ML19327B715: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 23: Line 23:
i
i
                                                           '89 OCT 30 A11 :34    October 27, 1989 UNITED STATES OP. AMERICA                              I NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION i
                                                           '89 OCT 30 A11 :34    October 27, 1989 UNITED STATES OP. AMERICA                              I NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION i
                      .
                                                                 )                                  '
                                                                 )                                  '
In the Matter of                                      )                                  '
In the Matter of                                      )                                  '
Line 29: Line 28:
NEW HAMPSHIRE, et al.                          )      (Offsite Emergency
NEW HAMPSHIRE, et al.                          )      (Offsite Emergency
                                                                 )    Planning Issues)            ;
                                                                 )    Planning Issues)            ;
                                                                                                    '
           '(Seabrock Station, Unit 1)                          )
           '(Seabrock Station, Unit 1)                          )
                                                                 )                                  ,
                                                                 )                                  ,
BRIEF OF SEACOAST ANTI-POLLUTION LEAGUE ON CERTAIN EMERGENCY PLANNING ISSUES INTRODUCTION In ALAB-922 (October 11, 1989) the Appeal Board did two
BRIEF OF SEACOAST ANTI-POLLUTION LEAGUE ON CERTAIN EMERGENCY PLANNING ISSUES INTRODUCTION In ALAB-922 (October 11, 1989) the Appeal Board did two things in regard to several pending appeals of an'ASLB decision (LPB-88-32, 28 NRC 667) which approved the New Hampshire Radiological Emergency Response Plan (NHRERI') for Seabrook.
                                                                                                    '
things in regard to several pending appeals of an'ASLB decision (LPB-88-32, 28 NRC 667) which approved the New Hampshire Radiological Emergency Response Plan (NHRERI') for Seabrook.
First, it held that " emergency planning requirements are intended to be second-tier, AEA section 161 safety provisions rather than a first-tier, ' adequate protection' requirements under
First, it held that " emergency planning requirements are intended to be second-tier, AEA section 161 safety provisions rather than a first-tier, ' adequate protection' requirements under
[          AEA section 182."          (Slip Opinion, p. 18)                                        -
[          AEA section 182."          (Slip Opinion, p. 18)                                        -
l l                Second, it certified to the Commission the question of                            '
l l                Second, it certified to the Commission the question of                            '
l
l whether, for this newly designated "second-tier" safety requirement, the ASLB's refusal to consider certain testimony sponsored by the Massachusetts Attorney General on the dose consequences of an accident could be disallowed as not relevant, as the ASLB had done.
!
whether, for this newly designated "second-tier" safety requirement, the ASLB's refusal to consider certain testimony sponsored by the Massachusetts Attorney General on the dose consequences of an accident could be disallowed as not relevant, as the ASLB had done.
                                                                                                    -
1'                                      -
1'                                      -
0911060449 891027 DR  ADOCK 050 g 3                                                                    $
0911060449 891027 DR  ADOCK 050 g 3                                                                    $
        ,                    . _ . , _ _ - -            ,


n I :
n I :
L-.    '
L-.    '
l-
l-As to the first issue, the second-tier holding, both SAPL and the Mass AG filed timely motions for reconsideration. By an order dated October 23, 1989, however, the Appeal Board summarily denied the motions, stating, "they are best addressed in the first instance to the Commission in the context of the intervenors' comments on the certified question."    (Memorandum and Order of 10/23/89, Slip Opinion, p. 2)
    .
Accordingly, SAPL will now address both the issue of the status of emergency planning requirements, and the issue of the correctness 121 n2D of the ASLB refusal to consider the dose consequence testimony at Seabrook in the event of a major accident including an off-site release of radioactivity,                      i I. THE APPEAL BOARD ERRED IN HOLDING EMERGENCY PLANNING IS A "SECOND-TIER" SAFETY REQUIREMENT.          ,
As to the first issue, the second-tier holding, both SAPL and the Mass AG filed timely motions for reconsideration. By an order dated October 23, 1989, however, the Appeal Board summarily denied the motions, stating, "they are best addressed in the first instance to the Commission in the context of the intervenors' comments on the certified question."    (Memorandum and Order of 10/23/89, Slip Opinion, p. 2)
Accordingly, SAPL will now address both the issue of the
,
status of emergency planning requirements, and the issue of the correctness 121 n2D of the ASLB refusal to consider the dose consequence testimony at Seabrook in the event of a major accident including an off-site release of radioactivity,                      i I. THE APPEAL BOARD ERRED IN HOLDING EMERGENCY PLANNING IS A "SECOND-TIER" SAFETY REQUIREMENT.          ,
                                                                          !
                                                                          '
In holding that emergency planning is a "second-tier, AEA I
In holding that emergency planning is a "second-tier, AEA I
section 161 safety provision" rather than a "first-tier,section i
section 161 safety provision" rather than a "first-tier,section i
Line 62: Line 48:
However, assuming that this authorization citation is indeed properly described as a " compelling indication" of Commission intent, a matter SAPL vigorously disputes, there remains no indication that an awareness of such second-tier status existed A
However, assuming that this authorization citation is indeed properly described as a " compelling indication" of Commission intent, a matter SAPL vigorously disputes, there remains no indication that an awareness of such second-tier status existed A


        .                                                            .                  -
      .
    '
i f
i f
either in 1979 or 1980, when the emergency planning' rules were proposed, and adopted.                                                                                '
either in 1979 or 1980, when the emergency planning' rules were proposed, and adopted.                                                                                '
Indeed, in defining the "two-tier" proposition, the Appeal                                    _;
Indeed, in defining the "two-tier" proposition, the Appeal                                    _;
Board cites to' Union of Concerned Scientists v. NRC, ("UCS (I)")
Board cites to' Union of Concerned Scientists v. NRC, ("UCS (I)")
(824 P.2d 108, 114-18). This case, however, was decided by the D.C. Circuit in 1987, seven vears after the emeroency olannino
(824 P.2d 108, 114-18). This case, however, was decided by the D.C. Circuit in 1987, seven vears after the emeroency olannino rule was finally adooted, and contains no suggestion that prior to the brief filed by the Commission in connection with that appeal                                      ,
                                                                                                                  '
rule was finally adooted, and contains no suggestion that prior to the brief filed by the Commission in connection with that appeal                                      ,
either the Commission or its general counsel ever considered a t
either the Commission or its general counsel ever considered a t
significantly different level of safety was implied by citation to i
significantly different level of safety was implied by citation to i
Line 82: Line 63:
l        statutory citation used to demonstrate authorization for the I
l        statutory citation used to demonstrate authorization for the I
promulgation of the rule.
promulgation of the rule.
                                                                                                                  !
In fact, every available indication of Commission intent at the time of the adoption of the emergency planning regulations is to the contrary:      that emergency planning was intended to have l
In fact, every available indication of Commission intent at the time of the adoption of the emergency planning regulations is to the contrary:      that emergency planning was intended to have l
1/ The brief of the Mass AG will demonstrate that in fact the I.        regulatory record conclusively demonstrates the opposite is true:
1/ The brief of the Mass AG will demonstrate that in fact the I.        regulatory record conclusively demonstrates the opposite is true:
l that the Commission in 1980 knowingly and deliberately intended to hold the emergency planning requirements were not intended to be in any way " secondary" because of the string citation.
l that the Commission in 1980 knowingly and deliberately intended to hold the emergency planning requirements were not intended to be in any way " secondary" because of the string citation.
1
1 l
                                                                                                                  !
l
  '
                    ..    .  - - . , . - , - . -    .. . . - - . . - . . - - . .
                                                                                    -- -  .- - - , - - - - - .
 
    -
                                                                                                                    ,
:g' i
:g' i
  *:                                                                                                                y
  *:                                                                                                                y equal status and was to~be considered as equally important as any other safety requirement.          These indications include the following:                                                                                              ,
                                                                '
equal status and was to~be considered as equally important as any other safety requirement.          These indications include the following:                                                                                              ,
(1) The very language of the regulation itself,                                      i 10 CPR-S50.47(a), which not only approximates,                                                  j but in fact utilizes the " adequate protection" (protective] language of what is now described                                                  .
(1) The very language of the regulation itself,                                      i 10 CPR-S50.47(a), which not only approximates,                                                  j but in fact utilizes the " adequate protection" (protective] language of what is now described                                                  .
                                                                                                                  !
as the "first-tier," statute, section 182.
as the "first-tier," statute, section 182.
(No one can reasonably read "second-tier"
(No one can reasonably read "second-tier" significance into the use of the words " adequate protective" (measures) in the regulation rather than the use of the words " adequate protection."
                                                                                                                  '
Surely " adequate protective measures" in the regulation is equivalent to " adequate protection" within the meaning of the AEA.
significance into the use of the words " adequate protective" (measures) in the regulation rather than the use of the words " adequate protection."
Surely " adequate protective measures" in the
                                                                                                                  ,
regulation is equivalent to " adequate protection" within the meaning of the AEA.
                                                                                                                  !
(2) The description in the Statement of Considerations accompanying the final rule of emergency planning as an " essential" safety feature (45 Fed. Reg. 55404) and the further statement "that the protection provided by safety and engineering design features must be bolstered by emergency planning requirements.                Id. at 55403.
(2) The description in the Statement of Considerations accompanying the final rule of emergency planning as an " essential" safety feature (45 Fed. Reg. 55404) and the further statement "that the protection provided by safety and engineering design features must be bolstered by emergency planning requirements.                Id. at 55403.
(Emphasis added.)
(Emphasis added.)
Line 114: Line 78:
                                                       ~ _  _  ._ _ _ _ _ _ _        ._          _ _ _ . _ _ . _      . _ . - _ _ - - . . . . . . . . _ . . _ _ _
                                                       ~ _  _  ._ _ _ _ _ _ _        ._          _ _ _ . _ _ . _      . _ . - _ _ - - . . . . . . . . _ . . _ _ _


                                                                            .
    "                                                                            ,
?ke                                                                              !
?ke                                                                              !
  -
                                                                                  !
                                                                                  !
                                                                                  !
(3)      The statement in the Statement of Considerations      )
(3)      The statement in the Statement of Considerations      )
i that the " General Counsel advises the Commission that the NRC final rules were consistent with (the NRC Authorization)                  l Act."            45 Fed. Reg. 55402. That Act prohibited l
i that the " General Counsel advises the Commission that the NRC final rules were consistent with (the NRC Authorization)                  l Act."            45 Fed. Reg. 55402. That Act prohibited l
operation.of nuclear plants without there being in place                  ;
operation.of nuclear plants without there being in place                  ;
1 emergency plans (state and local or utility) that provided                )
1 emergency plans (state and local or utility) that provided                )
                                                                                  !
       " reasonable assurance that public health and safety would                '
       " reasonable assurance that public health and safety would                '
i not be endangered by the operation of the facility
i not be endangered by the operation of the facility
Line 133: Line 90:
(4)      The statement accompanying the proposed rule change on December 16, 1979 that:                "The Commission recognizes that this proposal, to view emergency planning as eauivalent to, rather than secondary to sitino and desian in public protection, departs from its prior regulatory approach to emergency planning."            (Emphasis added, 44 Fed. Reg. 75167 at 169.)            This is a flat, explicit rejection of the notion that emergency planning requirements were "second-tier."
(4)      The statement accompanying the proposed rule change on December 16, 1979 that:                "The Commission recognizes that this proposal, to view emergency planning as eauivalent to, rather than secondary to sitino and desian in public protection, departs from its prior regulatory approach to emergency planning."            (Emphasis added, 44 Fed. Reg. 75167 at 169.)            This is a flat, explicit rejection of the notion that emergency planning requirements were "second-tier."
                                             -S-
                                             -S-
                                                                    -. _.    . .
            -_. . . . -            .-      -.  .    . . - .    -


  .
!'.
(5)  The decision in SAPL v. NRC, 690 F.2d 1025, at 1030, in which the Court noted that:
(5)  The decision in SAPL v. NRC, 690 F.2d 1025, at 1030, in which the Court noted that:
           "According the Commission, if it appears at the operating license review that the infeasibility of EPZ evacuation renders it impossible for PSC to provide the requisite
           "According the Commission, if it appears at the operating license review that the infeasibility of EPZ evacuation renders it impossible for PSC to provide the requisite
Line 143: Line 96:
This position, that an " infeasible" evacuation plan will preclude an operating license, is fundamentally inconsistent with the notion that emergency planning is a "second-tier" safety measure, an idea the NRC never advanced in dealing with the SAPL 10 CPR S2.206 petition, or in defending its failure to undertake a S2.206 review before the D.C. Circuit.
This position, that an " infeasible" evacuation plan will preclude an operating license, is fundamentally inconsistent with the notion that emergency planning is a "second-tier" safety measure, an idea the NRC never advanced in dealing with the SAPL 10 CPR S2.206 petition, or in defending its failure to undertake a S2.206 review before the D.C. Circuit.
These items are conclusive of the "first-tier" status of emergency planning requirements in 1979, 1980 and 1982.            The only suggestion anywhere of a "two-tier" safety approach, prior to the ESC 1 decision, is to be found in the conclusion of a Memorandum written in 1979 for the commissioners by former general counsel Leonard Bickwit, and which is included in the appendix to the Mass AG Brief on the Appeal of the New Hampshire Emergency Response Plan.      (Brief Appendix, Exhibit 9, at pp. 23-24).        In that Memorandum, Mr. Bickwit advanced the possibility of treating
These items are conclusive of the "first-tier" status of emergency planning requirements in 1979, 1980 and 1982.            The only suggestion anywhere of a "two-tier" safety approach, prior to the ESC 1 decision, is to be found in the conclusion of a Memorandum written in 1979 for the commissioners by former general counsel Leonard Bickwit, and which is included in the appendix to the Mass AG Brief on the Appeal of the New Hampshire Emergency Response Plan.      (Brief Appendix, Exhibit 9, at pp. 23-24).        In that Memorandum, Mr. Bickwit advanced the possibility of treating
                                                                                --    - .-  .-      _ - _ _ - .      .  - - _ _ -
_
                    -  -  - -


                                                                           ^
                                                                           ^
  ;,      ,
:.                                                                            !
Y
Y
  !                                                                              ;
       -                                                                          t i
       -                                                                          t
safety on a two-tier basis, depending on which section of the statute was utilized, but there is no indication that his          !
                                                                                  ;
i safety on a two-tier basis, depending on which section of the statute was utilized, but there is no indication that his          !
suggestion was ever adopted as policy by the Commission, or advanced as c legal proposition by the Commission's general        ,
suggestion was ever adopted as policy by the Commission, or advanced as c legal proposition by the Commission's general        ,
                                                                                  !
counsel, until the NRC filed its Brief in DCE 1 in 1987. To the contrary, Mr. Bickwit himself, at p. 3 of his Memorandum, footnote 5, states:                                                          !
counsel, until the NRC filed its Brief in DCE 1 in 1987. To the
                                                                                  ,
contrary, Mr. Bickwit himself, at p. 3 of his Memorandum, footnote
:
5, states:                                                          !
        '
                         "However, there is no basis in the Act or in              ,
                         "However, there is no basis in the Act or in              ,
its legislative history for distinguishing between      ,
its legislative history for distinguishing between      ,
Line 169: Line 109:
thing. Maine Yankee Atomic Comoany (Maine Yankee      ;
thing. Maine Yankee Atomic Comoany (Maine Yankee      ;
Atomic Station), ALAB-161, 6 AEC 1003,1009 (1973) ."    ;
Atomic Station), ALAB-161, 6 AEC 1003,1009 (1973) ."    ;
                                                                                ;
II. THE COMMISSION'S 1987 STATEMENTS CANNOT, AND DO NOT, ESTABLISH THE EMERGENCY PLANNING                  '
II. THE COMMISSION'S 1987 STATEMENTS CANNOT, AND DO NOT, ESTABLISH THE EMERGENCY PLANNING                  '
REQUIREMENTS AS "SECOND-TIER. "                          ,
REQUIREMENTS AS "SECOND-TIER. "                          ,
                                                                                  ,
The Appeal Board rested its "second-tier" holding solely on  !i the statutory citation to section 161 of the AEA, a matter          ,
The Appeal Board rested its "second-tier" holding solely on  !i the statutory citation to section 161 of the AEA, a matter          ,
discussed above.
discussed above.
However, by means of a footnote 46, page 19 of the Slip Opinion, the Appeal Board attempted to support its holding by reference to the Commission's " Statement of Consideration" that accompanied the 1987 rule change to accomodate consideration of utility-sponsored emergency plans. Those statements, found at 44 FR 42078 at 42081-82 (November 3, 1987) are both irrelevant to the l          issue, and in any event do not indicate that emergency planning was held to be "second-tier."      The reason the 1987 rule change l
However, by means of a footnote 46, page 19 of the Slip Opinion, the Appeal Board attempted to support its holding by reference to the Commission's " Statement of Consideration" that accompanied the 1987 rule change to accomodate consideration of utility-sponsored emergency plans. Those statements, found at 44 FR 42078 at 42081-82 (November 3, 1987) are both irrelevant to the l          issue, and in any event do not indicate that emergency planning was held to be "second-tier."      The reason the 1987 rule change l
l l
l l
l
l I
          . _ .    - -
I


                                                                                                        -. ._. -                      -
t                                                                                                                                          !
                                                                                                                                            !
* t                                                                                                                                          !
  !-                                                                                                                                          !
                                                                                                                                              !
    -
                                                                                                                                              !
                                                                                                                                              !
                                                                                                                                              ;
                                                                                                                                              !
statements are irrelevant is Obvious.                                    The Commission's statements                            l in 1987 cannot change the Commission's unequivocal statements made                                                              f i
statements are irrelevant is Obvious.                                    The Commission's statements                            l in 1987 cannot change the Commission's unequivocal statements made                                                              f i
in 1979 and 1980 about the status of emergency planning, in the                                                                  !
in 1979 and 1980 about the status of emergency planning, in the                                                                  !
                                                                                                                                            !
                                                                                                                                            ''
regulations it was adopting at that time.                                      No amount of historical revisionism can make a rule described in 1980 as " essential," and described, in 1979, "as equivalent to," rather than as secondary to siting and design in public protection to a requirement intended, at that time, to be "second-tier."                                                                                    !
regulations it was adopting at that time.                                      No amount of historical revisionism can make a rule described in 1980 as " essential," and described, in 1979, "as equivalent to," rather than as secondary to siting and design in public protection to a requirement intended, at that time, to be "second-tier."                                                                                    !
                                                                                                                                              !
In its 1987 statements, the Commission never did state                                                              ;
In its 1987 statements, the Commission never did state                                                              ;
                                                                                                                                            !
emergency planning was "second-tier," or in some way of lesser                                                                    !
emergency planning was "second-tier," or in some way of lesser                                                                    !
i importance than other safety requirements dealing with siting and
i importance than other safety requirements dealing with siting and
{
{
engineered safety features.                                  However, in a discussion it conceded "does not have to be addressed in the context of the final rule                                                                  l announced in this notice," (Lt. at 42081), it discussed two
engineered safety features.                                  However, in a discussion it conceded "does not have to be addressed in the context of the final rule                                                                  l announced in this notice," (Lt. at 42081), it discussed two aspects of the emergency planning requirements it felt.resulted in those requirements being " treated somewhat differently in terms of                                                              ;
                                                                                                                                            ;
the corrective actions to be taken when deficiencies are identified, from the engineered safety features                                          (' hardware') that                      i would be relied on in an emergency."                                    Id. at 42082.          The first is                      ;
aspects of the emergency planning requirements it felt.resulted in
,
'
those requirements being " treated somewhat differently in terms of                                                              ;
the corrective actions to be taken when deficiencies are identified, from the engineered safety features                                          (' hardware') that                      i
!                                                                                                                                            ,
would be relied on in an emergency."                                    Id. at 42082.          The first is                      ;
e          the Commission's apparent belief that the use of the word 1
e          the Commission's apparent belief that the use of the word 1
           " bolstered" in the 1979 and 1980 rule making " suggests the Commission of 1980 viewed emergency planning as a backstop for 1'
           " bolstered" in the 1979 and 1980 rule making " suggests the Commission of 1980 viewed emergency planning as a backstop for 1'
'
other means of public protection rather than as of equal importance to them."                (The Commission went on to note that "the l
other means of public protection rather than as of equal importance to them."                (The Commission went on to note that "the l
l
l
Line 219: Line 134:


_~      _
_~      _
                                                                                    ,
                                                                                    .
      "                                                                            ;
I, o t
I, o t
* I i
I i
4 i
4 i
:      e                                                                        j
:      e                                                                        j issue cannot be resolved definitively by microscopic analysis of  !
                                                                                    ,
issue cannot be resolved definitively by microscopic analysis of  !
the particular words chosen in 1980.). Id.
the particular words chosen in 1980.). Id.
However, in fact the word " bolster" does not in any way suggest a reduced safety standard, because it was preceded by the  ;
However, in fact the word " bolster" does not in any way suggest a reduced safety standard, because it was preceded by the  ;
statement that the other nuclear protections, siting and engineered safety featurec, "must be bolstered" by adequate        j
statement that the other nuclear protections, siting and engineered safety featurec, "must be bolstered" by adequate        j emergency planning. The description of the need to improve      ,
                                                                                    ;
emergency planning. The description of the need to improve      ,
9 nuclear safety by using the mandatory "must be" is not consistent  ;
9 nuclear safety by using the mandatory "must be" is not consistent  ;
with the idea that the new emergency plannings were "second-        ,
with the idea that the new emergency plannings were "second-        ,
            ,,
tier."
tier."
Moreover, in 1979, in proposing the emergency planning        }
Moreover, in 1979, in proposing the emergency planning        }
               -regulation, the Commission also utilized the same language, that    ;
               -regulation, the Commission also utilized the same language, that    ;
:              other safety protections "must be bolstered by the ability to take  i
:              other safety protections "must be bolstered by the ability to take  i i
'
protective measures during the course of an accident."      This    ;
i protective measures during the course of an accident."      This    ;
                                                                                    ;
language was accompanied, indeed on the same page in describing    j the rationale for change, by the further Commission's statement,    ;
language was accompanied, indeed on the same page in describing    j the rationale for change, by the further Commission's statement,    ;
                                                                                    '
                             "The Commission recognizes that this proposal, to view emergency planning as equivalent to,            i rather than as secondary tor siting and design in public protection, departs i' rom its        ,
                             "The Commission recognizes that this proposal, to view emergency planning as equivalent to,            i rather than as secondary tor siting and design in public protection, departs i' rom its        ,
prior regulatory approach to emergency planning."      !
prior regulatory approach to emergency planning."      !
44 FR 75167 at 169 (December 19, 1979).                ;
44 FR 75167 at 169 (December 19, 1979).                ;
In view of this, it is hardly a defensible proposition that the    :
In view of this, it is hardly a defensible proposition that the    :
,
use of the word " bolstered" by the Commission in 1979 and 1980 was intended in any way to suggest that emergency planning would be L              anything other than primary or first-tier safety measure.            ,
use of the word " bolstered" by the Commission in 1979 and 1980 was intended in any way to suggest that emergency planning would be L              anything other than primary or first-tier safety measure.            ,
Second, the Commission in the 1987 rule change cited the fact i
Second, the Commission in the 1987 rule change cited the fact i
Line 255: Line 158:
l l
l l
i      ~
i      ~
                          -


  .
  ,
remedial clock was provided.        (52 FR 42078 at 42082.)      The history of nuclear regulation does not afford many examples resulting in a requirement for immediate shutdown of nuclear reactors, even for
remedial clock was provided.        (52 FR 42078 at 42082.)      The history of nuclear regulation does not afford many examples resulting in a requirement for immediate shutdown of nuclear reactors, even for
             " major engineering deficiencies," on the basis of new regulatory requirementa. Indeed, SAPL is aware of no new regulation ever
             " major engineering deficiencies," on the basis of new regulatory requirementa. Indeed, SAPL is aware of no new regulation ever being adopted that resulted in an order for immediate shutdown of reactors.
                                                                                          '
being adopted that resulted in an order for immediate shutdown of reactors.
:
In any event, the 120-day remedial clock does not indicate that emergency planning is different from the typical                        r
In any event, the 120-day remedial clock does not indicate that emergency planning is different from the typical                        r
,          implementation of other new regulatory requirements.            Indeed, as l          the Commission noted, when it adopted the emergency planning                  f l
,          implementation of other new regulatory requirements.            Indeed, as l          the Commission noted, when it adopted the emergency planning                  f l
Line 270: Line 167:
I enforcement actions and many factors should be considered in                  J determining whether it is an appropriate action in a given case.
I enforcement actions and many factors should be considered in                  J determining whether it is an appropriate action in a given case.
(Emphasis added, 45 FR at 55406, August 19, 1980)                            t Accordingly, SAPL submits that for these reasons, and the                !
(Emphasis added, 45 FR at 55406, August 19, 1980)                            t Accordingly, SAPL submits that for these reasons, and the                !
reasons stated by the Mass AG and the New England Coalition on
reasons stated by the Mass AG and the New England Coalition on Nuclear Pollution, the Appeal Board's holding that emergency                  ,
                                                                                          !
Nuclear Pollution, the Appeal Board's holding that emergency                  ,
i I
i I
planning requirements are intended to be a "second-tier" safety l
planning requirements are intended to be a "second-tier" safety l
Line 279: Line 174:
l i
l i
l
l
    .- - .        .    . . . , . . - - . -.-  - .--.-- - - . - . .


i
i t
  .
attitude towards emergency planning, from statements made in the        '
!
Statement of Considerations accompanying the 1987 rule change, there is absolutely no basis anywhere in the Appeal Board opinion      j or elsewhere which suggests that the Commissioners who proposed the emergency planning regulations in 1979, and finally adopted them in 1980, ever considered emergency planning as anything other than a first-tier, primary safety requirement.2 i
* t attitude towards emergency planning, from statements made in the        '
Statement of Considerations accompanying the 1987 rule change, there is absolutely no basis anywhere in the Appeal Board opinion      j
:
or elsewhere which suggests that the Commissioners who proposed the emergency planning regulations in 1979, and finally adopted them in 1980, ever considered emergency planning as anything other than a first-tier, primary safety requirement.2 i
III. THE COMMISSION SHOULD REVERSE THE ASLB AND HOLD              l THAT THE MASS AG DOSE CONSEQUENCE TESTIMONY WAS            ;
III. THE COMMISSION SHOULD REVERSE THE ASLB AND HOLD              l THAT THE MASS AG DOSE CONSEQUENCE TESTIMONY WAS            ;
ADMISSIBLE.                                                t The emergency planning requirements adopted by the Commission in 1980 proceed on the assumption that a nuclear accident, beyond      .
ADMISSIBLE.                                                t The emergency planning requirements adopted by the Commission in 1980 proceed on the assumption that a nuclear accident, beyond      .
i the so-called design basis accidents previously considered, is a credible event, and needs to be planned for.        Indeed, as a matter of law, in assessing whether or not a proposed emergency plan, including the NHRERP, is " adequate" a reviewer must assume that a      j major accident, within the planning spectrum described in NUREG-0654 (Rev. 1) will indeed occur.
i the so-called design basis accidents previously considered, is a credible event, and needs to be planned for.        Indeed, as a matter of law, in assessing whether or not a proposed emergency plan, including the NHRERP, is " adequate" a reviewer must assume that a      j major accident, within the planning spectrum described in NUREG-0654 (Rev. 1) will indeed occur.
This, of course, must include a number of accidents that are      i fast breaking, that may result in releases within as little as one half hour after the initiating event, and a further result in plume travel to a five-mile radius within another one half hour.
This, of course, must include a number of accidents that are      i fast breaking, that may result in releases within as little as one half hour after the initiating event, and a further result in plume travel to a five-mile radius within another one half hour.
                                                                            .
The fact is, at Seabrook, there is no adequate sheltering available for the many thousands of beach goers who will be within      l 2/ SAPL also notes its disagreement with the holding in ALAB-922 that a governmental emergency plan is " feasible" merely because it is a governmental plan.      (ALAB-922, Slip Opinion, p. 20)
The fact is, at Seabrook, there is no adequate sheltering available for the many thousands of beach goers who will be within      l 2/ SAPL also notes its disagreement with the holding in ALAB-922 that a governmental emergency plan is " feasible" merely because it is a governmental plan.      (ALAB-922, Slip Opinion, p. 20)
_      _ _ - - _    _ _  _    _    .


  '
o two or three miles of the reactor during many days of the summers, and particularly weekends, when weather is favorable.
o
.
two or three miles of the reactor during many days of the summers, and particularly weekends, when weather is favorable.
Furthermore, it is a fact that, as testified by the Applicants' own expert on computer modeling of evacuation, Mr. Edward Leiberman, it would take "six or more" hours merely to get the last of those beach goers from one side of Hampton Beach, to the other.    (See attached excerpt of testimony of December 1, 1987, before the ASLB, attached hereto as Appendix A.)    At this point, the evacuees would be in sight of, and essentially no further from the plant than when they started to leave, "six" or more hours earlier.
Furthermore, it is a fact that, as testified by the Applicants' own expert on computer modeling of evacuation, Mr. Edward Leiberman, it would take "six or more" hours merely to get the last of those beach goers from one side of Hampton Beach, to the other.    (See attached excerpt of testimony of December 1, 1987, before the ASLB, attached hereto as Appendix A.)    At this point, the evacuees would be in sight of, and essentially no further from the plant than when they started to leave, "six" or more hours earlier.
In these circumstances, to rule that the dose consequences of an accident at Seabrook are irrelevant to the determination of the adequacy of the en.ergency plan simply flies in the face of logic, sense, and any meaningful use of the words of the emergency planning requirement. Adequacy, if is to be anything other than a so-called "best efforts" approach to emergency planning, must deal in some f-ashion with the results of the emergency plan, and the results must in some way be related to the dose savings to be achioved at a particular site.
In these circumstances, to rule that the dose consequences of an accident at Seabrook are irrelevant to the determination of the adequacy of the en.ergency plan simply flies in the face of logic, sense, and any meaningful use of the words of the emergency planning requirement. Adequacy, if is to be anything other than a so-called "best efforts" approach to emergency planning, must deal in some f-ashion with the results of the emergency plan, and the results must in some way be related to the dose savings to be achioved at a particular site.
The only testimony ever offered on this issue was that proffered by the Massachusetts Attorney General, and rejected by the Licensing Board. The rejection of this testimony was pervasive error, and since this matter has now been moved up to
The only testimony ever offered on this issue was that proffered by the Massachusetts Attorney General, and rejected by the Licensing Board. The rejection of this testimony was pervasive error, and since this matter has now been moved up to l.
 
F the highest level of this agency, that error must now be corrected by this Commission.
_
    .
l.
F
  .
the highest level of this agency, that error must now be corrected by this Commission.
Respectfully submitted, By its Attorneys, BACKUS, MEYER & SOLOMON By:                    --
Respectfully submitted, By its Attorneys, BACKUS, MEYER & SOLOMON By:                    --
ToferFA. Backus, Esquire 116 Lowell Street P.O. Box 516 Manchester, NH  03105 (603)  668-7272 DATED:  October 27, 1989 I hereby certify that copies of the within Seacoast Anti-Pollution League's Brief on Certain Emergency Planning Issues have been forwarded by first-class mail, postage prepaid, to the parties on the attached service list.
ToferFA. Backus, Esquire 116 Lowell Street P.O. Box 516 Manchester, NH  03105 (603)  668-7272 DATED:  October 27, 1989 I hereby certify that copies of the within Seacoast Anti-Pollution League's Brief on Certain Emergency Planning Issues have been forwarded by first-class mail, postage prepaid, to the parties on the attached service list.
                                     /                _
                                     /                _
j& _
j& _
BMrT 'A. Bickuis, Tsquire
BMrT 'A. Bickuis, Tsquire l
;
l
(
(
l 1
l 1
l
l
                                                                          -
1 l
1 l


        - . _ _ -
_,
o k
o k
ATTINDI,X A
ATTINDI,X A F
  .
UNITED STATES NUCLEAll HEGULATURY COMMISSION 1
                                                                                                            .
l 2      ATOMIC SAFETY AND LICEN$2NG DOARD Sec50Tc; 3
                                                                                                            '
                  **.
F UNITED STATES NUCLEAll HEGULATURY COMMISSION
                        '
1 l
2      ATOMIC SAFETY AND LICEN$2NG DOARD Sec50Tc; 3
                                                                                   )
                                                                                   )
4    In the Mattur of t
4    In the Mattur of t
Line 341: Line 209:
                                                                                   )      OFF-SITE EMERGENCY 6
                                                                                   )      OFF-SITE EMERGENCY 6
(SEABROOK STATION, UNITS 1 AND 2)        )      PLANNING 7
(SEABROOK STATION, UNITS 1 AND 2)        )      PLANNING 7
8    EVIDENTIARY HEAHING
8    EVIDENTIARY HEAHING 9                                  i,S Monday, 10 Decetaber 1,    1987
                                                                                                        ,
9                                  i,S Monday, 10 Decetaber 1,    1987
                                                                     .2          .,    .. .
                                                                     .2          .,    .. .
11 Hall of Hepresentatives New Harapshire St atehouse 12 Concord, NH I
11 Hall of Hepresentatives New Harapshire St atehouse 12 Concord, NH I
Line 351: Line 217:
                                           -                U. S. Nuclear Regulatory Corataission Washington, D. C.      20555 17
                                           -                U. S. Nuclear Regulatory Corataission Washington, D. C.      20555 17
                                             '{              JUDGE JERRY HARBOUR, MEMBER 18 Atolaic Safety and Licensing board 19                          U. S. Nuclear Regulatory Corniaission Washington, D. C.      20555
                                             '{              JUDGE JERRY HARBOUR, MEMBER 18 Atolaic Safety and Licensing board 19                          U. S. Nuclear Regulatory Corniaission Washington, D. C.      20555
     %                          20 JUDGE GUSTAVE A. LINENBERGER, J R. , MEMBER l                          21 Atoraic Safety and Licensing Board U. S. Nuclear' Hegulatcry Corataission 22                          Washington, D. C.      20555 23 24 25
     %                          20 JUDGE GUSTAVE A. LINENBERGER, J R. , MEMBER l                          21 Atoraic Safety and Licensing Board U. S. Nuclear' Hegulatcry Corataission 22                          Washington, D. C.      20555 23 24 25 Heritage Reporting Corporation (202) 628-4888 h                    ._.
                          ,
                                              .
                      ..
      '
Heritage Reporting Corporation (202) 628-4888 h                    ._.
                                                                                                            ,


Y      F,
Y      F,
.a
.a A.
-
                                                                                                          .
A.
.f t    ; 9 'y/                                                                                                            ;
.f t    ; 9 'y/                                                                                                            ;
                                                                                                                              !
h                                          PANEL NO. 7 - CROSS                                        6712,,,
h                                          PANEL NO. 7 - CROSS                                        6712,,,
4i
4i 1
      '
hearing and again today, you talked about the sat urated                                                [
1 hearing and again today, you talked about the sat urated                                                [
i g, condit ion of the roadways being the critical factor.                            Do I                      l f
i g, condit ion of the roadways being the critical factor.                            Do I                      l f
s 3  understand your testiroony correctly that on the beaches, and                                                i
s 3  understand your testiroony correctly that on the beaches, and                                                i
                                                                                                                              !
               .,  t'ra focusing part icularly on Seabrook and Hatapton Deaches, so                                            [
               .,  t'ra focusing part icularly on Seabrook and Hatapton Deaches, so                                            [
l 5  long as the roadways ~~ the raeans of egross out of those                                                  j
l 5  long as the roadways ~~ the raeans of egross out of those                                                  j 6  beaches are saturated, that t he t rip generat ion t irnes are                                              ;
                                                                                                                              ;
6  beaches are saturated, that t he t rip generat ion t irnes are                                              ;
i 7  actually irrelevant?                                                                                        i
i 7  actually irrelevant?                                                                                        i
                                         .                                                                                    i 0            A      (L i ebertaan)  They are irrelevant so long as they                                        ,
                                         .                                                                                    i 0            A      (L i ebertaan)  They are irrelevant so long as they                                        ,
                                                                                                                               ?
                                                                                                                               ?
                                                                                                                              !
9  don' t extend beyond the evacuation tiraes associated with the                                        ,
9  don' t extend beyond the evacuation tiraes associated with the                                        ,
i
i to    saturated t raf fic raovetaent.        In other words, if it takes six 8
                                                                                                                              !
11  hours, to cite a figure, to evacuate say Harapton Beach, so long 12    as a trip generation tiene does not approach that figure, 13    anything loss than that would havo no effect on evacuation i
to    saturated t raf fic raovetaent.        In other words, if it takes six 8
* 11  hours, to cite a figure, to evacuate say Harapton Beach, so long
                                                                                                                              '
12    as a trip generation tiene does not approach that figure,
:
13    anything loss than that would havo no effect on evacuation i
14    t i tae.
14    t i tae.
                                                                                                                              .
15            Q      Is that your figure, six hours?                                                            j 16            A      (Liuborraan)    No, I just picked it out.                  It's not far                  ,
15            Q      Is that your figure, six hours?                                                            j 16            A      (Liuborraan)    No, I just picked it out.                  It's not far                  ,
4      i t
4      i t
Line 397: Line 241:
18            0      I was going to suggest that it was five and a half                                          !
18            0      I was going to suggest that it was five and a half                                          !
19    hours; that that was any recollection of your testianony.
19    hours; that that was any recollection of your testianony.
20            A      (Lieberraa n)    Yes, that's right.            I used that as an
20            A      (Lieberraa n)    Yes, that's right.            I used that as an 21    e x arap l e.
                                                                                                                    .
21    e x arap l e.
22            Q      Okay, but I're not asking you to accept rny est ianate.
22            Q      Okay, but I're not asking you to accept rny est ianate.
* i 23    I'en asking you what your est itaat o is.
i 23    I'en asking you what your est itaat o is.
24            A      (Lieber nan)    Five and a hal f hours ray recollect ion 25    says is about right.          We also looked into the study conducted
24            A      (Lieber nan)    Five and a hal f hours ray recollect ion 25    says is about right.          We also looked into the study conducted Heritage    Reporting            Corporation (202) 628-4888
                                              .
Heritage    Reporting            Corporation
    '
(202) 628-4888
   \
   \
k                      _-    -      -        _  - _ _ _ . _ _ _  __    _. _ _ .._ __            _
k                      _-    -      -        _  - _ _ _ . _ _ _  __    _. _ _ .._ __            _


                                                                                                   -    ',          ,W
                                                                                                   -    ',          ,W
                           ../                                                                                        I'
                           ../                                                                                        I' r              .
                        ,.-
* r              .
                                                  .
L
L
: y.                                                                                                .
: y.                                                                                                .
                                                                                                                    ,.. ;
l y'    '
l y'    '
f'
f' E
* E l              s
l              s
                 .                                          PANEL NO. 7 - CROSS                      67 3          c,
                 .                                          PANEL NO. 7 - CROSS                      67 3          c, s
                      '
l        ,
        ,                                                                                                    '
1 by HMM wherein they took ATR counts throurjnout the surnener, and                ll 2  colapared the nuraber'. of vehicles which exited the beach areas                h n
s l        ,
                    ,
1 by HMM wherein they took ATR counts throurjnout the surnener, and                ll
                                                                                                                .
                                                                                                                  *;  .
2  colapared the nuraber'. of vehicles which exited the beach areas                h n
3  over a six-hous' period undee' noriaal t isaec when you have f
3  over a six-hous' period undee' noriaal t isaec when you have f
4  substantial inflowing volutae and t'ou nd that it was coraparable              f' f
4  substantial inflowing volutae and t'ou nd that it was coraparable              f' f
f
f
                               'J to the rautaber of vehicleb that would exit over that period of
                               'J to the rautaber of vehicleb that would exit over that period of 6  t irae during evacuat ion.                                                        ,
                                                                                                                  .
6  t irae during evacuat ion.                                                        ,
7            So offeetively what I*ca saying is the available data i' .
7            So offeetively what I*ca saying is the available data i' .
                                                                                                                     )
                                                                                                                     )
Line 441: Line 267:
1
1
                                               .                                                                    t ?
                                               .                                                                    t ?
9  service the nutabur of ectisaated cars on the beach at a peak                    ,' l
9  service the nutabur of ectisaated cars on the beach at a peak                    ,' l 10  point within the t 1:ae f ratae est itaat ed by the I-DYNEV taodel.            ;I 1        11              (Cor.t i r.ued on next page.)                                      ,
                                                                                                                      '
12 13 14 15                                      .
10  point within the t 1:ae f ratae est itaat ed by the I-DYNEV taodel.            ;I
16 17                                                                                  i 18                                                                                  i 19                                                                                    .
                                                                                                                  '
1        11              (Cor.t i r.ued on next page.)                                      ,
12
                                                                                                                      .
13 14 15                                      .
16 17                                                                                  i
                                                                                                                  !
18                                                                                  i
* 19                                                                                    .
                                                                                                                     ?
                                                                                                                     ?
20 1
20 1
21                                                                                    !I
21                                                                                    !I 22 23 24                                                                                    ',
                                                                                                                    .
25 Heritage    Reporting Corporation (202) 628-4888 d
                                                                                                                    !
22 23
                                                              '
24                                                                                    ',
                  .
25
                  >
Heritage    Reporting Corporation (202) 628-4888 d
_  me          __ .. .                                _                            --
_  me          __ .. .                                _                            --
_.


                                                                                                  *
                                         '.i PANEL NO. 7 - CROS$
                                         '.i
"                    ''
PANEL NO. 7 - CROS$
3 g,3
3 g,3
             ;.                  O
             ;.                  O
Line 477: Line 282:
So the nurabar is five and a half hours in --                      i
So the nurabar is five and a half hours in --                      i
       ,g        p 3        A      (L i e beriaan) To say recollect ton, that sour.du right.
       ,g        p 3        A      (L i e beriaan) To say recollect ton, that sour.du right.
:          ,                                                                                          e
:          ,                                                                                          e 3        O      And that assuraes a vehicle population -- I think that}
          .
3        O      And that assuraes a vehicle population -- I think that}
      -
1
1
                       .,  the nuraber was about 26,0007 5        A      (Liebersaan)    Well, the five and a hal f hour figure,
                       .,  the nuraber was about 26,0007 5        A      (Liebersaan)    Well, the five and a hal f hour figure,
                                                                                                            ,
                                                                                                            ;
                                                                                                             \
                                                                                                             \
6  and it iany be higher with the now Aviu figures, raay be closer
6  and it iany be higher with the now Aviu figures, raay be closer 7    to nix hours.
                                                                                                            .
7    to nix hours.
                     ~6                  We use the projected . figure chown on Page 38 of the 9    direct t est itaony of 29,300 roughly, n
                     ~6                  We use the projected . figure chown on Page 38 of the 9    direct t est itaony of 29,300 roughly, n
to          Q      Okay, so the five and a half hour figure, which you              '
to          Q      Okay, so the five and a half hour figure, which you              '
                                                                                                          ;
11    have Juct given uc, relates to a vehicle population of 29,300f 12          A      (Liebersaan)    No.
11    have Juct given uc, relates to a vehicle population of 29,300f 12          A      (Liebersaan)    No.
13                  Lot rae call your attontion to Page 10-11, which is 14    Table 10-9, chows thte L ct i taat ed tirae to evacuate the beach
13                  Lot rae call your attontion to Page 10-11, which is 14    Table 10-9, chows thte L ct i taat ed tirae to evacuate the beach
                 ,  15    a'r e a s , and it shows five hours and 40 tainuten for' Harapton. And 16    that is baced on our previous 'ectiinate, of vehiclon at the 17    beach, which in turn, relied upon our projection of reasonable 18    upperbound, or peak population on the beach, based on the i
                 ,  15    a'r e a s , and it shows five hours and 40 tainuten for' Harapton. And 16    that is baced on our previous 'ectiinate, of vehiclon at the 17    beach, which in turn, relied upon our projection of reasonable 18    upperbound, or peak population on the beach, based on the i
i          19    August lith, 1985 filrau.
i          19    August lith, 1985 filrau.
        ;
20                  We have since updated    t. hat i n fortaa t i on, using the 21    Avis photos. We now have a highor* count of vehicles on Harapton 22    Deach, and I ata Lure that translaten into a longer tirae to
20                  We have since updated    t. hat i n fortaa t i on, using the 21    Avis photos. We now have a highor* count of vehicles on Harapton
          .
22    Deach, and I ata Lure that translaten into a longer tirae to
: 23. evacuate the beach area.
: 23. evacuate the beach area.
24                  If you give sae a few rai nut en, 1 can look that up if
24                  If you give sae a few rai nut en, 1 can look that up if i
          ,
25    you like. But I would say that is probably in the neighborhood i
          ,
i
                                                ,              .
25    you like. But I would say that is probably in the neighborhood
            '
i
                ,
                ,
                '
Heritage  Reporting Corporation
Heritage  Reporting Corporation
       ;j                                                (202) 628-4888 Y '
       ;j                                                (202) 628-4888 Y '
        %
j l
j
        $                                                                                                    ,
                                            .
l
                              ._    ..                                                -    '


                                                                                                     '      \
                                                                                                     '      \
  .
                                                                                        .
ll f,                                                                                        '
ll f,                                                                                        '
i
i h
    -
PANEL NO. 7 - CT.0",S                      6715 ?n
h PANEL NO. 7 - CT.0",S                      6715 ?n
   ..[f
   ..[f
     ./i !                    1 of six ot* over six hours, at this point.
     ./i !                    1 of six ot* over six hours, at this point.
(J
(J
                                                                                                                  !
                                                                                                               ,j 2i
                                                                                                               ,j
                '
2i
         .                      2      O    No, it is not riocessary f ot' my purpocos that you give 3 me an exact n u m b er'. It is enough that you would agrue the more            ;
         .                      2      O    No, it is not riocessary f ot' my purpocos that you give 3 me an exact n u m b er'. It is enough that you would agrue the more            ;
I
I 4 vehicles there are, buyond the number you assurised, the lorgee                  l 6
                                                                                                                '
4 vehicles there are, buyond the number you assurised, the lorgee                  l 6
                               $ the evacuattor time.
                               $ the evacuattor time.
1 C      A    (Liebermon)    The more vehiclos there are on Hampton              i s
1 C      A    (Liebermon)    The more vehiclos there are on Hampton              i s
7 Deach, yeu.                                                                    l L
7 Deach, yeu.                                                                    l L
8      Q    Now, I want to clatify wh6t, where the vehicleu are,
8      Q    Now, I want to clatify wh6t, where the vehicleu are, 9 at the and of that period of time.                                              i i
                                                                                                                !
9 at the and of that period of time.                                              i i
10            In yout' d i t'e ct testimony, in the previous weeks of 11 the hearing, you talked about the time it takes for' the                        !
10            In yout' d i t'e ct testimony, in the previous weeks of 11 the hearing, you talked about the time it takes for' the                        !
i
i 12 vehicles to ger of f the beach and you identify being of f the                  :
                                                                                                                '
12 vehicles to ger of f the beach and you identify being of f the                  :
13 beach, with being, as I remember' it, at the point where the 14 man'shes stat't.
13 beach, with being, as I remember' it, at the point where the 14 man'shes stat't.
15            Have I t'emembered your tactimony correctly?
15            Have I t'emembered your tactimony correctly?
          -
16      A      (Lieberman)    That is close enough.
16      A      (Lieberman)    That is close enough.
17      O      Okay, you ae'e looking at the photograph behind you,
17      O      Okay, you ae'e looking at the photograph behind you, 18  and I was going to suggest exactly that.          In the upper'
          *        '
18  and I was going to suggest exactly that.          In the upper'
            <
           ~
           ~
19  right-hand cot'r er of the photo on the right, let's use the
19  right-hand cot'r er of the photo on the right, let's use the
Line 564: Line 328:
23        Q    A r.d is that the point that you were ref ei t ing to, yl                24  when you talked about being off the beach?
23        Q    A r.d is that the point that you were ref ei t ing to, yl                24  when you talked about being off the beach?
25              0 ' was it that U-shaped intersection, a little bit to t
25              0 ' was it that U-shaped intersection, a little bit to t
                      '
Heritage    Repotting Corporation (202) 628-4888 Y
            %.
            ''
                        ,
Heritage    Repotting Corporation (202) 628-4888
            .
Y
           }
           }
xm "
xm "
Line 578: Line 336:


i...._..
i...._..
                                                                                    .
                                                                . .
                                                . . . . . . .                                    . - . . . , ,
p                                      ..                                                  . ,.
p                                      ..                                                  . ,.
                                                                                                                        '  '
s        ,,
s        ,,
* f*                                                    l'ANEL NO. 7 - CZOSO                                  M'
f*                                                    l'ANEL NO. 7 - CZOSO                                  M'
(,'184 !
(,'184 !
, ,1
, ,1
;n g          l 1      tho went?                                                                                  (
;n g          l 1      tho went?                                                                                  (
        %,                                                                                                                    >
t    r            2            A      (L i e burinAn)      Wall, to be precise, what wu do is wu                  4
t    r            2            A      (L i e burinAn)      Wall, to be precise, what wu do is wu                  4
[
[
       ]
       ]
              '
3      gather data on a link arid we ask, when docu that 1 ink etapty 4      out ?
3      gather data on a link arid we ask, when docu that 1 ink etapty 4      out ?
      .
                             $                    A r.d I would say the water towere is probably a good 6      l andiaark for the poiret where, which we used as a reference to 7      gather these figurus.
                             $                    A r.d I would say the water towere is probably a good 6      l andiaark for the poiret where, which we used as a reference to 7      gather these figurus.
e                        ,
e                        ,
                       ,    8            Q      So the five and a hal f hour f i gure refoe's to the
                       ,    8            Q      So the five and a hal f hour f i gure refoe's to the 9      point in tieno, when a11 of the vehicles on Harapton Doach have 10      pasced the water tower?
                    ,
9      point in tieno, when a11 of the vehicles on Harapton Doach have 10      pasced the water tower?
                              .                '
11            A        (Li e beriaan)        That is eight.
11            A        (Li e beriaan)        That is eight.
12                    It includon the assurnpt ion that every vehicle that 3 13      actually there,            10,  in fact, used to evacuate.
12                    It includon the assurnpt ion that every vehicle that 3 13      actually there,            10,  in fact, used to evacuate.
Line 607: Line 355:
19                      I used soine cornplicated structures in tny sentences, 20      and I wanted to taake it sitnpler, so that it is unsice to 21        understand it when we go through the record later.
19                      I used soine cornplicated structures in tny sentences, 20      and I wanted to taake it sitnpler, so that it is unsice to 21        understand it when we go through the record later.
22                      What you are saying, as I understand it, is if it 23        taken five and a hal f hours to get of f t he t:'each, then it 24      doesn' t rauch raat t er, whather it takes people 10 rainutes or 25      three hours to get into their cars.
22                      What you are saying, as I understand it, is if it 23        taken five and a hal f hours to get of f t he t:'each, then it 24      doesn' t rauch raat t er, whather it takes people 10 rainutes or 25      three hours to get into their cars.
                                                        .
                 ''                                            Heritage                Reporting Corporation
                 ''                                            Heritage                Reporting Corporation
                 %                                                                  (202) 628-4888 l
                 %                                                                  (202) 628-4888 l
i J                                        -                      . _ . _ _ . _ . . . . . - - _ - . _}}
i J                                        -                      . _ . _ _ . _ . . . . . - - _ - . _}}

Latest revision as of 16:56, 18 February 2020

Brief of Seacoast Anti-Pollution League on Certain Emergency Planning Issues.* Addresses Issues of Emergency Planning Requirements & Correctness Vel Non of ASLB Refusal to Consider Dose Consequence Testimony in Event of Accident
ML19327B715
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 10/27/1989
From: Backus R
BACKUS, MEYER & SOLOMON, SEACOAST ANTI-POLLUTION LEAGUE
To:
NRC COMMISSION (OCM)
References
CON-#489-9372 ALAB-922, LBP-88-32, OL, NUDOCS 8911060449
Download: ML19327B715 (19)


Text

.,

o 2 "e' ,

L 00CKETED  !

u wec .

i

'89 OCT 30 A11 :34 October 27, 1989 UNITED STATES OP. AMERICA I NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION i

) '

In the Matter of ) '

) Docket Nos. 50-443-OL PUBLIC SERVICE COMPANY OF ) 50-444-OL '

NEW HAMPSHIRE, et al. ) (Offsite Emergency

) Planning Issues)  ;

'(Seabrock Station, Unit 1) )

) ,

BRIEF OF SEACOAST ANTI-POLLUTION LEAGUE ON CERTAIN EMERGENCY PLANNING ISSUES INTRODUCTION In ALAB-922 (October 11, 1989) the Appeal Board did two things in regard to several pending appeals of an'ASLB decision (LPB-88-32, 28 NRC 667) which approved the New Hampshire Radiological Emergency Response Plan (NHRERI') for Seabrook.

First, it held that " emergency planning requirements are intended to be second-tier, AEA section 161 safety provisions rather than a first-tier, ' adequate protection' requirements under

[ AEA section 182." (Slip Opinion, p. 18) -

l l Second, it certified to the Commission the question of '

l whether, for this newly designated "second-tier" safety requirement, the ASLB's refusal to consider certain testimony sponsored by the Massachusetts Attorney General on the dose consequences of an accident could be disallowed as not relevant, as the ASLB had done.

1' -

0911060449 891027 DR ADOCK 050 g 3 $

n I :

L-. '

l-As to the first issue, the second-tier holding, both SAPL and the Mass AG filed timely motions for reconsideration. By an order dated October 23, 1989, however, the Appeal Board summarily denied the motions, stating, "they are best addressed in the first instance to the Commission in the context of the intervenors' comments on the certified question." (Memorandum and Order of 10/23/89, Slip Opinion, p. 2)

Accordingly, SAPL will now address both the issue of the status of emergency planning requirements, and the issue of the correctness 121 n2D of the ASLB refusal to consider the dose consequence testimony at Seabrook in the event of a major accident including an off-site release of radioactivity, i I. THE APPEAL BOARD ERRED IN HOLDING EMERGENCY PLANNING IS A "SECOND-TIER" SAFETY REQUIREMENT. ,

In holding that emergency planning is a "second-tier, AEA I

section 161 safety provision" rather than a "first-tier,section i

182" requirement, the Appeal Board relied solely on the fact that in the string citations for authorization of the 1980 rule, the 1 Commission, presumably through its former general counsel, Mr. '

Leonard Bickwit, cited AEA section 161 (b), (i) and (o) rather than AEA section 182, describing this as a " compelling indication" of Commission intent. (Slip Opinion, p. 18)

However, assuming that this authorization citation is indeed properly described as a " compelling indication" of Commission intent, a matter SAPL vigorously disputes, there remains no indication that an awareness of such second-tier status existed A

i f

either in 1979 or 1980, when the emergency planning' rules were proposed, and adopted. '

Indeed, in defining the "two-tier" proposition, the Appeal _;

Board cites to' Union of Concerned Scientists v. NRC, ("UCS (I)")

(824 P.2d 108, 114-18). This case, however, was decided by the D.C. Circuit in 1987, seven vears after the emeroency olannino rule was finally adooted, and contains no suggestion that prior to the brief filed by the Commission in connection with that appeal ,

either the Commission or its general counsel ever considered a t

significantly different level of safety was implied by citation to i

one section of the AEA rather than another.

Moreover, it seems likely that the choice of citation, in the

{

process of adopting regulations, was left up to the Commission's general counsel, and was not presented as a matter for policy decision on the part of the Commissioners.1 At least, there is )

certainly no indication that the Commissioners thought they were 1

making a deliberate policy decision merely because of the l

l statutory citation used to demonstrate authorization for the I

promulgation of the rule.

In fact, every available indication of Commission intent at the time of the adoption of the emergency planning regulations is to the contrary: that emergency planning was intended to have l

1/ The brief of the Mass AG will demonstrate that in fact the I. regulatory record conclusively demonstrates the opposite is true:

l that the Commission in 1980 knowingly and deliberately intended to hold the emergency planning requirements were not intended to be in any way " secondary" because of the string citation.

1 l

g' i
  • y equal status and was to~be considered as equally important as any other safety requirement. These indications include the following: ,

(1) The very language of the regulation itself, i 10 CPR-S50.47(a), which not only approximates, j but in fact utilizes the " adequate protection" (protective] language of what is now described .

as the "first-tier," statute, section 182.

(No one can reasonably read "second-tier" significance into the use of the words " adequate protective" (measures) in the regulation rather than the use of the words " adequate protection."

Surely " adequate protective measures" in the regulation is equivalent to " adequate protection" within the meaning of the AEA.

(2) The description in the Statement of Considerations accompanying the final rule of emergency planning as an " essential" safety feature (45 Fed. Reg. 55404) and the further statement "that the protection provided by safety and engineering design features must be bolstered by emergency planning requirements. Id. at 55403.

(Emphasis added.)

(As to the use of the word " bolstered," see the discussion of the 1987 rule change, infra. at pp. 8-9)

~ _ _ ._ _ _ _ _ _ _ ._ _ _ _ . _ _ . _ . _ . - _ _ - - . . . . . . . . _ . . _ _ _

?ke  !

(3) The statement in the Statement of Considerations )

i that the " General Counsel advises the Commission that the NRC final rules were consistent with (the NRC Authorization) l Act." 45 Fed. Reg. 55402. That Act prohibited l

operation.of nuclear plants without there being in place  ;

1 emergency plans (state and local or utility) that provided )

" reasonable assurance that public health and safety would '

i not be endangered by the operation of the facility

{

concerned." (1980 Authorization Act, Pub. L. No.96-295, i S109(a)). The "no endangerment" standard is certainly [

equivalent to the section 182 " adequate proection" i standard.

(4) The statement accompanying the proposed rule change on December 16, 1979 that: "The Commission recognizes that this proposal, to view emergency planning as eauivalent to, rather than secondary to sitino and desian in public protection, departs from its prior regulatory approach to emergency planning." (Emphasis added, 44 Fed. Reg. 75167 at 169.) This is a flat, explicit rejection of the notion that emergency planning requirements were "second-tier."

-S-

(5) The decision in SAPL v. NRC, 690 F.2d 1025, at 1030, in which the Court noted that:

"According the Commission, if it appears at the operating license review that the infeasibility of EPZ evacuation renders it impossible for PSC to provide the requisite

' reasonable assurance,' the operating license will not be granted."

This position, that an " infeasible" evacuation plan will preclude an operating license, is fundamentally inconsistent with the notion that emergency planning is a "second-tier" safety measure, an idea the NRC never advanced in dealing with the SAPL 10 CPR S2.206 petition, or in defending its failure to undertake a S2.206 review before the D.C. Circuit.

These items are conclusive of the "first-tier" status of emergency planning requirements in 1979, 1980 and 1982. The only suggestion anywhere of a "two-tier" safety approach, prior to the ESC 1 decision, is to be found in the conclusion of a Memorandum written in 1979 for the commissioners by former general counsel Leonard Bickwit, and which is included in the appendix to the Mass AG Brief on the Appeal of the New Hampshire Emergency Response Plan. (Brief Appendix, Exhibit 9, at pp. 23-24). In that Memorandum, Mr. Bickwit advanced the possibility of treating

^

Y

- t i

safety on a two-tier basis, depending on which section of the statute was utilized, but there is no indication that his  !

suggestion was ever adopted as policy by the Commission, or advanced as c legal proposition by the Commission's general ,

counsel, until the NRC filed its Brief in DCE 1 in 1987. To the contrary, Mr. Bickwit himself, at p. 3 of his Memorandum, footnote 5, states:  !

"However, there is no basis in the Act or in ,

its legislative history for distinguishing between ,

the various statutory standards, and the Commission  :

has construed them all as amounting to the same  !

thing. Maine Yankee Atomic Comoany (Maine Yankee  ;

Atomic Station), ALAB-161, 6 AEC 1003,1009 (1973) ."  ;

II. THE COMMISSION'S 1987 STATEMENTS CANNOT, AND DO NOT, ESTABLISH THE EMERGENCY PLANNING '

REQUIREMENTS AS "SECOND-TIER. " ,

The Appeal Board rested its "second-tier" holding solely on !i the statutory citation to section 161 of the AEA, a matter ,

discussed above.

However, by means of a footnote 46, page 19 of the Slip Opinion, the Appeal Board attempted to support its holding by reference to the Commission's " Statement of Consideration" that accompanied the 1987 rule change to accomodate consideration of utility-sponsored emergency plans. Those statements, found at 44 FR 42078 at 42081-82 (November 3, 1987) are both irrelevant to the l issue, and in any event do not indicate that emergency planning was held to be "second-tier." The reason the 1987 rule change l

l l

l I

t  !

statements are irrelevant is Obvious. The Commission's statements l in 1987 cannot change the Commission's unequivocal statements made f i

in 1979 and 1980 about the status of emergency planning, in the  !

regulations it was adopting at that time. No amount of historical revisionism can make a rule described in 1980 as " essential," and described, in 1979, "as equivalent to," rather than as secondary to siting and design in public protection to a requirement intended, at that time, to be "second-tier."  !

In its 1987 statements, the Commission never did state  ;

emergency planning was "second-tier," or in some way of lesser  !

i importance than other safety requirements dealing with siting and

{

engineered safety features. However, in a discussion it conceded "does not have to be addressed in the context of the final rule l announced in this notice," (Lt. at 42081), it discussed two aspects of the emergency planning requirements it felt.resulted in those requirements being " treated somewhat differently in terms of  ;

the corrective actions to be taken when deficiencies are identified, from the engineered safety features (' hardware') that i would be relied on in an emergency." Id. at 42082. The first is  ;

e the Commission's apparent belief that the use of the word 1

" bolstered" in the 1979 and 1980 rule making " suggests the Commission of 1980 viewed emergency planning as a backstop for 1'

other means of public protection rather than as of equal importance to them." (The Commission went on to note that "the l

l

. _ . _ _ _ . _ . _ ~ . . _ _ . . . _ . _ - _ _ - - - ~ _ . . _ . . . _ _ _ . ___. ._ - - _ . - _ _ _

_~ _

I, o t

I i

4 i

e j issue cannot be resolved definitively by microscopic analysis of  !

the particular words chosen in 1980.). Id.

However, in fact the word " bolster" does not in any way suggest a reduced safety standard, because it was preceded by the  ;

statement that the other nuclear protections, siting and engineered safety featurec, "must be bolstered" by adequate j emergency planning. The description of the need to improve ,

9 nuclear safety by using the mandatory "must be" is not consistent  ;

with the idea that the new emergency plannings were "second- ,

tier."

Moreover, in 1979, in proposing the emergency planning }

-regulation, the Commission also utilized the same language, that  ;

other safety protections "must be bolstered by the ability to take i i

protective measures during the course of an accident." This  ;

language was accompanied, indeed on the same page in describing j the rationale for change, by the further Commission's statement,  ;

"The Commission recognizes that this proposal, to view emergency planning as equivalent to, i rather than as secondary tor siting and design in public protection, departs i' rom its ,

prior regulatory approach to emergency planning."  !

44 FR 75167 at 169 (December 19, 1979).  ;

In view of this, it is hardly a defensible proposition that the  :

use of the word " bolstered" by the Commission in 1979 and 1980 was intended in any way to suggest that emergency planning would be L anything other than primary or first-tier safety measure. ,

Second, the Commission in the 1987 rule change cited the fact i

l that when the emergency planning rule was promulgated a 120-day l

l l

i ~

remedial clock was provided. (52 FR 42078 at 42082.) The history of nuclear regulation does not afford many examples resulting in a requirement for immediate shutdown of nuclear reactors, even for

" major engineering deficiencies," on the basis of new regulatory requirementa. Indeed, SAPL is aware of no new regulation ever being adopted that resulted in an order for immediate shutdown of reactors.

In any event, the 120-day remedial clock does not indicate that emergency planning is different from the typical r

, implementation of other new regulatory requirements. Indeed, as l the Commission noted, when it adopted the emergency planning f l

regulations in 1980, the " final rule makes clear that for  !

i emergency planning rules, like all other rules, reactor shutdown as outlined in the rules is but one of a number of possible  !

I enforcement actions and many factors should be considered in J determining whether it is an appropriate action in a given case.

(Emphasis added, 45 FR at 55406, August 19, 1980) t Accordingly, SAPL submits that for these reasons, and the  !

reasons stated by the Mass AG and the New England Coalition on Nuclear Pollution, the Appeal Board's holding that emergency ,

i I

planning requirements are intended to be a "second-tier" safety l

l measure is wholly without support, contrary to the regulatory record, and must be reversed by the Commission. As a final point, l SAPL would point out that whatever may be the propriety of the  ;

i Appeal Board's attempting to determine the present Commission's l

l i

l

i t

attitude towards emergency planning, from statements made in the '

Statement of Considerations accompanying the 1987 rule change, there is absolutely no basis anywhere in the Appeal Board opinion j or elsewhere which suggests that the Commissioners who proposed the emergency planning regulations in 1979, and finally adopted them in 1980, ever considered emergency planning as anything other than a first-tier, primary safety requirement.2 i

III. THE COMMISSION SHOULD REVERSE THE ASLB AND HOLD l THAT THE MASS AG DOSE CONSEQUENCE TESTIMONY WAS  ;

ADMISSIBLE. t The emergency planning requirements adopted by the Commission in 1980 proceed on the assumption that a nuclear accident, beyond .

i the so-called design basis accidents previously considered, is a credible event, and needs to be planned for. Indeed, as a matter of law, in assessing whether or not a proposed emergency plan, including the NHRERP, is " adequate" a reviewer must assume that a j major accident, within the planning spectrum described in NUREG-0654 (Rev. 1) will indeed occur.

This, of course, must include a number of accidents that are i fast breaking, that may result in releases within as little as one half hour after the initiating event, and a further result in plume travel to a five-mile radius within another one half hour.

The fact is, at Seabrook, there is no adequate sheltering available for the many thousands of beach goers who will be within l 2/ SAPL also notes its disagreement with the holding in ALAB-922 that a governmental emergency plan is " feasible" merely because it is a governmental plan. (ALAB-922, Slip Opinion, p. 20)

o two or three miles of the reactor during many days of the summers, and particularly weekends, when weather is favorable.

Furthermore, it is a fact that, as testified by the Applicants' own expert on computer modeling of evacuation, Mr. Edward Leiberman, it would take "six or more" hours merely to get the last of those beach goers from one side of Hampton Beach, to the other. (See attached excerpt of testimony of December 1, 1987, before the ASLB, attached hereto as Appendix A.) At this point, the evacuees would be in sight of, and essentially no further from the plant than when they started to leave, "six" or more hours earlier.

In these circumstances, to rule that the dose consequences of an accident at Seabrook are irrelevant to the determination of the adequacy of the en.ergency plan simply flies in the face of logic, sense, and any meaningful use of the words of the emergency planning requirement. Adequacy, if is to be anything other than a so-called "best efforts" approach to emergency planning, must deal in some f-ashion with the results of the emergency plan, and the results must in some way be related to the dose savings to be achioved at a particular site.

The only testimony ever offered on this issue was that proffered by the Massachusetts Attorney General, and rejected by the Licensing Board. The rejection of this testimony was pervasive error, and since this matter has now been moved up to l.

F the highest level of this agency, that error must now be corrected by this Commission.

Respectfully submitted, By its Attorneys, BACKUS, MEYER & SOLOMON By: --

ToferFA. Backus, Esquire 116 Lowell Street P.O. Box 516 Manchester, NH 03105 (603) 668-7272 DATED: October 27, 1989 I hereby certify that copies of the within Seacoast Anti-Pollution League's Brief on Certain Emergency Planning Issues have been forwarded by first-class mail, postage prepaid, to the parties on the attached service list.

/ _

j& _

BMrT 'A. Bickuis, Tsquire l

(

l 1

l 1

l

o k

ATTINDI,X A F

UNITED STATES NUCLEAll HEGULATURY COMMISSION 1

l 2 ATOMIC SAFETY AND LICEN$2NG DOARD Sec50Tc; 3

)

4 In the Mattur of t

) Docket Nos.

5 PUBLIC SERVICE COMPANY OF ) 50-443-OL NEW HAMPSHIRE, et al., ) 50-444-OL

) OFF-SITE EMERGENCY 6

(SEABROOK STATION, UNITS 1 AND 2) ) PLANNING 7

8 EVIDENTIARY HEAHING 9 i,S Monday, 10 Decetaber 1, 1987

.2 ., .. .

11 Hall of Hepresentatives New Harapshire St atehouse 12 Concord, NH I

The above-ent it led raat t et' caine on for hearing, pursuant to notice, at 9:15 4.ra.

15 j

BEFORE: JUDGE IVAN W. SMITH, CHAIRMAN 16 Atorate Safety and Licensing Board

- U. S. Nuclear Regulatory Corataission Washington, D. C. 20555 17

'{ JUDGE JERRY HARBOUR, MEMBER 18 Atolaic Safety and Licensing board 19 U. S. Nuclear Regulatory Corniaission Washington, D. C. 20555

% 20 JUDGE GUSTAVE A. LINENBERGER, J R. , MEMBER l 21 Atoraic Safety and Licensing Board U. S. Nuclear' Hegulatcry Corataission 22 Washington, D. C. 20555 23 24 25 Heritage Reporting Corporation (202) 628-4888 h ._.

Y F,

.a A.

.f t  ; 9 'y/  ;

h PANEL NO. 7 - CROSS 6712,,,

4i 1

hearing and again today, you talked about the sat urated [

i g, condit ion of the roadways being the critical factor. Do I l f

s 3 understand your testiroony correctly that on the beaches, and i

., t'ra focusing part icularly on Seabrook and Hatapton Deaches, so [

l 5 long as the roadways ~~ the raeans of egross out of those j 6 beaches are saturated, that t he t rip generat ion t irnes are  ;

i 7 actually irrelevant? i

. i 0 A (L i ebertaan) They are irrelevant so long as they ,

?

9 don' t extend beyond the evacuation tiraes associated with the ,

i to saturated t raf fic raovetaent. In other words, if it takes six 8

11 hours, to cite a figure, to evacuate say Harapton Beach, so long 12 as a trip generation tiene does not approach that figure, 13 anything loss than that would havo no effect on evacuation i

14 t i tae.

15 Q Is that your figure, six hours? j 16 A (Liuborraan) No, I just picked it out. It's not far ,

4 i t

17 frota the truth, but I used a round nusaber. ,

18 0 I was going to suggest that it was five and a half  !

19 hours; that that was any recollection of your testianony.

20 A (Lieberraa n) Yes, that's right. I used that as an 21 e x arap l e.

22 Q Okay, but I're not asking you to accept rny est ianate.

i 23 I'en asking you what your est itaat o is.

24 A (Lieber nan) Five and a hal f hours ray recollect ion 25 says is about right. We also looked into the study conducted Heritage Reporting Corporation (202) 628-4888

\

k _- - - _ - _ _ _ . _ _ _ __ _. _ _ .._ __ _

- ', ,W

../ I' r .

L

y. .

l y' '

f' E

l s

. PANEL NO. 7 - CROSS 67 3 c, s

l ,

1 by HMM wherein they took ATR counts throurjnout the surnener, and ll 2 colapared the nuraber'. of vehicles which exited the beach areas h n

3 over a six-hous' period undee' noriaal t isaec when you have f

4 substantial inflowing volutae and t'ou nd that it was coraparable f' f

f

'J to the rautaber of vehicleb that would exit over that period of 6 t irae during evacuat ion. ,

7 So offeetively what I*ca saying is the available data i' .

)

8 deraonstrates that the exist ing highway nystera can in fact -

1

. t ?

9 service the nutabur of ectisaated cars on the beach at a peak ,' l 10 point within the t 1:ae f ratae est itaat ed by the I-DYNEV taodel. ;I 1 11 (Cor.t i r.ued on next page.) ,

12 13 14 15 .

16 17 i 18 i 19 .

?

20 1

21 !I 22 23 24 ',

25 Heritage Reporting Corporation (202) 628-4888 d

_ me __ .. . _ --

'.i PANEL NO. 7 - CROS$

3 g,3

. O

.. g.

So the nurabar is five and a half hours in -- i

,g p 3 A (L i e beriaan) To say recollect ton, that sour.du right.

, e 3 O And that assuraes a vehicle population -- I think that}

1

., the nuraber was about 26,0007 5 A (Liebersaan) Well, the five and a hal f hour figure,

\

6 and it iany be higher with the now Aviu figures, raay be closer 7 to nix hours.

~6 We use the projected . figure chown on Page 38 of the 9 direct t est itaony of 29,300 roughly, n

to Q Okay, so the five and a half hour figure, which you '

11 have Juct given uc, relates to a vehicle population of 29,300f 12 A (Liebersaan) No.

13 Lot rae call your attontion to Page 10-11, which is 14 Table 10-9, chows thte L ct i taat ed tirae to evacuate the beach

, 15 a'r e a s , and it shows five hours and 40 tainuten for' Harapton. And 16 that is baced on our previous 'ectiinate, of vehiclon at the 17 beach, which in turn, relied upon our projection of reasonable 18 upperbound, or peak population on the beach, based on the i

i 19 August lith, 1985 filrau.

20 We have since updated t. hat i n fortaa t i on, using the 21 Avis photos. We now have a highor* count of vehicles on Harapton 22 Deach, and I ata Lure that translaten into a longer tirae to

23. evacuate the beach area.

24 If you give sae a few rai nut en, 1 can look that up if i

25 you like. But I would say that is probably in the neighborhood i

Heritage Reporting Corporation

j (202) 628-4888 Y '

j l

' \

ll f, '

i h

PANEL NO. 7 - CT.0",S 6715 ?n

..[f

./i ! 1 of six ot* over six hours, at this point.

(J

,j 2i

. 2 O No, it is not riocessary f ot' my purpocos that you give 3 me an exact n u m b er'. It is enough that you would agrue the more  ;

I 4 vehicles there are, buyond the number you assurised, the lorgee l 6

$ the evacuattor time.

1 C A (Liebermon) The more vehiclos there are on Hampton i s

7 Deach, yeu. l L

8 Q Now, I want to clatify wh6t, where the vehicleu are, 9 at the and of that period of time. i i

10 In yout' d i t'e ct testimony, in the previous weeks of 11 the hearing, you talked about the time it takes for' the  !

i 12 vehicles to ger of f the beach and you identify being of f the  :

13 beach, with being, as I remember' it, at the point where the 14 man'shes stat't.

15 Have I t'emembered your tactimony correctly?

16 A (Lieberman) That is close enough.

17 O Okay, you ae'e looking at the photograph behind you, 18 and I was going to suggest exactly that. In the upper'

~

19 right-hand cot'r er of the photo on the right, let's use the

, 1 20 wattar tower as a point of referen'co.

21 Do you see that?

22 A (Lioborman) Yes. -

23 Q A r.d is that the point that you were ref ei t ing to, yl 24 when you talked about being off the beach?

25 0 ' was it that U-shaped intersection, a little bit to t

Heritage Repotting Corporation (202) 628-4888 Y

}

xm "

l

[ a> >,

l rem _ =

i...._..

p .. . ,.

s ,,

f* l'ANEL NO. 7 - CZOSO M'

(,'184 !

, ,1

n g l 1 tho went? (

t r 2 A (L i e burinAn) Wall, to be precise, what wu do is wu 4

[

]

3 gather data on a link arid we ask, when docu that 1 ink etapty 4 out ?

$ A r.d I would say the water towere is probably a good 6 l andiaark for the poiret where, which we used as a reference to 7 gather these figurus.

e ,

, 8 Q So the five and a hal f hour f i gure refoe's to the 9 point in tieno, when a11 of the vehicles on Harapton Doach have 10 pasced the water tower?

11 A (Li e beriaan) That is eight.

12 It includon the assurnpt ion that every vehicle that 3 13 actually there, 10, in fact, used to evacuate.

14 Q And let tae go back, for a raceaent , to one of tay 15 eatlier questions.

16 We won'a talking about the relationship between trip 17 generation tirae and evacuat' ion tirne, under saturated 18 conditions.

19 I used soine cornplicated structures in tny sentences, 20 and I wanted to taake it sitnpler, so that it is unsice to 21 understand it when we go through the record later.

22 What you are saying, as I understand it, is if it 23 taken five and a hal f hours to get of f t he t:'each, then it 24 doesn' t rauch raat t er, whather it takes people 10 rainutes or 25 three hours to get into their cars.

Heritage Reporting Corporation

% (202) 628-4888 l

i J - . _ . _ _ . _ . . . . . - - _ - . _