( l July 13, 1995 m)

To: All Holders of the Selected Licensee Commitments Manual Please find attached a revision to the Selected Licensee Commitments Manual. This revision changes the Standby Shutdown System testing requirements for the standby makeup pump water supply boron concentration in the storage pool to the minimum boron concentration specified in the Core Operating Limits Report.

Your copy of the manual should be revised as follows:

Remove these pages: Insert these pages:

List of Effective Pages List of Effective Pages Revision 2 Revision 3 Page 16.9-17 Page 16.9-17 Questions or problems should be directed to Kay Crane, r'%g McGuire Regulatory Compliance at extension 4306.

U Kay L. Crane, McGuire Regulatory Compliance 1

i l \

G I

yd 0 9507310086 950713 PDR P

ADDCK 05000369 PDR O}

1

t 4

s McGuire Nuclear Station Selected Licensee commitments (s,,j'/)

List of Effective Pages Paq) Revision Date LOEP Tab List of Effective Pages 3 1 through 7 Inb 16.0 16.0-1 16.0-2 Tab 16.1 16.1-1 Inb 16.2 16.2-1 3/91 16.2-2 5/91 16.2-3 16.2-4 f-s Tab 16.3 w

16.3-1 Tab 16.4 Tab 16.5 16.5-1 01/94 16.5-2 01/94 16.5-3 3/93 16.5-4 3/93 16.5-5 3/93 16.5-6 3/93 16.5-7 3/93 16.5-8 3/93 16.5-9 3/93 16.5-10 3/93 Tah_.lfL_6 Tab 16.7 16.7-1 Tab 16.8 Revision 3 1

r_.

t gs Page Revision Date

- ,_,/ 16.8-1 10/90 Table 16.8-la 1 of 28 10/94 Table 16.8-la 2 of 28 10/94 Table 16.8-la 3 of 28 10/94 Table 16.8-la 4 of 28 10/94 Table 16.8-la 5 of 28 10/94 Table 16.8-la 6 of 28 10/94 Table 16.8-la 7 of 28 10/94 Table 16.8-la 8 of 28 10/94 Table 16.8-la 9 of 28 10/94 Table 16.8-la 10 of 28 10/94 Table 16.8-la 11 of 28 10/94 Table 16.8-la 12 of 28 10/94 Table 16.8-la 13 of 28 10/94 Table 16.8-la 14 of 28 10/94

[\ Table 16.8-la 15 of 28 10/94 Table 16.8-la 16 of 28 10/94 Table 16.8-la 17 of 28 10/94 Table 16.8-la 18 of 28 10/94 Table 16.8-la 19 of 28 10/94 Table 16.8-la 20 of 28 10/94 Table 16.8-la 21 of 28 10/94

^

Table.16.8-ir 22 of 28 10/94 Table 16.8-la 23 of 28 10/94 Table 16.8-la 24 of 28 10/94 Table 16.8-la 25 of 28 10/94 Table 16.8-la 26 of 28 10/94 Table 16.8-la 27 of 28 10/94 Table 16.8-la 28 of 28 10/94 ,

Table 16.8-1b 1 of 30 10/94 l i

Table 16.8-1b 2 of 30 10/94 7- l s_ Table 16.8-1b 3 of 30 10/94 Table 16.8-1b 4 of 30 10/94 Revision 3 2

C 4

-s Page Revision Date

/ \

- ( _,l ' Table 16.8-1b 5 of 30 10/94 Table 16.8-lb 6 of 30 10/94 Table 16.8-1b 7 of 30 10/94 Table 16.8-lb 8 of 30 10/94 Table 16.8-1b 9 of 30 10/94 Table 16.8-lb 10 of 30 10/94 Table 16.8-1b 11 of 30 10/94 Table 16.8-1b 12 of 30 10/94 Table 16.8-lb 13 of 30 10/94 Table 16.8-1b 14 of 30 10/94 Table 16.8-1b 15 of 30 10/94 Table 16.8-lb 16 of 30 10/94 Table 16.8-1b 17 of 30 10/94 Table 16.8-1b 18 of 30 10/94 Table 16.8-1b 19 of 30 10/94

[GI T Table 16.8-1b 20 of 30 10/94 Table 16.8-1b 21 of 30 10/94 Table 16.8-lb 22 of 30 10/94 Table 16.8-1b 23 of 30 10/94 Table 16.8-1b 24 of 30 10/94 Table 16.8-1b 25 of 30 10/94 Table 16.8-1b 26 of 30 10/94 Table 16.8-1b 27 of 30 10/94 Table 16.8-1b 28 of 30 10/94 Table 16.8-lb 29 of 30 10/94 Table 16.8-lb 30 of 30 10/94 Tab 16.9 16.9-1 2/91 16.9-2 16.9-3

,_. 16.9-4

{ I q ,/ 16.9-5 Table 16.9-1 Revision 3 3

L

Page Revision Date 16.9-6 l 16.9-7 l

16.9-8 1 16.9-9 f

Table 16.9-2 8/90 f

Table 16.3-2 (cont'd) 16.9-10 6/94 ,

16.9-11 6/94 16.9-12 12/90 I

16.9-13 16.9-14 ,

i Table 16.9-3 12/90 ,

Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) I 16.9-15 11/94 16.9-15a 2/91  !

16.9-16 16.9-17 6/95 16.9-18 16.9-19 Table 16.9-4 Table 16.9-5 16.9-20 08/93 16.9-21 08/93 Table 16.9-6 Tab 16.10 Tab 16.11 16.11-1 9/93 16.11-2 9/93 16.11-3 9/93 Revision 3 l 4 l l

0 o

Page Revision Date 16.11-4 10/94 16.11-5 9/93 16.11-6 9/93 16.12-7 9/93 16.11-8 9/93 16.11-9 9/93 16.11-10 9/93 16.11-11 9/93 16.11-12 9/93 16.11-13 9/93 16.11-14 9/93 16.11-15 9/93 16.11-16 9/93 16.11-17 9/93 16.11-18 9/93 16.11-19 9/93 16.11-20 9/93 16.11-21 9/93 16.11-22 9/93

, 16.11-23 9/93 16.11-24 9/93 16 11-25 9/93 16.11-26 9/93 16.11-27 9/93 16.11-28 9/93 16.11-29 .. 9/93 16.11-30 9/93 16.11-31 9/93 16.11-32 9/93 16.11-33 9/93 16.11-34 12/93 0 16.11-35 12/93 16.11-36 12/93 Revision 3 5

\

\

Page Revision Date 16.11-37 12/93 16.11-38 9/93 l 16.11-39 9/93 16.11-40 9/93 16.11-41 9/93 16.11-42 9/93 16.11-43 9/93 16.11-44 9/93 16.11-45 9/93 16.11-46 9/93 16.11-47 9/93 16.11-48 9/93 16.11-49 9/93 16.11-50 1/93 16.11-51 9/93 ,

16.11-52 9/93 16.11-53 9/93 16.11-54 9/93 16.11-55 9/93 16.11-56 9/93 16.11-57 9/93 16.11-58 9/93 16.11-59 9/93 16.11-60 9/93 16.11-61 9/93 16.11-62 9/93 16.11-63 9/93 16.11-64 9/93 ,

16.11-65 9/93 16.11-66 9/93 16.11-67 9/93 16.11-6B 9/93 Tab 16.13 Revision 3 6

9 Page Revision Date 16.13-1 Tab 16.14 Tab 16.15 Apoendix Tab 1

2 3

4 5

6 7 i Attachment 1 Attachment 2 Attachment 3 L

Revision 3 7

+

v.

,g c. The Standby Makeup Pump water supply shall be demonstrated OPERABLE by:

_- i Verifying at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> that IDENTIFIED LEAKAGE, UNIDENTIFIED LEAKAGE, and Reactor Coolant Pump Seal leakoff do not exceed a total of 26 gpm.

11 Verifying at least once per 7 days:

1) That the requirements of Technical Specification 3.9.10 are met and the boron concentration in the storage pool is greater than or equal to the minimum boron concentration specified in the Core Operating Limits Report, or ,
2) That the refueling water storage tank is capable of being aligned to the Standby Makeup Pump.

iii Verifying at least once per 92 days that the Standby Makeup Pump develops a flow of greater than or equal to 26 gpm at a pressure greater than or equal to 2485 psig.

d. The Standby Shutdown System 250/125-Volt Battery Bank and its associated charger shall be demonstrated OPERABLE:

i At least once per 31 days by verifying:

1) That the electrolyte level of each battery is above the plates, and
2) The total battery terminal voltage is greater than or equal to 258/129 volts on float charge.

11 At least once per 92 days by verifying that the average specific gravity is greater than or equal to 1.200.

(

iii At least once per 18 months by verifying that:

1) The batteries, cell plates, and battery racks show no visual indications of physical damage or abnormal deterioration, and
2) The battery-to-battery and terminal cor.nactions are clean, tight, free of corrosion and coated with anti-cor.-osion material.
e. The Steam Turbine Driven Auxiliary Feedwater Pump and associated components shall be demonstrated OPERABLE at least once per 18 months by verifying that the "C" solenoid is capable of being deenergized to open valve SA48ABC to provide steam supply to the turbine driven auxiliary feedwater pump.
f. Standby Shutdown System instrumentation shall be demonstrated OPERABLE by performance of testing requirements in Table 16.9-5 16.9-17 6/95 l

i~

9 I i July 13, 1995 V

To: All Holders of the Selected Licensee Commitments Manual Please find attached a revision to the Selected Licensee Commitments Manual. This revision changes the Standby Shutdown System testing requirements for the standby makeup pump water supply boron concentration in the storage pool to the minimum boron concentration specified in the Core Operating Limits Report.

Your copy of the manual should be revised as follows:

Remove these pages: Insert these pages:

List of Effective Pages List of Effective Pages Revision 2 Revision 3 Page 16.9-17 Page 16.9-17 Questions or problems shculd be directed to Kay Crane, rs McGuire Regulatory Corapliance at extension 4306.

./

Ctw Kay L. Crane, McGuire Regulatory Compliance

\

l

l McGuire Nuclear Station I Selected Licensee Ceaunitments List of Effective Pages i Page Revision Date LOEP Tab List of Effective Pages 3 1 through 7 Tab 16.0 16.0-1 16.0-2 Tab 16.1 16.1-1 Tab 16.2 16.2-1 3/91 16.2-2 5/91 16.2-3 16.2-4

( TAMU k

16.3-1 IAb_ 1 W Tab 16.5 16.5-1 01/94 16.5-2 01/94 16.5-3 3/93 16.5-4 3/93 16.5-5 3/93 16.5-6 3/93 16.5-7 3/93 16.5-8 3/93 16.5-9 3/93 16.5-10 3/93 Tab 16.6 Tab 16.7 4- 16.7-1 IAb li B Revision 3 1

l 7s Page Revision Date i 1 Is _j 16.8-1 10/90 l

Table 16.8-la 1 of 23 10/94 Table 16.8-la 2 of 28 10/94 Table 16.8-la 3 of 28 10/94

Table 16.8-la 4 of 28 10/94 l

Table 16.8-la 5 of 28 10/94 f Table 16.8-la 6 of 28 10/94 Table 16.8-la 7 of 28 10/94 .

I Table 16.8-la 8 of 28 10/94 l Table 16.8-la 9 of 28 10/94 3 I

Table 16.8-la 10 of 28 10/94 l l

Table 16.8-la 11 of 28 10/94 )

Table 16.8-la 12 of 28 10/94 Table 16.8-la 13 of 28 10/94 l Table 16.8-la 14 of 28 10/94  !

es  !

\ Table 16.8-la 15 of 28 10/94

( i

\_ Y l Table 16.8-la 16 of 28 10/94 Table 16.8-la 17 of 28 10/94 Table 16.8-la 18 of 28 10/94 Table 16.8-la 19 of 28 10/94 Table 16.8-la 20 of 28 10/94 Table 16.8-la 21 of 28 10/94 Table 16.8-la 22 of 28 10'94

/

Table 16.8-la 23 of 28 10/94 Table 16.8-la 24 of 28 10/94 Table 16.8-la 25 of 28 10/94 Table 16.8-la 26 of 28 10/94 Table 16.8-la 27 of 28 10/94 Table 16.8-la 28 of 28 10/94 Table 16.8-lb I of 30 10/94 Table 16.8-1b of 30 10/94

\ ,, Table 16.8-1b 3 of 30 10/94 Table 16.8-lb 4 of 30 10/94 Revision 3 2

j

I fy Page Revision Date

! ,\

\ _,/

Table 16.8-1b 5 of 30 10/94 Table 16.8-Ib 6 of 30 10/94 Table 16.8-1b 7 of 30 10/94 Table 16.8-lb 8 of 30 10/94 Table 16.8-1b 9 of 30 10/94 Table 16.8-1b 10 of 30 10/94 Table 16.8-1b 11 of 30 10/94 Table 16.8-1b 12 of 30 10/94 Table 16.8-1b 13 of 30 10/94 Table 16.8-lb 14 of 30 10/94 Table 16.8-lb 15 of 30 10/94 Table 16.8-lb 16 of 30 10/94 Table 16.8-lb 17 of 30 10/94 Table 16.8-1b 18 of 30 10/94 Table 16.8-lb 19 of 30 10/94

[' ') Table 16.8-lb 20 of 30 10/94 v

Table 16.8-lb 21 of 30 10/94 Table 16.8-1b 22 of 30 10/94 Table 16.8-1b 23 of 30 10/94 Table 16.8-1b 24 of 30 10/94 Table 16.8-lb 25 of 30 10/94 Table 16.8-1b 26 of 30 10/94 Table 16.8-lb 27 of 30 10/94 Table 16.8-lb 28 of 30 10/94 Table 16.8-lb 29 of 30 10/94 Table 16.8-1b 30 of 30 10/94 Tab 16.9 16.9-1 2/91 16.9-2 16.9-3 16.9-4 i

(

(, 16.9-5 Table 16.9-1 Revision 3 3

l I

e- Page Revision Date 16.9-6 16.9-7 16.9-8 16.9-9 Table 16.9-2 8/90 Table 16.9-2 (cont'd) 16.9-10 6/94 16.9-11 6/94 16.9-12 12/90 16.9-13 16.9-14 Table 16.9-3 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 16.9-15 11/94 16.9-15a 2/91 16.9-16 16.9-17 6/95 16.9-18 16.9-19 Table 16.9-4 Table 16.9-5 16.9-20 08/93 16.9-21 08/93 Table 16.9-6 Iab 16.10 IAh_ lid 1 16.11-1 9/93 16.11-2 9/93 16.11-3 9/93 Revision 3 4

1 1

Page Revision Date 16.11-4 10/94 16.11-5 9/93 16.11-6 9/93 16.11-7 9/93 16.11-8 9/93 16.11-9 9/93 16.11-10 9/93 16,11-11 9/93 16.11-12 9/93 16.11-13 9/93 16.11-14 9/93 16.11-15 9/93 16.11-16 9/93 16.11-17 9/93 16.11-18 9/93 16.11-19 9/93 16.11-20 9/93 16.11-21 9/93 16.11-22 9/93 16.11-23 9/93 l 16.11-24 9/93 l 16.11-25 9/93 16.11-26 9/93 16.12-27 9/93 16.11-28 9/93 16.11-29 9/93 16.11-30 9/93 16.11-31 9/93 16.11-32 9/93 16.11-33 9/93 16.11-34 12/93 16.11-35 12/93 16.11-36 12/93 l Revision 3 l 5 l l

I Page Revision Date 16.11-37 12/93 16.11-38 9/93 16.11-39 9/93 16.11-40 9/93 16.11-41 9/93 16.11-42 9/93 16.11-43 9/93 16.11-44 9/93 ,

16.11-45 9/93 16.11-46 9/93 16.11-47 9/93 16.11-48 9/93 16.11-49 9/93 16.11-50 1/93 16.11-51 9/93 ,

16.11-52 9/93 16.11-53 9/93 16.11-54 9/93 16.11-55 9/93 16.11-56 9/93 16.11-57 9/93 16.11-58 9/93 16.11-59 9/93 16.11-60 9/93 16.11-61 9/93 16.11-62 9/93 16.11-63 9/93 I

16.11-64 9/93 16.11-65 9/93 1

16.11-66 9/93 16.11-67 9/93 16.11-68 9/93 1

Tab 16.13 Revision 3 6

w

T l

l

- l Page Revision Date 16.13-1 Tab 16.14 Tab 16.15 Accendix Tab 1

2 3 I

, 4 5

6 7

Attachment 1 Attachment 2 Attachment 3 Fevision 3 7

4 fs c. The Standby Makeup Pump water supply shall be demonstrated OPERABLE Dy:

N_s i Verifying at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> that IDENTIFIED LEAKAGE, UNIDENTIFIED LEAKAGE, and Reactor Coolant Pump Seal leakoff do not exceed a total of 26 gpm.

ii Verifying at least once per 7 days:

r

1) That the requirements of Technical Specification 3.9.10 are met and the boron concentration in the storage pool is greater than or equal to the minimum boron concentration specified in the Core Operating Limits Report, or
2) That the refueling water storage tank is capable of being I aligned to the Standby Makeup Pump.

iii Verifying at least once per 92 days that the Standby Makeup Pump  ;

develops a flow of greater than or equal to 26 gpm at a pressure greater than or equal to 2485 psig.

d. The Standby Shutdown System 250/125-Volt Battery Bank and its associated charger sha?1 be demonstrated OPERABLE:

i At least once per 31 days by verifying:

1) That the electrolyte level of each battery is above the plates, and  ;
2) The total battery terminal voltage is greater than or equal to 258/129 volts on float charge, 11 At least once per 92 days by verifying that the average specific gravity is greater than or equal to 1.200.

(

iii At least once per 18 months by verifying that:

1) The batteries, cell plates, and battery racks show no visual indications of physical damage or abnormal deterioration, and
2) The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material.
e. The Steam Turbine Driven Auxiliary Feedwater Pump and associated components shall be demonstrated OPERABLE at least once per 18 months by verifying that the "C" solenoid is capable of being deenergized to open valve SA48ABC to provide steam supply to the turbine driven auxiliary feedwater pump.
f. Standby Shutdown System instrumentation shall be demonstrated OPERABLE by performance of testing requirements in Table 16.9-5.

k U <

16.9-17 6/95 l

o

( j July 13, 1995 v

To: All Holders of the Selected Licensee Commitments Manual Please find attached a revision to the Selected Licensee Commitments Manual. This revision changes the Standby Shutdown System testing requirements for the standby makeup pump water supply boron concentration in the storage pool to the minimum boron concentration specified in the Core Operating Limits Report.

Your copy of the manual should be revised as follows:

Remove these pages: Insert these pages List of Effective Pages List of Effective Pages Revision 2 Revision 3 Page 16.9-17 Page 16.9-17 Questions or problems should be directed to Kay Crane, g McGuire Regulatory Compliance at extension 4306.

N3)

Kay L~. Crane, McGuire Regulatory Compliance a

McGuire Nuclear Station O Selected Licensee commitments List of Effective Pages Page Revision Date LOEP Tab List of Effective Pages 3 1 through 7 Tab 16.0 16.0-1 16.0-2 Tab 16.1 16.1-1 Tab 16.2 16.2-1 3/91 16.2-2 5/91 16.2-3 16.2-4 Tab 16.3 16.3-1 Tab 16.4 Tah_1 0 16.5-1 01/94 16.5-2 01/94 16.5-3 3/93 16.5-4 3/93 16,5-5 3/93 16.5-6 3/93 16.5-7 3/93 16.5-8 3/93 16,5-9 3/93 16.5-10 3/93 tab._1fLJit Tab 16.7 16.7-1 Tab 16.8 Revision 3 1

a fS Page Revision Date

( )

\,,/ 16.8-1 10/90 Table 16.8-la 1 of 28 10/94 Table 16.8-la 2 of 28 10/94 Table 16.8-la 3 of 28 10/94 Table 16.8-la 4 of 28 10/94 Table 16.8-la 5 of 28 10/94 Table 16.8-la 6 of 28 10/94 Table 16.8-la 7 of 28 10/94 Table 16.8-la 8 of 28 10/94 Table 16.8-la 9 of 28 10/94 Table 16.8-la 10 of 28 10/94 Table 16.8-la 11 of 28 10/94 Table 16.8-la 12 of 28 10/94 Table 16.8-la 13 of 28 10/94 Table 16.8-la 14 of 28 10/94 I\ Table 16.8-la 15 of 28 10/94

'd Table 16.8-la 16 of 28 10/94 Table 16.8-la 17 of 28 10/94 Table 16.8-la 18 of 28 10/94 Table 16.8-la 19 of 28 10/94 Table 16.8-la 20 of 28 10/94 Table 16,8-la 21 of 28 10/94 Table 16.8-la 22 of 28 10'/94 Table 16.8-la 23 of 28 10/94 Table 16.8-la 24 of 28 10/94 Table 16.8-la 25 of 28 10/94 Table 16.8-la 26 of 28 10/94 Table 16.8-la 27 of 28 10/94 Table 16.8-la 28 of 28 10/94 Table 16.8-lb 1 of 30 10/94 Table 16.8-1b 2 of 30 10/94 7s

__s Table 16.8-1b 3 of 30 10/94 Table 16.8-lb 4 of 30 10/94 Revision 3 2

c i

f- g Page Revision Date

'1_ j Table 16.8-1b 5 of 30 10/94 Table 16.8-1b 6 of 30 10/94 Table 16.8-1b 7 of 30 10/94 Table 16.8-1b 8 of 30 10/94 Table 16.8-1b 9 of 30 10/94 Table 16.8-lb 10 of 30 10/94 Table 16.8-1b 11 of 30 10/94 Table 16.8-1b 12 of 30 10/94 Table 16.8-lb 13 of 30 10/94 Table 16.8-lb 14 of 30 10/94 Table 16.8-1b 15 of 30 10/94 Table 16.8-lb 16 of 30 10/94 Table 16.8-1b 17 of 30 10/94 Table 16.8-lb 18 of 30 10/94 Table 16.8-lb 19 of 30 10/94 f"'s

}

Table 16.8-1b 20 of 30 10/94

%J Trable 16. 8-1b 21 of 30 10/94 Table 16.8-1b 22 of 30 10/94 Table 16.8-lb 23 of 30 10/94 Table 16.8-1b 24 of 30 10/94 Table 16.8-1b 25 of 30 10/94 Table 16.8-1b 26 of 30 10/94 Table 16.8-lb 27 of 30 10/94 Table 16.8-lb 28 of 30 10/94 Table 16.8-1b 29 of 30 10/94 Table 16.8-1b 30 of 30 10/94 Tab 16.9 16.9-1 2/91 16.9-2 16.9-3 16.9-4 16.9-5 Table 16.9-1 Revision 3 3

l

. I Page Revision Date 16.9-6 16.9-7 16.9-8

- 16.9-9 Table 16.9-2 8/90 Table 16.9-2 (cont'd) 16.9-10 6/94 16.9-11 6/94 l 1

16.9-12 12/90 l 16.9-13 16.9-14 ,

l Table 16.9-3 12/90 j Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) )

16.9-15 11/94 l 16.9-15a 2/91 )

16.9-16 16.9-17 6/95 l

16.9-18 16.9-19 Table 16.9-4 Table 16.9-5 l 16.9-20 08/93 16.9-21 08/93 Table 16.9-6 Tab 16.10 Tab 16.11 16.11-1 9/93 16.11-2 9/93 16.11-3 9/93 Revision 3 4 i F

J Page Revision Date ,

16.11-4 10/94 16.11-5 9/93 l 16.11-6 9/93 16.11-7 9/93 16.11-8 9/93 16.11-9 9/93 16.11-10 9/93 16.11-11 9/93 16.11-12 9/93 16.11-13 9/93 16.11-14 9/93 16.11-15 9/93 16.11-16 9/93 16.11-17 9/93 16.11-18 9/93 ,

16.11-19 9/93 16.11-20 9/93 16.11-21 9/93 i 16.11-22 9/93 16.11-23 9/93 16.11-24 9/93 l 1

16.11-25 9/93 l 16.11-26 9/93 16.11-27 9/93 16.11-28 9/93 16.11-29 9/93 16.11-30 9/93 16.11-31 9/93 16.11-32 9/93 16.11-33 9/93 16.11-34 12/93 I 16.11-35 12/93 16.11-36 12/93 Revision 3 5

i

)

Pare Revision Date 16.11-37 12/93 16.11-38 9/93 16.11-39 9/93 16.11-40 9/93 16.11-41 9/93 16.11-42 9/93 16.11-43 9/93 16.11-44 9/93 l 16.11-45 9/93 16.11-46 9/93 16.11-47 9/93 16.11-48 9/93 16.11-49 9/93 16.11-50 1/93 l 16.11-51 9/93 l

16.11-52 9/93

(

16.11-53 9/93 16.11-54 9/93 16.11-55 9/93 16.11-56 9/93 16.11-57 9/93 16.11-58 9/93 16.11-59 9/93 16.11-60 9/93 16.11-61 9/93 i 1

16.11-62 9/93 j 16.11-63 9/93 16.11-64 9/93 16.11-65 9/93 16.11-66 9/93 16.11-67 9/93 16.11-68 9/93 Tab 16.13 Revision 3 6

1

4 .

1 Page Revision Date 16.13-1 Tab 16.14 Tab 16.15 ADoendix Tab 1

2 3

4 5

6 7

Attachment 1 Attachment 2 Attachment 3 i

ee r

1 l

l Revision 3

, 7 l

l

J f-~s c. The Standby Makeup Pump water supply shall be demonstrated OPERABLE by:

1 )

\_,/ i Verifying at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> that IDENTIFIED LEAKAGE, UNIDENTIFIED LEAKAGE, and Reactor Coolant Pump Seal leakoff do not exceed a total of 26 gpm.

11 Verifying at least once per 7 days:

1) That the requirements of Technical Specification 3.9.10 are met and the boron concentration in the storage pool is greater than or equal to the minimum boron concentration specified in the Core operating Limits Report, or
2) That the refueling water storage tank is capable of being aligned to the Standby Makeup Pump.

iii Verifying at least once per 92 days that the Standby Makeup Pump develops a flow of greater than or equal to 26 gpm at a pressure greater than or equal to 2485 psig.

d. The Standby Shutdown System 250/125-Volt Battery Bank and its associated charger shall be demonstrated OPERABLE:

1 At least once per 31 days by verifying:

1) That the electrolyte level of each battery is above the plates, and
2) The total battery terminal voltage is greater than or equal to 258/129 volts on float charge.

(T ii At least once per 92 days by verifying that the average specific gravity is greater than or equal to 1.200.

(x/

iii At least once per 18 months by verifying that:

1) The batteries, cell plates, and battery racks show no visual indications of physical damage or abnormal deterioration, and
2) The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material,
e. The Steam Turbine Driven Auxiliary Feedwater Pump and associated components shall be demonstrated OPERABLE at least ence per 18 months by verifying that the *C" solenoid is capable of being deenergized to open valve SA48ABC to provide steam supply to the turbine driven auxiliary f eedwater pur..p.
f. Standby Shutdown System instrumentation shall be demonstrated OPERABLE by performance of testing requirements in Table 16.9-5.

16.9-17 6/95 l

o s

July 13, 1995

()

To: All Holders of the Selected Licensee Commitments Manual Please find attached a revision to the Selected Licensee j Commitments Manual. This revision changes the Standby Shutdown System testing requirements for the standby makeup pump water supply boron concentration in the storage pool to the minimum boron concentration specified in the Core Operating Limits Report. j 1

l Your copy of the manual should be revised as follows-l l

Remove these pages: Insert these pages l List of Effective Pages List of Effective Pages l Revision 2 Revision 3 Page 16.9-17 Page 16.9-17 Questions or problems should be directed to Kay Crane,

/~ McGuire Regulatory Compliance at extension 4306.

v Kay L. Crane, hN McGuire Regulatory Compliance l

l l

0

e McGuire Nuclear Station Selected Licensee Comunitments

-( List of Effective Pages Page Revision Date LCIP_ TAD List of Effective Pages 3 1 through 7 Tab 16.0 16.0-1 16.0-2 Tab 16.1 16.1-1 Tab 16.2 16.2-1 3/91 16.2-2 5/91 16.2-3 16.2-4 Tab 16.1 16.3-1 Tab 16J Iab 16J 16.5-1 01/94 16.5-2 01/94 16.5-3 3/93  ;

16.5-4 3/93 16.5-5 3/93 i i

16.5-6 3/93 16.5-7 3/93 .

3/93

)

16.5-8 '

)

16.5-9 3/93 16.5-10 3/93 Tab 16.6 l

Tab 16 J i I

( 16.7-1 l

Tab 16.8 Revision 3 1

F

,r'3 Page Revision Date

{ Y

\_/ 16,8-1 10/90 Table 16.8-la 1 of 28 10/94 Table 16.8-la 2 of 28 10/94 Table 16.8-la 3 of 28 10/94 Table 16.8-la 4 of 28 10/94 Table 16.8-la 5 of 28 10/94 Table 16.8-la 6 of 28 10/94 Table 16.8-la 7 of 28 10/94 Table 16.8-la 8 of 28 10/94 Table 16.8-la 9 of 28 - 10/94 Table 16.8-la 10 of 28 10/94 Table 16.8-la 11 of 28 10/94 Table 16.8-la 12 of 28 10/94 Table 16.8-la 13 of 28 10/94 Table 16.8-la 14 of 28 10/94 l

\_/

) Table 16.8-la 15 of 28 10/94 Table 16.8-la 16 of 28 10/94 Table 16.8-la 17 of 28 10/94 Table 16.8-la 18 of 28 10/94 Table 16.8-la 19 of 28 10/94 Table 16.8-la 20 of 28 10/94 Table 16.8-la 21 of 28 10/94 Table.16.8-la 22 of 28 I Table 16.8-la 23 of 28 Table 16.8-la 24 of 28 10/94 Table 16.8-la 25 of 28 10/94 Table 16.8-la 26 of 28 10/94 Table 16.8-la 27 of 28 10/94 Table 16.8-la 28 of 28 10/94 l

Table 16.8-lb 1 of 30 10/94 I Table 16.8-1b 2 of 30 10/94 I

'\ ,)

s Table 16.8-1b 3 of 30 10/94 l

!able 16.8-lb 4 of 30 10/94 Revision 3 2

,- Page Revision Date

\_/

s Table 16.8-1b 5 of 30 10/94 Table 16.8-1b 6 of 30 10/94 Table 16.8-1b 7 of 30 10/94 Table 16.8-1b 8 of 30 10/94 Table 16.8-lb 9 of 30 10/94 Table 16.8-1b 10 of 30 10/94 Table 16.8-1b 11 of 30 10/94

. Table 16.8-lb 12 of 30 10/94 Table 16.8-1b 13 of 30 10/94 Table 16.8-lb 14 of 30 10/94 Table 16.8-1b 15 of 30 10/94 Table 16.8-lb 16 of 30 10/94 Table 16.8-1b 17 of 30 10/94 Table 16.8-1b 18 of 30 10/94 Table 16.8-lb 19 of 30 10/94

[%/ ') Table 16.8-1b 20 of 30 10/94 Table 16.8-lb 21 of 30 10/94 Table 16.8-1b 22 of 30 10/94 Table 16.8-lb 23 of 30 10/94 Table 16.8-lb 24 of 30 10/94 ,

Table 16.8-lb 25 of 30 10/94 Table 16.8-1b 26 of 30 10/94 Table 16.8-lb 27 of 30 10/94 Table 16.8-1b 28 of 30 10/94 Table 16.8-lb 29 of 30 10/94 Table 16.8-lb 30 of 30 10/94 Tab _ lfid 16.9-1 2/91 16.9-2 16.9-3 7~, 16.9-4 k ,) 16.9-5 Table 16.9-1 Revision 3 3

[

c Page Revision Date 16.9-6 16.9-7 16.9-8 16.9-9 Table 16.9-2 8/90 Table 16.9-2 (cont'd) 16.9-10 6/94 16.9-11 6/94 16.9-12 12/90 16.9-13 16.9-14 Table 16.9-3 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 16.9-15 11/94 16.9-15a 2/91 16.9-16 16.9-17 6/95 16.9-18 16.9-19 Table 16.9-4 Table 16.9-5 16.9-20 08/93 16.9-21 08/93 Table 16.9-6 Tab 16.10 Tab 16.11 16.11-1 9/93 j 16.11-2 9/93  ;

16.11-3 9/93 1

i Revision 3 4

i Page Revision Date 16.11-4 10/94 16.11-5 9/93 16.11-6 9/93 16.11-7 9/93 16.11-8 9/93 16.11-) 9/93 16.11-10 9/93 16.11-11 9/93 16.11 12 9/93 16.11-1) 9/93 16.11-14 9/93 16.11-15 9/93 16.11-16 9/93 16.11-17 9/93 16.11-18 9/93 16.11-19 9/93 16.11-20 9/93 ,

16.11-21 9/93 16.11-22 9/93 16.11-23 9/93 16.11-24 9/93 16.11-25 9/93 16.11-26 9/93 16.11-27 9/93 16.11-28 9/93 16.11-29 ,

9/93 16.11-30 9/93 16.11-31 9/93 ,

i 16.11-32 9/93 l

16.11-33 9/93 16.11-34 12/93 )

16.11-35 12/93 16.11-36 12/93 l E .ision 3 5

Page Revision Date O 16.11-37 12/93 16.11-38 9/93 16.11-39 9/93 16.11-40 9/93 16.11-41 9/93 16.11-42 9/93 16.11-43 9/93 16.11-44 9/93 16.11-45 9/93 16.11-46 9/93 16.11-47 9/93 16.11-48 9/93 16.11-49 9/93 16.11-50 1/93 16.11-51 9/93 16.11-52 9/93 16.11-53 9/93 16.11-54 9/93 16.11-55 9/93 16.11-56 9/93 16.11-57 9/93 16.11-58 9/93 16.11-59 9/93 16.11-60 9/93 16.11-61 9/93 16.11-62 9/93 16.11-63 9/93 16.11-64 9/93 16.11-65 9/93 ,

16.11-66 9/93

., 16.11-67 9/s3 16.11-68 9/93 Tab 16.11 Revision 3 6

Page Revision Date 16.13-1 Tab 16.14 Inb 16.15 AppendiK_ Tab 1

i 2

3 4

5 6

7 Attachment 1 Attachment 2 Attachment 3 a

i i

Revision 3 7

o c. The Standby Makeup Pump water supply shall be demonstrated OPERABLE by:

I k k s/ i Verifying at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> that IDENTIFIED LEAKAGE, UNIDENTIFIED LEAKAGE, and Reactor Coolant Pump Seal leakoff do not exceed a total of 26 gpm. ,

11 Verifying at least once per 7 days:

1) That the requirements of Technical Specification 3.9.10 are met and the boron concentration in the storage pool is greater than or equal to the minimum boron concentration specified in the Core Operating Limits Report, or
2) That the refueling water storage tank is capable of being aligned to the Standby Makeup Pump.

iii Verifying at least once per 92 days that the Standby Makeup Pump develops a flow of greater than or equal to 26 gpm at a pressure greater than or equal to 2485 psig.

d. The Standby Shutdown System 250/125-Volt Battery Bank and its associated charger shall be demonstrated OPERABLE:

i At least once per 31 days by verifying:

1) That the electrolyte level of each battery is above the plates, and
2) The total battery terminal voltage is greater than or equal to 258/129 volts on float charge.

At least once per 92 days by verifying that the average specific

(,)

(N ii gravity is greater than or equal to 1.200.

iii At least once per 18 months by verifying that: *

1) The batteries, cell plates, and battery racks show no visual indications of physical damage or abnormal deterioration, and
2) The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material.
e. The Steam Turbine Driven Auxiliary Feedwater Pump and associated components shall be demonstrated OPERABLE at least once per 18 months by i verifying that the "C" solenoid is capable of being deenergized to open valve SA48ABC to provide steam supply to the turbine driven auxiliary feedwater pump.
f. Standby Shutdown System instrumentation shall be demonstrated OPERABLE I by performance of testing requirements in Table 16.9-5. l

/~'T

\_ / r 16.9-17 6/95 l

9 July 13, 1995

[v)

To: All Holders of the Selected Licensee Commitments Manual Please find attached a revision to the Selected Licensee Commitments Manual. This revision changes the Standby Shutdown System testing requirements for the standby makeup pump water supply boron concentration in the storage pool to the minimum boron concentration specified in the Core Operating Limits Report.

Your copy of the manual should be revised as follows:

Remove these pages Insert these pages:

List of Effective Pages List of Effective Pages Revision 2 Revision 3 Page 16.9-17 Page 16.9-17 Questions or problems should be directed to Kay Crane, McGuire Regulatory Compliance at extension 4306.

Kay L. Crane, McGuire Regulatory Compliance 1

i 1

1 1

l I

l

McGuire Nuclear Station

O Selected Licensee Commitments List of Effective Pages Page Revision Date LOEP Tab List of Effective Pages 3 1 through 7 i TAh_li D 1

\

16.0-1 {

l 16.0-2 Tab 16.1 16.1-1 l

Tab 16.2 16.2-1 3/91 16.2-2 5/91 16.2-3 16.2-4 l

1 Tab _1fal l l

16.3-1 Tab 16.4 ,

l I

Tab 16.5 16.5-1 01/94 16.5-2 01/94 16.5-3 3/93 16.5-4 3/93 16.5-5 3/93 16.5-6 3/93 16.5-7 3/93 16.5-8 3/93 16.5-9 3/93 16.5-10 3/93 Iab_lfLf Tab 16.7 O 16.7-1 Tab 16.8 Revision 3 1

, -'s Page Revision Data e t

\u) 16.8-1 10/90 Table 16.8-la 1 of 28 10/94 Table 16.8-la 2 of 28 10/94 Table 16.8-la 3 of 28 10/94 Table 16.8-la 4 of 28 10/94 Table 16.8-la 5 of 28 10/94 Table 16.8-la 6 of 28 10/94 Table 16.8-la 7 of 28 10/94 Table 16.8-la 8 of 28 10/94 Table 16.8-la 9 of 28 10/94 Table 16.8-la 10 of 28 10/94 Table 16.8-la 11 of 28 10/94 Table 16.8-la 12 of 28 10/94 Table 16.8-la 13 of 28 10/94 Table 16.8-la 14 of 28 10/94

[ h Table 16.8-la 15 of 28 10/94 V

Table 16.8-la 16 of 28 10/94 Table 16.8-la 17 of 29 10/94 Table 16.8-la 18 of 28 10/94 Table 16.8-la 19 of 28 10/94 Table 16.8-la 20 of 28 10/94 Table 16.8-la 21 of 28 10/94 Table 16.8-la 22 of 28 10/94 Table 16.8-la 23 of 28 10/94 Table 16.8-la 24 of 28 10/94 Table 16.8-la 25 of 28 10/94 Table 16.8-la 26 of 28 10/94 Table 16.8-la 27 of 28 10/94 Table 16.8-la 28 of 28 10/94 Table 16.8-lb 1 of 30 10/94 cs Table 16.8-1b 2 of 30 10/94

\s,/ Table 16.8-1b 3 of 30 10/94 Table 16.8-1b 4 of 30 10/94 Revision 3 2

L.

c r3 Page Revision Date

\_/ Table 16.8-1b 5 of 30 10/94 Table 16.8-lb 6 of 30 10/94 Table 16.8-1b 7 of 30 10/94 Table 16.8-1b 8 of 30 10/94 Table 16.8-lb 9 of 30 10/94 Table 16.8-15 10 of 30 10/94 Table 16.8-1b 11 of 30 10/94 Table 16.8-1b 12 of 30 10/94 Table 16.8-1b 13 of 30 10/94 Table 16.8-1b 14 of 30 10/94 Table 16.8-lb 15 of 30 10/94 Table 16.8-1b 16 of 30 10/94 Table 16.8-1b 17 of 30 10/94 Table 16.8-1b 18 of 30 10/94 Table 16.8-1b 19 of 30 10/94

/m

( Table 16.8-1b 20 of 30 10/94 Table 16.8-lb 21 of 30 10/94 Table 16.8-1b 22 of 30 10/94 Table 16.8-lb 23 of 30 10/94 Table 16.8-lb 24 of 30 10/94 Table 16.8-lb 25 of 30 10/94 Table 16.8-1b 26 of 30 10/94 Table 16.8-1b 27 of 30 10/94 Table 16.8-1b 28 of 30 10/94 Table 16.8-1b 29 of 30 10/94 Table 16.8-1b 30 of 30 10/94 Tab 16.2 16.9-1 2/91 ,

16.9-2 16.9-3 16.9-4 16.9-5 Table 16.9-1 Revision 3 3

Page Revision Date 16.9-6 16.9-7 16.9-8

, 16.9-9 Table 16.9-2 8/90 Table 16.9-2 (cont'd) 16.9-10 6/94

,l 16.9-11 6/94 16.9-12 12/90 '

16.9-13 16.9-14 Table 16.9-3 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 2/95 f Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 16.9-15 11/94 16.9-15a 2/91 j 16.9-16

! 16.9-17 6/95 i

j 16.9-18 1

16.9-19 l

Table 16.9-4 Table 16.9-5 16.9-20 08/93 16.9-21 08/93 Table 16.9-6 I Tab 16.10 IAD_._lf2 16.11-1 9/93 .

16.11-2 9/93 4 16.11-3 9/93 i Revision 3 4 I

l

. I l

l i

l Page Revision Date 16.11-4 10/94 16.11-5 9/93 16.11-6 9/93 16.11-7 9/93 16.11-8 9/93 16.11-9 9/93 16.11-10 9/93 16.11-11 9/93 16.11-12 9/93 16.11-13 9/93 >

16.11-14 9/93 16.11-15 9/93 16.11-16 9/93 16.11-17 9/93 16.11-18 9/93 16.11-19 9/93 16.11-20 9/93 16.11-21 9/93 16.11-22 9/93 16.11-23 9/93 16.11-24 9/93 16.11-25 9/93 16.11-26 9/93 16.11-27 9/93 ,

16.11-28 9/93 16.11-29 9/93 ,

16.11-30 9/93 16.11-31 9/93 16.11-32 9/93 i 1

16.11-33 9/93 I 16.11-34 12/93 1

16.11-35 12/93 l 16.11-36 12/93 i i

l Revision 3 j 5

-______m----- __a--_ _ _ --- __ _ ---+- '"m- ' r

Page Revision Date 16.11-37 12/93 ,

16.11-38 9/93 16.11-39 9/93 16.11-40 9/93 16.11-41 9/93 16.11-42 9/93 16.11-43 9/93 16.11-44 9/93 16.11-45 9/93 16.11-46 9/93 16.11-47 9/93 16.11-48 9/93 16.11-49 9/93 16.11-50 1/93 16.11-51 9/93 16.11-52 9/93 16.11-53 9/93 16.11-54 9/93 16.11-55 9/93 l 16.11-56 9/93 16.11-57 9/93 16.11-58 9/93 16.11-59 9/93 16.11-60 9/93 16.11-61 9/93 16.11-62 9/93 16.11-63 9/93 16.11-64 9/93 j 16.11-65 9/93 16.11-66 9/93 j 16.11-67 9/93 16.11-68 9/93 Igb 16.13 Revision 3 6 \

i i

. l l

I i

i Page Revision Date 16.13-1 l Tab 16.14 Tab 16.15 Apoendix Tab 1

2 3

4 5

6 7

Attachment 1 Attachment 2 Attachment 3 i

h Revision 3 7

L. _ _ _ _ _ _ . _ _ _ _ _. -

[ c. -The Standby Makeup Pump water supply shall be demonstrated OPERABLE by:

As i i Verifying at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> that IDENTIFIED LEAKAGE, UNIDENTIFIED LEAKAGE, .and Reactor Coolant Pump Seal leakoff do not exceed a total of 26 gpm.

11 Verifying at least-once per 7 days:

1) That the requirements of Technical Specification 3.9.10:are met and the boron concentration in the storage pool is greater than or equal to the minimum boron concentration specified in the Core Operating Limits Report, or 2)' That the refueling water storage tank is capable of being aligned to the Standby Makeup Pump, iii Verifying at least once per 92 days that the Standby Makeup Pump develops a flow of greater than or equal to 26 gpm'at a pressure greater than or equal to 2485 psig,
d. The Standby Shutdown System-250/125-Volt Battery Bank and its associated charger shall be demonstrated OPERABLE:

i At least once per 31 days by verifying:

1) That the electrolyte level of each battery is above the plates, and
2) The total battery terminal voltage is greater than or equal, to 258/129 volts on float charge.

/ 11 At least once per 92 days by verifying that the average specific gravity is greater than or= equal to 1.200. m lii At least once per 18 months by ver;fying that:

1) The batteries, cell plates, and battery racks show no visual indications of physical damage or abnormal deterioration, and
2) The battery-to-battery.and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material.
e. The Steam Turbine Driven Auxiliary Feedwater Pump and associated components shall be demonstrated OPERABLE at least once-per 18 months by.

verifying that the "C" solenoid is capable of being deenergized to open valve SA48ABC to provide steam supply to the turbine driven auxiliary feedwater pump.

.f. Standby Shutdown System instrumentation shall be demonstrated OPERABLE by performance of testing requirements in Table'16.9-5.

4

~

16.9-17 6/951 l c

e d'

July 13, 1995

']

(

To: All Holders of the Selected Licensee Commitments Manual Please find attached a revision to the Selected Licensee Cornitments Manual. This revision changes the Standby Shutdown System testing requirements for the standby makeup pump water supply boron concentration in the storage pool to tk.e minimum boron concentration specified in the Core OI.srating Limits Report.

Your copy of the manual should be revised as follows:

Remove these pages Insert these pages:

List of Effective Pages List of Effective Pages Revision 2 Revision 3 Page 16.9-17 Page 16.9-17 Questions or problems should be directed to Kay Crane, McGuire Regulatory Compliance at extension 4306.

(~'}

%J

& Os~)

Kay L'. Crane, McGuire Regulatory Compliance U

i k- _

i l

l

  • i McGuire Nuclear Station
  1. f~~g* Selected Licensee Commitments i N ss List of Effective Pages i I

Page Revision Date LoEP Tab List of Effective Pages 3 1 through 7 Tab 16.0 l

16.0-1 16.0-2 Iab 16.1 16.1-1 Tab 16.2 16.2-1 3/91 16.2-2 5/91 l 16.2-3 16.2-4 Tab 16.3 16.3-1 Tab 16.4  ;

Inh _1fm3 i 16.5-1 01/94 16.5-2 01/94 16.5-3 3/93 16.5-4 3/93 16.5-5 3/93 16.5-6 3/93 16.5-7 3/93 16.5-8 3/93 16.5-9 3/93 16.5-10 3/93 Tab 16.5 s Iah_16.1 .

16.7-1 j Tab 16.8  !

Revision 3 1

e

,r xs Page Revision Date i I

( _/ 16.8-1 10/90 Table 16.8-la 1 of 28 10/94 Table 16.8-la 2 of 28 10/94 Table 16.8-la 3 of 28 10/94 Table 16.8-la 4 of 28 10/94 Table 16.8-la 5 of 28 10/94 Table 16.8-la 6 of 28 10/94 Table 16.8-la 7 of 28 10/94 Table 16.8-la 8 of 28 10/94 Table 16.8-la 9 of 28 10/94 Table 16.8-la 10 of 28 10/94 Table 16.8-la 11 of 28 10/94 Table 16.8-la 12 of 28 10/94 Table 16.8-la 13 of 28 10/94 Table 16.8-la 14 of 28 10/94

[ b Table 16.8-la 15 of 28 10/94 V

Table 16.8-la 16 of 28 10/94 Table 16.8-la 17 of 28 10/94 Table 16.8-la 18 of 28 10/94 Table 16.8-la 19 of 28 10/94 Table 16.8-la 20 of 28 10/94 Table 16.8-la 21 of 28 10/94 Table.16.8-la 22 of 28 10/94 Table 16.8-la 23 of 28 10/94 Table 16.8-la 24 of 28 10/94 Table 16.8-la 25 of 28 10/94 Table 16.8-la 26 of 28 10/94 Table 16.8-la 27 of 28 10/94 l Table 16.8-la 28 of 28 10/94 Table 16.8-1b 1 of 30 10/94 j l

s Table 16.8-lb 2 of 30 10/94 ks ,- Table 16.8-1b 3 of 30 10/94 Table 16.8-lb 4 of 30 10/94 Revision 3 2

e

<~ ~~ 3 Page Revision Date i )

's. /' Table 16.8-1b 5 of 30 10/94 Table 16.8-1b 6 of 30 10/94 Table 16.8-1b 7 of 30 10/94 Table 16.8-1b 8 of 30 10/94 Table 16.8-1b 9 of 30 10/94 Table 16.8-1b 10 of 30 10/94 Table 16.8-1b 11 of 30 10/94 Table 16.8-1b 12 of 30 10/94 Table 16.8-ib 13 of 30 10/94 Table 16.8-1b 14 of 30 10/94 Table 16.8-1b 15 of 30 10/94 Table 16.8-1b 16 of 30 10/94 Table 16.8-lb 17 of 30 10/94 Table 16.8-lb 18 of 30 10/94 Table 16.8-lb 19 of 30 10/94

, - ~

l Table 16.8-1b 20 of 30 10/94 C

Table 16.8-lb 21 of 30 10/94 Table 16.8-lb 22 of 30 10/94 Table 16.8-lb 23 of 30 10/94 Table 16.8-1b 24 of 30 10/94 Table 16.8-1b 25 of 30 10/94 Table 16.8-1b 26 of 30 10/94 Table 16.8-1b 27 of 30 10/94 Table 16.8-lb 28 of 30 10/94 Table 16.8-1b 29 of 30 10/94 Table 16.8-lb 30 of 30 10/94 Tab 16.9 16.9-1 2/91 i

16.9-2 16.9-3 1

,-~g 16.9-4 l

_, 16.9-5 l l

Table 16.9-1 l Revision 3 3

C

l

, I l

Page Revision Date l

16.9-6 l 16.9-7 16.9-8  !

16.9-9 Table 16.9-2 8/90 1 Table 16.9-2 (cont'd) 16.9-10 6/94  !

16.9-11 6/94 l 1

16.9-12 12/90 l 16.9-13 i l

16.9-14 Table 16.9-3 12/90  ;

Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 2/95 i Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) l 16.9-15 11/94 l

16.9-15a 2/91 16.9-16  ;

1 16.9-17 6/95 1 16.9-18 16.9-19 Table 16.9-4 Table 16.9-5 16.9-20 08/93 16.9-21 08/93 Table 16.9-6 Tab 16.10 Tab 15.11 16.11-1 9/93 1

16.11-2 9/93 1 16.11-3 9/93 Revision 3 L_ _ _ _ _ _ _ _ _ _ . _ _ _ - _ _ _

i

Page Revision Date 16.11-4 10/94 16.11-5 9/93 16.11-6 9/93 16.11-7 9/93 1 16.11-8 9/93 16.11-9 9/93 16.11-10 9/93 16.11-11 9/93 16.11-12 9/93  !

16.11-13 9/93 16.11-14 9/93 16.11-15 9/93 16.11-16 9/93 l

16.11-17 9/93 I 16.11-18 9/93 16.11-19 9/93 16.11-20 9/93 16.11-21 9/93 16.11-22 9/93 i 16.11-23 9/93 l

l 16.11-24 9/93 l

l 16.11-25 9/93 16.11-26 9/93 16.11-27 9/93 l 16.11-28 9/93 1

l 16.11-29 9/93 16.11-30 9/93 16.11-31 9/93 16.11-32 9/93 16.11-33 9/93 16.11-34 12/93 16.11-35 12/93 16.11-36 12/93 Revision 3 5

L. .

. a

e I

Page Revision Date 16.11-37 12/93 16.11-38 9/93 16.11-39 9/93 ,

16.11-40 9/93 16.11-41 9/93 16.11-42 9/93 16.11-43 9/93 1 16.11-44 9/93 16.11-45 9/93 16.11-46 9/93 16.11-47 9/93 l 16.11-48 9/93 l 16.11-49 9/93 16.11-50 1/93 16.11-51 9/93 16.11-52 9/93 16.11-53 9/93 16.11-54 9/93 l

16.11-55 9/93 l l

16.11-56 9/93 16.11-57 9/93 16.11-58 9/93 16.11-59 9/93 16.11-60 9/93 l

16.11-61 9/93 1 16.11-62 9/93 16.11-63 9/93 16.11-64 9/93 16.11-65 9/93 16.11-66 9/93 16.11-67 9/93 O 16.11-68 9/93 TAh lh M Revision 3 6 1 L )

Page Revision Date 16.13-1 Tab 16.14 Tab 16.15 Apoendix Tab 1

2 3

4 5

6 7

Attachment 1 Attachment 2 Attacrunent 3 l

l 1

l 1

Revision 3 7

A

< r O c. The Standby Makeup Pump water supply shall be demonstrated OPERABLE by:

.I ) ,

\s / i Verifying at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> that IDENTIFIED LEAKAGE, UNIDENTIFIED LEAKAGE, and Reactor Coolant Pump Seal leakoff do not exceed a total of 26 gpm.

ii Verifying at least once per 7 days:

1) 'That the requirements of Technical Specification 3.9.10 are met and the boron concentration in the storage pool is greater than or equal to the minimum boron concentration specified in the Core Operating Limits Report, or
2) That the refueling water storage tank is capable of being aligned to the Standby Makeup Pump.

iii Verifying at least once per 92 days that the Standby Makeup Pump develops a flow of greater than or equal to 26 gpm at a pressure greater than or equal to 2485 psig,

d. The Standby Shutdown System 250/125-Volt Battery Bank and its associated charger shall be demonstrated OPERABLE:

i At least once per 31 days by verifying:

1) That the electrolyte level of each battery is above the plates, and
2) The total battery terminal voltage is greater than or equal to 258/129 volts on float charge.

(N

\

11 At least once per 92 days by verifying that the average specific gravity is greater than or equal to 1.200.

iii At least once per 18 months by verifying that:

1) The batteries, cell plates, and battery racks show no visual indications of physical damage or abnormal deterioration, and
2) The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material,
e. The Steam Turbine Driven Auxiliary Feedwater Pump and associated components shall be demonstrated OPERABLE at least once per 18 months by verifying that the 'C' solenoid is capable of being deenergized to open valve SA48ABC to provide steam supply to the turbine driven auxiliary feedwater pump.
f. Standby Shutdown System instrumentation shall be demonstrated OPERABLE by performance of testing requirements in Table 16.9-5.

T O

16.9-17 6/95 l b

l l

o l

O

' July 13, 1995 1

1 To: All Holders of the Selected Licensee Commitments Manual I l

Please find attached a revision to the Selected Licensee Commitments Manual. This revision changes the Standby Shutdown System testing requirements for the standby makeup pump water supply boron concentration in the storage pool to the minimum boron concentration specified in the Core Operating Limits Report.

Your copy of the manual should be revised as follows:

Remove these pages: Insert these pages:

List of Effective Pages List of Effective Pages Revision 2 Revision 3 Page 16.9-17 Page 16.9-17 Questions or problems should be directed to Kay Crane, r~' McGuire Regulatory Compliance at extension 4306.

b) 0%

Kay L'. Crane, McGuire Regulatory Compliance O

n McGuire Nuclear Station f 4 selected Licer.see comunitments V List of Effective Pages Page Revision Date LOEP Tab List of Effective Pages 3 1 through 7 tab 16.0 16.0-1 16.0-2 Tab 16.1 16.1-1 Tab 16.2 16.2-1 3/91 16.2-2 5/91 ,

16.2-3 16.2-4 g Tah 16.3 e

J 16.3-1 Tah_lfu.4 Tab 16J 16.5-1 01/94 16.5-2 01/94 16.5-3 3/93 16.5-4 3/93 16.5-5 3/93 16.5-6 3/93 16.5-7 3/93 16.5-8 3/93 16.5-9 3/93 16.5-10 3/93 l Tab 16.6 Tab _1ful 16.7-1 Tab 16J Revision 3 l 1 l l

4

(~'~x Page Revision Date x_ ' 16.8-1 10/90 Table 16.8-la 1 of 28 10/94 Table 16.8-la 2 of 28 10/94 Table 16 8-la 3 of 28 10/94 Table 16.8-la 4 of 28 10/94 Table 16.8-la 5 of 28 10/94 Table 16.8-la 6 of 28 10/94 Table 16.8-la 7 of 28 10/94 Table 16.8-la 8 of 28 10/94 Table 16.8-la 9 of 28 10/94 Table 16.8-la 10 of 28 10/94 Table 16.8-la 11 of 28 10/94 Table 16.8-la 12 of 28 10/94 Table 16.8-la 13 of 28 10/94 Table 16.8-la 14 of 28 10/94

[/)

N s-Table 16.8-la 15 of 28 Table 16.8-la 16 of 28 10/94 10/94 Table 16.8-la 17 of 28 10/94 Table 16.8-la 18 of 28 10/94 Table 16.8-la 19 of 28 10/94 Table 16.8-la 20 of 28 10/94 Table 16.8-la 21 of 28 10/94 l

Table 16.8-la 22 of 28 10/94 Table 16.8-la 23 of 28 10/94 Table 16.8-la 24 of 28 10/94 Table 16.8-la 25 of 28 10/94 i

Table 16.8-la 26 of 28 10/94 l i

Table 16.8-la 27 of 28 10/94 Table 16.8-la 28 of 28 10/94 Table 16.8-1b 1 of 30 10/94

,-~s Table 16.8-1b 2 of 30 10/94

)

ks _ ,/ Table 16.8-lb 3 of 30 10/94 Table 16.8-1b 4 of 30 10/94 Revision 3 2

(

0 ,

j 6

, Page Revision Date

\s _ Table 16.8-1b 5 of 30 10/94 Table 16.8-1b 6 of 30 10/94 Table 16.8-1b 7 of 30 10/94 Table 16.8-1b 8 of 30 10/94 Table 16.8-1b 9 of 30 10/94 Table 16.8-1b 10 of 30 10/94 Table 16.8-1b 11 of 30 10/94 Table 16.8-1b 12 of 30 10/94 Table 16.8-1b 13 of 30 10/94 Table 16.8-1b 14 of 30 10/94 Table 16.8-1b 15 of 30 10/94 Table 16.8-1b 16 of 30 10/94 Table 16.8-1b 17 of 30 10/94 Table 16.8-1b 18 of 30 10/94 Table 16.8-lb 19 of 30 10/94

) Table 16.8-lb 20 of 30 10/94 (J Table 16.8-1b 21 of 30 10/94 Table 16.8-1b 22 of 30 10/94 Table 16.8-lb 23 of 30 10/94 Table 16.8-1b 24 of 30 10/94 Table 16.8-lb 25 of 30 10/94 Table 16.8-1b 26 of 30 10/94 Table 16.8-1b 27 of 30 10/94 Table 16.8-lb 28 of 30 10/94 Table 16.8-1b 29 of 30 10/94 Table 16.8-1b 30 of 30 10/94 Tab 16.9 16.9-1 2/91 16.9-2 16.9-3 s 16.9-4 ,

(m,/ 16.9-5 Table 16.9-1 Revision 3 3

(

.. y e

o Page Revision Date 16.9-6 16.9-7 16.9-8 16.9-9 8/90 Table 16.9-2 Table 16.9-2 (cont'd) 16.9-10 6/94 16.9-11 6/94 16.9-12 12/90 16.9-13 16.9-14 Table 16.9-3 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 16.9-15 11/94 16.9-15a 2/91 1 16.9-16 16.9-17 6/95 16.9-18 16.9-19 Table 16.9-4 Table 16.9-5 16.9-20 08/93 16.9-21 08/93 Table 16.9-6 Tab IE 10 Igb 16.11 16.11-1 9/93 16.11-2 9/93 16.11-3 9/93 Revision 3 1 4

)

\. I

Page Revision Date 16.11-4 10/94 l 16.11-5 9/93 f 16.11-6 9/93 16.11-7 9/93 [

16.11-8 9/93 16.11-9 9/93 16.11-10 9/93 16.11-11 9/93 y 16.11-12 9/93 ,

16.11-13 9/93 ,

16.11-14 9/93 .

16.11-15 9/93 16.11-16 9/93 16.11-17 9/93 16.11-18 9/93 16.11-19 9/93 16.11-20 9/93 16.11-21 9/53 16.11-22 9/93

[

16.11-23 9/93 16.11-24 9/93 16,11-25 9/93 16.11-26 9/93 16.11-27 9/93 16.11-28 9/93 I 16.11-29 ..

9/93 16.11-30 9/93 16.11-31 9/93 16.11-32 9/93 16.11-33 9/93 16.1 14 12/93 16.11-35 12/93 16.11-36 12/93 Revision 3 5 l,

L s

Page Revision Date 16.11-37 12/93 16.11-38 9/93 16.11-39 9/93 16.11-40 9/93 16.11-41 9/93 16.11-42 9/93 16.11-43 9/93 16.11-44 9/93 16.11-45 9/93 16.11-46 9/93 16.11-47 9/93 16.11-48 9/93 16.11-49 9/93 16.11-50 1/93 16.11-51 9/93 16.11-52 9/93 16.11-53 9/93 16,11-54 9/93 16.11-55 9/93 16.11-56 9/93 16.11-57 9/93 16.11-58 9/93 16.11-59 9/93 16.11-60 9/93 16.11-61 9/93 16.11-62 9/93 a5.11-63 9/93 16.71-64 9/93 16.11-65 9/93 16.11-66 9/93 16.11-67 9/93

\i 16.11-68 9/93 Iab 16.13 Revision 3 6

L

Y Page Revision Date i

16.13-1 Tab _1L 14 Tab _1Ll3 Appendix Tab 1  ;

2 3

4 5

6 7

Attachment 1 Attachment 2 Attachment 3 I

l Revision 3 7

( ---- . - - - _ _ _ _ _ _ _ _ _ _

X c. The Standby Makeup Pump water supply shall be demonstrated OPERABLE by:

'l I

\m / i Verifying at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> that IDENTIFIED LEAKAGE, UNIDENTIFIED LEAKAGE, and Reactor Coolant Pump Seal leakoff do not  !

exceed a total of 26 gpm.

11 Verifying at least once per 7 days:

P

1) That the requirements of Technical Specification 3.9.10 are met and the boron concentration in the storage pool is greater than or equal to the minimum boron concentration specified in the Core Operating Limits Report, or c
2) That the refueling water storage tank is capable of being aligned to the Standby Makeup Pump.

iii Verifying at least once per 92 days that the Standby Makeup Pump [

develops a flow of greater than or equal to 26 gpm at a pressure greater than or equal to 2485 psig.

d. The Standby Shutdown System 250/125-Volt Battery Bank and its associated charger shall be demonstrated OPERABLE:

i At least once per 31 days by ifying:

1) That the electrolyte level of each battery is above the plates, and
2) The total battery terminal voltage is greater than or equal to 258/129 volts on float charge.

/T ii At least once per 92 days by verifying that the average specific (j gravity is greater than or equal to 1.200.

iii At least once per 18 months by verifying that:

1) The batteries, cell plates, and battery racks show no visual indications of physical damage or abnormal deterioration, and
2) The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material.
e. The Steam Turbine Driven Auxiliary Feedwater Pump and associated components shall be demonstrated OPERABLE at least once per 18 months by verifying that the 'C" solenoid is capable of being deenergized to open valve SA48ABC to provide steam supply to the turbine driven auxiliary feedwater pump.
f. Standby Shutdown System instrumentation shall be demonstrated OPERABLE by performance of testing requirements in Table 16.9-5.

16.9-17 6/95 l

< J

FOMM 0 t t 90 (R3-C2) FORM 90li1/REV (9 .

esopoemons or ties casement thll:t1AL N pgggyy gg M,,,

y A teos necspiEarr es ofteEsmosa T.

/4 11 083 ia OPP LC050 DUKE POWER COMPANY oaTE. 07/18/%

(214107 UAYNE H ll0YLE, HG010P DOCUMENTTRANSMITTAL FORM occuwtNT TRANsurTTAte li af 13)1557 R 0 SilARPE EC13G I414107 3 A GEUEHR EC050 151337Y D L CALDtill L tlG01RC f~13718 MCG CIIEli SilIFT GEN SUPV HG01CH oA cossomoss C yEs Q NO (713133 H E PACETTI HG02HE

REFERENCE:

ll I E;Y7, .I ', s .U P, m . !Aa oTHER ACsue0WLEoeEME9ETREOUIREo ]YES
91079 414 SRB GTAFT EC05N hCGUIPE HUCLEAR STATION F GA OR OTHER ACKNOWLEDGEMENT F.EOUNIED. PLEASE 10:3607 L K CRIHlilbER RP EUFV itG01RP SELECTFD 1ICENSEE $%%RECEM BY REWMMNG THIS FORM OR DPC 1183744 itCG DIR SIH i:llHDSn r i HG030T COMNIitiENTS hANUAL mw se 1213044 HCG DOC CNTEL hlSC tiA!! HG02DN P O. Bon 12700 1210422 HCG SAFETY REVIEU GROUP HG01SR naad 1815879 G C DOVER Cil01PC Hweem8*.NorihCaronna 28078 1516593 D E 110LDEN HG03A2 1812257 P A IIARRIS tlGo.hC R c d av Det.

1713759 U S NUCLEAR REG UAsti. DC 18)U297 ilPC REGION IT LIBRARY All PAGE 1 UF 4 OUALITY CHECHF0 f. S DOCUMENTNO. g "" *C c 1I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 TOTAL PAGE 16,9-17 NA 07/13/95 NADti-03 J1 VI V1 V1 Ut J1 V1 V1 VI V1 V2 VI V2 V1 V1 11 V7 '

.1 76 CO l= %

CD Q

C0 W

REMARKS:

T C HCHEEklil VICE PRESIDENT .

60 d

HCGUIRE HUCLEAR STATIUti 0

. m, c,m,r _ n1 m < , 1u_ 1

,__ _ - - - , , . - , . _ . _ - - - - - , _ . , y , , , , . . , , , , , , ,_,,_,,m _ , - , , . -, ,, -- _,

OftM 01290 (R3-02) FORM 901.1/REVDO osseosmoN or THE onut:NAL -

DOCUMENT WEL BE TO THE PRIORITY "' u ""t TnANsMfTTAL S*GNATURE UM- I tasn mECmEwT is oTHEnwisE

~~ '~

"7 /W 1 . c/.93 fu ,, C U P P i 0 0 5"

"**" "'"c ""^"'

oATE. 0 '1R^

34107 UA7f;E H liOYLE, hbO10P DOCUMENTTRANSMITTAL FORM ooCUMENT TRANSMITTAL e  ! ~l D)1557 k 0 SHAPfL EC116

4) 4 10 ? . ,
  • 6EiiEtlR ECO30 3)33 ' D' E ALDUl i t iniO1 FC Sil718 t1( G LHEti SHIFT GEN SUPV 'tG01CH oA CoNomON YES ] NO

?)3133 M E PACEir t ttG02ME

REFERENCE:

5) I t, - ' '

OTHER ACKNOWLEDGEMENT REQUIRED 0vts I .

1107?1 f43Rb 0f aft ECOLN nCt,UlliL NUCLEAR ST A TI0t1 iF QA oR OTHER ACKNOWLEDGEMENT REQUIRED. PLEASE

'013607 i K t.Ritill!t F P LP LUF V n601 RP SELECTED LICENSEE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM OR DPC FORM 01183 TO 1)]744 HCG DIP SIh ( 1.11 D 6.. : 7 MG030f 1

COMMlinEHIS hANUAL McCme Nuckar stathwi 2)l044 hE6 doc Ctif t1 nIE:C HAff (1602 Dh P O Box 12700 310422 HCG SAF E1 Y EEVILU 6RUUP r1GGIGE U '"* "*'"* "#

Hagers F eny Road 415079 G C DOVEi t:i!O1 LC HurdemHie.NathCeMa 28078 5).6571 0 C HOI.DEfl nG03A2 J)2257 P A HAFRlb ftGit t a' Roc d sy Date 713759 U S HilCLEAP FL6 UASii . DC 1m nec eroinn n t ioenn Au PAer 1 or 4 OUAUTY CHECKED ! . S DOCUMENT NO.

U C "~I o $'3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 TOTAL PAbf 16.?-17 ilA 07/13/95 hADf t- 03 J1 V1 V1 VI V1 11 v1 V1 UI VI V2 VI V2 V1 V1 J1 V7 .1' /0 Cd j6 O

o C.O M

REMARKS:

T C HCt1EEklil VICE PRESIDENT MCGUIRE HUCLEAR SIATION f0 BY U:Y I r ryin h .ni h t i r. . ! A_ _ ___3