ML15309A221

From kanterella
Jump to navigation Jump to search
NRCR10001 - NRC Staff Track 2 Exhibit List
ML15309A221
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/05/2015
From:
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28475, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15309A221 (14)


Text

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRCR10001 ALL NRC Staff Pre-filed Hearing Exhibit List (REVISED) 11/05/2015 NRCR20101 NYS-26B/ RK-TC1B NRC Staffs Revised Statement of Position Regarding 08/10/2015 NYS 26B/RK-TC-1B NRC000102 NYS-26B/ RK-TC1B NRC Staffs Testimony of Allen Hiser, On Yee and 03/31/2012 Yes.

Ching Ng Regarding NYS 26B/RK-TC-1B Superseded by NRC000168 NRC000103 NYS-26B/ RK-TC1B Allen Hiser Statement of Professional Qualifications 03/30/2012 Yes NRCR00104 NYS-26 NYS-38 On Yee Statement of Professional Qualifications 08/10/2015 (REVISED)

NRCR00105 NYS-26 NYS-38 Ching Ng Statement of Professional Qualifications 08/10/2015 (REVISED)

NRC000106 NYS-26B/ RK-TC1B NRC Inspection Manual, Inspection Procedure 71002, 03/30/2012 Yes License Renewal Inspection NRC000107 NYS-26B/ RK-TC1B NRC Inspection Report 05000247/2008006 and 03/30/2012 Yes 05000286/2008006 NRC000108 NYS-26B/ RK-TC1B Audit Report for Plant Aging Management Programs 03/31/2012 Yes and Reviews, Indian Point Nuclear Generating Unit Nos. 2 and 3 NRC000109 NYS-26B/ RK-TC1B Letter NL-08-057, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 3 NRC000110 NYS-26B/ RK-TC1B Letter NL-11-032, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc. to NRC, Indian Point, Units 2 & 3, Response to Request for Additional Information on Aging Management Programs Page 1 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000111 NYS-26B/ RK-TC1B Letter NL-07-153, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 1 NRC000112 NYS-26B/ RK-TC1B NRC Regulatory Issue Summary -2011-14, Metal 03/31/2012 Yes Fatigue Analysis Performed By Computer Software NRC000113 NYS-26B/ RK-TC1B ASME Code Section XI, Appendix L, Operating Plant 03/31/2012 Yes Fatigue Assessment NRC000114A-F NYS-26B/ RK-TC1B MRP-227-A, Materials Reliability Program: 04/02/2012 Yes Pressurized Water Reactor Internals Inspection and Evaluation Guidelines NRC000115 NYS-26B/ RK-TC1B EPRI, TR-105714, Rev. 5, Pressurized Water Reactor 03/31/2012 Yes Primary Water Chemistry Guidelines NRC000116 NYS-26B/ RK-TC1B Requests for Additional Information in NRC Letter, 03/31/2012 Yes Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application Time-Limited Aging Analyses, Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No. ML080870374)

NRC000117 NYS-26B/ RK-TC1B Statement Of Consideration for 1995 License 03/31/2012 Yes Renewal Rule NRCR00118 NYS-26 NYS-38 Indian Point Unit 3 Technical Specifications 08/10/2015 (EXCERPT) (REVISED)

NRC000119 NYS-26B/ RK-TC1B Salem Nuclear Generating Stations use of 03/31/2012 Yes WESTEMSTM fatigue software Page 2 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000123 NYS-26B/ RK-TC-1B, RK-TC- Audit and Review Plan for Plant Aging Management 03/31/2012 Yes 2 Reviews and Programs - Indian Point Generating Units Nos. 2 and 3)

NRC000124 NYS-26B/ RK-TC-1B, RK-TC- Scoping and Screening Methodology Audit Trip 03/31/2012 Yes 2 Report For Indian Point, Units 2 and 3 NRCR00147 NYS-26 NYS-38 NRC Staffs Revised Statement of Position on State of 08/10/2015 New York and Riverkeepers Joint Contention NYS-38/RK-TC5 (REVISED)

NRC000148 NYS-38/ RK-TC5 NRC Staffs Testimony of Allen L. Hiser, On Yee, and 08/20/2012 Yes.

Ching Ng Concerning Portions of Contention NYS-38 Superseded by NRC000168 NRC000149 NYS-38/ RK-TC5 ASME Section XI, Appendix A (Excerpt) 08/20/2012 Yes NRC000150 NYS-38/ RK-TC5 ASME Section XI, Appendix C (Excerpt) 08/20/2012 Yes NRC000151 NYS-38/ RK-TC5 Temporary Instruction 2516/001, dated March 30, 08/20/2012 Yes 2011 NRC000152 NYS-38/ RK-TC5 Indian Point Nuclear Generating Unit 2 - NRC 08/20/2012 Yes Inspection Report 05000247/2012008, dated April 19, 2012 NRC000153 NYS-38/ RK-TC5 NL-12-089, Entergy Letter Replying to Request for 08/20/2012 Yes Additional Information Regarding the License Renewal Application (dated June 14, 2012)

NRC000154 NYS-38/ RK-TC5 April 11, 2011 Summary of the March 11, 2011 08/20/2012 Yes Meeting between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute to Discuss Current License Renewal Topics Page 3 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000155 NYS-38/ RK-TC5 March 30, 2011 Audit Report on the Use of 08/20/2012 Yes WESTEMS Software in the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application NRC000156 NYS-38/ RK-TC5 NL-11-101, Entergy Letter Regarding Clarification for 08/20/2012 Yes Request for Additional Information - Aging Management Programs (dated August 22, 2011)

NRC000157 NYS-38/ RK-TC5 Kenneth J. Karwoski - Statement of Professional 08/20/2012 Yes Qualifications NRC000158 NYS-38/ RK-TC5 August 12, 2010 NEI Steam Generator Task Force 08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)

NRC000159 NYS-38/ RK-TC5 Electric Power Research Institute - Implementation 08/20/2012 Yes Status of Industry Change Management Plan for Materials Related R & D Committees under NEI 03-08 (CONTAINS COPYRIGHTED MATERIAL)

NRC000160 NYS-38/ RK-TC5 August 4, 2011 NEI Steam Generator Task Force 08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)

NRCR00161 NYS-38/ RK-TC5 NRC Staff Testimony of Dr. Allen L. Hiser and Mr. 08/10/2015 Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (REVISED)

NRC000168 NYS-26 NYS-38 NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, 08/10/2015 Mr. Gary Stevens, P.E., and Mr. On Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS- 38/RK-TC-5 Page 4 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000169 NYS-26 NYS-38 Indian Point Unit 2 Technical Specifications 08/10/2015 (EXCERPT)

NRC000170 NYS-26 NYS-38 EPRI 1008224, Final Report, Rev. 6, Pressurized 08/10/2015 Water Reactor Secondary Water Chemistry Guidelines (Dec. 2004) (PROPRIETARY)

NRC000171 NYS-26 NYS-38 EPRI 1015014, Materials Reliability Program: 08/10/2015 Evaluation of Controlling Transient Ramp Times Using Piping Methodologies When Considering Environmental Fatigue (Fen) Effects (MRP-218) (Sept.

2007) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000172 NYS-26 NYS-38 EPRI 1003536, Materials Reliability Program: Second 08/10/2015 International Conference on Fatigue of Reactor Components (MRP-84) (Feb. 2003) (EXCERPT)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000173 NYS-26 NYS-38 Excerpt from Transcript of Advisory Committee on 08/10/2015 Reactor Safeguards Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014)

NRC000174 NYS-26 NYS-38 Background of the Factors of Safety Used in Divisions 08/10/2015 I of Sections III and XI of the ASME Rules for Nuclear Vessels (Oct. 1984) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000175 NYS-26 NYS-38 Implementation of Automated, On-line Fatigue 08/10/2015 Monitoring in a Boiling Water Reactor (1993)

(CONTAINS COPYRIGHTED MATERIAL)

Page 5 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000176 NYS-26 NYS-38 EPRI 1003069, Materials Reliability Program Hot Cell 08/10/2015 Testing of Baffle/Former Bolts Removed From Two Lead PWR Plants (MRP-51) (PROPRIETARY)

NRC000177 NYS-26 NYS-38 ICONE5-2372, Fatigue and Stress Corrosion 08/10/2015 Cracking Behaviors of Irradiated Stainless Steels in PWR Primary Water (Nov. 2001) (CONTAINS COPYRIGHTED MATERIAL)

NRC000178 NYS-26 NYS-38 ASME Code,Section III - Subsection NCA, General 08/10/2015 Requirements for Division 1 and Division 2 Rules for Construction of Nuclear Facility Components (Jul. 1, 2007) (CONTAINS COPYRIGHTED MATERIAL)

NRC000179 NYS-26 NYS-38 Regulatory Guide 1.207, Guidelines for Evaluating 08/10/2015 Fatigue Analyses Incorporating the Life Reduction of Metal Components Due to the Effects of the Light-Water Reactor Environment for New Reactors (Mar.

2007)

NRC000180 NYS-26 NYS-38 NRC Inspection Manual, Chapter 2516, Policy and 08/10/2015 Guidance for the License Renewal Inspection Program (Aug. 13, 2013)

NRC000181 NYS-26 NYS-38 Letter from James Trapp, NRC, to John Ventosa, 08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -

NRC License Renewal Team Inspection Report 05000247/2013009 (July 5, 2013)

Page 6 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000182 NYS-26 NYS-38 Letter from James Trapp, NRC, to John Ventosa, 08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -

NRC License Renewal Team Inspection Report 05000247/2013010 (Sept. 19, 2013)

NRC000183 NYS-26 NYS-38 NRC Inspection Manual, Inspection Procedure 71013, 08/10/2015 Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013)

NRC000184 NYS-25 NYS-26 NYS-38 Letter NL-13-114, Letter from Fred Dacimo, Entergy, 08/10/2015 to NRC, Implementation of License Renewal Regulatory Commitments Indian Point Nuclear Generating Unit No. 2 Docket No. 50-257 License No.

DPR-26 (Aug. 28, 2013)

NRC000185 NYS-26 NYS-38 Letter from Arthur Burritt, NRC, to Larry Coyle, 08/10/2015 Entergy, Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)

NRC000186 NYS-26 NYS-38 Effect of LWR Coolant Environments on the Fatigue 08/10/2015 of Reactor Materials, 79 Fed. Reg. 21811 (Apr. 17, 2014)

NRC000187 NYS-26, 38 Letter from John Daily, NRC, to Entergy, Request for 08/10/2015 Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos.

MD5407 and MD5408) ( Feb. 6, 2013)

Page 7 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRCR00188 NYS-26 NYS-38 Letter NL-15-060, Letter from Fred Dacimo, Entergy, 08/19/2015 to NRC, Entergy Actions Required Prior to Entry into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015) (Revised)

NRC000189 NYS-38 TSTF-510, Rev. 2, Revision to Steam Generator 08/10/2015 Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011)

NRC000190 NYS-38 NRC White Paper on Risk-Informed and Performance- 08/10/2015 Based Regulation NRC000191 NYS-38 Biweekly Notice; Applications and Amendments to 08/10/2015 Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 Fed. Reg. 15144 (Mar. 18, 2014)

NRC000192 NYS-38 Letter NL-15-001, Letter from Lawrence Coyle, to 08/10/2015 NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50- 247 License No. DPR-26 (Jan. 15, 2015)

Page 8 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000193 NYS-38 Letter NL-13-143, Letter from Robert Walpole, to 08/10/2015 NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)

NRC000194 NYS-38 S. Miloudi et al, Destructive Examinations on Divider 08/10/2015 Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012) (CONTAINS COPYRIGHTED MATERIAL)

NRC000195 NYS-26 NYS-38 ASME Code,Section XI, Rules for Inservice 08/10/2015 Inspection of Nuclear Power Plant Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)

NRC000196 NYS-25 NYS-38 NRC Staffs Initial Statement of Position on 08/10/2015 Contention NYS-25 (Reactor Vessel Internals)

(PROPRIETARY)

NRC000197 NYS-25 NYS-38 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey 08/10/2015 Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 (PROPRIETARY)

Page 9 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000198 NYS-25 NYS-38 Enclosure to MRP Letter 2013-025, MRP-227-A 08/10/2015 Applicability Guidelines for Combustion Engineering and Westinghouse Pressurized Water Reactor Designs (Oct. 4, 2013)

NRC000199 NYS-25 NYS-38 ASME Code,Section XI, 2007 through 2008 08/10/2015 Addenda, IWA-2213 (Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)

NRC000200 NYS-25 NYS-38 WCAP-17096-NP, Rev. 2, Reactor Internals 08/10/2015 Acceptance Criteria Methodology and Data Requirements (Dec. 2009)

NRC000201 NYS-25 NYS-38 NRC Position on Aging Management of CASS 08/10/2015 Reactor Vessel Internal Components (June 11, 2014)

NRC000202 NYS-25 NYS-38 ASM Handbook, Vol. 19, Fatigue and Fracture, Figure 08/10/2015 14 at 595 (1996) (EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL)

NRC000203 NYS-25 NYS-38 EPRI 1021001NP/BWRVIP-100NP, Final Report, 08/10/2015 Rev. 1, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Oct. 2010)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000204 NYS-25 NYS-38 PWROG-14048-P, Rev. 0, Functionality Analysis: 08/10/2015 Lower Support Columns (Dec. 2014)

(PROPRIETARY)

NRC000205 NYS-25 NYS-38 Indian Point, Unit 2, Updated Final Safety Analysis 08/10/2015 Report (UFSAR), Rev. 25, Chapter 3 - Reactor (2014)

Page 10 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000206 NYS-25 NYS-38 Indian Point, Unit 2, Updated Final Safety Analysis 08/10/2015 Report (UFSAR), Rev. 25, Chapter 14 - Safety Analysis (2014)

NRC000207 NYS-25 NYS-38 Regulatory Information Conference Presentation 08/10/2015 Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015)

NRC00208A - E NYS-25 NYS-38 MRP Letter 2014-09, Biennial Report of Recent MRP- 08/10/2015 227-A Reactor Internals Inspection Results (May 12, 2014)

NRC000209 NYS-25 NYS-38 EPRI 1013396/BWRVIP-100-A, Final Report, BWR 08/10/2015 Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006) (PROPRIETARY)

NRC000210 NYS-25 NYS-38 EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, 08/10/2015 BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000211 NYS-25 NYS-38 MRP-227, Rev. 1 Presentation Slides, Westinghouse 08/10/2015 Figures Presented at Public Meeting on March 31, 2015 (Feb. 2015)

NRC000212 NYS-25 NYS-38 R. Reed-Hill and R. Abbaschian, Physical Metallurgy 08/10/2015 Principles , Third Edition (1992) (EXCERPT)

(CONTAINS COPYRIGHTED MATERIAL)

Page 11 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000213 NYS-25 NYS-38 Letter from Christopher Grimes, Chief, NRC, to 08/10/2015 Douglas Walters, NEI, License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components (May 19, 2000)

NRC000214 NYS-25 NYS-38 Letter from John Lubinski, NRC, to Jean Smith, EPRI, 08/10/2015 License Renewal Interim Staff Guidance LR-ISG-2011-04: Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013)

NRC000215 NYS-25 NYS-38 Evaluation of WCAP-17780-P, "Reactor Internals 08/10/2015 Aging Management MRP- 227-A Applicability for Combustion Engineering [(CE)] and Westinghouse

[Electric Company (Westinghouse)] Pressurized Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse Pressurized Water Reactor Designs (Nov. 7, 2014)

(PROPRIETARY)

NRC000216 NYS-25 NYS-38 U.S. Nuclear Regulatory Commission Office of 08/10/2015 Nuclear Reactor Regulation Division of License Renewal Aging Management Audit Report (Oct. 6, 2014)

Page 12 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000218 NYS-25 NYS-38 EPRI 1016106, Final Report, Materials Reliability 08/10/2015 Program: Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (MRP-210) (Dec. 2007) (COPYRIGHT)

NRC000219 NYS-25 NYS-38 Westinghouse InfoGram IG-10-1, Reactor Internals 08/10/2015 Lower Radial Support Clevis Insert Cap Screw Degradation (Mar. 31, 2010)

NRC000220 NYS-25 NYS-38 Pressurized Water Reactor Owners Group (PWROG) 08/10/2015 Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange:

Clevis Insert Bolt Update, (June 2014)

NRC00221A-F NYS-25 NYS-38 Babcock & Wilcox Report, S-1473-002, Final Report, 08/10/2015 Rev. 0, Examination of Clevis Bolts Removed from D.

C. Cook Nuclear Plant (Dec. 2013)

NRC000222 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT) 08/10/2015 NRC000223 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 14 (2011) 08/10/2015 NRC000224 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 16 08/10/2015 NRC00225A-B NYS-25 NYS-38 EPRI 1016593, Final Report, Materials Reliability 08/10/2015 Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (MRP-232) (Dec. 31, 2008)

(PROPRIETARY)

NRC000226 NYS-25 NYS-38 Jeffrey C. Poehler Statement of Professional 08/10/2015 NRC000227 NYS-25 NYS-26 NYS-38 Gary Stevens Statement of Professional 08/10/2015 NRC000228 NYS-25 NYS-38 Indian Point Unit 2 Technical Specifications 3.1.4 08/10/2015 NRC000229 NYS-25 NYS-38 Indian Point Unit 3 Technical Specifications 3.1.4 08/10/2015 Page 13 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000230 NYS-25, NYS-26, NYS-38 Table of Corrections to Staff Testimony 11/03/2015 Page 14 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRCR10001 ALL NRC Staff Pre-filed Hearing Exhibit List (REVISED) 11/05/2015 NRCR20101 NYS-26B/ RK-TC1B NRC Staffs Revised Statement of Position Regarding 08/10/2015 NYS 26B/RK-TC-1B NRC000102 NYS-26B/ RK-TC1B NRC Staffs Testimony of Allen Hiser, On Yee and 03/31/2012 Yes.

Ching Ng Regarding NYS 26B/RK-TC-1B Superseded by NRC000168 NRC000103 NYS-26B/ RK-TC1B Allen Hiser Statement of Professional Qualifications 03/30/2012 Yes NRCR00104 NYS-26 NYS-38 On Yee Statement of Professional Qualifications 08/10/2015 (REVISED)

NRCR00105 NYS-26 NYS-38 Ching Ng Statement of Professional Qualifications 08/10/2015 (REVISED)

NRC000106 NYS-26B/ RK-TC1B NRC Inspection Manual, Inspection Procedure 71002, 03/30/2012 Yes License Renewal Inspection NRC000107 NYS-26B/ RK-TC1B NRC Inspection Report 05000247/2008006 and 03/30/2012 Yes 05000286/2008006 NRC000108 NYS-26B/ RK-TC1B Audit Report for Plant Aging Management Programs 03/31/2012 Yes and Reviews, Indian Point Nuclear Generating Unit Nos. 2 and 3 NRC000109 NYS-26B/ RK-TC1B Letter NL-08-057, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 3 NRC000110 NYS-26B/ RK-TC1B Letter NL-11-032, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc. to NRC, Indian Point, Units 2 & 3, Response to Request for Additional Information on Aging Management Programs Page 1 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000111 NYS-26B/ RK-TC1B Letter NL-07-153, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 1 NRC000112 NYS-26B/ RK-TC1B NRC Regulatory Issue Summary -2011-14, Metal 03/31/2012 Yes Fatigue Analysis Performed By Computer Software NRC000113 NYS-26B/ RK-TC1B ASME Code Section XI, Appendix L, Operating Plant 03/31/2012 Yes Fatigue Assessment NRC000114A-F NYS-26B/ RK-TC1B MRP-227-A, Materials Reliability Program: 04/02/2012 Yes Pressurized Water Reactor Internals Inspection and Evaluation Guidelines NRC000115 NYS-26B/ RK-TC1B EPRI, TR-105714, Rev. 5, Pressurized Water Reactor 03/31/2012 Yes Primary Water Chemistry Guidelines NRC000116 NYS-26B/ RK-TC1B Requests for Additional Information in NRC Letter, 03/31/2012 Yes Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application Time-Limited Aging Analyses, Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No. ML080870374)

NRC000117 NYS-26B/ RK-TC1B Statement Of Consideration for 1995 License 03/31/2012 Yes Renewal Rule NRCR00118 NYS-26 NYS-38 Indian Point Unit 3 Technical Specifications 08/10/2015 (EXCERPT) (REVISED)

NRC000119 NYS-26B/ RK-TC1B Salem Nuclear Generating Stations use of 03/31/2012 Yes WESTEMSTM fatigue software Page 2 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000123 NYS-26B/ RK-TC-1B, RK-TC- Audit and Review Plan for Plant Aging Management 03/31/2012 Yes 2 Reviews and Programs - Indian Point Generating Units Nos. 2 and 3)

NRC000124 NYS-26B/ RK-TC-1B, RK-TC- Scoping and Screening Methodology Audit Trip 03/31/2012 Yes 2 Report For Indian Point, Units 2 and 3 NRCR00147 NYS-26 NYS-38 NRC Staffs Revised Statement of Position on State of 08/10/2015 New York and Riverkeepers Joint Contention NYS-38/RK-TC5 (REVISED)

NRC000148 NYS-38/ RK-TC5 NRC Staffs Testimony of Allen L. Hiser, On Yee, and 08/20/2012 Yes.

Ching Ng Concerning Portions of Contention NYS-38 Superseded by NRC000168 NRC000149 NYS-38/ RK-TC5 ASME Section XI, Appendix A (Excerpt) 08/20/2012 Yes NRC000150 NYS-38/ RK-TC5 ASME Section XI, Appendix C (Excerpt) 08/20/2012 Yes NRC000151 NYS-38/ RK-TC5 Temporary Instruction 2516/001, dated March 30, 08/20/2012 Yes 2011 NRC000152 NYS-38/ RK-TC5 Indian Point Nuclear Generating Unit 2 - NRC 08/20/2012 Yes Inspection Report 05000247/2012008, dated April 19, 2012 NRC000153 NYS-38/ RK-TC5 NL-12-089, Entergy Letter Replying to Request for 08/20/2012 Yes Additional Information Regarding the License Renewal Application (dated June 14, 2012)

NRC000154 NYS-38/ RK-TC5 April 11, 2011 Summary of the March 11, 2011 08/20/2012 Yes Meeting between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute to Discuss Current License Renewal Topics Page 3 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000155 NYS-38/ RK-TC5 March 30, 2011 Audit Report on the Use of 08/20/2012 Yes WESTEMS Software in the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application NRC000156 NYS-38/ RK-TC5 NL-11-101, Entergy Letter Regarding Clarification for 08/20/2012 Yes Request for Additional Information - Aging Management Programs (dated August 22, 2011)

NRC000157 NYS-38/ RK-TC5 Kenneth J. Karwoski - Statement of Professional 08/20/2012 Yes Qualifications NRC000158 NYS-38/ RK-TC5 August 12, 2010 NEI Steam Generator Task Force 08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)

NRC000159 NYS-38/ RK-TC5 Electric Power Research Institute - Implementation 08/20/2012 Yes Status of Industry Change Management Plan for Materials Related R & D Committees under NEI 03-08 (CONTAINS COPYRIGHTED MATERIAL)

NRC000160 NYS-38/ RK-TC5 August 4, 2011 NEI Steam Generator Task Force 08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)

NRCR00161 NYS-38/ RK-TC5 NRC Staff Testimony of Dr. Allen L. Hiser and Mr. 08/10/2015 Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (REVISED)

NRC000168 NYS-26 NYS-38 NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, 08/10/2015 Mr. Gary Stevens, P.E., and Mr. On Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS- 38/RK-TC-5 Page 4 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000169 NYS-26 NYS-38 Indian Point Unit 2 Technical Specifications 08/10/2015 (EXCERPT)

NRC000170 NYS-26 NYS-38 EPRI 1008224, Final Report, Rev. 6, Pressurized 08/10/2015 Water Reactor Secondary Water Chemistry Guidelines (Dec. 2004) (PROPRIETARY)

NRC000171 NYS-26 NYS-38 EPRI 1015014, Materials Reliability Program: 08/10/2015 Evaluation of Controlling Transient Ramp Times Using Piping Methodologies When Considering Environmental Fatigue (Fen) Effects (MRP-218) (Sept.

2007) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000172 NYS-26 NYS-38 EPRI 1003536, Materials Reliability Program: Second 08/10/2015 International Conference on Fatigue of Reactor Components (MRP-84) (Feb. 2003) (EXCERPT)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000173 NYS-26 NYS-38 Excerpt from Transcript of Advisory Committee on 08/10/2015 Reactor Safeguards Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014)

NRC000174 NYS-26 NYS-38 Background of the Factors of Safety Used in Divisions 08/10/2015 I of Sections III and XI of the ASME Rules for Nuclear Vessels (Oct. 1984) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000175 NYS-26 NYS-38 Implementation of Automated, On-line Fatigue 08/10/2015 Monitoring in a Boiling Water Reactor (1993)

(CONTAINS COPYRIGHTED MATERIAL)

Page 5 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000176 NYS-26 NYS-38 EPRI 1003069, Materials Reliability Program Hot Cell 08/10/2015 Testing of Baffle/Former Bolts Removed From Two Lead PWR Plants (MRP-51) (PROPRIETARY)

NRC000177 NYS-26 NYS-38 ICONE5-2372, Fatigue and Stress Corrosion 08/10/2015 Cracking Behaviors of Irradiated Stainless Steels in PWR Primary Water (Nov. 2001) (CONTAINS COPYRIGHTED MATERIAL)

NRC000178 NYS-26 NYS-38 ASME Code,Section III - Subsection NCA, General 08/10/2015 Requirements for Division 1 and Division 2 Rules for Construction of Nuclear Facility Components (Jul. 1, 2007) (CONTAINS COPYRIGHTED MATERIAL)

NRC000179 NYS-26 NYS-38 Regulatory Guide 1.207, Guidelines for Evaluating 08/10/2015 Fatigue Analyses Incorporating the Life Reduction of Metal Components Due to the Effects of the Light-Water Reactor Environment for New Reactors (Mar.

2007)

NRC000180 NYS-26 NYS-38 NRC Inspection Manual, Chapter 2516, Policy and 08/10/2015 Guidance for the License Renewal Inspection Program (Aug. 13, 2013)

NRC000181 NYS-26 NYS-38 Letter from James Trapp, NRC, to John Ventosa, 08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -

NRC License Renewal Team Inspection Report 05000247/2013009 (July 5, 2013)

Page 6 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000182 NYS-26 NYS-38 Letter from James Trapp, NRC, to John Ventosa, 08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -

NRC License Renewal Team Inspection Report 05000247/2013010 (Sept. 19, 2013)

NRC000183 NYS-26 NYS-38 NRC Inspection Manual, Inspection Procedure 71013, 08/10/2015 Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013)

NRC000184 NYS-25 NYS-26 NYS-38 Letter NL-13-114, Letter from Fred Dacimo, Entergy, 08/10/2015 to NRC, Implementation of License Renewal Regulatory Commitments Indian Point Nuclear Generating Unit No. 2 Docket No. 50-257 License No.

DPR-26 (Aug. 28, 2013)

NRC000185 NYS-26 NYS-38 Letter from Arthur Burritt, NRC, to Larry Coyle, 08/10/2015 Entergy, Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)

NRC000186 NYS-26 NYS-38 Effect of LWR Coolant Environments on the Fatigue 08/10/2015 of Reactor Materials, 79 Fed. Reg. 21811 (Apr. 17, 2014)

NRC000187 NYS-26, 38 Letter from John Daily, NRC, to Entergy, Request for 08/10/2015 Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos.

MD5407 and MD5408) ( Feb. 6, 2013)

Page 7 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRCR00188 NYS-26 NYS-38 Letter NL-15-060, Letter from Fred Dacimo, Entergy, 08/19/2015 to NRC, Entergy Actions Required Prior to Entry into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015) (Revised)

NRC000189 NYS-38 TSTF-510, Rev. 2, Revision to Steam Generator 08/10/2015 Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011)

NRC000190 NYS-38 NRC White Paper on Risk-Informed and Performance- 08/10/2015 Based Regulation NRC000191 NYS-38 Biweekly Notice; Applications and Amendments to 08/10/2015 Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 Fed. Reg. 15144 (Mar. 18, 2014)

NRC000192 NYS-38 Letter NL-15-001, Letter from Lawrence Coyle, to 08/10/2015 NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50- 247 License No. DPR-26 (Jan. 15, 2015)

Page 8 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000193 NYS-38 Letter NL-13-143, Letter from Robert Walpole, to 08/10/2015 NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)

NRC000194 NYS-38 S. Miloudi et al, Destructive Examinations on Divider 08/10/2015 Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012) (CONTAINS COPYRIGHTED MATERIAL)

NRC000195 NYS-26 NYS-38 ASME Code,Section XI, Rules for Inservice 08/10/2015 Inspection of Nuclear Power Plant Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)

NRC000196 NYS-25 NYS-38 NRC Staffs Initial Statement of Position on 08/10/2015 Contention NYS-25 (Reactor Vessel Internals)

(PROPRIETARY)

NRC000197 NYS-25 NYS-38 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey 08/10/2015 Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 (PROPRIETARY)

Page 9 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000198 NYS-25 NYS-38 Enclosure to MRP Letter 2013-025, MRP-227-A 08/10/2015 Applicability Guidelines for Combustion Engineering and Westinghouse Pressurized Water Reactor Designs (Oct. 4, 2013)

NRC000199 NYS-25 NYS-38 ASME Code,Section XI, 2007 through 2008 08/10/2015 Addenda, IWA-2213 (Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)

NRC000200 NYS-25 NYS-38 WCAP-17096-NP, Rev. 2, Reactor Internals 08/10/2015 Acceptance Criteria Methodology and Data Requirements (Dec. 2009)

NRC000201 NYS-25 NYS-38 NRC Position on Aging Management of CASS 08/10/2015 Reactor Vessel Internal Components (June 11, 2014)

NRC000202 NYS-25 NYS-38 ASM Handbook, Vol. 19, Fatigue and Fracture, Figure 08/10/2015 14 at 595 (1996) (EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL)

NRC000203 NYS-25 NYS-38 EPRI 1021001NP/BWRVIP-100NP, Final Report, 08/10/2015 Rev. 1, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Oct. 2010)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000204 NYS-25 NYS-38 PWROG-14048-P, Rev. 0, Functionality Analysis: 08/10/2015 Lower Support Columns (Dec. 2014)

(PROPRIETARY)

NRC000205 NYS-25 NYS-38 Indian Point, Unit 2, Updated Final Safety Analysis 08/10/2015 Report (UFSAR), Rev. 25, Chapter 3 - Reactor (2014)

Page 10 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000206 NYS-25 NYS-38 Indian Point, Unit 2, Updated Final Safety Analysis 08/10/2015 Report (UFSAR), Rev. 25, Chapter 14 - Safety Analysis (2014)

NRC000207 NYS-25 NYS-38 Regulatory Information Conference Presentation 08/10/2015 Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015)

NRC00208A - E NYS-25 NYS-38 MRP Letter 2014-09, Biennial Report of Recent MRP- 08/10/2015 227-A Reactor Internals Inspection Results (May 12, 2014)

NRC000209 NYS-25 NYS-38 EPRI 1013396/BWRVIP-100-A, Final Report, BWR 08/10/2015 Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006) (PROPRIETARY)

NRC000210 NYS-25 NYS-38 EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, 08/10/2015 BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000211 NYS-25 NYS-38 MRP-227, Rev. 1 Presentation Slides, Westinghouse 08/10/2015 Figures Presented at Public Meeting on March 31, 2015 (Feb. 2015)

NRC000212 NYS-25 NYS-38 R. Reed-Hill and R. Abbaschian, Physical Metallurgy 08/10/2015 Principles , Third Edition (1992) (EXCERPT)

(CONTAINS COPYRIGHTED MATERIAL)

Page 11 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000213 NYS-25 NYS-38 Letter from Christopher Grimes, Chief, NRC, to 08/10/2015 Douglas Walters, NEI, License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components (May 19, 2000)

NRC000214 NYS-25 NYS-38 Letter from John Lubinski, NRC, to Jean Smith, EPRI, 08/10/2015 License Renewal Interim Staff Guidance LR-ISG-2011-04: Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013)

NRC000215 NYS-25 NYS-38 Evaluation of WCAP-17780-P, "Reactor Internals 08/10/2015 Aging Management MRP- 227-A Applicability for Combustion Engineering [(CE)] and Westinghouse

[Electric Company (Westinghouse)] Pressurized Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse Pressurized Water Reactor Designs (Nov. 7, 2014)

(PROPRIETARY)

NRC000216 NYS-25 NYS-38 U.S. Nuclear Regulatory Commission Office of 08/10/2015 Nuclear Reactor Regulation Division of License Renewal Aging Management Audit Report (Oct. 6, 2014)

Page 12 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000218 NYS-25 NYS-38 EPRI 1016106, Final Report, Materials Reliability 08/10/2015 Program: Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (MRP-210) (Dec. 2007) (COPYRIGHT)

NRC000219 NYS-25 NYS-38 Westinghouse InfoGram IG-10-1, Reactor Internals 08/10/2015 Lower Radial Support Clevis Insert Cap Screw Degradation (Mar. 31, 2010)

NRC000220 NYS-25 NYS-38 Pressurized Water Reactor Owners Group (PWROG) 08/10/2015 Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange:

Clevis Insert Bolt Update, (June 2014)

NRC00221A-F NYS-25 NYS-38 Babcock & Wilcox Report, S-1473-002, Final Report, 08/10/2015 Rev. 0, Examination of Clevis Bolts Removed from D.

C. Cook Nuclear Plant (Dec. 2013)

NRC000222 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT) 08/10/2015 NRC000223 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 14 (2011) 08/10/2015 NRC000224 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 16 08/10/2015 NRC00225A-B NYS-25 NYS-38 EPRI 1016593, Final Report, Materials Reliability 08/10/2015 Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (MRP-232) (Dec. 31, 2008)

(PROPRIETARY)

NRC000226 NYS-25 NYS-38 Jeffrey C. Poehler Statement of Professional 08/10/2015 NRC000227 NYS-25 NYS-26 NYS-38 Gary Stevens Statement of Professional 08/10/2015 NRC000228 NYS-25 NYS-38 Indian Point Unit 2 Technical Specifications 3.1.4 08/10/2015 NRC000229 NYS-25 NYS-38 Indian Point Unit 3 Technical Specifications 3.1.4 08/10/2015 Page 13 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000230 NYS-25, NYS-26, NYS-38 Table of Corrections to Staff Testimony 11/03/2015 Page 14 of 14