NRCR11001 - Exhibt List NRC Staff Prefiled Hearing Exhibit List (Revised)
ML16078A413
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/18/2016
From:
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 51011, ASLBP 07-858-03-LR-BD01, 50-286-LR, 50-247-LR
Download: ML16078A413 (31)


Text

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000171 NYS-26 EPRI 1015014, Materials Reliability Program: Evaluation of Controlling NYS-38 Transient Ramp Times Using Piping Methodologies When Considering 08/10/2015 Environmental Fatigue (Fen) Effects (MRP-218) (Sept. 2007)

(EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000172 NYS-26 EPRI 1003536, Materials Reliability Program: Second International Conference NYS-38 on Fatigue of Reactor Components (MRP-84) (Feb. 2003) 08/10/2015 (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000173 NYS-26 Excerpt from Transcript of Advisory Committee on Reactor Safeguards NYS-38 Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014) 08/10/2015 NRC000174 NYS-26 Background of the Factors of Safety Used in Divisions I of Sections III and XI of NYS-38 the ASME Rules for Nuclear Vessels (Oct. 1984) 08/10/2015 (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000175 NYS-26 Implementation of Automated, On-line Fatigue Monitoring in a Boiling Water NYS-38 Reactor (1993) 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000176 NYS-26 EPRI 1003069, Materials Reliability Program Hot Cell Testing of Baffle/Former NYS-38 Bolts Removed From Two Lead PWR Plants (MRP-51) 08/10/2015 (Nov. 2001)

(PROPRIETARY)

NRC000177 NYS-26 ICONE5-2372, Fatigue and Stress Corrosion Cracking Behaviors of Irradiated NYS-38 Stainless Steels in PWR Primary Water 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000178 NYS-26 ASME Code,Section III - Subsection NCA, General Requirements for Division NYS-38 1 and Division 2 Rules for Construction of Nuclear Facility Components 08/10/2015 (Jul. 1, 2007)

(CONTAINS COPYRIGHTED MATERIAL)

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000179 NYS-26 Regulatory Guide 1.207, Guidelines for Evaluating Fatigue Analyses NYS-38 Incorporating the Life Reduction of Metal Components Due to the Effects of the 08/10/2015 Light-Water Reactor Environment for New Reactors (Mar. 2007)

NRC000180 NYS-26 NRC Inspection Manual, Chapter 2516, Policy and Guidance for the License NYS-38 Renewal Inspection Program (Aug. 13, 2013) 08/10/2015 NRC000181 NYS-26 Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear NYS-38 Generating Unit 2 - NRC License Renewal Team Inspection Report 08/10/2015 05000247/2013009 (July 5, 2013)

NRC000182 NYS-26 Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear NYS-38 Generating Unit 2 - NRC License Renewal Team Inspection Report 08/10/2015 05000247/2013010 (Sept. 19, 2013)

NRC000183 NYS-26 NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for NYS-38 Plants with a Timely Renewal Application (Sept. 25, 2013) 08/10/2015 NRC000184 NYS-25 Letter NL-13-114, Letter from Fred Dacimo, Entergy, to NRC, Implementation NYS-26 of License Renewal Regulatory Commitments Indian Point Nuclear Generating 08/10/2015 NYS-38 Unit No. 2 Docket No. 50-257 License No. DPR-26 (Aug. 28, 2013)

NRC000185 NYS-26 Letter from Arthur Burritt, NRC, to Larry Coyle, Entergy, Annual Assessment NYS-38 Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 08/10/2015 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)

NRC000186 NYS-26 Effect of LWR Coolant Environments on the Fatigue of Reactor Materials, 79 NYS-38 Fed. Reg. 21811 (Apr. 17, 2014) 08/10/2015

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000187 NYS-26 Letter from John Daily, NRC, to Entergy, Request for Additional Information for NYS-38 the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License 08/10/2015 Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) ( Feb. 6, 2013)

NRC000188 NYS-26 Letter NL-15-060, Letter from Fred Dacimo, Entergy, to NRC, Entergy Actions NYS-38 Required Prior to Entry into Period of Extended Operation Associated with 08/10/2015 License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015)

NRC000189 NYS-38 TSTF-510, Rev. 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011) 08/10/2015 NRC000190 NYS-38 NRC White Paper on Risk-Informed and Performance-Based Regulation 08/10/2015 NRC000191 NYS-38 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 08/10/2015 Fed. Reg. 15144 (Mar. 18, 2014)

NRC000192 NYS-38 Letter NL-15-001, Letter from Lawrence Coyle, to NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program 08/10/2015 Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50-247 License No. DPR-26 (Jan. 15, 2015)

NRC000193 NYS-38 Letter NL-13-143, Letter from Robert Walpole, to NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection 08/10/2015 Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000194 NYS-38 S. Miloudi et al, Destructive Examinations on Divider Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion 08/10/2015 Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000195 NYS-26 ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant NYS-38 Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, 08/10/2015 IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000196 NYS-25 NRC Staffs Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) 08/10/2015 (PROPRIETARY)

NRC000197 NYS-25 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-38 NYS-25 and NYS-38/RK-TC-5 08/10/2015 (PROPRIETARY)

NRC000198 NYS-25 Enclosure to MRP Letter 2013-025, MRP-227-A Applicability Guidelines for Combustion Engineering and Westinghouse Pressurized Water Reactor 08/10/2015 Designs (Oct. 4, 2013)

NRC000199 NYS-25 ASME Code,Section XI, 2007 through 2008 Addenda, IWA-2213 (Jul. 1, 2008) 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000200 NYS-25 WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance Criteria Methodology and Data Requirements (Dec. 2009) 08/10/2015 NRC000201 NYS-25 NRC Position on Aging Management of CASS Reactor Vessel Internal Components (June 11, 2014) 08/10/2015 NRC000202 NYS-25 ASM Handbook, Vol. 19, Fatigue and Fracture, Figure 14 at 595 (1996)

(EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000203 NYS-25 EPRI 1021001NP/BWRVIP-100NP, Final Report, Rev. 1, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated 08/10/2015 Stainless Steel for BWR Core Shrouds (Oct. 2010)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000204 NYS-25 PWROG-14048-P, Rev. 0, Functionality Analysis: Lower Support Columns (Dec. 2014) 08/10/2015 (PROPRIETARY)

NRC000205 NYS-25 Indian Point, Unit 2, Updated Final Safety Analysis Report (UFSAR), Rev. 25, Chapter 3 - Reactor (2014) 08/10/2015 NRC000206 NYS-25 Indian Point, Unit 2, Updated Final Safety Analysis Report (UFSAR), Rev. 25, Chapter 14 - Safety Analysis (2014) 08/10/2015 NRC000207 NYS-25 Regulatory Information Conference Presentation Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) 08/10/2015 NRC00208A NYS-25 MRP Letter 2014-09, Biennial Report of Recent MRP-227-A Reactor Internals

- Inspection Results (May 12, 2014) 08/10/2015 NRC00208E NRC000209 NYS-25 EPRI 1013396/BWRVIP-100-A, Final Report, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless 08/10/2015 Steel for BWR Core Shrouds (Aug. 2006)

(PROPRIETARY)

NRC000210 NYS-25 EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless 08/10/2015 Steel for BWR Core Shrouds (Aug. 2006)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000211 NYS-25 MRP-227, Rev. 1 Presentation Slides, Westinghouse Figures Presented at 08/10/2015 Public Meeting on March 31, 2015 (Feb. 2015)

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000220 NYS-25 Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical 08/10/2015 Exchange: Clevis Insert Bolt Update, (June 2014)

NRC00221A NYS-25 Babcock & Wilcox Report, S-1473-002, Final Report, Rev. 0, Examination of

- Clevis Bolts Removed from D. C. Cook Nuclear Plant (Dec. 2013) 08/10/2015 NRC00221F NRC000222 NYS-25 IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT) 08/10/2015 NRC000223 NYS-25 IP3 FSAR Rev. 04 Chapter 14 (2011) 08/10/2015 NRC000224 NYS-25 IP3 FSAR Rev. 04 Chapter 16 08/10/2015 NRC00225A NYS-25 EPRI 1016593, Final Report, Materials Reliability Program: Aging Management

- Strategies for Westinghouse and Combustion Engineering PWR Internals 08/10/2015 NRC00225B (MRP-232) (Dec. 31, 2008)

(PROPRIETARY)

NRC000226 NYS-25 Jeffrey C. Poehler Statement of Professional Qualifications NYS-38 08/10/2015 NRC000227 NYS-25 Gary Stevens Statement of Professional Qualifications NYS-26 08/10/2015 NYS-38 NRC000228 NYS-25 Indian Point Unit 2 Technical Specifications 3.1.4 08/10/2015 NRC000229 NYS-25 Indian Point Unit 3 Technical Specifications 3.1.4 08/10/2015 NRC000230 NYS-25 Table of Corrections to Staff Testimony 11/03/2015 NYS-26 NYS-38

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000231 NYS-25 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, Dr. Ching Ng, and 03/18/2016 NYS-38 On Yee Regarding NYS-25, NYS-26B, and NYS-38/RK-TC-5 (PROPRIETARY)

NRC000231 NYS-25 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, Dr. Ching Ng, and 03/18/2016 NYS-38 On Yee Regarding NYS-25, NYS-26B, and NYS-38/RK-TC-5 (PUBLIC, REDACTED)

NRC000232 NYS-25 BWRVIP-99-A, Final Report, Crack Growth Rates in Irradiated Stainless Steels 03/18/2016 NYS-38 in BWR Internal Components (Oct. 2008) (PROPRIETARY) (EXCERPT)

NRC000233 NYS-25 BWRVIP-99, Final Report, BWR Vessel and Internals Project Crack Growth 03/18/2016 NYS-38 Rates in Irradiated Stainless Steels in BWR Internal Components. (Dec. 2001)

(PROPRIETARY) (EXCERPT)

NRC000234 NYS-25 BWRVIP-14-A, Final Report, BWR Vessel and Internals Project, Evaluation of 03/18/2016 NYS-38 Crack Growth in BWR Stainless Steel RPV Internals (Sept. 2008)

(PROPRIETARY) (EXCERPT)

NRC000235 NYS-25 EPRI MRP 2-14-002, Proposed Edits to WCAP-17096-A Draft (Jan. 16, 2014) 03/18/2016 NYS-38 NRC000236 NYS-25 Crack Growth Rate Comparison - Eason-Pathania Model to MRP Model- Excel 03/18/2016 NYS-38 Spreadsheet

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000171 NYS-26 EPRI 1015014, Materials Reliability Program: Evaluation of Controlling NYS-38 Transient Ramp Times Using Piping Methodologies When Considering 08/10/2015 Environmental Fatigue (Fen) Effects (MRP-218) (Sept. 2007)

(EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000172 NYS-26 EPRI 1003536, Materials Reliability Program: Second International Conference NYS-38 on Fatigue of Reactor Components (MRP-84) (Feb. 2003) 08/10/2015 (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000173 NYS-26 Excerpt from Transcript of Advisory Committee on Reactor Safeguards NYS-38 Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014) 08/10/2015 NRC000174 NYS-26 Background of the Factors of Safety Used in Divisions I of Sections III and XI of NYS-38 the ASME Rules for Nuclear Vessels (Oct. 1984) 08/10/2015 (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000175 NYS-26 Implementation of Automated, On-line Fatigue Monitoring in a Boiling Water NYS-38 Reactor (1993) 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000176 NYS-26 EPRI 1003069, Materials Reliability Program Hot Cell Testing of Baffle/Former NYS-38 Bolts Removed From Two Lead PWR Plants (MRP-51) 08/10/2015 (Nov. 2001)

(PROPRIETARY)

NRC000177 NYS-26 ICONE5-2372, Fatigue and Stress Corrosion Cracking Behaviors of Irradiated NYS-38 Stainless Steels in PWR Primary Water 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000178 NYS-26 ASME Code,Section III - Subsection NCA, General Requirements for Division NYS-38 1 and Division 2 Rules for Construction of Nuclear Facility Components 08/10/2015 (Jul. 1, 2007)

(CONTAINS COPYRIGHTED MATERIAL)

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000179 NYS-26 Regulatory Guide 1.207, Guidelines for Evaluating Fatigue Analyses NYS-38 Incorporating the Life Reduction of Metal Components Due to the Effects of the 08/10/2015 Light-Water Reactor Environment for New Reactors (Mar. 2007)

NRC000180 NYS-26 NRC Inspection Manual, Chapter 2516, Policy and Guidance for the License NYS-38 Renewal Inspection Program (Aug. 13, 2013) 08/10/2015 NRC000181 NYS-26 Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear NYS-38 Generating Unit 2 - NRC License Renewal Team Inspection Report 08/10/2015 05000247/2013009 (July 5, 2013)

NRC000182 NYS-26 Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear NYS-38 Generating Unit 2 - NRC License Renewal Team Inspection Report 08/10/2015 05000247/2013010 (Sept. 19, 2013)

NRC000183 NYS-26 NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for NYS-38 Plants with a Timely Renewal Application (Sept. 25, 2013) 08/10/2015 NRC000184 NYS-25 Letter NL-13-114, Letter from Fred Dacimo, Entergy, to NRC, Implementation NYS-26 of License Renewal Regulatory Commitments Indian Point Nuclear Generating 08/10/2015 NYS-38 Unit No. 2 Docket No. 50-257 License No. DPR-26 (Aug. 28, 2013)

NRC000185 NYS-26 Letter from Arthur Burritt, NRC, to Larry Coyle, Entergy, Annual Assessment NYS-38 Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 08/10/2015 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)

NRC000186 NYS-26 Effect of LWR Coolant Environments on the Fatigue of Reactor Materials, 79 NYS-38 Fed. Reg. 21811 (Apr. 17, 2014) 08/10/2015

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000187 NYS-26 Letter from John Daily, NRC, to Entergy, Request for Additional Information for NYS-38 the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License 08/10/2015 Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) ( Feb. 6, 2013)

NRC000188 NYS-26 Letter NL-15-060, Letter from Fred Dacimo, Entergy, to NRC, Entergy Actions NYS-38 Required Prior to Entry into Period of Extended Operation Associated with 08/10/2015 License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015)

NRC000189 NYS-38 TSTF-510, Rev. 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011) 08/10/2015 NRC000190 NYS-38 NRC White Paper on Risk-Informed and Performance-Based Regulation 08/10/2015 NRC000191 NYS-38 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 08/10/2015 Fed. Reg. 15144 (Mar. 18, 2014)

NRC000192 NYS-38 Letter NL-15-001, Letter from Lawrence Coyle, to NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program 08/10/2015 Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50-247 License No. DPR-26 (Jan. 15, 2015)

NRC000193 NYS-38 Letter NL-13-143, Letter from Robert Walpole, to NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection 08/10/2015 Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000194 NYS-38 S. Miloudi et al, Destructive Examinations on Divider Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion 08/10/2015 Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000195 NYS-26 ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant NYS-38 Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, 08/10/2015 IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000196 NYS-25 NRC Staffs Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) 08/10/2015 (PROPRIETARY)

NRC000197 NYS-25 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-38 NYS-25 and NYS-38/RK-TC-5 08/10/2015 (PROPRIETARY)

NRC000198 NYS-25 Enclosure to MRP Letter 2013-025, MRP-227-A Applicability Guidelines for Combustion Engineering and Westinghouse Pressurized Water Reactor 08/10/2015 Designs (Oct. 4, 2013)

NRC000199 NYS-25 ASME Code,Section XI, 2007 through 2008 Addenda, IWA-2213 (Jul. 1, 2008) 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000200 NYS-25 WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance Criteria Methodology and Data Requirements (Dec. 2009) 08/10/2015 NRC000201 NYS-25 NRC Position on Aging Management of CASS Reactor Vessel Internal Components (June 11, 2014) 08/10/2015 NRC000202 NYS-25 ASM Handbook, Vol. 19, Fatigue and Fracture, Figure 14 at 595 (1996)

(EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000203 NYS-25 EPRI 1021001NP/BWRVIP-100NP, Final Report, Rev. 1, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated 08/10/2015 Stainless Steel for BWR Core Shrouds (Oct. 2010)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000204 NYS-25 PWROG-14048-P, Rev. 0, Functionality Analysis: Lower Support Columns (Dec. 2014) 08/10/2015 (PROPRIETARY)

NRC000205 NYS-25 Indian Point, Unit 2, Updated Final Safety Analysis Report (UFSAR), Rev. 25, Chapter 3 - Reactor (2014) 08/10/2015 NRC000206 NYS-25 Indian Point, Unit 2, Updated Final Safety Analysis Report (UFSAR), Rev. 25, Chapter 14 - Safety Analysis (2014) 08/10/2015 NRC000207 NYS-25 Regulatory Information Conference Presentation Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) 08/10/2015 NRC00208A NYS-25 MRP Letter 2014-09, Biennial Report of Recent MRP-227-A Reactor Internals

- Inspection Results (May 12, 2014) 08/10/2015 NRC00208E NRC000209 NYS-25 EPRI 1013396/BWRVIP-100-A, Final Report, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless 08/10/2015 Steel for BWR Core Shrouds (Aug. 2006)

(PROPRIETARY)

NRC000210 NYS-25 EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless 08/10/2015 Steel for BWR Core Shrouds (Aug. 2006)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000211 NYS-25 MRP-227, Rev. 1 Presentation Slides, Westinghouse Figures Presented at 08/10/2015 Public Meeting on March 31, 2015 (Feb. 2015)

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000220 NYS-25 Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical 08/10/2015 Exchange: Clevis Insert Bolt Update, (June 2014)

NRC00221A NYS-25 Babcock & Wilcox Report, S-1473-002, Final Report, Rev. 0, Examination of

- Clevis Bolts Removed from D. C. Cook Nuclear Plant (Dec. 2013) 08/10/2015 NRC00221F NRC000222 NYS-25 IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT) 08/10/2015 NRC000223 NYS-25 IP3 FSAR Rev. 04 Chapter 14 (2011) 08/10/2015 NRC000224 NYS-25 IP3 FSAR Rev. 04 Chapter 16 08/10/2015 NRC00225A NYS-25 EPRI 1016593, Final Report, Materials Reliability Program: Aging Management

- Strategies for Westinghouse and Combustion Engineering PWR Internals 08/10/2015 NRC00225B (MRP-232) (Dec. 31, 2008)

(PROPRIETARY)

NRC000226 NYS-25 Jeffrey C. Poehler Statement of Professional Qualifications NYS-38 08/10/2015 NRC000227 NYS-25 Gary Stevens Statement of Professional Qualifications NYS-26 08/10/2015 NYS-38 NRC000228 NYS-25 Indian Point Unit 2 Technical Specifications 3.1.4 08/10/2015 NRC000229 NYS-25 Indian Point Unit 3 Technical Specifications 3.1.4 08/10/2015 NRC000230 NYS-25 Table of Corrections to Staff Testimony 11/03/2015 NYS-26 NYS-38

NRCR11001 Submitted: Mar. 18, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000231 NYS-25 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, Dr. Ching Ng, and 03/18/2016 NYS-38 On Yee Regarding NYS-25, NYS-26B, and NYS-38/RK-TC-5 (PROPRIETARY)

NRC000231 NYS-25 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, Dr. Ching Ng, and 03/18/2016 NYS-38 On Yee Regarding NYS-25, NYS-26B, and NYS-38/RK-TC-5 (PUBLIC, REDACTED)

NRC000232 NYS-25 BWRVIP-99-A, Final Report, Crack Growth Rates in Irradiated Stainless Steels 03/18/2016 NYS-38 in BWR Internal Components (Oct. 2008) (PROPRIETARY) (EXCERPT)

NRC000233 NYS-25 BWRVIP-99, Final Report, BWR Vessel and Internals Project Crack Growth 03/18/2016 NYS-38 Rates in Irradiated Stainless Steels in BWR Internal Components. (Dec. 2001)

(PROPRIETARY) (EXCERPT)

NRC000234 NYS-25 BWRVIP-14-A, Final Report, BWR Vessel and Internals Project, Evaluation of 03/18/2016 NYS-38 Crack Growth in BWR Stainless Steel RPV Internals (Sept. 2008)

(PROPRIETARY) (EXCERPT)

NRC000235 NYS-25 EPRI MRP 2-14-002, Proposed Edits to WCAP-17096-A Draft (Jan. 16, 2014) 03/18/2016 NYS-38 NRC000236 NYS-25 Crack Growth Rate Comparison - Eason-Pathania Model to MRP Model- Excel 03/18/2016 NYS-38 Spreadsheet