Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205L2431999-04-0505 April 1999 SFP Soluble Boron Credit Dilution Analysis (Summary of Applicable Portions) ML20205L2531999-04-0505 April 1999 Boraflex Degradation Analysis ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y2461998-09-15015 September 1998 Proposed Improved Tss,Resolving Items Identified by Util During Review ML20151U3521998-09-0808 September 1998 Proposed Tech Specs & Bases Converting to Improved Tech Specs ML20151Z7751998-09-0808 September 1998 Rev 25 to McGuire Selected Licensee Commitment Manual, Consisting of Revised Pages 16.7-9 & 16.7-10 ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5721998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A0411998-08-0505 August 1998 Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236G5301998-06-29029 June 1998 Rev to Bases of TS 3/4.6/3,correcting Editorial Errors ML20249C2081998-06-0909 June 1998 Rev 24 to Selected License Commitments (SLC) Manual & SLC 16.10.1,dtd June 1998 ML20247E3891998-05-0808 May 1998 Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20217E6531998-04-20020 April 1998 Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 ML20217B7871998-03-20020 March 1998 Marked-up Proposed Improved TS 3.6 & 5.5.2 ML20217N9311998-03-0303 March 1998 Proposed Tech Specs 5.5 Re Meteorological Tower Location ML20216B9851998-03-0202 March 1998 Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl ML20203J9391998-02-19019 February 1998 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20198H5361997-12-17017 December 1997 Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20203E1911997-12-0101 December 1997 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20217H5541997-10-13013 October 1997 Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2511997-10-0606 October 1997 Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function ML20216A8691997-09-0101 September 1997 Rev 0 to QAM-2.0, Order Entry ML20210K9281997-08-31031 August 1997 Cycle 12 Startup Rept ML20216B8171997-08-25025 August 1997 Rev 0 to PE-9778-1, Test Rept-Grinnell Hydraulic Snubber Freedom of Motion Test Under Duke Powers McGuire Nuclear Station MSLB Accident Temp Condition 1999-09-13
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Z7751998-09-0808 September 1998 Rev 25 to McGuire Selected Licensee Commitment Manual, Consisting of Revised Pages 16.7-9 & 16.7-10 ML20249C2081998-06-0909 June 1998 Rev 24 to Selected License Commitments (SLC) Manual & SLC 16.10.1,dtd June 1998 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20203J9391998-02-19019 February 1998 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20203E1911997-12-0101 December 1997 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20216A8691997-09-0101 September 1997 Rev 0 to QAM-2.0, Order Entry ML20141F1521997-06-25025 June 1997 Rev 4 to Nuclear Security Training & Qualification Plan ML20140D1361997-05-27027 May 1997 Rev 21 to McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20148D5041997-05-0909 May 1997 Rev 19 to Selected Licensee Commitment Manual 16.5-4 ML20133F9041996-12-26026 December 1996 Selected Licensee Commitments Manual, Rev 18 ML20134F8651996-10-21021 October 1996 Rev to Selected Licensee Commitments Manual ML20117K2851996-08-22022 August 1996 Rev 16 to Selected Licensee Commitments Manual ML20117M5901996-08-15015 August 1996 Loss of Electrical Power ML20115C9971996-06-25025 June 1996 Revised McGuire Nuclear Station Selected Licensee Commitiments Manual ML20112B7651996-05-13013 May 1996 Rev to Selected Licensee Commitments Manual ML20108E2161996-04-29029 April 1996 Revised McGuire Nuclear Station Selected Licensee Commitments Manual & List of Effective Pages ML20112A7331996-04-22022 April 1996 Rev 13 to DPC MNS Pcp ML20101N1311996-02-29029 February 1996 Rev 11 to Selected Licensee Commitments Manual ML20100Q4751996-02-26026 February 1996 Revised McGuire Nuclear Station Selected Licensee Commitments Manual, List of Effective Pages ML20100B9601996-01-19019 January 1996 Revised McGuire Nuclear Station Selected Licensee Commitments Manual, Effective Pages ML20100B9541996-01-19019 January 1996 Revised McGuire Nuclear Station Selected Licensee Commitments Manual, Effective Pages ML20096F1651996-01-0404 January 1996 Rev 8 to McGuire Nuclear Station Selected Licensee Commitment Manual, Adding Clarity to Halon Sys Testing Requirements ML20094P9631995-11-15015 November 1995 Rev 7 to MNS Selected License Commitments Manual, Correcting Typographical Errors & Adding List of Effective Pages ML20094Q0021995-11-15015 November 1995 Rev 7 to MNS Selected Licensee Commitments Manual, Correcting Typographical Errors & Adding List of Effective Pages ML20093K9801995-10-18018 October 1995 Rev 17 & 22 of Pump Inservice Testing Program,For McGuire Nuclear Station Units 1 & 2 ML20093G5581995-10-0202 October 1995 Revised McGuire Nuclear Station Selected Licensee Commitments Manual, from Chapter 16 of FSAR ML20098B8531995-09-22022 September 1995 Rev 5 to MNS Selected Licensee Commitments Manual. Reissue Due to Typographical Error ML20092H5491995-08-31031 August 1995 Rev 4 to MNS Selected Licensee Commitments Manual (Slc), Relocating Certain Turbine Overspeed Protection,Seismic Instrumentation,Meteorological Instrumentation & loose-part Detection Sys TS Requirements from TS to SLC ML20086R2891995-07-13013 July 1995 Rev 3 to MNS Selected Licensee Commitments Manual. Rev Changes Standby Shutdown Sys Testing Requirements for Standby Makeup Pump Water Supply Boron Concentration (BC) in Storage Pool Min BC Specified in COLR ML20080H9741995-02-0808 February 1995 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20078S9681994-12-0707 December 1994 Rev 1 to Selected Licensee Commitments Manual ML20076J8341994-10-31031 October 1994 Rev to McGuire Nuclear Station Selected Licensee Commitment Manual, List of Effective Pages,Table 16.8-1a,Table 16.8-1b & Page 16.11-4 ML20070D7541994-06-30030 June 1994 Rev to MNS Selected Licensee Commitments Manual, Section 16.9.5,changing Term Fire Barriers to Fire Rated Assemblies ML20070B4131994-06-21021 June 1994 Revised McGuire Nuclear Station Selected Licensee Commitments Manual ML20065F5281994-01-31031 January 1994 Changes to McGuire Nuclear Station Selected Licensee Commitments Manual ML20063A8041993-12-31031 December 1993 Selected Licensee Commitments Manual ML20063A9411993-11-0101 November 1993 IST Program for Pumps & Valves ML20063A9291993-11-0101 November 1993 IST Program for Pumps & Valves ML20045B2691993-06-0404 June 1993 Rev 19 to McGuire Nuclear Station IST Program for Unit 1 ML20045B3761993-03-11011 March 1993 Rev 14 to McGuire Nuclear Station Pump & Valve IST Program for Unit 2 1999-08-18
[Table view] |
Text
__ _ ~
Q, gy u y s p~ s. %i : i Despossisoes OF THE " -"'8
~ PRIORITY 630owav 3. rrat seensad uns. -..
Less nacmenrr is orwEnwisE o1
.. O mm DUKE POWER COMPANY
' UI 1756 J B JONES MG01UC DATE- n?/no/09 .- '* '
- DOCUMENTTRANSMITTAL FORM -
(2) 3759%3IMNitM356 SISN2dCK4 oocUMENT TRANSMfTTAL
- 11 997 I33 0297 NRC. REGION II LIBRARY ATL DI 9665 VIC NERSES,USNRC,UASHINGTON,0C
- 15) 2532 MCG NRC INSP G F MAXUELL MG01A (61 5194 GAR ( H BARKER, MG01CH GA CO'80'T'0" O ves Guo III 1137 MARK U BELL, MG010P
REFERENCE:
OTMR ACIUs0WLEDGEMENT REcuestED hYES (81 3016 P.0 BIN J BELL MG010P (83 2192 M i CASH MG01SE MCGUIRE SELECTED LICENSEE IF GA OR OTHER ACKNOWLEDGEMENT REQUIRED. PLEASE U032665 GEORGE A COOK, MG010P COMMITMENTS MANUAL ^OgggRENT BY REWRNING mtS FORM OR M O 'I5248 HUBERT C. DAMERON, MG010P uccu.re Nuchr Sum 0 216057 JIMMY H DIAL MG010P PO. Bon 12700 U336299 J. SPENCER HACKNEY MG010P 0 415460 KENNETH L HOFFMAN HG010P C
Hummvdle NorthCamhna 28078 H5:4189 UAYNE H H0YLE, MG010P 06)1082 FRED B KIRK MG010P med ey care Hil5599 RICHARD F MORRIS, MG010P (1817797 y gg 7Aygop gqgigp pagp 4 3p 5 QA "~ '
DOCUMENT NO.
l'OND c nn o c1 F 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 TOTAL SLC 16.9-6 NA 02/08/95 MADM-03 V1 V1 V1 V1 V1 V1 U1 V1 V1 V1 V1 VI V1 V1 V1 V1 V1 Ji 81-SLC TABLE 16.9-3 NA 02/08/95
.r ~
C.
'D t>
C C;
REMARKS:
T C MCMEEKIN VICE. PRESIDENT.
g<
4- MCGUIRE NUCLEAR STATION p
d -
9502240246 950208 BY KAY I l'9ANF HRot Rf' Kt l'/f'_lR e PDR ADOCK 05000369
- p PM . . - .- . . . - . - - . - . . _ . . - - . _ _ _ _ _ . _ _ _ _ _ _ . _ _ _
a- , - - - - -.
e ^'
hs ,
February 8,.1995
'To: -All Holders of the Selected Licensee Commitments Manual
^
Please find attached a revision to'the Selected Licensee Commitments Manual. This revision to SLC 16.9-6 and SLC Table 16.9-3 involve changing the type of fire detectors :
around the RC Pumps from smoke type to heat type. It also deletes some smoke type fire detectors in the Purge Filter beds.
. Your copy of the manual should be revised as follows:
Remove these pages Insert these pages:
List of Effective Pages List of Effective Pages Revision 1 Revision 2 Table 16.9-3 (Continued) Table 16.9-3 (Continued)
Detector Zones 125-c158 Detector Zones 125-c158 Table 16.9-3 (Continued) Table 16.9-3 (Continued).
Detector Zones c159-d188 Detector Zones c-159-d188 Questions or problems should be directed to Kay Crane, McGuire Regulatory Compliance at extension 4306.
Kay L. Crane, McGuire Regulatory Compliance i
l l
\
1
)
i l
l i
l
f- N) McGuire Nuclear Station
- selected Licensee Consnitments !
V List of Effective Pages Page Revision Date LOEP Tab List of Effective Pages 2 1 through 7 Tab li d 16.0-1 16.0-2 Tab 16 J 16.1-1 Tab 16 2 16.2-1 3/91 16.2-2 5/91 16.2-3 16.2-4 Tab 16.3 16.3-1 Tab 16.4 Tab 16.5 16.5-1 01/94 16.5-2 01/94 16.5-3 3/93 16.5-4 3/93 16.5-5 3/93 16.5-6 3/93 .
16.5-7 3/93 16.5-8 3/93 16.5-9 3/93 16.5-10 3/93 Tab 16.6 pq
(
j Iab 16.7
%/
16.7-1 tab _1LA Revision 2 1
4 J s. Page Revision Date
'N 16.8-1 10/90 Table 16.8-la 1 of 28 10/94 Table 16.8-la 2 of 28 10/94 i Table 16.8-la 3 of 28 10/94 Table 16.8-la 4 of 28 10/94 l Table 16.8-la 5 of 28 10/94 Table 16.8-la 6 of 28 10/94 Table 16.8-la 7 of 28 10/94 Table 16.8-la 8 of 28 10/94 Table 16.8-la 9 of 28 10/94 Table 16.8-la 10 of 28 10/94 Table 16.8-la 11 of 28 10/94 Table 16.8-la 12 of 28 10/94 Table 16.8-la 13 of 28 10/94 Table 16.8-la 14 of 28 10/94 Og
?
j Table 16.8-la 15 of 28 10/94 Table 16.8-la 16 of 28 10/94 Table 16.8-la 17 of 28 10/94 Table 16.8-la 18 of 28 10/94 Table 16.8-la 19 of 28 10/94 Table 16.8-la 20 of 28 10/94 Table 16.8-la 21 of 28 10/94 Table 16.8-la 22 of 28 10/94 Table 16.8-la 23 of 28 10/94 Table 16.8-la 24 of 28 10/94 Table 16.8-la 25 of 28 10/94 Table 16-.8-la 26 of 28 10/94 Table 16.8-la 27 of 28 10/94 Table 16.8-la 28 of 28 10/94 Table 16. 8-1b 1 of 30 10/94
[] Table 16.8-1b 2 of 30 10/94 Table 16.8-1b 3 of 30 10/94 Table 16.8-1b 4 of 30 10/94 Revision 2 2
4 6
, -~s Page Rev1sion Date 1
x ,, I s Table 16.8-1b 5 of 30 10/94 Table 16.8-1b 6 of 30 10/94 Table 16.8-1b 7 of 30 10/94 Table 16.8-1b 8 of 30 10/94 Table 16.8-1b 9 of 30 10/94
. Table 16.8-1b 10 of 30 10/94 Table 16.8-lb 11 of 30 10/94 Table 16.8-1b 12 of 30 10/94 Table 16.8-lb 13 of 30 10/94 Table 16.8-lb 14 of 30 10/94 Table 16.8-1b 15 of 30 10/94 )
Table 16.8-lb 16 of 30 10/94 :
Table 16.8-lb 17 of 30 10/94 Table 16.8-lb 18 of 30 10/94 Table 16.8-1b 19 of 30 10/94
) Table 16.8-1b 20 of 30 10/94 l
Table 16.8-1b 21 of 30 10/94 Table 16.8-Ib 22 of 30 10/94
- Table 16.8-1b 23 of 30 10/94 Table 16.8-1b 24 of 30 10/94 Table 16.8-1b 25 of 30 10/94 Table 16.8-1b 26 of 30 10/94 Table 16.8-1b 27 of 30 10/94 Table 16.8-lb 28 of 30 10/94 Table 16.8-1b 29 of 30 10/94 Table 16.8-1b 30 of 30 10/94 Tab lfL.2 16.9-1 2/91 i 16.9-2 16.9-3
[' i 16.9-4 G 16.9-5 l Table 16.9-1 Revision 2 3 1 I
fm- ' Page Revision Date x_ 16.9-6 16.9-7 16.9-8 16.9-9 Table 16.9-2 8/90 Table 16.9 * (cont'd) 16.9-10 6/94 16.9-11 6/94 16.9-12 12/90 16.9-13 16.9-14 Table 16.9-3 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 12/90 Table 16.9-3 (cont'd) 2/95
,D)
() Table 16.9-3 (cont'd) 2/95 Table 16.9-3 (cont'd) 16.9-15 11/94 10.9-15a 2/91 16.9-16 16.9-17 16.9-18 16.9-19 Table 16.9-4 Table 16.9-5 16.9-20 08/93 16.9-21 08/93 Table 16.9-6 IAb 16.10 Tab 16.11 p)
.\ -_-
16.11-1 9/93 l
16.11-2 9/93 16.11-3 9/93 Revision 2 4
._ _ m . . ._. _ _ _ ._ - __ . . ..
?
-~
Paco Revision Date
\/% 16.11-4 10/94 16.11-5 9/93 16.11-6 9/93 16.11-7 9/93 16.11-8 9/93 16.11-9 9/93 16.11-10 9/93 16.11-11 9/93 e
16.11-12 9/93 16.11-13 9/93 16.11-14 9/93 1 16.11-15 9/93 16.11-16 9/93 i
16.11-17 9/93 i 16.11-18 9/93 16.11-19 9/93 16.11-20 9/93 16.11-21 9/93 16.11-22 9/93 l 16.11-23 9/93 16.11-24 9/93 16.11-25 9/93 16.11-26 9/93 16.11-27 9/93 16.11-28 9/93 16.11-29 9/93 ,
16.11-30 9/93 16.11-31 9/93 16.11-32 9/93 16.11-33 9/93 16.11-34 12/93 16.11-35 12/93 s
' 16.11-36 12/93 Revisien 2 5
Y , .
a
.e j ~'s Page Revision Date
),
\_ I 16.11-37 12/93 16.11-38 9/93 16.11-39 9/93 16.11-40 9/93 16.11-41 9/93 16.11-42 9/93 16.11-43 9/93 16.11-44 9/93 1
16.11-45 9/93 16.11-46 9/93 16.11-47 9/93 .
16.11-48 9/93 16.11-49 9/93 16.11-50 1/93 16.11-51 9/93
. /D
() 16.11-52 9/93 16.11-53 9/93 16.11-54 9/93 16.11-55 9/93 16.11-56 9/93 16.11-57 9/93 16.11-58 9/93 16.11-59 9/93
! 16.11-60 9/93 16.11-61 9/93 16.11-62 9/93 16.11-63 9/93 16.11-64 9/93 16.11-65 9/93 16.11-66 9/93
[ 16.11-67 9/93 s
t 16.11-68 9/93 5
Tak 16.13
- Revision 2 6
Page Rev1sion Date
(
16.13-1 Tab 16.14 lab 16.15 4
Ap2CDdix Tab 1
2 3
4 5
6 7
.i i Attachment 1 Att.achment 2 Attachment 3 i
i i
4 e
l k
i N
Revision 2 7
a
- ,. . . , , . . _ . _ . . . _ _ . . - . , _ . ,m .,- ..- _ .-
i
. i e
Page Revision Date I
i 1
1
)
i l
4 J
i i
'l l Revision 2 8
FIRE DETECTION I UMENTATION TOTAL NO. INSTRUMENTS (a)
DFTECTOR HEAT '
ZONE DESCRIPTION LOCATION SMOKE DETECTORS FUNCTION (b) i 125 Fuel Pool Area NN-62 EL 778+10 18 14 A 127 Fuel Pool Area NN-50 EL 731+ 6 18 14 A 128 Alste/Coble EE-57 EL 716 5 5 A
.129 600V MCC 2EMXH KK-56 EL 733 1 1 A 130 Cables /KF Pumps PP - 52 EL 750 4 4 A 131 Respiratory HH-56 EL 767 5 5 A 134 RB Pipe Corridor-Unit 1 215*-270* 5 0 A' 135 RB Pipe Corridor-Unit 1 270*-315* 5 0 A 136 RB Pipe Corridor-Unit 1 315*-0*_ 6 0 A 137 RB Pipe Corridor-Unit 1 0*-44' 4 0 A 138 RB Pipe Corridor-Unit 1 44*- 90* 4 0 A 139 RB Pipe Corridor-Unit 1 _90*-126' 4 0 A 140 RB Pipe Corridor-Unit 1 126*-173* 7 0 A 141 RB Below Oper. Floor-Unit 1 329*- 349' 7 0 A 142 RB Below Oper. Floor-Unit 1 13*- 29' 4 0 A 143 . RB Below Oper. Floor-Unit 1 34*- 51* 3 0 A 144 RB Below Oper. Floor-Unit 1 . 51*- 124* 13 0 A 145 RB Below Oper. Floor-Unit 1 124*-143' 3 0 A 146 RB Below Oper. Floor-Unit 1 143*-167* 8 0 A 147 RB Below Oper. Floor-Unit 1 RCP- 1 A Motor 0 5 A 148 RB Below Oper. Floor Unit 1 RCP - 1B Motor 0 2 A 149 RB Below Oper. Floor-Unit 1 .RCP- 1C Motor 0 4 A 150 RB Below Oper. Floor-Unit 1 RCP- ID Motor 0 5 A 151 RB Below Oper. Floor-Unit 1 Purge Filter Bed 0 2 A 152 RB Below Oper. Floor-Unit 1 Purge Filter Bed 0 2 A c153 RB Annulus - Unit 1 293*- 331* 10 10 B c154 RB Annulus- Unit 1 . 324*-0* 4 4 8 t' c155 RB Annulus- Unit 1 0*-50* 5 5. B
.$ c156 RB Annulus- Unit 1 50*- 88* 4 4 B c157 RB Annulus - Unit 1 88*-123* 24 24 8. '
c158' RB Annulus - Unit i 123*-165* 22 22 B ..
. . - - ~n.. .-c -- -
,v , e ----_ _ _ . _ __
(~
x -
\ / -.' -
FIRE DETECTION UMENTATION -
TOTAL NO. INSTRUMENTS (a) i DETECTOR HEAT.
ZONE DESCRIPTION LOCATION SMOKE DETECTORS FUNCTION (b) c159 RB Annulus- Unit 1 333*-16* 13 13 B c160 RB Annulus-Unil 1 16*- 54* 23 23 B c161 RB Annulus - Unit 1 !22*-180* 16 16 B c162 RB Annulus- Unit 1 180*- 256* 14 13 8 163 Unit 1 RB Pipe Corridor 215*- 270* 5 0 A
-164- Unit 1 RB Pipe Corridor 270*- 315' 5 0 A 165 Unit 1 RB Pipe Corridor 315*-0* 6 0 A 166 Unit 1 RB Pipe Corridor 0* . 44* 4 0 A 167 Unit 1 RB Pipe Corridor 44*- 90* 4 0 A 168 Unit 1 RB Pipe Corridor 90*-126* 4 0 A 169 Unit 1 RB Pipe Corridor 126*-173* 7 0 A 170 Unit 2 RB Below Oper. Floor 329'-347' 7 0 A 171 Unit 2 RB Below Oper. Floor 13*- 29' 4 0 A 172 Unit 2 RB Below Oper. Floor 34*- 51' 3 0 A 173 Unit 2 RB Below Oper. Floor 51'- 124* 13 0 A' 174 Unit 2 RB Below Oper. Floor 124*-143* 3 0 A 175 Unit 2 RB Below Oper. Floor 143*-167* 8 0 A 176 Unit 2 RB Below Oper. Floor RCP - 2A Motor 0 4 A 177 Unit 2 RB Below Oper. Floor RCP - 2B Motor 0 3 A 178 Unit 2 RB Below Oper. Floor RCP- 2C Motor 0 3 A 179 Unit 2 RB Below Oper. Floor RCP - 2D Motor 1 4 A 180 Unit 2 RB Below Oper. Floor Purge Filter Bed 0 2 A 181 Unit 2 RB Below Oper. Floor Purge Filter Bed 0 2 A d182 Unit 2 RB Annulus - 293*-331* 10 10 B d183 Unit 2 RB Annulus 324*-0* 4 4 B d184 Unit 2 RB Annulus 0*-50* 5 5 8 d185 Unit 2 RB Annulus 50*- 88* 4 4 8
" d186 Unit 2 RB Annulus 88*- 123* 24 24 .B 3 d187 Unit 2 RB Annulus 123'-165* 22 22 B d188 Unit 2 RB Annulus .333*-16* 13 13 8 e
P