ML12024A207: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
                     "Ir UNITED STATES
                     "Ir UNITED STATES
     ~                  0'))                NUCLEAR REGULATORY COMMISSION
     ~                  0'))                NUCLEAR REGULATORY COMMISSION
!
<I:
<I:
                           ~
                           ~
0 WASHINGTON, D.C. 20555-0001 Ii;                      :
0 WASHINGTON, D.C. 20555-0001 Ii;                      :
  ~                    ~~                                January 27,2012 10'1          ..,0
  ~                    ~~                                January 27,2012 10'1          ..,0 LICENSEE:      Entergy Nuclear Operations, Inc.
          ****...
LICENSEE:      Entergy Nuclear Operations, Inc.
FACILITY:      Indian Point Nuclear Generating Station, Units 2 and 3
FACILITY:      Indian Point Nuclear Generating Station, Units 2 and 3



Latest revision as of 19:45, 6 February 2020

January 12, 2012 - Summary of Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations Inc., Concerning the Reactor Vessell Internals Program at Indian Point Nuclear Generating Station Summary 1-12-
ML12024A207
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/27/2012
From: Robert Kuntz
License Renewal Projects Branch 2
To:
Kuntz R
References
Download: ML12024A207 (5)


Text

~(J'-

~p.R REGu~

"Ir UNITED STATES

~ 0')) NUCLEAR REGULATORY COMMISSION

<I:

~

0 WASHINGTON, D.C. 20555-0001 Ii;  :

~ ~~ January 27,2012 10'1 ..,0 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON JANUARY 12, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U. S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on January 12, 2012, to discuss the applicant's aging management activities for the reactor vessel internals (RVI) at Indian Point (IP) Nuclear Generating Station, Units 2 and 3.

These activities consist of the RVI Program, which was submitted to the NRC as part of License Renewal Application Amendment 9 by letter dated July 14, 2010, and the RVllnspection Plan, which was submitted to the NRC by letter dated September 28. 2011.

By letter dated August 22, 2011, the applicant stated, "Following issuance of MRP-227 -A, Entergy will review the inspection plan to determine the need for revision, and will modify the inspection plan to include the necessary revisions, if any." MRP-227-A was issued by the Electric Power Research Institute (EPRI) in December 2011. Therefore, the staff inquired if the applicam was aware that MRP-227 -A was issued, whether the applicant had reviewed MRP-227 -A, and when the applicant planned to address any differences between MRP-227-A and IP's RVI Program and RVllnspection Plan. The applicant indicated that it was in the process of reviewing MRP-227-A ana would notify the staff of its plan and schedule to address any necessary revisions to its RVI Program and RVI Inspection Plan based on the issuance of MRP-227 -A. With respect to two plant-specific action items for which the information was not provided in the IP RVI Inspection Plan, both of which require plant specific acceptance criteria or analyses for particular components, the applicant indicated that the Pressurized Water Reactor Owners Group (PWROG) is in the process of developing generic guidance for developing the criteria or analyses for these items, and that Entergy would defer providing the response for these items until the PWROG completes its generic work.

-2 Subsequent to the teleconference, Entergy contacted the NRC license renewal project manager for IP and indicated that Entergy would submit a letter by February 17, 2012, that would provide necessary revisions to the IP RVI Program and RVllnspection Plan based on the issuance of MRP-227-A.

The applicant had an opportunity to comment on this summar .

Robert . Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

List of Participants cc w/encl: Listserv

TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JANUARY 12. 2012 PARTICIPANTS: AFFILIATIONS:

Robert F. Kuntz U.S. Nuclear Regulatory Commission (NRC)

Bo Pham NRC Allen Hiser NRC Jeffery Poehler NRC Alan Cox Entergy Nuclear Operations, Inc. (Entergy)

Bob Walpole Entergy Roger Waters Entergy John Curry Entergy Nelson Azevedo Entergy Bob Dolansky Entergy ENCLOSURE

Letter to Entergy Nuclear Operations, Inc. from Robert F. Kuntz dated January 27,2012

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON JANUARY 12, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 DISTRIBUTION:

HARD COPY:

DLR RlF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource AStuyvenberg GMeyer, RI RAuluck RConte, RI BPham JBoska DPelton DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI BMizuno, OGC NMcNamara, RI STurk,OGC BWelling, RI SBurnell, OPA OAvegbusi, RI DMclntyre,OPA MCatts, RI EDacus,OCA MHalter, RI

ML12024A207

,iOFFICE LA: DLR/RPB1* PM: DLR/RPB1  : RPB1:DLR PM: DLR/RPB1 NAME YEdmonds RKuntz DMorey RKuntz DATE 01/26/12 01/27/12 01/27/12 01/27/12