ML18102B632: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 78: Line 78:
: 10. Pressurizer Pressure--High          4                2                3  1,2          6
: 10. Pressurizer Pressure--High          4                2                3  1,2          6


                                                                                                                          ;
TABLE 4.3-1                                                        r:
TABLE 4.3-1                                                        r:
REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL    MODES IN.WHICH CHANNEL                      FUNCTIONAL    SURVEILLANCE FUNCTIONAL UNIT                                            CHECK      CALIBRATION        TEST          REQUIRED
REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL    MODES IN.WHICH CHANNEL                      FUNCTIONAL    SURVEILLANCE FUNCTIONAL UNIT                                            CHECK      CALIBRATION        TEST          REQUIRED

Latest revision as of 09:43, 23 February 2020

Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position
ML18102B632
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/21/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18102B631 List:
References
NUDOCS 9710270012
Download: ML18102B632 (5)


Text

Document Control Desk LR-N97109 Attachment 3 LCR S95-19 SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 MODE APPLICABILITY OF THE POWER RANGE, NEUTRON FLUX REACTOR TRIP AND SURVEILLANCE REQUIREMENTS TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:

Technical Specification Page Table 3.3-1 3/4 3-2 Table 4.3-1 3/4 3-11 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:

Technical Specification Page Table 3.3-1 3/4 3-2 Table 4.3-1 3/4 3-11 Page 1 of 1

~--.-- - ---~-*- -- *----

. 9710270012 971021 -- --------\

. PDR ADOCK 05000272 I P PD_ij

TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL WII CHECK CALIBRATION TEST REQUIRED

1. Manual Reactor Trip Switch N.A. N.A. R(9) l, 2, and
  • I s 1, 2) ~3
2. Power Range, Neutron Flux D'2' , .;11 Q and 0(6)
3. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Positive Rate
4. Power Range, Neutron Flux, N.A. R"' Q 1, 2 High Negative Rate
5. Intermediate Range, Neutron Flux s R' s/u< 1, 2 and *
6. Source Range, Neutron Flux sm R' 0 and S/u'- 11 2, 3. 4, 5 and *
7. Overtemperature 4T s R Q 1,

'2

8. Overpower 6T s R Q 1, 2
9. Pressurizer Preseure--Low s R Q l, 2 10.

11.

12.

Pressurizer Preeeure--High Pressurizer Nater Level--High Lose of Plow - Single Loop s

s s

R R

R 0

Q Q

l, 1,

1 2

2 SALBM - UNIT 1 3/4 3-11 Amendment No. 176 I

tAIU& ~:3-l BlaCIQB IRlf SX§I~H IHSIBUMIHIAtIOH

...~

en 1111 MINIMUM <:

TOTAL NUMBER CHANNELS CHANNELS APPLICABLE c: [UNg'.IONAL UNII OF CHANNELS TO TBIP OPERABLE HODES ACTION

I

.+

N 1. Manual Reactor Trip 2 1 2 1,2 and

  • 12
2. Power Range, Heutron Flux* 4 2 3 1,2 0-MC~t

' 2

3. Power Range, Neutron Flux 4 2 3 1,2 2 High Positive Rate
4. Power Range, Neutron Flux, 4 2 3 1,2 2 High Negative Rate
5. Intermediate Range, Neutron Flux 2 1 2 1,2 and
  • 3
6. Source Range, Neutron Flux w

w I

A.

B.

Startup Shutdown 2

2 1

0 2

1 2##, and

  • 3,4 and 5 4

5 N

1. Overtemperature AT 4 2 3 1,2 6
8. overpower AT 4 2 ,3

\

1,2 6

9. Pressurizer Pressure-Low 4 2 3 1,2 6
10. Pressurizer Pressure--High 4 2 3 1,2 6

TABLE 4.3-1 r:

REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN.WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED

1. Manual Reactor Trip Switch N.A. N.A. R'" 1, 2, and *
2. Power Range, Neutron Flux s om, .r11 Q 2 a,,.._J.. 3 1, }

and Q

9,

3. Power Range, Neutron Flux, N.A. R Q 1, 2 High Positive Rate
4. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Negative Rate
5. Intermediate Range, Neutron Flux s Rcc.1 s;u<<*> 1, 2 and *
6. Source Ran~e, Neutron Flux sm Rl6> Q and s/u< 11 2, 3, 4, 5 and *
7. Overtemperature 6T s R Q 1, 2
8. Overpower 6T s R Q 1, 2
9. Pressurizer Pressure--Low s R Q 1, 2
10. Pressurizer Pressure--High s R Q 1, 2
11. Pressurizer Water Level--High s R Q 1, 2
12. Loss of Flow - Single Loop s R Q 1 SALEM - UNIT 2 3/4 3-11 Amendment No. 111/