrated to be a viable post accident action at WBN.

Should all 4 channels of HRRMs fail upscale,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date Annunciator Response Instructions would be followed and they call for evacuation of containment, sampling of RCS, checking other non-accident Radiation Monitors, notification of Radiological Control personnel to investigate, potential transition to Abnormal Operating procedures for management of potential radioactive material release, and evaluation under the Emergency Plan Implementing Procedures for event classification. All of these actions are conservative actions. 1) Should all 4 channels of the HRRMs fail downscale, the operators would turn to diverse indications as noted above before taking any further action.

Therefore, there are diverse methods and equipment sets that can be used for any functions provided by the HRRMs should both channels become nonfunctional.

291 7.7 9/7/2010 Responder: Clark 35. Y Open Open-NRC TVA Letter EICB (Carte)

Review dated 10/21/10 The equation at the bottom of Amendment 100 page The errors in the terms within the equation for Response provided in letter Enclosure 1 7.7-3 is wrong. There are two ways that this equation total rod speed error [TE] will be corrected in dated 10/21/10 Amendment 101 Item No. 21 is inconsistent with the text above it. FSAR Amendment 101 as shown below: Submitted 10/29/10.

1 1 1 1 1 1

293 7.7.4 7.2.2. 9/8/2010 Responder: Craig 36. Y Open Open-NRC EICB RAI TBD EICB RAI ML102861885 sent to EICB (Marcus) 3.5 Review ML102861885 DORL FSAR Amendment 100, Section 7.2.2.3.5 discusses Steam Generator Overfill Response is acceptable Item No. 22 Steam Generator Water Level and protection against FSAR Section 7.2 discusses reactor trip NRC to issue low water level. However, this section does not functions. Section 7.2.2.3.5 describes the Low- Response is included in formal RAI to discuss protection against Steam Generator overfill. Low steam generator level reactor trip. The letter dated 10/29/10 TVA.

Additionally, FSAR Section 7.2.2.3.4 discusses steam generator High-High level interlock (P-14)

Pressurizer Water Level and provides minimal protects against steam generator overfill by TVA formal information concerning Pressurizer overfill. Please initiating feedwater isolation and a turbine trip. response due provide a discussion of protection against Pressurizer Reactor trip occurs indirectly as a result of the 10/31/10 and Steam Generator overfill. turbine trip if power is above 50%, the P-9 interlock. This function is identified as ESFAS interlock P-14 in FSAR Section 7.3, Table 7.3-3.

The High-High level interlock is also discussed in FSAR Section 10.4.7.3. Section 15.2.10 analyzes the feedwater malfunction event which causes one or more feedwater control valves to fail to the fully open position.

Pressurizer Overfill The High pressurizer water level reactor trip protects against pressurizer overfill. This trip is described in FSAR Section 7.2.1.1.2 (3). Section 7.2.2.3.4 discusses specific control and protection interactions related to pressurizer level control.

The high water level trip setpoint provides sufficient margin such that the undesirable condition of discharging liquid coolant through the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date safety valves is avoided. Pressurizer level is modeled in various Chapter 15 events to ensure that critical protection functions will function as required.

300 Need Radiation Monitoring System Description/Design Responder: Temples/Mather 37. N Open Open-NRC RAI No. 25 Criteria Review ML102980005 (1) The Radiation Monitoring Design Criteria Response is included in 10/26/2010 Are detectors different from Unit 1. Describe any Document, WB-DC-40-24, Revision 21 is letter dated 10/29/10 Due 10/31/10 differences. contained in Attachment 6 to letter dated TVA to address October 31, 2010. the following Are there any commercially dedicated parts in the RM- comments:

1000? If so, how are they dedicated? (2) Attachment 7 contains the General Atomics detector differences report. The containment (1) Is it Att. 5 or Please confirm that digital communication ports high range radiation monitors are loops 271- Att. 6?

available in RM-1000 are not used. 274. (2) Pl. confirm that HRRMs (3) For safety-related applications, General are loops 271-EICB (Singh)

Atomics Electronic Systems, Inc. supplies the 274.

RM-1000 module assembly as a Basic (3) TVA to clarify Component. This assembly does contain that GA has a component parts that are Safety-Related commercial Commercial Grade Items (SRCGI). Because dedication these SRCGI components are assembled into program in the delivered Basic Component, they are place and that dedicated to the assembly by virtue of the GA is an acceptance test of the full RM-1000 approved assembly. Safety-related commercial grade 10CFR50, items are dedicated in accordance with App. B General Atomics approved 10 CFR 50 supplier.

Appendix B program. (4) Response acceptable.

(4) The digital communications ports on the safety-related RM-1000 radiation monitors are not used.

302 7.5.2. 7.5.1 09/17/2010 Responder: Tindell 38. Y Open Open-NRC EICB RAI TBD EICB RAI ML102861885 sent to 1 Review ML102861885 DORL Item 208 requested a description of the changes that Attachment 8 contains the requested 50.59 Response is included in Item No. 23 were performed under 10 CFR 50.59 for 16 Unit 1 evaluations and the variable table cross letter dated 10/29/10 NRC to issue See Item 332 PAM variables that were identified in Enclosure 1 Item referencing the variable to the appropriate DCN. formal RAI to TVA EICB (Marcus)

No.6 of the letter dated June 18, 2010 There are two changes to the original table.

(ML101940236). Please identify the specific 10 CFR Variable 9, RCS Pressurizer Level and 10, RCS TVA formal 50.59 documentation that applies to each of these 16 Pressure Wide Range have been changed from response due variables. 50.59 Y to N. The original response showed 10/31/10 these variables as changed under 10 CFR 50.59.

The response was based on the plan to replace all paper recorders in Unit 1. The assumption was that these recorders would be replaced prior to Unit 2 startup. While this may still occur, the recorders have not been replaced at this time.

303 7.5.2. 7.5.1 09/17/2010 Responder: Tindell 39. Y Open Open-NRC EICB RAI TBD EICB RAI ML102861885 sent to 1 Review ML102861885 DORL EICB (Marcus)

Enclosure 1 Item 6 of the letter dated June 18, 2010 Attachment 9 contains the cross reference Response is included in Item No. 24 included a column to indicate the Unit 2 variable between the Unit 2 and Unit 1 variable sources for letter dated 10/29/10 NRC to issue See Item 333 source for each PAM variable and also if the variable the unique WBN Unit 2 variables within the scope formal RAI to TVA was unique to Unit 2. For each variable that was of the Foxboro Spec 200, Common Q PAMS and indicated as unique to Unit 2 and the Unit 2 variable Foxboro I/A changes. TVA formal source is (1) Foxboro Spec 200, (2) Common Q response due PAMS, or (3) Foxboro IA, identify the Unit 1 variable NOTE: An error was identified during preparation 10/31/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date source. of this response. Variable 37 CCS Surge Tank Level was incorrectly identified as being within the scope of the Foxboro I/A system in TVA to NRC letter dated June 18, 2010. Variable 37 will be provided by the Foxboro Spec 200 system for Unit 2.

304 7.5.2. 7.5.1 09/17/2010 Responder: Tindell 40. Y Open Open-NRC EICB RAI TBD EICB RAI ML102861885 sent to 1 Review ML102861885 DORL EICB (Marcus)

Enclosure 1 Item 6 of the letter dated June 18, 2010 The source for the Unit 1 variables is the Eagle 21 Response is included in Item No. 25 indicated that the Unit 2 variable source for 14 PAM System. letter dated 10/29/10 NRC to issue variables is Eagle 21. Please confirm that for each of formal RAI to TVA these 14 variables the Unit 1 variable source is also Response is acceptable the Eagle 21. TVA formal response due 10/31/10 305 7.5.2. 7.5.1 09/17/2010 Responder: Tindell 41. Y Open Open-NRC EICB RAI TBD EICB RAI ML102861885 sent to 1 Review ML102861885 DORL EICB (Marcus)

Enclosure 1 Item 6 of the letter dated June 18, 2010 The source for the Unit 1 variables is the Response is included in Item No. 26 indicated that the Unit 2 variable source for 2 PAM Integrated Computer System. letter dated 10/29/10 NRC to issue variables is the Integrated Computer System. Please formal RAI to TVA confirm that for these 2 variables the Unit 1 variable Response is acceptable source was the Unit 1 plant computer system. TVA formal response due 10/31/10 313 7.7.8 7.7.1. EDCR 52408 (installation of AMSAC in Unit 2) states Responder: Ayala 42. Y Open Open-NRC EICB RAI No.18 12 that Design Criteria WB-DC-40-57 needs to be Review ML102910017, modified to reflect AMSAC in Unit 2. (1) The review of WB-DC-40-57 for Unit 2 Response is included in 10/19/10 applicability has been completed and letter dated 10/29/10

1. Has WB-DC-40-57 been completed for Unit 2? If included in Revision 4 of the document. Due 10/31/10.

so, please submit. Attachment 10 contains TVA design criteria Waiting for WB-DC-40-57, Revision 4, Anticipated docketed version

2. If WB-DC-40-57 has not been completed for Unit Transients Without Scram Mitigation System to close item.

2, please give an estimated date of completion Actuation Circuitry (AMSAC).

EICB (Darbali) and submittal.

(2) The revision for Unit 2 is complete with open

3. Please submit WB-DC-40-57 for Unit 1 and items as identified in item (3) below.

identify any changes to the Unit 2 version.

Attachment 10 contains TVA design criteria WB-DC-40-57, Revision 4, Anticipated Transients Without Scram Mitigation System Actuation Circuitry (AMSAC) which is applicable to both WBN Unit 1 and Unit 2. There are 17 open Watts Bar Nuclear Plant Unit 2 Startup Integration Task Equipment List (WITEL) punch list items associated with Revision 4 that require resolution.

A list of the punch list items is contained in Attachment 10.

317 7.5.2. 7.5 TVA has provided a proprietary and a non-proprietary Responder: Temples 43. Y Open Open-NRC RAI No. 27 3 version of Technical Manual for RM-1000 Digital Review ML102980005 Radiation Processor under ML101680582 and i. These documents are applicable to WBN Response is included in 10/26/2010 EICB (Singh)

ML101680587). Unit 2. letter dated 10/29/10 Proposed ii. This was an error in document response is (i) Are these documents applicable to WBN2 as preparation that occurred when acceptable. TVA provided (October 2003 version). attachments were assembled for a to issue and (ii) Why is DCN38993-A attached at the back of previous letter. confirm letter the proprietary version? It is for WBN1 iii. The Technical Manual is not intended to date.

Turbine Governor Control Valve. include equipment requirements. (iii) Staff is looking for

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date (iii) This document does not state the Requirements would be found in the high level requirements Due 10/31/10 requirements for RM-1000 units. Please applicable TVA Specifications for the for RM-1000 monitors. Pl.

provide a document that states the contract. provide appropriate requirements for the RM-1000 radiation documents.

monitors for WBN2. Attachment 11 contains the Material Requisition Specification Revisions 1 and 4 which contain the requested information.

318 7.5.2. 7.5 TVA has provided the following documents for RM- Responder: Temples 44. Y Open Open-NRC RAI No. 28 3 1000 equipment qualification: Review ML102980005 (i) Applicable to WBN Unit 2. 04508905-1QR Note check 04508905-1QR 10/26/2010 (i) Qualification Test Report for RM-1000 Processor is applicable only in regards to the RM-1000, or QR. Staff version is QR Module and Current-To-Frequency Converter with the exception of re-qualification of only. Due 10/31/10 04508905-QR (January 2001) certain RM-1000 equipment differences (ii) Qualification Test Report Supplement, RM-1000 covered in the -1SP report. The Current-to- Response is included in Response Upgrades 04508905-1SP (June 2006) Frequency (I-F) converter module letter dated 10/29/10 acceptable. TVA (iii) Qualification Test Report Supplement, RM-1000 qualifications in the base report and the - to issue letter and Upgrades 04508905-2SP (June 2008) 1SP report are not applicable to the RM- confirm stated EICB (Singh)

(iv) Qualification Test Report Supplement, RM-1000 1000s, and will be used later as references (future) dates Upgrades 04508905-3SP (May 2008) in the WBN Unit 2 specific qualification reports.

Please clarify whether all of these are fully applicable (ii) Applicable to WBN Unit 2.

to WBN2 or are they applicable with exceptions? If (iii) Not applicable to WBN Unit 2 with exceptions, then please clarify what those are. (iv) Not applicable to WBN Unit 2 Supplement 3 was issued one month prior to The 04508905-3SP report was prepared for supplement 2. Please explain the reason for the another TVA plant, as a monitor system-level same. report, where the system included equipment mostly based on the base report equipment items.

These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -

2SP document review/release process resulted in the release time difference.

319 7.5.2. 7.5 TVA provided System Verification Test Results Responder: Temples 45. Y Open Open-NRC RAI No. 29 3 04507007-1TR (July 1999) for Sequoyah to support Review ML102980005 test verification. However, the document states (page See TVA letter to the NRC dated October 21, Response is included in 10/26/2010 v) that it is not applicable for high range monitors with 2010, item 26 (RAI Matrix Item 316) for non- letter dated 10/29/10 an action noted for fixing a problem with the high range applicability of 04507007-1TR. The recorded Due 10/31/10 EICB (Singh)

RM-1000 monitors on page vi. TVA to respond to the anomaly was later resolved through the following clarifications: verification of software version 1.2, reported in Response RM-1000 v1.2 Software Verification Report acceptable. TVA Has the anomaly noted on page vi been resolved for 04508006. to issue letter and the high range monitors? confirm stated The high range verification documents are the (future) dates Provide the high range verification document for Sequoyah RM-1000 v1.1 Software Verification WBN2. Report 04508006 and RM-1000 v1.2 Software Verification Report 04508006.

323 WCAP-13869 revision 1 was previously reviewed Responder: Craig 46. N Open Open-NRC EICB(Gar under WBN Unit 1 SER SSER 13 (Reference 8). Unit Review 2 references revision 2. An analysis of the differences Attachment 12 contains the WCAP 13869 Response is included in g) and their acceptability will be submitted to the NRC by Revision 1 to Revision 2 Change Analysis. letter dated 10/29/10 Due 10/31/10 November 15, 2010 328 7.5.2. 7.5 Provide the model number for the four containment Responder: Temples 47. Y Open Open-NRC RAI No. 30 3 high range area monitors, RM-1000 and identify how Review ML102980005 EICB the software V&V and qualification documents apply to The Containment High Range Radiation Monitors Response is included in 10/26/2010 (Singh) them. If there is no specific model number then how is are model RM-1000. The monitors are uniquely letter dated 10/29/10 Response OK.

it ensured that the correct radiation monitor is received identified by serial numbers which are assigned Awaiting TVA ltter at the site and subsequently installed? when the equipment is assembled. The to close OI.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date applicability of V&V reports and quality Due 10/31/10 documentation for the RM-1000 model is in accordance with manufacturers approved 10 CFR 50 Appendix B Quality Program and the requirements of the purchase order.

329 7.6.1 7.6.7 Section 7.6.7 of the FSAR (Amendment 100) states Responder: Clark 48. N Open Open-NRC RAI No. 1 EICB (Singh) that, The DMIMS-DX' audio and visual alarm Review ML102980005 capability will remain functional after an The title of FSAR Section 3.10 is Seismic Design Response is included in 10/26/2010 Operating Basis Earthquake (OBE). All of the DMIMS- of Category I Instrumentation and Electrical letter dated 10/29/10 DX' components are qualified Equipment. Since the Loose Part Monitoring Due 10/31/10 for structural integrity during a Safe Shutdown System is not a Category 1 system, it is not Earthquake (SSE) and will not included in the scope of 3.10. FSAR Section TVA to confirm mechanically impact any safety-related equipment. 7.6.7, Loose Parts Monitoring System (LPMS) that the System Description, identifies basic system equipment has TVA to clarify the seismic qualification of the loose seismic design criteria which are consistent with been seismically parts monitoring system and include the appropriate the requirements of TVA Design Criteria, WB-DC- qualified as information in Table 3.10 (or another suitable section) 30-31, Loose Parts Monitoring System. As required and that of the FSAR. identified in FSAR Table 7.1-1, Watts Bar Nuclear TVA reviewed and Plant NRC Regulatory Guide Conformance, the found the report system conforms to Reg. Guide 1.133 as modified acceptable.

by Note 12. Reg. Guide 1.133 identifies the seismic requirements and Note 12 does not contain any exception to the Regulatory Guide seismic requirements.

092 5/20/2010 Responder: Hilmes 1. N Open Open-TVA DORL (Poole) TVA to review Licensee Open Item list and determine This item will close when we are no longer using Continuous review which items are proprietary. this document as a communications tool. as items are added 117 7.1 7.1 6/3/2010 Responder: Hilmes 2. Y Open Open-TVA EICB RAI EICB (Garg)

ML102910008 Does TVA use a single sided or double sided Reactor Protection System (RPS) (comprised of Revised response is Pending FSAR Item#21 methodology for as-found and as-left instrument Reactor Trip (RPS) and Engineered Safety included in letter dated Amendment 102 setpoint values. (RIS2006-7) Features Actuation System (ESFAS)) setpoint 10/29/10 submittal values are monitored by periodic performance of surveillance tests in accordance with Technical Due 10/31/10 Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor TVA needs to Trip and ESFAS trip setpoint surveillance tests as address that trip described in FSAR amendment 100. setpoint and allowable value TVA Revised Response: uncertainties are not reduced by For TSTF-493 parameters WBN Unit 2 uses only the reduction double sided correction factors. Attachment 3 factor for the contains the revised FSAR section 7.1.2.1.9 that single sided will be included in FSAR Amendment 102 that reduction factor.

reflects this change. TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date justifications.

274. 8/26/2010 Responder: Clark 3. Y Open Open-TVA RAI No. 6 TVA Letter EICB (Singh) b ML102980005 dated 10/21/10 Loose Parts Monitoring System: TR 3.3 refers to The reference will be changed to FSAR section Response provided in letter Response 10/26/2010 Enclosure 1 section 4.4.6 of the FSAR for description of the loose 7.6.7 Loose Part Monitoring System (LPMS) dated 10/21/10 acceptable. TVA Item No. 12 parts monitoring system. However, this section of the System Description in next revision of the to complete stated FSAR is not available. TVA to check the reference Technical Requirements Manual as shown below: action.

and respond.

1. Watts Bar FSAR, Section 7.6.7, Lose Part Due 10/31/10 Monitoring System.

(Note: Bechtel I&C to submit TRM change package to TVA Licensing.)

287 7.3 7.3-1 8/27/2010 Responder: Elton 4. Y Open Open-TVA ML102390538, EICB (Darbali)

Item No. 1, In Amendment 95 of FSAR section 7.3.2.3 Further Unit 2 FSAR Section 7.3 addresses Engineered Response included in next Due 10/31/10. 9/10/10 and Considerations, the list of signals that would start the Safety Features (ESF) Actuation System. TVA Licensing Formal RAI Waiting for EICB RAI No.17 auxiliary feedwater motor driven and turbine driven AMSAC is non-safety, and thus non-ESF. Response Letter. docketed version ML102910017, pumps was moved to table 7.3-1 item 3, Auxiliary Therefore, it was correct to not include AMSAC to close item. 10/19/10 Feedwater. However, item (6) AMSAC was not when the initiating signals were relocated from included in table 7.3-1. Unit 2 FSAR Section 7.3.2.3 to Table 7.3-1. Expected letter issue date is Please explain this omission or state your commitment 11/5/10 to correct this in a future amendment.

288 7.3 9/2/2010 Responder: McNeil 5. N Open Open-TVA EICB RAI EICB (Garg)

ML102910008 Can we add a section to chapter 7 giving a brief The following new section will be added to the Due TBD Item#67 overview of the Foxboro Spec 200 in Section 7.3? WBN Unit 2 FSAR as part of Amendment 102: TVA committed to adding a description of the TVA should 7.3.1.1.3 Analog Instrumentation Foxboro Spec 200 include the list of hardware at the 10/12 NRC all the functions The miscellaneous safety-related analog process Public Meeting. where Spec 200 is control and indication loops are a set of discrete used and discuss analog modules that have been tested and differences qualified for use in safety related systems. The between unit 1 various components have been qualified to IEEE and unit2. This Standard 323-1983 (R-1996) IEEE Standard for discussion should Qualifying Class IE Equipment for Nuclear Power also include loop Generating Stations, IEEE Standard 344-1987 which are (R-1993) IEEE Standard Recommended currently used for Practices for Seismic Qualification of Class IE Unit 1 operation If Equipment for Nuclear Power Generating Spec 200 Stations, and IEEE Standard 384-1984 (R-1992) components have IEEE Standard Criteria for Independence of also been Class IE Equipment and Circuits. The modules qualified to RG are arranged in instrument loops to provide the 1.209, it should be safety function as described in the TVA licensing stated and if not basis for the Emergency Gas Treatment, Auxiliary why not.

Feedwater, and Safety-Related Balance of Plant systems. Seismic qualification of the analog modules and racks is addressed in FSAR Section 3.10.

The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date Two IE analog modules are used to isolate IE to Non-IE signals. These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.

294 7.3 7.3.1. 9/9/2010 Responder: Elton 6. Y Open Open-TVA ML102390538, EICB (Darbali) 1.1 Item No. 2, In Amendment 95 of FSAR section 7.3.1.1.1 Function The information provided in Unit 2 FSAR Section Response included in next Due 10/31/10. 9/10/10 Initiation, item (13) was arranged into paragraph form 7.3.1.1 is not meant to describe the specific TVA Licensing Formal RAI Waiting for from what used to be a listing of items (a), (b) and (c). function of each item in detail; the descriptions Response Letter. docketed version provided are a summary listing. The omitted to close item.

The second bullet under item (c) was omitted in the information provided information beyond the level new paragraph. of detail provided for the other items in this Expected letter section. issue date is Initiates Phase B containment isolation of the 11/5/10 following: The level of detail contained in item (13) of Unit 2

Please explain this omission or state your commitment to correct this in a future amendment.

295 7.3 7.3.1. 9/9/2010 Responder: Elton 7. Y Open Open-TVA ML102390538, EICB (Darbali) 1.2 Item No. 3, In Amendment 95 of FSAR section 7.3.1.1.2 Process The level of detail is sufficient for this section Response included in next Due 10/31/10. 9/10/10 Protection Circuitry, item (3), references to sections without the two removed references to other TVA Licensing Formal RAI Waiting for 7.6 and 7.7 were removed. Sections. Response Letter. docketed version to close item.

Please explain the reason for removal. The level of detail contained in item (3) of Unit 2 FSAR Section 7.3.1.1.2 is consistent with that Expected letter contained in item 3. of Unit 1 UFSAR Section issue date is 7.3.1.1.2. 11/5/10 296 7.3 7.3.1. 9/9/2010 Responder: Elton 8. Y Open Open-TVA ML102390538, EICB (Darbali) 2.1 Item No. 4, In Amendment 95 of FSAR section 7.3.1.2.1 The information provided in Unit 2 FSAR Section Response included in next Due 10/31/10. 9/10/10 Generating Station Conditions, the new paragraph 7.3.1.2.1 is not meant to provide detailed TVA Licensing Formal RAI Waiting for was arranged from what used to be a listing of items information describing what each condition Response Letter. docketed version (1.b), (1.c), and (2.b), leaving out items (1.a) and (2.a).

includes. Deletion of the breaks described in to close item.

Even if the paragraph contains the word include, theItems (1.a) and (2.a) is justified because they are breaks in items (1.a) and (2.a) should be listed. encompassed by the operating conditions primary Expected letter system breaks and secondary system breaks, issue date is Please explain this omission or state your commitment respectively. 11/5/10 to correct this in a future amendment.

The level of detail contained in Unit 2 FSAR Section 7.3.1.2.1 is consistent with that contained in Unit 1 UFSAR Section 7.3.1.2.1.

297 7.3 7.3.1. 9/9/2010 Responder: Elton 9. Y Open Open-TVA ML102390538, EICB (Darbali) 2.2 Item No. 5, In Amendment 95 of FSAR section 7.3.1.2.2 Unit 2 FSAR Section 7.3 addresses Engineered Response included in next Due 10/31/10. 9/10/10 Generating Station Variables, the following sentence Safety Features (ESF) Actuation System. Post TVA Licensing Formal RAI Waiting for was erased: accident monitoring is not an ESF; thus, a Response Letter. docketed version reference to it is not required in 7.3.1.2.2. to close item.

Post accident monitoring requirements and variables are given in Tables 7.5-1 and 7.5-2. Expected letter issue date is Please explain the reason for removal. 11/5/10 298 7.3 XX B (D 9/9/2010 Responder: Clark 10. Y Open Open-TVA ML102390538, Item No. 6, ar

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date IE Bulletin 80-06 calls for review of engineered safety A review of the schematic diagrams for the Response included in next Due 10/31/10. 9/10/10 features with the objective of ensuring that no device WBN Unit 2 valves listed in SER 3 found the TVA Licensing Formal RAI Waiting for will change position solely because of the reset following: Response Letter. docketed version action. to close item.

(1) For feedwater isolation valves (FCV-3-33, In Supplement 3 of NUREG-0847, section 7.3.5, the FCV-3-47, FCV-3-87, and FCV-3-100), Expected letter staff approved the design modifications proposed by feedwater check valve bypass valves (FCV- issue date is the applicant that would allow certain devices to 3-185, FCV-3-186, FCV-3-187, and FCV 11/5/10 remain unchanged upon an ESF reset. The staff also 188), and upper tap main feedwater found acceptable the applicants justification for some isolation valves (FCV 3-236, FCV-3-239, safety-related equipment that does not remain in its FCV-3-242, and FCV-3-245), the Unit 2 emergency mode after an ESF reset. equivalent reset switch and a relay have been added for each steam generator loop.

Please confirm whether or not the equipment that was When the engineered safety feature (ESF) determined in NUREG-0847 and its supplements to signal is reset, the individual valve will not remain unchanged upon an ESF reset will still remain change state until both the loop and the unchanged in Unit 2. ESF train reset switches have been reset.

(2) For steam generator blowdown isolation valves (FCV-43-54D, FCV-43-56D, FCV-43-59D, FCV-43-63D, FCV-43-55, FCV 58, FCV-43-61, and FCV-43-64), the ESF signal is sealed in by means of a seal in relay. The individual valve will not change state until a hand switch in the sample room is used to reopen the individual valve.

(3) For residual heat removal heat exchanger outlet flow control valves (FCV-74-16 and FCV-74-28), the ESF signal is sealed in by the limit switch. The Unit 2 equivalent reset switch has been added at the control room control board. When the ESF signal is reset, the individual valve will not change state until the individual reset switch has been reset.

306 7.1 7.1 FSAR amendment 100, page 7.1-12 provides the Responder: Hilmes 11. Y Open Open-TVA EICB RAI definition of Allowable value which is not consistent ML102910008 EICB (Garg) with TSTF-493 as allowable value is the value beyond The FSAR Allowable Value definition will be Response is included in Due 10/31/10 Item#69 which instrument channel is declared inoperable. revised to be consistent with the TSTF-493 in letter dated 10/29/10 FSAR Amendment 102. Attachment 3 contains Pending FSAR the revised FSAR section 7.1.2.1.9 that will be Amendment 102 included in FSAR Amendment 102 that reflects submittal this change.

307 7.1 7.1 (1) FSAR amendment 100, Section 7.1, page 7.1-12, Responder: Hilmes 12. Y Open Open-TVA EICB RAI definition of Acceptable as found tolerance is not in ML102910008 accordance with TSTF-493 as AAF is the limit beyond (1) The Acceptable As Found (AAF) definition will Response is included in Due 10/31/10 Item#70 which the instrument channel is degraded but may be be revised to be consistent with TSTF-493 in letter dated 10/29/10 operable and its operability must be evaluated. (2) FSAR Amendment 102. Attachment 3 Pending FSAR EICB (Garg)

Also it states that AAF is based on measurable contains the revised FSAR section 7.1.2.1.9 Amendment 102 instrument channel uncertainties, such as drift, that will be included in FSAR Amendment 102 submittal expected during the surveillance interval. These that reflects this change.

wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very (2) Additional detail on the AAF methodology vague. (3) Also it states that RPS functions use double was provided in sections 7.1.2.1.9.1, sided tolerance limits for the AAF. Since AAF is a Westinghouse Setpoint Methodology, and band it will always be double sided and therefore, this 7.1.2.1.9.2, TVA Setpoint Methodology.

clarification does not mean anything and it clouds the These sections will be revised to clarify the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date issue. AAF calculations in FSAR Amendment 102.

Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

308 7.1 7.1 (1) FSAR Amendment 100, Section 7.1, page 7.1-13, Responder: Hilmes 13. Y Open Open-TVA EICB RAI definition of Acceptable as left tolerance is not in ML102910008 accordance with TSTF-493 as it states that this may (1) The statement about using calibration history Response is included in Due 10/31/10 Item#71 take calibration history into consideration. This is very to determine the Acceptable As Left (AAL) will letter dated 10/29/10 EICB (Garg) vague and ambiguous. (2) Also it states that RPS be deleted in FSAR Amendment 102. Pending FSAR functions use double sided tolerance limits. Since ALF Attachment 3 contains the revised FSAR Amendment 102 is a band it will always be double sided and therefore, section 7.1.2.1.9 that will be included in FSAR submittal this clarification does not mean anything and clouds Amendment 102 that reflects this change.

the issue.

(2) See response to letter item 27 (NRC Matrix Item 307).

309 7.1 7.1.2. (1) FSAR amendment 100, Page 7.1-14, Responder: Hilmes 14. Y Open Open-TVA EICB RAI 1.9.1 Westinghouse setpoint methodology, states that AAF ML102910008 is the algebraic sum of the .. This is not acceptable. (1) The AAF calculation for Westinghouse Response is included in Due 10/31/10 Item#72 As algebraic sum is non conservative compared to the setpoint methodology calculations in TI-28 for letter dated 10/29/10 EICB (Garg)

SRSS method and will mask the operability of the TSTF-493 will be revised to use the Square Pending FSAR instrument channel and therefore, it is not acceptable Root Sum of the Squares (SRSS) method. Amendment 102 to the staff. (2) It also make the statement that ALT submittal may take calibration history into consideration which is (2) AAF definition will be revised to be consistent vague and ambiguous. with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.

310 7.1 7.1.2. (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes 15. Y Open Open-TVA EICB RAI 1.9.2 methodology, states that for AAF .and other ML102910008 measurable uncertainties as appropriate (i.e., those (1) The statement will be revised to say those Response is included in Due 10/31/10 Item#73 present during calibration.) should be changed to present during the surveillance interval in letter dated 10/29/10 present during normal operation (2) Also on page FSAR Amendment 102. Attachment 3 Pending FSAR 7.1-15, states that ALT may take calibration history contains the revised FSAR section 7.1.2.1.9 Amendment 102 EICB (Garg) into consideration which is vague and ambiguous. that will be included in FSAR Amendment 102 submittal that reflects this change.

(2) The statement about using calibration history to determine the AAL will be deleted in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

311 7.1 7.1 EIC Both Westinghouse and TVA setpoint methodology do Responder: Hilmes 16. Y Open Open-TVA EICB RAI B

(Gar not have any discussion on single sided calculation. ML102910008 g)

Please confirm that single sided calculation has not A statement that single-sided corrections are not Response is included in Item#74

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date been used for all setpoints with TSTF-493 and provide used for TSTF-493 setpoints will be included in letter dated 10/29/10 Due 10/31/10 a statement to that effect in the FSAR. FSAR Amendment 102. Attachment 3 contains Pending FSAR the revised FSAR section 7.1.2.1.9 that will be Amendment 102 included in FSAR Amendment 102 that reflects submittal this change.

326 TVA uses double-sided methodology for as-found and Responder: Webb 17. Y Open October 22, 2010 Open-TVA as-left Reactor Trip and ESFAS instrument setpoint EICB(Garg) values. The FSAR will be revised in a future Attachment 3 contains the revised FSAR section Response is included in Due 10/31/10 amendment to reflect this methodology 7.1.2.1.9 that will be included in FSAR letter dated 10/29/10 Pending FSAR Amendment 102 that reflects this change. Amendment 102 submittal 327 Attachment 36 contains Foxboro proprietary drawings Responder: Webber 18. N Open Open-TVA DORL 08F802403-SC-2001 sheets 1 through 6. An affidavit (Poole) for withholding and non-proprietary versions of the Non-Prop drawings are available for submittal. Due 1/31/11 drawings will be submitted by January 31, 2011.

330 7.3 7.3 Related to Item 298 Responder: Hilmes/Faulkner 19. N Open Open-TVA EICB RAI No.20 ML102910017, IE Bulletin 80-06 calls for review of engineered safety The original response to IE Bulletin 80-06 for both Due TBD 10/19/10 features with the objective of ensuring that no device WBN Unit 1 and 2 was provided on TVA letter to will change position solely because of the reset the NRC dated March 11, 1982 (ML073530129) action. (Reference 4). Subsequent design changes have impacted the original response such that some In Supplement 3 of NUREG-0847, section 7.3.5, the equipment that originally changed state no longer staff approved the design modifications proposed by does so and some equipment has been deleted.

the applicant that would allow certain devices to The following is the updated list of equipment remain unchanged upon an ESF reset. The staff also from the letter that changes state on ESF reset:

found acceptable the applicants justification for some safety-related equipment that does not 1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or remain in its emergency mode after an ESF reset. 2- (Unit 2)

Please list for Unit 1 and Unit 2 the safety-related a. Auxiliary Feedwater Pump Turbine equipment that does not remain in its emergency Speed Control Valve, FCV-1-52 mode after an ESF reset.

b. Auxiliary Feedwater (AFW) Level EICB (Darbali)

Control Valves as listed below:

i. LCV-3-172 - SG3 - Level Control Valve ii. LCV-3-173 - SG2 - Level Control Valve iii. LCV-3-174 - SG1 - Level Control Valve iv. LCV-3-175 - SG4 - Level Control Valve
v. LIC-3-172 - SG3 - Level Indicating Controller vi. LIC-3-173 - SG2 - Level Indicating Controller vii. LIC-3-174 - SG1 - Level Indicating Controller viii. LIC-3-175 - SG4 - Level Indicating Controller ix. LCV-3-148 - SG3 - Level Valve
x. LCV-3-156 - SG2 - Level Valve xi. LCV-3-164 - SG1 - Level Valve xii. LCV-3-171 - SG4 - Level Valve xiii. LCV-3-148A - SG3 - Level Bypass

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date Control Valve xiv. LCV-3-156A - SG2 - Level Bypass Control Valve xv. LCV-3-164A - SG1 - Level Bypass Control Valve xvi. LCV-3-171A - SG4 - Level Bypass Control Valve xvii. LIC-3-148 - SG3 - Controller xviii. LIC-3-156 - SG2 - Controller xix. LIC-3-164 - SG1 - Controller xx. LIC-3-171 - SG4 - Controller

c. Lower and Upper Containment Cooler Fans and Control Rod Drive Mechanism Cooler Fan
d. Penetration Room Cooler Fans Elevations 737, 692 and 713
e. Pipe Chase Cooler Fans
2. Common Equipment
a. Shutdown Board Room A Pressurizing Fans
b. Control Building Ventilation Dampers as listed below:
i. 0-FCO-31 Spreading Room Supply Fan Damper ii. 0-FCO-31-10 - Spreading Room Supply Fan Damper iii. 0-FCO-31-16 - Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31-17 - Toilet a Locker Room Exhaust Fan Exhaust Damper
v. 0-FCO-31 Main Control Room Isolation Damper vi. 0-FCO-31 Main Control Room Isolation Damper vii. 0-FCO-31-36 - Spreading Room Fresh Air Supply Damper viii. 0-FCO-31-37 - Spreading Room Fresh Air Supply Damper
c. Cask Loading Exhaust Dampers as listed
i. 0-FCO-30-122 - Cask Loading Area Exhaust Damper ii. 0-FCO-30-123 -Cask Loading Area Exhaust Damper
d. Auxiliary Building General Supply Exhaust Fans Elevation 737
e. CCW and AFT Pump Space Cooler Fans

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date

f. Spent Fuel Pit Pumps Space Coolers
g. EGTS Room Coolers
h. Turbine Driven AFW and Boric Acid Space Coolers 334 7 7 FSAR Figure 7A-3 Mechanical Flow and Control Responder: TBD 20. N Open Open-TVA RAI not N/A RAI not required because the EICB Diagram Symbols doesnt show the symbols for the required. figure is not part of any SE (Darbal first column of valves. Please correct this in a future Due TBD section.

i)

FSAR amendment.

335 7.6.1 7.6.7 LPMS: Reference to OI-331, sub item 2. Responder: WEC 21. N Open Open-TVA Provide analysis, test, or combined analysis and test Due TBD EICB (Singh) for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.

041 7.5.2 7.5.1 2/19/2010 Responder: WEC 1. N Open Open-TVA/WEC NRC Meeting TVA Letter See also Open Item Nos. 226 &

EICB (Carte)

Summary NRC dated 6/18/10 270.

Please provide the following Westinghouse Items (1) and (2) were docketed by TVA letter Partial Response is included Due 12/7/10 Meeting documents: dated April 8, 2010. in letter dated 10/5/10. Summary TVA Letter (1) WNA-DS-01617-WBT Rev. 1, "PAMS System The SysRS and SRS TVA to docket ML093560019, dated 10/5/10 Requirements Specification" Item (3) will be addressed by Revision 2 of the incorporate requirements information Item No. 11 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Licensing Technical Report. Due 12/3/10 from many other documents indentified in Design Specification" by reference. ISG6.

(3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX Item (4) will be addressed by Westinghouse version 4.5g" developing a WBN2 Specific Test Plan to NNC 8/25/10: (3) An earlier Please provide the following Westinghouse documents compensate for the fact that the NRC version of this report was or pointers to where the material was reviewed and disapproved WNA-PT-00058-GEN during the docketed for the Common Q approved in the CQ TR or SPM: original Common Q review. Due 12/7/10 topical report; therefore, (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for there should be no problem Common Q Safety systems" Item (5) Procedures that are listed in the SPM to docket this version. (4)

(5) WNA-TP-00357-GEN Rev. 4, "Element Software compliance table in the Licensing Technical Per ML091560352, the Test Procedure" Report revision 1 supersede that test procedure testing process document WNA-TP-00357-GEN.Due 10/22/10 does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM.

067 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 2. N Open Open-TVA/WEC N/A - No TVA Letter EICB (Carte) target submittal date for the "Commercial Grade question was dated 6/18/10 Dedication Instructions for AI687, AI688, Upgraded PC The following status is from the revised WB2 This item is addressed in Due 12/3/10 asked. Item node box and flat panels." was September 28, 2010. Common Q PAMS ISG-6 Compliance Matrix Rev. 2 of the Licensing was opened to submitted in response to Item 43: Technical Report track comm8ittment

a. AI687, AI688 - Scheduled for September 28, made by 2010 applicant.
b. Upgraded PC node box and flat panel displays

- Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.

c. Power supplies - Per Westinghouse letter

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit 068 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 3. N Open Open-TVA/WEC N/A - No TVA Letter EICB (Carte) target submittal date for the "Summary Report on question was dated 6/18/10 acceptance of AI687, AI688, Upgraded PC node box, The following status is from the revised WB2 This item is addressed in Due 12/3/10 asked. Item flat panels, and power supplies." was September 28, Common Q PAMS ISG-6 Compliance Matrix Rev. 2 of the Licensing was opened to 2010. submitted in response to Item 43: Technical Report track comm8ittment

a. AI687, AI688 - Scheduled for September 28, made by 2010 applicant.
b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit 069 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 4. N Open Open-TVA/WEC N/A - No N/A EICB (Carte) target submittal date for the "Watts Bar 2 PAMS question was Specific FAT Report" was October 2010. Awaiting for document to be Due 2/18/11 asked. Item docketed by TVA. was opened to track comm8ittment made by applicant.

070 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 5. N Open Open-TVA/WEC N/A - No TVA Letter EICB (Carte) target submittal date for the "Concept and Definition question was dated 6/18/10 Phase V&V Report" was March 31, 2010. Per Westinghouse letter WBT-D-1961, Partial Response is included Due 12/21/10 asked. Item (Reference 8) this document is available for audit in letter dated 10/5/10. was opened to TVA Letter at the Westinghouse Rockville office. track dated 8/20/10 Regulations require that the comm8ittment WNA-VR- 00283-WBT, Rev 0 was submitted on NRC review be based on made by TVA Letter TVA letter to the NRC dated August 20, 2010 docketed material. Awaiting applicant. dated 10/5/10 (Reference 7). for document to be docketed by TVA.

The submitted V&V did not address the Requirements Traceability Matrix and did not NNC 8/25/10:

summarize anomalies. At the September 15th Requirements Phase SVVR public meeting, Westinghouse agreed to include provided by TVA letter dated the Concept and Definitions Phase Requirements 8/20/10.

Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date TVA Revised Response:

TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated August 20, 2010 (Reference 6).

The next Independent Verification and Validation (IV&V) report will include the Design Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.

071 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 6. N Open Open-TVA/WEC N/A - No N/A EICB (Carte) target submittal date for the "Design Phase V&V question was Report" was July 30, 2010. Awaiting for document to be Due 12/21/10 asked. Item docketed by TVA. was opened to track commitment made by applicant.

072 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 7. N Open Open-TVA/WEC N/A - No N/A EICB (Carte) target submittal date for the "Implementation Phase question was V&V Report" was September 30, 2010. Awaiting for document to be Due 12/21/10 asked. Item docketed by TVA. was opened to track commitment made by applicant.

073 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 8. N Open Open-TVA/WEC N/A - No N/A EICB (Carte) target submittal date for the "Integration Phase V&V question was Report" was October 29, 2010. Awaiting for document to be Due 12/31/10 asked. Item docketed by TVA. was opened to track commitment made by applicant.

074 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 9. N Open Open-TVA/WEC N/A - No N/A EICB (Carte) target submittal date for the "Final V&V Report" was question was November 30, 2010. TVA to provide due date. Due asked. Item was opened to track commitment made by applicant.

075 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the Responder: WEC Date: 5/25/10 10. N Open Open-TVA/WEC N/A - No N/A EICB (Carte) target submittal date for the "Watts Bar 2 PAMS question was Specific FAT Procedure" was September 30, 2010. Awaiting for document to be Due 11/24/20 asked. Item docketed by TVA. was opened to track commitment made by applicant.

081 7.5.2 7.5.1 5/6/2010 Responder: Merten/WEC 11. N Open Open-TVA/WEC EICB RAI TVA Letter EICB (Carte)

ML102910002 dated 6/18/10 The PAMS Licensing Technical Report (WNA-LI- The codes and standards documents listed in ML101600092 Item No.1: Due 12/31/10 Item No. 9 00058-WBT Rev. 0, Dated April 2010), in Section 7, Section 7 of the Common Q PAMS Licensing There are three sets of lists codes and standards applicable to the Common Q Technical Report are the documents that the regulatory criteria that relate TVA to provide PAMS. This list contains references to old revisions of Common Q platform was licensed to when the to a Common Q application requested several regulatory documents, for example: NRC approved the original topical report and (e.g. WBN2 PAMS): information.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date (1) RG 1.29 - September 1978 vs. March 2007 issued the approved SER. The WBN Unit 2 (a) Common Q platform (2) RG 1.53 - June 1973 vs. November 2003 Common Q PAMS is designed in accordance with components - Common Q (a) IEEE 379-1994 vs. -2000 the approved Common Q topical report and TR (3) RG 1.75 - September 1975 vs. February 2005 approved SER and the codes and standards on (b) Application Development (a) IEEE 384-1992 vs. -1992 which the SER was based. Since the current Processes - Common Q (4) RG 1.100 - June 1988 vs. September 2009 versions referenced are not applicable to WBN SPM (a) IEEE 344-1987 vs. -2004 Unit 2, there is no basis for a comparison review. (c) Application Specific -

(5) RG 1.152 - January 1996 vs. January 2006 current regulatory criteria (a) IEEE 7-4.33.2-1993 vs. -2003 Bechtel to develop a matrix and work with The Common Q Topical (6) RG 1.168 - September 1997 vs. February 2004 Westinghouse to provide justification. Report and associated (a) IEEE 1012-1986 vs. -1998 appendices primarily (b) IEEE 1028-1988 vs. -1997 addressed (a) and (b). The (7) IEEE 279-1991 vs. 603-1991 Common Q SER states:

(8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974) Appendix 1, Post However, LIC-110, "Watts Bar Unit 2 License Accident Monitoring Application Review," states: "Design features and Systems, provides the administrative programs that are unique to Unit 2 functional requirements and should then be reviewed in accordance with the conceptual design approach current staff positions." Please identify all differences for upgrading an existing between the versions referenced and the current staff PAMS based on Common Q positions. Please provide a justification for the components (page 58, acceptability PAMS with respect to these differences. Section 4.4.1.1, Description)On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design.

For example IEEE Std. 603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date Systems, contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

082 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 12. N Open Open-TVA/WEC EICB RAI TVA Letter EICB (Carte) 6/18/10 ML102910002 dated 7/30/10 The PAMS Licensing Technical Report (WNA-LI- Regulations require that the Revision 1, Due Item No. 10 00058-WBT Rev. 0, Dated April 2010), in Section 2.3, These components can be found in the Summary NRC review be based on 10/22/10 lists hardware/software changes to the Common Q Qualification Report Of Hardware Testing For docketed material. Awaiting PAMS previously reviewed by the NRC. However the Common Q Applications, 00000-ICE-37764, Rev for document to be docketed Common Q ISG-6 Compliance Matrix does not contain 3 and by TVA.

activities that address qualification of all changes TWICE Qualification Status Report, WNAQR-specifically: 00011-SSP Per Westinghouse letter WBT-D- NNC 8/9/10: per telephone 2024, (Reference __) dated June 9, 2010, these conversation on 8/5/10, it is documents are available for audit at the not clear how Westinghouse Westinghouse Rockville Office. Commercial Grade Dedication Plans and TVA provided information by letter dated July 30, Reports for Digital I&C.

2010 (ML102160349) - See Enclosure 1 Item No. Westinghouse agree to

7. present to the NRC in a public meeting on August Revision 1 of the Licensing Technical Report 17, 2010, and explanation of provides additional detail on the platform specific how their system addresses to WBN2 and references to the evaluation regulatory criteria for both documentation. commercial grade dedication and equipment qualification.

NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.

085 7.5.2 7.5.1 5/6/2010 Responder: WEC 13. N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102910002 Please provide a detailed description of the PAMS Is the WEC ISG4 evaluation inadequate? A response will be provided Due 11/24/10 Item No. 13 MTP data link to the plant computer. This description by 10/31/10 should identify all equipment (model & version) and Operation of the MTP as a barrier device. MTP Hardware is in describe the functions that each piece of equipment Fails as a barrier device. Describe what prevents NNC 8/11/10: Design Rev. 1 of the performs. This description should be of sufficient a MTP failure from propagating to the AC160? information should be Licensing detail for the NRC to independently evaluate the available now. By letter Technical Report statements made in WNA-LI-00058-WBT Rev. 0, Node loss on the bus? Bus loss? dated July 30, 2010 due 10/22.

Section 5.3. (ML102160349) TVA stated Revise the ISG4 section of the Licensing that the MTP was connected NNC 8/25/10:

Technical Report (Rev. 2) to provide a more to a Red Hat Linux Server Disagree with detailed description of the MTP as a barrier (see Enclosure 1, Item No. path forward input device. 14 part b.). It is presumed by TVA above.

that this server is not safety- An explanation is related. IEEE 603-1991 about the design Clause 5.6.3(1) states, is needed.

"Isolation devices used to affect a safety system FAT test boundary shall be classified procedure to

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date as part of the safety include data system." storm testing of the MTP Please describe how the interface due MTP serves as the isolation 11/24/10 device.

086 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 5/24/10 14. N Open Open-TVA/WEC EICB RAI TVA Letter EICB (Carte)

ML102910002 dated 6/18/10 The PAMS Licensing Technical Report (WNA-LI- The regulatory documents listed in the Common TVA to address with item Due 12/31/10 Item No. 14 00058-WBT Rev. 0, Dated April 2010), in Section 6, Q PAMS Licensing Technical Report are the OI 81.

lists references applicable to the Common Q PAMS. documents that the Common Q platform was This list contains references to old revisions of several licensed to when the NRC approved the original regulatory documents, for example: topical report and issued the approved SER. The (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 WBN Unit 2 Common Q PAMS is designed in (ML083310185) accordance with the approved Common Q topical However, LIC-110, "Watts Bar Unit 2 License report and approved SER and the regulatory Application Review," states: "Design features and documents on which the SER was based. Since administrative programs that are unique to Unit 2 the current versions referenced are not applicable should then be reviewed in accordance with the to WBN Unit 2, there is no basis for a comparison current staff positions." Please identify all differences review.

between the versions referenced and the current staff positions. Please provide a justification for the Rev 0 of the Licensing Technical Report acceptability PAMS with respect to these differences. references Rev. 1 of ISG4 138 By letter dated February 3, 2010, Westinghouse Responder: WEC 15. N Open Open-TVA/WEC ML101650255, EICB (Carte) informed TVA that certain PAMS documentation has Item No. 2 been completed. This item is used to track all Commercial TVA agreed to include a To be addressed Grade Dedication issues. description of the generic by Rev. 2 of the (a) The draft ISG6 states that a commercial grade Westinghouse hardware Licensing dedication plan should be provided with an application commercial grade Technical Report for a Tier 2 review. due 12/3.

dedication process in the By letter dated February 5, 2010, TVA stated that the PAMS licensing technical Due 12/3/10 commercial grade dedication plan was included in the report. (see Common Q Topical Report Section 11, Commercial ML102920031 Item No 1)

Grade Dedication Program. Section 11 includes a description of the Common Q Commercial Grade TVA agreed to include (in Dedication Program, and states: A detailed review the PAMS licensing plan is developed for each Common Q hardware or technical report) an software component that requires commercial grade evaluation of WBN2 dedication. critical characteristics for commercial Please provide the commercial grade dedication plans for each Common Q hardware or software component Westinghouse hardware that has not been previously reviewed and approved components against the by the NRC. generic critical characteristics. (see (b) The draft ISG6 states that a commercial grade ML102920031 Item No 2) dedication report should be provided within 12 months of requested approval for a Tier 2 review. TVA agreed to include a description of the generic (i) Please provide 00000-ICE-37722 Rev. 0, Westinghouse software Commercial Grade Dedication Report for the QNX commercial grade Operating System for Common Q Applications.

dedication process in the (ii) Please provide WNA-CD-00018-GEN Rev. 3, PAMS licensing technical Commercial Dedication Report for QNX 4.25G for report. (see Common Q Applications. ML102920031 Item No 3)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 142 The applicable regulatory guidance for reviewing the Responder: WEC 16. N Open Open-TVA/WEC ML101650255, WBN2 PAMS System EICB (Carte)

WBN2 PAMS SysRS would be IEEE 830 as endorsed Item No. 6 Requirements Specification by Regulatory Guide 1.172 and BTP 7-14 Section This item is used to track all traceability TVA/Westinghouse To be addressed B.3.3.1, Requirements Activities - Software issues with the Software Requirements agreed to include the by Revision of TVA docketed WNA-DS-01617-Requirements Specifications. IEEE 830-1994 Section Specification (SRS). V&V evaluation of their the RTM, SRS, WBT Rev. 1, RRAS Watts Bar 2 4.3.8, Traceable, states: A [requirements reusable software SysRS, and NSSS Completion Program I&C specification] is traceable of the origin of each of its At the September 15 public meeting in Rockville, SysDS. Projects Post Accident element development requirements is clear the following actions were agreed to. These Monitoring System- System items address the traceability concerns with the process in the V&V Due 12/31/10. Requirements Specification,

1. How did TVA ensure the traceability of each Software Requirements Specification. design phase summary dated December 2009.

requirement in the WBN2 PAMS SysRS. report. This evaluation

1. Westinghouse will perform completed a would include an
2. Explain the source(s) of the requirements present review of the Requirements Traceability evaluation against the in the Post Accident Monitoring Systems Software Matrix(RT), using the issues identified at the development process Requirements Specification. To clarify, many 9/15 public meeting as a guide (documented requirements. This documents have requirements that are below) and update the RTM as required. evaluation would also incorporated by reference into the SRS, but what include an evaluation of served to direct the author to include those 2. The next issue of the IV&V report will include how the WBN2 specific various documents in the SRS or, if the the Requirements phase review of the RTM requirement is based on the System and a partial review for the Design phase. requirements were Requirements Specification, what directed the addressed by the author to include the requirement there? 3. Westinghouse will add a comments column in reusable software the Requirements Traceability Matrix (RTM) elements. (see
3. Clarify whether the unnumbered paragraphs in the to address items not in the SRS or SysRS. ML102920031 Item No 5)

Post Accident Monitoring Systems Software Requirements Specification, such as in the section 4. IEEE 830 says you shouldnt have planning headings, or are all such sections simply information in the SRS. Westinghouse has considered to be informative? agreed to remove this information.

Does the same apply to documents referenced by 5. IEEE 830 says you shouldnt have process the SRS? Such as WCAP-16096-NP-A, Rev. 1A, requirements in the SRS. Westinghouse has Software Program Manual for Common Q agreed to remove these requirements.

Systems, which is incorporated by reference in requirement R2.3-2 in the SRS. 6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance R2.3-2 [The PAMS software shall comply with with Reg. Guide 1.172 and justify any the requirements and guidelines defined in WCAP- deviations.

16096-NP-A, Software Program Manual for Common Q Systems (reference 5).] 7. 25 issues identified by V&V where some requirements have not been included in the If any requirements are expressed in such SDS (14) and SRS (11) at the revisions unnumbered paragraph form instead of individually reviewed by V&V. Have these been identified requirements, please list them, describe addressed? Yes. The next revisions of the why they satisfy the fundamental requirement of SDS and SRS address these issues.

unambiguity, and describe how they were verified.

8. Some hardware requirements are contained
4. Are there any sources of requirements in parallel in the SRS instead of the System Design with the Post Accident Monitoring Systems Specification (SDS). These will be removed

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date Software Requirements Specification? Meaning from the SRS and incorporated into the next does the SRS contain, explicitly or by reference, revision of the SDS.

all the requirements that were used in the design phase for the application specific software, or do 9. RTM item R4.2-2 protection class software software design phase activities use requirements set to 0. Needs to be fixed internally write found in any other source or document? If so, CAPs to revise the application restrictions what are these sources or documents? document on AC160.

5. References 12, 27, 29, and 31-44 in the Post 10. Westinghouse to improve the traceability of Accident Monitoring Systems Software the tests that are performed with the function Requirements Specification are various types of enable (FE) switch in the ENABLE position.

Reusable Software Element.

11. Westinghouse to revise documents to be These references are used in the body of the consistent with referring to the FE switch in SRS, for example: the ENABLE position R5.3.14-2 [The Addressable Constants CRC error 12. The flow of information is from the SysRS to signal shall be TRUE when any CAL CRC's the SDS (hardware) and SRS (software).

respective ERROR terminal = TRUE (WNA-DS- Describe how the documents are used.

00315-GEN, "Reusable Software Element Describe in 1.1 of the SysRS. Need a good Document CRC for Calibration Data" [Reference write up of how the process works.

12]).]

13. Westinghouse and TVA will develop a revised They are also included via tables such as found in schedule for document submittals and requirement R7.1.2-1 provide it to the NRC no later than 9/30/10

[The Watts Bar 2 PAMS shall use the application- 14. TVA will update the Procurement Requisition specific type circuits and custom PC elements Resolution Matrix and submit it to show how listed in Table 7.1-1.] the Common Q PAMS design meets the contract requirements.

Do the referenced reusable software element documents include requirements not explicitly stated in 15. Westinghouse to add the Software Design the SRS? If so what is their origin? Descriptions to the RTM

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
18. Westinghouse to resolve the following questions concerning SDDs
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date SPM and qualified using the Software Elements Test procedure under Appendix B program.

Provide a summary of RSEDs generic WCAP.

Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable.

RSEDs are listed in the SDD References.

143 The WBN2 PAMS Software Requirements Responder: WEC 17. N Open Open-TVA/WEC ML101650255, WBN2 PAMS System EICB (Carte)

Specification (WBN2 PAMS SRS - ML101050202) Item No. 7 Requirements Specification contains a table (see page iii) titled, Document Addressed in the 9/15 public meeting and 9/20 - To be addressed Traceability & Compliance, which states that the 9/21 audit. A detailed explanation will be by Revision of TVA docketed WNA-DS-01617-WBN2 PAMS SRS was created to support the three provided. the RTM, SRS, WBT Rev. 1, RRAS Watts Bar 2 documents identified (one of which is the WBN2 PAMS SysRS, and NSSS Completion Program I&C SysRS). Section 1.1, Overview, of the WBN2 PAMS SysDS. Projects Post Accident SRS states: This document describes requirements Monitoring System- System for the major software components Due 12/31/10. Requirements Specification, dated December 2009.

(a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.

(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.

(c) What other documents contain the requirements for the other software components?

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?

(d) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.

145 The WBN2 PAMS System Design Specification Responder: WEC 18. N Open Open-TVA/WEC ML101650255, WBN2 PAMS System Design EICB (Carte)

(WBN2 PAMS SDS) contains a table (see page iii) Item No. 9 Specification titled, Document Traceability & Compliance, which This item is used to track all traceability During the September 20- To be addressed states that the WBN2 PAMS SDS was created to issues with the System Design Specification 21, 2010 audit at by Revision of TVA docketed WNA-DS-01667-support the WBN2 PAMS SysRS. (SDS). Westinghouse, it was the RTM, SRS, WBT Rev. 1, RRAS Watts Bar 2 acknowledged that SysRS, and NSSS Completion Program I&C (a) Does the WBN2 PAMS SDS implement all of the At the September 15 public meeting in SysDS. Projects Post Accident TVA/Westinghouse had hardware requirements in the WBN2 PAMS SysRS? Rockville, the following actions were agreed Monitoring System- System to. These items partially address the previously (in September Due 12/31/10. Design Specification, dated (b) Please briefly describe all of the documents that traceability concerns with the System Design 15, 2010 public meeting) December 2009.

implement the hardware requirements of the WBN2 Specification. This item will be updated with stated:

PAMS SysRS. the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM TVA would provide the audit. RSED RTM. (see

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date ML102920031 Item No 6)

1. Westinghouse will perform completed a review of the Requirements Traceability TVA would revise and Matrix(RT), using the issues identified at the resubmit the PAMS RTM 9/15 public meeting as a guide (documented to address all types of below) and update the RTM as required.

issues identified in the

2. Some hardware requirements are contained public meeting. (see in the SRS instead of the System Design ML102920031 Item No 7)

Specification (SDS). These will be removed from the SRS and incorporated into the next TVA would revise and revision of the SDS. resubmit the Software Verification and Validation

3. 25 issues identified by V&V where some phase summary report for requirements have not been included in the the requirements phase SDS (14) and SRS (11) at the revisions to document the reviewed by V&V. Have these been addressed? Yes. The next revisions of the completion of the SDS and SRS address these issues. requirements phase review. (see
4. TVA will update the Procurement Requisition ML102920031 Item No 8)

Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.

5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
6. Westinghouse to provide the generic AC160 and flat panel specifications.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software).

Describe how the documents are used.

Describe in 1.1 of the SysRS. Need a good write up of how the process works.

185 7/15/2010 Responder: WEC 19. N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102980066 An emphasis is placed on the traceability of Steve Clark to look at how to combine traceability Due 10/22/10 Item No. 17 requirements in Software Requirements Specifications items.

in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard Was addressed to during the 9/15 meeting and listed in Regulatory Guide 1.172, which breaks with 9/20 - 9/21 audit.

typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.

These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

187 By letter dated June 18, 2010, TVA docketed Responder: Merten 20. N Open Open-TVA/WEC ML101970033, TVA Letter Are these connections already EICB (Carte) responses to NRC requests for information. Item No. 1 & 2 dated 10/5/10 docketed?

1) Please refer to the revised response to letter Partial Response provided Revise Response
1) Enclosure 1, Item No. 33 of the TVA letter dated dated 10/5/10 Item 18 (RAI Matrix item 115). in letter dated 10/5/10 June 18, 2010, did not identify any connection from the Due 12/31 PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS 2) This is a duplicate of closed RAI Matrix Item NNC 8/25/10: Why did TVA System Requirements Specification (WNA-DS-01617- 45. not catch this on the review WBT Rev. 1 - ML101680578) shows a TCP of the PAMS SysRS or connection from the OMs to the plant computer and SRS? Does TVA check that printer. Please explain. the CQ PAMS system meets the requirements in its
2) Please clarify whether any digital safety-related purchase specifications?

systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket.

202 7.5.2 7/22/2010 Responder: WEC 21. N Open Open-TVA/WEC EICB RAI TVA Letter EICB (Carte)

ML102980066 dated 10/5/10 The letter (ML0003740165) which transmitted the Revision 1 of the Licensing Technical Report will Partial Response provided Licensing Item No. 4 Safety Evaluation for the Common Q topical report to provide more detailed information on the changes in letter dated 10/5/10 Technical Report Westinghouse stated: "Should our criteria or to the platform. R2 Due 12/3 regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Rev. 2 of the Licensing Technical Report will Power and/or the applicant referencing the topical include the applicability of guidance.

report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.

(

212 7.5.2 7/27/2010 Responder: WEC 22. N Open Open-TVA/WEC EICB RAI C

a

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date ML102980066 By letter dated June 18, 2010 (ML101940236) TVA Application specific requirements for testing. This Due 12/31/10 Item No. 10 stated (Enclosure 1, Attachment 3, Item No. 3) that the cannot be addressed in a topical report.

PAMS system design specification and software Evaluation of how the hardware meets the requirements specification contain information to regulatory requirements.

address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these WEC to provide the information and determine documents, and it is not clear how this is the case. where the information will be located.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.

(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.

245 8/3/2010 Responder: WEC 23. N Open Open-TVA/WEC EICB RAI LIC-101 Rev. 3 Appendix B EICB (Carte)

ML102980066 Section 4, "Safety Evaluation" Section 5.8 of the Common Q SPM (ML050350234) Relates to the commitment to provide the test Due 12/7/10 Item No. 119 states: "the information relied identifies the required test documentation for systems plan and the SPM compliance matrix upon in the SE must be developed using the Common Q SPM. Please provide docketed correspondence."

sufficient information for the NRC staff to independently assess whether the test plan for WBN2 LIC-101 Rev. 3 states: "The PAMS, is as described in the SPM (e.g., Section safety analysis that supports the 5.8.1). change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

250 8/8/2010 Responder: WEC 24. N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B EICB (Carte)

Section 4, "Safety Evaluation" The SPM describes the software and documents that Westinghouse develops Software Release Due 10/22/10 states: "the information relied will be created and placed under configuration control. Reports/Records and a Configuration upon in the SE must be The SCMP (e.g., SPM Section 6, Software Management Release Report. Describe the docketed correspondence."

Configuration Management Plan) describes the documents and when they will be produced.

implementation tasks that are to be carried out. The Summarize guidance on how to produce these LIC-101 Rev. 3 states: "The acceptance criterion for software CM implementation is records, focus on project specific requirements in safety analysis that supports the that the tasks in the SCMP have been carried out in SPM etc. change requested should include their entirety. Documentation should exist that shows technical information in sufficient that the configuration management tasks for that detail to enable the NRC staff to activity group have been successfully accomplished. make an independent Please provide information that shows that the CM assessment regarding the tasks have been successfully accomplished for each acceptability of the proposal in life cycle activity group. terms of regulatory requirements and the protection of public health and safety."

252 8/8/2010 Responder: WEC 25. N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B EICB (Carte)

Section 4, "Safety Evaluation" The SPM contain requirements for software Explain response to AP1000 audit report. Read ML091560352 RTM Revision due states: "the information relied requirements traceability analysis and associated RTM docketed NRC awaiting V&V evaluation of 12/31 upon in the SE must be documentation (see Section 5.4.5.3, Requirements RTM. docketed correspondence."

Traceability Analysis). Please provide information that demonstrates that requirements traceability Check on this LIC-101 Rev. 3 states: "The analysis has been successfully accomplished. Hilmes safety analysis that supports the change requested should include technical information in sufficient

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

268 8/19/2010 Responder: WEC 26. N Open Open-TVA/WEC EICB (Carte)

By letter dated March 12, 2010 (ML101680577), TVA Andy to see what can be done. Due 12/31/10 stated that the application specific hardware and software architecture descriptions are addressed in the HILMES Check on WBN2 PAMS System Design Specification This (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).

Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE.

Please provide a non-proprietary figure of the architecture.

301 1.TVA is requested to address the consequences of Responder: WEC/Davies/Clark 27. N Open Open-TVA/WEC RAI No. 11 software common cause failure including all potential ML102980005 resulting failures (i.e. total loss of CERPI, system fail TVA Partial Response: Due TBD 10/26/2010 as-is).

For all accidents analyzed in WBN Unit 2 FSAR, 1) Please

2. In addition, address how the actions stipulated in the Chapter 15, no credit is taken for the rod position address how plant Technical Specifications will be taken when the indication system. For all continuous rod fail-as-is is CERPI system indications are lost. Information notice withdrawal accidents analyzed in WBN Unit 2 detected i.e.

IN 2010-10 (ML100080281) addresses the need to FSAR, Chapter 15, no credit is taken for any rod alarms, rod consider software failures and the actions required to stop/block. position assure that the plant will stay within its licensing basis. deviation (1) Technical Specification 3.1.8, Rod Position alarms, etc.

3. Provide FMEA in support of your response. Indication, does not have an action for total 2) Response loss of indication; therefore, a total loss of acceptable.
4. FSAR Table 7.7-1, Plant Control System Interlocks CERPI puts the plant into LCO 3.0.3 which 3) Response lists interlock C-11 to block automatic rod withdrawal states: acceptable.

EICB (Singh) when 1/1 Control Bank D rod position is above 4) a. Response setpoint. This interlock capability would be lost in case When an LCO is not met and the associated acceptable.

of total loss of CERPI. How is the rod block assured ACTIONS are not met, an associated b. Pl. address for this event? ACTION is not provided, or if directed by the failure mode associated ACTIONS the unit shall be placed on fail-as-is.

5. How is automatic rod withdrawal affected in case of in a MODE or other specified condition in 5) Response total loss of signals from the CERPI to the ICS? Is this which the LCO is not applicable. Action shall acceptable.

interlock fail safe? be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as 6) Response applicable, in: acceptable.

6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />; span (7.2 inches). The CERPI system accuracy MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and specified in the CERPI System requirements MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 steps or 5.19%. The specified system accuracy Exceptions to this Specification are stated in seems to be greater than the accuracy assumed in the the individual Specifications. Where FSAR Chapter 15. Please clarify this anomaly. corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date (2) CERPI common mode software failure will be addressed in a future RAI response letter.

(3) There is no FMEA for the CERPI system.

(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:

a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit.

The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal. Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.

(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.

(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:

The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date operable, the operator is required to take action as required by the Technical Specifications.

This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.

331 7.6.1 7.6.7 As a follow up of OI 190, Staff has reviewed the Responder: WEC/Harless/Clark 28. N Open Open-TVA/WEC RAI No. 8 Follow-up of OI-190.

proprietary version of the DMIMS-DX system ML102980005 description to verify the conformance claims in the TVA Partial Response: Pending FSAR 10/26/2010 FSAR. Staff has noted the following insufficiencies Amendment 102 and discrepancies between the FSAR and the 1) The source of the information is the DMIMS- submittal proprietary version of the system description for loose DXTM Operations and Maintenance Manual, parts monitoring system provided by TVA. TS3176, Revision 0, dated August 2010.

Attachment 14 contains the revised system

1) FSAR, Amendment 100, page 7.6-5 states, description, Westinghouse DIMMS-DXTM During baseline testing, the reactor vessel and Loose Part Detection System Description, steam generator are impacted three feet from Revision 1.

each sensor with a force of 0.5 ft-lb. Loose parts detection is accomplished at a frequency of 1 kHz 2) The source of the information is the DMIMS-to 20 kHz, where background signals from the DXTM seismic qualification report, RCS are acceptable. Spurious alarming from Westinghouse report EQ-QR-33-WBT, control rod stepping is prevented by a module that Revision 0, Seismic Evaluation of the Digital detects CRDM motion commands and Metal Impact Monitoring System (DMIMS-automatically inhibits alarms during control rod DXTM) for Watts Bar Unit 2. Attachment 14 stepping. contains the revised system description, Westinghouse DIMMS-DXTM Loose Part The online sensitivity of the DMIMS-DX' is such Detection System Description, Revision 1.

that the system will detect a loose part that weighs from 0.25 to 30 Ib and impacts with a kinetic 3) The entries for the following items in FSAR energy of 0.5 ft-lb on the inside surface of the RCS Section 7.6.7 will be modified in Amendment pressure boundary within 3 ft of a sensor. 102 as shown in Attachment 3 for draft revision to WBN Unit 2 FSAR Section 7.6.7, The source of this information is not cited nor is it Loose Part Monitoring System (LPMS) described in the system description. TVA to System Description.

provide the source of the information and update the system description as needed. Sensors (In Containment)

Softline Cable (In Containment)

2) Regulatory Guide (RG) 1.133, rev.1, regulatory Preamplifier (In Containment) position C.1.g states that, Operability for Seismic and Environmental Conditions. Components of the Attachment 3 contains the FSAR Amendment loose-part detection system within containment 102 Change Markups that reflect these should be designed and installed to perform their changes.

function following all seismic events that do not require plant shutdown, i.e., up to and including 4) The source of the information is the Operating Basis Earthquake (OBE). Recording Westinghouse Letter WBT-D-2580, equipment need not function without maintenance Tennessee Valley Authority Watts Bar following the specified seismic event provided the Nuclear Plant Unit 2 Response to NRC RAIs audio or visual alarm capability remains functional. on LPMS (Reference 5). Attachment 14 The system should also be shown to be adequate contains Westinghouse DIMMS-DXTM by analysis, test, or combined analysis and test for Loose Part Detection System Description, the normal operating radiation, vibration, Revision 1.

temperature, and humidity environment.

EICB (Singh)

In responding to Item 4, conflicting FSAR, Amendment 100, page 7.6-5 states, The information was found between the DMIMS-DX' audio and visual alarm capability will Westinghouse-prepared FSAR section and remain functional after an Operating Basis various Westinghouse technical documents.

Earthquake (OBE). All of the DMIMS-DX' To fully respond to this item, a change to the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad12E8A.docx Open Items to be Resolved for SER Approval SE FSAR NRC

Response

Acceptable RAI Resp.

No. POC Issue TVA Response(s) Y/N Status/ Current Actions Resolution Path RAI No. & Date Comments Sec. Sec. Date components are qualified for structural integrity FSAR is required to change the minimum flat during a Safe Shutdown Earthquake (SSE) and sensor frequency response from 5 Hz to 10 will not mechanically impact any safety-related Hz. Attachment 3 contains the FSAR equipment. Paragraphs 4.c and 4.d of the system Amendment 102 Change Markups that reflect description are not consistent with the seismic the revised frequency response of the sensor.

qualifications described in the FSAR. TVA to provide the source of the information contained in 5) In-containment component qualification for the FSAR and update the system description as vibration as addressed in regulatory position needed. C.1.g of RG 1.133, will be addressed in a future RAI response letter.

3) The system description clearly describes the In-containment equipment and DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for clarification purposes.
4) The information regarding frequency ranges of the sensors is included on page 7.6-6 of Amendment 100 of the FSAR but the system description does not contain this information. Please provide the source of this information and update the system description to reflect the appropriate information.
5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG 1.133.