ML13053A361: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13053A361
| number = ML13053A361
| issue date = 03/07/2013
| issue date = 03/07/2013
| title = Request for Withholding Information from Public Disclosure for DNC, Dek, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests (TAC NOS MD711
| title = Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests
| author name = Feintuch K D
| author name = Feintuch K
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000245, 05000280, 05000281, 05000305, 05000336, 05000338, 05000339, 05000423
| docket = 05000245, 05000280, 05000281, 05000305, 05000336, 05000338, 05000339, 05000423
| license number = DPR-037, DPR-043, NPF-004, NPF-007, NPF-049, DPR-032
| license number = DPR-037, DPR-043, NPF-004, NPF-007, NPF-049, DPR-032
| contact person = Feintuch K D NRR/DORL/LPL3-1301-415-2597
| contact person = Feintuch K NRR/DORL/LPL3-1301-415-2597
| case reference number = TAC MD7112
| case reference number = TAC MD7112
| document type = Letter, Proprietary Information Review
| document type = Letter, Proprietary Information Review
| page count = 3
| page count = 3
| project = TAC:MD7112
| project = TAC:MD7112
| stage =  
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555"()001 March 7, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR DOMINION ENERGY KEWAUNEE, INC. (DEK), DOMINION NUCLEAR CONNECTICUT, INC. (DNC), VIRGINIA ELECTRIC AND POWER COMPANY KEWAUNEE POWER STATION, UNIT 1, MILLSTONE POWER STATION, UNITS 1,2, AND 3, NORTH ANNA POWER STATION, UNITS I AND 2, SURRY POWER STATION UNITS, 1 AND 2, INFORMATION PERTAINING TO FOREIGN INTERESTS Dear Mr. Heacock: By letter dated September 6,2012, you submitted an affidavit dated September 6,2012, executed by JJ. Alan Price. Vice president-Nuclear Engineering, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code ofFederal Regulations (10 CFR), Section 2.390(a)(6): Attachment 1, "Changes in Owners, Officers, Directors and Executive Personnel" Attachment 2, "Information to Support Changes in Owners, Officers, Directors and Executive Personnel" (Proprietary) The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (a) This information is and has been held in confidence by DEK. DNC, Dominion and their parent companies. (b) This information is a type that is held in confidence by DEK, DNC and Dominion, and there is a rational basis for doing so because the information contains sensitive business information related to the business structure of the companies. (c) This information is being transmitted to the NRC in confidence: (d) This information is not available in public sources arid could not be gathered readily from other publicly available information. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 March 7, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
D. Heacock -2 Therefore, attachments 1 and 2 of your letter dated September 6, 2012 marked as "proprietary information -withhold under 10 CFR 2.390" or "withhold from public disclosure under 10 CFR 2.390," will be withheld from public disclosure pursuant to 10 CFR 2.390(b){5) and Section 103{b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-3079. Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-305 50-245/336/423 50-338/339 50-280/281 cc: Distribution via Listserv D. Heacock -2 Therefore, attachments 1 and 2 of your letter dated September 6, 2012 marked as "proprietary information -withhold under 10 CFR 2.390" or "withhold from public disclosure under 10 CFR 2.390," will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-3079. Sincerely, IRA! Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-305 50-245/336/423 50-338/339 50-280/281 cc: Distribution via Listserv PUBLIC RidsNrrPMOconee Resource RidsNrrLASFigueroa Resource LPL2-1 R/F RidsNrrDciEicb Resource RidsAcrsAcnw_MailCTR Resource RidsOgcMailCenter Resource RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource ADAMS Accession No.: ML13053A361 OFFICE NRR/LPL2-1/PM 2-1/PM RR/LPL3-1/LA NRR/LPL3-1/BC NRR/LPL3-1/PM NAME Sreenivas Rohrer Carlson KFeintuch DATE 02/20/2013 02/28/2013 02/27/2013 03/01/2013 03/07/2013 OFFICIAL RECORD COpy
 
}}
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR DOMINION ENERGY KEWAUNEE, INC. (DEK), DOMINION NUCLEAR CONNECTICUT, INC. (DNC), VIRGINIA ELECTRIC AND POWER COMPANY KEWAUNEE POWER STATION, UNIT 1, MILLSTONE POWER STATION, UNITS 1,2, AND 3, NORTH ANNA POWER STATION, UNITS I AND 2, SURRY POWER STATION UNITS, 1 AND 2, INFORMATION PERTAINING TO FOREIGN INTERESTS
 
==Dear Mr. Heacock:==
 
By letter dated September 6,2012, you submitted an affidavit dated September 6,2012, executed by JJ. Alan Price. Vice president-Nuclear Engineering, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390(a)(6):
Attachment 1, "Changes in Owners, Officers, Directors and Executive Personnel" Attachment 2, "Information to Support Changes in Owners, Officers, Directors and Executive Personnel" (Proprietary)
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) This information is and has been held in confidence by DEK. DNC, Dominion and their parent companies.
(b) This information is a type that is held in confidence by DEK, DNC and Dominion, and there is a rational basis for doing so because the information contains sensitive business information related to the business structure of the companies.
(c) This information is being transmitted to the NRC in confidence:
(d) This information is not available in public sources arid could not be gathered readily from other publicly available information.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
 
D. Heacock                                       -2 Therefore, attachments 1 and 2 of your letter dated September 6, 2012 marked as "proprietary information - withhold under 10 CFR 2.390" or "withhold from public disclosure under 10 CFR 2.390," will be withheld from public disclosure pursuant to 10 CFR 2.390(b){5) and Section 103{b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3079.
Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.
50-305 50-245/336/423 50-338/339 50-280/281 cc: Distribution via Listserv
 
D. Heacock                                       -2 Therefore, attachments 1 and 2 of your letter dated September 6, 2012 marked as "proprietary information - withhold under 10 CFR 2.390" or "withhold from public disclosure under 10 CFR 2.390," will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3079.
Sincerely, IRA!
Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.
50-305 50-245/336/423 50-338/339 50-280/281 cc: Distribution via Listserv PUBLIC                                 RidsNrrPMOconee Resource       RidsNrrLASFigueroa Resource LPL2-1 R/F                             RidsNrrDciEicb Resource RidsAcrsAcnw_MailCTR Resource           RidsOgcMailCenter Resource RidsNrrDorlLpl2-1 Resource             RidsRgn2MailCenter Resource ADAMS Accession No.: ML13053A361 OFFICE NRR/LPL2-1/PM                   2-1/PM     RR/LPL3-1/LA NRR/LPL3-1/BC NRR/LPL3-1/PM NAME         Sreenivas                             Rohrer           Carlson           KFeintuch DATE       02/20/2013         02/28/2013         02/27/2013         03/01/2013         03/07/2013 OFFICIAL RECORD COpy}}

Latest revision as of 17:16, 1 March 2020

Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests
ML13053A361
Person / Time
Site: Millstone, Kewaunee, Surry, North Anna  Dominion icon.png
Issue date: 03/07/2013
From: Feintuch K
Plant Licensing Branch III
To: Heacock D
Virginia Electric & Power Co (VEPCO)
Feintuch K NRR/DORL/LPL3-1301-415-2597
References
TAC MD7112
Download: ML13053A361 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 March 7, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR DOMINION ENERGY KEWAUNEE, INC. (DEK), DOMINION NUCLEAR CONNECTICUT, INC. (DNC), VIRGINIA ELECTRIC AND POWER COMPANY KEWAUNEE POWER STATION, UNIT 1, MILLSTONE POWER STATION, UNITS 1,2, AND 3, NORTH ANNA POWER STATION, UNITS I AND 2, SURRY POWER STATION UNITS, 1 AND 2, INFORMATION PERTAINING TO FOREIGN INTERESTS

Dear Mr. Heacock:

By letter dated September 6,2012, you submitted an affidavit dated September 6,2012, executed by JJ. Alan Price. Vice president-Nuclear Engineering, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390(a)(6):

Attachment 1, "Changes in Owners, Officers, Directors and Executive Personnel" Attachment 2, "Information to Support Changes in Owners, Officers, Directors and Executive Personnel" (Proprietary)

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(a) This information is and has been held in confidence by DEK. DNC, Dominion and their parent companies.

(b) This information is a type that is held in confidence by DEK, DNC and Dominion, and there is a rational basis for doing so because the information contains sensitive business information related to the business structure of the companies.

(c) This information is being transmitted to the NRC in confidence:

(d) This information is not available in public sources arid could not be gathered readily from other publicly available information.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

D. Heacock -2 Therefore, attachments 1 and 2 of your letter dated September 6, 2012 marked as "proprietary information - withhold under 10 CFR 2.390" or "withhold from public disclosure under 10 CFR 2.390," will be withheld from public disclosure pursuant to 10 CFR 2.390(b){5) and Section 103{b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-3079.

Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.

50-305 50-245/336/423 50-338/339 50-280/281 cc: Distribution via Listserv

D. Heacock -2 Therefore, attachments 1 and 2 of your letter dated September 6, 2012 marked as "proprietary information - withhold under 10 CFR 2.390" or "withhold from public disclosure under 10 CFR 2.390," will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-3079.

Sincerely, IRA!

Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.

50-305 50-245/336/423 50-338/339 50-280/281 cc: Distribution via Listserv PUBLIC RidsNrrPMOconee Resource RidsNrrLASFigueroa Resource LPL2-1 R/F RidsNrrDciEicb Resource RidsAcrsAcnw_MailCTR Resource RidsOgcMailCenter Resource RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource ADAMS Accession No.: ML13053A361 OFFICE NRR/LPL2-1/PM 2-1/PM RR/LPL3-1/LA NRR/LPL3-1/BC NRR/LPL3-1/PM NAME Sreenivas Rohrer Carlson KFeintuch DATE 02/20/2013 02/28/2013 02/27/2013 03/01/2013 03/07/2013 OFFICIAL RECORD COpy