ML15223A702

From kanterella
Jump to navigation Jump to search
NRCR900001 - NRC Staff Pre-filed Hearing Exhibit List (Revised)
ML15223A702
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/10/2015
From:
NRC/OGC
To:
SECY RAS
References
RAS 28161, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15223A702 (31)


Text

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NRCR90001 ALL NRC Staff Pre-filed Hearing Exhibit List (REVISED) 08/10/2015 NUREG-1437, Volumes 1-2: Generic Environmental Impact Statement for License Renewal of Nuclear Plants (May 1996) (GEIS)

NRC000002 ALL 03/31/2012 (Incorporates Exhibit NYS000131A-I submitted by the State of New York (New York))

NUREG-1437, Volumes 1-2: Supplement 38: Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3 - Draft Report for Comment NRC000003 ALL (December 2008) (DSEIS) 03/31/2012 (Incorporates New York Exhibit NYS000132A-D)

NUREG-1437, Volumes 1-3: Supplement 38: Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3 - Final Report (December 2010)

NRC000004 ALL (FSEIS) 03/31/2012 (Incorporates New York Exhibit NYS000133A-J)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NUREG-1930, Volumes 1-2: Safety Evaluation Report - Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3 (November 2009) (SER)

NRC000005 ALL 03/31/2012 (Incorporates New York Exhibit NYS000326A-F)

NUREG-1930, Supplement 1: Safety Evaluation Report - Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3 (August 2011) (SER Supplement 1)

NRC000006 ALL 03/31/2012 (Incorporates New York Exhibit NYS000160)

Letter from Advisory Committee on Reactor Safeguards (ACRS) Chairman Mario Bonaca (ACRS) to Chairman Jaczko (NRC), Report on the Safety Aspects of the License Renewal Application for the Indian Point Nuclear NRC000007 ALL Generating Unit Nos. 2 and 3 (Sept. 23, 2009) ("ACRS Letter") 03/31/2012 (Incorporates New York Exhibit NYS000325)

NUREG-1801, Rev. 1: Generic Aging Lessons Learned (GALL) Report, Volumes 1-2 (September 2005) (GALL Report, Rev. 1)

NRC000008 ALL 03/31/2012 (Incorporates New York Exhibit NYS000146A-C)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NUREG-1801, Rev. 2: Generic Aging Lessons Learned (GALL) Final Report (December 2010) (GALL Report, Rev. 2)

NRC000009 ALL 03/31/2012 (Incorporates New York Exhibit NYS000147A-D)

NUREG-1800, Rev. 1: Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants (September 2005) (SRP-LR)

NRC000010 ALL 03/31/2012 (Incorporates New York Exhibit NYS000195)

NUREG-1555: Standard Review Plans for Environmental Reviews for Nuclear Power Plants (October 1999) (ESRP)

ALL 03/31/2012 NRC000011 (Incorporates New York Exhibit NYS00019A)

NUREG-1555, Supplement 1: Standard Review Plans for Environmental Reviews for Nuclear Power Plants - Supplement 1: Operating License Renewal (October 1999) (ESRP Supp. 1)

ALL 03/31/2012 NRC000012 (Incorporates New York Exhibit NYS00019B)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NRC Regulatory Guide 4.2, Rev. 2: Preparation of Environmental Reports for Nuclear Power Stations (July 1976) (RG 4.2)

NRC000013 ALL 03/31/2012 (Incorporates Exhibit ENT000023 submitted by Entergy Nuclear Operations, Inc. (Entergy))

NRC Regulatory Guide 4.2, Supplement 1: Preparation of Supplemental Environmental Reports for Applications To Renew Nuclear Power Plant Operating Licenses (September 2000) (RG 4.2, Supp. 1)

NRC000014 ALL 03/31/2012 (Incorporates Entergy Exhibit ENT000136)

NRC Staffs Statement of Position Concerning Contention NYS-5 (Buried Pipes NRCR00015 NYS-5 12/07/2012 and Tanks) (December 7, 2012) (REVISED)

NRC Staffs Testimony of Kimberly J. Green and William C. Holston NRCR20016 NYS-5 Concerning Contention NYS-5 (Buried Pipes and Tanks) (December 7, 2012) 12/07/2012 (REVISED)

NRC000017 NYS-5 Kimberly J. Green, Statement of Professional Qualifications (March 29, 2012) 03/29/2012

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NRC000018 NYS-5 William C. Holston, Statement of Professional Qualifications (March 29, 2012) 03/29/2012 Draft License Renewal Interim Staff Guidance LR-ISG-2011-03, Changes to the Generic Aging Lessons Learned (GALL) Report, Revision 2, Aging NRC000019 NYS-5 Management Program XI.M41 Buried and Underground Piping and Tanks 03/29/2012 (Draft LR-ISG-2011003)

Draft interim staff guidance; request for public comment, Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, NRC000020 NYS-5 Buried and Underground Piping and Tanks, 77 Fed. Reg. 14,446 (March 9, 03/29/2012 2012)

Letter from Fred Dacimo (Entergy) to NRC Document Control Desk, Correction to Previous Response Regarding Unit 1 Buried Piping, Indian Point NRC000021 NYS-5 03/29/2012 Nuclear Generating Unit Nos. 1, 2 & 3 (NL-12-032) (Jan. 30, 2012)

Letter from Mel Gray (NRC) to Joseph E. Pollock (Entergy), Indian Point Nuclear Generating Unit 2 - NRC Integrated Inspection Report NRC000022 NYS-5 03/29/2012 05000247/2009-002 (Integrated Inspection Report) (May 14, 2009)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date Letter from Fred Dacimo (Entergy) to NRC Document Control Desk, Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, NRC000023 NYS-5 and Unit 2 Auxiliary Feedwater Pump room Fire Event, Indian Point Nuclear 03/29/2012 Generating Unit Nos. 2 & 3 (NL-09-079) (June 12, 2009)

Generic Letter 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping (Generic Letter 90-05) (June 15, NRC000024 NYS-5 03/29/2012 1990)

ASME International, Case N-513-2, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping,Section XI, NRC000025 NYS-5 03/29/2012 Division 1 (February 20, 2004) (COPYRIGHT RESTRICTION)

ASME International, Case N-776 Alternative to IWA-5244 Requirements for Buried Piping,Section XI, Division 1 (April 9, 2010) (COPYRIGHT NRC000026 NYS-5 03/29/2012 RESTRICTION)

NACE International, NACE SP0169-2007, Standard Practice Control of External Corrosion on Underground or Submerged Metallic Piping Systems NRC000027 NYS-5 03/29/2012 (2007) (COPYRIGHT RESTRICTION)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date America Water Works Association (AWWA) Standard C105, AWWA C105/A21.5-10, Table A.1, Soil-test evaluation (Soil Characteristics Based on NRC000028 NYS-5 Samples Taken Down to Pipe Depth), p. 3 (undated) (AWWA Standard C105, 03/29/2012 Soil Corrosivity Ratings)

NRC Inspection Manual, Temporary Instruction 2516/001, Review of License Renewal Activities (Program Applicability: This temporary instruction (TI)

NRC000029 NYS-5 applies to Indian Point Nuclear Generating Unit 2 and Pilgrim Nuclear Power 03/29/2012 Station only) (March 30, 2011) (TI 2516/001)

NRC Staffs Statement of Position Concerning Contention NYS-8 NRC000030 NYS-8 03/29/2012 (Transformers) (March 29, 2012)

NRC000031 NYS-8 NRC Staffs Testimony of Roy K. Mathew and Sheila Ray Concerning 03/29/2012 Contention NYS-8 (Transformers) (March 29, 2012)

NRC000032 NYS-8 Roy K. Mathew, Statement of Professional Qualifications 03/29/2012 NRC000033 NYS-8 Sheila Ray, Statement of Professional Qualifications 03/29/2012 IEEE 100, The Authoritative Dictionary of IEEE Standards Terms, Seventh NRC000034 NYS-8 03/29/2012 Edition

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date National Fire Protection Recommended Practice 70B, Recommended Practice NRC000035 NYS-8 03/29/2012 for Electrical Equipment Maintenance (COPYRIGHT RESTRICTION)

IEEE C57.106, IEEE Guide for Acceptance and Maintenance of Insulating Oil NRCR00036 NYS-8 01/18/2013 in Equipment (COPYRIGHT RESTRICTION) (REVISED)

N.Y. Utami, et al., Evaluation Condition of Transformer Based on Infrared NRC000037 NYS-8 Thermography Results, Properties and Application of Dielectric Materials, 03/29/2012 IEEE 2009 (COPYRIGHT RESTRICTION)

IEEE Std 62-1995, IEEE Guide for Diagnostic Field Testing of Electric Power NRC000038 NYS-8 Apparatus -Part 1: Oil Filled Power Transformers, Regulators, and Reactors 03/29/2012 (COPYRIGHT RESTRICTION)

NRC000039 NYS-12C NRC Staffs Statement of Position Concerning Contention NYS-12C 03/30/2012 NRC000040 NYS-16B NRC Staffs Statement of Position Concerning Contention NYS-16B 03/30/2012

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NRC Staff Combined Testimony of Nathan Bixler, Tina Ghosh, Joseph Jones NRC000041 NYS-12C/16B 03/30/2012 and Donald Harrison Concerning NYS-12C/16B NRC000042 NYS-12C/16B Nathan Bixler Statement of Professional Qualifications 03/30/2012 NRC000043 NYS-12C/16B Tina Ghosh Statement of Professional Qualifications 03/30/2012 NRC000044 NYS-12C/16B Joseph Jones Statement of Professional Qualifications 03/30/2012 NRC000045 NYS-12C/16B Donald Harrison Statement of Professional Qualifications 03/30/2012 EPA, Empire Abrasive Blast NVac for Radiological Decontamination, NRC000046 NYS-12C/16B 03/30/2012 EPA600/R-11-014 May 2011 Innovative Technology Summary Report for ALARATM 1146 Strippable NRC000047 NYS-12C/16B 03/30/2012 Coating, Department of Energy 1999 R. Demmer, Large-Scale Urban Decontamiantion; DevelopmentsHistorical NRC000048 NYS-12C/16B 03/30/2012 Examples, and Lessons Learned, Idaho National Labortory 2007 J. Beyea, et. al, Damages from a Major Release of 137Cs into the Atmosphere NRC000049 NYS-12C/16B 03/30/2012 of the United States, 2004 E. Lyman, Chernobyl on the Hudson? The Health and Economic Impacts of a NRC000050 NYS-12C/16B 03/30/2012 Terrorist Attack at the Indian Point Nuclear Power Plant, 2004

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NRC000051 NYS-12C/16B D. Osborn et. al., Economic Costs from a Radiological Transportation Accident 03/30/2012 G. J. Edgington et. al., Presentation Slides, Decontamination of Cs-137, Pu-NRC000052 NYS-12C/16B 239, and Am-241 from Hard Surfaces using a Peelable Polymer-based 03/30/2012 Hydrogel, HealthPhysics Society Annual Meeting Pittsburgh, PA EPA, Radiation Protection - Plutonium, NRC000053 NYS-12C/16B 03/30/2012 http://www.epa.gov/radiation/radionuclides/plutonium.html EPA, Radiation Protection - cesium, NRC000054 NYS-12C/16B 03/30/2012 http://www.epa.gov/radiation/radionuclides/cesium.html U.S. Government Accountability Office, The Bureaus Plans for Reducing the NRC000055 NYS-12C/16B 03/30/2012 Undercount Show Promise, but Key Uncertainties Remain, 2008 NUREG-75/014 (WASH-1400), Reactor Safety Study - An Assessment of NRC000056 NYS-12C/16B 03/30/2012 Accident Risks in U.S. Commercial Nuclear Power Plants, 1975 NUREG/CR-4551, Volume 2, Part 7, Evaluation of Severe Accidents:

NRC000057 NYS-12C/16B 03/30/2012 Quantification of Major Input Parameters - MACCS Input NRC000058 NYS-12C/16B NUREG/CR-3673, Economic Risks of Nuclear Power Reactor Accidents 03/30/2012 NUREG-1150, Severe Accident Risks: An Assessment for Five U.S. Nuclear NRC000059 NYS-12C/16B 03/30/2012 Power Plants, 1990 NRC000060 NYS-12C/16B Fraction of Land Contaminated by Each Source Term Group (STG) 03/30/2012

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date Site Specific MACCS2 Input Data for Indian Point Energy Center, Volume 1 NRC000061 NYS-12C/16B 03/30/2012 (2006)

NRC000062 CW-EC-3A NRC Staffs Statement of Position Concerning Contention CW-EC-3A 03/30/2012 NRC Staffs Testimony of Jeffrey J. Rikhoff and Patricia A. Milligan Concerning NRC000063 CW-EC-3A 03/30/2012 Contention CW-EC-3A NRC000064 CW-EC-3A Patricia A. Milligan Statement of Professional Qualifications 03/30/2012 Federal Emergency Management Agency and NRC, 44 CFR Appendix A to NRC000065 CW-EC-3A 03/30/2012 Part 353; 58 Fed. Reg. 47,997 (Sept. 14, 1994) (FEMA/NRC MOU)

NUREG-0654/FEMA-REP-1, Rev. 1, Criteria for Preparation and Evaluation of NRC000066 CW-EC-3A Radiological Emergency Response Plans and Preparedness in Support of 03/30/2012 Nuclear Power Plants (NUREG-0654/FEMA-REP-1)

NUREG-0654/FEMA-REP-1, Rev. 1, Supplement 3, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness NRC000067 CW-EC-3A 03/30/2012 in Support of Nuclear Power Plants, Guidance for Protective Action Strategies (2011) (NUREG-0654/FEMA-REP-1 Supp. 3)

NUREG/CR-6864, Vol. 1, Identification and Analysis of Factors Affecting NRC000068 CW-EC-3A 03/30/2012 Emergency Evacuations (NUREG/CR-6864) 2010-2011 Putnam County Indian Point Emergency Guide (Putnam IP NRC000069 CW-EC-3A 03/30/2012 Emergency Guide)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date 2011-2012 Orange County Indian Point Emergency Guide (Orange IP NRC000070 CW-EC-3A 03/30/2012 Emergency Guide)

National Institute for Chemical Studies, Sheltering in Place as a Public NRC000071 CW-EC-3A 03/30/2012 Protective Action (June 2001) (NICS Study)

U.S. Department of Homeland Security (DHS) in cooperation with the U.S.

NRC000072 CW-EC-3A Department of Transportation, Nationwide Plan Review Phase 2 Report (June 03/30/2012 2006) (DHS Report)

Jeffrey A. Schwartz & David Webb, Hurricanes Katrina and Rita and the NRC000073 CW-EC-3A Louisiana Dept. of Public Safety and Corrections: A Chronicle and Critical 03/30/2012 Incident Review (May 2006) (Hurricanes Katrina and Rita Incident Review)

The Chernobyl Forum, Chernobyls Legacy: Health, Environmental and Socio-economic Impacts and Recommendations to the Governments of Belarus, the NRC000074 CW-EC-3A 03/30/2012 Russian Federation and Ukraine (September 2005) (Chernobyl Recommendations)

US Department of Health and Human Services, Food and Drug Administration, Center for Drug Evaluation and Research, Guidance: Potassium Iodide as a NRC000075 CW-EC-3A 03/30/2012 Thyroid Blocking Agent in Radiation Emergencies (Dec. 2001) (FDA Thyroid Guidance)

NRC000076 NYS-6/7 NRC Staffs Statement of Position Concerning Contention NYS-6/7 03/30/2012 NRC Staffs Testimony of Clifford Doutt and Duc Nguyen Concerning NRC000077 NYS-6/7 03/30/2012 Contention NYS-6/7

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NRC000078 NYS-6/7 Clifford Doutt Statement of Professional Qualifications 03/30/2012 NRC000079 NYS-6/7 Duc Nguyen Statement of Professional Qualifications 03/30/2012 NRC Staffs Initial Statement of Position of Contention NYS-17, 17A, 17B NRCR00080 NYS-17B 10/09/2012 (Land Use)

NRC Staffs Testimony of Jeffrey J. Rikhoff, Andrew L. Stuyvenberg, and John NRCR00081 NYS-17B P. Boska Concerning Contentions NYS-17, 17A and 17B (Land Use) 10/09/2012 (REVISED)

NRC000082 NYS-17B Jeffrey J. Rikhoff, Statement of Professional Qualifications 03/30/2012 NRC000083 NYS-17B Andrew L. Stuyvenberg, Statement of Professional Qualifications 03/30/2012 NRC000084 NYS-17B John P. Boska, Statement of Professional Qualifications 03/30/2012 NRC000085 NYS-17B NRC Information Digest (NUREG-1350), Dataset, Appendix B 03/30/2012 NRCR00086 NYS-17B NRC Information Digest (NUREG-1350), Dataset, Appendix A (REVISED) 10/09/2012 RK-EC3/ NRC Staffs Statement of Position Concerning Contention RK-EC3/ CW-EC1 NRCR00087 09/21/2012 CW-EC1 (REVISED)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date RK-EC3/ NRC Staffs Testimony of Stephen P. Klementowicz and James D. Noggle NRCR00088 09/21/2012 CW-EC1 Concerning Contention RK-EC3/ CW-EC1 (REVISED)

RK-EC3/

NRC000089 Stephen P. Klementowicz Statement of Professional Qualifications 03/30/2012 CW-EC1 RK-EC3/

NRCR00090 James D. Noggle Statement of Professional Qualifications (REVISED) 09/21/2012 CW-EC1 RK-EC3/

NRC000091 08/11/2006 IP Unit 2 - Integrated Inspection Report 05000247/2006003 03/30/2012 CW-EC1 RK-EC3/

NRC000092 01/31/2007 IP Unit 2 - Integrated Inspection Report 05000247/200605 03/30/2012 CW-EC1 RK-EC3/

NRC000093 05/10/2007 IP Unit 2 - Integrated Inspection Report 05000247/2007002 03/30/2012 CW-EC1 RK-EC3/

NRC000094 11/09/2007 IP Unit 2 - Integrated Inspection Report 05000247/2007004 03/30/2012 CW-EC1 RK-EC3/ 05/15/2008 - NL-08-079: Remediation and Long Term Monitoring of Site NRC000095 03/30/2012 CW-EC1 Groundwater RK-EC3/

NRC000096 Branch Technical Position, Rev. 1 (November 1979) 03/30/2012 CW-EC1 NUREG-1301: Offsite Dose Calculation Manual Guidance: Standard RK-EC3/

NRC000097 Radiological Effluent Controls for Pressurized Water Reactors (GL-89-01, 03/30/2012 CW-EC1 Supplement No. 1)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date 01/04/2005 - SRM-04-0223: Request for Approval of Staff Comments on the RK-EC3/

NRC000098 2005 Recommendations of the International Commission on Radiological 03/30/2012 CW-EC1 Protection RK-EC3/ 08/23/2006 - SRM-06-0168: Staff Comments on the Draft Recommendations NRC000099 03/30/2012 CW-EC1 of the International Commission on Radiological Protection NRC Reg. Guide 1.21, Rev. 1: Measuring, Evaluating, and Reporting RK-EC3/ Radioactivity in Solid Wastes and Releases of Radioactive Materials in NRC000100 03/30/2012 CW-EC1 Liquid and Gaseous Effluents from Light-Water-Cooled Nuclear Power Plants (June 1974)

NYS-26B/

NRCR20101 NRC Staffs Revised Statement of Position Regarding NYS 26B/RK-TC-1B 08/10/2015 RK-TC1B NYS-26B/ NRC Staffs Testimony of Allen Hiser, On Yee and Ching Ng Regarding NYS NRC000102 03/31/2012 RK-TC1B 26B/RK-TC-1B NYS-26B/

NRC000103 Allen Hiser Statement of Professional Qualifications 03/30/2012 RK-TC1B NYS-26 NRCR00104 On Yee Statement of Professional Qualifications (REVISED) 08/10/2015 NYS-38 NYS-26 NRCR00105 Ching Ng Statement of Professional Qualifications (REVISED) 08/10/2015 NYS-38 NYS-26B/ NRC Inspection Manual, Inspection Procedure 71002, License Renewal NRC000106 03/30/2012 RK-TC1B Inspection

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NYS-26B/

NRC000107 NRC Inspection Report 05000247/2008006 and 05000286/2008006 03/30/2012 RK-TC1B NYS-26B/ Audit Report for Plant Aging Management Programs and Reviews, Indian Point NRC000108 03/31/2012 RK-TC1B Nuclear Generating Unit Nos. 2 and 3 Letter NL-08-057, Letter from Entergy Nuclear Operations, Inc., to NRC, Indian NYS-26B/

NRC000109 Point Nuclear Generating Units 2 and 3, License Renewal Application 03/31/2012 RK-TC1B Amendment 3 Letter NL-11-032, Letter from Entergy Nuclear Operations, Inc. to NRC, Indian NYS-26B/

NRC000110 Point, Units 2 & 3, Response to Request for Additional Information on Aging 03/31/2012 RK-TC1B Management Programs Letter NL-07-153, Letter from Entergy Nuclear Operations, Inc., to NRC, Indian NYS-26B/

NRC000111 Point Nuclear Generating Units 2 and 3, License Renewal Application 03/31/2012 RK-TC1B Amendment 1 NYS-26B/ NRC Regulatory Issue Summary -2011-14, Metal Fatigue Analysis Performed NRC000112 03/31/2012 RK-TC1B By Computer Software NYS-26B/

NRC000113 ASME Code Section XI, Appendix L, Operating Plant Fatigue Assessment 03/31/2012 RK-TC1B NRC000114A NYS-26B/ MRP-227-A, Materials Reliability Program: Pressurized Water Reactor

- 04/02/2012 RK-TC1B Internals Inspection and Evaluation Guidelines NRC000114F NYS-26B/ EPRI, TR-105714, Rev. 5, Pressurized Water Reactor Primary Water NRC000115 03/31/2012 RK-TC1B Chemistry Guidelines

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date Requests for Additional Information in NRC Letter, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit NYS-26B/

NRC000116 Numbers 2 and 3, License Renewal Application Time-Limited Aging Analyses, 03/31/2012 RK-TC1B Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No. ML080870374)

NYS-26B/

NRC000117 Statement Of Consideration for 1995 License Renewal Rule 03/31/2012 RK-TC1B NYS-26 NRCR00118 NYS-38 Indian Point Unit 3 Technical Specifications (EXCERPT) (REVISED) 08/10/2015 NYS-26B/

NRC000119 Salem Nuclear Generating Stations use of WESTEMSTM fatigue software 03/31/2012 RK-TC1B NRC000120 RK-TC-2 NRC Staffs Statement Of Position Regarding RK-TC2 03/31/2012 NRC000121 RK-TC-2 NRC Staffs Testimony of Matthew Yoder and Allen Hiser Regarding RK-TC2 03/31/2012 NRC000122 RK-TC-2 Matthew Yoder Statement of Professional Qualifications 03/31/2012 NYS-26B/

Audit and Review Plan for Plant Aging Management Reviews and Programs -

NRC000123 RK-TC-1B, 03/31/2012 Indian Point Generating Units Nos. 2 and 3)

RK-TC-2

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NYS-26B/

Scoping and Screening Methodology Audit Trip Report For Indian Point, Units NRC000124 RK-TC-1B, 03/31/2012 2 and 3 RK-TC-2 Letter NL-07-056 , Letter from Indian Point Nuclear Generating Units 2 and 3 -

NRC000125 RK-TC-2 03/31/2012 Supplement to License Renewal Application (May 3, 2007)

Letter NL-07-078, Letter from Entergy Nuclear Operations, Inc., to NRC, Indian NRC000126 RK-TC-2 Point Nuclear Generating Unit 2, Response to NRC Review Status of License 03/31/2012 Renewal Application, (June 21, 2007)(ADAMS Accession No. ML071800318)

Letter NL-07-124, Letter From Entergy Nuclear Operations, Inc., to NRC, NRC000127 RK-TC-2 Indian Point Nuclear Generating Units 2 and 3, Supplement to License 03/31/2012 Renewal Application, (Oct 11, 2007) (ADAMS Accession No. ML072910276)

Letter from K. Green (NRC) to M. Balduzzi (Entergy Nuclear Operations, Inc),

"Requests for Additional Information for the Review of the Indian Point Nuclear NRC000128 RK-TC-2 03/31/2012 Generating Unit Nos. 2 and 3, License Renewal Application (December 7, 2007)(ADAMS Accession No. ML073250226)

WCAP-16212-NP (nonproprietary) Indian Point Nuclear Generating Unit No. 3 NRC000129 RK-TC-2 Stretch Power Uprate NSSS and BOP Licensing Report (June 2004) (ADAMS 03/31/2012 Accession Nos. ML041620616 & ML041630103)

SECY-99-148, Credit for Existing Programs for License renewal,(June 3, NRC000130 RK-TC-2 03/31/2012 1999)(ADAMS Accession No. ML992770130)

Staff Requirements - SECY-99-148- Credit for Existing Programs for License NRC000131 RK-TC-2 03/31/2012 Renewal (August 27, 1999)(ADAMS Accession No. ML003751930)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NRC Staffs Initial Statement of Position on Contention NYS-9, NYS-33 and NRCR00132 NYS-37 04/02/2012 NYS-37 (Alternatives, Consolidated) (CORRECTED)

NRC Staffs Testimony of Andrew L. Stuyvenberg Concerning Contention NRC000133 NYS-37 03/30/2012 NYS-9, NYS-33 and NYS-37 (Alternatives, Consolidated)

NRC000134 NYS-37 Andrew L. Stuyvenberg Statement of Professional Qualifications 03/30/2012 New York State Scoping Comments on License Renewal of Indian Point, Units NRC000135 NYS-37 03/30/2012 2 and 3, October 31, 2007 Letter from NYS to BPham, NRC, Re Tendered Application for Relicensure NRC000136 NYS-37 by Entergy Nuclear Indian Point LLCs for Operating Licenses Nos. DPR-26 03/30/2012 and DPR-64, dated July 13, 2007 Electric Power Annual 2009, U.S. Energy Information Administration, April NRC000137 NYS-37 03/30/2012 2011 Supplemental Proposed Rulemaking, Environmental Review for Renewal of NRC000138 NYS-37 03/30/2012 Operating licenses Environmental Impact Statement, Scoping Process, Summary Report, Indian NRCR00139 NYS-37 01/18/2013 Point, December 2008 (REVISED)

Generic Environmental Impact Statement for License Renewal of Nuclear NRC000140 NYS-37 03/30/2012 Plants, Supplement 37, Three Mile Island Nuclear Station, Unit 1 Generic Environmental Impact Statement for License Renewal of Nuclear NRC000141 NYS-37 03/30/2012 Plants, Supplement 33, Shearon Harris Nuclear Power Plant, Unit 1

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date Supplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms, by C. Archer and M. Jacobson, Journal of NRC000142 NYS-37 03/30/2012 Applied Meteorology and Climatology, November 2007 (COPYRIGHT RESTRICTION)

NRC000143 NYS-37 American Wind Energy Association, Production Tax Credit 03/30/2012 CNET News, Flywheel storage maker Beacon Power declares bankruptcy, by NRC000144 NYS-37 03/30/2012 Martin LaMonica, Oct. 31, 2011 NYS Supplemental Comments Regarding Scope of NEPA Analysis, NRC000145 NYS-37 Application for Relicensure by Entergy Nuclear Indian Point LLCs for Operating 03/30/2012 Licenses Nos. DPR-26 and CPR-64 NRC000146 N/A EXHIBIT NOT USED N/A NYS-26 NRC Staffs Revised Statement of Position on State of New York and NRCR00147 08/10/2015 NYS-38 Riverkeepers Joint Contention NYS-38/RK-TC5 (REVISED)

NYS-38/ NRC Staffs Testimony of Allen L. Hiser, On Yee, and Ching Ng Concerning NRC000148 08/20/2012 RK-TC5 Portions of Contention NYS-38 NYS-38/

NRC000149 ASME Section XI, Appendix A (Excerpt) 08/20/2012 RK-TC5 NYS-38/

NRC000150 ASME Section XI, Appendix C (Excerpt) 08/20/2012 RK-TC5

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NYS-38/

NRC000151 Temporary Instruction 2516/001, dated March 30, 2011 08/20/2012 RK-TC5 NYS-38/ Indian Point Nuclear Generating Unit 2 - NRC Inspection Report NRC000152 08/20/2012 RK-TC5 05000247/2012008, dated April 19, 2012 NYS-38/ NL-12-089, Entergy Letter Replying to Request for Additional Information NRC000153 08/20/2012 RK-TC5 Regarding the License Renewal Application (dated June 14, 2012)

April 11, 2011 Summary of the March 11, 2011 Meeting between the U.S.

NYS-38/

NRC000154 Nuclear Regulatory Commission Staff and the Nuclear Energy Institute to 08/20/2012 RK-TC5 Discuss Current License Renewal Topics NYS-38/ March 30, 2011 Audit Report on the Use of WESTEMS Software in the Salem NRC000155 08/20/2012 RK-TC5 Nuclear Generating Station, Units 1 and 2, License Renewal Application NYS-38/ NL-11-101, Entergy Letter Regarding Clarification for Request for Additional NRC000156 08/20/2012 RK-TC5 Information - Aging Management Programs (dated August 22, 2011)

NYS-38/

NRC000157 Kenneth J. Karwoski - Statement of Professional Qualifications 08/20/2012 RK-TC5

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date NYS-38/ August 12, 2010 NEI Steam Generator Task Force NRC/ Industry Update NRC000158 08/20/2012 RK-TC5 (CONTAINS COPYRIGHTED MATERIAL)

Electric Power Research Institute - Implementation Status of Industry Change NYS-38/

NRC000159 Management Plan for Materials Related R & D Committees under NEI 03-08 08/20/2012 RK-TC5 (CONTAINS COPYRIGHTED MATERIAL)

NYS-38/ August 4, 2011 NEI Steam Generator Task Force NRC/ Industry Update NRC000160 08/20/2012 RK-TC5 (CONTAINS COPYRIGHTED MATERIAL)

NYS-38/ NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski NRCR00161 08/10/2015 RK-TC5 Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (REVISED)

Final License Renewal Interim Staff Guidance - LR-ISG-2011-03 Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 NRC000162 NYS-5 08/23/2012 Aging Management Program Xi.M41, Buried And Underground Piping And Tanks

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Contention Exhibit Exhibit # Addressed by Exhibit Name Submission Exhibit Date 77 Fed. Reg. 46,127 (Aug. 2, 2012) Interim Staff Guidance on Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 NRC000163 NYS-5 08/23/2012 Aging Management Program Xi.M41, Buried And Underground Piping And Tanks Affidavit of S. Tina Ghosh Concerning State of New York Motion for Leave to NRC000164 NYS-12C File an Additional Exhibit and Additional Cross-Examination Questions 10/09/2012 Concerning Consolidated Contention NYS-12C NYS 17B/

NRC000165 Cricket Valley Energy Project - FEIS (EXCERPT) 10/15/2012 NYS-37 NRC000166 NYS-37 Cricket Valley Energy Project - DEIS (EXCERPT) 10/15/2012 Declaration of William C. Holston Updating NRC Staffs Testimony on NRC000167 NYS-5 Contention NYS-5 (Buried Piping and Tanks) to Address New Information 04/22/2013 Submitted by Applicant Entergy Nuclear Operations, Inc.

NRC000168 NYS-26 NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E.,

NYS-38 and Mr. On Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS- 08/10/2015 38/RK-TC-5 NRC000169 NYS-26 NYS-38 Indian Point Unit 2 Technical Specifications (EXCERPT) 08/10/2015 NRC000170 NYS-26 EPRI 1008224, Final Report, Rev. 6, Pressurized Water Reactor Secondary NYS-38 Water Chemistry Guidelines (Dec. 2004) 08/10/2015 (PROPRIETARY)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000171 NYS-26 EPRI 1015014, Materials Reliability Program: Evaluation of Controlling NYS-38 Transient Ramp Times Using Piping Methodologies When Considering 08/10/2015 Environmental Fatigue (Fen) Effects (MRP-218) (Sept. 2007)

(EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000172 NYS-26 EPRI 1003536, Materials Reliability Program: Second International Conference NYS-38 on Fatigue of Reactor Components (MRP-84) (Feb. 2003) 08/10/2015 (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000173 NYS-26 Excerpt from Transcript of Advisory Committee on Reactor Safeguards NYS-38 Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014) 08/10/2015 NRC000174 NYS-26 Background of the Factors of Safety Used in Divisions I of Sections III and XI of NYS-38 the ASME Rules for Nuclear Vessels (Oct. 1984) 08/10/2015 (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000175 NYS-26 Implementation of Automated, On-line Fatigue Monitoring in a Boiling Water NYS-38 Reactor (1993) 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000176 NYS-26 EPRI 1003069, Materials Reliability Program Hot Cell Testing of Baffle/Former NYS-38 Bolts Removed From Two Lead PWR Plants (MRP-51) 08/10/2015 (Nov. 2001)

(PROPRIETARY)

NRC000177 NYS-26 ICONE5-2372, Fatigue and Stress Corrosion Cracking Behaviors of Irradiated NYS-38 Stainless Steels in PWR Primary Water 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000178 NYS-26 ASME Code,Section III - Subsection NCA, General Requirements for Division NYS-38 1 and Division 2 Rules for Construction of Nuclear Facility Components 08/10/2015 (Jul. 1, 2007)

(CONTAINS COPYRIGHTED MATERIAL)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000179 NYS-26 Regulatory Guide 1.207, Guidelines for Evaluating Fatigue Analyses NYS-38 Incorporating the Life Reduction of Metal Components Due to the Effects of the 08/10/2015 Light-Water Reactor Environment for New Reactors (Mar. 2007)

NRC000180 NYS-26 NRC Inspection Manual, Chapter 2516, Policy and Guidance for the License NYS-38 Renewal Inspection Program (Aug. 13, 2013) 08/10/2015 NRC000181 NYS-26 Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear NYS-38 Generating Unit 2 - NRC License Renewal Team Inspection Report 08/10/2015 05000247/2013009 (July 5, 2013)

NRC000182 NYS-26 Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear NYS-38 Generating Unit 2 - NRC License Renewal Team Inspection Report 08/10/2015 05000247/2013010 (Sept. 19, 2013)

NRC000183 NYS-26 NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for NYS-38 Plants with a Timely Renewal Application (Sept. 25, 2013) 08/10/2015 NRC000184 NYS-25 Letter NL-13-114, Letter from Fred Dacimo, Entergy, to NRC, Implementation NYS-26 of License Renewal Regulatory Commitments Indian Point Nuclear Generating 08/10/2015 NYS-38 Unit No. 2 Docket No. 50-257 License No. DPR-26 (Aug. 28, 2013)

NRC000185 NYS-26 Letter from Arthur Burritt, NRC, to Larry Coyle, Entergy, Annual Assessment NYS-38 Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 08/10/2015 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)

NRC000186 NYS-26 Effect of LWR Coolant Environments on the Fatigue of Reactor Materials, 79 NYS-38 Fed. Reg. 21811 (Apr. 17, 2014) 08/10/2015 NRC000187 NYS-26 Letter from John Daily, NRC, to Entergy, Request for Additional Information for NYS-38 the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License 08/10/2015

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) ( Feb. 6, 2013)

NRC000188 NYS-26 Letter NL-15-060, Letter from Fred Dacimo, Entergy, to NRC, Entergy Actions NYS-38 Required Prior to Entry into Period of Extended Operation Associated with 08/10/2015 License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015)

NRC000189 NYS-38 TSTF-510, Rev. 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011) 08/10/2015 NRC000190 NYS-38 NRC White Paper on Risk-Informed and Performance-Based Regulation 08/10/2015 NRC000191 NYS-38 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 08/10/2015 Fed. Reg. 15144 (Mar. 18, 2014)

NRC000192 NYS-38 Letter NL-15-001, Letter from Lawrence Coyle, to NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program 08/10/2015 Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50-247 License No. DPR-26 (Jan. 15, 2015)

NRC000193 NYS-38 Letter NL-13-143, Letter from Robert Walpole, to NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection 08/10/2015 Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)

NRC000194 NYS-38 S. Miloudi et al, Destructive Examinations on Divider Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion 08/10/2015 Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012)

(CONTAINS COPYRIGHTED MATERIAL)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000195 NYS-26 ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant NYS-38 Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, 08/10/2015 IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000196 NYS-25 NRC Staffs Initial Statement of Position on Contention NYS-25 NYS-38 (Reactor Vessel Internals) 08/10/2015 (PROPRIETARY)

NRC000197 NYS-25 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-38 NYS-25 and NYS-38/RK-TC-5 08/10/2015 (PROPRIETARY)

NRC000198 NYS-25 Enclosure to MRP Letter 2013-025, MRP-227-A Applicability Guidelines for NYS-38 Combustion Engineering and Westinghouse Pressurized Water Reactor 08/10/2015 Designs (Oct. 4, 2013)

NRC000199 NYS-25 ASME Code,Section XI, 2007 through 2008 Addenda, IWA-2213 NYS-38 (Jul. 1, 2008) 08/10/2015 (CONTAINS COPYRIGHTED MATERIAL)

NRC000200 NYS-25 WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance Criteria Methodology NYS-38 and Data Requirements (Dec. 2009) 08/10/2015 NRC000201 NYS-25 NRC Position on Aging Management of CASS Reactor Vessel Internal NYS-38 Components (June 11, 2014) 08/10/2015 NRC000202 NYS-25 ASM Handbook, Vol. 19, Fatigue and Fracture, Figure 14 at 595 (1996)

NYS-38 (EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000203 NYS-25 EPRI 1021001NP/BWRVIP-100NP, Final Report, Rev. 1, BWR Vessel and NYS-38 Internals Project, Updated Assessment of the Fracture Toughness of Irradiated 08/10/2015 Stainless Steel for BWR Core Shrouds (Oct. 2010)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000204 NYS-25 PWROG-14048-P, Rev. 0, Functionality Analysis: Lower Support Columns NYS-38 (Dec. 2014) 08/10/2015 (PROPRIETARY)

NRC000205 NYS-25 Indian Point, Unit 2, Updated Final Safety Analysis Report (UFSAR), Rev. 25, NYS-38 Chapter 3 - Reactor (2014) 08/10/2015 NRC000206 NYS-25 Indian Point, Unit 2, Updated Final Safety Analysis Report (UFSAR), Rev. 25, NYS-38 Chapter 14 - Safety Analysis (2014) 08/10/2015 NRC000207 NYS-25 Regulatory Information Conference Presentation Slides, Recent Materials NYS-38 Inspections of PWR Reactor Internals (Mar. 2015) 08/10/2015 NRC00208A NYS-25 MRP Letter 2014-09, Biennial Report of Recent MRP-227-A Reactor Internals

- NYS-38 Inspection Results (May 12, 2014) 08/10/2015 NRC00208E NRC000209 NYS-25 EPRI 1013396/BWRVIP-100-A, Final Report, BWR Vessel and Internals NYS-38 Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless 08/10/2015 Steel for BWR Core Shrouds (Aug. 2006)

(PROPRIETARY)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000210 NYS-25 EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, BWR Vessel and Internals NYS-38 Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless 08/10/2015 Steel for BWR Core Shrouds (Aug. 2006) (CONTAINS COPYRIGHTED MATERIAL)

NRC000211 NYS-25 MRP-227, Rev. 1 Presentation Slides, Westinghouse Figures Presented at 08/10/2015 NYS-38 Public Meeting on March 31, 2015 (Feb. 2015)

NRC000212 NYS-25 R. Reed-Hill and R. Abbaschian, Physical Metallurgy Principles, Third Edition 08/10/2015 NYS-38 (1992)

(EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000213 NYS-25 Letter from Christopher Grimes, Chief, NRC, to Douglas Walters, NEI, License NYS-38 Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic 08/10/2015 Stainless Steel Components (May 19, 2000)

NRC000214 NYS-25 Letter from John Lubinski, NRC, to Jean Smith, EPRI, License Renewal Interim NYS-38 Staff Guidance LR-ISG-2011-04: Updated Aging Management Criteria for 08/10/2015 Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013)

NRC000215 NYS-25 Evaluation of WCAP-17780-P, "Reactor Internals Aging Management MRP-NYS-38 227-A Applicability for Combustion Engineering [(CE)] and Westinghouse 08/10/2015

[Electric Company (Westinghouse)] Pressurized Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse Pressurized Water Reactor Designs (Nov. 7, 2014)

NRC000216 NYS-25 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation NYS-38 Division of License Renewal Aging Management Audit Report (Oct. 6, 2014) 08/10/2015 (PROPRIETARY)

NRC000217 EXHIBIT NOT USED

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000218 NYS-25 EPRI 1016106, Final Report, Materials Reliability Program: Fracture NYS-38 Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal 08/10/2015 Components (MRP-210) (Dec. 2007)

(COPYRIGHT)

NRC000219 NYS-25 Westinghouse InfoGram IG-10-1, Reactor Internals Lower Radial Support NYS-38 Clevis Insert Cap Screw Degradation (Mar. 31, 2010) 08/10/2015 NRC000220 NYS-25 Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, NYS-38 Industry and NRC Coordination Meeting Materials Programs Technical 08/10/2015 Exchange: Clevis Insert Bolt Update, (June 2014)

NRC00221A NYS-25 Babcock & Wilcox Report, S-1473-002, Final Report, Rev. 0, Examination of

- NYS-38 Clevis Bolts Removed from D. C. Cook Nuclear Plant (Dec. 2013) 08/10/2015 NRC00221F NRC000222 NYS-25 IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT) 08/10/2015 NYS-38 NRC000223 NYS-25 IP3 FSAR Rev. 04 Chapter 14 (2011) 08/10/2015 NYS-38 NRC000224 NYS-25 IP3 FSAR Rev. 04 Chapter 16 08/10/2015 NYS-38 NRC00225A NYS-25 EPRI 1016593, Final Report, Materials Reliability Program: Aging Management

- NYS-38 Strategies for Westinghouse and Combustion Engineering PWR Internals 08/10/2015 NRC00225B (MRP-232) (Dec. 31, 2008)

(PROPRIETARY)

NRCR90001 Submitted: Aug 10, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing NRC Staff Hearing Exhibits NRC000226 NYS-25 Jeffrey C. Poehler Statement of Professional Qualifications NYS-38 08/10/2015 NRC000227 NYS-25 Gary Stevens Statement of Professional Qualifications NYS-26 08/10/2015 NYS-38 NRC000228 NYS-25 Indian Point Unit 2 Technical Specifications 3.1.4 NYS-38 08/10/2015 NRC000229 NYS-25 Indian Point Unit 3 Technical Specifications 3.1.4 NYS-38 08/10/2015