MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205L2431999-04-0505 April 1999 SFP Soluble Boron Credit Dilution Analysis (Summary of Applicable Portions) ML20205L2531999-04-0505 April 1999 Boraflex Degradation Analysis ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y2461998-09-15015 September 1998 Proposed Improved Tss,Resolving Items Identified by Util During Review ML20151U3521998-09-0808 September 1998 Proposed Tech Specs & Bases Converting to Improved Tech Specs ML20151Z7751998-09-0808 September 1998 Rev 25 to McGuire Selected Licensee Commitment Manual, Consisting of Revised Pages 16.7-9 & 16.7-10 ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5721998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A0411998-08-0505 August 1998 Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236G5301998-06-29029 June 1998 Rev to Bases of TS 3/4.6/3,correcting Editorial Errors ML20249C2081998-06-0909 June 1998 Rev 24 to Selected License Commitments (SLC) Manual & SLC 16.10.1,dtd June 1998 ML20247E3891998-05-0808 May 1998 Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20217E6531998-04-20020 April 1998 Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 ML20217B7871998-03-20020 March 1998 Marked-up Proposed Improved TS 3.6 & 5.5.2 ML20217N9311998-03-0303 March 1998 Proposed Tech Specs 5.5 Re Meteorological Tower Location ML20216B9851998-03-0202 March 1998 Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl ML20203J9391998-02-19019 February 1998 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20198H5361997-12-17017 December 1997 Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20203E1911997-12-0101 December 1997 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20217H5541997-10-13013 October 1997 Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2511997-10-0606 October 1997 Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function ML20216A8691997-09-0101 September 1997 Rev 0 to QAM-2.0, Order Entry ML20210K9281997-08-31031 August 1997 Cycle 12 Startup Rept ML20216B8171997-08-25025 August 1997 Rev 0 to PE-9778-1, Test Rept-Grinnell Hydraulic Snubber Freedom of Motion Test Under Duke Powers McGuire Nuclear Station MSLB Accident Temp Condition 1999-09-13
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Z7751998-09-0808 September 1998 Rev 25 to McGuire Selected Licensee Commitment Manual, Consisting of Revised Pages 16.7-9 & 16.7-10 ML20249C2081998-06-0909 June 1998 Rev 24 to Selected License Commitments (SLC) Manual & SLC 16.10.1,dtd June 1998 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20203J9391998-02-19019 February 1998 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20203E1911997-12-0101 December 1997 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20216A8691997-09-0101 September 1997 Rev 0 to QAM-2.0, Order Entry ML20141F1521997-06-25025 June 1997 Rev 4 to Nuclear Security Training & Qualification Plan ML20140D1361997-05-27027 May 1997 Rev 21 to McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20148D5041997-05-0909 May 1997 Rev 19 to Selected Licensee Commitment Manual 16.5-4 ML20133F9041996-12-26026 December 1996 Selected Licensee Commitments Manual, Rev 18 ML20134F8651996-10-21021 October 1996 Rev to Selected Licensee Commitments Manual ML20117K2851996-08-22022 August 1996 Rev 16 to Selected Licensee Commitments Manual ML20117M5901996-08-15015 August 1996 Loss of Electrical Power ML20115C9971996-06-25025 June 1996 Revised McGuire Nuclear Station Selected Licensee Commitiments Manual ML20112B7651996-05-13013 May 1996 Rev to Selected Licensee Commitments Manual ML20108E2161996-04-29029 April 1996 Revised McGuire Nuclear Station Selected Licensee Commitments Manual & List of Effective Pages ML20112A7331996-04-22022 April 1996 Rev 13 to DPC MNS Pcp ML20101N1311996-02-29029 February 1996 Rev 11 to Selected Licensee Commitments Manual ML20100Q4751996-02-26026 February 1996 Revised McGuire Nuclear Station Selected Licensee Commitments Manual, List of Effective Pages ML20100B9601996-01-19019 January 1996 Revised McGuire Nuclear Station Selected Licensee Commitments Manual, Effective Pages ML20100B9541996-01-19019 January 1996 Revised McGuire Nuclear Station Selected Licensee Commitments Manual, Effective Pages ML20096F1651996-01-0404 January 1996 Rev 8 to McGuire Nuclear Station Selected Licensee Commitment Manual, Adding Clarity to Halon Sys Testing Requirements ML20094P9631995-11-15015 November 1995 Rev 7 to MNS Selected License Commitments Manual, Correcting Typographical Errors & Adding List of Effective Pages ML20094Q0021995-11-15015 November 1995 Rev 7 to MNS Selected Licensee Commitments Manual, Correcting Typographical Errors & Adding List of Effective Pages ML20093K9801995-10-18018 October 1995 Rev 17 & 22 of Pump Inservice Testing Program,For McGuire Nuclear Station Units 1 & 2 ML20093G5581995-10-0202 October 1995 Revised McGuire Nuclear Station Selected Licensee Commitments Manual, from Chapter 16 of FSAR ML20098B8531995-09-22022 September 1995 Rev 5 to MNS Selected Licensee Commitments Manual. Reissue Due to Typographical Error ML20092H5491995-08-31031 August 1995 Rev 4 to MNS Selected Licensee Commitments Manual (Slc), Relocating Certain Turbine Overspeed Protection,Seismic Instrumentation,Meteorological Instrumentation & loose-part Detection Sys TS Requirements from TS to SLC ML20086R2891995-07-13013 July 1995 Rev 3 to MNS Selected Licensee Commitments Manual. Rev Changes Standby Shutdown Sys Testing Requirements for Standby Makeup Pump Water Supply Boron Concentration (BC) in Storage Pool Min BC Specified in COLR ML20080H9741995-02-0808 February 1995 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20078S9681994-12-0707 December 1994 Rev 1 to Selected Licensee Commitments Manual ML20076J8341994-10-31031 October 1994 Rev to McGuire Nuclear Station Selected Licensee Commitment Manual, List of Effective Pages,Table 16.8-1a,Table 16.8-1b & Page 16.11-4 ML20070D7541994-06-30030 June 1994 Rev to MNS Selected Licensee Commitments Manual, Section 16.9.5,changing Term Fire Barriers to Fire Rated Assemblies ML20070B4131994-06-21021 June 1994 Revised McGuire Nuclear Station Selected Licensee Commitments Manual ML20065F5281994-01-31031 January 1994 Changes to McGuire Nuclear Station Selected Licensee Commitments Manual ML20063A8041993-12-31031 December 1993 Selected Licensee Commitments Manual ML20063A9411993-11-0101 November 1993 IST Program for Pumps & Valves ML20063A9291993-11-0101 November 1993 IST Program for Pumps & Valves ML20045B2691993-06-0404 June 1993 Rev 19 to McGuire Nuclear Station IST Program for Unit 1 ML20045B3761993-03-11011 March 1993 Rev 14 to McGuire Nuclear Station Pump & Valve IST Program for Unit 2 1999-08-18
[Table view] |
Text
{{#Wiki_filter:.
W.J.WO0lley00. itt chment ,1 McCUIRE AIR LOCK DOORS SHOP INSPECTION PROCEDURE REVISION 0, 10/10/79 1.0 SCOPE This procedure is intended for use on Personnel Air Lock Doors for McGuire Nuclear Station Units 1 and 2.
2.0 PURPOSE Inspection of drilled and tapped holes in door seal plates.
3.0 PROCEDURE 3.1 Identification 3.1.1 Each hole for each door has a unique identification
~
as shown on drawings 36972 through 36979.
3.1.2 A map is included on each of the above drawings. It is to be completed with the appropriate measurements as evidence that each inspection stop has been completed.
3.2 Depth 3.2.1 Renove the inflatable seals and keeper bars.
3.2.2 A depth gauge with a 60* included angle pointed plunger shall be used.
3.2.3 The depth of each hole for the outer seal row A and the inner seal row A shall be measured and recorded on the map. Based on the thickness of the door plate and the depth of the hole, taking into account tolerances, those that are determined to be drilled through shall be rejected.
3.3 Thread Quality 3.3.1 A "Go - No Go" type thread gauge to measure a Class 3 threaded hole shall be used.
3.3.2 The threaded gauge shall be screwed into each hole.
The "Go" portion should go in to a minicum depth of 1/2 inch. The "No-Go" portion should not be able to be screwed in. Those holes that do not meet the above criteria shall be rejected.
3.3.3 An attempt shall be nade to correct rejected threads by running a tap into the hole. The thread gauge
" test procedure should then be repeated.
1626 133 7912190 3g3
WJ.Woolley Co.
McCUIRE AIR LOCK DOORS
;SIOP INSPECTION PROCEDURE REVISION 0, 10/10/79 3.0 PRECEDURE (continued) 3.4 Angularity The angularity of each hole shall be determined with the thread gauge in the hole. The counter line of the hole shall be 90* I *3 with the surface of the plate or the tangent of the curve. The maximum angle should be recorded on the map. Those holes that are off by more than 3* shall be rejected.
3.5 Documentation 3.5.1 The map shall bear the signature of the inspector (s) and dates.
3.5.2 The sign-off may be performed for each measurement recorded, or performed in groups of measurements made by each inspector. If one inspector performed all the inspections only one signature and date is required.
3.6 Repair Those holes which are rejected shall be repaired in accordance with drawings 36972 through 36979. The repairs shall be accomplished using approved welding procedures, and following the fabricators Quality Assurance Program.
1626 134
.M* - .
Ropair Procedure .No.
*~ ""="'"- "^
RW!i\ SILE. -ADR u CK~0RS Reference S.O. No. 29553_n CustomerV. J. Woolley Company Date Issued 11-12-79 .-
Dravring Number Number of D' erective Payts 1 Door Piece Mark or Assembly Name Inflatable Seal Air' Inck Door
~
Descriptica o'f Defect _ Improperly drilled holes for counting Air Iock Seals in Personnel Air Incks at McGuire Muclear Station. . .
. _ Location of Defect .
Sketch if Uecessary To be determined at ace'eptance'ina spection of holes (See Oper. No. -2). ,
-l ' -
- . - ~
- . ~ . - ~
.ccn 9- 5-- ,..,NS M<I-cE N,W rA=T4, .
'a REPAIR PROCEDURE f.hy k
r.-m S f amn.m a UM~;;"w:Ecc,>n?NNOU7 -5
. Operation _, Description- - - - . Supv. Date Insp. Da Oper. No, - - -
Init. Init.
- 1. Receive and inspect for danage that may have occured dur-ing shipping, 'haridling, etc. trior' to receitst 'by ISP. _
- 2. Pdrform acceptance inspection as detailed below. Holes found to be unacceptable shall be circled with paintstick.
Initial and date all inspect' ions 'in the a propriate col-
uans of the " Acceptance Inspection Report for TcGuire Doors' R.
. . A. Visual examine all holes. This examination is to det- c.[ @[
ect stripped, crossed, or torn threads. Describe any , %,,,\ 7[
defects on the " Acceptance Inspection Repprt for ,A.e, g, PcGuire Doois" under the " Visual Thread Condition"
~
,$k%[
Heading. If a thread is foursl to be defective, procsed 3 V
V[
to Om rntion is. 2n. fr[ '
lM5/
N */
~ ~
Rev !!o Date By l -~ ~ ~~ Revision ! Eng. review: Date:
i ANI/AIreview: Date:
O Production Control O shop ofrice o AnI/AI. -
0 Ins?ectio O '..' eld Floor (When Applicable)
. % . Sheet 1 of 5 Form 18 Rev. 3-79 1626 133 . . . - _.
Repair Procedure No.
REPAIR IROCEDURE Rework Order No. N/A.
(Gontinued from Sheet Noi ) ~
Reference S.O. No. 29553-N -
Operation Description I 8"F'* Date Insp. Dat Oper. No. l Init. Init.
B. Measure the depth of outer seal Row "A" and inner seal Row "A" holes by using a pointed Varnier Dial Caliter depth gauge. Record the actual depth dinension on the
" Acceptance Inspection Report for McGuire Doors" under the " Drilled Hole Depth" Heading. If a hole is found -
to be drilled thru proceed to operation No. 2D. *-
C. All threads shall be evnM ned by using a "Go-No Go type thread g,auge.
(1) The "No-Go" portion should not be able to be screw-ed into the hole more than 4 turns. ' Record the re-sults on the "Accettance Insrection Reprt for McGuire Doors" under the "No-Go" gauze Headinst by narking a "X" in the "No" colunn if the above crit-eria is not net. If a hole does not neet the above criteria proceed.to Operation No,2D.
(2) The "Go" portion should go into the hole a nininun depthof1/2". If the above criteria is met. re-cord the results on the " Acceptance Insrection Re-port for McGuire Doors".under the "Go Gauge" Heading g by marking a "X" -in the. "Yes" column and. under the _b /
" Tapped Thread Depth" Heading by marking (>1/2").' k/
If the above criteria is.not met, retap the hole .. [h[
by using a 1/2"-13 Um Hand Tap and re-examine with C"" [
a "Go-No Go" type thread gauge as follows: Q/
(a) Th'e "Go" portion should gn i etn +% bnh n A i mininua depth of 1/2". Record the results on A [[
_ the " Acceptance Inspection Report for itGuire k f7 -
Doors" by narking a "X" in the "Yes" celunn h/
under the "G0 Gauge" Heading and by marking h[,Acvisica _
Rev Mo Date By l ~~~ Revision l Rev !!o Date By l.----...,
i
~
i
- t O Production control O shop office O A. I. O Inspection O Weld Floor (Uhen Applicable) 2 d5 3
Form 18A Rev. 9-76 .
Repair Procedure No.-
, g gg,
~
(Gontinued from Sheet !!o 2 ) Rework Order No. N/A -
Reference S.O. No ' 29553-li Oper. No. Operation Description Date
[ Da'
(> '1/2") under the " Tapped Thread Depth" head-ing if the above criteria is net or by narking .
a "X" in the "No" colunn under the "Go Gauge" l Heading if the above criteria is not net pro-ceed to Operation No. 2D. ' ..
(b) The "No Go" portion should not be able to be -
screwed into the hole more than l+ turns. If
- 'the above criteria is not net, change the .
- "Ac, cept'ance Inspection Record for McGuire ,l Doors" by resoving 'the "X" in the "No" colunn under the '"No-Go Gauge" Heading and marking a "X" in the "Yes" colunn under the "No Go Giu e" .
Heading. .
D. Measure the thread ana:1e of each hole by screking the .
"Go-No Go" Gauge into'the hole and deternining the '
thread ankle -by using a protractor. Record the actual -
measurement in degrees on the "Accertance Inspection Report for IbCuire Doors" under the " Thread Angle Head- -
ing."
E. Responsible Engineering a. QA Ibrsonnel are to evaluate all Inspection Data and determine if repair is required ,
g -
nethod of repair, and any remarks that may be required. {N/.
Responsible Personnel will mark the above infornation o n ,
M ...
/
%g i.
'N% / +"
the "Accentance Inspection Report for thCuire Doors" uMer the apurocriate Headints. ' b(/
V/
'h7
- 3. Al'1 holes which'will be plugged are to be drilled 1" Dia.
~
thru by usinz a "Rotobroach"; thus renoving the existing A f[ .
inproperly dril1<1 hole. N/[
~~
q-_j Rev I!o Date By l Revision -
l l Rev !!o DateI
~
BY Q /Revisica
. -6 i
I ~
O Eroduction Control O Shop Office 0 A. I.
O Inspection O L' eld Floor (Uhen Applicable)
Forn ISA Rev. 9-76 - -
1626 l 3 Z sh**t 1 Or 5
Repair Procedure No.
. REPAIR IROCEDURE Rework Order No. N/A (Continued from Sheet No 3 )
Reference S.O. No.'29553-N Oper. No. Operation Description 6]t
- Dato [*, Dat 4 All holes which will be remired by using a thread insert arh to be drilled 17/32" Dia. x 13/16" Deep and Tapped 11/16" Deep by using a special Tap.
5 Screw threaded inserts into required hole ani set. .
- 6. Fron i 1/4" Dia. Round Par (SA-350-IF2) purchased on ISP P.O. # M8694, prepare required - quantities of piece #1 and piece #2 Per Drawing.. -
- 7. Use Xylene solvent to sufficiently clean all holes drilled
~
in Oper. #3
- 8. Fit and weld piece #1 and piece #2 into the auprocriate hole ;
in accordance with U.P. #126 including Addenda using Quali-fled Welders and Certified E-7018 Elect: ode.
- 9. Crind all welds flush.
' ~
- 10. Clean velds made in Operation No. 8 sufficiently for liquid Penetrant Examination.
- 11. Liquid Penetrant inspect welds nade in Operation No. 8 in \
accordance with ISP Procedure NDE-IC-Pri including Addenia. k */
P.T. Report Required. --
[
P.T. Report No. h/ *'
(HS3 and Duke Power Personnel to review all Reports and to 8., [ -
sanple Witness sone P.T. Inspections on the entire contract). _N[
H.S.B. Review $$[
D3e Power Review A [[ .
.bV/
- q,- i aAI Rev !!c'Jate By l ~~ Revision .
ll Rev !!c Date By % / Revision I626 138 l
0 Production Control O shop orfice O A. 1. -
0 Inspection O L' eld Floor
- (When Applicable) v ion o ,.. . .o.,c .
Sheet 4 - of 5
ML Repair Procedure No.
Rework Order No. N/A .
(Continued from Sheet Noh )
Reference S.O. No. 29553-N 0
- s Operation Description Dato De Oper. No. t
- 12. All clanp bars to be redrilled 5/8" Dia. thru and recounter- l sun'< for proper head depth.
Assemble clanp bars to assure plugged holes are troverly l 13 located.
- 14. Perform Acceptance Inspection of all repired holes per "Repai.r Inspection Report for McGuire Doors" s '
15, completo " Manufacturer's Report of Welded Repairs or Alter-ations" .
LS.B. ,
- 16. Review all final documentation.
H.S.B. Review Duke Power Review - -
- 17. Prepare for shipping.
- 18. Ship.
A
. .A ,,
e /
% s~/
- i. -
' g'/
i W/ .
I
- Q&l sj g .N $ /
LL 1/
_L P_ /_
~~
Revisios__ llRevHo Date By 4 g / Revision Rev No' Date By l
~
'/
1626 139 1
!' l i
O Shop office O A. I. O Inspection O eld Floor i O Production control (Uhen Applicable) l
.. _, l , Sheet 1 of 1
Attachment #3 1
"*f6 5 Gr 0 B l -13 UNC Thread (SA-304 Stainless Steel)
'h *
[\]
- -- / '
mm Seal
>/ 7 l 4 > / - Door Plate
,/ / SA 510 Gr.70 i
/1
/ s A
/ / Threaded Insert IS-8 Stainless Steel
] (Combination Of Tgpe 502 And Type 304) *
- Cold Rolled Wire-Ultimate Tensile strength 200 250 Ksi.
SKeTcs 2. .~
Threaded Inse.rt Assembly i
1626 140
-}}