ML12090A796: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/30/2012
| issue date = 03/30/2012
| title = Entergy Pre-Filed Hearing Exhibit ENT000449, Entergy'S Statement of Position Regarding Consolidated Contentions NYS-12C (Severe Accident Mitigation Alternatives Analysis)
| title = Entergy Pre-Filed Hearing Exhibit ENT000449, Entergy'S Statement of Position Regarding Consolidated Contentions NYS-12C (Severe Accident Mitigation Alternatives Analysis)
| author name = O'Neill M J
| author name = O'Neill M
| author affiliation = Entergy Nuclear Operations, Inc, Morgan, Lewis & Bockius, LLP
| author affiliation = Entergy Nuclear Operations, Inc, Morgan, Lewis & Bockius, LLP
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ENT000449 Submitted: March 30, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  
{{#Wiki_filter:ENT000449 Submitted: March 30, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
    )
                                                )
In the Matter of   ) Docket Nos. 50-247-LR and
In the Matter of                               )     Docket Nos. 50-247-LR and
  )   50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. )  
                                                )                     50-286-LR ENTERGY NUCLEAR OPERATIONS, INC.               )
  ) March 30, 2012 (Indian Point Nuclear Generating Units 2 and 3) )  
                                                )     March 30, 2012 (Indian Point Nuclear Generating Units 2 and 3) )
                                                )
ENTERGYS STATEMENT OF POSITION REGARDING CONSOLIDATED CONTENTION NYS-12C (SEVERE ACCIDENT MITIGATION ALTERNATIVES ANALYSIS)
William B. Glew, Jr., Esq.                      Kathryn M. Sutton, Esq.
William C. Dennis, Esq.                        Paul M. Bessette, Esq.
ENTERGY NUCLEAR OPERATIONS, INC.                MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue                            1111 Pennsylvania Avenue, NW White Plains, NY 10601                          Washington, DC 20004 Phone: (914) 272-3202                          Phone: (202) 739-3000 Fax: (914) 272-3205                            Fax: (202) 739-3001 E-mail: wglew@entergy.com                      E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com                    E-mail: pbessette@morganlewis.com Martin J. ONeill, Esq.
MORGAN, LEWIS & BOCKIUS LLP 1000 Louisiana Street Suite 4000 Houston, TX 77002 Phone: (713) 890-5710 Fax: (713) 890-5001 E-mail: martin.oneill@morganlewis.com COUNSEL FOR ENTERGY NUCLEAR OPERATIONS, INC.


  ) 
TABLE OF CONTENTS Page I. PRELIMINARY STATEMENT ....................................................................................... 2 II. PROCEDURAL HISTORY OF CONTENTION NYS-12C ............................................. 8 A. Contention NYS-12 ...8 B. Amended Contentions NYS-12A/12B/12C ..9 C. New York States Prefiled Testimony and Related Filings..11 D. Entergys Motion in Limine and the Boards Ruling ..11 III. BACKGROUND .14 A. Regulatory Background ...14 B. Technical Background  16 C. NRC Staff Assessment of Contention-Related Issues in the FSEIS ...18 IV. APPLICABLE LEGAL AND REGULATORY STANDARDS .................................... 20 A. Burden of Proof.................................................................................................... 20 B. Controlling NEPA Principles............................................................................... 21
: 1. NEPAs Rule of Reason ....................................................................... 21
: 2. Agency Discretion in Choosing an Appropriate Methodology ............... 22
: 3. The Intervenors Burden Under NEPA.................................................... 23 V. ARGUMENT ................................................................................................................... 25 A. Entergys Witnesses ............................................................................................. 25
: 1. Ms. Lori Ann Potts ................................................................................... 25
: 2. Dr. Kevin R. OKula ................................................................................ 26
: 3. Mr. Grant A. Teagarden ........................................................................... 26 B. Entergys Evidence .............................................................................................. 27
: 1. NYSs Arguments Are Fundamentally Inconsistent with the Purpose of A SAMA Analysis, As Required by NEPA and 10 C.F.R. Part 51........................................................................................... 27
: 2. NYS Incorrectly Claims That Entergy Has Improperly Relied on Inapplicable Default Values in MACCS2 Sample Problem A............. 29
: 3. NYSs and Dr. LeMays Arguments Are Incompatible With the MACCS2 Decontamination Model.......................................................... 29
: 4. NYSs Proposed Decontamination Time Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 ........................................................................ 31
: 5. NYSs Proposed Nonfarm Decontamination Cost Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 ................................................... 33
: 6. Summary of Arguments and Evidence .................................................... 40 VI. CONCLUSION ................................................................................................................ 42
                                                    - ii -


___________________________________________________________________________
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
                                                        )
In the Matter of                                        )      Docket Nos.      50-247-LR and
                                                        )                        50-286-LR ENTERGY NUCLEAR OPERATIONS, INC.                        )
                                                        )      March 30, 2012 (Indian Point Nuclear Generating Units 2 and 3)          )
                                                        )
ENTERGYS STATEMENT OF POSITION REGARDING CONSOLIDATED CONTENTION NYS-12C (SEVERE ACCIDENT MITIGATION ALTERNATIVES ANALYSIS)
Pursuant to 10 C.F.R. § 2.1207(a)(1) and the Atomic Safety and Licensing Boards (Board) Order Granting NRC Staffs Unopposed Time Extension Motion and Directing Filing of Status Updates,1 Entergy Nuclear Operations, Inc. (Entergy) submits this Statement of Position (Statement) on Consolidated Contention NYS-12C (NYS-12C) proffered by New York State (NYS). This Statement is supported by the Testimony of Applicant Witnesses Lori Potts, Kevin OKula, and Grant Teagarden Concerning Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives Analysis) (Entergy Testimony) (ENT000450) and the exhibits thereto (ENT000004, ENT000005, ENT000007, and ENT000451 to ENT000477).
As discussed below, NYS-12C lacks merit as a technical matter and as a legal matter.
Accordingly, the contention should be resolved in favor of Entergy and the Nuclear Regulatory Commission (NRC or Commission) Staff.
1 Licensing Board Order Granting NRC Staffs Unopposed Time Extension Motion and Directing Filing of Status Updates (Feb. 16, 2012) (unpublished).


ENTERGY'S STATEMENT OF POSITION REGARDING  CONSOLIDATED CONTENTION NYS-12C (SEVERE ACCIDENT MITIGATION ALTERNATIVES ANALYSIS)
I.      PRELIMINARY STATEMENT NYS-12C is an environmental contention that challenges the adequacy of Entergys severe accident mitigation alternatives (SAMA) analysis for Indian Point Nuclear Generating Units 2 and 3 (respectively, IP2 and IP3, and collectively, Indian Point Energy Center or IPEC), as evaluated by the NRC Staff under the National Environmental Policy Act (NEPA) and the NRCs 10 C.F.R. Part 51 NEPA regulations. Entergy performed its SAMA analysis using the MACCS2 computer code, which is a later version of the MELCOR Accident Consequence Code System (MACCS) code and is unique in its capability for modeling the relevant severe accident phenomenology of interest and quantifying those consequences needed for nuclear power plant severe accident risk studies, including SAMA analyses. As the Commission recently stated: The NRC uses MACCS2 to evaluate the potential offsite consequences of severe nuclear reactor accidents, and NRC-endorsed guidance on SAMA analysis endorses use of the MACCS2 code.2 As the most current, established code for NRC SAMA analysis,3 MACCS2 has been routinely applied by applicants since the inception of the NRC license renewal process.
___________________________________________________________________________
NYS-12C alleges that Entergy has underestimated the economic costs associated with a postulated severe accident at IPEC by relying on MACCS2 code input values that are not tailored to the specific area surrounding IPEC, and which purportedly do not account for the size of radionuclide particles released during a severe reactor accident. NYS principally asserts that Entergy improperly relies on default input values contained in Sample Problem A of the 2
 
Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-01, 75 NRC __, slip op. at 3 (Feb.
William B. Glew, Jr., Esq. Kathryn M. Sutton, Esq. William C. Dennis, Esq. Paul M. Bessette, Esq.
9, 2012) (citing Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 291 & n.11 (2010)).
ENTERGY NUCLEAR OPERATIONS, INC. MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue  1111 Pennsylvania Avenue, NW White Plains, NY 10601    Washington, DC 20004 Phone: (914) 272-3202    Phone: (202) 739-3000 Fax:   (914) 272-3205    Fax: (202) 739-3001 E-mail:  wglew@entergy.com  E-mail:  ksutton@morganlewis.com E-mail:  wdennis@entergy.com  E-mail:  pbessette@morganlewis.com
3 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010).
 
MACCS2 Users Guide.4 NYS and its proffered expert, Dr. François Lemay of International Safety Research, Inc. (ISR), propose alternative values for certain MACCS2 input parameters, including decontamination time and decontamination cost.
Martin J. O'Neill, Esq.
The SAMA analysis is an environmental mitigation analysis under NEPA and is not part of the license renewal safety review. Thus, whether additional accident mitigation measures may be warranted to assure public health and safety is addressed through the NRCs ongoing regulatory oversight of existing plants. Further, the adequacy of an applicants SAMA analysis, and the Staffs review thereof, is governed by NEPAs rule of reason. As the Commission recently explained, the proper question is not whether there are plausible alternative choices for use in the analysis, but whether the analysis that was done is reasonable under NEPA.5 The Commission provided the following additional guidance on the purpose of SAMA analysis and the adjudication of SAMA contentions:
MORGAN, LEWIS & BOCKIUS LLP 1000 Louisiana Street Suite 4000 Houston, TX 77002 Phone: (713) 890-5710 Fax: (713) 890-5001 E-mail:  martin.oneill@morganlewis.com COUNSEL FOR ENTERGY NUCLEAR      OPERATIONS, INC.
We ourselves have stated that to require worst case analyses can easily lead to limitless NEPA analyses because it is always possible to introduce yet another additional variable to a hypothetical scenario to conjure up a worse worst case.
 
The same can be said for SAMA analyses. It always will be possible to conceive of yet another input or methodology that could have been used in the SAMA computer modeling, and many different inputs and approaches may all be reasonable choices. But our adjudicatory hearings are not EIS editing sessions. The SAMA analysis is not a safety review performed under the Atomic Energy Act. The mitigation measures examined are supplemental to those we already require under our safety regulations for reasonable assurance of safe operation. Through our reactor oversight process, including generic safety issue reviews, we revisit whether additional mitigation measures should be imposed as a safety matter under 10 C.F.R. Part 50. And in 4
TABLE OF CONTENTS Page    I. PRELIMINARY STATEMENT ....................................................................................... 2 II. PROCEDURAL HISTORY OF CONTENTION NYS-12C ............................................. 8 A. Contention NYS-12 ----------...-------------8 B. Amended Contenti ons NYS-12A/12B/12C --------------..9  C. New York State's Prefiled Testimony and Related Filings--------..11  D. Entergy's Motion in Limi ne and the Board's Ruling ----------..11 III. BACKGROUND ---------------------------.14 A. Regulatory Background ---------------------...14 B. Technical Background ---------------------- 16 C. NRC Staff Assessment of Conten tion-Related Issues in the FSEIS ----...18 IV. APPLICABLE LEGAL AND REGULATORY STANDARDS .................................... 20 A. Burden of Proof.................................................................................................... 20 B. Controlling NEPA Principles ............................................................................... 21 1. NEPA's "Rule of Reason" ....................................................................... 21
NUREG/CR-6613, Code Manual for MACCS2, Users Guide, Vol. 1 (May 1998) (MACCS2 Users Guide)
: 2. Agency Discretion in Choosing an Appropriate Methodology ............... 22 3. The Intervenor's Burden Under NEPA .................................................... 23 V. ARGUMENT ................................................................................................................... 25 A. Entergy's Witnesses ............................................................................................. 25 1. Ms. Lori Ann Potts ................................................................................... 25
(NYS000243).
: 2. Dr. Kevin R. O'Kula ................................................................................ 26
5 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-05, 75 NRC __ slip op. at 28-29 (Mar. 8, 2012); see also FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-08, 75 NRC __, slip op. at 17-18 (Mar. 27, 2012) (same).
: 3. Mr. Grant A. Teagarden ........................................................................... 26 B. Entergy's Evidence .............................................................................................. 27 1. NYS's Arguments Are Fundament ally Inconsistent with the Purpose of A SAMA Analysis, As Required by NEPA and 10 C.F.R. Part 51........................................................................................... 27 2. NYS Incorrectly Claims That Entergy Has Improperly Relied on Inapplicable "Default" Values in MACCS2 Sample Problem A ............. 29 3. NYS's and Dr. LeMay's Arguments Are Incompatible With the MACCS2 Decontamination Model.......................................................... 29 4. NYS's Proposed Decontamination Time Values Lack Technical Justification and Are Not Reasona ble and Appropriate for a SAMA Analysis Using MACCS2 ........................................................................ 31 
response to the Fukushima accident in Japan, we currently are conducting a comprehensive safety review that involves, among other things, a review of the requirements and guidance associated with accident mitigation measures.6 The Commission further noted that there is questionable benefit to spending considerable agency resources in an attempt to fine-tune a NEPA mitigation analysis where, as here, an intervenor has failed to identify, through sufficiently probative evidence, a significant deficiency in the SAMA analysis; i.e., a deficiency that could credibly render the SAMA analysis altogether unreasonable under NEPA standards.7 It is against this legal and regulatory backdrop that the merits of NYS-12C must be judged. And, as Entergys expert testimony demonstrates, NYS-12C has no merit. As summarized herein, Entergys experts fully explain why Entergys inputs and assumptions related to decontamination costs in MACCS2 are both reasonable and appropriate for a SAMA analysis and comply with NEPA and related NRC requirements. They also demonstrate that Dr.
- ii - 5. NYS's Proposed Nonfarm Decontamination Cost Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 ................................................... 33 6. Summary of Arguments and Evidence .................................................... 40 VI. CONCLUSION ................................................................................................................ 42 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
Lemays testimony and supporting report (the ISR Report), while abounding with technical data, are fraught with incorrect uses of that data, among other major shortcomings that include a pervasive lack of technical justification. Also, through various cited references, Dr. Lemay delves into technical details concerning particular decontamination methods, the exploration of which is not necessary or warranted under NEPA. Nonetheless, Entergys experts rebut Dr.
    )
Lemays claims, and, in doing so, make a compelling case for the dismissal of NYS-12C.
In the Matter of  ) Docket Nos. 50-247-LR and 
The reasons for dismissal of the contention are numerous. As a threshold matter, NYS and Dr. Lemay do not acknowledge that SAMA analysis makes use of probabilistic analysis 6
  )  50-286-LR ENTERGY NUCLEAR OPERATIONS, INC.  )
Pilgrim, CLI-12-01, slip op. at 24 (citations omitted); see also Davis-Besse, CLI-12-08, slip op. at 17 ([I]t will always be possible to propose that the [MACCS2] analysis use one or more other inputs. But simply because a computer model also could have been run with alternate inputs does not suggest that the inputs used were unreasonable.).
  ) March 30, 2012 (Indian Point Nuclear Generating Units 2 and 3)  )
7 Pilgrim, CLI-12-01, slip op. at 25.
 
methods and focuses on long-term and spatially-averaged impacts from severe accidents for the purpose of making reasonable cost-benefit evaluations.8 The SAMA analysis is intended to estimate average consequence results for the entire 50-mile radius region from the IPEC site, not just the comparatively small region of New York City, which comprises approximately 2% of the SAMA analysis region.9 NYS and Dr. Lemay attempt to scale up certain cost estimates related to the New York City portion without including commensurate scaling down of estimates for the 98% of the SAMA analysis region that is outside New York City.10 Thus, contrary to NEPA, they seek to overemphasize highly speculative harms and worst-case scenarios for only a small fraction of the considered area.
  )
Furthermore, many of the studies and data sources relied upon by NYS and Dr. Lemay are irrelevant to the objectives of a nuclear power plant SAMA analysis. For example, several of the studies relied upon by NYS focus on postulated radiological releases from nuclear weapon or dirty bomb detonations and even a terrorist event with no radiological releases, and seek to assess the economic costs of a single release event at a single location (e.g., New York City).11 Entergys experts explain that, because those studies are based on assumptions that have no applicability to a nuclear power plant SAMA analysis, they lend no support to NYSs contention.12 NYSs criticisms of Entergys MACCS2 inputs also lack merit. It is true that certain of Entergys MACCS2 inputs coincide with the inputs used in MACCS2 Sample Problem A.
ENTERGY'S STATEMENT OF POSITION REGARDING CONSOLIDATED CONTENTION NYS-12C (SEVERE ACCIDENT MITIGATION ALTERNATIVES ANALYSIS)
However, those inputs have been subject to extensive peer review since the late 1980s and 8
Pursuant to 10 C.F.R. § 2.1207(a)(1) and the Atomic Safety and Licensing Board's ("Board") Order Granting NRC Staff's Unopposed Time Extension Motion and Directing Filing of Status Updates, 1 Entergy Nuclear Operations, Inc. ("Entergy") submits this Statement of Position ("Statement") on Consolidated Cont ention NYS-12C ("NYS-12C") proffered by New York State ("NYS"). This Statement is supported by the Testimony of Applicant Witnesses Lori Potts, Kevin O'Kula, and Grant Teagarden C oncerning Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives Analysis) ("Entergy Testimony") (ENT000450) and the exhibits thereto (ENT000004, ENT000005, ENT000007, and ENT000451 to ENT000477). As discussed below, NYS-12C lacks merit as a technical matter and as a legal matter.
Entergy Test. at A26 (ENT000450).
Accordingly, the contention should be resolved in favor of Entergy a nd the Nuclear Regulatory Commission ("NRC" or "Commission") Staff.
9 Id.
 
10 See, e.g., id. at A121.
1  Licensing Board Order Granting NRC Staff's Unopposed Time Extension Motion and Directing Filing of Status Updates (Feb. 16, 2012) (unpublished).
11 Id. at A26.
I. PRELIMINARY STATEMENT NYS-12C is an environmental contention that challenges the adequacy of Entergy's severe accident mitigation alternatives ("SAMA") analysis for Indian Point Nuclear Generating Units 2 and 3 (respectively, "IP2" and "IP3," and collectively, "Indian Point Energy Center" or "IPEC"), as evaluated by the NRC Staff under the National Environmental Policy Act ("NEPA")
12 Id.
and the NRC's 10 C.F.R. Part 51 NEPA regulations. Entergy performed its SAMA analysis using the MACCS2 computer code, which is a later version of th e MELCOR Accident Consequence Code System ("MACCS") code and is unique in its capability for modeling the relevant severe accident phenomenology of intere st and quantifying those consequences needed for nuclear power plant severe accident risk studies, including SAMA analyses. As the Commission recently stated: "The NRC uses MACCS2 to evaluate the potential offsite consequences of severe nuclear reactor accidents, and NRC-endorsed guidance on SAMA analysis endorses use of the MACCS2 code."
continue to be used in licensee probabilistic risk assessments (PRAs) and SAMA analyses and state-of-the-art severe accident analyses conducted by the NRC.13 Contrary to NYSs claims, they are not arbitrarily-selected default values. Rather, they are values with a well-established technical pedigree that is widely recognized and accepted by the PRA community. In fact, they continue to be used today in PRA applications, including the NRCs State-of-the-Art Reactor Consequence Analyses (SOARCA) project and licensee SAMA analyses.
2  As the "most current, established code for NRC SAMA analysis,"
NYSs criticisms of Entergys decontamination modeling in the SAMA analysis focuses largely on two MACCS2 parameters: decontamination time (TIMDEC) and nonfarm decontamination cost (CDNFRM). But as Dr. OKula and Mr. Teagarden explain, Dr. Lemay fails to accurately portray the MACCS2 decontamination model. The primary goal of the decontamination plan as modeled in MACCS2 is to cost-effectively reduce doses to meet applicable land habitability criteria for a resident population in the region of interest to allow population resettlement. It is not intended to bound or account for all potential decontamination-related and site restoration activities that may arise in the years following a severe accident at a nuclear power plant (e.g., decontamination of specific structures such as schools after population resettlement). Moreover, as applied in SAMA analyses, MACCS2 models the decontamination actions that may be taken during the long-term phase in the initial period of months after deposition of radioactive contamination, and subsequent to the end of the seven-day emergency phase following a severe accident. As a result, Dr. Lemays proposed decontamination time values (up to 30 years) lack technical justification and are fundamentally inconsistent with the decontamination and interdiction modeling assumptions built into and applied by MACCS2.
3 MACCS2 has been routinely applied by applicants since the inception of the NRC license renewal process. NYS-12C alleges that Entergy has underestimated the economic costs associated with a postulated severe accident at IPEC by relying on MACCS2 code input values that are not tailored to the specific area surrounding IPEC, and which purportedly do not account for the size of radionuclide particles released during a severe reacto r accident. NYS principally asserts that Entergy improperly relies on "default" input values contained in Sample Problem A of the
13 PRA is sometimes referred to as probabilistic safety assessment (PSA). The terms PRA and PSA generally are used interchangeably within the nuclear industry.
 
Dr. Lemays proposed decontamination cost values also suffer from major flaws. His several proposed valueswhich vary by an order of magnitudeare unreasonable and inappropriate for use in a NEPA assessment. In short, Dr. Lemays decontamination cost values are derived from cost data that are inapplicable to a nuclear power plant SAMA analysis and are based on selective and incorrect use of the data, without adequate technical justification. For example, Dr. Lemay relies heavily on the 1996 Site Restoration Report14 (and other related papers), which presents cost estimates for remediation following a plutonium dispersal event and lacks relevance to a nuclear power plant SAMA analysis performed using MACCS2. In fact, in a decision issued only weeks ago, the Commission discerned no suggestion [in the Site Restoration Report] that the MACCS2 code assumes inapplicable radionuclide particle sizes, and noted that the 1996 Site Restoration Report predates issuance of the MACCS2 code Users Guide and does not appear to discuss the MACCS2 code at all.15 Significantly, Dr. Lemay could only accommodate his alternative, substantially larger decontamination time and cost values by altering the FORTRAN source code in MACCS2. As Entergys experts explain, such modifications to the source code of a sophisticated, NRC-accepted and commonly-used software package to extend the range of established input variables are not prudent (due to quality assurance concerns), practical, reasonable, or warranted under NEPA. And the Commission agrees. In another recent decision, the Commission rejected an intervenors demand that the MACCS2 code be rewritten to contain an alternative atmospheric transport and dispersion plume model as far beyond NEPA requirements and explicitly noted 14 D. Chanin and W. Murfin, Technadyne Engg Consultants, Inc., SAND96-0957, Site Restoration: Estimation of Attributable Costs from Plutonium-Dispersal Accidents (May 1996) (1996 Site Restoration Report)
2  Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-01, 75 NRC __, slip op. at 3 (Feb. 9, 2012) (citing Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 291 & n.11 (2010)).
3  Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010).
MACCS2 User's Guide.
4  NYS and its proffered expert, Dr. François Lemay of International Safety Research, Inc. ("ISR"), propose alternative values for certain MACCS2 input parameters, including decontamination time and decontamination cost.
The SAMA analysis is an environmental mitigation analysis under NEPA and is not part of the license renewal safety review. Thus, whether additional accident mitigation measures may be warranted to assure public health and safety is addressed through the NRC's ongoing regulatory oversight of existing plants. Further, the adequacy of an applicant's SAMA analysis, and the Staff's review thereof, is governed by NEPA's "rule of reason."  As the Commission recently explained, "the proper question is not whether there are plausible alternative choices for use in the analysis, but whether the analysis that was done is reasonable under NEPA
."5  The Commission provided the followi ng additional guidance on the purpose of SAMA analysis and the adjudication of SAMA contentions:
We ourselves have stated that to require "worst case" analyses can easily lead to "limitless" NEPA analyses because it is always possible to introduce yet another "additi onal variable to a hypothetical scenario" to "conjure up a worse 'worst case.'"
 
The same can be said for SAMA analyses. It always will be possible
 
to conceive of yet another input or methodology that could have been used in the SAMA computer modeling, and many different inputs and approaches may all be reasonable choices. But our "adjudicatory hearings are not EIS ed iting sessions."  The SAMA analysis is not a safety review performed under the Atomic Energy Act. The mitigation measures examined are supplemental to those we already
 
require under our safety regulations for reasonable assurance of safe operation. Through our reactor oversi ght process, in cluding generic safety issue reviews, we revisit whether additional mitigation measures should be imposed as a safety matter under 10 C.F.R. Part 50. And in
 
4  NUREG/CR-6613, Code Manual for MACCS2, User's Guide, Vol. 1 (May 1998) ("MACCS2 User's Guide") (NYS000243).
5  NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-05, 75 NRC __ slip op. at 28-29 (Mar. 8, 2012); see also FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-08, 75 NRC __, slip op. at 17-18 (Mar. 27, 2012) (same).
response to the Fukushima accident in Japan, we currently are conducting a comprehensive safety review that involves, among other things, a review of the requireme nts and guidance associated with accident mitigation measures.
6  The Commission further noted that there is questi onable benefit to spending considerable agency resources in an attempt to fine-tune a NEPA mitigation analysis where, as here, an intervenor has failed to identify, through sufficiently probative evidence, a significant deficiency in the SAMA analysis; i.e., a deficiency that could credibly render the SAMA analysis altogether unreasonable under NEPA standards.
7    It is against this legal an d regulatory backdrop that the merits of NYS-12C must be judged. And, as Entergy's expert testimony demonstrates, NYS-12C has no merit. As summarized herein, Entergy's e xperts fully explain why Entergy's inputs and assumptions related to decontamination costs in MACCS2 ar e both reasonable and appropriate for a SAMA analysis and comply with NEPA and related NRC requirements. They also demonstrate that Dr. Lemay's testimony and supporting report (the ISR Report), while abounding with technical data, are fraught with incorrect uses of that data, among other major shortcomings that include a pervasive lack of technical justification. Also, through various cited references, Dr. Lemay delves into technical details concerning particular decontamination methods, the exploration of which is not necessary or warranted under NEPA. Nonetheless, Entergy's experts rebut Dr. Lemay's claims, and, in doing so, make a compelling case for the dismissal of NYS-12C. The reasons for dismissal of the contention are numerous. As a threshold matter, NYS and Dr. Lemay do not acknowledge that SAMA analysis makes use of probabilistic analysis
 
6  Pilgrim, CLI-12-01, slip op. at 24 (citations omitted); see also Davis-Besse, CLI-12-08, slip op. at 17 ("[I]t will always be possible to propose that the [MACCS2] analysis use one or more other inputs. But simply because a computer model also could have been run with alternate inputs does not suggest that the inputs used were unreasonable.").
7  Pilgrim, CLI-12-01, slip op. at 25.
methods and focuses on long-term and spatially-averaged impacts from severe accidents for the purpose of making reasonable cost-benefit evaluations.
8  The SAMA analysis is intended to estimate average consequence results for the entire 50-mile radius region from the IPEC site, not just the comparatively small region of New York City, which comprises approximately 2% of the SAMA analysis region.
9  NYS and Dr. Lemay attempt to scale up certain cost estimates related to the New York City portion without including commensurate scaling down of estimates for the 98% of the SAMA analysis re gion that is outside New York City.
10  Thus, contrary to NEPA, they seek to overemphasize highly speculative harms and worst-case scenarios for only a small fraction of the considered area.
Furthermore, many of the studies and data sources relied upon by NYS and Dr. Lemay are irrelevant to the objectives of a nuclear power plant SAMA analysis. For example, several of the studies relied upon by NYS focus on postulated radiological releases from nuclear weapon or "dirty bomb" detonations and even a terrorist ev ent with no radiological releases, and seek to assess the economic costs of a single release event at a single location (e.g., New York City).
11  Entergy's experts explain that, because those studies are based on assumptions that have no applicability to a nuclear power plant SA MA analysis, they lend no support to NYS's contention.
12  NYS's criticisms of Entergy's MACCS2 inputs also lack merit. It is true that certain of Entergy's MACCS2 inputs coincide with the inputs used in MACCS2 Sample Problem A.
However, those inputs have been subject to ex tensive peer review since the late 1980s and
 
8  Entergy Test. at A26 (ENT000450).
9  Id. 10  See, e.g., id. at A121.
11  Id. at A26.
12  Id.
continue to be used in licensee probabilistic risk assessments ("PRAs") and SAMA analyses and state-of-the-art severe accide nt analyses conducted by the NRC.
13  Contrary to NYS's claims, they are not arbitrarily-selected "default" values. Rather, they are values with a well-established technical pedigree that is wide ly recognized and accepted by the PR A community. In fact, they continue to be used today in PRA applicati ons, including the NRC's State-of-the-Art Reactor Consequence Analyses ("SOARCA") project and licensee SAMA analyses. NYS's criticisms of Entergy's decontamina tion modeling in the SAMA analysis focuses largely on two MACCS2 parameters: decontamination time (TIMDEC) and nonfarm decontamination cost (CDNFRM). But as Dr.
O'Kula and Mr. Teagarden explain, Dr. Lemay fails to accurately portray the MACCS2 decontamination model. The primary goal of the decontamination plan as modeled in MACCS2 is to cost-effectively reduce doses to meet applicable land habitability criteri a for a resident population in th e region of interest to allow population resettlement. It is not intended to bound or account for all potential decontamination-related and site restoration activities that may arise in the years following a severe accident at a nuclear power plant (e.g., decontamination of specific struct ures such as schools after population resettlement). Moreover, as applied in SAMA analyses, MACCS2 models the decontamination actions that may be taken during the long-term phase in the initial period of months after deposition of radioactive contamination, and subsequent to the end of the seven-day "emergency phase" following a severe accident. As a result, Dr. Lemay's proposed decontamination time values (up to 30 years) lack technical justification and are fundamentally inconsistent with the decontamination and interdiction modeling assumptions built into and applied by MACCS2. 
 
13  PRA is sometimes referred to as probabilistic safety assessment ("PSA"). The terms PRA and PSA generally are used interchangeably within the nuclear industry.
Dr. Lemay's proposed decontamination cost values also suffer from major flaws. His several proposed values-which vary by an order of magnitude-a re unreasonable and inappropriate for use in a NEPA assessment. In short, Dr. Lemay's decontamination cost values are derived from cost data that are inapplicable to a nuclear pow er plant SAMA analysis and are based on selective and incorrect use of the data, without adequate technical justification. For example, Dr. Lemay relies heavily on the 1996 Site Restoration Report 14 (and other related papers), which presents cost estimates for reme diation following a plutonium dispersal event and lacks relevance to a nuclear power plant SAMA analysis performed using MACCS2. In fact, in a decision issued only weeks ago, the Commission "discerned no suggestion [in the Site Restoration Report] that the MACCS2 code assumes inapplicable radionuclide particle sizes,"
and noted that the 1996 Site Restoration Report "predates issuance of the MACCS2 code User's Guide and does not appear to discuss the MACCS2 code at all."
15  Significantly, Dr. Lemay could only accommodate his alternative, substantially larger decontamination time and cost values by alte ring the FORTRAN source code in MACCS2. As Entergy's experts explain, such modifications to the source code of a sophisticated, NRC-accepted and commonly-used software package to extend the range of established input variables
 
are not prudent (due to quality assurance conc erns), practical, reasona ble, or warranted under NEPA. And the Commission agrees. In another recent decision, the Commission rejected an intervenor's demand that the MACCS2 code be rewritten to contain an alternative atmospheric transport and dispersion plume model as "far beyond NEPA requirements" and explicitly noted  
 
14 D. Chanin and W. Murfin, Technadyne Eng'g Consultants, Inc., SAND96-0957, Site Restoration: Estimation of Attributable Costs from Plutonium-Dispersal Accidents (May 1996) ("1996 Site Restoration Report")
(NYS000249).
(NYS000249).
15  Seabrook, CLI-12-05, slip op. at 40.
15 Seabrook, CLI-12-05, slip op. at 40.
that "NEPA does not require the NRC [or its licens ees] to engage in an extensive revision of the MACCS2 code."
that NEPA does not require the NRC [or its licensees] to engage in an extensive revision of the MACCS2 code.16 NYS has thus failed to meet its burden of providing sufficient (or even reliable) evidence to support its claims and of showing that the NRC could evaluate [SAMAs] more meaningfully than it has already done.17 In contrast, Entergys testimony shows that the decontamination cost-related values used in the IPEC SAMA analysis, which the Staff thoroughly evaluated and approved in the FSEIS, are reasonable and appropriate for a NEPA assessment.
16  NYS has thus failed to meet its burden of providing sufficient (or even reliable) evidence to support its claims and of showing that the NRC "could evaluate [SAMAs] more meaningfully than it has already done."
II. PROCEDURAL HISTORY OF CONTENTION NYS-12C A.      Contention NYS-12 As filed over four years ago, NYS-12 alleged that Entergys SAMA analysis is deficient because the MACCS2 computer code used by Entergy underestimates the costs associated with a
17  In contrast, Entergy's testimony shows that the decontamination cost-related values used in the IPEC SAMA analysis, which the Staff thoroughly evaluated and approved in the FSEIS, are reasonable and appropriate for a NEPA assessment.
II. PROCEDURAL HISTORY OF CONTENTION NYS-12C A. Contention NYS-12 As filed over four years ago, NYS-12 alleged that Entergy's SAMA analysis is deficient because the MACCS2 computer code used by Entergy underestimates the costs associated with a severe accident due to its use of "decontamination and clean-up costs" that are based on "large-sized" radionuclides.
18  NYS asserted that a severe accident at a nuclear power plant likely would result in the dispersion of "sma ll-sized radionuclides" that are more expensive to remove and clean up than large-size d radionuclide particles.
19  As principal support for this argument, NYS cited the 1996 Site Restoration Report is sued by Sandia National Laboratories:
In place of
* The TIMDEC values used by Entergy in the IPEC SAMA analysis have a long, established history of use, beginning with their development by Sandia under the sponsorship of the NRC.
* The TIMDEC values used by Entergy in the IPEC SAMA analysis have a long, established history of use, beginning with their development by Sandia under the sponsorship of the NRC.
* TIMDEC sets the minimum time that individuals are relocated and a long TIMDEC value can defeat MACCS2 internal decontamination optimization scheme regarding resettlement of temporarily relocated persons.
* TIMDEC sets the minimum time that individuals are relocated and a long TIMDEC value can defeat MACCS2 internal decontamination optimization scheme regarding resettlement of temporarily relocated persons.
* TIMDEC is not intended to represent the time until the cessation of all decontamination activities. Continued decontamination ac tivities following population resettlement as modeled by TIMDEC is not incongruous with other code assumptions or actual post-accident decontamination experience.
* TIMDEC is not intended to represent the time until the cessation of all decontamination activities. Continued decontamination activities following population resettlement as modeled by TIMDEC is not incongruous with other code assumptions or actual post-accident decontamination experience.
* TIMDEC is an "average" decontamination time with some activities expected to be completed prior to this time and some completed subsequent to this time.
* TIMDEC is an average decontamination time with some activities expected to be completed prior to this time and some completed subsequent to this time.145 The alternative decontamination times proposed by Dr. Lemay in the ISR Reportwhich range from 2 to 30 yearsare fundamentally inconsistent with the decontamination and interdiction modeling assumptions integral to MACCS2. Specifically, forcing a long decontamination period in the MACCS2 analysis via the variable TIMDEC, as proposed by Dr.
145 The alternative decontamination times proposed by Dr. Lemay in the ISR Report-which range from 2 to 30 years-are fundamentally inconsistent with the decontamination and interdiction modeling assumpti ons integral to MACCS2.
Lemay, distorts the dose reduction resettlement optimization strategy inherent in MACCS2.146 141 Id. at A102.
Specifically, forcing a long decontamination period in the MACCS2 analysis via the variable TIMDEC, as proposed by Dr. Lemay, distorts the dose reduction resettlement optimization strategy inherent in MACCS2.
142 Id.
146 141 Id. at A102.
143 Id.
142 Id. 143 Id. 144 Id. at A97-98.
144 Id. at A97-98.
145 See id. at A159.
145 See id. at A159.
146 Id. at A102.
146 Id. at A102.
For example, if a value of 10 years is used for TIMDEC, MACCS2 will not return any impacted individuals to their residence locations until 10 years have passed.
For example, if a value of 10 years is used for TIMDEC, MACCS2 will not return any impacted individuals to their residence locations until 10 years have passed.147 This is not appropriate for the modeling of a severe accident event, because many individuals will be able to return to their residences following modest decontamination activities.148 Indeed, Dr. Lemay could only accommodate his alternative, much larger TIMDEC values by altering the FORTRAN source code in MACCS2.149 As Entergys experts explain, modifying the source code of a sophisticated software package like MACCS2 to extend the range of selected inputs variables is not prudent from a quality assurance perspective, practical, reasonable, or warranted under NEPA.150
147 This is not appropriate for the modeling of a severe accident event, because many individuals will be able to return to their residences following modest decontamination activities.
: 5.     NYSs Proposed Nonfarm Decontamination Cost Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 NYS also claims that Entergys nonfarm decontamination cost (CDNFRM) values are too low and proposes substantially larger values of its own.151 But NYS and its expert err again on both counts. As an initial matter, the nonfarm decontamination cost values used by Entergy are reasonable and appropriate for a SAMA analysis. Specifically, Entergy used CDNFRM values consistent with those used in NUREG-1150 and adjusted them to 2005 (the basis year for the IPEC SAMA analysis) dollars in accordance with NRC-approved guidance.152 As Entergys experts explain, based on the pedigree of NUREG-1150 related data sources from Entergys decontamination cost values are derived, they know of no more appropriate data that are readily 147 Id.
148 Indeed, Dr. Lemay could only accommodate his alternative, much larger TIMDEC values by altering the FORTRAN source code in MACCS2.
148 Id.
149 As Entergy's experts explain, modify ing the source code of a sophisticated software package like MACCS2 to extend the range of selected inputs variables is not prudent from a quality assurance perspective, pract ical, reasonable, or warranted under NEPA.
149 Id. at A98.
150 5. NYS's Proposed Nonfarm Decontamination Cost Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 NYS also claims that Entergy's nonfarm decontamination cost (CDNFRM) values are too low and proposes substantially larger values of its own.
150 Id. at A99.
151 But NYS and its expert err again on both counts. As an initial matter, the nonfarm decontamination co st values used by Entergy are reasonable and appropriate for a SAMA analysis. Specifically, Entergy used CDNFRM values consistent with those used in NUREG-1150 and ad justed them to 2005 (the basis year for the IPEC SAMA analysis) dollars in acc ordance with NRC-approved guidance.
151 See Lemay Test. at 30 (NYS000241).
152 As Entergy's experts explain, based on the pedigree of NUREG-1150 related data sources from Entergy's decontamination cost values are derived, they kno w of no more appropriate data that are readily  
152 Entergy Test. at A111 (ENT000450).
 
available to licensees to use in a SAMA analysis to satisfy the purposes of NEPA.153 Although other decontamination data sources may exist, such data sources are not readily applicable in the U.S. context and are not readily assessed or processed for inclusion in MACCS2 analyses.154 This fact is evident from the four principal data sources on which Dr. Lemay relies and the alternative CDNFRM values he proposes based on those sources. His proposed values are unreasonable and inappropriate because they are derived from cost data that are inapplicable to a nuclear power plant SAMA analysis, are based on selective and incorrect use of the data, and lack adequate technical justification. These major flaws are summarized below.
147 Id. 148 Id. 149 Id. at A98.
150 Id. at A99.
151 See Lemay Test. at 30 (NYS000241).
152 Entergy Test. at A111 (ENT000450).
available to licensees to use in a SAMA analysis to satisfy the purposes of NEPA.
153 Although other decontamination data sources may exist, such data sources are not readily applicable in the U.S. context and are not readily assessed or processed for inclusion in MACCS2 analyses.
154   This fact is evident from the four principal data sources on which Dr. Lemay relies and the alternative CDNFRM values he proposes base d on those sources. His proposed values are unreasonable and inappropriate because they are derived from cost data that are inapplicable to a nuclear power plant SAMA analysis, are based on selective and incorrect use of the data, and lack adequate technical justification. These major flaws are summarized below.
: a. Site Restoration Report/Luna Paper (ISR Approach A)
: a. Site Restoration Report/Luna Paper (ISR Approach A)
NYS and Dr. Lemay rely heavily on data co ntained in the Sandia 1996 Site Restoration Report to develop alternative decontamination cost estimates but fail to properl y or accurately account for key attributes of th at study that render it inap plicable to a SAMA analysis.
NYS and Dr. Lemay rely heavily on data contained in the Sandia 1996 Site Restoration Report to develop alternative decontamination cost estimates but fail to properly or accurately account for key attributes of that study that render it inapplicable to a SAMA analysis.155 The Site Restoration Report serves to develop cost estimates for remediation of a plutonium dispersal event.156 This focus on plutonium significantly increases the decontamination/remediation costs estimated in the report, because the reports authors assume that any area requiring a DRF greater than 10 would require complete demolition of contaminated structures.157 This runs counter to actual remediation experience associated with Chernobyl, where DRFs of up to 15 were obtained without resorting to complete demolition.158 153 Id. at A72.
155 The Site Restoration Report serves to develop cost estimates for remediation of a plutonium dispersal event.156 This focus on plutonium significantly increases the decontamination/remediation costs estimated in the report, because the report's authors assume that any area requiring a DRF greater than 10 would require complete demolition of contaminated structures.
154 Id.
157 This runs counter to actual remediation experience associated with Chernobyl, where DRFs of up to 15 were obtained without resorting to complete demolition.
155 See ISR Report at 16-18 (NYS000242).
158 153 Id. at A72.
156 Entergy Test. at A90 (ENT000450).
154 Id. 155 See ISR Report at 16-18 (NYS000242).
157 Id.
156 Entergy Test. at A90 (ENT000450).
158 Id. at A92.
157 Id. 158 Id. at A92.
Furthermore, the 1996 Site Restoration Report focused on relatively small areas for remediation and did not fully investigate attributes that would be pursued for a significantly larger-scale cleanup effort (where complete demolition of all structures is not a viable option),
Furthermore, the 1996 Site Restoration Report focused on relatively small areas for remediation and did not fully investigate attributes that would be pursued for a significantly larger-scale cleanup effort (where complete demolition of all struct ures is not a viable option), such as segregating non-radiological waste from radiological waste, employing waste volume reduction techniques, and minimizing the cost s for associated with on-site disposal.
such as segregating non-radiological waste from radiological waste, employing waste volume reduction techniques, and minimizing the costs for associated with on-site disposal.159 The report thus does not take into account economy of scale attributes that likely would be associated with decontamination over a broader area, as would be expected in the case of a nuclear power plant severe accident.160 The 1996 Site Restoration Report explicitly acknowledges this point:
159 The report thus does not take into account "econom y of scale" attributes that likely would be associated with decontamination over a broader ar ea, as would be expected in the case of a nuclear power plant severe accident.
In order to derive the cost estimates presented, we assumed that the size of the affected area could range from a few hundred square meters to a few square kilometers. Our choice of the potential size of the affected area should not be used to predict the costs of accidents. Those predictions require detailed data on the masses of material at risk, accident phenomenology, release fractions, accident location, local terrain, and meteorological conditions, which are outside the scope of this report. For average weather conditions and flat terrain, even for HE [high explosive] detonation, the size of the affected area might be only a very few square kilometers.161 In ISR Approach A, Dr. Lemay also relies on data contained in a brief technical paper by Luna et al. (Luna Paper) that purports to survey efforts to estimate the clean-up costs for radiological dispersion events associated with radiological dispersion devices (RDDs) or dirty bombs.162 Dr. Lemays reliance on this paper is misplaced in multiple respects. For example, like the 1996 Site Restoration Report, the Luna Paper concerns small-scale dispersion events 159 Id. at A133.
160 The 1996 Site Restoration Report explicitly acknowledges this point: In order to derive the cost estimates presented, we assumed that the size of the affected area could range from a few hundred square meters to a few square kilometers. Our choice of the potential size of the affected area should not be used to predict the costs of accidents. Those predictions require detailed data on the masses of material at risk, accident phenomenology, release fractions, accident location, local terrain, and meteorological conditions, which are outside the scope of this report. For average weather conditions and flat terrain, even for HE [high explosive] detonation, the size of the affected area might be only a very few square kilometers.
160 Id.
161   In ISR Approach A, Dr. Lemay also relies on data contained in a brief technical paper by Luna et al. (Luna Paper) that purports to survey efforts to estimate the clean-up costs for radiological dispersion events associated with radiological dispersi on devices ("RDDs") or "dirty bombs."162 Dr. Lemay's reliance on this paper is misplaced in multiple respects. For example, like the 1996 Site Restoration Report, the Luna Paper concerns small-scale dispersion events  
161 1996 Site Restoration Report at 7-1 to -2 (emphasis added) (NYS000249).
 
162 See ISR Report at 16-18 (NYS000242).
159 Id. at A133.
and, therefore, lacks applicability in the present context.163 In fact, as Entergys experts explain, most of the data sets surveyed by Luna implicitly incorporate the Sandia 1996 Site Restoration Report economic model.164 Consequently, references to the Luna Paper to substantiate the magnitude of the cost estimates generated using the Sandia 1996 Site Restoration Report also is a circular argument.
160 Id. 161 1996 Site Restoration Report at 7-1 to -2 (emphasis added) (NYS000249).
In addition, based on the Luna Paper, Dr. Lemay attempts to scale up projected decontamination costs associated with postulated decontamination for New York City.165 However, he fails to apply his methodology consistently and scale down the decontamination costs associated with the remaining 98% of the 50-mile radius SAMA analysis area.166 As Dr.
162 See ISR Report at 16-18 (NYS000242).
OKula and Mr. Teagarden explain, given that the area outside the New York City region contributes approximately 90% of the ISR-calculated value for CDNFRM, this is a major oversight in Dr. Lemays analysis that undermines its reliability.167
and, therefore, lacks applicab ility in the present context.
: b. Reichmuth Paper (ISR Approach B)
163 In fact, as Entergy's experts explain, most of the data sets surveyed by Luna implic itly incorporate the Sandi a 1996 Site Restoration Report economic model.
Dr. Lemay also relies on data contained in a brief paper by Reichmuth as well as brief references to another paper by Reichmuth that is not publicly available or provided by NYS.168 Again, NYS and its expert fail to properly and accurately account for key aspects of the papers on which they rely in estimating decontamination costs. For example, the Reichmuth Papers estimated costs for radiological cleanup following an RDD detonation in New York City is based on costs associated with the September 11, 2001 attacks on the World Trade Center, an attack 163 Entergy Test. at A119 (ENT000450).
164 Consequently, references to th e Luna Paper to substantiate the magnitude of the cost estimates generated using the Sandia 1996 Site Restor ation Report also is a circular argument.
164 Id.
In addition, based on the Luna Paper, Dr. Lemay attempts to scale up projected decontamination costs associated with postulated decontamination for New York City.
165 Id. at A120.
165 However, he fails to apply his methodology consistently and scale down the decontamination costs associated with the remaining 98% of the 50-mile radius SAMA analysis area.
166 Id. at A121.
166 As Dr. O'Kula and Mr. Teagarden expl ain, given that the area outsid e the New York City region contributes approximately 90% of the ISR-calculated value for CDNFRM, this is a major oversight in Dr. Lemay's analysis that undermines its reliability.
167 Id.
167    b. Reichmuth Paper (ISR Approach B)
168 See ISR Report at 18-19 (NYS000242).
Dr. Lemay also relies on data contained in a brief paper by Reichmuth as well as brief references to another paper by Reichmuth that is not publicly availa ble or provided by NYS.
that did not involve any radiological material.169 The details of how Reichmuth estimated preliminary costs for an RDD event (with essentially no physical damage) from the attacks on the World Trade Center are not presented in the Reichmuth Paper for critical review.170 Further, the Reichmuth sources appear to use the same cost model as the 1996 Site Restoration Report and, therefore, lack applicability to the IPEC SAMA analysis for the same reasons summarized above and explained by Dr. OKula and Mr. Teagarden in their testimony.171 With regard to the second Reichmuth paper, which is briefly discussed in a Congressional Research Services (CRS) report but otherwise unavailable to the Board and parties, Dr. Lemay relies on a graphical presentation of cost estimates for a Cs137 attack on Vancouver (as apparently extracted from the second Reichmuth paper and presented in the CRS report).172 Review of the figure on which Dr. Lemay bases his cost estimate, however, confirms that 85% of the costs included in Dr. Lemays estimate are outside the scope of the MACCS2 nonfarm decontamination cost (CDNFRM) parameter; i.e., they are totally unrelated to radiological cleanup costs.173 Thus, Dr. Lemays assessment suffers from serious flaws.
168 Again, NYS and its expert fail to properly and accurately account for key aspects of the papers on which they rely in estimating decontamination costs. For example, the Reichmuth Paper's estimated costs for radiological cleanup following an RDD detonation in New York City is based on costs associated with the September 11, 2001 attacks on the World Trade Center, an attack  
 
163 Entergy Test. at A119 (ENT000450).
164 Id. 165 Id. at A120.
166 Id. at A121.
167 Id. 168 See ISR Report at 18-19 (NYS000242).
that did not involve any radiological material.
169 The details of how Reichmuth estimated "preliminary" costs for an RDD event (with essentially no physical damage) from the attacks on the World Trade Center are not presented in the Reichmuth Paper for critical review.
170 Further, the Reichmuth sources appear to use the same cost model as the 1996 Site Restoration Report and, therefore, lack applicability to the IPEC SAMA analysis for the same reasons summarized above and explained by Dr. O'Kula and Mr. Teagarden in their testimony.
171 With regard to the second Reichmuth paper, which is briefly disc ussed in a Congressional Research Services (CRS) report but otherwise unavailable to the Board and parties, Dr. Lemay relies on a graphical presentation of cost estimates for a Cs137 attack on Vancouver (as apparently extracted from the second Reichmuth paper and presented in the CRS report).
172 Review of the figure on which Dr. Lemay bases his cost estimate, however, confirms that 85% of the costs included in Dr. Lemay's estimate are outside the scope of the MACCS2 nonfarm decontamination cost (CDNFRM) parameter; i.e., they are totally unrelated to radiological cleanup costs.
173 Thus, Dr. Lemay's assessment suffers from serious flaws.
: c. CONDO Report (ISR Approach C)
: c. CONDO Report (ISR Approach C)
NYS and Dr. Lemay also rely on data relate d to the European CONDO software tool for estimating decontamination costs in the United Kingdom.
NYS and Dr. Lemay also rely on data related to the European CONDO software tool for estimating decontamination costs in the United Kingdom.174 However, Dr. Lemays use of the CONDO dataset is not objective and unreasonably skews the analysis results in favor of higher 169 Entergy Test. at A135 (ENT000450).
174 However, Dr. Lemay's use of the CONDO dataset is not objective and unreasonably skews the analysis results in favor of higher  
170 Id.
 
171 See generally, id. at A118-A134.
169 Entergy Test. at A135 (ENT000450).
172 Id. at A136.
170 Id. 171 See generally, id. at A118-A134.
173 Id.
172 Id. at A136.
174 See ISR Report at 19-21 (NYS000242).
173 Id. 174 See ISR Report at 19-21 (NYS000242).
estimated decontamination technique costs.175 Therefore, his CONDO-related cost estimate also is unreliable.
estimated decontamination technique costs.
For example, despite the availability of 61 decontamination techniques to apply from the CONDO database, Dr. Lemay appears to weight his results predominantly on decontamination of internal walls in buildings, and relies on a single decontamination technique in all of his spreadsheet calculations.176 That is, one technique (vacuuming, cleaning and washing) is a dominant contributor for the semi-urban, urban and hyper-urban population densities areas described in the ISR Report.177 With an internal wall weighting factor developed in the ISR spreadsheets, this single decontamination technique controls the outcome of the individual spreadsheets for the Approach C analyses.178 This is not reasonable because building interiors are expected to be less contaminated than the building exteriors in the event of a nuclear power plant severe accident.179 Additionally, the CONDO datasets present data for three different population category ranges (i.e., rural, semi-urban, and urban).180 Dr. Lemay invents a fourth population category called hyper-urban. Specifically, he develops a hyper-urban category to account for a population density of greater than 10,000 persons/km2 for the New York City region, but this category is not supported by the CONDO report land use and housing indices: rural (< 25 persons/km2), semi-urban (> 25 but  1,000 persons/km2), and urban (> 1,000 persons/km2).181 175 See Entergy Test. at A143 (ENT000450).
175 Therefore, his CONDO-related cost estimate also is unreliable.
176 Id.
For example, despite the availability of 61 decontamination techniques to apply from the CONDO database, Dr. Lemay appears to weight his results predominantly on decontamination of internal walls in buildings, and relies on a single decontamination technique in all of his spreadsheet calculations.
177 Id.
176 That is, one technique ("vacuuming, cleaning and washing") is a dominant contributor for the semi-urban, ur ban and "hyper-urban" population densities areas described in the ISR Report.
178 Id.
177 With an internal wall weighting factor developed in the ISR spreadsheets, this single decontamination technique controls the outcome of the individual spreadsheets for the Approach C analyses.
179 Id.
178 This is not reasonable because building interiors are expected to be less contaminated than the bu ilding exteriors in the event of a nuclear power plant severe accident.
180 Id. at A144.
179 Additionally, the CONDO datasets present data for three differe nt population category ranges (i.e., rural, semi-urban, and urban).
181 Id.
180 Dr. Lemay invents a fourth population category called "hyper-urban.Specifically, he devel ops a hyper-urban category to account for a population density of greater than 10,000 persons/km 2 for the New York City region, but this category is not supported by the CONDO report land use and housing in dices: rural (< 25 persons/km 2), semi-urban (> 25 but  1,000 persons/km 2), and urban (> 1,000 persons/km 2).181 175 See Entergy Test. at A143 (ENT000450).
In addition, for some cost estimates, Dr. Lemay ignores the CONDO cost category definitions and applies a higher cost category than would apply based on the population densities in the IPEC SAMA analysis region. He characterizes the New York City metropolitan area as either urban or hyper-urban by population density, and the area outside the NYC metropolitan area (but still in the 50-mile SAMA analysis region) as either semi-urban or urban.182 However, the 50-mile (80-km) SAMA analysis polar grid indicates that only one of eighty 22.5-degree sector elements (1.8% of the total SAMA grid area) meets the ISR definition of hyper-urban (10,000 persons per km2), and that 68 of the remaining grid elements (81.5% of the total SAMA grid area) would not meet the definition of an urban area.183 In short, Dr. Lemay appears to have chosen decontamination techniques without an objective, sound technical basis and outside the context of the CONDO software application, and then relied on one decontamination technique to arrive at his estimated decontamination costs.
176 Id. 177 Id. 178 Id. 179 Id. 180 Id. at A144.
Importantly, whether the same results would be obtained in the CONDO code itself is unknown, because Approach C relies on ISR-generated spreadsheets (not the code itself) that are presented by NYS and Dr. Lemay without adequate explanation or technical justification.
181 Id.
: d.     Ris&#xf8; Report (ISR Approach D)
In addition, for some cost estimates, Dr. Lemay ignores the CONDO cost category definitions and applies a higher cost category than would apply based on the population densities in the IPEC SAMA analysis region. He characterizes the New York City metropolitan area as either urban or hyper-urban by population density, and the area outside the NYC metropolitan area (but still in the 50-mile SAMA analysis region) as either semi-urban or urban.
To develop a fourth and final decontamination cost estimate, NYS and Dr. Lemay also rely on data contained in a report prepared by Denmarks Ris&#xf8; National Laboratory.184 As Entergys experts explain, Dr. Lemays development of this cost estimate is not technically justified or even presented in sufficient detail to permit an adequate and objective evaluation.185 While a spectrum of decontamination effectiveness levels is documented in the Ris&#xf8; report, ISR 182 Lemay Test. at 43-44 (NYS000241).
182 However, the 50-mile (80-km) SAMA analysis polar grid indicates that only one of eighty 22.5-degree sector elements (1.8% of the total SAMA grid area) meets the ISR definition of hyper-urban (10,000 persons per km 2), and that 68 of the remaining grid elements (81.5% of the total SAMA grid area) would not meet the definition of an urban area.
183 Entergy Test. at A144 (ENT000450).
183   In short, Dr. Lemay appears to have chosen decontamination techniques without an objective, sound technical basis a nd outside the context of the CO NDO software application, and then relied on one decontamination technique to arrive at his estimated decontamination costs. Importantly, whether the same results would be obtained in the CONDO code itself is unknown, because Approach C relies on ISR-generated spreadsheets (not the code itself) that are presented by NYS and Dr. Lemay without adequate expl anation or technical justification.
184 Lemay Test. at 46-48 (NYS000241).
: d. Ris&#xf8; Report (ISR Approach D)
185 Entergy Test. at A148 (ENT000450).
To develop a fourth and final decontamination cost estimate, NYS and Dr. Lemay also rely on data contained in a report prepared by Denmark's Ris&#xf8; National Laboratory.
infers that the report only supports light decontamination work.186 Also, labor cost information is not presented in the Ris&#xf8; report, and it is unclear from the limited information presented in the ISR what labor cost data Dr. Lemay is applying in his assessment.187 Finally, Dr. Lemay chooses decontamination techniques from the Ris&#xf8; Report that most closely correlated to those selected in the CONDO analysis, which as discussed above, suffers from significant flaws.188
184 As Entergy's experts explain, Dr. Lemay's development of this cost estimate is not technically justified or even presented in sufficient detail to permit an adequate and objective evaluation.
: 6.     Summary of Arguments and Evidence In summary, Entergy followed the prescriptive guidance in the NRC-approved industry guidance document NEI 05-01, Rev. A to perform its SAMA analyses for IP2 and IP3 and appropriately used MACCS2, the only NRC-recognized computer code available in the U.S. that is capable of meeting all of the offsite consequence requirements of a SAMA analysis, including those of calculating population dose and economic cost consequences. In addition, Entergys MACCS2 inputs and assumptions relating to decontamination costs and times are based on NUREG-1150 values that have been well-vetted by the nuclear industry, the national laboratories, and the NRC. Those values are both reasonable and appropriate for a SAMA analysis and comply with NEPA and related NRC requirements.
185 While a spectrum of decontamination effectiveness levels is documented in the Ris&#xf8; report, ISR  
In contrast, the decontamination time and cost values proposed by NYS and its expert are neither technically justified nor reasonable and appropriate for a NEPA-based SAMA analysis.
 
It is noteworthy that NYSs proposed decontamination cost estimates (ISR Approaches A to D) for light decontamination (which range from $19,000 - $272,000) and heavy decontamination (which range from $90,000 - $898,000) vary by an order of magnitude in each 186 Id.
182 Lemay Test. at 43-44 (NYS000241).
187 Id. at A149.
183 Entergy Test. at A144 (ENT000450).
188 Id. at A148.
184 Lemay Test. at 46-48 (NYS000241).
case. Such widely differing values demonstrate the importance of MACCS2 analysts using well-vetted and widely-accepted values of the type used by Entergy in the IPEC SAMA analysis.
185 Entergy Test. at A148 (ENT000450).
Further, Dr. Lemay modified the MACCS2 FORTRAN source code to accept his larger, out-of-range of allowed input values for TIMDEC and CDNFRM values. Entergys experts and most nuclear safety professionals would strongly advise against this practice. Computer code use for PRA applications as well as those supporting NEPA applications necessitates consistency and quality assurance standards in the development, maintenance and use of software. User training and understanding of the allowed data ranges in the inputs to PRA and severe accident software such as the MACCS2 code is required of all users. Dr. Lemays alteration of the MACCS2 source code to accept user-preferred, out-of-range input values, and executing the modified code without seeking independent verification of proper code functionality, departs from accepted industry practices, including adherence to software quality assurance principles followed by all of the nuclear industry. And, as the Commissions recent Pilgrim ruling makes clear, it also runs counter to NEPA requirements and principles.
infers that the report only supports "light decontamination" work.
VI. CONCLUSION For the reasons stated above and detailed in Entergys testimony, the NRC Staff correctly concluded in its FSEIS that Entergys decontamination cost estimates are reasonable, appropriate, and consistent with estimates used in prior NRC-approved SAMA analyses. As the Commission has held, the relevant inquiry here is whether the analysis in question, including the methodology used, is reasonable under NEPA.189 It is not whether there are plausible alternative choices for use in the analysis.190 189 Seabrook, CLI-12-05, slip op. at 46-47.
186 Also, labor cost information is not presented in the Ris&#xf8; report, and it is unclear from the limited information presented in the ISR what labor cost data Dr. Lemay is applying in his assessment.
190 Id. at 28.
187 Finally, Dr. Lemay chooses decontamination techniques from the Ris&#xf8; Report that most closely correlated to those selected in the CONDO analysis, which as discussed above, suffers from significant flaws.
NYS has not met its burden to prove that the SAMA analysis methodology and assumptions used by Entergy and approved by the NRC Staff are unreasonable under NEPA. In fact, NYS has failed even to provide plausible alternative choices. By relying on information that has no demonstrated applicability to a nuclear power plant SAMA analysis, NYS has not established the requisite direct connection between the factual information on which it relies and the IPEC SAMA analysis cost-benefit results.191 Further, as Entergys testimony demonstrates, NYS and its expert rely on unsupported reasoning and computations that yield widely-varying and dubious results.192 Accordingly, under controlling NEPA principles applied by the Commission in proceedings involving similar SAMA contentions, NYS-12C should be dismissed for lack of merit.
188  6. Summary of Arguments and Evidence In summary, Entergy followed the prescr iptive guidance in the NRC-approved industry guidance document NEI 05-01, Rev. A to perfor m its SAMA analyses for IP2 and IP3 and appropriately used MACCS2, the only NRC-recognized computer code available in the U.S. that is capable of meeting all of the offsite consequence requireme nts of a SAMA analysis, including those of calculating population dose and economic cost consequences. In addition, Entergy's MACCS2 inputs and assumptions relating to decontamination costs and times are based on NUREG-1150 values that have been well-vetted by the nuc lear industry, the national laboratories, and the NRC. Those values ar e both reasonable and appropriate for a SAMA analysis and comply with NEPA and related NRC requirements. In contrast, the decontamination time and cost values proposed by NYS and its expert are neither technically justified nor reasonable and appropriate for a NEPA-based SAMA analysis. It is noteworthy that NYS's proposed decontamination cost estimates (ISR Approaches A to D) for "light decontamination" (which range from $19,000 - $272,000) and "heavy decontamination" (which range from $90,000 - $898,000) vary by an order of magnitude in each 186 Id. 187 Id. at A149.
191 See Pilgrim, CLI-10-11, 71 NRC at 311 n.121.
188 Id. at A148.
192 Id. at 315 (emphasis added).
case. Such widely differing values demonstrate the importance of MACCS2 analysts using well-vetted and widely-accepted values of the type used by Entergy in the IPEC SAMA analysis. Further, Dr. Lemay modified the MACCS2 FORTRAN source code to accept his larger, out-of-range of allowed input values for TIMDEC and CDNFRM values. Entergy's experts and most nuclear safety professionals would strongly advise against this practice. Computer code use for PRA applications as well as those supporting NEPA applications necessitates consistency and quality assurance standards in the development, maintenance and use of software. User training and understanding of the allowed data ranges in the inputs to PRA and severe accident software such as the MACCS2 code is required of all users. Dr. Lemay's alteration of the MACCS2 source code to accept user-preferred, out-of-range input values, and executing the modified code without seeking independent verification of proper code functionality, departs from accepted industry practices, including adheren ce to software quality assurance principles followed by all of the nuclear industry. And, as the Commission's recent Pilgrim ruling makes clear, it also runs counter to NEPA requirements and principles.
Respectfully submitted, Signed (electronically) by Martin J. ONeill William B. Glew, Jr., Esq.           Kathryn M. Sutton, Esq.
VI. CONCLUSION For the reasons stated above and detailed in Entergy's testimony, the NRC Staff correctly concluded in its FSEIS that Entergy's decontamination cost estimates are reasonable, appropriate, and consistent with estimates used in prior NRC-approved SAMA analyses. As the Commission has held, the re levant inquiry here is whether th e analysis in question, including the methodology used, is "reasonable under NEPA."
William C. Dennis, Esq.               Paul M. Bessette, Esq.
189 It is "not whether there are plausible alternative choices for use in the analysis."
ENTERGY NUCLEAR OPERATIONS, INC.     MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue                   1111 Pennsylvania Avenue, NW White Plains, NY 10601               Washington, DC 20004 Phone: (914) 272-3202                 Phone: (202) 739-3000 Fax: (914) 272-3205                   Fax: (202) 739-3001 E-mail: wglew@entergy.com             E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com           E-mail: pbessette@morganlewis.com Martin J. ONeill, Esq.
190 189 Seabrook, CLI-12-05, slip op. at 46-47.
MORGAN, LEWIS & BOCKIUS LLP 1000 Louisiana Street Suite 4000 Houston, TX 77002 Phone: (713) 890-5710 Fax: (713) 890-5001 E-mail: martin.oneill@morganlewis.com Counsel for Entergy Nuclear Operations, Inc.
190 Id. at 28.
Dated in Washington, D.C.
NYS has not met its burden to prove that the SAMA analysis methodology and assumptions used by Entergy and approved by th e NRC Staff are unreasonable under NEPA. In fact, NYS has failed even to provide plausible alternative choices. By relying on information that has no demonstrated applicability to a nuc lear power plant SAMA analysis, NYS has not established the requisite "direct connection" between the factual information on which it relies and the IPEC SAMA analysis cost-benefit results.
this 30th day of March 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
191 Further, as Entergy's testimony demonstrates, NYS and its expert rely on "unsupported reasoning and computations" that yield widely-varying and dubious results.
                                                    )       Docket Nos. 50-247-LR and In the Matter of                                     )       50-286-LR
192 Accordingly, under controlling NEPA principles applied by the Commission in proceedings involving similar SAMA contentions, NYS-12C should be dismissed for lack of merit.  
                                                    )
 
ENTERGY NUCLEAR OPERATIONS, INC.                     )       ASLBP No. 07-858-03-LR-BD01
191 See Pilgrim, CLI-10-11, 71 NRC at 311 n.121.
                                                    )
192 Id. at 315 (emphasis added).
(Indian Point Nuclear Generating Units 2 and 3)     )
 
                                                    )       March 30, 2012 CERTIFICATE OF SERVICE I certify that, on March 30, 2012, a copy of Entergys Statement of Position Regarding Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives Analysis),
Respectfully submitted, Signed (electronically) by Martin J. O'Neill William B. Glew, Jr., Esq. Kathryn M. Sutton, Esq. William C. Dennis, Esq. Paul M. Bessette, Esq.
Testimony of Applicant Witnesses Lori Potts, Kevin OKula, and Grant Teagarden Concerning Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives Analysis), and supporting exhibits was served electronically with the Electronic Information Exchange on the following recipients:
ENTERGY NUCLEAR OPERATIONS, INC. MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue 1111 Pennsylvania Avenue, NW White Plains, NY 10601   Washington, DC 20004 Phone: (914) 272-3202     Phone: (202) 739-3000 Fax:   (914) 272-3205     Fax: (202) 739-3001 E-mail: wglew@entergy.com   E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com   E-mail: pbessette@morganlewis.com  
Administrative Judge                                 Administrative Judge Lawrence G. McDade, Chair                           Dr. Kaye D. Lathrop Atomic Safety and Licensing Board Panel              Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23                                   190 Cedar Lane E.
 
U.S. Nuclear Regulatory Commission                   Ridgway, CO 81432 Washington, DC 20555-0001                           (E-mail: Kaye.Lathrop@nrc.gov)
Martin J. O'Neill, Esq.
(E-mail: Lawrence.McDade@nrc.gov)
MORGAN, LEWIS & BOCKIUS LLP 1000 Louisiana Street Suite 4000 Houston, TX 77002 Phone: (713) 890-5710 Fax: (713) 890-5001 E-mail: martin.oneill@morganlewis.com Counsel for Entergy Nuclear Operations, Inc. Dated in Washington, D.C.
Administrative Judge                                 Office of the Secretary Dr. Richard E. Wardwell                              Attn: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel             U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23                                  Washington, D.C. 20555-0001 U.S. Nuclear Regulatory Commission                  (E-mail: hearingdocket@nrc.gov)
this 30th day of March 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  
Washington, DC 20555-0001 (E-mail: Richard.Wardwell@nrc.gov)
       ) Docket Nos. 50-247-LR and In the Matter of   ) 50-286-LR  
  )
ENTERGY NUCLEAR OPERATIONS, INC. ) ASLBP No. 07-858-03-LR-BD01   )
(Indian Point Nuclear Generating Units 2 and 3) )
 
  ) March 30, 2012 CERTIFICATE OF SERVICE I certify that, on March 30, 2012, a copy of "Entergy's Statement of Position Regarding Consolidated Contention NYS-12C (Severe Acci dent Mitigation Alternatives Analysis)," "Testimony of Applicant Witnesses Lori Potts, Kevin O'Kula, and Gran t Teagarden Concerning Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives Analysis)," and supporting exhibits was served electronically with the Electronic Information Exchange on the following recipients:  
 
Administrative Judge  
 
Lawrence G. McDade, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: Lawrence.McDade@nrc.gov)  
 
Administrative Judge Dr. Kaye D. Lathrop Atomic Safety and Licensing Board Panel 190 Cedar Lane E.
Ridgway, CO 81432 (E-mail:  Kaye.Lathrop@nrc.gov) Administrative Judge Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel
 
Mail Stop:  T-3 F23
 
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: Richard.Wardwell@nrc.gov)  
 
Office of the Secretary Attn:  Rulemaking and Adjudications Staff U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 (E-mail:  hearingdocket@nrc.gov)
Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: O-7H4M
 
Washington, DC  20555-0001 (E-mail:  ocaamail.resource@nrc.gov)
Josh Kirstein, Law Clerk Katherine Tucker, Law Clerk Atomic Safety and Licensing Board Panel
 
Mail Stop:  T-3 F23
 
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail:  Josh.Kirstein@nrc.gov)
(E-mail:  Katie.Tucker@nrc.gov)
Sherwin E. Turk, Esq.
Beth N. Mizuno, Esq.
 
David E. Roth, Esq.
 
Brian G. Harris, Esq.
 
Andrea Z. Jones, Esq.
 
Office of the General Counsel
 
Mail Stop:  O-15D21
 
U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 (E-mail:  Sherwin.Turk@nrc.gov)
(E-mail:  Beth.Mizuno@nrc.gov)
(E-mail:  david.roth@nrc.gov)
(E-mail:  brian.harris@nrc.gov)
(E-mail:  andrea.jones@nrc.gov)
 
Melissa-Jean Rotini, Esq.
Assistant County Attorney
 
Office of Robert F. Meehan, Esq.
 
Westchester County Attorney
 
148 Martine Avenue, 6th Floor
 
White Plains, NY 10601 (E-mail:  MJR1@westchestergov.com)
Manna Jo Greene Stephen C. Filler Karla Raimundi Hudson River Sloop Clearwater, Inc.
724 Wolcott Ave.
 
Beacon, NY 12508 (E-mail:  mannajo@clearwater.org)
(E-mail:  karla@clearwater.org)
(E-mail:  stephenfiller@gmail.com)
 
Thomas F. Wood, Esq.
Daniel Riesel, Esq.
Victoria Shiah, Esq.
Sive, Paget & Riesel, P.C.
 
460 Park Avenue
 
New York, NY 10022 (E-mail:  driesel@sprlaw.com)
(E-mail:  vshiah@sprlaw.com)
 
Joan Leary Matthews, Esq. Associate Commissioner
 
Hearings and Medi ation Services New York State Department of Environmental Conservation
 
625 Broadway, 14th Floor 
 
Albany, NY  12233-1500 (E-mail:  jlmatthe@gw.dec.state.ny.us)
 
John Louis Parker, Esq. Office of General Counsel, Region 3
 
NYS Dept. of Environmental Conservation
 
21 S. Putt Corners Road
 
New Paltz, New York  12561-1620 (E-mail:  jlparker@gw.dec.state.ny.us)
 
DB1/ 68919789.2 John J. Sipos, Esq.
Charlie Donaldson Esq.
Assistant Attorneys General Office of the Attorney General
 
of the State of New York
 
The Capitol
 
Albany, NY 12224-0341 (E-mail: John.Sipos@ag.ny.gov)
 
Michael J. Delaney, Esq. Vice President - Energy Department New York City Economic Development
 
Corporation (NYCDEC) 110 William Street New York, NY 10038 
 
mdelaney@nycedc.com Phillip Musegaas, Esq.
Deborah Brancato, Esq.
Riverkeeper, Inc.
 
20 Secor Road
 
Ossining, NY 10562 (E-mail:  phillip@riverkeeper.org)
(E-mail:  dbrancato@riverkeeper.org) Daniel E. O'Neill, Mayor James Siermarco, M.S.
Village of Buchanan Municipal Building
 
236 Tate Avenue
 
Buchanan, NY 10511-1298 (E-mail:  vob@bestweb.net)
(E-mail:  smurray@villageofbuchanan.com) 
 
Robert D. Snook, Esq.
Assistant Attorney General Office of the Attorney General
 
State of Connecticut 55 Elm Street
 
P.O. Box 120
 
Hartford, CT 06141-0120 (E-mail:  Robert.Snook@po.state.ct.us)
Janice A. Dean, Esq. Assistant Attorney General Office of the Attorney General 
 
of the State of New York
 
120 Broadway, 26th Floor
 
New York, New York 10271 (E-mail: Janice.Dean@ag.ny.gov)
Signed (electronically) by Martin J. O'Neill Martin J. O'Neill, Esq. MORGAN, LEWIS & BOCKIUS LLP
 
1000 Louisiana Street
 
Suite 4000
 
Houston, TX 77002
 
Phone:  (713) 890-5710 E-mail:  martin.oneill@morganlewis.com


Counsel for Entergy Nuclear Operations, Inc.}}
Office of Commission Appellate Adjudication    Josh Kirstein, Law Clerk U.S. Nuclear Regulatory Commission              Katherine Tucker, Law Clerk Mail Stop: O-7H4M                              Atomic Safety and Licensing Board Panel Washington, DC 20555-0001                      Mail Stop: T-3 F23 (E-mail: ocaamail.resource@nrc.gov)            U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: Josh.Kirstein@nrc.gov)
(E-mail: Katie.Tucker@nrc.gov)
Sherwin E. Turk, Esq.                          Melissa-Jean Rotini, Esq.
Beth N. Mizuno, Esq.                            Assistant County Attorney David E. Roth, Esq.                            Office of Robert F. Meehan, Esq.
Brian G. Harris, Esq.                          Westchester County Attorney Andrea Z. Jones, Esq.                          148 Martine Avenue, 6th Floor Office of the General Counsel                  White Plains, NY 10601 Mail Stop: O-15D21                              (E-mail: MJR1@westchestergov.com)
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: Sherwin.Turk@nrc.gov)
(E-mail: Beth.Mizuno@nrc.gov)
(E-mail: david.roth@nrc.gov)
(E-mail: brian.harris@nrc.gov)
(E-mail: andrea.jones@nrc.gov)
Manna Jo Greene                                Thomas F. Wood, Esq.
Stephen C. Filler                              Daniel Riesel, Esq.
Karla Raimundi                                  Victoria Shiah, Esq.
Hudson River Sloop Clearwater, Inc.            Sive, Paget & Riesel, P.C.
724 Wolcott Ave.                                460 Park Avenue Beacon, NY 12508                                New York, NY 10022 (E-mail: mannajo@clearwater.org)                (E-mail: driesel@sprlaw.com)
(E-mail: karla@clearwater.org)                  (E-mail: vshiah@sprlaw.com)
(E-mail: stephenfiller@gmail.com)
Joan Leary Matthews, Esq.                      John Louis Parker, Esq.
Associate Commissioner                          Office of General Counsel, Region 3 Hearings and Mediation Services                NYS Dept. of Environmental Conservation New York State Department of                    21 S. Putt Corners Road Environmental Conservation                      New Paltz, New York 12561-1620 625 Broadway, 14th Floor                        (E-mail: jlparker@gw.dec.state.ny.us)
Albany, NY 12233-1500 (E-mail: jlmatthe@gw.dec.state.ny.us)
John J. Sipos, Esq.                          Michael J. Delaney, Esq.
Charlie Donaldson Esq.                        Vice President - Energy Department Assistant Attorneys General                  New York City Economic Development Office of the Attorney General                Corporation (NYCDEC) of the State of New York                    110 William Street New York, NY 10038 The Capitol                                  mdelaney@nycedc.com Albany, NY 12224-0341 (E-mail: John.Sipos@ag.ny.gov)
Phillip Musegaas, Esq.                        Daniel E. ONeill, Mayor Deborah Brancato, Esq.                        James Siermarco, M.S.
Riverkeeper, Inc.                            Village of Buchanan 20 Secor Road                                Municipal Building Ossining, NY 10562                            236 Tate Avenue (E-mail: phillip@riverkeeper.org)            Buchanan, NY 10511-1298 (E-mail: dbrancato@riverkeeper.org)          (E-mail: vob@bestweb.net)
(E-mail: smurray@villageofbuchanan.com)
Robert D. Snook, Esq.                        Janice A. Dean, Esq.
Assistant Attorney General                    Assistant Attorney General Office of the Attorney General                Office of the Attorney General State of Connecticut                          of the State of New York 55 Elm Street                                120 Broadway, 26th Floor P.O. Box 120                                  New York, New York 10271 Hartford, CT 06141-0120                      (E-mail: Janice.Dean@ag.ny.gov)
(E-mail: Robert.Snook@po.state.ct.us)
Signed (electronically) by Martin J. ONeill Martin J. ONeill, Esq.
MORGAN, LEWIS & BOCKIUS LLP 1000 Louisiana Street Suite 4000 Houston, TX 77002 Phone: (713) 890-5710 E-mail: martin.oneill@morganlewis.com Counsel for Entergy Nuclear Operations, Inc.
DB1/ 68919789.2
                                      }}

Latest revision as of 16:34, 6 February 2020

Entergy Pre-Filed Hearing Exhibit ENT000449, Entergy'S Statement of Position Regarding Consolidated Contentions NYS-12C (Severe Accident Mitigation Alternatives Analysis)
ML12090A796
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/30/2012
From: O'Neill M
Entergy Nuclear Operations, Morgan, Morgan, Lewis & Bockius, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML12090A783 List:
References
RAS 22158, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12090A796 (49)


Text

ENT000449 Submitted: March 30, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of ) Docket Nos. 50-247-LR and

) 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. )

) March 30, 2012 (Indian Point Nuclear Generating Units 2 and 3) )

)

ENTERGYS STATEMENT OF POSITION REGARDING CONSOLIDATED CONTENTION NYS-12C (SEVERE ACCIDENT MITIGATION ALTERNATIVES ANALYSIS)

William B. Glew, Jr., Esq. Kathryn M. Sutton, Esq.

William C. Dennis, Esq. Paul M. Bessette, Esq.

ENTERGY NUCLEAR OPERATIONS, INC. MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue 1111 Pennsylvania Avenue, NW White Plains, NY 10601 Washington, DC 20004 Phone: (914) 272-3202 Phone: (202) 739-3000 Fax: (914) 272-3205 Fax: (202) 739-3001 E-mail: wglew@entergy.com E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com E-mail: pbessette@morganlewis.com Martin J. ONeill, Esq.

MORGAN, LEWIS & BOCKIUS LLP 1000 Louisiana Street Suite 4000 Houston, TX 77002 Phone: (713) 890-5710 Fax: (713) 890-5001 E-mail: martin.oneill@morganlewis.com COUNSEL FOR ENTERGY NUCLEAR OPERATIONS, INC.

TABLE OF CONTENTS Page I. PRELIMINARY STATEMENT ....................................................................................... 2 II. PROCEDURAL HISTORY OF CONTENTION NYS-12C ............................................. 8 A. Contention NYS-12 ...8 B. Amended Contentions NYS-12A/12B/12C ..9 C. New York States Prefiled Testimony and Related Filings..11 D. Entergys Motion in Limine and the Boards Ruling ..11 III. BACKGROUND .14 A. Regulatory Background ...14 B. Technical Background 16 C. NRC Staff Assessment of Contention-Related Issues in the FSEIS ...18 IV. APPLICABLE LEGAL AND REGULATORY STANDARDS .................................... 20 A. Burden of Proof.................................................................................................... 20 B. Controlling NEPA Principles............................................................................... 21

1. NEPAs Rule of Reason ....................................................................... 21
2. Agency Discretion in Choosing an Appropriate Methodology ............... 22
3. The Intervenors Burden Under NEPA.................................................... 23 V. ARGUMENT ................................................................................................................... 25 A. Entergys Witnesses ............................................................................................. 25
1. Ms. Lori Ann Potts ................................................................................... 25
2. Dr. Kevin R. OKula ................................................................................ 26
3. Mr. Grant A. Teagarden ........................................................................... 26 B. Entergys Evidence .............................................................................................. 27
1. NYSs Arguments Are Fundamentally Inconsistent with the Purpose of A SAMA Analysis, As Required by NEPA and 10 C.F.R. Part 51........................................................................................... 27
2. NYS Incorrectly Claims That Entergy Has Improperly Relied on Inapplicable Default Values in MACCS2 Sample Problem A............. 29
3. NYSs and Dr. LeMays Arguments Are Incompatible With the MACCS2 Decontamination Model.......................................................... 29
4. NYSs Proposed Decontamination Time Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 ........................................................................ 31
5. NYSs Proposed Nonfarm Decontamination Cost Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 ................................................... 33
6. Summary of Arguments and Evidence .................................................... 40 VI. CONCLUSION ................................................................................................................ 42

- ii -

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of ) Docket Nos. 50-247-LR and

) 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. )

) March 30, 2012 (Indian Point Nuclear Generating Units 2 and 3) )

)

ENTERGYS STATEMENT OF POSITION REGARDING CONSOLIDATED CONTENTION NYS-12C (SEVERE ACCIDENT MITIGATION ALTERNATIVES ANALYSIS)

Pursuant to 10 C.F.R. § 2.1207(a)(1) and the Atomic Safety and Licensing Boards (Board) Order Granting NRC Staffs Unopposed Time Extension Motion and Directing Filing of Status Updates,1 Entergy Nuclear Operations, Inc. (Entergy) submits this Statement of Position (Statement) on Consolidated Contention NYS-12C (NYS-12C) proffered by New York State (NYS). This Statement is supported by the Testimony of Applicant Witnesses Lori Potts, Kevin OKula, and Grant Teagarden Concerning Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives Analysis) (Entergy Testimony) (ENT000450) and the exhibits thereto (ENT000004, ENT000005, ENT000007, and ENT000451 to ENT000477).

As discussed below, NYS-12C lacks merit as a technical matter and as a legal matter.

Accordingly, the contention should be resolved in favor of Entergy and the Nuclear Regulatory Commission (NRC or Commission) Staff.

1 Licensing Board Order Granting NRC Staffs Unopposed Time Extension Motion and Directing Filing of Status Updates (Feb. 16, 2012) (unpublished).

I. PRELIMINARY STATEMENT NYS-12C is an environmental contention that challenges the adequacy of Entergys severe accident mitigation alternatives (SAMA) analysis for Indian Point Nuclear Generating Units 2 and 3 (respectively, IP2 and IP3, and collectively, Indian Point Energy Center or IPEC), as evaluated by the NRC Staff under the National Environmental Policy Act (NEPA) and the NRCs 10 C.F.R. Part 51 NEPA regulations. Entergy performed its SAMA analysis using the MACCS2 computer code, which is a later version of the MELCOR Accident Consequence Code System (MACCS) code and is unique in its capability for modeling the relevant severe accident phenomenology of interest and quantifying those consequences needed for nuclear power plant severe accident risk studies, including SAMA analyses. As the Commission recently stated: The NRC uses MACCS2 to evaluate the potential offsite consequences of severe nuclear reactor accidents, and NRC-endorsed guidance on SAMA analysis endorses use of the MACCS2 code.2 As the most current, established code for NRC SAMA analysis,3 MACCS2 has been routinely applied by applicants since the inception of the NRC license renewal process.

NYS-12C alleges that Entergy has underestimated the economic costs associated with a postulated severe accident at IPEC by relying on MACCS2 code input values that are not tailored to the specific area surrounding IPEC, and which purportedly do not account for the size of radionuclide particles released during a severe reactor accident. NYS principally asserts that Entergy improperly relies on default input values contained in Sample Problem A of the 2

Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-01, 75 NRC __, slip op. at 3 (Feb.

9, 2012) (citing Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 291 & n.11 (2010)).

3 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010).

MACCS2 Users Guide.4 NYS and its proffered expert, Dr. François Lemay of International Safety Research, Inc. (ISR), propose alternative values for certain MACCS2 input parameters, including decontamination time and decontamination cost.

The SAMA analysis is an environmental mitigation analysis under NEPA and is not part of the license renewal safety review. Thus, whether additional accident mitigation measures may be warranted to assure public health and safety is addressed through the NRCs ongoing regulatory oversight of existing plants. Further, the adequacy of an applicants SAMA analysis, and the Staffs review thereof, is governed by NEPAs rule of reason. As the Commission recently explained, the proper question is not whether there are plausible alternative choices for use in the analysis, but whether the analysis that was done is reasonable under NEPA.5 The Commission provided the following additional guidance on the purpose of SAMA analysis and the adjudication of SAMA contentions:

We ourselves have stated that to require worst case analyses can easily lead to limitless NEPA analyses because it is always possible to introduce yet another additional variable to a hypothetical scenario to conjure up a worse worst case.

The same can be said for SAMA analyses. It always will be possible to conceive of yet another input or methodology that could have been used in the SAMA computer modeling, and many different inputs and approaches may all be reasonable choices. But our adjudicatory hearings are not EIS editing sessions. The SAMA analysis is not a safety review performed under the Atomic Energy Act. The mitigation measures examined are supplemental to those we already require under our safety regulations for reasonable assurance of safe operation. Through our reactor oversight process, including generic safety issue reviews, we revisit whether additional mitigation measures should be imposed as a safety matter under 10 C.F.R. Part 50. And in 4

NUREG/CR-6613, Code Manual for MACCS2, Users Guide, Vol. 1 (May 1998) (MACCS2 Users Guide)

(NYS000243).

5 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-05, 75 NRC __ slip op. at 28-29 (Mar. 8, 2012); see also FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-08, 75 NRC __, slip op. at 17-18 (Mar. 27, 2012) (same).

response to the Fukushima accident in Japan, we currently are conducting a comprehensive safety review that involves, among other things, a review of the requirements and guidance associated with accident mitigation measures.6 The Commission further noted that there is questionable benefit to spending considerable agency resources in an attempt to fine-tune a NEPA mitigation analysis where, as here, an intervenor has failed to identify, through sufficiently probative evidence, a significant deficiency in the SAMA analysis; i.e., a deficiency that could credibly render the SAMA analysis altogether unreasonable under NEPA standards.7 It is against this legal and regulatory backdrop that the merits of NYS-12C must be judged. And, as Entergys expert testimony demonstrates, NYS-12C has no merit. As summarized herein, Entergys experts fully explain why Entergys inputs and assumptions related to decontamination costs in MACCS2 are both reasonable and appropriate for a SAMA analysis and comply with NEPA and related NRC requirements. They also demonstrate that Dr.

Lemays testimony and supporting report (the ISR Report), while abounding with technical data, are fraught with incorrect uses of that data, among other major shortcomings that include a pervasive lack of technical justification. Also, through various cited references, Dr. Lemay delves into technical details concerning particular decontamination methods, the exploration of which is not necessary or warranted under NEPA. Nonetheless, Entergys experts rebut Dr.

Lemays claims, and, in doing so, make a compelling case for the dismissal of NYS-12C.

The reasons for dismissal of the contention are numerous. As a threshold matter, NYS and Dr. Lemay do not acknowledge that SAMA analysis makes use of probabilistic analysis 6

Pilgrim, CLI-12-01, slip op. at 24 (citations omitted); see also Davis-Besse, CLI-12-08, slip op. at 17 ([I]t will always be possible to propose that the [MACCS2] analysis use one or more other inputs. But simply because a computer model also could have been run with alternate inputs does not suggest that the inputs used were unreasonable.).

7 Pilgrim, CLI-12-01, slip op. at 25.

methods and focuses on long-term and spatially-averaged impacts from severe accidents for the purpose of making reasonable cost-benefit evaluations.8 The SAMA analysis is intended to estimate average consequence results for the entire 50-mile radius region from the IPEC site, not just the comparatively small region of New York City, which comprises approximately 2% of the SAMA analysis region.9 NYS and Dr. Lemay attempt to scale up certain cost estimates related to the New York City portion without including commensurate scaling down of estimates for the 98% of the SAMA analysis region that is outside New York City.10 Thus, contrary to NEPA, they seek to overemphasize highly speculative harms and worst-case scenarios for only a small fraction of the considered area.

Furthermore, many of the studies and data sources relied upon by NYS and Dr. Lemay are irrelevant to the objectives of a nuclear power plant SAMA analysis. For example, several of the studies relied upon by NYS focus on postulated radiological releases from nuclear weapon or dirty bomb detonations and even a terrorist event with no radiological releases, and seek to assess the economic costs of a single release event at a single location (e.g., New York City).11 Entergys experts explain that, because those studies are based on assumptions that have no applicability to a nuclear power plant SAMA analysis, they lend no support to NYSs contention.12 NYSs criticisms of Entergys MACCS2 inputs also lack merit. It is true that certain of Entergys MACCS2 inputs coincide with the inputs used in MACCS2 Sample Problem A.

However, those inputs have been subject to extensive peer review since the late 1980s and 8

Entergy Test. at A26 (ENT000450).

9 Id.

10 See, e.g., id. at A121.

11 Id. at A26.

12 Id.

continue to be used in licensee probabilistic risk assessments (PRAs) and SAMA analyses and state-of-the-art severe accident analyses conducted by the NRC.13 Contrary to NYSs claims, they are not arbitrarily-selected default values. Rather, they are values with a well-established technical pedigree that is widely recognized and accepted by the PRA community. In fact, they continue to be used today in PRA applications, including the NRCs State-of-the-Art Reactor Consequence Analyses (SOARCA) project and licensee SAMA analyses.

NYSs criticisms of Entergys decontamination modeling in the SAMA analysis focuses largely on two MACCS2 parameters: decontamination time (TIMDEC) and nonfarm decontamination cost (CDNFRM). But as Dr. OKula and Mr. Teagarden explain, Dr. Lemay fails to accurately portray the MACCS2 decontamination model. The primary goal of the decontamination plan as modeled in MACCS2 is to cost-effectively reduce doses to meet applicable land habitability criteria for a resident population in the region of interest to allow population resettlement. It is not intended to bound or account for all potential decontamination-related and site restoration activities that may arise in the years following a severe accident at a nuclear power plant (e.g., decontamination of specific structures such as schools after population resettlement). Moreover, as applied in SAMA analyses, MACCS2 models the decontamination actions that may be taken during the long-term phase in the initial period of months after deposition of radioactive contamination, and subsequent to the end of the seven-day emergency phase following a severe accident. As a result, Dr. Lemays proposed decontamination time values (up to 30 years) lack technical justification and are fundamentally inconsistent with the decontamination and interdiction modeling assumptions built into and applied by MACCS2.

13 PRA is sometimes referred to as probabilistic safety assessment (PSA). The terms PRA and PSA generally are used interchangeably within the nuclear industry.

Dr. Lemays proposed decontamination cost values also suffer from major flaws. His several proposed valueswhich vary by an order of magnitudeare unreasonable and inappropriate for use in a NEPA assessment. In short, Dr. Lemays decontamination cost values are derived from cost data that are inapplicable to a nuclear power plant SAMA analysis and are based on selective and incorrect use of the data, without adequate technical justification. For example, Dr. Lemay relies heavily on the 1996 Site Restoration Report14 (and other related papers), which presents cost estimates for remediation following a plutonium dispersal event and lacks relevance to a nuclear power plant SAMA analysis performed using MACCS2. In fact, in a decision issued only weeks ago, the Commission discerned no suggestion [in the Site Restoration Report] that the MACCS2 code assumes inapplicable radionuclide particle sizes, and noted that the 1996 Site Restoration Report predates issuance of the MACCS2 code Users Guide and does not appear to discuss the MACCS2 code at all.15 Significantly, Dr. Lemay could only accommodate his alternative, substantially larger decontamination time and cost values by altering the FORTRAN source code in MACCS2. As Entergys experts explain, such modifications to the source code of a sophisticated, NRC-accepted and commonly-used software package to extend the range of established input variables are not prudent (due to quality assurance concerns), practical, reasonable, or warranted under NEPA. And the Commission agrees. In another recent decision, the Commission rejected an intervenors demand that the MACCS2 code be rewritten to contain an alternative atmospheric transport and dispersion plume model as far beyond NEPA requirements and explicitly noted 14 D. Chanin and W. Murfin, Technadyne Engg Consultants, Inc., SAND96-0957, Site Restoration: Estimation of Attributable Costs from Plutonium-Dispersal Accidents (May 1996) (1996 Site Restoration Report)

(NYS000249).

15 Seabrook, CLI-12-05, slip op. at 40.

that NEPA does not require the NRC [or its licensees] to engage in an extensive revision of the MACCS2 code.16 NYS has thus failed to meet its burden of providing sufficient (or even reliable) evidence to support its claims and of showing that the NRC could evaluate [SAMAs] more meaningfully than it has already done.17 In contrast, Entergys testimony shows that the decontamination cost-related values used in the IPEC SAMA analysis, which the Staff thoroughly evaluated and approved in the FSEIS, are reasonable and appropriate for a NEPA assessment.

II. PROCEDURAL HISTORY OF CONTENTION NYS-12C A. Contention NYS-12 As filed over four years ago, NYS-12 alleged that Entergys SAMA analysis is deficient because the MACCS2 computer code used by Entergy underestimates the costs associated with a severe accident due to its use of decontamination and clean-up costs that are based on large-sized radionuclides.18 NYS asserted that a severe accident at a nuclear power plant likely would result in the dispersion of small-sized radionuclides that are more expensive to remove and clean up than large-sized radionuclide particles.19 As principal support for this argument, NYS cited the 1996 Site Restoration Report issued by Sandia National Laboratories:

In place of the outdated decontamination cost figure contained in the MACCS2 code, the SAMA analysis for IP2 and/or IP3 should incorporate the analytical framework contained in the 1996 Sandia National Laboratories report concerning site restoration costs as well as recent studies examining the cost consequences in the New York metropolitan area.20 16 Pilgrim, CLI-12-01, slip op. at 29.

17 N.J. Dept. of Envtl. Prot. v. NRC, 561 F.3d 132, 144 (3d. Cir. 2009) (citing Limerick Ecology Action, Inc. v.

NRC, 869 F.2d 719, 744 n.31 (3d Cir.1989)).

18 See New York State Notice of Intention to Participate and Petition to Intervene at 140-45 (Nov. 30, 2007)

(NYS Petition), available at ADAMS Accession No. ML073400187.

19 See id. at 140-41.

20 Id. at 142 (citing 1996 Site Restoration Report (NYS000249)).

According to NYS, the 1996 Site Restoration Report recognized that earlier estimates (such as those incorporated within the MACCS2 code) of decontamination costs are incorrect because they are based on studies of nuclear weapons that produce large particles.21 As cited by NYS, the 1996 Site Restoration Report also discusses decontamination factors (DF) (i.e., estimates of the effectiveness of clean up measures) after severe reactor accidents. The Board admitted NYS-12 in July 2008 to the extent that it challenges the cost data for decontamination and cleanup used by MACCS2.22 B. Amended Contentions NYS-12A/12B/12C NYS amended NYS-12 three separate times to reassert the contention and apply it to Staffs draft supplemental environmental impact statement (DSEIS),23 Entergys December 2009 revised SAMA analysis,24 and the Staffs final SEIS (FSEIS).25 In the first two amendments, NYS-12A and NYS-12B, which Entergy did not oppose, NYS sought to apply NYS-12 to the Staffs DSEIS and Entergys revised SAMA analysis, respectively. In both cases, NYS essentially repeated verbatim the supporting bases and evidence stated in its original contention. Thus, the scope of the contention did not change.26 21 See id. at 143.

22 See Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), LBP-08-13, 68 NRC 43, 102 (2008).

23 See State of New York Contentions Concerning NRC Staffs Draft Supplemental Environmental Impact Statement (Feb. 27, 2009) (NYS DSEIS Contentions), available at ADAMS Accession No. ML090690303.

24 See State of New Yorks New and Amended Contentions Concerning the December 2009 Reanalysis of Severe Accident Mitigation Alternatives (Mar. 11, 2010) (Amended Contention NYS-12B), available at ADAMS Accession No. ML100780366.

25 See State of New York New Contention 12-C Concerning NRC Staffs December 2010 Final Environmental Impact Statement and the Underestimation of Decontamination and Clean Up Costs Associated with a Severe Reactor Accident in the New York Metropolitan Area at 3-15 (Feb. 3, 2011) (Amended Contention NYS-12C), available at ADAMS Accession No. ML110680212; see also FSEIS (NYS00133A-J).

26 See Licensing Board Order (Ruling on New York States New and Amended Contentions) at 3-4 (June 16, 2009) (unpublished) (admitting NYS-12A and stating that [w]e see no issue with an intervenor proactively asking the Board to recognize that an admitted contention relative to the ER challenges the same issue when In NYS-12C (the third and final version of the contention), NYS again sought to update its previously-admitted contentions, this time in response to the NRC Staffs FSEIS.27 NYS-12C also sought to challenge the discussion in Section G.2.3 of the FSEIS as it applies to those contentions.28 NYS and its former consultant, Mr. David Chanin, argued that the FSEIS (1) incorrectly accepts and applies cost data for moderate decontamination efforts in lieu of cost data for heavy contamination events, and (2) fails to scale up the 1996 Site Restoration Report decontamination cost data to a hyper-density urban area such as New York City.29 Notably, the only MACCS2 input value explicitly challenged by Mr. Chanin in his report was the per capita cost of nonfarm heavy decontamination (CDNFRM, DF = 15),30 for which Entergy used a value of $13,824 per person.31 Thus, as pled and admitted, and as reasonably construed, NYS-12C challenged the adequacy of Entergys nonfarm decontamination cost value, principally vis--vis information contained in the 1996 Site Restoration Report and other studies cited by NYS. The Board recognized as much in admitting NYS-12C, noting that it mirrors the basic allegation found in included in the Draft SEIS.); Entergy Nuclear Operations, Inc. (Indian Point, Units 2 and 3), LBP-10-13, 71 NRC 673, 683 (2010) (noting no material opposition to admission of NYS-12B to the degree New York is relying on the same analytic framework that the Board accepted in admitting NYS-12/12A) (emphasis added).

27 See Amended Contention NYS-12B at 1, 10.

28 See id. at 1-2.

29 See Amended Contention NYS-12C at 7; see also id. Attach. (David I. Chanin, Errors and Omissions in NRC Staffs Economic Cost Estimates of Severe Accident Mitigation Alternatives Analysis Contained in December 2010 Indian Point Final Supplemental Environmental Impact Statement (FSEIS), NUREG-1437, Supplement 38 at 1, 3 (Feb. 2011) (Chanin Report)).

30 In MACCS2, decontamination/clean-up cost is entered as two parameters, CDFRM (farmland decontamination cost-not applicable here) and CDNFRM (nonfarm decontamination cost). See MACCS2 Users Guide at 7-11 (NYS000243). The State has not challenged Entergys farmland decontamination cost figure in the prefiled testimony of Dr. Lemay or in prior submissions by its former consultant, Mr. Chanin.

31 See Chanin Report at 3, 8, 16 (stating that the 1996 Site Restoration Report and other studies cited by Mr.

Chanin should be considered conclusive proof that [Entergys and] NRCs use of $13,824/person for cleanup of the Indian Point area results in a gross underestimation of costs); Amended Contention NYS-12C at 14 (same).

the original contention, and that the overarching aspect of this contention, including its citation to the 1996 Site Restoration Report, has not differed significantly in four years.32 C. New York States Prefiled Testimony and Related Filings On December 21, 2011, NYS filed its statement of position, written testimony, and supporting exhibits for contention NYS-12C. As noted above, NYSs testimony is sponsored by Dr. François Lemay, Vice President of International Safety Research, Inc. (ISR). His professional experience includes experience with the MACCS/MACCS2 codes and other computer codes.

NYS and Dr. Lemay allege that Entergy has underestimated the economic costs associated with a severe accident at IPEC by using certain MACCS2 Sample Problem A inputs from the MACCS2 Users Guide in lieu of site-specific inputs. In doing so, Dr. Lemay proposes alternative values, as described in his testimony and the ISR Report, for a number of MACCS2 input parameters.

D. Entergys Motion in Limine and the Boards Ruling On January 30, 2012, Entergy filed a Motion in Limine to exclude certain portions of Dr.

Lemays testimony, report and supporting exhibits on the ground that NYSs prefiled testimony discussed issues and challenged MACCS2 parameters beyond the scope of the admitted contention.33 Specifically, Entergy contended that Dr. Lemays testimony improperly takes issue with numerous other Entergy inputs to the MACCS2 economic cost mode other than nonfarm 32 Licensing Board Memorandum and Order (Ruling on Pending Motions for Leave to File New and Amended Contentions) at 7-8 (July 6, 2011 (July 2011 Board Amended Contentions Order) (emphasis added).

33 Applicants Motion in Limine to Exclude Portions of the Prefiled Testimony, Report, and Exhibits Filed by New York State and Dr. Francois LeMay in Support of Consolidated Contention NYS-12C (Jan. 30, 2012).

decontamination cost (CDNFRM).34 The NRC Staff supported Entergys Motion in Limine,35 and NYS opposed it.36 As explained in Entergys Motion in Limine, the Commission has held that intervenors are not permitted to change the scope of a contention as admitted by the Board.

For example, the Commission has emphasized that the scope of a contention is limited to admitted issues of law and fact pled with particularity in the intervention petition, including its stated bases.37 The Board denied Entergys Motion in Limine on March 6, 2012, noting that Boards admit contentions, not bases, and finding that the additional contested MACCS2 inputs go to the core of the question of property values and how they might be affected by a radionuclide-releasing accident at IPEC and the resulting decontamination process.38 The Board further stated that Dr. Lemays MACCS2 source code modifications illustrate the effect of varying MACCS2s assumptions to address alternative inputs, as conceptualized by the original contention admitted by the Board.39 Shortly after the Board denied Entergys Motion in Limine, the Commission issued an order in the Seabrook license renewal proceeding rejecting several admitted contentions 34 Those additional MACCS2 parameters include decontamination time (TIMDEC), value of nonfarm wealth (VALWNF), societal discount rate of property (DSRATE), fraction of nonfarm property due to improvements (FRNFIM), depreciation rate (DPRATE), and relocation costs (POPCST).

35 See NRC Staffs Answer to Applicants Motion in Limine to Exclude Portions of the Prefiled Testimony, Report, and Exhibits Filed by New York State and Dr. Francois Lemay in Support of Consolidated Contention NYS-12C (Feb. 9, 2012).

36 State of New Yorks Answer to Entergys Motion in Limine to Exclude Portions of Pre-Filed Testimony and Exhibits for Consolidated Contention NYS-12C (Feb. 17, 2012) (NYS Answer to Motion in Limine).

37 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-5, 71 NRC 90, 100 (2010); see also Pilgrim, CLI-10-11, 71 NRC at 311 (NRC adjudicatory proceedings would prove endless if parties were free .

. . to introduce entirely new claims which they either originally opted not to make or which simply did not occur to them at the outset.) (quoting La. Energy Servs., L.P. (Natl Enrichment Facility), CLI-05-28, 62 NRC 721, 727-28 (2005)).

38 Licensing Board Order (Granting in Part and Denying in Part Applicants Motions in Limine) at 6-7 (Mar. 6, 2012) (unpublished).

39 Id. at 7.

including a portion of a SAMA contention that raised MACCS2 decontamination cost issues very similar to those raised in NYS-12C.40 The Seabrook Board had similarly stated that it admits contentions . . . and not their supporting bases.41 Consistent with Entergys arguments in its motion, the Commission rejected this statement, because an admitted contention is defined by its bases.42 The Commission also reminded Boards of the need to specify each basis relied upon for admitting a contention.43 While Entergy acknowledges the Boards ruling on its Motion in Limine, in view of the Commissions recent Seabrook decision, it respectfully submits that NYSs challenges to numerous CHRONC input values other than the nonfarm decontamination cost value (i.e.,

CDNFRM) constitute new bases not relied upon by NYS or the Board in admitting the contention. Further, in light of the Commissions recent Pilgrim ruling, Entergy reiterates that Dr. Lemays modifications to the MACCS2 source code are improper both in the context of the admitted contention (which foreclosed challenges to the MACCS2 code) and NEPAs requirements (which do not warrant modifications of widely-used and NRC-accepted computer codes like MACCS2). In any event, as summarized below, Entergys experts address and fully refute NYSs various new arguments in their testimony.

40 See Seabrook, CLI-12-05, slip op. at 36-47; see also Davis-Besse, CLI-12-08, slip op. at 32-34 (citing CLI 05 and reversing the Boards admission of a similar MACCS2 decontamination cost-related contention).

41 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), LBP-11-02, 73 NRC __, slip op. at 31 (Feb. 15, 2011).

42 Seabrook, CLI-12-05, slip op. at 11 n.50 (emphasis added).

43 Id.

III. BACKGROUND A. Regulatory Background The NRCs GEIS44 provides an evaluation of severe accident impacts that applies to all U.S. nuclear power plants.45 A severe accident is defined as a beyond-design-basis accident that could result in substantial damage to the reactor core, whether or not there are serious offsite consequences.46 Severe accidents are thus events whose probability of occurrence is so low that they are excluded from the spectrum of design-basis accidents postulated for a plant by the Commissions regulations.47 Based on the GEIS evaluation, 10 C.F.R. Part 51 concludes that [t]he probability weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts from severe accidents are small for all plants.48 The NRC has noted that the GEIS analyses represent plant-specific estimates of the impacts from severe accidents that would generally over-predict, rather than under-predict, environmental consequences.49 As the Commission has observed: Because the GEIS provides a severe accident impacts analysis that envelopes the potential impacts at all existing plants, the environmental impacts of severe accidents during the license renewal term already have been 44 NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (May 1996)

(GEIS) (NYS00131A-I).

45 See Pilgrim, CLI-10-11, 71 NRC at 316; GEIS at 5-114 to -116.

46 See FSEIS at 5-3 (NYS00133B).

47 See id. at 5-2 to -3, 5-11 (NYS00133B-C).

48 FSEIS at 5-3 (NYS00133B) (quoting 10 C.F.R. Pt. 51, Subpt. A, App. B, Tbl. B-1 (Postulated Accidents; Severe Accidents)) (emphasis added).

49 Final Rule, Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 61 Fed. Reg.

28,467, 28,480 (June 5, 1996).

addressed generically in bounding fashion.50 Thus, NRC SAMA analyses are not a substitute for, and do not represent, the NRC NEPA analysis of potential impacts of severe accidents.51 Nonetheless, Part 51 states that if the Staff has not previously considered SAMAs for a license renewal applicants plant in an EIS or in an environmental assessment, then the applicant must complete an evaluation of alternatives that may mitigate severe accidents.52 The purpose of a SAMA analysis is to identify potential changes to a nuclear power plant, or its operations, that (1) could further reduce the already very low risk of severe reactor accident scenarios postulated in the GEIS, and (2) may be cost-beneficial to implement.53 The Nuclear Energy Institute (NEI) has issued a guidance document, NEI 05-01, Revision A, to assist NRC license renewal applicants in preparing SAMA analyses.54 The Staff has approved and recommended the use of NEI 05-01, Rev. A by license renewal applicants.55 NEI 05-01, Rev. A states that the MACCS2 code, which the Commission recently described as the most current, established code for NRC SAMA analysis,56 may be used to calculate the offsite consequences of a severe accident, and provides guidance on the input data.57 50 Pilgrim, CLI-10-11, slip op. at 38.

51 Id. at 37.

52 10 C.F.R. § 51.53(c)(3)(ii)(L); see also id. Pt. 51, Subpt. A, App. B, Tbl. B-1.

53 See Pilgrim, CLI-10-11, slip op. at 3.

54 See NEI 05-01, Rev. A, Severe Accident Mitigation Alternatives (SAMA) Analysis, Guidance Document at i (Nov. 2005) (NEI 05-01, Rev. A) (NYS000287).

55 See Final License Renewal Interim Staff Guidance LR-ISG-2006-03: Staff Guidance for Preparing Severe Accident Mitigation Alternatives Analyses (Aug. 2, 2007) (LR-ISG-2006-03) (ENT000451); see also Notice of Availability of the Final License Renewal Interim Staff Guidance LR-ISG-2006-03: Staff Guidance for Preparing Severe Accident Mitigation Alternatives Analyses, 72 Fed. Reg. 45,466 (Aug. 14, 2007).

56 Pilgrim, CLI-10-22, 72 NRC at 208; see also Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), LBP-07-13, 66 NRC 131, 142 (2007) (stating that the MACCS2 code has been widely used and accepted as an appropriate tool in a large number of SAMA analyses).

57 See NEI-05-01, at 13; see also Pilgrim, CLI-10-11, slip op. at 4 (NRC guidance documents conclude that the MACCS2 code (a version of the MELCOR Accident Consequence Code System code) is acceptable for performing SAMA analyses, and NRC licensees commonly use the MACCS2 code for performing SAMA analyses. (citation omitted)).

B. Technical Background Entergy relied on the NRC-endorsed guidance in NEI 05-01, Rev. A in preparing the IPEC SAMA analysis and, in accordance with that guidance, used MACCS2 to calculate the offsite consequences. MACCS2 is divided into three primary modulesATMOS, EARLY, and CHRONCand supports dispersion and transport on a radial-polar grid (16 compass sectors over a 50-mile radius).58 Plant-specific input to MACCS2 includes the PRA-based and related source terms for each source term release category and the reactor core radionuclide inventory, site-specific meteorological data, projected population distribution, and economic data.59 ATMOS performs all calculations pertaining to atmospheric transport, dispersion, and deposition of radioactive material, and to radioactive decay of that material both before and after its release into the atmosphere.60 It calculates air and ground concentrations, plume size, and timing information for all plume segments as a function of downwind distance.61 The results of the ATMOS calculations are then used by the other MACCS2 modules. Specifically, EARLY and CHRONC use the calculated air and ground concentrations, plume size, and timing information for all plume segments calculated by ATMOS and other inputs (e.g., population) to calculate consequences due to radiation exposure in the emergency phase (first seven days from the time of release in IPECs SAMA analysis) and the long-term doses due to exposure after the emergency phase (beginning at the end of the seven-day emergency phase and extending for a period of 30 years in most SAMA analyses, including IPECs), respectively.62 58 See MACCS2 Users Guide at 2-1, 2-3 (NYS000243).

59 See id. at 2-1 to 2-3.

60 See id. at 2-2.

61 See id.

62 See id.

Relevant here, CHRONC calculates the estimated long-term population dose and the offsite economic consequences of a severe accident.63 The offsite economic consequences largely arise from the protective actions taken (such as evacuation and relocation of people away from contaminated areas) to limit radiation exposure of the public during and after plume passage.64 The CHRONC module uses the radioactivity concentrations determined in the initial ATMOS module, as well as extensive economic cost data inputs and parameters, to determine long-term offsite population dose and long-term economic costs.65 Long-term consequences are calculated for the period from after the end of the seven-day emergency phase and extending approximately thirty years.66 In addition to population data, numerous economic cost inputs are used, including, for example, average county-wide value of farm wealth and of non-farm wealth, average cost of labor to perform decontamination, population relocation costs, and daily cost for an evacuated person.67 The numerous economic cost parameters and inputs used in the SAMA analysis in the CHRONC module phase help to translate the plume modeling results into the estimated long-term monetary costs and dose of a severe accident.68 The primary results developed by MACCS2 for use in the SAMA analysis are two values from a distribution of potential results for each release category include: (1) the mean population dose and (2) the mean economic costs. MACCS2 provides results in terms of offsite population dose and offsite economic cost that are used to compute the offsite risk measures; i.e., population 63 See id. at 7-1.

64 See id.

65 See id.

66 See Seabrook, CLI-12-01, slip op. at 5.

67 See id.; see also NEI 05-01, Rev. A, at 13-14. The MACCS2 code will invoke user-specified condemnation if dose criteria are not met following decontamination/interdiction efforts. With respect to loss of use and return on property, as part of interdiction, costs the MACCS2 code provides for (1) a depreciation rate on property improvements to account for loss of value, of buildings and other structures, and (2) an expected rate of return from land, building, equipment, etc. See MACCS2 Users Guide at 7-13 (NYS000243).

68 See Seabrook, CLI-12-01, slip op. at 5 dose risk (PDR) expressed in units of person-rem/year,69 and offsite economic cost risk (OECR) expressed in dollars/year.70 The PDR and OECR are the mean annual risk metrics and represent the mean cumulative impacts from postulated severe accidents (i.e., dose or economic costs) to all individuals and land within a 50-mile radius of the plant.71 C. NRC Staff Assessment of Contention-Related Issues in the FSEIS When the Staff issued its FSEIS in December 2010, it included a new technical analysis in Section G.2.3 to address directly the allegations made in NYS-12/12A/12B.72 As an initial matter, the Staff emphasized that it does not consider the methodology for clean-up of a nuclear weapons accident relevant to the clean-up that would be necessary following a nuclear power plant severe accident.73 Nonetheless, the Staff asked Sandia, an NRC technical contractor, to review the inputs and assumptions regarding particle size distribution and decontamination costs used in the IPEC SAMA analysis, and to perform a comparison of the decontamination cost factors derived from Sandias 1996 Site Restoration Report cited by NYS to those used in the IPEC SAMA analysis.74 According to the FSEIS, the approach used by Sandia included identifying basic considerations of each type of accident (e.g., contaminants, half life of contaminants, and health and safety considerations), identifying the decontamination methods 69 A rem is a unit of radiation dose and person refers to the number of people exposed to the particular amount of rem. These two factors are multiplied to obtain the population dose in person-rem. Under NRC practice, for a particular weather sequence, SAMA analysis calculates the total population dose, the sum of the estimated dose commitments to populations located in all the sectors on a spatial grid-map out to a defined distance (usually 50 miles) from the plant. See Pilgrim, CLI-10-11, slip op. at 22 n.88, 38-39.

70 See Pilgrim, CLI-10-11, slip op at 22 & n.86.

71 See id. at 38-39.

72 See FSEIS G at G-22 to -24 (NYS00133I).

73 See id. at G-23.

74 See id. The FSEIS states that the NRC Staff and Sandia performed a comprehensive review of relevant documents and references, including the ER, the draft SEIS, the MACCS2 input decks for Indian Point and associated documentation, the NYS contentions and supporting documents and references, the Boards rulings on the contentions, and other relevant filings in the adjudicatory proceeding. See id. at G-22.

required, and comparing the 1996 Site Restoration Report cost values (as applied to the urban area of New York City) to those used in Entergys SAMA analysis.75 Based upon that evaluation, the Staff and Sandia provided the following key observations and conclusions:

  • The MACCS2 dispersion model does not assume that the dispersion will consist of large-sized radionuclide particles. In the MACCS2 input files, Entergy used a dry deposition velocity value of 0.01 meters per second (m/s) for all aerosol particles. This corresponds to a 5 to 10-micron radius particle (i.e., small particle based on NYSs definition),76 based on gravitational settling of small spheres in dilute laminar flow fields.77
  • The primary constituent in weapons grade plutonium, Plutonium- 239 (Pu239), is an alpha emitter, whereas the primary contaminant from a nuclear power plant accident, Cesium-137 (Cs137), is a gamma emitter. Pu239 is more difficult and expensive to characterize and verify in the field than gamma emitters like Cs137. In addition, Pu239 is primarily an inhalation hazard with half-life of 24,000 years, whereas Cs137 is primarily an external health hazard with half-life of about 30 years. The need for evacuating the public is much greater with plutonium because, if inhaled, the health consequences can be severe.78
  • The 1996 Site Restoration Report provides cost estimates for remediation of light contamination (decontamination factor or DF = 2 to 5), moderate contamination (DF =

5 to 10), and heavy contamination (DF > 10). Appendix F of the 1996 Site Restoration Report describes the decontamination methods for light, moderate, and heavy contamination caused by plutonium. In view of the decontamination activities described in the 1996 Site Restoration Report and the differences in health hazards posed by Pu239 and Cs137, the activities required to support clean-up of moderate plutonium contamination align more closely with clean-up activities for heavy cesium contamination. Thus, Sandia performed a comparison of decontamination cost values on this basis.79

  • In the MACCS2 input files, Entergy used decontamination cost parameters that were typically higher than the MACCS2 Sample Problem A values by a factor of 1.7. As described in the ER, the values were obtained by adjusting the generic Sample Problem 75 See id. at G-23.

76 NYS defines large-sized particles as ranging in size from tens to hundreds of microns and defines small particles as ranging in size from a fraction of a micron to a few microns. Amended Contention 12C at 10; see also FSEIS App. G at G-23 (NYS00133I).

77 See FSEIS, Vol. 3, App. G at G-23.

78 See id.

79 See id. at G-24.

A economic data with the consumer price index of 195.3, which accounts for inflation between 1986 and 2005. Farm and nonfarm values for IPEC were based on site-specific data and were not extrapolated from Sample Problem A.80

  • The decontamination cost from the 1996 Site Restoration Report ($14,900 per person) is not significantly different than the value used by Entergy in the SAMA analysis ($13,824 per person). Even if the 1996 Site Restoration Report values were escalated to 2005 dollars, as were the values used in the SAMA analysis, the difference would be greater, but still would be within a factor of about 2.81
  • Considering the uncertainties inherent in such predictions, Entergys decontamination cost estimates appear reasonable, acceptable, and consistent with the estimates used in prior NRC-approved SAMA analyses for other nuclear power plants.82 IV. APPLICABLE LEGAL AND REGULATORY STANDARDS A. Burden of Proof At the hearing stage, an intervenor has the initial burden of going forward; i.e., it must provide sufficient evidence to support the claims made in the admitted contention.83 The mere admission of the contention does not satisfy that burden. Moreover, an intervenor cannot meet its burden by relying on unsupported allegations and speculation.84 Rather, it must introduce sufficient evidence during the hearing phase to establish a prima facie case. If it does so, then 80 See id. at G-23.

81 See id. at G-24.

82 Id.

83 Oyster Creek, CLI-09-7, 69 NRC at 269 (quoting Consumers Power Co. (Midland Plant, Units 1 & 2), ALAB-123, 6 AEC 331, 345 (1973)) (The ultimate burden of proof on the question of whether the permit or license should be issued is . . . upon the applicant. But where . . . one of the other parties contends that, for a specific reason . . . the permit or license should be denied, that party has the burden of going forward with evidence to buttress that contention. Once he has introduced sufficient evidence to establish a prima facie case, the burden then shifts to the applicant who, as part of his overall burden of proof, must provide a sufficient rebuttal to satisfy the Board that it should reject the contention as a basis for denial of the permit or license.); see also Vt.

Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 554 (1978) (upholding this threshold test for intervenor participation in licensing proceedings); Phila. Elec. Co. (Limerick Generating Station, Units 1 & 2), ALAB-262, 1 NRC 163, 191 (1975) (holding that the intervenors had the burden of introducing evidence to demonstrate that the basis for their contention was more than theoretical).

84 See Oyster Creek, CLI-09-07, 69 NRC 268-70; see also Phila. Elec. Co. (Limerick Generating Station, Units 1

& 2), ALAB-857, 25 NRC 7, 13 (1987) (stating that an intervenor may not merely assert a need for more current information without having raised any questions concerning the accuracy of the applicants submitted facts).

the burden shifts to the applicant to provide sufficient evidence to rebut the intervenors contention.85 While the NRC Staff, not the applicant, has the burden of complying with NEPA,86 the applicant also has the burden of proof in licensing proceedings if it becomes a proponent of the challenged portion of the Staffs FSEIS.87 Ultimately, a preponderance of the evidence must support the applicants position.88 B. Controlling NEPA Principles

1. NEPAs Rule of Reason SAMA analysis is a NEPA-derived requirement, and consequently, the consideration of mitigation alternatives is governed by NEPAs rule of reason.89 NEPA requires a reasonably complete discussion of possible mitigation measures,90 but gives federal agencies discretion as to how to meet this mandate.91 It grounds an agencys duty in evaluation of scientific opinion rather than in the framework of a conjectural worst case analysis92 that overemphasizes highly 85 See, e.g., 10 C.F.R. § 2.325; La. Power & Light Co. (Waterford Steam Electric Station, Unit 3), ALAB-732, 17 NRC 1076, 1093 (1983) (citing Midland, ALAB-123, 6 AEC at 345).

86 See, e.g., Duke Power Co. (Catawba Nuclear Station, Units 1 & 2), CLI-83-19, 17 NRC 1041, 1049 (1983).

87 La. Energy Servs., L.P. (Claiborne Enrichment Ctr.), LBP-96-25, 44 NRC 331, 338-39 (1996) (citing Pub.

Serv. Co. of N.H. (Seabrook Station, Units 1 & 2), ALAB-471, 7 NRC 477, 489 n.8 (1978), revd on other grounds, CLI-97-15, 46 NRC 294 (1997)).

88 See Pac. Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 & 2), ALAB-763, 19 NRC 571, 577 (1984).

89 Duke Energy Corp. (McGuire Nuclear Station, Units 1 & 2; Catawba Nuclear Station, Units 1 & 2), CLI 17, 56 NRC 1, 12 (2002) (citing Vt. Yankee, 435 U.S. at 551; Citizens Against Burlington v. Busey, 938 F.2d 190, 195) (D.C. Cir. 1991).

90 Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 352 (1989); see also Laguna Greenbelt, Inc. v.

U.S. Dept of Transp., 42 F.3d 517, 528 (9th Cir. 1994) (NEPA does not require a fully developed plan that will mitigate all environmental harm before an agency can act; NEPA requires only that mitigation be discussed in sufficient detail to ensure that environmental consequences have been fully evaluated.).

91 Sierra Club v. U.S. Dept of Transp., 753 F.2d 120, 128 (D.C. Cir. 1985) (citing Ethyl Corp. v. EPA, 541 F.2d 1, 12 & n. 16 (D.C. Cir.), cert. denied, 426 U.S. 941 (1976)).

92 Methow Valley at 354-55.

speculative harms.93 An EIS must only furnish such information as appears to be reasonably necessary under the circumstances for evaluation of the project.94 NEPAs rule of reason applies to NRC SAMA analyses. As the Commission explained earlier this month in the Seabrook license renewal proceeding:

Given the quantitative nature of the SAMA analysis, where the analysis rests largely on selected inputs, it may always be possible to conceive of alternative and more conservative inputs, whose use in the analysis could result in greater estimated accident consequences. But the proper question is not whether there are plausible alternative choices for use in the analysis, but whether the analysis that was done is reasonable under NEPA.95 Thus, NRC SAMA analysis is neither a worst-case nor a best-case impacts analysis.96 Rather, it involves an averaging of potential consequences. It is NRC practice to utilize the mean values of the consequence distributions for each postulated release scenario or categorythe mean estimated value for predicted total population dose and predicted offsite economic costs (as weighted by the probability of many weather sequences and plume directions).97 Thus, for example, SAMA analysis is not intended to be a worst-case estimate of the population dose or economic costs for a specific location or area (e.g., New York City). Instead, the estimated impacts are averaged both over the entire area within 50 miles of the site and over the expected variations in meteorological patterns.98 93 Id. at 356.

94 Lee v. U.S. Air Force, 354 F.3d 1229, 1245 (10th Cir. 2004) 95 Seabrook, CLI-12-05, slip op. at 28.

96 Pilgrim, CLI-10-11, slip op. at 38.

97 Id. at 38-39.

98 Pilgrim, CLI-12-01, slip op. at 19.

2. Agency Discretion in Choosing an Appropriate Methodology Under NEPAs rule of reason, an agency is permitted to select its own methodology as long as that methodology is reasonable.99 NEPA, therefore, does not dictate adherence to a particular analytic protocol100 or require agencies to use the best scientific methodology.101 Furthermore, [w]hen specialists express conflicting views, an agency must have discretion to rely on the reasonable opinions of its own qualified experts.102 Courts generally will not second-guess methodological choices made by an agency in its area of expertise.103 The Commission has applied these principles in NRC proceedings involving SAMA contentions. In the Pilgrim license renewal proceeding, the Commission recently stated:

The question is not whether there are plainly better . . . models or whether the SAMA analysis can be refined further. There is no NEPA requirement to use the best scientific methodology, and NEPA should be construed in the light of reason if it is not to demand virtually infinite study and resources. Nor is an environmental impact statement intended to be a research document, reflecting the frontiers of scientific methodology, studies and data. NEPA does not require agencies to use technologies and methodologies that are still emerging and under development, or to study phenomena for which there are not yet standard methods of measurement or analysis. And while there will always be more data that could be gathered, agencies must have some discretion to draw the line and move forward with 99 Pilgrim, CLI-10-11, 71 NRC at 316 (quoting Town of Winthrop v. FAA, 535 F.3d 1, 13 (1st Cir. 2008)).

100 Assn of Pub. Agency Customers, Inc. v. Bonneville Power Admin., 126 F.3d 1158, 1188 (9th Cir. 1997).

101 Pilgrim, CLI-10-11, 71 NRC at 315 (citing Hells Canyon Alliance v. U.S. Forest Serv., 227 F.3d 1170, 1185 (9th Cir. 2000)).

102 Pac. Gas & Elec. Co. (Diablo Canyon Power Plant Indep. Spent Fuel Storage Installation), CLI-08-26, 68 NRC 509, 518 (2008) (quoting Marsh v. Or. Natural Res. Council, 490 U.S. 360, 378 (1989)).

103 See Marsh, 490 U.S. at 376, 378 (When specialists express conflicting views, an agency must have discretion to rely on the reasonable opinions of its own qualified experts . . . .); Browning-Ferris Indus. of S. Jersey, Inc.

v. Muszynski, 899 F.2d 151, 160 (2d Cir. 1990) (Courts should be particularly reluctant to second-guess agency choices involving scientific disputes that are in the agencys province of expertise.); see also Salmon River Concerned Citizens v. Robertson, 32 F.3d 1346, 1359 (9th Cir. 1994) (citation omitted) (NEPA does not require that we decide whether an [EIS] is based on the best scientific methodology available, nor does NEPA require us to resolve disagreements among various scientists as to methodology. (alternations in original omitted); City of Carmel-By-The-Sea v. U.S. Dept of Transp., 123 F.3d 1142, 1151 (9th Cir. 1997) (stating that NEPA does not require unanimity of opinion, expert or otherwise).

decisionmaking. In short, NEPA allows agencies to select their own methodology as long as that methodology is reasonable.104 The NRC Staff meets its obligations under NEPA when, based upon the available technical information, the mitigation analysis outlines relevant factors, discloses opposing viewpoints, and indicates particular assumptions under which the Staff ultimately concludes that certain SAMAs (22 in the case of IPEC) are potentially cost-beneficial.105 According to the Commission, NEPA requires no more.106 As explained below, Entergy and the Staff have fully met their respective NEPA obligations here.

3. The Intervenors Burden Under NEPA As stated above, intervenors in NRC proceedings have the burden of going forward with sufficient evidence at hearing to support the claims made in their contention. NEPA contentions are no exception. As a leading treatise on NEPA law and litigation explains:

Because a consensus is usually lacking on the state of the art in environmental methodology, the courts have usually accepted the methodology used by an agency in analyzing environmental impacts.

They put the burden of proof on plaintiffs to prove that the methodology was unacceptable.107 Additionally, courts also will uphold an agencys methodology against a complaint that it was improperly applied when the evidence shows that there is only a disagreement among experts.108 The Commission also has applied this settled NEPA principle in the context of contentions challenging a SAMA analysis. Specifically, it has held that, where an intervenor 104 Pilgrim, CLI-10-11, 71 NRC at 315-16 (citations omitted).

105 See Duke Energy Corp., (McGuire Nuclear Station, Units 1 & 2; Catawba Nuclear Station, Units 1 & 2) CLI-03-17, 58 NRC 419, 431 (2003).

106 Id.

107 Daniel R. Mandelker, NEPA Law and Litigation § 10.45 (1984 & 2011 Supp.)

108 Id. (citing Nashvillians Against I-440 v. Lewis, 524 F. Supp. 962 (M.D. Tenn. 1981) (holding traffic count data for highway to be adequate).

challenges the SAMA analysis methodology or assumptions, it must provide adequate support109 and a reasoned evaluation of whether and to what extent the petitioners allegations credibly could or would alter the applicants SAMA analysis conclusions on which SAMAs are cost-beneficial to implement.110 The Commission has further held that a petitioner must identify some direct connection between the factual information on which it relies and the SAMA analysis cost-benefit results.111 Importantly, a petitioners own unsupported reasoning and computations are not sufficient to meet this obligation.112 V. ARGUMENT A. Entergys Witnesses Entergys testimony on NYS-12C is provided by the following witnesses:

1. Ms. Lori Ann Potts Ms. Potts is a senior consulting engineer to Entergy in the areas of SAMA analysis and fire probabilistic risk assessment in Russellville, Arkansas. As indicated in her testimony,113 Ms.

Potts has over 30 years of experience as a technical professional in the nuclear industry in the areas of safety analysis, PRA, deterministic and probabilistic accident and consequence analysis, materials aging management, reactor engineering, and systems engineering. Ms. Potts experience includes performing PRA and severe accident analysis of reactor, emergency system, and containment phenomena under accident conditions. She has participated directly in the SAMA analyses for eight nuclear plants, including the SAMA analysis for IP2 and IP3 and has peer reviewed the SAMA analyses for three additional nuclear plants. Ms. Potts is also one of 109 Pilgrim, CLI-10-11, 71 NRC at 315.

110 Pilgrim, CLI-10-22, 72 NRC at 208-09.

111 See Pilgrim, CLI-10-11, 71 NRC at 311 n.121.

112 Id at 315 (emphasis added).

113 See Entergy Test. at A2-4 (ENT000450).

the authors of the industry guidance document for performing SAMA analyses - NEI 05-01, Rev. A (NYS000287). Ms. Potts has a Bachelors of Science (B.S.) degree in Nuclear Engineering from The Pennsylvania State University.

2. Dr. Kevin R. OKula Dr. OKula is an Advisory Engineer with URS Safety Management Solutions LLC in Aiken, South Carolina. As indicated in his testimony,114 Dr. OKula has over 29 years of experience as a technical professional and manager in the areas of safety analysis methods and guidance development, computer code validation and verification, PRA, deterministic and probabilistic accident and consequence analysis applications for reactor and non-reactor nuclear facilities, source term evaluation, risk management, software quality assurance, and shielding. In addition, he has over 20 years of experience using, applying, and providing training on the MACCS and the MACCS2 computer codes, which are used to evaluate the potential impacts of severe accidents at nuclear power plants on the surrounding public. Dr. OKula obtained his B.S.

in Applied and Engineering Physics from Cornell University in 1975, and his Masters of Science (M.S.) degree and Ph.D. in Nuclear Engineering from the University of Wisconsin in 1977 and 1984, respectively. He also is a member of the State-of-the-Art Reactor Consequence Analyses (SOARCA) Project Peer Review Committee.

3. Mr. Grant A. Teagarden Mr. Teagarden is the Manager for Consequence Analysis for ERIN Engineering &

Research, Inc. in Campbell, California. As indicated in his testimony,115 Mr. Teagarden has 14 years of experience in the nuclear field, including 10 years as a manager and technical professional in the areas of PRA, source term analysis, consequence analysis, and nuclear power 114 See id. at A6-9.

115 See id. at A11-13.

plant security risk assessment. His is also a member of the American Nuclear Society (ANS) and Vice Chair of the writing committee for ANSI/ANS-58.25, Standard for Radiological Accident Offsite Consequence Analysis (Level 3 PRA) to Support Nuclear Installation Applications. Mr. Teagarden has substantial experience using MACCS2 and developing MACCS2 models for commercial nuclear power plants in the United States. He has developed or managed the development of MACCS2 models in support of SAMA analyses for ten nuclear power plant sites. Mr. Teagarden obtained his B.S. degree in Mechanical Engineering from University of Miami in 1990 and completed the Bettis Reactor Engineering School at the Bettis Atomic Power Laboratory as part of his training in the U.S. Navy nuclear program.

B. Entergys Evidence Entergys experts will testify about the basis for Entergys offsite economic cost inputs to the MACCS2 code and the underlying assumptions, and why the inputs Entergy selected are both reasonable and appropriate for a SAMA analysis and in compliance with NEPA. As summarized below, Entergys experts also will explain why NYSs criticisms of Entergys inputs and assumptions are meritless.

1. NYSs Arguments Are Fundamentally Inconsistent with the Purpose of a SAMA Analysis, As Required by NEPA and 10 C.F.R. Part 51 As a threshold matter, in arguing that Entergy has underestimated decontamination costs in its SAMA analysis, NYS overlooks the fact that SAMA analysis makes use of probabilistic analysis methods and focuses on long-term and spatially-averaged impacts from severe accidents for the purpose of making reasonable cost-benefit evaluations.116 The IPEC SAMA analysis, in particular, estimates average consequence results for the entire 50-mile radius region around the IPEC site (an area of approximately 7,854 square miles), not just the comparatively small region 116 See id. at A26.

of New York City, which comprises approximately 2% of the much broader SAMA analysis region.117 For example, NYS and its expert, Dr. Lemay, attempt to scale up certain cost estimates related to the New York City portion without including commensurate scaling down of estimates for the 98% of the SAMA analysis region that is outside of New York City.118 They also rely on studies or reports related to the economic costs resulting from the detonation of dirty bombs or nuclear weapon in a specific metropolitan area, including New York City.119 Such studies or reports do not provide valid or useful points of reference for a SAMA analysis that considers the postulated release of radionuclides over a 50-mile radius region from a nuclear power plant severe accident.120 It bears emphasis that MACCS2 is the standard tool used in the U.S. to support quantification of offsite population dose and economic cost consequences from postulated reactor accidents, as is done in a SAMA analysis.121 Among the U.S. consequence codes that are publicly available, MACCS2 is unique in its capability for modeling the primary phenomena associated with atmospheric releases of radiological material from postulated severe accidents and estimating the consequences of interest for PRA studies, including SAMA analyses.122 Other U.S. codes are available to assess dose and dose pathways, recovery options, and recovery strategies, but only MACCS2 can evaluate these consequences and potential economic impacts in the context of a PRA-based, SAMA cost-benefit analysis.123 Indeed, all NRC license renewal 117 Id.

118 See, e.g., id. at A125.

119 Id. at A26.

120 See id.

121 Id. at A39.

122 Id. at A38.

123 Id. at A26.

SAMA analyses performed to date, including several for plants located near major urban areas, have utilized the MACCS2 code.124

2. NYS Incorrectly Claims That Entergy Has Improperly Relied on Inapplicable Default Values in MACCS2 Sample Problem A NYS and Dr. Lemay incorrectly portray the IPEC MACCS2 analysis cost parameters as being arbitrarily based on the MACCS2 Sample Problem A distributed with the MACCS2 code.125 Although the cost parameters used in the IPEC analysis are consistent with Sample Problem A, these parameter inputs were utilized based on their development and use for NUREG-1150 analyses conducted by the NRC and Sandia.126 These values have a long-established and appropriate technical basis, are widely accepted within the PRA community, and continue to be used today in PRAs and SAMA analyses.127
3. NYSs and Dr. LeMays Arguments Are Incompatible With the MACCS2 Decontamination Model Another critical flaw in NYSs case is its failure to accurately portray the MACCS2 decontamination model. The primary goal of the decontamination plan as modeled in MACCS2 is to cost-effectively reduce doses to meet applicable land habitability criteria for a resident population in the region of interest to allow population resettlement.128 It is not intended to bound or account for all potential decontamination-related activities that may arise in the years following a severe accident at a nuclear power plant (e.g., decontamination of specific structures 124 See id. at A42-43.

125 See Lemay Test. at 20-21 (NYS000241).

126 See Entergy Test. at A76 (ENT000450).

127 Id.

128 Id. at A26.

such as schools after population resettlement). NYS and Dr. Lemay incorrectly suggest otherwise.129 As applied in SAMA analyses, MACCS2 models the decontamination actions that may be taken during the initial period after deposition of radioactive contamination at the end of the emergency phase following a severe accident.130 The decontamination model input data define the strategies that are possible, their effectiveness, and their cost.131 Up to three decontamination levels may be defined in MACCS2, where a given decontamination level represents a combination of decontamination activities that reduce the projected long-term doses by a factor called the dose reduction factor (DRF).132 Based on the defined habitability criteria and costs for each decontamination level, MACCS2 determines if decontamination is needed and, if so, how long to employ a given strategy to limit a projected dose to inhabitants, i.e., such that the affected area will meet a habitability criterion, generally established by federal or state agencies.133 This approach is consistent with NRC-endorsed guidance, has been applied in all NRC-approved license renewal SAMA analyses to date, and also has been applied by the NRC in its SOARCA project.134 Notably, Dr. Lemay does not distinguish between decontamination factor (DF) and DRF, which are two related but fundamentally different terms used in connection with radiological decontamination.135 Radiological remediation may involve removing deposited contaminants or, alternatively, leaving those contaminants in place but reducing the dose 129 Id.

130 Id.

131 Id.

132 Id.

133 Id.

134 Id.

135 Id. at A91.

associated with those contaminants (e.g., by burying the contaminants).136 MACCS2 applies the second definition (i.e., DRF), which focuses on reducing projected doses below the long-term dose criterion.137 Thus, when Entergy enters values in the MACCS2 CHRONC input file for the IPEC SAMA analysis for the decontamination effectiveness that is achieved for a given cost, it is entering a DRF, not a DF.138 NYS and Dr. Lemay, however, make a fundamental error by relying on sources and data that invoke the definition of DF, not DRF. Removing contaminants will be reflected in both the DF and the DRF, but remediation actions like burying contaminants or sealing a road will only be reflected in the DRF due to the associated dose reduction.139 (The DF for such remediation actions that do not physically remove the contamination remains a value of 1.0.)140 Thus, conflating the two terms can lead to invalid and misleading comparisons, as in NYSs testimony on NYS-12C.

4. NYSs Proposed Decontamination Time Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 Dr. Lemays proposed decontamination time values also are incompatible with the MACCS2 decontamination model. In MACCS2, the decontamination time variable, TIMDEC, represents the time period during which persons are temporarily interdicted (i.e., kept away from their residences) while decontamination activities are completed to reduce the dose by the 136 Id.

137 Id. In fact, in discussing the CHRONC variable DSRFCT, the MACCS2 Users Guide states that this variable:

Defines the effectiveness of the various decontamination levels in reducing the dose. A dose reduction factor of 3 means that the resulting population dose at that location will be reduced to one-third of what it would be without decontamination. See id.

138 Id.

139 Id.

140 Id.

specified dose reduction factor.141 Once the time period modeled by TIMDEC is completed, MACCS2 models the relocation of persons back to their residences if the specified habitability criteria are satisfied.142 Thus, TIMDEC establishes the minimum time that an individual is relocated due to dose constraints.143 Dr. Lemay proposes TIMDEC values so large that they are outside the accepted input range of the MACCS2 code.144 In doing so, Dr. Lemay fails to recognize that:

  • The TIMDEC values used by Entergy in the IPEC SAMA analysis have a long, established history of use, beginning with their development by Sandia under the sponsorship of the NRC.
  • TIMDEC sets the minimum time that individuals are relocated and a long TIMDEC value can defeat MACCS2 internal decontamination optimization scheme regarding resettlement of temporarily relocated persons.
  • TIMDEC is not intended to represent the time until the cessation of all decontamination activities. Continued decontamination activities following population resettlement as modeled by TIMDEC is not incongruous with other code assumptions or actual post-accident decontamination experience.
  • TIMDEC is an average decontamination time with some activities expected to be completed prior to this time and some completed subsequent to this time.145 The alternative decontamination times proposed by Dr. Lemay in the ISR Reportwhich range from 2 to 30 yearsare fundamentally inconsistent with the decontamination and interdiction modeling assumptions integral to MACCS2. Specifically, forcing a long decontamination period in the MACCS2 analysis via the variable TIMDEC, as proposed by Dr.

Lemay, distorts the dose reduction resettlement optimization strategy inherent in MACCS2.146 141 Id. at A102.

142 Id.

143 Id.

144 Id. at A97-98.

145 See id. at A159.

146 Id. at A102.

For example, if a value of 10 years is used for TIMDEC, MACCS2 will not return any impacted individuals to their residence locations until 10 years have passed.147 This is not appropriate for the modeling of a severe accident event, because many individuals will be able to return to their residences following modest decontamination activities.148 Indeed, Dr. Lemay could only accommodate his alternative, much larger TIMDEC values by altering the FORTRAN source code in MACCS2.149 As Entergys experts explain, modifying the source code of a sophisticated software package like MACCS2 to extend the range of selected inputs variables is not prudent from a quality assurance perspective, practical, reasonable, or warranted under NEPA.150

5. NYSs Proposed Nonfarm Decontamination Cost Values Lack Technical Justification and Are Not Reasonable and Appropriate for a SAMA Analysis Using MACCS2 NYS also claims that Entergys nonfarm decontamination cost (CDNFRM) values are too low and proposes substantially larger values of its own.151 But NYS and its expert err again on both counts. As an initial matter, the nonfarm decontamination cost values used by Entergy are reasonable and appropriate for a SAMA analysis. Specifically, Entergy used CDNFRM values consistent with those used in NUREG-1150 and adjusted them to 2005 (the basis year for the IPEC SAMA analysis) dollars in accordance with NRC-approved guidance.152 As Entergys experts explain, based on the pedigree of NUREG-1150 related data sources from Entergys decontamination cost values are derived, they know of no more appropriate data that are readily 147 Id.

148 Id.

149 Id. at A98.

150 Id. at A99.

151 See Lemay Test. at 30 (NYS000241).

152 Entergy Test. at A111 (ENT000450).

available to licensees to use in a SAMA analysis to satisfy the purposes of NEPA.153 Although other decontamination data sources may exist, such data sources are not readily applicable in the U.S. context and are not readily assessed or processed for inclusion in MACCS2 analyses.154 This fact is evident from the four principal data sources on which Dr. Lemay relies and the alternative CDNFRM values he proposes based on those sources. His proposed values are unreasonable and inappropriate because they are derived from cost data that are inapplicable to a nuclear power plant SAMA analysis, are based on selective and incorrect use of the data, and lack adequate technical justification. These major flaws are summarized below.

a. Site Restoration Report/Luna Paper (ISR Approach A)

NYS and Dr. Lemay rely heavily on data contained in the Sandia 1996 Site Restoration Report to develop alternative decontamination cost estimates but fail to properly or accurately account for key attributes of that study that render it inapplicable to a SAMA analysis.155 The Site Restoration Report serves to develop cost estimates for remediation of a plutonium dispersal event.156 This focus on plutonium significantly increases the decontamination/remediation costs estimated in the report, because the reports authors assume that any area requiring a DRF greater than 10 would require complete demolition of contaminated structures.157 This runs counter to actual remediation experience associated with Chernobyl, where DRFs of up to 15 were obtained without resorting to complete demolition.158 153 Id. at A72.

154 Id.

155 See ISR Report at 16-18 (NYS000242).

156 Entergy Test. at A90 (ENT000450).

157 Id.

158 Id. at A92.

Furthermore, the 1996 Site Restoration Report focused on relatively small areas for remediation and did not fully investigate attributes that would be pursued for a significantly larger-scale cleanup effort (where complete demolition of all structures is not a viable option),

such as segregating non-radiological waste from radiological waste, employing waste volume reduction techniques, and minimizing the costs for associated with on-site disposal.159 The report thus does not take into account economy of scale attributes that likely would be associated with decontamination over a broader area, as would be expected in the case of a nuclear power plant severe accident.160 The 1996 Site Restoration Report explicitly acknowledges this point:

In order to derive the cost estimates presented, we assumed that the size of the affected area could range from a few hundred square meters to a few square kilometers. Our choice of the potential size of the affected area should not be used to predict the costs of accidents. Those predictions require detailed data on the masses of material at risk, accident phenomenology, release fractions, accident location, local terrain, and meteorological conditions, which are outside the scope of this report. For average weather conditions and flat terrain, even for HE [high explosive] detonation, the size of the affected area might be only a very few square kilometers.161 In ISR Approach A, Dr. Lemay also relies on data contained in a brief technical paper by Luna et al. (Luna Paper) that purports to survey efforts to estimate the clean-up costs for radiological dispersion events associated with radiological dispersion devices (RDDs) or dirty bombs.162 Dr. Lemays reliance on this paper is misplaced in multiple respects. For example, like the 1996 Site Restoration Report, the Luna Paper concerns small-scale dispersion events 159 Id. at A133.

160 Id.

161 1996 Site Restoration Report at 7-1 to -2 (emphasis added) (NYS000249).

162 See ISR Report at 16-18 (NYS000242).

and, therefore, lacks applicability in the present context.163 In fact, as Entergys experts explain, most of the data sets surveyed by Luna implicitly incorporate the Sandia 1996 Site Restoration Report economic model.164 Consequently, references to the Luna Paper to substantiate the magnitude of the cost estimates generated using the Sandia 1996 Site Restoration Report also is a circular argument.

In addition, based on the Luna Paper, Dr. Lemay attempts to scale up projected decontamination costs associated with postulated decontamination for New York City.165 However, he fails to apply his methodology consistently and scale down the decontamination costs associated with the remaining 98% of the 50-mile radius SAMA analysis area.166 As Dr.

OKula and Mr. Teagarden explain, given that the area outside the New York City region contributes approximately 90% of the ISR-calculated value for CDNFRM, this is a major oversight in Dr. Lemays analysis that undermines its reliability.167

b. Reichmuth Paper (ISR Approach B)

Dr. Lemay also relies on data contained in a brief paper by Reichmuth as well as brief references to another paper by Reichmuth that is not publicly available or provided by NYS.168 Again, NYS and its expert fail to properly and accurately account for key aspects of the papers on which they rely in estimating decontamination costs. For example, the Reichmuth Papers estimated costs for radiological cleanup following an RDD detonation in New York City is based on costs associated with the September 11, 2001 attacks on the World Trade Center, an attack 163 Entergy Test. at A119 (ENT000450).

164 Id.

165 Id. at A120.

166 Id. at A121.

167 Id.

168 See ISR Report at 18-19 (NYS000242).

that did not involve any radiological material.169 The details of how Reichmuth estimated preliminary costs for an RDD event (with essentially no physical damage) from the attacks on the World Trade Center are not presented in the Reichmuth Paper for critical review.170 Further, the Reichmuth sources appear to use the same cost model as the 1996 Site Restoration Report and, therefore, lack applicability to the IPEC SAMA analysis for the same reasons summarized above and explained by Dr. OKula and Mr. Teagarden in their testimony.171 With regard to the second Reichmuth paper, which is briefly discussed in a Congressional Research Services (CRS) report but otherwise unavailable to the Board and parties, Dr. Lemay relies on a graphical presentation of cost estimates for a Cs137 attack on Vancouver (as apparently extracted from the second Reichmuth paper and presented in the CRS report).172 Review of the figure on which Dr. Lemay bases his cost estimate, however, confirms that 85% of the costs included in Dr. Lemays estimate are outside the scope of the MACCS2 nonfarm decontamination cost (CDNFRM) parameter; i.e., they are totally unrelated to radiological cleanup costs.173 Thus, Dr. Lemays assessment suffers from serious flaws.

c. CONDO Report (ISR Approach C)

NYS and Dr. Lemay also rely on data related to the European CONDO software tool for estimating decontamination costs in the United Kingdom.174 However, Dr. Lemays use of the CONDO dataset is not objective and unreasonably skews the analysis results in favor of higher 169 Entergy Test. at A135 (ENT000450).

170 Id.

171 See generally, id. at A118-A134.

172 Id. at A136.

173 Id.

174 See ISR Report at 19-21 (NYS000242).

estimated decontamination technique costs.175 Therefore, his CONDO-related cost estimate also is unreliable.

For example, despite the availability of 61 decontamination techniques to apply from the CONDO database, Dr. Lemay appears to weight his results predominantly on decontamination of internal walls in buildings, and relies on a single decontamination technique in all of his spreadsheet calculations.176 That is, one technique (vacuuming, cleaning and washing) is a dominant contributor for the semi-urban, urban and hyper-urban population densities areas described in the ISR Report.177 With an internal wall weighting factor developed in the ISR spreadsheets, this single decontamination technique controls the outcome of the individual spreadsheets for the Approach C analyses.178 This is not reasonable because building interiors are expected to be less contaminated than the building exteriors in the event of a nuclear power plant severe accident.179 Additionally, the CONDO datasets present data for three different population category ranges (i.e., rural, semi-urban, and urban).180 Dr. Lemay invents a fourth population category called hyper-urban. Specifically, he develops a hyper-urban category to account for a population density of greater than 10,000 persons/km2 for the New York City region, but this category is not supported by the CONDO report land use and housing indices: rural (< 25 persons/km2), semi-urban (> 25 but 1,000 persons/km2), and urban (> 1,000 persons/km2).181 175 See Entergy Test. at A143 (ENT000450).

176 Id.

177 Id.

178 Id.

179 Id.

180 Id. at A144.

181 Id.

In addition, for some cost estimates, Dr. Lemay ignores the CONDO cost category definitions and applies a higher cost category than would apply based on the population densities in the IPEC SAMA analysis region. He characterizes the New York City metropolitan area as either urban or hyper-urban by population density, and the area outside the NYC metropolitan area (but still in the 50-mile SAMA analysis region) as either semi-urban or urban.182 However, the 50-mile (80-km) SAMA analysis polar grid indicates that only one of eighty 22.5-degree sector elements (1.8% of the total SAMA grid area) meets the ISR definition of hyper-urban (10,000 persons per km2), and that 68 of the remaining grid elements (81.5% of the total SAMA grid area) would not meet the definition of an urban area.183 In short, Dr. Lemay appears to have chosen decontamination techniques without an objective, sound technical basis and outside the context of the CONDO software application, and then relied on one decontamination technique to arrive at his estimated decontamination costs.

Importantly, whether the same results would be obtained in the CONDO code itself is unknown, because Approach C relies on ISR-generated spreadsheets (not the code itself) that are presented by NYS and Dr. Lemay without adequate explanation or technical justification.

d. Risø Report (ISR Approach D)

To develop a fourth and final decontamination cost estimate, NYS and Dr. Lemay also rely on data contained in a report prepared by Denmarks Risø National Laboratory.184 As Entergys experts explain, Dr. Lemays development of this cost estimate is not technically justified or even presented in sufficient detail to permit an adequate and objective evaluation.185 While a spectrum of decontamination effectiveness levels is documented in the Risø report, ISR 182 Lemay Test. at 43-44 (NYS000241).

183 Entergy Test. at A144 (ENT000450).

184 Lemay Test. at 46-48 (NYS000241).

185 Entergy Test. at A148 (ENT000450).

infers that the report only supports light decontamination work.186 Also, labor cost information is not presented in the Risø report, and it is unclear from the limited information presented in the ISR what labor cost data Dr. Lemay is applying in his assessment.187 Finally, Dr. Lemay chooses decontamination techniques from the Risø Report that most closely correlated to those selected in the CONDO analysis, which as discussed above, suffers from significant flaws.188

6. Summary of Arguments and Evidence In summary, Entergy followed the prescriptive guidance in the NRC-approved industry guidance document NEI 05-01, Rev. A to perform its SAMA analyses for IP2 and IP3 and appropriately used MACCS2, the only NRC-recognized computer code available in the U.S. that is capable of meeting all of the offsite consequence requirements of a SAMA analysis, including those of calculating population dose and economic cost consequences. In addition, Entergys MACCS2 inputs and assumptions relating to decontamination costs and times are based on NUREG-1150 values that have been well-vetted by the nuclear industry, the national laboratories, and the NRC. Those values are both reasonable and appropriate for a SAMA analysis and comply with NEPA and related NRC requirements.

In contrast, the decontamination time and cost values proposed by NYS and its expert are neither technically justified nor reasonable and appropriate for a NEPA-based SAMA analysis.

It is noteworthy that NYSs proposed decontamination cost estimates (ISR Approaches A to D) for light decontamination (which range from $19,000 - $272,000) and heavy decontamination (which range from $90,000 - $898,000) vary by an order of magnitude in each 186 Id.

187 Id. at A149.

188 Id. at A148.

case. Such widely differing values demonstrate the importance of MACCS2 analysts using well-vetted and widely-accepted values of the type used by Entergy in the IPEC SAMA analysis.

Further, Dr. Lemay modified the MACCS2 FORTRAN source code to accept his larger, out-of-range of allowed input values for TIMDEC and CDNFRM values. Entergys experts and most nuclear safety professionals would strongly advise against this practice. Computer code use for PRA applications as well as those supporting NEPA applications necessitates consistency and quality assurance standards in the development, maintenance and use of software. User training and understanding of the allowed data ranges in the inputs to PRA and severe accident software such as the MACCS2 code is required of all users. Dr. Lemays alteration of the MACCS2 source code to accept user-preferred, out-of-range input values, and executing the modified code without seeking independent verification of proper code functionality, departs from accepted industry practices, including adherence to software quality assurance principles followed by all of the nuclear industry. And, as the Commissions recent Pilgrim ruling makes clear, it also runs counter to NEPA requirements and principles.

VI. CONCLUSION For the reasons stated above and detailed in Entergys testimony, the NRC Staff correctly concluded in its FSEIS that Entergys decontamination cost estimates are reasonable, appropriate, and consistent with estimates used in prior NRC-approved SAMA analyses. As the Commission has held, the relevant inquiry here is whether the analysis in question, including the methodology used, is reasonable under NEPA.189 It is not whether there are plausible alternative choices for use in the analysis.190 189 Seabrook, CLI-12-05, slip op. at 46-47.

190 Id. at 28.

NYS has not met its burden to prove that the SAMA analysis methodology and assumptions used by Entergy and approved by the NRC Staff are unreasonable under NEPA. In fact, NYS has failed even to provide plausible alternative choices. By relying on information that has no demonstrated applicability to a nuclear power plant SAMA analysis, NYS has not established the requisite direct connection between the factual information on which it relies and the IPEC SAMA analysis cost-benefit results.191 Further, as Entergys testimony demonstrates, NYS and its expert rely on unsupported reasoning and computations that yield widely-varying and dubious results.192 Accordingly, under controlling NEPA principles applied by the Commission in proceedings involving similar SAMA contentions, NYS-12C should be dismissed for lack of merit.

191 See Pilgrim, CLI-10-11, 71 NRC at 311 n.121.

192 Id. at 315 (emphasis added).

Respectfully submitted, Signed (electronically) by Martin J. ONeill William B. Glew, Jr., Esq. Kathryn M. Sutton, Esq.

William C. Dennis, Esq. Paul M. Bessette, Esq.

ENTERGY NUCLEAR OPERATIONS, INC. MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue 1111 Pennsylvania Avenue, NW White Plains, NY 10601 Washington, DC 20004 Phone: (914) 272-3202 Phone: (202) 739-3000 Fax: (914) 272-3205 Fax: (202) 739-3001 E-mail: wglew@entergy.com E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com E-mail: pbessette@morganlewis.com Martin J. ONeill, Esq.

MORGAN, LEWIS & BOCKIUS LLP 1000 Louisiana Street Suite 4000 Houston, TX 77002 Phone: (713) 890-5710 Fax: (713) 890-5001 E-mail: martin.oneill@morganlewis.com Counsel for Entergy Nuclear Operations, Inc.

Dated in Washington, D.C.

this 30th day of March 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

) Docket Nos. 50-247-LR and In the Matter of ) 50-286-LR

)

ENTERGY NUCLEAR OPERATIONS, INC. ) ASLBP No. 07-858-03-LR-BD01

)

(Indian Point Nuclear Generating Units 2 and 3) )

) March 30, 2012 CERTIFICATE OF SERVICE I certify that, on March 30, 2012, a copy of Entergys Statement of Position Regarding Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives Analysis),

Testimony of Applicant Witnesses Lori Potts, Kevin OKula, and Grant Teagarden Concerning Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives Analysis), and supporting exhibits was served electronically with the Electronic Information Exchange on the following recipients:

Administrative Judge Administrative Judge Lawrence G. McDade, Chair Dr. Kaye D. Lathrop Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 190 Cedar Lane E.

U.S. Nuclear Regulatory Commission Ridgway, CO 81432 Washington, DC 20555-0001 (E-mail: Kaye.Lathrop@nrc.gov)

(E-mail: Lawrence.McDade@nrc.gov)

Administrative Judge Office of the Secretary Dr. Richard E. Wardwell Attn: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, D.C. 20555-0001 U.S. Nuclear Regulatory Commission (E-mail: hearingdocket@nrc.gov)

Washington, DC 20555-0001 (E-mail: Richard.Wardwell@nrc.gov)

Office of Commission Appellate Adjudication Josh Kirstein, Law Clerk U.S. Nuclear Regulatory Commission Katherine Tucker, Law Clerk Mail Stop: O-7H4M Atomic Safety and Licensing Board Panel Washington, DC 20555-0001 Mail Stop: T-3 F23 (E-mail: ocaamail.resource@nrc.gov) U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: Josh.Kirstein@nrc.gov)

(E-mail: Katie.Tucker@nrc.gov)

Sherwin E. Turk, Esq. Melissa-Jean Rotini, Esq.

Beth N. Mizuno, Esq. Assistant County Attorney David E. Roth, Esq. Office of Robert F. Meehan, Esq.

Brian G. Harris, Esq. Westchester County Attorney Andrea Z. Jones, Esq. 148 Martine Avenue, 6th Floor Office of the General Counsel White Plains, NY 10601 Mail Stop: O-15D21 (E-mail: MJR1@westchestergov.com)

U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: Sherwin.Turk@nrc.gov)

(E-mail: Beth.Mizuno@nrc.gov)

(E-mail: david.roth@nrc.gov)

(E-mail: brian.harris@nrc.gov)

(E-mail: andrea.jones@nrc.gov)

Manna Jo Greene Thomas F. Wood, Esq.

Stephen C. Filler Daniel Riesel, Esq.

Karla Raimundi Victoria Shiah, Esq.

Hudson River Sloop Clearwater, Inc. Sive, Paget & Riesel, P.C.

724 Wolcott Ave. 460 Park Avenue Beacon, NY 12508 New York, NY 10022 (E-mail: mannajo@clearwater.org) (E-mail: driesel@sprlaw.com)

(E-mail: karla@clearwater.org) (E-mail: vshiah@sprlaw.com)

(E-mail: stephenfiller@gmail.com)

Joan Leary Matthews, Esq. John Louis Parker, Esq.

Associate Commissioner Office of General Counsel, Region 3 Hearings and Mediation Services NYS Dept. of Environmental Conservation New York State Department of 21 S. Putt Corners Road Environmental Conservation New Paltz, New York 12561-1620 625 Broadway, 14th Floor (E-mail: jlparker@gw.dec.state.ny.us)

Albany, NY 12233-1500 (E-mail: jlmatthe@gw.dec.state.ny.us)

John J. Sipos, Esq. Michael J. Delaney, Esq.

Charlie Donaldson Esq. Vice President - Energy Department Assistant Attorneys General New York City Economic Development Office of the Attorney General Corporation (NYCDEC) of the State of New York 110 William Street New York, NY 10038 The Capitol mdelaney@nycedc.com Albany, NY 12224-0341 (E-mail: John.Sipos@ag.ny.gov)

Phillip Musegaas, Esq. Daniel E. ONeill, Mayor Deborah Brancato, Esq. James Siermarco, M.S.

Riverkeeper, Inc. Village of Buchanan 20 Secor Road Municipal Building Ossining, NY 10562 236 Tate Avenue (E-mail: phillip@riverkeeper.org) Buchanan, NY 10511-1298 (E-mail: dbrancato@riverkeeper.org) (E-mail: vob@bestweb.net)

(E-mail: smurray@villageofbuchanan.com)

Robert D. Snook, Esq. Janice A. Dean, Esq.

Assistant Attorney General Assistant Attorney General Office of the Attorney General Office of the Attorney General State of Connecticut of the State of New York 55 Elm Street 120 Broadway, 26th Floor P.O. Box 120 New York, New York 10271 Hartford, CT 06141-0120 (E-mail: Janice.Dean@ag.ny.gov)

(E-mail: Robert.Snook@po.state.ct.us)

Signed (electronically) by Martin J. ONeill Martin J. ONeill, Esq.

MORGAN, LEWIS & BOCKIUS LLP 1000 Louisiana Street Suite 4000 Houston, TX 77002 Phone: (713) 890-5710 E-mail: martin.oneill@morganlewis.com Counsel for Entergy Nuclear Operations, Inc.

DB1/ 68919789.2