ML15309A171

From kanterella
Jump to navigation Jump to search
RIVR14001 - Riverkeeper Tailored Track 2 Exhibit List
ML15309A171
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/05/2015
From:
Riverkeeper
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28473, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15309A171 (19)


Text

RIVR14001 Revised: November 5, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIVR14001 All Riverkeeper Track 2 Tailored Hearing Exhibit List Nov. 5, 2015 Proffered RIV000004 RK-TC-2; RK-TC-1B; Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV") Dec. 22, 2011 Admitted during RK-TC-5 Track 1 Hearings (10-15-2012)

RIV000034 RK-TC-1B Dr.Hopenfeld Pre-filed Testimony Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000035 RK-TC-1B; RK-TC-5 Dr. Hopenfeld Report Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000036 RK-TC-1B; RK-TC-5 Westinghouse "EnvFat User's Manual Version 1" Dec. 22, 2011 Admitted during IPECPROP00056785 Track 1 Hearings (10-15-2012)

RIV000037 RK-TC-1B; RK-TC-5 Official Transcript, ACRS Subcommittee, 12/6/2006 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 1

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000038 RK-TC-1B; RK-TC-5 NRC IN 2011-04 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000039 RK-TC-1B; RK-TC-5 Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, Dec. 22, 2011 Admitted during 5/12/08 Track 1 Hearings (10-15-2012)

RIV000040 RK-TC-1B; RK-TC-5 Taylor, EPRI R & D Status Report, Jan/Feb 1983 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000041 RK-TC-1B; RK-TC-5 Entergy, Table of Environmental Correction Actions for Dec. 22, 2011 Admitted during Metal Fatigue, 11/6/07 Track 1 Hearings (10-15-2012)

RIV000042 RK-TC-1B; RK-TC-5 DC Cook Charging Nozzle LR Fatigue Evaluations, Dec. 22, 2011 Admitted during IPECPROP00061294 Track 1 Hearings (10-15-2012) 2

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000043 RK-TC-1B; RK-TC-5 Diablo Canyon Unit 1 Insurge/Outsurge Eval, Dec. 22, 2011 Admitted during IPECPROP00061179 Track 1 Hearings (10-15-2012)

RIV000044 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000045 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 1 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000046 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 2 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 3

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000047 RK-TC-1B; RK-TC-5 NRC IN 97-46 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000048 RK-TC-1B; RK-TC-5 Final Report of the NESC-Thermal Fatigue Project, Dec. 22, 2011 Admitted during EUR22763 Track 1 Hearings (10-15-2012)

RIV000049 RK-TC-1B; RK-TC-5, Entergy Indian Point U3, FAC, 3RF13 Outage, 2005 Dec. 22, 2011 Admitted during RK-TC-2 Track 1 Hearings (10-15-2012)

RIV000050 RK-TC-1B; RK-TC-5 Westinghouse, WCAP-14950, IPECPROP00059247 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000051 RK-TC-1B; RK-TC-5 Kwang Chu Kim, Journal of Mechanical Dec. 22, 2011 Admitted during Science/Technology, 2008 Track 1 Hearings (10-15-2012) 4

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000052A RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1110 Dec. 22, 2011 Admitted during

-D Track 1 Hearings (10-15-2012)

RIV000053 RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1122 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000054 RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000055 RK-TC-1B; RK-TC-5 Westinghouse CN-PAFM-09-64, IPECPROP00058077 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000056 RK-TC-1B; RK-TC-5 Systems Standard Design Criteria, IPECPROP00059698 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 5

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000057 RK-TC-1B; RK-TC-5 RAI Indian Point U2 and U3 LRA, 2/10/11 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIVR00058 RK-TC-1B; RK-TC-5 Response to RAI, Indian Point U2 and U3, 3/28/11 Oct. 9, 2012 Admitted during Track 1 Hearings (10-15-2012)

RIV000102 RK-TC-5 Pre-Filed Testimony of Joram Hopenfeld in Support of RK- June 19, 2012 Admitted during TC-5 Track 1 Hearings (10-15-2012)

RIV000103 RK-TC-5; RK-TC-1B Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation June 19, 2012 Admitted during to LMFBR Leak Detection System Design (International Track 1 Hearings Conference on Liquid Metal Technology, May 3-6, 1976) (10-15-2012) 6

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000104 RK-TC-5; RK-TC-1B Memorandum from S. Collins (NRR) to W. Travers (EDO), June 19, 2012 Admitted during Re: Steam Generator Action Plan Revision to Address Track 1 Hearings Differing Professional Opinion on Steam Generator Tube (10-15-2012)

Integrity (WITS ITEM 200100026), May 11, 2011 RIV000105 RK-TC-5; RK-TC-1B NUREG-1740, Voltage-Based Alternative Repair Criteria, A June 19, 2012 Admitted during Report to the Advisory Committee on Reactor Safeguards by Track 1 Hearings the Ad Hoc Subcommittee on a Differing Professional (10-15-2012)

Opinion (March/Feb. 2001)

RIV000106 RK-TC-5; RK-TC-1B Associated Press, Nuke inspectors focus on 'unusual' wear on June 19, 2012 Admitted during tubes, Fox News.com, February 3, 2012 Track 1 Hearings (10-15-2012)

RIV000114 RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld June 29, 2012 Admitted during Regarding Contention NYS-26B/TC-1B - Metal Fatigue Track 1 Hearings (10-15-2012) 7

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000115 RK-TC-1B; RK-TC-5 NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal June 29, 2012 Admitted during Stratification (December 20, 1988) Track 1 Hearings (10-15-2012)

RIV000116 RK-TC-1B; RK-TC-5 Audit of NRCs License Renewal Program, OIG-07-A-15, June 29, 2012 Admitted during September 6, 2007 Track 1 Hearings (10-15-2012)

RIV000117 RK-TC-1B; RK-TC-5 Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, June 29, 2012 Admitted during Development of an Environmental Fatigue Evaluation Track 1 Hearings Method for Nuclear Power Plants in JSME Code* , J. of (10-15-2012)

Environment and Engineering Vol. 6, No. 2, 2011 8

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000118 RK-TC-1B; RK-TC-5 G. T. Yahr and R. C. Gwaltney (Oak Ridge National June 29, 2012 Admitted during Laboratory), Ao K. Richardson and W. L. Server (EG&G Track 1 Hearings Idaho, Inc), Case Study of the Propagation of a Small Flaw (10-15-2012)

Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119 RK-TC-1B; RK-TC-5 International Atomic Energy Agency, Applicability of the June 29, 2012 Admitted during leak before break concept, Report of the IAEA Track 1 Hearings Extrabudgetary Programme on the Safety of WWER-440 (10-15-2012)

Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 9

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000132 RK-TC-2; RK-TC-5 Excerpt of IP3, RO13 FAC Inspection Report (2005), Oct. 17, 2012 Admitted during IP00044076 Track 1 Hearings (10-17-2012)

RIV000133 RK-TC-2; RK-TC-5 Excerpt of IP3, RO15 FAC Inspection Report (2009), Oct. 17, 2012 Admitted during IPEC00213685 Track 1 Hearings (10-17-2012)

RIV000134 RK-TC-5 Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Nov. 9, 2012 Filed/Proffered Regarding Contention NYS-38/RK-TC-5 duing Track 1, not Admitted RIV000135 RK-TC-5; RK-TC-1B Entergy Ultrasonic Examination Reports, IPEC00020933 Nov. 9, 2012 Filed/Proffered duing Track 1, not Admitted 10

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000136 RK-TC-5; RK-TC-1B New York Power Authority Ultrasonic Examination Report, Nov. 9, 2012 Filed/Proffered Report No.: 99UT155, IPEC00021837 duing Track 1, not Admitted RIV000137 RK-TC-5; RK-TC-1B New York Power Authority Ultrasonic Examination Report, Nov. 9, 2012 Filed/Proffered Report No.: 99UT251, IPEC00021885 duing Track 1, not Admitted RIV000138 RK-TC-5; RK-TC-1B J.S. Kim & J.S. Seo, Development of Engineering Formulae Nov. 9, 2012 Filed/Proffered for Stress Concentration Factors of Local Wall Thinning in duing Track 1, not CANDU Feeder Pipe Under Pressure, Proceedings of the Admitted ASME 2011 Pressure Vessels & Piping Division Conference, PVP2011, July 17-21, 2011, Baltimore, Maryland, USA, PVP2011-57930 RIV000139 RK-TC-5; RK-TC-1B M.J. Jhung, Fatigue Analysis of a Reactor Pressure Vessel Nov. 9, 2012 Filed/Proffered For SMART, Nuclear Engineering and Technology, Vol. 44, duing Track 1, not No. 6 (August 2012) Admitted 11

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000140 RK-TC-5; RK-TC-1B François Vaillant, et al., Influence of a Cyclic Loading on the Nov. 9, 2012 Filed/Proffered Initiation and Propagation of PWSCC in Weld Metal 182, duing Track 1, not Proceedings of the 12th International Conference on Admitted Environmental Degradation of Materials in Nuclear Power System - Water Reactors - Edited by T.R. Allen, P.J. King, and L. Nelson TMS (The Minerals, Metals & Materials Society), 2005 RIV000141 RK-TC-5; RK-TC-1B E.C. Eggertson, et al, Turbulent Mixing and its Effects on Nov. 9, 2012 Filed/Proffered Thermal Fatigue in Nuclear Reactors, World Academy of duing Track 1, not Science, Engineering and Technology 52 (2011) Admitted RIV000142 RK-TC-5; RK-TC-1B Supplemental Prefiled Written Testimony of Dr. Joram June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-26B/RK-TC-1B Track 2, not Admitted 12

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000143 RK-TC-5; RK-TC-1B Supplemental Prefiled Written Testimony of Dr. Joram June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-38/RK-TC-5 Track 2, not Admitted RIV000144 RK-TC-5; RK-TC-1B Supplemental Report of Dr. Joram Hopenfeld in Support of June 9, 2015 Filed/Proffered for Contention NYS-26B/RK-TC-1B and Amended Contention Track 2, not NYS-38/RK-TC-5 (Non-Public/Non-Redacted) Admitted

[PROPRIETARY]

RIV000145 RK-TC-5; RK-TC-1B K L Murty, Materials Ageing and Degradation in Light June 9, 2015 Filed/Proffered for Water Reactors (Woodhead Publishing Ltd. 2013) Track 2, not

[EXCERPT; COPYRIGHT] Admitted RIV00146A- RK-TC-5; RK-TC-1B NUREG-1150, Severe Accident Risks: An Assessment for June 9, 2015 Filed/Proffered for B Five U.S. Nuclear Power Plants (1990), available at Track 2, not http://www.nrc.gov/reading-rm/doc- Admitted collections/nuregs/staff/sr1150/

13

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000147 RK-TC-5; RK-TC-1B NUREG-75/014 (WASH-1400), Reactor Safety Study: An June 9, 2015 Filed/Proffered for Assessment of Accident Risks in U.S. Commercial Nuclear Track 2, not Power Plants (1975) Admitted RIV000148 RK-TC-5; RK-TC-1B Declaration of Dr. Joram Hopenfeld (February 12, 2015) June 9, 2015 Filed/Proffered for

[PROPRIETARY] Track 2, not Admitted RIV000149 RK-TC-5; RK-TC-1B Material Aging Institute International Conference on Plants June 9, 2015 Filed/Proffered for Materials Degradations, Chemical conditioning of Light Track 2, not Water reactors Systems (2008), IPEC00265853 Admitted RIV000150 RK-TC-5; RK-TC-1B ANL, Report on Assessment of Environmentally-Assisted June 9, 2015 Filed/Proffered for Fatigue for LWR Extended Service Conditions, ANL-LWRS- Track 2, not 47 (September 2011) Admitted 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000151 RK-TC-5; RK-TC-1B NASA, Nuclear and Space Radiation Effects on Materials, June 9, 2015 Filed/Proffered for NASA SP-8053 (June 1970), available at, Track 2, not http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19710015 Admitted 558.pdf RIV000152 RK-TC-5; RK-TC-1B G. E. Korth & M. D. Harper, Effects of Neutron Radiation June 9, 2015 Filed/Proffered for on the Fatigue and Creep/Fatigue Behavior of Type 308 Track 2, not Stainless Steel Weld Metal at Elevated Temperatures Admitted (Seventh ASTM International Symposium on Effects of Radiation on Structural Materials, June 1974), available at, http://www.osti.gov/scitech/servlets/purl/4294682 15

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000153 RK-TC-5; RK-TC-1B Argonne National Laboratory, Corrosion and Mechanics of June 9, 2015 Filed/Proffered for Materials, Light Water Reactors, Irradiation-Induced Stress Track 2, not Corrosion Cracking of Austenitic Stainless Steels, Admitted http://www.ne.anl.gov/capabilities/cmm/highlights/ssc_auste nic_ss.html (last visited June 2, 2015)

RIV000154 RK-TC-5; RK-TC-1B S. Mohanty, S. Majumdar, & K. Natesan, Argonne National June 9, 2015 Filed/Proffered for Laboratory, A Review of Stress Corrosion Cracking/Fatigue Track 2, not Modeling for Light Water Reactor Cooling System Admitted Components (June 2012)

RIV000155 RK-TC-5; RK-TC-1B S. McKelvey & A. Fatemi, Effect of Forging Surface on June 9, 2015 Filed/Proffered for Fatigue Behavior of Steels: A Literature Review (University Track 2, not of Toledo) Admitted 16

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000156 RK-TC-5; RK-TC-1B Westinghouse, Indian Point Unit 2 Reactor Vessel Core June 9, 2015 Filed/Proffered for Support Pad Fatigue Reevaluation, CN-MRCDA-13-11, Track 2, not IPECPROP00079179 [PROPRIETARY] Admitted RIV000157 RK-TC-5; RK-TC-1B Pilkey & Pilkey, Petersons Stress Concentration Factors, June 9, 2015 Filed/Proffered for 3rd Edition, ISBN: 978-0-470-04824-5 (2008) [EXCERPT; Track 2, not COPYRIGHT] Admitted RIV000158 RK-TC-5; RK-TC-1B Herve Bodineau & Thierry Sollier, Tube support plate June 9, 2015 Filed/Proffered for clogging up of French PWR steam generators, Eurosafe, Track 2, not IRSN - Reactor Safety Division, BP17 (2009) Admitted RIV000159 RK-TC-5; RK-TC-1B NUREG/BR-0058, Rev.4, Regulatory Analysis Guidelines of June 9, 2015 Filed/Proffered for the U.S. Nuclear Regulatory Commission (2004), available Track 2, not at http://www.nrc.gov/reading-rm/doc- Admitted collections/nuregs/brochures/br0058/br0058r4.pdf 17

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000160 RK-TC-5; RK-TC-1B U.S. NRC, Commissioner Apostolakis, Application of Risk June 9, 2015 Filed/Proffered for Assessment and Management to Nuclear Safety (DOE Track 2, not Nuclear Safety Workshop, September 2012), available at, Admitted http://energy.gov/sites/prod/files/2013/12/f5/Apostolakis.pdf RIV000161 RK-TC-5; RK-TC-1B Report of Dr. Joram Hopenfeld in Response to Entergy and Sept. 9, 2015 Filed/Proffered for NRC Staff Testimony Regarding Contention NYS- Track 2, not 26/RK0TC-1B and Amended Contention NYS-38/RK-TC-5 Admitted

[PROPRIETARY]

RIV000162 RK-TC-5; RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-38/RK-TC-5 [PROPRIETARY] Track 2, not Admitted RIV000163 RK-TC-5; RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-26B/RK-TC-1B Track 2, not

[PROPRIETARY] Admitted 18

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000164 RK-TC-5; RK-TC-1B NUREG-1740, ACRS, Voltage-Based Alternative Repair Sept. 9, 2015 Filed/Proffered for Criteria: A Report to the Advisory Committee on Reactor Track 2, not Safeguards by the Ad Hoc Subcommittee on a Differing Admitted Professional Opinion (2001), available at, http://pbadupws.nrc.gov/docs/ML0107/ML010750315.pdf RIV000165 RK-TC-5; RK-TC-1B U.S. NRC, Office of the Inspector General, OIG-07-A-15, Sept. 9, 2015 Filed/Proffered for Audit of NRCs License Renewal Program (September 6, Track 2, not 2007), available at, Admitted http://pbadupws.nrc.gov/docs/ML0724/ML072490486.pdf 19

RIVR14001 Revised: November 5, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIVR14001 All Riverkeeper Track 2 Tailored Hearing Exhibit List Nov. 5, 2015 Proffered RIV000004 RK-TC-2; RK-TC-1B; Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV") Dec. 22, 2011 Admitted during RK-TC-5 Track 1 Hearings (10-15-2012)

RIV000034 RK-TC-1B Dr.Hopenfeld Pre-filed Testimony Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000035 RK-TC-1B; RK-TC-5 Dr. Hopenfeld Report Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000036 RK-TC-1B; RK-TC-5 Westinghouse "EnvFat User's Manual Version 1" Dec. 22, 2011 Admitted during IPECPROP00056785 Track 1 Hearings (10-15-2012)

RIV000037 RK-TC-1B; RK-TC-5 Official Transcript, ACRS Subcommittee, 12/6/2006 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 1

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000038 RK-TC-1B; RK-TC-5 NRC IN 2011-04 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000039 RK-TC-1B; RK-TC-5 Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, Dec. 22, 2011 Admitted during 5/12/08 Track 1 Hearings (10-15-2012)

RIV000040 RK-TC-1B; RK-TC-5 Taylor, EPRI R & D Status Report, Jan/Feb 1983 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000041 RK-TC-1B; RK-TC-5 Entergy, Table of Environmental Correction Actions for Dec. 22, 2011 Admitted during Metal Fatigue, 11/6/07 Track 1 Hearings (10-15-2012)

RIV000042 RK-TC-1B; RK-TC-5 DC Cook Charging Nozzle LR Fatigue Evaluations, Dec. 22, 2011 Admitted during IPECPROP00061294 Track 1 Hearings (10-15-2012) 2

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000043 RK-TC-1B; RK-TC-5 Diablo Canyon Unit 1 Insurge/Outsurge Eval, Dec. 22, 2011 Admitted during IPECPROP00061179 Track 1 Hearings (10-15-2012)

RIV000044 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000045 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 1 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000046 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 2 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 3

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000047 RK-TC-1B; RK-TC-5 NRC IN 97-46 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000048 RK-TC-1B; RK-TC-5 Final Report of the NESC-Thermal Fatigue Project, Dec. 22, 2011 Admitted during EUR22763 Track 1 Hearings (10-15-2012)

RIV000049 RK-TC-1B; RK-TC-5, Entergy Indian Point U3, FAC, 3RF13 Outage, 2005 Dec. 22, 2011 Admitted during RK-TC-2 Track 1 Hearings (10-15-2012)

RIV000050 RK-TC-1B; RK-TC-5 Westinghouse, WCAP-14950, IPECPROP00059247 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000051 RK-TC-1B; RK-TC-5 Kwang Chu Kim, Journal of Mechanical Dec. 22, 2011 Admitted during Science/Technology, 2008 Track 1 Hearings (10-15-2012) 4

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000052A RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1110 Dec. 22, 2011 Admitted during

-D Track 1 Hearings (10-15-2012)

RIV000053 RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1122 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000054 RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000055 RK-TC-1B; RK-TC-5 Westinghouse CN-PAFM-09-64, IPECPROP00058077 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000056 RK-TC-1B; RK-TC-5 Systems Standard Design Criteria, IPECPROP00059698 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 5

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000057 RK-TC-1B; RK-TC-5 RAI Indian Point U2 and U3 LRA, 2/10/11 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIVR00058 RK-TC-1B; RK-TC-5 Response to RAI, Indian Point U2 and U3, 3/28/11 Oct. 9, 2012 Admitted during Track 1 Hearings (10-15-2012)

RIV000102 RK-TC-5 Pre-Filed Testimony of Joram Hopenfeld in Support of RK- June 19, 2012 Admitted during TC-5 Track 1 Hearings (10-15-2012)

RIV000103 RK-TC-5; RK-TC-1B Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation June 19, 2012 Admitted during to LMFBR Leak Detection System Design (International Track 1 Hearings Conference on Liquid Metal Technology, May 3-6, 1976) (10-15-2012) 6

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000104 RK-TC-5; RK-TC-1B Memorandum from S. Collins (NRR) to W. Travers (EDO), June 19, 2012 Admitted during Re: Steam Generator Action Plan Revision to Address Track 1 Hearings Differing Professional Opinion on Steam Generator Tube (10-15-2012)

Integrity (WITS ITEM 200100026), May 11, 2011 RIV000105 RK-TC-5; RK-TC-1B NUREG-1740, Voltage-Based Alternative Repair Criteria, A June 19, 2012 Admitted during Report to the Advisory Committee on Reactor Safeguards by Track 1 Hearings the Ad Hoc Subcommittee on a Differing Professional (10-15-2012)

Opinion (March/Feb. 2001)

RIV000106 RK-TC-5; RK-TC-1B Associated Press, Nuke inspectors focus on 'unusual' wear on June 19, 2012 Admitted during tubes, Fox News.com, February 3, 2012 Track 1 Hearings (10-15-2012)

RIV000114 RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld June 29, 2012 Admitted during Regarding Contention NYS-26B/TC-1B - Metal Fatigue Track 1 Hearings (10-15-2012) 7

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000115 RK-TC-1B; RK-TC-5 NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal June 29, 2012 Admitted during Stratification (December 20, 1988) Track 1 Hearings (10-15-2012)

RIV000116 RK-TC-1B; RK-TC-5 Audit of NRCs License Renewal Program, OIG-07-A-15, June 29, 2012 Admitted during September 6, 2007 Track 1 Hearings (10-15-2012)

RIV000117 RK-TC-1B; RK-TC-5 Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, June 29, 2012 Admitted during Development of an Environmental Fatigue Evaluation Track 1 Hearings Method for Nuclear Power Plants in JSME Code* , J. of (10-15-2012)

Environment and Engineering Vol. 6, No. 2, 2011 8

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000118 RK-TC-1B; RK-TC-5 G. T. Yahr and R. C. Gwaltney (Oak Ridge National June 29, 2012 Admitted during Laboratory), Ao K. Richardson and W. L. Server (EG&G Track 1 Hearings Idaho, Inc), Case Study of the Propagation of a Small Flaw (10-15-2012)

Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119 RK-TC-1B; RK-TC-5 International Atomic Energy Agency, Applicability of the June 29, 2012 Admitted during leak before break concept, Report of the IAEA Track 1 Hearings Extrabudgetary Programme on the Safety of WWER-440 (10-15-2012)

Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 9

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000132 RK-TC-2; RK-TC-5 Excerpt of IP3, RO13 FAC Inspection Report (2005), Oct. 17, 2012 Admitted during IP00044076 Track 1 Hearings (10-17-2012)

RIV000133 RK-TC-2; RK-TC-5 Excerpt of IP3, RO15 FAC Inspection Report (2009), Oct. 17, 2012 Admitted during IPEC00213685 Track 1 Hearings (10-17-2012)

RIV000134 RK-TC-5 Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Nov. 9, 2012 Filed/Proffered Regarding Contention NYS-38/RK-TC-5 duing Track 1, not Admitted RIV000135 RK-TC-5; RK-TC-1B Entergy Ultrasonic Examination Reports, IPEC00020933 Nov. 9, 2012 Filed/Proffered duing Track 1, not Admitted 10

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000136 RK-TC-5; RK-TC-1B New York Power Authority Ultrasonic Examination Report, Nov. 9, 2012 Filed/Proffered Report No.: 99UT155, IPEC00021837 duing Track 1, not Admitted RIV000137 RK-TC-5; RK-TC-1B New York Power Authority Ultrasonic Examination Report, Nov. 9, 2012 Filed/Proffered Report No.: 99UT251, IPEC00021885 duing Track 1, not Admitted RIV000138 RK-TC-5; RK-TC-1B J.S. Kim & J.S. Seo, Development of Engineering Formulae Nov. 9, 2012 Filed/Proffered for Stress Concentration Factors of Local Wall Thinning in duing Track 1, not CANDU Feeder Pipe Under Pressure, Proceedings of the Admitted ASME 2011 Pressure Vessels & Piping Division Conference, PVP2011, July 17-21, 2011, Baltimore, Maryland, USA, PVP2011-57930 RIV000139 RK-TC-5; RK-TC-1B M.J. Jhung, Fatigue Analysis of a Reactor Pressure Vessel Nov. 9, 2012 Filed/Proffered For SMART, Nuclear Engineering and Technology, Vol. 44, duing Track 1, not No. 6 (August 2012) Admitted 11

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000140 RK-TC-5; RK-TC-1B François Vaillant, et al., Influence of a Cyclic Loading on the Nov. 9, 2012 Filed/Proffered Initiation and Propagation of PWSCC in Weld Metal 182, duing Track 1, not Proceedings of the 12th International Conference on Admitted Environmental Degradation of Materials in Nuclear Power System - Water Reactors - Edited by T.R. Allen, P.J. King, and L. Nelson TMS (The Minerals, Metals & Materials Society), 2005 RIV000141 RK-TC-5; RK-TC-1B E.C. Eggertson, et al, Turbulent Mixing and its Effects on Nov. 9, 2012 Filed/Proffered Thermal Fatigue in Nuclear Reactors, World Academy of duing Track 1, not Science, Engineering and Technology 52 (2011) Admitted RIV000142 RK-TC-5; RK-TC-1B Supplemental Prefiled Written Testimony of Dr. Joram June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-26B/RK-TC-1B Track 2, not Admitted 12

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000143 RK-TC-5; RK-TC-1B Supplemental Prefiled Written Testimony of Dr. Joram June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-38/RK-TC-5 Track 2, not Admitted RIV000144 RK-TC-5; RK-TC-1B Supplemental Report of Dr. Joram Hopenfeld in Support of June 9, 2015 Filed/Proffered for Contention NYS-26B/RK-TC-1B and Amended Contention Track 2, not NYS-38/RK-TC-5 (Non-Public/Non-Redacted) Admitted

[PROPRIETARY]

RIV000145 RK-TC-5; RK-TC-1B K L Murty, Materials Ageing and Degradation in Light June 9, 2015 Filed/Proffered for Water Reactors (Woodhead Publishing Ltd. 2013) Track 2, not

[EXCERPT; COPYRIGHT] Admitted RIV00146A- RK-TC-5; RK-TC-1B NUREG-1150, Severe Accident Risks: An Assessment for June 9, 2015 Filed/Proffered for B Five U.S. Nuclear Power Plants (1990), available at Track 2, not http://www.nrc.gov/reading-rm/doc- Admitted collections/nuregs/staff/sr1150/

13

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000147 RK-TC-5; RK-TC-1B NUREG-75/014 (WASH-1400), Reactor Safety Study: An June 9, 2015 Filed/Proffered for Assessment of Accident Risks in U.S. Commercial Nuclear Track 2, not Power Plants (1975) Admitted RIV000148 RK-TC-5; RK-TC-1B Declaration of Dr. Joram Hopenfeld (February 12, 2015) June 9, 2015 Filed/Proffered for

[PROPRIETARY] Track 2, not Admitted RIV000149 RK-TC-5; RK-TC-1B Material Aging Institute International Conference on Plants June 9, 2015 Filed/Proffered for Materials Degradations, Chemical conditioning of Light Track 2, not Water reactors Systems (2008), IPEC00265853 Admitted RIV000150 RK-TC-5; RK-TC-1B ANL, Report on Assessment of Environmentally-Assisted June 9, 2015 Filed/Proffered for Fatigue for LWR Extended Service Conditions, ANL-LWRS- Track 2, not 47 (September 2011) Admitted 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000151 RK-TC-5; RK-TC-1B NASA, Nuclear and Space Radiation Effects on Materials, June 9, 2015 Filed/Proffered for NASA SP-8053 (June 1970), available at, Track 2, not http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19710015 Admitted 558.pdf RIV000152 RK-TC-5; RK-TC-1B G. E. Korth & M. D. Harper, Effects of Neutron Radiation June 9, 2015 Filed/Proffered for on the Fatigue and Creep/Fatigue Behavior of Type 308 Track 2, not Stainless Steel Weld Metal at Elevated Temperatures Admitted (Seventh ASTM International Symposium on Effects of Radiation on Structural Materials, June 1974), available at, http://www.osti.gov/scitech/servlets/purl/4294682 15

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000153 RK-TC-5; RK-TC-1B Argonne National Laboratory, Corrosion and Mechanics of June 9, 2015 Filed/Proffered for Materials, Light Water Reactors, Irradiation-Induced Stress Track 2, not Corrosion Cracking of Austenitic Stainless Steels, Admitted http://www.ne.anl.gov/capabilities/cmm/highlights/ssc_auste nic_ss.html (last visited June 2, 2015)

RIV000154 RK-TC-5; RK-TC-1B S. Mohanty, S. Majumdar, & K. Natesan, Argonne National June 9, 2015 Filed/Proffered for Laboratory, A Review of Stress Corrosion Cracking/Fatigue Track 2, not Modeling for Light Water Reactor Cooling System Admitted Components (June 2012)

RIV000155 RK-TC-5; RK-TC-1B S. McKelvey & A. Fatemi, Effect of Forging Surface on June 9, 2015 Filed/Proffered for Fatigue Behavior of Steels: A Literature Review (University Track 2, not of Toledo) Admitted 16

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000156 RK-TC-5; RK-TC-1B Westinghouse, Indian Point Unit 2 Reactor Vessel Core June 9, 2015 Filed/Proffered for Support Pad Fatigue Reevaluation, CN-MRCDA-13-11, Track 2, not IPECPROP00079179 [PROPRIETARY] Admitted RIV000157 RK-TC-5; RK-TC-1B Pilkey & Pilkey, Petersons Stress Concentration Factors, June 9, 2015 Filed/Proffered for 3rd Edition, ISBN: 978-0-470-04824-5 (2008) [EXCERPT; Track 2, not COPYRIGHT] Admitted RIV000158 RK-TC-5; RK-TC-1B Herve Bodineau & Thierry Sollier, Tube support plate June 9, 2015 Filed/Proffered for clogging up of French PWR steam generators, Eurosafe, Track 2, not IRSN - Reactor Safety Division, BP17 (2009) Admitted RIV000159 RK-TC-5; RK-TC-1B NUREG/BR-0058, Rev.4, Regulatory Analysis Guidelines of June 9, 2015 Filed/Proffered for the U.S. Nuclear Regulatory Commission (2004), available Track 2, not at http://www.nrc.gov/reading-rm/doc- Admitted collections/nuregs/brochures/br0058/br0058r4.pdf 17

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000160 RK-TC-5; RK-TC-1B U.S. NRC, Commissioner Apostolakis, Application of Risk June 9, 2015 Filed/Proffered for Assessment and Management to Nuclear Safety (DOE Track 2, not Nuclear Safety Workshop, September 2012), available at, Admitted http://energy.gov/sites/prod/files/2013/12/f5/Apostolakis.pdf RIV000161 RK-TC-5; RK-TC-1B Report of Dr. Joram Hopenfeld in Response to Entergy and Sept. 9, 2015 Filed/Proffered for NRC Staff Testimony Regarding Contention NYS- Track 2, not 26/RK0TC-1B and Amended Contention NYS-38/RK-TC-5 Admitted

[PROPRIETARY]

RIV000162 RK-TC-5; RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-38/RK-TC-5 [PROPRIETARY] Track 2, not Admitted RIV000163 RK-TC-5; RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-26B/RK-TC-1B Track 2, not

[PROPRIETARY] Admitted 18

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000164 RK-TC-5; RK-TC-1B NUREG-1740, ACRS, Voltage-Based Alternative Repair Sept. 9, 2015 Filed/Proffered for Criteria: A Report to the Advisory Committee on Reactor Track 2, not Safeguards by the Ad Hoc Subcommittee on a Differing Admitted Professional Opinion (2001), available at, http://pbadupws.nrc.gov/docs/ML0107/ML010750315.pdf RIV000165 RK-TC-5; RK-TC-1B U.S. NRC, Office of the Inspector General, OIG-07-A-15, Sept. 9, 2015 Filed/Proffered for Audit of NRCs License Renewal Program (September 6, Track 2, not 2007), available at, Admitted http://pbadupws.nrc.gov/docs/ML0724/ML072490486.pdf 19