{{#Wiki_filter:Exelon Nuclear Job Performance Measure Calc u late a Reactivity Change
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Calculate a Reactivity Change JPM Number: RA 1a Revision Number: 01 Date: 10/17/2011 Developed By:    Bill Hochstetter            10/17/2011 Instructor          Date Validated By:    Brain Lewin                  11/6/2011 SME or Instructor          Date Approved By:    Rob Lawlor                  11/6/2011 Facility Representative      Date


JPM Number:
RA 1a - rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:        All steps of this checklist should be performed upon initial validation.
R A 1a Revision Number:
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
0 1 Date: 10/17/2011  Developed By:
________    1. Task description and number, JPM description and number are identified.
Bill Hochstetter Instructor Date 10/17/2011
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure OP-AP-300-1004 Rev: 2 Procedure                                Rev:
Procedure                                Rev:
________    9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                             Date SME / Instructor                            Date SME / Instructor                            Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 7


Validated By:
RA 1a - rev 01 Revision Record (Summary)
Brain Lewin SME or Instructor Dat e 11/6/2011 
Revision 01      Initial revision of JPM Comment                                                    Resolution Revised JPM for 2012 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 7


Approved By:
RA 1a - rev 01 INITIAL CONDITIONS:
Rob Lawlor Facility Representative Date 11/6/2011 RA 1a - rev 01 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 1. Unit 1 is at 95% power, 6200 EFPH, 892 ppm boron, with CB D at 215 steps.
Page 2 of 7 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:  All steps of this checklist should be performed upon initial validation.
: 2. Tave is 1 degree less than Tref.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. ________ 1. Task description and number, JPM description and number are identified.
INITIATING CUES:
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure OP-AP-300-1004  Rev: 2  ________ Procedure  Rev:  Procedure Rev:  9. Verify cues both verbal and visual are free of conflict
. ________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:        SME / Instructor Date        SME / Instructor Date        SME / Instructor Date RA 1a - rev 01  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 7 Revision Record (Summary)
Revision 0 1 Initial revision of JPM Comment Resolution Revised JPM for 2012 NRC Exam
 
RA 1a - rev 01  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 7 INITIAL CONDITIONS:
: 1. Unit 1 is at 95% power, 6200 EFPH, 892 ppm boron, with CB D at 215 steps. 2. Tave is 1 degree less than Tref. INITIATING CUES:
: 1. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
: 1. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
: 2. The US has directed you to calculate a reactivity change, utilizing OP
: 2. The US has directed you to calculate a reactivity change, utilizing OP-AP-300-1004, that will allow rod withdrawal and match Tave to Tref keeping turbine load constant.
-AP-300-1004, that will allow rod withdrawal and match Tave to Tref keeping turbine load constant
* Provide blank copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
. Provide blank copy of OP
* Provide copy of Unit 1 Rema Thumbrules Information For Evaluators Use:
-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Provide copy of Unit 1 Rema Thumbrules Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system. 2 & 3 Some operations that are performed from outside of the control room may require multiple steps.
* Denotes critical steps 2 & 3 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
Line 61: Line 58:
: 2. Calculate the Reactivity Change Determination Form.
: 2. Calculate the Reactivity Change Determination Form.
MATERIALS:
MATERIALS:
Blank copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 1 Rema Thumbrules at 6211 EFPH RA 1a - rev 01  SRRS: 3D.105 (when utilized for operator initial or continuing training)
* Blank copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
Page 5 of 7   RECORD START TIME:
* Unit 1 Rema Thumbrules at 6211 EFPH SRRS: 3D.105 (when utilized for operator initial or continuing training)
EVALUATOR NOTE: These steps may be performed in any order.
Page 4 of 7
STEP ELEMENT STANDARD SAT UNSAT CMT# CUE Provide copy of OP
 
-AP-3 00-1004 and a copy of the Unit 1 Rema thumbrules 1 Refer to OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 1 Rema Thumbrules In accordance with the provided:
RA 1a - rev 01 RECORD START TIME:
OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 1 Rema Thumbrules
EVALUATOR NOTE: These steps may be performed in any order.
___ ___ ___ *2 Compute Attachment 1 of OP
STEP                 ELEMENT                                   STANDARD               SAT     UNSAT     CMT#
-AP-300-1004  Station: Byron Unit: 1 Date and time Desired change Withdraw Ro ds 6 steps for PDMA02 control Raise RCS temp. 1 degree Reason for change (per QNE recommendation)
CUE Provide copy of OP-AP-300-1004 and a copy of the Unit 1 Rema thumbrules 1     Refer to                                 In accordance with the provided:    ___      ___      ___
PDMA02 control Temperature control What is the method & am't for the reactivity change?
* OP-AP-300-1004, Rev 2, Pwr
6 steps withdrawal of CB D 224 gallons dilution per 1 degree F change Inputs Rema thumbrules
* OP-AP-300-1004, Rev 2, Pwr Boration and Dilution                     Boration and Dilution Requirements                              Requirements
___ ___ ___  NOTE:   The correctly calculated numbers are listed below.
* Unit 1 Rema Thumbrules
*3 Evaluate calculation Calculation of change (Uses numbers as calculated above) 6 steps of Control Bank D at 100% power: Tave
* Unit 1 Rema Thumbrules
-
  *2     Compute Attachment 1 of OP-AP-
Tref = 1/2° rise in temperature
* Station: Byron Unit: 1                       ___      ___      ___
  -1° + 0.5° (mismatch after rod movement) = -0.5° 224 gallons PW/1° x .5° = 112 gallons dilution   CUE This JPM is complete.
300-1004
* Date and time
* Desired change
* Withdraw Rods 6 steps for PDMA02 control
* Raise RCS temp. 1 degree
* Reason for change (per QNE recommendation)
* PDMA02 control
* Temperature control
* What is the method & amt for the reactivity change?
* 6 steps withdrawal of CB D
* 224 gallons dilution per 1 degree F change
* Inputs
* Rema thumbrules NOTE: The correctly calculated numbers are listed below.
  *3     Evaluate calculation
* Calculation of change (Uses numbers as calculated above)
* 6 steps of Control Bank D at 100% power: Tave-Tref = 1/2° rise in temperature
                                                        * -1° + 0.5° (mismatch after rod movement) = -
0.5°
* 224 gallons PW/1° x .5° =
112 gallons dilution CUE This JPM is complete.
RECORD STOP TIME:
RECORD STOP TIME:
  *******************************************************************************************************************
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 7


RA 1a - rev 01 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA 1a - rev 01 JPM  
Page 6 of 7 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
Operators Name:                                                 Job
Evaluate a Reactivity Change JPM Number:
 
R A-1a Revision Number:
==Title:==
Task Number and Title:
EO       RO     SRO     FS STA/IA         SRO Cert JPM
00 K/A Number and Importance:
 
S-AM-151 , Perform proper reactivity management on unit startup and during normal plant operations Suggested Testing Environment:
==Title:==
GEN 2.1.37 Imp Factor 4.3/4.6 Alternate Path:
Evaluate a Reactivity Change JPM Number: RA-1a                                                         Revision Number: 00 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Classroom Reference(s):
==Title:==
OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 1 Rema Thumbrules Actual Testing Environment:
S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37 Imp Factor 4.3/4.6 Suggested Testing Environment:            Classroom Alternate Path:     Yes       No SRO Only:               Yes       No   Time Critical: Yes     No Reference(s):
Simulator Control Room In-Plant Other Testing Method:
* OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
Simulate Perform Estimated Time to Complete:
* Unit 1 Rema Thumbrules Actual Testing Environment:             Simulator             Control Room       In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:           minutes Critical Steps: 2 and 3 EVALUATION  
15Critical Steps: 2 and 3  minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                       Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                       Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                         Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print)
Page 6 of 7
Evaluator's Signature
 
:   Date:
RA 1a - rev 01 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
RA 1a - rev 01   JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
1 Unit 1 is at 95% power, 6200 EFPH, 892 ppm boron, with CB D at 215 steps.
1 Unit 1 is at 95% power, 6200 EFPH, 892 ppm boron, with CB D at 215 steps. 2 Tave is 1 degree less than Tref.
2 Tave is 1 degree less than Tref.
INITIATING CUES:
INITIATING CUES:
: 1. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
: 1. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
2 The US has directed you to calculate a reactivity change, utilizing OP
2 The US has directed you to calculate a reactivity change, utilizing OP-AP-300-1004, that will allow rod withdrawal and match Tave to Tref keeping turbine load constant.
-AP-300-1004, that will allow rod withdraw al and match Tave to Tref keeping turbine load constant
.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 11  Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (ACB 2424 OOS
)  JPM Number:
RA-1.b Revision Number:
11 Date:  10/21/2011 Revised By: Bill Hochstetter Instructor Date 10/21/2011
 
Validated By:
Brain Lewin SME or Instructor Date 11/06/2011


Approved By:
Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (ACB 2424 OOS)
Rob Lawlor Facility Representative Date 11/06/2011
JPM Number: RA-1.b Revision Number: 11 Date: 10/21/2011 Revised By:              Bill Hochstetter                10/21/2011 Instructor            Date Validated By:            Brain Lewin                      11/06/2011 SME or Instructor          Date Approved By:             Rob Lawlor                       11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 1 of 11


RA-1.b - rev 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA-1.b - rev 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 2 of 11  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 138: Line 141:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure 1BOSR 8.1.1
Procedure 1BOSR 8.1.1-1       Rev: 009 Procedure                      Rev:
-1 Rev: 009 9. Verify cues both verbal and visual are free of conflict.
Procedure                      Rev:
Procedure Rev:  Procedure Rev:   10. Verify performance time is accurate
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date             SME / Instructor Date       SME / Instructor Date RA-1.b - rev 11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)               Page 2 of 11
Page 3 of 11 Revision Record (Summary)
 
Revised to current format Revision 11 RA-1.b - rev 11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA-1.b - rev 11 Revision Record (Summary)
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS
Revision 11 Revised to current format SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 11
: 1) Reset to IC
 
-21 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually us ed is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
RA-1.b - rev 11 SIMULATOR SETUP INSTRUCTIONS
: 2) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 3) This completes the setup for this JPM
: 1) Reset to IC-21 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
: 3) This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 11


RA-1.b - rev 11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA-1.b - rev 11 INITIAL CONDITIONS
Page 5 of 11 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Unit 1 is in Mode 1, steady state power.
: 2. Unit 1 is in Mode 1, steady state power.
INITIATING CUE
INITIATING CUE
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
: 2. An SRO has signed and dated the 1BOSR 8.1.1
: 2. An SRO has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.
-1 data package cover sheet.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use: UNSAT requires written comments on respective step.
Information For Evaluators Use:
* Denotes critical steps Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
UNSAT requires written comments on respective step.
* Denotes critical steps Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 11
RA-1.b - rev 11 RECORD START TIME:
Comment ELEMENT                                      STANDARD                SAT      UNSAT Number NOTE Provide examinee with a copy of 1BOSR 8.1.1-1 to complete
: 1. Circle status of offsite power    At 0PM03J, OBSERVE bus sources.                          alive lights, line amps, and MWs for all 345 KV lines:
                                          °    Line 0621 Note: The bus alive light alone is              Line 0627
                                          ° NOT adequate verification
                                          °    Line 0624 of bus status.
                                          °    Line 0622
                                      °    CIRCLE energized for all 345 KV lines INDICATE:
: 2.      Indicate status of disconnects, breakers and SAT links
* Open disconnects, breakers and removed SAT links Cue: Both units SAT x-tie links are                  using  O REMOVED
* Closed disconnects, breakers and installed SAT Cue: Both units SAT disconnect                        links using  X links are INSTALLED
: 3. Trace path along dashed lines                TRACE path correctly on data from any energized offsite power            sheet:
source to the unit ONE SAT
* Line energized, breakers banks and disconnects closed
: 4. Trace second path from second                TRACE SECOND path independent power source to unit            correctly on data sheet:
TWO SAT bank.
* Line energized, breakers and disconnects closed SRRS: 3D.105 (when utilized for operator initial or continuing training)        Page 6 of 11
RA-1.b - rev 11 Comment ELEMENT                                      STANDARD                SAT      UNSAT Number
*5. Verify independent paths exist                Verify independent paths from offsite power thru switchyard
* L0621 and L0622 NOT to both units SAT banks BOTH used
* Two paths DO NOT overlap
* ENTER Yes for step 5 of data sheet
*6. Check normal and reserve 345              At 0PM03J, VERIFY bus alive KV buses energized                        light and voltmeter indications for:
* 345 KV bus 6
* 345 KV bus 13 ENTER Yes for steps 6a and 6b on data sheet
*7. Check normal and reserve                  At 1/2PM01J, VERIFY X and power SATs available                      Y winding MW and amps indication for:
* SATs 142-1 and 142-2 Cue: SATs 242-1 and 242-2
* SATs 242-1 and 242-2 ENERGIZED                                    ENTER Yes for steps 7a and 7b on data sheet
*8. Check ESF buses 141 and 142              At 1PM01J, CHECK bus alive energized                                lights, SAT feeder breaker to bus position and bus voltmeter indication for:
* Bus 141
* Bus 142 ENTER Yes for steps 8a and 8b on data sheet SRRS: 3D.105 (when utilized for operator initial or continuing training)          Page 7 of 11


RA-1.b - rev 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA-1.b - rev 11 Comment ELEMENT                                     STANDARD              SAT       UNSAT Number
Page 6 of 11 RECORD START TIME:
*9. CHECK ESF buses 241 and 242                  At 2PM01J, CHECK bus alive energized                                    lights, SAT feeder breaker to bus position and bus voltmeter indication for:
ELEMENT SAT STANDARD UNSAT Comment Number NOTE Provide examinee with a copy of 1BOSR 8.1.1
Cue: BUS 241 BUS ALIVE light is LIT and voltage is normal
-1 to complete
* Bus 241 Cue: BUS 242 BUS ALIVE light is
: 1. Circle status of offsite power sources.
* Bus 242 LIT and voltage is normal                    ENTER Yes for steps 9a and 9b on data sheet
Note: The bus alive light alone is NOT adequate verification of bus status.
*10. Check SAT Feed breakers are                 At 1/2PM01J, VERIFY position closed and connected                        and control power available:
At 0PM03J, OBSERVE bus alive lights, line amps, and MWs for all 345 KV lines:
* ACB 1412 Cue: ACB 2412 GREEN light LIT
°Line 0621 °Line 0627 °Line 0624 °Line 0622 °CIRCLE 'energized' for all 345 KV lines
* ACB 2412
: 2. Indicate status of disconnects, breakers and SAT links Cue: Cue: Both units SAT x
* ACB 1422 Cue: ACB 2422 GREEN light LIT
-tie links are REMOVED INDICATE: Both units SAT disconnect  links are INSTALLED Open disconnects, breakers and removed SAT links using " O "
* ACB 2422 ENTER Yes for steps 10a through 10d on data sheet NOTE Faulted portion of JPM is initiated in the following step.
Closed disconnects, breakers and installed SAT links using " X "
*11. Check SAT Reserve Feed                      At 1/2PM01J, VERIFY position breakers are closed and                      and control power available:
: 3. Trace path along dashed lines from any energized offsite power source to the unit ONE  SAT banks TRACE path correctly on data sheet:  Line energized, breakers and disconnects closed
connected
: 4. Trace second path from second independent power source to unit TWOTRACE SECOND path correctly on data sheet:
* ACB 1414
SAT bank. Line energized, breakers and disconnects closed
* ACB 1424 Cue: ACB 2414 GREEN light LIT
* ACB 2414
* ACB 2424 Cue: ACB 2424 control switch is in ENTER No for step 11d and PTL and OOS Yes for steps 11a through 11c on data sheet SRRS: 3D.105 (when utilized for operator initial or continuing training)      Page 8 of 11


RA-1.b - rev 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA-1.b - rev 11 Comment ELEMENT                                      STANDARD              SAT      UNSAT Number
Page 7 of 11 ELEMENT SAT STANDARD UNSAT Comment Number *5. Verify independent paths exist from offsite power thru switchyard to both units SAT banks Verify independent paths L0621 and L0622 NOT BOTH used  Two paths DO NOT overlap ENTER 'Yes' for step 5 of data sheet
*12. Determine acceptance criteria
      *6. Check normal and reserve 345 KV buses energized At 0PM03J, VERIFY bus alive light and voltmeter indications for:  345 KV bus 6 345 KV bus 13 ENTER 'Yes' for steps 6a and 6b on data sheet
* DETERMINE acceptance are NOT met                                      criteria are NOT MET
      *7. Check normal and reserve power SATs available
: 13. Notify US that acceptance
* Notify US verbally or by criteria are not met                                  checking NO and writing in Remarks on cover sheet.
Cue: US has verified 1BOL 8.1 has been implemented.
Cue: This JPM is completed.
RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)       Page 9 of 11


Cue: At 1/2PM01J, VERIFY 'X' and 'Y' winding MW and amps indication for:
RA-1.b - rev 11 JPM
SATs 242-1 and 242-2 ENERGIZED  SATs 142-1 and 142-2  SATs 242-1 and 242-2 ENTER 'Yes' for steps 7a and 7b on data sheet
      *8. Check ESF buses 141 and 142 energized  At 1PM01J, CHECK bus alive lights, SAT feeder breaker to


bus position and bus voltmeter indication for:
==SUMMARY==
Bus 141  Bus 142 ENTER 'Yes' for steps 8a and 8b on data sheet


RA-1.b - rev 11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:                                                 Job
Page 8 of 11 ELEMENT SAT STANDARD UNSAT Comment Number *9. CHECK ESF buses 241 and 242 energized  Cue: Cue: BUS 241 BUS ALIVE light is LIT and voltage is normal At 2PM01J, CHECK bus alive lights, SAT feeder breaker to bus position and bus voltmeter indication for:
BUS 242 BUS ALIVE light is LIT and voltage is normal Bus 241  Bus 242 ENTER 'Yes' for steps 9a and 9b on data sheet
        *10. Check SAT Feed breakers are closed and connected Cue:  ACB 2412 'GREEN' light LIT Cue: ACB 2422 'GREEN' light LIT At 1/2PM01J, VERIFY position and control power available:
ACB 1412  ACB 2412  ACB 1422  ACB 2422 ENTER 'Yes' for steps 10a through 10d on data sheet NOTE Faulted portion of JPM is initiated in the following step.
*1 1. Check SAT Reserve Feed breakers are closed and connected Cue:  ACB 2414 'GREEN' light LIT Cue: At 1/2PM01J, VERIFY position and control power available:
ACB 2424 control switch is in PTL and OOS ACB 1414  ACB 1424  ACB 2414  ACB 242 4 ENTER 'No' for step 11d and 'Yes' for steps 11a through 11c on data sheet


RA-1.b - rev 11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
==Title:==
Page 9 of 11 ELEMENT SAT STANDARD UNSAT Comment Number *1 2. Determine acceptance criteria are NOT met    DETERMINE acceptance criteria are NOT MET        13. Notify US that acceptance criteria are not met Cue:  US has verified 1BOL 8.1 has been implemented.
EO        RO    SRO      FS STA/IA          SRO Cert JPM
Notify US verbally or by checking NO and writing in Remarks on cover sheet.
Cue: This JPM is completed
. RECORD STOP TIME
:
RA-1.b - rev 11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 11 JPM  


==SUMMARY==
==Title:==
Perform Offsite AC Power Availability Surveillance (ACB 2424 OOS)
JPM Number: RA 1 (N-75a)                            Revision Number: 11 Task Number and


Operator's Name
==Title:==
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
4C.AP-06 Perform the Offsite AC Power Availability Surveillance.
JPM Number:
K/A Number and Importance: 2.1.31 4.6 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
Perform Offsite AC Power Availability Surveillance (ACB 2424 OOS)
1BOSR 8.1.1-1, Rev 9, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS (*) 5 through 12 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                        Actual Time Used:            minutes EVALUATION
RA 1 (N-75a)Task Number and Title:
Revision Number:
11 K/A Number and Importance:
4C.AP-06 Perform the Offsite AC  Power Availability Surveillance
. Suggested Testing Environment:
2.1.31 4.6 Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Simulator Reference(s):
1BOSR 8.1.1
-1, Rev 9, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS
(*) 5 through 12 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)           Page 10 of 11
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
 
:   (Print) Evaluator's Signature
RA-1.b - rev 11 INITIAL CONDITIONS
:   Date:
RA-1.b - rev 11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 11 of 11 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Unit 1 is in Mode 1, steady state power.
: 2. Unit 1 is in Mode 1, steady state power.
INITIATING CUE
INITIATING CUE
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
: 2. An SRO has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.
: 2. An SRO has signed and dated the 1BOSR 8.1.1
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 11
-1 data package cover sheet.
 
Exelon Nuclear Job Performance Measure Identify Leak Isolation Points from Mechanical and Electrical Drawings JPM Number: RA-2 Revision Number: 0 Date: 10/20/2011 Revised By:              Bill Hochstetter                12/30/2011 Instructor            Date Validated By:
SME or Instructor          Date Approved By:
Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 1 of 7


SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA 2- rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 1 of 7  Exelon Nuclear Job Performance Measure Identify Leak Isolation Points from Mechanical and Electrical Drawings  JPM Number:
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
R A-2  Revision Number:
0  Date:  10/20/20 1 1  Revised By: Bill Hochstetter Instructor Date 12/30/2011  Validated By:
SME or Instructor Date  Approved By:
Facility Representative Date RA 2- rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 7  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 265: Line 279:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure P & ID M-46 sht.1B   Rev: 9. Procedure AR Schematic 6E 4030CS06     Rev: M 10. Verify cues both verbal and visual are free of conflict.
Procedure P & ID M-46 sht.1B Rev: AR
: 9. Procedure Schematic 6E-1-4030CS06 Rev: M
: 10. Verify cues both verbal and visual are free of conflict.
: 11. Verify performance time is accurate
: 11. Verify performance time is accurate
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date           SME / Instructor Date       SME / Instructor Date RA 2- rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)               Page 2 of 7
Page 3 of 7 Revision Record (Summary)
 
Modified from Braidwood
RA 2- rev 0 Revision Record (Summary)
. Rev. 0 at Byron Revision 0 RA 2- rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 0 Modified from Braidwood. Rev. 0 at Byron SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 7
Page 4 of 7 INITIAL CONDITIONS
 
: 1. You are an extra NSO
RA 2- rev 0 INITIAL CONDITIONS
. 2. Both units are at 100% steady state power. 3. The Aux. Building EO has just reported 1CS043A, 1A CS EDUC INLET HDR DRN CONN ISOL VLV, has a leak at the welded inlet connection to the valve.
: 1. You are an extra NSO.
: 2. Both units are at 100% steady state power.
: 3. The Aux. Building EO has just reported 1CS043A, 1A CS EDUC INLET HDR DRN CONN ISOL VLV, has a leak at the welded inlet connection to the valve.
INITIATING CUE
INITIATING CUE
: 1. The Shift Manager has directed you to recommend mechanical isolation points for the leak as close as possible to the source and report back with your recommendation
: 1. The Shift Manager has directed you to recommend mechanical isolation points for the leak as close as possible to the source and report back with your recommendation.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
*- Denotes critical steps.
              *- Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 4 of 7


RA 2- rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA 2- rev 0 RECORD START TIME:
Page 5 of 7 RECORD START TIME:
Comment ELEMENT                                     STANDARD              SAT       UNSAT Number NOTE Once the examinee demonstrates the ability to locate the required mechanical print, provide a copy of print M-46 sheet 1B
ELEMENT SAT STANDARD UNSAT Comment Number NOTE Once the examinee demonstrates the ability to locate the required mechanical print
: 1. Locate correct P& ID
, provide a copy of print M-46 sheet 1B 1. Locate correct P& ID Note: When examinee determines M-46 sheet 1B is required, then provide copy of  
* LOCATE M-46 sheet 1B Note: When examinee determines                         o Use computer such as M-46 sheet 1B is required,                          Passport or EDMS then provide copy of                              o Use P&ID book M-46 sheet 1B.
*2 Determine upstream acceptable
* Refers to M-46 sheet 1B isolation point                                      and determine upstream isolation point is 1CS046A - CLOSED.
*3. Determine downstream
* Refers to M-46 sheet 1B acceptable isolation points                        and determine downstream isolation point is 1CS019A - CLOSED.
: 4. Shift Manager notified                      °    NOTIFY SM of Isolation points Cue:    The SM requests that you identify the breaker to be opened to provide electrical isolation for the MOV.
: 5. Locate correct schematic
* LOCATE 6E-1-4030CS06 Note: When examinee determines                          o Use computer such as 6E-1-4030CS06 is required,                           Passport or EDMS then provide copy of                             o Use Electrical 6E-1-4030CS06 .                                      Schematic book
*6. Determines Breaker to be opened
* Determine 480VAC MCC to provide Electrical Isolation.                    131X1 Compt. K2 is correct breaker to be Cue: This JPM is complete.                              opened and Notify SM.
RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)        Page 5 of 7


M-46 sheet 1B. LOCATE M-46 sheet 1B  o Use computer such as Passport or EDMS o Use P&ID book
RA 2- rev 0 JPM
      *2 Determine upstream acceptable isolation point


Refers to M
==SUMMARY==
-46 sheet 1B and determi ne upstream isolation point is        1CS046A - CLOSED.      *3. Determine downstream  acceptable isolation points Refers to M
-46 sheet 1B and determine downstream isolation point is 1CS019A
- CLOSED.      4. Shift Manager notifie d Cue:    The SM requests that you  identify the breaker to be opened to provide electrical isolation for the MOV. NOTIFY SM of Isolation points
: 5. Locate correct schematic Note:  When examinee determines 6E-1-4030CS06  is required, then provide copy of


6E-1-4030CS06 . LOCATE 6E-1-4030CS06  o Use computer such as Passport or EDMS o Use Electrical Schematic book
Operators Name:                                                 Job
      *6. Determine s Breaker to be opened to provide Electrical Isolation.
Cue:   Determine 480VAC M CC 131X1 Compt. K2 is correct breaker to be opened and Notify SM.
This JPM is complete.
RECORD STOP TIME
:
RA 2- rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 7 JPM


==SUMMARY==
==Title:==
EO        RO      SRO      FS STA/IA          SRO Cert JPM
 
==Title:==
Identify leak isolation points using Mechanical Drawings JPM Number: RA 2                                    Revision Number: 0 Task Number and


Operator's Name
==Title:==
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
T.AM33-10 DISCUSS valving, piping, electrical, and instrumentation practices used in the C/O program K/A Number and Importance: 2.2.41 3.5 Suggested Testing Environment: Simulator or Classroom Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s): P & ID M-46 sht.1B Rev: AR Schematic 6E-1-4030CS06 Rev: M_
JPM Number:
CRITICAL STEPS (*) 2, 3 & 6.
Identify leak isolation points using Mechanical Drawings R A 2 Revision Number:
Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 10 minutes                        Actual Time Used:              minutes EVALUATION
Task Number and Title:
0 T.AM33-10   K/A Number and Importance:
DISCUSS valving, piping, electrical, and instrumentation practices used in the C/O program Suggested Testing Environment:
2.2.41   3.5 Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Simulator or Classroom Reference(s):
P & ID M-46 sht.1B   Rev: AR Schematic 6E 4030CS06   Rev: M_CRITICAL STEPS
(*) 2, 3 & 6. Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete:
10EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)             Page 6 of 7
Satisfactory Unsatisfactory Comments:                       Evaluator's Name
 
:   (Print) Evaluator's Signatur e:   Date:
RA 2- rev 0 INITIAL CONDITIONS
RA 2- rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 1.     You are an extra NSO.
Page 7 of 7 INITIAL CONDITIONS
: 2.     Both units are at 100% steady state power.
: 1. You are an extra NSO
: 4.     The Aux. Building EO has just reported 1CS043A, 1A CS EDUC INLET HDR DRN CONN ISOL VLV, has a leak at the welded inlet connection to the valve.
. 2. Both units are at 100% steady state power. 4. The Aux. Building EO has just reported 1CS043A, 1A CS EDUC INLET HDR DRN CONN ISOL VLV, has a leak at the welded inlet connection to the valve.
INITIATING CUE The Shift Manager has directed you to recommend isolation points for the leak as close as possible to the source and report back to him with your recommendation.
INITIATING CUE The Shift Manager has directed you to recommend isolation points for the leak as close as possible to the source and report back to him with your recommendation
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 7
.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 10  Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number:
RA-3 Revision Number:
5  Date:  12/30/2011  Revised By: Bill Hochstetter
* Instructor Date 12/30/2012


Validated By:
Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-3 Revision Number: 5 Date: 12/30/2011 Revised By:              Bill Hochstetter
* SME or Instructor Date Approved By:
* 12/30/2012 Instructor            Date Validated By:
* Facility Representative Date
* SME or Instructor         Date Approved By:
* Signature on File
* Facility Representative       Date
* Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 1 of 10


RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA/SA rev 4 (from N-100)
Page 2 of 10  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 362: Line 370:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BCP 400-TCNMT/Routine Rev: 9. Verify cues both verbal and visual are free of conflict.
Procedure BCP 400-TCNMT/Routine           Rev: 20
20 10. Verify performance time is accurate
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
W. Hochstetter(Signature on file)                        12/30/2011 SME / Instructor                                Date (Signature on file)
SME / Instructor                                Date SME / Instructor                                Date SRRS: 3D.105 (when utilized for operator initial or continuing training)              Page 2 of 10


SME / Instructor Date  W. Hochstetter(Signature on file) 12/30/2011
RA/SA rev 4 (from N-100)
Revision Record (Summary)
Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Revision 5 Generated a new BCP 400-Tcnmt/routine SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 10


SME / Instructor Date  (Signature on file)
RA/SA rev 4 (from N-100)
SME / Instructor Date RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
SIMULATOR SETUP INSTRUCTIONS
Page 3 of 10 Revision Record (Summary)
: 1. Reset to IC-22 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
Applied new template TQ
-JA-150-02 Rev.1 Revision 4  Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator  Generated a new BCP 400
-Tcnmt/routine Revision 5 RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC
-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
: 2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
: 3. Verify that the RM
: 3. Verify that the RM-11 values for the appropriate channels agree with the surveillance paperwork and Supervisory key for the RM-11 available.
-11 values for the appropriate channels agree with the surveillance paperwork and Supervisory key for the RM
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
-11 available.
: 5. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)    Page 4 of 10
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 5. This completes the setup for this JPM


RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA/SA rev 4 (from N-100)
Page 5 of 10 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 Assist NSO.
: 1. You are the Unit 1 Assist NSO.
: 2. A Unit 1 Containment release is pending.
: 2. A Unit 1 Containment release is pending.
: 3. 1PR11J is inoperable.
: 3. 1PR11J is inoperable.
INITIATING CUE You have been instructed to perform Section 4 of BCP 400
INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.
-TCNMT/ROUTINE in preparation for this release.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 10


RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA/SA rev 4 (from N-100)
Page 6 of 10 RECORD START TIME:
RECORD START TIME:
ELEME NT SAT STANDARD UNSAT Comment Number NOTE If this JPM is performed on the simulator, only the underlined cue need s to be provided to the examinee.
Comment ELEMENT                                      STANDARD                SAT       UNSAT Number NOTE If this JPM is performed on the simulator, only the underlined cue needs to be provided to the examinee.
To initiate this JPM, hand the partially completed BCP 400
To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE to the examinee.
-TCNMT/ROUTINE to the examinee. 1. Refer to the partially completed BCP 400-TCNMT/ROUTINE Cue: (if asked) Section 2 has been verified along with the RETDAS Gaseous Release Rate printouts.
: 1. Refer to the partially completed       °  REVIEW BCP 400-BCP 400-TCNMT/ROUTINE                     TCNMT/ROUTINE for completeness up to Cue: (if asked) Section 2 has been           Section 3 verified along with the RETDAS Gaseous Release Rate printouts.
REVIEW BCP 400
: 2. Complete daily channel checks         °  VERIFY/COMPLETE the daily channel check on Cue: The daily channel check of               1RE-PR001 1RE-PR001 has been performed satisfactorily
-TCNMT/ROUTINE for completeness up to Section 3      2. Complete daily channel checks Cue:  VERIFY/COMPLETE the daily channel check on 1RE-PR001 The daily channel check of 1RE-PR001 has been performed satisfactor il y      3. Perform Source/Channel check Cue:  PERFORM the 1PR01J source/channel check 1BOSR 11.b.
: 3. Perform Source/Channel check           °  PERFORM the 1PR01J source/channel check Cue: 1BOSR 11.b.6-1 has been completed and reviewed satisfactorily.
6-1 has been completed and reviewed satisfactor il y.       NOTE In the following JPM step, the examinee should N/A the step because 1PR11J is inoperable.
NOTE In the following JPM step, the examinee should N/A the step because 1PR11J is inoperable.
: 4. Noble gas trend Cue: 1PR11J is inoperable VERIFY noble gas trend
: 4. Noble gas trend                              °    VERIFY noble gas trend Cue: 1PR11J is inoperable
: 5. "As Found" setpoints of 1RE
: 5. As Found setpoints of 1RE-                At the RM-11, RECORD As PR001                                        Found setpoints of 1RE-PR001 gas channel:
-PR001 Note: The High alarm setpoint is 4.83 E-04 Note: The Alert alarm setpoint is 2.42 E-04 At the RM-11, RECORD "As Found" setpoints of 1RE
Note: The High alarm setpoint is 4.83 E-04                                   °    High alarm setpoint Note: The Alert alarm setpoint is                 °    Alert alarm setpoint 2.42 E-04 SRRS: 3D.105 (when utilized for operator initial or continuing training)        Page 6 of 10
-PR001 gas channel:
High alarm setpoint Alert alarm setpoint


RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
RA/SA rev 4 (from N-100)
Page 7 of 10 ELEME NT SAT STANDARD UNSAT Comment Number *6. RM-11 supervisory mode Cue:   Give candidate the Supervisory k ey for RM-11 when requested.
Comment ELEMENT                                      STANDARD                SAT       UNSAT Number
At the RM-11:  Obtain Supervisory Key from Unit. Supervisor. PLACE RM-11 in Supervisory Mode
*6. RM-11 supervisory mode                       At the RM-11:
    *7. Select monitor At the RM-11, Grid 2:
Cue: Give candidate the
SELECT 1PB101 and DEPRESS the SEL key
* Obtain Supervisory Key Supervisory key for RM-11                         from Unit. Supervisor.
    *8. Select high alarm setpoint channe l At the RM-11:   DEPRESS Channel Item key   KEY IN "9"
when requested.
* PLACE RM-11 in Supervisory Mode
*7. Select monitor                               At the RM-11, Grid 2:
* SELECT 1PB101 and DEPRESS the SEL key
*8. Select high alarm setpoint                   At the RM-11:
channel
* DEPRESS Channel Item key
* KEY IN 9
* DEPRESS the SEL key
*9. High alarm setpoint                          At the RM-11:
Note: The setpoint to be entered is
* ENTER high alarm setpoint 5.60 E-04                                        on 1PB101 per Step 4.1.1.8
                                                  °    RECORD new value Cue: Your request for verification                °    Request verification is acknowledged, please continue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)        Page 7 of 10


DEPRESS the SEL key
RA/SA rev 4 (from N-100)
    *9. High alarm setpoint Note: The setpoint to be entered is 5.60 E-04
Comment ELEMENT                                      STANDARD                SAT      UNSAT Number
*10. Select alert alarm channel                  At the RM-11:
* DEPRESS Channel Item key
* KEY IN 10
* DEPRESS the SEL Note: The setpoint to be entered is
* ENTER alert alarm setpoint 3.14 E-04.                                        on 1PB101 per Step 4.1.1.8
                                                  °  RECORD new value Cue:    Your request for verification is          °  Request verification acknowledged, please continue.
: 11. Place the RM-11 in Normal Mode                At the RM-11:
                                                  °  PLACE the RM-11 in NORMAL MODE
: 12. Aux building exhaust fan status              At 0PM02J:
                                                  °  ENSURE the 0A OR 0B Aux Building Exhaust Fan is in operation
: 13. Turn in Package for approval                  Hand in Release package to Unit Supervisor for approval.
Cue:    The US will continue at step 5.
Cue: This JPM is completed.
RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)          Page 8 of 10


Cue: Your request for verification is acknowledged, please continue . At the RM-11:  ENTER high alarm setpoint on 1PB101 per Step 4.1.1.8  RECORD new value Request verification
RA/SA rev 4 (from N-100)
JPM


RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
==SUMMARY==
Page 8 of 10 ELEME NT SAT STANDARD UNSAT Comment Number *10. Select alert alarm channel
 
Note: The setpoint to be entered is 3.14 E-04. 


Cue: Your request for verification is acknowledged, please continue.
Operators Name:                                                 Job
At the RM-11:  DEPRESS Channel Item key


KEY IN "10" DEPRESS the SEL
==Title:==
EO        RO    SRO      FS STA/IA            SRO Cert JPM


ENTER alert alarm setpoint on 1PB101 per Step 4.1.1.8  RECORD new value Request verification
==Title:==
: 11. Place the RM
Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA/SA-3                                  Revision Number: 4 Task Number and
-11 in Normal Mode At the RM-11:   PLACE the RM
-11 in NORMAL MODE
: 12. Aux building exhaust fan status 


At 0PM02J:
==Title:==
ENSURE the 0A OR  0B Aux Building Exhaust Fan is in operation
4C.GW-01 PERFORM a Gaseous Release.
: 13. Turn in Package for approval Cue:  The US will continue at step 5.
K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path:    Yes        No SRO Only: Yes                      No   Time Critical:    Yes    No Reference(s):
Cue:    This JPM is completed.
BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 20)
Hand in Release package to Unit Supervisor for approval.
CRITICAL STEPS (*) 6, 7, 8, 9 & 10 Actual Testing Environment:              Simulator            Control Room          In-Plant      Other Testing Method:          Simulate            Perform Estimated Time to Complete: 15 minutes                        Actual Time Used:            minutes EVALUATION
RECORD STOP TIME
:
RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 10 JPM


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?                    Yes                No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                    Satisfactory      Unsatisfactory Comments:
Evaluators Name:                                                            (Print)
Evaluators Signature:                                                      Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)            Page 9 of 10


Operator's Name
RA/SA rev 4 (from N-100)
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
INITIAL CONDITIONS
JPM Number:
Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release RA/SA-3 Revision Number:
Task Number and Title:
4 K/A Number and Importance:
4C.GW-01  PERFORM a Gaseous Release.
Suggested Testing Environment:
Generic 2.3.5 2.9/2.9 Alternate Path:
Yes  No SRO Only:  Yes  No Time Critical:
Yes  No Simulator Reference(s):
BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 20
) CRITICAL STEPS
(*) 6, 7, 8, 9 & 10 Actual Testing Environment:
Simulator  Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
15EVALUATION
 
==SUMMARY==
:
minutes Actual Time Used:
minutes Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                        Evaluator's Name
:  (Print) Evaluator's Signature
:  Date:
RA/SA rev 4 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 10 INITIAL CONDITIONS
: 1. You are the Unit 1 Assist NSO.
: 1. You are the Unit 1 Assist NSO.
: 2. A Unit 1 Containment release is pending.
: 2. A Unit 1 Containment release is pending.
: 3. 1PR11J is inoperable.
: 3. 1PR11J is inoperable.
INITIATING CUE You have been instructed to perform Section 4 of BCP 400
INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.
-TCNMT/ROUTINE in preparation for this release.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 10


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Determine venting time for Reactor Vessel void JPM Number: SA-1.b Revision Number: 0 Date: 10/18/2011 Revised By:             Bill Hochstetter                 10/18/2011 Instructor            Date Validated By:            Brian Lewin                      11/06/2011 SME or Instructor         Date Approved By:            Rob Lawlor                      11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 1 of 8
Page 1 of 8  Exelon Nuclear Job Performance Measure Determine venting time for Reactor Vessel void JPM Number:
S A-1.b Revision Number:
0 Date: 10/18/201 1  Revised By: Bill Hochstetter Instructor Date 10/18/2011


Validated By:
SA-1.b - rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Brian Lewin 11/06/201 SME or Instructor Date 1  Approved By:
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Rob Lawlor 11/06/201 Facility Representative Date 1 SA-1.b - rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 6. Task standards identified and verified by SME review.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Procedure: 1BFR I.3 Rev: 200 9. Verify cues both verbal and visual are free of conflict.
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:  Procedure Rev:   10. Verify performance time is accurate
Procedure: 1BFR I.3           Rev: 200 Procedure                      Rev:
Procedure                      Rev:
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date             SME / Instructor Date       SME / Instructor Date SA-1.b - rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)                 Page 2 of 8
Page 3 of 8 Revision Record (Summary)
 
Revised to current format Revision 11 SA-1.b - rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA-1.b - rev 0 Revision Record (Summary)
Page 4 of 8 INITIAL CONDITIONS
Revision 11 Revised to current format SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 8
: 1. You are an extra S R O. 2. Unit 1 is recover ing from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel hea
 
: d. 3. The crew is performing 1BFR
SA-1.b - rev 0 INITIAL CONDITIONS
-I.3, RESPONSE TO VOIDS IN THE REACTOR VESSEL.
: 1. You are an extra SRO.
: 4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to
: 2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
: 5. Current plant conditions are as follows perform a direct vessel vent
: 3. The crew is performing 1BFR-I.3, RESPONSE TO VOIDS IN THE REACTOR VESSEL.
. Containment temperature (dry bulb) = 135 degreesF Containment pressure = 2.1 psig Containment hydrogen concentration = 1%
: 4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
RCS pressure = 1500 psig INITIATING CUE
: 5. Current plant conditions are as follows
: 1. The Shift Manager directs you to assist the Unit 1 SRO by calculating reactor vessel vent time per 1B FR-I.3, Attachment B.
* Containment temperature (dry bulb) = 135 degreesF
: 2. Inform the SM when you have completed 1BFR
* Containment pressure = 2.1 psig
-I.3, Attachment B Fill in the JPM Start Time when the student acknowledges the Initiating Cue Information For Evaluator's Use:
* Containment hydrogen concentration = 1%
* RCS pressure = 1500 psig INITIATING CUE
: 1. The Shift Manager directs you to assist the Unit 1 SRO by calculating reactor vessel vent time per 1BFR-I.3, Attachment B.
: 2. Inform the SM when you have completed 1BFR-I.3, Attachment B Fill in the JPM Start Time when the student acknowledges the Initiating Cue Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 4 of 8


SA-1.b - rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA-1.b - rev 0 RECORD START TIME:
Page 5 of 8 RECORD START TIME:
Comment ELEMENT                                     STANDARD                  SAT       UNSAT Number NOTE Provide examinee with a copy of 1BFR-I.3
ELEMENT SAT STANDARD UNSAT Comment Number NOTE Provide examinee with a copy of 1BFR-I.3 1. Refer to 1BFR
: 1. Refer to 1BFR-I.3.                       Refer to 1BFR-I.3 Note:     Provide copy of 1BFR-I.3 and a calculator to examinee.
-I.3. Note: Provide copy of 1BFR
*2. Calculate containment temperature Perform Attachment B, step 1:
-I.3 and a calculator to examinee. Refer to 1BFR
in Rankine
-I.3      *2. Calculate containment temperature in Rankine Perform Attachment B, step 1
* Enter 135 in degrees F blank
Enter 135 in degrees F blank Add 460 to 135 and enter 595 in degree R blank
* Add 460 to 135 and enter 595 in degree R blank
        *3. Calculate containment air volume based on current temperature and pressure. Perform Attachment B, step 2 Enter 595 in degree R blank Enter 2.1 in CNMT press blank Perform calculation and enter 2,646,050 (or approx.) in cu. ft. blank
*3. Calculate containment air volume Perform Attachment B, step 2 based on current temperature and
        *4. Calculate maximum hydrogen volume that can be vented keeping cnmt concentration below 3% Perform Attachment B, step 3 Enter 1 in cnmt hydrogen conc. blank.
* Enter 595 in degree R blank pressure.
Enter 2,646,050 (or appr ox.) in cu. ft. blank Perform calculation and enter 52,921 (or approx.) in cu. ft. blank
* Enter 2.1 in CNMT press blank
* Perform calculation and enter 2,646,050 (or approx.)
in cu. ft. blank
*4. Calculate maximum hydrogen       Perform Attachment B, step 3 volume that can be vented
* Enter 1 in cnmt hydrogen keeping cnmt concentration below conc. blank.
3%
* Enter 2,646,050 (or approx.)
in cu. ft. blank
* Perform calculation and enter 52,921 (or approx.) in cu. ft. blank SRRS: 3D.105 (when utilized for operator initial or continuing training)            Page 5 of 8


SA-1.b - rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA-1.b - rev 0 Comment ELEMENT                                     STANDARD                  SAT       UNSAT Number
Page 6 of 8 ELEMENT SAT STANDARD UNSAT Comment Number *5. Determine hydrogen flow rate from RCS vent.
*5. Determine hydrogen flow rate                 Perform Attachment B, step 4 from RCS vent.
Perform Attachment B, step 4 Plot RCS pressure on 1BFR-I.3-4 and determine flow rate will be about 4725
* Plot RCS pressure on 1BFR-I.3-4 and determine flow rate will be about 4725 scfm (4675-4775)
* Enter flow rate in step 4 SCFM blank
*6. Calculate maximum venting                Perform Attachment B, step 5 time.
* Enter 52,921 (or approx.) in cu. ft. blank
* Enter 4725 (4675-4775) in SCFM blank
* Calculate minutes and enter 11.2 (11.08 to 11.32) in minutes blank
: 7.      Report to SM results of venting          Notify SM that RCS venting can calculation                              be performed for approx. 11.1 to 11.3 minutes:
Cue: This JPM is completed.
RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)            Page 6 of 8


scfm (4675-4775)  Enter flow rate in step 4 SCFM blank
SA-1.b - rev 0 JPM
        *6. Calculate maximum venting time. Perform Attachment B, step 5 Enter 52,921 (or approx.) in cu. ft. blank  Enter 4725 (4675-4775) in SCFM blank Calculate minutes and enter 11.2 (11.0 8 to 11.32) in minutes blank
: 7. Report to SM results of venting calculation


Cue:  This JPM is completed.
==SUMMARY==
Notify SM that RCS venting c an be performed for approx. 11.1 to 11.3 minutes:        RECORD STOP TIME
:
SA-1.b - rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 8 JPM


==SUMMARY==
Operators Name:                                                Job
 
==Title:==
EO        RO      SRO      FS STA/IA          SRO Cert JPM
 
==Title:==
Determine Venting time for Reactor Vessel Void JPM Number: SA-1.b                                  Revision Number: 0 Task Number and


Operator's Name
==Title:==
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Diagnose and analyze voids in the reactor vessel (T.FR6-04)
JPM Number:
K/A Number and Importance: 2.1.25 4.2 Suggested Testing Environment: Simulator or classroom Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
Determine Venting time for Reactor Vessel Void SA-1.bTask Number and Title:
1BFR-I.3, Response to voids in the reactor vessel CRITICAL STEPS (*) 2, 3, 4, 5, & 6 Actual Testing Environment:             Simulator             Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                        Actual Time Used:              minutes EVALUATION
Revision Number:
0 K/A Number and Importance:
Diagnose and analyze voids in the reactor vessel (T.FR6
-04) Suggested Testing Environment:
2.1.25 4.2 Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Simulator or classroom Reference(s):
1BFR-I.3, Response to voids in the reactor vessel CRITICAL STEPS
(*) 2, 3, 4, 5, & 6 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standar ds contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)             Page 7 of 8
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
 
:   (Print) Evaluator's Signature
SA-1.b - rev 0 INITIAL CONDITIONS
:   Date:
SA-1.b - rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 8 INITIAL CONDITIONS
: 1. You are an extra SRO.
: 1. You are an extra SRO.
: 2. Unit 1 is recover ing from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
: 2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
: 3. The crew is performing 1BFR
: 3. The crew is performing 1BFR-I.3, RESPONSE TO VOIDS IN THE REACTOR VESSEL.
-I.3, RESPONSE TO VOIDS IN THE REACTOR VESSEL.
: 4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
: 4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent
: 5. Current plant conditions are as follows
. 5. Current plant conditions are as follows Containment temperature (dry bulb) = 135 degreesF Containment pressure = 2.1 psig Containment hydrogen concentration = 1%
* Containment temperature (dry bulb) = 135 degreesF
RCS pressure = 1500 psig INITIATING CUE
* Containment pressure = 2.1 psig
: 1. The Shift Manager directs you to assist the Unit 1 SRO by calculating reactor vessel vent time per 1BFR
* Containment hydrogen concentration = 1%
-I.3, Attachment B.
* RCS pressure = 1500 psig INITIATING CUE
: 2. Inform the SM when you have completed 1BFR
: 1. The Shift Manager directs you to assist the Unit 1 SRO by calculating reactor vessel vent time per 1BFR-I.3, Attachment B.
-I.3, Attachment B
: 2. Inform the SM when you have completed 1BFR-I.3, Attachment B SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 8


Exelon Nuclear Job Performance Measure Evaluate a Reactivity Change
Exelon Nuclear Job Performance Measure Evaluate a Reactivity Change JPM Number: SA 1a Revision Number: 01 Date: 10/17/2011 Developed By:    Bill Hochstetter            10/17/2011 Instructor          Date Validated By:    Brian Lewin                  11/06/2011 SME or Instructor        Date Approved By:    Rob Lawlor                  11/06/2011 Facility Representative    Date


JPM Number:
SA 1a - rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:        All steps of this checklist should be performed upon initial validation.
SA 1a Revision Number:
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
0 1 Date: 10/17/2011  Developed By:
________    1. Task description and number, JPM description and number are identified.
Bill Hochstetter Instructor Date 10/17/2011
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure OP-AP-300-1004 Rev: 2 Procedure                                Rev:
Procedure                                Rev:
________    9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                             Date SME / Instructor                            Date SME / Instructor                            Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8


Validated By:
SA 1a - rev 01 Revision Record (Summary)
Brian Lewin SME or Instructor Dat e 11/06/2011
Revision 01      Initial revision of JPM Comment                                                    Resolution Revised JPM for 2012 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 8


Approved By:
SA 1a - rev 01 INITIAL CONDITIONS:
Rob Lawlor Facility Representative Date 11/06/2011
: 1. Unit 1 is at 95% power, 6300 EFPH, 892 ppm boron, with CB D at 215 steps, steady state and equilibrium Xenon
 
: 2. Tave is 1 degree less than Tref.
SA 1a - rev 01 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 3. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:  All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure OP-AP-300-1004  Rev: 2  ________ Procedure  Rev:  Procedure Rev:  9. Verify cues both verbal and visual are free of conflic
: t. ________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:        SME / Instructor Date        SME / Instructor Date        SME / Instructor Date SA 1a - rev 01  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 8 Revision Record (Summary)
Revision 0 1 Initial revision of JPM Comment Resolution Revised JPM for 2012 NRC Exam
 
SA 1a - rev 01  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 8 INITIAL CONDITIONS:
: 1. Unit 1 is at 95% power, 63 00 EFPH, 892 ppm boron, with CB D at 215 steps, steady state and equilibrium Xenon
: 2. Tave is 1 degree less than Tref. 3. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
: 4. The NSO has calculated a reactivity change to match Tave with Tref.
: 4. The NSO has calculated a reactivity change to match Tave with Tref.
INITIATING CUES:
INITIATING CUES:
: 1. Evaluate the reactivity change to match Tave to Tref by reviewing OP
: 1. Evaluate the reactivity change to match Tave to Tref by reviewing OP-AA-300-1004, Att. 1, Reactivity Change Determination Form.
-AA-300-1004, Att. 1, Reactivity Change Determination Form.
* Provide completed copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
Provide completed copy of OP
* Provide copy of Unit 1 Rema Thumbrules Information For Evaluators Use:
-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Provide copy of Unit 1 Rema Thumbrules Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps 3 & 4 Number any comments in the "Comment Number" column on the following pages.
* Denotes critical steps 3 & 4 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
TASK STANDARDS:
TASK STANDARDS:
: 1. Evaluate the reactivity change to match Tave to Tref.
: 1.     Evaluate the reactivity change to match Tave to Tref.
: 2. Review the Reactivity Change Determination Form.
: 2.     Review the Reactivity Change Determination Form.
MATERIALS:
MATERIALS:
Completed OP
* Completed OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached)
-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached)     Unit 1 Rema Thumbrules at 6211 EFPH SA 1a - rev 01  SRRS: 3D.105 (when utilized for operator initial or continuing training)
* Unit 1 Rema Thumbrules at 6211 EFPH SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8   RECORD START TIME:
Page 4 of 8
EVALUATOR NOTE: These steps may be performed in any order.
 
STEP ELEMENT STANDARD SAT UNSAT CMT# CUE Provide completed copy of OP
SA 1a - rev 01 RECORD START TIME:
-AP-3 00-1004 (att. 1) and a copy of the Unit 1 Rema thumbrules 1 Refer to OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 1 Rema Thumbrules In accordance with the provided:
EVALUATOR NOTE: These steps may be performed in any order.
OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 1 Rema Thumbrules 2 Review Attachment 1 of OP
STEP                   ELEMENT                                 STANDARD                     SAT     UNSAT CMT#
-AP-300-1004  Review Attachment 1 of OP
CUE Provide completed copy of OP-AP-300-1004 (att. 1) and a copy of the Unit 1 Rema thumbrules 1     Refer to                                 In accordance with the provided:
-AP-300-1004 . ___ ___ ___  Evaluator note:
* OP-AP-300-1004, Rev 2, Pwr
* OP-AP-300-1004, Rev 2, Pwr Boration and Dilution                    Boration and Dilution Requirements                             Requirements
* Unit 1 Rema Thumbrules
* Unit 1 Rema Thumbrules 2     Review Attachment 1 of OP-AP-             Review Attachment 1 of OP-AP-             ___        ___        ___
300-1004                                  300-1004 Evaluator note:
6 step withdrawal of CB D will raise temperature 0.5 degrees calculation is flawed because it omits above from calculation and dilutes a full 224 gallons of primary water, which is 1 degree, rather than taking into account the control rod withdrawal. Correct dilution volume is 112 gallons
6 step withdrawal of CB D will raise temperature 0.5 degrees calculation is flawed because it omits above from calculation and dilutes a full 224 gallons of primary water, which is 1 degree, rather than taking into account the control rod withdrawal. Correct dilution volume is 112 gallons
  *3 Evaluate calculation for dilution volume listed at 224 gallons, should be 112 gallons.
  *3     Evaluate calculation for dilution        Determine dilution volume volume listed at 224 gallons, should be 112 gallons.
Cue: Determine dilution volume SM has instructed you to correct the identified error and continue your review. Should identify volume of dilution is incorrect.
* Should identify volume of dilution is incorrect.
    *4 Evaluate calculation and determine that rod withdrawal was omitted from calculation Determine rod withdrawal CUE This JPM is complete. RECORD STOP TIME:
Cue: SM has instructed you to correct the identified error and continue your review.
  ****************************************************************************************************************************
  *4     Evaluate calculation and                 Determine rod withdrawal determine that rod withdrawal was omitted from calculation CUE     This JPM is complete.
RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8


SA 1a - rev 01 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA 1a - rev 01 JPM  
Page 6 of 8 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Evaluate a Reactivity Change JPM Number:
==Title:==
SA-1a Revision Number:
EO       RO     SRO     FS STA/IA         SRO Cert JPM
Task Number and Title:
 
00 K/A Number and Importance:
==Title:==
S-AM-151 , Perform proper reactivity management on unit startup and during normal plant operations Suggested Testing Environment:
Evaluate a Reactivity Change JPM Number: SA-1a                                                         Revision Number: 00 Task Number and
GEN 2.1.37 Imp Factor 4.3/4.6 Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Classroom Reference(s):
S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37 Imp Factor 4.3/4.6 Suggested Testing Environment:            Classroom Alternate Path:     Yes       No SRO Only:               Yes       No   Time Critical: Yes     No Reference(s):
OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 1 Rema Thumbrules Actual Testing Environment:
* OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
Simulator Control Room In-Plant Other Testing Method:
* Unit 1 Rema Thumbrules Actual Testing Environment:             Simulator             Control Room       In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                          Actual Time Used:          minutes EVALUATION
Simulate Perform Estimated Time to Complete:
15EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                       Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                       Satisfactory     Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                         Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
Page 6 of 8
:   (Prin t)
 
Evaluator's Signature
SA 1a - rev 01 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
:   Date:
SA 1a - rev 01   JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
: 1. Unit 1 is at 95% power, 6300 EFPH, 892 ppm boron, with CB D at 215 steps, steady state and equilibrium Xenon
: 1. Unit 1 is at 95% power, 6300 EFPH, 892 ppm boron, with CB D at 215 steps, steady state and equilibrium Xenon
: 2. Tave is 1 degree less than Tref.
: 2. Tave is 1 degree less than Tref.
Line 696: Line 695:
: 4. The NSO has calculated a reactivity change to match Tave with Tref.
: 4. The NSO has calculated a reactivity change to match Tave with Tref.
INITIATING CUES:
INITIATING CUES:
: 1. Evaluate the reactivity change to match Tave to Tref by reviewing OP
: 1. Evaluate the reactivity change to match Tave to Tref by reviewing OP-AA-300-1004, Att. 1, Reactivity Change Determination Form.
-AA-3 00-1004, Att.
1, Reactivity Change Determination Form.


SA 1a - rev 01   OP-AP-300-1004 Revision 2 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron Unit: 1 2 Time: Now Date: Today   Desired change:
SA 1a - rev 01 OP-AP-300-1004 Revision 2 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron           Unit: 1       2         Time: Now                 Date: Today Desired change:
(Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.)
(Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.)
Withdraw Rods 6 steps for PDMA02 control Raise RCS Ave. Temp by 1 degree Reason for Change:
Withdraw Rods 6 steps for PDMA02 control Raise RCS Ave. Temp by 1 degree Reason for Change:
(Temperature control, flux control, fuel burn up)
(Temperature control, flux control, fuel burn up)
PDMA02 control and temperature control. What is the method and amount required for the reactivity change?
PDMA02 control and temperature control.
(Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 6 steps withdrawal of CB D and 224 gallons dilution per 1 degree Fahrenheit change. Inputs: (ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD  
What is the method and amount required for the reactivity change?
- Preparer and Reviewer should use independent inputs when possible) Rema thumbrules for Unit 1 at 6211 EFPH Calculation of change:
(Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 6 steps withdrawal of CB D and 224 gallons dilution per 1 degree Fahrenheit change.
Inputs:
(ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD - Preparer and Reviewer should use independent inputs when possible)
Rema thumbrules for Unit 1 at 6211 EFPH Calculation of change:
(E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0°F RCS temp reduction.
(E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0°F RCS temp reduction.
Desired change = 0.5°F drop. Calculation of change: (20 gal/1.0°F)
Desired change = 0.5°F drop. Calculation of change: (20 gal/1.0°F)
* 0.5°F = 10 gal., previously used borations and dilutions)
* 0.5°F = 10 gal.,
(TMI: Procedure 1102
previously used borations and dilutions)
-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion) 1.0° low x 224 gallons dilution per degree raised = 224 gallons dilution Joe Rowe   P Chech ______________
(TMI: Procedure 1102-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion) 1.0° low x 224 gallons dilution per degree raised = 224 gallons dilution Joe Rowe                                 P Chech                         ______________
Preparer Reviewer Approver (RO) (RO/SRO) (SRO)   Shift Manager Notified:   Yes    No
Preparer                               Reviewer                             Approver (RO)                                   (RO/SRO)                               (SRO)
Shift Manager Notified:     Yes    No


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Initiate a LCOAR JPM Number: SA-2 New Revision Number: 0 Date: 10/19/2011 Revised By:             Bill Hochstetter                 10/19/2011 Instructor            Date Validated By:           Brian Lewin                     11/06/2011 SME or Instructor          Date Approved By:             Rob Lawlor                       11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 1 of 9
Page 1 of 9  Exelon Nuclear Job Performance Measure Initiate a LCOAR JPM Number:
S A-2 New Revision Number:
0 Date: 10/19/20 1 1  Revised By: Bill Hochstetter Instructor Date 10/19/2011 Validated By:
Brian Lewin SME or Instructor Date 11/06/2011 Approved B y: Rob Lawlor Facility Representative Date 11/06/2011


SA 2- rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA 2- rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 2 of 9  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified. 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 6. Task standards identified and verified by SME review.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BAP 1400-6     Rev: 28 Procedure 1BOL 7.6 9. Verify cues both verbal and visual are free of conflict.
Procedure BAP 1400-6             Rev: 28 Procedure 1BOL 7.6               Rev: 6
Rev: 6 10. Verify performance time is accurate
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date           SME / Instructor Date       SME / Instructor Date SA 2- rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)                 Page 2 of 9
Page 3 of 9 Revision Record (Summary)
Modified S009 Rev. 6 Revision 0  Changed component that is in LCOAR


SA 2- rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA 2- rev 0 Revision Record (Summary)
Page 4 of 9 INITIAL CONDITIONS
Revision 0 Modified S009 Rev. 6 Changed component that is in LCOAR SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 9
 
SA 2- rev 0 INITIAL CONDITIONS
: 1. You are the Unit 1 Unit Supervisor.
: 1. You are the Unit 1 Unit Supervisor.
: 2. The unit is at 90% steady state power, all conditions normal.
: 2. The unit is at 90% steady state power, all conditions normal.
INITIATING CUE
INITIATING CUE
: 1. The Unit 1 Assist NSO notified you 5 minutes ago; the Unit 1 CST level is 58%
: 1. The Unit 1 Assist NSO notified you 5 minutes ago; the Unit 1 CST level is 58%.
. 2. The Shift Manager directs that it is NOT necessary to update the DEL per LCO 3.0.6 for this LCO.
: 2. The Shift Manager directs that it is NOT necessary to update the DEL per LCO 3.0.6 for this LCO.
: 3. IR 1234567 has been written to document the issue.
: 3. IR 1234567 has been written to document the issue.
: 4. No other LCOARs or DELs exist on Unit 1
: 4. No other LCOARs or DELs exist on Unit 1.
. 5. Initiate the LCOAR paperwork as necessary
: 5. Initiate the LCOAR paperwork as necessary.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
*- Denotes critical steps.
              *- Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 4 of 9


SA 2- rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA 2- rev 0 RECORD START TIME:
Page 5 of 9 RECORD START TIME:
Comment ELEMENT                                       STANDARD                SAT       UNSAT Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure.
ELEMENT SAT STANDARD UNSAT Comment Number NOTE Once the student demonstrates the ability to locate referenced procedure provide th e student with a copy of the procedure.
Step 1 of this JPM is optional
Step 1 of this JPM is optional
: 1. Refer to BAP 1400
: 1. Refer to BAP 1400-6, Technical       °    LOCATE and OPEN BAP Specification Limiting Conditions         1400-6 for Operation Action Requirements (LCOAR)
-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR)
: 2. Refer to 1BOL 7.6, LCOAR                     °    LOCATE and OPEN 1BOL Condensate Storage Tank -Tech                     7.6 Spec LCO 3.7.6
LOCATE and OPEN BAP 1400-6      2. Refer to 1BOL 7.6, LCOAR Condensate Storage Tank  
*3. Section A of 1 BOL 7.6                       ENTER into Section A:
-Tech Spec LCO 3.7.6   LOCATE and OPEN 1BOL 7.6      *3. Section A of 1 BOL 7.6 Note: Notification occurred 5 minutes ago per initiating Cue. ENTER into Section A:
Note: Notification occurred 5
Time/Date By Title    Present mode Initiating event
* Time/Date minutes ago per initiating Cue.                                       °    By
                                                  °    Title
* Present mode
* Initiating event
* Condition
*4. Safety function determination                PERFORM SFD
* Indicate No in Section C Cue: There is no other inoperable
* Sign Coversheet or degraded support or supported equipment on the
* Indicate NO on coversheet A train.                                        for invalidating current SFD SRRS: 3D.105 (when utilized for operator initial or continuing training)            Page 5 of 9
 
SA 2- rev 0 Comment ELEMENT                                      STANDARD                  SAT      UNSAT Number
: 5. Update DEL:
* Check N/A box N/A - from initiating cue information
: 6. Determine Planned or Unplanned
* Mark UNPLANNED on coversheet NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO.
: 7. Related WR/WO block                        o N/A OR List IR #
Note: IR # should be recorded here
: 8. Fill in Related Clearance Orders          o N/A OR Leave Blank Note: Acceptable if left Blank
: 9. Was an IR written?
* Check Yes box
*10. LCOAR TABLE of 1 BOL 7.6                    COMPLETE LCOAR Table:
                                                  °    CIRCLE Condition A
* ENTER notification Time/Date AND sign Condition A
*11. Goes to ATTACHMENT A
* Recognized the need to perform the following within Cue: An Extra NSO will perform                        4 hours:
1BOSR 7.8.1-1.
* 1BOSR 7.8.1-1
* 1AF006A & B and Per Initiating Cue: 1AF006 and                          1AF017A&B are 1AF017 A&B are operable.                                operable
* SX basin above its limit Cue: SX basin level is 90%
SRRS: 3D.105 (when utilized for operator initial or continuing training)            Page 6 of 9


Condition        *4. Safety function determination Cue: PERFORM SFD There is no other inoperable or degraded support or supported equipment on the A train. Indicate No in Section C Sign Coversheet Indicate NO on coversheet for invalidating current SFD
SA 2- rev 0 Comment ELEMENT                                      STANDARD                SAT      UNSAT Number
: 12. Peer check prior to SM review                °    BAP 1400-6 for Peer check Cue: A second SRO has provided a peer check.                                °    Get an additional SRO to Peer check the BOL package
: 13. Signed by Shift Manager                      °    NOTIFY SM Cue: The shift manager acknowledges LCOAR entry and review request.
Cue: This JPM is complete.
RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)          Page 7 of 9


SA 2- rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA 2- rev 0 JPM
Page 6 of 9 ELEMENT SAT STANDARD UNSAT Comment Number 5. Update DEL
:  N/A - from initiating cue information Check "N/A" box
: 6. Determine Planned or Unplanned Mark UNPLANNED on coversheet NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO.
: 7. Related WR/WO block Note: IR # should be recorded here o N/A OR List IR #
: 8. Fill in Related Clearance Orders


Note:  Acceptable if left Blank o N/A OR Leave Blank
==SUMMARY==
: 9. Was an IR written?
Check "Yes" box        *10. LCOAR TABLE of 1 BOL 7.6  COMPLETE LCOAR Table:
CIRCLE Condition A ENTER notification Time/Date AND  sign Condition A
      *11. Goes to ATTACHMENT A Cue:    An Extra NSO will perform 1BOSR 7.8.1
-1. Per Initiating Cue:  1AF006 and 1AF017 A&B are operable.
Cu e:  SX basin level is 90%
Recognized the need to perform the following within 4 hours:  1BOSR 7.8.1
-1  1AF006A & B and 1AF017A&B are operable  SX basin above its limit


SA 2- rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:                                                 Job
Page 7 of 9 ELEMENT SAT STANDARD UNSAT Comment Number 12. Peer check prior to SM review Cue:  BAP 1400-6 for  Peer check  A second SRO has provide d a  peer check.
Get an additional SRO to Peer check the BOL package        13. Signed by Shift Manager Cue:  The shift manager acknowledges LCOAR entry and review request. Cue:  This JPM is complete.
NOTIFY SM          RECORD STOP TIME
:
SA 2- rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 9 JPM


==SUMMARY==
==Title:==
EO        RO      SRO      FS STA/IA          SRO Cert JPM


Operator's Name
==Title:==
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
JPM Number:
Initiate a LCOAR. (SRO)
Initiate a LCOAR. (SRO)
SA 2 (S009) Revision Number:
JPM Number: SA 2(S009)                               Revision Number: 0 Task Number and
Task Number and Title:
 
0 K/A Number and Importance:
==Title:==
8E.TS-007   ENSURE compliance with all applicable Tech Spec Action Statements.
8E.TS-007 ENSURE compliance with all applicable Tech Spec Action Statements.
Suggested Testing Environment:
K/A Number and Importance: 2.2.23 4.6 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
2.2.23   4.6 Alternate Path:
BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev 28) 1BOL 7.6, LCOAR U-1 CST - Operating Tech Spec LCO 3.7.6 (Rev 6)
Yes No SRO Only: Yes No Time Critical:
CRITICAL STEPS (*) 3, 4, 10, & 11 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 10 minutes                        Actual Time Used:              minutes EVALUATION
Yes No Simulator Reference(s):
BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev 28) 1BOL 7.6, LCOAR U-1 CST - Operating Tech Spec LCO 3.7.
6 (Rev 6) CRITICAL STEPS
(*) 3, 4, 10, & 1 1 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
10EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standard s contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)             Page 8 of 9
Satisfactory Unsatisfactory Comments:                       Evaluator's Name
 
:   (Print) Evaluator's Signature
SA 2- rev 0 INITIAL CONDITIONS
:   Date:
SA 2- rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 9 INITIAL CONDITIONS
: 1. You are the Unit 1 Unit Supervisor.
: 1. You are the Unit 1 Unit Supervisor.
: 2. The unit is at 90% steady state power, all conditions normal.
: 2.     The unit is at 90% steady state power, all conditions normal.
INITIATING CUE
INITIATING CUE
: 1. The Unit 1 Assist NSO notified you 5 minutes ago; the Unit 1 CST level is 58%.
: 1. The Unit 1 Assist NSO notified you 5 minutes ago; the Unit 1 CST level is 58%.
Line 832: Line 836:
: 4. No other LCOARs or DELs exist on Unit 1.
: 4. No other LCOARs or DELs exist on Unit 1.
: 5. Initiate the LCOAR paperwork as necessary.
: 5. Initiate the LCOAR paperwork as necessary.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 9


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Review Containment Release package in preparation for a Unit 1 Containment Release JPM Number: SA-3 Revision Number: 5 Date: 12/30/2011 Revised By:             Bill Hochstetter
Page 1 of 9  Exelon Nuclear Job Performance Measure Review Containment Release package in preparation for a Unit 1 Containment Release JPM Number:
* 12/30/2011 Instructor            Date Validated By:
S A-3 Revision Number:
* SME or Instructor          Date Approved By:
5 Date: 12/30/2011 Revised By: Bill Hochstetter
* Facility Representative      Date
* Instructor Date 12/30/2011
* Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 1 of 9


Validated By:
SA rev 5 (from N-100)
* SME or Instructor Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
* Facility Representative Date
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
* Signature on File
 
SA rev 5 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 856: Line 856:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BCP 400-TCNMT/Routine Rev: 9. Verify cues both verbal and visual are free of conflict.
Procedure BCP 400-TCNMT/Routine           Rev: 20
20 10. Verify performance time is accurate
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Bill Hochstetter (Signature on file)                      12/30/2011 SME / Instructor                              Date (Signature on file)
SME / Instructor                                Date SME / Instructor                                Date SRRS: 3D.105 (when utilized for operator initial or continuing training)                Page 2 of 9


SME / Instructor Date Bill Hochstetter (Signature on file) 12/30/2011
SA rev 5 (from N-100)
Revision Record (Summary)
Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Revision 5 Revised to SRO Only review of containment release prior to approval SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 9


SME / Instructor Date (Signature on file)
SA rev 5 (from N-100)
SME / Instructor Date SA rev 5 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
SIMULATOR SETUP INSTRUCTIONS
Page 3 of 9 Revision Record (Summary)
: 1. Reset to IC-22 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
Applied new template TQ
-JA-150-02 Rev.1 Revision 4  Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Revised to SRO Only review of containment release prior to approval Revision 5 SA rev 5 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC
-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
: 2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
: 3. Verify that the RM
: 3. Verify that the RM-11 values for the appropriate channels agree with the surveillance paperwork and Supervisory key for the RM-11 available.
-11 values for the appropriate channels agree with the surveillance paperwork and Supervisory key for the RM
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
-11 available.
: 5. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)     Page 4 of 9
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 5. This completes the setup for this JPM SA rev 5 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Page 5 of 9 INITIAL CONDITIONS
SA rev 5 (from N-100)
: 1. You are the Unit 1 Unit Supervisor
INITIAL CONDITIONS
. 2. A Unit 1 Containment release is pending.
: 1. You are the Unit 1 Unit Supervisor.
: 2. A Unit 1 Containment release is pending.
: 3. 1PR11J is inoperable.
: 3. 1PR11J is inoperable.
: 4. The Unit has been at 100% power and stable for the past 72 hours INITIATING CUE You have been instructed to review Sections 1 through 5 of BCP 400
: 4. The Unit has been at 100% power and stable for the past 72 hours INITIATING CUE You have been instructed to review Sections 1 through 5 of BCP 400-TCNMT/ROUTINE in preparation for this release.
-TCNMT/ROUTINE in preparation for this release.
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps
* Denotes critical steps.
. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)  Page 5 of 9
SA rev 5 (from N-100)
RECORD START TIME:
Comment ELEMENT                                      STANDARD              SAT      UNSAT Number NOTE If this JPM is performed on the simulator, only the underlined cue needs to be provided to the examinee.
To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE to the examinee.
Examine may start with section 5 first (step 4 below), then continue with review of previous sections.
: 1. Refer to the partially completed            °    REVIEW BCP 400-BCP 400-TCNMT/ROUTINE                            TCNMT/ROUTINE for completeness up to Cue: (if asked) Section 2 has been                      Section 3.
verified along with the RETDAS Gaseous Release Rate printouts.
*2. Notices signature missing in
* Notices Rad protection HP Section 3 page 9.                              or SRO signature is NOT signed and dated Note: The examinee should determine the release cannot occur until this is resolved.
Cue: Acknowledge the error and request further review for accuracy.
*3. Reviews Section 4
* REVIEW BCP 400-TCNMT/ROUTINE for completeness of Section 4 Note: The examinee should determine the release cannot
* Determine Step 8 proceed at this time.                            numbers dont match Proceed to step 5.                                section 2.5 (6.05 E-04 versus 5.60 E-04)
SRRS: 3D.105 (when utilized for operator initial or continuing training)        Page 6 of 9
SA rev 5 (from N-100)
Comment ELEMENT                                      STANDARD                SAT      UNSAT Number
: 4. Reviews Section 5:                              °    Determines that the first Found in initial conditions                          paragraph is satisfied.
                                                      °    Determines that Cue: The unit NSO will place the                          containment release placard.                                              placard must be placed on 0PM02J Cue: The Unit 2 Unit Supervisor                      °    Determines that 1BOSR has verified 1BOSR 11.b.6-1                          11.b.6-1 must be is complete and has been                              completed and reviewed reviewed.
*5. Does NOT approve the release
* Determines that the release should NOT be Cue:    This JPM is complete.                            approved.
RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)          Page 7 of 9
SA rev 5 (from N-100)
JPM
==SUMMARY==


SA rev 5 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:                                                 Job
Page 6 of 9 RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number  NOTE If this JPM is performed on the simulator, only the underlined cue need s to be provided t o the examinee.
To initiate this JPM, hand the partially completed BCP 400
-TCNMT/ROUTINE to the examinee. Examine may start with section 5 first (step 4 below), then continue with review of previous sections. 1. Refer to the partially completed BCP 400-TCNMT/ROUTINE Cue: (if asked) Section 2 has been verified along with the RETDAS Gaseous Release Rate printouts.
REVIEW BCP 400
-TCNMT/ROUTINE for completeness up to Section 3.      *2. Notices signature missing in Section 3 page 9.
Note: The examinee should determine the release cannot occur until this is resolved.


Cue:   Acknowledge the error and request further review for accuracy. Notices Rad protection HP or SRO signature is NOT signed and dated
==Title:==
         *3. Reviews Section 4
EO         RO      SRO      FS STA/IA            SRO Cert JPM


Note: The examin ee should determine the release cannot proceed at this time. 
==Title:==
Review Containment release package in preparation for a Unit 1 Containment Release JPM Number: SA-3                                    Revision Number: 5 Task Number and


Proceed to step
==Title:==
: 5. REVIEW BCP 400
4C.GW-01 PERFORM a Gaseous Release.
-TCNMT/ROUTINE for completeness of Section 4 Determine Step 8 numbers don't match section 2.5  (6.05 E-04 versus 5.60 E
K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
-0 4)
BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 20)
SA rev 5 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
CRITICAL STEPS (*) 2, 3, & 5 Actual Testing Environment:             Simulator             Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                        Actual Time Used:              minutes EVALUATION
Page 7 of 9 ELEMENT SAT STANDARD UNSAT Comment Number 4. Reviews Section 5
:  Found in initial conditions Cue:  The unit NSO will place the placard. Cue:  The Unit 2 Unit Supervisor has verified 1BOSR 11.b.6
-1 is complete and has been reviewed. Determines that the first paragraph is satisfied.
Determines that "containment release placard must be placed on 0PM02J  Determines that 1BOSR 11.b.6-1 must be completed and reviewed
      *5. Does NOT approve the release Cue:    This JPM is complete.
Determines that the release should NOT be approved.        RECORD STOP TIME
:
SA rev 5 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 9 JPM SUMMAR Y Operator's Name
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
JPM Number:
Review Containment release package in preparation for a Unit 1 Containment Release SA-3 Revision Number:
Task Number and Title:
5 K/A Number and Importance:
4C.GW-01   PERFORM a Gaseous Release.
Suggested Testing Environment:
Generic 2.3.5 2.9/2.9 Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Simulator Reference(s):
BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 20
) CRITICAL STEPS
(*) 2, 3, & 5 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Use d:  minutes Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
SRRS: 3D.105 (when utilized for operator initial or continuing training)             Page 8 of 9
:   (Print) Evaluator's Signature
 
:   Date:
SA rev 5 (from N-100)
SA rev 5 (from N-100) SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
Page 9 of 9 INITIAL CONDITIONS
: 1.           You are the Unit 1 Unit Supervisor.
: 1. You are the Unit 1 Unit Supervisor
: 2.           A Unit 1 Containment release is pending.
. 2. A Unit 1 Containment release is pending. 3. 1PR11J is inoperable.
: 3.           1PR11J is inoperable.
: 4. The Unit has been at 100% power and stable for the past 72 hours INITIATING CUE You have been instructed to review Sections 1 through 5 of BCP 400
: 4.           The Unit has been at 100% power and stable for the past 72 hours INITIATING CUE You have been instructed to review Sections 1 through 5 of BCP 400-TCNMT/ROUTINE in preparation for this release.
-TCNMT/ROUTINE in preparation for this release.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 9
.    


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Classify Event and Fill Out a NARS Form (LBLOCA)
Exelon Nuclear Job Performance Measure Classify Event and Fill Out a NARS Form (LBLOCA) JPM Number:
JPM Number: SA-4 Revision Number: 5 Date: 10/28/2011 Revised By:             Bill Hochstetter                 10/28/2011 Instructor            Date Reviewed By:             Brian Lewin                     11/06/2011 Operations Representative        Date Approved By:             Rob Lawlor                       11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
S A-4 Revision Number:
 
5 Date: 10/28/2011 Revised By: Bill Hochstetter Instructor Date 10/28/2011   Reviewed By:
SA-4 (from S016t - rev 4)
Brian Lewin Operations Representative Date 11/06/2011   Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Rob Lawlor Facility Representative Date 11/06/2011 SA-4 (from S01 6 t - rev 4)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 968: Line 964:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure EP-MW-114-100       Rev: 11 Procedure EP-MW-114-100-F-01 Rev: F Procedure EP-AA-1 002        Rev: 9. Verify cues both verbal and visual are free of conflict. 2 8 10. Verify performance time is accurate
Procedure EP-MW-114-100           Rev: 11 Procedure EP-MW-114-100-F-01 Rev: F Procedure EP-AA-1002              Rev: 28
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Lynn Sanders (Signature on file)
Lynn Sanders (Signature on file)                         9/09/11 SME / Instructor                                Date x                                                              x SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor Date      9/09/11 x
 
SME / Instructor Date         x SA-4 (from S01 6 t - rev 4)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA-4 (from S016t - rev 4)
Revision Record (Summary)
Revision Record (Summary)
Applied new template TQ
Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Validated 9/20/11 by Lynn Sanders and Mike McCue, only change was procedure rev that did not affect JPM.
-JA-150-02 Rev.1 Revision 4  Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Validated 9/2 0/11 by Lynn Sanders and Mike McCue, only change was procedure rev that did not affect JPM.
New event created for 2011 Requal, classified as modified for ILT exam since this specific item has not been tested previously in ILT.
New event created for 2011 Requal, classified as modified for ILT exam since this specific item has not been tested previously in ILT.


SA-4 (from S01 6 t - rev 4)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
SA-4 (from S016t - rev 4)
SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC
: 1. Reset to IC-22 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. None.
: 2. None. 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 4. This completes the setup for this JPM
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
: 4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)


SA-4 (from S01 6 t - rev 4)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA-4 (from S016t - rev 4)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Shift Emergency Director.
: 1. You are the Shift Emergency Director.
Line 991: Line 991:
INITIATING CUE
INITIATING CUE
: 1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
: 1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
: 2. This is a time critical JPM
: 2. This is a time critical JPM.
. PLANT CONDITIONS Unit 1 and 2 were both at full power.
PLANT CONDITIONS
A Unit 1 Reactor Trip and Safety Injection occurred based on the following conditions:
* Unit 1 and 2 were both at full power.
A large break Loss of Primary Coolant Containment Spray pumps did not automatically start and could NOT be manually started.
* A Unit 1 Reactor Trip and Safety Injection occurred based on the following conditions:
Containment pressure peaked at 29 psig.
* A large break Loss of Primary Coolant
 
* Containment Spray pumps did not automatically start and could NOT be manually started.
* Containment pressure peaked at 29 psig.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


SA-4 (from S01 6 t - rev 4)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA-4 (from S016t - rev 4)
RECORD START TIME:
RECORD START TIME:
ELEMEN T SAT STANDARD UNSAT Comment Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM.
Comment ELEMENT                                      STANDARD                SAT   UNSAT Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM.
: 1. Refer to Exelon Nuclear  
: 1. Refer to Exelon Nuclear -                        Refer to EAL Matrix, EP-Radiological Emergency Plan                       AA-1002 Annex for Byron Station.
- Radiological Emergency Plan Annex for Byron Station.
Note: This step may be performed at any time.
Note: This step may be performed at any time
*2. Classify the Event utilizing EAL
. Refer to EAL Matrix, EP
* Classify event as SITE Matrix.                                        AREA EMERGENCY, from FS1 Loss OR Potential Loss Critical portion stop time ______                    of 2 Fission Product Barriers (RCS and CNMT).
-AA-1002      *2. Classify the Event utilizing EAL Matrix. Critical portion stop time ______
Time from start to Classification =               &#xa2; < 15 minutes
Classify event as SITE AREA EMERGENCY, from FS1 Loss OR Potential Loss of 2 Fission Product Barriers (RCS and CNMT).
________ minutes NOTE Provide the examinee with a copy of the NARS form.
Time from start to Classification = ________ minutes
: 3. Obtain NARS form, EP-MW-114-                   &deg;  Obtain NARS form.
&#xa2; < 15 minutes NOTE Provide the examinee with a copy of the NARS form.
100-F-01, Nuclear Accident Reporting System (NARS).
: 3. Obtain NARS form, EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS).
Note: Step 3 may be performed at any time.
Note: Step 3 may be performed at any time. Obtain NARS form. 4. Refer to EP
: 4. Refer to EP-MW-114-100,                     &deg;  Locate and Open, EP-MW-MWROG Offsite Notifications, to                114-100, MWROG Offsite complete NARS form.                            Notifications, Section 4.2, to complete NARS form.
-MW-114-100, MWROG Offsite Notifications, to complete NARS form.
Note: Step 4 may be performed at any time.
Note:  Step 4 may be performed at any time. Locate and Open, EP
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-MW-114-100, MWROG Offsite Notifications, Section 4.
2, to complete NARS form.


SA-4 (from S01 6 t - rev 4)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SA-4 (from S016t - rev 4)
ELEMEN T SAT STANDARD UNSAT Comment Number NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has demonstrated the ability to obtain the information from the computer or from the main control board. *5. Fill out NARS form according to instructions, EP-MW-114-100, Section 4.
Comment ELEMENT                                      STANDARD                  SAT   UNSAT Number NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has demonstrated the ability to obtain the information from the computer or from the main control board.
2, Completing the NARS Form.
*5. Fill out NARS form according to
* Fill out NARS form instructions, EP-MW-114-100,                    according to instructions, Section 4.2, Completing the                     EP-MW-114-100, Section NARS Form.                                      4.2 Completing the NARS Form.
Cue: The wind direction on AM004
* BLOCKS 2 thru 9 must be is 286&deg;.                                        filled correctly to meet the critical portion of filling out Cue: The wind speed on AM001 is                      the NARS form. (See 3 mph.                                          attached KEY).
Time to complete NARS Form =                      &#xa2; < 12 minutes
________ minutes RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Cue:  The wind direction on AM004 is 286. Cue:  The wind speed on AM001 is 3 mph. Fill out NARS form according to instructions, EP-MW-114-100, Section 4.2 Completing the NARS Form. BLOCKS 2 thru 9 must be filled correctly to meet the critical portion of filling out the NARS form. (See attached KEY).
S016t - rev 4 Nuclear Accident Reporting System (NARS) Form UTILITY MESSAGE NO. ____1___                                                                    STATE MESSAGE NO. ____N/A_
Time to complete NARS Form  = ________ minutes
: 1. STATUS                            2. STATION
&#xa2; < 1 2 minutes        RECORD STOP TIME
[A] ACTUAL                             [A] BRAIDWOOD [C] CLINTON                       [E] LASALLE                   [G] ZION
:
[X] DRILL/EXERCISE                    [X] BYRON               [D] DRESDEN           [F] QUAD CITIES
S016t - rev 4 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 3. ONSITE CONDITION                                  4. ACCIDENT CLASSIFIED                      ACCIDENT TERMINATED
Nuclear Accident Reporting System (NARS) Form UTILITY MESSAGE NO. ____
[A] UNUSUAL EVENT                                     TIME (3[A-E]): Now                    TIME (3[F]): N/A
1___ STATE MESSAGE NO. ___
[B] ALERT                                             DATE (3[A-E]): Today                  DATE (3[F]):N/A
_N/A 1. _ [A] ACTUAL STATUS [X] DRILL/EXERCISE
[X] SITE AREA EMERGENCY                               EAL#: FS1
: 2.  [A] BRAIDWOOD
[C] CLINTON
[E] LASALLE
[G] ZION STATION  [X] BYRON [D] DRESDEN
[F] QUAD CITIES
: 3. [A] UNUSUAL EVENT ONSITE CONDITION
[B] ALERT [X] SITE AREA EMERGENCY
[D] GENERAL EMERGENCY
[D] GENERAL EMERGENCY
[E] RECOVERY
[E] RECOVERY
[F] TERMINATED
[F] TERMINATED
: 4. ACCIDENT CLASSIFIED TIME (3[A-E]): ACCIDENT TERMINATED Now  TIME (3[F]): DATE (3[A-E]): N/A  Today  DATE (3[F]):EAL#: N/A  5. F S 1  [X] NONE RELEASE STATUS
: 5. RELEASE STATUS 6. TYPE OF RELEASE                                     7. WIND DIR              8. WIND SPEED
[B] OCCURRING [C] TERMINATED
[X] NONE                            [X] NOT APPLICABLE                  286&deg;                     [A] METERS/SEC.: _
: 6. [X] NOT APPLICABLE TYPE OF RELEASE
[B] OCCURRING                        [B] GASEOUS                        (DEGREES FROM)            [X] MILES/HR.: ___3
[B] GASEOUS [C] LIQUID 7. WIND DIR (DEGREES FROM) 286&deg; 8. [A] METERS/SEC.: WIND SPEED
[C] TERMINATED                      [C] LIQUID
[X] MILES/HR.:
: 9. RECOMMENDED ACTIONS UTILITY RECOMMENDATION
___ _  9. UTILITY RECOMMENDATION RECOMMENDED ACTIONS
[X NONE (UE, Alert and SAE Only)
[X NONE (UE, Alert and SAE Only)
  --------------------------------
    -------------------------------------------------------------- (GE Only) -----------------------------------------------------------------
------------------------------
[B] SHELTER ILLINOIS SUB-AREAS:
(GE Only)  
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
--------------------------------
[C] SHELTER IOWA SUB-AREAS:
--------------------------------
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
[B] SHELTER ILLINOIS SUB-AREAS:   AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
[D] EVACUATE ILLINOIS SUB-AREAS:
[C] SHELTER IOWA SUB-AREAS:   AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
[D] EVACUATE ILLINOIS SUB
[E] EVACUATE IOWA SUB-AREAS:
-AREAS:   AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS STATE RECOMMENDATION
[E] EVACUATE IOWA SUB
[F] NONE
-AREAS:   AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS STATE RECOMMENDATION
[G] SHELTER SUB-AREAS:
[F] NONE [G] SHELTER SUB
[H] EVACUATE SUB-AREAS:
-AREAS:   [H] EVACUATE SUB
[I] RECOMMEND POTASSIUM IODIDE (KI) PER PROCEDURES
-AREAS:   [I] RECOMMEND POTASSIUM IODIDE (KI) PER PROCEDURES
[J] COMMENCE RETURN OF PUBLIC
[J] COMMENCE RETURN OF PUBLIC
[K] OTHER   10. ADDITIONAL INFORMATION       None Verified With:
[K] OTHER
STA Approved By:
: 10. ADDITIONAL INFORMATION                       None Verified With: STA                                                       Approved By: SRO
: 11. TRANSMITTED BY:
: 11. TRANSMITTED BY:                   NAME                             PHONE NUMBER                           TIME/DATE
SRO  NAME PHONE NUMBER
[A] EXELON:
[A] EXELON:
TIME/DATE [B] STATE:
[B] STATE:
[C] COUNTY:
[C] COUNTY:
: 12. RECEIVED BY:
: 12. RECEIVED BY:               NAME                                     ORGANIZATION                           TIME/DATE SRRS: 3D.105 (when utilized for operator initial or continuing training)
NAME ORGANIZATION TIME/DATE S016t - rev 4  SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Nuclear Accident Reporting System (NARS) Form Braidwood (UE, Alert, SAE, escalated GE(s), Termination and Recovery)
S016t - rev 4 Nuclear Accident Reporting System (NARS) Form Braidwood (UE, Alert, SAE, escalated GE(s),
NARS Code 20 Initial                 # Illinois EMA Final         Illinois REAC (Only if NARS #1 is a GE)
ROLL CALL                                LaSalle (UE, Alert, SAE, escalated GE(s),
NARS Code 38 Initial      # Illinois EMA Final      # Grundy Co. Sheriff
Termination and Recovery)              Initial Roll Call Complete:              Termination and Recovery)
    # Kankakee Co. Sheriff
NARS Code 20                                                                    NARS Code 20 Initial                       Final                           (time / date)       Initial                        Final
      # Will County Sheriff Illinois REAC Grundy Co. EMA Kankakee Co. EOC Will Co. EOC ROLL CALL Initial Roll Call Complete:
            # Illinois EMA                                                                   # Illinois EMA Illinois REAC                                                                    Illinois REAC Clinton UE, Alert, SAE, escalated GE(s),
(time / date)
(Only if NARS #1 is a GE)                                                        (Only if NARS #1 is a GE)
LaSalle (UE, Alert, SAE, escalated GE(s), Termination and Recovery)
Termination and Recovery)
NARS Code 20 Initial        # Illinois EMA Final        Illinois REAC (Only if NARS #1 is a GE)
NARS Code 38                                                                    NARS Code 25 NARS Code 98 Initial                        Final                                              Initial                       Final Initial                        Final
NARS Code 25 Initial       # Illinois EMA Final  # Grundy Co. Sheriff
          # Illinois EMA                                                                    # Illinois EMA
    # LaSalle Co. Sheriff Illinois REAC Grundy Co. EMA LaSalle Co. ESDA Clinton UE, Alert, SAE, escalated GE(s), Termination and Recovery)
                                                        # Illinois EMA
NARS Code 98 Initial        # Illinois EM A  Final        Illinois REAC (Only if NARS #1 is a GE)
                                                                                        # Grundy Co. Sheriff
NARS Code 36 Initial       # Illinois EMA Final        # DeWitt Co. Sheriff Illinois REAC DeWitt Co. EOC Byron (UE, Alert, SAE, escalated GE(s), Termination and Recovery) NARS Code 20 Initial   # Illinois EMA Final    Illinois REAC (Only if NARS #1 is a GE)
        # Grundy Co. Sheriff                           Illinois REAC                   # LaSalle Co. Sheriff
NARS Code 37 Initial    #Illinois EMA Final  **Ogle Co. Sheriff
      # Kankakee Co. Sheriff                                                                Illinois REAC (Only if NARS #1 is a GE)             Grundy Co. EMA
    **Rochelle Poli ce    Illinois REAC Ogle Co. ESDA Ogle Co. EOC Dresden (UE, Alert, SAE, escalated GE(s), Termination and Recovery) NARS Code 2 0 Initial   # Illinois EMA Final   Illinois REAC (Only   if NARS #1 is a GE)
      # Will County Sheriff NARS Code 36                 LaSalle Co. ESDA Illinois REAC                    Initial                         Final Grundy Co. EMA                              # Illinois EMA Kankakee Co. EOC                              # DeWitt Co. Sheriff Will Co. EOC                                Illinois REAC DeWitt Co. EOC Byron                                       Dresden                          Quad Cities (UE, Alert, SAE, escalated                  (UE, Alert, SAE, escalated            (UE, Alert, SAE, escalated GE(s), Termination and                       GE(s), Termination and                GE(s), Termination and Recovery)                                    Recovery)                             Recovery)
NARS Code 22 Initial    #Illinois EMA Final    #Grundy Co. Sheriff
NARS Code 20                                  NARS Code 20                       NARS Code 43 Initial                         Final        Initial                      Final  Initial                        Final
    #Kendall Co. Sheriff
      # Illinois EMA                               # Illinois EMA                        # Illinois EMA Illinois REAC                        # Iowa EMD Illinois REAC Illinois REAC Scott Co. Sheriff (Only if NARS #1 is a GE)                                                       Clinton Co. EOC NARS Code 37               (Only if NARS #1 is a GE)
    #Will County Sheriff Illinois REAC Grundy Co. EMA Kendall Co. EOC Will Co. EOC Quad Cities (UE, Alert, SAE, escalated GE(s), Termination and Recovery) NARS Code 43 Initial    # Illinois EMA Final    # Iowa EMD Illinois REAC Scott Co. Sheriff Clinton Co. EOC Scott Co. EOC                     (Only if NARS #1 is a GE)
NARS Code 22                Scott Co. EOC Initial                         Final
NARS Code 23 Initial    # Illinois EMA Final    # Iowa EMD
      #Illinois EMA                         Initial                      Final
    # Clinton Co. EOC
                                                  #Illinois EMA                          (Only if NARS #1 is a GE)
    #Rock Island Co. Sheriff
    **Ogle Co. Sheriff                                                                          NARS Code 23
    # Whiteside Co. Sheriff
                                                  #Grundy Co. Sheriff
    # Scott Co. Sheriff
      **Rochelle Police                                                            Initial                        Final
    # Scott Co. EOC Whiteside Co. ESDA Rock Island ESDA Illinois REAC Commercial numbers:
                                                  #Kendall Co. Sheriff                 # Illinois EMA Illinois REAC
(QC only) IEMA 217-782-7860 Iowa EMD 515-281-3231 NOTES: # Indicates that this agency is required to be notified within 15 minutes.
                                                  #Will County Sheriff                 # Iowa EMD Ogle Co. ESDA Illinois REAC                         # Clinton Co. EOC Ogle Co. EOC Grundy Co. EMA                        #Rock Island Co. Sheriff Commercial numbers:                        Kendall Co. EOC                      # Whiteside Co. Sheriff IEMA                  217-782-7860                Will Co. EOC                          # Scott Co. Sheriff (QC only)                                                                                # Scott Co. EOC Iowa EMD              515-281-3231                                                      Whiteside Co. ESDA Rock Island ESDA Illinois REAC NOTES: # Indicates that this agency is required to be notified within 15 minutes.
  ** Only one needs to answer for notification.
                ** Only one needs to answer for notification.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


S016t - rev 4 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S016t - rev 4 JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
JPM Number:
==Title:==
Classify Event and Fill Out a NARS Form (LOCA) S01 6 t Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
4 K/A Number and Importance:
==Title:==
S-ZP-008   CLASSIFY/RECLASSIFY Emergency Action Levels.
Classify Event and Fill Out a NARS Form (LOCA)
Suggested Testing Environment: 2.4.41   4.6 Alternate Path:
JPM Number: S016t                                    Revision Number: 4 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Simulator Reference(s):
==Title:==
EP-MW-114-100 (Rev 11), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. F) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 (Rev 2 8) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS
S-ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels.
(*) 2 & 5 Actual Testing Environment:
K/A Number and Importance: 2.4.41 4.6 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
Simulator Control Room In-Plant Other Testing Method:
EP-MW-114-100 (Rev 11), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. F) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 (Rev 28) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS (*) 2 & 5 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                        Actual Time Used:            minutes EVALUATION
Simulate Perform Estimated Time to Complete:
15EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                     Evaluator's Name
 
:   (Print) Evaluator's Signature
S016t - rev 4 INITIAL CONDITIONS
:   Date:
: 1.     You are the Shift Emergency Director.
S016t - rev 4  SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 2.     The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.
INITIAL CONDITIONS
: 1. You are the Shift Emergency Director.
: 2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.
INITIATING CUE
INITIATING CUE
: 1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
: 1.     Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
: 2. This is a time critical JPM
: 2.     This is a time critical JPM.
. PLANT CONDITIONS Unit 1 and 2 were both at full power.
PLANT CONDITIONS
A Unit 1 Reactor Trip and Safety Injection occurred based on the following conditions:
* Unit 1 and 2 were both at full power.
A large break Loss of Primary Coolant Containment Spray pumps did not automatically start and could NOT be manually started.
* A Unit 1 Reactor Trip and Safety Injection occurred based on the following conditions:
Containment pressure peaked at 29 psig.
* A large break Loss of Primary Coolant
* Containment Spray pumps did not automatically start and could NOT be manually started.
* Containment pressure peaked at 29 psig.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Perform Moveable Control Assemblies Quarterly Surveillance JPM Number:
CR-A Revision Number:
10 Date:  10/20/2011  Revised By: Bill Hochstetter Instructor Date 10/20/11  Reviewed By:
Rob Friskey 11/06/201 Operations Representative Date 1  Approved By:
Rob Lawlor Facility Representative Date 11/06/2011


CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Perform Moveable Control Assemblies Quarterly Surveillance JPM Number: CR-A Revision Number: 10 Date: 10/20/2011 Revised By:              Bill Hochstetter                10/20/11 Instructor            Date Reviewed By:            Rob Friskey                      11/06/2011 Operations Representative        Date Approved By:            Rob Lawlor                      11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
 
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
CR-A (from N rev 9)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other) 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 6. Task standards identified and verified by SME review.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure 1BOSR 1.4.2
Procedure 1BOSR 1.4.2-1           Rev: 17 Procedure Rev:
-1       Rev: 17 9. Verify cues both verbal and visual are free of conflict.
Procedure                        Rev:
Procedure  Rev:
: 9. Verify cues both verbal and visual are free of conflict.
Procedure        Rev: 10. Verify performance time is accurate
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Bill Hochstetter (Signature on file)
Bill Hochstetter (Signature on file)                   10/20/11 SME / Instructor                              Date x                                                              x SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor Date  10/20/11 x
 
SME / Instructor Date         x CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-A (from N rev 9)
Revision Record (Summary)
Revision Record (Summary)
Applied new template TQ
Revision 10 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor.
-JA-150-02 Rev.1 Revision 10  Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor
Placed some examiner notes concerning alarms received during step performance Created from JPM No. N-41 Changed to Alt. Path based on NRC request SRRS: 3D.105 (when utilized for operator initial or continuing training)
. Placed some examiner notes concerning alarms received during step performance Created from JPM No. N
-41 Changed to Alt. Path based on NRC request


CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-A (from N rev 9)
SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset to IC-22 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Insert Malfunction RD05F08 prior to running this JPM to fail rod F-08 when it steps to 222 steps.
: 2. Insert Malfunction RD05F08 prior to running this JPM to fail rod F-08 when it steps to 222 steps.
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 4. This completes the setup for this JPM CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
: 4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
CR-A (from N rev 9)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 NSO.
: 1. You are the Unit 1 NSO.
: 2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL INITIATING CUE
: 2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL INITIATING CUE
: 1. You have been directed to perform a partial surveillance of 1BOSR 1.4.2
: 1.     You have been directed to perform a partial surveillance of 1BOSR 1.4.2-1, Moveable Control Assemblies Quarterly Surveillance. You are to perform the surveillance on SD Bank E and Control Banks A through D.
-1, Moveable Control Assemblies Quarterly Surveillance.
You are to perform the surveillance on SD Bank E and Control Banks A through D.
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-A (from N rev 9)
RECORD START TIME:
RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee
Comment ELEMENT                                       STANDARD              SAT   UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN
: 1. Refer to 1BOSR 1.4.2
: 1. Refer to 1BOSR 1.4.2-1, Moveable                   1BOSR 1.4.2-1 Control Assemblies Quarterly Surveillance Note: Step 1 may be performed at any time Cue: All prerequisites are met NOTE Provide the examinee with a copy of the 1BOSR 1.4.2-1.
-1, Moveable Control Assemblies Quarterly Surveillance Note: Step 1 may be performed at any time Cue: LOCATE and OPEN 1BOSR 1.4.2
: 2. Transfer rod control to manual                 At 1PM05J:
-1 All prerequisites are met NOTE Provide the examinee with a copy of the 1BOSR 1.4.2
PLACE Rod Bank Selector switch to MANUAL
-1. 2. Transfer rod control to manual At 1PM05J:
                                                    &deg;  MAINTAIN Tave matched with Tref using rod motion control In column 2a:
PLACE Rod Bank Selector switch to MANUAL MAINTAIN Tave matched with Tref using rod motion control   3. Record initial shutdown bank step counter readi ngs   In column 2a:
: 3. Record initial shutdown bank step counter readings
                                                    &deg;   ENTER initial step counter readings for Shutdown Bank E
*4. Shutdown bank E                                  At 1PM05J:
* SELECT SBE position on Rod Bank Selector switch SRRS: 3D.105 (when utilized for operator initial or continuing training)


ENTER initial step counter readings for Shutdown Bank E    *4. Shutdown bank E At 1PM05J:
CR-A (from N rev 9)
SELECT SBE position on Rod Bank Selector switch CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment ELEMENT                                       STANDARD            SAT   UNSAT Number
ELEMENT SAT STANDARD UNSAT Comment Number *5. Insert Shutdown Bank E 1 step At 1PM05J:
*5. Insert Shutdown Bank E 1 step                   At 1PM05J:
Using the rod motion control switch, INSERT Shutdown Bank E 1 step
* Using the rod motion control switch, INSERT Shutdown Bank E 1 step
    *6. Withdraw shutdown bank E At 1PM05J:
*6. Withdraw shutdown bank E                         At 1PM05J:
Using the rod motion control switch, WITHDRAW Shutdown Bank E to 231 steps
* Using the rod motion control switch, WITHDRAW Shutdown Bank E to 231 steps
: 7. DRPI indication At 1PM05J:
: 7. DRPI indication                               At 1PM05J:
VERIFY DRPI indicates 228 steps withdrawn NOTE Annunciator 1 A7 ROD DEV POWER RNG TILT, will alarm during performance of step 8
                                                    &deg; VERIFY DRPI indicates 228 steps withdrawn NOTE Annunciator 1-10-A7 ROD DEV POWER RNG TILT, will alarm during performance of step 8
  *8. Insert shutdown bank E At 1PM05J:
*8. Insert shutdown bank E                           At 1PM05J:
Using the rod motion control switch, INSERT Shutdown Bank E 10 to 15 steps   9. Record step counter readings In column 2g:
* Using the rod motion control switch, INSERT Shutdown Bank E 10 to 15 steps
RECORD shutdown bank E step counter reading
: 9. Record step counter readings                     In column 2g:
: 10. Shutdown bank E DRPI In column 2h:
                                                    &deg;      RECORD shutdown bank E step counter reading In column 2h:
VERIFY each rod in shutdown bank E moved 10  
: 10. Shutdown bank E DRPI
- 15 steps using DRPI and INITIAL   *11. Return rods to initial position
                                                    &deg;    VERIFY each rod in shutdown bank E moved 10 -
15 steps using DRPI and INITIAL
*11. Return rods to initial position                 At 1PM05J:
* WITHDRAW shutdown bank E rods to 228 steps SRRS: 3D.105 (when utilized for operator initial or continuing training)


At 1PM05J:
CR-A (from N rev 9)
WITHDRAW shutdown bank E rods to 228 steps
Comment ELEMENT                                        STANDARD              SAT    UNSAT Number
: 12. Final shutdown bank E position                  In column 2j:
                                                    &deg;    RECORD final shutdown bank E position
: 13. Final shutdown bank E DRPI                      In column 2k:
                                                    &deg;      VERIFY each rod in shutdown bank E is restored to original position and INITIAL NOTE The steps for Shutdown Banks A, B, C, and D will not be performed. The examinee should go to the next step that addresses control banks.
: 14. Record initial control rod bank step counter readings In column 3a:
                                                    &deg;    ENTER initial step counter readings for Control Banks A, B, C, and D
*15. Control bank A                                  At 1PM05J:
* SELECT CBA position on Rod Bank Selector switch
*16. Insert Control Bank A 1 step                At 1PM05J:
* Using the rod motion control switch, INSERT Control Bank A 1 step
*17. Withdraw control bank A                        At 1PM05J:
* Using the rod motion control switch, WITHDRAW Control Bank A to 231 steps SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
CR-A (from N rev 9)
Comment ELEMENT                                        STANDARD              SAT    UNSAT Number NOTE The following Annunciators will alarm during the performance of step 18 1-10-A6 ROD BANK LO-2 INSERTION LIMIT, 1-10-A7 ROD DEV POWER RNG TILT, and 1-10-B6 ROD BANK LO INSERTION LIMIT NOTE Alternate Path starts HERE
*18. Insert control bank A                        At 1PM05J:
* Using the rod motion control switch, INSERT Control Bank A 10 to 15 steps NOTE The examinee may notice that DRPI for Rod F-8 stayed at 222 steps while the rest of the Bank continued to 216 steps, depending on how far the candidate inserts rods.
If the above occurs, then, the examinee should Notify the Unit Sup. and the evaluator should go to step 24.
: 19. Record step counter readings      In column 3f:
                                                    &deg;      RECORD control rod bank A step counter readings for both groups 1 and 2 In column 3g:
: 20. Control bank A DRPI
                                                    &deg;      VERIFY each rod in control bank A moved 10 - 15 steps using DRPI and INITIAL (DRPI will not change by 2 LEDs for the failed rod)
*21. Return rods to initial position                At 1PM05J:
* WITHDRAW control bank A to original position
: 22. Final control rod bank A position            In column 3i:
                                                    &deg;    RECORD final control bank A position SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-A (from N rev 9)
ELEMENT SAT STANDARD UNSAT Comment Number 12. Final shutdown bank E position In column 2j:
Comment ELEMENT                                       STANDARD                SAT   UNSAT Number
RECORD final shutdown bank E position
*23. Final control bank A DRPI                    In column 3j:
: 13. Final shutdown bank E DRPI
* VERIFY each rod in NOTE: Examinee should note F-08                            control bank A is at its DRPI does not agree with other rods                        original position in that Group
*24    Notifies Unit Supervisor
* Notify Unit Supervisor of failure of Rod F-08 to withdraw Cue: (if required) This JPM is completed RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


In column 2k:
CR-A (from N-41 R9)
VERIFY each rod in shutdown bank E is restored to original position and INITIAL NOTE The steps for Shutdown Banks A, B, C, and D will not be performed. The examinee should go to the next step that addresses control banks
JPM
. 14. Record initial control rod bank step counter readings In column 3a:
ENTER initial step counter readings for Control Banks A, B, C, and D    *15. Control bank A At 1PM05J:
SELECT CBA position on Rod Bank Selector switch
    *16. Insert Control Bank A 1 step At 1PM05J:
Using the rod motion control switch, INSERT Control Bank A 1 step
    *17. Withdraw control bank A At 1PM05J:
Using the rod motion control switch, WITHDRAW Control Bank A to 231 steps


CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
==SUMMARY==
ELEMENT SAT STANDARD UNSAT Comment Number  NOTE The following Annunciators will alarm during the performance of step 18 1-10-A6 ROD BANK LO
-2 INSERTION LIMIT, 1-10-A7 ROD DEV POWER RNG TILT, and 1-10-B6 ROD BANK LO INSERTION LIMIT Alternate Path starts HERE NOTE *18. Insert control bank A


At 1PM05J:
Operators Name:                                                 Job
Using the rod motion control switch, INSERT Control Bank A 10 to 15 steps NOTE The examinee may notice that DRPI for Rod F-8 stayed at 222 steps while the rest of the Bank continued to 216 steps, depending on how far the candidate inserts rods.
If the above occurs, then, the examinee should Notify the Unit Sup. and the evaluator should go to step 24.
: 19. Record step counter readings In column 3f:
RECORD control rod bank A step counter readings for both groups 1 and 2
: 20. Control bank A DRPI In column 3g:
VERIFY each rod in control bank A moved 10
- 15 steps using DRPI and INITIAL (DRPI will not change by 2 LEDs for the failed rod)
    *21. Return rods to initial position At 1PM05J:
WITHDRAW control bank A to original position
: 22. Final control rod bank A position In column 3i:
RECORD final control bank A position


CR-A (from N rev 9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
==Title:==
ELEMENT SAT STANDARD UNSAT Comment Number *23. Final control bank A DRPI NOTE: Examinee should note F
EO        RO      SRO      FS STA/IA          SRO Cert JPM
-08 DRPI does not agree with other rods in that Group In column 3j:
VERIFY each rod in control bank A is at its original position
    *24    Notifies Unit Supervisor Notify Unit Supervisor of failure of Rod F
-08 to withdraw    Cue: (if required)
This JPM is completed      RECORD STOP TIME
:
CR-A (from N-41 R9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==Title:==
Moveable Control Assemblies Quarterly Surveillance JPM Number: CR-A                                    Revision Number: 10 Task Number and


Operator's Name
==Title:==
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
4C.RD-01 PERFORM Control Rod Exercises K/A Number and Importance:           014A4.02 3.4/3.2 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
JPM Number:
1BOSR 1.4.2 Moveable Control Assemblies Quarterly Surveillance CRITICAL STEPS (*) 4, 5, 6, 8, 11, 15, 16, 17, 18 & 21, 23 and 24 (21 and 23 may not be performed if failure is noted during inward rod motion).
Moveable Control Assemblies Quarterly Surveillance CR-A Revision Number:
Actual Testing Environment:             Simulator             Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 23 minutes                        Actual Time Used:            minutes EVALUATION
Task Number and Title:
10 4C.RD-01   K/A Number and Importance:
PERFORM Control Rod Exercises Suggested Testing Environment:
014A4.02   3.4/3.2 Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Simulator Reference(s):
1BOSR 1.4.2 Moveable Control Assemblies Quarterly Surveillance CRITICAL STEPS
(*) 4, 5, 6, 8, 11, 15, 16, 17, 18 & 21, 23 and 24 (21 and 23 may not be performed if failure is noted during inward rod motion).
Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
23EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                     Evaluator's Name
 
:   (Print) Evaluator's Signature
CR-A (from N-41 R9)
:   Date:
CR-A (from N-41 R9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 NSO.
: 1.     You are the Unit 1 NSO.
: 2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL INITIATING CUE
: 2.     Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL INITIATING CUE
: 1. You have been directed to perform a partial surveillance of 1BOSR 1.4.2
: 1.       You have been directed to perform a partial surveillance of 1BOSR 1.4.2-1, Moveable Control Assemblies Quarterly Surveillance. You are to perform the surveillance on SD Bank E and Control Banks A through D.
-1, Moveable Control Assemblies Quarterly Surveillance. You are to perform the surveillance on SD Bank E and Control Banks A through D.
.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Raise Accumulator Level With SI Pump JPM Number:
 
CR-b Revision Number:
Exelon Nuclear Job Performance Measure Raise Accumulator Level With SI Pump JPM Number: CR-b Revision Number: 0 Date: 10/21/2011 Revised By:             Bill Hochstetter                 10/20/11 Instructor            Date Reviewed By:             Rob Friskey                     11/06/2011 Operations Representative        Date Approved By:             Rob Lawlor                       11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
0 Date: 10/21/2011 Revised By: Bill Hochstetter Instructor Date 10/20/11   Reviewed By:
Rob Friskey Operations Representative Date 11/06/2011 Approved By:
Rob Lawlor Facility Representative Date 11/06/2011


CR-b (from N rev 6 modified for alternate path)
CR-b (from N rev 6 modified for alternate path)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using step s 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 1,320: Line 1,299:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BOP SI-22       Rev: 10 9. Procedure       Rev: Procedure        Rev: 10. Verify cues both verbal and visual are free of conflict.
Procedure BOP SI-22               Rev: 10 Procedure                        Rev:
: 11. Verify performance time is accurat e 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 9. Procedure                         Rev:
: 10. Verify cues both verbal and visual are free of conflict.
: 11. Verify performance time is accurate
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Bill Hochstetter (Signature on file)                           SME / Instructor Date  10/21/11 x
Bill Hochstetter (Signature on file)                   10/21/11 SME / Instructor                              Date x                                                              x SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor Date         x CR-b (from N rev 6 modified for alternate path)
 
CR-b (from N rev 6 modified for alternate path)
Revision Record (Summary)
Revision 0 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor,. Created from JPM No. N-73 Changed NLO to EO
 
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
Applied new template TQ
-JA-150-02 Rev.1 Revision 0  Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor,. Created from JPM No. N
-73  Changed NLO to EO


CR-b (from N rev 6 modified for alternate path)
CR-b (from N rev 6 modified for alternate path)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC
: 1. Reset to IC-22 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Set C accumulator level to 30% by:
: 2. Set "C" accumulator level to 30% by:
set SIMACC(3)= 58065 set SIMN2ACC93)= 1290
set SIMACC(3)= 58065 set SIMN2ACC93)= 1290
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 4. This completes the setup for this JPM
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
: 4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-b (from N rev 6 modified for alternate path)
CR-b (from N rev 6 modified for alternate path)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Extra NSO. 2. Unit 1 is at full power, steady state, equilibrium Xenon, MOL
: 1. You are the Extra NSO.
: 3. All plant systems and controls are normal INITIATING CUE
: 2.     Unit 1 is at full power, steady state, equilibrium Xenon, MOL
: 3.     All plant systems and controls are normal INITIATING CUE
: 1. The chemistry department left accumulator 1C sample valve open after sampling, resulting in a low level of 30%.
: 1. The chemistry department left accumulator 1C sample valve open after sampling, resulting in a low level of 30%.
: 2. The sample valve has been closed, and the lineup returned to normal.
: 2. The sample valve has been closed, and the lineup returned to normal.
Line 1,351: Line 1,332:
: 5. 1B SI pump is OPERABLE
: 5. 1B SI pump is OPERABLE
: 6. The US has directed you to return the accumulator level to the normal band using the 1A SI pump.
: 6. The US has directed you to return the accumulator level to the normal band using the 1A SI pump.
: 7. An EO is standing by the 1A SI pp with a copy of BOP SI
: 7. An EO is standing by the 1A SI pp with a copy of BOP SI-1T1 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
-1T1   Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-b (from N rev 6 modified for alternate path)
CR-b (from N rev 6 modified for alternate path)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
RECORD START TIME:
RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee
Comment ELEMENT                                       STANDARD                SAT   UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN BOP
: 1. Refer to BOP SI
: 1. Refer to BOP SI-22, Raising SI                         SI-22 Accumulator Level in Mode 1, 2 or 3 Note: Step 1 may be performed at any time.
-22, Raising SI Accumulator Level in Mode 1, 2 or 3 Note: Step 1 may be performed at any time. LOCATE and OPEN BOP SI-22      2. VERIFY the following NOT discharging to applicable RWST Cue: Cue: The Field Supervisor/WEC reports the purification pumps are not discharging to the RWST The Field Supervisor/WEC reports the RWST heating pump is not discharging to the RWST Cue: Note: Examinee checks 1CS01PA/B 'GREEN' lights are LIT The Field Supervisor/WEC reports that the SFP demineralizer is not discharging to the RWST
Verify nothing discharging to
: 2. VERIFY the following NOT RWST:
discharging to applicable RWST
                                                    &deg;    0FC03PA/B, 0A/B refueling Cue: The Field Supervisor/WEC reports the purification pumps are                       water purification pumps not discharging to the RWST                         &deg;    1SI03P, RWST heating pump (May mark N/A per Cue: The Field Supervisor/WEC                             NOTE) reports the RWST heating pump is not discharging to the RWST                               1RE01PA/B, RCDT pump
                                                    &deg; A/B Cue: The Field Supervisor/WEC reports that the SFP demineralizer is               &deg;    1FC01D, spent fuel pit not discharging to the RWST                               demineralizer effluents Note: Examinee checks 1CS01PA/B GREEN lights are LIT                              &deg;    1CS01PA/B, CS pump A/B Cue: Makeup from BA blender not aligned to RWST:                                    &deg;    RWST makeup from BA blender SRRS: 3D.105 (when utilized for operator initial or continuing training)


Cue: Makeup from BA blender not aligned to RWSTVerify nothing discharging to RWST: : &deg; 0FC03PA/B, 0A/B refueling water purification pumps
CR-b (from N rev 6 modified for alternate path)
&deg;  1SI03P, RWST heating pump (May mark N/A per NOTE) &deg; 1RE01PA/B, RCDT pump A/B &deg;  1FC01D, spent fuel pit demineralizer effluents
Comment ELEMENT                                        STANDARD                SAT    UNSAT Number VERIFY/CLOSE:
&deg;  1CS01PA/B, CS pump A/B  &deg;  RWST makeup from BA blender CR-b (from N rev 6 modified for alternate path)
: 3. Align mini-flow path for 1A SI pump
* 1CV8804A (A pump)
                                                        &deg;   1SI8804B (B pump)
VERIFY/OPEN:
* 1SI8814 (A pump)
                                                        &deg; 1SI8920 (B pump)
* 1SI8813 (both pumps)
*4. Align SI pump to accumulator                    At 1PM06J VERIFY/OPEN: (both pumps)
* 1SI8806
* 1SI8923A
* 1SI8888
* 1SI8871
: 5. Verify SI to radwaste isolated                    At 1PM11J:
* VERIFY/CLOSE 1SI8964 (both pumps)
: 6. Verify SI pump isolated to hot legs            At 1PM06J:
VERIFY CLOSED and DEENERGIZED: (Both pumps)
* 1SI8802A
* 1SI8802B NOTE The procedure branches at this point dependent on the SI pump to be used. The intent of this JPM is to use the 1A SI pump, therefore the examinee should proceed to step F.7.b Cue: The SM directs that step F.7.a be omitted.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
ELEMENT SAT STANDARD UNSAT Comment Number 3. Align mini
-flow path for 1A SI pump VERIFY/CLOSE:
1CV8804A (A pump)  1SI8804B (B pump)


VERIFY/OPEN:
CR-b (from N rev 6 modified for alternate path)
1SI8814 (A pump) 1SI8920 (B pump) 1SI8813 (both pumps)   *4. Align SI pump to accumulator At 1PM06J VERIFY/OPEN:
Comment ELEMENT                                        STANDARD                  SAT    UNSAT Number NOTE The Examinee may elect to have an EO do a pre-start check of the 1A SI pump prior to starting.
(both pumps) 1SI8806  1SI8923A  1SI8888  1SI8871   5. Verify SI to radwaste isolated
Cue: (if asked): The 1A SI pump is ready for a start and I am clear of the pump
 
*7. Start the 1A SI pump                          At 1PM06J:
At 1PM11J:
* Take 1A SI pump C/S to start
VERIFY/CLOSE 1SI8964  (both pumps)
* Ensure discharge CUE: The EO will perform the                              pressure does NOT applicable portions of BOP SI-                          exceed 1700 psig 1T1                                                  &deg; Initiate BOP SI-1T1 NOTE When the examinee fills the accumulator 1% to 2% above the low level alarm setpoint (alarm clears) provide the following cue:
: 6. Verify SI pump isolated to hot legs At 1 PM06 J:  VERIFY CLOSED and DEENERGIZED:
Cue: The desired accumulator level has been achieved.
(Both pumps) 1SI8802A  1SI8802B     NOTE The procedure branches at this point dependent on the SI pump to be used.
*8. Fill 1C Accumulator                          At 1PM06J:
The intent of this JPM is to use the 1A SI pump, therefore the examinee should proceed to step F.7.b Cu e: The SM directs that step F.7.a be omitted.
                                                    &deg;   Enter 1BOL 5.1 Cue:Unit 1 Unit Supervisor acknowledges entry into 1BOL
* OPEN 1SI8878C 5.1
*9. Stop filling accumulator                      At 1PM06J:
* CLOSE 1SI8878C when Cue: Unit 1 Unit Supervisor                              accumulator level is acknowledges exit BOL 5.1                                 between 31% and <63%
                                                    &deg;     Exit 1BOL 5.1
: 10. Stop the 1A SI pump                         At 1PM06J:
                                                    &deg;    STOP the 1A SI pump
: 11. Verify/Open 1SI8821A                        At 1PM06J:
                                                    &deg;        Verify/Open 1SI8821A SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-b (from N rev 6 modified for alternate path)
CR-b (from N rev 6 modified for alternate path)
Comment ELEMENT                                        STANDARD                  SAT    UNSAT Number
: 12. Isolate accumulator fill                    At 1PM06J:
                                                    &deg;    CLOSE 1SI8871 At 1PM011J:
: 13. Vent SI train to SI accumulators
                                                    &deg;      At 1PM11J, OPEN 1SI8964
                                                    &deg;      At 1PM06J, MONITOR SI pump discharge pressure At PM11J, CLOSE
                                                        &deg; 1SI8964
: 14. Isolate SI pump from accumulator            At 1PM06J:
                                                    &deg;  CLOSE 1SI8888
: 15. Notify chemistry to initiate 1BCSR              NOTIFY chemistry to initiate 5.1.5                                            1BCSR 5.1.5 per Tech Spec 3.5.1 Cue: Chemistry has been notified to initiate 1BCSR 5.1.5 Cue: This JPM is completed RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
ELEMENT SAT STANDARD UNSAT Comment Number  NOTE The Examinee may elect to have an EO do a pre
-start check of the 1A SI pump prior to starting. Cue: (if asked):
The 1A SI pump is ready for a start and I am clear of the pump
*7. Start the 1A SI pump    CUE: The EO will perform the applicable portions of BOP SI
-1T1 At 1PM 06 J:  Take 1A SI pump C/S to start  Ensure discharge pressure does NOT exceed 1700 psig Initiate BOP SI
-1T1    When the examinee fills the accumulator 1% to 2% above the low level alarm setpoint (alarm clears) provide the following cue:
NOTE  Cue:  The desired accumulator level has been achieved.
*8. Fill 1C Accumulator Cue: Unit 1 Unit Supervisor acknowledges entry into 1BOL 5.1 At 1PM06J:  &deg;  Enter 1BOL 5.1  OPEN 1SI8878C    *9. Stop filling accumulator Cue: At 1PM06J:  Unit 1 Unit Supervisor acknowledges exit  BOL 5.1    CLOSE 1SI8878C when accumulator level is between 31% and <63%
  &deg;  Exit 1BOL 5.1    10. Stop the 1A SI pump  At 1 PM 06 J:  &deg;  STOP the 1 A SI pump    11.      Verify/Open 1SI8821A At 1PM06J:
  &deg;  Verify/Open 1SI8821A


CR-b (from N rev 6 modified for alternate path)
CR-b (from N-73 R6)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
ELEMENT SAT STANDARD UNSAT Comment Number 12. Isolate accumulator fill At 1 PM 06 J:  &deg;  CLOSE 1SI8871    13. Vent SI train to SI accumulators At 1 PM011 J:  &deg;  At 1PM11J, OPEN 1SI8964 
&deg;  At 1PM06J, MONITOR SI pump discharge pressure
  &deg;  At PM11J, CLOSE 1SI8964    14. Isolate SI pump from accumulator At 1PM06J:  &deg;  CLOSE 1SI8888    15. Notify chemistry to initiate 1BCSR 5.1.5  Cue:  Chemistry has been notified to initiate 1BCSR 5.1.5 Cue: This JPM is completed NOTIFY chemistry to initiate 1BCSR 5.1.5 per Tech Spec 3.5.1 RECORD STOP TIME
:
CR-b (from N-73 R6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title: JPM Number:
 
Raise Accumulator Level With SI Pump CR-b Revision Number:
==Title:==
Task Number and Title:
EO         RO     SRO     FS STA/IA           SRO Cert JPM
00 4C.SI-02   FILL the SI System Accumulators K/A Number and Importance:
 
Suggested Testing Environment:
==Title:==
006A1.13   3.5/3.7 Alternate Path:
Raise Accumulator Level With SI Pump JPM Number: CR-b                                     Revision Number: 00 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Simulator Reference(s):
==Title:==
4C.SI-02 FILL the SI System Accumulators K/A Number and Importance:           006A1.13 3.5/3.7 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
BOP SI-22, Raising SI Accumulator Level in Modes 1,2 or 3 (Rev. 10)
BOP SI-22, Raising SI Accumulator Level in Modes 1,2 or 3 (Rev. 10)
CRITICAL STEPS
CRITICAL STEPS (*) 4, 7, 8, & 9 Actual Testing Environment:             Simulator             Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 23 minutes                        Actual Time Used:            minutes EVALUATION
(*) 4 , 7, 8, & 9 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
23EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minut es Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                     Evaluator's Name
 
:   (Print) Evaluator's Signature
CR-b (from N-73 R6)
:   Date:
CR-b (from N-73 R6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Extra NSO. 2. Unit 1 is at full power, steady state, equilibrium Xenon, MOL
: 1.     You are the Extra NSO.
: 3. All plant systems and controls are normal INITIATING CUE
: 2.       Unit 1 is at full power, steady state, equilibrium Xenon, MOL
: 3.       All plant systems and controls are normal INITIATING CUE
: 1. The chemistry department left accumulator 1C sample valve open after sampling, resulting in a low level of 30%.
: 1. The chemistry department left accumulator 1C sample valve open after sampling, resulting in a low level of 30%.
: 2. The sample valve has been closed, and the lineup returned to normal.
: 2. The sample valve has been closed, and the lineup returned to normal.
Line 1,442: Line 1,439:
: 4. U-1 RWST boron concentration is 2350 ppm.
: 4. U-1 RWST boron concentration is 2350 ppm.
: 5. 1B SI pump is OPERABLE
: 5. 1B SI pump is OPERABLE
: 6. The US has directed you to return the accumulator leve l to the normal band using the 1A SI pump.
: 6. The US has directed you to return the accumulator level to the normal band using the 1A SI pump.
: 7. An EO is standing by the 1A SI pp with a copy of BOP SI
: 7. An EO is standing by the 1A SI pp with a copy of BOP SI-1T1 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-1T1 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Exelon Nuclear Job Performance Measure Perform Transfer to Hot Leg Recirc JPM Number:
Exelon Nuclear Job Performance Measure Perform Transfer to Hot Leg Recirc JPM Number: CR-c Revision Number: 00 Date: 10/24/2011 Revised By:             Bill Hochstetter                 10/24/11 Instructor            Date Reviewed By:             Brian Lewin                     11/06/2011 Operations Representative        Date Approved By:             Rob Lawlor                       11/06/2011 Training Department        Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-c Revision Number:
00 Date: 10/24/2011 Revised By: Bill Hochstetter Instructor Date 10/24/11   Reviewed By:
Brian Lewin Operations Representative Date 11/06/2011 Approved By:
Rob Lawlor Training Department Date 11/06/2011


CR-c (from N-30 -revised to make "alternate path" rev 0)
CR-c (from N-30 -revised to make alternate path rev 0)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 an d 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 1,464: Line 1,456:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure 1BEP ES-1.4       Rev: 200 9. Verify cues both verbal and visual are free of conflict.
Procedure 1BEP ES-1.4             Rev: 200 Procedure Rev:
Procedure  Rev:
Procedure                        Rev:
Procedure        Rev: 10. Verify performance time is accurate
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Bill Hochstetter (Signature on file)
Bill Hochstetter (Signature on file)                   10/20/11 SME / Instructor                              Date x                                                              x SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor Date  10/20/11 x
 
SME / Instructor Date         x CR-c (from N-30 -revised to make "alternate path" rev 0)
CR-c (from N-30 -revised to make alternate path rev 0)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
Revision Record (Summary)
Applied new template TQ
Revision 0 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, revised to make alternate path Created from JPM No. N-30.
-JA-150-02 Rev.1 Revision 0  Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor , revised to make alternate path Created from JPM No. N
-30.  


CR-c (from N-30 -revised to make "alternate path" rev 0)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-c (from N-30 -revised to make alternate path rev 0)
SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC
: 1. Reset to IC-180 (LOCA and currently on Cold Leg Recirc)
-180 (LOCA and currently on Cold Leg Recirc)
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Turn annunciators to OFF.
: 2. Turn annunc iators to OFF
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
. 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 4. This completes the setup for this JPM
: 4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-c (from N-30 -revised to make "alternate path" rev 0)
CR-c (from N-30 -revised to make alternate path rev 0)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 NSO.
: 1. You are the Unit 1 NSO.
Line 1,495: Line 1,485:
: 4. 5 hours 50 minutes has elapsed since SI was actuated.
: 4. 5 hours 50 minutes has elapsed since SI was actuated.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to proceed with 1BEP ES
: 1.       The Unit Supervisor has directed you to proceed with 1BEP ES-1.4, Transfer to Hot Leg Recirculation.
-1.4, Transfer to Hot Leg Recirculation.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-c (from N-30 -revised to make "alternate path" rev 0)
CR-c (from N-30 -revised to make alternate path rev 0)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
RECORD START TIME:
RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number NOTE If this JPM is performed on the simulator, only the cues underlined1. Refer to 1BEP ES
Comment ELEMENT                                       STANDARD              SAT   UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee
-1.4, Transfer to Hot Leg Recirculation are required to be provided to the examinee Note: This step may be performed at any time. LOCATE and OPEN              1BEP ES-1.4      *2. Place SVAG Valve Bus Feeds to Close. At 1PM06J, CLOSE:
: 1. Refer to 1BEP ES-1.4, Transfer to           LOCATE and OPEN Hot Leg Recirculation                           1BEP ES-1.4 Note: This step may be performed at any time.
480V Feed to Bus 131X1A/X2A 480V Feed to Bus 132X2A/X4A
*2. Place SVAG Valve Bus Feeds to                   At 1PM06J, CLOSE:
    *3. Close RH to cold legs isol valves.
Close.
At 1PM06J, CLOSE:
* 480V Feed to Bus 131X1A/X2A
1SI8809A   1SI8809B   Alternate Path JPM starts here NOTE *4. Check 1A RH pump running.
* 480V Feed to Bus 132X2A/X4A
At 1PM06J:
*3. Close RH to cold legs isol valves.               At 1PM06J, CLOSE:
CHECK RHR pump 1A NOT RUNNING   *5 OPEN Train B RH HX discharge crosstie header valve At 1PM0 6 J:  OPEN 1RH8716B
* 1SI8809A
    *6. Open RH to hot legs isol valve.
* 1SI8809B NOTE Alternate Path JPM starts here
At 1PM06J:
*4. Check 1A RH pump running.         At 1PM06J:
OPEN 1SI8840
* CHECK RHR pump 1A NOT RUNNING
    *7. Stop SI pump 1A. At 1PM06J:
*5 OPEN Train B RH HX discharge                     At 1PM06J:
crosstie header valve
* OPEN 1RH8716B
*6. Open RH to hot legs isol valve.                 At 1PM06J:
* OPEN 1SI8840
*7. Stop SI pump 1A.                                 At 1PM06J:
STOP 1A SI pump
STOP 1A SI pump
    *8. Close SI pump 1A to cold legs isol valve. At 1PM06J:
*8. Close SI pump 1A to cold legs isol               At 1PM06J:
CLOSE 1SI8821A
valve.
* CLOSE 1SI8821A SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-c (from N-30 -revised to make "alternate path" rev 0)
CR-c (from N-30 -revised to make alternate path rev 0)
Comment ELEMENT                                        STANDARD              SAT    UNSAT Number
*9. Open SI pump 1A to hot legs isol                At 1PM06J:
valve.
* OPEN 1SI8802A
*10. Start the 1A SI pump.                          At 1PM06J:
* START 1A SI pump
*11. Stop SI pump 1B.                                At 1PM06J:
STOP 1B SI pump
*12. Close SI pump 1B to cold legs isol              At 1PM06J:
valve.
* CLOSE 1SI8821B
*13. Open SI pump 1B to hot legs isol                At 1PM06J:
valve.
* OPEN 1SI8802B
*14. Start the 1B SI pump.                        At 1PM06J:
* START 1B SI pump
: 15. Check SI pumps to hot legs isol              At 1PM06J, Verify OPEN valves open 1SI8802A 1SI8802B
: 16. Close SI pumps to cold leg isol                  At 1PM06J:
valve CLOSE 1SI8835
: 17. Place SVAG Valve Bus Feeds to                    At 1PM06J, TRIP TRIP.
480V Feed to Bus 131X1A/X2A 480V Feed to Bus 132X2A/X4A Cue: This JPM is completed RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
ELEMENT SAT STANDARD UNSAT Comment Number *9. Open SI pump 1A to hot legs isol valve. At 1PM06J:
 
OPEN 1SI8802A
CR-c (from N-30 R7)
    *10. Start the 1A SI pump.
At 1PM06J:
START 1A SI pump    *11. Stop SI pump 1B.
At 1PM06J:
STOP 1B SI pump
    *12. Close SI pump 1B to cold legs isol valve. At 1PM06J:
CLOSE 1SI8821B
    *13. Open SI pump 1B to hot legs isol valve. At 1PM06J:
OPEN 1SI8802B
    *14. Start the 1B SI pump.
At 1PM06J:
START 1B SI pump
: 15. Check SI pumps to hot legs isol valves open At 1PM06J, Verify OPEN 1SI8802A  1SI8802B    16. Close SI pumps to cold leg isol valve  At 1PM 06 J:  CLOSE 1SI8835
: 17. Place SVAG Valve Bus Feeds to TRIP. At 1PM 06J, TRIP  480V Feed to Bus 131X1A/X2A 480V Feed to Bus 132X2A/X4A Cue:  This JPM is completed RECORD STOP TIME
:
CR-c (from N-30 R7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
JPM Number:
==Title:==
Align ECCS to Hot Leg Recirc CR-c Revision Number:
EO         RO     SRO     FS STA/IA           SRO Cert JPM
Task Number and Title:
 
0 4D.EP-15   K/A Number and Importance:
==Title:==
TRANSFER ECCS to Hot Leg Recirculation Suggested Testing Environment:
Align ECCS to Hot Leg Recirc JPM Number: CR-c                                     Revision Number: 0 Task Number and
011EA1.11   4.2/4
 
.2 Alternate Path:
==Title:==
Yes No SRO Only: Yes No Time Critical:
4D.EP-15 TRANSFER ECCS to Hot Leg Recirculation K/A Number and Importance:           011EA1.11 4.2/4.2 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
Yes No Simulator Reference(s):
1BEP ES1.4, Transfer to Hot Leg Recirculation (Rev. 200)
1BEP ES1.4, Transfer to Hot Leg Recirculation (Rev. 200)
CRITICAL STEPS
CRITICAL STEPS (*) 2 through 14 Actual Testing Environment:             Simulator             Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 23 minutes                        Actual Time Used:            minutes EVALUATION
(*) 2 through 14 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perfor m Estimated Time to Complete:
23EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                     Evaluator's Name
 
:   (Print) Evaluator's Signature
CR-c (from N-30 R7)
:   Date:
CR-c (from N-30 R7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 NSO.
: 1.     You are the Unit 1 NSO.
: 2. A large LOCA is in progress.
: 2.     A large LOCA is in progress.
: 3. 1BEP-1 step 19 has been completed.
: 3.     1BEP-1 step 19 has been completed.
: 4. 5 hours 50 minutes has elapsed since SI was actuated.
: 4.     5 hours 50 minutes has elapsed since SI was actuated.
INITIATING CUE
INITIATING CUE
: 2. The Unit Supervisor has directed you to proceed with 1BEP ES
: 2.       The Unit Supervisor has directed you to proceed with 1BEP ES-1.4, Transfer to Hot Leg Recirculation.
-1.4, Transfer to Hot Leg Recirculation.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Respond To 1A SX Pump Trip (Standby Pump Does Not Start)
Page 1 of 11  Exelon Nuclear Job Performance Measure Respond To 1A SX Pump Trip (Standby Pump Does Not Start
JPM Number: CR-d Revision Number: 0 Date: 10/20/2011 Developed By:           Bill Hochstetter                 10/20/2011 Instructor              Date Validated By:               Mark Ristau                 11/06/2011 SME or Instructor           Date Approved By:                   Rob Lawlor
)
* 11/06/2011 Training Department            Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 11
JPM Number:
 
CR-d Revision Number:
CR-d from N130a rev 3 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
0 Date: 10/20/2011 Developed By: Bill Hochstetter Instructor Date 10/20/2011 Validated By:               Mark Ristau SME or Instructor Date 11/06/20 11    Approved By:                 Rob Lawlor
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
* Training Department Date  11/06/2011 CR-d from  N130a rev 3 Page 2 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 1,603: Line 1,593:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BAR 1-2-A1 Rev 4 9. Verify cues both verbal and visual are free of conflict.
Procedure BAR 1-2-A1 Rev 4
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date Lynn Sanders (Signature on File) 9/24/09   Brian Clark (Signature on File) 9/24/09   SME / Instructor Date CR-d from  N130a rev 3 Page 3 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Lynn Sanders (Signature on File)                         9/24/09 SME / Instructor                                  Date Brian Clark (Signature on File)                         9/24/09 SME / Instructor                               Date Page 2 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
 
: 1. New JPM Revision 0 0 2. Operator Actions PRA Establish SX Crosstie across units.
CR-d from N130a rev 3 Revision Record (Summary)
Revision 00
: 1. New JPM
: 2. Operator Actions PRA Establish SX Crosstie across units.
: 3. The examinee will direct the performance of 3 critical steps. The high PRA value of establish SX Crosstie across units justifies counting these steps as critical steps.
: 3. The examinee will direct the performance of 3 critical steps. The high PRA value of establish SX Crosstie across units justifies counting these steps as critical steps.
: 4. Validated 11/06/11 by Rob Lawlor and Bill Hochstetter
: 4. Validated 11/06/11 by Rob Lawlor and Bill Hochstetter.
.    
Page 3 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-d from N130a rev 3 Page 4 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-d from N130a rev 3 SIMULATOR SETUP INSTRUCTIONS NOTE:
SIMULATOR SETUP INSTRUCTIONS NOTE: It is okay to use a similar IC to the IC listed below, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
It is okay to use a similar IC to the IC listed below, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset to IC
: 1. Reset to IC-13
-13 2. Verify 1A SX is running 3. Insert malfunction SW01B to trip the 1B SX pump
: 2. Verify 1A SX is running
: 3. Insert malfunction SW01B to trip the 1B SX pump
: 4. Insert malfunction PN1427 to off
: 4. Insert malfunction PN1427 to off
: 5. Place the simulator in RUN. 6. On the Examiner's cue insert malfunction SW01A (15 sec delay) to trip the 1A SX pump 7. When Unit 2 NSO is requested to open 2SX005 modify remote function SW07 to 100 CR-d from  N130a rev 3 Page 5 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 5. Place the simulator in RUN.
INITIAL CONDITIONS You are the Unit1 NSO
: 6. On the Examiners cue insert malfunction SW01A (15 sec delay) to trip the 1A SX pump
. INITIATING CUE Respond to alarms on 1PM06J.
: 7. When Unit 2 NSO is requested to open 2SX005 modify remote function SW07 to 100 Page 4 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-d from N130a rev 3 INITIAL CONDITIONS You are the Unit1 NSO.
INITIATING CUE Respond to alarms on 1PM06J.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 5 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-d from N130a rev 3 Page 6 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-d from N130a rev 3 RECORD START TIME:
RECORD START TIME:
Note If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee.
Note If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee.
ELEMENT STANDARD SAT UNSAT Comment Number NOTE The examinee may refer to BAR 1 A1 at any time.
ELEMENT                                     STANDARD Comment SAT   UNSAT Number NOTE The examinee may refer to BAR 1-2-A1 at any time.
If this JPM is performed on the simulator, only the underlined cue need to be provided to the examinee. 1. Refer to BAR 1-2-A1 o Locate and Open BAR 1-2-A 1      NOTE The next step begins the alternate path steps.
If this JPM is performed on the simulator, only the underlined cue need to be provided to the examinee.
: 2. Start 1B SX Pump (This is an Immediate Action)
: 1. Refer to BAR 1-2-A1                           o Locate and Open BAR 1                                                     A1 NOTE The next step begins the alternate path steps.
At 1PM06J:  Start 1B SX pump NOTE If this is being performed on the simulator
: 2. Start 1B SX Pump (This is an     At 1PM06J:
, the Simulator O perator will act as the U2 NSO and will perform steps 3 and 5 when requested.
Immediate Action)
Have examinee call Unit 2 @ X
* Start 1B SX pump NOTE If this is being performed on the simulator, the Simulator Operator will act as the U2 NSO and will perform steps 3 and 5 when requested.
-2209 during the next step.
Have examinee call Unit 2 @ X-2209 during the next step.
  *3. Determines SX Pump unavailable and DIRECTS U2 NSO to START the standby SX Pump on Unit 2 Cue: Unit 2 NSO reports the Unit 2 Standby SX pump is running DIRECTS U2 NSO to START the standby SX Pump on Unit 2        NOTE Steps 4 and 5 may be performed in any order.
*3. Determines SX Pump unavailable
* DIRECTS U2 NSO to and DIRECTS U2 NSO to START                      START the standby SX the standby SX Pump on Unit 2                    Pump on Unit 2 Cue: Unit 2 NSO reports the Unit 2 Standby SX pump is running NOTE Steps 4 and 5 may be performed in any order.
Page 6 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-d from N130a rev 3 Page 7 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-d from N130a rev 3 ELEMENT                                     STANDARD Comment SAT   UNSAT Number
ELEMENT STANDARD SAT UNSAT Comment Number *4. Open 1SX005.
*4. Open 1SX005.                                 At 1PM06J:
At 1PM06J:   Open 1SX005:
* Open 1SX005:
        *5. DIRECTS U2 NSO to O PEN 2SX005    DIRECTS U2 NSO to OPEN 2SX005       6. DETERMINE cause of trip
*5. DIRECTS U2 NSO to OPEN
. Cue: EO reports phase C overcurrent target is up on the 1A SX pump breaker.
* DIRECTS U2 NSO to OPEN 2SX005                                               2SX005
Cue: EO reports phase B overcurrent target is up on the 1B SX pump breaker.
: 6. DETERMINE cause of trip.
o Dispatch an EO to check the 1A SX pump (BUS 141 Cub 2) o Dispatch an EO to check the 1B SX pump (BUS 142
o Dispatch an EO to check Cue: EO reports phase C the 1A SX pump (BUS 141 overcurrent target is up on the 1A Cub 2)
SX pump breaker.
Cue: EO reports phase B                           o Dispatch an EO to check overcurrent target is up on the 1B                 the 1B SX pump (BUS 142 SX pump breaker.                                    Cub 2)
: 7. REFER to 1BOA PRI-7                            o Direct Unit Supervisor to refer to 1BOA PRI-7.
Cue: The Unit Supervisor will refer to 1BOA PRI-7 NOTE The following steps from 1BOA PRI-7 may not be performed, if they were essentially performed per the BAR .
Page 7 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)


Cub 2)        7. REFER to 1BOA PRI-7  Cue:  The Unit Supervisor will refer to 1BOA PRI-7 o Direct Unit Supervisor to refer to 1BOA PRI
CR-d from N130a rev 3 ELEMENT                                       STANDARD Comment SAT   UNSAT Number 7A. NOTE: if examinee performs actions contained in 1BOA PRI-7, the steps are outlined in this sub-step:
-7.        NOTE  The following steps from 1BOA PRI
Determines no SX pp running                 o Check at least 1 SX pp running on Unit 1 o Manually open 1SX016B and 1SX027B (RCFC inlet Note: pp fails to start                       and outlet valves)
-7 may not be performed, if they were essentially performed per the BAR
Note: The solid bullet steps are           o Start 1B SX pp the Critical Steps of the expected         o Go to attachment A path of this JPM.                           o Direct U-2 NSO to check RCFC inlet and outlet isolation valves for standby SX pump OPEN AND Already running if following the
.
* Start standby U-2 SX BAR. If not following the BAR                         pp report: Unit 2 NSO reports the Unit 2 Standby SX pump is running Cross-tie to both U-2 SX pps
CR-d from N130a rev 3 Page 8 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
                                                          **Open 1SX005
ELEMENT STANDARD SAT UNSAT Comment Number 7A. NOTE: if examinee performs actions contained in 1BOA PRI
                                                          **Direct U-2 to open 2SX005 Check open 1SX033 Cue: 2SX033 and 034                                  and 1SX034 indicates open                                    Direct U-2 to check open 2SX033 and Cue: U-2 SX pp disc. pressure                        034 indicates 95 psig                                  Direct U-2 to check SX pp disc. press. >
-7, the steps are outlined in this sub
Goes to step 6 of attachment A                        90 psig of 1BOA PRI-7                                      Check that 1 MCR Chiller and 1 Cnmt.
-step: Determines no SX pp running Note: pp fails to start Note: The solid bullet steps are the Critical Steps of the expected path of this JPM.
Chiller running Returns to main body step 2.
Already running if following the BAR. If not following the BAR report: Unit 2 NSO reports the Unit 2 Standby SX pump is running Cross-tie to both U
: 8. REFER to Technical Specification              o Direct Unit Supervisor to 3.7.8.                                          refer to Technical Specification 3.7.8.
-2 SX pps     Cue: 2SX033 and 034 indicates open Cue: U-2 SX pp disc. pressure indicates 95 psig  Goes to step 6 of attachment A of 1BOA PRI
Cue: The Unit Supervisor will refer to Technical Specification 3.7.8.
-7 o Check at least 1 SX pp running on Unit 1 o Manually open 1SX016B and 1SX027B (RCFC inlet and outlet valves) o Start 1B SX pp o Go to attachment A o Direct U-2 NSO to check RCFC inlet and outlet isolation valves for standby SX pump OPEN AND  Start standby U
Page 8 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-2 SX pp      *Open 1SX005
 
  *Direct U-2 to open 2SX005 Check open 1SX033 and 1SX034 Direct U-2 to check open 2SX033 and 034 Direct U-2 to check SX pp disc. press. >
CR-d from N130a rev 3 ELEMENT                                      STANDARD Comment SAT  UNSAT Number
90 psig Check that 1 MCR Chiller and 1 Cnm
: 9. INITIATE corrective action.                o Direct Unit Supervisor to INITIATE corrective action Cue: The Unit Supervisor will INITIATE corrective action.
: t. Chiller running Returns to main body step 2. 8. REFER to Technical Specification 3.7.8. Cue: The Unit Supervisor will refer to Technical Specification 3.7.8.
Cue: This JPM is complete RECORD STOP TIME:
o Direct Unit Supervisor to refer to Technical Specification 3.7.8.
Page 9 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-d from  N130a rev 3 Page 9 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
ELEMENT STANDARD SAT UNSAT Comment Number 9. INITIATE corrective action.
Cue:  The Unit Supervisor will INITIATE corrective action
. o Direct Unit Supervisor to INITIATE corrective action Cue:  This JPM is complete RECORD STOP TIME
:
Page 10 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title: Respond To 1A SX Pump Trip (Standby Pump Does Not Start)
 
JPM Number:
==Title:==
N130 a: Revision Number:
EO     RO     SRO     FS STA/IA         SRO Cert JPM
0 Task Number and Title:
 
R-OA-108 Respond to Essential Service Water Malfunction
==Title:==
. K/A Number and Importance:
Respond To 1A SX Pump Trip (Standby Pump Does Not Start)
076 A2.01   (3.5/3.7) Suggested Testing Environment:
JPM Number:           N130a: Revision Number: 0 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
R-OA-108 Respond to Essential Service Water Malfunction.
BAR 1-2-A1 Rev 4 CRITICAL STEPS
K/A Number and Importance: 076 A2.01 (3.5/3.7)
(*) 3, 4 & 5 Actual Testing Environment:
Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical:   Yes     No Reference(s): BAR 1-2-A1 Rev 4 CRITICAL STEPS (*) 3, 4 & 5 Actual Testing Environment:               Simulator             Control Room       In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 5 minutes                         Actual Time Used:           minutes EVALUATION  
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:___________________________________ (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:________________________________ Date:_____________
Satisfactory Unsatisfactory Comments:                         Evaluator's Name:___________________________________ (Print)
Page 10 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Evaluator's Signature:________________________________
Date:_____________


Page 11 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS You are the Unit1 NSO.
INITIAL CONDITIONS You are the Unit1 NSO.
INITIATING CUE Respond to alarms on 1PM06J.
INITIATING CUE Respond to alarms on 1PM06J.
Page 11 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)


Page 1 of 10  Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure MANUALLY INITIATE CONTAINMENT SPRAY (BEP-0)
JPM Number: CR-e Revision Number: 4 Date: 11/06/2011 Developed By:    Brian Clark (Signature on file)    10/04/07 Instructor                Date Validated By:  Bill Hochstetter (Signature on file) 11/06/11 SME or Instructor            Date Approved By:    Rob Lawlor (Signature on file)    11/06/11 Operations Representative        Date Page 1 of 10


MANUALLY INITIATE CONTAINMENT SPRAY (BEP
CR-e from N-46A rev 3 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
-0)  JPM Number:  CR
________     1. Task description and number, JPM description and number are identified.
-e  Revision Number:  4 Date: 11/06/2011 Developed By:
________     2. Knowledge and Abilities (K/A) references are included.
Brian Clark (Signature on file) 10/04/07  Instructor Date      Validated By:
________     3. Performance location specified. (in-plant, control room, or simulator)
Bill Hochstetter (Signature on file) 11/06/11  SME or Instructor Date      Approved By
________     4. Initial setup conditions are identified.
: Rob Lawlor (Signature on file) 11/06/11  Operations Representative Date      :
________     5. Initiating and terminating cues are properly identified.
CR-e from N-46A rev 3 Page 2 of 10  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
________     6. Task standards identified and verified by SME review.
________ 1. Task description and number, JPM description and number are identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 2. Knowledge and Abilities (K/A) references are included.
________     8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
________ 3. Performance location specified. (in
_BEP-0, Reactor Trip or Safety Injection.
-plant, control room, or simulator)
Procedure Rev. 202 Verified Date: 10/28/2011
________ 4. Initial setup conditions are identified.
________     9. Pilot test the JPM:
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
_BE P-0, Reactor Trip or Safety Injection
. Procedure Rev. 202 Verified Date: 10/28/2011
________ 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
________     11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date       SME/Instructor Date       SME/Instructor Date CR-e from N-46A rev 3 Page 3 of 10 Revision Record (Summary)
SME/Instructor                                         Date SME/Instructor                                         Date SME/Instructor                                         Date Page 2 of 10
: 1. Revision 3 Changed task conditions from "CNMT press is 25#" to "Containment pressure peaked at 25#". RCPs will be tripped in setup and action has been deleted as a critical task. The two actions of manually opening of _CS019A and placing _A CS pump to Test are each designated as critical tasks.
 
: 2. Revision 4 Changed attachment B to attachment C based on rev. to _BEP
CR-e from N-46A rev 3 Revision Record (Summary)
-0 CR-e from N-46A rev 3 Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
: 1. Revision 3   Changed task conditions from CNMT press is 25# to Containment pressure peaked at 25#. RCPs will be tripped in setup and action has been deleted as a critical task. The two actions of manually opening of _CS019A and placing _A CS pump to Test are each designated as critical tasks.
: 1. Reset the simulator to IC 179 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Revision 4   Changed attachment B to attachment C based on rev. to _BEP-0 Page 3 of 10
 
CR-e from N-46A rev 3 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 179 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Turn annunciators OFF
: 2. Turn annunciators OFF
: 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 4. This completes the setup for this JPM.
: 4. This completes the setup for this JPM.
Page 4 of 10


CR-e from N-46A rev 3 Page 5 of 10 INITIAL CONDITIONS
CR-e from N-46A rev 3 INITIAL CONDITIONS
: 1. You are a unit NSO.
: 1. You are a unit NSO.
: 2. A LOCA has just occurred and 1BEP-0 is in progress.
: 2. A LOCA has just occurred and 1BEP-0 is in progress.
Line 1,748: Line 1,740:
INITIATING CUE The Unit Supervisor has directed you to perform step 14 of 1BEP-0, Reactor Trip or Safety Injection.
INITIATING CUE The Unit Supervisor has directed you to perform step 14 of 1BEP-0, Reactor Trip or Safety Injection.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
CRITICAL ELEMENTS(*): 9, 10 & 13 APPROXIMATE COMPLETION TIME: 26 minutes UNSAT requires written comments on respective step.
CRITICAL ELEMENTS(*): 9, 10 & 13 APPROXIMATE COMPLETION TIME: 26 minutes UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 5 of 10


CR-e from N-46A rev 3 Page 6 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number  RECORD START TIME ________
CR-e from N-46A rev 3 Comment SAT    UNSAT  Number STEP               ELEMENT                         STANDARD RECORD START TIME ________
If this JPM is given on the simulator, only the cues NOTE underlined are required to be given to the examinee.
NOTE If this JPM is given on the simulator, only the cues underlined are required to be given to the examinee.
: 1. Enter BEP-0 at step 14 LOCATE and OPEN 1 BEP-0 to step 14 o o      2. Check containment pressure At 1PM06J: CHECK Containment pressure o o      3. Group 6 containment spray monitor lights At 1PM06J: CHECK Group 6 CS Monitor lights LIT o o      4. 1 BEP-0, Step 14.b RNO At 1PM05J or 1PM06J: MANUALLY ACTUATE Containment Spray and Phase B Isolation CHECK Group 6 CS Monitor lights LIT o o      5. 1 B EP-0, Attachment C  GO TO BEP-0, Attachment C o o      6. 1 BEP-0, Attachment C, CS RWST Suction valves At 1PM06J, CHECK OPEN: 1CS001A 1CS001B o o      7. 1 BEP-0, Attachment C, CS Pump Header isol valves At 1PM06J, CHECK OPEN: 1CS007A  1CS007B o o CR-e from  N-46A rev 3 Page 7 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number      8. 1 BEP-0, Attachment C, CS eductor spray additive valves At 1PM06J, CHECK OPEN:  1CS019A  1CS019B  o o        Alternate path begins with step 9 and ends with step 10 NOTE      *9. 1 BEP-0, Attachment C, Step 1.c RNO  At 1PM06J;   PLACE 1 A  and/or 1B CS pump test switch in TEST  o o  *10 1 BEP-0, Attachment C, Step 1.c RNO (continued)
: 1. Enter BEP-0 at step 14                 &deg;  LOCATE and OPEN               o      o 1BEP-0 to step 14
At 1PM06J;   MANUALLY OPEN
: 2.     Check containment pressure         At 1PM06J:                       o      o
                                            &deg;  CHECK Containment pressure
: 3. Group 6 containment spray             At 1PM06J:                       o      o monitor lights
                                            &deg;  CHECK Group 6 CS Monitor lights LIT
: 4. 1BEP-0, Step 14.b RNO                                                   o      o At 1PM05J or 1PM06J:
                                            &deg;  MANUALLY ACTUATE Containment Spray and Phase B Isolation
                                            &deg;  CHECK Group 6 CS Monitor lights LIT
: 5. 1BEP-0, Attachment C                     &deg;   GO TO BEP-0,                 o      o Attachment C
: 6. 1BEP-0, Attachment C, CS RWST         At 1PM06J, CHECK OPEN:           o      o Suction valves                            &deg; 1CS001A
                                                &deg; 1CS001B
: 7. 1BEP-0, Attachment C, CS Pump         At 1PM06J, CHECK OPEN:           o       o Header isol valves                         &deg; 1CS007A
                                                &deg; 1CS007B Page 6 of 10


1CS19A and/or 1CS019B o o      11. 1 BEP-0, Attachment C, Step 1.c RNO (continued)
CR-e from N-46A rev 3 Comment SAT    UNSAT  Number STEP              ELEMENT                      STANDARD
At 1PM06J;   PLACE 1 A and/or1B CS pump test switch in NORMAL o o       12. 1 BEP-0, Attachment C, CS Eductor Inlet FCV's At 1PM06J, CHECK OPEN:
: 8. 1BEP-0, Attachment C, CS eductor At 1PM06J, CHECK OPEN:              o    o spray additive valves                &deg; 1CS019A
1CS010A  1CS010B o o      *13. 1 BEP-0, Attachment C, CS Pumps  At 1PM06J: Check at least one CS pump RUNNING o      14. 1 B EP-0, Attachment C , Step 3   RETURN TO BEP
                                          &deg; 1CS019B NOTE Alternate path begins with step 9 and ends with step 10
-0, Step 14.c o o CR-e from  N-46A rev 3 Page 8 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number 15. Group 6 Phase B isolation monitor lights  At 1PM06J:  CHECK Group 6 Phase B Isolation monitor lights LIT o o      16. Stop All Reactor Coolant Pumps At 1PM05J: o Check  all RCPs STOPPED o o      15. Check CS eductor suction flow > 15 gpm  At 1PM06J:  CHECK CS eductor suction flow on 1 FI-CS013 and/or 1FI
*9. 1BEP-0, Attachment C, Step 1.c    At 1PM06J;                          o    o RNO
-CS014 o o      16. Check CS eductor additive flow >
* PLACE 1A and/or 1B CS pump test switch in TEST
5 gpm Cue: At 1PM06J: This JPM is completed CHECK CS eductor additive flow on 1 FI-CS015 and/or 1FI
*10 1BEP-0, Attachment C, Step 1.c    At 1PM06J;                          o    o RNO (continued)
-CS016 o o  RECORD STOP TIME_______
* MANUALLY OPEN 1CS19A and/or 1CS019B
: 11. 1BEP-0, Attachment C, Step 1.c   At 1PM06J;                          o    o RNO (continued)
                                      &deg;   PLACE 1A and/or1B CS pump test switch in NORMAL At 1PM06J, CHECK OPEN:              o   o
: 12. 1BEP-0, Attachment C, CS             &deg; 1CS010A Eductor Inlet FCVs                  &deg; 1CS010B
*13. 1BEP-0, Attachment C, CS         At 1PM06J:                           o    o Pumps
* Check at least one CS pump RUNNING
: 14. 1BEP-0, Attachment C, Step 3       &deg;    RETURN TO BEP-0,               o    o Step 14.c Page 7 of 10


CR-e from N-46A rev 3 Page 9 of 10  Operator's Name:
CR-e from N-46A rev 3 Comment SAT  UNSAT  Number STEP              ELEMENT                      STANDARD
Job Title:
: 15. Group 6 Phase B isolation monitor  At 1PM06J:                       o      o lights
RO  SRO  SRO Cert   JPM Title:
                                        &deg;  CHECK Group 6 Phase B Isolation monitor lights LIT
JPM Number:
: 16. Stop All Reactor Coolant Pumps   At 1PM05J:                       o      o o Check all RCPs STOPPED
Manually Initiate Containment Spray (_BEP
: 15. Check CS eductor suction flow >  At 1PM06J:                      o      o 15 gpm
-0) N-46a  Revision Number: Task Number and Title:
                                        &deg;  CHECK CS eductor suction flow on 1FI-CS013 and/or 1FI-CS014
4 4D.CS-01 Manually Initiate Containment Spray (BEP
: 16. Check CS eductor additive flow >    At 1PM06J:                       o      o 5 gpm Cue: This JPM is completed
-0)  K/A Number and Importance:
                                        &deg;  CHECK CS eductor additive flow on 1FI-CS015 and/or 1FI-CS016 RECORD STOP TIME_______
Page 8 of 10


026A4.01  (4.5 / 4.3)
CR-e from N-46A rev 3 Operators Name:
Task Standard
Job
: Manually Initiate Containment Spray _BEP
-0 Step 14 Suggested Testing Environment:


Simulator Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Testing Method:
RO      SRO      SRO Cert JPM
Simulate Alternate Path
 
: Yes No   Perform SRO Only: Yes No   Time Critical:
==Title:==
Yes No Estimated Time to Complete:
Manually Initiate Containment Spray (_BEP-0)
2 0  minutes Actual Time Used:
JPM Number: N-46a                                                Revision Number: 4 Task Number and
minutes  
 
==Title:==
4D.CS-01 Manually Initiate Containment Spray (BEP-0)
K/A Number and Importance: 026A4.01 (4.5 / 4.3)
Task Standard: Manually Initiate Containment Spray _BEP-0 Step 14 Suggested Testing Environment: Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes             No Perform               SRO Only:       Yes             No Time Critical:       Yes         No Estimated Time to Complete: 20        minutes Actual Time Used:               minutes


==References:==
==References:==
_ BEP-0, Step 14 EVALUATION


_  BEP-0, Step 14 EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name:                                                  (Print)
Evaluators Signature:                                                Date:
Page 9 of 10


==SUMMARY==
CR-e from N-46A rev 3 INITIAL CONDITIONS TASK CONDITIONS:
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                    Evaluator's Name:
(Print)  Evaluator's Signature:
Date:
CR-e from N-46A rev 3 Page 10 of 10 INITIAL CONDITIONS TASK CONDITIONS:
: 1. You are the Unit NSO.
: 1. You are the Unit NSO.
: 2. A LOCA has just occurred and 1 BEP-0 is in progress.
: 2. A LOCA has just occurred and 1BEP-0 is in progress.
: 3. The ECCS is in the injection mode with decreasing RCS pressure.
: 3. The ECCS is in the injection mode with decreasing RCS pressure.
: 4. Containment pressure peaked at 25 psig. INITIATING CUES:
: 4. Containment pressure peaked at 25 psig.
The US has directed you to initiate Containment Spray per 1 BEP-0, Step 14.
INITIATING CUES:
The US has directed you to initiate Containment Spray per 1BEP-0, Step 14.
Page 10 of 10


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Unload D/G that is paralleled to the SAT JPM Number: CR-f Revision Number: 15 Date: 10/29/2011 Revised By:             Bill Hochstetter                 10/29/2011 Instructor            Date Reviewed By:             Mark Ristau                     11/06/2011 Operations Representative        Date Approved By:             Rob Lawlor                       11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Unload D/G that is paralleled to the SAT JPM Number:
CR-f Revision Number:
15 Date: 10/29/2011 Revised By: Bill Hochstetter Instructor Date 10/29/2011   Reviewed By:
Mark Ristau Operations Representative Date 11/06/2011 Approved By:
Rob Lawlor Facility Representative Date 11/06/2011


CR-f (from N-006 - rev 14)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-f (from N-006 - rev 14)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 6. Task standards identified and verified by SME review.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Procedure BOP DG-12       Rev: 20 Procedure BOP DG-11T1, Diesel Generator Start/Stop Log
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BOP DG-12               Rev: 20 Procedure BOP DG-11T1, Diesel Generator Start/Stop Log               Rev: 2
: 9. Verify cues both verbal and visual are free of conflict.
: 9. Verify cues both verbal and visual are free of conflict.
Rev: 2 10. Verify performance time is accurate
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Bill Hochstetter (Signature on file)                  10/29/11 SME / Instructor                              Date x                                                              x SME / Instructor                                Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


Bill Hochstetter (Signature on file)
CR-f (from N-006 - rev 14)
SME / Instructor Date  10/29/11 x
Revision Record (Summary)
SME / Instructor Date        x 
Revision 15 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, change was procedure rev that added 1 step to the JPM.
Created from JPM No. N-6 rev.14


CR-f (from N-006 - rev 14)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
Applied new template TQ
-JA-150-02 Rev.1 Revision 15  Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor
, change was procedure rev that added 1 step to the JPM. Created from JPM No. N
-6 rev.14 


CR-f (from N-006 - rev 14)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-f (from N-006 - rev 14)
SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC
: 1. Reset to IC-22 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Start, parallel, and load DG to 5500 KW using procedure then snap for succeeding uses.
: 2. Start, parallel, and load DG to 5500 KW using procedure then snap for succeeding uses.
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 4. This completes the setup for this JPM
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
: 4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-f (from N-006 - rev 14)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-f (from N-006 - rev 14)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the extra NSO.
: 1. You are the extra NSO.
: 2. The Unit is in mode 1, with a normal "at power" electrical lineup.
: 2. The Unit is in mode 1, with a normal "at power" electrical lineup.
: 3. Diesel Generator 1A has been running paralleled to the grid for 4 hours at 5500 KW INITIATING CUE
: 3. Diesel Generator 1A has been running paralleled to the grid for 4 hours at 5500 KW INITIATING CUE
: 1. The Unit Supervisor has just directed you to shutdown the 1A Diesel Generator per BOP DG-12 from the Control Room.
: 1. The Unit Supervisor has just directed you to shutdown the 1A Diesel Generator per BOP DG-12 from the Control Room.
: 2. Electric Operations has been notified and expects the DG load to be reduced and then removed from parallel operation.
: 2. Electric Operations has been notified and expects the DG load to be reduced and then removed from parallel operation.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-f (from N-006 - rev 14)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-f (from N-006 - rev 14)
RECORD START TIME:
RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee
Comment ELEMENT                                       STANDARD              SAT   UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN
: 1. Refer to BOP DG-12, Diesel Generator Shutdown Note: Step 1 may be performed at any time Cue: LOCATE and OPEN BOP DG-12 All prerequisites are met NOTE Cue the candidate at each plateau that the time frame has been met.
: 1. Refer to BOP DG-12, Diesel                           BOP DG-12 Generator Shutdown Note: Step 1 may be performed at any time Cue: All prerequisites are met NOTE Cue the candidate at each plateau that the time frame has been met.
  *2. Reduce load on the 1 A DG to less than 250 KW using DG 1A Gov Adj control. Note: The examinee may adjust VAR loading as necessary while unloading the machine At 1PM 01 J:  LOWER the DG Gov Adj control to REDUCE load to < 250 KW per the schedule in the note 4100 KW for 2 minutes 2750 KW for 2 minutes 1400 KW for 15 minutes
*2. Reduce load on the 1A DG to less                 At 1PM01J:
  < 250 KW   3. Adjust reactive load to zero KVARS using Diesel Gen 1A Volt Adj. Control. At 1PM01J:
than 250 KW using DG 1A Gov Adj
ADJUST DG KVARS to ZERO using the 1A DG VOLT ADJ   The following annunciator will alarm after DG output breaker is opened:
* LOWER the DG Gov Adj control.                                            control to REDUCE load to
NOTE 1-21-D9, DG 1A RUNNING UNLOADED The diesel will continue running for 5 minutes after step 10 execution of this JPM
                                                        < 250 KW per the schedule Note: The examinee may adjust VAR                      in the note loading as necessary while unloading
                                                    &deg;    4100 KW for 2 minutes the machine
                                                    &deg;    2750 KW for 2 minutes
                                                    &deg;    1400 KW for 15 minutes
                                                    &deg;    < 250 KW
: 3. Adjust reactive load to zero KVARS             At 1PM01J:
using Diesel Gen 1A Volt Adj.                   &deg; ADJUST DG KVARS to Control.                                            ZERO using the 1A DG VOLT ADJ NOTE The following annunciator will alarm after DG output breaker is opened:
1-21-D9, DG 1A RUNNING UNLOADED The diesel will continue running for 5 minutes after step 10 execution of this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
CR-f (from N-006 - rev 14)
Comment ELEMENT                                        STANDARD                    SAT  UNSAT Number
*4. Open ACB 1413 DG 1A Feed to                  At 1PM01J:
4KV Bus 141.
* OPEN ACB 1413 NOTE:
The completion of BOP DG-11T1 is NOT required for this JPM.
: 5. Record the time ACB 1413 was opened on BOP DG-11T1
                                        &deg; RECORD the time ACB Cue: The Unit NSO will complete          1413 was opened on BOP DG-11T1                        BOP DG-11T1 At 1PM01J:
*6. VERIFY/PLACE DG 1A ACB 1413 auto re-close circuit arm selector
* VERIFY/PLACE DG 1A switch in the NORM position.                            ACB 1413 auto re-close circuit arm selector switch in the NORM position.
Locally
: 7. VERIFY/PLACE the Start Mode Selector Switch at 1PL07J in FAST.                Start mode selector switch:
                                                    &deg;  DIRECT NLO to Cue: The EO reports the start mode selector switch is in FAST                            VERIFY/PLACE the Start Mode Selector switch in FAST at 1PL07J
: 8. VERIFY DG air receiver pressures                  Locally:
are > 175 psig prior to stopping DG              Starting Air receiver pressures to ensure operability.
                                                    &deg;      DIRECT NLO to VERIFY Cue: The EO reports the air receiver                        DG starting air receiver pressures are > 175 psig.                                    pressures > 175 psig SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
CR-f (from N-006 - rev 14)
Comment ELEMENT                                        STANDARD              SAT  UNSAT Number
: 9. VERIFY control mode selector                      Locally:
switch                                            Control mode selector switch Cue: The EO reports the control mode selector switch is in REMOTE                    &deg;    DIRECT the NLO to VERIFY the Control Mode Note: The operator may check the                          Selector Switch is in LOCAL white light NOT LIT                            REMOTE
*10. PLACE the DG 1A Start Switch in                At 1PM01J:
STOP position.
Stop the 1A DG
* PLACE the 1A DG Start Switch to STOP Cue: This JPM is complete
                                                          &deg; CHECK STOP light LIT RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-f (from N-006 - rev 14)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-f (from N-41 R9)
ELEMENT SAT STANDARD UNSAT Comment Number *4. Open ACB 1413 DG 1A Feed to 4KV Bus 1 41. At 1PM 01 J:    OPEN ACB 1413    NOTE:  The completion of BOP DG
-11T1 is NOT required for this JPM.
: 5. Record the time ACB 1413 was opened on BOP DG
-11T1  Cue:  The Unit NSO will complete BOP DG-11T1    RECORD the time ACB 1413 was opened on BOP DG-11T1    *6. VERIFY/PLACE DG 1A ACB 1413 auto re-close circuit arm selector switch in the NORM position.
At 1PM 01 J:  VERIFY/PLACE DG 1A ACB 1413 auto re
-close circuit arm selector switch in the NORM position. 7. VERIFY/PLACE the Start Mode Selector Switch at 1PL07J in FAST.
Cue:  The EO reports  the start mode selector switch is in FAST Locally Start mode selector switch:
DIRECT NLO to VERIFY/PLACE the Start Mode Selector switch in FAST at 1PL07J    8. VERIFY DG air receiver pressures are > 175 psig prior to stopping DG to ensure operability.
Cue:  Locally: The EO reports the air receiver pressures are > 175 psig.
Starting Air receiver pressures DIRECT NLO to VERIFY DG starting air receiver pressures
> 175 psig CR-f (from N-006 - rev 14)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
ELEMENT SAT STANDARD UNSAT Comment Number 9. VERIFY control mode selector switch Cue:  Note:  The operator may check the 'LOCAL' white light NOT LIT The EO reports the control mode selector switch is in REMOTE Locally: Control mode selector switch DIRECT the NLO to VERIFY the Control Mode Selector Switch is in REMOTE    *10. PLACE the DG 1A Start Switch in STOP position.
Cue:  This JPM is complete At 1PM01J:
Stop the 1A DG    PLACE the 1A DG Start Switch to STOP CHECK STOP light LIT RECORD STOP TIME:
CR-f (from N-41 R9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
JPM Number:
==Title:==
Unload and Shutdown a Diesel Generator CR-f Revision Number:
EO         RO     SRO     FS STA/IA           SRO Cert JPM
Task Number and Title:
 
15 4C.DG-04,05   K/A Number and Importance:
==Title:==
064A4.06UNLOAD a DG & SHUTDOWN a DG Suggested Testing Environment:
Unload and Shutdown a Diesel Generator JPM Number: CR-f                                     Revision Number: 15 Task Number and
3.1/3.9 Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Simulator Reference(s):
4C.DG-04,05 UNLOAD a DG & SHUTDOWN a DG K/A Number and Importance:           064A4.06 3.1/3.9 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
: 1. BOP DG-11T1, Diesel Generator Start/Stop Log (Rev 2)
: 1.       BOP DG-11T1, Diesel Generator Start/Stop Log (Rev 2)
: 2. BOP DG-12, Diesel Generator Shutdown (Rev. 20)
: 2.       BOP DG-12, Diesel Generator Shutdown (Rev. 20)
CRITICAL STEPS
CRITICAL STEPS (*) 2, 4, 6 & 10 Actual Testing Environment:             Simulator             Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 20 minutes                        Actual Time Used:            minutes EVALUATION
(*) 2, 4, 6 & 10 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
20EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                     Evaluator's Name
 
:   (Print) Evaluator's Signature
CR-f (from N-41 R9)
:   Date:
CR-f (from N-41 R9)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the extra NSO.
: 1.     You are the extra NSO.
: 2. The unit is in mode 1, with a normal "at power" electrical line up. 3. Diesel Generator 1A has been running paralleled to the grid for 4 hours at 5500 KW. INITIATING CUE
: 2.     The unit is in mode 1, with a normal "at power" electrical lineup.
: 1. The Unit Supervisor has just directed you to shutdown the 1 A Diesel Generator, per BOP DG
: 3.         Diesel Generator 1A has been running paralleled to the grid for 4 hours at 5500 KW.
-12 from the Control Room.
INITIATING CUE
: 1.       The Unit Supervisor has just directed you to shutdown the 1A Diesel Generator, per BOP DG-12 from the Control Room.
: 2. Electric Operations has been notified and expects the DG load to be reduced and then removed from parallel operation.
: 2. Electric Operations has been notified and expects the DG load to be reduced and then removed from parallel operation.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Align Ventilation Systems for Emergency Operations (Failure of Fuel Handling Building Fans to Start)
Exelon Nuclear Job Performance Measure Align Ventilation Systems for Emergency Operations (Failure of Fuel Handling Building Fans to Start)
JPM Number:
JPM Number: CR-g Revision Number: 6 Date: 10/29/2011 Revised By:             Bill Hochstetter                 10/29/2011 Instructor            Date Reviewed By:             Mark Ristau                     11/06/2011 Operations Representative        Date Approved By:             Rob Lawlor                       11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-g Revision Number:
6 Date: 10/29/2011 Revised By: Bill Hochstetter Instructor Date 10/29/2011   Reviewed By:
Mark Ristau Operations Representative Date 11/06/2011 Approved By:
Rob Lawlor Facility Representative Date 11/06/2011


CR-g (from N-99b - rev 5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-g (from N-99b - rev 5)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in-plant, control room, simulator, or other)
: 3. Performance location specified. (in-plant, control room, simulator, or other)
Line 1,949: Line 1,968:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BOP VA-6       Rev: 4 Procedure 2 BEP-0 9. Verify cues both verbal and visual are free of conflict.
Procedure BOP VA-6               Rev: 4 Procedure 2BEP-0                 Rev: 202
Rev: 202  10. Verify performance time is accurate
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Bill Hochstetter (Signature on file)
Bill Hochstetter (Signature on file)                   10/29/11 SME / Instructor                              Date x                                                              x SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor Date  10/29/11 x
 
SME / Instructor Date         x CR-g (from N-99b - rev 5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-g (from N-99b - rev 5)
Revision Record (Summary)
Revision Record (Summary)
Applied new template TQ
Revision X Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.
-JA-150-02 Rev.1 Revision X  Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.
Created from JPM No. N-99b
Created from JPM No. N
-99b  


CR-g (from N-99b - rev 5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
CR-g (from N-99b - rev 5)
SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC
: 1. Reset to IC-22 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify:
: 2. Verify: 0VA085Y closed 0VA084Y open 0VA086Y open
* 0VA085Y closed
* 0VA084Y open
* 0VA086Y open
: 3. VC M/U Filter Unit on running VC Train
: 3. VC M/U Filter Unit on running VC Train
: 4. Place VC Recirc Charcoal Adsorber Selector Switches on BOTH trains of VC to ABSORB, allow dampers to realign, then place both switches back to AUTO
: 4. Place VC Recirc Charcoal Adsorber Selector Switches on BOTH trains of VC to ABSORB, allow dampers to realign, then place both switches back to AUTO
: 5. Start 0B and 0F VA Inaccessible Plenum Charcoal Booster Fans
: 5. Start 0B and 0F VA Inaccessible Plenum Charcoal Booster Fans
: 6. Close FHB Pre
: 6. Close FHB Pre-Filter Isolation Dampers:
-Filter Isolation Dampers:
: a. 0VA058Y/0VA059Y
: a. 0VA058Y/0VA059Y b. 0VA053Y/0VA054Y
: b. 0VA053Y/0VA054Y
: 7. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 8. Obtain Unit
: 7. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
-2 E-0 Attachment. B binder with steps for the examinee
: 8. Obtain Unit-2 E-0 Attachment. B binder with steps for the examinee
: 9. This completes the setup for this JPM
: 9. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-g (from N-99b - rev 5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-g (from N-99b - rev 5)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 Assist NSO.
: 1.       You are the Unit 1 Assist NSO.
: 2. Unit 2 has experienced a LOCA.
: 2.       Unit 2 has experienced a LOCA.
: 3. 2BEP-0 is in progress in response to the event.
: 3.       2BEP-0 is in progress in response to the event.
INITIATING CUE You are directed to verify Fuel Handling Building ventilation is aligned for emergency operation per step 6 of 2BEP
INITIATING CUE You are directed to verify Fuel Handling Building ventilation is aligned for emergency operation per step 6 of 2BEP-0 Attachment B.
-0 Attachment B.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step
UNSAT requires written comments on respective step.
.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-g (from N-99b - rev 5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-g (from N-99b - rev 5)
RECORD START TIME:
RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee
Comment ELEMENT                                       STANDARD            SAT   UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee
: 1. Refer to 2BEP-0, Reactor Trip or Safety Injection, Attachment B step 6 Note: JPM step 1 may be performed at any time LOCATE and OPEN  2BEP-0 to Attachment B step 6        NOTE ALTERNATE PATH STARTS HER E JPM steps 2 through 10 verify the fuel handling building ventilation is aligned for emergency operation. The fuel handling building fans fail to start initially
: 1. Refer to 2BEP-0, Reactor Trip or                   LOCATE and OPEN Safety Injection, Attachment B step                  2BEP-0 to Attachment B 6                                                    step 6 Note: JPM step 1 may be performed at any time NOTE ALTERNATE PATH STARTS HERE JPM steps 2 through 10 verify the fuel handling building ventilation is aligned for emergency operation. The fuel handling building fans fail to start initially
: 2. Verify FH building ventilation aligned At 1PM02J, VERIFY 0VA04CA NOT running 0VA04CB NOT running AND    3. Refer to BOP VA
: 2. Verify FH building ventilation aligned At 1PM02J, VERIFY
-6, Fuel Handling Building Charcoal Booster Fan Operation Note: JPM step 10 may be performed at any time Cue:   (if asked) The system is lined up IAW BOP VA
* 0VA04CA NOT running AND
-E3 LOCATE and OPEN BOP VA-6 In the following JPM steps, provide cues to the examinee based on which train is started NOTE CR-g (from N-99b - rev 5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
* 0VA04CB NOT running
ELEMENT SAT STANDARD UNSAT Comment Number *4. Place one FHB Exhaust Plenum on line    At 0PM02J , VERIFY/OPEN:
: 3. Refer to BOP VA-6, Fuel Handling                 LOCATE and OPEN BOP Building Charcoal Booster Fan                     VA-6 Operation Note: JPM step 10 may be performed                   &deg; at any time Cue: (if asked) The system is lined up IAW BOP VA-E3 NOTE In the following JPM steps, provide cues to the examinee based on which train is started SRRS: 3D.105 (when utilized for operator initial or continuing training)
0VA058Y and 0VA059Y (A Train) OR  0VA053Y and 0VA054Y (B Train)    5. Ensure the other train's FHB Filter Flow Control damper is CLOSED.
At 1PM02J, VERIFY/CLOSE for fan NOT being started:


o 0VA062Y (for 'A' fan) 0VA057Y (for 'B' fan)
CR-g (from N-99b - rev 5)
OR    6. Verify the fan transfer switch is in remote. Note: The student may use the Stop light (green) on the associated control switch to verify the fan is in REMOTE Cue:   The EO reports that the fan transfer switch is in the REMOTE position at 0VA01JA VERIFY fan transfer switch is in REMOTE
Comment ELEMENT                                        STANDARD            SAT    UNSAT Number
    *7. Start one train of Fuel Handling Building Charcoal Booster fan.
*4. Place one FHB Exhaust Plenum on                At 0PM02J, line                                          VERIFY/OPEN:
At 0PM02J, START
* 0VA058Y and 0VA059Y (A Train)
0VA04CA OR   0VA04CB     8. Ensure FHB Filter Train Flow Control damper opens.
OR
At 0PM02J, VERIFY/OPEN:
* 0VA053Y and 0VA054Y (B Train)
o 0VA057Y (for 'A' fan)
: 5. Ensure the other trains FHB Filter            At 1PM02J, VERIFY/CLOSE Flow Control damper is CLOSED.                for fan NOT being started:
OR 0VA062Y (for 'B' fan)
o 0VA062Y (for A fan)
OR 0VA057Y (for B fan)
: 6. Verify the fan transfer switch is in remote.                                             &deg; VERIFY fan transfer switch is in REMOTE Note: The student may use the Stop light (green) on the associated control switch to verify the fan is in REMOTE Cue: The EO reports that the fan transfer switch is in the REMOTE position at 0VA01JA
*7. Start one train of Fuel Handling                 At 0PM02J, START:
Building Charcoal Booster fan.
* 0VA04CA OR
* 0VA04CB
: 8. Ensure FHB Filter Train Flow Control             At 0PM02J, VERIFY/OPEN:
damper opens.
o 0VA057Y (for A fan)
OR 0VA062Y (for B fan)
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-g (from N-99b - rev 5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-g (from N-99b - rev 5)
ELEMENT SAT STANDARD UNSAT Comment Number 9. Ensure FHB Charcoal Adsorber Inlet Isol opens.
Comment ELEMENT                                       STANDARD        SAT   UNSAT Number
 
: 9. Ensure FHB Charcoal Adsorber Inlet               At 0PM02J, VERIFY/OPEN:
At 0PM02J, VERIFY/OPEN:
Isol opens.
o 0VA060Y (for 'A' fa n) OR 0VA055Y (for 'B' fan)
o 0VA060Y (for A fan)
: 10. Ensure FHB Charcoal Adsorber Bypass Isol damper closes.
OR 0VA055Y (for B fan)
At 0PM02J, VERIFY/CLOSE:
: 10. Ensure FHB Charcoal Adsorber                     At 0PM02J, VERIFY/CLOSE:
Bypass Isol damper closes.
o 0VA051Y (for A fan)
OR 0VA435Y (for B fan)
Cue: (if required) This JPM is completed RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


o 0VA051Y (for 'A' fan)
CR-g (from N-99b R5)
OR  0VA435Y (for 'B' fan)
Cue: (if required)
This JPM is completed      RECORD STOP TIME
:
CR-g (from N-99b R5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
JPM Numbe r:  Align Ventilation Systems for Emergency Operation (Failure of FHB)
==Title:==
CR-g Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
6 4D.EP-19   K/A Number and Importance:
==Title:==
RESPOND to Safety Injection Signal Suggested Testing Environment:
Align Ventilation Systems for Emergency Operation (Failure of FHB)
072A3.01   2.9/3.1 Alternate Path:
JPM Number: CR-g                                     Revision Number: 6 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Simulator Reference(s):
==Title:==
BOP VA-6       Rev: 4 2 BEP-0         Rev: 202 CRITICAL STEPS
4D.EP-19 RESPOND to Safety Injection Signal K/A Number and Importance:           072A3.01 2.9/3.1 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s): BOP VA-6             Rev: 4 2BEP-0               Rev: 202 CRITICAL STEPS (*) 4 and 7 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 12 minutes                        Actual Time Used:            minutes EVALUATION
(*) 4 and 7 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 2EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                     Evaluator's Name
 
:   (Print) Evaluator's Signature
CR-g (from N-99b R5)
:   Date:
CR-g (from N-99b R5)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 Assist NSO.
: 1. You are the Unit 1 Assist NSO.
: 2. Unit 2 has experienced a LOCA.
: 2. Unit 2 has experienced a LOCA.
: 3. 2BEP-0 is in progress in response to the event.
: 3. 2BEP-0 is in progress in response to the event.
INITIATING CUE You are directed to verify Fuel Handling Building ventilation is aligned for emergency operation per step 6 of 2BEP
INITIATING CUE You are directed to verify Fuel Handling Building ventilation is aligned for emergency operation per step 6 of 2BEP-0 Attachment B.
-0 Attachment B.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Establish and Secure Normal and RH Letdown flow JPM Number: CR-h Revision Number: 09 Date: 10/29/2011 Revised By:             Bill Hochstetter                 10/29/2011 Instructor            Date Reviewed By:             Mark Ristau                      11/06/2011 Operations Representative        Date Approved By:             Rob Lawlor                       11/06/2011 Facility Representative      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Establish and Secure Normal and RH Letdown flow JPM Number:
CR-h Revision Number:
09 Date: 10/29/2011 Revised By: Bill Hochstetter Instructor Date 10/29/2011   Reviewed By:
Mark Rista u  Operations Representative Date 11/06/2011 Approved By:
Rob Lawlor Facility Representative Date 11/06/2011


CR-h (from N rev 8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-h (from N rev 8)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 2,082: Line 2,102:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BOP CV-17       Rev: 25 9. Verify cues both verbal and visual are free of conflict.
Procedure BOP CV-17               Rev: 25 Procedure Rev:
Procedure  Rev:
Procedure                        Rev:
Procedure        Rev: 10. Verify performance time is accurate 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Bill Hochstetter (Signature on file)
Bill Hochstetter (Signature on file)                   10/29/11 SME / Instructor                              Date x                                                              x SME / Instructor                               Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor Date  10/29/11 x
 
SME / Instructor Date         x CR-h (from N rev 8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-h (from N rev 8)
Revision Record (Summary)
Revision Record (Summary)
Applied new template TQ
Revision 9 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.
-JA-150-02 Rev.1 Revision 9  Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.
Created from JPM No. N-64 R8
Created from JPM No. N
-64 R8  


CR-h (from N rev 8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
CR-h (from N rev 8)
SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset to IC
: 1. Reset to IC-25 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
-25 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Modify Remote Function RH02 to 100, to open 1RH8734B when called as EO by examinee.
: 2. Modify Remote Function RH02 to 100, to open 1RH8734B when called as EO by examinee. 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 4. This completes the setup for this JPM
: 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
: 4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-h (from N rev 8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-h (from N rev 8)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the unit NSO.
: 1. You are the unit NSO.
: 2. The plant is in MODE 4 with RHR in shutdown cooling.
: 2. The plant is in MODE 4 with RHR in shutdown cooling.
: 3. Normal letdown is in service.
: 3. Normal letdown is in service.
: 4. Train B RHR is operating with train A in stand-by. 5. Degassing of the RCS is NOT required at this time.
: 4. Train B RHR is operating with train A in stand-by.
INITIATING CUE The US directs you to establish 55 gpm letdown from RH and secure normal letdown per BOP  
: 5. Degassing of the RCS is NOT required at this time.
 
INITIATING CUE The US directs you to establish 55 gpm letdown from RH and secure normal letdown per BOP CV-17.
CV-17. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CR-h (from N rev 8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
CR-h (from N rev 8)
RECORD START TIME:
RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee
Comment ELEMENT                                       STANDARD          SAT   UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee
: 1. Refer to BOP CV
: 1. Refer to BOP CV-17, step F.1                       LOCATE and OPEN BOP CV-17 Note: May be performed at any time Cue: Prerequisites are met
-17, step F.1 Note: May be performed at any time Cue: LOCATE and OPEN BOP CV-17 Prerequisites are met
: 2. Verify/Open 1CV460                               At 1PM05J:
: 2. Verify/Open 1CV460   At 1PM05 J: VERIFY/OPEN 1CV460     3. Verify/Open 1CV459 At 1PM05J:   VERIFY/OPEN 1CV459   4. Verify/Open 1CV8389A/B   At 1PM05J:   VERIFY/OPEN 1CV8389A/B
VERIFY/OPEN 1CV460
: 5. Verify/Open 1CV8160   At 1PM05J:   VERIFY/OPEN 1CV8160   6. Verify/Open 1CV8149A/B/C At 1PM05J:   VERIFY/OPEN 1CV8149A/B/C
: 3. Verify/Open 1CV459                             At 1PM05J:
: 7. Verify RH letdown control valve position   At 1PM05J:  VERIFY/REDUCE 1CV128 demand to 0
                                                    &deg; VERIFY/OPEN 1CV459
%    *8. Align RH letdown flowpath Cue: Operator reports 1RH8734B is OPEN  DISPATCH operator to locally open 1RH8734B CR-h (from N rev 8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 4. Verify/Open 1CV8389A/B                           At 1PM05J:
ELEMENT SAT STANDARD UNSAT Comment Number *9. Place 1CC130 A to Manual at 40%
VERIFY/OPEN 1CV8389A/B
At 1PM05J:  PLACE 1CC130A in MANUAL and ADJUST demand to 40%
: 5. Verify/Open 1CV8160                             At 1PM05J:
    *10. Place 1CV131 to Manual at 40% At 1PM05J:  PLACE 1CV131 in MANUAL and ADJUST demand to 40%
VERIFY/OPEN 1CV8160
: 11. Place the 1CV129 to VCT
: 6. Verify/Open 1CV8149A/B/C                       At 1PM05J:
                                                    &deg; VERIFY/OPEN 1CV8149A/B/C At 1PM05J:
: 7. Verify RH letdown control valve position
                                                    &deg; VERIFY/REDUCE 1CV128 demand to 0%
*8. Align RH letdown flowpath Cue: Operator reports 1RH8734B is
* DISPATCH operator to OPEN locally open 1RH8734B SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
CR-h (from N rev 8)
Comment ELEMENT                                         STANDARD            SAT   UNSAT Number At 1PM05J:
*9. Place 1CC130A to Manual at 40%
* PLACE 1CC130A in MANUAL and ADJUST demand to 40%
At 1PM05J:
*10. Place 1CV131 to Manual at 40%
* PLACE 1CV131 in MANUAL and ADJUST demand to 40%
At 1PM05J:
: 11. Place the 1CV129 to VCT PLACE 1CV129 to the VCT position At 1PM05J:
: 12. Adjust 1LK-112 o ADJUST 1LK-112 pot setting to 7.3 AND PLACE 1LK-112 in AUTO
: 13. Place 1CV112A in Auto                            At 1PM05J:
PLACE 1CV-112A in AUTO
*14. Establish RH Letdown Flow At 1PM05J:
* OPEN/THROTTLE 1CV-128
*15. Adjust RH Letdown Flow At 1PM05J:
* ADJUST 1CV131 in manual to obtain desired flow
: 16. Place 1CV131 in Auto, if required At 1PM05J:
PLACE 1CV131 in AUTO, IF required SRRS: 3D.105 (when utilized for operator initial or continuing training)


At 1PM05J:   PLACE 1CV129 to the VCT position    12. Adjust 1 LK-112  At 1PM05J: o ADJUST 1 LK-112 pot setting to 7.3 AND  PLACE 1 LK-112 in AUTO    13. Place 1CV112A in Auto At 1PM05J:   PLACE 1 CV-112A in AUTO    *14. Establish RH Letdown Flow
CR-h (from N rev 8)
Comment ELEMENT                                          STANDARD                SAT    UNSAT Number
: 17. Adjust letdown temperature                      At 1PM05J:
NOTE: When examiner is satisfied,                              ADJUST 1CC130A to CUE the examinee that temp=                                  obtain ~ 110&deg;F 110&deg;F At 1PM05J:
: 18. Establish auto temperature control PLACE 1CC130A in AUTO At the RM-11:
: 19. Verify letdown radiation monitor in service                                                    VERIFY/PLACE 1RE-PR006 in service per BOP AR/PR-1 Cue: An extra NSO will place 1RE-PR006 in service
*20. Isolate normal letdown flowpath              At 1PM05J:
* CLOSE 1CV8152
: 21. Align 1CV129 for RCS cleanup                    At 1PM05J:
PLACE 1CV129 in the proper position for RCS Cue: Place 1CV129 is in DEMIN cleanup position to allow continued cleanup.
Cue: This JPM is complete RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


At 1PM05J:  OPEN/THROTTLE 1 CV-128    *15. Adjust RH Letdown Flow At 1PM05J:  ADJUST 1CV131 in manual to obtain desired
CR-h (from N-64 R8)
JPM


flow    16. Place 1CV131 in Auto, if required At 1PM05J:  PLACE 1CV131 in AUTO, IF required
==SUMMARY==


CR-h (from N rev 8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:                                                 Job
ELEMENT SAT STANDARD UNSAT Comment Number 17. Adjust letdown temperature NOTE: When examiner is satisfied, CUE the examinee that temp=


110&deg;F  At 1PM05J:   ADJUST 1CC130A to obtain ~ 110&deg;F
==Title:==
: 18. Establish auto temperature control At 1PM05J:  PLACE 1CC130 A in AUTO    19. Verify letdown radiation monitor in service  Cue:  An extra NSO will place 1 RE-PR006 in service At the RM-11:  VERIFY/PLACE 1 RE-PR006 in service per BOP AR/PR-1    *20. Isolate normal letdown flowpath A t 1PM05J:  CLOSE 1CV8152    21. Align 1CV129 for RCS cleanup Cue: At 1PM05J: Place 1CV129 is in DEMIN position to allow continued cleanup.
EO        RO      SRO      FS STA/IA          SRO Cert JPM
PLACE 1CV129 in the proper position for RCS cleanup    Cue:  This JPM is complete RECORD STOP TIME
:
CR-h (from N-64 R8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==Title:==
Establish and Secure Normal and RH Letdown JPM Number: CR-h                                    Revision Number: 09 Task Number and


Operator's Name
==Title:==
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
4C.CV-16 ESTABLISHING and SECURING Normal and RH Letdown flow.
JPM Number:
K/A Number and Importance:           005 2.1.23 4.3/4.4 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
Establish and Secure Normal and RH Letdown CR-h Revision Number:
1BOP CV-17 Rev. 25 CRITICAL STEPS (*) 8, 9, 10, 14, 15, & 20 Actual Testing Environment:             Simulator             Control Room          In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 20 minutes                        Actual Time Used:            minutes EVALUATION
Task Number and Title:
09 4C.CV-16   K/A Number and Importance:
ESTABLISHING and SECURING Normal and RH Letdown flow.
Suggested Testing Environment:
005 2.1.23   4.3
/4.4 Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Simulator Reference(s):
1BOP CV-17 Rev. 25 CRITICAL STEPS
(*) 8, 9, 10, 14, 15, & 20 Actual Testing Environment:
Simulator Control Roo m  In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
2 0EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily? Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
 
:   Date:
CR-h (from N-64 R8)
CR-h (from N-64 R8)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the unit NSO.
: 1. You are the unit NSO.
: 2. The plant is in MODE 4 with RHR in shutdown cooling.
: 2. The plant is in MODE 4 with RHR in shutdown cooling.
: 3. Normal letdown is in service.
: 3. Normal letdown is in service.
: 4. Train B RHR is operating with train A in stand-by. 5. Degassing of the RCS is NOT required at this time.
: 4. Train B RHR is operating with train A in stand-by.
INITIATING CUE The US directs you to establish 55 gpm letdown from RH and secure normal letdown per BOP  
: 5. Degassing of the RCS is NOT required at this time.
INITIATING CUE The US directs you to establish 55 gpm letdown from RH and secure normal letdown per BOP CV-17.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


CV-17.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Operate the Fire Detection/Alarm Equipment (without control power)
Exelon Nuclear Job Performance Measure Operate the Fire Detection/Alarm Equipment (without control power)
JPM Number:
JPM Number: IP-i Revision Number: 07 Date: 10/30/2011 Revised By:             Bill Hochstetter                 10/30/2011 Instructor            Date Reviewed By:             Brian Lewin                     11/6/2011 Operations Representative        Date Approved By:             /s/ Rob Lawlor                   11/6/2011 Facility Representative        Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-i Revision Number:
 
07 Date: 10/3 0/2011 Revised By: Bill Hochstetter Instructor Date 10/3 0/2011   Reviewed By:
IP-i (from N-49a - rev 6)
Brian Lewin Operations Representative Date 11/6/2011   Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
/s/ Rob Lawlor Facility Representative Date 11/6/2011 IP-i (from N-49a - rev 6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 2,201: Line 2,242:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BOP FP-22 Rev: 6 Procedure BOP FP-22A20 Rev: 0 Procedure BOP FP-22A25 Rev: 9. Verify cues both verbal and visual are free of conflict. 10. Verify performance time is accurate
Procedure BOP FP-22           Rev: 6 Procedure BOP FP-22A20         Rev: 0 Procedure BOP FP-22A25         Rev: 0
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Bill Hochstetter (Signature on file)
Bill Hochstetter (Signature on file)                   10/30/11 SME / Instructor                             Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor Date 10/3 0/11 


IP-i (from N-49a - rev 6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-i (from N-49a - rev 6)
Revision Record (Summary)
Revision Record (Summary)
Verified/ updated KAs and TPOs to current revision Revision 7  Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.
Revision 7 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.
Created from JPM No. N
Created from JPM No. N-49a R6
-49a R6  


IP-i (from N-49a - rev 6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
IP-i (from N-49a - rev 6)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an Equipment Operator.
: 1.       You are an Equipment Operator.
: 2. A fire exists in the _B Diesel Generator room as determined by an alarm at
: 2.       A fire exists in the _B Diesel Generator room as determined by an alarm at
_PM09J and local report.
_PM09J and local report.
: 3. Automatic actuation of CO 2 to the _B Diesel Generator room has failed.
: 3.       Automatic actuation of CO2 to the _B Diesel Generator room has failed.
INITIATING CUE The Fire Chief directs you to manually initiate CO 2 to the _B Diesel Generator room using BOP FP-22. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
INITIATING CUE The Fire Chief directs you to manually initiate CO2 to the _B Diesel Generator room using BOP FP-22.
Information For Evaluator's Use:
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


IP-i (from N-49a - rev 6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-i (from N-49a - rev 6)
RECORD START TIME:
RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number 1. Refer to BOP FP
Comment ELEMENT                                       STANDARD              SAT   UNSAT Number
-22, Manual Operation of the Carbon Dioxide and Halon Fire Suppression Systems LOCATE and OPEN BOP
: 1. Refer to BOP FP-22, Manual                 &deg; LOCATE and OPEN BOP              ___  ___      ___
Operation of the Carbon                     FP-22 Dioxide and Halon Fire Suppression Systems CUE      All prerequisites have been met NOTE:            Provide the examinee with a copy of BOP FP-22.
: 2. Refer to Section G to determine            DETERMINE attachment:              ___  ___      ___
attachment
                                                    &deg; FP-22A20 for DG 1B
                                                    &deg; FP-22A25 for DG 2B CUE      (if requested) The detection zone in alarm is _D-71 Note: (If requested), local panel has control power indication NOTE:            Provide the examinee with a copy of FP-22A20 for DG 1B OR FP-22A25 for DG 2B as appropriate.
: 3. Request MCR to contact                    REQUEST Center Desk to:            ___  ___      ___
Security
                                                    &deg; Call Security to ensure room clear of personnel CUE      Security has verified the room is clear of personnel NOTE:            This is a prerequisite, and was met in JPM step 1.
: 4. Request a page announcement. REQUEST Center Desk to:                          ___  ___      ___
                                                    &deg; Page plant for pending initiation CUE      Page announcement has been made
: 5. Verify open CO2 block valve.              &deg; VERIFY/OPEN _CO5022B            ___  ___      ___
CUE      _CO5022B is PARALLEL to the piping (OPEN)
SRRS: 3D.105 (when utilized for operator initial or continuing training)


FP-22 ___ ___ ___ CUE All prerequisites have been met NOTE: Provide the examinee with a copy of BOP FP
IP-i (from N-49a - rev 6)
-22. 2. Refer to Section G to determine attachment DETERMINE attachment:
Comment ELEMENT                                        STANDARD          SAT  UNSAT Number
FP-22A20 for DG 1B FP-22A25 for DG 2B
: 6. Verify Abort Switch not in Abort.          VERIFY _HS-CO004 NOT in        ___   ___     ___
___ ___ ___ CUE (if requested) The detection zone in alarm is _D
ABORT CUE     HS-CO004 is NOT in ABORT
-71 Note:  (If requested), local panel has control power indication NOTE: Provide the examinee with a copy of FP
: 7. Pull down the CO2 push button              PULL DOWN cover for:          ___  ___    ___
-22A20 for DG 1B OR 3. FP-22A25 for DG 2B as appropriate.
station cover.                                _HS-CO002 OR
Request MCR to contact Security REQUEST Center Desk to:
_HS-CO003 CUE      HS-CO002 button cover is DOWN                        OR CUE      HS-CO003 button cover is DOWN CUE     (if asked) The red light associated with the button is off NOTE:           Alternate path initiated in the following step.
Call Security to ensure room clear of personnel
DEPRESS CO2 button:
___ ___ ___ CUE Security has verified the room is clear of personnel NOTE: This is a prerequisite, and was met in JPM step 1.
: 8. Locally actuate system                                                    ___   ___     ___
: 4. Request a page announcement.
_HS-CO002 OR
REQUEST Center Desk to:
_HS-CO003 CUE     HS-CO002 button is DEPRESSED                          OR CUE      _HS-CO003 button is DEPRESSED
Page plant for pending initiation
: 9. Verify system actuates locally.           At _CO03J:                     ___   ___     ___
___ ___ ___ CUE Page announcement has been made
                                                    &deg; Verify CO2 System Actuated light LIT CUE     The CO2 System Actuated light is NOT LIT on _CO03J NOTE:            If the examinee elects to try the other push button - repeat this cue.
: 5. Verify open CO2 block valve.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
VERIFY/OPEN _CO5022B
___ ___ ___ CUE _CO5022B is 'PARALLEL' to the piping (OPEN)


IP-i (from N-49a - rev 6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-i (from N-49a - rev 6)
ELEMENT SAT STANDARD UNSAT Comment Number 6. Verify Abort Switch not in Abort.
Comment ELEMENT                                       STANDARD          SAT   UNSAT Number
VERIFY _HS
: 10. Verify alarm received on                  VERIFY:                        ___   ___     ___
-CO004  NOT in ABORT ___ ___ ___ CUE HS-CO004 is NOT in ABORT
_PM09J.
: 7. Pull down the CO2 push button station cover.
                                                    &deg; Suppression alarm on
PULL DOWN cover for_HS-CO002    OR _HS-CO003 ___ ___ ___ CUE HS-CO002 button cover is DOWN CUE OR HS-CO003 button cover is DOWN CUE (if asked) The red light associated with the button is off NOTE: Alternate path initiated in the following step.
_PM09J CUE     The Unit NSO reports that the suppression alarm was NOT received on _PM09J NOTE:           If the examinee elects to try the other push button - repeat this cue.
: 8. Locally actuate system DEPRESS CO 2 button_HS-CO002    OR  _HS-CO003 ___ ___ ___ CUE HS-CO002 button is DEPRESSED CUE OR _HS-CO003 button is DEPRESSED
: 11. Determine manual initiation                &deg; PROCEED to step B.1          ___   ___      ___
: 9. Verify system actuates locally.
without control power is required
At _CO03J:
  *12. Open the Master EMPC.                      VERIFY/OPEN:                  ___   ___     ___
Verify CO 2 System  Actuated light LIT ___ ___ ___ CUE The CO 2 System Actuated light is NOT LIT on _CO03J NOTE: If the examinee elects to try the other push button
* 0CO09J CUE     0CO09J actuator lever is in the OPEN position
- repeat this cue.
: 13. Verify open CO2 block valve.               VERIFY/OPEN:                   ___   ___     ___
                                                    &deg; _CO5022B CUE     _CO5022B is PARALLEL to the piping (OPEN)
NOTE:           _C05022B was previously verified open (JPM step 5)
*14. Break glass on _CO03JB
* BREAK glass cover on        ___  ___      ___
_CO03JB CUE      The glass cover has been broken on _CO03JB
  *15. Actuate using EMPC actuator
* PLACE actuator lever for    ___   ___     ___
lever                                        _CO03JB in OPEN
* NOTE time CUE     _CO03JB actuator lever is in the OPEN position CUE      Use current time SRRS: 3D.105 (when utilized for operator initial or continuing training)


IP-i (from N-49a - rev 6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-i (from N-49a - rev 6)
ELEMENT SAT STANDARD UNSAT Comment Number 10. Verify alarm received on _PM09J. VERIFY:  Suppression alarm on _PM09J ___ ___ ___ CUE The Unit NSO reports that the suppression alarm was NOT received on _PM09J NOTE: If the examinee elects to try the other push button
Comment ELEMENT                                       STANDARD              SAT   UNSAT Number
- repeat this cue.
: 16. Verify alarm received on                   VERIFY:                            ___  ___      ___
: 11. Determine manual initiation without control power is required  PROCEED to step B.1
_PM09J.
___ ___ ___ *12. Open the Master EMPC.
                                                    &deg; Suppression alarm on
VERIFY/OPEN:
_PM09J (_S-37)
0CO09J ___ ___ ___ CUE 0CO09J actuator lever is in the OPEN position
CUE     The Unit NSO reports that the suppression alarm _S-37 was received on _PM09J
: 13. Verify open CO2 block valve.
  *17. Terminate CO2                              WHEN 1 minute for 1B DG OR        ___   ___     ___
VERIFY/OPEN:
1 minute and 40 seconds for 2B DG has passed, THEN:
_CO5022B ___ ___ ___ CUE _CO5022B is 'PARALLEL' to the piping (OPEN)
* PLACE _CO03JB actuator lever in CLOSE CUE      (If the 1B DG, then) 1 minute has passed CUE      (If the 2B DG, then) 1 minute and 40 seconds has passed CUE     The _CO03JB actuator lever is in the CLOSED position NOTE:
NOTE: _C05022B was previously verified open (JPM step 5)
*18. Close CO2 block valve.                     CLOSE:                             ___   ___     ___
*14. Break glass on _CO03JB BREAK glass cover on _CO03JB ___ ___ ___ CUE The glass cover has been broken on _CO03JB
                                                    &deg; _CO5022B CUE     _CO5022B is PERPENDICULAR to the piping (CLOSE)
*15. Actuate using EMPC actuator lever  PLACE actuator lever for _CO03JB in OPEN NOTE time ___ ___ ___ CUE _CO03JB actuator lever is in the OPEN position CUE Use current time
CUE      This JPM is completed JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


IP-i (from N-49a - rev 6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-i (from N-49a R6)
ELEMENT SAT STANDARD UNSAT Comment Number 16. Verify alarm received on _PM09J. VERIFY:  Suppression alarm on
_PM09J (_S
-37) ___ ___ ___ CUE The Unit NSO reports that the suppression alarm _S
-37 was received on _PM09J
*17. Terminate CO 2 WHEN 1 minute for 1B DG OR  1 minute and 40 seconds for 2B DG has passed, THEN:
PLACE _CO03JB actuator lever in CLOSE
___ ___ ___ CUE (If the 1B DG, then) 1 minute has passed CUE (If the 2B DG, then) 1 minute and 40 seconds has passed CUE The _CO03JB actuator lever is in the CLOSED position NOTE:  *18. Close CO2 block valve.
CLOSE:  _CO5022B ___ ___ ___ CUE _CO5022B is 'PERPENDICULAR' to the piping (CLOSE)
CUE This JPM is completed
___ ___ ___    JPM Stop Time:
IP-i (from N-49a R6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
JPM Number:
==Title:==
EO         RO     SRO       FS STA/IA           SRO Cert JPM
 
==Title:==
Operate the Fire Detection/Alarm Equipment (without control power)
Operate the Fire Detection/Alarm Equipment (without control power)
IP-i Revision Number:
JPM Number: IP-i                                     Revision Number: 07 Task Number and
Task Number and Title:
 
07  K/A Number and Importance:
==Title:==
4C.FP-02 OPERATE the Fire Detection/Alarm equipment.
4C.FP-02 OPERATE the Fire Detection/Alarm equipment.
Suggested Testing Environment:
K/A Number and Importance:            086A2.04 3.3/3.9 Suggested Testing Environment::                 Simulator         Control Room       In-Plant     Other Alternate Path: Yes           No SRO Only:               Yes         No   Time Critical:     Yes     No Reference(s):
:     Simulator Control Room In-Plant   Other Alternate Path
BOP FP-22, Manual Operation of the CO2 and Halon Fire Suppression Systems (Rev 6)
: Yes No SRO Only: Yes No Time Critical:
BOP FP-22A20, Manual Initiation of CO2 to 1B Diesel Generator Room (Rev. 0)
Yes No 086A2.04  3.3/3.9 Reference(s):
BOP FP-22, Manual Operation of the CO2 and Halon Fire Suppression Systems (Rev 6) BOP FP-22A20, Manual Initiation of CO2 to 1B Diesel Generator Room (Rev. 0)
BOP FP-22A25, Manual Initiation of CO2 to 2B Diesel Generator Room (Rev. 0)
BOP FP-22A25, Manual Initiation of CO2 to 2B Diesel Generator Room (Rev. 0)
CRITICAL STEPS
CRITICAL STEPS (*) 12, 14, 15, 17, & 18 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                        Actual Time Used:            minutes EVALUATION
(*) 12, 14, 15, 17, & 18 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 5EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                     Evaluator's Name
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
 
:   Date:
IP-i (from N-49a R6)
IP-i (from N-49a R6)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an Equipment Operator. 2. A fire exists in the _B Diesel Generator room as determined by an alarm at
: 1. You are an Equipment Operator.
: 2. A fire exists in the _B Diesel Generator room as determined by an alarm at
_PM09J and local report.
_PM09J and local report.
: 3. Automatic actuation of CO 2 to the _B Diesel Generator room has failed.
: 3. Automatic actuation of CO2 to the _B Diesel Generator room has failed.
INITIATING CUE The Fire Chief directs you to manually initiate CO 2 to the _B Diesel Generator room using BOP F P-22.
INITIATING CUE The Fire Chief directs you to manually initiate CO2 to the _B Diesel Generator room using BOP FP-22.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Perform a Local Emergency Start of the 1B AF pp using BOA ELECT
 
-5, Attachment D.
Exelon Nuclear Job Performance Measure Perform a Local Emergency Start of the 1B AF pp using BOA ELECT-5, Attachment D.
JPM Number:
JPM Number: IP-j Revision Number: 08 Date: 11/02/2011 Revised By:             Bill Hochstetter                 11/02/2011 Instructor            Date Reviewed By:             Brian Lewin                     11/6/2011 Operations Representative        Date Approved By:             /s/ Rob Lawlor                   11/6/2011 Facility Representative        Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-j Revision Number:
 
08 Date: 11/02/2011 Revised By: Bill Hochstetter Instructor Date 11/02/2011   Reviewed By:
IP-j (from N rev 7)
Brian Lewin Operations Representative Date 11/6/2011   Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
/s/ Rob Lawlor Facility Representative Date 11/6/2011 IP-j (from N rev 7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 2,342: Line 2,394:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure 1BOA ELEC-5 att. D       Rev: 101 9. Verify cues both verbal and visual are free of conflict.
Procedure 1BOA ELEC-5 att. D                 Rev: 101 Procedure                        Rev:
Procedure        Rev:  Procedure        Rev: 10. Verify performance time is accurate
Procedure                        Rev:
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:   Bill Hochstetter (Signature on file)
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date 11/02/20 11 
Bill Hochstetter (Signature on file)                   11/02/2011 SME / Instructor                             Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


IP-j (from N rev 7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-j (from N rev 7)
Revision Record (Summary)
Revision Record (Summary)
Applied new template TQ
Revision 8 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.
-JA-150-02 Rev.1 Revision 8  Verified/ updated KAs and TPOs to current revision Validated 11/0 6/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.
Created from JPM No. N-56 Rev. 7 Specified to use on Unit 1 only.
Created from JPM No. N
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-56 Rev. 7 Specified to use on Unit 1 only.


IP-j (from N rev 7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-j (from N rev 7)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are a Non
: 1. You are a Non-Licensed Operator.
-Licensed Operator.
: 2. The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
: 2. The unit has just tripped in conjunction with an electrical fire in the unit's Remote Shutdown Panel.
: 3. The 1A AF pump is OOS for maintenance and the 1B AF pump did not automatically start, and will not manually start with the MCR switch.
: 3. The 1A AF pump is OOS for maintenance and the 1B AF pump did not automatically start, and will not manually start with the MCR switch.
 
INITIATING CUE The Shift Manager has just directed you to initiate a local emergency start of the 1B AF pump using BOA ELEC-5, Attachment D Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
INITIATING CUE The Shift Manager has just directed you to initiate a local emergency start of the 1B AF pump using BOA ELEC
Information For Evaluators Use:
-5, Attachment D Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


IP-j (from N rev 7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-j (from N rev 7)
RECORD START TIME:
RECORD START TIME:
ELEMENT SAT STANDARD UNSAT Comment Number 1. Locate the 1B AF pump.
Comment ELEMENT                                       STANDARD              SAT   UNSAT Number
Note: Provide the Candidate with a copy of 1 or 2BOA ELEC-5, Attachment D.
: 1. Locate the 1B AF pump.                         On 383 Aux Bldg:
On 383' Aux Bldg:
Note: Provide the Candidate with a                         LOCATE _B AF pump.
LOCATE _B AF pump.
copy of 1 or 2BOA ELEC-5, Attachment D.
NOTE Double Hearing Protection will be required prior to room entry. Ensure double hearing protection is available.
NOTE Double Hearing Protection will be required prior to room entry. Ensure double hearing protection is available.
JPM steps 2 and 3 may be performed in any order
JPM steps 2 and 3 may be performed in any order
: 2. Verify/Start associated Aux Lube Oil Pump. Cue: Aux Lube Oil Pump CS is in the 'START' position
: 2. Verify/Start associated Aux Lube Oil Pump.                                           Inside pp room 383 L15 (U-1)
. Inside pp room 383 L 15 (U-1) Inside pp room 383 L18 (U
Cue: Aux Lube Oil Pump CS is in the                 Inside pp room 383 L18 (U-2)
-2) VERIFY/START _B Aux Lube Oil Pump
START position.
: 3. Verify/Start Gearbox Lube Oil Pump. Cue:  Gearbox Lube Oil Pump CS is in the 'START' position.
VERIFY/START _B Aux Lube Oil Pump
Inside pp room 383 L16 (U-1) Inside pp room 383 L19 (U
: 3. Verify/Start Gearbox Lube Oil Pump.                                           Inside pp room 383 L16 (U-1)
-2) VERIFY/START _B Gearbox Lube Oil Pump
Cue: Gearbox Lube Oil Pump CS is                    Inside pp room 383 L19 (U-2) in the START position.
      *4. Place ENGINE START Switch to MAN.
VERIFY/START _B Gearbox Lube Oil Pump
Cue: ENGINE START Switch is in MAN. Note: The "blue" "Engine ready to start" light will extinguish when switch is repositioned
*4. Place ENGINE START Switch to                     At _AF01J:
. At _AF01J:
MAN.
PLACE Engine Start Switch to MAN IP-j (from N rev 7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
* PLACE Engine Start Switch Cue: ENGINE START Switch is in                           to MAN MAN.
ELEMENT SAT STANDARD UNSAT Comment Number 5. Verify Diesel Air Box Trip reset.
Note: The blue Engine ready to start light will extinguish when switch is repositioned.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Cue: Air Box Trip Annunciator is NOT LIT. At _AF01J    CHECK Diesel Air Box Trip reset
IP-j (from N rev 7)
: 6. Momentarily depress the RESET button. Cue:   Reset pushbutton depressed and released At _AF01J:
Comment ELEMENT                                        STANDARD              SAT    UNSAT Number
DEPRESS and RELEASE the Reset button     *7. Start the 1B AF Pump.
: 5. Verify Diesel Air Box Trip reset.              At _AF01J Cue: Air Box Trip Annunciator is                           CHECK Diesel Air Box NOT LIT.                                                Trip reset
 
: 6. Momentarily depress the RESET                     At _AF01J:
Cue: The ENGINE RUNNING light is LIT. Note: engine should start within 60 seconds At _AF01J:
button.
DEPRESS the Start button.
Cue: Reset pushbutton depressed                             DEPRESS and and released                                           RELEASE the Reset button
VERIFY the Engine Running Light is lit
*7. Start the 1B AF Pump.
At _AF01J:
Cue: The ENGINE RUNNING light is LIT.
* DEPRESS the Start button.
Note: engine should start within 60 seconds                                         VERIFY the Engine Running Light is lit
: 8. Monitor _B AF pump operation.
: 8. Monitor _B AF pump operation.
Cue: AF-7T1 will be completed by                        PERFORM BOP AF-7T1 another NLO who will monitor the pump.
Cue: This JPM is completed RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Cue:    AF-7T1 will be completed by another NLO who will monitor the pump. PERFORM BOP AF
IP-j (from N-56 R7)
-7T1    Cue:  This JPM is completed RECORD STOP TIME:
IP-j (from N-56 R7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
JPM Number:
==Title:==
Local Emergency start of the _B AF pump IP-j Revision Number:
EO         RO     SRO     FS STA/IA           SRO Cert JPM
Task Number and Title:
08 4D.OA-35  K/A Number and Importance:
Establish Emergency Control of Safe Shutdown Equipment Suggested Testing Environment:
061.2.1.30    4.4/4
.0 Alternate Path:
Yes  No SRO Only:  Yes  No Time Critical:
Yes  No In-Plant Reference(s):
1BOA ELECT
-5 att. D        Rev: 101  CRITICAL STEPS
(*) 4 & 7 Actual Testing Environment:
Simulator  Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
12 minutes Actual Time Used:
minutes EVALUATION


==SUMMARY==
==Title:==
:
Local Emergency start of the _B AF pump JPM Number: IP-j                                     Revision Number: 08 Task Number and
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                    Evaluator's Name
:  (Print) Evaluator's Signature
:  Date:
IP-j (from N-56 R7)  SRRS: 3D.105 (when utilized for operator initial or continuing training)
TASK CONDITIONS
: 1. You are a Non
-Licensed Operator.
: 2. The unit has just tripped in conjunction with an electrical fire in the unit's Remote Shutdown Panel
.
: 3. The 1A AF pump is OOS for maintenance and the 1B AF pump did not automatically start, and will not manually start with the MCR switch.
INITIATING CUES


The Shift Manager has just directed you to initiate a local emergency start of the 1B AF pump using BOA ELEC
==Title:==
-5, Attachment D.
4D.OA-35 Establish Emergency Control of Safe Shutdown Equipment K/A Number and Importance:            061.2.1.30 4.4/4.0 Suggested Testing Environment: In-Plant Alternate Path:    Yes        No SRO Only: Yes                      No    Time Critical:    Yes    No Reference(s):
1BOA ELECT-5 att. D                 Rev: 101 CRITICAL STEPS (*) 4 & 7 Actual Testing Environment:              Simulator            Control Room          In-Plant      Other Testing Method:          Simulate            Perform Estimated Time to Complete:          12 minutes              Actual Time Used:            minutes EVALUATION


==SUMMARY==
Were all the Critical Elements performed satisfactorily?                    Yes                No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                    Satisfactory      Unsatisfactory Comments:
Evaluators Name:                                                            (Print)
Evaluators Signature:                                                      Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 10  Exelon Nuclear Job Performance Measure Instrument Bus Inverter Startup JPM Number:
IP-k Revision Number:
11 Date:  9/17/2009  Revised By: Bill Hochstetter
* Instructor Date 11/01/2011


Validated By:
IP-j (from N-56 R7)
Brian Lewin
TASK CONDITIONS
* SME or Instructor Date 11/06/2011
: 1.      You are a Non-Licensed Operator.
: 2.      The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
: 3.      The 1A AF pump is OOS for maintenance and the 1B AF pump did not automatically start, and will not manually start with the MCR switch.
INITIATING CUES The Shift Manager has just directed you to initiate a local emergency start of the 1B AF pump using BOA ELEC-5, Attachment D.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Approved By:
Exelon Nuclear Job Performance Measure Instrument Bus Inverter Startup JPM Number: IP-k Revision Number: 11 Date: 9/17/2009 Revised By:              Bill Hochstetter
Rob Lawlor
* 11/01/2011 Instructor            Date Validated By:            Brian Lewin
* Training Department Date 11/06/2011
* 11/06/2011 SME or Instructor          Date Approved By:             Rob Lawlor
* Signature on File
* 11/06/2011 Training Department          Date
* Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 10


IP-k - rev 11 From N-32 R11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-k - rev 11 From N-32 R11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 2 of 10  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 2,473: Line 2,508:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BOP IP-1 Rev: 14 9. Verify cues both verbal and visual are free of conflict.
Procedure BOP IP-1             Rev: 14 Procedure                      Rev:
Procedure Rev:  Procedure Rev:   10. Verify performance time is accurate
Procedure                      Rev:
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date Brian Clark (Signature on file) 9/18/09   Lynn Sanders (Signature on file)
Brian Clark (Signature on file)                       9/18/09 SME / Instructor                              Date Lynn Sanders (Signature on file)                     9/18/09 SME / Instructor                                 Date SME / Instructor                                Date SRRS: 3D.105 (when utilized for operator initial or continuing training)               Page 2 of 10
SME / Instructor Date 9/18/09         SME / Instructor Date IP-k - rev 11 From N-32 R11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 10 Revision Record (Summary)
Applied new template TQ
-JA-150-02 Rev.1 Revision 11  Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Added statement concerning critical step Added photos of panels


IP-k - rev 11 From N-32 R11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-k - rev 11 From N-32 R11 Revision Record (Summary)
Page 4 of 10 INITIAL CONDITIONS
Revision 11 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Added statement concerning critical step Added photos of panels SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 10
: 1. You are a n Equipment Operator. 2. The unit is at 65% power.
 
: 3. The unit has experienced a loss of Instrument Bus _11 due to failure of Inst r ument Inverter _11.
IP-k - rev 11 From N-32 R11 INITIAL CONDITIONS
: 1. You are an Equipment Operator.
: 2. The unit is at 65% power.
: 3. The unit has experienced a loss of Instrument Bus _11 due to failure of Instrument Inverter _11.
: 4. All maintenance is completed on Instrument Inverter _11 and the Clearance Order Tags have been removed.
: 4. All maintenance is completed on Instrument Inverter _11 and the Clearance Order Tags have been removed.
: 5. Instrument Bus _11 is currently energized from the constant voltage transformer (_IP01E). INITIATING CUE
: 5. Instrument Bus _11 is currently energized from the constant voltage transformer
: 1. The Unit Supervisor directs you to startup Instrument _11 Inverter _IP05E and to transfer Instrument Bus _11 power to the inverter per BOP IP
(_IP01E).
-1. 2. A n Equipment Operator is standing by at MCC _31X2.
INITIATING CUE
: 1. The Unit Supervisor directs you to startup Instrument _11 Inverter _IP05E and to transfer Instrument Bus _11 power to the inverter per BOP IP-1.
: 2. An Equipment Operator is standing by at MCC _31X2.
: 3. All prerequisites associated with any critical step are met.
: 3. All prerequisites associated with any critical step are met.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
IP-k - rev 11 From N-32 R11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)   Page 4 of 10
Page 5 of 10 RECORD START TIME:
 
ELEMENT SAT STANDARD UNSAT Comment Number 1. Refer to BOP IP
IP-k - rev 11 From N-32 R11 RECORD START TIME:
-1 Cue: (If requested)
Comment ELEMENT                                     STANDARD              SAT       UNSAT Number
No instrument channels are in a tripped condition and the control room has reviewed _BOA Elec-2. Cue:   LOCATE and OPEN BOP IP-1 Prerequisites are met
: 1. Refer to BOP IP-1                           &deg;    LOCATE and OPEN BOP IP-1 Cue: (If requested) No instrument channels are in a tripped condition and the control room has reviewed _BOA Elec-2.
: 2. VERIFY On Inverter Fan _IP09E.
Cue: Prerequisites are met
Cue: Inverter fan switch is in ON or the 'ORANGE' light is lit At _IP09E:
: 2. VERIFY On Inverter Fan _IP09E.                 At _IP09E:
VERIFY/PLACE Inverter Fan _IP09E ON
Cue: Inverter fan switch is in ON                 &deg;    VERIFY/PLACE Inverter or the ORANGE light is lit                       Fan _IP09E ON
        *3. VERIFY/CLOSE Inverter AC feed breaker at MCC _31X2 Cub. C2.
*3. VERIFY/CLOSE Inverter AC feed                 Close Inverter AC feed breaker.
Cue: Close Inverter AC feed breaker.
breaker at MCC _31X2 Cub. C2.
EO reports that feed breaker _31X2 cub C2 is CLOSED DIRECT EO to CLOSE AC feed breaker at _31X2 cub C2       *4. VERIFY/CLOSE Inverter DC feed breaker, at 125 VDC Distribution Panel _11 BF1, CKT 1.
* DIRECT EO to CLOSE AC Cue: EO reports that feed breaker                       feed breaker at _31X2 cub
Note: Located 451' elevation ME ER Cue: DC feed breaker at 125 VDC panel _11 BF1, Ckt #1 is to the 'RIGHT' (CLOSED)
_31X2 cub C2 is CLOSED                             C2
Close Inverter DC feed breaker. LOCATE 125 VDC Distribution Panel _11 BF1 CLOSE 125 VDC Distribution Panel _11 BF1 Breaker, ckt 1
*4. VERIFY/CLOSE Inverter DC feed                Close Inverter DC feed breaker, at 125 VDC Distribution             breaker.
        *5. CLOSE Battery input breaker 2CB Note: Located 451' elevation MEER Cue: Battery input breaker 2CB is in the 'UP' position (ON)
Panel _11 BF1, CKT 1.
At Inverter _IP05E:
                                                  &deg;    LOCATE 125 VDC Note: Located 451 elevation MEER                      Distribution Panel _11 BF1 Cue: DC feed breaker at 125 VDC
LOCATE Instrument Inverter _11 (_IP05E)
* CLOSE 125 VDC panel _11 BF1, Ckt #1 is to                       Distribution Panel _11 BF1 the RIGHT (CLOSED)                               Breaker, ckt 1
CLOSE "Battery Input Bkr 2CB" on the inverter
*5. CLOSE Battery input breaker 2CB At Inverter _IP05E:
Note: Located 451 elevation MEER                 &deg;    LOCATE Instrument Inverter _11 (_IP05E)
Cue: Battery input breaker 2CB is in the UP position (ON)
* CLOSE Battery Input Bkr 2CB on the inverter SRRS: 3D.105 (when utilized for operator initial or continuing training)        Page 5 of 10


IP-k - rev 11 From N-32 R11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-k - rev 11 From N-32 R11 Comment ELEMENT                                     STANDARD                SAT       UNSAT Number NOTE The pre-charge pushbutton should not be released until DC Input Breaker, 3CB, is closed
Page 6 of 10 ELEMENT SAT STANDARD UNSAT Comment Number NOTE The pre-charge pushbutton should not be released until DC Input Breaker, 3CB, is closed
*6. DEPRESS and HOLD pre-charge                   At _IP05E:
  *6. DEPRESS and HOLD pre
button 1PB for at least 15 seconds
-charge button 1PB for at least 15 seconds Cue:   The Pre-charge 1PB button has been DEPRESSED and HELD for at least 15 seconds If asked: Output volts indicate > 110 on volt meter.
* DEPRESS and HOLD Pre-charge 1PB button Cue: The Pre-charge 1PB button                         for at least 15 seconds has been DEPRESSED and HELD for at least 15 seconds If asked: Output volts indicate > 110 on volt meter.
At _IP05E:
*7. CLOSE DC input breaker 3CB       At _IP05E:
DEPRESS and HOLD "Pre-charge 1PB" button for at least 15 seconds
Cue: DC Input Breaker 3CB is in
    *7. CLOSE DC input breaker 3CB Cue: DC Input Breaker 3CB is in the 'UP' position (ON)
* CLOSE DC Input Breaker the UP position (ON)           3CB on the inverter
At _IP05E:
: 8. Release pre-charge button 1PB At _IP05E:
CLOSE "DC Input Breaker 3CB" on the inverter
Cue: The Pre-charge 1PB button                   &deg;  RELEASE Pre-charge has been RELEASED                                1PB button
: 8. Release pre-charge button 1PB Cue: At _IP05E:
: 9. VERIFY AC output voltage                       At _IP05E, on 2VM:
The Pre-charge 1PB button has been RELEASED RELEASE "Pre
greater than 110 V
-charge 1PB" button
                                                  &deg;    VERIFY output voltage Cue: AC voltmeter indicates 119V                       greater than 110V (or as indicated)
: 9. VERIFY AC output voltage greater than 110 V Cue: AC voltmeter indicates 119V (or as indicated)
*10. CLOSE AC output breaker 4CB                 At _IP05E:
At _IP05E, on 2VM:
Cue: AC Output Breaker 4CB is in
VERIFY output voltage greater than 110V
* CLOSE AC Output Brkr the UP position (ON)                           4CB on the inverter
    *10. CLOSE AC output breaker 4CB Cue: AC Output Breaker 4CB is in the 'UP' position (ON)
: 11. Establish communications with                &deg;    Establish communications Unit NSO                                            with Unit NSO Cue: The Unit NSO has been contacted and directs you to proceed NOTE: The AEER is a No Radio Zone SRRS: 3D.105 (when utilized for operator initial or continuing training)          Page 6 of 10
At _IP05E:
CLOSE "AC Output Brkr 4CB" on the inverter
: 11. Establish communications with Unit NSO Cue: The Unit NSO has been contacted and directs you to proceed NOTE: The AEER is a 'No Radio Zone'      Establish communications with Unit NSO


IP-k - rev 11 From N-32 R11 SRRS: 3D.105 (when utilized for operator initial or continuing training)
IP-k - rev 11 From N-32 R11 Comment ELEMENT                                     STANDARD            SAT       UNSAT Number
Page 7 of 10 ELEMENT SAT STANDARD UNSAT Comment Number 12. PLACE Rod Control in MANUAL at discretion of US.
: 12. PLACE Rod Control in MANUAL                   &deg;    Request NSO/ US to place at discretion of US.                                Rod Control in MANUAL if desired.
Cue:  Request NSO/ US to place Rod Control in MANUAL if desired. Rod Control is in MANUAL The examinee may verify that the CAUTION prior to step F.1.m is met, if the MCR is contacted give the following cue:
Cue: Rod Control is in MANUAL NOTE The examinee may verify that the CAUTION prior to step F.1.m is met, if the MCR is contacted give the following cue:
NOTE  Cue: 1) The SR and IR trips are blocked and/or         2) No instrument channels are in a tripped condition If asked about the "critical" step give the following cue:
Cue: 1) The SR and IR trips are blocked and/or
Cue: All prerequisite requirements associated with the critical step have been met.
: 2) No instrument channels are in a tripped condition If asked about the critical step give the following cue:
Cue:     All prerequisite requirements associated with the critical step have been met.
(This includes an SRO present, and US permission)
(This includes an SRO present, and US permission)
Note: The examiner may want to use the attached picture of the Instrument bus and have the examinee explain the operation
Note:
, rather than opening the panel.
The examiner may want to use the attached picture of the Instrument bus and have the examinee explain the operation, rather than opening the panel.
: 13. PLACE Reserve AC feed breaker to OFF  Cue: RESERVE AC feed breaker is to the 'LEFT' (OFF position)
: 13. PLACE Reserve AC feed breaker At 120 VAC Instr Panel _11:
At 120 VAC Instr Panel _11:
to OFF
PLACE the RESERVE AC feed breaker to OFF
                                  &deg; PLACE the RESERVE AC Cue: RESERVE AC feed breaker is       feed breaker to OFF to the LEFT (OFF position)
: 14. PLACE NORMAL/RESERVE feed breaker interlock bar in a position to allow operation of the NORMAL AC Feed Breaker Cue: At 120 VAC Instr Panel _11:
: 14. PLACE NORMAL/RESERVE feed At 120 VAC Instr Panel _11:
Interlock bar is in a pos ition to allow NORMAL AC feed breaker is operation PLACE the NORMAL/RESERVE feed brkr interlock bar in position to allow for operation of NORMAL AC feed breaker
breaker interlock bar in a position to allow operation of the NORMAL AC Feed Breaker                     &deg; PLACE the NORMAL/RESERVE feed Cue: Interlock bar is in a position      brkr interlock bar in to allow NORMAL AC feed           position to allow for breaker is operation              operation of NORMAL AC feed breaker
    *15. Place Normal AC feed breaker to ON  Cue: The normal AC feed breaker is  to the 'LEFT' (ON position)
*15. Place Normal AC feed breaker to At 120 VAC Instr Panel _11:
At 120 VAC Instr Panel _11:
ON
PLACE the NORMAL AC feed breaker to the ON position IP-k - rev 11 From N-32 R11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
* PLACE the NORMAL AC Cue: The normal AC feed breaker          feed breaker to the ON is to the LEFT (ON position)    position SRRS: 3D.105 (when utilized for operator initial or continuing training)     Page 7 of 10
Page 8 of 10 ELEMENT SAT STANDARD UNSAT Comment Number 16. VERIFYN41 energized at _PM02J Cue:  CONTACT Unit NSO to verify N41 is energized The Unit NSO confirms that N41 is ENERGIZED
 
: 17. RESET N41 Positive Rate Trip as required. Cue:    CONTACT Unit NSO to verify N41 positive rate trip is reset. The Unit NSO confirms that N41 Positive Rate Trip is RESET   18. CLOSE Rectifier AC input breaker 1CB Cue: The rectifier AC input breaker 1CB is in the 'UP' position (ON)
IP-k - rev 11 From N-32 R11 Comment ELEMENT                                     STANDARD                  SAT       UNSAT Number
At _IP05E:
: 16. VERIFYN41 energized at _PM02J &deg;                    CONTACT Unit NSO to verify N41 is energized Cue: The Unit NSO confirms that N41 is ENERGIZED
CLOSE "Rectifier AC INPUT Brkr 1CB"
: 17. RESET N41 Positive Rate Trip as               &deg;    CONTACT Unit NSO to required.                                          verify N41 positive rate trip is reset.
: 19. PLACE Rod Control in AUTO at discretion of US.
Cue: The Unit NSO confirms that N41 Positive Rate Trip is RESET
Cue:  Request NSO/ US to place Rod Control in AUTO if desired. Rod Control is in AUTO
: 18. CLOSE Rectifier AC input breaker At _IP05E:
: 20. PLACE Instrument Bus _11 transformer Input breaker in OFF position. Note: Located 451' elevation MEER Cue: Transformer input breaker at
1CB
_IP01E is in the 'DOWN' position (OFF)
                                    &deg;  CLOSE Rectifier AC Cue: The rectifier AC input             INPUT Brkr 1CB breaker 1CB is in the UP position (ON)
LOCATE Inverter Transformer _IP01E PLACE the Instrument Bus _11 Transformer Input breaker at _IP01E to OFF Cue: This JPM is complete RECORD STOP TIME
: 19. PLACE Rod Control in AUTO at     &deg;  Request NSO/ US to place discretion of US.                  Rod Control in AUTO if desired.
:
Cue: Rod Control is in AUTO
IP-k - rev 11 From N-32 R11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 20. PLACE Instrument Bus _11         &deg;  LOCATE Inverter transformer Input breaker in OFF     Transformer _IP01E position.
Page 9 of 10 JPM  
                                    &deg;  PLACE the Instrument Bus Note: Located 451 elevation MEER       _11 Transformer Input breaker at _IP01E to OFF Cue: Transformer input breaker at
_IP01E is in the DOWN position (OFF)
Cue: This JPM is complete RECORD STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)           Page 8 of 10
 
IP-k - rev 11 From N-32 R11 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
JPM Number:
==Title:==
Instrument Bus Inverter Startup IP-k Revision Number: Task Number and Title:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
11 K/A Number and Importance:
 
4D.OA-22 RESPOND to a Loss of Vital AC Electrical Instrument Bus.
==Title:==
Suggested Testing Environment:
Instrument Bus Inverter Startup JPM Number: IP-k                                     Revision Number: 11 Task Number and
057 AA1.01 3.7/3.7 Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No In-Plant Reference(s):
4D.OA-22 RESPOND to a Loss of Vital AC Electrical Instrument Bus.
BOP IP-1, Instrument Bus Inverter Startup (Rev. 14
K/A Number and Importance: 057 AA1.01 3.7/3.7 Suggested Testing Environment: In-Plant Alternate Path:     Yes       No SRO Only: Yes                       No   Time Critical:     Yes     No Reference(s):
) CRITICAL STEPS
BOP IP-1, Instrument Bus Inverter Startup (Rev. 14)
(*) 3, 4, 5, 6, 7 10, & 15 Actual Testing Environment:
CRITICAL STEPS (*) 3, 4, 5, 6, 7 10, & 15 Actual Testing Environment:             Simulator             Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 20 minutes                        Actual Time Used:            minutes EVALUATION
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
20EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
SRRS: 3D.105 (when utilized for operator initial or continuing training)           Page 9 of 10
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
 
:   (Print) Evaluator's Signature
IP-k - rev 11 From N-32 R11 INITIAL CONDITIONS
:   Date:
: 1.     You are an Equipment Operator.
IP-k - rev 11 From N-32 R11  SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 2.     The unit is at 65% power.
Page 10 of 10 INITIAL CONDITIONS
: 3.     The unit has experienced a loss of Instrument Bus _11 due to failure of Instrument Inverter _11.
: 1. You are a n Equipment Operator. 2. The unit is at 65% power.
: 4.     All maintenance is completed on Instrument Inverter _11 and the Clearance Order Tags have been removed.
: 3. The unit has experienced a loss of Instrument Bus _11 due to failure of Inst rument Inverter _11.
: 5.     Instrument Bus _11 is currently energized from the constant voltage transformer
: 4. All maintenance is completed on Instrument Inverter _11 and the Clearance Order Tags have been removed.
(_IP01E).
: 5. Instrument Bus _11 is currently energized from the constant voltage transformer (_IP01E). INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor directs you to startup Instrument _11 Inverter _IP05E and to transfer Instrument Bus _11 power to the inverter per BOP IP
: 1.     The Unit Supervisor directs you to startup Instrument _11 Inverter _IP05E and to transfer Instrument Bus _11 power to the inverter per BOP IP-1.
-1. 2. A n Equipment Operator is standing by at MCC _31X2.
: 2.     An Equipment Operator is standing by at MCC _31X2.
: 3. All prerequisites associated with any critical step are met.}}
: 3.     All prerequisites associated with any critical step are met.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 10}}

Latest revision as of 18:54, 6 February 2020

2012 Byron Station Initial License Examination Administered Job Performance Measures
ML12054A691
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/10/2012
From: Bielby M
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML11354A066 List:
References
Download: ML12054A691 (191)


Text

Exelon Nuclear Job Performance Measure Calculate a Reactivity Change JPM Number: RA 1a Revision Number: 01 Date: 10/17/2011 Developed By: Bill Hochstetter 10/17/2011 Instructor Date Validated By: Brain Lewin 11/6/2011 SME or Instructor Date Approved By: Rob Lawlor 11/6/2011 Facility Representative Date

RA 1a - rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AP-300-1004 Rev: 2 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 7

RA 1a - rev 01 Revision Record (Summary)

Revision 01 Initial revision of JPM Comment Resolution Revised JPM for 2012 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 7

RA 1a - rev 01 INITIAL CONDITIONS:

1. Unit 1 is at 95% power, 6200 EFPH, 892 ppm boron, with CB D at 215 steps.
2. Tave is 1 degree less than Tref.

INITIATING CUES:

1. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
2. The US has directed you to calculate a reactivity change, utilizing OP-AP-300-1004, that will allow rod withdrawal and match Tave to Tref keeping turbine load constant.
  • Provide blank copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
  • Provide copy of Unit 1 Rema Thumbrules Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2 & 3 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TASK STANDARDS:

1. Evaluate the reactivity change to match Tave to Tref
2. Calculate the Reactivity Change Determination Form.

MATERIALS:

  • Blank copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
  • Unit 1 Rema Thumbrules at 6211 EFPH SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 7

RA 1a - rev 01 RECORD START TIME:

EVALUATOR NOTE: These steps may be performed in any order.

STEP ELEMENT STANDARD SAT UNSAT CMT#

CUE Provide copy of OP-AP-300-1004 and a copy of the Unit 1 Rema thumbrules 1 Refer to In accordance with the provided: ___ ___ ___

  • OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Boration and Dilution Requirements Requirements
  • Unit 1 Rema Thumbrules
  • Unit 1 Rema Thumbrules
  • 2 Compute Attachment 1 of OP-AP-
  • Station: Byron Unit: 1 ___ ___ ___

300-1004

  • Date and time
  • Desired change
  • Withdraw Rods 6 steps for PDMA02 control
  • Raise RCS temp. 1 degree
  • Reason for change (per QNE recommendation)
  • PDMA02 control
  • Temperature control
  • What is the method & amt for the reactivity change?
  • 6 steps withdrawal of CB D
  • 224 gallons dilution per 1 degree F change
  • Inputs
  • Rema thumbrules NOTE: The correctly calculated numbers are listed below.
  • 3 Evaluate calculation
  • Calculation of change (Uses numbers as calculated above)
  • 6 steps of Control Bank D at 100% power: Tave-Tref = 1/2° rise in temperature
  • -1° + 0.5° (mismatch after rod movement) = -

0.5°

  • 224 gallons PW/1° x .5° =

112 gallons dilution CUE This JPM is complete.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 7

RA 1a - rev 01 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Evaluate a Reactivity Change JPM Number: RA-1a Revision Number: 00 Task Number and

Title:

S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37 Imp Factor 4.3/4.6 Suggested Testing Environment: Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • Unit 1 Rema Thumbrules Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes Critical Steps: 2 and 3 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 7

RA 1a - rev 01 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1 Unit 1 is at 95% power, 6200 EFPH, 892 ppm boron, with CB D at 215 steps.

2 Tave is 1 degree less than Tref.

INITIATING CUES:

1. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.

2 The US has directed you to calculate a reactivity change, utilizing OP-AP-300-1004, that will allow rod withdrawal and match Tave to Tref keeping turbine load constant.

Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (ACB 2424 OOS)

JPM Number: RA-1.b Revision Number: 11 Date: 10/21/2011 Revised By: Bill Hochstetter 10/21/2011 Instructor Date Validated By: Brain Lewin 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 11

RA-1.b - rev 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOSR 8.1.1-1 Rev: 009 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 11

RA-1.b - rev 11 Revision Record (Summary)

Revision 11 Revised to current format SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 11

RA-1.b - rev 11 SIMULATOR SETUP INSTRUCTIONS

1) Reset to IC-21 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
3) This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 11

RA-1.b - rev 11 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 is in Mode 1, steady state power.

INITIATING CUE

1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
2. An SRO has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 11

RA-1.b - rev 11 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee with a copy of 1BOSR 8.1.1-1 to complete

1. Circle status of offsite power At 0PM03J, OBSERVE bus sources. alive lights, line amps, and MWs for all 345 KV lines:

° Line 0621 Note: The bus alive light alone is Line 0627

° NOT adequate verification

° Line 0624 of bus status.

° Line 0622

° CIRCLE energized for all 345 KV lines INDICATE:

2. Indicate status of disconnects, breakers and SAT links
  • Open disconnects, breakers and removed SAT links Cue: Both units SAT x-tie links are using O REMOVED
  • Closed disconnects, breakers and installed SAT Cue: Both units SAT disconnect links using X links are INSTALLED
3. Trace path along dashed lines TRACE path correctly on data from any energized offsite power sheet:

source to the unit ONE SAT

  • Line energized, breakers banks and disconnects closed
4. Trace second path from second TRACE SECOND path independent power source to unit correctly on data sheet:

TWO SAT bank.

  • Line energized, breakers and disconnects closed SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 11

RA-1.b - rev 11 Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Verify independent paths exist Verify independent paths from offsite power thru switchyard
  • L0621 and L0622 NOT to both units SAT banks BOTH used
  • Two paths DO NOT overlap
  • ENTER Yes for step 5 of data sheet
  • 6. Check normal and reserve 345 At 0PM03J, VERIFY bus alive KV buses energized light and voltmeter indications for:
  • 345 KV bus 13 ENTER Yes for steps 6a and 6b on data sheet
  • 7. Check normal and reserve At 1/2PM01J, VERIFY X and power SATs available Y winding MW and amps indication for:
  • SATs 142-1 and 142-2 Cue: SATs 242-1 and 242-2
  • SATs 242-1 and 242-2 ENERGIZED ENTER Yes for steps 7a and 7b on data sheet
  • 8. Check ESF buses 141 and 142 At 1PM01J, CHECK bus alive energized lights, SAT feeder breaker to bus position and bus voltmeter indication for:
  • Bus 141
  • Bus 142 ENTER Yes for steps 8a and 8b on data sheet SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 11

RA-1.b - rev 11 Comment ELEMENT STANDARD SAT UNSAT Number

  • 9. CHECK ESF buses 241 and 242 At 2PM01J, CHECK bus alive energized lights, SAT feeder breaker to bus position and bus voltmeter indication for:

Cue: BUS 241 BUS ALIVE light is LIT and voltage is normal

  • Bus 241 Cue: BUS 242 BUS ALIVE light is
  • Bus 242 LIT and voltage is normal ENTER Yes for steps 9a and 9b on data sheet
  • 10. Check SAT Feed breakers are At 1/2PM01J, VERIFY position closed and connected and control power available:
  • ACB 1412 Cue: ACB 2412 GREEN light LIT
  • ACB 2412
  • ACB 1422 Cue: ACB 2422 GREEN light LIT
  • ACB 2422 ENTER Yes for steps 10a through 10d on data sheet NOTE Faulted portion of JPM is initiated in the following step.
  • 11. Check SAT Reserve Feed At 1/2PM01J, VERIFY position breakers are closed and and control power available:

connected

  • ACB 1414
  • ACB 1424 Cue: ACB 2414 GREEN light LIT
  • ACB 2414
  • ACB 2424 Cue: ACB 2424 control switch is in ENTER No for step 11d and PTL and OOS Yes for steps 11a through 11c on data sheet SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 11

RA-1.b - rev 11 Comment ELEMENT STANDARD SAT UNSAT Number

  • 12. Determine acceptance criteria
  • DETERMINE acceptance are NOT met criteria are NOT MET
13. Notify US that acceptance
  • Notify US verbally or by criteria are not met checking NO and writing in Remarks on cover sheet.

Cue: US has verified 1BOL 8.1 has been implemented.

Cue: This JPM is completed.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 11

RA-1.b - rev 11 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Perform Offsite AC Power Availability Surveillance (ACB 2424 OOS)

JPM Number: RA 1 (N-75a) Revision Number: 11 Task Number and

Title:

4C.AP-06 Perform the Offsite AC Power Availability Surveillance.

K/A Number and Importance: 2.1.31 4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOSR 8.1.1-1, Rev 9, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS (*) 5 through 12 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

RA-1.b - rev 11 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 is in Mode 1, steady state power.

INITIATING CUE

1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
2. An SRO has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 11

Exelon Nuclear Job Performance Measure Identify Leak Isolation Points from Mechanical and Electrical Drawings JPM Number: RA-2 Revision Number: 0 Date: 10/20/2011 Revised By: Bill Hochstetter 12/30/2011 Instructor Date Validated By:

SME or Instructor Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 7

RA 2- rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure P & ID M-46 sht.1B Rev: AR

9. Procedure Schematic 6E-1-4030CS06 Rev: M
10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 7

RA 2- rev 0 Revision Record (Summary)

Revision 0 Modified from Braidwood. Rev. 0 at Byron SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 7

RA 2- rev 0 INITIAL CONDITIONS

1. You are an extra NSO.
2. Both units are at 100% steady state power.
3. The Aux. Building EO has just reported 1CS043A, 1A CS EDUC INLET HDR DRN CONN ISOL VLV, has a leak at the welded inlet connection to the valve.

INITIATING CUE

1. The Shift Manager has directed you to recommend mechanical isolation points for the leak as close as possible to the source and report back with your recommendation.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • - Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 7

RA 2- rev 0 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Once the examinee demonstrates the ability to locate the required mechanical print, provide a copy of print M-46 sheet 1B

1. Locate correct P& ID
  • LOCATE M-46 sheet 1B Note: When examinee determines o Use computer such as M-46 sheet 1B is required, Passport or EDMS then provide copy of o Use P&ID book M-46 sheet 1B.
  • 2 Determine upstream acceptable
  • Refers to M-46 sheet 1B isolation point and determine upstream isolation point is 1CS046A - CLOSED.
  • 3. Determine downstream
  • Refers to M-46 sheet 1B acceptable isolation points and determine downstream isolation point is 1CS019A - CLOSED.
4. Shift Manager notified ° NOTIFY SM of Isolation points Cue: The SM requests that you identify the breaker to be opened to provide electrical isolation for the MOV.
5. Locate correct schematic
  • LOCATE 6E-1-4030CS06 Note: When examinee determines o Use computer such as 6E-1-4030CS06 is required, Passport or EDMS then provide copy of o Use Electrical 6E-1-4030CS06 . Schematic book
  • 6. Determines Breaker to be opened
  • Determine 480VAC MCC to provide Electrical Isolation. 131X1 Compt. K2 is correct breaker to be Cue: This JPM is complete. opened and Notify SM.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 7

RA 2- rev 0 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Identify leak isolation points using Mechanical Drawings JPM Number: RA 2 Revision Number: 0 Task Number and

Title:

T.AM33-10 DISCUSS valving, piping, electrical, and instrumentation practices used in the C/O program K/A Number and Importance: 2.2.41 3.5 Suggested Testing Environment: Simulator or Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): P & ID M-46 sht.1B Rev: AR Schematic 6E-1-4030CS06 Rev: M_

CRITICAL STEPS (*) 2, 3 & 6.

Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 7

RA 2- rev 0 INITIAL CONDITIONS

1. You are an extra NSO.
2. Both units are at 100% steady state power.
4. The Aux. Building EO has just reported 1CS043A, 1A CS EDUC INLET HDR DRN CONN ISOL VLV, has a leak at the welded inlet connection to the valve.

INITIATING CUE The Shift Manager has directed you to recommend isolation points for the leak as close as possible to the source and report back to him with your recommendation.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 7

Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-3 Revision Number: 5 Date: 12/30/2011 Revised By: Bill Hochstetter

  • 12/30/2012 Instructor Date Validated By:
  • SME or Instructor Date Approved By:
  • Facility Representative Date
  • Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 10

RA/SA rev 4 (from N-100)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BCP 400-TCNMT/Routine Rev: 20

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

W. Hochstetter(Signature on file) 12/30/2011 SME / Instructor Date (Signature on file)

SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 10

RA/SA rev 4 (from N-100)

Revision Record (Summary)

Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Revision 5 Generated a new BCP 400-Tcnmt/routine SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 10

RA/SA rev 4 (from N-100)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
3. Verify that the RM-11 values for the appropriate channels agree with the surveillance paperwork and Supervisory key for the RM-11 available.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
5. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 10

RA/SA rev 4 (from N-100)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1PR11J is inoperable.

INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 10

RA/SA rev 4 (from N-100)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the underlined cue needs to be provided to the examinee.

To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE to the examinee.

1. Refer to the partially completed ° REVIEW BCP 400-BCP 400-TCNMT/ROUTINE TCNMT/ROUTINE for completeness up to Cue: (if asked) Section 2 has been Section 3 verified along with the RETDAS Gaseous Release Rate printouts.
2. Complete daily channel checks ° VERIFY/COMPLETE the daily channel check on Cue: The daily channel check of 1RE-PR001 1RE-PR001 has been performed satisfactorily
3. Perform Source/Channel check ° PERFORM the 1PR01J source/channel check Cue: 1BOSR 11.b.6-1 has been completed and reviewed satisfactorily.

NOTE In the following JPM step, the examinee should N/A the step because 1PR11J is inoperable.

4. Noble gas trend ° VERIFY noble gas trend Cue: 1PR11J is inoperable
5. As Found setpoints of 1RE- At the RM-11, RECORD As PR001 Found setpoints of 1RE-PR001 gas channel:

Note: The High alarm setpoint is 4.83 E-04 ° High alarm setpoint Note: The Alert alarm setpoint is ° Alert alarm setpoint 2.42 E-04 SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 10

RA/SA rev 4 (from N-100)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 6. RM-11 supervisory mode At the RM-11:

Cue: Give candidate the

  • Obtain Supervisory Key Supervisory key for RM-11 from Unit. Supervisor.

when requested.

  • PLACE RM-11 in Supervisory Mode
  • 7. Select monitor At the RM-11, Grid 2:
  • SELECT 1PB101 and DEPRESS the SEL key
  • 8. Select high alarm setpoint At the RM-11:

channel

  • DEPRESS Channel Item key
  • KEY IN 9
  • DEPRESS the SEL key
  • 9. High alarm setpoint At the RM-11:

Note: The setpoint to be entered is

  • ENTER high alarm setpoint 5.60 E-04 on 1PB101 per Step 4.1.1.8

° RECORD new value Cue: Your request for verification ° Request verification is acknowledged, please continue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 10

RA/SA rev 4 (from N-100)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 10. Select alert alarm channel At the RM-11:
  • DEPRESS Channel Item key
  • KEY IN 10
  • DEPRESS the SEL Note: The setpoint to be entered is
  • ENTER alert alarm setpoint 3.14 E-04. on 1PB101 per Step 4.1.1.8

° RECORD new value Cue: Your request for verification is ° Request verification acknowledged, please continue.

11. Place the RM-11 in Normal Mode At the RM-11:

° PLACE the RM-11 in NORMAL MODE

12. Aux building exhaust fan status At 0PM02J:

° ENSURE the 0A OR 0B Aux Building Exhaust Fan is in operation

13. Turn in Package for approval Hand in Release package to Unit Supervisor for approval.

Cue: The US will continue at step 5.

Cue: This JPM is completed.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 10

RA/SA rev 4 (from N-100)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA/SA-3 Revision Number: 4 Task Number and

Title:

4C.GW-01 PERFORM a Gaseous Release.

K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 20)

CRITICAL STEPS (*) 6, 7, 8, 9 & 10 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

RA/SA rev 4 (from N-100)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1PR11J is inoperable.

INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 10

Exelon Nuclear Job Performance Measure Determine venting time for Reactor Vessel void JPM Number: SA-1.b Revision Number: 0 Date: 10/18/2011 Revised By: Bill Hochstetter 10/18/2011 Instructor Date Validated By: Brian Lewin 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 8

SA-1.b - rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: 1BFR I.3 Rev: 200 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 8

SA-1.b - rev 0 Revision Record (Summary)

Revision 11 Revised to current format SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 8

SA-1.b - rev 0 INITIAL CONDITIONS

1. You are an extra SRO.
2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
3. The crew is performing 1BFR-I.3, RESPONSE TO VOIDS IN THE REACTOR VESSEL.
4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
5. Current plant conditions are as follows
  • Containment temperature (dry bulb) = 135 degreesF
  • Containment pressure = 2.1 psig
  • RCS pressure = 1500 psig INITIATING CUE
1. The Shift Manager directs you to assist the Unit 1 SRO by calculating reactor vessel vent time per 1BFR-I.3, Attachment B.
2. Inform the SM when you have completed 1BFR-I.3, Attachment B Fill in the JPM Start Time when the student acknowledges the Initiating Cue Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 8

SA-1.b - rev 0 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee with a copy of 1BFR-I.3

1. Refer to 1BFR-I.3. Refer to 1BFR-I.3 Note: Provide copy of 1BFR-I.3 and a calculator to examinee.
  • 2. Calculate containment temperature Perform Attachment B, step 1:

in Rankine

  • Enter 135 in degrees F blank
  • Add 460 to 135 and enter 595 in degree R blank
  • 3. Calculate containment air volume Perform Attachment B, step 2 based on current temperature and
  • Enter 595 in degree R blank pressure.
  • Enter 2.1 in CNMT press blank
  • Perform calculation and enter 2,646,050 (or approx.)

in cu. ft. blank

  • 4. Calculate maximum hydrogen Perform Attachment B, step 3 volume that can be vented
  • Enter 1 in cnmt hydrogen keeping cnmt concentration below conc. blank.

3%

  • Enter 2,646,050 (or approx.)

in cu. ft. blank

  • Perform calculation and enter 52,921 (or approx.) in cu. ft. blank SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 8

SA-1.b - rev 0 Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Determine hydrogen flow rate Perform Attachment B, step 4 from RCS vent.
  • Plot RCS pressure on 1BFR-I.3-4 and determine flow rate will be about 4725 scfm (4675-4775)
  • Enter flow rate in step 4 SCFM blank
  • 6. Calculate maximum venting Perform Attachment B, step 5 time.
  • Enter 52,921 (or approx.) in cu. ft. blank
  • Enter 4725 (4675-4775) in SCFM blank
  • Calculate minutes and enter 11.2 (11.08 to 11.32) in minutes blank
7. Report to SM results of venting Notify SM that RCS venting can calculation be performed for approx. 11.1 to 11.3 minutes:

Cue: This JPM is completed.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 8

SA-1.b - rev 0 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Determine Venting time for Reactor Vessel Void JPM Number: SA-1.b Revision Number: 0 Task Number and

Title:

Diagnose and analyze voids in the reactor vessel (T.FR6-04)

K/A Number and Importance: 2.1.25 4.2 Suggested Testing Environment: Simulator or classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BFR-I.3, Response to voids in the reactor vessel CRITICAL STEPS (*) 2, 3, 4, 5, & 6 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 8

SA-1.b - rev 0 INITIAL CONDITIONS

1. You are an extra SRO.
2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
3. The crew is performing 1BFR-I.3, RESPONSE TO VOIDS IN THE REACTOR VESSEL.
4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
5. Current plant conditions are as follows
  • Containment temperature (dry bulb) = 135 degreesF
  • Containment pressure = 2.1 psig
  • RCS pressure = 1500 psig INITIATING CUE
1. The Shift Manager directs you to assist the Unit 1 SRO by calculating reactor vessel vent time per 1BFR-I.3, Attachment B.
2. Inform the SM when you have completed 1BFR-I.3, Attachment B SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 8

Exelon Nuclear Job Performance Measure Evaluate a Reactivity Change JPM Number: SA 1a Revision Number: 01 Date: 10/17/2011 Developed By: Bill Hochstetter 10/17/2011 Instructor Date Validated By: Brian Lewin 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date

SA 1a - rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AP-300-1004 Rev: 2 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

SA 1a - rev 01 Revision Record (Summary)

Revision 01 Initial revision of JPM Comment Resolution Revised JPM for 2012 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

SA 1a - rev 01 INITIAL CONDITIONS:

1. Unit 1 is at 95% power, 6300 EFPH, 892 ppm boron, with CB D at 215 steps, steady state and equilibrium Xenon
2. Tave is 1 degree less than Tref.
3. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
4. The NSO has calculated a reactivity change to match Tave with Tref.

INITIATING CUES:

1. Evaluate the reactivity change to match Tave to Tref by reviewing OP-AA-300-1004, Att. 1, Reactivity Change Determination Form.
  • Provide completed copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
  • Provide copy of Unit 1 Rema Thumbrules Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 3 & 4 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TASK STANDARDS:

1. Evaluate the reactivity change to match Tave to Tref.
2. Review the Reactivity Change Determination Form.

MATERIALS:

  • Completed OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached)
  • Unit 1 Rema Thumbrules at 6211 EFPH SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

SA 1a - rev 01 RECORD START TIME:

EVALUATOR NOTE: These steps may be performed in any order.

STEP ELEMENT STANDARD SAT UNSAT CMT#

CUE Provide completed copy of OP-AP-300-1004 (att. 1) and a copy of the Unit 1 Rema thumbrules 1 Refer to In accordance with the provided:

  • OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Boration and Dilution Requirements Requirements
  • Unit 1 Rema Thumbrules
  • Unit 1 Rema Thumbrules 2 Review Attachment 1 of OP-AP- Review Attachment 1 of OP-AP- ___ ___ ___

300-1004 300-1004 Evaluator note:

6 step withdrawal of CB D will raise temperature 0.5 degrees calculation is flawed because it omits above from calculation and dilutes a full 224 gallons of primary water, which is 1 degree, rather than taking into account the control rod withdrawal. Correct dilution volume is 112 gallons

  • 3 Evaluate calculation for dilution Determine dilution volume volume listed at 224 gallons, should be 112 gallons.
  • Should identify volume of dilution is incorrect.

Cue: SM has instructed you to correct the identified error and continue your review.

  • 4 Evaluate calculation and Determine rod withdrawal determine that rod withdrawal was omitted from calculation CUE This JPM is complete.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

SA 1a - rev 01 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Evaluate a Reactivity Change JPM Number: SA-1a Revision Number: 00 Task Number and

Title:

S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37 Imp Factor 4.3/4.6 Suggested Testing Environment: Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • Unit 1 Rema Thumbrules Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

SA 1a - rev 01 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. Unit 1 is at 95% power, 6300 EFPH, 892 ppm boron, with CB D at 215 steps, steady state and equilibrium Xenon
2. Tave is 1 degree less than Tref.
3. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
4. The NSO has calculated a reactivity change to match Tave with Tref.

INITIATING CUES:

1. Evaluate the reactivity change to match Tave to Tref by reviewing OP-AA-300-1004, Att. 1, Reactivity Change Determination Form.

SA 1a - rev 01 OP-AP-300-1004 Revision 2 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron Unit: 1 2 Time: Now Date: Today Desired change:

(Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.)

Withdraw Rods 6 steps for PDMA02 control Raise RCS Ave. Temp by 1 degree Reason for Change:

(Temperature control, flux control, fuel burn up)

PDMA02 control and temperature control.

What is the method and amount required for the reactivity change?

(Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 6 steps withdrawal of CB D and 224 gallons dilution per 1 degree Fahrenheit change.

Inputs:

(ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD - Preparer and Reviewer should use independent inputs when possible)

Rema thumbrules for Unit 1 at 6211 EFPH Calculation of change:

(E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0°F RCS temp reduction.

Desired change = 0.5°F drop. Calculation of change: (20 gal/1.0°F)

  • 0.5°F = 10 gal.,

previously used borations and dilutions)

(TMI: Procedure 1102-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion) 1.0° low x 224 gallons dilution per degree raised = 224 gallons dilution Joe Rowe P Chech ______________

Preparer Reviewer Approver (RO) (RO/SRO) (SRO)

Shift Manager Notified: Yes No

Exelon Nuclear Job Performance Measure Initiate a LCOAR JPM Number: SA-2 New Revision Number: 0 Date: 10/19/2011 Revised By: Bill Hochstetter 10/19/2011 Instructor Date Validated By: Brian Lewin 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 9

SA 2- rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAP 1400-6 Rev: 28 Procedure 1BOL 7.6 Rev: 6

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 9

SA 2- rev 0 Revision Record (Summary)

Revision 0 Modified S009 Rev. 6 Changed component that is in LCOAR SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 9

SA 2- rev 0 INITIAL CONDITIONS

1. You are the Unit 1 Unit Supervisor.
2. The unit is at 90% steady state power, all conditions normal.

INITIATING CUE

1. The Unit 1 Assist NSO notified you 5 minutes ago; the Unit 1 CST level is 58%.
2. The Shift Manager directs that it is NOT necessary to update the DEL per LCO 3.0.6 for this LCO.
3. IR 1234567 has been written to document the issue.
4. No other LCOARs or DELs exist on Unit 1.
5. Initiate the LCOAR paperwork as necessary.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • - Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 9

SA 2- rev 0 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure.

Step 1 of this JPM is optional

1. Refer to BAP 1400-6, Technical ° LOCATE and OPEN BAP Specification Limiting Conditions 1400-6 for Operation Action Requirements (LCOAR)
2. Refer to 1BOL 7.6, LCOAR ° LOCATE and OPEN 1BOL Condensate Storage Tank -Tech 7.6 Spec LCO 3.7.6
  • 3. Section A of 1 BOL 7.6 ENTER into Section A:

Note: Notification occurred 5

  • Time/Date minutes ago per initiating Cue. ° By

° Title

  • Present mode
  • Initiating event
  • Condition
  • 4. Safety function determination PERFORM SFD
  • Indicate No in Section C Cue: There is no other inoperable
  • Sign Coversheet or degraded support or supported equipment on the
  • Indicate NO on coversheet A train. for invalidating current SFD SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 9

SA 2- rev 0 Comment ELEMENT STANDARD SAT UNSAT Number

5. Update DEL:
  • Check N/A box N/A - from initiating cue information
6. Determine Planned or Unplanned
  • Mark UNPLANNED on coversheet NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO.
7. Related WR/WO block o N/A OR List IR #

Note: IR # should be recorded here

8. Fill in Related Clearance Orders o N/A OR Leave Blank Note: Acceptable if left Blank
9. Was an IR written?
  • Check Yes box
  • 10. LCOAR TABLE of 1 BOL 7.6 COMPLETE LCOAR Table:

° CIRCLE Condition A

  • ENTER notification Time/Date AND sign Condition A
  • 11. Goes to ATTACHMENT A
  • Recognized the need to perform the following within Cue: An Extra NSO will perform 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s:

1BOSR 7.8.1-1.

  • 1BOSR 7.8.1-1
  • 1AF006A & B and Per Initiating Cue: 1AF006 and 1AF017A&B are 1AF017 A&B are operable. operable
  • SX basin above its limit Cue: SX basin level is 90%

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 9

SA 2- rev 0 Comment ELEMENT STANDARD SAT UNSAT Number

12. Peer check prior to SM review ° BAP 1400-6 for Peer check Cue: A second SRO has provided a peer check. ° Get an additional SRO to Peer check the BOL package
13. Signed by Shift Manager ° NOTIFY SM Cue: The shift manager acknowledges LCOAR entry and review request.

Cue: This JPM is complete.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 9

SA 2- rev 0 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Initiate a LCOAR. (SRO)

JPM Number: SA 2(S009) Revision Number: 0 Task Number and

Title:

8E.TS-007 ENSURE compliance with all applicable Tech Spec Action Statements.

K/A Number and Importance: 2.2.23 4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev 28) 1BOL 7.6, LCOAR U-1 CST - Operating Tech Spec LCO 3.7.6 (Rev 6)

CRITICAL STEPS (*) 3, 4, 10, & 11 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 9

SA 2- rev 0 INITIAL CONDITIONS

1. You are the Unit 1 Unit Supervisor.
2. The unit is at 90% steady state power, all conditions normal.

INITIATING CUE

1. The Unit 1 Assist NSO notified you 5 minutes ago; the Unit 1 CST level is 58%.
2. The Shift Manager directs that it is NOT necessary to update the DEL per LCO 3.0.6 for this LCO.
3. IR 1234567 has been written to document the issue.
4. No other LCOARs or DELs exist on Unit 1.
5. Initiate the LCOAR paperwork as necessary.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 9

Exelon Nuclear Job Performance Measure Review Containment Release package in preparation for a Unit 1 Containment Release JPM Number: SA-3 Revision Number: 5 Date: 12/30/2011 Revised By: Bill Hochstetter

  • 12/30/2011 Instructor Date Validated By:
  • SME or Instructor Date Approved By:
  • Facility Representative Date
  • Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 9

SA rev 5 (from N-100)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BCP 400-TCNMT/Routine Rev: 20

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 12/30/2011 SME / Instructor Date (Signature on file)

SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 9

SA rev 5 (from N-100)

Revision Record (Summary)

Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Revision 5 Revised to SRO Only review of containment release prior to approval SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 9

SA rev 5 (from N-100)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
3. Verify that the RM-11 values for the appropriate channels agree with the surveillance paperwork and Supervisory key for the RM-11 available.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
5. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 9

SA rev 5 (from N-100)

INITIAL CONDITIONS

1. You are the Unit 1 Unit Supervisor.
2. A Unit 1 Containment release is pending.
3. 1PR11J is inoperable.
4. The Unit has been at 100% power and stable for the past 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> INITIATING CUE You have been instructed to review Sections 1 through 5 of BCP 400-TCNMT/ROUTINE in preparation for this release.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 9

SA rev 5 (from N-100)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the underlined cue needs to be provided to the examinee.

To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE to the examinee.

Examine may start with section 5 first (step 4 below), then continue with review of previous sections.

1. Refer to the partially completed ° REVIEW BCP 400-BCP 400-TCNMT/ROUTINE TCNMT/ROUTINE for completeness up to Cue: (if asked) Section 2 has been Section 3.

verified along with the RETDAS Gaseous Release Rate printouts.

  • 2. Notices signature missing in
  • Notices Rad protection HP Section 3 page 9. or SRO signature is NOT signed and dated Note: The examinee should determine the release cannot occur until this is resolved.

Cue: Acknowledge the error and request further review for accuracy.

  • 3. Reviews Section 4
  • REVIEW BCP 400-TCNMT/ROUTINE for completeness of Section 4 Note: The examinee should determine the release cannot
  • Determine Step 8 proceed at this time. numbers dont match Proceed to step 5. section 2.5 (6.05 E-04 versus 5.60 E-04)

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 9

SA rev 5 (from N-100)

Comment ELEMENT STANDARD SAT UNSAT Number

4. Reviews Section 5: ° Determines that the first Found in initial conditions paragraph is satisfied.

° Determines that Cue: The unit NSO will place the containment release placard. placard must be placed on 0PM02J Cue: The Unit 2 Unit Supervisor ° Determines that 1BOSR has verified 1BOSR 11.b.6-1 11.b.6-1 must be is complete and has been completed and reviewed reviewed.

  • 5. Does NOT approve the release
  • Determines that the release should NOT be Cue: This JPM is complete. approved.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 9

SA rev 5 (from N-100)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Review Containment release package in preparation for a Unit 1 Containment Release JPM Number: SA-3 Revision Number: 5 Task Number and

Title:

4C.GW-01 PERFORM a Gaseous Release.

K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 20)

CRITICAL STEPS (*) 2, 3, & 5 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 9

SA rev 5 (from N-100)

INITIAL CONDITIONS

1. You are the Unit 1 Unit Supervisor.
2. A Unit 1 Containment release is pending.
3. 1PR11J is inoperable.
4. The Unit has been at 100% power and stable for the past 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> INITIATING CUE You have been instructed to review Sections 1 through 5 of BCP 400-TCNMT/ROUTINE in preparation for this release.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 9

Exelon Nuclear Job Performance Measure Classify Event and Fill Out a NARS Form (LBLOCA)

JPM Number: SA-4 Revision Number: 5 Date: 10/28/2011 Revised By: Bill Hochstetter 10/28/2011 Instructor Date Reviewed By: Brian Lewin 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure EP-MW-114-100 Rev: 11 Procedure EP-MW-114-100-F-01 Rev: F Procedure EP-AA-1002 Rev: 28

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Lynn Sanders (Signature on file) 9/09/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

Revision Record (Summary)

Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Validated 9/20/11 by Lynn Sanders and Mike McCue, only change was procedure rev that did not affect JPM.

New event created for 2011 Requal, classified as modified for ILT exam since this specific item has not been tested previously in ILT.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. None.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

INITIAL CONDITIONS

1. You are the Shift Emergency Director.
2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.

INITIATING CUE

1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
2. This is a time critical JPM.

PLANT CONDITIONS

  • Unit 1 and 2 were both at full power.
  • A Unit 1 Reactor Trip and Safety Injection occurred based on the following conditions:
  • A large break Loss of Primary Coolant
  • Containment Spray pumps did not automatically start and could NOT be manually started.
  • Containment pressure peaked at 29 psig.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM.

1. Refer to Exelon Nuclear - Refer to EAL Matrix, EP-Radiological Emergency Plan AA-1002 Annex for Byron Station.

Note: This step may be performed at any time.

  • 2. Classify the Event utilizing EAL
  • Classify event as SITE Matrix. AREA EMERGENCY, from FS1 Loss OR Potential Loss Critical portion stop time ______ of 2 Fission Product Barriers (RCS and CNMT).

Time from start to Classification = ¢ < 15 minutes

________ minutes NOTE Provide the examinee with a copy of the NARS form.

3. Obtain NARS form, EP-MW-114- ° Obtain NARS form.

100-F-01, Nuclear Accident Reporting System (NARS).

Note: Step 3 may be performed at any time.

4. Refer to EP-MW-114-100, ° Locate and Open, EP-MW-MWROG Offsite Notifications, to 114-100, MWROG Offsite complete NARS form. Notifications, Section 4.2, to complete NARS form.

Note: Step 4 may be performed at any time.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has demonstrated the ability to obtain the information from the computer or from the main control board.

  • 5. Fill out NARS form according to

Cue: The wind direction on AM004

  • BLOCKS 2 thru 9 must be is 286°. filled correctly to meet the critical portion of filling out Cue: The wind speed on AM001 is the NARS form. (See 3 mph. attached KEY).

Time to complete NARS Form = ¢ < 12 minutes

________ minutes RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S016t - rev 4 Nuclear Accident Reporting System (NARS) Form UTILITY MESSAGE NO. ____1___ STATE MESSAGE NO. ____N/A_

1. STATUS 2. STATION

[A] ACTUAL [A] BRAIDWOOD [C] CLINTON [E] LASALLE [G] ZION

[X] DRILL/EXERCISE [X] BYRON [D] DRESDEN [F] QUAD CITIES

3. ONSITE CONDITION 4. ACCIDENT CLASSIFIED ACCIDENT TERMINATED

[A] UNUSUAL EVENT TIME (3[A-E]): Now TIME (3[F]): N/A

[B] ALERT DATE (3[A-E]): Today DATE (3[F]):N/A

[X] SITE AREA EMERGENCY EAL#: FS1

[D] GENERAL EMERGENCY

[E] RECOVERY

[F] TERMINATED

5. RELEASE STATUS 6. TYPE OF RELEASE 7. WIND DIR 8. WIND SPEED

[X] NONE [X] NOT APPLICABLE 286° [A] METERS/SEC.: _

[B] OCCURRING [B] GASEOUS (DEGREES FROM) [X] MILES/HR.: ___3

[C] TERMINATED [C] LIQUID

9. RECOMMENDED ACTIONS UTILITY RECOMMENDATION

[X NONE (UE, Alert and SAE Only)


(GE Only) -----------------------------------------------------------------

[B] SHELTER ILLINOIS SUB-AREAS:

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[C] SHELTER IOWA SUB-AREAS:

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[D] EVACUATE ILLINOIS SUB-AREAS:

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[E] EVACUATE IOWA SUB-AREAS:

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS STATE RECOMMENDATION

[F] NONE

[G] SHELTER SUB-AREAS:

[H] EVACUATE SUB-AREAS:

[I] RECOMMEND POTASSIUM IODIDE (KI) PER PROCEDURES

[J] COMMENCE RETURN OF PUBLIC

[K] OTHER

10. ADDITIONAL INFORMATION None Verified With: STA Approved By: SRO
11. TRANSMITTED BY: NAME PHONE NUMBER TIME/DATE

[A] EXELON:

[B] STATE:

[C] COUNTY:

12. RECEIVED BY: NAME ORGANIZATION TIME/DATE SRRS: 3D.105 (when utilized for operator initial or continuing training)

S016t - rev 4 Nuclear Accident Reporting System (NARS) Form Braidwood (UE, Alert, SAE, escalated GE(s),

ROLL CALL LaSalle (UE, Alert, SAE, escalated GE(s),

Termination and Recovery) Initial Roll Call Complete: Termination and Recovery)

NARS Code 20 NARS Code 20 Initial Final (time / date) Initial Final

  1. Illinois EMA # Illinois EMA Illinois REAC Illinois REAC Clinton UE, Alert, SAE, escalated GE(s),

(Only if NARS #1 is a GE) (Only if NARS #1 is a GE)

Termination and Recovery)

NARS Code 38 NARS Code 25 NARS Code 98 Initial Final Initial Final Initial Final

  1. Illinois EMA # Illinois EMA
  1. Illinois EMA
  1. Grundy Co. Sheriff
  1. Grundy Co. Sheriff Illinois REAC # LaSalle Co. Sheriff
  1. Kankakee Co. Sheriff Illinois REAC (Only if NARS #1 is a GE) Grundy Co. EMA
  1. Will County Sheriff NARS Code 36 LaSalle Co. ESDA Illinois REAC Initial Final Grundy Co. EMA # Illinois EMA Kankakee Co. EOC # DeWitt Co. Sheriff Will Co. EOC Illinois REAC DeWitt Co. EOC Byron Dresden Quad Cities (UE, Alert, SAE, escalated (UE, Alert, SAE, escalated (UE, Alert, SAE, escalated GE(s), Termination and GE(s), Termination and GE(s), Termination and Recovery) Recovery) Recovery)

NARS Code 20 NARS Code 20 NARS Code 43 Initial Final Initial Final Initial Final

  1. Illinois EMA # Illinois EMA # Illinois EMA Illinois REAC # Iowa EMD Illinois REAC Illinois REAC Scott Co. Sheriff (Only if NARS #1 is a GE) Clinton Co. EOC NARS Code 37 (Only if NARS #1 is a GE)

NARS Code 22 Scott Co. EOC Initial Final

  1. Illinois EMA Initial Final
  1. Illinois EMA (Only if NARS #1 is a GE)
    • Ogle Co. Sheriff NARS Code 23
  1. Grundy Co. Sheriff
    • Rochelle Police Initial Final
  1. Kendall Co. Sheriff # Illinois EMA Illinois REAC
  1. Will County Sheriff # Iowa EMD Ogle Co. ESDA Illinois REAC # Clinton Co. EOC Ogle Co. EOC Grundy Co. EMA #Rock Island Co. Sheriff Commercial numbers: Kendall Co. EOC # Whiteside Co. Sheriff IEMA 217-782-7860 Will Co. EOC # Scott Co. Sheriff (QC only) # Scott Co. EOC Iowa EMD 515-281-3231 Whiteside Co. ESDA Rock Island ESDA Illinois REAC NOTES: # Indicates that this agency is required to be notified within 15 minutes.
    • Only one needs to answer for notification.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S016t - rev 4 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Classify Event and Fill Out a NARS Form (LOCA)

JPM Number: S016t Revision Number: 4 Task Number and

Title:

S-ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels.

K/A Number and Importance: 2.4.41 4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

EP-MW-114-100 (Rev 11), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. F) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 (Rev 28) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS (*) 2 & 5 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S016t - rev 4 INITIAL CONDITIONS

1. You are the Shift Emergency Director.
2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.

INITIATING CUE

1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
2. This is a time critical JPM.

PLANT CONDITIONS

  • Unit 1 and 2 were both at full power.
  • A Unit 1 Reactor Trip and Safety Injection occurred based on the following conditions:
  • A large break Loss of Primary Coolant
  • Containment Spray pumps did not automatically start and could NOT be manually started.
  • Containment pressure peaked at 29 psig.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Perform Moveable Control Assemblies Quarterly Surveillance JPM Number: CR-A Revision Number: 10 Date: 10/20/2011 Revised By: Bill Hochstetter 10/20/11 Instructor Date Reviewed By: Rob Friskey 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOSR 1.4.2-1 Rev: 17 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/20/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Revision Record (Summary)

Revision 10 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor.

Placed some examiner notes concerning alarms received during step performance Created from JPM No. N-41 Changed to Alt. Path based on NRC request SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Insert Malfunction RD05F08 prior to running this JPM to fail rod F-08 when it steps to 222 steps.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL INITIATING CUE
1. You have been directed to perform a partial surveillance of 1BOSR 1.4.2-1, Moveable Control Assemblies Quarterly Surveillance. You are to perform the surveillance on SD Bank E and Control Banks A through D.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN

1. Refer to 1BOSR 1.4.2-1, Moveable 1BOSR 1.4.2-1 Control Assemblies Quarterly Surveillance Note: Step 1 may be performed at any time Cue: All prerequisites are met NOTE Provide the examinee with a copy of the 1BOSR 1.4.2-1.
2. Transfer rod control to manual At 1PM05J:

PLACE Rod Bank Selector switch to MANUAL

° MAINTAIN Tave matched with Tref using rod motion control In column 2a:

3. Record initial shutdown bank step counter readings

° ENTER initial step counter readings for Shutdown Bank E

  • 4. Shutdown bank E At 1PM05J:
  • SELECT SBE position on Rod Bank Selector switch SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Insert Shutdown Bank E 1 step At 1PM05J:
  • Using the rod motion control switch, INSERT Shutdown Bank E 1 step
  • 6. Withdraw shutdown bank E At 1PM05J:
  • Using the rod motion control switch, WITHDRAW Shutdown Bank E to 231 steps
7. DRPI indication At 1PM05J:

° VERIFY DRPI indicates 228 steps withdrawn NOTE Annunciator 1-10-A7 ROD DEV POWER RNG TILT, will alarm during performance of step 8

  • 8. Insert shutdown bank E At 1PM05J:
  • Using the rod motion control switch, INSERT Shutdown Bank E 10 to 15 steps
9. Record step counter readings In column 2g:

° RECORD shutdown bank E step counter reading In column 2h:

10. Shutdown bank E DRPI

° VERIFY each rod in shutdown bank E moved 10 -

15 steps using DRPI and INITIAL

  • 11. Return rods to initial position At 1PM05J:
  • WITHDRAW shutdown bank E rods to 228 steps SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number

12. Final shutdown bank E position In column 2j:

° RECORD final shutdown bank E position

13. Final shutdown bank E DRPI In column 2k:

° VERIFY each rod in shutdown bank E is restored to original position and INITIAL NOTE The steps for Shutdown Banks A, B, C, and D will not be performed. The examinee should go to the next step that addresses control banks.

14. Record initial control rod bank step counter readings In column 3a:

° ENTER initial step counter readings for Control Banks A, B, C, and D

  • 15. Control bank A At 1PM05J:
  • SELECT CBA position on Rod Bank Selector switch
  • 16. Insert Control Bank A 1 step At 1PM05J:
  • Using the rod motion control switch, INSERT Control Bank A 1 step
  • 17. Withdraw control bank A At 1PM05J:
  • Using the rod motion control switch, WITHDRAW Control Bank A to 231 steps SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number NOTE The following Annunciators will alarm during the performance of step 18 1-10-A6 ROD BANK LO-2 INSERTION LIMIT, 1-10-A7 ROD DEV POWER RNG TILT, and 1-10-B6 ROD BANK LO INSERTION LIMIT NOTE Alternate Path starts HERE

  • 18. Insert control bank A At 1PM05J:
  • Using the rod motion control switch, INSERT Control Bank A 10 to 15 steps NOTE The examinee may notice that DRPI for Rod F-8 stayed at 222 steps while the rest of the Bank continued to 216 steps, depending on how far the candidate inserts rods.

If the above occurs, then, the examinee should Notify the Unit Sup. and the evaluator should go to step 24.

19. Record step counter readings In column 3f:

° RECORD control rod bank A step counter readings for both groups 1 and 2 In column 3g:

20. Control bank A DRPI

° VERIFY each rod in control bank A moved 10 - 15 steps using DRPI and INITIAL (DRPI will not change by 2 LEDs for the failed rod)

  • 21. Return rods to initial position At 1PM05J:
  • WITHDRAW control bank A to original position
22. Final control rod bank A position In column 3i:

° RECORD final control bank A position SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 23. Final control bank A DRPI In column 3j:
  • VERIFY each rod in NOTE: Examinee should note F-08 control bank A is at its DRPI does not agree with other rods original position in that Group
  • 24 Notifies Unit Supervisor
  • Notify Unit Supervisor of failure of Rod F-08 to withdraw Cue: (if required) This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N-41 R9)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Moveable Control Assemblies Quarterly Surveillance JPM Number: CR-A Revision Number: 10 Task Number and

Title:

4C.RD-01 PERFORM Control Rod Exercises K/A Number and Importance: 014A4.02 3.4/3.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOSR 1.4.2 Moveable Control Assemblies Quarterly Surveillance CRITICAL STEPS (*) 4, 5, 6, 8, 11, 15, 16, 17, 18 & 21, 23 and 24 (21 and 23 may not be performed if failure is noted during inward rod motion).

Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 23 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N-41 R9)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL INITIATING CUE
1. You have been directed to perform a partial surveillance of 1BOSR 1.4.2-1, Moveable Control Assemblies Quarterly Surveillance. You are to perform the surveillance on SD Bank E and Control Banks A through D.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Raise Accumulator Level With SI Pump JPM Number: CR-b Revision Number: 0 Date: 10/21/2011 Revised By: Bill Hochstetter 10/20/11 Instructor Date Reviewed By: Rob Friskey 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP SI-22 Rev: 10 Procedure Rev:

9. Procedure Rev:
10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/21/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Revision Record (Summary)

Revision 0 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor,. Created from JPM No. N-73 Changed NLO to EO

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Set C accumulator level to 30% by:

set SIMACC(3)= 58065 set SIMN2ACC93)= 1290

3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

INITIAL CONDITIONS

1. You are the Extra NSO.
2. Unit 1 is at full power, steady state, equilibrium Xenon, MOL
3. All plant systems and controls are normal INITIATING CUE
1. The chemistry department left accumulator 1C sample valve open after sampling, resulting in a low level of 30%.
2. The sample valve has been closed, and the lineup returned to normal.
3. The accumulator has been declared inoperable due to the low level and the LCOAR 1BOL 5.1 has been entered.
4. U-1 RWST boron concentration is 2350 ppm.
5. 1B SI pump is OPERABLE
6. The US has directed you to return the accumulator level to the normal band using the 1A SI pump.
7. An EO is standing by the 1A SI pp with a copy of BOP SI-1T1 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN BOP

1. Refer to BOP SI-22, Raising SI SI-22 Accumulator Level in Mode 1, 2 or 3 Note: Step 1 may be performed at any time.

Verify nothing discharging to

2. VERIFY the following NOT RWST:

discharging to applicable RWST

° 0FC03PA/B, 0A/B refueling Cue: The Field Supervisor/WEC reports the purification pumps are water purification pumps not discharging to the RWST ° 1SI03P, RWST heating pump (May mark N/A per Cue: The Field Supervisor/WEC NOTE) reports the RWST heating pump is not discharging to the RWST 1RE01PA/B, RCDT pump

° A/B Cue: The Field Supervisor/WEC reports that the SFP demineralizer is ° 1FC01D, spent fuel pit not discharging to the RWST demineralizer effluents Note: Examinee checks 1CS01PA/B GREEN lights are LIT ° 1CS01PA/B, CS pump A/B Cue: Makeup from BA blender not aligned to RWST: ° RWST makeup from BA blender SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Comment ELEMENT STANDARD SAT UNSAT Number VERIFY/CLOSE:

3. Align mini-flow path for 1A SI pump
  • 1CV8804A (A pump)

° 1SI8804B (B pump)

VERIFY/OPEN:

  • 1SI8814 (A pump)

° 1SI8920 (B pump)

  • 1SI8813 (both pumps)
  • 4. Align SI pump to accumulator At 1PM06J VERIFY/OPEN: (both pumps)
  • 1SI8806
  • 1SI8923A
  • 1SI8888
  • 1SI8871
5. Verify SI to radwaste isolated At 1PM11J:
  • VERIFY/CLOSE 1SI8964 (both pumps)
6. Verify SI pump isolated to hot legs At 1PM06J:

VERIFY CLOSED and DEENERGIZED: (Both pumps)

  • 1SI8802A
  • 1SI8802B NOTE The procedure branches at this point dependent on the SI pump to be used. The intent of this JPM is to use the 1A SI pump, therefore the examinee should proceed to step F.7.b Cue: The SM directs that step F.7.a be omitted.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Comment ELEMENT STANDARD SAT UNSAT Number NOTE The Examinee may elect to have an EO do a pre-start check of the 1A SI pump prior to starting.

Cue: (if asked): The 1A SI pump is ready for a start and I am clear of the pump

  • 7. Start the 1A SI pump At 1PM06J:
  • Take 1A SI pump C/S to start
  • Ensure discharge CUE: The EO will perform the pressure does NOT applicable portions of BOP SI- exceed 1700 psig 1T1 ° Initiate BOP SI-1T1 NOTE When the examinee fills the accumulator 1% to 2% above the low level alarm setpoint (alarm clears) provide the following cue:

Cue: The desired accumulator level has been achieved.

° Enter 1BOL 5.1 Cue:Unit 1 Unit Supervisor acknowledges entry into 1BOL

  • OPEN 1SI8878C 5.1
  • CLOSE 1SI8878C when Cue: Unit 1 Unit Supervisor accumulator level is acknowledges exit BOL 5.1 between 31% and <63%

° Exit 1BOL 5.1

10. Stop the 1A SI pump At 1PM06J:

° STOP the 1A SI pump

11. Verify/Open 1SI8821A At 1PM06J:

° Verify/Open 1SI8821A SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Comment ELEMENT STANDARD SAT UNSAT Number

12. Isolate accumulator fill At 1PM06J:

° CLOSE 1SI8871 At 1PM011J:

13. Vent SI train to SI accumulators

° At 1PM11J, OPEN 1SI8964

° At 1PM06J, MONITOR SI pump discharge pressure At PM11J, CLOSE

° 1SI8964

14. Isolate SI pump from accumulator At 1PM06J:

° CLOSE 1SI8888

15. Notify chemistry to initiate 1BCSR NOTIFY chemistry to initiate 5.1.5 1BCSR 5.1.5 per Tech Spec 3.5.1 Cue: Chemistry has been notified to initiate 1BCSR 5.1.5 Cue: This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N-73 R6)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Raise Accumulator Level With SI Pump JPM Number: CR-b Revision Number: 00 Task Number and

Title:

4C.SI-02 FILL the SI System Accumulators K/A Number and Importance: 006A1.13 3.5/3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BOP SI-22, Raising SI Accumulator Level in Modes 1,2 or 3 (Rev. 10)

CRITICAL STEPS (*) 4, 7, 8, & 9 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 23 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N-73 R6)

INITIAL CONDITIONS

1. You are the Extra NSO.
2. Unit 1 is at full power, steady state, equilibrium Xenon, MOL
3. All plant systems and controls are normal INITIATING CUE
1. The chemistry department left accumulator 1C sample valve open after sampling, resulting in a low level of 30%.
2. The sample valve has been closed, and the lineup returned to normal.
3. The accumulator has been declared inoperable due to the low level and the LCOAR (1BOL 5.1) has been entered.
4. U-1 RWST boron concentration is 2350 ppm.
5. 1B SI pump is OPERABLE
6. The US has directed you to return the accumulator level to the normal band using the 1A SI pump.
7. An EO is standing by the 1A SI pp with a copy of BOP SI-1T1 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Perform Transfer to Hot Leg Recirc JPM Number: CR-c Revision Number: 00 Date: 10/24/2011 Revised By: Bill Hochstetter 10/24/11 Instructor Date Reviewed By: Brian Lewin 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BEP ES-1.4 Rev: 200 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/20/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

Revision Record (Summary)

Revision 0 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, revised to make alternate path Created from JPM No. N-30.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-180 (LOCA and currently on Cold Leg Recirc)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Turn annunciators to OFF.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. A large LOCA is in progress.
3. 1BEP-1 step 19 has been completed.
4. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 50 minutes has elapsed since SI was actuated.

INITIATING CUE

1. The Unit Supervisor has directed you to proceed with 1BEP ES-1.4, Transfer to Hot Leg Recirculation.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee

1. Refer to 1BEP ES-1.4, Transfer to LOCATE and OPEN Hot Leg Recirculation 1BEP ES-1.4 Note: This step may be performed at any time.
  • 2. Place SVAG Valve Bus Feeds to At 1PM06J, CLOSE:

Close.

  • 480V Feed to Bus 131X1A/X2A
  • 480V Feed to Bus 132X2A/X4A
  • 3. Close RH to cold legs isol valves. At 1PM06J, CLOSE:
  • 1SI8809A
  • 1SI8809B NOTE Alternate Path JPM starts here
  • 4. Check 1A RH pump running. At 1PM06J:
  • CHECK RHR pump 1A NOT RUNNING
  • 5 OPEN Train B RH HX discharge At 1PM06J:

crosstie header valve

  • OPEN 1RH8716B
  • 6. Open RH to hot legs isol valve. At 1PM06J:
  • OPEN 1SI8840
  • 7. Stop SI pump 1A. At 1PM06J:

STOP 1A SI pump

  • 8. Close SI pump 1A to cold legs isol At 1PM06J:

valve.

  • CLOSE 1SI8821A SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 9. Open SI pump 1A to hot legs isol At 1PM06J:

valve.

  • OPEN 1SI8802A
  • 10. Start the 1A SI pump. At 1PM06J:
  • START 1A SI pump
  • 11. Stop SI pump 1B. At 1PM06J:

STOP 1B SI pump

  • 12. Close SI pump 1B to cold legs isol At 1PM06J:

valve.

  • CLOSE 1SI8821B
  • 13. Open SI pump 1B to hot legs isol At 1PM06J:

valve.

  • OPEN 1SI8802B
  • 14. Start the 1B SI pump. At 1PM06J:
  • START 1B SI pump
15. Check SI pumps to hot legs isol At 1PM06J, Verify OPEN valves open 1SI8802A 1SI8802B
16. Close SI pumps to cold leg isol At 1PM06J:

valve CLOSE 1SI8835

17. Place SVAG Valve Bus Feeds to At 1PM06J, TRIP TRIP.

480V Feed to Bus 131X1A/X2A 480V Feed to Bus 132X2A/X4A Cue: This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 R7)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Align ECCS to Hot Leg Recirc JPM Number: CR-c Revision Number: 0 Task Number and

Title:

4D.EP-15 TRANSFER ECCS to Hot Leg Recirculation K/A Number and Importance: 011EA1.11 4.2/4.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BEP ES1.4, Transfer to Hot Leg Recirculation (Rev. 200)

CRITICAL STEPS (*) 2 through 14 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 23 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 R7)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. A large LOCA is in progress.
3. 1BEP-1 step 19 has been completed.
4. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 50 minutes has elapsed since SI was actuated.

INITIATING CUE

2. The Unit Supervisor has directed you to proceed with 1BEP ES-1.4, Transfer to Hot Leg Recirculation.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Respond To 1A SX Pump Trip (Standby Pump Does Not Start)

JPM Number: CR-d Revision Number: 0 Date: 10/20/2011 Developed By: Bill Hochstetter 10/20/2011 Instructor Date Validated By: Mark Ristau 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor

  • 11/06/2011 Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 11

CR-d from N130a rev 3 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAR 1-2-A1 Rev 4

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Lynn Sanders (Signature on File) 9/24/09 SME / Instructor Date Brian Clark (Signature on File) 9/24/09 SME / Instructor Date Page 2 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 Revision Record (Summary)

Revision 00

1. New JPM
2. Operator Actions PRA Establish SX Crosstie across units.
3. The examinee will direct the performance of 3 critical steps. The high PRA value of establish SX Crosstie across units justifies counting these steps as critical steps.
4. Validated 11/06/11 by Rob Lawlor and Bill Hochstetter.

Page 3 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 SIMULATOR SETUP INSTRUCTIONS NOTE:

It is okay to use a similar IC to the IC listed below, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

1. Reset to IC-13
2. Verify 1A SX is running
3. Insert malfunction SW01B to trip the 1B SX pump
4. Insert malfunction PN1427 to off
5. Place the simulator in RUN.
6. On the Examiners cue insert malfunction SW01A (15 sec delay) to trip the 1A SX pump
7. When Unit 2 NSO is requested to open 2SX005 modify remote function SW07 to 100 Page 4 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 INITIAL CONDITIONS You are the Unit1 NSO.

INITIATING CUE Respond to alarms on 1PM06J.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Page 5 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 RECORD START TIME:

Note If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee.

ELEMENT STANDARD Comment SAT UNSAT Number NOTE The examinee may refer to BAR 1-2-A1 at any time.

If this JPM is performed on the simulator, only the underlined cue need to be provided to the examinee.

1. Refer to BAR 1-2-A1 o Locate and Open BAR 1 A1 NOTE The next step begins the alternate path steps.
2. Start 1B SX Pump (This is an At 1PM06J:

Immediate Action)

  • Start 1B SX pump NOTE If this is being performed on the simulator, the Simulator Operator will act as the U2 NSO and will perform steps 3 and 5 when requested.

Have examinee call Unit 2 @ X-2209 during the next step.

  • 3. Determines SX Pump unavailable
  • DIRECTS U2 NSO to and DIRECTS U2 NSO to START START the standby SX the standby SX Pump on Unit 2 Pump on Unit 2 Cue: Unit 2 NSO reports the Unit 2 Standby SX pump is running NOTE Steps 4 and 5 may be performed in any order.

Page 6 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 ELEMENT STANDARD Comment SAT UNSAT Number

  • 4. Open 1SX005. At 1PM06J:
  • Open 1SX005:
  • 5. DIRECTS U2 NSO to OPEN
  • DIRECTS U2 NSO to OPEN 2SX005 2SX005
6. DETERMINE cause of trip.

o Dispatch an EO to check Cue: EO reports phase C the 1A SX pump (BUS 141 overcurrent target is up on the 1A Cub 2)

SX pump breaker.

Cue: EO reports phase B o Dispatch an EO to check overcurrent target is up on the 1B the 1B SX pump (BUS 142 SX pump breaker. Cub 2)

7. REFER to 1BOA PRI-7 o Direct Unit Supervisor to refer to 1BOA PRI-7.

Cue: The Unit Supervisor will refer to 1BOA PRI-7 NOTE The following steps from 1BOA PRI-7 may not be performed, if they were essentially performed per the BAR .

Page 7 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 ELEMENT STANDARD Comment SAT UNSAT Number 7A. NOTE: if examinee performs actions contained in 1BOA PRI-7, the steps are outlined in this sub-step:

Determines no SX pp running o Check at least 1 SX pp running on Unit 1 o Manually open 1SX016B and 1SX027B (RCFC inlet Note: pp fails to start and outlet valves)

Note: The solid bullet steps are o Start 1B SX pp the Critical Steps of the expected o Go to attachment A path of this JPM. o Direct U-2 NSO to check RCFC inlet and outlet isolation valves for standby SX pump OPEN AND Already running if following the

  • Start standby U-2 SX BAR. If not following the BAR pp report: Unit 2 NSO reports the Unit 2 Standby SX pump is running Cross-tie to both U-2 SX pps
    • Open 1SX005
    • Direct U-2 to open 2SX005 Check open 1SX033 Cue: 2SX033 and 034 and 1SX034 indicates open Direct U-2 to check open 2SX033 and Cue: U-2 SX pp disc. pressure 034 indicates 95 psig Direct U-2 to check SX pp disc. press. >

Goes to step 6 of attachment A 90 psig of 1BOA PRI-7 Check that 1 MCR Chiller and 1 Cnmt.

Chiller running Returns to main body step 2.

8. REFER to Technical Specification o Direct Unit Supervisor to 3.7.8. refer to Technical Specification 3.7.8.

Cue: The Unit Supervisor will refer to Technical Specification 3.7.8.

Page 8 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 ELEMENT STANDARD Comment SAT UNSAT Number

9. INITIATE corrective action. o Direct Unit Supervisor to INITIATE corrective action Cue: The Unit Supervisor will INITIATE corrective action.

Cue: This JPM is complete RECORD STOP TIME:

Page 9 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Respond To 1A SX Pump Trip (Standby Pump Does Not Start)

JPM Number: N130a: Revision Number: 0 Task Number and

Title:

R-OA-108 Respond to Essential Service Water Malfunction.

K/A Number and Importance: 076 A2.01 (3.5/3.7)

Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): BAR 1-2-A1 Rev 4 CRITICAL STEPS (*) 3, 4 & 5 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name:___________________________________ (Print)

Evaluators Signature:________________________________ Date:_____________

Page 10 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS You are the Unit1 NSO.

INITIATING CUE Respond to alarms on 1PM06J.

Page 11 of 11 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure MANUALLY INITIATE CONTAINMENT SPRAY (BEP-0)

JPM Number: CR-e Revision Number: 4 Date: 11/06/2011 Developed By: Brian Clark (Signature on file) 10/04/07 Instructor Date Validated By: Bill Hochstetter (Signature on file) 11/06/11 SME or Instructor Date Approved By: Rob Lawlor (Signature on file) 11/06/11 Operations Representative Date Page 1 of 10

CR-e from N-46A rev 3 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

_BEP-0, Reactor Trip or Safety Injection.

Procedure Rev. 202 Verified Date: 10/28/2011

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 10

CR-e from N-46A rev 3 Revision Record (Summary)

1. Revision 3 Changed task conditions from CNMT press is 25# to Containment pressure peaked at 25#. RCPs will be tripped in setup and action has been deleted as a critical task. The two actions of manually opening of _CS019A and placing _A CS pump to Test are each designated as critical tasks.
2. Revision 4 Changed attachment B to attachment C based on rev. to _BEP-0 Page 3 of 10

CR-e from N-46A rev 3 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 179 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Turn annunciators OFF
3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
4. This completes the setup for this JPM.

Page 4 of 10

CR-e from N-46A rev 3 INITIAL CONDITIONS

1. You are a unit NSO.
2. A LOCA has just occurred and 1BEP-0 is in progress.
3. The ECCS is in the injection mode with dropping RCS pressure.
4. Containment pressure peaked at 25 psig.

INITIATING CUE The Unit Supervisor has directed you to perform step 14 of 1BEP-0, Reactor Trip or Safety Injection.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

CRITICAL ELEMENTS(*): 9, 10 & 13 APPROXIMATE COMPLETION TIME: 26 minutes UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Page 5 of 10

CR-e from N-46A rev 3 Comment SAT UNSAT Number STEP ELEMENT STANDARD RECORD START TIME ________

NOTE If this JPM is given on the simulator, only the cues underlined are required to be given to the examinee.

1. Enter BEP-0 at step 14 ° LOCATE and OPEN o o 1BEP-0 to step 14
2. Check containment pressure At 1PM06J: o o

° CHECK Containment pressure

3. Group 6 containment spray At 1PM06J: o o monitor lights

° CHECK Group 6 CS Monitor lights LIT

4. 1BEP-0, Step 14.b RNO o o At 1PM05J or 1PM06J:

° MANUALLY ACTUATE Containment Spray and Phase B Isolation

° CHECK Group 6 CS Monitor lights LIT

5. 1BEP-0, Attachment C ° GO TO BEP-0, o o Attachment C
6. 1BEP-0, Attachment C, CS RWST At 1PM06J, CHECK OPEN: o o Suction valves ° 1CS001A

° 1CS001B

7. 1BEP-0, Attachment C, CS Pump At 1PM06J, CHECK OPEN: o o Header isol valves ° 1CS007A

° 1CS007B Page 6 of 10

CR-e from N-46A rev 3 Comment SAT UNSAT Number STEP ELEMENT STANDARD

8. 1BEP-0, Attachment C, CS eductor At 1PM06J, CHECK OPEN: o o spray additive valves ° 1CS019A

° 1CS019B NOTE Alternate path begins with step 9 and ends with step 10

  • 9. 1BEP-0, Attachment C, Step 1.c At 1PM06J; o o RNO
  • PLACE 1A and/or 1B CS pump test switch in TEST
  • 10 1BEP-0, Attachment C, Step 1.c At 1PM06J; o o RNO (continued)
  • MANUALLY OPEN 1CS19A and/or 1CS019B
11. 1BEP-0, Attachment C, Step 1.c At 1PM06J; o o RNO (continued)

° PLACE 1A and/or1B CS pump test switch in NORMAL At 1PM06J, CHECK OPEN: o o

12. 1BEP-0, Attachment C, CS ° 1CS010A Eductor Inlet FCVs ° 1CS010B
  • 13. 1BEP-0, Attachment C, CS At 1PM06J: o o Pumps
  • Check at least one CS pump RUNNING
14. 1BEP-0, Attachment C, Step 3 ° RETURN TO BEP-0, o o Step 14.c Page 7 of 10

CR-e from N-46A rev 3 Comment SAT UNSAT Number STEP ELEMENT STANDARD

15. Group 6 Phase B isolation monitor At 1PM06J: o o lights

° CHECK Group 6 Phase B Isolation monitor lights LIT

16. Stop All Reactor Coolant Pumps At 1PM05J: o o o Check all RCPs STOPPED
15. Check CS eductor suction flow > At 1PM06J: o o 15 gpm

° CHECK CS eductor suction flow on 1FI-CS013 and/or 1FI-CS014

16. Check CS eductor additive flow > At 1PM06J: o o 5 gpm Cue: This JPM is completed

° CHECK CS eductor additive flow on 1FI-CS015 and/or 1FI-CS016 RECORD STOP TIME_______

Page 8 of 10

CR-e from N-46A rev 3 Operators Name:

Job

Title:

RO SRO SRO Cert JPM

Title:

Manually Initiate Containment Spray (_BEP-0)

JPM Number: N-46a Revision Number: 4 Task Number and

Title:

4D.CS-01 Manually Initiate Containment Spray (BEP-0)

K/A Number and Importance: 026A4.01 (4.5 / 4.3)

Task Standard: Manually Initiate Containment Spray _BEP-0 Step 14 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

_ BEP-0, Step 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 10

CR-e from N-46A rev 3 INITIAL CONDITIONS TASK CONDITIONS:

1. You are the Unit NSO.
2. A LOCA has just occurred and 1BEP-0 is in progress.
3. The ECCS is in the injection mode with decreasing RCS pressure.
4. Containment pressure peaked at 25 psig.

INITIATING CUES:

The US has directed you to initiate Containment Spray per 1BEP-0, Step 14.

Page 10 of 10

Exelon Nuclear Job Performance Measure Unload D/G that is paralleled to the SAT JPM Number: CR-f Revision Number: 15 Date: 10/29/2011 Revised By: Bill Hochstetter 10/29/2011 Instructor Date Reviewed By: Mark Ristau 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP DG-12 Rev: 20 Procedure BOP DG-11T1, Diesel Generator Start/Stop Log Rev: 2

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/29/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

Revision Record (Summary)

Revision 15 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, change was procedure rev that added 1 step to the JPM.

Created from JPM No. N-6 rev.14

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Start, parallel, and load DG to 5500 KW using procedure then snap for succeeding uses.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

INITIAL CONDITIONS

1. You are the extra NSO.
2. The Unit is in mode 1, with a normal "at power" electrical lineup.
3. Diesel Generator 1A has been running paralleled to the grid for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at 5500 KW INITIATING CUE
1. The Unit Supervisor has just directed you to shutdown the 1A Diesel Generator per BOP DG-12 from the Control Room.
2. Electric Operations has been notified and expects the DG load to be reduced and then removed from parallel operation.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN

1. Refer to BOP DG-12, Diesel BOP DG-12 Generator Shutdown Note: Step 1 may be performed at any time Cue: All prerequisites are met NOTE Cue the candidate at each plateau that the time frame has been met.
  • 2. Reduce load on the 1A DG to less At 1PM01J:

than 250 KW using DG 1A Gov Adj

  • LOWER the DG Gov Adj control. control to REDUCE load to

< 250 KW per the schedule Note: The examinee may adjust VAR in the note loading as necessary while unloading

° 4100 KW for 2 minutes the machine

° 2750 KW for 2 minutes

° 1400 KW for 15 minutes

° < 250 KW

3. Adjust reactive load to zero KVARS At 1PM01J:

using Diesel Gen 1A Volt Adj. ° ADJUST DG KVARS to Control. ZERO using the 1A DG VOLT ADJ NOTE The following annunciator will alarm after DG output breaker is opened:

1-21-D9, DG 1A RUNNING UNLOADED The diesel will continue running for 5 minutes after step 10 execution of this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 4. Open ACB 1413 DG 1A Feed to At 1PM01J:

4KV Bus 141.

  • OPEN ACB 1413 NOTE:

The completion of BOP DG-11T1 is NOT required for this JPM.

5. Record the time ACB 1413 was opened on BOP DG-11T1

° RECORD the time ACB Cue: The Unit NSO will complete 1413 was opened on BOP DG-11T1 BOP DG-11T1 At 1PM01J:

  • 6. VERIFY/PLACE DG 1A ACB 1413 auto re-close circuit arm selector
  • VERIFY/PLACE DG 1A switch in the NORM position. ACB 1413 auto re-close circuit arm selector switch in the NORM position.

Locally

7. VERIFY/PLACE the Start Mode Selector Switch at 1PL07J in FAST. Start mode selector switch:

° DIRECT NLO to Cue: The EO reports the start mode selector switch is in FAST VERIFY/PLACE the Start Mode Selector switch in FAST at 1PL07J

8. VERIFY DG air receiver pressures Locally:

are > 175 psig prior to stopping DG Starting Air receiver pressures to ensure operability.

° DIRECT NLO to VERIFY Cue: The EO reports the air receiver DG starting air receiver pressures are > 175 psig. pressures > 175 psig SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

Comment ELEMENT STANDARD SAT UNSAT Number

9. VERIFY control mode selector Locally:

switch Control mode selector switch Cue: The EO reports the control mode selector switch is in REMOTE ° DIRECT the NLO to VERIFY the Control Mode Note: The operator may check the Selector Switch is in LOCAL white light NOT LIT REMOTE

  • 10. PLACE the DG 1A Start Switch in At 1PM01J:

STOP position.

Stop the 1A DG

  • PLACE the 1A DG Start Switch to STOP Cue: This JPM is complete

° CHECK STOP light LIT RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-41 R9)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Unload and Shutdown a Diesel Generator JPM Number: CR-f Revision Number: 15 Task Number and

Title:

4C.DG-04,05 UNLOAD a DG & SHUTDOWN a DG K/A Number and Importance: 064A4.06 3.1/3.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1. BOP DG-11T1, Diesel Generator Start/Stop Log (Rev 2)
2. BOP DG-12, Diesel Generator Shutdown (Rev. 20)

CRITICAL STEPS (*) 2, 4, 6 & 10 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-41 R9)

INITIAL CONDITIONS

1. You are the extra NSO.
2. The unit is in mode 1, with a normal "at power" electrical lineup.
3. Diesel Generator 1A has been running paralleled to the grid for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at 5500 KW.

INITIATING CUE

1. The Unit Supervisor has just directed you to shutdown the 1A Diesel Generator, per BOP DG-12 from the Control Room.
2. Electric Operations has been notified and expects the DG load to be reduced and then removed from parallel operation.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Align Ventilation Systems for Emergency Operations (Failure of Fuel Handling Building Fans to Start)

JPM Number: CR-g Revision Number: 6 Date: 10/29/2011 Revised By: Bill Hochstetter 10/29/2011 Instructor Date Reviewed By: Mark Ristau 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP VA-6 Rev: 4 Procedure 2BEP-0 Rev: 202

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/29/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

Revision Record (Summary)

Revision X Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.

Created from JPM No. N-99b

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Verify:
  • 0VA085Y closed
  • 0VA084Y open
  • 0VA086Y open
3. VC M/U Filter Unit on running VC Train
4. Place VC Recirc Charcoal Adsorber Selector Switches on BOTH trains of VC to ABSORB, allow dampers to realign, then place both switches back to AUTO
5. Start 0B and 0F VA Inaccessible Plenum Charcoal Booster Fans
6. Close FHB Pre-Filter Isolation Dampers:
a. 0VA058Y/0VA059Y
b. 0VA053Y/0VA054Y
7. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
8. Obtain Unit-2 E-0 Attachment. B binder with steps for the examinee
9. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. Unit 2 has experienced a LOCA.
3. 2BEP-0 is in progress in response to the event.

INITIATING CUE You are directed to verify Fuel Handling Building ventilation is aligned for emergency operation per step 6 of 2BEP-0 Attachment B.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee

1. Refer to 2BEP-0, Reactor Trip or LOCATE and OPEN Safety Injection, Attachment B step 2BEP-0 to Attachment B 6 step 6 Note: JPM step 1 may be performed at any time NOTE ALTERNATE PATH STARTS HERE JPM steps 2 through 10 verify the fuel handling building ventilation is aligned for emergency operation. The fuel handling building fans fail to start initially
2. Verify FH building ventilation aligned At 1PM02J, VERIFY
  • 0VA04CA NOT running AND
  • 0VA04CB NOT running
3. Refer to BOP VA-6, Fuel Handling LOCATE and OPEN BOP Building Charcoal Booster Fan VA-6 Operation Note: JPM step 10 may be performed ° at any time Cue: (if asked) The system is lined up IAW BOP VA-E3 NOTE In the following JPM steps, provide cues to the examinee based on which train is started SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 4. Place one FHB Exhaust Plenum on At 0PM02J, line VERIFY/OPEN:
  • 0VA058Y and 0VA059Y (A Train)

OR

  • 0VA053Y and 0VA054Y (B Train)
5. Ensure the other trains FHB Filter At 1PM02J, VERIFY/CLOSE Flow Control damper is CLOSED. for fan NOT being started:

o 0VA062Y (for A fan)

OR 0VA057Y (for B fan)

6. Verify the fan transfer switch is in remote. ° VERIFY fan transfer switch is in REMOTE Note: The student may use the Stop light (green) on the associated control switch to verify the fan is in REMOTE Cue: The EO reports that the fan transfer switch is in the REMOTE position at 0VA01JA
  • 7. Start one train of Fuel Handling At 0PM02J, START:

Building Charcoal Booster fan.

  • 0VA04CA OR
  • 0VA04CB
8. Ensure FHB Filter Train Flow Control At 0PM02J, VERIFY/OPEN:

damper opens.

o 0VA057Y (for A fan)

OR 0VA062Y (for B fan)

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

Comment ELEMENT STANDARD SAT UNSAT Number

9. Ensure FHB Charcoal Adsorber Inlet At 0PM02J, VERIFY/OPEN:

Isol opens.

o 0VA060Y (for A fan)

OR 0VA055Y (for B fan)

10. Ensure FHB Charcoal Adsorber At 0PM02J, VERIFY/CLOSE:

Bypass Isol damper closes.

o 0VA051Y (for A fan)

OR 0VA435Y (for B fan)

Cue: (if required) This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b R5)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Align Ventilation Systems for Emergency Operation (Failure of FHB)

JPM Number: CR-g Revision Number: 6 Task Number and

Title:

4D.EP-19 RESPOND to Safety Injection Signal K/A Number and Importance: 072A3.01 2.9/3.1 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): BOP VA-6 Rev: 4 2BEP-0 Rev: 202 CRITICAL STEPS (*) 4 and 7 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b R5)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. Unit 2 has experienced a LOCA.
3. 2BEP-0 is in progress in response to the event.

INITIATING CUE You are directed to verify Fuel Handling Building ventilation is aligned for emergency operation per step 6 of 2BEP-0 Attachment B.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Establish and Secure Normal and RH Letdown flow JPM Number: CR-h Revision Number: 09 Date: 10/29/2011 Revised By: Bill Hochstetter 10/29/2011 Instructor Date Reviewed By: Mark Ristau 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP CV-17 Rev: 25 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/29/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

Revision Record (Summary)

Revision 9 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.

Created from JPM No. N-64 R8

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-25 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Modify Remote Function RH02 to 100, to open 1RH8734B when called as EO by examinee.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

INITIAL CONDITIONS

1. You are the unit NSO.
2. The plant is in MODE 4 with RHR in shutdown cooling.
3. Normal letdown is in service.
4. Train B RHR is operating with train A in stand-by.
5. Degassing of the RCS is NOT required at this time.

INITIATING CUE The US directs you to establish 55 gpm letdown from RH and secure normal letdown per BOP CV-17.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee

1. Refer to BOP CV-17, step F.1 LOCATE and OPEN BOP CV-17 Note: May be performed at any time Cue: Prerequisites are met
2. Verify/Open 1CV460 At 1PM05J:

VERIFY/OPEN 1CV460

3. Verify/Open 1CV459 At 1PM05J:

° VERIFY/OPEN 1CV459

4. Verify/Open 1CV8389A/B At 1PM05J:

VERIFY/OPEN 1CV8389A/B

5. Verify/Open 1CV8160 At 1PM05J:

VERIFY/OPEN 1CV8160

6. Verify/Open 1CV8149A/B/C At 1PM05J:

° VERIFY/OPEN 1CV8149A/B/C At 1PM05J:

7. Verify RH letdown control valve position

° VERIFY/REDUCE 1CV128 demand to 0%

  • 8. Align RH letdown flowpath Cue: Operator reports 1RH8734B is
  • DISPATCH operator to OPEN locally open 1RH8734B SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

Comment ELEMENT STANDARD SAT UNSAT Number At 1PM05J:

  • 9. Place 1CC130A to Manual at 40%
  • PLACE 1CC130A in MANUAL and ADJUST demand to 40%

At 1PM05J:

  • 10. Place 1CV131 to Manual at 40%
  • PLACE 1CV131 in MANUAL and ADJUST demand to 40%

At 1PM05J:

11. Place the 1CV129 to VCT PLACE 1CV129 to the VCT position At 1PM05J:
12. Adjust 1LK-112 o ADJUST 1LK-112 pot setting to 7.3 AND PLACE 1LK-112 in AUTO
13. Place 1CV112A in Auto At 1PM05J:

PLACE 1CV-112A in AUTO

  • 14. Establish RH Letdown Flow At 1PM05J:
  • 15. Adjust RH Letdown Flow At 1PM05J:
  • ADJUST 1CV131 in manual to obtain desired flow
16. Place 1CV131 in Auto, if required At 1PM05J:

PLACE 1CV131 in AUTO, IF required SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

Comment ELEMENT STANDARD SAT UNSAT Number

17. Adjust letdown temperature At 1PM05J:

NOTE: When examiner is satisfied, ADJUST 1CC130A to CUE the examinee that temp= obtain ~ 110°F 110°F At 1PM05J:

18. Establish auto temperature control PLACE 1CC130A in AUTO At the RM-11:
19. Verify letdown radiation monitor in service VERIFY/PLACE 1RE-PR006 in service per BOP AR/PR-1 Cue: An extra NSO will place 1RE-PR006 in service
  • 20. Isolate normal letdown flowpath At 1PM05J:
  • CLOSE 1CV8152
21. Align 1CV129 for RCS cleanup At 1PM05J:

PLACE 1CV129 in the proper position for RCS Cue: Place 1CV129 is in DEMIN cleanup position to allow continued cleanup.

Cue: This JPM is complete RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N-64 R8)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Establish and Secure Normal and RH Letdown JPM Number: CR-h Revision Number: 09 Task Number and

Title:

4C.CV-16 ESTABLISHING and SECURING Normal and RH Letdown flow.

K/A Number and Importance: 005 2.1.23 4.3/4.4 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOP CV-17 Rev. 25 CRITICAL STEPS (*) 8, 9, 10, 14, 15, & 20 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N-64 R8)

INITIAL CONDITIONS

1. You are the unit NSO.
2. The plant is in MODE 4 with RHR in shutdown cooling.
3. Normal letdown is in service.
4. Train B RHR is operating with train A in stand-by.
5. Degassing of the RCS is NOT required at this time.

INITIATING CUE The US directs you to establish 55 gpm letdown from RH and secure normal letdown per BOP CV-17.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Operate the Fire Detection/Alarm Equipment (without control power)

JPM Number: IP-i Revision Number: 07 Date: 10/30/2011 Revised By: Bill Hochstetter 10/30/2011 Instructor Date Reviewed By: Brian Lewin 11/6/2011 Operations Representative Date Approved By: /s/ Rob Lawlor 11/6/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP FP-22 Rev: 6 Procedure BOP FP-22A20 Rev: 0 Procedure BOP FP-22A25 Rev: 0

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/30/11 SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

Revision Record (Summary)

Revision 7 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.

Created from JPM No. N-49a R6

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

INITIAL CONDITIONS

1. You are an Equipment Operator.
2. A fire exists in the _B Diesel Generator room as determined by an alarm at

_PM09J and local report.

3. Automatic actuation of CO2 to the _B Diesel Generator room has failed.

INITIATING CUE The Fire Chief directs you to manually initiate CO2 to the _B Diesel Generator room using BOP FP-22.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Refer to BOP FP-22, Manual ° LOCATE and OPEN BOP ___ ___ ___

Operation of the Carbon FP-22 Dioxide and Halon Fire Suppression Systems CUE All prerequisites have been met NOTE: Provide the examinee with a copy of BOP FP-22.

2. Refer to Section G to determine DETERMINE attachment: ___ ___ ___

attachment

° FP-22A20 for DG 1B

° FP-22A25 for DG 2B CUE (if requested) The detection zone in alarm is _D-71 Note: (If requested), local panel has control power indication NOTE: Provide the examinee with a copy of FP-22A20 for DG 1B OR FP-22A25 for DG 2B as appropriate.

3. Request MCR to contact REQUEST Center Desk to: ___ ___ ___

Security

° Call Security to ensure room clear of personnel CUE Security has verified the room is clear of personnel NOTE: This is a prerequisite, and was met in JPM step 1.

4. Request a page announcement. REQUEST Center Desk to: ___ ___ ___

° Page plant for pending initiation CUE Page announcement has been made

5. Verify open CO2 block valve. ° VERIFY/OPEN _CO5022B ___ ___ ___

CUE _CO5022B is PARALLEL to the piping (OPEN)

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

Comment ELEMENT STANDARD SAT UNSAT Number

6. Verify Abort Switch not in Abort. VERIFY _HS-CO004 NOT in ___ ___ ___

ABORT CUE HS-CO004 is NOT in ABORT

7. Pull down the CO2 push button PULL DOWN cover for: ___ ___ ___

station cover. _HS-CO002 OR

_HS-CO003 CUE HS-CO002 button cover is DOWN OR CUE HS-CO003 button cover is DOWN CUE (if asked) The red light associated with the button is off NOTE: Alternate path initiated in the following step.

DEPRESS CO2 button:

8. Locally actuate system ___ ___ ___

_HS-CO002 OR

_HS-CO003 CUE HS-CO002 button is DEPRESSED OR CUE _HS-CO003 button is DEPRESSED

9. Verify system actuates locally. At _CO03J: ___ ___ ___

° Verify CO2 System Actuated light LIT CUE The CO2 System Actuated light is NOT LIT on _CO03J NOTE: If the examinee elects to try the other push button - repeat this cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

Comment ELEMENT STANDARD SAT UNSAT Number

10. Verify alarm received on VERIFY: ___ ___ ___

_PM09J.

° Suppression alarm on

_PM09J CUE The Unit NSO reports that the suppression alarm was NOT received on _PM09J NOTE: If the examinee elects to try the other push button - repeat this cue.

11. Determine manual initiation ° PROCEED to step B.1 ___ ___ ___

without control power is required

  • 12. Open the Master EMPC. VERIFY/OPEN: ___ ___ ___
  • 0CO09J CUE 0CO09J actuator lever is in the OPEN position
13. Verify open CO2 block valve. VERIFY/OPEN: ___ ___ ___

° _CO5022B CUE _CO5022B is PARALLEL to the piping (OPEN)

NOTE: _C05022B was previously verified open (JPM step 5)

  • 14. Break glass on _CO03JB
  • BREAK glass cover on ___ ___ ___

_CO03JB CUE The glass cover has been broken on _CO03JB

  • 15. Actuate using EMPC actuator
  • PLACE actuator lever for ___ ___ ___

lever _CO03JB in OPEN

  • NOTE time CUE _CO03JB actuator lever is in the OPEN position CUE Use current time SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

Comment ELEMENT STANDARD SAT UNSAT Number

16. Verify alarm received on VERIFY: ___ ___ ___

_PM09J.

° Suppression alarm on

_PM09J (_S-37)

CUE The Unit NSO reports that the suppression alarm _S-37 was received on _PM09J

  • 17. Terminate CO2 WHEN 1 minute for 1B DG OR ___ ___ ___

1 minute and 40 seconds for 2B DG has passed, THEN:

  • PLACE _CO03JB actuator lever in CLOSE CUE (If the 1B DG, then) 1 minute has passed CUE (If the 2B DG, then) 1 minute and 40 seconds has passed CUE The _CO03JB actuator lever is in the CLOSED position NOTE:
  • 18. Close CO2 block valve. CLOSE: ___ ___ ___

° _CO5022B CUE _CO5022B is PERPENDICULAR to the piping (CLOSE)

CUE This JPM is completed JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a R6)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Operate the Fire Detection/Alarm Equipment (without control power)

JPM Number: IP-i Revision Number: 07 Task Number and

Title:

4C.FP-02 OPERATE the Fire Detection/Alarm equipment.

K/A Number and Importance: 086A2.04 3.3/3.9 Suggested Testing Environment:: Simulator Control Room In-Plant Other Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BOP FP-22, Manual Operation of the CO2 and Halon Fire Suppression Systems (Rev 6)

BOP FP-22A20, Manual Initiation of CO2 to 1B Diesel Generator Room (Rev. 0)

BOP FP-22A25, Manual Initiation of CO2 to 2B Diesel Generator Room (Rev. 0)

CRITICAL STEPS (*) 12, 14, 15, 17, & 18 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a R6)

INITIAL CONDITIONS

1. You are an Equipment Operator.
2. A fire exists in the _B Diesel Generator room as determined by an alarm at

_PM09J and local report.

3. Automatic actuation of CO2 to the _B Diesel Generator room has failed.

INITIATING CUE The Fire Chief directs you to manually initiate CO2 to the _B Diesel Generator room using BOP FP-22.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Perform a Local Emergency Start of the 1B AF pp using BOA ELECT-5, Attachment D.

JPM Number: IP-j Revision Number: 08 Date: 11/02/2011 Revised By: Bill Hochstetter 11/02/2011 Instructor Date Reviewed By: Brian Lewin 11/6/2011 Operations Representative Date Approved By: /s/ Rob Lawlor 11/6/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOA ELEC-5 att. D Rev: 101 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 11/02/2011 SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

Revision Record (Summary)

Revision 8 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.

Created from JPM No. N-56 Rev. 7 Specified to use on Unit 1 only.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

INITIAL CONDITIONS

1. You are a Non-Licensed Operator.
2. The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
3. The 1A AF pump is OOS for maintenance and the 1B AF pump did not automatically start, and will not manually start with the MCR switch.

INITIATING CUE The Shift Manager has just directed you to initiate a local emergency start of the 1B AF pump using BOA ELEC-5, Attachment D Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Locate the 1B AF pump. On 383 Aux Bldg:

Note: Provide the Candidate with a LOCATE _B AF pump.

copy of 1 or 2BOA ELEC-5, Attachment D.

NOTE Double Hearing Protection will be required prior to room entry. Ensure double hearing protection is available.

JPM steps 2 and 3 may be performed in any order

2. Verify/Start associated Aux Lube Oil Pump. Inside pp room 383 L15 (U-1)

Cue: Aux Lube Oil Pump CS is in the Inside pp room 383 L18 (U-2)

START position.

VERIFY/START _B Aux Lube Oil Pump

3. Verify/Start Gearbox Lube Oil Pump. Inside pp room 383 L16 (U-1)

Cue: Gearbox Lube Oil Pump CS is Inside pp room 383 L19 (U-2) in the START position.

VERIFY/START _B Gearbox Lube Oil Pump

  • 4. Place ENGINE START Switch to At _AF01J:

MAN.

  • PLACE Engine Start Switch Cue: ENGINE START Switch is in to MAN MAN.

Note: The blue Engine ready to start light will extinguish when switch is repositioned.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

Comment ELEMENT STANDARD SAT UNSAT Number

5. Verify Diesel Air Box Trip reset. At _AF01J Cue: Air Box Trip Annunciator is CHECK Diesel Air Box NOT LIT. Trip reset
6. Momentarily depress the RESET At _AF01J:

button.

Cue: Reset pushbutton depressed DEPRESS and and released RELEASE the Reset button

  • 7. Start the 1B AF Pump.

At _AF01J:

Cue: The ENGINE RUNNING light is LIT.

  • DEPRESS the Start button.

Note: engine should start within 60 seconds VERIFY the Engine Running Light is lit

8. Monitor _B AF pump operation.

Cue: AF-7T1 will be completed by PERFORM BOP AF-7T1 another NLO who will monitor the pump.

Cue: This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N-56 R7)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Local Emergency start of the _B AF pump JPM Number: IP-j Revision Number: 08 Task Number and

Title:

4D.OA-35 Establish Emergency Control of Safe Shutdown Equipment K/A Number and Importance: 061.2.1.30 4.4/4.0 Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOA ELECT-5 att. D Rev: 101 CRITICAL STEPS (*) 4 & 7 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N-56 R7)

TASK CONDITIONS

1. You are a Non-Licensed Operator.
2. The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
3. The 1A AF pump is OOS for maintenance and the 1B AF pump did not automatically start, and will not manually start with the MCR switch.

INITIATING CUES The Shift Manager has just directed you to initiate a local emergency start of the 1B AF pump using BOA ELEC-5, Attachment D.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Instrument Bus Inverter Startup JPM Number: IP-k Revision Number: 11 Date: 9/17/2009 Revised By: Bill Hochstetter

  • 11/01/2011 Instructor Date Validated By: Brian Lewin
  • 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor
  • 11/06/2011 Training Department Date
  • Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 10

IP-k - rev 11 From N-32 R11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP IP-1 Rev: 14 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Brian Clark (Signature on file) 9/18/09 SME / Instructor Date Lynn Sanders (Signature on file) 9/18/09 SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 10

IP-k - rev 11 From N-32 R11 Revision Record (Summary)

Revision 11 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Added statement concerning critical step Added photos of panels SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 10

IP-k - rev 11 From N-32 R11 INITIAL CONDITIONS

1. You are an Equipment Operator.
2. The unit is at 65% power.
3. The unit has experienced a loss of Instrument Bus _11 due to failure of Instrument Inverter _11.
4. All maintenance is completed on Instrument Inverter _11 and the Clearance Order Tags have been removed.
5. Instrument Bus _11 is currently energized from the constant voltage transformer

(_IP01E).

INITIATING CUE

1. The Unit Supervisor directs you to startup Instrument _11 Inverter _IP05E and to transfer Instrument Bus _11 power to the inverter per BOP IP-1.
2. An Equipment Operator is standing by at MCC _31X2.
3. All prerequisites associated with any critical step are met.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 10

IP-k - rev 11 From N-32 R11 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Refer to BOP IP-1 ° LOCATE and OPEN BOP IP-1 Cue: (If requested) No instrument channels are in a tripped condition and the control room has reviewed _BOA Elec-2.

Cue: Prerequisites are met

2. VERIFY On Inverter Fan _IP09E. At _IP09E:

Cue: Inverter fan switch is in ON ° VERIFY/PLACE Inverter or the ORANGE light is lit Fan _IP09E ON

  • 3. VERIFY/CLOSE Inverter AC feed Close Inverter AC feed breaker.

breaker at MCC _31X2 Cub. C2.

  • DIRECT EO to CLOSE AC Cue: EO reports that feed breaker feed breaker at _31X2 cub

_31X2 cub C2 is CLOSED C2

  • 4. VERIFY/CLOSE Inverter DC feed Close Inverter DC feed breaker, at 125 VDC Distribution breaker.

Panel _11 BF1, CKT 1.

° LOCATE 125 VDC Note: Located 451 elevation MEER Distribution Panel _11 BF1 Cue: DC feed breaker at 125 VDC

  • CLOSE 125 VDC panel _11 BF1, Ckt #1 is to Distribution Panel _11 BF1 the RIGHT (CLOSED) Breaker, ckt 1
  • 5. CLOSE Battery input breaker 2CB At Inverter _IP05E:

Note: Located 451 elevation MEER ° LOCATE Instrument Inverter _11 (_IP05E)

Cue: Battery input breaker 2CB is in the UP position (ON)

  • CLOSE Battery Input Bkr 2CB on the inverter SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 10

IP-k - rev 11 From N-32 R11 Comment ELEMENT STANDARD SAT UNSAT Number NOTE The pre-charge pushbutton should not be released until DC Input Breaker, 3CB, is closed

  • 6. DEPRESS and HOLD pre-charge At _IP05E:

button 1PB for at least 15 seconds

  • DEPRESS and HOLD Pre-charge 1PB button Cue: The Pre-charge 1PB button for at least 15 seconds has been DEPRESSED and HELD for at least 15 seconds If asked: Output volts indicate > 110 on volt meter.
  • 7. CLOSE DC input breaker 3CB At _IP05E:

Cue: DC Input Breaker 3CB is in

  • CLOSE DC Input Breaker the UP position (ON) 3CB on the inverter
8. Release pre-charge button 1PB At _IP05E:

Cue: The Pre-charge 1PB button ° RELEASE Pre-charge has been RELEASED 1PB button

9. VERIFY AC output voltage At _IP05E, on 2VM:

greater than 110 V

° VERIFY output voltage Cue: AC voltmeter indicates 119V greater than 110V (or as indicated)

  • 10. CLOSE AC output breaker 4CB At _IP05E:

Cue: AC Output Breaker 4CB is in

  • CLOSE AC Output Brkr the UP position (ON) 4CB on the inverter
11. Establish communications with ° Establish communications Unit NSO with Unit NSO Cue: The Unit NSO has been contacted and directs you to proceed NOTE: The AEER is a No Radio Zone SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 10

IP-k - rev 11 From N-32 R11 Comment ELEMENT STANDARD SAT UNSAT Number

12. PLACE Rod Control in MANUAL ° Request NSO/ US to place at discretion of US. Rod Control in MANUAL if desired.

Cue: Rod Control is in MANUAL NOTE The examinee may verify that the CAUTION prior to step F.1.m is met, if the MCR is contacted give the following cue:

Cue: 1) The SR and IR trips are blocked and/or

2) No instrument channels are in a tripped condition If asked about the critical step give the following cue:

Cue: All prerequisite requirements associated with the critical step have been met.

(This includes an SRO present, and US permission)

Note:

The examiner may want to use the attached picture of the Instrument bus and have the examinee explain the operation, rather than opening the panel.

13. PLACE Reserve AC feed breaker At 120 VAC Instr Panel _11:

to OFF

° PLACE the RESERVE AC Cue: RESERVE AC feed breaker is feed breaker to OFF to the LEFT (OFF position)

14. PLACE NORMAL/RESERVE feed At 120 VAC Instr Panel _11:

breaker interlock bar in a position to allow operation of the NORMAL AC Feed Breaker ° PLACE the NORMAL/RESERVE feed Cue: Interlock bar is in a position brkr interlock bar in to allow NORMAL AC feed position to allow for breaker is operation operation of NORMAL AC feed breaker

  • 15. Place Normal AC feed breaker to At 120 VAC Instr Panel _11:

ON

  • PLACE the NORMAL AC Cue: The normal AC feed breaker feed breaker to the ON is to the LEFT (ON position) position SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 10

IP-k - rev 11 From N-32 R11 Comment ELEMENT STANDARD SAT UNSAT Number

16. VERIFYN41 energized at _PM02J ° CONTACT Unit NSO to verify N41 is energized Cue: The Unit NSO confirms that N41 is ENERGIZED
17. RESET N41 Positive Rate Trip as ° CONTACT Unit NSO to required. verify N41 positive rate trip is reset.

Cue: The Unit NSO confirms that N41 Positive Rate Trip is RESET

18. CLOSE Rectifier AC input breaker At _IP05E:

1CB

° CLOSE Rectifier AC Cue: The rectifier AC input INPUT Brkr 1CB breaker 1CB is in the UP position (ON)

19. PLACE Rod Control in AUTO at ° Request NSO/ US to place discretion of US. Rod Control in AUTO if desired.

Cue: Rod Control is in AUTO

20. PLACE Instrument Bus _11 ° LOCATE Inverter transformer Input breaker in OFF Transformer _IP01E position.

° PLACE the Instrument Bus Note: Located 451 elevation MEER _11 Transformer Input breaker at _IP01E to OFF Cue: Transformer input breaker at

_IP01E is in the DOWN position (OFF)

Cue: This JPM is complete RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 10

IP-k - rev 11 From N-32 R11 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Instrument Bus Inverter Startup JPM Number: IP-k Revision Number: 11 Task Number and

Title:

4D.OA-22 RESPOND to a Loss of Vital AC Electrical Instrument Bus.

K/A Number and Importance: 057 AA1.01 3.7/3.7 Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BOP IP-1, Instrument Bus Inverter Startup (Rev. 14)

CRITICAL STEPS (*) 3, 4, 5, 6, 7 10, & 15 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

IP-k - rev 11 From N-32 R11 INITIAL CONDITIONS

1. You are an Equipment Operator.
2. The unit is at 65% power.
3. The unit has experienced a loss of Instrument Bus _11 due to failure of Instrument Inverter _11.
4. All maintenance is completed on Instrument Inverter _11 and the Clearance Order Tags have been removed.
5. Instrument Bus _11 is currently energized from the constant voltage transformer

(_IP01E).

INITIATING CUE

1. The Unit Supervisor directs you to startup Instrument _11 Inverter _IP05E and to transfer Instrument Bus _11 power to the inverter per BOP IP-1.
2. An Equipment Operator is standing by at MCC _31X2.
3. All prerequisites associated with any critical step are met.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 10