ML15309A129
ML15309A129 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 11/05/2015 |
From: | Entergy Nuclear Operations |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
RAS 28471, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR | |
Download: ML15309A129 (31) | |
Text
ENT000726 Submitted: November 5, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Entergy (ENT) TRACK 2 Hearing Exhibits Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENTR16001 All Entergy Hearing Exhibit List (ENT Exhibit List) 10/29/2015
[Revised]
ENT00015A-B All Indian Point Energy Center License Renewal Application (April 2007) 3/28/2012 X
NYS-26B/RK- Curriculum Vitae of Alan B. Cox 8/10/2015 TC-1B, NYS-38/RK-TC-5, ENTR00031 NYS-25 [Revised]
NYS-26B/RK- Curriculum Vitae of Nelson F. Azevedo 3/28/2012 TC-1B, NYS-ENT000032 38/RK-TC-5, X NYS-25 NYS-38/RK- NRC, Audit Report for Plant Aging Management Programs and Reviews 3/28/2012 ENT000041 (Jan. 13, 2009)
TC-5 X
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-26B/RK- Declaration of Dr. Joram Hopenfeld in Support of New England 3/28/2012 ENT000089 Coalitions Motion for Reconsideration (Dec. 15, 2008)
TC-1B X NYS-25 NEI 95-10, Industry Guideline for Implementing the Requirements of 10 3/28/2012 ENT000098 CFR Part 54 - The License Renewal Rule, Rev. 6 (June 2005) X NYS-26B/RK- Entergy Statement of Position Regarding Contention NYS-26/RK-TC-1B 3/29/2012 ENT000182 (Metal Fatigue)
TC-1B X NYS-26B/RK- Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. 3/29/2012 ENT000183 TC-1B Strosnider, Robert E. Nickell, and Mark A. Gray Regarding Contention X NYS-26/RK-TC-1B (Metal Fatigue)
NYS-26B/RK- Curriculum Vitae of Jack R. Strosnider 8/10/2015 TC-1B, NYS-ENTR00184 38/RK-TC-5, [Revised]
NYS-25 NYS-26B/RK- Curriculum Vitae of Robert E. Nickell 8/20/2012 ENTR00185 TC-1B, NYS-
[Revised]
38/RK-TC-5 NYS-26B/RK- Curriculum Vitae of Mark A. Gray 8/10/2015 TC-1B, NYS-ENTR00186 38/RK-TC-5, [Revised]
NYS-25 NYS-26B/RK- ASTM Vol. 03.01, Metals - Mechanical Testing; Elevated and Low 3/29/2012 ENT000187 TC-1B Temperature Tests; Metallography (2005) (excerpted) X 2
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-26B/RK- ASME, Criteria of the ASME Boiler and Pressure Vessel Code for Design 3/29/2012 ENT000188 TC-1B by Analysis in Sections III and VIII, Division 2 (1969) X NYS-26B/RK- SAND94-0187, Evaluation of Conservatisms and Environmental Effects in 3/29/2012 ENT000189 TC-1B ASME Code,Section III, Class 1 Fatigue Analysis (Aug. 1994) X NYS-26B/RK- Memorandum from Ashok C. Thadani to William D. Travers, Closeout of 3/29/2012 ENT000190 TC-1B, NYS- Generic Safety Issue 190, Fatigue Evaluation of Metal Components for 60-X 38/RK-TC-5 year Plant Life (Dec. 26, 1999)
NYS-26B/RK- K. R. Rao, Companion Guide to the ASME Boiler & Pressure Vessel Code 3/29/2012 ENT000191 TC-1B (3rd ed. 2009) (excerpted) X NYS-26B/RK- NRC Regulatory Issue Summary 2011-05, Information on Revision 2 to 3/29/2012 TC-1B, NYS- the Generic Aging Lessons Learned Report for License Renewal of ENT000192 38/RK-TC-5, Nuclear Power Plants (July 1, 2011) X NYS-25 NYS-26B/RK- NL-08-092, Letter from Fred R. Dacimo, Entergy, to NRC, Amendment 5 3/29/2012 ENT000193 TC-1B, NYS- to License Renewal Application (June 11, 2008)
X 25 NYS-26B/RK- NL-08-084, Letter from Fred R. Dacimo, Entergy, to NRC, Reply to 3/29/2012 ENT000194 TC-1B Request for Additional Information Regarding License Renewal X
Application - Time-Limited Aging Analyses and Boraflex (May 16, 2008)
NYS-26B/RK- NUREG-2101, Safety Evaluation Report Related to the License Renewal 8/10/2015 ENTR00195 TC-1B of Salem Nuclear Generating Station § 4.3 (Jun. 2011) (exceprt) [Revised]
3
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-26B/RK- Westinghouse Level 2 Policy/Procedure NSNP 3.2.6, Design Analysis 3/29/2012 ENT000196 TC-1B, NYS- (Mar. 2011) [PROPRIETARY]
X 38/RK-TC-5 NYS-26B/RK- Letter from P. Davison, PSEG Nuclear, LLC, to NRC, Close-out of the 3/29/2012 TC-1B, NYS- NRC Audit Associated with Use of WESTEMS' Related to the Salem ENT000197 38/RK-TC-5 Nuclear Generating Station, Units 1 and 2 License Renewal Application X (Feb. 24, 2011)
NYS-26B/RK- Letter from Paul Bessette, Entergy, to Janice Dean, NYS, Twenty-Second 3/29/2012 TC-1B Update to Disclosures Pursuant to 10 C.F.R. § 2.336; Entergy Nuclear ENT000198 Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket X Nos. 50-247- LR and 50-286-LR (Dec. 1, 2010)
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-100, Rev. 0, Indian 3/29/2012 ENT000199 TC-1B Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations, X (Jun. 10, 2010) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-63, Rev. 0, Indian 3/29/2012 ENT000200 TC-1B Point Unit 2 Pressurizer Insurge/Outsurge Transient Development (June X 18, 2010) ) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-109, Rev. 0, Indian 3/29/2012 ENT000201 TC-1B Point Units 2 and 3 Transfer Function Database Development for Hot Leg X Surge Nozzle (June 18, 2010) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-78, Rev. 0, Indian 3/29/2012 ENT000202 TC-1B Point Unit 2 and Unit 3: Transfer Function Database Development for Hot X Leg Charging Nozzle (June 18, 2010) [PROPRIETARY]
4
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-116, Rev. 0, Indian 3/29/2012 ENT000203 TC-1B Point Unit 2 BIT Nozzle Transfer Function Database Development (June X 18, 2010) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-08-103, Rev. 0, Indian 3/29/2012 ENT000204 TC-1B Point Units 2 and 3 Transfer Function Database Development for X Accumulator Nozzles (June 17, 2010) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-105, Rev. 0, Indian 3/29/2012 ENT000205 TC-1B Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations X (June 22, 2010) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-74, Rev. 0, Indian 3/29/2012 ENT000206 TC-1B Point Unit 3 Boron Injection Tank Nozzle Environmental Fatigue X Evaluations (Jun. 14, 2010) [PROPRIETARY]
NYS-26B/RK- Westinghouse Calculation Note Number CN-PAFM-09-13, Rev. 0, Indian 3/29/2012 ENT000207 TC-1B Point Unit 3 BIT Nozzle Transfer Function Database Development (June X 18, 2010) [PROPRIETARY]
NYS-26B/RK- F. Kreith, Principles of Heat Transfer (3rd ed. 1973) (excerpted) 3/29/2012 ENT000208 TC-1B X NYS-26B/RK- J. P. Holman, Heat Transfer (4th ed. 1976) (excerpted) 3/29/2012 ENT000209 TC-1B X NYS-26B/RK- Westinghouse, Systems Standard Design Criteria 1.3.F, Rev. 0, Reactor 3/29/2012 ENT000210 TC-1B Coolant System Design Transients for Standard Plants with Model F Steam X Generators (July 1978) [PROPRIETARY]
NYS-26B/RK- Westinghouse Memorandum LTR-SSO-03-43, Rev. 1, from NS Systems & 3/29/2012 ENT000211 TC-1B Safety Analysis, Design Transient Revisions for Indian Point 2 4.7% X Uprate - Revised Figures (Apr. 25, 2003) [PROPRIETARY]
5
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-26B/RK- Westinghouse Memorandum LTR-SCS-03-53, Rev. 0, from NS Systems & 3/29/2012 ENT000212 TC-1B Safety Analysis, Design Transient Revisions for Indian Point 3 Stretch Power Uprate Project - Revised Figures (Aug. 21, 2003) X
[PROPRIETARY]
NYS-26B/RK- Westinghouse, Systems Standard Design Criteria 1.3.X, Rev. 0, Nuclear 3/29/2012 ENT000213 TC-1B Steam Supply System Auxiliary Equipment Design Transients for All X Standard Plants (Sept. 1978) [PROPRIETARY]
NYS-26B/RK- EPRI, Materials Reliability Program: Evaluation of Fatigue Data Including 3/29/2012 ENT000214 Reactor Water Environmental Effects (Dec. 2001)
TC-1B X NYS-26B/RK- W. E. Cooper, The Initial Scope and Intent of the Section III Fatigue 3/29/2012 ENT000215 TC-1B Design Procedures, in Pressure Vessel Research Council, Technical Information from Workshop on Cyclic Events in Nuclear Applications, X Clearwater Beach, Florida, Vol. 1, (Jan. 20, 1992)
NYS-26B/RK- NUREG-1929, Safety Evaluation Report Related to the License Renewal 3/29/2012 ENT000216 of Beaver Valley Power Station, Units 1 and 2 (Oct. 2009) (excerpted)
TC-1B X NYS-26B/RK- Westinghouse, WCAP-9693, Investigation of Feedwater Line Cracking in 3/29/2012 ENT000217 TC-1B Pressurized Water Reactor Plants (June 1980) [PROPRIETARY] X (excerpted)
NYS-26B/RK- Westinghouse Owners Group, WCAP-12639, Pressurizer Surge Line 3/29/2012 ENT000218 TC-1B Thermal Stratification Generic Detailed Analysis Program MUHP-1091 X Summary Report (June 1990) [PROPRIETARY]
NYS-26B/RK- Westinghouse, WCAP-12937, Structural Evaluation of Indian Point Units 3/29/2012 ENT000219 TC-1B 2 and 3 Pressurizer Surge Lines, Considering the Effects of Thermal X Stratification (May 1991) [PROPRIETARY]
6
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-26B/RK- J. D. Burr et al., PVP2011-57700, Simulation and Evaluation of Thermal 3/29/2012 ENT000220 TC-1B Stratification in a Sloped Surge Nozzle Correlated with Plant X Measurements (July 2011)
NYS-26B/RK- M. E. Nitzel et al., Comparison of ASME Code NB-3200 and NB-3600: 3/29/2012 ENT000221 Results for Fatigue Analysis of B31.1 Branch Nozzles (Apr. 1996)
TC-1B X NYS-26B/RK- Letter from Ekaterina Lenning, NRC, to James A Gresham, Westinghouse, 3/29/2012 ENT000222 TC-1B Westinghouse Electric Company Quality Management System, Revision X 6 (Feb. 24, 2011)
NYS-26B/RK- NUREG-1916, Safety Evaluation Report Related to the License Renewal 3/29/2012 ENT000223 TC-1B of Shearon Harris Nuclear Power Plant, Unit 1, Vol. 2 (Nov. 2008) X (excerpted)
NYS-26B/RK- SECY-95-245, Completion of the Fatigue Action Plan (Sept. 25, 1995) 3/29/2012 ENT000224 TC-1B X NYS-26B/RK- NUREG/CR-6815, Review of the Margins for ASME Code Fatigue Design 3/29/2012 ENT000225 TC-1B Curve - Effects of Surface Roughness and Material Variability (Sept. X 2003)
NYS-26B/RK- Entergy, 0-CY-2310, Rev. 16, Reactor Coolant System Specification and 3/29/2012 ENT000226 Frequencies (Oct. 2011)
TC-1B X NYS-26B/RK- Westinghouse, WCAP-13588, Operating Strategies for Mitigating 3/29/2012 ENT000227 TC-1B Pressurizer Insurge and Outsurge Transients (Mar. 1993) X
[PROPRIETARY] (excerpted)
NYS-26B/RK- Calculation Note RCDA-03-75, Indian Point Unit 3 Stretch Power Uprate 3/29/2012 ENT000228 Reactor Vessel Structural Evaluation (May 2005) [PROPRIETARY]
TC-1B X 7
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-26B/RK- Calculation Note RCDA-03-64, Indian Point Unit 2 Stretch Power Uprate 3/29/2012 ENT000229 Reactor Vessel Evaluation (Feb. 2005) [PROPRIETARY]
TC-1B X NYS-26B/RK- Letter from R. Nelson, NRC, to N. Wilmshurst, EPRI, Revision 1 to the 3/29/2012 TC-1B, NYS- Safety Evaluation of Electric Power Research Institute (EPRI) Report, ENT000230 Materials Reliability Prog[ra]m (MRP) Report 1016596 (MRP-227),
38/RK-TC-5, X Revision 0, Pressurized Water Reactor (PWR) Internals Inspection and NYS-25 Evaluation Guidelines (Dec. 16, 2011)
NYS-26B/RK- NL-08-143, Letter from F. Dacimo, Entergy, to NRC, Additional 3/29/2012 ENT000231 TC-1B, NYS- Information (Regarding License Renewal Application - Reactor Vessel Fluence Clarification (Sept. 24, 2008) X 25 NYS-38/RK- NRC Inspection Manual Chapter 71003, Post-Approval Site Inspection for 3/29/2012 ENT000251 License Renewal (Oct. 31, 2008)
TC-5 X NYS-38/RK- NRC Inspection Manual, Temporary Instruction 2516/001 (Mar. 30, 2011) 3/29/2012 ENT000252 TC-5 X NYS-26B/RK- Entergy Nuclear Vt. Yankee (Vt. Yankee Nuclear Power Station), Docket 3/29/2012 ENT000369 TC-1B No. 50-271-LR, Hearing Transcript (Jul. 21, 2008) (excerpted) X NYS-38/RK- Entergy Statement of Position Regarding Contention NYS-38/RK-TC-5 8/20/2012 ENT000520 TC-5 (Safety Commitments) X NYS-38/RK- Direct Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. 8/20/2012 ENT000521 TC-5 Dolansky, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell, and Mark A. X Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments)
NYS-38/RK- Curriculum Vitae of Robert J. Dolansky 8/20/2012 ENT000522 X TC-5, NYS-25 8
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-38/RK- EPRI, Report No. 1020988, Steam Generator Management Program: 8/20/2012 ENT000523 TC-5 Phase II Divider Plate Cracking Engineering Study (Nov. 2010) X
[PROPRIETARY]
NYS-38/RK- EPRI, Report 1025133, Steam Generator Management Program: 8/20/2012 ENT000524 TC-5 Assessment of Channel Head Susceptibility to Primary Water Stress X Corrosion Cracking (June 2012) [PROPRIETARY]
NYS-38/RK- NRC Inspection Manual Chapter 2516 (Feb. 18, 2005) 8/20/2012 ENT000525 X TC-5 NYS-38/RK- F. DAnnucci and E. Lecour, ICONE18-29457, Inspection of the Steam 8/20/2012 ENT000526 TC-5 Generator Divider Plate (May 2010) X NYS-38/RK- NRC Information Notice 2005-09, Indications in Thermally Treated Alloy 8/20/2012 ENT000527 TC-5 600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005) X NYS-38/RK- NUREG-1950, Disposition of Public Comments and Technical Bases for 8/20/2012 ENT000528 TC-5 Changes in the License Renewal Guidance Documents NUREG-1801 and X NUREG-1800 (Apr. 2011) (excerpted)
NYS-38/RK- Westinghouse Technical Manual No. TMMC 1440-C350, Vertical Steam 8/10/2015 ENTR00529 TC-5 Generator Instruction for New York Power Authority - Indian Point [Revised]
Nuclear Plant No. 3 (Dec. 1989) [PROPRIETARY] (excerpted)
NYS-38/RK- EPRI, Report 1014982, Divider Plate Cracking in Steam Generators - 8/20/2012 TC-5 Results of Phase 1: Analysis of Primary Water Stress Corrosion Cracking ENT000530 and Mechanical Fatigue in the Alloy 600 Stub Runner to Divider Plate X Weld Material (June 2007) [PROPRIETARY]
NYS-38/RK- ASME Code, Sec. XI, Art. IWA-2000 (2001) 8/20/2012 ENT000531 X TC-5 NYS-38/RK- ASME Code, Sec. V, Art. 14 (2001) 8/20/2012 ENT000532 X TC-5 9
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-38/RK- Memorandum from C. Hunt, NRC to G. Kulesa, NRC, Summary of the 8/20/2012 TC-5 February 16, 2012, Category 2 Public Meeting with the Electric Power ENT000533 Research Institute (EPRI) and Industry to Discuss Steam Generator Issues X (Mar. 15, 2012)
NYS-38/RK- NEI 99-04, Guidelines for Managing NRC Commitment Changes (July 8/20/2012 ENT000534 TC-5 1999) X NYS-38/RK- NRR Office Instruction, LIC-105, Rev. 3, Managing Regulatory 8/20/2012 ENT000535 TC-5 Commitments Made by Licensees to the NRC (Mar. 2009) X NYS-38/RK- NUREG-2101, Safety Evaluation Report Related to the License Renewal 8/20/2012 ENT000536 TC-5 of Salem Nuclear Generating Station (June 2011) (excerpted) X NYS-38/RK- NUREG-1961, Safety Evaluation Report Related to the License Renewal 8/20/2012 ENT000537 TC-5 of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Apr. 2011) X (excerpted)
NYS-38/RK- SECY 2000-45, Acceptance of NEI 99-04, Guidelines for Managing NRC 8/20/2012 ENT000538 TC-5 Commitments (Feb. 22, 2000) X NYS-38/RK- NRC Enforcement Manual, Rev. 7 (Oct. 1, 2010) (excerpted) 8/20/2012 ENT000539 X TC-5 NYS-38/RK- Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station) Docket 8/20/2012 ENT000540 TC-5 No. 50-293, Renewed Facility Operating License (May 9, 2012) X (excerpted)
NYS-38/RK- EN-LI-110, Commitment Management Program (Jan. 2012) 8/20/2012 ENT000541 X TC-5 NYS-38/RK- NRC Regulatory Issue Summary 2000-17, Managing Regulatory 8/20/2012 ENT000542 TC-5 Commitments Made by Power Reactor Licensees to the NRC Staff (Sept. X 21, 2000) 10
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-38/RK- Inspection Procedure 71002, License Renewal Inspection (Nov. 2011) 8/20/2012 ENT000543 X TC-5 NYS-38/RK- Letter from A. Macfarlane, Chairman, NRC, to E. Markey, U.S. 8/20/2012 ENT000544 TC-5 Congressman, Regulatory Commitments (July 12, 2012) X NYS-38/RK- Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits, 8/20/2012 TC-5 NRC, to R. W. Borchardt, Exec. Dir. for Operations, NRC, Status of ENT000545 Recommendations: Audit of NRCs Management of Licensee X Commitments (OIG-11-A-17) (Apr. 16, 2012)
NYS-38/RK- NUREG-1958, Safety Evaluation Report Related to the License Renewal 8/20/2012 ENT000546 TC-5 of Kewaunee Power Station (Jan. 2011) (excerpted) X NYS-38/RK- EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel 8/20/2012 ENT000547 TC-5 Pool Instrumentation (Effective Immediately) (Mar. 12, 2012) X NYS-38/RK- Letter from R. Braun, Senior Vice President, PSEG Nuclear LLC, to NRC 8/20/2012 TC-5 Document Control Desk, PSEG Nuclear LLCs Response to March 12, ENT000548 2012 Commission Order Modifying License with Regard to Reliable Spent X Fuel Pool Instrumentation (Mar. 29, 2012)
NYS-38/RK- Letter from R. Conte, NRC, to J. Ventosa, Entergy, Indian Point Nuclear 8/20/2012 ENT000549 TC-5 Generating Unit 2 - NRC Inspection Report 05000247/2012008 (Apr. 19, X 2012)
NYS-38/RK- Letter from A. Cunanan, NRC Project Manager, to S.K. Gambhir, Vice 8/20/2012 TC-5, NYS- President, Energy Northwest, Request for Additional Information for the ENT000550 26B/RK-TC- Review of the Columbia Generating Station License Renewal Application X 1B for Metal Fatigue (Feb. 3, 2011)
NYS-38/RK- Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, 8/20/2012 ENT000551 TC-5 Request for Additional Information for the Review of the Davis-Besse X Nuclear Power Station - Batch 3 (May 2, 2011) (excerpted) 11
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-38/RK- Letter from P. Bessette, Morgan Lewis, to Administrative Judges (May 15, 8/20/2012 ENT000552 TC-5 2012) X NYS-38/RK- Entergy, Condition Report LO-LAR-2011-00174, Corrective Actions 8/20/2012 ENT000553 TC-5 (Aug. 2011) (excerpted) X NYS-38/RK- NL-12-089, Letter from F. Dacimo, Entergy, to NRC, Reply to Request 8/20/2012 TC-5, NYS- for Additional Information Regarding the License Renewal Application ENT000554 X 26B/RK-TC- Indian Point Nuclear Generating Unit Nos. 2 & 3 (June 14, 2011) 1B NYS-38/RK- B. Gordon, Minimum Chromium Content In Nickel-Alloy Weld Overlays 8/20/2012 ENT000555 TC-5 to Mitigate PWSCC (Jan. 18, 2005) X NYS-38/RK- F. Delabrouille et al., Effect of the Chromium Content and Strain on the 8/20/2012 ENT000556 TC-5 Corrosion of Nickel Based Alloys in Primary Water of Pressurized Water X Reactors (2005)
NYS-38/RK- EPRI, Report 1014986, Pressurized Water Reactor Primary Water 8/20/2012 ENT000557 TC-5 Chemistry Guidelines, Rev. 6 (Dec. 2007) [PROPRIETARY] (excerpted) X NYS-38/RK- Letter from J. Daily, Project Manager, NRC, to D. Heacock, President, 8/20/2012 TC-5 Dominion Energy Kewaunee, Request for Additional Information for the ENT000558 Review of the Kewaunee Power Station License Renewal Application X (Mar. 11, 2010)
NYS-38/RK- Letter from B. Brady, Project Manager, NRC, to T. Joyce, President, PSEG 8/20/2012 TC-5 Nuclear, Request for Additional Information for Salem Nuclear ENT000559 Generating Stations Units 1 and 2 License Renewal Application (June 10, X 2010)
NYS-38/RK- Letter from R. Plasse, Project Manager, NRC, to P. Freeman, Site Vice 8/20/2012 TC-5 President, NextEra Energy Seabrook, Request for Additional Information ENT000560 Related to the Review of the Seabrook Station, License Renewal X Application (Dec. 14, 2010) 12
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-38/RK- Kewaunee Tr., Advisory Comm. on Reactor Safeguards, Plant License 8/20/2012 ENT000561 TC-5 Renewal Subcomm. (Aug. 18, 2010) (excerpted) X NYS-38/RK- Letter from J. Daily, NRC, to D. Heacock, President, Dominion Energy 8/20/2012 TC-5 Kewaunee, Inc., Request for Additional Information for the Review of the ENT000562 Kewaunee Power Station License Renewal Application (TAC No. X MD9408) (Sept. 10, 2010)
NYS-38/RK- Letter from Said Abdel-Khalik, ACRS Chairman, to Jaczko, NRC 8/20/2012 ENT000563 TC-5 Chairman, Report on the Safety Aspects of the License Renewal X Application for the Kewaunee Power Station (Jan. 7, 2011)
NYS-38/RK- Final License Renewal Interim Staff Guidance, LR-ISG-2011-05, 8/20/2012 ENT000564 TC-5 Ongoing Review of Operating Experience (Mar. 9, 2012) X NYS-38/RK- Letter from L. Hartz, Vice President, Dominion Energy Kewaunee., to, 8/20/2012 TC-5 NRC, Response to Request for Additional Information for the Review of ENT000565 the Kewaunee Power Station License Renewal Application (Sept. 23, X 2010)
NYS-38/RK- Letter from P. Freeman, Site Vice President, NextEra Energy Seabrook, to 8/20/2012 ENT000566 TC-5 NRC, Response to Request for additional Information - Set 10 (Mar. 22, X 2011)
NYS-38/RK- NL-00-043, Letter from J. Baumstark, Consol. Edison Co. of N.Y., to 8/20/2012 ENT000567 TC-5 NRC, Root Cause Evaluation For Steam Generator Tube Rupture Event of X February 15, 2000 (Apr. 14, 2000)
NYS-38/RK- EPRI, Report 1019044, Steam Generator Management Program: 8/20/2012 ENT000568 TC-5 Improvement Factors for Pressurized Water Reactor Steam Generator Tube X Materials (Dec. 2009) [PROPRIETARY] (excerpted)
NYS-38/RK- Letter from E. Shields, Westinghouse, to W. Wittich, Entergy, Steam 8/20/2012 ENT000569 TC-5 Generator Operational Assessment (June 29, 2010) [PROPRIETARY] X 13
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
NYS-38/RK- WCAP-17091-NP, Rev. 0, H*, Alternate Repair Criteria for the Tubesheet 8/20/2012 ENT000570 TC-5 Expansion Region in Steam Generators with Hydraulically Expanded X Tubes (Model 44F) (June 2009) (excerpted)
NYS-38/RK- Safety Evaluation Related to Amendment No. 308 for Oconee Nuclear 8/20/2012 ENT000571 TC-5 Station Units 1, 2 and 3 (Dec. 3, 1999) X NYS-38/RK- Letter from A. Cunanan, NRC, to M. Reddemann, Energy Northwest, 8/20/2012 ENT000572 TC-5 Issuance of Renewed Facility Operating License No. NPF-21 for X Columbia Generating Station (May 22, 2012) (ENT000540) (excerpted)
NYS-25, EN-LI-100, Rev. 12, Process Applicability Determination (Nov. 6, 2012) 1/11/2013 NYS-26B/RK-ENT000602 TC-1B, NYS- X 38/RK-TC-5 NYS-25, EN-LI-101, Rev. 9, 10 CFR 50.59 Evaluations (Feb. 16, 2012) 1/11/2013 NYS-26B/RK-ENT000603 TC-1B, NYS- X 38/RK-TC-5 NYS-25, Indian Point Nuclear Generating Units 2 and 3, NRC Evaluation of 1/11/2013 NYS-26B/RK- Changes, Tests or Experiments and Permanent Plant Modifications Team ENT000604 TC-1B, NYS- Inspection Report (Jan. 13, 2012) X 38/RK-TC-5 ENT000615 NYS-25 Entergy's Statement of Position Regarding Contention NYS-25 8/10/2015 (Embrittlement) (Aug. 10, 2015) 14
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000616 NYS-25, Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, 8/10/2015 NYS-26B/RK- Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and TC-1B, NYS- Mark A. Gray Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 38/RK-TC-5 2015)
ENT000617 NYS-25, Curriculum Vitae of Timothy J. Griesbach 8/10/2015 NYS-38/RK-TC-5 ENT000618 NYS-25, Curriculum Vitae of Randy G. Lott 8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000619 NYS-25 NL-08-127, Letter from F. Dacimo, Entergy, to NRC Document Control 8/10/2015 Desk, Additional Information Regarding License Renewal Application -
Structural OE Clarifications, Clarifications for Electrical RAIs and Audit Questions, License Renewal Application Amendment (Aug. 14, 2008)
ENT000620 NYS-25, PWROG Presentation, Material Orientation Toughness Assessment 8/10/2015 NYS-38/RK- (MOTA) for the Purpose of Mitigating Branch Technical Position (BTP) 5-TC-5 3 Uncertainties (Feb. 19, 2015)
ENT000621 NYS-25, Westinghouse, WCAP-17894-NP, Rev. 0, Component Inspection Details 8/10/2015 NYS-38/RK- Supporting Aging Management of Reactor Internals at Indian Point Unit 2 TC-5 (Sept. 2014)
ENT000622 NYS-25, Westinghouse, WCAP-17901-NP, Rev. 1, Component Inspection Details 8/10/2015 NYS-38/RK- Supporting Aging Management of Reactor Internals at Indian Point Unit 3 TC-5 (Sept. 2014) 15
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000623 NYS-25, Cases of ASME Boiler and Pressure Vessel Code, Case N-729-1, 8/10/2015 NYS-38/RK- Alternative Examination Requirements for PWR Reactor Vessel Upper TC-5 Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds, (Section XI, Division 1) (Mar. 28, 2006) [Full-Text Copyright]
ENT000624 NYS-25, Letter from N. Salgado to Vice President, Operations, Entergy Nuclear 8/10/2015 NYS-38/RK- Operations, Inc., Indian Point Nuclear Generating Unit No. 2 - Relief TC-5 from the Examination Area for Reactor Vessel Head Penetration Nozzles (TAC No. ME1658) (Mar. 1, 2010)
ENT000625 NYS-25, Letter from N. Salgado to Vice President, Operations, Entergy Nuclear 8/10/2015 NYS-38/RK- Operations, Inc., Indian Point Nuclear Generating Unit No. 3 - Relief TC-5 Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examination (TAC Nos. ME0411 and ME0412) (July 8, 2009)
ENT000626 NYS-25, Letter from P. Milano, NRC, to M. Kansler, Entergy,Bulletin 2002-01, 8/10/2015 NYS-38/RK- Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure TC-5 Boundary Integrity, 15-Day Response for Indian Pont Nuclear Generating Unit Nos. 2 & 3 (TAC Nos. MB4550 and MB4551) (Nov. 12, 2002)
(ENT-25-0026)
ENT000627 NYS-25, G. Was, Fundamentals of Radiation Materials Science: Metals and Alloys; 8/10/2015 NYS-26B/RK- Part III: Mechanical Effects of Radiation Damage (2007) [Full-Text TC-1B, NYS- Copyright] [excerpt]
38/RK-TC-5 ENT000628 NYS-25, I. Tylek and K. Kuchta, Mechanical Properties of Structural Stainless 8/10/2015 NYS-38/RK- Steels, 4-B Technical Transactions, Civil Engineering 59 (2014) [Full-Text TC-5 Copyright]
16
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000629 NYS-25, Letter from C. Grimes, NRC, to D. Walters, NEI, License Renewal Issue 8/10/2015 NYS-38/RK- No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless TC-5 Steel Components (May 19, 2000)
ENT000630 NYS-25, W.J. Mills, Effect of Temperature on the Fracture Toughness Behavior of 8/10/2015 NYS-38/RK- Inconel X-750, in ASTM STP 733: Fractography and Materials Science 98 TC-5 (L.N. Gilbertson and R.D. Zipp, eds., 1981) [Full-Text Copyright]
ENT000631 NYS-25, EPRI, MRP-175, Materials Reliability Program: PWR Internals Material 8/10/2015 NYS-26B/RK- Aging Degradation Mechanism Screening and Threshold Values (Dec.
TC-1B, NYS- 2005) [Full-Text Copyright]
38/RK-TC-5 ENT000632 NYS-25, ASME Boiler & Pressure Vessel Code,Section III, Article NB-2000, 8/10/2015 NYS-38/RK- Material (1998) [Full-Text Copyright]
TC-5 ENT000633 NYS-25, Letter from P. Anderson, Entergy, to NRC Document Control Desk, 8/10/2015 NYS-38/RK- Documentation for Pressurized Thermal Shock Evaluation Meeting (June TC-5 2, 2010)
ENT000634 NYS-25, Entergy, IP2, FSAR Update, Revision 25 (2014) [excerpts] 8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000635 NYS-25, Westinghouse, WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance 8/10/2015 NYS-38/RK- Criteria Methodology and Data Requirements (Dec. 2009)
TC-5 17
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000636 NYS-25, P. Shahinian et al., NRL Report 7446, Effect of Neutron Irradiation on 8/10/2015 NYS-26B/RK- Fatigue Crack Propagation in Types 304 and 316 Stainless Steels at High TC-1B, NYS- Temperature (July 21, 1972) 38/RK-TC-5 ENT000637 NYS-25, NUREG-1874, Recommended Screening Limits for Pressurized Thermal 8/10/2015 NYS-38/RK- Shock (PTS) (March 2010)
TC-5 ENT00638A-C NYS-25, NUREG-1806, Vol. 1, Technical Basis for Revision of the Pressurized 8/10/2015 NYS-38/RK- Thermal Shock (PTS) Screening Limit in the PTS Rule (10 CFR 50.61)
TC-5 (Aug. 2007)
ENT00639A-F NYS-25, Westinghouse, WCAP-16156, Indian Point Nuclear Generating Unit No. 2, 8/10/2015 NYS-26B/RK- Stretch Power Uprate NSSS Engineering Report (Mar. 2004)
TC-1B, NYS- [PROPRIETARY]
38/RK-TC-5 ENT00640A-I NYS-25, Westinghouse, WCAP-16211, Power Uprate Project, Indian Point Unit 3 8/10/2015 NYS-26B/RK- Power Plant, NSSS Engineering Report (June 2004) [PROPRIETARY]
TC-1B, NYS-38/RK-TC-5 ENT000641 NYS-25, Final License Renewal Interim Staff Guidance LR-ISG-2011-04, Updated 8/10/2015 NYS-38/RK- Aging Management Criteria for Reactor Vessel Internal Components for TC-5 Pressurized Water Reactors (May 28, 2013)
ENT00642A-C NYS-25, EPRI, MRP-232, Materials Reliability Program: Aging Management 8/10/2015 NYS-38/RK- Strategies for Westinghouse and Combustion Engineering PWR Internals TC-5 (Dec. 2008) [Full-Text Copyright]
18
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000643 NYS-25, EPRI, MRP-232, Revision 1, Materials Reliability Program: Aging 8/10/2015 NYS-38/RK- Management Strategies for Westinghouse and Combustion Engineering TC-5 PWR Internals (Dec. 2008) [Full-Text Copyright]
ENT000644 NYS-25, EPRI, MRP-230, Materials Reliability Program: Functionality Analysis 8/10/2015 NYS-38/RK- for Westinghouse and Combustion Engineering Representative PWR TC-5 Internals (Oct. 2009) [Full-Text Copyright]
ENT000645 NYS-25, EPRI, MRP-228, Rev. 1, Materials Reliability Program: Inspection 8/10/2015 NYS-38/RK- Standard for PWR Internals - 2012 Update (Dec. 2012) [Full-Text TC-5 Copyright]
ENT000646 NYS-25, EPRI, MRP-210, Materials Reliability Program: Fracture Toughness 8/10/2015 NYS-26B/RK- Evaluation of Highly Irradiated PWR Stainless Steel Internal Components TC-1B, NYS- (Dec. 2007) [Full-Text Copyright]
38/RK-TC-5 ENT000647 NYS-25, EPRI, MRP-134, Materials Reliability Program: Framework and 8/10/2015 NYS-38/RK- Strategies for Managing Aging Effects in PWR Internals (June 2005) [Full-TC-5 Text Copyright]
ENT000648 NYS-25, M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to 8/10/2015 NYS-38/RK- Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-TC-5 227, Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (undated)
ENT000649 NYS-25, Letter from D. Pelton, NRC, to E. McCartney, NextEra Energy Point 8/10/2015 NYS-38/RK- Beach, Point Beach Nuclear Plant, Units 1 and 2 - Staff Assessment of TC-5 Reactor Vessel Internals Inspection Plan Based on MRP-227-A (TAC Nos.
ME8235 and ME8236) (Mar. 30, 2015) 19
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000650 NYS-25, G. Gardner, Chair, EPRI Reactor Internals Working Group, Recent 8/10/2015 NYS-38/RK- Materials Inspections of PWR Reactor Internals (Mar. 2015)
TC-5 ENT000651 NYS-25, T. Griesbach and B. Gordon, Materials Aging Management Programs at 8/10/2015 NYS-38/RK- Nuclear Power Plants in the United States (Oct. 2007) [Full-Text TC-5 Copyright]
ENT000652 NYS-25, Letter from P. Milano, NRR, to M. Kansler, Entergy, Indian Point Nuclear 8/10/2015 NYS-38/RK- Generating Unit No. 2 - Issuance of Amendment Re: 3.26 Percent Power TC-5 Uprate (TAC No. MC1865) (Oct. 27, 2004)
ENT000653 NYS-25, Letter from P. Milano, NRR, to M. Kansler, Entergy, Indian Point Nuclear 8/10/2015 NYS-38/RK- Generating Unit No. 3 - Issuance of Amendment Re: 4.85 Percent Stretch TC-5 Power Uprate and Relocation of Cycle-Specific Parameters (TAC No.
MC3552) (Mar. 24, 2005)
ENT000654 NYS-25, Westinghouse, WCAP-15270, Determination of Acceptable Baffle-Barrel- 8/10/2015 NYS-38/RK- Bolting for Four-Loop Westinghouse Downflow and Converted Upflow TC-5 Domestic Plants (Nov. 2001) [PROPRIETARY]
ENT000655 NYS-25, Westinghouse, WCAP-15030-NP-A, Westinghouse Methodology for 8/10/2015 NYS-38/RK- Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distributions TC-5 under Faulted Load Conditions (Mar. 2, 1999)
ENT000656 NYS-25, Westinghouse, Technical Bulletin TB-14-5, Reactor Internals Lower 8/10/2015 NYS-38/RK- Radial Support Clevis Insert Cap Screw Degradation (Aug. 25, 2014)
TC-5 20
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000657 NYS-25, NRC Inspection Manual, Manual Chapter 2516, Policy and Guidance for 8/10/2015 NYS-38/RK- the License Renewal Inspection Program (LRIP) (Aug. 13, 2013)
TC-5 ENT000658 NYS-25, J. Smith, Irradiated Materials Testing, Inside MRP (Winter 2012) 8/10/2015 NYS-38/RK-TC-5 ENT000659 NYS-25, Letter from R. Kuntz, NRC, to Vice President, Operations, Entergy, 8/10/2015 NYS-26B/RK- Request for Additional Information for the Review of the Indian Point TC-1B, NYS- Nuclear Generating Unit Nos. 2 and 3, License Renewal Application 38/RK-TC-5 (May 15, 2012)
ENT000660 NYS-25, Letter from J. Daly, NRC, to Vice President, Operations, Entergy, 8/10/2015 NYS-38/RK- Request for Additional Information for the Review of the Indian Point TC-5 Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) (Feb. 6, 2013)
ENT000661 NYS-25, Letter from K. Green, NRC, to Vice President, Operations, Entergy, 8/10/2015 NYS-38/RK- Request for Additional Information for the Review of the Indian Point TC-5 Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5407 and MD5408) (July 26, 2013)
ENT000662 NYS-25, Letter from K. Green, NRC, to Vice President, Operations, Entergy, 8/10/2015 NYS-38/RK- Request for Additional Information for the Review of the Indian Point TC-5 Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5407 and MD5408) (Apr. 9, 2014) 21
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000663 NYS-25, Letter from A. McGehee & T. Hanley, EPRI, to NRC Document Control 8/10/2015 NYS-38/RK- Desk, BWRVIP 2015-025, Project No. 704 - Summary of Industry TC-5 Position on Screening Criteria for Thermal and Irradiation Embrittlement for PWR and BWR Reactor Internals Fabricated of Cast Austenitic Stainless Steel (Mar. 9, 2015)
ENT000664 NYS-25, Email from J. Holonich, NRC, to K. Amberge, EPRI, et al., Summary 8/10/2015 NYS-38/RK- Tables for CASS Position (Mar. 12, 2014, 1:23 PM)
TC-5 ENT000665 NYS-25, ASME Boiler & Pressure Vessel Code,Section XI, Subsection IWB, 8/10/2015 NYS-26B/RK- Requirements for Class 1 Components of Light-Water Cooled Plants TC-1B, NYS- (2010) [Full-Text Copyright]
38/RK-TC-5 ENT00666A-I NYS-25, NUREG/CR-6943, A Study of Remote Visual Methods to Detect Cracking 8/10/2015 NYS-38/RK- in Reactor Components (Oct. 2007)
TC-5 ENT000667 NYS-25, PWROG-14048-P, Rev. 0-A, PWROG, Functionality Analysis: Lower 8/10/2015 NYS-38/RK- Support Columns (Oct. 2014) [PROPRIETARY]
TC-5 ENT000668 NYS-25, EPRI, MRP-219, Rev. 10, Materials Reliability Program: Inspection Data 8/10/2015 NYS-38/RK- Survey Report (Nov. 2014) [Full-Text Copyright]
TC-5 22
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000669 NYS-25, Regulatory Guide 1.99, Radiation Embrittlement of Reactor Vessel 8/10/2015 NYS-26B/RK- Materials, Revision 2 (May 1988)
TC-1B, NYS-38/RK-TC-5 ENT000670 NYS-25 NL-13-106, Letter from J. Ventosa, Entergy, to NRC Document Control 8/10/2015 Desk, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H (Aug. 12, 2013)
ENT000671 NYS-25 NL-14-129, Letter from J. Ventosa, Entergy, to NRC Document Control 8/10/2015 Desk, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H (Nov. 5, 2014)
ENT000672 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, Indian Point 8/10/2015 Nuclear Generating Unit No. 2 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF2558) (Jan. 14, 2014)
ENT000673 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, Indian Point 8/10/2015 Nuclear Generating Unit No. 3 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF5148) (Mar. 4, 2015)
ENT000674 NYS-25 NL-08-014, Letter from Fred R. Dacimo, Entergy, to NRC Document 8/10/2015 Control Desk, Clarifications to Reactor Vessel Surveillance Program and Neutron Embrittlement Time-Limited Aging Analyses and Audit Item
- 105; and Revision to License Renewal Regulatory Commitment List (Jan. 17, 2008) 23
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000675 NYS-25 Letter from M. Hodges, NRC, to W. Rasin, Nuclear Management and 8/10/2015 Resources Council, Safety Assessment of Report WCAP-13587, Revision 1, Reactor Vessel Upper Shelf Energy Bounding Evaluation for Westinghouse Pressurized Water Reactors, September 1993 (Apr. 21, 1994)
ENT000676 NYS-25 NUREG-1785, Safety Evaluation Report Related to the License Renewal 8/10/2015 of H.B. Robinson Steam Electric Plant, Unit 2 (Mar. 2004)
ENT000677 NYS-25 NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control 8/10/2015 Desk, Reply to Request for Additional Information Regarding License Renewal Application (Nov. 28, 2007)
ENT000678 NYS-26B/RK- Entergy's Revised Statement of Position Regarding Contention NYS- 8/10/2015 TC-1B 26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015)
ENT000679 NYS-25, Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, 8/10/2015 NYS-26B/RK- Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon TC-1B, NYS- Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 38/RK-TC-5 2015)
ENT000680 NYS-26B/RK- Curriculum Vitae of Barry M. Gordon 8/10/2015 TC-1B, NYS-38/RK-TC-5 ENT000681 NYS-25, Westinghouse, WCAP-17199-P, Rev. 1, Environmental Fatigue Evaluation 8/10/2015 NYS-26B/RK- for Indian Point Unit 2, (Dec. 2014) [PROPRIETARY]
TC-1B, NYS-38/RK-TC-5 24
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000682 NYS-25, Westinghouse, WCAP-17200-P, Rev. 1, Environmental Fatigue Evaluation 8/10/2015 NYS-26B/RK- for Indian Point Unit 3, (Dec. 2014) [PROPRIETARY]
TC-1B, NYS-38/RK-TC-5 ENT000683 NYS-25, Westinghouse, Calculation Note CN-PAFM-13-32, Rev. 3 Indian Point 8/10/2015 NYS-26B/RK- Unit 2 (IP2) and Unit 3 (IP3) Refined EAF Analyses and EAF Screening TC-1B, NYS- Evaluations (June 25, 2015) [PROPRIETARY]
38/RK-TC-5 ENT000684 NYS-25, Cases of ASME Boiler and Pressure Vessel, Code Case N-779, 8/10/2015 NYS-26B/RK- Alternative Rules for Simplified Elastic-Plastic Analysis, Class 1 TC-1B, NYS- (Section III, Division 1) (Jan. 26, 2009) [Full-Text Copyright]
38/RK-TC-5 ENT00686A-C NYS-25, Westinghouse, WESTEMS' User Manual, Volume 2: Design Analysis, 8/10/2015 NYS-26B/RK- Rev. 6 (Mar. 2015) [PROPRIETARY]
TC-1B, NYS-38/RK-TC-5 ENT000687 NYS-25, NRC, Safety Evaluation Report, Topical Report on ASME Section III 8/10/2015 NYS-26B/RK- Piping and Component Fatigue Analysis Utilizing the WESTEMSTM TC-1B, NYS- Computer Code (WCAP-17577, Revision 2) (undated) 38/RK-TC-5 ENT000688 NYS-25, Westinghouse, Calculation Note CN-PAFM-13-40, Rev. 1, Indian Point 8/10/2015 NYS-26B/RK- Unit 2 and Unit 3 Pressurizer Spray Nozzle Transfer Function Database TC-1B, NYS- Development and Environmental Fatigue Evaluations (Jan. 15, 2015) 38/RK-TC-5 [PROPRIETARY]
25
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000689 NYS-25, Westinghouse, WCAP-12191, Rev. 4, Transient and Fatigue Cycle 8/10/2015 NYS-26B/RK- Monitoring Program Transient History Evaluation Report for Indian Point TC-1B, NYS- Unit 2 (Dec. 2014) [PROPRIETARY]
38/RK-TC-5 ENT000690 NYS-25, Westinghouse, WCAP-16898-P, Rev. 1, Indian Point Unit 3 Transient and 8/10/2015 NYS-26B/RK- Fatigue Cycle Monitoring Program Transient History Evaluation (May TC-1B, NYS- 2015) [PROPRIETARY]
38/RK-TC-5 ENT000691 NYS-25, EPRI, BWRVIP-187, BWR Vessel and Internals Project: Controlling 8/10/2015 NYS-26B/RK- Intergranular Stress Corrosion Cracking During a BWR Startup-Addition TC-1B, NYS- of Hydrazine or Carbohydrazide (Mar. 2008) [PROPRIETARY]
38/RK-TC-5 ENT000692 NYS-25, Entergy, 0-CY-2310, Rev. 24, Reactor Coolant System Specification and 8/10/2015 NYS-26B/RK- Frequencies (Jan. 16, 2015)
TC-1B, NYS-38/RK-TC-5 ENT000693 NYS-25, IPEC, Unit 3 Chemistry Data (Mar. 21-22, 2015) 8/10/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ENT000694 NYS-25, Z. Szklarska-Smialowska et al., Mechanism of Crack Growth in Alloy 600 8/10/2015 NYS-26B/RK- in High-Temperature Deaerated Water, 50 Corrosion 676 (Sept. 1994)
TC-1B, NYS- [Full-Text Copyright]
38/RK-TC-5 26
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000695 NYS-25, Letter from J. Trapp, NRC, to J. Ventosa, Entergy, Indian Point Nuclear 8/10/2015 NYS-26B/RK- Generating Unit 2 - NRC License Renewal Team Inspection Report TC-1B, NYS- 05000247/2013010 (Sept. 19, 2013) 38/RK-TC-5 ENT000696 NYS-25, Westinghouse, Calculation Note CN-SGDA-02-214, 4.7% Uprate 8/10/2015 NYS-26B/RK- Structural Evaluation of Primary and Secondary side Components for TC-1B, NYS- Indian Point Unit 2 (44F), 10% Plugging (June 12, 2003) 38/RK-TC-5 [PROPRIETARY]
ENT000697 NYS-25, Entergy, Visual Examination of Reactor Vessel and Internals (VT-3), 8/10/2015 NYS-26B/RK- Summary No. 206913-RVVINT for IP2 (Mar. 10, 2014), and Summary TC-1B, NYS- No. 1-1200-VESS. INT. for IP3 (Mar. 13, 2015) 38/RK-TC-5 ENT000698 NYS-38/RK- Entergy's Revised Statement of Position Regarding Contention NYS- 8/10/2015 TC-5 38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015)
ENT000699 NYS-25, Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. 8/10/2015 NYS-26B/RK- Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Barry TC-1B, NYS- M. Gordon, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5 38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015)
ENT000700 NYS-38/RK- State of New York, Riverkeeper, Inc., Nuclear Regulatory Commission 8/10/2015 TC-5 Staff, and Entergy Nuclear Operations, Inc., Joint Stipulation Regarding State of New York Pre-Filed Testimony for Contention NYS-38/RK-TC-5 (Safety Commitments) (June 23, 2015) 27
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000701 NYS-38/RK- Letter from A. Burritt, NRC, to L. Coyle, Entergy, Annual Assessment 8/10/2015 TC-5 Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)
ENT000703 NYS-38/RK- NRC Inspection Manual, Inspection Procedure 71003, Post-Approval Site 8/10/2015 TC-5 Inspection for License Renewal (Feb. 25, 2013)
ENT000704 NYS-38/RK- NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for 8/10/2015 TC-5 Plants with a Timely Renewal Application (Sept. 25, 2013)
ENT000705 NYS-38/RK- NRR Office Instruction, LIC-105, Revision 5, Managing Regulatory 8/10/2015 TC-5 Commitments Made by Licensees to the NRC (Sept. 16, 2013)
ENT000706 NYS-38/RK- NRC Enforcement Manual, Rev. 9 (Sept. 9, 2013) 8/10/2015 TC-5 ENT000707 NYS-38/RK- Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits, 8/10/2015 TC-5 NRC, to M. Satorius, Exec. Dir. for Operations, NRC, Status of Recommendations: Audit of NRCs Management of Licensee Commitments (OIG-11-A-17) (Nov. 25, 2013)
ENT000708 NYS-25, Entergy, Commitment Closure Verification Form, LRC # 43 (Aug. 27, 8/10/2015 NYS-26B/RK- 2013)
TC-1B, NYS-38/RK-TC-5 ENT000709 NYS-25, Entergy, Commitment Closure Verification Form, LRC # 49 (Aug. 27, 8/10/2015 NYS-26B/RK- 2013)
TC-1B, NYS-38/RK-TC-5 28
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000710 NYS-25, Entergy, Commitment Closure Verification Form, LRC # 44 (June 19, 8/10/2015 NYS-26B/RK- 2013)
TC-1B, NYS-38/RK-TC-5 ENT000711 NYS-38/RK- H. Kawamura et al., Paper No. 141, The Effect of Zinc Addition to 8/10/2015 TC-5 Simulated PWR Primary Water on the PWSCC Resistance, Crack Growth Rate and Surface Oxide Film Characteristics of Prefilmed Alloy 600 (Corrosion 98, 1998) [Full-Text Copyright]
ENT000712 NYS-38/RK- P.L. Andresen et al., Effects of Hydrogen on Stress Corrosion Crack 8/10/2015 TC-5 Growth Rate of Nickel Alloys in High-Temperature Water, 64 Corrosion 707 (Sept. 2008) [Full-Text Copyright]
ENT000713 NYS-38/RK- B. Gordon, Corrosion and Corrosion Control in Light Water Reactors, 65 8/10/2015 TC-5 Journal of Metals 1043 (Aug. 2013) [Full-Text Copyright]
ENT00714A-B NYS-38/RK- H. Cothron et al., EPRI, Slides: NRC/Industry Meeting Regarding Tube-to- 8/10/2015 TC-5 Tubesheet Weld and Divider Plate Cracking Report (July 30, 2015)
ENT000715 NYS-38/RK- NRC, Notice of Meeting with Industry on Divider Plate and Tube-to- 8/10/2015 TC-5 Tubesheet Weld (July 1, 2015)
ENT000716 NYS-38/RK- EPRI, Final Report No. 3002000473, Steam Generator Channel Head 8/10/2015 TC-5 Degradation Failure Modes and Effects Analysis (Apr. 2013) [Full-Text Copyright]
ENT000717 NYS-38/RK- Entergy Procedure SEP-SG-IP3-001, IP3 Steam Generator Program, 8/10/2015 TC-5 Revision 1 (May 21, 2014) 29
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000718 NYS-38/RK- Westinghouse, Technical Manual No. TM 1440-C348, Vertical Steam 8/10/2015 TC-5 Generator Instructions for Consolidated Edison Company of New York, Indian Point Station - Unit 2 (2001) [PROPRIETARY] (excerpt)
ENT000719 NYS-38/RK- T. Couvant et al., Paper Reference No. A004T04, PWSCC of Steam 8/10/2015 TC-5 Generator Divider Plates in Alloy 600: Coupling Field Characterizations with R&D Studies (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright]
ENT000720 NYS-38/RK- M. Boccanfuso, et al., Paper Reference No. A165-T06, Steam Generator 8/10/2015 TC-5 Mechanical Plug Failure: A Tribologic Problem (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright]
ENT000721 NYS-38/RK- EPRI, MRP-55, Rev. 1, Materials Reliability Program: Crack Growth 8/10/2015 TC-5 Rates for Evaluating Primary Water Stress Corrosion Cracking (PWSCC) of Thick-Wall Alloy 600 Materials (Nov. 2002) [Full-Text Copyright]
ENT000722 NYS-25, Supplemental Testimony of Entergy Witnesses Nelson F. Azevedo, 10/29/2015 NYS-26B/RK- Timothy J. Griesbach, and Randy G. Lott Regarding Contention NYS-25 TC-1B, NYS- (Reactor Vessel Internals AMP), NYS-26B/RK-TC-1B (Metal Fatigue),
38/RK-TC-5 and NYS-38/RK-TC-5 (Safety Commitments) (Oct. 29, 2015)
ENT000723 NYS-25, D.J. Gavenda et al., NUREG/CR-6428, Effects of Thermal Aging on 10/29/2015 NYS-26B/RK- Fracture Toughness and Charpy-Impact Strengths of Stainless Steel Pipe TC-1B, NYS- Welds (May 1996) 38/RK-TC-5 ENT000724 NYS-25, Westinghouse, Calculation Note CN-RIDA-13-48, Rev. 0 Indian Point 10/29/2015 NYS-26B/RK- Units 2 and 3 Reactor Internals Lower Support Column Bodies Thermal TC-1B, NYS- Embrittlement and Irradiation Embrittlement Screening Assessment (Oct.
38/RK-TC-5 15, 2013) [PROPRIETARY]
30
Track 2 Exhibit Admitted Contentions Entergy Exhibit # Exhibit Name Submission During Addressed by Track 1 Date Exhibit Hearing?
ENT000725 NYS-25, Westinghouse, WCAP-14574-A, License Renewal Evaluation: Aging 10/29/2015 NYS-26B/RK- Management Evaluation for Pressurizers (Dec. 2000)
TC-1B, NYS-38/RK-TC-5 ENT000726 NYS-25, Entergy Track 2 Hearing Exhibit List 11/4/2015 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 DB1/ 85187843 31