0 Appendix B                                                                                      Page 1 of 2 Recent BACTILAER Determinations for Cooling Towers Particulate Emissions PERMIT OPERATING I              CONTROLDESCRIPTION                                            UMIT BASIS BACT-PSD BACT-PSD HOMELAND  ENERGYSOLUTIONS                                                                                                                            None              BACT-PSD ANCLOTEPOWER PLANT INSTALLATION    OF HIGHEFFICIENCY0 00W5% DRIFT ELIMINATORSLIMITTOTALDISSOLVEDSOUDS IN WANAPAENERGYCENTER                            UMATI.LLAOR        8/S2005I          NO    THE WATERTO LESS THAN3.532 PPMW                  -  I  NIA  1 0.0005%  BACT-PSD GOOD DESIGN,MAINTENANCE,      ANDINTEGRATED PLAQUEMINE  PVC PLANT                          IBERVILLE,LA        7/2702005        NO    DRIFTELIMINATORS                              019    Lb/MMGal      7    BACT-PSD DRIFTELIMINATORS      TO ACHIEVEODOW5% DRIFT XCELENERGY(PSCO) - COMANCHE    STATION        PUEBLO,CO          7/512005          NO    OR LESS                                          -      N/A    0.0005%  BACT-PSD CRESCENTCITYPOWER                              ORLEANS.LA          6W5/2005          NO    NONEINDICATED                                  2 61      None    0.0050%  RACT.PSD NEWMONT  NV ENERGY- TS POWER PLANT            EUREKANV                W/5/2005    NO    DRIFTELIMINATORS                                -      N/A    00005%    BACT-PSD ARIZONACLEANFUELS YUMA                        YUMA,AZ            4/14/2005        NO      HIGHEFFICIENCYDRIFTEUMINATORS                  1 60    None      '      BACT-PSD TRIGEN-NASSAU ENERGYCORPORATION                NASSAU,NY          30312005          NO    NONEINDICATED                                    -      NAA    00005%    BACT-PSD OPPD - NEBRASKACITYSTATION                    OTOE. NE            3/9/2005        NO      NONEINDICATED                                  0.001    None      I      BACT-PSE INSTALLATION    OF DRIFTELIMINATORS WITHDRIFT LOSS OF LESS THAN0 001% OF THE DARRINGTON  ENERGYCOGENERATION    POWER PLANT SNOHOMISH,WA        2/11/2005        NO      RECIRCULATING    WATER FLOWRATE                  -      N/A      0001%    BACT-PSE LOSEOFLEESTHAN0.001%OPTHE WHATCOM,  WA        1/11/2005        NO I-GiRCULAMPNGWAIER FLOW RATE                              N/A  I 0001% I  RACY.T-P LAWRENCE,OH        1202802004                DRIFTELIMINATORS                              260  1  None  I        I BACT-PSD HERTFORD,NC        1102302004 MONTGOMERY,        115/25004 WAUSAU.WI          10/192004 ORLEANS.LA        10/1202004 POWER, ID          4/5/2004 LONGVIEWPOWER, LLC                            MAIDSV1LLE,WV      3/2004          NO    IREDUNDANT  BAFFLEANDMESHDEMISTERSYSTEM                  None                  T-PSD RATONROUGEREFINERY                            EASTBATONRC        2/18004 SANTEECOOPER CROSS GENERATING    STATIOI      PINESVILLE,SC      2/1802004 ACEETHANOL- STANLEY                            CHIPPEWA.WI        1/2102004 LAPAZ GENERATING    FACILITY                  LAPAZ, AZ          9/4/2003 PLUMPOINT ENERGY                              ARKANSAS            82000003 DUKEENERGYWASHINGTONCOUNTYLLC                  WASHINGTON,  C      8/1402003 0 005% MAY DRIFTRATE,2,000 PPM SOLIDS,MAX UWGP - FUELGRADEETHANOLPLANT                  FRIESLAND, Wl      8/140003          ?    FLOWOF 22.000 GPM                              110      Noon    00005%I    OTHER II  O--                              YFS                        - . I OAR                            N*n*
0 Appendix B                                                                                      Page 1 of 2 Recent BACTILAER Determinations for Cooling Towers Particulate Emissions PERMIT OPERATING I              CONTROLDESCRIPTION                                            UMIT BASIS BACT-PSD BACT-PSD HOMELAND  ENERGYSOLUTIONS                                                                                                                            None              BACT-PSD ANCLOTEPOWER PLANT INSTALLATION    OF HIGHEFFICIENCY0 00W5% DRIFT ELIMINATORSLIMITTOTALDISSOLVEDSOUDS IN WANAPAENERGYCENTER                            UMATI.LLAOR        8/S2005I          NO    THE WATERTO LESS THAN3.532 PPMW                  -  I  NIA  1 0.0005%  BACT-PSD GOOD DESIGN,MAINTENANCE,      ANDINTEGRATED PLAQUEMINE  PVC PLANT                          IBERVILLE,LA        7/2702005        NO    DRIFTELIMINATORS                              019    Lb/MMGal      7    BACT-PSD DRIFTELIMINATORS      TO ACHIEVEODOW5% DRIFT XCELENERGY(PSCO) - COMANCHE    STATION        PUEBLO,CO          7/512005          NO    OR LESS                                          -      N/A    0.0005%  BACT-PSD CRESCENTCITYPOWER                              ORLEANS.LA          6W5/2005          NO    NONEINDICATED                                  2 61      None    0.0050%  RACT.PSD NEWMONT  NV ENERGY- TS POWER PLANT            EUREKANV                W/5/2005    NO    DRIFTELIMINATORS                                -      N/A    00005%    BACT-PSD ARIZONACLEANFUELS YUMA                        YUMA,AZ            4/14/2005        NO      HIGHEFFICIENCYDRIFTEUMINATORS                  1 60    None      '      BACT-PSD TRIGEN-NASSAU ENERGYCORPORATION                NASSAU,NY          30312005          NO    NONEINDICATED                                    -      NAA    00005%    BACT-PSD OPPD - NEBRASKACITYSTATION                    OTOE. NE            3/9/2005        NO      NONEINDICATED                                  0.001    None      I      BACT-PSE INSTALLATION    OF DRIFTELIMINATORS WITHDRIFT LOSS OF LESS THAN0 001% OF THE DARRINGTON  ENERGYCOGENERATION    POWER PLANT SNOHOMISH,WA        2/11/2005        NO      RECIRCULATING    WATER FLOWRATE                  -      N/A      0001%    BACT-PSE LOSEOFLEESTHAN0.001%OPTHE WHATCOM,  WA        1/11/2005        NO I-GiRCULAMPNGWAIER FLOW RATE                              N/A  I 0001% I  RACY.T-P LAWRENCE,OH        1202802004                DRIFTELIMINATORS                              260  1  None  I        I BACT-PSD HERTFORD,NC        1102302004 MONTGOMERY,        115/25004 WAUSAU.WI          10/192004 ORLEANS.LA        10/1202004 POWER, ID          4/5/2004 LONGVIEWPOWER, LLC                            MAIDSV1LLE,WV      3/2004          NO    IREDUNDANT  BAFFLEANDMESHDEMISTERSYSTEM                  None                  T-PSD RATONROUGEREFINERY                            EASTBATONRC        2/18004 SANTEECOOPER CROSS GENERATING    STATIOI      PINESVILLE,SC      2/1802004 ACEETHANOL- STANLEY                            CHIPPEWA.WI        1/2102004 LAPAZ GENERATING    FACILITY                  LAPAZ, AZ          9/4/2003 PLUMPOINT ENERGY                              ARKANSAS            82000003 DUKEENERGYWASHINGTONCOUNTYLLC                  WASHINGTON,  C      8/1402003 0 005% MAY DRIFTRATE,2,000 PPM SOLIDS,MAX UWGP - FUELGRADEETHANOLPLANT                  FRIESLAND, Wl      8/140003          ?    FLOWOF 22.000 GPM                              110      Noon    00005%I    OTHER II  O--                              YFS                        - . I OAR                            N*n*
LIMACHEMICALSCOMPLEX CHOCOLATE  BAYOUPLANT                                                                                                                                None DUKEENERGYSTEPHENS.LLC ENNISTRACTEBEL  POWER BRAZOSVALLEYELECTRICGENERATING ATOFINACHEMICALS    INCORPORATED DOWTEXASOPERATIONSFREEPORT TENASKAINDIANA  PARTNERS, LP.
LIMACHEMICALSCOMPLEX CHOCOLATE  BAYOUPLANT                                                                                                                                None DUKEENERGYSTEPHENS.LLC ENNISTRACTEBEL  POWER BRAZOSVALLEYELECTRICGENERATING ATOFINACHEMICALS    INCORPORATED DOWTEXASOPERATIONSFREEPORT TENASKAINDIANA  PARTNERS, LP.
LAWRENCEENERGY                                OHIO                                                          ý*I                                                          SIP CLOY/SENERGYFACILITY                                                                                                                                                    ACTY-PSD GENOVAOKI POWER PROJECT REDBUDPOWER PLT BATONROUGEREFINERY UBERTYGENERATING    STATION IIMPLEMENTATION      OF HIGHEFFICIENCYDRIFI UMAENERGYCOMPANY                              CINCINNATI.OH      3/26r2002        YES    EULMINATORS
LAWRENCEENERGY                                OHIO                                                          ý*I                                                          SIP CLOY/SENERGYFACILITY                                                                                                                                                    ACTY-PSD GENOVAOKI POWER PROJECT REDBUDPOWER PLT BATONROUGEREFINERY UBERTYGENERATING    STATION IIMPLEMENTATION      OF HIGHEFFICIENCYDRIFI UMAENERGYCOMPANY                              CINCINNATI.OH      3/26r2002        YES    EULMINATORS 1 88 1  None  I    ?    I BACT-PSD NO                                                                                    THER I*  - AIU
                                                                                          ....        . --
                                                                                              ... ......
1 88 1  None  I    ?    I BACT-PSD NO                                                                                    THER I*  - AIU
                           .-                                                          "    DELIMINATORS                                                                  'T-PSD
                           .-                                                          "    DELIMINATORS                                                                  'T-PSD
                                                                                       ?    IDRIFTELIMINATORS                                                          BACT-PSD RACT-PSD PARISH                                                                                                            1.70                          T-PSD I 1008.0    I001  YES    DORIFT ELIMINATOR
                                                                                       ?    IDRIFTELIMINATORS                                                          BACT-PSD RACT-PSD PARISH                                                                                                            1.70                          T-PSD I 1008.0    I001  YES    DORIFT ELIMINATOR


Appendix B                                                                                Page 2 of 2 Recent BACTILAER Determinations for Cooling Towers Particulate Emissions 3LA                  W712001                                                                  None BACT-PSD IHIGHEFFICIENCYDRIFTEUMINATORS,GOOD DEMINGENERGYFACIUTY                          NEW MEXICO              I 12129Q00CI    NO    ENGINEERINGPRACTICES                          160  NL    I 0.0005%    BACT-OTHER LtfDa,      I-    - BACT-PSD 1.3A 1.69  None        ?        OTHER None        7        BACT-PSD None        '        BACT-PSD IDESIGNEDTO REDUCEDRIFT(OVERSPRAY)TO AGRIFIOS-DUN FACILITY                        PASADENA.TX              40720000I      NO    MINIMIZEPMEMISSIONS                        4.50  None  I      I    BACT-OTHER BASTROP,TX                                                                                  245 TEXAS                                                                                        I 7 HOUSTON,TX                                                                                  0.04 BEAUMONT,TX                                                                                  1.10                          NSPS HOUSTON.TX                                                                                  4.23 MONACILLOS.PR                                                                                0004 TEXAS                                                                                        1.90 TEXAS                                                                                        11.15 CHARLOTTE,NC                                                                                0.04 FARMERSBRANCH                                                                                17.50 12019999 I      ?
Appendix B                                                                                Page 2 of 2 Recent BACTILAER Determinations for Cooling Towers Particulate Emissions 3LA                  W712001                                                                  None BACT-PSD IHIGHEFFICIENCYDRIFTEUMINATORS,GOOD DEMINGENERGYFACIUTY                          NEW MEXICO              I 12129Q00CI    NO    ENGINEERINGPRACTICES                          160  NL    I 0.0005%    BACT-OTHER LtfDa,      I-    - BACT-PSD 1.3A 1.69  None        ?        OTHER None        7        BACT-PSD None        '        BACT-PSD IDESIGNEDTO REDUCEDRIFT(OVERSPRAY)TO AGRIFIOS-DUN FACILITY                        PASADENA.TX              40720000I      NO    MINIMIZEPMEMISSIONS                        4.50  None  I      I    BACT-OTHER BASTROP,TX                                                                                  245 TEXAS                                                                                        I 7 HOUSTON,TX                                                                                  0.04 BEAUMONT,TX                                                                                  1.10                          NSPS HOUSTON.TX                                                                                  4.23 MONACILLOS.PR                                                                                0004 TEXAS                                                                                        1.90 TEXAS                                                                                        11.15 CHARLOTTE,NC                                                                                0.04 FARMERSBRANCH                                                                                17.50 12019999 I      ?
                                                                                        ",
GOP TO LIMITEXCESSWATER&AIR FLOW&AVOID BYPASSOF THEDRIFTPLIMINATOR NORTHBROOK.LA                                                                          I.092 3.20  None  I            BACT-PSD TEXAS                                                                                  I    ym                          BACT.PSD LAKECHARLES,LA                                                                                                          BACT-PSD CORDOVA,IL                                                                                                              BACT-PSD WESTLAKE,LA                                                                                                              BACT-PSD TEXAS                                                                                                                    BACT-PSD MINOOKA,IL                                                                                                              BACT-PSD WESTLAKE,LA                                                                                                            BACT-OTHER SAN ANTONIO,TX                                                                                                          BACT-PSD PARISGENERATINGSTATION                      DALLAS,TX                                                                                                                BACT.PSD HINAUILANUUHIEMICAL COMHAI                  PORT ARTHUR,TX                                                                                                            ýA I-PS HAWESVILLE,KY                                                                                                              OTHER II 9      I DRIFTEUMINATOR& TDS INTHE COOUNGWATER CHARTERSTEELDIVISION                        SAUKVILLE, WI              222611997        "
GOP TO LIMITEXCESSWATER&AIR FLOW&AVOID BYPASSOF THEDRIFTPLIMINATOR NORTHBROOK.LA                                                                          I.092 3.20  None  I            BACT-PSD
                                                                                                                            -...
TEXAS                                                                                  I    ym                          BACT.PSD LAKECHARLES,LA                                                                                                          BACT-PSD CORDOVA,IL                                                                                                              BACT-PSD WESTLAKE,LA                                                                                                              BACT-PSD TEXAS                                                                                                                    BACT-PSD MINOOKA,IL                                                                                                              BACT-PSD WESTLAKE,LA                                                                                                            BACT-OTHER SAN ANTONIO,TX                                                                                                          BACT-PSD PARISGENERATINGSTATION                      DALLAS,TX                                                                                                                BACT.PSD HINAUILANUUHIEMICAL COMHAI                  PORT ARTHUR,TX                                                                                                            ýA I-PS HAWESVILLE,KY                                                                                                              OTHER II 9      I DRIFTEUMINATOR& TDS INTHE COOUNGWATER CHARTERSTEELDIVISION                        SAUKVILLE, WI              222611997        "
                                                                                         '      1.2% BYWVT                                1.30  None  I    ?    I  BACT-PSD GOP = GOOD OPERATINGPRACTICES,WAR = LEAKDETECTIONAND REPAIR,TDS = TOTALDISSOLVEDSOLIDS
                                                                                         '      1.2% BYWVT                                1.30  None  I    ?    I  BACT-PSD GOP = GOOD OPERATINGPRACTICES,WAR = LEAKDETECTIONAND REPAIR,TDS = TOTALDISSOLVEDSOLIDS


Line 1,114: Line 1,108:
17  Q: What was your role in evaluating potential alternative intake technologies for 18    IPEC?
17  Q: What was your role in evaluating potential alternative intake technologies for 18    IPEC?
19  A: I was responsible for the preparation of the Bums and Roe report entitled BREI 20    Independent Review of the Proposed ClearSky© Cooling Towers Impact on the 21    Indian Point Energy Center Main Condensers, which is Attachment 3 to the 22    Enercon report entitled ENERCON Response to Tetra Tech's Indian Point 23    Closed-Cycle Cooling System Retrofit Evaluation Report (Entergy Ex. 296(A)).
19  A: I was responsible for the preparation of the Bums and Roe report entitled BREI 20    Independent Review of the Proposed ClearSky© Cooling Towers Impact on the 21    Indian Point Energy Center Main Condensers, which is Attachment 3 to the 22    Enercon report entitled ENERCON Response to Tetra Tech's Indian Point 23    Closed-Cycle Cooling System Retrofit Evaluation Report (Entergy Ex. 296(A)).
PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.
PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.
CLOSED CYCLE COOLING 1    In addition, and in preparation for my testimony in these Proceedings, I have also 2    reviewed various materials, including the following reports:
CLOSED CYCLE COOLING 1    In addition, and in preparation for my testimony in these Proceedings, I have also 2    reviewed various materials, including the following reports:
Line 1,127: Line 1,120:
18 A: I reviewed the reports and Mr. Beaver's prefiled direct and rebuttal testimony, 19    focusing on aspects of Mr. Beaver's testimony that concerned the feasibility of 20    construction and operation of cooling towers at IPEC.
18 A: I reviewed the reports and Mr. Beaver's prefiled direct and rebuttal testimony, 19    focusing on aspects of Mr. Beaver's testimony that concerned the feasibility of 20    construction and operation of cooling towers at IPEC.
21 Q: Do you agree with Mr. Beaver's conclusion that the operation of cooling 22    towers at IPEC would adversely impact plant performance?
21 Q: Do you agree with Mr. Beaver's conclusion that the operation of cooling 22    towers at IPEC would adversely impact plant performance?
PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.
CLOSED CYCLE COOLING 1 A: Yes. As Mr. Beaver stated in his prefiled rebuttal, "[rietrofitting a nuclear plant 2    constructed in the 1970s with a once-through cooling system to a closed-cycle 3    cooling system will impact virtually every aspect of IPEC's circulating water 4    system." See Beaver CCC Rebuttal at 9:12-14; see also Beaver CCC Rebuttal at 5    3:8-6:8, 7:1-8:17, 8:19-10:10, 26:5-26:22, 28:22-29:8, 37:1-10, 38:4-39:2, with 6    which I agree and accept. I would also underscore three points: First, it took 7    nearly 40 years of engineering work to produce IPEC's consistent current 8    capacity factor of over 90 percent. That work will compromised by installing 9    cooling towers. Not only will a cooling tower retrofit project adversely impact 10    overall IPEC performance by reducing the flow rate of the circulating water and 11    increasing the temperature of the circulating water, but any cooling tower retrofit 12    will also necessarily change and disrupt many of the complex controls and 13    interlocks that assure the reliable and safe operation of the plant, including its 14    defense in depth systems. These impacts may extend to the Units' primary (or 15    nuclear) and secondary (or electricity generation) systems. Second, a feasibility 16    analysis would need to consider not only stable operations but also various 17    operational transients evaluated under the regulatory regime in which nuclear 18    power plants operate and under standard engineering practices.      One of those 19    transients is identified in Mr. Beaver's testimony, but as Mr. Beaver indicated, 20    there are many others that would need to be identified and evaluated as a 21    precursor to reaching a feasibility determination. See Beaver CCC Direct at 11:5-22    17. Third, as Mr. Beaver indicates, an engineer operating consistent with standard 23    nuclear engineering practices could not reach a conclusion that retrofitting IPEC
PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.
PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.
CLOSED CYCLE COOLING 1 A: Yes. As Mr. Beaver stated in his prefiled rebuttal, "[rietrofitting a nuclear plant 2    constructed in the 1970s with a once-through cooling system to a closed-cycle 3    cooling system will impact virtually every aspect of IPEC's circulating water 4    system." See Beaver CCC Rebuttal at 9:12-14; see also Beaver CCC Rebuttal at 5    3:8-6:8, 7:1-8:17, 8:19-10:10, 26:5-26:22, 28:22-29:8, 37:1-10, 38:4-39:2, with 6    which I agree and accept. I would also underscore three points: First, it took 7    nearly 40 years of engineering work to produce IPEC's consistent current 8    capacity factor of over 90 percent. That work will compromised by installing 9    cooling towers. Not only will a cooling tower retrofit project adversely impact 10    overall IPEC performance by reducing the flow rate of the circulating water and 11    increasing the temperature of the circulating water, but any cooling tower retrofit 12    will also necessarily change and disrupt many of the complex controls and 13    interlocks that assure the reliable and safe operation of the plant, including its 14    defense in depth systems. These impacts may extend to the Units' primary (or 15    nuclear) and secondary (or electricity generation) systems. Second, a feasibility 16    analysis would need to consider not only stable operations but also various 17    operational transients evaluated under the regulatory regime in which nuclear 18    power plants operate and under standard engineering practices.      One of those 19    transients is identified in Mr. Beaver's testimony, but as Mr. Beaver indicated, 20    there are many others that would need to be identified and evaluated as a 21    precursor to reaching a feasibility determination. See Beaver CCC Direct at 11:5-22    17. Third, as Mr. Beaver indicates, an engineer operating consistent with standard 23    nuclear engineering practices could not reach a conclusion that retrofitting IPEC PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.
CLOSED CYCLE COOLING 1    with cooling towers is feasible to a reasonable degree of engineering certainty.
CLOSED CYCLE COOLING 1    with cooling towers is feasible to a reasonable degree of engineering certainty.
2    See Beaver CCC Rebuttal at 38:4-39:2.
2    See Beaver CCC Rebuttal at 38:4-39:2.
3 Q: Please summarize the information that you relied on or considered for your 4    testimony.
3 Q: Please summarize the information that you relied on or considered for your 4    testimony.
5 A: In addition to the testimony and reports identified above, I have also reviewed the 6    prefiled direct, prefiled rebuttal, and live testimony of Tim Havey and Eduardo 7    Ortiz de Zarate.
5 A: In addition to the testimony and reports identified above, I have also reviewed the 6    prefiled direct, prefiled rebuttal, and live testimony of Tim Havey and Eduardo 7    Ortiz de Zarate.
END OF TESTIMONY
END OF TESTIMONY STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and      DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC          SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,        DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                        3-5522-00105/00031 (IP3)
 
STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and      DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC          SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,        DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                        3-5522-00105/00031 (IP3)
Joint Application for CWA § 401 Water Quality Certification PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
Joint Application for CWA § 401 Water Quality Certification PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
Line 1,152: Line 1,140:
11 A: Yes. I am offering my testimony with respect to Issue for Adjudication No. 1 as it 12    relates to the feasibility of constructing and operating closed-cycle cooling 13    ("CCC") towers as proposed by NYSDEC Staff at Indian Point Energy Center 14    ("IPEC"). I offer my expert testimony concerning whether, from an engineering 15    perspective, the proposed retrofits of Indian Point Units 2 and 3 with CCC (and 16    therefore cooling towers) can be successfully constructed and operated without 17    material detriment impacts to Indian Point during the license-renewal period on a 18    site-specific basis.
11 A: Yes. I am offering my testimony with respect to Issue for Adjudication No. 1 as it 12    relates to the feasibility of constructing and operating closed-cycle cooling 13    ("CCC") towers as proposed by NYSDEC Staff at Indian Point Energy Center 14    ("IPEC"). I offer my expert testimony concerning whether, from an engineering 15    perspective, the proposed retrofits of Indian Point Units 2 and 3 with CCC (and 16    therefore cooling towers) can be successfully constructed and operated without 17    material detriment impacts to Indian Point during the license-renewal period on a 18    site-specific basis.
19 Q: Please describe your academic background.
19 Q: Please describe your academic background.
20 A: I earned a B.S. in mechanical engineering and an MBA from the Georgia Institute 21    of Technology.      My undergraduate degree focused on thermodynamics, fluids, 22    heat transfer, and failure analysis. I am a Registered Professional Engineer in the
20 A: I earned a B.S. in mechanical engineering and an MBA from the Georgia Institute 21    of Technology.      My undergraduate degree focused on thermodynamics, fluids, 22    heat transfer, and failure analysis. I am a Registered Professional Engineer in the PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
 
PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
CLOSED CYCLE COOLING I    State of Georgia. My most recent curriculum vitae, including a list of my recent 2    publications, is submitted as Entergy Exhibit 540.
CLOSED CYCLE COOLING I    State of Georgia. My most recent curriculum vitae, including a list of my recent 2    publications, is submitted as Entergy Exhibit 540.
3 Q: Please summarize your relevant specializations and work experience.
3 Q: Please summarize your relevant specializations and work experience.
Line 1,160: Line 1,146:
8    As set forth in my CV, in addition to the work performed in this proceeding, I 9    have worked on circulating water and service water systems and/or cooling tower 10    projects at the following nuclear facilities: James A. Fitzpatrick Nuclear Power 11    Plant; Pilgrim Nuclear Power Station; Quad Cities Nuclear Generating Station; 12    Pickering Nuclear Generating Station; Diablo Canyon Power Plant; Dresden 13    Generating Station; Robinson Nuclear Plant; and San Onofre Nuclear Generating 14    Station.
8    As set forth in my CV, in addition to the work performed in this proceeding, I 9    have worked on circulating water and service water systems and/or cooling tower 10    projects at the following nuclear facilities: James A. Fitzpatrick Nuclear Power 11    Plant; Pilgrim Nuclear Power Station; Quad Cities Nuclear Generating Station; 12    Pickering Nuclear Generating Station; Diablo Canyon Power Plant; Dresden 13    Generating Station; Robinson Nuclear Plant; and San Onofre Nuclear Generating 14    Station.
15 Q: What was your role in evaluating potential CCC configurations for IPEC?
15 Q: What was your role in evaluating potential CCC configurations for IPEC?
16 A: I was a principal author and responsible for managing day-to-day activities related 17    to the development of the following reports: EngineeringFeasibilityand Costs of 18    Conversion of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling 19    Water Configuration, dated February 12, 2010 (Entergy Ex. 7); Analysis of 20    Closed-Loop Cooling Salinity Levels Indian Point Units 2 & 3, dated November 21    2010 (Entergy Ex. 310); and ENERCON Response to Tetra Tech's Indian Point 22    Closed-Cycle Cooling System Retrofit Evaluation Report, dated December 2013 23    (Entergy Ex. 296A). As part of my role preparing these reports, I worked hand-
16 A: I was a principal author and responsible for managing day-to-day activities related 17    to the development of the following reports: EngineeringFeasibilityand Costs of 18    Conversion of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling 19    Water Configuration, dated February 12, 2010 (Entergy Ex. 7); Analysis of 20    Closed-Loop Cooling Salinity Levels Indian Point Units 2 & 3, dated November 21    2010 (Entergy Ex. 310); and ENERCON Response to Tetra Tech's Indian Point 22    Closed-Cycle Cooling System Retrofit Evaluation Report, dated December 2013 23    (Entergy Ex. 296A). As part of my role preparing these reports, I worked hand-PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
 
PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
CLOSED CYCLE COOLING I      in-hand with Mr. Beaver, who was the Technical Lead on each of these projects.
CLOSED CYCLE COOLING I      in-hand with Mr. Beaver, who was the Technical Lead on each of these projects.
2 Q:  Have you reviewed the prefiled direct testimony of Sam Beaver, dated 3      February 28, 2014, and the prefiled rebuttal testimony of Sam Beaver, dated 4      March 28, 2014?
2 Q:  Have you reviewed the prefiled direct testimony of Sam Beaver, dated 3      February 28, 2014, and the prefiled rebuttal testimony of Sam Beaver, dated 4      March 28, 2014?
Line 1,175: Line 1,159:
19    9 Memorandum from John Sunda, SAIC and Kelly Meadows, to Paul Shriner and 20      Jan Matuszko, USEPA, Re: Cooling Tower Noise, Plume and Drift Abatement 21      Costs, dated June 11, 2010 (Entergy Ex. 346);
19    9 Memorandum from John Sunda, SAIC and Kelly Meadows, to Paul Shriner and 20      Jan Matuszko, USEPA, Re: Cooling Tower Noise, Plume and Drift Abatement 21      Costs, dated June 11, 2010 (Entergy Ex. 346);
22    0 SPX, Entergy Indian Point Units 2 & 3, ClearSky Selection Summary (Entergy 23      Ex. 347);
22    0 SPX, Entergy Indian Point Units 2 & 3, ClearSky Selection Summary (Entergy 23      Ex. 347);
PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
CLOSED CYCLE COOLING I
CLOSED CYCLE COOLING I
Line 1,191: Line 1,174:
19  356);
19  356);
20 0 U.S. Department of Energy, Project Facts, Improvement to Air2Air Technology 21  to Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 22  Power Plants ProMIS/Project No.: DE-NT0005647 (Entergy Ex. 357);
20 0 U.S. Department of Energy, Project Facts, Improvement to Air2Air Technology 21  to Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 22  Power Plants ProMIS/Project No.: DE-NT0005647 (Entergy Ex. 357);
23 0 Bob Cashner, American Electric Power, AEP's Experience with Polyester FRP
23 0 Bob Cashner, American Electric Power, AEP's Experience with Polyester FRP PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
 
PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
CLOSED CYCLE COOLING 1  Structure Cooling Towers, dated Feb. 2011 (Entergy Ex. 358);
CLOSED CYCLE COOLING 1  Structure Cooling Towers, dated Feb. 2011 (Entergy Ex. 358);
2 9 SPX Cooling Technologies, Inc., Improvement to Air2AirTM Technology to 3  Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 4  Power Plants, Final Report, dated June 30, 2012 (Entergy Ex. 359);
2 9 SPX Cooling Technologies, Inc., Improvement to Air2AirTM Technology to 3  Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 4  Power Plants, Final Report, dated June 30, 2012 (Entergy Ex. 359);
Line 1,209: Line 1,190:
19 0  U.S. NRC letter regarding South Carolina Electric & Gas Co. response to request 20  for additional information (Entergy Ex. 475);
19 0  U.S. NRC letter regarding South Carolina Electric & Gas Co. response to request 20  for additional information (Entergy Ex. 475);
21 0 Technical Report: Operating Cooling Towers in Freezing Weather (Marley, April 22  2012) (Entergy Ex. 479);
21 0 Technical Report: Operating Cooling Towers in Freezing Weather (Marley, April 22  2012) (Entergy Ex. 479);
23 0 Cooling Technology Institute, Common Industrial Cooling Tower Errors and
23 0 Cooling Technology Institute, Common Industrial Cooling Tower Errors and PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
 
PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.
CLOSED CYCLE COOLING 1  Omissions, dated Feb. 2009 (Entergy Ex. 481);
CLOSED CYCLE COOLING 1  Omissions, dated Feb. 2009 (Entergy Ex. 481);
2 0 U.S. NRC: GEIS for Nuclear Plants (Entergy Ex. 486);
2 0 U.S. NRC: GEIS for Nuclear Plants (Entergy Ex. 486);
Line 1,217: Line 1,196:
5 0 SPX PowerPoint: Seawater Cooling Tower - District Cooling Symposium (Oct.
5 0 SPX PowerPoint: Seawater Cooling Tower - District Cooling Symposium (Oct.
6  14, 2009) (Entergy Ex. 535).
6  14, 2009) (Entergy Ex. 535).
END OF TESTIMONY
END OF TESTIMONY Exhibit A 0
 
Exhibit A 0


STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and      DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC          SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,        DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                        3-5522-00105/00031 (IP3)
STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and      DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC          SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,        DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                        3-5522-00105/00031 (IP3)
Line 1,244: Line 1,221:
2 A:  This testimony describes the report prepared by Enercon entitled, ENERCON 3    Response to Tetra Tech's Indian Point Closed-Cycle Cooling System Retrofit 4    Evaluation Report ("2013 ENERCON CCC Response"), dated December 2013 5    (Entergy Ex. 296(A)), which is Appendix A to the TRC Environmental 6      Corporation ("TRC") report entitled, New York State Environmental Quality 7    Review Act, Entergy Response Document to the Tetra Tech Report and the 8    Powers Engineering Report (Entergy Ex. 296).          In addition, this testimony 9    describes Enercon's report entitled, Analysis of Closed-Loop Cooling Salinity 10    Levels Indian Point Units 2 & 3, with Appendices A-F, dated November 2010 11    (Entergy Ex. 310) ("Salinity Report"). I understand that the 2013 ENERCON 12    CCC Response and the Salinity Report have been previously provided to the 13    parties to the Proceedings, and I adopt both reports as part of my prefiled 14    testimony.
2 A:  This testimony describes the report prepared by Enercon entitled, ENERCON 3    Response to Tetra Tech's Indian Point Closed-Cycle Cooling System Retrofit 4    Evaluation Report ("2013 ENERCON CCC Response"), dated December 2013 5    (Entergy Ex. 296(A)), which is Appendix A to the TRC Environmental 6      Corporation ("TRC") report entitled, New York State Environmental Quality 7    Review Act, Entergy Response Document to the Tetra Tech Report and the 8    Powers Engineering Report (Entergy Ex. 296).          In addition, this testimony 9    describes Enercon's report entitled, Analysis of Closed-Loop Cooling Salinity 10    Levels Indian Point Units 2 & 3, with Appendices A-F, dated November 2010 11    (Entergy Ex. 310) ("Salinity Report"). I understand that the 2013 ENERCON 12    CCC Response and the Salinity Report have been previously provided to the 13    parties to the Proceedings, and I adopt both reports as part of my prefiled 14    testimony.
15  Q: Please describe the purpose of the 2013 ENERCON CCC Response.
15  Q: Please describe the purpose of the 2013 ENERCON CCC Response.
16  A: I understand that NYSDEC Staff has proposed the installation and operation of 17    CCC as the best technology available to minimize adverse environmental impacts 18    consistent with the requirements of 6 NYCRR § 704.5 and § 316(b) of the Clean 19    Water Act. The purpose of the 2013 ENERCON CCC Response was to review 20    the engineering feasibility of the CCC configurations selected by Tetra Tech in its 21    report entitled, Indian Point Closed-Cycle Cooling System Retrofit Evaluation, 22    dated June 2013 (the "Tetra Tech CCC Report"). The 2013 ENERCON CCC 23    Response also assesses CCC proposals submitted by Powers Engineering on
16  A: I understand that NYSDEC Staff has proposed the installation and operation of 17    CCC as the best technology available to minimize adverse environmental impacts 18    consistent with the requirements of 6 NYCRR § 704.5 and § 316(b) of the Clean 19    Water Act. The purpose of the 2013 ENERCON CCC Response was to review 20    the engineering feasibility of the CCC configurations selected by Tetra Tech in its 21    report entitled, Indian Point Closed-Cycle Cooling System Retrofit Evaluation, 22    dated June 2013 (the "Tetra Tech CCC Report"). The 2013 ENERCON CCC 23    Response also assesses CCC proposals submitted by Powers Engineering on PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I    behalf of Riverkeeper, Inc., as presented in the Revised Closed Cycle Cooling 2    FeasibilityAssessment for Indian Point Energy Center Unit 2 and Unit 3for Best 3    Technology Available Report, dated October 24, 2012, and subsequently limited 4      by the November 22, 2013 letter from Mark Lucas to ALJs Villa and O'Connell 5    (the "Powers Report"). I understand that Riverkeeper has recently withdrawn the 6      Powers Report and, in an email from Riverkeeper's counsel dated February 24 at 7      8:45 pm, declined to specify what CCC proposal it actually will be advancing.
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I    behalf of Riverkeeper, Inc., as presented in the Revised Closed Cycle Cooling 2    FeasibilityAssessment for Indian Point Energy Center Unit 2 and Unit 3for Best 3    Technology Available Report, dated October 24, 2012, and subsequently limited 4      by the November 22, 2013 letter from Mark Lucas to ALJs Villa and O'Connell 5    (the "Powers Report"). I understand that Riverkeeper has recently withdrawn the 6      Powers Report and, in an email from Riverkeeper's counsel dated February 24 at 7      8:45 pm, declined to specify what CCC proposal it actually will be advancing.
8    My testimony is therefore limited to addressing the Tetra Tech proposal.          If 9    Riverkeeper in fact advances some other CCC proposal, then to the extent 10    necessary I will address such proposal in rebuttal.
8    My testimony is therefore limited to addressing the Tetra Tech proposal.          If 9    Riverkeeper in fact advances some other CCC proposal, then to the extent 10    necessary I will address such proposal in rebuttal.
11  Q: How did you go about preparing the 2013 ENERCON CCC Response?
11  Q: How did you go about preparing the 2013 ENERCON CCC Response?
Line 1,252: Line 1,227:
17              Under my supervision, the Enercon team conducted a thorough review of 18    the reports submitted by NYSDEC Staff and Riverkeeper to determine whether 19    those reports demonstrated the feasibility of retrofitting Unit 2 and Unit 3 with 20    CCC and in addition, whether there existed any potential problems, errors, or
17              Under my supervision, the Enercon team conducted a thorough review of 18    the reports submitted by NYSDEC Staff and Riverkeeper to determine whether 19    those reports demonstrated the feasibility of retrofitting Unit 2 and Unit 3 with 20    CCC and in addition, whether there existed any potential problems, errors, or
: 21. omissions that (1) implicate essential equipment and/or nuclear station reliability; 22    (2) represent high risk assumptions or unknowns; and (3) would significantly 23    increase the estimated costs of construction or operation.
: 21. omissions that (1) implicate essential equipment and/or nuclear station reliability; 22    (2) represent high risk assumptions or unknowns; and (3) would significantly 23    increase the estimated costs of construction or operation.
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1            In addition to our in-house experts, Alden Research Laboratory ("Alden")
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1            In addition to our in-house experts, Alden Research Laboratory ("Alden")
2    was engaged by Entergy to conduct computational fluid dynamic ("CFD")
2    was engaged by Entergy to conduct computational fluid dynamic ("CFD")
Line 1,261: Line 1,235:
OF TETRA TECH'S CCC CONFIGURATIONS 8  Q: Please describe the key elements of Tetra Tech's proposed conceptual design 9    that were relevant to your review.
OF TETRA TECH'S CCC CONFIGURATIONS 8  Q: Please describe the key elements of Tetra Tech's proposed conceptual design 9    that were relevant to your review.
10  A: For its conceptual design, Tetra Tech has selected SPX ClearSkyTM ("ClearSky")
10  A: For its conceptual design, Tetra Tech has selected SPX ClearSkyTM ("ClearSky")
11    plume-abated cooling towers for use at IPEC based on the claim that the ClearSky 12    cooling towers were the only practical alternative for a CCC-retrofit apart from 13    circular hybrid cooling towers. See Tetra Tech CCC Report at 11. For each Unit, 14    Tetra Tech has proposed that the towers would operate at a flow rate of 700,000 15    gallons per minute, a design wet-bulb temperature of 77°F, and an approach to 16    wet-bulb temperature of 12TF. See id. at 13. Tetra Tech's cooling towers are 17    configured "back-to-back," meaning that towers for each unit would be 2 cells 18    wide and 22 cells long for a total of 44 cells per tower.      Id. The overall 19    dimensions of each tower block would be 1,408 ft x 151 ft (or approximately 5 20    acres). Id. The locations that Tetra Tech proposes to site the cooling towers 21    would make the cooling water basins in the cooling towers 52.5 feet above mean 22    sea level. See id. at 15. Finally, Tetra Tech assumes that the cooling towers 23    would operate at three cycles of concentration, which means that the chemical or 24    biological constituents in the Hudson River water will be raised to three times
11    plume-abated cooling towers for use at IPEC based on the claim that the ClearSky 12    cooling towers were the only practical alternative for a CCC-retrofit apart from 13    circular hybrid cooling towers. See Tetra Tech CCC Report at 11. For each Unit, 14    Tetra Tech has proposed that the towers would operate at a flow rate of 700,000 15    gallons per minute, a design wet-bulb temperature of 77°F, and an approach to 16    wet-bulb temperature of 12TF. See id. at 13. Tetra Tech's cooling towers are 17    configured "back-to-back," meaning that towers for each unit would be 2 cells 18    wide and 22 cells long for a total of 44 cells per tower.      Id. The overall 19    dimensions of each tower block would be 1,408 ft x 151 ft (or approximately 5 20    acres). Id. The locations that Tetra Tech proposes to site the cooling towers 21    would make the cooling water basins in the cooling towers 52.5 feet above mean 22    sea level. See id. at 15. Finally, Tetra Tech assumes that the cooling towers 23    would operate at three cycles of concentration, which means that the chemical or 24    biological constituents in the Hudson River water will be raised to three times PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    their initial levels in the close-cycle system, before being blown down or released 2      from the tower. See id at 13.
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    their initial levels in the close-cycle system, before being blown down or released 2      from the tower. See id at 13.
3  Q:  What is a "design wet bulb temperature"?
3  Q:  What is a "design wet bulb temperature"?
4  A:  The wet bulb temperature is a meteorological measurement which incorporates 5      both moisture content and the temperature of the ambient air (referred to as the 6      "dry bulb temperature").      Cooling tower performance depends on the wet bulb 7    temperature of the air entering the cooling tower inlets because it determines the 8    lowest temperature that the circulating water can be cooled using cooling towers, 9    which reject heat through evaporation.          When selecting cooling towers at a 10    particular facility, the "design" wet bulb temperature should reflect the highest 11    wet bulb temperature experienced in the area where the cooling towers will be 12    sited allowing a small margin for infrequent exceedances (typically less than 1%).
4  A:  The wet bulb temperature is a meteorological measurement which incorporates 5      both moisture content and the temperature of the ambient air (referred to as the 6      "dry bulb temperature").      Cooling tower performance depends on the wet bulb 7    temperature of the air entering the cooling tower inlets because it determines the 8    lowest temperature that the circulating water can be cooled using cooling towers, 9    which reject heat through evaporation.          When selecting cooling towers at a 10    particular facility, the "design" wet bulb temperature should reflect the highest 11    wet bulb temperature experienced in the area where the cooling towers will be 12    sited allowing a small margin for infrequent exceedances (typically less than 1%).
13  Q: What is an "approach to wet bulb temperature"?
13  Q: What is an "approach to wet bulb temperature"?
14  A: No cooling tower is capable of cooling water to the wet bulb temperature.
14  A: No cooling tower is capable of cooling water to the wet bulb temperature.
15      Therefore, the approach to wet bulb temperature describes the number of degrees 16      above the ambient wet bulb temperature by which the cooling tower can be 17      expected to reduce the temperature of the cooling water after it passes through the 18      condensers. It is a value based on the size and efficiency of the cooling towers 19      and it represents the cooling ability of the towers. For example, Tetra Tech's 20      selected cooling towers would be capable of cooling the CCC water to 89TF (77TF 21      design wet bulb + 12TF approach) when the amnbient wet bulb temperature at the 22      cooling towers is 77TF. To understand how the approach temperature changes 23      with changes to the wet bulb temperature, engineers use cooling tower
15      Therefore, the approach to wet bulb temperature describes the number of degrees 16      above the ambient wet bulb temperature by which the cooling tower can be 17      expected to reduce the temperature of the cooling water after it passes through the 18      condensers. It is a value based on the size and efficiency of the cooling towers 19      and it represents the cooling ability of the towers. For example, Tetra Tech's 20      selected cooling towers would be capable of cooling the CCC water to 89TF (77TF 21      design wet bulb + 12TF approach) when the amnbient wet bulb temperature at the 22      cooling towers is 77TF. To understand how the approach temperature changes 23      with changes to the wet bulb temperature, engineers use cooling tower PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    performance curves. A single point is not adequate to determine the operational 2    impacts of CCC over the entire range of expected wet bulb temperatures.
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    performance curves. A single point is not adequate to determine the operational 2    impacts of CCC over the entire range of expected wet bulb temperatures.
3 Q:  How does the "approach to wet bulb temperature" affect cooling tower 4    design?
3 Q:  How does the "approach to wet bulb temperature" affect cooling tower 4    design?
5 A:  There is an inherent trade-off between the size of a cooling tower and its ability to 6    cool the circulating water.      Increasing the approach to wet bulb temperature 7    decreases the cooling tower size, but results in greater circulating water 8    temperatures. Power plants operate less efficiently-that is, it will detrimentally 9    affect power plant performance-when the temperature of the circulating water is 10    increased, and indeed may result in a plant shut down if the temperatures exceed 11    the condenser's operational limits.
5 A:  There is an inherent trade-off between the size of a cooling tower and its ability to 6    cool the circulating water.      Increasing the approach to wet bulb temperature 7    decreases the cooling tower size, but results in greater circulating water 8    temperatures. Power plants operate less efficiently-that is, it will detrimentally 9    affect power plant performance-when the temperature of the circulating water is 10    increased, and indeed may result in a plant shut down if the temperatures exceed 11    the condenser's operational limits.
Line 1,276: Line 1,246:
15  A: There are two primary conclusions that Enercon reached after its review of the 16    Tetra Tech CCC Report and which are discussed in detail in the 2013 ENERCON 17    CCC Response.        First, based on my and my team's experience and best 18    professional judgment, NYSDEC Staffs proposed configuration for a CCC 19    retrofit at IPEC as presented by Tetra Tech cannot be considered feasible.          In 20    particular, it is my opinion that NYSDEC Staff's proposed cooling towers cannot 21    be installed and function efficiently within the operating constraints of IPEC.
15  A: There are two primary conclusions that Enercon reached after its review of the 16    Tetra Tech CCC Report and which are discussed in detail in the 2013 ENERCON 17    CCC Response.        First, based on my and my team's experience and best 18    professional judgment, NYSDEC Staffs proposed configuration for a CCC 19    retrofit at IPEC as presented by Tetra Tech cannot be considered feasible.          In 20    particular, it is my opinion that NYSDEC Staff's proposed cooling towers cannot 21    be installed and function efficiently within the operating constraints of IPEC.
22    Second, at a minimum, Tetra Tech's CCC Report does not contain fundamental 23    design detail that demonstrates that CCC are feasible at IPEC.
22    Second, at a minimum, Tetra Tech's CCC Report does not contain fundamental 23    design detail that demonstrates that CCC are feasible at IPEC.
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 Q:  What is your understanding of what it means for a technology to be feasible?
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 Q:  What is your understanding of what it means for a technology to be feasible?
2 A: A technology is feasible where it can be installed and operated at a particular site, 3    based on the relevant considerations. at that site, with a reasonable level of 4    engineering certainty.
2 A: A technology is feasible where it can be installed and operated at a particular site, 3    based on the relevant considerations. at that site, with a reasonable level of 4    engineering certainty.
Line 1,282: Line 1,251:
7  A: As set forth in the 2013 ENERCON CCC Response, there are three primary 8    reasons Tetra Tech's proposal cannot be considered feasible from an engineering 9    perspective.
7  A: As set forth in the 2013 ENERCON CCC Response, there are three primary 8    reasons Tetra Tech's proposal cannot be considered feasible from an engineering 9    perspective.
10            First, ClearSky cooling towers are not a demonstrated, available 11    technology for a large baseload nuclear power plant such as IPEC because there is 12    inadequate design, construction, and operational history for ClearSky towers-13    measured both in the total number of installations of ClearSky towers and the 14    diversity among the limited installations that do exist-to conclude they would be 15    viable with a reasonable level of confidence. No nuclear stations designed solely 16    for once-through cooling have been converted to closed-loop cooling, let alone 17    converted using ClearSky cooling towers. In fact, there is only one very small 18    ClearSky installation with any measurable operational experience (five years)-a 19    one test cell cooling tower in New Mexico. Nowhere does Tetra Tech provide 20    any operational history for that test cell operating in the New Mexico desert.
10            First, ClearSky cooling towers are not a demonstrated, available 11    technology for a large baseload nuclear power plant such as IPEC because there is 12    inadequate design, construction, and operational history for ClearSky towers-13    measured both in the total number of installations of ClearSky towers and the 14    diversity among the limited installations that do exist-to conclude they would be 15    viable with a reasonable level of confidence. No nuclear stations designed solely 16    for once-through cooling have been converted to closed-loop cooling, let alone 17    converted using ClearSky cooling towers. In fact, there is only one very small 18    ClearSky installation with any measurable operational experience (five years)-a 19    one test cell cooling tower in New Mexico. Nowhere does Tetra Tech provide 20    any operational history for that test cell operating in the New Mexico desert.
21    After the submission of the 2013 ENERCON CCC Report three additional 22    ClearSky cells became operational, two at a biomass facility in Wisconsin and 23    one "demo" tower in South Korea,          There are no ClearSky cooling towers
21    After the submission of the 2013 ENERCON CCC Report three additional 22    ClearSky cells became operational, two at a biomass facility in Wisconsin and 23    one "demo" tower in South Korea,          There are no ClearSky cooling towers PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I  operating at a nuclear power plant, and all three of the ClearSky configurations-2  in New Mexico, Wisconsin, and South Korea-are for in-line ClearSky cooling 3  towers, not the back-to-back configurations selected by Tetra Tech for use at 4  Units 2 and 3. Given the absence of any practical history of CCC retrofits at 5  nuclear facilities using ClearSky cooling towers, engineering observations and 6  conclusions regarding any such conversion are purely speculative and inherently 7  subject to unforeseen challenges during the detailed design phase and the 8  subsequent implementation.      Indeed, the lack of installation and operational 9  history presents a large potential risk, and under these circumstances, should have 10  eliminated ClearSky cooling towers from serious consideration. Adding to the 11  inherent risk of the ClearSky towers is the fact that they are only available in 12  fiberglass and are therefore (1) susceptible to fire damage and (2) not necessarily 13  designed to withstand the wind loading requirements at a nuclear facility like 14  IPEC.
 
15            Second, there are several construction and siting issues that were not 16  addressed by Tetra Tech.      Most notably, there are existing, essential plant 17  components and structures already located where Tetra Tech proposes siting the 18  cooling towers. Among the structures and components that would need to be 19  relocated are the Algonquin Natural Gas Pipeline, which is displaced by the 20  proposed Unit 3 cooling tower; components containing radionuclides (in the form 21  of spent nuclear fuel and low level radionuclide material); high voltage power 22  transmission lines; and various security towers, fencing and facilities. In fact, 23  with respect to radionuclide management, Tetra Tech acknowledged, "[i]f an PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I acceptable method cannot be identified, construction and excavation could not 2 proceed in this area, where the CT2 [Unit 2 cooling tower] pipe corridor would be 3 sited. In this case, the proposed Unit 2 retrofit would be infeasible." See Tetra 4  Tech CCC Report at 28. As set forth in the 2013 ENERCON CCC Response, 5 many of the structures that would need to be relocated are currently relied upon 6  for safe, secure and efficient power generation at IPEC.        Taken together, the 7  essential structures and components that are impacted by the Tetra Tech 8  configuration represent major detrimental impacts to the. IPEC site and raise 9  serious concerns about the plant's ability to generate power in a safe and efficient 10  manner. Further, the overall cost and schedule impacts of relocating these 11  essential structures was not addressed by Tetra Tech, hence making its report 12  substantially lacking relative to overall impacts of the proposed conversion.
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I  operating at a nuclear power plant, and all three of the ClearSky configurations-2  in New Mexico, Wisconsin, and South Korea-are for in-line ClearSky cooling 3  towers, not the back-to-back configurations selected by Tetra Tech for use at 4  Units 2 and 3. Given the absence of any practical history of CCC retrofits at 5  nuclear facilities using ClearSky cooling towers, engineering observations and 6  conclusions regarding any such conversion are purely speculative and inherently 7  subject to unforeseen challenges during the detailed design phase and the 8  subsequent implementation.      Indeed, the lack of installation and operational 9  history presents a large potential risk, and under these circumstances, should have 10  eliminated ClearSky cooling towers from serious consideration. Adding to the 11  inherent risk of the ClearSky towers is the fact that they are only available in 12  fiberglass and are therefore (1) susceptible to fire damage and (2) not necessarily 13  designed to withstand the wind loading requirements at a nuclear facility like 14  IPEC.
13          Third, operation of Tetra Tech's ClearSky cooling towers would have a 14  detrimental impact on plant operations. Tetra Tech's proposed ClearSky towers 15  will discharge saturated salt-laden mist that will be concentrated and localized at 16  ground levels rather than discharged and dispersed higher in the atmosphere, as is 17  the case with round hybrid cooling towers.        This will lead to increased salt 18  deposition and moisture on the power blocks and electrical transmission facilities, 19  creating a known risk of electrical arcing (discharging of current through the air) 20  in the switchyard. The risk of electrical arcing is a workplace safety hazard, and 21  may lead to a shutdown of the nuclear reactor via a reactor scram, which is the 22  sudden shutting down of a nuclear reactor, usually by rapid insertion of control 23  rods. Unplanned reactor scrams upset plant stability and challenge critical safety PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    functions during power operations. In addition, the plume from Tetra Tech's 2    proposed ClearSky tower configuration would have an adverse impact on the 3    electrical switchyard, heating/ventilation/air conditioning (HVAC) systems, and 4    major outdoor equipment at IPEC that creates operability concerns. Finally, the 5    low level plume would create significant recirculation of the saturated air which 6    would increase operational power losses. In fact, operational and parasitic power 7    losses combined due to the ClearSky CCC conversion represent as much as a 6%
15            Second, there are several construction and siting issues that were not 16  addressed by Tetra Tech.      Most notably, there are existing, essential plant 17  components and structures already located where Tetra Tech proposes siting the 18  cooling towers. Among the structures and components that would need to be 19  relocated are the Algonquin Natural Gas Pipeline, which is displaced by the 20  proposed Unit 3 cooling tower; components containing radionuclides (in the form 21  of spent nuclear fuel and low level radionuclide material); high voltage power 22  transmission lines; and various security towers, fencing and facilities. In fact, 23  with respect to radionuclide management, Tetra Tech acknowledged, "[i]f an
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I acceptable method cannot be identified, construction and excavation could not 2 proceed in this area, where the CT2 [Unit 2 cooling tower] pipe corridor would be 3 sited. In this case, the proposed Unit 2 retrofit would be infeasible." See Tetra 4  Tech CCC Report at 28. As set forth in the 2013 ENERCON CCC Response, 5 many of the structures that would need to be relocated are currently relied upon 6  for safe, secure and efficient power generation at IPEC.        Taken together, the 7  essential structures and components that are impacted by the Tetra Tech 8  configuration represent major detrimental impacts to the. IPEC site and raise 9  serious concerns about the plant's ability to generate power in a safe and efficient 10  manner. Further, the overall cost and schedule impacts of relocating these 11  essential structures was not addressed by Tetra Tech, hence making its report 12  substantially lacking relative to overall impacts of the proposed conversion.
13          Third, operation of Tetra Tech's ClearSky cooling towers would have a 14  detrimental impact on plant operations. Tetra Tech's proposed ClearSky towers 15  will discharge saturated salt-laden mist that will be concentrated and localized at 16  ground levels rather than discharged and dispersed higher in the atmosphere, as is 17  the case with round hybrid cooling towers.        This will lead to increased salt 18  deposition and moisture on the power blocks and electrical transmission facilities, 19  creating a known risk of electrical arcing (discharging of current through the air) 20  in the switchyard. The risk of electrical arcing is a workplace safety hazard, and 21  may lead to a shutdown of the nuclear reactor via a reactor scram, which is the 22  sudden shutting down of a nuclear reactor, usually by rapid insertion of control 23  rods. Unplanned reactor scrams upset plant stability and challenge critical safety
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    functions during power operations. In addition, the plume from Tetra Tech's 2    proposed ClearSky tower configuration would have an adverse impact on the 3    electrical switchyard, heating/ventilation/air conditioning (HVAC) systems, and 4    major outdoor equipment at IPEC that creates operability concerns. Finally, the 5    low level plume would create significant recirculation of the saturated air which 6    would increase operational power losses. In fact, operational and parasitic power 7    losses combined due to the ClearSky CCC conversion represent as much as a 6%
8    reduction in IPEC's net power output.
8    reduction in IPEC's net power output.
9  Q: Please summarize the basis for your conclusion that the Tetra Tech CCC 10    Report did not demonstrate the feasibility of CCC at IPEC.
9  Q: Please summarize the basis for your conclusion that the Tetra Tech CCC 10    Report did not demonstrate the feasibility of CCC at IPEC.
Line 1,299: Line 1,262:
5          In addition, Tetra Tech failed to perform any transient or accident analysis 6  for IPEC post-CCC retrofit. A review of the transient and accident analysis is 7  necessary for any significant plant change to ensure that there are no potential 8  impacts to the operation of any nuclear power plant. In fact, as set forth in 2013 9  ENERCON CCC Response, Burns and Roe identified and analyzed one transient 10  condition-high pressure steam dump (50% load rejection) at Unit 3-that would 11  exceed the condenser's operational limits and would require either additional 12  ClearSky cells or other substantial means to reject additional heat load. The 13  transient condition analyzed by Bums and Roe is just one of several transient 14  conditions that must be evaluated prior to reaching a feasibility determination.
5          In addition, Tetra Tech failed to perform any transient or accident analysis 6  for IPEC post-CCC retrofit. A review of the transient and accident analysis is 7  necessary for any significant plant change to ensure that there are no potential 8  impacts to the operation of any nuclear power plant. In fact, as set forth in 2013 9  ENERCON CCC Response, Burns and Roe identified and analyzed one transient 10  condition-high pressure steam dump (50% load rejection) at Unit 3-that would 11  exceed the condenser's operational limits and would require either additional 12  ClearSky cells or other substantial means to reject additional heat load. The 13  transient condition analyzed by Bums and Roe is just one of several transient 14  conditions that must be evaluated prior to reaching a feasibility determination.
15  Without identifying and resolving potential transient and accident conditions, the 16  feasibility and operability of the Tetra Tech's CCC configuration has not been 17  demonstrated.
15  Without identifying and resolving potential transient and accident conditions, the 16  feasibility and operability of the Tetra Tech's CCC configuration has not been 17  demonstrated.
18          Further, Tetra Tech did not provide basic details needed to validate 19  whether its assumptions about the number of cells and size of its proposed cooling 20  towers are valid. Most notably, Tetra Tech did not identify the type of fill 21  material and/or address fill degradation impacts over time for the proposed 22  ClearSky towers. "Fill" is installed into the cooling towers themselves and is 23  used to increase the surface area and the contact time between the heated water
18          Further, Tetra Tech did not provide basic details needed to validate 19  whether its assumptions about the number of cells and size of its proposed cooling 20  towers are valid. Most notably, Tetra Tech did not identify the type of fill 21  material and/or address fill degradation impacts over time for the proposed 22  ClearSky towers. "Fill" is installed into the cooling towers themselves and is 23  used to increase the surface area and the contact time between the heated water PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1  and the cooling air.      In other words, fill is the medium that facilitates and 2  determines the heat transfer from the towers, and the selection and identification 3  of the proper fill is one of the most critical components in any cooling tower 4  design. In addition, the fill selected by Tetra Tech may be susceptible to fouling, 5  which will degrade cooling tower performance and potentially jeopardize the 6  structural integrity of the cooling towers.      The potential for fill fouling is a 7  particular concern with Tetra Tech's proposal because, as I stated above, it 8  proposes to operate the cooling towers at three (3) cycles of concentration, which 9  means that the level of total dissolved solids ("TDS") in the cooling water will be 10  three times as high as the level in the Hudson River, thereby increasing the risk 11  for fouling and operational impacts. Without a cooling tower fill selection, it is 12  simply not possible to determine if the cooling towers proposed by Tetra Tech are 13  feasible for continuous operation at IPEC or if the size, performance, cost and 14  schedule information for the cooling towers is appropriate.
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1  and the cooling air.      In other words, fill is the medium that facilitates and 2  determines the heat transfer from the towers, and the selection and identification 3  of the proper fill is one of the most critical components in any cooling tower 4  design. In addition, the fill selected by Tetra Tech may be susceptible to fouling, 5  which will degrade cooling tower performance and potentially jeopardize the 6  structural integrity of the cooling towers.      The potential for fill fouling is a 7  particular concern with Tetra Tech's proposal because, as I stated above, it 8  proposes to operate the cooling towers at three (3) cycles of concentration, which 9  means that the level of total dissolved solids ("TDS") in the cooling water will be 10  three times as high as the level in the Hudson River, thereby increasing the risk 11  for fouling and operational impacts. Without a cooling tower fill selection, it is 12  simply not possible to determine if the cooling towers proposed by Tetra Tech are 13  feasible for continuous operation at IPEC or if the size, performance, cost and 14  schedule information for the cooling towers is appropriate.
15          Finally, there is the potential for detrimental operational impacts on the 16  plant that were not adequately analyzed by Tetra Tech. Tetra Tech's report did 17  not include any Performance Evaluation of Power System Efficiency (PEPSE) 18  model results or Seasonal Annual Cooling Tower Impact (SACTI) model results.
15          Finally, there is the potential for detrimental operational impacts on the 16  plant that were not adequately analyzed by Tetra Tech. Tetra Tech's report did 17  not include any Performance Evaluation of Power System Efficiency (PEPSE) 18  model results or Seasonal Annual Cooling Tower Impact (SACTI) model results.
19  PEPSE is the industry standard heat balancing and hydraulic modeling software 20  used at nuclear power plants to evaluate potential operational impacts associated 21  with changes to the design of the plant. SACTI is a modeling software used to 22  model where the cooling tower plume migrates after being exhausted from the 23  towers and therefore allows better understanding of the operational impacts of
19  PEPSE is the industry standard heat balancing and hydraulic modeling software 20  used at nuclear power plants to evaluate potential operational impacts associated 21  with changes to the design of the plant. SACTI is a modeling software used to 22  model where the cooling tower plume migrates after being exhausted from the 23  towers and therefore allows better understanding of the operational impacts of PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    that moist, hot plume. While other models can be employed, Tetra Tech used no 2    modeling to establish the scope and scale of operational impacts, a real concern-3    particularly at a nuclear facility-that must be addressed before feasibility can be 4    determined. Moreover, with respect to Tetra Tech's claim that the ClearSky 5    towers are "plume abated," ClearSky towers rely on novel and proprietary PVC 6    heat exchanger packs to re-condense moisture that would otherwise exit in the 7    exhaust. Tetra Tech failed to provide any information regarding the tower's heat 8    exchangers or associated maintenance history, and no corroborating information 9    has been provided that such plume-abatement technology would be an appropriate 10    choice at IPEC.
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    that moist, hot plume. While other models can be employed, Tetra Tech used no 2    modeling to establish the scope and scale of operational impacts, a real concern-3    particularly at a nuclear facility-that must be addressed before feasibility can be 4    determined. Moreover, with respect to Tetra Tech's claim that the ClearSky 5    towers are "plume abated," ClearSky towers rely on novel and proprietary PVC 6    heat exchanger packs to re-condense moisture that would otherwise exit in the 7    exhaust. Tetra Tech failed to provide any information regarding the tower's heat 8    exchangers or associated maintenance history, and no corroborating information 9    has been provided that such plume-abatement technology would be an appropriate 10    choice at IPEC.
II                IV. SALINITY REPORT AND CONCLUSIONS 12  Q: Please describe the purpose of the Salinity Report.
II                IV. SALINITY REPORT AND CONCLUSIONS 12  Q: Please describe the purpose of the Salinity Report.
13  A: Generally speaking, the purpose of the Salinity Report was to evaluate how the 14    salt content of the Hudson River at IPEC would lead to exceedances of applicable 15    air quality limits based on the operation of the circular hybrid mechanical draft 16    cooling tower arrangement discussed in the reports entitled, Economic and 17    Environmental Impacts Associated with Conversion of Indian Point Units 2 and 3 18    to a Closed-Loop Condenser Cooling Water Configuration, dated June 2003 19    (Entergy Ex. 7A) and Engineering Feasibilityand Costs of Conversion of Indian 20    Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 21    dated February 12, 2010 (Entergy Ex. 7).        1 understand that no party to the 22    Proceedings is advancing the circular hybrid mechanical draft cooling towers 23    discussed in those reports. However, because no air quality impact analysis has 24    been conducted by Tetra Tech or provided by NYSDEC Staff, here I summarize
13  A: Generally speaking, the purpose of the Salinity Report was to evaluate how the 14    salt content of the Hudson River at IPEC would lead to exceedances of applicable 15    air quality limits based on the operation of the circular hybrid mechanical draft 16    cooling tower arrangement discussed in the reports entitled, Economic and 17    Environmental Impacts Associated with Conversion of Indian Point Units 2 and 3 18    to a Closed-Loop Condenser Cooling Water Configuration, dated June 2003 19    (Entergy Ex. 7A) and Engineering Feasibilityand Costs of Conversion of Indian 20    Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 21    dated February 12, 2010 (Entergy Ex. 7).        1 understand that no party to the 22    Proceedings is advancing the circular hybrid mechanical draft cooling towers 23    discussed in those reports. However, because no air quality impact analysis has 24    been conducted by Tetra Tech or provided by NYSDEC Staff, here I summarize PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    the conclusions in the Salinity Report that Enercon drew with respect the site-2    specific barriers to large-scale CCC conversion at IPEC based on the relevant, 3    available information concerning the salinity of the Hudson River.
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    the conclusions in the Salinity Report that Enercon drew with respect the site-2    specific barriers to large-scale CCC conversion at IPEC based on the relevant, 3    available information concerning the salinity of the Hudson River.
4  Q:  Why would the salt content of the Hudson River affect cooling tower 5    performance at IPEC?
4  Q:  Why would the salt content of the Hudson River affect cooling tower 5    performance at IPEC?
6  A:  Although conversion of Unit 2 and Unit 3 to CCC would reduce the water intake 7      currently required by the facilities, a continuous supply of water would still need 8      to be withdrawn from the Hudson River for CCC makeup and blowdown 9      requirements. I understand from Theodore Main at TRC that the salinity of the 10      makeup water in a CCC system is a primary contributing factor to air emissions, II      which can lead to violations of national ambient air quality standards ("NAAQS")
6  A:  Although conversion of Unit 2 and Unit 3 to CCC would reduce the water intake 7      currently required by the facilities, a continuous supply of water would still need 8      to be withdrawn from the Hudson River for CCC makeup and blowdown 9      requirements. I understand from Theodore Main at TRC that the salinity of the 10      makeup water in a CCC system is a primary contributing factor to air emissions, II      which can lead to violations of national ambient air quality standards ("NAAQS")
12      and Significant Impact Levels ("SIL").        In addition, the manufacturer of the 13      cooling towers evaluated in Enercon's 2010 CCC report, SPX, recommends that 14      the TDS (i.e., salt) concentration remain below 5000 ppm, and notes that 15      concentrations above those levels can affect thermal performance of the cooling 16      towers. See Entergy Ex. 310 at 52.
12      and Significant Impact Levels ("SIL").        In addition, the manufacturer of the 13      cooling towers evaluated in Enercon's 2010 CCC report, SPX, recommends that 14      the TDS (i.e., salt) concentration remain below 5000 ppm, and notes that 15      concentrations above those levels can affect thermal performance of the cooling 16      towers. See Entergy Ex. 310 at 52.
17  Q: How was the concentration of salt in the Hudson River in the vicinity of 18      IPEC calculated in the Salinity Report?
17  Q: How was the concentration of salt in the Hudson River in the vicinity of 18      IPEC calculated in the Salinity Report?
19  A: As set forth in Appendix F to the Salinity Report, Applied Science Associates, 20      Inc. (now RPS ASA) ("ASA/RPS") provided a long-term data set of Hudson 21      River salinity in the vicinity of IPEC based upon 10 years of modeled Hudson 22      River salinity data for the period 2000 - 2009 in one hour increments. Because 23      direct measurements of salinity at IPEC are not made, ASA/RPS developed a
19  A: As set forth in Appendix F to the Salinity Report, Applied Science Associates, 20      Inc. (now RPS ASA) ("ASA/RPS") provided a long-term data set of Hudson 21      River salinity in the vicinity of IPEC based upon 10 years of modeled Hudson 22      River salinity data for the period 2000 - 2009 in one hour increments. Because 23      direct measurements of salinity at IPEC are not made, ASA/RPS developed a PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    statistical analysis of data collected every 15 minutes by the U.S. Geological 2    Survey (USGS) at three locations:          Hastings-on-Hudson, Tomkins Cove, and 3    West Point. The Hastings station is located 21 miles downstream of IPEC and 4    has been continuously operating since 1992. The West Point station is located 9 5    miles upstream of IPEC and has been operating since 1991. The Tomkins station 6    was located I mile downstream of IPEC, but was discontinued in 2001. Based on 7    that statistical analysis, a decadal (2000-2009) salinity time series at IPEC (which 8    was assumed to be equivalent to that at Tomkins) was generated to provide a 9    long-term estimate of salinity under a variety of environmental conditions.
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    statistical analysis of data collected every 15 minutes by the U.S. Geological 2    Survey (USGS) at three locations:          Hastings-on-Hudson, Tomkins Cove, and 3    West Point. The Hastings station is located 21 miles downstream of IPEC and 4    has been continuously operating since 1992. The West Point station is located 9 5    miles upstream of IPEC and has been operating since 1991. The Tomkins station 6    was located I mile downstream of IPEC, but was discontinued in 2001. Based on 7    that statistical analysis, a decadal (2000-2009) salinity time series at IPEC (which 8    was assumed to be equivalent to that at Tomkins) was generated to provide a 9    long-term estimate of salinity under a variety of environmental conditions.
10  Q: What did Enercon do with the results from ASA/RPS's salinity analysis?
10  Q: What did Enercon do with the results from ASA/RPS's salinity analysis?
11  A: First, Enercon determined that the most practical flow scenario for CCC would 12    utilize 1.5 cycles of concentration (not the three cycles of concentration selected 13    by Tetra Tech). Second, TRC calculated the maximum salt concentration of CCC 14    water that would allow cooling tower emissions at a drift rate of 0.001% to not 15    violate PM, 0 and PM 2 5 NAAQS and SILs. Enercon then used the information 16    provided by ASA/RPS and TRC to determine whether CCC could be operated in 17    a manner to keep the concentration of salinity in the cooling water below the 18    thresholds identified by TRC.
11  A: First, Enercon determined that the most practical flow scenario for CCC would 12    utilize 1.5 cycles of concentration (not the three cycles of concentration selected 13    by Tetra Tech). Second, TRC calculated the maximum salt concentration of CCC 14    water that would allow cooling tower emissions at a drift rate of 0.001% to not 15    violate PM, 0 and PM 2 5 NAAQS and SILs. Enercon then used the information 16    provided by ASA/RPS and TRC to determine whether CCC could be operated in 17    a manner to keep the concentration of salinity in the cooling water below the 18    thresholds identified by TRC.
19  Q: Briefly summarize the conclusions of the Salinity Report.
19  Q: Briefly summarize the conclusions of the Salinity Report.
20  A: Based on the salinity information provided by ASA/RPS and the emissions limits 21    provided by TRC, CCC cannot be operated year round at IPEC without violating 22    air emission limitations. For purposes of our analysis, we assumed that it would 23    be feasible to revert from closed-loop to once-through operation when salinity
20  A: Based on the salinity information provided by ASA/RPS and the emissions limits 21    provided by TRC, CCC cannot be operated year round at IPEC without violating 22    air emission limitations. For purposes of our analysis, we assumed that it would 23    be feasible to revert from closed-loop to once-through operation when salinity PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    levels would lead to air quality exceedances and that such a determination could 2    be made on a weekly basis-although the Tetra Tech CCC Report does not 3    contemplate that type of switch-over mechanism and a weekly switch-over would 4    be impractical for actual station operation based on input from Entergy.
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1    levels would lead to air quality exceedances and that such a determination could 2    be made on a weekly basis-although the Tetra Tech CCC Report does not 3    contemplate that type of switch-over mechanism and a weekly switch-over would 4    be impractical for actual station operation based on input from Entergy.
5    Nevertheless, and with those assumptions, the Salinity Report concluded that in 6    order to avoid exceeding the PM 2 .5 NAAQS and PM 2 .5 SIL, operation of closed-7    loop cooling would be expected to occur no more than 43% and 13% of the year, 8    respectively. Although it would be operationally and economically infeasible to 9    run a nuclear facility under such restrictions, Dr. Young has used this information 10    to update the estimated reductions in entrainment and impingement losses that II    would be achievable under these scenarios, provided as Appendix D to the 12    Salinity Report.
5    Nevertheless, and with those assumptions, the Salinity Report concluded that in 6    order to avoid exceeding the PM 2 .5 NAAQS and PM 2 .5 SIL, operation of closed-7    loop cooling would be expected to occur no more than 43% and 13% of the year, 8    respectively. Although it would be operationally and economically infeasible to 9    run a nuclear facility under such restrictions, Dr. Young has used this information 10    to update the estimated reductions in entrainment and impingement losses that II    would be achievable under these scenarios, provided as Appendix D to the 12    Salinity Report.
13                            V.      QUALIFICATIONS AND 14              SUFFICIENCY OF METHODS, DATA AND CONCLUSIONS 15  Q: Please describe your educational and professional qualifications, including 16    relevant professional activities.
13                            V.      QUALIFICATIONS AND 14              SUFFICIENCY OF METHODS, DATA AND CONCLUSIONS 15  Q: Please describe your educational and professional qualifications, including 16    relevant professional activities.
17  A: I previously described my academic background, relevant specializations and 18    work experience in prefiled direct testimony that I have submitted in these 19    Proceedings during administrative hearings in Albany, New York on October 17, 20    2011. I refer to and incorporate that testimony by reference in this prefiled 21    testimony. In addition, I have previously provided a copy of my curriculum vitae 22    (Entergy Ex. 49).
17  A: I previously described my academic background, relevant specializations and 18    work experience in prefiled direct testimony that I have submitted in these 19    Proceedings during administrative hearings in Albany, New York on October 17, 20    2011. I refer to and incorporate that testimony by reference in this prefiled 21    testimony. In addition, I have previously provided a copy of my curriculum vitae 22    (Entergy Ex. 49).
23  Q: In your professional opinion, did Enercon's review of Tetra Tech's proposed 24    CCC configuration reliably apply procedures and methodologies generally
23  Q: In your professional opinion, did Enercon's review of Tetra Tech's proposed 24    CCC configuration reliably apply procedures and methodologies generally PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I    accepted in the engineering community concerned with evaluating the ability 2      to.successfully install and operate a technology?
 
PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I    accepted in the engineering community concerned with evaluating the ability 2      to.successfully install and operate a technology?
3  A:  Yes, the engineering review performed by Enercon of Tetra Tech's proposal was 4    no different than numerous other engineering reviews Enercon has performed for 5    nuclear facilities in the past.
3  A:  Yes, the engineering review performed by Enercon of Tetra Tech's proposal was 4    no different than numerous other engineering reviews Enercon has performed for 5    nuclear facilities in the past.
6  Q: In your professional opinion, did the Salinity Report reliably apply 7    scientifically accepted principles to estimate CCC operational limitations due to 8    air quality exceedances based on the salinity of the Hudson River?
6  Q: In your professional opinion, did the Salinity Report reliably apply 7    scientifically accepted principles to estimate CCC operational limitations due to 8    air quality exceedances based on the salinity of the Hudson River?
Line 1,336: Line 1,287:
19  Q: Do you hold your opinions to a reasonable degree of engineering certainty?
19  Q: Do you hold your opinions to a reasonable degree of engineering certainty?
20  A: Yes.
20  A: Yes.
END OF TESTIMONY
END OF TESTIMONY Exhibit B 2
 
Exhibit B 2


STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and        DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC            SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,          DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                          3-5522-00105/00031 (IP3)
STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and        DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC            SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,          DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                          3-5522-00105/00031 (IP3)
Line 1,355: Line 1,304:
14 A:  Yes.
14 A:  Yes.
15 Q: Please state the purpose of your prefiled rebuttal testimony.
15 Q: Please state the purpose of your prefiled rebuttal testimony.
16 A:  The purpose of my prefiled rebuttal testimony is to address certain portions of 17    the prefiled direct testimony of Eduardo Ortiz (Hatch) ("Ortiz Direct"), Tim 18    Havey (Tetra Tech) ("Havey Direct"), and William Charles Nieder (NYSDEC 19    Staff) ("Nieder Direct"). Specifically, my rebuttal testimony responds to the 20    prefiled direct testimony of Mr. Ortiz and Mr. Havey that relates to the 21    engineering feasibility of retrofitting either or both Indian Point Energy Center, 22    Unit 2 and Unit 3 (collectively, "IPEC"), with eighty-eight (88) back-to-back 23    ClearSky cooling towers, forty-four (44) cells at each of Unit 2 and Unit 3, as 24    described in the report prepared by Tetra Tech entitled Indian Point Closed-
16 A:  The purpose of my prefiled rebuttal testimony is to address certain portions of 17    the prefiled direct testimony of Eduardo Ortiz (Hatch) ("Ortiz Direct"), Tim 18    Havey (Tetra Tech) ("Havey Direct"), and William Charles Nieder (NYSDEC 19    Staff) ("Nieder Direct"). Specifically, my rebuttal testimony responds to the 20    prefiled direct testimony of Mr. Ortiz and Mr. Havey that relates to the 21    engineering feasibility of retrofitting either or both Indian Point Energy Center, 22    Unit 2 and Unit 3 (collectively, "IPEC"), with eighty-eight (88) back-to-back 23    ClearSky cooling towers, forty-four (44) cells at each of Unit 2 and Unit 3, as 24    described in the report prepared by Tetra Tech entitled Indian Point Closed-1    Cycle Cooling System Retrofit Evaluation, dated June 2013 (the "Tetra Tech 2    CCC Report"); and two (2) round hybrid cooling towers, one at Unit 2 and Unit 3    3 respectively, as described in the initial report prepared by Enercon entitled, 4    Economic and Environmental Impacts Associated with Conversion of Indian 5    Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 6    dated June 2003 (Entergy Ex. 7A) ("ENERCON 2003") and as more intensively 7    reviewed in the report entitled EngineeringFeasibility and Costs of Conversion 8    of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water 9    Configuration, dated February 12, 2010 (Entergy Ex. 7) ("ENERCON 2010";
 
1    Cycle Cooling System Retrofit Evaluation, dated June 2013 (the "Tetra Tech 2    CCC Report"); and two (2) round hybrid cooling towers, one at Unit 2 and Unit 3    3 respectively, as described in the initial report prepared by Enercon entitled, 4    Economic and Environmental Impacts Associated with Conversion of Indian 5    Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 6    dated June 2003 (Entergy Ex. 7A) ("ENERCON 2003") and as more intensively 7    reviewed in the report entitled EngineeringFeasibility and Costs of Conversion 8    of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water 9    Configuration, dated February 12, 2010 (Entergy Ex. 7) ("ENERCON 2010";
10    collectively, the "ENERCON Closed-Loop Cooling Reports").              My rebuttal 11    testimony also responds to the portion of Mr. Nieder's testimony that discusses 12    the expected operational and maintenance ("O&M") costs of Entergy's 13    cylindrical wedgewire screen ("CWWS") proposal. I have reviewed the prefiled 14    direct testimony of each of these individuals, as well as the identified materials 15    on which each of these individuals relies (to the extent it was provided).
10    collectively, the "ENERCON Closed-Loop Cooling Reports").              My rebuttal 11    testimony also responds to the portion of Mr. Nieder's testimony that discusses 12    the expected operational and maintenance ("O&M") costs of Entergy's 13    cylindrical wedgewire screen ("CWWS") proposal. I have reviewed the prefiled 14    direct testimony of each of these individuals, as well as the identified materials 15    on which each of these individuals relies (to the extent it was provided).
16 Q: How is your rebuttal testimony organized?
16 Q: How is your rebuttal testimony organized?
Line 1,367: Line 1,314:
6    II. BACKGROUND AND CONTEXT FOR RETROFITTING IPEC WITH 7                              CLOSED-CYCLE COOLING 8 Q:    Please describe what engineering feasibility means in the context of 9        retrofitting a nuclear power plant with a new cooling water system?
6    II. BACKGROUND AND CONTEXT FOR RETROFITTING IPEC WITH 7                              CLOSED-CYCLE COOLING 8 Q:    Please describe what engineering feasibility means in the context of 9        retrofitting a nuclear power plant with a new cooling water system?
10 A:      The "feasibility" of retrofitting power plants with a new cooling water system 11        depends on two related considerations. First, the technology that is chosen for 12        the retrofit must be available. As I testified in October 2011, "availability" 13        means that technology is used in the industry for which it is intended on a regular 14        basis, with an adequate design, construction and operational history to allow an 15        engineering assessment with a reasonable level of confidence.          The second 16        consideration is whether an otherwise "available" technology can be installed 17        and operated at a particular site, based on the relevant considerations at that site, 18        with a reasonable level of engineering certainty.
10 A:      The "feasibility" of retrofitting power plants with a new cooling water system 11        depends on two related considerations. First, the technology that is chosen for 12        the retrofit must be available. As I testified in October 2011, "availability" 13        means that technology is used in the industry for which it is intended on a regular 14        basis, with an adequate design, construction and operational history to allow an 15        engineering assessment with a reasonable level of confidence.          The second 16        consideration is whether an otherwise "available" technology can be installed 17        and operated at a particular site, based on the relevant considerations at that site, 18        with a reasonable level of engineering certainty.
19                The need for a reasonable level of engineering certainty is particularly 20        acute in the nuclear industry for two reasons. First, nuclear powered electric 21        generating power plants-as baseload suppliers-are designed to operate (to 22        produce power in the form of electricity) on a consistent, reliable basis. Second, 23        the regulatory structure for nuclear power plants and the safety consciousness of 24        nuclear engineers and operators place a high priority on consistent operations in
19                The need for a reasonable level of engineering certainty is particularly 20        acute in the nuclear industry for two reasons. First, nuclear powered electric 21        generating power plants-as baseload suppliers-are designed to operate (to 22        produce power in the form of electricity) on a consistent, reliable basis. Second, 23        the regulatory structure for nuclear power plants and the safety consciousness of 24        nuclear engineers and operators place a high priority on consistent operations in 1 accordance with design parameters.        Excursions (that is, atypical operations),
 
1 accordance with design parameters.        Excursions (that is, atypical operations),
2  including conditions that may increase the likelihood of excursions, are strongly 3  disfavored by NRC and plant personnel alike. This has two direct implications 4  for the major retrofit proposed by NYSDEC Staff for IPEC: (1) relevant, 5  demonstrated operational experience in a comparable dynamic is typically 6  necessary for a technology to be installed, particularly major equipment essential 7  for plant operation; and (2) actual retrofitting history is preferred before reaching 8  an "engineering feasibility" conclusion.      At nuclear power plants, novel and 9  unproven technologies are generally not considered available.
2  including conditions that may increase the likelihood of excursions, are strongly 3  disfavored by NRC and plant personnel alike. This has two direct implications 4  for the major retrofit proposed by NYSDEC Staff for IPEC: (1) relevant, 5  demonstrated operational experience in a comparable dynamic is typically 6  necessary for a technology to be installed, particularly major equipment essential 7  for plant operation; and (2) actual retrofitting history is preferred before reaching 8  an "engineering feasibility" conclusion.      At nuclear power plants, novel and 9  unproven technologies are generally not considered available.
10        As it is relevant to this phase of the Proceedings, to reach a conclusion 11  about the engineering feasibility of retrofitting IPEC with closed-cycle cooling, 12  an engineer with nuclear design and operational experience would have to 13  conclude that it is likely that the retrofit can be completed and function without 14  major adverse impacts within the remaining plant operational period (that is, the 15  twenty-year license renewal period). If, for instance, it is reasonably foreseeable 16  that construction will not be completed in a timeframe to allow operation of the 17  equipment for a substantial period of time before the end (respectively, in 2033 18  and 2035) of the license renewal period; that construction will result in unit shut-19  downs of substantial duration; that operation will result in measurable and 20  significant power losses; or that there is a heightened risk of incidence of 21  excursions, then an experienced nuclear engineer would not consider the closed-22  cycle cooling retrofit to be a practically feasible.
10        As it is relevant to this phase of the Proceedings, to reach a conclusion 11  about the engineering feasibility of retrofitting IPEC with closed-cycle cooling, 12  an engineer with nuclear design and operational experience would have to 13  conclude that it is likely that the retrofit can be completed and function without 14  major adverse impacts within the remaining plant operational period (that is, the 15  twenty-year license renewal period). If, for instance, it is reasonably foreseeable 16  that construction will not be completed in a timeframe to allow operation of the 17  equipment for a substantial period of time before the end (respectively, in 2033 18  and 2035) of the license renewal period; that construction will result in unit shut-19  downs of substantial duration; that operation will result in measurable and 20  significant power losses; or that there is a heightened risk of incidence of 21  excursions, then an experienced nuclear engineer would not consider the closed-22  cycle cooling retrofit to be a practically feasible.
1 Q: To understand the implications of an engineering feasibility determination 2    for retrofitting IPEC with cooling towers, is it helpful to understand the 3    physical constraints of the IPEC site?
1 Q: To understand the implications of an engineering feasibility determination 2    for retrofitting IPEC with cooling towers, is it helpful to understand the 3    physical constraints of the IPEC site?
4  A:  Yes. Background information is essential to understanding how disruptive and 5      intrusive it would be to retrofit the existing IPEC stations.
4  A:  Yes. Background information is essential to understanding how disruptive and 5      intrusive it would be to retrofit the existing IPEC stations.
6            Both IPEC Units sit on a combined 239 acres, which represents one of the 7      most site-constrained nuclear power plants that I have worked on in my over 8      thirty years of experience.      The site topography is challenging, spanning an 9      elevation from the River up to approximately 150 feet. As a result of the 10      topography challenges and the substantial subsurface rock shelf that rises 11      beneath and behind the Stations, within the 239 acre site only 128 acres is readily 12      usable for major structures, and that area already has been developed. Further, 13      all major structures and equipment representing the main power block are 14      contained in a central area of approximately 25 acres located along the 15      Riverfront. Because the two operating unit and one shut down unit share the 16      Riverfront area and given the number of plant systems located in this area, there 17      is a very high density of equipment and structures in this defined area - in fact, 18      the density is visible to even the casual observer. Entergy Ex. 351 is a recent 19      aerial photograph of the IPEC site. The Unit 2 and Unit 3 containment buildings 20      are the two tallest domed structures, with their respective power house unit 21      immediately in front of (closest to the River) the containment buildings. Unit 1 22      is the shorter domed-building between Unit 2 and Unit 3. What is not visible, 23      but is as important, is the substantial underground network of major piping,
6            Both IPEC Units sit on a combined 239 acres, which represents one of the 7      most site-constrained nuclear power plants that I have worked on in my over 8      thirty years of experience.      The site topography is challenging, spanning an 9      elevation from the River up to approximately 150 feet. As a result of the 10      topography challenges and the substantial subsurface rock shelf that rises 11      beneath and behind the Stations, within the 239 acre site only 128 acres is readily 12      usable for major structures, and that area already has been developed. Further, 13      all major structures and equipment representing the main power block are 14      contained in a central area of approximately 25 acres located along the 15      Riverfront. Because the two operating unit and one shut down unit share the 16      Riverfront area and given the number of plant systems located in this area, there 17      is a very high density of equipment and structures in this defined area - in fact, 18      the density is visible to even the casual observer. Entergy Ex. 351 is a recent 19      aerial photograph of the IPEC site. The Unit 2 and Unit 3 containment buildings 20      are the two tallest domed structures, with their respective power house unit 21      immediately in front of (closest to the River) the containment buildings. Unit 1 22      is the shorter domed-building between Unit 2 and Unit 3. What is not visible, 23      but is as important, is the substantial underground network of major piping, 1 ranging up to 8-feet in diameter, as well as numerous cabling duct banks and 2 conduits, that runs throughout the Riverfront area. What this means is that the 3 addition at IPEC of any new large-scale structures, particularly those involving 4 the addition of new underground piping, is a challenge from the outset. As a 5 result, any comparisons to "greenfield" design and construction projects for 6 similar components (i.e., usage of cooling towers for new nuclear units currently 7 under construction) would be inappropriate and misleading from an engineering 8 perspective.
 
1 ranging up to 8-feet in diameter, as well as numerous cabling duct banks and 2 conduits, that runs throughout the Riverfront area. What this means is that the 3 addition at IPEC of any new large-scale structures, particularly those involving 4 the addition of new underground piping, is a challenge from the outset. As a 5 result, any comparisons to "greenfield" design and construction projects for 6 similar components (i.e., usage of cooling towers for new nuclear units currently 7 under construction) would be inappropriate and misleading from an engineering 8 perspective.
9        In fact, even Tetra Tech has recognized the "important role" the size of the 10 property plays in determining whether a retrofit to cooling towers is feasible.
9        In fact, even Tetra Tech has recognized the "important role" the size of the 10 property plays in determining whether a retrofit to cooling towers is feasible.
II See Memorandum from Kelly Meadows, Tetra Tech to Paul Shriner, EPA, dated 12 Feb. 28, 2011, at 1 (Entergy Ex. 356). In a memorandum from Tetra Tech to 13 EPA, dated February 28, 2011, Tetra Tech documented the approximately 73 14 sites visited by EPA in 2011 as part of the proposed § 316(b) rulemaking. Tetra 15 Tech noted that facilities that have a ratio of 160 acres per 1,000 MWs "should 16 have ample space to construct retrofit cooling towers."          Id. at 1-2. Here, 17 assuming all of IPEC's 239 acres is available for a retrofit, IPEC's "ratio" is 110 18 acres per 1000 MW, which by EPA's and Tetra Tech's own definition would 19 make it among the most space-constrained site visited by in the Tetra Tech 20 review. As stated above, only 128 acres of the IPEC site is readily useable for 21 major structures, making the site even more constrained in Tetra Tech's terms 22 further lowering the sites effective acreage. See id. at 3 (discussing the "effective 23 acreage" of the McDonough Power Plant).
II See Memorandum from Kelly Meadows, Tetra Tech to Paul Shriner, EPA, dated 12 Feb. 28, 2011, at 1 (Entergy Ex. 356). In a memorandum from Tetra Tech to 13 EPA, dated February 28, 2011, Tetra Tech documented the approximately 73 14 sites visited by EPA in 2011 as part of the proposed § 316(b) rulemaking. Tetra 15 Tech noted that facilities that have a ratio of 160 acres per 1,000 MWs "should 16 have ample space to construct retrofit cooling towers."          Id. at 1-2. Here, 17 assuming all of IPEC's 239 acres is available for a retrofit, IPEC's "ratio" is 110 18 acres per 1000 MW, which by EPA's and Tetra Tech's own definition would 19 make it among the most space-constrained site visited by in the Tetra Tech 20 review. As stated above, only 128 acres of the IPEC site is readily useable for 21 major structures, making the site even more constrained in Tetra Tech's terms 22 further lowering the sites effective acreage. See id. at 3 (discussing the "effective 23 acreage" of the McDonough Power Plant).
1 Q: Is there any additional background information that informs your analysis of 2    the feasibility of retrofitting IPEC with closed-cycle cooling?
1 Q: Is there any additional background information that informs your analysis of 2    the feasibility of retrofitting IPEC with closed-cycle cooling?
3 A:  Yes. It is also essential to consider the way nuclear units, such as IPEC, are 4    designed and operated. Nuclear power plants, like IPEC, generate electricity 5    through the use of two major categories of systems which convert heat generated 6    in the reactor core into electrical power for commercial use: (1) a closed, 7    pressurized "Reactor Coolant System" (primary systems), (2) and a "Steam and 8    Power Conversion System" (secondary systems). Figure 1.1 in Entergy Exhibit 9    7 (pg. 2) depicts the basic configuration of IPEC-type pressurized water reactors.
3 A:  Yes. It is also essential to consider the way nuclear units, such as IPEC, are 4    designed and operated. Nuclear power plants, like IPEC, generate electricity 5    through the use of two major categories of systems which convert heat generated 6    in the reactor core into electrical power for commercial use: (1) a closed, 7    pressurized "Reactor Coolant System" (primary systems), (2) and a "Steam and 8    Power Conversion System" (secondary systems). Figure 1.1 in Entergy Exhibit 9    7 (pg. 2) depicts the basic configuration of IPEC-type pressurized water reactors.
Line 1,386: Line 1,327:
11    The thermal energy generated in the reactor core is then transferred to steam 12    generators where steam is generated in the secondary system and utilized to drive 13    the turbine generator, where it is converted into electricity. The primary and 14    secondary systems are physically separated in the steam generator, minimizing 15    radioisotope transfer to the secondary system.
11    The thermal energy generated in the reactor core is then transferred to steam 12    generators where steam is generated in the secondary system and utilized to drive 13    the turbine generator, where it is converted into electricity. The primary and 14    secondary systems are physically separated in the steam generator, minimizing 15    radioisotope transfer to the secondary system.
16            At IPEC, each unit has a multistage turbine comprised of one high-17    pressure turbine and three low-pressure turbines.      After passing through the 18    turbines, the steam passes to the main condenser to allow it to be cooled and 19    condensed back into feedwater that can be pumped back through the steam-20    generators in what is effectively a closed loop system.
16            At IPEC, each unit has a multistage turbine comprised of one high-17    pressure turbine and three low-pressure turbines.      After passing through the 18    turbines, the steam passes to the main condenser to allow it to be cooled and 19    condensed back into feedwater that can be pumped back through the steam-20    generators in what is effectively a closed loop system.
21            Importantly, the Unit 2 and Unit 3 main condensers are operated in a 22    vacuum in order to optimize plant performance by facilitating the flow of steam 23    through the low-pressure turbines.      Even a slight increase in pressure in the
21            Importantly, the Unit 2 and Unit 3 main condensers are operated in a 22    vacuum in order to optimize plant performance by facilitating the flow of steam 23    through the low-pressure turbines.      Even a slight increase in pressure in the 1    condensers, referred to as condenser "backpressure," can have an appreciable 2      impact on the efficiency of the plant and, in some instances, lead to excursions or 3      forced plant shutdowns.
 
1    condensers, referred to as condenser "backpressure," can have an appreciable 2      impact on the efficiency of the plant and, in some instances, lead to excursions or 3      forced plant shutdowns.
4  Q: How do the Unit 2 and Unit 3 condensers convert the steam exhaust back 5    into feedwater?
4  Q: How do the Unit 2 and Unit 3 condensers convert the steam exhaust back 5    into feedwater?
6  A:  The purpose of the main condenser is to absorb heat contained in the expanded 7      exhaust steam after exiting the low pressure turbines. Cold circulating water 8      flows through the condenser tubes to condense the steam back into water. Unit 2 9      and Unit 3 were designed and constructed with a once-through circulating water 10      system, and reflect a highly specialized design analysis, a "heat balance" that 11      accounted for the qualities of the existing cooling water source, here the Hudson 12      River, to accommodate the heat rejection of the main steam system for each 13      Unit. In other words, the turbines and condenser design rely on the low-14      temperature of the River water, as does efficient performance of the plant. The 15      design rate for each Unit's circulating water system is 840,000 gallons per 16      minute ("gpm"). For obvious reasons, the IPEC condenser cooling systems are 17      essential plant equipment. As I stated in my previous prefiled testimony, dated 18      July 22, 2011, which I fully incorporate by reference here, and by way of 19      analogy, if the reactor is the heart of IPEC, then the cooling system is its lungs-20      providing the necessary cooling for the system to function properly.
6  A:  The purpose of the main condenser is to absorb heat contained in the expanded 7      exhaust steam after exiting the low pressure turbines. Cold circulating water 8      flows through the condenser tubes to condense the steam back into water. Unit 2 9      and Unit 3 were designed and constructed with a once-through circulating water 10      system, and reflect a highly specialized design analysis, a "heat balance" that 11      accounted for the qualities of the existing cooling water source, here the Hudson 12      River, to accommodate the heat rejection of the main steam system for each 13      Unit. In other words, the turbines and condenser design rely on the low-14      temperature of the River water, as does efficient performance of the plant. The 15      design rate for each Unit's circulating water system is 840,000 gallons per 16      minute ("gpm"). For obvious reasons, the IPEC condenser cooling systems are 17      essential plant equipment. As I stated in my previous prefiled testimony, dated 18      July 22, 2011, which I fully incorporate by reference here, and by way of 19      analogy, if the reactor is the heart of IPEC, then the cooling system is its lungs-20      providing the necessary cooling for the system to function properly.
21              Given that IPEC's condensers and turbines were specifically designed and 22      constructed as a once-through cooling system utilizing cold River water, any 23      retrofit of IPEC to a closed-loop cooling system that results in higher circulating
21              Given that IPEC's condensers and turbines were specifically designed and 22      constructed as a once-through cooling system utilizing cold River water, any 23      retrofit of IPEC to a closed-loop cooling system that results in higher circulating 1    water temperatures and/or lower flows will result in inherent impacts to the 2    plant. Here, it is unavoidable that a shift to closed-cycle cooling will result in 3    higher circulating water temperatures and lower flows that challenge plant 4    performance and operations.      For this reason, any proposal for closed-cycle 5    cooling must rely on the requisite heat balance analysis to demonstrate that 6    performance and operational impacts are known, manageable and not too 7    significant The twin dynamic of higher circulating water temperature and lower 8    flows (as discussed below) represents a particular challenge to Station 9    performance and functionality.
 
1    water temperatures and/or lower flows will result in inherent impacts to the 2    plant. Here, it is unavoidable that a shift to closed-cycle cooling will result in 3    higher circulating water temperatures and lower flows that challenge plant 4    performance and operations.      For this reason, any proposal for closed-cycle 5    cooling must rely on the requisite heat balance analysis to demonstrate that 6    performance and operational impacts are known, manageable and not too 7    significant The twin dynamic of higher circulating water temperature and lower 8    flows (as discussed below) represents a particular challenge to Station 9    performance and functionality.
10 Q: What are the inherent impacts with retrofitting IPEC to a closed-cycle 11    cooling system?
10 Q: What are the inherent impacts with retrofitting IPEC to a closed-cycle 11    cooling system?
12 A:  Retrofitting a nuclear plant constructed in the 1970s with a once-through cooling 13    system to a closed-cycle cooling system will impact virtually every aspect of 14    IPEC's circulating water system.        First, less water will be available to run 15    through the condensers. The design of both the ClearSky and round hybrid 16    towers decrease the maximum available circulating water from 840,000 gpm to 17    700,000 gpm-a 16.7% reduction. Second, the temperature of the circulating 18    water entering the condensers to cool the steam will be higher at the most critical 19    times, namely during the summer when cooling need is the greatest.            The 20    reduction in water and increase in circulating water inlet temperatures increase 21    condenser back pressure of both Unit 2 and Unit 3. See Entergy Ex. 7A at 20 22    (Figure 3.2 and 3.3). Third, the water pressure in the condenser tubing will be 23    measurably higher in a closed-cycle cooling configuration as compared to the
12 A:  Retrofitting a nuclear plant constructed in the 1970s with a once-through cooling 13    system to a closed-cycle cooling system will impact virtually every aspect of 14    IPEC's circulating water system.        First, less water will be available to run 15    through the condensers. The design of both the ClearSky and round hybrid 16    towers decrease the maximum available circulating water from 840,000 gpm to 17    700,000 gpm-a 16.7% reduction. Second, the temperature of the circulating 18    water entering the condensers to cool the steam will be higher at the most critical 19    times, namely during the summer when cooling need is the greatest.            The 20    reduction in water and increase in circulating water inlet temperatures increase 21    condenser back pressure of both Unit 2 and Unit 3. See Entergy Ex. 7A at 20 22    (Figure 3.2 and 3.3). Third, the water pressure in the condenser tubing will be 23    measurably higher in a closed-cycle cooling configuration as compared to the 1    existing once-through cooling system. This is a particular concern with the Tetra 2    Tech proposal which, while within the technical design limits for the condenser, 3    calls for the circulating water to be at a materially higher pressure than the 4    Stations have ever operated under, which introduces additional uncertainty in 5    plant operations and equipment service life.
 
1    existing once-through cooling system. This is a particular concern with the Tetra 2    Tech proposal which, while within the technical design limits for the condenser, 3    calls for the circulating water to be at a materially higher pressure than the 4    Stations have ever operated under, which introduces additional uncertainty in 5    plant operations and equipment service life.
6            Finally, closed-cycle cooling creates significant and costly parasitic losses 7    that further affect the ability of the plant to generate power efficiently. These 8    losses are attributable to the extra energy required to pump the circulating water 9    to the elevated cooling towers and operate the fans in the cooling towers 10    themselves.
6            Finally, closed-cycle cooling creates significant and costly parasitic losses 7    that further affect the ability of the plant to generate power efficiently. These 8    losses are attributable to the extra energy required to pump the circulating water 9    to the elevated cooling towers and operate the fans in the cooling towers 10    themselves.
11 Q: Please briefly summarize what would be required in order to retrofit IPEC 12    with closed-cycle cooling.
11 Q: Please briefly summarize what would be required in order to retrofit IPEC 12    with closed-cycle cooling.
13 A:  In addition to the construction of the cooling towers themselves and the 14    extensive piping that would be needed to supply and return circulating water to 15    and from those towers, retrofitting IPEC to closed-cycle cooling will require 16    reconfiguring the current circulating water system to hold the considerable 17    volume of water necessary to ensure reliable operation of the cooling towers. In 18    the current once-through configuration, after the circulating water passes through 19    the condensers, it is discharged into a canal that runs along the shoreline in front 20    of the Unit 2 and Unit 3 power houses, eventually joining the River on south end 21    of the facility. The discharge canal extends from the Unit 2 power house, where 22    circulating water from the Unit 2 condenser and Unit 2 service water is 23    discharged. The Unit 2 discharged water flows past Unit 3 where the Unit 3
13 A:  In addition to the construction of the cooling towers themselves and the 14    extensive piping that would be needed to supply and return circulating water to 15    and from those towers, retrofitting IPEC to closed-cycle cooling will require 16    reconfiguring the current circulating water system to hold the considerable 17    volume of water necessary to ensure reliable operation of the cooling towers. In 18    the current once-through configuration, after the circulating water passes through 19    the condensers, it is discharged into a canal that runs along the shoreline in front 20    of the Unit 2 and Unit 3 power houses, eventually joining the River on south end 21    of the facility. The discharge canal extends from the Unit 2 power house, where 22    circulating water from the Unit 2 condenser and Unit 2 service water is 23    discharged. The Unit 2 discharged water flows past Unit 3 where the Unit 3 1  service and circulating water is discharged, and the combined flow is returned to 2  the River.
 
1  service and circulating water is discharged, and the combined flow is returned to 2  the River.
3        In order to retrofit IPEC to a closed-cycle cooling configuration and to 4 hold sufficient water to meet the Unit's combined flow rate of 1.4 million gpm 5 (assuming 700,000 gpm per Unit) of circulating water, the existing discharge 6 canal must be converted into a hot water reservoir that can hold approximately 7 10.7 million gallons of water. See Entergy Ex. 7 at 12. After modification, the 8 Unit 2 and Unit 3 reservoirs would hold over 4.2 million and 6.5 million gallons 9 of circulating water, respectively. Id. The makeup water source for the hot water 10 reservoir is the service water discharge, with Unit 2's service water discharged 11 into the Unit 2 reservoir, and Unit 3's service water discharged into the Unit 3 12 reservoir. New circulating water pumps would be installed in each reservoir that 13 would pump the hot water from each reservoir to its respective cooling tower. To 14 accommodate the additional capacity and to meet the new circulating pump 15 submergence requirements, the current discharge canal in front of Units 2 and 3 16 will need to be excavated. The excavation and construction of the new reservoirs 17 requires a 42 week concurrent construction outage for both IPEC units. As Tetra 18 Tech acknowledged in its July 6, 2010 memorandum, "[t]he obstacles presented 19 by reconfiguring the existing discharge canal to function as a main component of 20 the new cooling system are correctly cited by Enercon as unavoidable. There do 21 not appear to be any practical means to significantly decrease this estimate."
3        In order to retrofit IPEC to a closed-cycle cooling configuration and to 4 hold sufficient water to meet the Unit's combined flow rate of 1.4 million gpm 5 (assuming 700,000 gpm per Unit) of circulating water, the existing discharge 6 canal must be converted into a hot water reservoir that can hold approximately 7 10.7 million gallons of water. See Entergy Ex. 7 at 12. After modification, the 8 Unit 2 and Unit 3 reservoirs would hold over 4.2 million and 6.5 million gallons 9 of circulating water, respectively. Id. The makeup water source for the hot water 10 reservoir is the service water discharge, with Unit 2's service water discharged 11 into the Unit 2 reservoir, and Unit 3's service water discharged into the Unit 3 12 reservoir. New circulating water pumps would be installed in each reservoir that 13 would pump the hot water from each reservoir to its respective cooling tower. To 14 accommodate the additional capacity and to meet the new circulating pump 15 submergence requirements, the current discharge canal in front of Units 2 and 3 16 will need to be excavated. The excavation and construction of the new reservoirs 17 requires a 42 week concurrent construction outage for both IPEC units. As Tetra 18 Tech acknowledged in its July 6, 2010 memorandum, "[t]he obstacles presented 19 by reconfiguring the existing discharge canal to function as a main component of 20 the new cooling system are correctly cited by Enercon as unavoidable. There do 21 not appear to be any practical means to significantly decrease this estimate."
22 Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris
22 Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris I    Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 3 2    (Staff Ex. 214, Appendix B).
 
I    Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 3 2    (Staff Ex. 214, Appendix B).
3            As noted above, the discharge canal is also used by the service water 4    system, which serves a nuclear safety function, and which cannot be impacted by 5    the proposed retrofit. Because the design utilizes services water to provide 6    cooling tower makeup at IPEC, and the combined service water discharge will 7    likely exceed the cooling towers' make-up water needs, the reservoir weirs will 8    facilitate the overflow of excess water (that is, water not pumped to the cooling 9    towers) back to the River. The excess water that overflows the Unit 2 and Unit 3 10    reservoirs is in essence the cooling tower "blowdown," which is the intentional 11    release of circulating water used to control the cycles of concentration of the 12    system (i.e., the number of times suspended and dissolved sediment are 13    concentrated above ambient River levels).        Thus, when the service water 14    discharge exceeds the makeup needs of the closed-cycle system, water will 15    overflow from the reservoirs, which will represent the blowdown of the system.
3            As noted above, the discharge canal is also used by the service water 4    system, which serves a nuclear safety function, and which cannot be impacted by 5    the proposed retrofit. Because the design utilizes services water to provide 6    cooling tower makeup at IPEC, and the combined service water discharge will 7    likely exceed the cooling towers' make-up water needs, the reservoir weirs will 8    facilitate the overflow of excess water (that is, water not pumped to the cooling 9    towers) back to the River. The excess water that overflows the Unit 2 and Unit 3 10    reservoirs is in essence the cooling tower "blowdown," which is the intentional 11    release of circulating water used to control the cycles of concentration of the 12    system (i.e., the number of times suspended and dissolved sediment are 13    concentrated above ambient River levels).        Thus, when the service water 14    discharge exceeds the makeup needs of the closed-cycle system, water will 15    overflow from the reservoirs, which will represent the blowdown of the system.
16    For both the round hybrid towers and Tetra Tech's ClearSky towers, there is no 17    method by which the blowdown rate (or content of the blowdown) can be 18    controlled. I understand that Tetra Tech has also included additional piping that 19    will siphon cooling water from the pipes running from the cooling towers to the 20    condensers and discharge it in the discharge canal beyond the Unit 3 weir.
16    For both the round hybrid towers and Tetra Tech's ClearSky towers, there is no 17    method by which the blowdown rate (or content of the blowdown) can be 18    controlled. I understand that Tetra Tech has also included additional piping that 19    will siphon cooling water from the pipes running from the cooling towers to the 20    condensers and discharge it in the discharge canal beyond the Unit 3 weir.
21 Q: Are there any examples of operating nuclear power plants that were 22    designed for once-through cooling that were retrofitted as a closed-cycle 23    cooling?
21 Q: Are there any examples of operating nuclear power plants that were 22    designed for once-through cooling that were retrofitted as a closed-cycle 23    cooling?
1  A:      No. No nuclear power plant that has been designed, constructed, and operated 2          with a once-through cooling system has ever been retrofitted into a closed-loop 3          cooling system. While certain individuals may occasionally reference Palisades 4          Nuclear Power Plant as a "retrofit," as Tetra Tech explains in its November 18, 5          2009 memorandum on page 5, the so-called retrofit was "planned and completed 6          before initial operation." See Memorandum from Tim Havey, Tetra Tech, Inc. to 7          Chris Hogan, NYS Department of Environmental Conservation, dated Nov. 18, 8          2009 at 5 (Staff Ex. 214, Appendix B). The importance of the absence of any 9          successful conversion from once-through to closed-cycle cooling to a feasibility 10          assessment cannot be overstated. Unless a given unit's condenser is specifically 11          designed to utilize cooling water temperatures as provided by cooling towers, 12        there will be a compromise in unit operating efficiency and hence performance.
1  A:      No. No nuclear power plant that has been designed, constructed, and operated 2          with a once-through cooling system has ever been retrofitted into a closed-loop 3          cooling system. While certain individuals may occasionally reference Palisades 4          Nuclear Power Plant as a "retrofit," as Tetra Tech explains in its November 18, 5          2009 memorandum on page 5, the so-called retrofit was "planned and completed 6          before initial operation." See Memorandum from Tim Havey, Tetra Tech, Inc. to 7          Chris Hogan, NYS Department of Environmental Conservation, dated Nov. 18, 8          2009 at 5 (Staff Ex. 214, Appendix B). The importance of the absence of any 9          successful conversion from once-through to closed-cycle cooling to a feasibility 10          assessment cannot be overstated. Unless a given unit's condenser is specifically 11          designed to utilize cooling water temperatures as provided by cooling towers, 12        there will be a compromise in unit operating efficiency and hence performance.
13          The complete absence of any practical history of closed-loop cooling retrofits at 14          nuclear facilities and the associated impacts on the circulating water system and 15          condensers renders such a project subject to an unacceptably high degree of 16          uncertainty.
13          The complete absence of any practical history of closed-loop cooling retrofits at 14          nuclear facilities and the associated impacts on the circulating water system and 15          condensers renders such a project subject to an unacceptably high degree of 16          uncertainty.
17      Il.      REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 18    FEASIBILITY OF RETROFITTING IPEC WITH CLEARSKY COOLING 19                                          TOWERS 20 Q:    With that background, let us now discuss some of the specific challenges to 21        the Tetra Tech ClearSky cooling tower configuration discussed by Messrs.
17      Il.      REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 18    FEASIBILITY OF RETROFITTING IPEC WITH CLEARSKY COOLING 19                                          TOWERS 20 Q:    With that background, let us now discuss some of the specific challenges to 21        the Tetra Tech ClearSky cooling tower configuration discussed by Messrs.
22        Havey and Ortiz in their prefiled direct testimony. First, did Messrs. Havey 23        and Ortiz offer any opinion(s) concerning the feasibility of retrofitting IPEC 24        Units 2 and 3 with ClearSky cooling towers?
22        Havey and Ortiz in their prefiled direct testimony. First, did Messrs. Havey 23        and Ortiz offer any opinion(s) concerning the feasibility of retrofitting IPEC 24        Units 2 and 3 with ClearSky cooling towers?
1 A:  Yes. Mr. Havey testified that Tetra Tech's proposal to retrofit IPEC Units 2 and 2    3 with 44 ClearSky plume-abated cooling towers is a "practicalalternative for a 3    closed-cycle cooling retrofit at IPEC apart from the circular hybrid cooling 4    towers initially proposed by Enercon." Havey Direct at p. 13, 1. 9-13 (emphasis 5    added). Mr. Ortiz similarly testifies that "[b]ased on a preliminary review, and 6    subject to the limitations previously stated, the installation of a closed loop 7    system was determined to be technically feasible," Ortiz Direct at p. 6, 1. 17-19, 8    and "[b]ased on the conclusions of the Hatch 2012 Report and subject to the 9    limitations previously outlined, no major issues or deficiencies were identified by 10    Hatch with respect to the technical feasibility of transferring from a once-through 11    cooling system to a closed loop cooling system using the ClearSky TM cooling 12    tower system." Id. atp. 8,1.21 -p. 9 , 1. 2 .
1 A:  Yes. Mr. Havey testified that Tetra Tech's proposal to retrofit IPEC Units 2 and 2    3 with 44 ClearSky plume-abated cooling towers is a "practicalalternative for a 3    closed-cycle cooling retrofit at IPEC apart from the circular hybrid cooling 4    towers initially proposed by Enercon." Havey Direct at p. 13, 1. 9-13 (emphasis 5    added). Mr. Ortiz similarly testifies that "[b]ased on a preliminary review, and 6    subject to the limitations previously stated, the installation of a closed loop 7    system was determined to be technically feasible," Ortiz Direct at p. 6, 1. 17-19, 8    and "[b]ased on the conclusions of the Hatch 2012 Report and subject to the 9    limitations previously outlined, no major issues or deficiencies were identified by 10    Hatch with respect to the technical feasibility of transferring from a once-through 11    cooling system to a closed loop cooling system using the ClearSky TM cooling 12    tower system." Id. atp. 8,1.21 -p. 9 , 1. 2 .
13 Q: Do you agree with Mr. Havey that Tetra Tech's ClearSky cooling towers are 14    a "practical alternative" at IPEC?
13 Q: Do you agree with Mr. Havey that Tetra Tech's ClearSky cooling towers are 14    a "practical alternative" at IPEC?
Line 1,422: Line 1,351:
1 cooling system. Here, Unit 2 and Unit 3 were both designed and constructed in 2  the mid-1970s with turbines and condensers that were specifically designed for 3  cold Hudson River water that cannot be replicated with closed-cycle cooling 4  under maximum thermal load conditions.
1 cooling system. Here, Unit 2 and Unit 3 were both designed and constructed in 2  the mid-1970s with turbines and condensers that were specifically designed for 3  cold Hudson River water that cannot be replicated with closed-cycle cooling 4  under maximum thermal load conditions.
5          Even more problematically, Tetra Tech has selected novel and unproven 6  ClearSky cooling towers as the centerpiece of its proposed retrofit. Mr. Havey 7  provides no performance data from the test cell that has operated approximately 8  seven (7) years in the New Mexico desert at the San Juan Generating Station. In 9  fact, the only study of ClearSky cooling towers is from a Department of Energy 10  ("DOE") grant for that single test cell, and even the DOE recognized, in 2009, 11  the unproven nature of the technology. At the time, the towers were referred to 12  as Air2Air:
5          Even more problematically, Tetra Tech has selected novel and unproven 6  ClearSky cooling towers as the centerpiece of its proposed retrofit. Mr. Havey 7  provides no performance data from the test cell that has operated approximately 8  seven (7) years in the New Mexico desert at the San Juan Generating Station. In 9  fact, the only study of ClearSky cooling towers is from a Department of Energy 10  ("DOE") grant for that single test cell, and even the DOE recognized, in 2009, 11  the unproven nature of the technology. At the time, the towers were referred to 12  as Air2Air:
13          SPX Cooling Technologies is presently investigating the 14          Air2Air( for evaporative cooling towers (Figure 1) under 15          the U.S. Department of Energy (DOE) Grant No. DE-16          FC26-06NT42725. The preliminary findings from the 17          research are encouraging in that the basic principles behind 18          the technology are sound and the water savings are 19          substantial. However, in the course of executing this 20          project, construction costs of the validation cell (Figure2) 21          exceeded expectations. To be economically viable, more 22          research is required to develop an efficient heat transfer
13          SPX Cooling Technologies is presently investigating the 14          Air2Air( for evaporative cooling towers (Figure 1) under 15          the U.S. Department of Energy (DOE) Grant No. DE-16          FC26-06NT42725. The preliminary findings from the 17          research are encouraging in that the basic principles behind 18          the technology are sound and the water savings are 19          substantial. However, in the course of executing this 20          project, construction costs of the validation cell (Figure2) 21          exceeded expectations. To be economically viable, more 22          research is required to develop an efficient heat transfer 1        pack and redesign the overall geometry of the tower 2        includingpack orientationand superstructure.
 
1        pack and redesign the overall geometry of the tower 2        includingpack orientationand superstructure.
3 U.S. Dept. of Energy, Improvement to Air2Air Technology to Reduce Fresh-4  Water Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants, 5 ProMIS/ProjectNo.: DE-NT0005647 (Jan. 2009) (Entergy Ex. 357) (emphasis 6 added).      As evident from the title of the study, the experimental ClearSky 7 technology originally had a specific focus which was to promote cooling tower 8 applications in arid areas via reduction of fresh water evaporative cooling loss, 9 which is largely irrelevant to the IPEC application.
3 U.S. Dept. of Energy, Improvement to Air2Air Technology to Reduce Fresh-4  Water Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants, 5 ProMIS/ProjectNo.: DE-NT0005647 (Jan. 2009) (Entergy Ex. 357) (emphasis 6 added).      As evident from the title of the study, the experimental ClearSky 7 technology originally had a specific focus which was to promote cooling tower 8 applications in arid areas via reduction of fresh water evaporative cooling loss, 9 which is largely irrelevant to the IPEC application.
10        Accordingly, SPX undertook a second study under a DOE grant award 11 from October 1, 2008 through December 31, 2011 with the objective to "further 12 enable Air2Air becoming a commercially viable water savings and plume 13 abatement technology by researching a re-engineered pack, testing improvement 14 provided by modification, and prototyping the pack manufacture to improve pack 15 economy, as it relates to superstructure volume, cost, pack orientation, and 16 ducting details."  See Final Report, Improvement to Air2AirTM Technology to 17 Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 18 Power Plants (June 30, 2012) (Entergy Ex. 359) at 5. The final report, dated 19 June 30, 2012, detailed SPX's efforts under the research grant to "prototype" and 20 "adjust our design and propose new experiments as we proceeded in the 21 program." Id. at 24, 30. Based on these adjustments, even SPX acknowledged 22 that its first commercial products were not available until 2012. See id. at 25-26.
10        Accordingly, SPX undertook a second study under a DOE grant award 11 from October 1, 2008 through December 31, 2011 with the objective to "further 12 enable Air2Air becoming a commercially viable water savings and plume 13 abatement technology by researching a re-engineered pack, testing improvement 14 provided by modification, and prototyping the pack manufacture to improve pack 15 economy, as it relates to superstructure volume, cost, pack orientation, and 16 ducting details."  See Final Report, Improvement to Air2AirTM Technology to 17 Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 18 Power Plants (June 30, 2012) (Entergy Ex. 359) at 5. The final report, dated 19 June 30, 2012, detailed SPX's efforts under the research grant to "prototype" and 20 "adjust our design and propose new experiments as we proceeded in the 21 program." Id. at 24, 30. Based on these adjustments, even SPX acknowledged 22 that its first commercial products were not available until 2012. See id. at 25-26.
1      As I stated in my prefiled direct, only two ClearSky installations recently (i.e.,
1      As I stated in my prefiled direct, only two ClearSky installations recently (i.e.,
2      within the last six months) became operational.
2      within the last six months) became operational.
Line 1,434: Line 1,360:
14  Q:  Do you agree with Mr. Ortiz's testimony that the ClearSky configuration 15      proposed by Tetra Tech "was determined to be technically feasible"?
14  Q:  Do you agree with Mr. Ortiz's testimony that the ClearSky configuration 15      proposed by Tetra Tech "was determined to be technically feasible"?
16  A:  It is not clear to me how Mr. Ortiz can offer this opinion. Mr. Ortiz does not 17      appear to have any relevant engineering experience performing modifications at 18      a nuclear power plant, much less modifications associated with cooling tower 19      applications. Rather, Mr. Ortiz is a "Piping Engineer" who has "worked in the 20      pulp and paper, petrochemical and mining industries."            Staff Ex. 247 at 1.
16  A:  It is not clear to me how Mr. Ortiz can offer this opinion. Mr. Ortiz does not 17      appear to have any relevant engineering experience performing modifications at 18      a nuclear power plant, much less modifications associated with cooling tower 19      applications. Rather, Mr. Ortiz is a "Piping Engineer" who has "worked in the 20      pulp and paper, petrochemical and mining industries."            Staff Ex. 247 at 1.
21      Moreover, the basis for Mr. Ortiz's opinion is unclear in light of the admission in 22      the first page of his testimony that he "ha[d] no firsthand knowledge of this 23      project ....." Ortiz Direct at p. 1, 1. 19-23. As a result, all of his direct testimony
21      Moreover, the basis for Mr. Ortiz's opinion is unclear in light of the admission in 22      the first page of his testimony that he "ha[d] no firsthand knowledge of this 23      project ....." Ortiz Direct at p. 1, 1. 19-23. As a result, all of his direct testimony 1  is "based on [his] personal observations and interpretations of the project files, 2  reports, and conversations with former members of this project." Id. Mr. Ortiz 3  never identifies any employees at Hatch that actually have firsthand knowledge 4  of Hatch's review of the ENERCON Closed-Loop Cooling Reports or the Tetra 5  Tech CCC Report, nor does he identify any of the "project files" other than the 6  four reports provided by the parties in this proceeding-ENERCON 2003, 7  ENERCON 2010, Tetra Tech CCC Report, and Hatch 2012. Throughout his 8  testimony, Mr. Ortiz offers opinions based upon his "review of ... report[s]
 
1  is "based on [his] personal observations and interpretations of the project files, 2  reports, and conversations with former members of this project." Id. Mr. Ortiz 3  never identifies any employees at Hatch that actually have firsthand knowledge 4  of Hatch's review of the ENERCON Closed-Loop Cooling Reports or the Tetra 5  Tech CCC Report, nor does he identify any of the "project files" other than the 6  four reports provided by the parties in this proceeding-ENERCON 2003, 7  ENERCON 2010, Tetra Tech CCC Report, and Hatch 2012. Throughout his 8  testimony, Mr. Ortiz offers opinions based upon his "review of ... report[s]
9  presented to [him]" or his "interpretation of the documents [he has] reviewed,"
9  presented to [him]" or his "interpretation of the documents [he has] reviewed,"
10  and he acknowledges that "varying interpretations of [Hatch's] services may S1I exist." Id. Mr. Ortiz nevertheless goes on to say that, "based on [his] research 12  the direct testimony being provided is a reasonable interpretationof Hatch's 13  methods and findings." Id. at p. 1, 1.21-23 (emphasis added).
10  and he acknowledges that "varying interpretations of [Hatch's] services may S1I exist." Id. Mr. Ortiz nevertheless goes on to say that, "based on [his] research 12  the direct testimony being provided is a reasonable interpretationof Hatch's 13  methods and findings." Id. at p. 1, 1.21-23 (emphasis added).
Line 1,446: Line 1,370:
12  A:  Neither Mr. Havey nor Mr. Ortiz address the fact that ClearSky cooling towers 13      employ novel technology with limited operating experience that presents a large 14      potential risk for a nuclear baseload facility, which should have eliminated the 15      ClearSky towers from consideration as a feasible technology.        This lack of 16      response to a fundamental concern is unacceptable in the nuclear power industry, 17      which generally requires that technology choices be supported by demonstrated 18      and reliable operational experience.
12  A:  Neither Mr. Havey nor Mr. Ortiz address the fact that ClearSky cooling towers 13      employ novel technology with limited operating experience that presents a large 14      potential risk for a nuclear baseload facility, which should have eliminated the 15      ClearSky towers from consideration as a feasible technology.        This lack of 16      response to a fundamental concern is unacceptable in the nuclear power industry, 17      which generally requires that technology choices be supported by demonstrated 18      and reliable operational experience.
19              In fact, Tetra Tech repeatedly and contemporaneously has rejected 20      ClearSky cooling towers as an unproven technology in reviews it has performed 21      for NYSDEC and the U.S. EPA for other non-nuclear power plants that operate 22      at a much smaller-scale than IPEC. For example:
19              In fact, Tetra Tech repeatedly and contemporaneously has rejected 20      ClearSky cooling towers as an unproven technology in reviews it has performed 21      for NYSDEC and the U.S. EPA for other non-nuclear power plants that operate 22      at a much smaller-scale than IPEC. For example:
23    0    Section 316(b) Rulemaking. As part of its § 316(b) rulemaking, EPA tasked
23    0    Section 316(b) Rulemaking. As part of its § 316(b) rulemaking, EPA tasked 1 Tetra Tech and SAIC (who, according to Mr. Havey reviewed ENERCON 2 2010 in lieu of Hatch) with evaluating how costs for plume and drift 3 abatement technology, among other things, may be developed for a universe 4 of facilities potentially subject to CCC retrofits under the proposed existing 5 facility rulemaking. As part of that review, Tetra Tech evaluated ClearSky 6 cooling towers, and in its June 11, 2010 memorandum to EPA, concluded that 7 SPX ClearSky "technology has only been demonstrated on a full-scale basis at 8 a single location in New Mexico and remains a somewhat unproven 9 technology and may require time to develop acceptance within the industry."
 
1 Tetra Tech and SAIC (who, according to Mr. Havey reviewed ENERCON 2 2010 in lieu of Hatch) with evaluating how costs for plume and drift 3 abatement technology, among other things, may be developed for a universe 4 of facilities potentially subject to CCC retrofits under the proposed existing 5 facility rulemaking. As part of that review, Tetra Tech evaluated ClearSky 6 cooling towers, and in its June 11, 2010 memorandum to EPA, concluded that 7 SPX ClearSky "technology has only been demonstrated on a full-scale basis at 8 a single location in New Mexico and remains a somewhat unproven 9 technology and may require time to develop acceptance within the industry."
10 Memorandum from John Sunda, SAIC, and Kelly Meadows, Tetra Tech to 11 Paul Shriner and Jan Matuszko, USEPA, dated June 11, 2010, at 8 (Entergy 12 Ex. 346) (emphasis added).
10 Memorandum from John Sunda, SAIC, and Kelly Meadows, Tetra Tech to 11 Paul Shriner and Jan Matuszko, USEPA, dated June 11, 2010, at 8 (Entergy 12 Ex. 346) (emphasis added).
13 Glenwood Main Power Station. Tetra Tech was asked by NYSDEC to 14 conduct a technical review and evaluate the feasibility of various alternatives 15 at the Glenwood fossil fuel steam electric facility. In rejecting a cooling 16 tower configuration proposed by Powers Engineering (Riverkeeper's expert) 17 that would require only 12 ClearSky cells, Tetra Tech's technical review 18 repeated    its EPA finding that ClearSky towers "ha[ve]            only been 19 demonstrated on a full-scale basis at a single location in New Mexico and 20 remain[] an unproven technologyfor applicationssuch as this." Tetra Tech, 21 Inc., Glenwood Technical Review, at 4 (Entergy Ex. 348) (emphasis added).
13 Glenwood Main Power Station. Tetra Tech was asked by NYSDEC to 14 conduct a technical review and evaluate the feasibility of various alternatives 15 at the Glenwood fossil fuel steam electric facility. In rejecting a cooling 16 tower configuration proposed by Powers Engineering (Riverkeeper's expert) 17 that would require only 12 ClearSky cells, Tetra Tech's technical review 18 repeated    its EPA finding that ClearSky towers "ha[ve]            only been 19 demonstrated on a full-scale basis at a single location in New Mexico and 20 remain[] an unproven technologyfor applicationssuch as this." Tetra Tech, 21 Inc., Glenwood Technical Review, at 4 (Entergy Ex. 348) (emphasis added).
22 Although the Tetra Tech's review of the Glenwood facility is undated, it 23 references documents there were published as late as 2010.
22 Although the Tetra Tech's review of the Glenwood facility is undated, it 23 references documents there were published as late as 2010.
1 Northport Power Station.        On January 28, 2010, NYSDEC requested 2 Northport's owner (National Grid) to provide "...an assessment of a back-to-3 back, linear array of towers, such as the SPX/Marley ClearSky TM tower 4 configuration for all four units."    Washington Group International, Inc.,
1 Northport Power Station.        On January 28, 2010, NYSDEC requested 2 Northport's owner (National Grid) to provide "...an assessment of a back-to-3 back, linear array of towers, such as the SPX/Marley ClearSky TM tower 4 configuration for all four units."    Washington Group International, Inc.,
5 National Grid Generation LLC, Response to NYSDEC's Request for 6 Additional Information Regarding Cooling Towers (July 1, 2010), at 1-1 7 (Entergy Ex. 349). In response, Washington Group International, a division 8 of URS Corporation, submitted a report concluding "the cooling tower 9 technology identified by NYSDEC for further study [ClearSky towers], is yet 10 unproven for application to generating stations such as Northport..." Id. at 2-11 1 ("[A] plume abatement cooling tower using an array of back-to-back cells, 12 such as the system referenced by the NYSDEC, is an unproven technology for 13 a generating station such as Northport. Therefore, there is a high degree of 14 uncertainty associated with its environmental impacts."); Letter from Timothy 15 Curt, National Grid Environmental Management to Colleen Kimble, NYS 16 Department of Environmental Conservation, dated July 1, 2010 at 4 (Entergy 17 Ex. 353) (same). The Washington Group went on to assert that "the tower 18 suggested by DEC is an unproven technology with no identified commercially 19 comparable installations to Northport." Entergy Ex. 349 at 2-6. Tetra Tech 20 performed the technical review of the Washington Group's report and 21 concluded, "[t]he report's conclusion that the Clear Sky Plume Abatement 22 System remains an unproven technology in this application has some merit, 23 but the analysis demonstrates that alternative cooling tower locations for
5 National Grid Generation LLC, Response to NYSDEC's Request for 6 Additional Information Regarding Cooling Towers (July 1, 2010), at 1-1 7 (Entergy Ex. 349). In response, Washington Group International, a division 8 of URS Corporation, submitted a report concluding "the cooling tower 9 technology identified by NYSDEC for further study [ClearSky towers], is yet 10 unproven for application to generating stations such as Northport..." Id. at 2-11 1 ("[A] plume abatement cooling tower using an array of back-to-back cells, 12 such as the system referenced by the NYSDEC, is an unproven technology for 13 a generating station such as Northport. Therefore, there is a high degree of 14 uncertainty associated with its environmental impacts."); Letter from Timothy 15 Curt, National Grid Environmental Management to Colleen Kimble, NYS 16 Department of Environmental Conservation, dated July 1, 2010 at 4 (Entergy 17 Ex. 353) (same). The Washington Group went on to assert that "the tower 18 suggested by DEC is an unproven technology with no identified commercially 19 comparable installations to Northport." Entergy Ex. 349 at 2-6. Tetra Tech 20 performed the technical review of the Washington Group's report and 21 concluded, "[t]he report's conclusion that the Clear Sky Plume Abatement 22 System remains an unproven technology in this application has some merit, 23 but the analysis demonstrates that alternative cooling tower locations for
Line 1,462: Line 1,383:
15      19, 1.20 - pg. 20, 1.3. Mr. Ortiz specifically testifies that Hatch did not analyze 16    "building or equipment relocations, [and] the modification or addition of site 17    services." Ortiz Direct at p. 6, 1.6-9. Mr. Ortiz went on to inexplicably assert 18    that such conflicts "cannot be studied in detail during the limited scope of a 19    feasibility report." Id. at p. 9, 1.21 - p. 10, 1.3.
15      19, 1.20 - pg. 20, 1.3. Mr. Ortiz specifically testifies that Hatch did not analyze 16    "building or equipment relocations, [and] the modification or addition of site 17    services." Ortiz Direct at p. 6, 1.6-9. Mr. Ortiz went on to inexplicably assert 18    that such conflicts "cannot be studied in detail during the limited scope of a 19    feasibility report." Id. at p. 9, 1.21 - p. 10, 1.3.
20            Enercon has prepared Exhibit 373 which is an overhead aerial photograph 21    of the IPEC site showing the footprint of Tetra Tech's proposed cooling towers 22    for Unit 2 and Unit 3. As reflected on Exhibit 373, Tetra Tech proposes to locate 23    its cooling towers effectively on top of many essential buildings and structures.
20            Enercon has prepared Exhibit 373 which is an overhead aerial photograph 21    of the IPEC site showing the footprint of Tetra Tech's proposed cooling towers 22    for Unit 2 and Unit 3. As reflected on Exhibit 373, Tetra Tech proposes to locate 23    its cooling towers effectively on top of many essential buildings and structures.
1    Without these structures, IPEC would be unable to operate.                  By not 2    acknowledging these siting conflicts and developing a plan for relocating 3    essential structures, Tetra Tech's ClearSky towers cannot be considered feasible 4    at IPEC.
1    Without these structures, IPEC would be unable to operate.                  By not 2    acknowledging these siting conflicts and developing a plan for relocating 3    essential structures, Tetra Tech's ClearSky towers cannot be considered feasible 4    at IPEC.
5 Q: I would like to focus on some of the specific site disruptions that were 6    identified by Enercon in the ENERCON 2013 CCC Response. First, how, if 7    at all, do Messrs. Havey and Ortiz propose resolving the potential issues with 8    groundwater contamination?
5 Q: I would like to focus on some of the specific site disruptions that were 6    identified by Enercon in the ENERCON 2013 CCC Response. First, how, if 7    at all, do Messrs. Havey and Ortiz propose resolving the potential issues with 8    groundwater contamination?
9 A:  They do not address the issue. As I explained earlier, Tetra Tech's proposed 10    configuration calls for the existing discharge canal, which is parallel to the River 11    and the Unit 2 and Unit 3 power houses, to be converted into a hot water 12    reservoir and pump pit. In order for the reservoir to provide the necessary 13    submergence for proper operation of the new circulating water pumps, the 14    current Unit 2 discharge canal will need to be deepened considerably. As set 15    forth in the ENERCON 2013 CCC Response, this excavation is in the very 16    location where groundwater containing Tritium and Strontium has been 17    observed. See Entergy Ex. 42. To maintain dry conditions required for pipe 18    construction and backfilling, contaminated groundwater would need to be 19    continually pumped from the excavation area below the groundwater table (i.e.,
9 A:  They do not address the issue. As I explained earlier, Tetra Tech's proposed 10    configuration calls for the existing discharge canal, which is parallel to the River 11    and the Unit 2 and Unit 3 power houses, to be converted into a hot water 12    reservoir and pump pit. In order for the reservoir to provide the necessary 13    submergence for proper operation of the new circulating water pumps, the 14    current Unit 2 discharge canal will need to be deepened considerably. As set 15    forth in the ENERCON 2013 CCC Response, this excavation is in the very 16    location where groundwater containing Tritium and Strontium has been 17    observed. See Entergy Ex. 42. To maintain dry conditions required for pipe 18    construction and backfilling, contaminated groundwater would need to be 19    continually pumped from the excavation area below the groundwater table (i.e.,
20    dewatering), which will have to be continued until completion of the excavation.
20    dewatering), which will have to be continued until completion of the excavation.
21            In fact, Mr. Havey admits that "the retrofit project for Unit 2 is heavily 22    dependent on finding an acceptable solution for dewatering the area during 23    excavation and construction" and "[i]t is my opinion that the plume area will
21            In fact, Mr. Havey admits that "the retrofit project for Unit 2 is heavily 22    dependent on finding an acceptable solution for dewatering the area during 23    excavation and construction" and "[i]t is my opinion that the plume area will 1      likely require sampling to determine what disposal and/or treatment methods, if 2      any, are most appropriate to manage dewatered groundwater and excavated 3      material." Havey Direct at p. 21, 1. 19 - p. 22, 1. 1 (emphasis added). Despite 4      Mr. Havey's acknowledgement that groundwater radiological contamination may 5      render the Unit 2 tower infeasible, both Tetra Tech and Hatch inexplicably 6      excluded "issues related to potential groundwater radiological contamination" 7      from their feasibility assessment. See, e.g., id at p 13, 1. 1-3. No feasibility 8      determination can be reached for retrofitting Unit 2 with closed-cycle cooling 9      unless and until Tetra Tech addresses impacts from the groundwater plume.
 
1      likely require sampling to determine what disposal and/or treatment methods, if 2      any, are most appropriate to manage dewatered groundwater and excavated 3      material." Havey Direct at p. 21, 1. 19 - p. 22, 1. 1 (emphasis added). Despite 4      Mr. Havey's acknowledgement that groundwater radiological contamination may 5      render the Unit 2 tower infeasible, both Tetra Tech and Hatch inexplicably 6      excluded "issues related to potential groundwater radiological contamination" 7      from their feasibility assessment. See, e.g., id at p 13, 1. 1-3. No feasibility 8      determination can be reached for retrofitting Unit 2 with closed-cycle cooling 9      unless and until Tetra Tech addresses impacts from the groundwater plume.
10 Q:  Continuing with specific site disruptions discussed in the ENERCON 2013 11    CCC Response, how, if at all, does Tetra Tech's ClearSky configuration 12    proposed for Unit 2 account for IPEC's Independent Spent Fuel Storage 13    Installation ("ISFSI")?
10 Q:  Continuing with specific site disruptions discussed in the ENERCON 2013 11    CCC Response, how, if at all, does Tetra Tech's ClearSky configuration 12    proposed for Unit 2 account for IPEC's Independent Spent Fuel Storage 13    Installation ("ISFSI")?
14  A:  It does not. One of the most apparent and problematic aspects of Tetra Tech's 15      proposal for Unit 2 is that the excavation for the Unit 2 towers and associated 16      piping interferes directly with IPEC's ISFSI. The ISFSI is a critical component 17      of the IPEC site for dry cask spent nuclear fuel storage. IPEC's ISFSI is a three-18      foot thick concrete pad that is approximately 100 ft by 200 ft designed to store 19      large, sealed casks containing spent fuel rods. Construction of the ISFSI lasted 20      three years and cost over $13 million dollars. As of February 2014, there were 21      twenty-six (26) casks contained within the ISFSI. The casks are made of steel 22      and concrete and are 18-20 feet high, 11 feet in diameter, and have 2 foot thick 23      concrete walls. Each cask weighs over 300,000 pounds when loaded.
14  A:  It does not. One of the most apparent and problematic aspects of Tetra Tech's 15      proposal for Unit 2 is that the excavation for the Unit 2 towers and associated 16      piping interferes directly with IPEC's ISFSI. The ISFSI is a critical component 17      of the IPEC site for dry cask spent nuclear fuel storage. IPEC's ISFSI is a three-18      foot thick concrete pad that is approximately 100 ft by 200 ft designed to store 19      large, sealed casks containing spent fuel rods. Construction of the ISFSI lasted 20      three years and cost over $13 million dollars. As of February 2014, there were 21      twenty-six (26) casks contained within the ISFSI. The casks are made of steel 22      and concrete and are 18-20 feet high, 11 feet in diameter, and have 2 foot thick 23      concrete walls. Each cask weighs over 300,000 pounds when loaded.
1              IPEC's ISFSI and the spent-fuel casks that it stores are heavily regulated 2      and subject to intensive oversight by NRC. In order to construct the proposed 3      towers for Unit 2, the current ISFSI must be decommissioned and demolished.
1              IPEC's ISFSI and the spent-fuel casks that it stores are heavily regulated 2      and subject to intensive oversight by NRC. In order to construct the proposed 3      towers for Unit 2, the current ISFSI must be decommissioned and demolished.
4      Before that work can start, however, IPEC must obtain permits for and construct 5      an entirely new ISFSI at a different location to store the spent fuel casks. The 6      Tetra Tech CCC Report and the prefiled testimony of Messrs. Havey and Ortiz 7      completely fail to address the significant impact on the feasibility of the Unit 2 8      cooling towers, not to mention its schedule, of the need to: (1) identify a viable 9      location for, permit and construct a new ISFSI; (2) transfer the existing casks to 10      that new ISFSI; and (3) decommission and demolish the existing ISFSI, all 11      before commencing construction of the Unit 2 tower. In fact, Tetra Tech has 12      performed no analysis to determine if a new ISFSI can be built at IPEC. Another 13      significant obstacle is that the extremely heavy loads restrict what roads can be 14      used to transport the 300,000 pound spent fuel casks. Given these restrictions, 15      there is a risk that there will be no suitable right-of-way to transfer the spent fuel 16      from the reactors to the new ISFSI location.          Without resolving this siting 17      conflict and others that may arise relative to the need for a new ISFSI, the Unit 2 18      towers cannot be considered feasible.
4      Before that work can start, however, IPEC must obtain permits for and construct 5      an entirely new ISFSI at a different location to store the spent fuel casks. The 6      Tetra Tech CCC Report and the prefiled testimony of Messrs. Havey and Ortiz 7      completely fail to address the significant impact on the feasibility of the Unit 2 8      cooling towers, not to mention its schedule, of the need to: (1) identify a viable 9      location for, permit and construct a new ISFSI; (2) transfer the existing casks to 10      that new ISFSI; and (3) decommission and demolish the existing ISFSI, all 11      before commencing construction of the Unit 2 tower. In fact, Tetra Tech has 12      performed no analysis to determine if a new ISFSI can be built at IPEC. Another 13      significant obstacle is that the extremely heavy loads restrict what roads can be 14      used to transport the 300,000 pound spent fuel casks. Given these restrictions, 15      there is a risk that there will be no suitable right-of-way to transfer the spent fuel 16      from the reactors to the new ISFSI location.          Without resolving this siting 17      conflict and others that may arise relative to the need for a new ISFSI, the Unit 2 18      towers cannot be considered feasible.
Line 1,484: Line 1,401:
7    Assuming the towers can be constructed, have' Messrs. Havey and Ortiz 8    reasonably demonstrated that the towers will function efficiently at IPEC 9    without significantly degrading IPEC's performance?
7    Assuming the towers can be constructed, have' Messrs. Havey and Ortiz 8    reasonably demonstrated that the towers will function efficiently at IPEC 9    without significantly degrading IPEC's performance?
10  A:  No. Mr. Havey does not address the impacts associated with Tetra Tech's 11      proposal on the ability of IPEC's condensers to efficiently reject heat, nor does 12      he address the Bums and Roe condenser analysis described in the ENERCON 13      2013 CCC Response and my prefiled direct testimony that demonstrated that 14      additional capacity is likely needed to reduce the pressure in the condenser 15      during at least one of IPEC's transient conditions.      For his part, Mr. Ortiz 16      concedes in his testimony that it "was impossible to accurately assess the impact 17      on condenser thermal performance with a higher inlet cooling water temperature 18      resulting from use of the cooling towers."      Ortiz Direct at p. 10, 1. 20-22 19      (emphasis added). Based on what Tetra Tech has reported, however, there are 20      several known issues with the ClearSky towers that will detrimentally and 21      materially impact IPEC's performance, including its ability to generate 22      electricity reliably and efficiently.
10  A:  No. Mr. Havey does not address the impacts associated with Tetra Tech's 11      proposal on the ability of IPEC's condensers to efficiently reject heat, nor does 12      he address the Bums and Roe condenser analysis described in the ENERCON 13      2013 CCC Response and my prefiled direct testimony that demonstrated that 14      additional capacity is likely needed to reduce the pressure in the condenser 15      during at least one of IPEC's transient conditions.      For his part, Mr. Ortiz 16      concedes in his testimony that it "was impossible to accurately assess the impact 17      on condenser thermal performance with a higher inlet cooling water temperature 18      resulting from use of the cooling towers."      Ortiz Direct at p. 10, 1. 20-22 19      (emphasis added). Based on what Tetra Tech has reported, however, there are 20      several known issues with the ClearSky towers that will detrimentally and 21      materially impact IPEC's performance, including its ability to generate 22      electricity reliably and efficiently.
1 Q:  What are those known issues?
1 Q:  What are those known issues?
2  A: The current closed-cycle cooling retrofit alternatives at IPEC will both (1) reduce 3      the amount of available circulating available to cool the condensers and (2) 4      increase the temperature of the cooling water. These are both major operating 5      constraints that will mean that IPEC will not be able to generate as much 6      electricity as it does in the current once-through system, and in some cases, could 7      lead to excursions and unplanned outages.
2  A: The current closed-cycle cooling retrofit alternatives at IPEC will both (1) reduce 3      the amount of available circulating available to cool the condensers and (2) 4      increase the temperature of the cooling water. These are both major operating 5      constraints that will mean that IPEC will not be able to generate as much 6      electricity as it does in the current once-through system, and in some cases, could 7      lead to excursions and unplanned outages.
Line 1,491: Line 1,407:
16            Consequently, each unit's replacement cooling tower 17            should be designed to meet the most critical operating 18            conditions that would be expected during the year, i.e.,
16            Consequently, each unit's replacement cooling tower 17            should be designed to meet the most critical operating 18            conditions that would be expected during the year, i.e.,
19            840,000 rather than the 700,000 gpm used in the design 20            criteria.
19            840,000 rather than the 700,000 gpm used in the design 20            criteria.
21      Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris 22      Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 23      6 (Appendix B to Staff Ex. 214). Tetra Tech went on to note that "[i]f correct, 24      the tower as designed appears to be insufficiently sized to accommodate the 25      higher summertime volumes that are sometimes needed."              Id. Enercon's 26      decision to reduce the maximum flow to 700,000 gpm was appropriate at the 27      time because it reflected a balance between the parasitic loss associated with
21      Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris 22      Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 23      6 (Appendix B to Staff Ex. 214). Tetra Tech went on to note that "[i]f correct, 24      the tower as designed appears to be insufficiently sized to accommodate the 25      higher summertime volumes that are sometimes needed."              Id. Enercon's 26      decision to reduce the maximum flow to 700,000 gpm was appropriate at the 27      time because it reflected a balance between the parasitic loss associated with 1    pumping the extra circulating water up to the cooling towers and additional fans 2    required to cool that water with the expected degradation in power performance 3    based on the then-current PEPSE models for IPEC Units 2 and 3. Because Tetra 4    Tech's proposal has a different pump and fan dynamics than the round hybrid 5    towers with less parasitic losses, Tetra Tech ought to have reanalyzed whether 6    700,000 gpm was an appropriate design choice for its towers. Instead, Tetra 7    Tech simply copied design decisions from the round hybrid towers described in 8    ENERCON 2010 without properly considering whether those design choices are 9    appropriate for the ClearSky towers.
 
1    pumping the extra circulating water up to the cooling towers and additional fans 2    required to cool that water with the expected degradation in power performance 3    based on the then-current PEPSE models for IPEC Units 2 and 3. Because Tetra 4    Tech's proposal has a different pump and fan dynamics than the round hybrid 5    towers with less parasitic losses, Tetra Tech ought to have reanalyzed whether 6    700,000 gpm was an appropriate design choice for its towers. Instead, Tetra 7    Tech simply copied design decisions from the round hybrid towers described in 8    ENERCON 2010 without properly considering whether those design choices are 9    appropriate for the ClearSky towers.
10            As part of the preparation for this testimony, Enercon was informed by 11    Entergy that the PEPSE model used in ENERCON 2010 and the ENERCON 12    2013 CCC Response had been updated and re-benchmarked.                  Preliminary 13    analysis of the updated model shows higher power losses when the Units are run 14    at 700,000 gpm, particularly at Unit 2 and particularly during the critical summer 15    months, than what has been reported previously. Based on the results of this 16    preliminary analysis, it is clear that the ClearSky towers proposed by Tetra Tech 17    are significantly undersized. This analysis emphasizes why it was incumbent on 18    Tetra Tech to perform and include PEPSE modeling, as well as other critical 19    thermal performance data, such as cooling tower performance curves, in its 20    report in order to validate its design choices and establish post-modification 21    operating power losses.
10            As part of the preparation for this testimony, Enercon was informed by 11    Entergy that the PEPSE model used in ENERCON 2010 and the ENERCON 12    2013 CCC Response had been updated and re-benchmarked.                  Preliminary 13    analysis of the updated model shows higher power losses when the Units are run 14    at 700,000 gpm, particularly at Unit 2 and particularly during the critical summer 15    months, than what has been reported previously. Based on the results of this 16    preliminary analysis, it is clear that the ClearSky towers proposed by Tetra Tech 17    are significantly undersized. This analysis emphasizes why it was incumbent on 18    Tetra Tech to perform and include PEPSE modeling, as well as other critical 19    thermal performance data, such as cooling tower performance curves, in its 20    report in order to validate its design choices and establish post-modification 21    operating power losses.
22 Q: You also mentioned that in addition to reducing the maximum amount of 23    available water, closed-cycle cooling would also increase the temperature of
22 Q: You also mentioned that in addition to reducing the maximum amount of 23    available water, closed-cycle cooling would also increase the temperature of 1    the circulating water used to cool the condensers. How will that affect plant 2    performance?
 
1    the circulating water used to cool the condensers. How will that affect plant 2    performance?
3  A:  The increased temperature of the circulating water, combined with the reduced 4      flow, will lead to increased condenser backpressure that will reduce the facility's 5      ability to generate power. These effects will be felt most in the summer, when 6      the cooling need is the highest and the demand for electricity is the greatest. But 7      there are additional aspects of the ClearSky towers that amplify the inherent and 8      detrimental impact associated with a closed-cycle cooling retrofit at IPEC.
3  A:  The increased temperature of the circulating water, combined with the reduced 4      flow, will lead to increased condenser backpressure that will reduce the facility's 5      ability to generate power. These effects will be felt most in the summer, when 6      the cooling need is the highest and the demand for electricity is the greatest. But 7      there are additional aspects of the ClearSky towers that amplify the inherent and 8      detrimental impact associated with a closed-cycle cooling retrofit at IPEC.
9            First, as I stated in my prefiled direct, the cooling towers are susceptible to 10      recirculation of the hot, humid exhaust back into the intake, which will increase 11      the entering wet-bulb temperature and reduce the towers' ability to cool the 12      water. Mr. Havey does not address Enercon's concern that the configuration and 13      orientation of the ClearSky towers will likely result in recirculation thereby 14      decreasing their performance and detrimentally affect plant operations.          Mr.
9            First, as I stated in my prefiled direct, the cooling towers are susceptible to 10      recirculation of the hot, humid exhaust back into the intake, which will increase 11      the entering wet-bulb temperature and reduce the towers' ability to cool the 12      water. Mr. Havey does not address Enercon's concern that the configuration and 13      orientation of the ClearSky towers will likely result in recirculation thereby 14      decreasing their performance and detrimentally affect plant operations.          Mr.
15      Ortiz states only that "to better simulate recirculation effects created by different 16      wind conditions a more detailed analysis is required," but he defers this 17      important consideration to later in the "engineering phase of the project" where 18      "adjustments, if required can be implemented...." Ortiz Direct at p. 11, 1. 12-19.
15      Ortiz states only that "to better simulate recirculation effects created by different 16      wind conditions a more detailed analysis is required," but he defers this 17      important consideration to later in the "engineering phase of the project" where 18      "adjustments, if required can be implemented...." Ortiz Direct at p. 11, 1. 12-19.
19      This is not sufficient; the impact recirculation will have on cooling tower 20      performance affects threshold design decisions, such as the number of cooling 21      cells required and the size of those cells. It would be inappropriate to make a 22      "feasibility" determination of a configuration that calls for forty-four (44) cells 23      per unit, only to find out later in the process that, for example, fifty (50) or more
19      This is not sufficient; the impact recirculation will have on cooling tower 20      performance affects threshold design decisions, such as the number of cooling 21      cells required and the size of those cells. It would be inappropriate to make a 22      "feasibility" determination of a configuration that calls for forty-four (44) cells 23      per unit, only to find out later in the process that, for example, fifty (50) or more I cells per unit were actually needed. By way of example, SPX has provided to 2 Enercon    a "ClearSky      Selection    Summary"  that proposes    a different 3 configuration ClearSky towers for IPEC, consisting of sixty-two (62) smaller 4 ClearSky cells per Unit. The selection summary provided to Enercon explicitly 5 assumes recirculation would increase the inlet wet bulb temperature by 20 F 6 (changing the design wet-bulb temperature from 77OF to 790 F), and as much as 7 5°F "under certain wind conditions." See SPX, Entergy Indian Point Units 2 &
 
I cells per unit were actually needed. By way of example, SPX has provided to 2 Enercon    a "ClearSky      Selection    Summary"  that proposes    a different 3 configuration ClearSky towers for IPEC, consisting of sixty-two (62) smaller 4 ClearSky cells per Unit. The selection summary provided to Enercon explicitly 5 assumes recirculation would increase the inlet wet bulb temperature by 20 F 6 (changing the design wet-bulb temperature from 77OF to 790 F), and as much as 7 5°F "under certain wind conditions." See SPX, Entergy Indian Point Units 2 &
8 3, ClearSky Selection Summary (Entergy Ex. 347).
8 3, ClearSky Selection Summary (Entergy Ex. 347).
9        Second, Tetra Tech proposes aligning the ClearSky cooling towers in a 10 back-to-back configuration. It is well understood that linear, mechanical draft 11 cooling towers do not perform well in a back-to-back configuration. In fact, this 12 is a point that Tetra Tech has made in several other technical reviews it has 13 made. For example, in a review Tetra Tech performed for NYSDEC for the 14 Northport Generating Station, Tetra Tech noted that "[c]onventional hybrid 15 wet/dry mechanical draft cooling towers must be configured in an in-line (single 16 row) arrangement and cannot be placed in a back-to-back configuration because 17 of issues with poor mixing of the wet and dry section exhaust in the back-to-back 18 configuration." Tetra Tech, Inc., Northport Technical Review at 2 (Entergy Ex.
9        Second, Tetra Tech proposes aligning the ClearSky cooling towers in a 10 back-to-back configuration. It is well understood that linear, mechanical draft 11 cooling towers do not perform well in a back-to-back configuration. In fact, this 12 is a point that Tetra Tech has made in several other technical reviews it has 13 made. For example, in a review Tetra Tech performed for NYSDEC for the 14 Northport Generating Station, Tetra Tech noted that "[c]onventional hybrid 15 wet/dry mechanical draft cooling towers must be configured in an in-line (single 16 row) arrangement and cannot be placed in a back-to-back configuration because 17 of issues with poor mixing of the wet and dry section exhaust in the back-to-back 18 configuration." Tetra Tech, Inc., Northport Technical Review at 2 (Entergy Ex.
19 354). Tetra Tech made a similar statement in the review of the Huntley facility:
19 354). Tetra Tech made a similar statement in the review of the Huntley facility:
20 "[d]oubled-up towers are also referred to as back-to-back configurations and are 21 generally not compatible with hybrid wet/dry plume abatement cooling towers."
20 "[d]oubled-up towers are also referred to as back-to-back configurations and are 21 generally not compatible with hybrid wet/dry plume abatement cooling towers."
22 Memorandum from John Sunda, Steve Geil, and Kelly Meadows, to Chuck 23 Nieder, NYSDEC, and Jamie Hurley, USEPA, dated Oct. 5, 2011, at 6-7
22 Memorandum from John Sunda, Steve Geil, and Kelly Meadows, to Chuck 23 Nieder, NYSDEC, and Jamie Hurley, USEPA, dated Oct. 5, 2011, at 6-7 1 (Entergy Ex. 355). I understand that SPX advertises that, conceptually, ClearSky 2  cooling towers can be designed and operated in a back-to-back configuration, but 3  there is no operational experience showing this to be the case.        Indeed, the 4  Air2Air test cell at the San Juan Generating Station in New Mexico cannot be 5  used in a back-to-back configuration because it has air intakes on two sides, 6  which is another reason that it is not representative of NYSDEC's proposal to 7  construct two towers of 44 back-to-back ClearSky cells at IPEC.
 
1 (Entergy Ex. 355). I understand that SPX advertises that, conceptually, ClearSky 2  cooling towers can be designed and operated in a back-to-back configuration, but 3  there is no operational experience showing this to be the case.        Indeed, the 4  Air2Air test cell at the San Juan Generating Station in New Mexico cannot be 5  used in a back-to-back configuration because it has air intakes on two sides, 6  which is another reason that it is not representative of NYSDEC's proposal to 7  construct two towers of 44 back-to-back ClearSky cells at IPEC.
8          Third, in addition to known operational problems associated with using 9  cooling towers in salt water applications (e.g., salt deposition, electric arcing, 10  etc.), the thermophysical properties of salt water degrades cooling tower 11  performance as compared to cooling towers that use freshwater. Recent studies 12  have shown that increased salt concentrations materially alter the efficiency of 13  cooling towers to a substantial degree. See Mostafa H. Sharqawy et al., On 14  Thermal Performanceof Seawater Cooling Towers, 133 J. Eng. Gas Turbines &
8          Third, in addition to known operational problems associated with using 9  cooling towers in salt water applications (e.g., salt deposition, electric arcing, 10  etc.), the thermophysical properties of salt water degrades cooling tower 11  performance as compared to cooling towers that use freshwater. Recent studies 12  have shown that increased salt concentrations materially alter the efficiency of 13  cooling towers to a substantial degree. See Mostafa H. Sharqawy et al., On 14  Thermal Performanceof Seawater Cooling Towers, 133 J. Eng. Gas Turbines &
15  Power (Apr. 2011), at 6 (Entergy Ex. 352) ("It is found that an increase in 16  salinity decreases the air effectiveness by 5-20% relative to freshwater cooling 17  tower."). Here, Tetra Tech proposes concentrating the salt level in the Hudson 18  River three times in its closed-cycle system, which will amplify degradation of 19  thermal performance attributable to increased salinity. Although Mr. Havey 20  asserts in his prefiled testimony that Tetra Tech's proposed ClearSky towers are 21  designed to reject the maximum thermal load under the "most stringent 22  conditions," including "highest salinity" (Havey Direct at p. 29, 1. 10-13), Tetra 23  Tech does not identify the salinity levels that were provided to SPX or how (or
15  Power (Apr. 2011), at 6 (Entergy Ex. 352) ("It is found that an increase in 16  salinity decreases the air effectiveness by 5-20% relative to freshwater cooling 17  tower."). Here, Tetra Tech proposes concentrating the salt level in the Hudson 18  River three times in its closed-cycle system, which will amplify degradation of 19  thermal performance attributable to increased salinity. Although Mr. Havey 20  asserts in his prefiled testimony that Tetra Tech's proposed ClearSky towers are 21  designed to reject the maximum thermal load under the "most stringent 22  conditions," including "highest salinity" (Havey Direct at p. 29, 1. 10-13), Tetra 23  Tech does not identify the salinity levels that were provided to SPX or how (or 1    even whether) SPX adjusted the size of its cooling towers to account for the 2    increased salinity of the Hudson River. Without this information, there is a 3    substantial risk that Tetra Tech has further undersized its cooling towers.
 
1    even whether) SPX adjusted the size of its cooling towers to account for the 2    increased salinity of the Hudson River. Without this information, there is a 3    substantial risk that Tetra Tech has further undersized its cooling towers.
4 Q: Aside fiom and in addition to the impacts that will reduce IPEC's ability to 5    generate power, are there any significant operational problems associated 6    with the proposed ClearSky towers that are not addressed by Messrs. Havey 7    and Ortiz and need to be to reach a feasibility determination?
4 Q: Aside fiom and in addition to the impacts that will reduce IPEC's ability to 5    generate power, are there any significant operational problems associated 6    with the proposed ClearSky towers that are not addressed by Messrs. Havey 7    and Ortiz and need to be to reach a feasibility determination?
8 A:  Yes. Mr. Havey and Mr. Ortiz fail to address the potential site impacts that 9    could result from the localized plume of humid, salt-laden air that is exhausted 10    from Tetra Tech's ClearSky cooling towers. Importantly, the ClearSky towers 11    discharge at lower velocities, at a lower height, and with less thermal buoyancy 12    than the round hybrid towers described in the ENERCON Closed-Loop Cooling 13    Reports. As a result, the ClearSky towers have more concentrated and localized 14    plumes      at  ground    level,  which    increases    salt    deposition and 15    temperature/humidity effects on electrical equipment and components in close 16    proximity to the towers. This creates a number of personnel and station safety-17    related issues, such as electrical arcing, icing during the winter, and fogging due 18    to the cooling tower plume on occasion. Ground level icing and salt deposition 19    poses serious workplace safety, maintenance, and environmental concerns, with 20    the potential to render certain areas of the site treacherous during winter months, 21    as well as creating substantial local vegetation impacts. Fogging that would lead 22    to reduce visibility creates associated security risks at the facility.
8 A:  Yes. Mr. Havey and Mr. Ortiz fail to address the potential site impacts that 9    could result from the localized plume of humid, salt-laden air that is exhausted 10    from Tetra Tech's ClearSky cooling towers. Importantly, the ClearSky towers 11    discharge at lower velocities, at a lower height, and with less thermal buoyancy 12    than the round hybrid towers described in the ENERCON Closed-Loop Cooling 13    Reports. As a result, the ClearSky towers have more concentrated and localized 14    plumes      at  ground    level,  which    increases    salt    deposition and 15    temperature/humidity effects on electrical equipment and components in close 16    proximity to the towers. This creates a number of personnel and station safety-17    related issues, such as electrical arcing, icing during the winter, and fogging due 18    to the cooling tower plume on occasion. Ground level icing and salt deposition 19    poses serious workplace safety, maintenance, and environmental concerns, with 20    the potential to render certain areas of the site treacherous during winter months, 21    as well as creating substantial local vegetation impacts. Fogging that would lead 22    to reduce visibility creates associated security risks at the facility.
1        The risk of icing poses unique operational concerns for ClearSky towers, 2 which use proprietary "ClearSky heat exchangers" that are designed to condense 3 moisture from the cooling tower's exhaust in the form of "high purity water-4 approaching distilled water quality." Entergy Ex. 359 at 10. As SPX noted in its 5 2012 DOE Report, imperfect seals will cause leakage within the ClearSky heat 6 exchanger that will cause icing in the heat exchanger in cold weather.        SPX 7 correctly acknowledged that "[t]his behavior is unacceptable in the commercial 8 market place."    See id. at 19. Although SPX advertises that it has performed 9 laboratory testing on its condensing modules in "all four seasons," tellingly, the 10 test data it selected to include in its 2012 DOE Report only includes results for 11 spring and summer, not the cooler seasons of fall and winter. See id. at 14-15.
1        The risk of icing poses unique operational concerns for ClearSky towers, 2 which use proprietary "ClearSky heat exchangers" that are designed to condense 3 moisture from the cooling tower's exhaust in the form of "high purity water-4 approaching distilled water quality." Entergy Ex. 359 at 10. As SPX noted in its 5 2012 DOE Report, imperfect seals will cause leakage within the ClearSky heat 6 exchanger that will cause icing in the heat exchanger in cold weather.        SPX 7 correctly acknowledged that "[t]his behavior is unacceptable in the commercial 8 market place."    See id. at 19. Although SPX advertises that it has performed 9 laboratory testing on its condensing modules in "all four seasons," tellingly, the 10 test data it selected to include in its 2012 DOE Report only includes results for 11 spring and summer, not the cooler seasons of fall and winter. See id. at 14-15.
12 At this point, it is simply unknown whether SPX's ClearSky heat exchangers are 13 appropriate for the IPEC site conditions.
12 At this point, it is simply unknown whether SPX's ClearSky heat exchangers are 13 appropriate for the IPEC site conditions.
Line 1,527: Line 1,432:
6  A:  Yes. IPEC's security procedures require the site to be fully lighted at night, 7      which would illuminate any visible plume.
6  A:  Yes. IPEC's security procedures require the site to be fully lighted at night, 7      which would illuminate any visible plume.
8  Q: Finally, assuming they can be constructed, did Messrs. Havey and Ortiz 9    account for the inherent concerns with fiberglass towers?
8  Q: Finally, assuming they can be constructed, did Messrs. Havey and Ortiz 9    account for the inherent concerns with fiberglass towers?
10  A:  No. Mr. Havey argues at page 20 of his prefiled testimony that fiberglass towers 11      generally are "structurally sound" and can be reinforced to "meet higher wind 12      load requirements." Havey Direct at p. 20, 1.4-20. There is evidence, however, 13      that raises serious concerns of fiberglass towers' structural integrity. Most 14      notably, in the 2011 Cooling Technology Institute Annual Conference, American 15      Electric Power presented a paper entitled, AEP's Experience with Polyester FRP 16      Structure Cooling Towers, that described significant structural failures with five 17      fiberglass towers constructed with pultruded fiberglass. Of the 15 hyperbolic 18      and 30 mechanical draft cooling towers on the AEP system, the five towers 19      constructed from 2008 through 2010 were AEP's first fiberglass towers. AEP's 20      experience is a cautionary tale insofar as four of the five towers experienced 21      failed or cracked fiberglass columns and surface blisters were noticed in two of 22      the new towers after 2 to 18 months of operation. See Bob Cashner, AEP's 23      Experience with Polyester FRP Structure Cooling Towers, Cooling Tower
10  A:  No. Mr. Havey argues at page 20 of his prefiled testimony that fiberglass towers 11      generally are "structurally sound" and can be reinforced to "meet higher wind 12      load requirements." Havey Direct at p. 20, 1.4-20. There is evidence, however, 13      that raises serious concerns of fiberglass towers' structural integrity. Most 14      notably, in the 2011 Cooling Technology Institute Annual Conference, American 15      Electric Power presented a paper entitled, AEP's Experience with Polyester FRP 16      Structure Cooling Towers, that described significant structural failures with five 17      fiberglass towers constructed with pultruded fiberglass. Of the 15 hyperbolic 18      and 30 mechanical draft cooling towers on the AEP system, the five towers 19      constructed from 2008 through 2010 were AEP's first fiberglass towers. AEP's 20      experience is a cautionary tale insofar as four of the five towers experienced 21      failed or cracked fiberglass columns and surface blisters were noticed in two of 22      the new towers after 2 to 18 months of operation. See Bob Cashner, AEP's 23      Experience with Polyester FRP Structure Cooling Towers, Cooling Tower 1        Institute (Feb. 6-10, 2011), at 2 (Entergy Ex. 358). These failures caused AEP to 2        conduct additional testing of the fiberglass material in 2009. See id. at 11. The 3        testing involved repeated exposure to saturation and then freezing or drying or 4        both. In sum, a total of 83 defects were documented in all sixteen samples 5        representing the four different test conditions. Id.
 
1        Institute (Feb. 6-10, 2011), at 2 (Entergy Ex. 358). These failures caused AEP to 2        conduct additional testing of the fiberglass material in 2009. See id. at 11. The 3        testing involved repeated exposure to saturation and then freezing or drying or 4        both. In sum, a total of 83 defects were documented in all sixteen samples 5        representing the four different test conditions. Id.
6    IV.      REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 7  FEASIBILITY OF RETROFITTING IPEC WITH ROUND HYBRID COOLING 8                                        TOWERS 9 Q:    Turning now to the round hybrid mechanical draft cooling towers described 10      in the ENERCON Closed-Loop Cooling Reports, as a preliminary matter, 11      has Enercon or Entergy proposed the circular hybrid cooling towers 12      described in the ENERCON Closed-Loop Cooling Reports as the best 13      technology available for IPEC under 7 NYCRR § 704.5 and § 316(b) of the 14      Clean Water Act?
6    IV.      REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 7  FEASIBILITY OF RETROFITTING IPEC WITH ROUND HYBRID COOLING 8                                        TOWERS 9 Q:    Turning now to the round hybrid mechanical draft cooling towers described 10      in the ENERCON Closed-Loop Cooling Reports, as a preliminary matter, 11      has Enercon or Entergy proposed the circular hybrid cooling towers 12      described in the ENERCON Closed-Loop Cooling Reports as the best 13      technology available for IPEC under 7 NYCRR § 704.5 and § 316(b) of the 14      Clean Water Act?
15 A:    No. Entergy was required by NYSDEC to evaluate the possible conversion of 16        the existing system to a closed-loop circulation water system configuration. In 17        response to that mandate, Enercon selected a closed-loop configuration utilizing 18        hybrid round towers, which are the only cooling towers that could "reasonably 19        be considered" at IPEC. As I stated in my prefiled testimony dated July 22, 20        2011:
15 A:    No. Entergy was required by NYSDEC to evaluate the possible conversion of 16        the existing system to a closed-loop circulation water system configuration. In 17        response to that mandate, Enercon selected a closed-loop configuration utilizing 18        hybrid round towers, which are the only cooling towers that could "reasonably 19        be considered" at IPEC. As I stated in my prefiled testimony dated July 22, 20        2011:
21                In the Closed-Loop Cooling Report, ENERCON concluded that 22                the absence of a history of closed-cycle cooling retrofits and site-23                specific conditions at Indian Point would challenge the feasibility 24                of such an installation. The several reasons for the conclusion are 25                explained in detail in the Closed-Loop Cooling Report. Briefly,
21                In the Closed-Loop Cooling Report, ENERCON concluded that 22                the absence of a history of closed-cycle cooling retrofits and site-23                specific conditions at Indian Point would challenge the feasibility 24                of such an installation. The several reasons for the conclusion are 25                explained in detail in the Closed-Loop Cooling Report. Briefly, 1        conversion of Indian Point to closed-loop cooling would be an 2        unprecedented    undertaking    that would encounter numerous 3        significant identified siting and construction challenges, some of 4        which may not be successfully surmounted. Such a conversion is 5        unprecedented, because no nuclear stations designed solely for 6        once-through cooling have been converted to closed-loop cooling.
 
1        conversion of Indian Point to closed-loop cooling would be an 2        unprecedented    undertaking    that would encounter numerous 3        significant identified siting and construction challenges, some of 4        which may not be successfully surmounted. Such a conversion is 5        unprecedented, because no nuclear stations designed solely for 6        once-through cooling have been converted to closed-loop cooling.
7        This nuclear experience is critical, because conversion of the 8        condenser    cooling    system    of an existing      plant presents 9        fundamental design problems that result in plant performance 10        impacts or require redesign of the essential plant equipment, e.g.,
7        This nuclear experience is critical, because conversion of the 8        condenser    cooling    system    of an existing      plant presents 9        fundamental design problems that result in plant performance 10        impacts or require redesign of the essential plant equipment, e.g.,
11        the condenser. Moreover, absent any practical history of closed-12        loop cooling retrofits at nuclear facilities, engineering observations 13        and conclusions regarding any such conversion must be made on a 14        purely speculative basis and are inherently subject to unforeseen 15        challenges during the detailed design and the subsequent 16        construction phases.      Only upon successful operation of a 17        completed closed-loop cooling retrofit at a representative number 18        of comparable facilities could this type of conversion be 19        conclusively considered feasible.
11        the condenser. Moreover, absent any practical history of closed-12        loop cooling retrofits at nuclear facilities, engineering observations 13        and conclusions regarding any such conversion must be made on a 14        purely speculative basis and are inherently subject to unforeseen 15        challenges during the detailed design and the subsequent 16        construction phases.      Only upon successful operation of a 17        completed closed-loop cooling retrofit at a representative number 18        of comparable facilities could this type of conversion be 19        conclusively considered feasible.
20 Prefiled Testimony of Sam Beaver in Support of Entergy Nuclear Indian Point 2, 21 LLC, Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations, 22 Inc. at 21:5-22, dated July 22, 2011.
20 Prefiled Testimony of Sam Beaver in Support of Entergy Nuclear Indian Point 2, 21 LLC, Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations, 22 Inc. at 21:5-22, dated July 22, 2011.
1 Q:  Are there any examples of round hybrid towers at nuclear facilities of the 2    size contemplated in the ENERCON Closed-Loop Cooling Reports?
1 Q:  Are there any examples of round hybrid towers at nuclear facilities of the 2    size contemplated in the ENERCON Closed-Loop Cooling Reports?
3  A:  There is only one round hybrid tower of a size that approaches what would be 4      required for each of IPEC Unit 2 and Unit 3, located at the Neckarwestheim 5      nuclear power plant (Unit 2) in Germany. There are, however, several important 6      differences between the Neckarwestheim facility and IPEC. Most significantly, 7      the Neckarwestheim Unit 2 cooling tower was constructed as part of a new 8      facility, not a retrofit of an existing facility. The Neckarwestheim Unit 2 cooling 9      tower is also subject to different environmental and water quality conditions than 10      what would be experienced at IPEC.
3  A:  There is only one round hybrid tower of a size that approaches what would be 4      required for each of IPEC Unit 2 and Unit 3, located at the Neckarwestheim 5      nuclear power plant (Unit 2) in Germany. There are, however, several important 6      differences between the Neckarwestheim facility and IPEC. Most significantly, 7      the Neckarwestheim Unit 2 cooling tower was constructed as part of a new 8      facility, not a retrofit of an existing facility. The Neckarwestheim Unit 2 cooling 9      tower is also subject to different environmental and water quality conditions than 10      what would be experienced at IPEC.
11 Q:  Did Messrs. Ortiz and Havey offer any analysis concerning the feasibility of 12    retrofitting IPEC Units 2 and 3 with round hybrid cooling towers?
11 Q:  Did Messrs. Ortiz and Havey offer any analysis concerning the feasibility of 12    retrofitting IPEC Units 2 and 3 with round hybrid cooling towers?
13 A:  No. While Mr. Havey testifies that the circular hybrid cooling towers described 14      in ENERCON 2003 "could be constructed, installed, and operated at the Indian 15      Point nuclear facilities," Havey Direct at p. 3, 1. 19-21, and that "Enercon's 16      circular hybrid cooling tower proposal was available and generally feasible for 17      the IPEC facilities in order to satisfy the BTA requirements of 6 NYCRR 18      § 704.5," id. at p. 10, 1. 8-10, he offers no additional analysis. Likewise, Mr.
13 A:  No. While Mr. Havey testifies that the circular hybrid cooling towers described 14      in ENERCON 2003 "could be constructed, installed, and operated at the Indian 15      Point nuclear facilities," Havey Direct at p. 3, 1. 19-21, and that "Enercon's 16      circular hybrid cooling tower proposal was available and generally feasible for 17      the IPEC facilities in order to satisfy the BTA requirements of 6 NYCRR 18      § 704.5," id. at p. 10, 1. 8-10, he offers no additional analysis. Likewise, Mr.
19      Ortiz offers no analysis nor justification. Further, Mr. Ortiz's opinion as to the 20      feasibility of retrofitting Units 2 and 3 with round hybrid towers is even less 21      clear. In response to a question as to whether the circular hybrid cooling tower 22      configuration described by Enercon in its 2003 and 2010 is "available and 23      generally feasible," Mr. Ortiz testifies that "[b]ased on the limited scope and
19      Ortiz offers no analysis nor justification. Further, Mr. Ortiz's opinion as to the 20      feasibility of retrofitting Units 2 and 3 with round hybrid towers is even less 21      clear. In response to a question as to whether the circular hybrid cooling tower 22      configuration described by Enercon in its 2003 and 2010 is "available and 23      generally feasible," Mr. Ortiz testifies that "[b]ased on the limited scope and 1    analysis of the study [the round hybrid towers] may be feasible, but a more in 2    depth study would be necessary to obtain afinalconclusion." Ortiz Direct at p.
 
1    analysis of the study [the round hybrid towers] may be feasible, but a more in 2    depth study would be necessary to obtain afinalconclusion." Ortiz Direct at p.
3    5, 1. 1-2 (emphasis added).
3    5, 1. 1-2 (emphasis added).
4 Q: Do you agree with Mr. Havey's opinion that the circular hybrid cooling 5    towers described in the ENERCON Closed-Loop Cooling Reports "could be 6    constructed, installed, and operated at the Indian Point nuclear facilities" 7    and Mr. Ortiz's testimony that such a retrofit "may be feasible"?
4 Q: Do you agree with Mr. Havey's opinion that the circular hybrid cooling 5    towers described in the ENERCON Closed-Loop Cooling Reports "could be 6    constructed, installed, and operated at the Indian Point nuclear facilities" 7    and Mr. Ortiz's testimony that such a retrofit "may be feasible"?
8 A:  No. While retrofitting IPEC Units 2 and 3 may be theoretically possible (and 9    cost over two billion dollars and take over eight years in construction time 10    alone), the ENERCON Closed-Loop Cooling Reports identified numerous 11    significant challenges to the feasibility of retrofitting IPEC Units 2 and 3 with 12    circular hybrid cooling tower. These include, but are not limited to, appreciable 13    elevation changes, a general lack of available space, a subsurface primarily 14    composed of solid rock, the location of a major interstate gas pipeline, local air 15    quality, archeological and aesthetic considerations, etc.      Given the sizeable 16    challenges and level of unknowns, based upon my best professional judgment, I 17    could not in good conscience recommend round hybrid cooling towers for IPEC 18    as a practical or reasonable alternative for compliance with regulatory 19    requirements associated with the Clean Water Act.
8 A:  No. While retrofitting IPEC Units 2 and 3 may be theoretically possible (and 9    cost over two billion dollars and take over eight years in construction time 10    alone), the ENERCON Closed-Loop Cooling Reports identified numerous 11    significant challenges to the feasibility of retrofitting IPEC Units 2 and 3 with 12    circular hybrid cooling tower. These include, but are not limited to, appreciable 13    elevation changes, a general lack of available space, a subsurface primarily 14    composed of solid rock, the location of a major interstate gas pipeline, local air 15    quality, archeological and aesthetic considerations, etc.      Given the sizeable 16    challenges and level of unknowns, based upon my best professional judgment, I 17    could not in good conscience recommend round hybrid cooling towers for IPEC 18    as a practical or reasonable alternative for compliance with regulatory 19    requirements associated with the Clean Water Act.
20            To reach any other conclusion about the feasibility of round hybrid towers, 21    the challenges identified in the ENERCON Closed-Loop Cooling Report would 22    need to be fully addressed. Neither Mr. Havey nor Mr. Ortiz resolved any of the 23    uncertainties described in the ENERCON Closed-Loop Cooling Reports, and as
20            To reach any other conclusion about the feasibility of round hybrid towers, 21    the challenges identified in the ENERCON Closed-Loop Cooling Report would 22    need to be fully addressed. Neither Mr. Havey nor Mr. Ortiz resolved any of the 23    uncertainties described in the ENERCON Closed-Loop Cooling Reports, and as 1    a result, are not in a position to conclude that round hybrid towers are feasible at 2    IPEC.
 
1    a result, are not in a position to conclude that round hybrid towers are feasible at 2    IPEC.
3 Q: Did Tetra Tech or Hatch materially dispute any of the conclusions of the 4    ENERCON Closed-Loop Cooling Reports?
3 Q: Did Tetra Tech or Hatch materially dispute any of the conclusions of the 4    ENERCON Closed-Loop Cooling Reports?
5 A:  No. According to Mr. Ortiz, Hatch's review of the Enercon Closed-Loop 6    Cooling Reports was limited to reviewing the reports by unidentified Hatch 7    employees and providing "comments" to Mr. Havey at Tetra Tech. Hatch's 8    review of ENERCON 2003 was reportedly limited to "challenging certain 9    assumptions on the prevailing winds, soil conditions, some contradictions on the 10    wet bulb temperatures used, and identified minor discrepancies." Ortiz Direct at 11    p. 3, 1. 17-19. Given this context, Mr. Ortiz's testimony that in Hatch's review of 12    ENERCON 2010, "no major issues or deficiencies were identified by Hatch with 13    respect to the technical feasibility of transferring from a once-through cooling 14    system to a closed loop cooling system" is not helpful to me as an engineer. See 15    id. at p. 4, 1. 15-28 (emphasis added). It is further complicated by the fact that 16    Mr. Havey states in his testimony that SAIC, not Hatch, reviewed ENERCON 17    2010. See Havey Direct, at p. 8, 1.20-22. Mr. Ortiz does not even discuss the 18    major issues and challenges identified by Enercon in its report.
5 A:  No. According to Mr. Ortiz, Hatch's review of the Enercon Closed-Loop 6    Cooling Reports was limited to reviewing the reports by unidentified Hatch 7    employees and providing "comments" to Mr. Havey at Tetra Tech. Hatch's 8    review of ENERCON 2003 was reportedly limited to "challenging certain 9    assumptions on the prevailing winds, soil conditions, some contradictions on the 10    wet bulb temperatures used, and identified minor discrepancies." Ortiz Direct at 11    p. 3, 1. 17-19. Given this context, Mr. Ortiz's testimony that in Hatch's review of 12    ENERCON 2010, "no major issues or deficiencies were identified by Hatch with 13    respect to the technical feasibility of transferring from a once-through cooling 14    system to a closed loop cooling system" is not helpful to me as an engineer. See 15    id. at p. 4, 1. 15-28 (emphasis added). It is further complicated by the fact that 16    Mr. Havey states in his testimony that SAIC, not Hatch, reviewed ENERCON 17    2010. See Havey Direct, at p. 8, 1.20-22. Mr. Ortiz does not even discuss the 18    major issues and challenges identified by Enercon in its report.
19            There is nothing in Mr. Ortiz's testimony that shows a basis for any 20    engineering conclusions as to feasibility of round hybrid cooling towers at IPEC.
19            There is nothing in Mr. Ortiz's testimony that shows a basis for any 20    engineering conclusions as to feasibility of round hybrid cooling towers at IPEC.
21    Similarly, Tetra Tech did not dispute and in fact, validated, many of the major 22    conclusions of the ENERCON Closed-Loop Cooling Reports.              For example, 23    Tetra Tech agreed:
21    Similarly, Tetra Tech did not dispute and in fact, validated, many of the major 22    conclusions of the ENERCON Closed-Loop Cooling Reports.              For example, 23    Tetra Tech agreed:
1 1. Enercon's estimate for direct capital costs of $1.19 billion and ongoing 2    operation and maintenance costs of $2.0 to $4.0 million per year per unit were 3    "well within the range of comparable project estimates developed for other 4    nuclear facilities when adjusted for the unique considerations at IPEC (found 5    hybrid towers, transmission pipeline relocation, etc.)." Memorandum from 6    Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris Hogan, NYS 7    Department of Environmental Conservation, dated July 6, 2010 at 3 (Staff Ex.
1 1. Enercon's estimate for direct capital costs of $1.19 billion and ongoing 2    operation and maintenance costs of $2.0 to $4.0 million per year per unit were 3    "well within the range of comparable project estimates developed for other 4    nuclear facilities when adjusted for the unique considerations at IPEC (found 5    hybrid towers, transmission pipeline relocation, etc.)." Memorandum from 6    Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris Hogan, NYS 7    Department of Environmental Conservation, dated July 6, 2010 at 3 (Staff Ex.
8    214, Appendix B).
8    214, Appendix B).
Line 1,571: Line 1,466:
15  A:  Yes. Mr. Nieder suggests that Enercon did not provide enough detail to support 16      its estimate of the capital costs for constructing the proposed array of CWWS. I 17      have submitted as Entergy Exhibit 372 additional details that support Enercon's 18      estimate of capital costs which should address Mr. Nieder's concern.
15  A:  Yes. Mr. Nieder suggests that Enercon did not provide enough detail to support 16      its estimate of the capital costs for constructing the proposed array of CWWS. I 17      have submitted as Entergy Exhibit 372 additional details that support Enercon's 18      estimate of capital costs which should address Mr. Nieder's concern.
19  Q:  Have you had an opportunity to review Mr. Nieder's testimony regarding the 20      O&M costs of operating cylindrical wedgewire screens at IPEC?
19  Q:  Have you had an opportunity to review Mr. Nieder's testimony regarding the 20      O&M costs of operating cylindrical wedgewire screens at IPEC?
21  A:  Yes. Mr. Nieder contends that he was not able to calculate the proportional costs 22      of Entergy's proposed CWWS array because it did not include annual O&M 23      costs of the CWWS array.        He further disputes NERA's conclusion that the 24      O&M costs for CWWS would be insignificant based on other estimates he had
21  A:  Yes. Mr. Nieder contends that he was not able to calculate the proportional costs 22      of Entergy's proposed CWWS array because it did not include annual O&M 23      costs of the CWWS array.        He further disputes NERA's conclusion that the 24      O&M costs for CWWS would be insignificant based on other estimates he had 1    received for CWWS O&M costs from other facilities because the "median O&M 2      costs represented 38 percent of the total costs for constructing and operating 3      CWWSs for 20 years. This percentage level of the overall costs for constructing 4      and operating CWWSs for 20 years is significant." Nieder Direct at p. 17, 1. 8-5      10.
 
1    received for CWWS O&M costs from other facilities because the "median O&M 2      costs represented 38 percent of the total costs for constructing and operating 3      CWWSs for 20 years. This percentage level of the overall costs for constructing 4      and operating CWWSs for 20 years is significant." Nieder Direct at p. 17, 1. 8-5      10.
6  Q: As a preliminary matter, is it appropriate to calculate O&M costs for the 7    CWWS for a 20 year life period?
6  Q: As a preliminary matter, is it appropriate to calculate O&M costs for the 7    CWWS for a 20 year life period?
8  A:  No. CWWS will not be operating for the full twenty years of Entergy's renewed 9      license. Entergy's NRC renewed operating licenses for Unit 2 and Unit 3 would 10      expire in 2033 and 2035, respectively. We have estimated that the design phase 11      of the CWWS project would extend for approximately two years and in-river 12      construction activities would occur over three successive years, with the final tie-13      in occurring in the sixth year. Accordingly, assuming design and construction 14      begin after these proceedings and any associated court proceedings end, which I 15      understand NERA assumed would be 2018, construction would not be complete, 16      and therefore Entergy would not be incurring O&M costs for each Unit, until 17      roughly 2024. As a result, O&M costs would only be incurred for 9-11 years 18      until the operating license respectively expire, or an average of 10 years per unit.
8  A:  No. CWWS will not be operating for the full twenty years of Entergy's renewed 9      license. Entergy's NRC renewed operating licenses for Unit 2 and Unit 3 would 10      expire in 2033 and 2035, respectively. We have estimated that the design phase 11      of the CWWS project would extend for approximately two years and in-river 12      construction activities would occur over three successive years, with the final tie-13      in occurring in the sixth year. Accordingly, assuming design and construction 14      begin after these proceedings and any associated court proceedings end, which I 15      understand NERA assumed would be 2018, construction would not be complete, 16      and therefore Entergy would not be incurring O&M costs for each Unit, until 17      roughly 2024. As a result, O&M costs would only be incurred for 9-11 years 18      until the operating license respectively expire, or an average of 10 years per unit.
19      That is only half the period assumed by Mr. Nieder.
19      That is only half the period assumed by Mr. Nieder.
20  Q: Do you agree with Mr. Nieder's estimate that potential O&M costs for 21    CWWS would render the overall costs significant?
20  Q: Do you agree with Mr. Nieder's estimate that potential O&M costs for 21    CWWS would render the overall costs significant?
22  A: No. As Mr. Nieder acknowledges, the principal O&M cost associated with any 23      CWWS proposal is the cost associated with cleaning the screens. Entergy has
22  A: No. As Mr. Nieder acknowledges, the principal O&M cost associated with any 23      CWWS proposal is the cost associated with cleaning the screens. Entergy has 1    specifically made design choices to minimize the risk of fouling and therefore 2      reduce the need for cleanings, including constructing the screens out of Johnson 3      Screen's Z-Alloy, which has been demonstrated to resist biofouling in the 4      Hudson River, and selecting a conservative through-slot velocity of 0.25 feet per 5      second. In addition to these design choices, during the summer months when the 6      potential for fouling is at its highest and when the biological need is the greatest, 7      Entergy can use divers to regularly-and even continually---clean the screens.
 
1    specifically made design choices to minimize the risk of fouling and therefore 2      reduce the need for cleanings, including constructing the screens out of Johnson 3      Screen's Z-Alloy, which has been demonstrated to resist biofouling in the 4      Hudson River, and selecting a conservative through-slot velocity of 0.25 feet per 5      second. In addition to these design choices, during the summer months when the 6      potential for fouling is at its highest and when the biological need is the greatest, 7      Entergy can use divers to regularly-and even continually---clean the screens.
8      From Entergy's past experience with cleaning the Ristroph screens, the average 9      cost for a dive team at IPEC is $7,000 per day. There is no reason to conclude 10      that the per day cost of dive teams would be any different for CWWS than the 11      current intake structure. For the rest of the year (i.e., fall through spring), when 12      the risk of fouling is considerably lower, monitoring in the intake bays would 13      alert the operators of any potential fouling issues with the screens, and divers can 14      be deployed on an "as needed" basis.
8      From Entergy's past experience with cleaning the Ristroph screens, the average 9      cost for a dive team at IPEC is $7,000 per day. There is no reason to conclude 10      that the per day cost of dive teams would be any different for CWWS than the 11      current intake structure. For the rest of the year (i.e., fall through spring), when 12      the risk of fouling is considerably lower, monitoring in the intake bays would 13      alert the operators of any potential fouling issues with the screens, and divers can 14      be deployed on an "as needed" basis.
15                                VI.      CONCLUSION 16  Q: Has anything that you have read in the testimonies of Messrs. Havey, Ortiz, 17    and Nieder or in the documentary exhibits attached to their testimony 18    affected the opinions you previously testified to in your February 28, 2014 19    prefiled testimony?
15                                VI.      CONCLUSION 16  Q: Has anything that you have read in the testimonies of Messrs. Havey, Ortiz, 17    and Nieder or in the documentary exhibits attached to their testimony 18    affected the opinions you previously testified to in your February 28, 2014 19    prefiled testimony?
20  A:  No. For the reasons detailed above, nothing that I have reviewed alters my 21      bottom-line conclusion that the given the numerous and significant site-specific 22      challenges    associated with retrofitting    IPEC    with closed-cycle    cooling 23      documented by Enercon, the considerable uncertainty inherent in such a retrofit 24      project, and the detrimental impact that a closed-cycle cooling retrofit would
20  A:  No. For the reasons detailed above, nothing that I have reviewed alters my 21      bottom-line conclusion that the given the numerous and significant site-specific 22      challenges    associated with retrofitting    IPEC    with closed-cycle    cooling 23      documented by Enercon, the considerable uncertainty inherent in such a retrofit 24      project, and the detrimental impact that a closed-cycle cooling retrofit would 1 have on the facility's ability to generate electricity, NYSDEC Staff has failed to 2 demonstrate that cooling towers are feasible at IPEC.
 
END OF TESTIMONY STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and        DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC            SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,          DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                          3-5522-00105/00031 (IP3)
1 have on the facility's ability to generate electricity, NYSDEC Staff has failed to 2 demonstrate that cooling towers are feasible at IPEC.
END OF TESTIMONY
 
STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and        DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC            SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,          DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                          3-5522-00105/00031 (IP3)
Joint Application for CWA § 401 Water Quality Certification PREFILED REBUTTAL TESTIMONY OF SAM BEAVER IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
Joint Application for CWA § 401 Water Quality Certification PREFILED REBUTTAL TESTIMONY OF SAM BEAVER IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POIN T 3, LLC, AND ENTERGY NUCLEAR OPERATIONS, INC.
CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POIN T 3, LLC, AND ENTERGY NUCLEAR OPERATIONS, INC.
Line 1,600: Line 1,487:
14 A:  Yes.
14 A:  Yes.
15 Q: Please state the purpose of your prefiled rebuttal testimony.
15 Q: Please state the purpose of your prefiled rebuttal testimony.
16 A:  The purpose of my prefiled rebuttal testimony is to address certain portions of 17    the prefiled direct testimony of Eduardo Ortiz (Hatch) ("Ortiz Direct"), Tim 18    Havey (Tetra Tech) ("Havey Direct"), and William Charles Nieder (NYSDEC 19    Staff) ("Nieder Direct"). Specifically, my rebuttal testimony responds to the 20    prefiled direct testimony of Mr. Ortiz and Mr. Havey that relates to the 21    engineering feasibility of retrofitting either or both Indian Point Energy Center, 22    Unit 2 and Unit 3 (collectively, "IPEC"), with eighty-eight (88) back-to-back 23    ClearSky cooling towers, forty-four (44) cells at each of Unit 2 and Unit 3, as 24    described in the report prepared by Tetra Tech entitled Indian Point Closed-
16 A:  The purpose of my prefiled rebuttal testimony is to address certain portions of 17    the prefiled direct testimony of Eduardo Ortiz (Hatch) ("Ortiz Direct"), Tim 18    Havey (Tetra Tech) ("Havey Direct"), and William Charles Nieder (NYSDEC 19    Staff) ("Nieder Direct"). Specifically, my rebuttal testimony responds to the 20    prefiled direct testimony of Mr. Ortiz and Mr. Havey that relates to the 21    engineering feasibility of retrofitting either or both Indian Point Energy Center, 22    Unit 2 and Unit 3 (collectively, "IPEC"), with eighty-eight (88) back-to-back 23    ClearSky cooling towers, forty-four (44) cells at each of Unit 2 and Unit 3, as 24    described in the report prepared by Tetra Tech entitled Indian Point Closed-I    Cycle Cooling System Retrofit Evaluation, dated June 2013 (the "Tetra Tech 2    CCC Report"); and two (2) round hybrid cooling towers, one at Unit 2 and Unit 3    3 respectively, as described in the initial report prepared by Enercon entitled, 4    Economic and Environmental Impacts Associated with Conversion of Indian 5    Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 6    dated June 2003 (Entergy Ex. 7A) ("ENERCON 2003") and as more intensively 7    reviewed in the report entitled EngineeringFeasibility and Costs of Conversion 8    of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water 9    Configuration, dated February 12, 2010 (Entergy Ex. 7) ("ENERCON 2010";
 
I    Cycle Cooling System Retrofit Evaluation, dated June 2013 (the "Tetra Tech 2    CCC Report"); and two (2) round hybrid cooling towers, one at Unit 2 and Unit 3    3 respectively, as described in the initial report prepared by Enercon entitled, 4    Economic and Environmental Impacts Associated with Conversion of Indian 5    Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 6    dated June 2003 (Entergy Ex. 7A) ("ENERCON 2003") and as more intensively 7    reviewed in the report entitled EngineeringFeasibility and Costs of Conversion 8    of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water 9    Configuration, dated February 12, 2010 (Entergy Ex. 7) ("ENERCON 2010";
10    collectively, the "ENERCON Closed-Loop Cooling Reports").              My rebuttal II    testimony also responds to the portion of Mr. Nieder's testimony that discusses 12    the expected operational and maintenance          ("O&M") costs of Entergy's 13    cylindrical wedgewire screen ("CWWS") proposal. I have reviewed the prefiled 14    direct testimony of each of these individuals, as well as the identified materials 15    on which each of these individuals relies (to the extent it was provided).
10    collectively, the "ENERCON Closed-Loop Cooling Reports").              My rebuttal II    testimony also responds to the portion of Mr. Nieder's testimony that discusses 12    the expected operational and maintenance          ("O&M") costs of Entergy's 13    cylindrical wedgewire screen ("CWWS") proposal. I have reviewed the prefiled 14    direct testimony of each of these individuals, as well as the identified materials 15    on which each of these individuals relies (to the extent it was provided).
16 Q: How is your rebuttal testimony organized?
16 Q: How is your rebuttal testimony organized?
17 A: First, I provide some general background and context about how engineers 18    address feasibility questions at nuclear power plants, and how this context relates 19    to my conclusions regarding the inherent challenges to the feasibility of 20    retrofitting Unit 2 and Unit 3 with a closed-cycle cooling system during the 21    license renewal period. Second, I address specific statements in Messrs. Ortiz 22    and Havey's testimony concerning the feasibility of Tetra Tech's ClearSky 23    cooling tower configuration, with a focus on misimpressions and errors in that
17 A: First, I provide some general background and context about how engineers 18    address feasibility questions at nuclear power plants, and how this context relates 19    to my conclusions regarding the inherent challenges to the feasibility of 20    retrofitting Unit 2 and Unit 3 with a closed-cycle cooling system during the 21    license renewal period. Second, I address specific statements in Messrs. Ortiz 22    and Havey's testimony concerning the feasibility of Tetra Tech's ClearSky 23    cooling tower configuration, with a focus on misimpressions and errors in that 1        testimony and therefore their respective conclusions. Third, I address Messrs.
 
1        testimony and therefore their respective conclusions. Third, I address Messrs.
2        Ortiz and Havey's testimony as it relates to the feasibility of retrofitting IPEC 3        with round hybrid cooling towers, with the same focus. Finally, I respond to Mr.
2        Ortiz and Havey's testimony as it relates to the feasibility of retrofitting IPEC 3        with round hybrid cooling towers, with the same focus. Finally, I respond to Mr.
4        Nieder's argument that O&M costs for Entergy's proposed array of CWWS are 5        likely to be significant.
4        Nieder's argument that O&M costs for Entergy's proposed array of CWWS are 5        likely to be significant.
6  II. BACKGROUND AND CONTEXT FOR RETROFITTING IPEC WITH 7                              CLOSED-CYCLE COOLING 8 Q:    Please describe what engineering feasibility means in the context of 9      retrofitting a nuclear power plant with a new cooling water system?
6  II. BACKGROUND AND CONTEXT FOR RETROFITTING IPEC WITH 7                              CLOSED-CYCLE COOLING 8 Q:    Please describe what engineering feasibility means in the context of 9      retrofitting a nuclear power plant with a new cooling water system?
10  A:    The "feasibility" of retrofitting power plants with a new cooling water system 11        depends on two related considerations. First, the technology that is chosen for 12        the retrofit must be available. As I testified in October 2011, "availability" 13        means that technology is used in the industry for which it is intended on a regular 14        basis, with an adequate design, construction and operational history to allow an 15        engineering assessment with a reasonable level of confidence.          The second 16        consideration is whether an otherwise "available" technology can be installed 17        and operated at a particular site, based on the relevant considerations at that site, 18        with a reasonable level of engineering certainty.
10  A:    The "feasibility" of retrofitting power plants with a new cooling water system 11        depends on two related considerations. First, the technology that is chosen for 12        the retrofit must be available. As I testified in October 2011, "availability" 13        means that technology is used in the industry for which it is intended on a regular 14        basis, with an adequate design, construction and operational history to allow an 15        engineering assessment with a reasonable level of confidence.          The second 16        consideration is whether an otherwise "available" technology can be installed 17        and operated at a particular site, based on the relevant considerations at that site, 18        with a reasonable level of engineering certainty.
19                The need for a reasonable level of engineering certainty is particularly 20        acute in the nuclear industry for two reasons. First, nuclear powered electric 21        generating power plants-as baseload suppliers-are designed to operate (to 22        produce power in the form of electricity) on a consistent, reliable basis. Second, 23        the regulatory structure for nuclear power plants and the safety consciousness of 24        nuclear engineers and operators place a high priority on consistent operations in
19                The need for a reasonable level of engineering certainty is particularly 20        acute in the nuclear industry for two reasons. First, nuclear powered electric 21        generating power plants-as baseload suppliers-are designed to operate (to 22        produce power in the form of electricity) on a consistent, reliable basis. Second, 23        the regulatory structure for nuclear power plants and the safety consciousness of 24        nuclear engineers and operators place a high priority on consistent operations in 1 accordance with design parameters. Excursions (that is, atypical operations),
 
1 accordance with design parameters. Excursions (that is, atypical operations),
2 including conditions that may increase the likelihood of excursions, are strongly 3 disfavored by NRC and plant personnel alike. This has two direct implications 4 for the major retrofit proposed by NYSDEC Staff for IPEC: (1) relevant, 5 demonstrated operational experience in a comparable dynamic is typically 6 necessary for a technology to be installed, particularly major equipment essential 7 for plant operation; and (2) actual retrofitting history is preferred before reaching 8 an "engineering feasibility" conclusion.      At nuclear power plants, novel and 9 unproven technologies are generally not considered available.
2 including conditions that may increase the likelihood of excursions, are strongly 3 disfavored by NRC and plant personnel alike. This has two direct implications 4 for the major retrofit proposed by NYSDEC Staff for IPEC: (1) relevant, 5 demonstrated operational experience in a comparable dynamic is typically 6 necessary for a technology to be installed, particularly major equipment essential 7 for plant operation; and (2) actual retrofitting history is preferred before reaching 8 an "engineering feasibility" conclusion.      At nuclear power plants, novel and 9 unproven technologies are generally not considered available.
10        As it is relevant to this phase of the Proceedings, to reach a conclusion 11 about the engineering feasibility of retrofitting IPEC with closed-cycle cooling, 12 an engineer with nuclear design and operational experience would have to 13 conclude that it is likely that the retrofit can be completed and function without 14 major adverse impacts within the remaining plant operational period (that is, the 15 twenty-year license renewal period). If, for instance, it is reasonably foreseeable 16 that construction will not be completed in a timeframe to allow operation of the 17 equipment for a substantial period of time before the end (respectively, in 2033 18 and 2035) of the license renewal period; that construction will result in unit shut-19 downs of substantial duration; that operation will result in measurable and 20 significant power losses; or that there is a heightened risk of incidence of 21 excursions, then an experienced nuclear engineer would not consider the closed-22 cycle cooling retrofit to be a practically feasible.
10        As it is relevant to this phase of the Proceedings, to reach a conclusion 11 about the engineering feasibility of retrofitting IPEC with closed-cycle cooling, 12 an engineer with nuclear design and operational experience would have to 13 conclude that it is likely that the retrofit can be completed and function without 14 major adverse impacts within the remaining plant operational period (that is, the 15 twenty-year license renewal period). If, for instance, it is reasonably foreseeable 16 that construction will not be completed in a timeframe to allow operation of the 17 equipment for a substantial period of time before the end (respectively, in 2033 18 and 2035) of the license renewal period; that construction will result in unit shut-19 downs of substantial duration; that operation will result in measurable and 20 significant power losses; or that there is a heightened risk of incidence of 21 excursions, then an experienced nuclear engineer would not consider the closed-22 cycle cooling retrofit to be a practically feasible.
1 Q: To understand the implications of an engineering feasibility determination 2    for retrofitting IPEC with cooling towers, is it helpful to understand the 3    physical constraints of the IPEC site?
1 Q: To understand the implications of an engineering feasibility determination 2    for retrofitting IPEC with cooling towers, is it helpful to understand the 3    physical constraints of the IPEC site?
4 A:  Yes. Background information is essential to understanding how disruptive and 5    intrusive it would be to retrofit the existing IPEC stations.
4 A:  Yes. Background information is essential to understanding how disruptive and 5    intrusive it would be to retrofit the existing IPEC stations.
6            Both IPEC Units sit on a combined 239 acres, which represents one of the 7    most site-constrained nuclear power plants that I have worked on in my over 8    thirty years of experience. The site topography is challenging, spanning an 9    elevation from the River up to approximately 150 feet.        As a result of the 10    topography challenges and the substantial subsurface rock shelf that rises 11    beneath and behind the Stations, within the 239 acre site only 128 acres is readily 12    usable for major structures, and that area already has been developed. Further, 13    all major structures and equipment representing the main power block are 14    contained in a central area of approximately 25 acres located along the 15    Riverfront. Because the two operating unit and one shut down unit share the 16    Riverfront area and given the number of plant systems located in this area, there 17    is a very high density of equipment and structures in this defined area - in fact, 18    the density is visible to even the casual observer. Entergy Ex. 351 is a recent 19    aerial photograph of the IPEC site. The Unit 2 and Unit 3 containment buildings 20    are the two tallest domed structures, with their respective power house unit 21    immediately in front of (closest to the River) the containment buildings. Unit 1 22    is the shorter domed-building between Unit 2 and Unit 3. What is not visible, 23    but is as important, is the substantial underground network of major piping,
6            Both IPEC Units sit on a combined 239 acres, which represents one of the 7    most site-constrained nuclear power plants that I have worked on in my over 8    thirty years of experience. The site topography is challenging, spanning an 9    elevation from the River up to approximately 150 feet.        As a result of the 10    topography challenges and the substantial subsurface rock shelf that rises 11    beneath and behind the Stations, within the 239 acre site only 128 acres is readily 12    usable for major structures, and that area already has been developed. Further, 13    all major structures and equipment representing the main power block are 14    contained in a central area of approximately 25 acres located along the 15    Riverfront. Because the two operating unit and one shut down unit share the 16    Riverfront area and given the number of plant systems located in this area, there 17    is a very high density of equipment and structures in this defined area - in fact, 18    the density is visible to even the casual observer. Entergy Ex. 351 is a recent 19    aerial photograph of the IPEC site. The Unit 2 and Unit 3 containment buildings 20    are the two tallest domed structures, with their respective power house unit 21    immediately in front of (closest to the River) the containment buildings. Unit 1 22    is the shorter domed-building between Unit 2 and Unit 3. What is not visible, 23    but is as important, is the substantial underground network of major piping, 1 ranging up to 8-feet in diameter, as well as numerous cabling duct banks and 2 conduits, that runs throughout the Riverfront area. What this means is that the 3 addition at IPEC of any new large-scale structures, particularly those involving 4 the addition of new underground piping, is a challenge from the outset. As a 5 result, any comparisons to "greenfield" design and construction projects for 6 similar components (i.e., usage of cooling towers for new nuclear units currently 7 under construction) would be inappropriate and misleading from an engineering 8 perspective.
 
1 ranging up to 8-feet in diameter, as well as numerous cabling duct banks and 2 conduits, that runs throughout the Riverfront area. What this means is that the 3 addition at IPEC of any new large-scale structures, particularly those involving 4 the addition of new underground piping, is a challenge from the outset. As a 5 result, any comparisons to "greenfield" design and construction projects for 6 similar components (i.e., usage of cooling towers for new nuclear units currently 7 under construction) would be inappropriate and misleading from an engineering 8 perspective.
9        In fact, even Tetra Tech has recognized the "important role" the size of the 10 property plays in determining whether a retrofit to cooling towers is feasible.
9        In fact, even Tetra Tech has recognized the "important role" the size of the 10 property plays in determining whether a retrofit to cooling towers is feasible.
11 See Memorandum from Kelly Meadows, Tetra Tech to Paul Shriner, EPA, dated 12 Feb. 28, 2011, at 1 (Entergy Ex. 356). In a memorandum from Tetra Tech to 13 EPA, dated February 28, 2011, Tetra Tech documented the approximately 73 14 sites visited by EPA in 2011 as part of the proposed § 316(b) rulemaking. Tetra 15 Tech noted that facilities that have a ratio of 160 acres per 1,000 MWs "should 16 have ample space to construct retrofit cooling towers."          Id. at 1-2. Here, 17 assuming all of IPEC's 239 acres is available for a retrofit, IPEC's "ratio" is 110 18 acres per 1000 MW, which by EPA's and Tetra Tech's own definition would 19 make it among the most space-constrained site visited by in the Tetra Tech 20 review. As stated above, only 128 acres of the IPEC site is readily useable for 21 major structures, making the site even more constrained in Tetra Tech's terms 22 further lowering the sites effective acreage. See id. at 3 (discussing the "effective 23 acreage" of the McDonough Power Plant).
11 See Memorandum from Kelly Meadows, Tetra Tech to Paul Shriner, EPA, dated 12 Feb. 28, 2011, at 1 (Entergy Ex. 356). In a memorandum from Tetra Tech to 13 EPA, dated February 28, 2011, Tetra Tech documented the approximately 73 14 sites visited by EPA in 2011 as part of the proposed § 316(b) rulemaking. Tetra 15 Tech noted that facilities that have a ratio of 160 acres per 1,000 MWs "should 16 have ample space to construct retrofit cooling towers."          Id. at 1-2. Here, 17 assuming all of IPEC's 239 acres is available for a retrofit, IPEC's "ratio" is 110 18 acres per 1000 MW, which by EPA's and Tetra Tech's own definition would 19 make it among the most space-constrained site visited by in the Tetra Tech 20 review. As stated above, only 128 acres of the IPEC site is readily useable for 21 major structures, making the site even more constrained in Tetra Tech's terms 22 further lowering the sites effective acreage. See id. at 3 (discussing the "effective 23 acreage" of the McDonough Power Plant).
1 Q:  Is there any additional background information that informs your analysis of 2      the feasibility of retrofitting IPEC with closed-cycle cooling?
1 Q:  Is there any additional background information that informs your analysis of 2      the feasibility of retrofitting IPEC with closed-cycle cooling?
3  A:  Yes. It is also essential to consider the way nuclear units, such as [PEC, are 4      designed and operated. Nuclear power plants, like IPEC, generate electricity 5      through the use of two major categories of systems which convert heat generated 6      in the reactor core into electrical power for commercial use: (1) a closed, 7      pressurized "Reactor Coolant System" (primary systems), (2) and a "Steam and 8      Power Conversion System" (secondary systems). Figure 1.1 in Entergy Exhibit 9      7 (pg. 2) depicts the basic configuration of IPEC-type pressurized water reactors.
3  A:  Yes. It is also essential to consider the way nuclear units, such as [PEC, are 4      designed and operated. Nuclear power plants, like IPEC, generate electricity 5      through the use of two major categories of systems which convert heat generated 6      in the reactor core into electrical power for commercial use: (1) a closed, 7      pressurized "Reactor Coolant System" (primary systems), (2) and a "Steam and 8      Power Conversion System" (secondary systems). Figure 1.1 in Entergy Exhibit 9      7 (pg. 2) depicts the basic configuration of IPEC-type pressurized water reactors.
Line 1,631: Line 1,508:
11      The thermal energy generated in the reactor core is then transferred to steam 12      generators where steam is generated in the secondary system and utilized to drive 13      the turbine generator, where it is converted into electricity. The primary and 14      secondary systems are physically separated in the steam generator, minimizing 15      radioisotope transfer to the secondary system.
11      The thermal energy generated in the reactor core is then transferred to steam 12      generators where steam is generated in the secondary system and utilized to drive 13      the turbine generator, where it is converted into electricity. The primary and 14      secondary systems are physically separated in the steam generator, minimizing 15      radioisotope transfer to the secondary system.
16              At IPEC, each unit has a multistage turbine comprised of one high-17      pressure turbine and three low-pressure turbines. After passing through the 18      turbines, the steam passes to the main condenser to allow it to be cooled and 19      condensed back into feedwater that can be pumped back through the steam-20      generators in what is effectively a closed loop system.
16              At IPEC, each unit has a multistage turbine comprised of one high-17      pressure turbine and three low-pressure turbines. After passing through the 18      turbines, the steam passes to the main condenser to allow it to be cooled and 19      condensed back into feedwater that can be pumped back through the steam-20      generators in what is effectively a closed loop system.
21              Importantly, the Unit 2 and Unit 3 main condensers are operated in a 22      vacuum in order to optimize plant performance by facilitating the flow of steam 23      through the low-pressure turbines. Even a slight increase in pressure in the
21              Importantly, the Unit 2 and Unit 3 main condensers are operated in a 22      vacuum in order to optimize plant performance by facilitating the flow of steam 23      through the low-pressure turbines. Even a slight increase in pressure in the 1    condensers, referred to as condenser "backpressure," can have an appreciable 2      impact on the efficiency of the plant and, in some instances, lead to excursions or 3      forced plant shutdowns.
 
1    condensers, referred to as condenser "backpressure," can have an appreciable 2      impact on the efficiency of the plant and, in some instances, lead to excursions or 3      forced plant shutdowns.
4  Q: How do the Unit 2 and Unit 3 condensers convert the steam exhaust back 5    into feedwater?
4  Q: How do the Unit 2 and Unit 3 condensers convert the steam exhaust back 5    into feedwater?
6  A:  The purpose of the main condenser is to absorb heat contained in the expanded 7      exhaust steam after exiting the low pressure turbines. Cold circulating water 8      flows through the condenser tubes to condense the steam back into water. Unit 2 9      and Unit 3 were designed and constructed with a once-through circulating water 10      system, and reflect a highly specialized design analysis, a "heat balance" that 11      accounted for the qualities of the existing cooling water source, here the Hudson 12      River, to accommodate the heat rejection of the main steam system for each 13      Unit. In other words, the turbines and condenser design rely on the low-14      temperature of the River water, as does efficient performance of the plant. The 15      design rate for each Unit's circulating water system is 840,000 gallons per 16      minute ("gpm"). For obvious reasons, the IPEC condenser cooling systems are 17      essential plant equipment. As I stated in my previous prefiled testimony, dated 18      July 22, 2011, which I fully incorporate by reference here, and by way of 19      analogy, if the reactor is the heart of IPEC, then the cooling system is its lungs-20      providing the necessary cooling for the system to function properly.
6  A:  The purpose of the main condenser is to absorb heat contained in the expanded 7      exhaust steam after exiting the low pressure turbines. Cold circulating water 8      flows through the condenser tubes to condense the steam back into water. Unit 2 9      and Unit 3 were designed and constructed with a once-through circulating water 10      system, and reflect a highly specialized design analysis, a "heat balance" that 11      accounted for the qualities of the existing cooling water source, here the Hudson 12      River, to accommodate the heat rejection of the main steam system for each 13      Unit. In other words, the turbines and condenser design rely on the low-14      temperature of the River water, as does efficient performance of the plant. The 15      design rate for each Unit's circulating water system is 840,000 gallons per 16      minute ("gpm"). For obvious reasons, the IPEC condenser cooling systems are 17      essential plant equipment. As I stated in my previous prefiled testimony, dated 18      July 22, 2011, which I fully incorporate by reference here, and by way of 19      analogy, if the reactor is the heart of IPEC, then the cooling system is its lungs-20      providing the necessary cooling for the system to function properly.
21              Given that IPEC's condensers and turbines were specifically designed and 22      constructed as a once-through cooling system utilizing cold River water, any 23      retrofit of IPEC to a closed-loop cooling system that results in higher circulating
21              Given that IPEC's condensers and turbines were specifically designed and 22      constructed as a once-through cooling system utilizing cold River water, any 23      retrofit of IPEC to a closed-loop cooling system that results in higher circulating 1    water temperatures and/or lower flows will result in inherent impacts to the 2    plant. Here, it is unavoidable that a shift to closed-cycle cooling will result in 3    higher circulating water temperatures and lower flows that challenge plant 4    performance and operations.      For this reason, any proposal for closed-cycle 5    cooling must rely on the requisite heat balance analysis to demonstrate that 6    performance and operational impacts are known, manageable and not too 7    significant. The twin dynamic of higher circulating water temperature and lower 8    flows (as discussed below) represents a particular challenge to Station 9    performance and functionality.
 
1    water temperatures and/or lower flows will result in inherent impacts to the 2    plant. Here, it is unavoidable that a shift to closed-cycle cooling will result in 3    higher circulating water temperatures and lower flows that challenge plant 4    performance and operations.      For this reason, any proposal for closed-cycle 5    cooling must rely on the requisite heat balance analysis to demonstrate that 6    performance and operational impacts are known, manageable and not too 7    significant. The twin dynamic of higher circulating water temperature and lower 8    flows (as discussed below) represents a particular challenge to Station 9    performance and functionality.
10 Q: What are the inherent impacts with retrofitting IPEC to a closed-cycle 11    cooling system?
10 Q: What are the inherent impacts with retrofitting IPEC to a closed-cycle 11    cooling system?
12 A:  Retrofitting a nuclear plant constructed in the 1970s with a once-through cooling 13    system to a closed-cycle cooling system will impact virtually every aspect of 14    IPEC's circulating water system.        First, less water will be available to run 15    through the condensers. The design of both the ClearSky and round hybrid 16    towers decrease the maximum available circulating water from 840,000 gpm to 17    700,000 gpm-a 16.7% reduction. Second, the temperature of the circulating 18    water entering the condensers to cool the steam will be higher at the most critical 19    times, namely during the summer when cooling need is the greatest.            The 20    reduction in water and increase in circulating water inlet temperatures increase 21    condenser back pressure of both Unit 2 and Unit 3. See Entergy Ex. 7A at 20 22    (Figure 3.2 and 3.3). Third, the water pressure in the condenser tubing will be 23    measurably higher in a closed-cycle cooling configuration as compared to the
12 A:  Retrofitting a nuclear plant constructed in the 1970s with a once-through cooling 13    system to a closed-cycle cooling system will impact virtually every aspect of 14    IPEC's circulating water system.        First, less water will be available to run 15    through the condensers. The design of both the ClearSky and round hybrid 16    towers decrease the maximum available circulating water from 840,000 gpm to 17    700,000 gpm-a 16.7% reduction. Second, the temperature of the circulating 18    water entering the condensers to cool the steam will be higher at the most critical 19    times, namely during the summer when cooling need is the greatest.            The 20    reduction in water and increase in circulating water inlet temperatures increase 21    condenser back pressure of both Unit 2 and Unit 3. See Entergy Ex. 7A at 20 22    (Figure 3.2 and 3.3). Third, the water pressure in the condenser tubing will be 23    measurably higher in a closed-cycle cooling configuration as compared to the 1    existing once-through cooling system. This is a particular concern with the Tetra 2    Tech proposal which, while within the technical design limits for the condenser, 3    calls for the circulating water to be at a materially higher pressure than the 4    Stations have ever operated under, which introduces additional uncertainty in 5    plant operations and equipment service life.
 
1    existing once-through cooling system. This is a particular concern with the Tetra 2    Tech proposal which, while within the technical design limits for the condenser, 3    calls for the circulating water to be at a materially higher pressure than the 4    Stations have ever operated under, which introduces additional uncertainty in 5    plant operations and equipment service life.
6            Finally, closed-cycle cooling creates significant and costly parasitic losses 7    that further affect the ability of the plant to generate power efficiently. These 8    losses are attributable to the extra energy required to pump the circulating water 9    to the elevated cooling towers and operate the fans in the cooling towers 10    themselves.
6            Finally, closed-cycle cooling creates significant and costly parasitic losses 7    that further affect the ability of the plant to generate power efficiently. These 8    losses are attributable to the extra energy required to pump the circulating water 9    to the elevated cooling towers and operate the fans in the cooling towers 10    themselves.
11 Q: Please briefly summarize what would be required in order to retrofit IPEC 12    with closed-cycle cooling.
11 Q: Please briefly summarize what would be required in order to retrofit IPEC 12    with closed-cycle cooling.
13 A:  In addition to the construction of the cooling towers themselves and the 14    extensive piping that would be needed to supply and return circulating water to 15    and from those towers, retrofitting IPEC to closed-cycle cooling will require 16    reconfiguring the current circulating water system to hold the considerable 17    volume of water necessary to ensure reliable operation of the cooling towers. In 18    the current once-through configuration, after the circulating water passes through 19    the condensers, it is discharged into a canal that runs along the shoreline in front 20    of the Unit 2 and Unit 3 power houses, eventually joining the River on south end 21    of the facility. The discharge canal extends from the Unit 2 power house, where 22    circulating water from the Unit 2 condenser and Unit 2 service water is 23    discharged. The Unit 2 discharged water flows past Unit 3 where the Unit 3
13 A:  In addition to the construction of the cooling towers themselves and the 14    extensive piping that would be needed to supply and return circulating water to 15    and from those towers, retrofitting IPEC to closed-cycle cooling will require 16    reconfiguring the current circulating water system to hold the considerable 17    volume of water necessary to ensure reliable operation of the cooling towers. In 18    the current once-through configuration, after the circulating water passes through 19    the condensers, it is discharged into a canal that runs along the shoreline in front 20    of the Unit 2 and Unit 3 power houses, eventually joining the River on south end 21    of the facility. The discharge canal extends from the Unit 2 power house, where 22    circulating water from the Unit 2 condenser and Unit 2 service water is 23    discharged. The Unit 2 discharged water flows past Unit 3 where the Unit 3 1  service and circulating water is discharged, and the combined flow is returned to 2    the River.
 
1  service and circulating water is discharged, and the combined flow is returned to 2    the River.
3          In order to retrofit IPEC to a closed-cycle cooling configuration and to 4  hold sufficient water to meet the Unit's combined flow rate of 1.4 million gpm 5  (assuming 700,000 gpm per Unit) of circulating water, the existing discharge 6  canal must be converted into a hot water reservoir that can hold approximately 7  10.7 million gallons of water. See Entergy Ex. 7 at 12. After modification, the 8  Unit 2 and Unit 3 reservoirs would hold over 4.2 million and 6.5 million gallons 9  of circulating water, respectively. Id. The makeup water source for the hot water 10  reservoir is the service water discharge, with Unit 2's service water discharged 11  into the Unit 2 reservoir, and Unit 3's service water discharged into the Unit 3 12  reservoir. New circulating water pumps would be installed in each reservoir that 13  would pump the hot water from each reservoir to its respective cooling tower. To 14  accommodate the additional capacity and to meet the new circulating pump 15  submergence requirements, the current discharge canal in front of Units 2 and 3 16  will need to be excavated. The excavation and construction of the new reservoirs 17  requires a 42 week concurrent construction outage for both IPEC units. As Tetra 18  Tech acknowledged in its July 6, 2010 memorandum, "[t]he obstacles presented 19  by reconfiguring the existing discharge canal to function as a main component of 20  the new cooling system are correctly cited by Enercon as unavoidable. There do 21  not appear to be any practical means to significantly decrease this estimate."
3          In order to retrofit IPEC to a closed-cycle cooling configuration and to 4  hold sufficient water to meet the Unit's combined flow rate of 1.4 million gpm 5  (assuming 700,000 gpm per Unit) of circulating water, the existing discharge 6  canal must be converted into a hot water reservoir that can hold approximately 7  10.7 million gallons of water. See Entergy Ex. 7 at 12. After modification, the 8  Unit 2 and Unit 3 reservoirs would hold over 4.2 million and 6.5 million gallons 9  of circulating water, respectively. Id. The makeup water source for the hot water 10  reservoir is the service water discharge, with Unit 2's service water discharged 11  into the Unit 2 reservoir, and Unit 3's service water discharged into the Unit 3 12  reservoir. New circulating water pumps would be installed in each reservoir that 13  would pump the hot water from each reservoir to its respective cooling tower. To 14  accommodate the additional capacity and to meet the new circulating pump 15  submergence requirements, the current discharge canal in front of Units 2 and 3 16  will need to be excavated. The excavation and construction of the new reservoirs 17  requires a 42 week concurrent construction outage for both IPEC units. As Tetra 18  Tech acknowledged in its July 6, 2010 memorandum, "[t]he obstacles presented 19  by reconfiguring the existing discharge canal to function as a main component of 20  the new cooling system are correctly cited by Enercon as unavoidable. There do 21  not appear to be any practical means to significantly decrease this estimate."
22  Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris
22  Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris 1    Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 3 2    (Staff Ex. 214, Appendix B).
 
1    Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 3 2    (Staff Ex. 214, Appendix B).
3            As noted above, the discharge canal is also used by the service water 4    system, which serves a nuclear safety function, and which cannot be impacted by 5    the proposed retrofit. Because the design utilizes services water to provide 6    cooling tower makeup at IPEC, and the combined service water discharge will 7    likely exceed the cooling towers' make-up water needs, the reservoir weirs will 8    facilitate the overflow of excess water (that is, water not pumped to the cooling 9    towers) back to the River. The excess water that overflows the Unit 2 and Unit 3 10    reservoirs is in essence the cooling tower "blowdown," which is the intentional 11    release of circulating water used to control the cycles of concentration of the 12    system (i.e., the number of times suspended and dissolved sediment are 13    concentrated above ambient River levels).        Thus, when the service water 14    discharge exceeds the makeup needs of the closed-cycle system, water will 15    overflow from the reservoirs, which will represent the blowdown of the system.
3            As noted above, the discharge canal is also used by the service water 4    system, which serves a nuclear safety function, and which cannot be impacted by 5    the proposed retrofit. Because the design utilizes services water to provide 6    cooling tower makeup at IPEC, and the combined service water discharge will 7    likely exceed the cooling towers' make-up water needs, the reservoir weirs will 8    facilitate the overflow of excess water (that is, water not pumped to the cooling 9    towers) back to the River. The excess water that overflows the Unit 2 and Unit 3 10    reservoirs is in essence the cooling tower "blowdown," which is the intentional 11    release of circulating water used to control the cycles of concentration of the 12    system (i.e., the number of times suspended and dissolved sediment are 13    concentrated above ambient River levels).        Thus, when the service water 14    discharge exceeds the makeup needs of the closed-cycle system, water will 15    overflow from the reservoirs, which will represent the blowdown of the system.
16    For both the round hybrid towers and Tetra Tech's ClearSky towers, there is no 17    method by which the blowdown rate (or content of the blowdown) can be 18    controlled. I understand that Tetra Tech has also included additional piping that 19    will siphon cooling water from the pipes running from the cooling towers to the 20    condensers and discharge it in the discharge canal beyond the Unit 3 weir.
16    For both the round hybrid towers and Tetra Tech's ClearSky towers, there is no 17    method by which the blowdown rate (or content of the blowdown) can be 18    controlled. I understand that Tetra Tech has also included additional piping that 19    will siphon cooling water from the pipes running from the cooling towers to the 20    condensers and discharge it in the discharge canal beyond the Unit 3 weir.
21 Q: Are there any examples of operating nuclear power plants that were 22    designed for once-through cooling that were retrofitted as a closed-cycle 23    cooling?
21 Q: Are there any examples of operating nuclear power plants that were 22    designed for once-through cooling that were retrofitted as a closed-cycle 23    cooling?
1 A:      No. No nuclear power plant that has been designed, constructed, and operated 2          with a once-through cooling system has ever been retrofitted into a closed-loop 3          cooling system. While certain individuals may occasionally reference Palisades 4          Nuclear Power Plant as a "retrofit," as Tetra Tech explains in its November 18, 5          2009 memorandum on page 5, the so-called retrofit was "planned and completed 6          before initial operation." See Memorandum from Tim Havey, Tetra Tech, Inc. to 7          Chris Hogan, NYS Department of Environmental Conservation, dated Nov. 18, 8          2009 at 5 (Staff Ex. 214, Appendix B). The importance of the absence of any 9          successful conversion from once-through to closed-cycle cooling to a feasibility 10          assessment cannot be overstated. Unless a given unit's condenser is specifically 11          designed to utilize cooling water temperatures as provided by cooling towers, 12          there will be a compromise in unit operating efficiency and hence performance.
1 A:      No. No nuclear power plant that has been designed, constructed, and operated 2          with a once-through cooling system has ever been retrofitted into a closed-loop 3          cooling system. While certain individuals may occasionally reference Palisades 4          Nuclear Power Plant as a "retrofit," as Tetra Tech explains in its November 18, 5          2009 memorandum on page 5, the so-called retrofit was "planned and completed 6          before initial operation." See Memorandum from Tim Havey, Tetra Tech, Inc. to 7          Chris Hogan, NYS Department of Environmental Conservation, dated Nov. 18, 8          2009 at 5 (Staff Ex. 214, Appendix B). The importance of the absence of any 9          successful conversion from once-through to closed-cycle cooling to a feasibility 10          assessment cannot be overstated. Unless a given unit's condenser is specifically 11          designed to utilize cooling water temperatures as provided by cooling towers, 12          there will be a compromise in unit operating efficiency and hence performance.
13          The complete absence of any practical history of closed-loop cooling retrofits at 14          nuclear facilities and the associated impacts on the circulating water system and 15          condensers renders such a project subject to an unacceptably high degree of 16          uncertainty.
13          The complete absence of any practical history of closed-loop cooling retrofits at 14          nuclear facilities and the associated impacts on the circulating water system and 15          condensers renders such a project subject to an unacceptably high degree of 16          uncertainty.
17    II1.      REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 18    FEASIBILITY OF RETROFITTING IPEC WITH CLEARSKY COOLING 19                                          TOWERS 20 Q:    With that background, let us now discuss some of the specific challenges to 21        the Tetra Tech ClearSky cooling tower configuration discussed by Messrs.
17    II1.      REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 18    FEASIBILITY OF RETROFITTING IPEC WITH CLEARSKY COOLING 19                                          TOWERS 20 Q:    With that background, let us now discuss some of the specific challenges to 21        the Tetra Tech ClearSky cooling tower configuration discussed by Messrs.
22        Havey and Ortiz in their prefiled direct testimony. First, did Messrs. Havey 23        and Ortiz offer any opinion(s) concerning the feasibility of retrofitting IPEC 24        Units 2 and 3 with ClearSky cooling towers?
22        Havey and Ortiz in their prefiled direct testimony. First, did Messrs. Havey 23        and Ortiz offer any opinion(s) concerning the feasibility of retrofitting IPEC 24        Units 2 and 3 with ClearSky cooling towers?
1 A:  Yes. Mr. Havey testified that Tetra Tech's proposal to retrofit IPEC Units 2 and 2    3 with 44 ClearSky plume-abated cooling towers is a "practicalalternative for a 3    closed-cycle cooling retrofit at IPEC apart from the circular hybrid cooling 4    towers initially proposed by Enercon." Havey Direct at p. 13, 1. 9-13 (emphasis 5    added). Mr. Ortiz similarly testifies that "[b]ased on a preliminary review, and 6    subject to the limitations previously stated, the installation of a closed loop 7    system was determined to be technically feasible," Ortiz Direct at p. 6, 1. 17-19, 8    and "[b]ased on the conclusions of the Hatch 2012 Report and subject to the 9    limitations previously outlined, no major issues or deficiencies were identified by 10    Hatch with respect to the technical feasibility of transferring from a once-through 11    cooling system to a closed loop cooling system using the ClearSkyTM cooling 12    tower system." Id. at p. 8, 1.21 - p. 9, 1.2.
1 A:  Yes. Mr. Havey testified that Tetra Tech's proposal to retrofit IPEC Units 2 and 2    3 with 44 ClearSky plume-abated cooling towers is a "practicalalternative for a 3    closed-cycle cooling retrofit at IPEC apart from the circular hybrid cooling 4    towers initially proposed by Enercon." Havey Direct at p. 13, 1. 9-13 (emphasis 5    added). Mr. Ortiz similarly testifies that "[b]ased on a preliminary review, and 6    subject to the limitations previously stated, the installation of a closed loop 7    system was determined to be technically feasible," Ortiz Direct at p. 6, 1. 17-19, 8    and "[b]ased on the conclusions of the Hatch 2012 Report and subject to the 9    limitations previously outlined, no major issues or deficiencies were identified by 10    Hatch with respect to the technical feasibility of transferring from a once-through 11    cooling system to a closed loop cooling system using the ClearSkyTM cooling 12    tower system." Id. at p. 8, 1.21 - p. 9, 1.2.
13 Q: Do you agree with Mr. Havey that Tetra Tech's ClearSky cooling towers are 14    a "practical alternative" at IPEC?
13 Q: Do you agree with Mr. Havey that Tetra Tech's ClearSky cooling towers are 14    a "practical alternative" at IPEC?
15 A:  No. Mr. Havey is not an engineer, and it does not appear that he has any relevant 16    engineering experience with large-scale modifications to power plants, let alone 17    nuclear power plants. His degree is in environmental science and public policy 18    and it appears the extent of his relevant experience consists of performing 19    reviews of similar "feasibility analys[e]s" in California. To an engineer, there is 20    nothing "practical" about retrofitting a forty-year-old baseload nuclear power 21    plant on a constrained site with challenging topography with closed-cycle 22    cooling. As I testified above, no nuclear facility originally designed for and 23    operated with once-through cooling has been retrofitted with a closed-loop
15 A:  No. Mr. Havey is not an engineer, and it does not appear that he has any relevant 16    engineering experience with large-scale modifications to power plants, let alone 17    nuclear power plants. His degree is in environmental science and public policy 18    and it appears the extent of his relevant experience consists of performing 19    reviews of similar "feasibility analys[e]s" in California. To an engineer, there is 20    nothing "practical" about retrofitting a forty-year-old baseload nuclear power 21    plant on a constrained site with challenging topography with closed-cycle 22    cooling. As I testified above, no nuclear facility originally designed for and 23    operated with once-through cooling has been retrofitted with a closed-loop 1 cooling system. Here, Unit 2 and Unit 3 were both designed and constructed in 2 the mid-1970s with turbines and condensers that were specifically designed for 3 cold Hudson River water that cannot be replicated with closed-cycle cooling 4 under maximum thermal load conditions.
 
1 cooling system. Here, Unit 2 and Unit 3 were both designed and constructed in 2 the mid-1970s with turbines and condensers that were specifically designed for 3 cold Hudson River water that cannot be replicated with closed-cycle cooling 4 under maximum thermal load conditions.
5        Even more problematically, Tetra Tech has selected novel and unproven 6 ClearSky cooling towers as the centerpiece of its proposed retrofit. Mr. Havey 7 provides no performance data from the test cell that has operated approximately 8 seven (7) years in the New Mexico desert at the San Juan Generating Station. In 9 fact, the only study of ClearSky cooling towers is from a Department of Energy 10 ("DOE") grant for that single test cell, and even the DOE recognized, in 2009, 11 the unproven nature of the technology. At the time, the towers were referred to 12 as Air2Air:
5        Even more problematically, Tetra Tech has selected novel and unproven 6 ClearSky cooling towers as the centerpiece of its proposed retrofit. Mr. Havey 7 provides no performance data from the test cell that has operated approximately 8 seven (7) years in the New Mexico desert at the San Juan Generating Station. In 9 fact, the only study of ClearSky cooling towers is from a Department of Energy 10 ("DOE") grant for that single test cell, and even the DOE recognized, in 2009, 11 the unproven nature of the technology. At the time, the towers were referred to 12 as Air2Air:
13        SPX Cooling Technologies is presently investigating the 14        Air2Air for evaporative cooling towers (Figure 1) under 15        the U.S. Department of Energy (DOE) Grant No. DE-16        FC26-06NT42725. The preliminary findings from the 17        research are encouraging in that the basic principles behind 18        the technology are sound and the water savings are 19        substantial. However, in the course of executing this 20        project, construction costs of the validation cell (Figure2) 21        exceeded expectations. To be economically viable, more 22        research is required to develop an efficient heat transfer
13        SPX Cooling Technologies is presently investigating the 14        Air2Air for evaporative cooling towers (Figure 1) under 15        the U.S. Department of Energy (DOE) Grant No. DE-16        FC26-06NT42725. The preliminary findings from the 17        research are encouraging in that the basic principles behind 18        the technology are sound and the water savings are 19        substantial. However, in the course of executing this 20        project, construction costs of the validation cell (Figure2) 21        exceeded expectations. To be economically viable, more 22        research is required to develop an efficient heat transfer 1        pack and redesign the overall geometry of the tower 2          includingpack orientation and superstructure.
 
1        pack and redesign the overall geometry of the tower 2          includingpack orientation and superstructure.
3  U.S. Dept. of Energy, Improvement to Air2Airg Technology to Reduce Fresh-4  Water Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants, 5  ProMIS/ProjectNo.: DE-NT0005647 (Jan. 2009) (Entergy Ex. 357) (emphasis 6  added).      As evident from the title of the study, the experimental ClearSky 7  technology originally had a specific focus which was to promote cooling tower 8  applications in ard areas via reduction of fresh water evaporative cooling loss, 9  which is largely irrelevant to the IPEC application.
3  U.S. Dept. of Energy, Improvement to Air2Airg Technology to Reduce Fresh-4  Water Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants, 5  ProMIS/ProjectNo.: DE-NT0005647 (Jan. 2009) (Entergy Ex. 357) (emphasis 6  added).      As evident from the title of the study, the experimental ClearSky 7  technology originally had a specific focus which was to promote cooling tower 8  applications in ard areas via reduction of fresh water evaporative cooling loss, 9  which is largely irrelevant to the IPEC application.
10        Accordingly, SPX undertook a second study under a DOE grant award 11  from October 1, 2008 through December 31, 2011 with the objective to "further 12  enable Air2Air becoming a commercially viable water savings and plume 13  abatement technology by researching a re-engineered pack, testing improvement 14  provided by modification, and prototyping the pack manufacture to improve pack 15  economy, as it relates to superstructure volume, cost, pack orientation, and 16  ducting details."  See Final Report, Improvement to Air2AirTM Technology to 17  Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 18  Power Plants (June 30, 2012) (Entergy Ex. 359) at 5. The final report, dated 19  June 30, 2012, detailed SPX's efforts under the research grant to "prototype" and 20  "adjust our design and propose new experiments as we proceeded in the 21  program." Id. at 24, 30. Based on these adjustments, even SPX acknowledged 22  that its first commercial products were not available until 2012. See id. at 25-26.
10        Accordingly, SPX undertook a second study under a DOE grant award 11  from October 1, 2008 through December 31, 2011 with the objective to "further 12  enable Air2Air becoming a commercially viable water savings and plume 13  abatement technology by researching a re-engineered pack, testing improvement 14  provided by modification, and prototyping the pack manufacture to improve pack 15  economy, as it relates to superstructure volume, cost, pack orientation, and 16  ducting details."  See Final Report, Improvement to Air2AirTM Technology to 17  Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 18  Power Plants (June 30, 2012) (Entergy Ex. 359) at 5. The final report, dated 19  June 30, 2012, detailed SPX's efforts under the research grant to "prototype" and 20  "adjust our design and propose new experiments as we proceeded in the 21  program." Id. at 24, 30. Based on these adjustments, even SPX acknowledged 22  that its first commercial products were not available until 2012. See id. at 25-26.
1      As I stated in my prefiled direct, only two ClearSky installations recently (i.e.,
1      As I stated in my prefiled direct, only two ClearSky installations recently (i.e.,
2      within the last six months) became operational.
2      within the last six months) became operational.
Line 1,679: Line 1,539:
14  Q:  Do you agree with Mr. Ortiz's testimony that the ClearSky configuration 15      proposed by Tetra Tech "was determined to be technically feasible"?
14  Q:  Do you agree with Mr. Ortiz's testimony that the ClearSky configuration 15      proposed by Tetra Tech "was determined to be technically feasible"?
16  A:  It is not clear to me how Mr. Ortiz can offer this opinion. Mr. Ortiz does not 17      appear to have any relevant engineering experience performing modifications at 18      a nuclear power plant, much less modifications associated with cooling tower 19      applications. Rather, Mr. Ortiz is a "Piping Engineer" who has "worked in the 20      pulp and paper, petrochemical and mining industries."          Staff Ex. 247 at 1.
16  A:  It is not clear to me how Mr. Ortiz can offer this opinion. Mr. Ortiz does not 17      appear to have any relevant engineering experience performing modifications at 18      a nuclear power plant, much less modifications associated with cooling tower 19      applications. Rather, Mr. Ortiz is a "Piping Engineer" who has "worked in the 20      pulp and paper, petrochemical and mining industries."          Staff Ex. 247 at 1.
21      Moreover, the basis for Mr. Ortiz's opinion is unclear in light of the admission in 22      the first page of his testimony that he "ha[d] no firsthand knowledge of this 23      project...." Ortiz Direct at p. 1, 1. 19-23. As a result, all of his direct testimony
21      Moreover, the basis for Mr. Ortiz's opinion is unclear in light of the admission in 22      the first page of his testimony that he "ha[d] no firsthand knowledge of this 23      project...." Ortiz Direct at p. 1, 1. 19-23. As a result, all of his direct testimony 1 is "based on [his] personal observations and interpretations of the project files, 2 reports, and conversations with former members of this project." Id. Mr. Ortiz 3 never identifies any employees at Hatch that actually have firsthand knowledge 4 of Hatch's review of the ENERCON Closed-Loop Cooling Reports or the Tetra 5 Tech CCC Report, nor does he identify any of the "project files" other than the 6 four reports provided by the parties in this proceeding-ENERCON 2003, 7 ENERCON 2010, Tetra Tech CCC Report, and Hatch 2012. Throughout his 8 testimony, Mr. Ortiz offers opinions based upon his "review of ... report[s]
 
1 is "based on [his] personal observations and interpretations of the project files, 2 reports, and conversations with former members of this project." Id. Mr. Ortiz 3 never identifies any employees at Hatch that actually have firsthand knowledge 4 of Hatch's review of the ENERCON Closed-Loop Cooling Reports or the Tetra 5 Tech CCC Report, nor does he identify any of the "project files" other than the 6 four reports provided by the parties in this proceeding-ENERCON 2003, 7 ENERCON 2010, Tetra Tech CCC Report, and Hatch 2012. Throughout his 8 testimony, Mr. Ortiz offers opinions based upon his "review of ... report[s]
9 presented to [him]" or his "interpretation of the documents [he has] reviewed,"
9 presented to [him]" or his "interpretation of the documents [he has] reviewed,"
10 and he acknowledges that "varying interpretations of [Hatch's] services may 11 exist." Id. Mr. Ortiz nevertheless goes on to say that, "based on [his] research 12 the direct testimony being provided is a reasonable interpretation of Hatch's 13 methods and findings." Id. at p. 1, 1.21-23 (emphasis added).
10 and he acknowledges that "varying interpretations of [Hatch's] services may 11 exist." Id. Mr. Ortiz nevertheless goes on to say that, "based on [his] research 12 the direct testimony being provided is a reasonable interpretation of Hatch's 13 methods and findings." Id. at p. 1, 1.21-23 (emphasis added).
14        Accordingly, Mr. Ortiz does not appear to be offering his own opinion on 15 the feasibility of a closed-cycle cooling retrofit of IPEC, but his interpretation of 16 documents authored by and containing the opinions of unidentified Hatch 17 personnel. Further, Mr. Havey indicates that Hatch did not review ENERCON 18 2010 (SAIC did). See Havey Direct at p. 8, 1.20-22.
14        Accordingly, Mr. Ortiz does not appear to be offering his own opinion on 15 the feasibility of a closed-cycle cooling retrofit of IPEC, but his interpretation of 16 documents authored by and containing the opinions of unidentified Hatch 17 personnel. Further, Mr. Havey indicates that Hatch did not review ENERCON 18 2010 (SAIC did). See Havey Direct at p. 8, 1.20-22.
19        In addition, Mr. Ortiz's opinion and his review of the Tetra Tech proposal 20 is heavily caveated and "limited" in a manner that does not allow a reasonable 21 feasibility determination of the sort that represents the industry standard or 22 expectation. According to his testimony, Hatch expressly "did not analyze the 23 Algonquin pipeline feasibility assessment, nor did they review issues related to
19        In addition, Mr. Ortiz's opinion and his review of the Tetra Tech proposal 20 is heavily caveated and "limited" in a manner that does not allow a reasonable 21 feasibility determination of the sort that represents the industry standard or 22 expectation. According to his testimony, Hatch expressly "did not analyze the 23 Algonquin pipeline feasibility assessment, nor did they review issues related to 1    potential groundwater radiological contamination, nor any visual assessment, 2      blasting, building or equipment relocations, the modification or addition of site 3      services, and air quality."  Ortiz Direct at p. 6, 1. 6-10. These "limitations" 4      represent the majority of the most obvious and most significant challenges to the 5      feasibility of retrofitting IPEC with closed-cycle cooling.      No reasonable 6      engineer could conclude that any closed-cycle cooling retrofit of IPEC is 7      technically feasible without addressing these items.
 
1    potential groundwater radiological contamination, nor any visual assessment, 2      blasting, building or equipment relocations, the modification or addition of site 3      services, and air quality."  Ortiz Direct at p. 6, 1. 6-10. These "limitations" 4      represent the majority of the most obvious and most significant challenges to the 5      feasibility of retrofitting IPEC with closed-cycle cooling.      No reasonable 6      engineer could conclude that any closed-cycle cooling retrofit of IPEC is 7      technically feasible without addressing these items.
8  Q: You mentioned earlier that the ClearSky cooling towers represented a novel 9    and unproven technology. What response, if any, did Messrs. Havey and 10    Ortiz have to Enercon's concern about the novelty of Tetra Tech's ClearSky 11    cooling towers?
8  Q: You mentioned earlier that the ClearSky cooling towers represented a novel 9    and unproven technology. What response, if any, did Messrs. Havey and 10    Ortiz have to Enercon's concern about the novelty of Tetra Tech's ClearSky 11    cooling towers?
12  A:  Neither Mr. Havey nor Mr. Ortiz address the fact that ClearSky cooling towers 13      employ novel technology with limited operating experience that presents a large 14      potential risk for a nuclear baseload facility, which should have eliminated the 15      ClearSky towers from consideration as a feasible technology.      This lack of 16      response to a fundamental concern is unacceptable in the nuclear power industry, 17      which generally requires that technology choices be supported by demonstrated 18      and reliable operational experience.
12  A:  Neither Mr. Havey nor Mr. Ortiz address the fact that ClearSky cooling towers 13      employ novel technology with limited operating experience that presents a large 14      potential risk for a nuclear baseload facility, which should have eliminated the 15      ClearSky towers from consideration as a feasible technology.      This lack of 16      response to a fundamental concern is unacceptable in the nuclear power industry, 17      which generally requires that technology choices be supported by demonstrated 18      and reliable operational experience.
19            In fact, Tetra Tech repeatedly and contemporaneously has rejected 20      ClearSky cooling towers as an unproven technology in reviews it has performed 21      for NYSDEC and the U.S. EPA for other non-nuclear power plants that operate 22      at a much smaller-scale than IPEC. For example:
19            In fact, Tetra Tech repeatedly and contemporaneously has rejected 20      ClearSky cooling towers as an unproven technology in reviews it has performed 21      for NYSDEC and the U.S. EPA for other non-nuclear power plants that operate 22      at a much smaller-scale than IPEC. For example:
23
23
* Section 316(b) Rulemaking. As part of its § 316(b) rulemaking, EPA tasked
* Section 316(b) Rulemaking. As part of its § 316(b) rulemaking, EPA tasked 1 Tetra Tech and SAIC (who, according to Mr. Havey reviewed ENERCON 2  2010 in lieu of Hatch) with evaluating how costs for plume and drift 3  abatement technology, among other things, may be developed for a universe 4  of facilities potentially subject to CCC retrofits under the proposed existing 5  facility rulemaking. As part of that review, Tetra Tech evaluated ClearSky 6  cooling towers, and in its June 11, 2010 memorandum to EPA, concluded that 7  SPX ClearSky "technology has only been demonstrated on a full-scale basis at 8  a single location in New Mexico and remains a somewhat unproven 9  technology and may require time to develop acceptance within the industry."
 
1 Tetra Tech and SAIC (who, according to Mr. Havey reviewed ENERCON 2  2010 in lieu of Hatch) with evaluating how costs for plume and drift 3  abatement technology, among other things, may be developed for a universe 4  of facilities potentially subject to CCC retrofits under the proposed existing 5  facility rulemaking. As part of that review, Tetra Tech evaluated ClearSky 6  cooling towers, and in its June 11, 2010 memorandum to EPA, concluded that 7  SPX ClearSky "technology has only been demonstrated on a full-scale basis at 8  a single location in New Mexico and remains a somewhat unproven 9  technology and may require time to develop acceptance within the industry."
10  Memorandum from John Sunda, SAIC, and Kelly Meadows, Tetra Tech to I1  Paul Shriner and Jan Matuszko, USEPA, dated June 11, 2010, at 8 (Entergy 12  Ex. 346) (emphasis added).
10  Memorandum from John Sunda, SAIC, and Kelly Meadows, Tetra Tech to I1  Paul Shriner and Jan Matuszko, USEPA, dated June 11, 2010, at 8 (Entergy 12  Ex. 346) (emphasis added).
13  Glenwood Main Power Station. Tetra Tech was asked by NYSDEC to 14  conduct a technical review and evaluate the feasibility of various alternatives 15  at the Glenwood fossil fuel steam electric facility. In rejecting a cooling 16  tower configuration proposed by Powers Engineering (Riverkeeper's expert) 17  that would require only 12 ClearSky cells, Tetra Tech's technical review 18  repeated    its EPA finding that ClearSky towers "halve]            only been 19  demonstrated on a full-scale basis at a single location in New Mexico and 20  remain[]an unproven technologyfor applicationssuch as this." Tetra Tech, 21  Inc., Glenwood Technical Review, at 4 (Entergy Ex. 348) (emphasis added).
13  Glenwood Main Power Station. Tetra Tech was asked by NYSDEC to 14  conduct a technical review and evaluate the feasibility of various alternatives 15  at the Glenwood fossil fuel steam electric facility. In rejecting a cooling 16  tower configuration proposed by Powers Engineering (Riverkeeper's expert) 17  that would require only 12 ClearSky cells, Tetra Tech's technical review 18  repeated    its EPA finding that ClearSky towers "halve]            only been 19  demonstrated on a full-scale basis at a single location in New Mexico and 20  remain[]an unproven technologyfor applicationssuch as this." Tetra Tech, 21  Inc., Glenwood Technical Review, at 4 (Entergy Ex. 348) (emphasis added).
22  Although the Tetra Tech's review of the Glenwood facility is undated, it 23  references documents there were published as late as 2010.
22  Although the Tetra Tech's review of the Glenwood facility is undated, it 23  references documents there were published as late as 2010.
1 Northport Power Station.        On January 28, 2010, NYSDEC requested 2  Northport's owner (National Grid) to provide "...an assessment of a back-to-3  back, linear array of towers, such as the SPX/Marley ClearSkyTM tower 4  configuration for all four units."    Washington Group International, Inc.,
1 Northport Power Station.        On January 28, 2010, NYSDEC requested 2  Northport's owner (National Grid) to provide "...an assessment of a back-to-3  back, linear array of towers, such as the SPX/Marley ClearSkyTM tower 4  configuration for all four units."    Washington Group International, Inc.,
5  National Grid Generation LLC, Response to NYSDEC's Request for 6  Additional Information Regarding Cooling Towers (July 1, 2010), at 1-1 7  (Entergy Ex. 349). In response, Washington Group International, a division 8  of URS Corporation, submitted a report concluding "the cooling tower 9  technology identified by NYSDEC for further study [ClearSky towers], is yet 10  unproven for application to generating stations such as Northport..." Id. at 2-11  1 ("[A] plume abatement cooling tower using an array of back-to-back cells, 12  such as the system referenced by the NYSDEC, is an unproven technology for 13  a generating station such as Northport. Therefore, there is a high degree of 14  uncertainty associated with its environmental impacts."); Letter from Timothy 15  Curt, National Grid Environmental Management to Colleen Kimble, NYS 16  Department of Environmental Conservation, dated July 1, 2010 at 4 (Entergy 17  Ex. 353) (same). The Washington Group went on to assert that "the tower 18  suggested by DEC is an unproven technology with no identified commercially 19  comparable installations to Northport." Entergy Ex. 349 at 2-6. Tetra Tech 20  performed the technical review of the Washington Group's report and 21  concluded, "[t]he report's conclusion that the Clear Sky Plume Abatement 22  System remains an unproven technology in this application has some merit, 23  but the analysis demonstrates that alternative cooling tower locations for
5  National Grid Generation LLC, Response to NYSDEC's Request for 6  Additional Information Regarding Cooling Towers (July 1, 2010), at 1-1 7  (Entergy Ex. 349). In response, Washington Group International, a division 8  of URS Corporation, submitted a report concluding "the cooling tower 9  technology identified by NYSDEC for further study [ClearSky towers], is yet 10  unproven for application to generating stations such as Northport..." Id. at 2-11  1 ("[A] plume abatement cooling tower using an array of back-to-back cells, 12  such as the system referenced by the NYSDEC, is an unproven technology for 13  a generating station such as Northport. Therefore, there is a high degree of 14  uncertainty associated with its environmental impacts."); Letter from Timothy 15  Curt, National Grid Environmental Management to Colleen Kimble, NYS 16  Department of Environmental Conservation, dated July 1, 2010 at 4 (Entergy 17  Ex. 353) (same). The Washington Group went on to assert that "the tower 18  suggested by DEC is an unproven technology with no identified commercially 19  comparable installations to Northport." Entergy Ex. 349 at 2-6. Tetra Tech 20  performed the technical review of the Washington Group's report and 21  concluded, "[t]he report's conclusion that the Clear Sky Plume Abatement 22  System remains an unproven technology in this application has some merit, 23  but the analysis demonstrates that alternative cooling tower locations for I        towers arranged in a linear configuration could be found on-site albeit at 2        increased costs." Tetra Tech, Inc., Northport Technical Review at 3 (Entergy 3        Ex. 350) at 3.
 
I        towers arranged in a linear configuration could be found on-site albeit at 2        increased costs." Tetra Tech, Inc., Northport Technical Review at 3 (Entergy 3        Ex. 350) at 3.
4 Q: Earlier you mentioned site constraints at IPEC that would render retrofitting 5    the facility with closed-cycle cooling problematic. Did Messrs. Havey and 6    Ortiz address the site disruption of the Tetra Tech closed-cycle cooling 7    configuration?
4 Q: Earlier you mentioned site constraints at IPEC that would render retrofitting 5    the facility with closed-cycle cooling problematic. Did Messrs. Havey and 6    Ortiz address the site disruption of the Tetra Tech closed-cycle cooling 7    configuration?
8 A:  No. Neither Mr. Havey nor Mr. Ortiz addressed how Tetra Tech or Hatch plans 9    to relocate the several existing essential structures that conflict with Tetra Tech's 10    proposed ClearSky towers.          Mr. Havey testified that, with respect to siting 11    conflicts, the Tetra Tech CCC Report was "not intended to enumerate all 12    potential items that would be addressed in a final engineering and construction 13    plan. Their exclusion from the Tetra Tech 2013 report does not imply they are 14    immaterial or irrelevant for final design and cost estimates." Havey Direct at pg.
8 A:  No. Neither Mr. Havey nor Mr. Ortiz addressed how Tetra Tech or Hatch plans 9    to relocate the several existing essential structures that conflict with Tetra Tech's 10    proposed ClearSky towers.          Mr. Havey testified that, with respect to siting 11    conflicts, the Tetra Tech CCC Report was "not intended to enumerate all 12    potential items that would be addressed in a final engineering and construction 13    plan. Their exclusion from the Tetra Tech 2013 report does not imply they are 14    immaterial or irrelevant for final design and cost estimates." Havey Direct at pg.
15      19, 1.20 - pg. 20, 1.3. Mr. Ortiz specifically testifies that Hatch did not analyze 16    "building or equipment relocations, [and] the modification or addition of site 17    services." Ortiz Direct at p. 6, 1. 6-9. Mr. Ortiz went on to inexplicably assert 18    that such conflicts "cannot be studied in detail during the limited scope of a 19    feasibility report." Id. atp. 9 , 1. 2 1 -p. 10, 1.3.
15      19, 1.20 - pg. 20, 1.3. Mr. Ortiz specifically testifies that Hatch did not analyze 16    "building or equipment relocations, [and] the modification or addition of site 17    services." Ortiz Direct at p. 6, 1. 6-9. Mr. Ortiz went on to inexplicably assert 18    that such conflicts "cannot be studied in detail during the limited scope of a 19    feasibility report." Id. atp. 9 , 1. 2 1 -p. 10, 1.3.
20            Enercon has prepared Exhibit 373 which is an overhead aerial photograph 21    of the IPEC site showing the footprint of Tetra Tech's proposed cooling towers 22    for Unit 2 and Unit 3. As reflected on Exhibit 373, Tetra Tech proposes to locate 23    its cooling towers effectively on top of many essential buildings and structures.
20            Enercon has prepared Exhibit 373 which is an overhead aerial photograph 21    of the IPEC site showing the footprint of Tetra Tech's proposed cooling towers 22    for Unit 2 and Unit 3. As reflected on Exhibit 373, Tetra Tech proposes to locate 23    its cooling towers effectively on top of many essential buildings and structures.
I      Without these structures, IPEC would be unable to operate.                  By not 2      acknowledging these siting conflicts and developing a plan for relocating 3      essential structures, Tetra Tech's ClearSky towers cannot be considered feasible 4      at IPEC.
I      Without these structures, IPEC would be unable to operate.                  By not 2      acknowledging these siting conflicts and developing a plan for relocating 3      essential structures, Tetra Tech's ClearSky towers cannot be considered feasible 4      at IPEC.
5  Q: I would like to focus on some of the specific site disruptions that were 6    identified by Enercon in the ENERCON 2013 CCC Response. First, how, if 7    at all, do Messrs. Havey and Ortiz propose resolving the potential issues with 8    groundwater contamination?
5  Q: I would like to focus on some of the specific site disruptions that were 6    identified by Enercon in the ENERCON 2013 CCC Response. First, how, if 7    at all, do Messrs. Havey and Ortiz propose resolving the potential issues with 8    groundwater contamination?
Line 1,713: Line 1,563:
: 12. reservoir and pump pit. In order for the reservoir to provide the necessary 13      submergence for proper operation of the new circulating water pumps, the 14      current Unit 2 discharge canal will need to be deepened considerably. As set 15      forth in the ENERCON 2013 CCC Response, this excavation is in the very 16      location where groundwater containing Tritium and Strontium has been 17      observed. See Entergy Ex. 42. To maintain dry conditions required for pipe 18      construction and backfilling, contaminated groundwater would need to be 19      continually pumped from the excavation area below the groundwater table (i.e.,
: 12. reservoir and pump pit. In order for the reservoir to provide the necessary 13      submergence for proper operation of the new circulating water pumps, the 14      current Unit 2 discharge canal will need to be deepened considerably. As set 15      forth in the ENERCON 2013 CCC Response, this excavation is in the very 16      location where groundwater containing Tritium and Strontium has been 17      observed. See Entergy Ex. 42. To maintain dry conditions required for pipe 18      construction and backfilling, contaminated groundwater would need to be 19      continually pumped from the excavation area below the groundwater table (i.e.,
20      dewatering), which will have to be continued until completion of the excavation.
20      dewatering), which will have to be continued until completion of the excavation.
21              In fact, Mr. Havey admits that "the retrofit project for Unit 2 is heavily 22      dependent on finding an acceptable solution for dewatering the area during 23      excavation and construction" and "[i]t is my opinion that the plume area will
21              In fact, Mr. Havey admits that "the retrofit project for Unit 2 is heavily 22      dependent on finding an acceptable solution for dewatering the area during 23      excavation and construction" and "[i]t is my opinion that the plume area will 1    likely require sampling to determine what disposal and/or treatment methods, if 2    any, are most appropriate to manage dewatered groundwater and excavated 3    material." Havey Direct at p. 21, 1. 19 - p. 22, 1. 1 (emphasis added). Despite 4    Mr. Havey's acknowledgement that groundwater radiological contamination may 5    render the Unit 2 tower infeasible, both Tetra Tech and Hatch inexplicably 6    excluded "issues related to potential groundwater radiological contamination" 7    from their feasibility assessment. See, e.g., id. at p 13, 1. 1-3. No feasibility 8    determination can be reached for retrofitting Unit 2 with closed-cycle cooling 9    unless and until Tetra Tech addresses impacts from the groundwater plume.
 
1    likely require sampling to determine what disposal and/or treatment methods, if 2    any, are most appropriate to manage dewatered groundwater and excavated 3    material." Havey Direct at p. 21, 1. 19 - p. 22, 1. 1 (emphasis added). Despite 4    Mr. Havey's acknowledgement that groundwater radiological contamination may 5    render the Unit 2 tower infeasible, both Tetra Tech and Hatch inexplicably 6    excluded "issues related to potential groundwater radiological contamination" 7    from their feasibility assessment. See, e.g., id. at p 13, 1. 1-3. No feasibility 8    determination can be reached for retrofitting Unit 2 with closed-cycle cooling 9    unless and until Tetra Tech addresses impacts from the groundwater plume.
10 Q: Continuing with specific site disruptions discussed in the ENERCON 2013 11    CCC Response, how, if at all, does Tetra Tech's ClearSky configuration 12    proposed for Unit 2 account for IPEC's Independent Spent Fuel Storage 13    Installation ("ISFSr")?
10 Q: Continuing with specific site disruptions discussed in the ENERCON 2013 11    CCC Response, how, if at all, does Tetra Tech's ClearSky configuration 12    proposed for Unit 2 account for IPEC's Independent Spent Fuel Storage 13    Installation ("ISFSr")?
14 A:  It does not. One of the most apparent and problematic aspects of Tetra Tech's 15    proposal for Unit 2 is that the excavation for the Unit 2 towers and associated 16    piping interferes directly with IPEC's ISFSI. The ISFSI is a critical component 17    of the IPEC site for dry cask spent nuclear fuel storage. IPEC's ISFSI is a three-18    foot thick concrete pad that is approximately 100 ft by 200 ft designed to store 19    large, sealed casks containing spent fuel rods. Construction of the ISFSI lasted 20    three years and cost over $13 million dollars. As of February 2014, there were 21    twenty-six (26) casks contained within the ISFSI. The casks are made of steel 22    and concrete and are 18-20 feet high, 11 feet in diameter, and have 2 foot thick 23    concrete walls. Each cask weighs over 300,000 pounds when loaded.
14 A:  It does not. One of the most apparent and problematic aspects of Tetra Tech's 15    proposal for Unit 2 is that the excavation for the Unit 2 towers and associated 16    piping interferes directly with IPEC's ISFSI. The ISFSI is a critical component 17    of the IPEC site for dry cask spent nuclear fuel storage. IPEC's ISFSI is a three-18    foot thick concrete pad that is approximately 100 ft by 200 ft designed to store 19    large, sealed casks containing spent fuel rods. Construction of the ISFSI lasted 20    three years and cost over $13 million dollars. As of February 2014, there were 21    twenty-six (26) casks contained within the ISFSI. The casks are made of steel 22    and concrete and are 18-20 feet high, 11 feet in diameter, and have 2 foot thick 23    concrete walls. Each cask weighs over 300,000 pounds when loaded.
1              IPEC's ISFSI and the spent-fuel casks that it stores are heavily regulated 2      and subject to intensive oversight by NRC. In order to construct the proposed 3      towers for Unit 2, the current ISFSI must be decommissioned and demolished.
1              IPEC's ISFSI and the spent-fuel casks that it stores are heavily regulated 2      and subject to intensive oversight by NRC. In order to construct the proposed 3      towers for Unit 2, the current ISFSI must be decommissioned and demolished.
4      Before that work can start, however, IPEC must obtain permits for and construct 5      an entirely new ISFSI at a different location to store the spent fuel casks. The 6      Tetra Tech CCC Report and the prefiled testimony of Messrs. Havey and Ortiz 7      completely fail to address the significant impact on the feasibility of the Unit 2 8      cooling towers, not to mention its schedule, of the need to: (1) identify a viable 9      location for, permit and construct a new ISFSI; (2) transfer the existing casks to 10      that new ISFSI; and (3) decommission and demolish the existing ISFSI, all 11      before commencing construction of the Unit 2 tower. In fact, Tetra Tech has 12      performed no analysis to determine if a new ISFSI can be built at IPEC. Another 13      significant obstacle is that the extremely heavy loads restrict what roads can be 14      used to transport the 300,000 pound spent fuel casks. Given these restrictions, 15      there is a risk that there will be no suitable right-of-way to transfer the spent fuel 16      from the reactors to the new ISFSI location.          Without resolving this siting 17      conflict and others that may arise relative to the need for a new ISFSI, the Unit 2 18      towers cannot be considered feasible.
4      Before that work can start, however, IPEC must obtain permits for and construct 5      an entirely new ISFSI at a different location to store the spent fuel casks. The 6      Tetra Tech CCC Report and the prefiled testimony of Messrs. Havey and Ortiz 7      completely fail to address the significant impact on the feasibility of the Unit 2 8      cooling towers, not to mention its schedule, of the need to: (1) identify a viable 9      location for, permit and construct a new ISFSI; (2) transfer the existing casks to 10      that new ISFSI; and (3) decommission and demolish the existing ISFSI, all 11      before commencing construction of the Unit 2 tower. In fact, Tetra Tech has 12      performed no analysis to determine if a new ISFSI can be built at IPEC. Another 13      significant obstacle is that the extremely heavy loads restrict what roads can be 14      used to transport the 300,000 pound spent fuel casks. Given these restrictions, 15      there is a risk that there will be no suitable right-of-way to transfer the spent fuel 16      from the reactors to the new ISFSI location.          Without resolving this siting 17      conflict and others that may arise relative to the need for a new ISFSI, the Unit 2 18      towers cannot be considered feasible.
Line 1,730: Line 1,577:
7    Assuming the towers can be constructed, have- Messrs. Havey and Ortiz 8    reasonably demonstrated that the towers will function efficiently at IPEC 9    without significantly degrading IPEC's performance?
7    Assuming the towers can be constructed, have- Messrs. Havey and Ortiz 8    reasonably demonstrated that the towers will function efficiently at IPEC 9    without significantly degrading IPEC's performance?
10  A:  No. Mr. Havey does not address the impacts associated with Tetra Tech's 11      proposal on the ability of IPEC's condensers to efficiently reject heat, nor does 12      he address the Burns and Roe condenser analysis described in the ENERCON 13      2013 CCC Response and my prefiled direct testimony that demonstrated that 14      additional capacity is likely needed to reduce the pressure in the condenser 15      during at least one of IPEC's transient conditions.      For his part, Mr. Ortiz 16      concedes in his testimony that it "was impossibleto accuratelyassess the impact 17      on condenser thermal performance with a higher inlet cooling water temperature 18      resulting from use of the cooling towers."      Ortiz Direct at p. 10, 1. 20-22 19      (emphasis added). Based on what Tetra Tech has reported, however, there are 20      several known issues with the ClearSky towers that will detrimentally and 21      materially impact IPEC's performance, including its ability to generate 22      electricity reliably and efficiently.
10  A:  No. Mr. Havey does not address the impacts associated with Tetra Tech's 11      proposal on the ability of IPEC's condensers to efficiently reject heat, nor does 12      he address the Burns and Roe condenser analysis described in the ENERCON 13      2013 CCC Response and my prefiled direct testimony that demonstrated that 14      additional capacity is likely needed to reduce the pressure in the condenser 15      during at least one of IPEC's transient conditions.      For his part, Mr. Ortiz 16      concedes in his testimony that it "was impossibleto accuratelyassess the impact 17      on condenser thermal performance with a higher inlet cooling water temperature 18      resulting from use of the cooling towers."      Ortiz Direct at p. 10, 1. 20-22 19      (emphasis added). Based on what Tetra Tech has reported, however, there are 20      several known issues with the ClearSky towers that will detrimentally and 21      materially impact IPEC's performance, including its ability to generate 22      electricity reliably and efficiently.
1 Q:  What are those known issues?
1 Q:  What are those known issues?
2  A:  The current closed-cycle cooling retrofit alternatives at IPEC will both (1) reduce 3      the amount of available circulating available to cool the condensers and (2) 4      increase the temperature of the cooling water. These are both major operating 5      constraints that will mean that IPEC will not be able to generate as much 6      electricity as it does in the current once-through system, and in some cases, could 7      lead to excursions and unplanned outages.
2  A:  The current closed-cycle cooling retrofit alternatives at IPEC will both (1) reduce 3      the amount of available circulating available to cool the condensers and (2) 4      increase the temperature of the cooling water. These are both major operating 5      constraints that will mean that IPEC will not be able to generate as much 6      electricity as it does in the current once-through system, and in some cases, could 7      lead to excursions and unplanned outages.
Line 1,737: Line 1,583:
16              Consequently, each unit's replacement cooling tower 17              should be designed to meet the most critical operating 18              conditions that would be expected during the year, i.e.,
16              Consequently, each unit's replacement cooling tower 17              should be designed to meet the most critical operating 18              conditions that would be expected during the year, i.e.,
19              840,000 rather than the 700,000 gpm used in the design 20              criteria.
19              840,000 rather than the 700,000 gpm used in the design 20              criteria.
21      Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris 22      Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 23      6 (Appendix B to Staff Ex. 214). Tetra Tech went on to note that "[i]f correct, 24      the tower as designed appears to be insufficiently sized to accommodate the 25      higher summertime volumes that are sometimes needed."                Id. Enercon's 26      decision to reduce the maximum flow to 700,000 gpm was appropriate at the 27      time because it reflected a balance between the parasitic loss associated with
21      Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris 22      Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 23      6 (Appendix B to Staff Ex. 214). Tetra Tech went on to note that "[i]f correct, 24      the tower as designed appears to be insufficiently sized to accommodate the 25      higher summertime volumes that are sometimes needed."                Id. Enercon's 26      decision to reduce the maximum flow to 700,000 gpm was appropriate at the 27      time because it reflected a balance between the parasitic loss associated with 1    pumping the extra circulating water up to the cooling towers and additional fans 2      required to cool that water with the expected degradation in power performance 3      based on the then-current PEPSE models for IPEC Units 2 and 3. Because Tetra 4      Tech's proposal has a different pump and fan dynamics than the round hybrid 5      towers with less parasitic losses, Tetra Tech ought to have reanalyzed whether 6      700,000 gpm was an appropriate design choice for its towers. Instead, Tetra 7      Tech simply copied design decisions from the round hybrid towers described in 8      ENERCON 2010 without properly considering whether those design choices are 9      appropriate for the ClearSky towers.
 
1    pumping the extra circulating water up to the cooling towers and additional fans 2      required to cool that water with the expected degradation in power performance 3      based on the then-current PEPSE models for IPEC Units 2 and 3. Because Tetra 4      Tech's proposal has a different pump and fan dynamics than the round hybrid 5      towers with less parasitic losses, Tetra Tech ought to have reanalyzed whether 6      700,000 gpm was an appropriate design choice for its towers. Instead, Tetra 7      Tech simply copied design decisions from the round hybrid towers described in 8      ENERCON 2010 without properly considering whether those design choices are 9      appropriate for the ClearSky towers.
10            As part of the preparation for this testimony, Enercon was informed by 11      Entergy that the PEPSE model used in ENERCON 2010 and the ENERCON 12      2013 CCC Response had been updated and re-benchmarked.                  Preliminary 13      analysis of the updated model shows higher power losses when the Units are run 14      at 700,000 gpm, particularly at Unit 2 and particularly during the critical summer 15      months, than what has been reported previously. Based on the results of this 16      preliminary analysis, it is clear that the ClearSky towers proposed by Tetra Tech 17      are significantly undersized. This analysis emphasizes why it was incumbent on 18      Tetra Tech to perform and include PEPSE modeling, as well as other critical 19      thermal performance data, such as cooling tower performance curves, in its 20      report in order to validate its design choices and establish post-modification 21      operating power losses.
10            As part of the preparation for this testimony, Enercon was informed by 11      Entergy that the PEPSE model used in ENERCON 2010 and the ENERCON 12      2013 CCC Response had been updated and re-benchmarked.                  Preliminary 13      analysis of the updated model shows higher power losses when the Units are run 14      at 700,000 gpm, particularly at Unit 2 and particularly during the critical summer 15      months, than what has been reported previously. Based on the results of this 16      preliminary analysis, it is clear that the ClearSky towers proposed by Tetra Tech 17      are significantly undersized. This analysis emphasizes why it was incumbent on 18      Tetra Tech to perform and include PEPSE modeling, as well as other critical 19      thermal performance data, such as cooling tower performance curves, in its 20      report in order to validate its design choices and establish post-modification 21      operating power losses.
22  Q: You also mentioned that in addition to reducing the maximum amount of 23    available water, closed-cycle cooling would also increase the temperature of
22  Q: You also mentioned that in addition to reducing the maximum amount of 23    available water, closed-cycle cooling would also increase the temperature of 1    the circulating water used to cool the condensers. How will that affect plant 2    performance?
 
1    the circulating water used to cool the condensers. How will that affect plant 2    performance?
3  A:  The increased temperature of the circulating water, combined with the reduced 4      flow, will lead to increased condenser backpressure that will reduce the facility's 5      ability to generate power. These effects will be felt most in the summer, when 6      the cooling need is the highest and the demand for electricity is the greatest. But 7      there are additional aspects of the ClearSky towers that amplify the inherent and 8      detrimental impact associated with a closed-cycle cooling retrofit at IPEC.
3  A:  The increased temperature of the circulating water, combined with the reduced 4      flow, will lead to increased condenser backpressure that will reduce the facility's 5      ability to generate power. These effects will be felt most in the summer, when 6      the cooling need is the highest and the demand for electricity is the greatest. But 7      there are additional aspects of the ClearSky towers that amplify the inherent and 8      detrimental impact associated with a closed-cycle cooling retrofit at IPEC.
9            First, as I stated in my prefiled direct, the cooling towers are susceptible to 10      recirculation of the hot, humid exhaust back into the intake, which will increase 11      the entering wet-bulb temperature and reduce the towers' ability to cool the 12      water. Mr. Havey does not address Enercon's concern that the configuration and 13      orientation of the ClearSky towers will likely result in recirculation thereby 14      decreasing their performance and detrimentally affect plant operations.          Mr.
9            First, as I stated in my prefiled direct, the cooling towers are susceptible to 10      recirculation of the hot, humid exhaust back into the intake, which will increase 11      the entering wet-bulb temperature and reduce the towers' ability to cool the 12      water. Mr. Havey does not address Enercon's concern that the configuration and 13      orientation of the ClearSky towers will likely result in recirculation thereby 14      decreasing their performance and detrimentally affect plant operations.          Mr.
15      Ortiz states only that "to better simulate recirculation effects created by different 16      wind conditions a more detailed analysis is required," but he defers this 17      important consideration to later in the "engineering phase of the project" where 18      "adjustments, if required can be implemented ...." Ortiz Direct at p. 11, 1. 12-19.
15      Ortiz states only that "to better simulate recirculation effects created by different 16      wind conditions a more detailed analysis is required," but he defers this 17      important consideration to later in the "engineering phase of the project" where 18      "adjustments, if required can be implemented ...." Ortiz Direct at p. 11, 1. 12-19.
19      This is not sufficient; the impact recirculation will have on cooling tower 20      performance affects threshold design decisions, such as the number of cooling 21      cells required and the size of those cells. It would be inappropriate to make a 22      "feasibility" determination of a configuration that calls for forty-four (44) cells 23      per unit, only to find out later in the process that, for example, fifty (50) or more
19      This is not sufficient; the impact recirculation will have on cooling tower 20      performance affects threshold design decisions, such as the number of cooling 21      cells required and the size of those cells. It would be inappropriate to make a 22      "feasibility" determination of a configuration that calls for forty-four (44) cells 23      per unit, only to find out later in the process that, for example, fifty (50) or more 1 cells per unit were actually needed. By way of example, SPX has provided to 2 Enercon    a "ClearSky      Selection  Summary"    that proposes    a different 3 configuration ClearSky towers for IPEC, consisting of sixty-two (62) smaller 4 ClearSky cells per Unit. The selection summary provided to Enercon explicitly 5 assumes recirculation would increase the inlet wet bulb temperature by 20F 6 (changing the design wet-bulb temperature from 77'F to 79 0F), and as much as 7 50F "under certain wind conditions." See SPX, Entergy Indian Point Units 2 &
 
1 cells per unit were actually needed. By way of example, SPX has provided to 2 Enercon    a "ClearSky      Selection  Summary"    that proposes    a different 3 configuration ClearSky towers for IPEC, consisting of sixty-two (62) smaller 4 ClearSky cells per Unit. The selection summary provided to Enercon explicitly 5 assumes recirculation would increase the inlet wet bulb temperature by 20F 6 (changing the design wet-bulb temperature from 77'F to 79 0F), and as much as 7 50F "under certain wind conditions." See SPX, Entergy Indian Point Units 2 &
8 3, ClearSky Selection Summary (Entergy Ex. 347).
8 3, ClearSky Selection Summary (Entergy Ex. 347).
9        Second, Tetra Tech proposes aligning the ClearSky cooling towers in a 10 back-to-back configuration. It is well understood that linear, mechanical draft 11 cooling towers do not perform well in a back-to-back configuration. In fact, this 12 is a point that Tetra Tech has made in several other technical reviews it has 13 made. For example, in a review Tetra Tech performed for NYSDEC for the 14 Northport Generating Station, Tetra Tech noted that "[c]onventional hybrid 15 wet/dry mechanical draft cooling towers must be configured in an in-line (single 16 row) arrangement and cannot be placed in a back-to-back configuration because 17 of issues with poor mixing of the wet and dry section exhaust in the back-to-back 18 configuration." Tetra Tech, Inc., Northport Technical Review at 2 (Entergy Ex.
9        Second, Tetra Tech proposes aligning the ClearSky cooling towers in a 10 back-to-back configuration. It is well understood that linear, mechanical draft 11 cooling towers do not perform well in a back-to-back configuration. In fact, this 12 is a point that Tetra Tech has made in several other technical reviews it has 13 made. For example, in a review Tetra Tech performed for NYSDEC for the 14 Northport Generating Station, Tetra Tech noted that "[c]onventional hybrid 15 wet/dry mechanical draft cooling towers must be configured in an in-line (single 16 row) arrangement and cannot be placed in a back-to-back configuration because 17 of issues with poor mixing of the wet and dry section exhaust in the back-to-back 18 configuration." Tetra Tech, Inc., Northport Technical Review at 2 (Entergy Ex.
19 354). Tetra Tech made a similar statement in the review of the Huntley facility:
19 354). Tetra Tech made a similar statement in the review of the Huntley facility:
20 "[d]oubled-up towers are also referred to as back-to-back configurations and are 21 generally not compatible with hybrid wet/dry plume abatement cooling towers."
20 "[d]oubled-up towers are also referred to as back-to-back configurations and are 21 generally not compatible with hybrid wet/dry plume abatement cooling towers."
22 Memorandum from John Sunda, Steve Geil, and Kelly Meadows, to Chuck 23 Nieder, NYSDEC, and Jamie Hurley, USEPA, dated Oct. 5, 2011, at 6-7
22 Memorandum from John Sunda, Steve Geil, and Kelly Meadows, to Chuck 23 Nieder, NYSDEC, and Jamie Hurley, USEPA, dated Oct. 5, 2011, at 6-7 I  (Entergy Ex. 355). I understand that SPX advertises that, conceptually, ClearSky 2  cooling towers can be designed and operated in a back-to-back configuration, but 3  there is no operational experience showing this to be the case.      Indeed, the 4  Air2Air test cell at the San Juan Generating Station in New Mexico cannot be 5  used in a back-to-back configuration because it has air intakes on two sides, 6  which is another reason that it is not representative of NYSDEC's proposal to 7  construct two towers of 44 back-to-back ClearSky cells at IPEC.
 
I  (Entergy Ex. 355). I understand that SPX advertises that, conceptually, ClearSky 2  cooling towers can be designed and operated in a back-to-back configuration, but 3  there is no operational experience showing this to be the case.      Indeed, the 4  Air2Air test cell at the San Juan Generating Station in New Mexico cannot be 5  used in a back-to-back configuration because it has air intakes on two sides, 6  which is another reason that it is not representative of NYSDEC's proposal to 7  construct two towers of 44 back-to-back ClearSky cells at IPEC.
8          Third, in addition to known operational problems associated with using 9  cooling towers in salt water applications (e.g., salt deposition, electric arcing, 10  etc.), the thermophysical properties of salt water degrades cooling tower 11  performance as compared to cooling towers that use freshwater. Recent studies 12  have shown that increased salt concentrations materially alter the efficiency of 13  cooling towers to a substantial degree. See Mostafa H. Sharqawy et al., On 14  Thermal Performanceof Seawater Cooling Towers, 133 J. Eng. Gas Turbines &
8          Third, in addition to known operational problems associated with using 9  cooling towers in salt water applications (e.g., salt deposition, electric arcing, 10  etc.), the thermophysical properties of salt water degrades cooling tower 11  performance as compared to cooling towers that use freshwater. Recent studies 12  have shown that increased salt concentrations materially alter the efficiency of 13  cooling towers to a substantial degree. See Mostafa H. Sharqawy et al., On 14  Thermal Performanceof Seawater Cooling Towers, 133 J. Eng. Gas Turbines &
15  Power (Apr. 2011), at 6 (Entergy Ex. 352) ("It is found that an increase in 16  salinity decreases the air effectiveness by 5-20% relative to freshwater cooling 17  tower."). Here, Tetra Tech proposes concentrating the salt level in the Hudson 18  River three times in its closed-cycle system, which will amplify degradation of 19  thermal performance attributable to increased salinity. Although Mr. Havey 20  asserts in his prefiled testimony that Tetra Tech's proposed ClearSky towers are 21  designed to reject the maximum thermal load under the "most stringent 22  conditions," including "highest salinity" (Havey Direct at p. 29, 1. 10-13), Tetra 23  Tech does not identify the salinity levels that were provided to SPX or how (or
15  Power (Apr. 2011), at 6 (Entergy Ex. 352) ("It is found that an increase in 16  salinity decreases the air effectiveness by 5-20% relative to freshwater cooling 17  tower."). Here, Tetra Tech proposes concentrating the salt level in the Hudson 18  River three times in its closed-cycle system, which will amplify degradation of 19  thermal performance attributable to increased salinity. Although Mr. Havey 20  asserts in his prefiled testimony that Tetra Tech's proposed ClearSky towers are 21  designed to reject the maximum thermal load under the "most stringent 22  conditions," including "highest salinity" (Havey Direct at p. 29, 1. 10-13), Tetra 23  Tech does not identify the salinity levels that were provided to SPX or how (or I    even whether) SPX adjusted the size of its cooling towers to account for the 2    increased salinity of the Hudson River. Without this information, there is a 3    substantial risk that Tetra Tech has further undersized its cooling towers.
 
I    even whether) SPX adjusted the size of its cooling towers to account for the 2    increased salinity of the Hudson River. Without this information, there is a 3    substantial risk that Tetra Tech has further undersized its cooling towers.
4 Q: Aside from and in addition to the impacts that will reduce IPEC's ability to 5    generate power, are there any significant operational problems associated 6    with the proposed ClearSky towers that are not addressed by Messrs. Havey 7    and Ortiz and need to be to reach a feasibility determination?
4 Q: Aside from and in addition to the impacts that will reduce IPEC's ability to 5    generate power, are there any significant operational problems associated 6    with the proposed ClearSky towers that are not addressed by Messrs. Havey 7    and Ortiz and need to be to reach a feasibility determination?
8 A:  Yes. Mr. Havey and Mr. Ortiz fail to address the potential site impacts that 9    could result from the localized plume of humid, salt-laden air that is exhausted 10    from Tetra Tech's ClearSky cooling towers. Importantly, the ClearSky towers 11    discharge at lower velocities, at a lower height, and with less thermal buoyancy 12    than the round hybrid towers described in the ENERCON Closed-Loop Cooling 13    Reports. As a result, the ClearSky towers have more concentrated and localized 14    plumes      at  ground    level,    which    increases    salt    deposition and 15    temperature/humidity effects on electrical equipment and components in close 16    proximity to the towers. This creates a number of personnel and station safety-17    related issues, such as electrical arcing, icing during the winter, and fogging due 18    to the cooling tower plume on occasion. Ground level icing and salt deposition 19    poses serious workplace safety, maintenance, and environmental concerns, with 20    the potential to render certain areas of the site treacherous during winter months, 21    as well as creating substantial local vegetation impacts. Fogging that would lead 22    to reduce visibility creates associated security risks at the facility.
8 A:  Yes. Mr. Havey and Mr. Ortiz fail to address the potential site impacts that 9    could result from the localized plume of humid, salt-laden air that is exhausted 10    from Tetra Tech's ClearSky cooling towers. Importantly, the ClearSky towers 11    discharge at lower velocities, at a lower height, and with less thermal buoyancy 12    than the round hybrid towers described in the ENERCON Closed-Loop Cooling 13    Reports. As a result, the ClearSky towers have more concentrated and localized 14    plumes      at  ground    level,    which    increases    salt    deposition and 15    temperature/humidity effects on electrical equipment and components in close 16    proximity to the towers. This creates a number of personnel and station safety-17    related issues, such as electrical arcing, icing during the winter, and fogging due 18    to the cooling tower plume on occasion. Ground level icing and salt deposition 19    poses serious workplace safety, maintenance, and environmental concerns, with 20    the potential to render certain areas of the site treacherous during winter months, 21    as well as creating substantial local vegetation impacts. Fogging that would lead 22    to reduce visibility creates associated security risks at the facility.
1        The risk of icing poses unique operational concerns for ClearSky towers, 2 which use proprietary "ClearSky heat exchangers" that are designed to condense 3 moisture from the cooling tower's exhaust in the form of "high purity water-4 approaching distilled water quality." Entergy Ex. 359 at 10. As SPX noted in its 5 2012 DOE Report, imperfect seals will cause leakage within the ClearSky heat 6 exchanger that will cause icing in the heat exchanger in cold weather. SPX 7 correctly acknowledged that "[t]his behavior is unacceptable in the commercial 8 market place." See id. at 19. Although SPX advertises that it has performed 9 laboratory testing on its condensing modules in "all four seasons," tellingly, the 10 test data it selected to include in its 2012 DOE Report only includes results for 11 spring and summer, not the cooler seasons of fall and winter. See id. at 14-15.
1        The risk of icing poses unique operational concerns for ClearSky towers, 2 which use proprietary "ClearSky heat exchangers" that are designed to condense 3 moisture from the cooling tower's exhaust in the form of "high purity water-4 approaching distilled water quality." Entergy Ex. 359 at 10. As SPX noted in its 5 2012 DOE Report, imperfect seals will cause leakage within the ClearSky heat 6 exchanger that will cause icing in the heat exchanger in cold weather. SPX 7 correctly acknowledged that "[t]his behavior is unacceptable in the commercial 8 market place." See id. at 19. Although SPX advertises that it has performed 9 laboratory testing on its condensing modules in "all four seasons," tellingly, the 10 test data it selected to include in its 2012 DOE Report only includes results for 11 spring and summer, not the cooler seasons of fall and winter. See id. at 14-15.
12 At this point, it is simply unknown whether SPX's ClearSky heat exchangers are 13 appropriate for the IPEC site conditions.
12 At this point, it is simply unknown whether SPX's ClearSky heat exchangers are 13 appropriate for the IPEC site conditions.
Line 1,773: Line 1,608:
6  A:  Yes. IPEC's security procedures require the site to be fully lighted at night, 7      which would illuminate any visible plume.
6  A:  Yes. IPEC's security procedures require the site to be fully lighted at night, 7      which would illuminate any visible plume.
8  Q: Finally, assuming they can be constructed, did Messrs. Havey and Ortiz 9    account for the inherent concerns with fiberglass towers?
8  Q: Finally, assuming they can be constructed, did Messrs. Havey and Ortiz 9    account for the inherent concerns with fiberglass towers?
10  A:  No. Mr. Havey argues at page 20 of his prefiled testimony that fiberglass towers II      generally are "structurally sound" and can be reinforced to "meet higher wind 12      load requirements." Havey Direct at p. 20, 1.4-20. There is evidence, however, 13      that raises serious concerns of fiberglass towers' structural integrity. Most  0 14      notably, in the 2011 Cooling Technology Institute Annual Conference, American 15      Electric Power presented a paper entitled, AEP's Experience with Polyester FRP 16      Structure Cooling Towers, that described significant structural failures with five 17      fiberglass towers constructed with pultruded fiberglass. Of the 15 hyperbolic 18      and 30 mechanical draft cooling towers on the AEP system, the five towers 19      constructed from 2008 through 2010 were AEP's first fiberglass towers. AEP's 20      experience is a cautionary tale insofar as four of the five towers experienced 21      failed or cracked fiberglass columns and surface blisters were noticed in two of 22      the new towers after 2 to 18 months of operation. See Bob Cashner, AEP's 23      Experience with Polyester FRP Structure Cooling Towers, Cooling Tower
10  A:  No. Mr. Havey argues at page 20 of his prefiled testimony that fiberglass towers II      generally are "structurally sound" and can be reinforced to "meet higher wind 12      load requirements." Havey Direct at p. 20, 1.4-20. There is evidence, however, 13      that raises serious concerns of fiberglass towers' structural integrity. Most  0 14      notably, in the 2011 Cooling Technology Institute Annual Conference, American 15      Electric Power presented a paper entitled, AEP's Experience with Polyester FRP 16      Structure Cooling Towers, that described significant structural failures with five 17      fiberglass towers constructed with pultruded fiberglass. Of the 15 hyperbolic 18      and 30 mechanical draft cooling towers on the AEP system, the five towers 19      constructed from 2008 through 2010 were AEP's first fiberglass towers. AEP's 20      experience is a cautionary tale insofar as four of the five towers experienced 21      failed or cracked fiberglass columns and surface blisters were noticed in two of 22      the new towers after 2 to 18 months of operation. See Bob Cashner, AEP's 23      Experience with Polyester FRP Structure Cooling Towers, Cooling Tower 1      Institute (Feb. 6-10, 2011), at 2 (Entergy Ex. 358). These failures caused AEP to 2        conduct additional testing of the fiberglass material in 2009. See id. at 11. The 3        testing involved repeated exposure to saturation and then freezing or drying or 4        both. In sum, a total of 83 defects were documented in all sixteen samples 5      representing the four different test conditions. Id.
 
1      Institute (Feb. 6-10, 2011), at 2 (Entergy Ex. 358). These failures caused AEP to 2        conduct additional testing of the fiberglass material in 2009. See id. at 11. The 3        testing involved repeated exposure to saturation and then freezing or drying or 4        both. In sum, a total of 83 defects were documented in all sixteen samples 5      representing the four different test conditions. Id.
6      IV. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 7  FEASIBILITY OF RETROFITTING IPEC WITH ROUND HYBRID COOLING 8                                        TOWERS 9  Q:  Turning now to the round hybrid mechanical draft cooling towers described 10      in the ENERCON Closed-Loop Cooling Reports, as a preliminary matter, 11      has Enercon or Entergy proposed the circular hybrid cooling towers 12      described in the ENERCON Closed-Loop Cooling Reports as the best 13      technology available for IPEC under 7 NYCRR § 704.5 and § 316(b) of the 14      Clean Water Act?
6      IV. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 7  FEASIBILITY OF RETROFITTING IPEC WITH ROUND HYBRID COOLING 8                                        TOWERS 9  Q:  Turning now to the round hybrid mechanical draft cooling towers described 10      in the ENERCON Closed-Loop Cooling Reports, as a preliminary matter, 11      has Enercon or Entergy proposed the circular hybrid cooling towers 12      described in the ENERCON Closed-Loop Cooling Reports as the best 13      technology available for IPEC under 7 NYCRR § 704.5 and § 316(b) of the 14      Clean Water Act?
15  A:    No. Entergy was required by NYSDEC to evaluate the possible conversion of 16        the existing system to a closed-loop circulation water system configuration. In 17        response to that mandate, Enercon selected a closed-loop configuration utilizing 18        hybrid round towers, which are the only cooling towers that could "reasonably 19        be considered" at IPEC. As I stated in my prefiled testimony dated July 22, 20        2011:
15  A:    No. Entergy was required by NYSDEC to evaluate the possible conversion of 16        the existing system to a closed-loop circulation water system configuration. In 17        response to that mandate, Enercon selected a closed-loop configuration utilizing 18        hybrid round towers, which are the only cooling towers that could "reasonably 19        be considered" at IPEC. As I stated in my prefiled testimony dated July 22, 20        2011:
21              In the Closed-Loop Cooling Report, ENERCON concluded that 22              the absence of a history of closed-cycle cooling retrofits and site-23              specific conditions at Indian Point would challenge the feasibility 24              of such an installation. The several reasons for the conclusion are 25              explained in detail in the Closed-Loop Cooling Report. Briefly,
21              In the Closed-Loop Cooling Report, ENERCON concluded that 22              the absence of a history of closed-cycle cooling retrofits and site-23              specific conditions at Indian Point would challenge the feasibility 24              of such an installation. The several reasons for the conclusion are 25              explained in detail in the Closed-Loop Cooling Report. Briefly, 1        conversion of Indian Point to closed-loop cooling would be an 2        unprecedented    undertaking    that would encounter numerous 3        significant identified siting and construction challenges, some of 4        which may not be successfully surmounted. Such a conversion is 5        unprecedented, because no nuclear stations designed solely for 6        once-through cooling have been converted to closed-loop cooling.
 
1        conversion of Indian Point to closed-loop cooling would be an 2        unprecedented    undertaking    that would encounter numerous 3        significant identified siting and construction challenges, some of 4        which may not be successfully surmounted. Such a conversion is 5        unprecedented, because no nuclear stations designed solely for 6        once-through cooling have been converted to closed-loop cooling.
7        This nuclear experience is critical, because conversion of the 8        condenser    cooling    system    of an existing      plant presents 9        fundamental design problems that result in plant performance 10        impacts or require redesign of the essential plant equipment, e.g.,
7        This nuclear experience is critical, because conversion of the 8        condenser    cooling    system    of an existing      plant presents 9        fundamental design problems that result in plant performance 10        impacts or require redesign of the essential plant equipment, e.g.,
11        the condenser. Moreover, absent any practical history of closed-12        loop cooling retrofits at nuclear facilities, engineering observations 13        and conclusions regarding any such conversion must be made on a        0 14        purely speculative basis and are inherently subject to unforeseen 15        challenges during the detailed design and the subsequent 16        construction phases.      Only upon successful operation of a 17        completed closed-loop cooling retrofit at a representative number 18        of comparable facilities could this type of conversion be 19        conclusively considered feasible.
11        the condenser. Moreover, absent any practical history of closed-12        loop cooling retrofits at nuclear facilities, engineering observations 13        and conclusions regarding any such conversion must be made on a        0 14        purely speculative basis and are inherently subject to unforeseen 15        challenges during the detailed design and the subsequent 16        construction phases.      Only upon successful operation of a 17        completed closed-loop cooling retrofit at a representative number 18        of comparable facilities could this type of conversion be 19        conclusively considered feasible.
20 Prefiled Testimony of Sam Beaver in Support of Entergy Nuclear Indian Point 2, 21 LLC, Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations, 22 Inc. at 21:5-22, dated July 22, 2011.
20 Prefiled Testimony of Sam Beaver in Support of Entergy Nuclear Indian Point 2, 21 LLC, Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations, 22 Inc. at 21:5-22, dated July 22, 2011.
1 Q:  Are there any examples of round hybrid towers at nuclear facilities of the 2      size contemplated in the ENERCON Closed-Loop Cooling Reports?
1 Q:  Are there any examples of round hybrid towers at nuclear facilities of the 2      size contemplated in the ENERCON Closed-Loop Cooling Reports?
3  A:  There is only one round hybrid tower of a size that approaches what would be 4        required for each of IPEC Unit 2 and Unit 3, located at the Neckarwestheim 5        nuclear power plant (Unit 2) in Germany. There are, however, several important 6        differences between the Neckarwestheim facility and IPEC. Most significantly, 7      the Neckarwestheim Unit 2 cooling tower was constructed as part of a new 8      facility, not a retrofit of an existing facility. The Neckarwestheim Unit 2 cooling 9      tower is also subject to different environmental and water quality conditions than 10      what would be experienced at IPEC.
3  A:  There is only one round hybrid tower of a size that approaches what would be 4        required for each of IPEC Unit 2 and Unit 3, located at the Neckarwestheim 5        nuclear power plant (Unit 2) in Germany. There are, however, several important 6        differences between the Neckarwestheim facility and IPEC. Most significantly, 7      the Neckarwestheim Unit 2 cooling tower was constructed as part of a new 8      facility, not a retrofit of an existing facility. The Neckarwestheim Unit 2 cooling 9      tower is also subject to different environmental and water quality conditions than 10      what would be experienced at IPEC.
11  Q:  Did Messrs. Ortiz and Havey offer any analysis concerning the feasibility of 12      retrofitting IPEC Units 2 and 3 with round hybrid cooling towers?
11  Q:  Did Messrs. Ortiz and Havey offer any analysis concerning the feasibility of 12      retrofitting IPEC Units 2 and 3 with round hybrid cooling towers?
13  A:  No. While Mr. Havey testifies that the circular hybrid cooling towers described 14      in ENERCON 2003 "could be constructed, installed, and operated at the Indian 15      Point nuclear facilities," Havey Direct at p. 3, 1. 19-21, and that "Enercon's 16      circular hybrid cooling tower proposal was available and generally feasible for 17      the IPEC facilities in order to satisfy the BTA requirements of 6 NYCRR 18      § 704.5," id. at p. 10, 1. 8-10, he offers no additional analysis. Likewise, Mr.
13  A:  No. While Mr. Havey testifies that the circular hybrid cooling towers described 14      in ENERCON 2003 "could be constructed, installed, and operated at the Indian 15      Point nuclear facilities," Havey Direct at p. 3, 1. 19-21, and that "Enercon's 16      circular hybrid cooling tower proposal was available and generally feasible for 17      the IPEC facilities in order to satisfy the BTA requirements of 6 NYCRR 18      § 704.5," id. at p. 10, 1. 8-10, he offers no additional analysis. Likewise, Mr.
19      Ortiz offers no analysis nor justification. Further, Mr. Ortiz's opinion as to the 20      feasibility of retrofitting Units 2 and 3 with round hybrid towers is even less 21      clear. In response to a question as to whether the circular hybrid cooling tower 22      configuration described by Enercon in its 2003 and 2010 is "available and 23      generally feasible," Mr. Ortiz testifies that "[b]ased on the limited scope and
19      Ortiz offers no analysis nor justification. Further, Mr. Ortiz's opinion as to the 20      feasibility of retrofitting Units 2 and 3 with round hybrid towers is even less 21      clear. In response to a question as to whether the circular hybrid cooling tower 22      configuration described by Enercon in its 2003 and 2010 is "available and 23      generally feasible," Mr. Ortiz testifies that "[b]ased on the limited scope and I    analysis of the study [the round hybrid towers] may be feasible, but a more in 2      depth study would be necessary to obtain afinalconclusion." Ortiz Direct at p.
 
I    analysis of the study [the round hybrid towers] may be feasible, but a more in 2      depth study would be necessary to obtain afinalconclusion." Ortiz Direct at p.
3      5, 1. 1-2 (emphasis added).
3      5, 1. 1-2 (emphasis added).
4  Q: Do you agree with Mr. Havey's opinion that the circular hybrid cooling 5    towers described in the ENERCON Closed-Loop Cooling Reports "could be 6    constructed, installed, and operated at the Indian Point nuclear facilities" 7    and Mr. Ortiz's testimony that such a retrofit "may be feasible"?
4  Q: Do you agree with Mr. Havey's opinion that the circular hybrid cooling 5    towers described in the ENERCON Closed-Loop Cooling Reports "could be 6    constructed, installed, and operated at the Indian Point nuclear facilities" 7    and Mr. Ortiz's testimony that such a retrofit "may be feasible"?
8  A:  No. While retrofitting IPEC Units 2 and 3 may be theoretically possible (and 9      cost over two billion dollars and take over eight years in construction time 10      alone), the ENERCON Closed-Loop Cooling Reports identified numerous 11      significant challenges to the feasibility of retrofitting IPEC Units 2 and 3 with 12      circular hybrid cooling tower. These include, but are not limited to, appreciable 13      elevation changes, a general lack of available space, a subsurface primarily 14      composed of solid rock, the location of a major interstate gas pipeline, local air 15      quality, archeological and aesthetic considerations, etc.      Given the sizeable 16      challenges and level of unknowns, based upon my best professional judgment, I 17      could not in good conscience recommend round hybrid cooling towers for IPEC 18      as a practical or reasonable alternative for compliance with regulatory 19      requirements associated with the Clean Water Act.
8  A:  No. While retrofitting IPEC Units 2 and 3 may be theoretically possible (and 9      cost over two billion dollars and take over eight years in construction time 10      alone), the ENERCON Closed-Loop Cooling Reports identified numerous 11      significant challenges to the feasibility of retrofitting IPEC Units 2 and 3 with 12      circular hybrid cooling tower. These include, but are not limited to, appreciable 13      elevation changes, a general lack of available space, a subsurface primarily 14      composed of solid rock, the location of a major interstate gas pipeline, local air 15      quality, archeological and aesthetic considerations, etc.      Given the sizeable 16      challenges and level of unknowns, based upon my best professional judgment, I 17      could not in good conscience recommend round hybrid cooling towers for IPEC 18      as a practical or reasonable alternative for compliance with regulatory 19      requirements associated with the Clean Water Act.
20              To reach any other conclusion about the feasibility of round hybrid towers, 21      the challenges identified in the ENERCON Closed-Loop Cooling Report would 22      need to be fully addressed. Neither Mr. Havey nor Mr. Ortiz resolved any of the 23      uncertainties described in the ENERCON Closed-Loop Cooling Reports, and as
20              To reach any other conclusion about the feasibility of round hybrid towers, 21      the challenges identified in the ENERCON Closed-Loop Cooling Report would 22      need to be fully addressed. Neither Mr. Havey nor Mr. Ortiz resolved any of the 23      uncertainties described in the ENERCON Closed-Loop Cooling Reports, and as I      a result, are not in a position to conclude that round hybrid towers are feasible at 2      IPEC.
 
I      a result, are not in a position to conclude that round hybrid towers are feasible at 2      IPEC.
3 Q:  Did Tetra Tech or Hatch materially dispute any of the conclusions of the 4    ENERCON Closed-Loop Cooling Reports?
3 Q:  Did Tetra Tech or Hatch materially dispute any of the conclusions of the 4    ENERCON Closed-Loop Cooling Reports?
5  A:  No. According to Mr. Ortiz, Hatch's review of the Enercon Closed-Loop 6      Cooling Reports was limited to reviewing the reports by unidentified Hatch 7      employees and providing "comments" to Mr. Havey at Tetra Tech. Hatch's 8      review of ENERCON 2003 was reportedly limited to "challenging certain 9      assumptions on the prevailing winds, soil conditions, some contradictions on the 10      wet bulb temperatures used, and identified minor discrepancies." Ortiz Direct at 11      p. 3, 1.17-19. Given this context, Mr. Ortiz's testimony that in Hatch's review of 12      ENERCON 2010, "no major issues or deficiencies were identified by Hatch with 13      respect to the technical feasibility of transferring from a once-through cooling 14      system to a closed loop cooling system" is not helpful to me as an engineer. See 15      id. at p. 4, 1. 15-28 (emphasis added). It is further complicated by the fact that 16      Mr. Havey states in his testimony that SAIC, not Hatch, reviewed ENERCON 17      2010. See Havey Direct, at p. 8, 1. 20-22. Mr. Ortiz does not even discuss the 18      major issues and challenges identified by Enercon in its report.
5  A:  No. According to Mr. Ortiz, Hatch's review of the Enercon Closed-Loop 6      Cooling Reports was limited to reviewing the reports by unidentified Hatch 7      employees and providing "comments" to Mr. Havey at Tetra Tech. Hatch's 8      review of ENERCON 2003 was reportedly limited to "challenging certain 9      assumptions on the prevailing winds, soil conditions, some contradictions on the 10      wet bulb temperatures used, and identified minor discrepancies." Ortiz Direct at 11      p. 3, 1.17-19. Given this context, Mr. Ortiz's testimony that in Hatch's review of 12      ENERCON 2010, "no major issues or deficiencies were identified by Hatch with 13      respect to the technical feasibility of transferring from a once-through cooling 14      system to a closed loop cooling system" is not helpful to me as an engineer. See 15      id. at p. 4, 1. 15-28 (emphasis added). It is further complicated by the fact that 16      Mr. Havey states in his testimony that SAIC, not Hatch, reviewed ENERCON 17      2010. See Havey Direct, at p. 8, 1. 20-22. Mr. Ortiz does not even discuss the 18      major issues and challenges identified by Enercon in its report.
19              There is nothing in Mr. Ortiz's testimony that shows a basis for any 20      engineering conclusions as to feasibility of round hybrid cooling towers at IPEC.
19              There is nothing in Mr. Ortiz's testimony that shows a basis for any 20      engineering conclusions as to feasibility of round hybrid cooling towers at IPEC.
21      Similarly, Tetra Tech did not dispute and in fact, validated, many of the major 22      conclusions of the ENERCON Closed-Loop Cooling Reports.              For example, 23      Tetra Tech agreed:
21      Similarly, Tetra Tech did not dispute and in fact, validated, many of the major 22      conclusions of the ENERCON Closed-Loop Cooling Reports.              For example, 23      Tetra Tech agreed:
1 1. Enercon's estimate for direct capital costs of $1.19 billion and ongoing 2    operation and maintenance costs of $2.0 to $4.0 million per year per unit were 3    "well within the range of comparable project estimates developed for other 4    nuclear facilities when adjusted for the unique considerations at IPEC (found 5    hybrid towers, transmission pipeline relocation, etc.)." Memorandum from 6    Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris Hogan, NYS 7    Department of Environmental Conservation, dated July 6, 2010 at 3 (Staff Ex.
1 1. Enercon's estimate for direct capital costs of $1.19 billion and ongoing 2    operation and maintenance costs of $2.0 to $4.0 million per year per unit were 3    "well within the range of comparable project estimates developed for other 4    nuclear facilities when adjusted for the unique considerations at IPEC (found 5    hybrid towers, transmission pipeline relocation, etc.)." Memorandum from 6    Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris Hogan, NYS 7    Department of Environmental Conservation, dated July 6, 2010 at 3 (Staff Ex.
8    214, Appendix B).
8    214, Appendix B).
Line 1,817: Line 1,642:
15  A:  Yes. Mr. Nieder suggests that Enercon did not provide enough detail to support 16      its estimate of the capital costs for constructing the proposed array of CWWS. I 17      have submitted as Entergy Exhibit 372 additional details that support Enercon's 18      estimate of capital costs which should address Mr. Nieder's concern.
15  A:  Yes. Mr. Nieder suggests that Enercon did not provide enough detail to support 16      its estimate of the capital costs for constructing the proposed array of CWWS. I 17      have submitted as Entergy Exhibit 372 additional details that support Enercon's 18      estimate of capital costs which should address Mr. Nieder's concern.
19 Q:  Have you had an opportunity to review Mr. Nieder's testimony regarding the 20    O&M costs of operating cylindrical wedgewire screens at IPEC?
19 Q:  Have you had an opportunity to review Mr. Nieder's testimony regarding the 20    O&M costs of operating cylindrical wedgewire screens at IPEC?
21 A:  Yes. Mr. Nieder contends that he was not able to calculate the proportional costs 22      of Entergy's proposed CWWS array because it did not include annual O&M 23      costs of the CWWS array.        He further disputes NERA's conclusion that the 24      O&M costs for CWWS would be insignificant based on other estimates he had
21 A:  Yes. Mr. Nieder contends that he was not able to calculate the proportional costs 22      of Entergy's proposed CWWS array because it did not include annual O&M 23      costs of the CWWS array.        He further disputes NERA's conclusion that the 24      O&M costs for CWWS would be insignificant based on other estimates he had 1      received for CWWS O&M costs from other facilities because the "median O&M 2      costs represented 38 percent of the total costs for constructing and operating 3      CWWSs for 20 years. This percentage level of the overall costs for constructing 4      and operating CWWSs for 20 years is significant." Nieder Direct at p. 17, 1. 8-5      10.
 
1      received for CWWS O&M costs from other facilities because the "median O&M 2      costs represented 38 percent of the total costs for constructing and operating 3      CWWSs for 20 years. This percentage level of the overall costs for constructing 4      and operating CWWSs for 20 years is significant." Nieder Direct at p. 17, 1. 8-5      10.
6 Q:  As a preliminary matter, is it appropriate to calculate O&M costs for the 7    CWWS for a 20 year life period?
6 Q:  As a preliminary matter, is it appropriate to calculate O&M costs for the 7    CWWS for a 20 year life period?
8  A:  No. CWWS will not be operating for the full twenty years of Entergy's renewed 9      license. Entergy's NRC renewed operating licenses for Unit 2 and Unit 3 would 10      expire in 2033 and 2035, respectively. We have estimated that the design phase 11      of the CWWS project would extend for approximately two years and in-river 12      construction activities would occur over three successive years, with the final tie-13      in occurring in the sixth year. Accordingly, assuming design and construction        0 14      begin after these proceedings and any associated court proceedings end, which I 15      understand NERA assumed would be 2018, construction would not be complete, 16      and therefore Entergy would not be incurring O&M costs for each Unit, until 17      roughly 2024. As a result, O&M costs would only be incurred for 9-11 years 18      until the operating license respectively expire, or an average of 10 years per unit.
8  A:  No. CWWS will not be operating for the full twenty years of Entergy's renewed 9      license. Entergy's NRC renewed operating licenses for Unit 2 and Unit 3 would 10      expire in 2033 and 2035, respectively. We have estimated that the design phase 11      of the CWWS project would extend for approximately two years and in-river 12      construction activities would occur over three successive years, with the final tie-13      in occurring in the sixth year. Accordingly, assuming design and construction        0 14      begin after these proceedings and any associated court proceedings end, which I 15      understand NERA assumed would be 2018, construction would not be complete, 16      and therefore Entergy would not be incurring O&M costs for each Unit, until 17      roughly 2024. As a result, O&M costs would only be incurred for 9-11 years 18      until the operating license respectively expire, or an average of 10 years per unit.
Line 1,834: Line 1,657:


1 have on the facility's ability to generate electricity, NYSDEC Staff has failed to 2 demonstrate that cooling towers are feasible at IPEC.
1 have on the facility's ability to generate electricity, NYSDEC Staff has failed to 2 demonstrate that cooling towers are feasible at IPEC.
END OF TESTIMONY
END OF TESTIMONY STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and      DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC          SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,          DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                          3-5522-00105/00031 (IP3)
 
STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and      DEC No.:      3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC          SPDES No.:    NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,          DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s                          3-5522-00105/00031 (IP3)
Joint Application for CWA § 401 Water Quality Certification PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3. LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
Joint Application for CWA § 401 Water Quality Certification PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3. LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC, AND ENTERGY NUCLEAR OPERATIONS, INC.
CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC, AND ENTERGY NUCLEAR OPERATIONS, INC.
Line 1,852: Line 1,673:
22  Q: How is your rebuttal testimony organized?
22  Q: How is your rebuttal testimony organized?
23  A: My testimony is organized into three sections. First, I respond to statements by 24    Mr. Hogan about CCC furthering recreational and commercial fishing and Mr.
23  A: My testimony is organized into three sections. First, I respond to statements by 24    Mr. Hogan about CCC furthering recreational and commercial fishing and Mr.
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1      Nieder's testimony that the theoretical harvest impacts presented in the reports 2      produced    by NERA Economic          Consulting ("NERA")      entitled "Wholly 3      Disproportionate" Assessments of Cylindrical Wedgewire Screens and Cooling 4      Towers at IPEC (December 2013) (Entergy Ex. 297) and Benefits and Costs of 5      Cylindrical Wedgewire Screens or Cooling Towers at IPEC (December 2013) 6      (Entergy Ex. 296D) (collectively, the "NERA Reports") are inconsistent with the 7      previous testimony of Entergy's biology team that reducing impingement and 8      entrainment mortality at Indian Point would not increase fish populations in the 9      Hudson River. Second, I respond to Mr. Nieder's testimony understating the 10      reductions in entrainment mortality, or efficacy, associated with Entergy's 11      proposed Cylindrical Wedgewire Screen ("CWWS") array.          Third, I address 12      NYSDEC Staff's continued lack of analysis of potential impacts of its proposed 13      CCC retrofit on endangered sturgeon.
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1      Nieder's testimony that the theoretical harvest impacts presented in the reports 2      produced    by NERA Economic          Consulting ("NERA")      entitled "Wholly 3      Disproportionate" Assessments of Cylindrical Wedgewire Screens and Cooling 4      Towers at IPEC (December 2013) (Entergy Ex. 297) and Benefits and Costs of 5      Cylindrical Wedgewire Screens or Cooling Towers at IPEC (December 2013) 6      (Entergy Ex. 296D) (collectively, the "NERA Reports") are inconsistent with the 7      previous testimony of Entergy's biology team that reducing impingement and 8      entrainment mortality at Indian Point would not increase fish populations in the 9      Hudson River. Second, I respond to Mr. Nieder's testimony understating the 10      reductions in entrainment mortality, or efficacy, associated with Entergy's 11      proposed Cylindrical Wedgewire Screen ("CWWS") array.          Third, I address 12      NYSDEC Staff's continued lack of analysis of potential impacts of its proposed 13      CCC retrofit on endangered sturgeon.
14  II. CALCULATION OF THEORETICAL HARVEST IMPACTS DOES NOT 15                      INDICATE FISH POPULATION EFFECTS 16 Q:  Let's begin with Mr. Hogan's testimony. On pages 36-39 of his prefiled 17      testimony, Mr. Hogan discusses the report he prepared entitled Indian Point 18      Energy Center Unit 2 and Unit 3 Cooling System RetrofitAlternative: State 19      Environmental Quality Review Act PreliminaryAssessment of Consistency 20      with Applicable State Coastal Policies(the "Hogan CMP Report"), Staff Ex.
14  II. CALCULATION OF THEORETICAL HARVEST IMPACTS DOES NOT 15                      INDICATE FISH POPULATION EFFECTS 16 Q:  Let's begin with Mr. Hogan's testimony. On pages 36-39 of his prefiled 17      testimony, Mr. Hogan discusses the report he prepared entitled Indian Point 18      Energy Center Unit 2 and Unit 3 Cooling System RetrofitAlternative: State 19      Environmental Quality Review Act PreliminaryAssessment of Consistency 20      with Applicable State Coastal Policies(the "Hogan CMP Report"), Staff Ex.
21      243. Have you reviewed the Hogan CMP Report?
21      243. Have you reviewed the Hogan CMP Report?
22 A:  Yes. I have reviewed relevant portions of the Hogan CMP Report.
22 A:  Yes. I have reviewed relevant portions of the Hogan CMP Report.
23 Q:  On page 11 of the Hogan CMP Report, Mr. Hogan states that installing the 24      "closed cycle cooling retrofit alternative would restore the viability of habitat
23 Q:  On page 11 of the Hogan CMP Report, Mr. Hogan states that installing the 24      "closed cycle cooling retrofit alternative would restore the viability of habitat PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1    in the water column" and "further commercial and recreational fishing 2    activities" in the Hudson River. Do you agree with his assessment?
 
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1    in the water column" and "further commercial and recreational fishing 2    activities" in the Hudson River. Do you agree with his assessment?
3  A: No. As Entergy's Biology Team testified at length in the Best Usages portion of 4    these Proceedings, multiple lines of analysis of more than 30 years of Hudson 5    River fish population data have shown that Indian Point impingement and 6    entrainment have no effect on the populations (or the community) of fish in the 7    Hudson River. See, e.g., Hearing Tr. at 3379:7-86:4 (Heimbuch); 3386:5-92:14 8    (J. Young); 3393:15-3407:13 (Barnthouse); 3409:4-13:5 (J. Young); 3413:14-21 9    (J. Young, Barnthouse, Heimbuch). Therefore, installing a CCC retrofit, or any 10    other cooling water intake structure technology, at Indian Point would have no 11    impact on the "viability of habitat in the water column," nor would it "further 12    commercial and recreational fishing activities" in the Hudson River.
3  A: No. As Entergy's Biology Team testified at length in the Best Usages portion of 4    these Proceedings, multiple lines of analysis of more than 30 years of Hudson 5    River fish population data have shown that Indian Point impingement and 6    entrainment have no effect on the populations (or the community) of fish in the 7    Hudson River. See, e.g., Hearing Tr. at 3379:7-86:4 (Heimbuch); 3386:5-92:14 8    (J. Young); 3393:15-3407:13 (Barnthouse); 3409:4-13:5 (J. Young); 3413:14-21 9    (J. Young, Barnthouse, Heimbuch). Therefore, installing a CCC retrofit, or any 10    other cooling water intake structure technology, at Indian Point would have no 11    impact on the "viability of habitat in the water column," nor would it "further 12    commercial and recreational fishing activities" in the Hudson River.
13  Q: Now let's turn to Mr. Nieder's testimony. On page 25 of his testimony, Mr.
13  Q: Now let's turn to Mr. Nieder's testimony. On page 25 of his testimony, Mr.
14    Nieder states that "Entergy's experts have previously opined that no amount 15    of impingement mortality and entrainment reduction would increase the 16    abundance of any Hudson River fish population but in the December 2013 17    NERA reports, Entergy's biologists present a fisheries harvest benefit for 18    striped bass, American shad, white perch, and river herring as a result of 19    reducing impingement and entrainment at IPEC." Is the "fisheries harvest 20    benefit" presented in the NERA Reports inconsistent with the Biology 21    Team's conclusions that impingement and entrainment at Indian Point have 22    no effect on Hudson River fish populations?
14    Nieder states that "Entergy's experts have previously opined that no amount 15    of impingement mortality and entrainment reduction would increase the 16    abundance of any Hudson River fish population but in the December 2013 17    NERA reports, Entergy's biologists present a fisheries harvest benefit for 18    striped bass, American shad, white perch, and river herring as a result of 19    reducing impingement and entrainment at IPEC." Is the "fisheries harvest 20    benefit" presented in the NERA Reports inconsistent with the Biology 21    Team's conclusions that impingement and entrainment at Indian Point have 22    no effect on Hudson River fish populations?
23  A: The "fisheries harvest benefit" calculated in NERA's reports for both CWWS and
23  A: The "fisheries harvest benefit" calculated in NERA's reports for both CWWS and PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1    CCC technologies appears inconsistent with the Biology Team's conclusions that 2      impingement and entrainment at Indian Point have no effect on Hudson River fish 3    populations. However, as is stated in my reports providing biological inputs for 4    NERA's benefits and costs analyses (Entergy Exs. 185B, 300) and "wholly 5    disproportionate" analysis (Entergy Ex. 301), as well as in my prefiled testimony 6    regarding these reports (see J. Young May 31, 2013 Direct at 3-4; J. Young Feb.
 
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1    CCC technologies appears inconsistent with the Biology Team's conclusions that 2      impingement and entrainment at Indian Point have no effect on Hudson River fish 3    populations. However, as is stated in my reports providing biological inputs for 4    NERA's benefits and costs analyses (Entergy Exs. 185B, 300) and "wholly 5    disproportionate" analysis (Entergy Ex. 301), as well as in my prefiled testimony 6    regarding these reports (see J. Young May 31, 2013 Direct at 3-4; J. Young Feb.
7    28, 2014 Direct at 12-13), in calculating the theoretical increased harvests that 8    would result from installation of the proposed CWWS or CCC systems, we are 9    attempting to be highly conservative by maximizing our estimate of potential 10    benefits for both CWWS and for CCC. Accordingly, we give appropriate weight 11    to the impingement and entrainment losses on a theoretical basis consistent with 12    their expected contribution to the fishery, if we ignore the scientific evidence that 13    impingement and entrainment at Indian Point do not affect Hudson River fish 14    populations. Our doing so does not favor either of these two technology 15    alternatives - CWWS and CCC - over the other; rather, it favors both alternative 16    technologies over the no-action alternative, reflecting a conservative approach to 17    the issue. The Biology Team continues to believe there would be no positive 18    impacts from elimination of impingement and entrainment at Indian Point, but to 19    be very conservative in comparing the two proposed alternatives to the no-action 20    alternative, we present the potential increases in harvest that would be expected if 21    30+ years of empirical data were ignored.
7    28, 2014 Direct at 12-13), in calculating the theoretical increased harvests that 8    would result from installation of the proposed CWWS or CCC systems, we are 9    attempting to be highly conservative by maximizing our estimate of potential 10    benefits for both CWWS and for CCC. Accordingly, we give appropriate weight 11    to the impingement and entrainment losses on a theoretical basis consistent with 12    their expected contribution to the fishery, if we ignore the scientific evidence that 13    impingement and entrainment at Indian Point do not affect Hudson River fish 14    populations. Our doing so does not favor either of these two technology 15    alternatives - CWWS and CCC - over the other; rather, it favors both alternative 16    technologies over the no-action alternative, reflecting a conservative approach to 17    the issue. The Biology Team continues to believe there would be no positive 18    impacts from elimination of impingement and entrainment at Indian Point, but to 19    be very conservative in comparing the two proposed alternatives to the no-action 20    alternative, we present the potential increases in harvest that would be expected if 21    30+ years of empirical data were ignored.
22    III. MR. NIEDER UNDERSTATES THE BENEFITS (EFFICACY) 23                          OF THE PROPOSED CWWS ARRAY 24  Q: In the fourth step of his best technology available ("BTA") analysis, Mr.
22    III. MR. NIEDER UNDERSTATES THE BENEFITS (EFFICACY) 23                          OF THE PROPOSED CWWS ARRAY 24  Q: In the fourth step of his best technology available ("BTA") analysis, Mr.
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1    Nieder presents the benefits associated with Entergy's proposed CWWS 2      system as an efficacy of 54%; do you agree with his estimate?
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1    Nieder presents the benefits associated with Entergy's proposed CWWS 2      system as an efficacy of 54%; do you agree with his estimate?
3  A: No. The 54% figure used by Mr. Nieder as an estimate of the efficacy of the 4    proposed CWWS in the fourth step of his BTA analysis significantly understates 5    the actual entrainment reduction associated with the proposed CWWS. Indeed, 6    the 54% figure Mr. Nieder presents in his most recent prefiled testimony on page 7      14 is even lower than the 60% figure NYSDEC Staff has advanced in previous 8    testimony in these Proceedings. See e.g., Nieder June 29, 2012 Rebuttal at 30 9    ("the results.., suggest that the T-12 2.0 mm slot-width CWWS tested in-river 10    from a barge resulted in approximately 60% reduction in entrainment density 11    from that measured by the control port."). Mr. Nieder does not address this 12    inconsistency between his prior testimony and his present testimony regarding 13    CWWS efficacy.
3  A: No. The 54% figure used by Mr. Nieder as an estimate of the efficacy of the 4    proposed CWWS in the fourth step of his BTA analysis significantly understates 5    the actual entrainment reduction associated with the proposed CWWS. Indeed, 6    the 54% figure Mr. Nieder presents in his most recent prefiled testimony on page 7      14 is even lower than the 60% figure NYSDEC Staff has advanced in previous 8    testimony in these Proceedings. See e.g., Nieder June 29, 2012 Rebuttal at 30 9    ("the results.., suggest that the T-12 2.0 mm slot-width CWWS tested in-river 10    from a barge resulted in approximately 60% reduction in entrainment density 11    from that measured by the control port."). Mr. Nieder does not address this 12    inconsistency between his prior testimony and his present testimony regarding 13    CWWS efficacy.
14            In addition to being inconsistent with his prior testimony, Mr. Nieder's 15    54% figure also is inconsistent with the scientific evidence, which Mr. Nieder 16    likewise has failed to address. Mr. Nieder, referring back to his August 3, 2012 17    live hearing testimony (Hearing Tr. at 5140-45), states that the "best estimate" of 18    the efficacy of the proposed CWWS array is 54% when accounting for actual 19    intake flows during the "entrainment season" (averaging 93.9% of design 20    capacity), which he describes as being from May 10 through August 10 each year.
14            In addition to being inconsistent with his prior testimony, Mr. Nieder's 15    54% figure also is inconsistent with the scientific evidence, which Mr. Nieder 16    likewise has failed to address. Mr. Nieder, referring back to his August 3, 2012 17    live hearing testimony (Hearing Tr. at 5140-45), states that the "best estimate" of 18    the efficacy of the proposed CWWS array is 54% when accounting for actual 19    intake flows during the "entrainment season" (averaging 93.9% of design 20    capacity), which he describes as being from May 10 through August 10 each year.
21    See Nieder Direct at 14:6-19; 27:1-20; see also Staff Ex. 215 at 15, 16. While we 22    appreciate and agree with NYSDEC that most entrainment occurs within that May 23      10 to August 10 timeframe, we would note that some entrainment is known to
21    See Nieder Direct at 14:6-19; 27:1-20; see also Staff Ex. 215 at 15, 16. While we 22    appreciate and agree with NYSDEC that most entrainment occurs within that May 23      10 to August 10 timeframe, we would note that some entrainment is known to PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1  occur outside of that window when average flows may be less than 93.9% of full 2 flow, and that to the extent Mr. Nieder's entrainment reduction calculation does 3 not include entrainment reductions that occur outside the May 10 to August 10 4 time period, it under-represents the actual reduction.
 
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1  occur outside of that window when average flows may be less than 93.9% of full 2 flow, and that to the extent Mr. Nieder's entrainment reduction calculation does 3 not include entrainment reductions that occur outside the May 10 to August 10 4 time period, it under-represents the actual reduction.
5          Mr. Nieder's 54% estimate of efficacy is based on his interpretation of the 6 data in the report prepared by Entergy's Biology Team entitled Wedgewire Screen 7 In-River Efficacy Study at Indian Point Energy Center (January 2012) (the "In 8  River Study") (Entergy Ex. 163). See Nieder Direct at 14:8-11. However, Mr.
5          Mr. Nieder's 54% estimate of efficacy is based on his interpretation of the 6 data in the report prepared by Entergy's Biology Team entitled Wedgewire Screen 7 In-River Efficacy Study at Indian Point Energy Center (January 2012) (the "In 8  River Study") (Entergy Ex. 163). See Nieder Direct at 14:8-11. However, Mr.
9 Nieder's estimate is based on a comparison of the density of ichthyoplankton 10 entrained through the In-River Study's 2.0 mm slot width T-12 test screen against 11 the control port used in the In-River Study, and not against ambient density 12 estimated via the Tucker trawl. See Hearing Tr. at 5140-5141. Entergy's Biology 13 Team has explained at length that the Tucker trawl provides a more accurate and 14 appropriate estimate of ambient ichthyoplankton density for the calculation of 15  efficacy because it less susceptible than a control port to avoidance by larval and 16 juvenile fish. See, e.g., June 29, 2012 Panel Prefiled Rebuttal at 4-33; Hearing Tr.
9 Nieder's estimate is based on a comparison of the density of ichthyoplankton 10 entrained through the In-River Study's 2.0 mm slot width T-12 test screen against 11 the control port used in the In-River Study, and not against ambient density 12 estimated via the Tucker trawl. See Hearing Tr. at 5140-5141. Entergy's Biology 13 Team has explained at length that the Tucker trawl provides a more accurate and 14 appropriate estimate of ambient ichthyoplankton density for the calculation of 15  efficacy because it less susceptible than a control port to avoidance by larval and 16 juvenile fish. See, e.g., June 29, 2012 Panel Prefiled Rebuttal at 4-33; Hearing Tr.
17  at 4871-88: Entergy Ex. 17. Thus, Mr. Nieder's assessment is understated.
17  at 4871-88: Entergy Ex. 17. Thus, Mr. Nieder's assessment is understated.
18          Rather, as set forth in the 2011 Update, the proposed CWWS will reduce 19 the entrainment of all representative important species ("RIS") by an average of 20  75.4%, taking into account average annual intake water flows, and without taking 21  into account entrainment survival. See Entergy Exs. 21 at 3 (case 4.1); see also 22  Entergy Ex. 96C, case 4.1 (reporting average entrainment reductions for age-1 23  equivalents of 89.7% from regulatory baseline); July 22, 2011 Panel Direct
18          Rather, as set forth in the 2011 Update, the proposed CWWS will reduce 19 the entrainment of all representative important species ("RIS") by an average of 20  75.4%, taking into account average annual intake water flows, and without taking 21  into account entrainment survival. See Entergy Exs. 21 at 3 (case 4.1); see also 22  Entergy Ex. 96C, case 4.1 (reporting average entrainment reductions for age-1 23  equivalents of 89.7% from regulatory baseline); July 22, 2011 Panel Direct PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 Prefiled at 67:11-15 (entrainment reductions for age-1 equivalents between 86%
 
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 Prefiled at 67:11-15 (entrainment reductions for age-1 equivalents between 86%
2  and 93.2% from regulatory baseline). The In-River Study data, which formed the 3  entire basis for Mr. Nieder's estimate, in fact confirmed our 75.7% estimate based 4  on extensive laboratory studies (taking into account annual intake water flows and 5  sweeping velocity reductions among individual screens in the array). See May 30, 6  2012 Panel Prefiled Direct at 42 (case 4.1c); see also Entergy Ex. 180C. As the 7  Biology Team also has testified, the efficacy of the proposed CWWS increases to 8  82.2% when accounting for entrainment survival and 89.7% when expressed as 9  age-I equivalents, each of which approaches Mr. Nieder's 96% figure for CCC on 10  an annualized basis. See May 30, 2012 Panel Prefiled Direct at 42 (case 4.1a);
2  and 93.2% from regulatory baseline). The In-River Study data, which formed the 3  entire basis for Mr. Nieder's estimate, in fact confirmed our 75.7% estimate based 4  on extensive laboratory studies (taking into account annual intake water flows and 5  sweeping velocity reductions among individual screens in the array). See May 30, 6  2012 Panel Prefiled Direct at 42 (case 4.1c); see also Entergy Ex. 180C. As the 7  Biology Team also has testified, the efficacy of the proposed CWWS increases to 8  82.2% when accounting for entrainment survival and 89.7% when expressed as 9  age-I equivalents, each of which approaches Mr. Nieder's 96% figure for CCC on 10  an annualized basis. See May 30, 2012 Panel Prefiled Direct at 42 (case 4.1a);
11  Entergy Ex. 180C.
11  Entergy Ex. 180C.
12          In addition, Mr. Nieder's 54% figure does not account for the fact that, on 13  a cumulative basis - i.e., over the course of the remaining life of the facility upon 14  license renewal (until 2033 for Unit 2 and 2035 for Unit 3) and accounting for 15  differences in CWWS and CCC implementation schedules - the reductions in 16  entrainment losses attributable to installation of CWWS would be greater than for 17  either CCC proposal. What is more, even the 54% figure for CWWS used by Mr.
12          In addition, Mr. Nieder's 54% figure does not account for the fact that, on 13  a cumulative basis - i.e., over the course of the remaining life of the facility upon 14  license renewal (until 2033 for Unit 2 and 2035 for Unit 3) and accounting for 15  differences in CWWS and CCC implementation schedules - the reductions in 16  entrainment losses attributable to installation of CWWS would be greater than for 17  either CCC proposal. What is more, even the 54% figure for CWWS used by Mr.
18  Nieder in his February 28, 2014 prefiled testimony is higher than the true efficacy 19  one would achieve with CCC on an annual basis, if CCC must be curtailed to 20  meet air quality requirements. Although Mr. Nieder contests whether air quality 21  requirements would limit the operation of CCC at Indian Point, he has not 22  disputed Entergy's estimates of the magnitude of entrainment reductions 23  associated with CCC, assuming air quality requirements do in fact limit its
18  Nieder in his February 28, 2014 prefiled testimony is higher than the true efficacy 19  one would achieve with CCC on an annual basis, if CCC must be curtailed to 20  meet air quality requirements. Although Mr. Nieder contests whether air quality 21  requirements would limit the operation of CCC at Indian Point, he has not 22  disputed Entergy's estimates of the magnitude of entrainment reductions 23  associated with CCC, assuming air quality requirements do in fact limit its PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1        operation.
 
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1        operation.
2    IV. NYSDEC STAFF STILL PROVIDE NO ANALYSIS OF POTENTIAL 3            IMPACTS OF THE PROPOSED CCC RETROFIT ON STURGEON 4 Q:    Does Mr. Nieder address potential impacts of NYSDEC's proposed CCC 5        retrofit on endangered sturgeon in the Hudson River?
2    IV. NYSDEC STAFF STILL PROVIDE NO ANALYSIS OF POTENTIAL 3            IMPACTS OF THE PROPOSED CCC RETROFIT ON STURGEON 4 Q:    Does Mr. Nieder address potential impacts of NYSDEC's proposed CCC 5        retrofit on endangered sturgeon in the Hudson River?
6 A:    No. Mr. Nieder does not address any potential impacts of NYSDEC's proposed 7        CCC retrofit on endangered sturgeon.        Potential impacts to sturgeon are 8        mentioned briefly in Mr. Hogan's prefiled testimony. I understand, however, that 9        issues regarding the environmental impacts of NYSDEC's proposed CCC retrofit 10        on endangered species including shortnose and Atlantic sturgeon are supposed to 11        be addressed in later hearings that have yet to be scheduled; I respond to Mr.
6 A:    No. Mr. Nieder does not address any potential impacts of NYSDEC's proposed 7        CCC retrofit on endangered sturgeon.        Potential impacts to sturgeon are 8        mentioned briefly in Mr. Hogan's prefiled testimony. I understand, however, that 9        issues regarding the environmental impacts of NYSDEC's proposed CCC retrofit 10        on endangered species including shortnose and Atlantic sturgeon are supposed to 11        be addressed in later hearings that have yet to be scheduled; I respond to Mr.
Line 1,892: Line 1,701:
16 Q:    Can you summarize Mr. Hogan's prefiled testimony regarding potential 17        effects of NYSDEC's proposed CCC retrofit on endangered sturgeon in the 18        Hudson River?
16 Q:    Can you summarize Mr. Hogan's prefiled testimony regarding potential 17        effects of NYSDEC's proposed CCC retrofit on endangered sturgeon in the 18        Hudson River?
19 A:    Yes. On page 15 of his prefiled testimony, Mr. Hogan states that NYSDEC Staff 20        have "considered impacts to shortnose and Atlantic sturgeon in evaluating which 21        BTA alternatives would accomplish acceptable reduction in entrainment and 22        impingement by the cooling water intake structure" and that "there is a sufficient 23        body of data developed and supplied to the record during the BTA portion of this 24        proceeding, with which to assess the impacts." Hogan Direct at 15:20-24. Mr.
19 A:    Yes. On page 15 of his prefiled testimony, Mr. Hogan states that NYSDEC Staff 20        have "considered impacts to shortnose and Atlantic sturgeon in evaluating which 21        BTA alternatives would accomplish acceptable reduction in entrainment and 22        impingement by the cooling water intake structure" and that "there is a sufficient 23        body of data developed and supplied to the record during the BTA portion of this 24        proceeding, with which to assess the impacts." Hogan Direct at 15:20-24. Mr.
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1    Hogan also states that after considering "appropriate facts and information" 2    NYSDEC staff "made a determination selecting a preferred closed cycle cooling 3    alternative as the BTA." Hogan Direct at 16:1-4.
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1    Hogan also states that after considering "appropriate facts and information" 2    NYSDEC staff "made a determination selecting a preferred closed cycle cooling 3    alternative as the BTA." Hogan Direct at 16:1-4.
4  Q: Does Mr. Hogan's testimony discuss any actual potential impacts of 5    NYSDEC's proposed CCC retrofit on sturgeon?
4  Q: Does Mr. Hogan's testimony discuss any actual potential impacts of 5    NYSDEC's proposed CCC retrofit on sturgeon?
Line 1,898: Line 1,706:
10    As I stated in my prefiled direct testimony, no analysis of the potential impacts of 11    construction activities, including blasting of a "significant area of the IPEC site,"
10    As I stated in my prefiled direct testimony, no analysis of the potential impacts of 11    construction activities, including blasting of a "significant area of the IPEC site,"
12    or the loading and movement of more than 1,200 barges at the Unit 1 pier, was 13    included in the report Indian Point Closed-Cycle System Retrofit Evaluation 14    (Tetra Tech June 2013), and such an analysis also is absent from NYSDEC Staff's 15    testimony. Nor do NYSDEC Staff s witnesses' testimonies address the record 16    evidence that CWWS are more effective at reducing impingement mortality than 17    CCC would be (whereas entrainment of sturgeon is not an issue for either 18    technology). See, e.g., Nieder, Wholly DisproportionateTest Report, Feb. 28, 19    2014, at 14; NMFS, Biological Opinionfor Continued Operationsof Indian Point 20    Nuclear Generating Unit Nos. 2 and 3, Jan. 30, 2013 (Entergy Ex. 213), at 59-6 1, 21    64. As such, NYSDEC Staffs analysis and testimony continues to be inadequate 22    to make a State Environmental Quality Review Act ("SEQRA") determination for 23    the CCC retrofit proposed by NYSDEC staff.
12    or the loading and movement of more than 1,200 barges at the Unit 1 pier, was 13    included in the report Indian Point Closed-Cycle System Retrofit Evaluation 14    (Tetra Tech June 2013), and such an analysis also is absent from NYSDEC Staff's 15    testimony. Nor do NYSDEC Staff s witnesses' testimonies address the record 16    evidence that CWWS are more effective at reducing impingement mortality than 17    CCC would be (whereas entrainment of sturgeon is not an issue for either 18    technology). See, e.g., Nieder, Wholly DisproportionateTest Report, Feb. 28, 19    2014, at 14; NMFS, Biological Opinionfor Continued Operationsof Indian Point 20    Nuclear Generating Unit Nos. 2 and 3, Jan. 30, 2013 (Entergy Ex. 213), at 59-6 1, 21    64. As such, NYSDEC Staffs analysis and testimony continues to be inadequate 22    to make a State Environmental Quality Review Act ("SEQRA") determination for 23    the CCC retrofit proposed by NYSDEC staff.
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1        Moreover, Mr. Hogan's testimony addresses, if cursorily, only NYSDEC 2 Staff s BTA determination (Hogan Prefiled at 16:28-17:2), and therefore ignores 3 the issue of whether the proposed CCC system meets the requirements of the 4 SEQRA with respect to any aspects other than entrainment and impingement.
PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1        Moreover, Mr. Hogan's testimony addresses, if cursorily, only NYSDEC 2 Staff s BTA determination (Hogan Prefiled at 16:28-17:2), and therefore ignores 3 the issue of whether the proposed CCC system meets the requirements of the 4 SEQRA with respect to any aspects other than entrainment and impingement.
5 Therefore NYSDEC Staff still have not provided a complete analysis of potential 6 CCC impacts to endangered sturgeon sufficient to meet SEQRA requirements.
5 Therefore NYSDEC Staff still have not provided a complete analysis of potential 6 CCC impacts to endangered sturgeon sufficient to meet SEQRA requirements.
END OF TESTIMONY
END OF TESTIMONY
                                   }}
                                   }}

Latest revision as of 16:56, 5 February 2020

Unit 3 Coastal Zone Management Act Consistency Certification, Vol. II of III, Supplemental Information Regarding NYSDEC Record, Part 9 of 9
ML14304A752
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/31/2012
From:
AKRF, Entergy Nuclear Indian Point 2, Entergy Nuclear Indian Point 3, Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML14304A441 List:
References
F-2012-1028
Download: ML14304A752 (239)


Text

()_-TRC 4.0 OTHER ENVIRONMENTAL CONSIDERATIONS 4.1 Methodology As discussed in the Executive Summary, cooling towers can frequently result in a plume of water vapor and liquid water droplets (spray drift). TRC performed its analysis of Project cooling tower plume impacts using the Seasonal/Annual Cooling Tower Impacts ("SACTI") model.

Developed by researchers for the Electric Power Research Institute ("EPRI") in the mid 1980's,33 the SACTI model was formulated especially for modeling cooling tower operations associated with electric generating facilities or power plants. The model is widely recognized by the power industry and regulatory agencies (including NYSDEC) as being the most comprehensive field-validated cooling tower plume model available for modeling power plant cooling tower plumes.

The model has been tested and validated using actual field data. Thus, SACTI is considered by the power industry and regulatory agencies to be the model of choice for calculating potential environmental impacts from a wet evaporative cooling tower. A discussion of the structure of the SACTI model and the modeling methodology employed by this analysis is included in Appendix A of this report.

The SACTI cooling tower model calculates the seasonal and annual configuration of cooling tower vapor plumes. A visible cooling tower plume is evaporated water that will condense to form a visible cloud when it cools by coming into contact with air at a cooler ambient temperature. The condensed vapor plume from the cooling tower is essentially condensed distilled water that does not contain any minerals present in the circulating water. Any minerals that are emitted from the tower originate from the spray drift (small droplets of the circulating water) that are entrained in the exhaust air stream. Many of the drift droplets are fairly large compared to the condensed vapor droplets as they are emitted from the tower, and have an appreciable settling velocity causing many of them to fall out of the plume. The droplet size of the condensed water vapor is sufficiently small as to have no appreciable settling velocity.

Conditions simulated in the SACTI model include:

" Plume-induced fogging and icing (during freezing conditions) downwind of the cooling tower. A ground fog or icing condition occurs when the condensed vapor plume is lower than the tower outlet and impacts upon the ground.

  • Frequencies of plume length, height and radius.

" Hours of plume shadowing (the amount and duration of plume shadows at a given location). Plume shadowing is also used as an indicator for the frequency and length of visible plumes.

33 Policastro, A.J., L. Coke, and M. Wastag (1984). User's Manual:-Cooling Tower Plume Prediction Code, Electric Power Research Institute, EPRI CS-34o3-CCM, Palo Alto, CA.

4-1

,TRC

  • Deposition of liquid water (drift) and minerals dissolved in the cooling tower plume drift (water droplets entrained in the plume during plume exhaust). Mineral deposition is primarily from the concentration of calcium and magnesium carbonates and sodium chloride in the circulating water.
  • Salt deposition is experienced from cooling towers where salt or brackish water is used for make-up, as is the case for the proposed Project cooling towers.

The SACTI model can be used to determine the worst case plume configuration for a plume abated cooling tower, assuming no plume mitigation is being employed and the cooling tower is operated in the wet-only mode. The SACTI model does not allow calculation of combined impacts from cooling towers that are widely separated. Thus, only one tower was assessed and the impacts assumed to be representative for both towers. The combined effects of both Project cooling towers were determined by manually adding the impacts from each tower, in areas where the impacts from the towers could be seen, from their distribution around each tower, to overlap, thus representing the combined tower impacts.

The SACTI model calculates the effects of the Project cooling tower condensed water plume for ground fogging, rime ice formation, elevated plumes and mineral deposition using actual (representative) meteorological data. However, SACTI does not discern plume density, but discerns whether the plume water vapor content is greater than or less than the ambient saturation deficit (i.e., the amount of water vapor that must be added to the atmosphere to raise its relative humidity to loo%). Consequently, SACTI tabulates the presence of a potential condensed plume, but does not differentiate between a plume that is barely saturated and evaporating and one that is opaque with a high liquid water content ("LWC") of condensed water droplets. Essentially, SACTI considers any saturation deficit of greater than zero as forming a visible plume.34 In the real world, a plume typically is not visible until the liquid water content is greater than a threshold value of approximately 0.2 grams/cubic meter such that the width (or length) of the plume exceeds the optical depth35 of the condensed water vapor cloud.

Similarly, SACTI tabulates a ground rime icing condition if there is a tabulated occurrence of a ground fog when the ambient temperature is below 32 0 F. SACTI tabulates the conditions which may be conducive for rime ice formation, rather than actual formation of rime ice. Neither of these limitations, although properly noted, are considered to offset SACTI's usage or dominance 34 Once the cooling tower exhaust mixes with the atmosphere and cools, the plume may become super-saturated with respect to water vapor, such that the balance of water vapor in excess of the saturation deficit must condense as a condensed water vapor cloud, resulting in a visible plume.

35 Optical depth or optical thickness is a measure of transparency, and is defined as the negative logarithm of the fraction of radiation (or light) that is scattered or absorbed on a path. The optical depth for a water droplet cloud (visible plume) is related to the LWC of the cloud.

4-2

. .TRC for cooling tower modeling. SACTI remains the method of choice of most, if not all, regulatory agencies, including NYSDEC.

4.2 SACTI Modeling Analysis The model analysis used ten years of actual hourly meteorological data (1999-2oo8)36 recorded onsite at the IPEC meteorological monitoring station with seasonal mixing height data that was obtained from the mixing height37 study and protocol prepared and used by EPA.38 The use of onsite data provides a very accurate and representative meteorological data base for performing the cooling tower assessment. The onsite data was converted into the multiple-level NRC format that can be used by SACTI. Table 4-1 lists the specific cooling tower dimensional parameters input into SACTI. Wet mode operation of the cooling towers was simulated using the SACTI model as a single cell circular mechanical draft tower.

36 Enercon prepared a cooling tower plume impact study in 2003 using SACTI with IPEC data recorded for the period 1998-2002. (Enercon, 2003) The present analysis expanded upon the previous analysis and incorporated ten years of data, with a portion of the years overlapping the previous study. A larger period of record was chosen because SACTI uses a statistically based approach for calculating the plume impacts, such that a longer period of data will provide a preferable indicator of the average annual impacts. The meteorology for both periods is quite similar, resulting in similar results between the two studies.

37 Mixing height is the height (above ground) to which the lower atmosphere will undergo mechanical or turbulent mixing, producing a nearly homogeneous air mass.

38 Holzworth, George C., Mixing Heights, Wind Speeds, and Potential for Urban Air Pollution Throughout the Contiguous United States. Environmental Protection Agency, Office of Air Programs, Research Triangle Park, NC.

(January 1972).

4-3

TRC Table 4-1: Cooling Tower Parameters Parameters Evaluated Cooling Tower Number of Cells 1 cell per tower (two separate towers)

Tower Height (top of fan) (meters) 51.21 Cell Diameter (meters) 73.58 Tower Effective Diameter (meters) 73.58 Total Tower Heat Duty0) (MWt) 2,052.02 Total Tower Heat Duty(0) (MMBtu/hr) 7,005.60 Cooling Water Range (OF) 20 Tower Air Flow (ACFM) 56,400,000 Tower Air Flow (Kg/sec) 33,538 Circulating Water flow (gpm) 700,000 Circulating Water flow (Kg/sec) 44,135 Liquid to Gas Ratio 1.316 Circulating water total dissolved solids (TDS) 7,200 (ppm as NaC1)

Cycles of concentration (variable) 4 Drift Elimination efficiency (%) 0.001%

Water drift (pounds per hour) 3,502.8 Particulate emissions (pounds per hour) 25.22 Site Latitude (degrees North) 41.2833 Site Longitude (degrees West) 73.9667 (i)= Circulating water rate times temperature range converted to MWt and MMBtu/hr 4.2.1 DetailedModeling Methodology The SACTI model calculated the probable frequency of occurrence of ground-level plume fogging, rime icing, and elevated plume lengths during daylight conditions (i.e., used to estimate hours of elevated visible plumes). In the case of ground fogging and rime icing, the SACTI model provides results tabulated as total hours for the total block of data, which in this case is ten years (then converted to the average number of hours per year). To determine the maximum annual average of visible elevated plumes (without plume abatement), the elevated plume lengths were tabulated for only the daylight hours, where "daylight" included a half-hour before sunrise until a half-hour after sunset. In the case of mineral (dissolved solids, i.e., salt) deposition, the results are presented as the maximum average kilograms/square kilometer/month, which may be converted to milligrams/square centimeter/month (by dividing by io,ooo).

4-4

Vý."TRC 4.2.2 Methodologyfor EstimatingGround-Level Impacts The plume dispersion modeling program within the suite of SACTI programs considers that ground fogging and rime icing potentially occur during ten pre-defined meteorological scenarios. The meteorological processing program within the suite of SACTI programs tabulates the frequency of occurrence of these ten scenarios within the meteorological data set. In this way, SACTI can conservatively calculate an upper bound on the number of potential ground fogging and rime icing cases with a high degree of confidence. The lower bound would be no cases of either fogging or icing, since there is a possibility that in any given year the meteorological conditions conducive for plume fogging or icing do not occur.

For the purpose of this study, ground "fogging" has been defined to occur during the ten fogging scenarios when the plume is modeled to be in physical contact with the ground and/or the plume is below the height of the cooling tower. The area covered by the plume is then defined to be the area of ground fogging. Likewise, ground-level rime icing is assumed to occur during five (of the ten) plume fogging scenarios for which the air temperature is less than freezing. Note that, in addition to plume fogging and rime ice formation, additional plume impacts, such as visible plume length and frequency, and mineral deposition were considered in this analysis. A more detailed explanation of these conditions is provided in Appendix A of this report.

4.3 Summary of Modeled Impacts The SACTI modeling results are tabulated and presented in the attached figures which illustrate the frequency of occurrence as average hours per year. Table 4-2 provides a summary of the maximum average number of hours of ground fog and rime ice formation, with distance and direction from each tower being identified.

Table 4-2: Summary of Potential Cooling Tower Plume Impacts Description Wet-only Operation - Evaporative Tower (units based on 1o-years of hourly meteorology') Configuration Maximum Value Direction of Plume Distance from towards Tower (meters)

Plume Ground Fogging 2 RMDCT 2 14 (hrs/yr) SE (IPEC550 Unit 2)

Rime Icing 2 RMDCT 0 Elevated Visible Plume 200 (during daylight hours) 2 RMDCT 610 (hrs) SE (IPEC Unit 3) o~o13 ,8oo Salt Deposition 2 RMDCT 0.013 SSE (IPEC Unit 3)

(Mg/cm2/Mo) ________Unit__3)

(1) Entergy Indian Point Onsite Meteorological Tower (1999-2oo8)

(2) RMDCT - Round Mechanical Draft Cooling Tower. These results reflect impacts from the combined operation of both the north (IPEC Unit 2) and the south (IPEC Unit 3) cooling towers being studied.

4-5

TRC 4.3.1 GroundFoggingAssociated with Plume A ground fog attributed to a cooling tower occurs when atmospheric conditions39 cause the condensed water vapor plume to come into contact with or impact upon the ground surface.

Table 4-3 provides the average number of hours per year of ground fog occurrence by distance and direction from the cooling towers being studied (assuming no plume abatement). As indicated on this table, a maximum average of about 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> of plume fogging may be expected to occur approximately 500 - 600 meters (1640 - 1970 feet) south-southeast of each cooling tower. The table presents the fogging counts for only the north (CT2) cooling tower, and synergistic effects between the two cooling towers can result in an extra hour of ground fog at the location of maximum impact, resulting in approximately a maximum of 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> per year at the location of maximum impact. The location of this maximum impact primarily is on the IPEC facility property. This area is illustrated by the contours of fogging hours presented in Figure 4-1 that examined the ground fog hours from both cooling towers being studied. In between the two towers, however, the contours would merge to form two distinct maximum locations. The values indicate the total number of hours each year a ground fog plume may occur at each specific location around the facility. While any ground fog events from the north cooling tower (CT2) are typically confined to the facility property, the ground fog events that occur due to the south cooling tower (CT3) are shown to occur immediately off of the facility site towards the south and along Broadway in the Village of Buchanan.

39 Such conditions are typically cool ambient temperatures, high relative humidity and strong winds.

4-6

0 CTRC Table 4-3: Average Annual Plume Fogging Hours (CT2 wet mode) One Tower Distance Direction Plume is Headed (M) S SSW Sw WSW W WNW NW NNW N NNE NE ENE E ESE SE SSE 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 350 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 400 1 0 0 0 0 0 1 1 2 1 0 0 0 0 0 1 450 1 0 0 0 0 0 1 1 2 1 0 0 0 0 0 1 500 9 1 0 0 0 0 2 3 3 1 0 0 1 2 3 10 550 11 1 0 0 0 0 2 3 3 1 0 0 2 3 3 13 600 11 1 0 0 0 0 1 2 2 1 0 0 2 3 3 13 650 10 1 0 0 0 0 1 2 2 1 0 0 2 3 3 12 700 10 1 0 0 0 0 1 2 2 1 0 0 2 3 3 12 750 5 0 0 0 0 0 0 1 1 0 0 0 1 1 2 6 825 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 850 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 900 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 950 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4-7

kTRC 586600 586800 587000 587200 587400 587600 587800 588000 588200 588400 588600 588800 589000 UTM Meters East 4-8

`4ýTRC 4.3.2 Elevated Visible Plumes When each individual Project cooling tower is operated in wet mode, and when both are operated in this fashion, condensed water vapor plumes visible to the surrounding community will form under certain meteorological conditions. Normally, these visible plumes will be confined to the area immediately over the cooling tower and over the IPEC property. However, under cool temperatures (typically during the late fall, winter, and early spring seasons) with high ambient humidity, such elevated visible plumes may extend for several hundred to thousands of meters. Figure 4-2 illustrates the average number of counts for elevated visible plumes per year for the wet mode case, using the ten year meteorological data set. Note that these counts reflect the combined elevated plumes for both cooling towers being studied.

These counts are based on daytime conditions only (which include the half hour before sunrise until a half hour after sunset). Plumes that occur at night under cooler meteorological conditions, therefore, are not counted. As illustrated, the SACTI model results indicate that a visible plume would occur immediately south and northwest of each tower during an average maximum of 61o daylight hours per year, or approximately 13 percent of the total daylight hours during the year. The aesthetic impact of the potential elevated visible plumes from the cooling towers being studied was assessed by Saratoga Associates.40 4.3.3 Salt (NaCl) Deposition Figure 4-3 provides the average maximum mineral deposition rate (milligrams/square centimeter/month) by distance and direction from the combined deposition from both cooling towers being studied. The circulating water was conservatively assumed to contain as much as 7,200 ppm of total dissolved solids, primarily as sodium chloride (NaC1).41 As drift droplets are emitted and deposit downwind from the towers the minerals in the circulating water may be deposited. Cooling tower drift from the Project cooling towers is anticipated to be kept to a minimum through the use of high efficiency drift eliminators with liquid water drift being maintained at or below o.oo1% of the circulating water rate. However, due to the substantial height of the tower and exhaust plume, the mineral (i.e., salt) nonetheless would be carried a considerable distance from the cooling towers being studied. The salt deposition pattern is in two lobes, towards the northwest and southeast of the towers. The salt deposition from both cooling towers will be additive, as indicated by the deposition pattern illustrated in Figure 4-3.

40 Saratoga Associates. "Indian Point Energy Center Closed Cycle Cooling Conversion Feasibility Study - Visual Assessment", Prepared for Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC. (June 1, 2009).

41The assumed total dissolved solids content of the circulating water is based on an annual average Hudson River makeup water salinity of i,8oo ppm and 4 cycles of concentration.

4-9

CTRC Figure 4-2: Average Annual Hours of Elevated Visible Plumes (in Wet Mode - Both Towers Operating) 4569800-4569700-4569600-4569500-4569400-4569300-0 Z

S4569200 4569100 f 456 9000-4568900.

4568800-4568700-4568600-586800 586900 587000 587100 587200 587300 587400 587500 587600 587700 587800 587900 588000 588100 588200 588300 588400 588500 588600 588700 588800 UTM Meters East 4-1o 0

CTRC Figure 4-3: NaCI Deposition - Wet Mode Both Towers (milligrams/square centimeter/monthI .

x 10-4)

I I 4572000 1, 1. 1 1 ,I MI 45715000 4571000 n-,

11 0

4567000-45780000 o-e 4567500- "!

585000 585500 586000 586500 587000 587500 588000 588500 589000 589500 590000 UTM Meters East 4-11

TRC NYSDEC does not directly regulate mineral deposition from the cooling towers. The maximum combined deposition rate for the cooling towers being studied is 0.0127 mg/cm2/month located approximately 1,8oo meters (6,00o feet) south-southeast of the IPEC Unit 3. This value is sufficiently low so as to not cause an adverse impact to vegetation.

4.4 Other Environmental Considerations Conclusion The water vapor plumes resulting from the Project cooling towers were rigorously assessed using the SACTI cooling tower plume model. Ten years of hourly on-site meteorological data were used to determine potential fogging, opacity (i.e., visible elevated plumes) and salt deposition impacts. A combined minimal number of about 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> per year of ground fog plumes would occur if the Project cooling towers were operated without plume abatement, most, if not all of which would be eliminated by operating in plume abatement mode. Similarly, without plume abatement, the cooling tower(s) being studied would result in occasional condensed elevated water vapor plumes which would be visible. The vast majority of time these visible plumes would be immediately above the tower(s) and within several hundred feet towards the northeast. Under high humidity conditions, the elevated visible plumes may extend off of the facility property. However, the plumes would be well above the ground, and would normally evaporate and dissipate within several hundred feet of the facility. On rare occasions, visible plumes extend an appreciable distance from the facility. Due to the high efficiency drift eliminators, mineral (i.e., salt) deposition will not pose an adverse impact either off of IPEC property.

4-12

. TRC 5.0

SUMMARY

OF CONCLUSIONS 5.1 Description of Project TRC evaluated air quality impacts and other environmental considerations of the Project, which is identified by Entergy's consultant Enercon to consist of two hybrid circular mechanical draft cooling towers, one for each steam turbine condenser at IPEC. The purpose of the Project cooling towers is to dissipate heat generated by the stations. In order to do so, the Project cooling towers draw in a significant amount of water from the Hudson River. The water drawn in contains the same dissolved solids concentration as the river. The predominant mineral in the circulating water is common salt. In order to reduce the amount of water used, the circulating water in the cooling towers is recycled. This results in increased dissolved mineral concentration because the dissolved solids remain as water evaporates. In addition to the concentrated salt and minerals, the circulating water contains additives such as biocides and anti-scaling chemicals. During operation, a portion of the recycled circulating water is discharged from the towers in the form of very small water droplets or spray drift. The spray drift, like the circulating water, contains an appreciable concentration of dissolved minerals and additives. These dissolved solids in the spray drift form a fine particulate matter with an aerodynamic diameter less than 2.5 micrometers (PM-2.5) which is emitted from the towers as the drift liquid evaporates. As such, these Project towers, individually and collectively, will result in particulate matter emissions.

5.2 Fine Particulate Emissions Impacts TRC assessed the air quality impact from the Project cooling towers (i.e., PM-io and PM-2.5 emissions) using the current state-of-the-art air quality dispersion model - AERMOD - for the following operational conditions:

  • Plume abated mode;

" Wet mode;

" Towers operating in combination;

" Towers operating individually; and

" Drift rates of o.o01% of circulating water, and o.ooo5% of circulating water.

The worst case particulate matter impacts occurred during wet mode operating conditions. The maximum ground level concentrations of PM-io and PM-2.5, when added to a representative background concentration for Westchester County were shown to exceed the NAAQS by a substantial margin. When TRC considered higher efficiency (o.ooo5%) drift eliminators as a mitigation measure assuming a reduction of the spray drift by half, the 24-hour concentrations of PM-io and PM-2.5 will still exceed the NAAQS by a substantial margin under various operating parameters. The conclusion of the analysis is that under the conditions that the 5-1

UC"TRC Project cooling towers will be required to operate, the particulate emissions would preclude the Project from obtaining a 6 NYCRR Part 2Ol Air Permit from NYSDEC.

5.3 Other Environmental Impacts TRC assessed other environmental considerations including ground fogging caused by the condensed water vapor plume from the Project cooling towers impinging on the ground, and the deposition of salt from the cooling tower spray drift. TRC assessed the water vapor plume impacts using the SACTI model. Since SAC-TI is unable to assess plume abated towers, the Project cooling towers were assessed while operating in wet mode only. As such, the analysis was considered very conservative since the plume abated mode would mitigate and possibly eliminate any environment impacts associated with the condensed water vapor plumes. The analysis concluded that the cooling towers would result in ground fog conditions for an average of 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> per year, assuming that the towers were not operated with plume abatement.

Similarly, TRC assessed the impact of salt deposition around the IPEC facility. TRC concluded that salt deposition would be minimal and well below any thresholds that would indicate an adverse impact.

5.4 Conclusion TRC and Enercon concluded that the Project's closed cycle cooling towers would emit particulates in excess of loo tons per year, the regulatory threshold for requiring the Project to undergo a major new source review for particulate emissions, triggering a state requirement for obtaining an air quality construction and operating permit under 6 NYCRR Parts 2O0 and 231.

TRC assessed the impact of the fine particulate on the local and surrounding communities and determined that it posed a significant adverse threat to the ambient air quality. TRC further concluded that mitigation measures that could reduce the adverse impact, such a higher efficiency drift eliminators or reductions in the dissolved solids content of the circulating water, do not sufficiently eliminate the adverse impact or are infeasible.

In conclusion, TRC's AERMOD analysis demonstrates that the particulate emissions from the Project cooling towers will cause an adverse air quality impact to the surrounding community, such that obtaining a required construction and operating air emissions permit pursuant to 6 NYCRR Part 201 would not be possible.

5-2

, .TRC

6.0 REFERENCES

Enercon, 2003. Enercon Services, Inc. Economic and Environmental Impacts Associated with Conversion of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, Attachment 5 Plume Model/ Salt Deposition Analysis. June 2003.

Policastro, A.J., L. Coke, and M. Wastag (1984). User's Manual:-Cooling Tower Plume Prediction Code, Electric Power Research Institute, EPRI CS-34o3-CCM, Palo Alto, CA U.S. EPA, 1972. Holzworth, George C. Mixing Heights, Wind Speeds, and Potential for Urban Air Pollution Throughout the Contiguous United States, Office of Air Programs Publications No.

AP-1ol. U.S. Environmental Protection Agency. Research Triangle Park, North Carolina.

U.S. EPA, 1985. Guidelines for Determination of Good Engineering Practice Stack Height (Technical Support Document for the Stack Height Regulations-Revised). EPA-45o/4-8o-023R. U.S. Environmental Protection Agency.

U.S. EPA, 199o. "New Source Review Workshop Manual, Draft". Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency. Research Triangle Park, North Carolina.

U.S. EPA, 1992. "Screening Procedures for Estimating the Air Quality Impact of Stationary Sources, Revised". EPA Document 454/R-92-019, Office of Air Quality Planning and Standards, Research Triangle Park, North Carolina.

U.S. EPA, 2005. "Guideline on Air Quality Models (Revised). Appendix W to Title 40 US Code of Federal Regulations (CFR) Parts 51 and 52, Office of Air Quality Planning and Standards, U.S.

Environmental Protection Agency. Research Triangle Park, North Carolina.

6-1

C'-ýTRC APPENDIX A SACTI MODEL DESCRIPTION

TRC T

Appendix A SACTI Model Description The EPRI SACTI CWT model calculates the seasonal and annual impacts of cooling water tower ("CWT") vapor plumes. Various environmental impacts simulated in the SACTI model include:

" Plume-induced ground fogging and rime icing (during freezing conditions) downwind of the CWT;

  • Visible plume length and height;
  • Elevated plumes and plume shadowing (the frequency and length of elevated plumes at a given location);

" Deposition of minerals (salt) contained in CWT plume drift (water droplets entrained in the plume during plume exhaust).

The SACTI model is a multiple-source model that predicts CWT plume impacts from any number of identical natural draft, linear mechanical draft, or circular mechanical draft CWTs. The SACTI model was designed to provide predictions that can be used in the licensing of power plants with CWTs. The model developers validated the model with field and laboratory data in all situations where good quality data existed.

The seasonal/annual modeling methodology employed by the SACTI model is a parameterization scheme that reduces the available hourly meteorological data to between 30 and loo categories (typically 35-45 plume categories are used) of unique meteorological conditions (from a CWT plume dispersion perspective). Potential ground fogging and rime icing cases are reduced to a predefined lo categories, which are assumed by the model to be the result of aerodynamic downwash in the lee (downwind side) of the CWT. Plumes that are rapidly brought to the ground due to aerodynamic effects will always be lower in height than the tower. The elevated plumes will typically be at or higher than the height of the tower. Rime icing events are tabulated by SACTI when a ground fog event occurs while the ambient temperature is below freezing (32 oF).

Each category is modeled separately and the modeling results of the category are assumed to apply for all occurrences of the category for the period for which modeling is performed. The number of specific categories for a given situation is dependent upon the CWT geometry, tower emission parameters, and the meteorological conditions experienced at the site. The categorization scheme used in the SACTI model allows a user to analyze multiple years of meteorological data without the need to model every hour of every year to determine plume impacts. The representative scenarios are assumed to apply for multiple hours, thereby greatly reducing computer execution time.

However, as discussed earlier, because SACTI is a statistically based model, a large meteorological database is recommended to provide a large selection of meteorological conditions.

SAMTI Suite of Programs The SACTI model is composed of four separate programs: a meteorological preprocessing program (PREP); a plume dispersion program (MULT); a program to produce tabular summaries of the modeling results (TABLES); and a graphical postprocessor program (PAGE).

To begin a SACTI modeling analysis, the PREP program reads a sequential hourly meteorological data file and generates a set of meteorological scenarios that produce significant plume dispersion effects. The MULT program then computes the expected plume dispersion for each meteorological scenario developed by PREP. The output of the PREP program is a sequential hourly listing of the meteorological conditions and plume dispersion category for each hour of meteorological data processed. The output from the MULT program is a listing of the plume dispersion and fogging impacts for each meteorological scenario (category) simulated.

The TABLES program combines the output of the PREP and MULT programs and produces a set of tabular frequency of occurrence listings of the various environmental effects produced by the CWT plume. The environmental effects computed by the TABLES program are the average of the individual impacts of each scenario model weighted by the number occurrences of that scenario in the input PREP data file.

The post-processing program, PAGE, produces computer page plots of the output from the TABLES program. Only the first three programs were needed for this analysis.

Graphical post-processing was performed using a separate graphics package, rather than the PAGE program.

The SACTI-PREP model generates five scenarios that are assumed to produce CWT plume rime icing and ground fogging, and five additional scenarios that produce CWT plume ground fogging only. Because plume ground fogging and rime icing occur during plume downwash conditions, and downwash is assumed to be different for circular and linear CWTs of the same size, the rime icing and ground fogging scenarios for these two tower types are different. These lO scenarios are independent of individual tower or plume geometry characteristics, except that plumes from natural draft CWTs are assumed not to produce ground level fogging and rime icing.

STRC An additional number of scenarios are also developed that are functions of the meteorological conditions occurring in the input meteorological data. These scenarios depend upon observed wind speed, dry bulb and dew point temperatures, atmospheric stability, and other meteorological factors, in addition to specific CWT parameters.

These scenarios can vary with the specific CWT modeled and are used to estimate the potential for rime icing and ground fogging impacts. A total of 1o downwash (ground fogging and rime icing scenarios) and 35 plume scenarios were used by SACTI for the Project's CWT analysis.

Mineral deposition is simulated by SACTI by calculating the amount of liquid water that is emitted by the tower through drift (liquid water droplets that are entrained in the exhaust flow). The drift contains dissolved minerals, and in the case of the IPEC cooling towers in this study, predominately sodium chloride from the tidal Hudson River being used for makeup, and any anti-scaling agents used to treat the circulating water. The drift droplets are modeled as a tilted plume, causing deposition of the droplets in the immediate vicinity of the tower. If sufficiently heavy, the mineral deposition will manifest itself as a white film on surfaces and can be particularly noticeable on vehicles (i.e., windshields and windows) that may be parked adjacent to the tower for any extended period of time (days or weeks).

._TRC APPENDIX B RACT/BACT/LAER Clearing House Search

0 Appendix B Page 1 of 2 Recent BACTILAER Determinations for Cooling Towers Particulate Emissions PERMIT OPERATING I CONTROLDESCRIPTION UMIT BASIS BACT-PSD BACT-PSD HOMELAND ENERGYSOLUTIONS None BACT-PSD ANCLOTEPOWER PLANT INSTALLATION OF HIGHEFFICIENCY0 00W5% DRIFT ELIMINATORSLIMITTOTALDISSOLVEDSOUDS IN WANAPAENERGYCENTER UMATI.LLAOR 8/S2005I NO THE WATERTO LESS THAN3.532 PPMW - I NIA 1 0.0005% BACT-PSD GOOD DESIGN,MAINTENANCE, ANDINTEGRATED PLAQUEMINE PVC PLANT IBERVILLE,LA 7/2702005 NO DRIFTELIMINATORS 019 Lb/MMGal 7 BACT-PSD DRIFTELIMINATORS TO ACHIEVEODOW5% DRIFT XCELENERGY(PSCO) - COMANCHE STATION PUEBLO,CO 7/512005 NO OR LESS - N/A 0.0005% BACT-PSD CRESCENTCITYPOWER ORLEANS.LA 6W5/2005 NO NONEINDICATED 2 61 None 0.0050% RACT.PSD NEWMONT NV ENERGY- TS POWER PLANT EUREKANV W/5/2005 NO DRIFTELIMINATORS - N/A 00005% BACT-PSD ARIZONACLEANFUELS YUMA YUMA,AZ 4/14/2005 NO HIGHEFFICIENCYDRIFTEUMINATORS 1 60 None ' BACT-PSD TRIGEN-NASSAU ENERGYCORPORATION NASSAU,NY 30312005 NO NONEINDICATED - NAA 00005% BACT-PSD OPPD - NEBRASKACITYSTATION OTOE. NE 3/9/2005 NO NONEINDICATED 0.001 None I BACT-PSE INSTALLATION OF DRIFTELIMINATORS WITHDRIFT LOSS OF LESS THAN0 001% OF THE DARRINGTON ENERGYCOGENERATION POWER PLANT SNOHOMISH,WA 2/11/2005 NO RECIRCULATING WATER FLOWRATE - N/A 0001% BACT-PSE LOSEOFLEESTHAN0.001%OPTHE WHATCOM, WA 1/11/2005 NO I-GiRCULAMPNGWAIER FLOW RATE N/A I 0001% I RACY.T-P LAWRENCE,OH 1202802004 DRIFTELIMINATORS 260 1 None I I BACT-PSD HERTFORD,NC 1102302004 MONTGOMERY, 115/25004 WAUSAU.WI 10/192004 ORLEANS.LA 10/1202004 POWER, ID 4/5/2004 LONGVIEWPOWER, LLC MAIDSV1LLE,WV 3/2004 NO IREDUNDANT BAFFLEANDMESHDEMISTERSYSTEM None T-PSD RATONROUGEREFINERY EASTBATONRC 2/18004 SANTEECOOPER CROSS GENERATING STATIOI PINESVILLE,SC 2/1802004 ACEETHANOL- STANLEY CHIPPEWA.WI 1/2102004 LAPAZ GENERATING FACILITY LAPAZ, AZ 9/4/2003 PLUMPOINT ENERGY ARKANSAS 82000003 DUKEENERGYWASHINGTONCOUNTYLLC WASHINGTON, C 8/1402003 0 005% MAY DRIFTRATE,2,000 PPM SOLIDS,MAX UWGP - FUELGRADEETHANOLPLANT FRIESLAND, Wl 8/140003  ? FLOWOF 22.000 GPM 110 Noon 00005%I OTHER II O-- YFS - . I OAR N*n*

LIMACHEMICALSCOMPLEX CHOCOLATE BAYOUPLANT None DUKEENERGYSTEPHENS.LLC ENNISTRACTEBEL POWER BRAZOSVALLEYELECTRICGENERATING ATOFINACHEMICALS INCORPORATED DOWTEXASOPERATIONSFREEPORT TENASKAINDIANA PARTNERS, LP.

LAWRENCEENERGY OHIO ý*I SIP CLOY/SENERGYFACILITY ACTY-PSD GENOVAOKI POWER PROJECT REDBUDPOWER PLT BATONROUGEREFINERY UBERTYGENERATING STATION IIMPLEMENTATION OF HIGHEFFICIENCYDRIFI UMAENERGYCOMPANY CINCINNATI.OH 3/26r2002 YES EULMINATORS 1 88 1 None I  ? I BACT-PSD NO THER I* - AIU

.- " DELIMINATORS 'T-PSD

? IDRIFTELIMINATORS BACT-PSD RACT-PSD PARISH 1.70 T-PSD I 1008.0 I001 YES DORIFT ELIMINATOR

Appendix B Page 2 of 2 Recent BACTILAER Determinations for Cooling Towers Particulate Emissions 3LA W712001 None BACT-PSD IHIGHEFFICIENCYDRIFTEUMINATORS,GOOD DEMINGENERGYFACIUTY NEW MEXICO I 12129Q00CI NO ENGINEERINGPRACTICES 160 NL I 0.0005% BACT-OTHER LtfDa, I- - BACT-PSD 1.3A 1.69 None  ? OTHER None 7 BACT-PSD None ' BACT-PSD IDESIGNEDTO REDUCEDRIFT(OVERSPRAY)TO AGRIFIOS-DUN FACILITY PASADENA.TX 40720000I NO MINIMIZEPMEMISSIONS 4.50 None I I BACT-OTHER BASTROP,TX 245 TEXAS I 7 HOUSTON,TX 0.04 BEAUMONT,TX 1.10 NSPS HOUSTON.TX 4.23 MONACILLOS.PR 0004 TEXAS 1.90 TEXAS 11.15 CHARLOTTE,NC 0.04 FARMERSBRANCH 17.50 12019999 I  ?

GOP TO LIMITEXCESSWATER&AIR FLOW&AVOID BYPASSOF THEDRIFTPLIMINATOR NORTHBROOK.LA I.092 3.20 None I BACT-PSD TEXAS I ym BACT.PSD LAKECHARLES,LA BACT-PSD CORDOVA,IL BACT-PSD WESTLAKE,LA BACT-PSD TEXAS BACT-PSD MINOOKA,IL BACT-PSD WESTLAKE,LA BACT-OTHER SAN ANTONIO,TX BACT-PSD PARISGENERATINGSTATION DALLAS,TX BACT.PSD HINAUILANUUHIEMICAL COMHAI PORT ARTHUR,TX ýA I-PS HAWESVILLE,KY OTHER II 9 I DRIFTEUMINATOR& TDS INTHE COOUNGWATER CHARTERSTEELDIVISION SAUKVILLE, WI 222611997 "

' 1.2% BYWVT 1.30 None I  ? I BACT-PSD GOP = GOOD OPERATINGPRACTICES,WAR = LEAKDETECTIONAND REPAIR,TDS = TOTALDISSOLVEDSOLIDS

Appendix C Flora and Terrestrial Fauna Habitat and Communities in the Vicinity of IPEC Coastal Zone Management Act Consistency Certification in Support of USNRC's Renewal of Indian Point Unit 2 and 3 Operating Licenses Prepared for:

Entergy Nuclear Indian Point 2, LLC; Entergy Nuclear Indian Point 3, LLC; and Entergy Nuclear Operations, Inc.

Prepared by:

AKRF, Inc.

December 2012

IPEC CZMA Consistency Certification December 2012 TABLE OF CONTENTS List of Tables ............................................................................................................................... C-i List of Figures .............................................................................................................................. C-i List of Acronyms, Defined Terms, and Abbreviations for Units of Measurement ............... C-ii I. INTRO D U CTION .................................................................................................................. C-I II. DA TA SO URCES .................................................................................................................. C-1 A . N Y SD O S H abitat Rating Form s ...................................................................................... C-2 B. N YN HP Databases and N Y SD EC Lists .......................................................................... C-2 C. USFWS County List of Federally Endangered, Threatened, and Candidate Species ..... C-4 D . FSEIS ............................................................................................................................... C-4 Ill. LISTED PLANT SPECIES AND ECOLOGICAL COMMUNITIES ................................ C-4 A . Plants ............................................................................................................................... C-4 I. N YN HP-listed Endangered Plant Species Recorded Since 1980 ................................... C-5

a. Saltm arsh Bulrush .................................................................................................. C-5
b. Straw Sedge ............................................................................................................ C-5
c. Lined Sedge ................................................................................................................ C-6
d. W ater Pigm yw eed ...................................................................................................... C-6
e. Yellow Flatsedge ........................................................................................................ C-6
f. Gypsy-w ort ................................................................................................................. C-7
g. V irginia Pine ............................................................................................................... C-7
h. Basil M ountain-m int ................................................................................................... C-7
i. Torrey's M ountain-m int ............................................................................................. C-8
2. N YN H P-listed Threatened Plant Species Recorded Since 1980 .................................... C-8
a. W oodland A grim ony .................................................................................................. C-8
b. V irginia Snakeroot ..................................................................................................... C-9
c. Sm ooth-bur M arigold ................................................................................................. C-9
d. Terrestrial Starw ort .............................................................................................. C-10
e. Long's Bittercress ................................................................................................. C-10
f. Clustered Sedge ................................................................................................... C-i l
g. M arsh Straw Sedge .............................................................................................. C-i 1
h. M idland Sedge ..................................................................................................... C-i I
i. Salt-m arsh Spikerush ................................................................................................ C-12
j. Featherfoil ................................................................................................................ C-12
k. V iolet W ood-sorrel ................................................................................................... C-13
1. Spongy A rrow head ................................................................................................... C-13 m . Saltm arsh A ster ........................................................................................................ C-13
3. N YN HP-listed Rare Plant Species Recorded Since 1980 ............................................. C-14
a. Sm all-flow ered Crow foot ......................................................................................... C-14
b. Delm arva Beggars-ticks ........................................................................................... C-14
4. NYNHP Historical Records of State-Listed Endangered Plants Documented Before 1980 ............................................................................................................................... C-15
a. Puttyroot ................................................................................................................... C-15
b. W ild Potato-vine ................................................................................................... C-15 C-i

IPEC CZMA Consistency Certification December 2012

c. Riverbank Quiliwort ................................................................................................. C-15
d. Large Twayblade ...................................................................................................... C-16
e. V irginia False Grom well .......................................................................................... C-16
f. Hooker's Orchid ....................................................................................................... C-17
g. Catfoot ...................................................................................................................... C-17
h. Slender M arsh-pink .............................................................................................. C-17
i. M ichaux's Blue-eyed-Grass .................................................................................. C-18
j. Am erican W aterw ort ........................................................................................... C-18
k. Estuary Beggars-ticks ............................................................................................... C-19 I. M exican Seaside Goldenrod ..................................................................................... C-19
5. NYNHP Historical Records of State-Listed Threatened Plants Documented Before 1980 ............................................................................................................................... C-19
a. Troublesom e Sedge ............................................................................................. C-I 9
b. Rough Avens ............................................................................................................ C-20
c. Eastern Grasswort ..................................................................................................... C-20
d. G lobe-fruited Ludw igia ............................................................................................ C-21
6. NYNHP Historical Records of State-Listed Rare Plants Documented Before 1980 .... C-21
a. Heartleaf Plantain ..................................................................................................... C-21
7. USFW S-listed Plant Species ......................................................................................... C-22
a. Sm all W horled Pogonia ............................................................................................ C-22 B. N YN HP/N ew York State Rare Ecological Com m unities ............................................. C-22
1. Acidic Talus Slope W oodland ...................................................................................... C-22
2. A ppalachian Oak-H ickory Forest ................................................................................. C-23
3. Brackish Intertidal M udflats ......................................................................................... C-23
4. Brackish Tidal M arsh .................................................................................................... C-24
5. Chestnut Oak Forest ...................................................................................................... C-24
6. Cliff Com m unity ........................................................................................................... C-24
7. Freshw ater Tidal M arsh ................................................................................................ C-25
8. Oak-Tulip Tree Forest ................................................................................................... C-25
9. Pitch-pine-oak-heath Rocky Sum m it ............................................................................ C-26
10. Red Cedar Rocky Sum m it ........................................................................................ C-26 1 I. Rocky Sum m it Grassland ......................................................................................... C-26
12. Floodplain Forest ...................................................................................................... C-27
13. Tidal River ................................................................................................................ C-27 C. Discussion of Potential Impacts to Rare Plants and Natural Communities ................... C-28 I. IPEC Site ....................................................................................................................... C-28
2. RM 44-56 SCFW H ....................................................................................................... C-28
3. lona Island M arsh SCFW H ........................................................................................... C-28
4. Haverstraw Bay SCFW H .............................................................................................. C-29
5. Proposed Expansion A rea RM 56-60 ........................................................................... C-29
6. Coastal Zone ................................................................................................................. C-29
a. RM 34-56 ................................................................................................................. C-29
b. RM 56-60 ................................................................................................................. C-30 IV . TERRESTRIAL W ILDLIFE SPECIES ............................................................................ C-30 A . Birds ............................................................................................................................... C-31 C-ii

IPEC CZMA Consistency Certification December 2012

1. Peregrine Falcon ........................................................................................................... C-31
2. Short-eared Owl ............................................................................................................ C-31
3. Bald Eagle ..................................................................................................................... C-32
4. Northern Harrier ............................................................................................................ C-33
5. Least Bittern .................................................................................................................. C-33
6. Osprey ........................................................................................................................... C-34
7. Canada Goose ............................................................................................................... C-34
8. W ood Duck ................................................................................................................... C-34
9. American Black Duck ................................................................................................... C-35
10. M allard ..................................................................................................................... C-35
11. Green Heron ............................................................................................................. C-36
12. Virginia Rail ............................................................................................................. C-36
13. Sofa ........................................................................................................................... C-36
14. Common M oorhen ................................................................................................... C-37
15. Spotted Sandpiper ..................................................................................................... C-37
16. Belted Kingfisher ..................................................................................................... C-37
17. M arsh W ren .............................................................................................................. C-38
18. Kentucky W arbler .................................................................................................... C-38
19. Swamp Sparrow ....................................................................................................... C-39
20. Red-winged Blackbird .............................................................................................. C-39 B. M am mals ....................................................................................................................... C-39
1. Indiana Bat .................................................................................................................... C-39
2. Eastern Small-footed M yotis ........................................................................................ C-40
3. New England Cottontail ................................................................................................ C-40
4. M ink .............................................................................................................................. C-41
5. M uskrat ......................................................................................................................... C-41 C. Reptiles and Amphibians ............................................................................................... C-41
1. Bog Turtle ..................................................................................................................... C-42
2. Tim ber Rattlesnake ....................................................................................................... C-42
3. Eastern Fence Lizard ..................................................................................................... C-43
4. Eastern W orm snake ...................................................................................................... C-43
5. Green Frog .................................................................................................................... C-44
6. Snapping Turtle ............................................................................................................. C-44
7. Northern W ater Snake ................................................................................................... C-44 D. Insects ............................................................................................................................ C-45
1. Appalachian Azure ........................................................................................................ C-45
2. Tiger Spiketail ............................................................................................................... C-45
3. Arrowhead Spiketail ..................................................................................................... C-45
4. Needham 's Skim mer ..................................................................................................... C-46
5. Spatterdock Darner ....................................................................................................... C-46
6. M ocha Emerald ............................................................................................................. C-47
7. Gray Petaltail ................................................................................................................ C-47 V. ANALYSIS AN D CONCLUSION S .................................................................................... C-48 VI. REFERENCES .................................................................................................................. C-49 C-iii

IPEC CZMA Consistency Certification December 2012 LIST OF TABLES C-1 Relevant Terrestrial Plants Within the Vicinity of IPEC C-2 NYNHP/New York State Rare Natural Communities C-3 Relevant Terrestrial Wildlife Within the Vicinity of IPEC LIST OF FIGURES C-I Project Area C-la IPEC Coastal Zone - River Mile 34 to 60 (Proposed)

C-iv

IPEC CZMA Consistency Certification December 2012 LIST OF ACRONYMS, DEFINED TERMS, AND ABBREVIATIONS FOR UNITS OF MEASUREMENT Acronym, defined term, or Definition abbreviation BGEPA Bald and Golden Eagle Protection Act CFWHRF Coastal Fish and Wildlife Habitat Rating Form ECL Environmental Conservation Law ESA Endangered Species Act FSEIS Final Supplemental Environmental Impact Statement IPEC Indian Point Energy Center (IP2 and IP3)

License Renewal renewal of IPEC's operating licenses NYCMP New York Coastal Management Program NYNHP New York Natural Heritage Program NYSDEC New York State Department of Environmental Conservation NYSDOS New York State Department of State ppt parts per thousand RM river mile SCFWH Significant Coastal Fish and Wildlife Habitat USFWS United States Fish and Wildlife Service USNRC United States Nuclear Regulatory Commission C-v

IPEC CZMA Consistency Certification December 2012 I. INTRODUCTION This Appendix describes the flora and terrestrial fauna habitat in the vicinity of Indian Point Energy Center ("IPEC"), and evaluates whether the United States Nuclear Regulatory Commission's ("USNRC") operating license renewal ("License Renewal") for IPEC is consistent with Policies 7, 8, and 9 of the New York State Department of State ("NYSDOS")

New York Coastal Management Program ("NYCMP").

AKRF's key findings are as follows:

  • no State- or federally listed plant species, ecological communities, or wildlife are documented for the IPEC Site;
  • although State-listed rare, threatened, and endangered plant species occur within the vicinity of IPEC, they will not be adversely affected by the License Renewal;
  • although State-listed ecological communities occur within the vicinity of IPEC, they will not be adversely affected by License Renewal;
  • although State-listed threatened, endangered, and special concern wildlife occur within the vicinity of IPEC, they will not be adversely affected by the License Renewal;

" although federally listed wildlife species occur within the vicinity of IPEC, they will not be adversely affected by IPEC License Renewal; and

  • although recreationally important terrestrial wildlife species occur in the vicinity of IPEC, they will not be adversely affected by IPEC License Renewal.

This Appendix addresses five areas in the vicinity of IPEC: the Hudson River in the IPEC region (River Mile ("RM") 41-44); the three Hudson River NYSDOS Significant Coastal Fish and Wildlife Habitats ("SCFWHs") that NYSDOS requested Entergy to consider in this Consistency Certification, namely, Hudson RM 44-56, Iona Island Marsh located at RM 45, and Haverstraw Bay (RM 34-40); the Coastal Zone portions of Orange, Putnam, Rockland, Westchester (see Figure C-i), and Dutchess Counties; and the newly proposed Hudson Highland Expansion Area RM 56-60 SCFWH.'

II. DATA SOURCES To identify terrestrial plants, ecological communities, and wildlife (i.e., those identified as rare, special concern, threatened or endangered species, or considered a candidate species After Entergy's License Renewal Application was filed with USNRC in 2007, NYSDOS proposed expanding the boundaries of RM 44 to 56 SCFWH to include RM 57 to 60 and RM 40 to 43 - the portion of the Hudson River adjacent to IPEC - within the new "Hudson Highlands" SCFWH. In a recent letter from the Acting Chief of the National Oceanographic and Atmospheric Administration's (NOAA) Coastal Programs Division, NOAA advised NYSDOS that changes to the NYCMP adopted after submission of an application to a federal agency cannot be applied retroactively to that consistency certification review (NOAA 2012).

C-I

IPEC CZMA Consistency Certification December 2012 under the Endangered Species Act ("ESA") that have the potential to occur within the vicinity of IPEC, the following data sources were consulted: NYSDOS guidance, the New York Natural Heritage Program ("NYNHP") database, United States Fish and Wildlife Service ("USFWS")

County Lists of federally listed species, and the USNRC's December 2010 Final Supplemental Environmental Impact Statement ("FSEIS"). A brief description of these data sources and methodology is provided below.

A. NYSDOS Habitat Rating Forms The NYSDOS Coastal Fish and Wildlife Habitat Rating Forms ("CFWHRFs") for the three SCFWHs were reviewed to determine the presence of any listed plant species occurring within these habitats (NYSDOS 1987a, b, c). No federally or State-listed plant species were specifically identified as occurring within the three SCFWHs in the CFWHRFs. However, the bald eagle (Haliaeetusleucocephalus) was listed in CFWHRF for the proposed new Hudson Highlands SCFWH (NYSDOS 2011). In addition, all terrestrial species noted in the CFWHRFs, including those that are not state or federally listed, are included in this analysis.

NYSDOS's CFWHRFs identify the presence of several ecological communities in the CFWHRFs as occurring in the three SCFWHs and the proposed Hudson Highlands SCFWH that are being assessed for IPEC License Renewal. These communities range from deep water habitats to rocky uplands. These ecological communities have also been defined by NYNHP and therefore have been described under the NYNHP headings below.

B. NYNHP Databases and NYSDEC Lists In order to collect information on protected species within the State, letters dated September 25, 2009, and January 6, 2010, were sent to NYNHP requesting information on rare, special concern, threatened, endangered species, and significant ecological communities within the Hudson River between RM 34 and RM 56, within the three SCFWHs, and the Coastal Zone portions of Orange, Putnam, Rockland, and Westchester Counties (AKRF 2009, 2010). NYNHP sent responses to these requests on October 5, 2009, and February 1, 2010, with reports of rare or State-listed animals, plants, and ecological communities that NYNHP's databases indicate occur in the immediate vicinity of IPEC (NYNHP 2009a, 2010).

Following the 2009 and 2010 NYNHP correspondences, NYSDOS promulgated regulations proposing to expand the boundaries of the RM 44-56 SCFWH to include RM 56-60.

In order to collect information on state-protected species within the boundaries of the proposed Hudson Highlands Expansion Area RM 56-60, a letter dated October 12, 2012, was sent to NYNHP requesting information on rare, special concern, threatened, endangered species of the lona Island Marsh, Haverstraw Bay, and Hudson Highlands SCFWHs, and the Coastal Zone portions associated with these areas (AKRF 2012). NYNHP has not yet responded. In order to gain as much information as possible in support of this Consistency Certification, the New York State Department of Environmental Conservation's ("NYSDEC") New York Nature Explorer database was reviewed for data within a user defined area that included Hudson River Expansion Area RM 56-60 and the associated Coastal Zone (NYSDEC 2012). In addition, the NYNHP C-2

IPEC CZMA Consistency Certification December 2012 significant natural communities database was reviewed for ecological communities within the Hudson River between RM 34 to 60 and the associated Coastal Zone (NYSDEC 2009). Any species or ecological communities that were not previously documented by NYNHP in its 2009 and 2010 correspondences were added to this analysis.

The plant designations presented in the NYNHP and NYSDEC New York Nature Explorer data are taken from the NYSDEC's 6 NYCRR Section 193.3 "Protected Native Plants" regulations and the wildlife designations are from the Section 182.3 "Listing of Endangered and Threatened Species" and Section 182.4 "Listing of Species of Special Concern." On May 23, 2012, a new Section 193.3 was adopted to reflect changes in endangered, threatened, rare or exploitably vulnerable plant populations since the last revisions of the lists, which occurred in 2000. Therefore, all of the plant designations presented in the NYNHP data were cross-checked against the May 23, 2012 list and designations were updated accordingly.

With respect to the database query, NYNHP defines the distinction between a current and historical record to be the year 1980. Species observed and recorded since 1980 are considered to be current records; species observed and recorded prior to 1980 are considered historical records. Lists of species provided by NYNHP indicate that within the vicinity of the three SCFHWs, the IPEC Region, the Proposed Hudson Highland Expansion Area RM 56 to 60,2 and/or the Coastal Zone (Table C-I; NYNHP 2009a, 2010) there are:

  • 13 State-listed threatened plant species;
  • 9 State-listed endangered plant species;
  • 2 State-listed rare plant species;
  • 12 State-listed historical-endangered plants records;
  • 4 State-listed historical-threatened plants records;
  • 1 State- listed historical-rare plant records;
  • 13 rare ecological communities;
  • 2 State-listed endangered bird species;
  • 3 State-listed threatened bird species;
  • 1 State-listed special concern bird species;
  • 1 federally and State-listed endangered mammal species;
  • 1 federally listed threatened and State-listed endangered turtle species;
  • 1 State-listed threatened snake species; 2 All river miles between 34 and 60 are included in all analyses. As an artifact of analyses conducted before NYSDOS proposed the Hudson Highlands SCFWH, Appendices A and C include RM 56-60 in the northern end of the Expansion Area, while Appendices B and D and the Exhibits to Appendix B include RM 57-60 in the northern end of the Expansion Area.

C-3

IPEC CZMA Consistency Certification December 2012

  • 1 State-listed threatened lizard species;
  • 1 State-listed special concern snake species;
  • 1 State-listed special concern insect; and
  • 6 unlisted/unprotected insects.

The information provided by NYNHP did not specify whether the State-protected species or rare natural communities are present on the IPEC Site itself, and specific locations of these species and communities were not specified in correspondence from NYNHP (NYNHP 2009a, 2010). However, to document State-listed flora, fauna, and ecological communities in the IPEC region, the majority of the plant species, natural community, and wildlife profiles were drawn from NYNHP Conservation Guides.

C. USFWS County List of Federally Endangered, Threatened, and Candidate Species The USFWS County Lists for Orange, Putnam, Rockland, Westchester, and Dutchess Counties were consulted for the presence of federally listed endangered, threatened, or candidate plant species. One plant is listed as historically occurring in Rockland County (USFWS 2012a).

No federally listed bird or insect species occur in the vicinity of IPEC, although one delisted bird species, bald eagle, is noted for all four counties. One federally listed endangered mammal (Indiana bat [Myotis sodalist]), one federally listed candidate mammal species (New England cottontail [Sylvilagus transitionalis]),and one federally listed threatened reptile species (bog turtle [Glyptemys muhlenbergii]) are noted for the five counties.

D. FSEIS The FSEIS also evaluated the effects of License Renewal on plants, ecological communities, and terrestrial wildlife species that occur within the assessment area. Four state-and/or federally-listed wildlife species, the bald eagle, Indiana bat, the bog turtle, and the New England cottontail, as described above, were also evaluated in the FSEIS. These four species are presented in Section IV below.

III. LISTED PLANT SPECIES AND ECOLOGICAL COMMUNITIES A. Plants The species lists provided by NYNHP are for the immediate vicinity of the IPEC Site (RM 41-44), the three SCFWHs, and for the Coastal Zone. Although general locations (i.e., at the county and SCFWH level) of specific plants were provided in correspondence from NYNHP, specific locations of individual species were not furnished. The information in this section is organized by source: NYSDOS, NYNHP, and USFWS. NYNHP State-listed plants are divided by the State ranking for each plant: endangered, threatened, rare, historical records of endangered C-4

IPEC CZMA Consistency Certification December 2012 plants, historical records of threatened plants, and historical records of rare plants. Summaries of NYSDOS-, NYNHP-, and USFWS-listed plants are presented in Table C-2.

The majority of species profiles below are drawn from NYNHP Conservation Guides, which provide both general habitat information known for each species (i.e., water and soil regime, upland versus wetland, etc.) and specific ecological communities 3 identified within the State (e.g., brackish-tidal marsh, oak-tulip tree forest, and acidic talus slope woodland) where each species has been documented. Thus, many of the following profiles include both general habitat information and specific ecological community information.

1. NYNHP-listed Endangered Plant Species Recorded Since 1980
a. Saltmarsh Bulrush Saltmarsh bulrush (Bolboschoenus novae-angliae [Scirpus novae-angliae]) is a State-listed endangered species of the sedge (Cyperaceae) family. Habitat for this species includes saline to brackish marshes of tidal creeks and rivers, and brackish to fresh tidal shores (Fernald 1950). Due to these habitat preferences, this species is most likely a hybrid between the freshwater species, river bulrush (Bolboschoenusfluviatilis),and the saltwater species, sturdy bulrush (Bolboschoenus robustus) (FNA 2002a as cited in NYNHP 201 Ic). NYNHP-designated ecological communities associated with this species include brackish tidal marshes and tidal rivers (NYNHP 201 Ic).

Historical records indicate that six populations were known for New York, suggesting that this species had never been common. Currently, there are four saltmarsh bulrush populations within the State. These populations occur from western Long Island and New York City north through the lower Hudson River Valley to Orange County (NYNHP 201 lc). Threats to this species include disturbances to habitat and associated water chemistry alterations, and invasion of habitat by common reed (Phragmitesaustralis). One of the known historical populations was extirpated as a result of common reed invasion, and it is expected that, without management, common reed will potentially have an impact on all of the known populations in the future (NYNHP 201 ic).

b. Straw Sedge Straw sedge (Carex straminea)is a State-listed endangered plant of the sedge family.

Habitat for this species in New York includes swamp margins and marshes. Within its range, other potential habitat includes freshwater swales, non-saline swamps, and wet meadows (Fernald 1950; Gleason and Cronquist 1991 as cited in NYNHP 201 le). NYNHP-designated ecological communities associated with this species include shallow emergent marshes. This species has the potential to occur in other NYNHP-designated ecological communities, including red maple-hardwood swamp and shrub swamps (NYNHP 201 le).

Specific ecological communities of New York States are documented in "DRAFT Ecological Communities of New York State" (Edinger et al. 2002).

C-5

IPEC CZMA Consistency Certification December 2012 NYNHP recommends that recorded populations of this species be verified for their accuracy, as it is thought that reports and specimen labels of this species (more than 50 reports) may actually be misidentifications due to confusion over the taxonomic history of the species (NYNHP 201 le). Populations occur in southeastern New York (NYNHP 201 le). However, most of the populations are small, with the exception of one that has about 500 plants (NYNHP 201 le).

c. Lined Sedge Lined sedge (Carex striatula)is a State-listed endangered plant of the sedge family.

Habitat for this species includes deciduous granitic rocky woodlands in ravines with chestnut oak (Quercus montana), dry to moist ravine slopes, dry to mesic woods, rich open woods, and rich hardwoods (NYNHP 201 If; Gleason and Cronquist 1991 as cited in NYNHP 201 If; Rhoads and Block 2000 as cited in NYNHP 201 If; Fernald 1950). This species has the potential to occur in other NYNHP-designated ecological communities including the Appalachian oak-hickory forest, limestone woodland, maple-basswood rich mesic forest, and oak-tulip tree forest (NYNHP 201 If).

In New York State, lined sedge is at the northern edge of its range and is only known to occur in the lower Hudson Valley. Because this species is at the northern end of its range, it is likely that it has always been rare within the State. Historical records indicate that there were three known locations of this species. Currently, there is one known population of approximately 20 plants within the Hudson Valley. There are no known specific threats to populations of this species within the State (NYNHP 201 lf).

d. Water Pigmyweed Water pigmyweed (Crassulaaquatica[Tillaea aquatica])is a State-listed endangered plant of the stonecrop (Crassulaceae) family. In New York State, this annual species occurs in tidal mudflats, marshes, and rocky shorelines of the lower Hudson River and in one location on Long Island along the banks of an intertidal river (NYNHP 201 Ig). Within its range, this species occurs along pond margins, fresh to tidal shores, and coastal areas where mud shores and intertidal areas occur (Fernald 1950; Gleason and Cronquist 1991 as cited in NYNHP 201 lg).

NYNHP-designated ecological communities associated with this species include freshwater intertidal mudflats, freshwater intertidal shore, freshwater tidal marsh, and riverine submerged structure (NYNHP 201 lg).

Historical records indicate that water pigmyweed has always been rare in New York.

Currently, known populations of this species occur in the lower Hudson Valley. Current threats to this species include habitat invasion by common reed (NYNHP 201 lg).

e. Yellow Flatsedge Yellow flatsedge (Cyperusflavescens) is a State-listed endangered species of the sedge family. In New York State, habitats include salt marshes (high marsh) and coastal plain pond C-6

IPEC CZMA Consistency Certification December 2012 shores, as well as wet, sandy, and weedy roadsides (NYNHP 201 lh). NYNHP-designated ecological communities associated with this species include coastal plain pond shores and unpaved road/path communities. This species also has the potential to occur in the NYNHP-designated high marsh community (NYNHP 201 lh).

In New York State, habitat availability appears to be extensive, but the species is only known to occur from New York City north to Orange County (NYNHP 201 lh). Historical records indicate that 15 populations once existed, but approximately half of these have been extirpated. Currently, there are five recorded populations, but more survey work is required to verify these populations. Current threats to this species include roadside management activities and habitat invasion by common reed (NYNHP 201 lh).

f. Gypsy-wort Gypsy-wort (Lycopus rubellus) is a State-listed endangered species of the mint (Lamiaceae) family. In New York State, this species occurs in marshes, fens, and flooded swamps. In one location on the Hudson River, it has been found growing in cracks of a stone wall. NYNHP-designated ecological communities associated with this species include marine riprap/artificial shore and medium fen (NYNHP 201 Ii).

Gypsy-wort has always occurred in low numbers within New York, and it is unlikely that more than five populations are present at one time. Historical records indicate that 10 occurrences have been documented, but not relocated. Currently, there are five small existing populations, but their likelihood of survival is not high. Some of the known populations are located within the lower Hudson Valley. Threats to the New York State populations have not been widely documented (NYNHP 2011 i).

g. Virginia Pine Virginia pine (Pinus virginiana)is a State-listed endangered plant of the pine family (Pinaceae). Habitat for this species includes sterile, dry soils. In New York, this species occurs in coastal oak forest openings, pitch pine and/or scrub oak barrens, and open rocky summits.

One NYNHP-designated ecological community associated with this species is the pitch pine-oak-heath-rocky summit. This species has the potential to occur in other NYNHP-designated communities, including coastal oak-beech forest and coastal oak-heath forest (NYNHP 201 lj).

In New York, Virginia pine occurs in the lower Hudson Valley north to Orange County.

Currently, known populations are small and threatened by succession and/or invasion from surrounding vegetation (NYNHP 201 lj).

h. Basil Mountain-mint Basil mountain-mint (Pycnanthemum clinopodioides) is a State-listed endangered plant of the mint family. In New York State, populations of basil mountain-mint are typically found on south- or west-facing slopes in dry rocky soil. The species is often found in alkaline soil at C-7

IPEC CZMA Consistency Certification December 2012 sites located on traprock (diabase, a typically high-pH igneous rock) or calcareous bedrock where other mountain-mint species occur. NYNHP-designated ecological communities associated with this species include oak-hickory forests, woodlands, or savannas with exposed bedrock (NYNHP 2011 k).

Basil mountain-mint is a globally rare species. In New York State, the range for this species is limited to the Palisades and Harlem Valley, which is the smallest range of any northeastern mountain-mint species (NYNHP 2011 k). In addition, there are only three known basil mountain-mint populations within the State; two of which are small and one is threatened by competition from aggressive non-native plants (NYNHP 2011 k). Threats to basil mountain-mint populations include succession within plant communities, encroachment of invasive plants, particularly black swallowwort (Cynanchum spp.), and in some cases, hybridization with other mountain-mint species (NYNHP 2011 k).

i. Torrey's Mountain-mint Torrey's mountain-mint (Pycnanthemum torrei) is a State-listed endangered plant of the mint family. In New York, this species occurs in dry, open areas of red cedar barrens, rocky summits, trails, and roadsides (NYNHP 20111). Within its range, this species occurs in woods and thickets with fertile soils (Fernald 1950). NYNHP-designated ecological communities associated with this species include Appalachian oak-hickory forest and red cedar rocky summit.

This species has the potential to occur in other NYNHP-designated communities characterized by limestone woodlands (NYNHP 20111).

In New York, Torrey's mountain-mint is at the northeastern limit of its range, and, as such, this plant was never common within the State; populations are known to exist in Rockland and Dutchess Counties. There are three extant populations for the State and eight historical records for the New York City area. The three known populations are small or highly threatened by plant succession, development, or roadside management; the eight historical populations are thought to be extirpated. The best place to see this species is within High Tor Park in Rockland County (NYNHP 20111).

2. NYNHP-listed Threatened Plant Species Recorded Since 1980
a. Woodland Agrimony Woodland agrimony (Agrimoniarostellata)is a State-listed threatened species of the rose family. In New York State, habitat for this species includes rich mesic forests associated with slopes, calcareous bedrock of gorges, limestone shelves, streambanks, and other sites. Other habitat in New York includes dry oak woods, wooded pastures on rich soil and shrub thickets, (New York Natural Heritage Program 2006 as cited in NYNHP 2011111). Within its range, this species also occurs in open woods, fields, thickets, and sandy clearings (Gleason and Cronquist 1991, Voss 1995, Rhoads and Block 2000, Fernald 1950 as cited in NYNHP 2011111). NYNHP-designated ecological communities associated with this species include Appalachian oak-hickory C-8

IPEC CZMA Consistency Certification December 2012 forest, hemlock-northern hardwood forest, limestone woodland, and maple-basswood rich mesic forest (NYNHP 201 1111).

In New York, there are 17 known existing populations of woodland agrimony, each of which contains fewer than 100 plants, with the exception of one that has greater than 10,000 plants. These populations are considered stable and occur in the Hudson Valley, Long Island, and north and west of Albany. Sixteen historical populations are known, but many of these are extirpated as a result of development. Threats to this species are minimal. However, logging, development, succession, deer browsing, and invasive species are likely threats to some populations (NYNHP 2011111).

b. Virginia Snakeroot Virginia snakeroot (Aristolochiaserpentaria)is a State-listed threatened plant of the birthwort (Aristolochiaceae) family. In New York, this species occurs in well-drained, rocky slopes of oak woods. Preferred drainage patterns for this species include southwest- to southeast- facing slopes in oak-hickory forests or chestnut oak forests where leaves collect in drainage channels. Within its range, Virginia snakeroot may occur in mesic forests, moist or dry upland woods, floodplains, and often in calcareous soils (FNA 1997 as cited in NYNHP 2011 b; Gleason and Cronquist 1963; Mitchell and Beal 1979 as cited in NYNHP 201 lb). NYNHP-designated ecological communities associated with this species include Appalachian oak-hickory and chestnut oak forests. Virginia snakeroot also has the potential to occur in other NYNYP-designated ecological communities, such as those characterized by limestone woodlands, oak-tulip tree forests, rich mesophytic forests, and successional old fields (NYNHP 2011 b).

Virginia snakeroot is at the northern portion of its range in New York. Six known populations occur in the State on the west side of the Hudson River in the Hudson Highlands, and it is expected that with increased survey efforts additional populations of this plant will be discovered within the Hudson Highlands and the mid-Hudson Valley (NYNHP 201 lb). With the exception of occasional deer browsing, threats to populations of this species are not known in New York State (NYNHP 201 lb).

C. Smooth-bur Marigold Smooth-bur marigold (Bidens laevis) is a State-listed threatened plant of the aster family (Asteraceae). In New York., the primary habitat for this species includes freshwater and brackish tidal mudflats and marshes. Associated species within these habitats include chairmaker's bulrush (Schoenoplectus americanus), annual wildrice (Zizania aquatic), Delmarva beggarticks (Bidens bidentoides), nodding beggartick (Bidens cernua), pickerelweed (Pontederiacordata),

and green arrow arum (Peltandravirginica). Historical records indicate that this species once occurred in swamps, marshy meadows, and stream margins in western New York (NYNHP 201 Im). Within its range, this species occurs along margins of freshwater or brackish pools and slow-moving streams and in low, wet places of coastal areas (Fernald 1950; Gleason and Cronquist 1963). NYNHP-designated communities associated with this species include brackish intertidal mudflats, brackish intertidal shores, brackish tidal marshes, freshwater intertidal mudflats, freshwater tidal marshes, and shallow emergent marshes (NYNHP 2011 m).

C-9

IPEC CZMA Consistency Certification December 2012 In New York State, this species exists on Long Island and along the Hudson River, and, with the exception of the northern counties, is scattered throughout the State. Eleven populations have been recorded; 10 of these populations are present along the Hudson River. Common reed invasion within tidal marshes is the primary threat to the Hudson River populations (NYNHP 201 im).

d. Terrestrial Starwort Terrestrial starwort (Callitricheterrestris) is a State-listed threatened plant of the water-starwort family (Callitrichaceae). In general, habitat for this species is diverse, as long as bare, muddy soil is present. In New York State, this species has been observed in a wide range of habitats, including mudflats, pond shores, and upland and wetland forests and in disturbed habitats of driveways and pastures (NYNHP 201 In). Within its range, habitat for this species also includes damp shaded soil, fallow fields, and footpaths (Gleason and Cronquist 1991 as cited in NYNHP 201 In; Fernald 1950). NYNHP-designated ecological communities associated with this species include chestnut oak forest, freshwater intertidal mudflats, hemlock-northern hardwood forest, pastureland, and red maple-hardwood swamp.

In New York, the majority of the known populations of this species occur within the Hudson Valley between Rockland and Columbia Counties. Currently, there are a total of 10 known populations, which all occupy disturbed sites. Because this species tends to persist in disturbed areas, such as unpaved or old secondary roads, human-induced threats to this species are related to the maintenance and upgrading of these roads to paved surfaces. Natural threats to this species include natural succession and drought (NYNHP 201 In).

e. Long's Bittercress Long's bittercress (Cardamine longii) is a State-listed threatened species of the mustard family (Brassicaceae). Habitat within New York includes intertidal areas of tidal estuaries and backwater areas, including shaded portions of tidal swamps, mudflats, and muddy banks of tidal creeks. One known population is located in a non-tidal swamp forest on muddy, organic, alkaline soil (NYNHP 2011o). Within its range, other potential habitats include shady tidal banks and mucky areas under northern white cedar (Thuja occidentalis) and yellow birch (Betula alleghaniensis)woodlands and the edges of salt marshes (Crow 1982 as cited in NYNHP 2011 o; Gleason and Cronquist 1991 as cited in NYNHP 2011o). NYNHP-designated ecological communities associated with this species include brackish intertidal mudflats, brackish intertidal shore, freshwater intertidal shore, freshwater tidal marsh, freshwater tidal swamp, red maple-hardwood swamp, and saltwater tidal creek.

In New York, Long's bittercress's range appears to be expanding northward up the Hudson River. Nine populations of this species occur along the Hudson River. The known populations of this species range in size from three to 300 plants. This species occurs in Iona Island Marsh and Bear Mountain State Park (NYNHP 201 lo).

C-10

IPEC CZMA Consistency Certification December 2012

f. Clustered Sedge Clustered sedge (Carex cumulata) is a State-listed threatened species of the sedge family.

In New York, habitat for this species includes open rocky damp areas on acidic bedrock or shallow soil, recently burned areas, power line rights-of-way, open oak forests, woodlands, heathlands, and successional communities (NYNHP 201 1p). Within its range, this species occurs in areas of dry, rocky, or sandy soil (Gleason and Cronquist 1963). NYNHP-designated ecological communities associated with this species include pitch pine-oak-heath rocky summit, pitch pine scrub oak barrens, rocky summit grassland, and shrub swamp. This species has the potential to occur in other communities designated by NYNHP, including mowed roadside/pathway, pitch pine-oak-heath woodland, and red cedar rocky summit (NYNHP 2011p).

Clustered sedge appears to be widely distributed within the State, and populations occur within the Hudson Valley. The majority of the plants in New York are found in the lower Hudson Valley in the Shawangunk Mountains, Hudson Highlands (i.e., Breakneck Ridge), and Taconic Mountains (NYNHP 201 Ip). There are no known threats to populations of this species within New York State.

g. Marsh Straw Sedge Marsh straw sedge (Carex hormathodes) is a State-listed threatened species of the sedge family. Within New York State, the common habitat for this species is in locations that are adjacent to salt or brackish coastal areas, but occasionally this species occurs in tidal marshes and within dune swales and dry or wet sands that are located slightly inland. Other habitats within the State include fens, wetland edges, and wet forests of coastal communities, fresh marshes, and rocky areas near the coast (NYNHP 201 lq; Fernald 1950). NYNHP-designated ecological communities associated with this species include brackish interdunal swales, brackish meadow, brackish tidal marsh, high salt marsh, and sea level fen. This species has the potential to occur in other NYNHP-designated communities, including brackish intertidal shore, maritime beach, and maritime dunes (NYNHP 201 lq).

In New York State, two populations of marsh straw sedge occur on the Hudson River, with the most northern populations occurring near Bear Mountain Bridge in Con Hook Marsh.

Threats to populations of this species include habitat invasion by common reed, foot traffic, and habitat alterations due to roadway construction projects (NYNHP 2011 q).

h. Midland Sedge Midland sedge (Carex mesochorea) is a State-listed threatened plant of the sedge family.

In New York, habitat for this species includes sandy soils of maritime grasslands, oak woods, mowed cemeteries, paths, and fields (NYNHP 201 Id). Other habitats may include pitch pine-oak-heaths., rocky summits, and red cedar rocky summits.

C-II

IPEC CZMA Consistency Certification December 2012 This species is probably not native at the northern and eastern limits of its range, and since New York is near these range limits, further evaluation is warranted (NYNHP 201 Id).

Within New York, biologists consider the presence of Midland sedge a natural extension of a Midwestern population. Currently, there are eight known populations of this species within New York. These populations are known to exist in the Hudson Highlands (NYNHP 201 Id).

With the exception of the invasion of habitat by exotic and invasive species, there are few known threats to this species. This sedge tends to colonize disturbed areas, particularly those that have been burned (i.e., abandoned fire pits) or mowed (NYNHP 201 Id). Since surveys for this species within New York have not been exhaustive, it is likely that the species is more common than the State rank may indicate, and based on long-term trends, it is expected that additional populations of this species will be discovered in the future (NYNHP 201 ld).

i. Salt-marsh Spikerush Salt-marsh spikerush (Eleocharisuniglumis var. halophila)is a State-listed threatened plant of the sedge family. In New York State, habitat for this species is diverse and includes the margins of fluctuating shorelines influenced by salt or brackish water. Within its range, this species tolerates a wide range of soil types, including peat, muck, and sand. NYNHP-designated ecological communities associated with this species include coastal plain pond and coastal plain pond shore. This species has the potential to occur in other NYNHP-designated communities, including brackish tidal marsh and high and low salt marshes (NYNHP 201 Ir).

In New York State, existing populations occur on the lower Hudson River north to Orange County. Current threats to this species include habitat invasion by common reed and habitat degradation as a result of stormwater runoff (NYNHP 201 Ir).

j. Featherfoil Featherfoil (Hottonia inflata) is a State-listed threatened species of the primrose family (Primulaceae). In New York State, habitat for this species includes kettle ponds, vernal pools, coastal swales, and ponded areas of small streams. Other habitat includes pools, ditches, and quiet shallow waters or wet soil of coastal plain areas (Fernald 1950; Gleason and Cronquist 1963). The seed of this species is thought to be spread by ducks and beavers. NYNHP-designated ecological communities associated with this species include coastal plain pond, deep emergent marsh, pine-barrens vernal pond, shallow emergent marsh, shrub swamp, and vernal pool (NYNHP 201 Is).

In New York, known populations of this species occur in the Hudson Valley north to Orange County. Featherfoil populations tend to fluctuate naturally, as the species has a two-year life cycle. Threats to populations of this species include habitat development and habitat invasion by Japanese silver grass (Microstegium spp.) (NYNHP 2011 s).

C-12

IPEC CZMA Consistency Certification December 2012

k. Violet Wood-sorrel Violet wood-sorrel (Oxalis violacea) is a State-listed threatened species of the wood-sorrel family (Oxalidaceae). In New York, the primary habitat for this species is steep rocky slopes and open summits on ledges, trail edges, and openings surrounded by oak-hickory communities that have rocky rich soils (NYNHP 201 It). Within its range, violet wood-sorrel occurs on gravelly banks and prairies and dry upland woods (Femald 1950; Gleason and Cronquist 1991 as cited in NYNHP 2011 t). NYNHP-designated communities associated with this species include Appalachian oak-hickory forest, calcareous talus slope woodland, chestnut oak forest, and red cedar rocky summit (NYNHP 201 It).

In New York State, the majority of the extant populations are within the lower Hudson Valley south of Columbia County. Threats to the species include habitat invasion by garlic mustard (Alliariapetiolata)and foot traffic (NYNHP 2011 t).

1. Spongy Arrowhead Spongy arrowhead (Sagittaria montevidensis var. spongiosa) is a State-listed threatened annual plant of the water-plantain family (Alismataceae). In New York State, the primary habitat for this species is freshwater to brackish intertidal mudflats, but the species occasionally occurs in adjacent brackish to fresh tidal marshes. Associated species include awl-leaf arrowhead (Sagittariasubulata) in mudflats and taller vegetation in the marshes (NYNHP 201 lv). This species is also known to occur in shallow waters of the Hudson River (Haynes 1979 as cited in NYNHP 201 lv). NYNHP-designated ecological communities associated with this species include brackish intertidal mudflats, brackish tidal marsh, freshwater intertidal mudflats, and freshwater tidal marsh (NYNHP 2011 v).

In New York State, the habitat for this species is very limited. Known populations of this species occur in a location south of Albany, an area north of the Tappan Zee Bridge on the Hudson River, and in Iona Island Marsh. Currently, there are approximately 20 known extant populations of spongy arrowhead, and seven of these have no more than 100 plants. Threats to these populations include habitat alterations and disturbances as result of large wakes by boats (NYNHP 201 lv).

m. Saltmarsh Aster Saltmarsh aster (Symphyotrichum subulatum var. subulatum [Aster subulatus var.

euroauster])is a State-listed threatened plant of the aster family. In New York, the habitat for this species includes coastal salt to brackish marshes, saltwater influenced communities of tidal channel edges and creek banks, shrub-dominated habitats, salt ponds, and disturbed habitats, as well as wet brackish swales in between maritime dunes. This species also occurs in inland salt marshes, artificial salt ponds, and salt storage sites near the City of Syracuse (NYNHP 2011 w).

Within its range, this species occurs in the vicinity of salted highways and salt mines, fresh thickets, and woodland edges (Brouillet et al. 2006 as cited in NYNHP 2011 w; Fernald 1950).

NYNHP-designated ecological communities associated with this species include brackish C-13

IPEC CZMA Consistency Certification December 2012 interdunal swales, brackish meadow, brackish tidal marsh, coastal salt pond, estuarine riprap/artificial shore, high salt marsh, inland salt marsh, salt shrub, and sea level fen (NYNHP 2011 w).

In New York, saltmarsh aster occurs along brackish tidal drainages of the Hudson River north to Putnam and Rockland Counties. At least five out of the extant populations are small, with 50 or fewer individuals. The habitat for this species is limited within the State, and much of it has been damaged or destroyed. Populations have declined over the past 100 years, and current populations are threatened by habitat invasion by common reed and purple loosestrife (Lythrum salicaria),alterations to habitat, and browsing by deer (NYNHP 2011 w).

3. NYNHP-listed Rare Plant Species Recorded Since 1980
a. Small-flowered Crowfoot Small-flowered crowfoot (Ranunculus micranthus) is a rare species of the buttercup family (Ranunculaceae). In New York, small-flowered crowfoot occurs on south- and southeast-facing slopes of ridges and summits. The species prefers partial shade and small openings; sites often have rich soils and high species diversity. This species has also been observed in acidic sandstone soils. The plant has been observed in a wide-range of forest communities, including beech-sugar maple, oak-hickory, and red cedar summits. NYNHP-designated ecological communities associated with this species include acidic talus slope woodland, Appalachian oak-hickory forest, pitch pine-oak-heath rocky summit, pitch pine-oak-heath woodland, pitch pine-scrub oak barrens, and rocky summit grasslands (NYNHP 201 lu).

Within New York, small-flowered crowfoot occurs within the lower Hudson Valley to Columbia County. Currently, there are 22 extant populations that are in good to excellent condition, and it is expected that more populations are present in dry forests of the lower Hudson Valley. Small-flowered crowfoot has always been a rare plant in the State, but the number of extant populations has remained the same over the past 100 years. Iona Island North Knoll is the best location in the State to see this species (NYNHP 201 lu).

b. Delmarva Beggars-ticks Delmarva beggar-ticks (Bidens bidentoides) is a rare species of the aster family. Within New York State, habitat for this species includes NYNHP-designated freshwater tidal mudflats and marsh ecological communities. Delmarva beggar-ticks are usually found in the transitional area between the two communities and within sandy or muddy openings of the vegetated portions of the freshwater tidal marsh (New York Natural Heritage Program 2007 as cited in NYNHP 201 lmmm). Within its range, this species also occurs along fresh and brackish tidal shores and estuaries (Gleason 1963).

In New York, Delmarva beggar-ticks occur in the freshwater tidally-influenced segment along the Hudson River as far north as Rensselaer County. There are 26 existing populations and many historical populations have been also found. These populations are thought to be C- 14

IPEC CZMA Consistency Certification December 2012 stable and additional populations are expected to exist in New York (NYNHP 201 Immm).

Threats to this species include: erosion from boat wakes in shoreline habitats, overuse by recreational boaters, development along the shoreline, future sea-level rise, and minor impacts from invasive species.

4. NYNHP Historical Records of State-Listed Endangered Plants Documented Before 1980
a. Puttyroot Puttyroot (Aplectrum hyemale) is a State-listed endangered plant of the orchid family. In New York, this species occurs near limestone outcrops or in calcareous talus of rich deciduous or mixed deciduous-evergreen woods in soils of mesic upland to damp low ground areas. Within its range, this species also has the potential to occur in habitats ranging from upland to swamp forests and beech-maple woods, but is less likely to occur in rich wooded slopes and bottom lands (FNA 2002 as cited in NYNHP 201 laa; Voss 1972 as cited in NYNHP 201 laa; Rhoads and Block 2000 as cited in NYNHP 201 laa). NYNHP-designated ecological communities associated with this species include Appalachian oak-hickory forest and limestone woodland.

This species also has the potential to occur in other NYNHP-designated communities, including beech-maple mesic forest, calcareous talus slope woodland, maple-basswood rich mesic forest, and rich mesophytic forest (NYNHP 201 laa).

Historical records indicate that this species once occurred throughout New York State, but currently there are no known occurrences in the Hudson River Valley. Threats to this population are thought to include acid rain, deer browsing, and changes in soil composition and chemistry (NYNHP 201 laa).

b. Wild Potato-vine Wild potato-vine (Ipomoeapandurata)is a State-listed endangered species of the morning glory family (Convolvulaceae). This species occurs in dry fields, slopes, and thickets, and dry open or partially shaded soil (Connecticut Botanical Society 2005; Fernald 1950).

Distribution data for New York State indicate that the species occurs in Dutchess County (USDA 2012a). Little information is available for this species within New York State.

c. Riverbank Quillwort Riverbank quillwort (Isoetes riparia)is a State-listed endangered species of the quiliwort family (Isoetaceae). In New York, habitat for this species includes pond margins, cobble shores of large rivers, tidal mudflats, and gravelly shallows of lakes (New York Natural Heritage Program 2004 as cited in NYNHP 2011 nnn). In addition to the habitats listed above, within its range, the habitat for this species is diverse and includes streams, tidal shores and estuaries, and calcareous to slightly acidic substrates in fresh, usually oligotrophic water (Flora of North America 1993 as cited in NYNHP 2011 nnn), and gravelly or muddy tidal and non-tidal fresh-C-15

IPEC CZMA Consistency Certification December 2012 water shores, streams, and fresh or slightly brackish rivers (Gleason and Cronquist 1991, Fernald 1970, Flora of North America 1993 as cited in NYNHP 201 lnnn). NYNHP-designated ecological communities associated with this species include brackish intertidal mudflats, cobble shore wet meadow, freshwater intertidal mudflats, inland calcareous lake shore, and unconfined river (NYNHP 201 lnnn).

There are two known populations located in the vicinity of the Taconic Range and the Delaware River, and a number of historical populations within the state, including areas along the Hudson River. However, historical populations along the Hudson River have not been found in recent years. Another population is reported for the Shawangunk Mountains near Mohonk Lake, but this population has not been relocated since the late 1970s. Riverbank quillwort is also found on the Vermont side of Lake Champlain, which suggests that it could also be found in the northern portions of the lake on the New York side. Water quality degradation is thought to be the reason for the decline of this species. Known threats include pollutants, run-off, boat traffic, among others (NYNHP201 l nnn).

d. Large Twayblade Large twayblade (Liparis liliifolia) is a State-listed endangered species of the orchid family (Orchidaceae). In New York State, habitat for this species occurs in both wetland and upland areas. Large twayblade is known to grow in hummocks in sphagnous peat in red maple-dominated swamps and is also known to occur in dry woods in limestone soils, wooded talus slopes, and at railroad rights-of-way at the edge of swamps (NYNHP 201 Ix). Within its range, this species also occurs in loamy or sandy woods and clearings and rich woods (Fernald 1950; Gleason and Cronquist 1991 as cited in NYNHP 201 Ix). Large twayblade is known to occur in early to mid-successional forests in areas recovering from disturbance. NYNHP-designated communities associated with this species include limestone woodland, red maple-hardwood swamp, and shrub swamp. This species also has the potential to occur in NYNHP-designated red cedar rocky summit (NYNHP 201 Ix).

In New York State, this species is at the northern edge of its range and is found in scattered populations across the State with the exception of the northern counties. Large twayblade appears to have declined within the State, as there are 52 historical records for this species but only eight known populations. Four of the existing populations have been surveyed, and plants were present in three of them (NYNHP 201 Ix). Threats to the species include flooding due to beaver activities, extirpation of some pollinators (i.e., flies exterminated during mosquito control activities), and maturation of mid-successional communities (Mattrick 2004 as cited in NYNHP 201 Ix).

e. Virginia False Gromwell Virginia false gromwell (Onosmodium virginianum) is a State-listed endangered species of the borage family (Boraginaceae). Habitat for this species within the State is based on one single population, which occurs inland in a NYNHP-designated red cedar barrens community.

Within this habitat, the soils are calcareous, exposed bedrock is present, and there is mixture of C-16

IPEC CZMA Consistency Certification December 2012 tree, grass, and herbaceous species (NYNHP 201 ly). Within its range, this species occupies maritime upland and inland limestone and other rocky calcareous sites, pinelands, dry sandy woods, and open sands (NYNHP 201 ly; Fernald 1950).

In New York State, populations of this species are known to occur in the lower Hudson Valley. Historical records indicate that in the late I 800s and early 1900s, 22 known locations were known from areas that have since been developed. The single known population has 20 plants and is located in Dutchess County (NYNHP 201 ly).

f. Hooker's Orchid Hooker's orchid (Platantherahookeri) is a State-listed endangered species of the orchid family. In New York State, the primary habitat for this species occurs in successional forest communities or forests with open understories dominated by poplar and pine species (NYNHP 201 lz). Within its range, this species is also known to occur in a wide range of habitats, including dry to mesic coniferous and deciduous forest, rich moist woods, and thickets and borders (FNA 2002b as cited in NYNHP 201 lz; Gleason and Cronquist 1991 as cited in NYNHP 2011 z; Voss 1972 as cited in NYNHP 2011 z). However, some reports contradict the above-mentioned habitat preferences and indicate that this species is less likely to occur in rich, well-drained deciduous woods and deciduous forest or hemlock-hardwoods (Rhoads and Block 2000 as cited in NYNHP 201 lz; Voss 1972 as cited in NYNHP 201 lz). Within New York State, this species occurs in the following NYNHP-designated ecological communities: beech-maple mesic forest, chestnut oak forest, hemlock-northern hardwood forest, red maple-hardwood swamp, and successional northern hardwood. This species also has the potential to occur within other NYNHP-designated ecological communities, including Appalachian oak-hickory forest, Appalachian oak-pine forest, calcareous talus slope woodland, limestone woodland, and pine-northern hardwood forest (NYNHP 201 lz).

Within New York State, historical records indicate that this orchid occurred throughout a large portion of the State. However, currently, no known populations occur in the Hudson Valley region (NYNHP 201 lz).

g. Catfoot Catfoot (Pseudognaphaliumhelleri ssp. micradenium) is a State-listed endangered annual plant of the aster family. The species has range on the East Coast that extends from New York and New Jersey south and west to Virginia, Kentucky, and Georgia. Habitat for this species includes dry sandy soil of upland hardwood to mixed forests (Maine Department of Conservation 2004). This species has been documented in Rockland County (USDA 2012b). Very little information is available for the habitat and occurrences of this species within New York State.
h. Slender Marsh-pink Slender marsh-pink (Sabatia campanulata)is a State-listed endangered plant of the gentian family (Gentianaceae). It is known to occur within 19 states (Zaremba 2004). In New C-17

IPEC CZMA Consistency Certification December 2012 York, this species can be found on the upper edges of salt marshes, interdunal swales, and brackish tidal areas. One known population occurs in a salt marsh that receives freshwater seepage from gravel uplands. Associated species include northern bayberry (Myrica pensylvanica), cranberry (Vaccinium macrocarpon),drumheads (Polygala cruciata),swamp sunflower (Helianthus angustifolius), ridged yellow flax (Linum striatum), and common three-square (Schoenoplectuspungens). Within its range, this species also occurs in wet sands and peats (Newcomb 1977; Fernald 1950). Little information is documented on the extent of populations of this species within New York. However, two known populations in New York have been documented to have hundreds of individuals (Zaremba 2004). This species has been documented in Westchester County (USDA 2012c).

i. Michaux's Blue-eyed-Grass Michaux's blue-eyed-grass (Sisyrinchium mucronatum) is a State-listed endangered species of the iris family (Iridaceae). In New York State, the primary habitat for this species is herb-dominated non-forested habitats, including fields, pastures, roadsides, forest edges, maritime grasslands, and ditches. Occasionally, this species occurs in non-forested shrub and sapling-dominated habitats. Michaux's blue-eyed grass occurs in soils ranging from very dry to seasonally wet or wetter and ranging from acidic to calcareous. This species is also known to occur in disturbed soils (NYNHP 201 lgg). Within its range, this species occurs on prairies, moist open woods, and rock or sandy open shores, dry fields, roadsides, and open woods, and meadows (Cholewa and Henderson 2002 as cited in NYNHP 201 lgg; Rhoads and Block 2000 as cited in NYNHP 201 lgg; Gleason and Cronquist 1991 as cited in NYNHP 201 lgg; Fermald 1950). NYNHP-designated ecological communities associated with this species include maritime grassland, mowed roadside/pathway, successional old field, and successional shrubland (NYNHP 2011 gg).

In New York State, populations of this species are known throughout most of the State (NYNHP 201 lgg). Although New York is located at the northern end of this species' range, habitat within the State is expansive, but long-term trends are unknown. There are seven extant populations and between 16 and 18 historical populations. Since Michaux's blue-eyed-grass prefers successional habitats, it is expected that it may not occur in one location over a long-term period (NYNHP 201 lgg).

j. American Waterwort American waterwort (Elatineamericana)is a State-listed endangered plant of the waterwort family (Elatinaceae). In New York State, American waterwort occurs in intertidal mudflats and marshes along the Hudson River. Historically, this species occurred in kettle holes of the coastal plain (New York Natural Heritage Program 2007 as cited in NYNHP 2011 ooo).

Within its range, this species is known to occur along muddy tidal shores and at the margins of ponds and streams (Gleason 1952; Fernald 1970 as cited in NYNHP 2011 ooo). NYNHP-designated ecological communities associated with this species include freshwater intertidal mudflats.

C-18

IPEC CZMA Consistency Certification December 2012 Two small populations, together containing less than 100 plants, are known to occur in New York State. A total of 18 historical populations are known for areas along the Hudson River with a small number on Long Island (NYNHP 2011 ooo). Long-term trends for this species are unknown as the two existing populations have not been surveyed in recent years.

According to NYNHP, historically, this species may not have been common in New York State (NYNHP 2011 ooo). Shoreline use has been identified as a potential threat to this species (NYNHP 2011 ooo).

k. Estuary Beggars-ticks Estuary beggars-ticks (Bidens hyperborea var. hyperborean) is a State-listed endangered plant of the aster family. In New York State, estuary beggars-ticks only known habitats is freshwater intertidal mud flats and marshes containing three square (Scirpus americana), soft-stemmed bulrush (Scirpus validus), annual wildrice (Zizania aquatica),Delmarva beggars-ticks and narrow-leaf bur-read (Sparganium eurycarpus) (New York Natural Heritage Program 2007 as cited in NYNHP 201 lppp). Within its range, this species is known to occur within estuaries (Fernald 1970; Gleason 1952 as cited in NYNHP 201 lppp).

Two new populations (found in 1985) and one historical population is known to occur in New York State. No other historical populations have been found. Historically, this plant has not been common in New York State (NYNHP 201 lppp). Common reed invasion and recreational boating are potential threats to this species (NYNHP 201 lppp)

1. Mexican Seaside Goldenrod Mexican seaside goldenrod (Solidago sempervirens var. mexicana) is a State-listed endangered plant of the aster family. In New York, habitat includes the high salt marsh community (NYNHP 201 lqqq).

Three existing populations, each with hundreds of plants and seven historical populations with unknown statuses are known to occur in New York State. An additional two historical populations have been extirpated. Historically, this plant has not been common in New York.

Common reed invasion is the known threat to all of the known populations of this species in New York (NYNHP 201 lqqq)

5. NYNHP Historical Records of State-Listed Threatened Plants Documented Before 1980
a. Troublesome Sedge Troublesome sedge (Carex molesta) is a State-listed threatened species of the sedge family. Primary habitat for this species includes wet fields, alvar grasslands, and oak openings in dry to wet calcareous soils. Within New York State, this species is also known to occur on river banks, woodlands, talus slopes, and disturbed areas (NYNHP 201 lbb). Other habitats within its C-19

IPEC CZMA Consistency Certification December 2012 range include dry to slightly moist open grounds and woodland edges (Fernald 1950). NYNHP-designated ecological communities associated with this species include alvar grassland, inland calcareous lake shore, oak openings, and successional old field. This species also has the potential to occur in NYNHP-designated communities of alvar woodland, calcareous talus slope woodland, limestone woodland, and successional shrubland (NYNHP 201 lbb).

There are 13 extant populations scattered across the New York State outside of the Catskill and Adirondack Mountains. Historical records indicate that there were 20 to 40 populations known at one time, but surveys have not been conducted to verify the status of these populations. Furthermore, due to the weedy nature of this species, it is possible that unrecorded populations are present throughout the State (NYNHP 2011 bb).

b. Rough Avens Rough avens (Geum virginianum) is a State-listed endangered plant of the rose family.

In New York, rough avens occurs in a wide range of habitats, including Appalachian oak-hickory forests, northern-hardwood forests, woodlands of limestone bedrock substrates and swamps, sandy dunes, riverbanks, marshes, and roadsides (NYNHP 201 1cc). Within its range, this species is also known to occur on rocky banks, dry woods, and in moist upland woods (Fernald 1950; Newcomb 1977; Gleason and Cronquist 1963). NYNHP-designated communities associated with this species include alvar woodland, great lakes dunes, hemlock-northern hardwood forest, shallow emergent marsh, and silver maple-ash swamp. This species also has the potential to occur in NYNHP-designated beech-maple mesic forests (NYNHP 2011 cc).

In New York, rough avens is scattered throughout the State. Currently, there are 15 known populations and 22 historical records of this species, but little is known about them. Only one of these populations has more than 50 individuals. More survey work is required to document the status of existing populations and to understand the long-term trends of this species (NYNHP 2011 cc). Threats to known populations within the State include development and invasive species (NYNHP 2011 cc).

c. Eastern Grasswort Eastern grasswort (Lilaeopsischinensis) is a State-listed threatened species of the carrot family (Apiaceae). In New York, this species occurs in brackish marshes and intertidal mudflats, peat edges of salt marshes, muddy locations with brackish or salt water influences, and rocky shores adjacent to the abovementioned communities (NYNHP 201 ldd). Within its range, eastern grasswort is also known to occur in tidal shores bordering the coastal plain, and mud of tidal and brackish marshes (Gleason and Cronquist 1991 as cited in NYNHP 201 ldd). NYNHP-designated ecological communities associated with this species include brackish intertidal mudflats, brackish intertidal shore, brackish tidal marsh, low salt marsh, and sea level fen (NYNHP 201 ldd).

In New York, this species is known to occur in brackish areas of the lower Hudson River.

It is likely that no more than 50 populations of this species ever existed within the State, and C-20

IPEC CZMA Consistency Certification December 2012 currently there are nine known populations. There are a number of threats to this species, including alterations to habitat and hydrology, runoff, sedimentation, common reed invasion, and Canada goose activity (NYNHP 201 ldd).

d. Globe-fruited Ludwigia Globe-fruited ludwigia (Ludwigia sphaerocarpa)is a State-listed threatened species of the evening-primrose family (Onagraceae). In New York, the primary habitat for this species is the edges of shallow coastal plain ponds of pine barrens. Due to pond water variations, plants can occur on pond shores or within standing water of the ponds. This species is also known to occur in shrub swamps and inlets/outlets of wetlands of pine barrens. Within the lower Hudson Valley, one population is known to occur in shallow water on mats of floating vegetation along the shore of a pond (NYNHP 201 lee). Within its range, this species is also known to occur in wet soil, drainage ditches, stream shores, river marshes, swales, edges of limestone sinks, peaty bogs in pastures, and interdunal marshes (Gleason and Cronquist 1991 as cited in NYNHP 201 lee; Peng 1989 as cited in NYNHP 201 lee). NYNHP-designated ecological communities associated with this species include coastal plain pond, coastal plain pond shore, and pine barrens shrub swamp (NYNHP 201 lee).

Within New York, this species is at the northern edge of its range. Historical populations are known to have occurred in the lower Hudson Valley to as far north as Ulster County, but have not been seen in more than 70 years. Currently, 17 known extant populations exist. It is likely that habitat destruction as a result of development is the leading cause of the extirpation of this species at the historical locations (NYNHP 201 lee).

6. NYNHP Historical Records of State-Listed Rare Plants Documented Before 1980
a. Heartleaf Plantain Heartleaf plantain (Plantagocordata) is a State-listed threatened species of the plantain family (Plantaginaceae). In New York, this species occurs in two different locations and habitats. In western New York, this species is found in gravelly streams within red maple-hardwood swamps. Within the Hudson Valley, heartleaf plantain occurs in freshwater habitats including intertidal mudflats, sandy or gravel shorelines of tidal waterways, tidal marshes, and gravelly shorelines of the Hudson River (NYNHP 201 1ff). Within its range, this species also occurs in semi-aquatic areas of marshes and along streams, particularly with calcareous substrates (Gleason and Cronquist 1991 as cited in NYNHP 201 1ff). NYNHP-designated ecological communities associated with this species include freshwater intertidal mudflats, freshwater intertidal shore, freshwater tidal creek, freshwater tidal marsh, and marsh headwater stream (NYNHP 201 1ff).

In New York, a large proportion of the population is located on the Hudson River.

Currently, there are approximately 30 known populations and sub-populations of this species C-21

IPEC CZMA Consistency Certification December 2012 along the freshwater tidal portion of the Hudson River. Several of these populations are small and have less than 40 individuals, with the exception of at least three populations that have more than 1,000 plants. It likely that one colony of about 3,000 plants located upstream is the main seed source of the populations located downstream (Mitchell and Sheviak 1983). All of the current and historical populations of this species within the State are located along the Hudson River. Although historical records indicate that this species occurred as far south as New York City on the Hudson River, current populations are known to exist between the Rondout Creek mouth (-RM 90) and Troy (RM 150) (NYNHP 2011 ff).

7. USFWS-listed Plant Species The following presents the one federally listed species documented by USFWS for the Coastal Zone. A summary of this species is presented in Table C-3.
a. Small Whorled Pogonia The small whorled pogonia (Isotriamedeoloides) is a federally listed threatened and a State-listed endangered plant of the orchid family (USFWS 2012a, b; Young 2010). This species prefers acidic soils and a thick layer of decaying leaf matter, and often occurs on the slopes that border small streams. Associated ecological communities include the open understory areas of older hardwood forests, including those that have beech, birch, maple, oak, and hickory species (USFWS 2012b).

Although historical records are available for this species, it is currently thought to be extirpated from New York (USFWS 2012b). Loss of populations of this species is thought to be due to development and habitat degradation as a result of urban expansion, forestry practices, and recreational activities (USFWS 2012b).

B. NYNHP/New York State Rare Ecological Communities The following are profiles for 13 ecological communities provided by NYNHP for the immediate vicinity of the IPEC Site (RM 41-44), the three SCFWHs, the Coastal Zone, and RM 56 to 60.

1. Acidic Talus Slope Woodland The acidic talus slope woodland community typically occurs on unstable well-drained talus slopes in dry shallow soils composed of non-calcareous bedrock (Edinger et al. 2002).

Because the substrate is unstable, canopy cover is typically less than 50 percent. Common trees include chestnut oak, pignut hickory (Caryaglabra), red oak (Quercus rubra), and white oak (Quercus alba). Smooth sumac (Rhus glabra)and scrub oak (Quercus ilicifolia)are other characteristic species. Pennsylvania sedge is common throughout the herbaceous layer. New York State-listed protected plant species that may be found in this community may include some of the following: musk root (Adoxa moschatellina),Fernald's sedge (Carex merritt-fernaldii),

C-22

IPEC CZMA Consistency Certification December 2012 Carey's smartweed (Persicariacareyi), and small-flowered crowfoot. One federally and State-listed threatened plant, Northern monk's-hood (Aconitum noveboracense), also has the potential to occur within this community (NYNHP 201 lhh). Within New York State, there are several hundred occurrences of the acidic talus slope woodland community. This community is present in the areas of the Hudson Highlands. Threats to this community include changes in land use, forest fragmentation, invasive species, over-browsing by deer, lack of fire, and air pollution (NYNHP 2011 hh).

2. Appalachian Oak-Hickory Forest The Appalachian oak-hickory forest is a hardwood forest that commonly occurs at the tops of ridges and upper slopes, and south- and west-facing slopes. The soils of this community are typically well-drained and comprised of loams or sandy loams. This community is broadly defined. Dominant trees include at least one species of oak along with other characteristic tree species including red maple (Acer rubrum), sugar maple (Acer saccharum), pignut hickory, shagbark hickory (Carya ovata), and white ash (Fraxinusamericana)(Edinger et al. 2002).

Characteristic large shrubs may include flowering dogwood (Cornusflorida)and American witch-hazel (Hamemelis virginana);smaller shrubs may include early low-bush blueberry (Vaccinium pallidum) and maple-leaf viburnum (Viburnum acerifolium). Herbaceous species and grasses typical of the Appalachian oak-hickory forest include wild sarsaparilla (Aralia nudicaulis) and black snakeroot (Cimicifuga racemosa) (NYNHP 2011 ii).

In New York, the Appalachian oak-hickory forest is considered a matrix forest whereby the community has a widespread distribution and includes several large, high-quality occurrences, which may also have pockets of other ecological communities nested within them.

Appalachian oak-hickory forests occur within the Hudson Highlands, the Hudson Limestone Valley, Taconic Foothills, and Catskill Mountains. Appalachian oak-hickory forests that are located on public or private conservation land are the most stable, but are in decline in unprotected areas due to development pressure, forest fragmentation, invasive species, and changes in land use (NYNHP 201 lii).

3. Brackish Intertidal Mudflats Brackish intertidal mudflats are intertidal mudflats that are exposed at low tide and submerged at high tide in waters that have a salinity range from 0.5 to 18 parts per thousand

("ppt"). Vegetation of this community is limited and dominated by aquatic species, such as spongy arrowhead (Sagittariamontevidensis), strap-leaf arrowhead, mudwort (Limosella australis),and tapegrass (Val/isneria americana). State-protected species that have the potential to occur may include eastern grasswort, riverbank quillwort (Isoetes riparia),Long's bittercress, American waterwort (Elatine americana), spongy arrowhead, and smooth bur-marigold (NYNHP 201 ljj).

In New York, this community occurs along the Hudson River in Dutchess, Orange, Putnam, Rockland, and Westchester Counties. Along the Hudson River, this community is present in Hudson Highlands State Park, Bear Mountain State Park, and Tallman Mountain State C-23

IPEC CZMA Consistency Certification December 2012 Park, among others. Brackish intertidal mudflats are listed as potential communities of Iona Island Marsh. Threats to this community include shoreline development, invasive species, recreational boat traffic, and reductions of water quality as a result of shipping lane dredging (NYNHP 201 ljj).

4. Brackish Tidal Marsh The brackish tidal marsh community occurs where water salinity levels range between 0.5 and 18 ppt and water depth is less than 6 feet at high tide. Vegetation of the brackish tidal marsh community is dense and dominated by a mixture of salt marsh and freshwater tidal marsh graminoid species. Dominant species include narrowleaf cattail, crimsoneyed rosemallow (Hibiscus moscheutos), seaside goldenrod (Solidago sempervirens), saltmarsh fleabane (Pluchea odorata), and various bulrushes. However, brackish tidal marshes can also be dominated by common reed. Brackish tidal marshes that are dominated by common reed are not defined as brackish tidal marshes, but are defined by NYNHP as "cultural" communities (i.e., those that have been affected by human activities). State-protected plant species that may occur in the brackish tidal marsh include eastern grasswort, Long's bittercress, saltmarsh aster, smooth bur-marigold, saltmarsh bulrush, and terrestrial starwort (NYNHP 2011 kk).

Along the Hudson River, the occurrence of this community corresponds to the brackish tidal waters between New Hamburg/Poughkeepsie (-RM 75) and Hastings-on-Hudson (RM 22).

Tidal brackish marshes are known to occur in Hudson Highlands State Park and Bear Mountain State Park. The primary threats to this community are shoreline development and invasive species, but reductions in water quality as a result of chemical runoff and dredging of the shipping lane may also threaten brackish tidal marshes. Brackish tidal marshes are listed as potentially occurring in RM 44-56, Iona Island Marsh, and Haverstraw Bay (NYNHP 2011 kk).

5. Chestnut Oak Forest The chestnut oak forest community occurs on well-drained rocky sites of glaciated areas of the Appalachians and the coastal plain. Dominant species include chestnut oak and red oak with ericaceous shrubs such as mountain laurel (Kalmia latifolia), huckleberry (Gavlussacia spp.), and low-bush blueberries in the understory. State-protected species that have the potential to occur in this community include Bayard's adder's-mouth orchid (Malaxis bayardii), glaucous sedge (Carex glaucodea), black-edge sedge, Virginia snakeroot, Hooker's orchid, terrestrial starwort, and violet wood-sorrel (NYNHP 201111).

In New York, this community occurs in the lower portion of the Hudson Valley in the Hudson Highlands. Threats to this community include development, changes in land use, invasive species, air pollution, fire suppression, and over-browsing by deer (NYNHP 201111).

6. Cliff Community The cliff community is comprised of shallow soils with sparse vegetative cover on vertical non-calcareous bedrock walls. Plant species can be a variety of tree, shrub, and C-24

IPEC CZMA Consistency Certification December 2012 herbaceous species that grow in shallow pockets of soil that collects on ledges, cracks, and crevices within the bedrock. State-protected species that have the potential to occur in cliff communities include Bradley's spleenwort (Asplenium bradleyi), black-edge sedge (Carex nigromarginata),mountain spleenwort (Asplenium montanum), fragrant cliff fern (Diyopteris fragrans),golden corydalis (Corydalisaurea), alpine cliff fern (Woodsia alpina), and alpine goldenrod (Solidago leiocarpa)(NYNHP 2011 mm).

In New York State, this community is widely distributed north of the North Atlantic Coast Ecoregion and is known to occur in the Catskill Mountains and the Hudson Highlands.

Cliff communities are threatened by upslope development, recreational uses, habitat alterations, and invasive species (NYNHP 2011 mm).

7. Freshwater Tidal Marsh A freshwater tidal marsh is a marsh community that occurs in waters that are less than 6 feet deep and have a salinity of less than 0.5 ppt. These communities typically occur in shallow bays, shoals, and the mouths of tributaries of large tidal river systems with dominant aquatic vegetation that is emergent at high tide. Within the freshwater tidal marsh community, there are two vegetative zones: one that is located at a lower elevation and is dominated by short, broad-leaved emergent plant species that border mudflat areas or open water; and a zone located at a slightly higher-elevation that is dominated by taller graminoids (Edinger et al. 2002). The vegetation is dominated by aquatics that are emergent at high tide. Species within these zones may include kidneyleaf mud-plantain (Heterantherareniformis), spotted jewelweed (Impatiens capensis), yellow pond-lily (Nupharadvena), pickerelweed, narrow-leaved cattail, and wild rice (NYNHP 201 Inn).

Within New York State, freshwater tidal marsh communities are limited to the central portion of the Hudson River between Rensselaer and Rockland Counties, with the majority of the habitat occurring within Columbia, Green, Dutchess, and Ulster Counties. Examples of the freshwater tidal marsh community occur in the Hudson River, Bear Mountain State Park, Hudson River Islands State Park., and Tivoli Bay Wildlife and Management Area. Threats to this community include development, stormwater runoff, dredging of the shipping lane, and invasion by non-native invasive species, such as purple loosestrife and common reed (NYNHP 201 Inn).

8. Oak-Tulip Tree Forest The oak-tulip tree forest is a mesophytic hardwood community of well-drained soils.

Dominant species include a variety of oaks, tulip tree (Liriodendron tulipifera),American beech (Fagusgrandifolia), black birch (Betula lenta), and red maple. Flowering dogwood, American witch-hazel, sassafras (Sassqfrasalbidum), and lowbush blueberries (Vaccinium angustifolium, Vaccinium pallidum) may occur in the sub-canopy and shrub layers. Species in the herbaceous layer include New York fern (Thelvpteris novaboracenis), white wood aster (Eurvbia divaricata),and Solomon's plume (Maianthemum racemosum) (Edinger et al. 2002). State-protected plants with the potential to occur within this community include Virginia snakeroot, C-25

IPEC CZMA Consistency Certification December 2012 wild comfrey (Cynoglossum virginianum var. virginianum), terrestrial starwort, narrow-leaved sedge (Carex amphibola), and Reznicek's sedge (Carex reznicekii) (NYNHP 2011 oo).

In New York, this community occurs within the Hudson Highlands and the Hudson Limestone Valley. Bear Mountain Park is among one of the best locations to see this community. Threats to this community include development, invasive species, deer browsing, fire suppression, air pollution, and forest fragmentation (NYNHP 2011 oo).

9. Pitch-pine-oak-heath Rocky Summit The pitch-pine-oak-heath rocky summit community occurs on warm, rocky ridgetops, and summits in non-calcareous bedrock and dry, acidic soils. Vegetation is typically sparse, but widely defined where pine (Pinus spp.) species may be replaced with scrub oak or heath shrubs.

This community is often surrounded by the chestnut oak forest community described above.

State-protected plant species that have the potential to occur in this community include broom crowberry (Corema conradi),clustered sedge, Bayard's adder's-mouth orchid, Appalachian sandwort (Minuartiaglabra), midland sedge, Fernald's sedge, and small-flowered crowfoot, among others (NYNHP 201 lpp).

In New York, this community occurs in the eastern portion of the State from the Adirondack Mountains south through the Hudson Highlands. Bear Mountain State Park, Catskill Park, and Taconic State Park are among some of the locations where this community occurs.

Threats to this community include development and recreational uses (NYNHP 2011 pp).

10. Red Cedar Rocky Summit The red cedar rocky summit community occurs on warm, rocky ridge-tops, and summits comprised of calcareous bedrock and dry soils. Vegetation is typically sparse with lichen-covered outcrops surrounded by the Appalachian oak-hickory forest community. The dominant tree species is the eastern red cedar (Juniperusvirginiana),which may be dead or dying due to heat stress (Edinger et al. 2002). State-protected species that have the potential to occur in this community include clustered sedge, Bayard's Adder's-mouth orchid, midland sedge, large twayblade, violet wood-sorrel, and Torrey's mountain-mint (NYNHP 201 lqq).

This community is present throughout New York State. Threats to this community include development and recreational traffic (NYNHP 201 lqq).

11. Rocky Summit Grassland Rocky summit grassland communities occur in rocky areas of summits, ridges, and outcrops. This grassland community is dominated by grasses, such as Indian grass (Sorgastrum nutans), and herbaceous plant species with limited cover of woody species, such as blueberries and red oak. State-protected plant species that have the potential to occur in a rocky summit grassland community include clustered sedge, basil mountain-mint, reflexed sedge (Carex retroflexa), midland sedge, and small-flowered crowfoot, among others (NYNHP 201 lrr).

C-26

IPEC CZMA Consistency Certification December 2012 In New York, this community is found in the Lower New England Ecoregion within the Hudson Highlands. Threats to this community include development, overuse, fire suppression, invasive species, and deer browsing (NYNHP 201 Irr).

12. Floodplain Forest The floodplain forest is a hardwood forest that occurs on low terraces of river floodplains and river deltas with mineral soils. This is a broadly defined community with a plant composition that is variable, can be diverse, and is influenced by flood frequency and elevation along the river delta (NYNHP 2011 rrr). Commonly occurring trees include silver maple (Acer saccharinum),ashes (Fraxinusspp.), cottonwood (Populus deltoides), red maple, box elder (Acer negundo), elms (Ulmus americana,U rubra), hickories, butternut and black walnut (Juglanscinerea,J nigra), sycamore (Platanusoccidentalis), white oak, pin oak (Quercus palustris),and river birch (Betula nigra). Dominant shrubs include spicebush (Lindera benzoin),

ironwood (Carpinus carolinianus),bladdernut (Staphylea trifoliata), speckled alder (Alnus incana spp. rugosa), dogwoods (Cornus sericea, C. foemina spp. racemosa, C. amomum),

viburnums (Viburnum cassinoides, V prunifolium, V dentatum, V lentago), and sapling canopy trees (Edinger et al. 2002).

In New York, there are several hundred occurrences statewide; these are limited to large streams and rivers. Most occurrences are small and degraded, but there are a few large, high quality old growth patches within the state. Floodplain forests that are located on public or private conservation land are the most stable, but are in decline in unprotected areas due to development pressure (NYNHP 201 lrrr). A small portion of a floodplain forest is located in the northeastern portion of the Coastal Zone in Dutchess County.

13. Tidal River The tidal river is an aquatic community with permanently flooded substrates that is restricted to the tidally influenced areas of the state. This community has two zones: a deepwater zone and a shallow zone. The deepwater zone has substrates that are usually covered with water at depths of six feet or more at low tide. The shallow zone has submerged substrates less than 6 feet in depth at low tide. The tidal river does not support emergent vegetation (NYNHP 2011 sss; Edinger et al. 2002).

With respect to water salinity, there is a vertical salinity gradient, with a surface layer of fresh water (salinity less than 0.5 parts per thousand [ppt]) on top of a deeper layer of brackish water (salinity between 0.5 and 18.0 ppt). Salinity can fluctuate with the vertical movement of water due to the tides (NYNHP 2011 sss; Edinger et al. 2002).

In New York State, the largest occurrence of this community within the state is the Hudson River. Smaller tidal rivers occur on Long Island. Threats to tidal rivers include pollution, shoreline development, dredging, commercial shipping, recreation, and invasive species (NYNHP 201 lsss).

C-27

IPEC CZMA Consistency Certification December 2012 C. Discussion of Potential Impacts to Rare Plants and Natural Communities

1. IPEC Site On the basis of a literature review, no known State or federally protected plants or rare natural communities are known to be present on the IPEC Site, and the current land use associated with the project site would not be likely to support rare species and communities. As IPEC License Renewal will not entail any new construction, disturbance, or development, License Renewal will not adversely affect State- or federally listed plants or rare natural communities.

The IPEC Site is highly developed with large expanses of impervious surfaces. Plant species likely to occur at the IPEC Site would be limited to successional, weedy, or invasive species that would be likely to occur within cracks and crevices of paved surfaces and undeveloped areas. Similarly, ecological communities of the project site would be limited to NYNHP-defined "cultural" communities characterized by disturbance. These communities may include mowed areas, wooded lots, and paved roads and paths.

2. RM 44-56 SCFWH A number of State-protected plants and NYNHP-designated ecological communities occur within the RM 44-56 SCFWH, which is upstream from IPEC at RM 42. Significant ecological communities that occur within the RM 44-56 SCFWH include tidal river, brackish tidal marshes, and the cliff community. Within the brackish tidal marsh, State-protected plant species recorded after 1980 within RM 44-56 SCFWH include water pigmyweed, gypsy-wort, terrestrial starwort, Long's bittercress, and saltmarsh aster. Historical records indicate that slender marsh-pink once occurred within the RM 44-56 SCFWH prior to 1980 (NYNHP 2010).

Threats to these species and rare natural communities are related to development, habitat disturbances, or invasive species in the immediate area of the listed plant or ecological community. IPEC License Renewal will not adversely affect State-protected plant species or rare natural communities located in the RM 44-56 SCFWH or elsewhere in the Hudson River.

3. Iona Island Marsh SCFWH A number of State-protected plants and rare natural communities occur within the Iona Island Marsh SCFWH. Rare ecological communities that occur within the Iona Island Marsh SCFWH include tidal river, brackish tidal marshes, brackish intertidal flats, and freshwater tidal marshes. Narrow-leaved cattail is the dominant vegetation (NYSDEC 1998a), although in some portions of the marsh, common reed has become more prominent (Winogrand and Kiviat 1997; NYSDEC 2007a). State-protected plant species that occur within the vicinity of the lona Island Marsh SCFWH include saltmarsh bulrush, water pigmyweed, yellow flatsedge, smooth-bur marigold, terrestrial starwort, Long's bittercress, small-flowered crowsfoot, spongy arrowhead, and saltmarsh aster. No known historical State-protected plant species are documented for the Iona Island Marsh SCFWH (NYNHP 2010). Threats to these species and rare natural C-28

IPEC CZMA Consistency Certification December 2012 communities pertain to development, habitat disturbances, or encroachment by invasive species in the immediate area of the plant or ecological community. IPEC License Renewal will not adversely affect State-protected plant species or rare natural communities of the Iona Island Marsh SCFWH or elsewhere in the Hudson River.

4. Haverstraw Bay SCFWH A number of State-protected plants and rare natural communities have the potential to occur within the Haverstraw Bay SCFWH. With respect to natural communities, the Hudson River in Haverstraw Bay is classified as a tidal river. No other rare natural communities have been documented by NYNHP for Haverstraw Bay. Historical records indicate that the eastern starwort occurred within Haverstraw Bay prior to 1980 (NYNHP 2010). IPEC License Renewal will not adversely affect plant species or ecological communities located in the Haverstraw Bay SCFWH or elsewhere in the Hudson River.
5. Proposed Expansion Area RM 56-60 With respect to ecological communities, this section of river is designated as tidal river.

No other ecological communities have been documented by NYNHP for the proposed Expansion Area RM 56-60 (NYSDEC 2009). No state-listed plants are known to occur within the proposed Expansion Area RM 56-60. IPEC License Renewal will not adversely affect ecological communities located in the proposed Expansion Area RM 56-60 or elsewhere in the Hudson River.

6. Coastal Zone
a. RM 34-56 A number of State-protected plants and rare natural communities occur within the RM 34-56 Coastal Zone. On the west side of the Hudson River., within Orange and Rockland Counties, rare natural communities include chestnut oak forest, oak-tulip tree forest, pitch pine-oak-heath rocky summit, and rocky summit grassland. Within Orange County, only brackish intertidal mudflats, brackish tidal marsh, acidic talus slope woodland, Appalachian oak-hickory forest, and red cedar rocky summit are found. State-protected plant species that occur within the Coastal Zone in Orange County include spongy arrowhead, saltmarsh bulrush, and marsh straw sedge in marsh and intertidal areas and lined sedge, Virginia pine, and straw sedge in upland areas. Within Rockland County, State-protected plants include Long's bittercress, saltmarsh aster, spongy arrowhead, saltmarsh bulrush, and terrestrial starwort in marshes and intertidal areas and basil mountain-mint, Torrey's mountain-mint, featherfoil, and midland sedge in upland areas. Historical records include Michaux's blue-eyed-grass and rough avens for the Coastal Zone within Orange County and catfoot, heartleaf plantain, troublesome sedge, wild potato vine, and straw sedge within the Coastal Zone of Rockland County (NYNHP 2010).

C-29

IPEC CZMA Consistency Certification December 2012 On the east side of the Hudson River, within Putnam and Westchester Counties, rare natural communities include the cliff community, Appalachian oak-hickory forest, chestnut oak forest, oak-tulip tree forest, and pitch pine-oak-heath rocky summit; within Westchester County, they include brackish intertidal mudflats, brackish tidal marsh, Appalachian oak-hickory forest, chestnut oak forest, and rocky summit grassland. State-protected species that occur within the Coastal Zone in Putnam County include gypsy-wort, Long's bittercress, saltmarsh aster, water pigmyweed, and smooth bur marigold in marsh and intertidal areas, and clustered sedge and violet wood-sorrel in upland habitats. NYNHP records for the Coastal Zone within Westchester County indicate that spongy arrowhead is the only listed State-protected species. Historical records indicate that slender marsh-pink and large twayblade were once present within the Coastal Zone of Putnam County and that eastern grasswort once occurred within the Coastal Zone of Westchester County (NYNHP 2010).

Several of the above-mentioned State-protected plant species and rare natural communities occur within State parkland. As described above, threats to these species and ecological communities, in habitats that are not protected, include development, habitat disturbances, and invasive species in the immediate area of the plant or rare ecological community. IPEC License Renewal will not adversely affect State-protected plant species or rare natural communities located in the RM 34-56 Coastal Zone or elsewhere in the Hudson River.

b. RM 56-60 A number of rare ecological communities occur within the east and west sides of the river in the Coastal Zone of the proposed Hudson Highlands Expansion Area RM 56-60. On the east side of the river within Putnam and Dutchess Counties, five upland communities including the oak-tulip tree forest, chestnut oak forest, Appalachian oak hickory forest, red cedar rocky summit, pitch pine-oak-heath-rocky summit, are present. Ecological communities associated with wetlands that are tidally influenced are the brackish tidal marsh, brackish intertidal wetlands, and tidal river communities located in the vicinity of Fishkill Creek.4 On the west side of the river, ecological communities of the Coastal Zone are mostly concentrated in Moodna Creek 5 where brackish tidal, intertidal wetlands, and tidal river communities are present. The one exception is the Appalachian oak hickory forest located in the southern portion of the Coastal Zone near the RM 44-56 Coastal Zone border.

IV. TERRESTRIAL WILDLIFE SPECIES The following are profiles of terrestrial wildlife species occurring within the vicinity of IPEC, including birds, mammals, reptiles and amphibians, and insects. Species are presented according to their status, with federally listed or State-listed endangered, threatened, and special concern presented first.

4 Fishkill Creek was designated a SCFWH in 1987 by NYSDOS (NYSDOS 1987d).

' Moodna Creek was designated a SCFWH in 1987 by NYSDOS (NYSDOS 1987e).

C-30

IPEC CZMA Consistency Certification December 2012 A. Birds

1. Peregrine Falcon The peregrine falcon (Falcoperegrinus)is a State-listed endangered species that is present in the vicinity of IPEC throughout the year. Peregrine falcons nest in natural and human-made settings including rocky cliffs, bridges, tall buildings, and other structures in proximity to large waterbodies (NYNHP 201 lss; Loucks 1998a). Wintering birds also use perching and roosting habitat in similar urban and natural habitats (White et al. 2002). Peregrine falcons feed primarily on medium to large birds, from songbirds to small waterfowl (NYNHP 201 Iss).

Peregrine falcons were extirpated as breeders from the lower Hudson Valley by 1961, and wintering populations in the area also declined dramatically (Herbert and Herbert 1969).

This was due to a combination of habitat loss, human disturbance (e.g., hunting, collection of young by falconers), and reproductive effects caused by exposure to organochlorine pesticides, such as dichlorodiphenyltrichloroethane and dieldrin (NYNHP 201 lss; Herbert and Herbert 1969; White et al. 2002). Efforts to propagate, foster, and release falcons began in late 1960s, and their populations have recovered slightly (White et al. 2002). Nesting activity in the vicinity of IPEC returned in the mid-1980s; approximately five nesting pairs were located in the vicinity of IPEC in 2009 (Loucks 2009).

Threats to this species include: habitat alteration, nest disturbance, exposure to contaminants, and, for species nesting in urban centers, collisions with tall structures (NYNHP 2011 ss). Taking of peregrine falcons or critical habitat within New York State would be pursuant to Article 11 of the Environmental Conservation Law ("ECL"), potentially requiring an Incidental Take Permit from the New York State Department of Environmental Conservation

("NYSDEC"). Due to range-wide recovery, peregrine falcons were delisted from the ESA, but they remain protected under the federal Migratory Bird Treaty Act.

2. Short-eared Owl The short-eared owl (Asioflammeus) is a State-listed endangered species that is present in the vicinity of IPEC during wintering and migratory periods. This species has not been known to breed in the Hudson River Valley in the vicinity of IPEC in recent years (Schneider 2008).

Habitat includes areas such as grasslands (i.e., hayfields, fallow farm lands, and pastures) and freshwater marshes (NYNHP 201 Itt). Preferred habitat is typically found adjacent to wet areas.

Daytime roosting typically occurs on the ground and in/under low vegetation. Voles are the preferred prey of short-eared owls, although they will also prey upon other small mammals and sometimes birds, and occasionally insects (Schneider 2008).

While no breeding activity has been recorded in the vicinity of IPEC, any open marshes or grasslands within the vicinity of IPEC would provide suitable overwintering habitat. Short-eared owls have been noted overwintering in Westchester County (NYNHP 2010).

C-31

IPEC CZMA Consistency Certification December 2012 Threats to wintering short-eared owls in the vicinity of IPEC include habitat loss due to development, wetland loss, changes in farming practices (i.e., converting hayfields to row crops, more frequent mowing of hayfields, etc.), and increased forest regeneration and succession in former grasslands (NYNHP 201 Itt). Taking of short-eared owls or critical habitat within New York State would be pursuant to Article 11 of the ECL, potentially requiring an Incidental Take Permit from the NYSDEC. Short-eared owls are also protected under the federal Migratory Bird Treaty Act.

3. Bald Eagle The bald eagle (Haliaeetusleucocephalus) is a State-listed threatened species that is present in the vicinity of IPEC throughout the year. Bald eagles are typically found near large waterbodies (i.e., bays, rivers, and lakes) that support sufficient prey populations. While they tend to avoid areas with human activity, they will construct nests and rear young within industrial and suburban sites adjacent to suitable foraging and nesting habitat (NYNHP 2011 uu).

Perching habitat includes mature deciduous and coniferous trees; eagles typically construct nests near water in tall pine, spruce, fir, cottonwood, oak, poplar, or beech trees (NYNHP 2011 uu).

Non-breeding adults and wintering birds are known to have communal roost sites, occasionally distant from food sources (Nye 2008).

Associated ecological communities include a variety of mixed hardwood forests (NYNHP 201 Iuu). This species feeds primarily on fish, injured waterbirds, mammals, and carrion. However, they are flexible in their foraging technique, and will hunt various types of prey, scavenge, and pirate food from other birds (NYNHP 201 Iuu).

Within the vicinity of IPEC, breeding and wintering bald eagles have been noted (Nye 2008). In terms of breeding, a single bald eagle nest was noted along the Hudson River in 1997 (the first such record in 100 years), and nesting in the lower Hudson River has increased to 24 nesting pairs with 15 successful nests in 2009 (NYSDEC 2012d; Nye 2009). Up to 87 bald eagles have been noted during wintering surveys in the lower Hudson River between Fishkill and Croton Point in recent years (Nye 2009). Wintering bald eagles have been noted to concentrate within the Hudson RM 44-56 SCFWH, which rarely freezes and provides a dependable foraging site for fish due to upwelling (NYSDOS 1987a). Fish species commonly taken by the wintering eagles include goldfish, brown bullhead, alewife, white perch, and sunfish. Roosting areas include Iona Island Marsh SCFWH and undisturbed woodlands along both sides of the Hudson River, particularly within sheltered coves (NYSDOS 1987b).

The bald eagle was delisted from the ESA by the USFWS in August 2007. While bald eagles are no longer protected under the ESA, they are protected under the Bald and Golden Eagle Protection Act ("BGEPA"). The USFWS Bald Eagle Management Guidelines are used to determine whether projects avoid impacts under the BGEPA (USFWS 2007). Taking of bald eagles or critical habitat within New York State would be pursuant to Article 11 of the ECL, potentially requiring an Incidental Take Permit from the NYSDEC.

C-32

IPEC CZMA Consistency Certification December 2012

4. Northern Harrier The northern harrier (Circus cyaneus) is listed as a State-listed threatened species, and is potentially present in the assessment area throughout the year. It is considered a rare breeder in New York State and breeds in agricultural, grassland, old field, marsh, and wet meadow habitats (Marsti and Kirch 1998; Post 2008). Northern harriers construct their nests on the ground, generally in areas of tall, dense, and undisturbed herbaceous vegetation, often in or near wet habitats (Macwhirter and Bildstein 1996).

Within the vicinity of IPEC, no breeding activity has been observed, although northern harriers would be expected to forage in open areas during wintering periods, and pass through the area during migration (Post 2008). Threats to breeding and non-breeding northern harriers in the vicinity of IPEC include habitat loss due to development, human disturbance, wetland loss, alteration of farming practices (i.e., converting hayfields to row crops, more frequent mowing of hayfields, etc.), and increased forest regeneration and succession in former grasslands (NYNHP 2011 vv). Taking of northern harriers or critical habitat within New York State would be pursuant to Article 11 of the ECL, potentially requiring an Incidental Take Permit from the NYSDEC. They are also protected under the federal Migratory Bird Treaty Act.

5. Least Bittern The least bittern (Ixobrychus exilis) is a State-listed threatened marsh-dwelling bird that is present in the vicinity of IPEC during the breeding and migratory seasons. In New York, least bitterns breed in shallow to deep emergent marshes and freshwater tidal marshes of the lower Hudson River. Preferred nesting habitat includes cattails, bulrush with bur-reed, sedges, or common reed; preferred nesting vegetation is tall and interspersed with pools of open water or slow-moving channels (Kennedy 2008). Larger marsh habitats are important breeding areas for this species. Least bittern diet includes small prey items, including fishes, amphibians, insects, and occasionally small mammals (NYNHP 201 lww).

Within the vicinity of IPEC, least bitterns are known to breed at Iona Island Marsh (NYSDOS 1987b). However, over the past 20 years, least bittern breeding activity has declined significantly at Iona Island Marsh SCFWH (Wells et al. 2008). This species is likely to use tall emergent marsh habitat within the vicinity of IPEC during spring and fall migration.

Threats to least bitterns include marsh degradation and loss, habitat fragmentation, intrusion of invasive species into breeding habitat, and prey-base effects due to reductions in water quality (NYNHP 2011 ww). Taking of least bitterns or critical habitat within New York State would be pursuant to Article II of the ECL, potentially requiring an Incidental Take Permit from the NYSDEC. Least bitterns are also protected under the federal Migratory Bird Treaty Act.

C-33

IPEC CZMA Consistency Certification December 2012

6. Osprey Osprey (Pandionhaliaetus) is a raptor listed as a State-listed special concern species and is known to occur within the assessment area during breeding and migratory seasons. They are piscivorous raptors that breed and forage in coastal ecosystems within New York State (Nye 2008). Osprey nests are often built in trees or artificial nest platforms and will also nest on a variety of tall, man-made structures, including light and telephone poles, channel markers, houses, and pilings (Loucks 1998b).

Due to their tendency to nest on human structures in proximity to estuaries, foraging and nesting resources for osprey exist in the vicinity of IPEC. Iona Island Marsh is noted by NYSDOS as potential concentration areas for migrating osprey (NYSDOS 1987b). At least five NYSDEC breeding bird atlas blocks within the coastal zone of Orange, Putnam, Rockland, and Westchester Counties in the vicinity of IPEC recorded osprey nesting activity in recent years (Nye 2008).

Threats to osprey include susceptibility to environmental contaminants, habitat loss, and human disturbance (Nye 2008). Although osprey are listed as a special concern species, they are not afforded special protection under Article 11 of the ECL as presently written for New York State endangered and threatened species. They are protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

7. Canada Goose The Canada goose (Branta canadensis)is a common waterfowl species in New York that is present in the vicinity of IPEC throughout the year. This species breeds and forages in a variety of wetland and upland habitats, from human-created to natural (McGowan 2008a). They are principally herbivorous, although will also feed on small fish and insects (Mowbray et al.

2002).

Canada goose is a widespread species within the vicinity of IPEC. This species is known to breed at Iona Island Marsh, is increasing as a breeding species in the lower Hudson Valley, and is also prevalent in winter within the vicinity of IPEC (Wells et al. 2008; Griffith 1998).

There are few threats to Canada goose populations within the vicinity of IPEC; human modification of habitat has created ideal roosting and foraging habitat for this species (Griffith 1998). Canada goose is listed as a game species in New York, with a daily limit of three to eight individuals per day during the 2009-2010 New York State hunting season regulations (NYSDEC 2012a). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL. Breeding populations are actively managed in New York (NYSDEC 2007b).

8. Wood Duck The wood duck (Aix sponsa) is a waterfowl species in New York that is present in the vicinity of IPEC throughout the year, though less often in winter. They nest in cavities (either C-34

IPEC CZMA Consistency Certification December 2012 natural or human-created), and in forested wetlands, swamps, beaver-modified habitats, and slow-moving streams (Swift 2008a). Wood ducks have a broad diet, and typically forage on seeds, fruits, and aquatic and terrestrial invertebrates in open water or forested wetland habitats (Hepp and Bellrose 1995).

Wood ducks are a widespread species within the vicinity of IPEC, and few threats to their population stability are apparent; they are increasing as a breeding species within the lower Hudson Valley, including the vicinity of IPEC (Swift 2008a). They breed, migrate, and winter within the vicinity of IPEC, including all three SCFWHs (NYSDOS 1987a, b, c). Wood duck is a game species in New York, with a daily limit of three individuals per day during the 2009-2010 New York State hunting season regulations (NYSDEC 2012b). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

9. American Black Duck The American black duck (Anas rubripes) is a waterfowl species in New York that is present in the vicinity of IPEC throughout the year. This species breeds and forages in a variety of wetland habitats, from tidal wetlands to the shores of lakes, ponds, and streams (Swift 2008b; Levine 1998a). They feed on aquatic invertebrates and vertebrates, and aquatic and upland vegetation and crops (Longcore et al. 2000).

American black ducks breed, migrate, and winter within the vicinity of IPEC, including all three SCFWHs (NYSDOS 1987a, b, c). Over the past 20 years, declines in American black duck breeding populations have been noted in the vicinity of IPEC, possibly due to a combination of habitat loss, hunting pressure, and substantial interbreeding with mallards (Swift 2008b). While American black duck is listed as a Species of Greatest Conservation Need in New York, it is also a game species with a daily limit of one individual per day during the 2009-2010 New York State hunting season regulations (NYSDEC 2012b). The American black duck is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

10. Mallard The mallard (Anasplatvrhynchos)is an abundant waterfowl species in New York that is present in the vicinity of IPEC throughout the year. This species breeds and forages in a variety of wetland and upland habitats, from human-created to natural (Swift 2008c, Levine 1998b).

They are omnivorous, feeding on aquatic invertebrates and vertebrates, to aquatic and upland vegetation (Drilling and McKinney 2002).

Mallards are a widespread species within the vicinity of IPEC, where there are few threats to their population stability. Mallards breed, migrate, and winter within the vicinity of IPEC, including all three SCFWHs (NYSDOS 1987a, b, c). Mallard is a game species in New York, with a daily limit of four individuals (including a maximum of two females) per day during the 2012-2013 New York State hunting season regulations (NYSDEC 2012b). No special C-35

IPEC CZMA Consistency Certification December 2012 status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

11. Green Heron The green heron (Butorides virescens) is a common heron species in New York State that is present in the vicinity of IPEC during breeding and migratory seasons (McCrimmon 2008; Sweet 1998). It is a semi-colonial nester, and will breed either singularly or in proximity to other wading birds. Habitat includes swamp thickets, forested wetlands, and occasionally drier locations in proximity to water (McCrimmon 2008).

Green herons are a widespread breeding and migratory species within the vicinity of IPEC (McCrimmon 2008). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

12. Virginia Rail The Virginia rail (Rallus limicola) is the most common rail species in New York, and is present in the vicinity of IPEC throughout the year, though less often in winter. They typically breed in freshwater marshes with shallow water and tall emergent vegetation, and forage on invertebrates and insects during the breeding season and invertebrates and aquatic vegetation during the winter (Medler 2008a; Able 1998a; Conway 1995).

Virginia rail breeding populations have declined significantly at Iona Island Marsh, most likely due to a change in vegetation structure, but have remained relatively stable over the past 20 years (Wells et al. 2008). Threats include habitat degradation, pesticide exposure, collision with tall structures during migration, and hunting pressure (Conway 1995). Virginia rail is listed as a game species in New York, with a daily limit of eight individuals per day during September to November, according to the 2012-2013 New York State hunting season regulations (NYSDEC 2012c). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

13. Sora The sora (Porzanacarolina)is a rail species that is an uncommon breeder in New York.

It is locally present in the vicinity of IPEC during the breeding and migratory seasons. They typically breed in freshwater marshes with shallow water and emergent vegetation, such as cattails, sedges, and bulrushes (Medler 2008b; Able 1998b). They feed on aquatic plants and invertebrates (Melvin and Gibbs 1996).

Although an uncommon breeder, Sora is declining as a breeding species in the vicinity of IPEC. Threats include habitat degradation, pesticide exposure, ingestion of lead and plastics, collision with tall structures during migration, and hunting pressure (Melvin and Gibbs 1996).

Sora is listed as a game species in New York, with a daily limit of eight individuals per day C-36

IPEC CZMA Consistency Certification December 2012 during September to November, according to the 2012-2013 New York State hunting season regulations (NYSDEC 2012c). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

14. Common Moorhen The common moorhen (Gallinulachloropus) is a local, declining breeder in New York that is mainly present in the vicinity of IPEC during the migratory season. They typically nest in open water habitats with dense cover of cattail and emergent species for security and nesting substrate (Medler 2008c). They generally feed on aquatic vegetation and invertebrates, including snails (Bannor and Kiviat 2002).

Common moorhens no longer appear to breed within the vicinity of IPEC from three confirmed breeding blocks in 1985 to none in 2005, although they do occur as migrants. Threats include hunting pressure, pesticides and contaminants, habitat degradation, and collisions with structures during migration (Medler 2008c; Bannor and Kiviat 2002). This species is listed as a game species in New York, with a daily limit of eight individuals per day during September to November, according to the 2012-2013 New York State hunting season regulations (NYSDEC 2012c). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

15. Spotted Sandpiper The spotted sandpiper (Actitis macularius)is a shorebird species in New York that is present in the vicinity of IPEC during the breeding and migratory seasons. They will nest along the edge of any water source, from urban ponds to remote wetlands (McGowan 2008b). They typically feed on invertebrates and small fish (Oring et al. 1997).

Spotted sandpiper breeding populations appear stable within the vicinity of IPEC, and have been recorded at Iona Island Marsh (McGowan 2008b; NYSDOS 1987b). Potential threats include exposure to pesticides and various human impacts (Oring et al. 1997). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

16. Belted Kingfisher The belted kingfisher (Ceryle alcyon) is a common species in New York State, and is present within the vicinity of IPEC throughout the year. They are cavity-nesters and breed in burrows constructed in banks associated with streams and lakes (McGowan 2008c). They primarily forage on fish species by hovering and plunge-diving (Kelly et al. 2009).

Within the vicinity of IPEC, belted kingfisher breeding populations appear to be stable where suitable breeding habitat exists (McGowan 2008c). Threats include shoreline development and human activities that degrade breeding habitat, and exposure to pesticides and C-37

IPEC CZMA Consistency Certification December 2012 contaminants (Kelly et al. 2009). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

17. Marsh Wren The marsh wren (Cistothoruspalustris)is a common marsh-dwelling passerine in New York and is present in the vicinity of IPEC during the breeding and migratory seasons. They nest in a variety of freshwater marshes, particularly those with dense reeds and shrubs (McGowan 2008d). They are opportunistic feeders, largely foraging on terrestrial invertebrates (e.g., insects and spiders) and aquatic insects in freshwater marshes (Kroodsma and Verner 1997).

Although marsh wrens are found in the vicinity of IPEC, over the past 20 years they appear to be declining in this area (McGowan 2008d). Marsh wren populations have declined significantly at lona Island Marsh (likely due to changes in vegetation structure) over the past 20 years (Wells et al. 2008). Threats include habitat degradation (including changes in habitat structure) and collisions with tall structures during migration (Kroodsma and Verner 1997). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

18. Kentucky Warbler The Kentucky warbler (Oporornisformosus)is a ground-foraging wood warbler that is present in the vicinity of IPEC during migratory and breeding periods (NYNHP 201 lxx). This species is an uncommon, local breeder in southeastern New York (McDonald 1998; Salzman 1998). Kentucky warblers are typically considered to be forest-interior songbirds (Robbins et al.

1989). They will nest in many a variety of forest communities provided that a dense layer of ground cover is present (Wenny et al. 1993). Kentucky warblers may be somewhat tolerant of habitat fragmentation compared with other warbler species and will nest in fragmented landscapes if there is a sufficiently dense understory within mature deciduous woodlands (Gibbs and Faaborg 1990; McDonald 1998).

According to the recent New York State Breeding Bird Atlas, breeding activity for Kentucky warblers occurred within Westchester and Orange Counties, though it has markedly declined as a breeding species in Westchester County since 1985 (Rosenberg 2008). Threats to this species include development and damage to forest understory by white-tailed deer (Rosenberg 2008). Although Kentucky warblers are listed as a Species of Greatest Conservation Need in New York State, no special protected status is applied to this species. It is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

C-38

IPEC CZMA Consistency Certification December 2012

19. Swamp Sparrow The swamp sparrow (Melospiza georgiana)is a common passerine in New York State that is present in the vicinity of IPEC throughout the year. They breed in emergent and shrub wetland habitats and typically forage on arthropods, insects, and fruits/seeds during the breeding season, and vegetation during the winter period (Osborne 2008; Salzman and Parkes 1998; Mowbray 1997).

Swamp sparrow populations have declined as breeders at Iona Island Marsh over the past 20 years; this trend is apparent throughout the lower Hudson River (Wells et al. 2008; Osborne 2008). Threats include degradation of habitat, succession in wetlands (i.e., from shrub to forested wetlands), and collision with tall structures during migration (Mowbray 1997). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

20. Red-winged Blackbird The red-winged blackbird (Agelaiusphoeniceus)is a common passerine in New York State and is present within the vicinity of IPEC throughout the year during breeding and migratory seasons. They are a common inhabitant of marshes, swamps, riparian habitats, and other wetland systems (Clark 2008; Smith 1998). They feed on a variety of small terrestrial and aquatic vertebrates and invertebrates and vegetation (Yasukawa and Searcy 1995).

Red-winged blackbird breeding populations have increased dramatically throughout the vicinity of IPEC over the past 20 years, including Iona Island Marsh (Clark 2008; Wells et al.

2008). There appear to be few threats to their population stability, although pesticide and contaminant exposure may adversely affect reproductive success in urban areas, and nuisance control of migrating and wintering flocks in agricultural and residential areas could adversely affect populations (Clark 2008). No special status is applied to this species, although it is protected under the federal Migratory Bird Treaty Act and New York State wildlife regulations within the ECL.

B. Mammals The following are profiles for the five mammals listed by NYNHP for the immediate vicinity of the IPEC Site, the three SCFWHs, the Coastal Zone, and, and the proposed Hudson Highlands Expansion Area RM 56-60.

1. Indiana Bat The Indiana bat (Myotis sodalis) is a federally and State-listed endangered species.

Overwintering habitat includes caves and mines, and summer roosts and maternity colonies are typically found in living, dying, and dead trees in rural and suburban landscapes. Ecological communities associated with this species include Appalachian oak-hickory forest, beech-maple mesic forest, calcareous cliff community, calcareous talus slope woodland, deep emergent C-39

IPEC CZMA Consistency Certification December 2012 marsh, floodplain forest, hemlock-northern hardwood forest, limestone woodland, and maple-basswood rich mesic forest (NYNHP 201 lyy). Up to 50,000 Indiana bats are known to hibernate in a single location, although relatively few hibernacula are known (USFWS 2006a).

No Indiana bat hibernacula are known in the vicinity of IPEC, although four are known from nearby Ulster County, one of which is the largest known Indiana bat hibernacula within the United States (NYNHP 201 lyy). Breeding season records for Indiana bat occur within the vicinity of IPEC in Westchester, Putnam, Orange, and Rockland Counties (USFWS 2006a).

Threats to the Indiana bat include disease (i.e., white nose syndrome); human disturbance in caves during hibernation, particularly those caves that are occupied by large populations; cave commercialization; constructed structures (i.e., gates) at entrances to caves that restrict bat movement or alter airflow and temperatures; pesticides and environmental contaminants; and loss of foraging and breeding habitat due to destruction, alteration, and fragmentation of forested habitat (USFWS 2006a).

2. Eastern Small-footed Myotis The eastern small-footed myotis (Myotis leibii) is a State-listed special concern species of the vesper bat (Vespertilionidae) family (NYNHP 201 lzz). Habitat for this species differs from that of other bats, in that roosting locations and maternity colonies consist of rock crevices and talus slopes rather than trees. Habitat includes deciduous forests during the summer months within the vicinity of IPEC, and caves and mines during winter months in northern New York.

Foraging activity often occurs in the vicinity of ponds, streams, and roadways (NYNHP 201 lzz).

Ecological communities associated with this species include Appalachian oak-hickory forest, beech-maple mesic forest, calcareous cliff community, chestnut oak forest, hemlock-northern hardwood forest, limestone woodland, maple-basswood rich mesic forest, and red cedar rocky summit (NYNHP 201 izz).

In the summer, the eastern small-footed myotis has been recorded at foraging locations in Orange and Putnam Counties, although the summer range for this species may include a wider area of southern New York (NYNHP 201 lzz). Specific threats to the eastern small-footed myotis include foraging habitat loss, disease, and disturbance during their hibernation period such as mine collapse or closure, commercialization or frequent visitation of caves (NYNHP 2011 zz).

3. New England Cottontail The New England cottontail (Sylvilagus transitionalis)is a State-listed special concern species and a candidate species for federal protection under the ESA. Within New York, habitat for the New England cottontail includes early-successional areas of open woods, shrub lands, disturbed sites, thickets, and marshes (Whitaker and Hamilton 1998). Ecological communities associated with this species include beech-maple mesic forest, hemlock-northern hardwood forest, and sedge meadow (NYNHP 201 laaa).

C-40

IPEC CZMA Consistency Certification December 2012 Since the 1960s, the range of this species has shrunk by more than 75 percent, and has been reduced to five small populations throughout its historic range, including records within the vicinity of IPEC (USFWS 2006b; NYNHP 201 laaa; Litvaitis et al. 2006). Within the vicinity of IPEC, this species is known to occur within Westchester and Putnam Counties in isolated habitat patches of agricultural fields and edges and brushy edges of transportation corridors (Tash and Litvaitis 2007). Likely threats that have contributed to the decline of the New England cottontail include habitat alteration, forest fragmentation, and competition with the eastern cottontail rabbit (Sylvilagusfloridanus)(Litvaitis 1993a as cited in NYNHP 201 laaa; Litvaitis 1993b; Tash and Litvaitis 2007).

4. Mink The mink (Neovison vison) is listed as a game species in the southern zone of New York State (which includes the IPEC Site) and is a member of the Mustelidae family (Myers et al.

2012). Mink occupy a variety of wetland habitats, including streams, rivers, lakes, and freshwater and saltwater marshes and coasts (NYSDEC 2012e). In general, mink are more abundant in sparsely populated rural areas, although they occasionally are found in suburban settings (NYSDEC 2012e).

Mink are distributed throughout New York (NYSDEC 2012e). Within the vicinity of IPEC, they are known to occur within Iona Island Marsh, and minks are likely to occur in other wetland habitats located within the Coastal Zone within the vicinity of IPEC (NYSDOS 1987b).

Mink are open to hunting and trapping, with possession of the appropriate game license (NYSDEC 2012c). There are no known threats to this species that would result in this species being listed under Article 11 of the ECL or Section 9 of ESA.

5. Muskrat The muskrat (Ondatrazibethicus) is a game species in New York State of the family Cricetidae (NYSDEC 2012f; Myers et al. 2012). Muskrats occupy freshwater and brackish aquatic habitats, including streams, lakes, marshes, and streams, but they prefer marshlands that are heavily vegetated with cattails (Typha spp.), bur-reeds (Sparganiumspp.), and bulrushes (Schoenoplectus spp.) (NYSDEC 2012f). They are distributed throughout New York State, including aquatic habitats within the vicinity of IPEC (NYSDEC 2012f). This species is known to occur within Iona Island Marsh and is likely to occur within all SCFWHs and RM 40-43 and RM 56-60 within the vicinity of IPEC (NYSDOS 1987b).

Muskrat are open to hunting and trapping, with possession of the appropriate game license (NYSDEC 2012c). There are no current threats to this species that would result in this species being listed under Article 11 of the ECL or Section 9 of ESA.

C. Reptiles and Amphibians The following are profiles for the seven reptiles and amphibians listed by NYNHP for the immediate vicinity of the IPEC Site (RM 41-44), the three SCFWHs, and for the Coastal Zone.

C-41

IPEC CZMA Consistency Certification December 2012

1. Bog Turtle The bog turtle (Glyptemys muhlenbergii), a member of the family Emydidae, is both a federally listed threatened species and a State-listed endangered species. Bog turtles require diverse micro-habitats within wetlands for basking, hibernation, foraging, and nesting. These microhabitats include dry pockets, fully saturated areas, and areas that are occasionally flooded (NRCS 2006). In New York, habitat for this species includes wet meadows with open canopies, sedge meadows, and calcareous fens. Bog turtles are usually found below 800 feet within the New York State (NYNHP 2011 bbb).

Within the vicinity of IPEC, known bog turtle habitats include groundwater-fed wetlands that are either isolated or connected to larger wetland complexes. Within their range, bog turtles are known to occur in seepage and spring-fed emergent freshwater wetlands and in clear and slow-moving brooks with soft organic substrates. Ecological communities associated with the bog turtle include fens, red maple-hardwood swamp, red-maple tamarack swamp, and sedge meadow (NYNHP 201 lbbb). Plant species associated with bog turtle habitat include a variety of sedges (Carex spp.), shrubby cinquefoil (Potentillafruticosa),grass-of-parnassus (Parnassia glauca), mosses (Sphagnum spp.), and horsetail (Equisetum sp.) in the understory, with scattered trees and shrubs. Woody species within these habitats may include red maple, eastern red cedar, tamarack (Larix laricina),willows (Salix spp.), dogwood (Cornus spp.), and alder (Alnus spp.).

These shrubs may occur in the shrub, subcanopy, and canopy (NYNHP 201 lbbb).

In New York State, extant populations are known to occur within Orange and Putnam Counties, with Westchester County populations noted in the 1990s, although the status of the latter populations is unknown (NYNHP 2011 bbb; NYSDEC 1998b; NYSDEC 2012g). Threats to this species include habitat loss, degradation, and fragmentation of its habitat, road mortality, ecological community succession, and the invasion of native vegetation by invasive exotic species. In addition, illegal collecting of this species as part of the pet trade has had a direct threat to populations (NYNHP 2011 bbb). Taking of individuals or habitat would be required to comply with both the ESA and Article 11 of the ECL.

2. Timber Rattlesnake The timber rattlesnake (Crotalushorridus) is a State-listed threatened species of the viper family (Viperidae). Habitat for this species includes mountainous or hilly deciduous or mixed deciduous-coniferous forests, often with rocky outcroppings with southern exposures (Petersen and Frisch 1986 as cited in NYNHP 201 lccc; Brown 1993 as cited in NYNHP 201 lccc; Conant and Collins 1998). In winter, the timber rattlesnake congregates in dens or hibernacula to hibernate (Brown 1993 as cited in NYNHP 201 lccc; Conant and Collins 1998). In New York, dens are often below ledges in accumulations of talus, in fractures with or underneath ledges or rock outcrops (NYNHP 201 lccc). Some examples of ecological communities associated with this species include acidic talus slope woodland, Appalachian oak-hickory forest, Appalachian oak-pine forest, beech-maple mesic forest, calcareous cliff community, calcareous talus slope woodland, chestnut oak forest, and cliff community (NYNHP 201 lccc).

C-42

IPEC CZMA Consistency Certification December 2012 Although widespread in New York State, timber rattlesnakes are typically found in isolated or semi-isolated populations within the vicinity of IPEC (i.e., in Doodletown, adjacent to Iona Island Marsh). They have been recorded in the coastal zone of all four counties within the vicinity of IPEC (NYSDEC 2012h). Threats to this species include loss and fragmentation of habitat, mining, road mortality, illegal collecting, extermination, and pathogenic organisms (NYNHP 201 lccc). Taking of timber rattlesnakes or critical habitat within New York State would be pursuant to Article 11 of the ECL, potentially requiring an Incidental Take Permit from the NYSDEC. The collection or possession of any native snakes of New York is prohibited without a special collection license (NYSDEC 2012c).

3. Eastern Fence Lizard The eastern fence lizard (Sceloporus undulates) is a State-listed threatened species of the spiny lizard family (Phrynosomatidae). Habitat for this species includes steep slopes with extensive open rocky outcrops surrounded by mixed-deciduous oak-dominated forests.

Ecological communities associated with this species include chestnut oak forests, pitch pine-oak-heath rocky summit, post oak-blackjack oak barrens, and rocky summit grassland.

In New York, the natural range of this species is restricted to the Hudson Highlands (NYNHP 201 lddd; NYSDEC 2012i). Isolated colonies are present within the vicinity of IPEC in Putnam and Westchester Counties (NYNHP 201 lddd; NYSDEC 1998b). Threats to this species include habitat loss and illegal collecting (NYNHP 201 lddd). Taking offence lizards or critical habitat within New York State would be pursuant to Article I1 of the ECL, potentially requiring an Incidental Take Permit from the NYSDEC.

4. Eastern Wormsnake The eastern wormsnake (Carphophisa. amoenus) is a State-listed special concern species of the Colubrid family (Colubridae). It is rarely observed and occurs in moist forested habitats where the soil allows burrowing; it is also found beneath surface objects, including logs, stumps, rocks, and human debris (e.g., boards, trash) (Conant and Collins 1998).

The eastern wormsnake is known to occur in or near rocky summit communities or similar habitats such as power line rights-of-way in deciduous forests (NYNHP 201 ieee).

Ecological communities associated with this species include Appalachian oak-hickory forest, chestnut oak forest, oak-tulip tree forest, and pitch pine-oak-heath rocky summit.

Within the vicinity of IPEC, the eastern wormsnake occurs in the coastal zone of all four counties (NYSDEC 1998b; NYSDEC 2012j). Threats to this species include habitat loss and fragmentation and mortality due to pesticides (NYNHP 201 ieee). Although the eastern wormsnake is listed as a special concern species, it is not afforded special protection under Article 11 of the ECL as presently written for New York State endangered and threatened species. The collection or possession of any native snakes of New York is prohibited without a special (NYSDEC 2012c).

C-43

IPEC CZMA Consistency Certification December 2012

5. Green Frog The green frog (Lithobatesclamitans melanota) is a member of the Ranidae family.

Habitat for this species includes shallow freshwater, springs, creeks, ditches, and edges of lakes and ponds (Conant and Collins 1998). This species can be found in large numbers in marshes, ponds, lakes, and backwaters of streams where food sources are also abundant (Johnson 2012).

Within the vicinity of IPEC, green frogs are widely distributed and occur at lona Island Marsh and in the coastal zone of all four counties (NYSDEC 1998b, NYSDEC 2012k; NYSDOS 1987b; NYSDEC 1998b).

Green frogs are open to hunting, taking, and possession, pursuant to small game license requirements, during the open hunting season (July 15 through September 30) (NYSDEC 2012c). There are no current threats to this species that would result in this species being listed by the State under Article 11 of the ECL or Section 9 of ESA.

6. Snapping Turtle The snapping turtle (Chelydras. serpentina) is a member of the Chelydridae family. This is one of the most common turtle species of New York (Ford and Johnson 2012). Habitat for snapping turtle consists of small or large permanent bodies of freshwater, occasionally brackish water, and can be found in a variety of waters ranging from pristine lakes, large rivers, and marshes to farm ponds, salt marshes, and canals (Conant and Collins 1998). However, habitat preferences are of slow-moving waters of shallow areas that have muddy substrates (Ford and Johnson 2012).

The common snapping turtle is widespread within the vicinity of IPEC and occurs at Iona Island Marsh and in the coastal zone of all four counties (NYSDEC 1998b, NYSDEC 20121; NYSDOS 1987b; NYSDEC 1998b). Firearm or bow hunting of snapping turtles is allowed with a small game permit in New York State during the open hunting season (July 15 through September 30; NYSDEC 2012c). NYSDEC regulations state a daily limit of five and a seasonal limit of 30 (NYSDEC 2012c). There are no current threats to this species that would result in its being listed by the NYSDEC under Article 11 of the ECL or Section 9 of the ESA.

7. Northern Water Snake The northern water snake (Nerodiasipedon sipedon) is a member of the Elapidae family.

In New York, this species is found in, or in the vicinity, of almost any waterbody or wetland system, including swamps, marshes, bogs, streams, and lakes. Slow-moving or quiet waters are preferred habitat although this species is known to occur in the vicinity of waterfalls and rapids of streams (Johnson and Gibbs 2003; Conant and Collins 1998).

Northern water snakes are widely distributed within the vicinity of IPEC and occur in Iona Island Marsh and the coastal zone of all four counties (NYSDEC 1998b; NYSDEC 2012m; NYSDOS 1987b; NYSDEC 1998b). There do not appear to be current threats to this species that would result in it being listed by the State under Article 11 of the ECL and Section 9 of the ESA.

C-44

IPEC CZMA Consistency Certification December 2012 However, the collection or possession of any native snakes of New York is prohibited without a special collection license (NYSDEC 2012c).

D. Insects The following are profiles for the seven insects listed by NYNHP for the IPEC Region, the three SCFWHs, the Coastal Zone, and RM 40-43 and RM 56-60.

1. Appalachian Azure The Appalachian azure (Celastrinaneglectamajor)is a butterfly of the blue, copper, hairstreak, and elfin family (Lycaenidae) that is unlisted/unprotected in New York State, though characterized as rare (NYNHP 201 lttt). Habitat for this species is a rich deciduous forest, containing black cohosh (Actaea racemosa), which is the sole foodplant for the larvae of this species.

Adult Appalachian azures are present between adults present in New York State from the middle or late May to the middle of June with larvae present into July. For the remainder of the year, this species exists as pupae in the leaf litter or humus layer.

2. Tiger Spiketail The tiger spiketail (Cordulegastererronea)is a dragonfly of the spiketail family (Cordulegastridae) that is unlisted/unprotected in New York State, though characterized as rare (NYNHP 201 lfff). Habitat for this species is very specific and limited to fishless, partially shaded coldwater streams, spring trickles, and seepage areas that have non-silt substrates (Barlow 1995; Dunkle 2000; Nikula et al. 2003 as cited in NYNHP 201 lfff; White 2010). The adult stage of this species is terrestrial; adults rest on vegetation along the edges of streams and seeps and feed in nearby fields and forest clearings. The larval stage of this species is aquatic, whereby females oviposit eggs into muddy substrates of shallow water habitats (Dunkle 2000; Nikula et al. 2003 as cited in NYNHP 2011 fff).

The tiger spiketail is a resident species of New York State throughout the year (NYNHP 2011 fff). This species occurs in the vicinity of IPEC in Putnam, Westchester, and Rockland Counties (Donnelly 2004 as cited in NYNHP 201 Ieee, NYNHP 2011 fff).

3. Arrowhead Spiketail The arrowhead spiketail (Cordulegasterobliqua) is a dragonfly of the spiketail family (Cordulegastridae) that is unlisted/unprotected in New York State, though characterized as rare.

Within its range, arrowhead spiketails occur primarily in spring-fed streams and seeps of forested areas and occasionally in open wet meadows. Streams and seeps commonly have soft substrates, but sometimes this species occurs in streams with rocky bottoms. While adult arrowhead C-45

IPEC CZMA Consistency Certification December 2012 spiketails oviposit and primarily dwell within these habitats, they may feed in forest clearings in the vicinity of the breeding habitat (NYNHP 201 lggg).

The arrowhead spiketail is a resident species of New York State throughout the year (NYNHP 201 lggg). This species is present in the Hudson Valley, including Rockland County within the vicinity of IPEC. The preferred habitat occurrence is not uncommon; therefore, it is expected that this species occurs in a scattered distribution in other locations within the counties and regions for which it is known (NYNHP 201 lggg).

4. Needham's Skimmer The Needham's skimmer (Libellula needhami) is a dragonfly of the skimmer family (Libellulidae) that is unlisted/unprotected in New York State, though characterized as rare. This species is known to occur in coastal areas of brackish marshes, tidal rivers, ponds, and lakes (Dunkle 2000; Nikula et al. 2003 as cited in NYNHP 201 lhhh). Adults are largely terrestrial and occur in surrounding habitats, but tend to feed in marshes of coastal areas while larvae are found within the water (NYNHP 201 lhhh).

The Needham's skimmer is a resident species of New York State throughout the year (Abbott 2007 as cited in NYNHP 201 Ihhh; Dunkle 2000). Records indicate that this species is present within the lower Hudson Valley to Orange County, and within the vicinity of IPEC at Iona Island Marsh, and in Rockland County (Donnelly 1999 as cited in NYNHP 201 lhhh; NYNHP 201 Ihhh; NYNHP 2010). It is expected that additional Needham's skimmer populations may be discovered with increased surveying efforts (NYNHP 2011 hhh).

5. Spatterdock Darner The spatterdock darner (Rhionaeschnamutata) is a dragonfly of the darner family (Aeshnidae) that is unlisted/unprotected in New York State, though characterized as rare. Within its range, this species occurs in ponds and lakes, but primarily within fishless ponds with emergent aquatic vegetation, particularly spatterdocks/pond lilies (Nupharspp.), or pools, open marsh, and bogs also with spatterdock (Nuphar variegatum) (Dunkle 2000; Nikula et al. 2003 as cited in NYNHP 2011 iii). In general, the majority of the populations occur in small, densely vegetated ponds where some of the vegetative cover includes spatterdock. It is expected that certain habitat characteristics including water depth, substrate, pH, and vegetation may need to be studied to understand habitat preferences of this species (NYNHP 201 liii).

Spatterdock darner adults tend to feed along forest edges, fields, wetland edges, and dirt paths (Nikula et al. 2003 as cited in NYNHP 2011 iii; Dunkle 2000 as cited in NYNHP 2011 iii).

Females lay eggs on the undersides of aquatic emergent vegetation and have a preference for spatterdock.

The spatterdock darner is a resident species of New York State throughout the year (NYNHP 2011 iii). This species is widely distributed across multiple locations within nine counties in regions of the southern tier, including the southern Catskill Mountains, and southern C-46

IPEC CZMA Consistency Certification December 2012 Hudson Valley. Given the wide distribution of this species across the State, and that the preferred habitat occurrence is not uncommon, it is expected that this species occurs in a scattered distribution in a small number of other locations within the counties and regions for which it is known (NYNHP 201 liii).

6. Mocha Emerald The mocha emerald (Somatochloralinearis)is a dragonfly of the emerald family (Corduliidae) that is unlisted/unprotected in New York State, though characterized as rare.

Habitat for this species includes shady streams of forests that range between 3 and 9 feet wide and have sand, gravel, or rocky bottoms (Dunkle 2000; Nikula et al. 2003 as cited in NYNHP 201 ljjj; Hoist 2005 as cited in NYNHP 201 ljjj; White et al. 2010). Adults of this species are terrestrial and found in fields and forests adjacent forested streams. Males can be found as far as 60 to 90 feet from the streams during breeding periods (Dunkle 2000). Females oviposit into mud or shallow water at stream edges (Natural Heritage Endangered Species Program 2003 as cited in NYNHP 201 ljjj; Nikula et al. 2003 as cited in NYNHP 201 ljjj).

The mocha emerald is a resident species of New York State throughout the year.

(NYNHP 201 ljjj). Known populations of the mocha emerald occur in eight counties and are widely distributed across the Hudson Valley (Donnelly 2004 as cited in NYNHP 201 ljjj; NYNHP 201 ljjj). Surveys conducted between the early 1990s and 2002 revealed mocha emerald populations in Westchester, Rockland, Orange, and Dutchess Counties within the lower Hudson River Valley, including the vicinity of IPEC (Donnelly 2004 as cited in NYNHP 201 ljjj; NYNHP 201 ljjj; NYNHP 2009a). The full New York State range has not been determined for this species (NYNHP 201 ljjj).

7. Gray Petaltail The gray petaltail (Tachopteryx thoreyi) is a dragonfly of the petaltail family (Petaluridae) and is listed as a New York State special concern species. Within its range, habitat includes hillside seeps and fens of deciduous forest (Dunkle 2000). Within New York, habitat for this species includes streams, hillside and groundwater-fed seepages of streamlets and fens of rocky gorges, and glens of deciduous or mixed forests. Larval habitat includes mud, muck, vegetation, and moss of seepage areas with limited standing water (Needham et al. 2000 as cited in NYNHP 201 lkkk; Nikula et al. 2003 as cited in NYNHP 201 lkkk). Adult habitat includes both seepage areas and streams (NYNHP 201 lkkk).

The gray petaltail is a resident species of New York State (NYNHP 201 lkkk). It is distributed widely within the southern portion of the State; within the vicinity of IPEC, it is found in Rockland County (NYNHP 201 lkkk; NYNHP 2010). Currently, there are II confirmed locations, many of which are very close to one another on protected lands. It is suspected that populations that are in close proximity may represent a single metapopulation (NYNHP 201 lkkk). Long-term trends indicate that development throughout the lower Hudson Valley has caused the extirpation of this species at sites within this portion of its range (NYNHP 201 lkkk).

C-47

IPEC CZMA Consistency Certification December 2012 V. ANALYSIS AND CONCLUSIONS A number of federally and State-listed plants and wildlife and significant ecological communities are known to occur within the vicinity of IPEC, including within the SCFWHs and the proposed Hudson Highlands Expansion Area RM 56-60. As described above, threats to these flora and fauna and significant ecological communities, as documented by NYSDOS, range from invasive species to the use of significant ecological communities for recreational activities.

However, the operation of IPEC cannot reasonably be identified as a threat to flora, terrestrial fauna, significant ecological communities, or federally or State-listed plants or terrestrial wildlife.

In addition, there are a number of game species within the vicinity of IPEC. However, the operation of IPEC has not adversely affected game species populations or hindered their presence within the vicinity of IPEC. Therefore, IPEC License Renewal will not adversely impact game species populations or the presence of these species within the vicinity of IPEC.

No new construction, land disturbance, or development is proposed as part of IPEC License Renewal. IPEC will continue to operate as it has over the term of its current operating licenses subject to all federal, State, and/or local regulations established to protect flora and terrestrial fauna within the vicinity of IPEC. Therefore, IPEC License Renewal cannot reasonably be considered to adversely affect flora, terrestrial fauna, or ecological communities.

C-48

IPEC CZMA Consistency Certification December 2012 V1. REFERENCES Able, K. P. 1998a. Virginia Rail Rallus limicola. In Bull's Birds of New York State, E. Levine (Ed.). Ithaca: Comstock Publishing Associates. 222-3.

Able, K. P. 1998b. Sora Porzanacarolina.In Bull's Birds of New York State, E. Levine (Ed.).

Ithaca: Comstock Publishing Associates. 222-3.

Bannor, B. K., and E. Kiviat. 2002. Common Moorhen (Gallinulachloropus), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.cornell.edu.bnaproxy.birds.cornell.edu/bna/species/685 (accessed October 15, 2012).

Barlow, A. E. 1995. On the status of Cordulegastererronea [Hagen in Selys, 1878] in the state of New Jersey. Argia 7: 6-9.

AKRF, Inc. (AKRF). 2009. Letter from Andrew J. Bernick, PhD., AKRF, Inc. to Ms. Jean Pietrusiak, New York State Department of Environmental Conservation Division of Fish and Wildlife & Marine Resources, New York Natural Heritage Program. Re: Request for information on rare, special concern, threatened and endangered species and habitat communities within the Hudson River Coastal Zone between Hudson River Mile 34 and

56. September 25, 2009.

AKRF, Inc. (AKRF). 2010. Letter from Andrew J. Bernick, PhD., AKRF, Inc. to Ms. Tara Salerno, New York State Department of Environmental Conservation Division of Fish and Wildlife & Marine Resources, New York Natural Heritage Program. Re: Request for information on rare, special concern, threatened, and endangered species and habitat communities within five SCFWHs and the New York State Coastal Zone portions of Orange, Putnam, Rockland, and Westchester Counties. January 6, 2010.

AKRF, Inc. (AKRF). 2012. Letter from Aubrey McMahon, AKRF, Inc. to Ms. Tara Salerno, New York State Department of Environmental Conservation Division of Fish and Wildlife & Marine Resources, New York Natural Heritage Program. Re: Request for information on rare, special concern, threatened, and endangered species and habitat communities within five Significant Coastal Fish and Wildlife Habitats and the New York State Coastal Zone portions of Orange, Putnam, Rockland, and Westchester Counties. October 12, 2012.

Clark, A. B. 2008. Red-winged Blackbird In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY. pp. 590-591.

Conant, R., and J. T. Collins. 1998. A Field Guide to Reptiles and Amphibians of Eastern and CentralNorth America. Third Edition, Expanded. New York: Houghton Mifflin Company.

C-49

IPEC CZMA Consistency Certification December 2012 Connecticut Botanical Society. 2005. Wild Potato Vine. Ipomoeapandurata.http://www.ct-botanical-society.org/galleries/ipomoeapand.html (accessed October 8, 2012).

Conway, C. J. 1995. Virginia Rail (Rallus limicola), The Birds of North America Online (A.

Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online. http://bna.birds.cornell.edu.bnaproxy.birds.comell.edu/bna/species/173 (accessed October 15, 2012).

Drilling, N., R. Titman, and F. Mckinney. 2002. Mallard (Anasplatyrhynchos),The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.cornell.edu.bnaproxy.birds.cornell.edu/bna/species/658 (accessed October 15, 2012).

Dunkle, S. W. 2000. Dragonflies through Binoculars; a field guide to dragonflies of North America. Oxford University Press: 266 pp.

Edinger, G. J., D. J. Evans, S. Gebauer, T. G. Howard, D. M. Hunt, and A. M. Olivero (editors).

2002. Ecological Communities of New York State. Second Edition. A revised and expanded edition of Carol Reschke's Ecological Communities of New York State. (Draft for review). New York Natural Heritage Program, New York State Department of Environmental Conservation. Albany, NY. 136 pp.

Fernald, M. L. 1950. Gray's Manual of Botany. 8th edition. American Book Company, New York. 1632 pp.

Ford, D., and G. Johnson. 2012. Turtles of New York. SUNY Environmental School of Forestry.

http://www.esf.edu/pubprog/brochure/turtle/turtles.htm (accessed October 8, 2012).

Gibbs, J. P., and J. Faaborg. 1990. Estimating the Viability of Ovenbird and Kentucky Warbler Populations in Forest Fragments. Conservation Biology 4: 193-196.

Gleason, H. A., and A. Cronquist. 1963. Manual of Vascular Plants of Northeastern United States and Adjacent Canada. D. Van Nostrand Company, New York. 810 pp.

Griffith, K. C. 1998. Canada Goose Brantacanadensis. In Bull's Birds of New York State, E.

Levine (Ed.). Ithaca: Comstock Publishing Associates. 144-5.

Hepp, G. R., and F. C. Bellrose. 1995. Wood Duck (Aix sponsa), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.comell.edu.bnaproxy.birds.cornell.edu/bna/species/ 169 (accessed October 15, 2012).

C-50 0

IPEC CZMA Consistency Certification December 2012 Herbert, R. A., and K. G. S. Herbert. 1969. The extirpation of the Hudson River peregrine falcon population. In Peregrine falcon populations: Their biology and decline. Hickey, J. J.,

editor. University of Wisconsin Press. Madison, WI. 596pp.

Johnson, G,, and J. Gibbs. 2003. Snakes of New York. SUNY Environmental School of Forestry.

http://www.esf.edu/pubprog/brochure/snakes/snakes.htm (accessed on April 16, 2010).

Johnson, G, 2012. Frogs and Toads of New York. Environmental School of Forestry.

http://www.esf.edu/pubprog/brochure/frogstoads/frogs.htm (accessed October 8, 2012).

Kelly, J. F., E. S. Bridge, and M. J. Hamas. 2009. Belted Kingfisher (Megacervie alcyon), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.comell.edu.bnaproxy.birds.cornell.edu/bna/species/084 (accessed October 15, 2012).

Kennedy, H. B. 2008. Least Bittern In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

Kroodsma, D. E., and J. Verner. 1997. Marsh Wren (Cistothoruspalustris), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.cornell.edu.bnaproxy.birds.cornell.edu/bna/species/308 (accessed October 15, 2012).

Levine, E. 1998a. American Black Duck Anas rubripes.In Bull's Birds of New York State., E.

Levine (Ed.). Ithaca: Comstock Publishing Associates. 154-5.

Levine, E. 1998b. Mallard Anasplatvrhynchos. In Bull's Birds of New York State, E. Levine (Ed.). Ithaca: Comstock Publishing Associates. 155.

Litvaitis, J. A. 1993b. Response of early successional vertebrates to historic change in land use.

ConservationBiology 7: 866-873.

Litvaitis, J. A., J. P. Tash, M. K. Litvaitis, M. N. Marchand, A. I. Kovach, and R. Innis. 2006. A range-wide survey to determine the current distribution of New England cottontails.

Wildlife Society Bulletin 34: 1190-1197.

Longcore, J. R., D. G. Mcauley, G. R. Hepp, and J. M. Rhymer. 2000. American Black Duck (Anas rubripes), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.cornell.edu.bnaproxy.birds.cornell.edu/bna/species/4 81 (accessed October 15, 2012).

Loucks, B. A. 1998a. Peregrine Falcon Falconperegrines. In Bull's Birds of New York State, E.

Levine (Ed.). Ithaca: Comstock Publishing Associates. 203-6.

C-51

IPEC CZMA Consistency Certification December 2012 Loucks, B. A. 1998b. Osprey Pandionhaliaetus.In Bull's Birds of New York State, E. Levine (Ed.). Ithaca: Comstock Publishing Associates. 178-80.

Loucks, B. A. 2009. New York State Peregrine Falcons 2009. New York State Department of Environmental Conservation. l4pp.

Macwhirter, R. B., and K. L. Bildstein. 1996. Northern Harrier (Circus cyaneus), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved on 2 February 2010 from the Birds of North America Online.

http://bna.birds.cornell.edu.bnaproxy.birds.cornell.edu/bna/species/210 (accessed October 15, 2012).

Maine Department of Conservation Natural Areas Program. 2004. Pseudognaphaliumhelleri (Britt.) A. Anderb. Small Rabbit Tobacco. Available:

http://maine.gov/doc/nrimc/mnap/features/pseudognaphalium_helleri.pdf (accessed October 8, 2012).

Marsti, H. T., and G. Kirch. 1998. Northern Harrier Circus cvaneus. In Bull's Birds of New York State, E. Levine (Ed.). Ithaca: Comstock Publishing Associates. 185-6.

McCrimmon, D. 2008. Green Heron In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY. pp. 172-173.

McDonald, M. V. 1998. Kentucky Warbler (Oporornisformosus).In The Birds of North America, No. 324 (A. Poole and F. Gill, eds.). The Birds of North America, Inc.,

Philadelphia, PA.

McGowan, K. J. 2008a. Canada Goose In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY. pp88-89.

McGowan, K. J. 2008b. Spotted Sandpiper In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

McGowan, K. J. 2008c. Belted Kingfisher In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

McGowan, K. J. 2008d. Marsh Wren In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY. Pp 428-429.

Medler, M. D. 2008a. Virginia Rail In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

Medler, M. D. 2008b. Sora In The Second Atlas of Breeding Birds in New York State, K.

McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

C-52

IPEC CZMA Consistency Certification December 2012 Medler, M. D. 2008c. Common Moorhen In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

Melvin, S. M., and J. P. Gibbs. 1996. Sora (Porzanacarolina),The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.comell.edu.bnaproxy.birds.cornell.edu/bna/species/250 (accessed on October 15, 2012).

Mitchell, R. S., and C. J. Sheviak. 1983. Rare Plants of New York State. New York State Museum. Albany, NY.

Mowbray, T. B. 1997. Swamp Sparrow (Melospiza georgiana),The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.comell.edu.bnaproxy.birds.comell.edu/bna/species/279 (accessed October 15, 2012).

Mowbray, T. B., C. R. Ely, J. S. Sedinger, and R. E. Trost. 2002. Canada Goose (Branta canadensis), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.cornell.edu.bnaproxy.birds.cornell.edu/bna/species/682 (accessed October 15, 2012).

Myers, P., R. Espinosa, C. S. Parr, T. Jones, G. S. Hammond, and T. A. Dewey. 2012. The Animal Diversity Web (online). http://animaldiversity. ummz.umich.edu. (accessed October 8, 2012).

National Oceanic and Atmospheric Administration (NOAA). 2012. Letter from Joelle Gore, Acting Deputy Chief, Coastal Program Divison, to George Stafford, Deputy Secretary of State, State of New York. Re: Approval of NYCMP Program Changes. November 30, 2012.

Natural Resources Conservation Service (NRCS). 2006. Bog Turtle (Clemmys muhlenbergii).

http://www.nrcs.usda.gov/wps/portal/nrcs/detailfull/national/plantsanimals/fishwildlife/p ub/?&cid=nrcs143_022362 (accessed October 8, 2012).

Newcomb, L. 1977. Newcomb's Wildflower Guide. Little, Brown and Company, New York. 490 pp.

New York Natural Heritage Program (NYNHP). 2009a. Letter from T. Salerno (NYNHP) to A.

Bernick (AKRF., Inc.) on rare, special concern, threatened and endangered species and habitat communities within the Hudson River Coastal Zone between Hudson River Miles 34 and 56. Received October 5, 2009.

C-53

IPEC CZMA Consistency Certification December 2012 New York Natural Heritage Program (NYNHP). 2010. Letter from Ms. Tara Salerno, New York State Department of Environmental Conservation Division of Fish and Wildlife &

Marine Resources, New York Natural Heritage Program, to Andrew J. Bernick, Ph.D.,

AKRF, Inc. February 1, 2010.

New York Natural Heritage Program (NYNHP). 201 lb. Virginia Snakeroot.

http://www.acris.nynhp.org/guide.php?id=8726 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 c. Saltmarsh Bulrush.

http://www.acris.nynhp.org/guide.php?id=9594 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 ld. Midland Sedge.

http://www.acris.nynhp.org/guide.php?id=9504 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 le. Straw Sedge.

http://www.acris.nynhp.org/guide.php?id=9518 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 f. Lined-sedge.

http://www.acris.nynhp.org/guide.php?id=9519 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 g. Water Pigmyweed.

http://www.acris.nynhp.org/guide.php?id=8985 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lh. Yellow Flatsedge.

http://www.acris.nynhp.org/guide.php?id=9540 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 i. Gypsy-wort.

http://www.acris.nynhp.org/guide.php?id=9134 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lj. Virginia Pine.

http://www.acris.nynhp.org/guide.php?id=9426 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 k. Basil Mountain-mint.

http://www.acris.nynhp.org/guide.php?id=9142 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 20111. Torrey's Mountain Mint.

http://www.acris.nynhp.org/guide.php?id=9144 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lm. Smooth-bur Marigold.

http://www.acris.nynhp.org/guide.php?id=8753 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 n. Terrestrial Starwort.

http://www.acris.nynhp.org/guide.php?id=8952 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 o. Long's Bittercress.

http://www.acris.nynhp.org/guide.php?id=8893 (accessed October 8, 2012).

C-54

IPEC CZMA Consistency Certification December 2012 New York Natural Heritage Program (NYNHP). 201 ip. Clustered Sedge.

http://www.acris.nynhp.org/guide.php?id=9473 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lq. Marsh Straw Sedge.

http//www.acris.nynhp.org/guide.php?id=9490 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 ir. Saltmarsh Spikerush.

http://acris.nynhp.org/report.php?id=9558 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 Is. Featherfoil.

http://www.acris.nynhp.org/guide.php?id=9254 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 It. Violet Wood-sorrel.

http://www.acris.nynhp.org/guide.php?id=921 0 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lu. Small-flowered Crowfoot.

http://acris.nynhp.org/guide.php?id=9277 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 v. Spongy Arrowhead.

http://www.acris.nynhp.org/guide.php?id=9707 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 w. Saltmarsh Aster.

http://www.acris.nynhp.org/guide.php?id=8749 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 x. Large Twayblade.

http://www.acris.nynhp.org/guide.php?id=9698 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 ly. Virginia False Gromwell.

http://www.acris.nynhp.org/guide.php?id=8882 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lz. Hooker's Orchid.

http://www.acris.nynhp.org/guide.php?id=9243 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 Iaa. Puttyroot.

http://www.acris.nynhp.org/guide.php?id=9688 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 bb. Troublesome Sedge.

http://www.acris.nynhp.org/guide.php?id=9506 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 1cc. Rough Avens.

http://www.acris.nynhp.org/guide.php?id=9297 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 Idd. Eastern Grasswort.

http://www.acris.nynhp.org/guide.php?id=8714 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lee. Globe-fruited Ludwigia.

http://www.acris.nynhp.org/guide.php?id=9206 (accessed October 8, 2012).

C-55

IPEC CZMA Consistency Certification December 2012 New York Natural Heritage Program (NYNHP). 2011 ff. Heartleaf Plantain.

http://www.acris.nynhp.org/guide.php?id=9243 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 Igg. Michaux's Blue-eyed-grass.

http://www.acris.nynhp.org/guide.php?id=9622 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lhh. Acidic Talus Slope Woodland.

http://www.acris.nynhp.org/guide.php?id=9966 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lii. Appalachian Oak-Hickory Forest.

http://www.acris.nynhp.org/report.php?id=9980 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 ljj. Brackish Intertidal Mudflats.

http://www.acris.nynhp.org/guide.php?id=9866 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 kk. Brackish Tidal Marsh.

http://www.acris.nynhp.org/guide.php?id=9865 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201111. Chestnut oak forest.

http://www.acris.nynhp.org/guide.php?id=9982 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 mm. Cliff Community.

http://www.acris.nynhp.org/guide.php?id= 10016 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 Inn. Freshwater Tidal Marsh.

http://www.acris.nynhp.org/guide.php?id=9869 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 oo. Oak-Tulip Tree Forest.

http://www.acris.nynhp.org/guide.php?id=9985 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lpp. Pitch-pine-oak-heath rocky summit.

http://www.acris.nynhp.org/guide.php?id=9968 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lqq. Red cedar rocky summit.

http://www.acris.nynhp.org/guide.php?id=9970 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lrr). 2009. Rocky Summit Grassland.

http://www.acris.nynhp.org/guide.php?id= 10019 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lss. Online Conservation Guide for Peregrine Falcon. http://www.acris.nynhp.org/guide.php?id=6824. (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 Itt. Online Conservation Guide for Short-eared Owl. http://www.acris.nynhp.org/guide.php?id=6949. (accessed October 8, 2012).

C-56

IPEC CZMA Consistency Certification December 2012 New York Natural Heritage Program (NYNHP). 201 luu. Online Conservation Guide for Bald Eagle. http://www.acris.nynhp.org/guide.php?id=681 1. (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 vv. Online Conservation Guide for Northern Harrier. http://www.acris.nynhp.org/guide.php?id=6812. (accessed January 20, 2010).

New York Natural Heritage Program (NYNHP). 201 lww. Online Conservation Guide for Least Bittern. Available from: http://www.acris.nynhp.org/guide.php?id=675 1. (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lxx. Online Conservation Guide for Kentucky Warbler. Available from: http://www.acris.nynhp.org/guide.php?id=7074.

(accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lyy. Conservation Guide for Indiana Bat.

http://www.acris.nynhp.org/guide.php?id=7405 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lzz. Conservation Guide for Eastern Small-footed Myotis. http://www.acris.nynhp.org/guide.php?id=7406 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 aaa. Conservation Guide for New England cottontail. http://www.acris.nynhp.org/guide.php?id=7415 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 bbb. Conservation Guide for Bog Turtle.

http://www.acris.nynhp.org/guide.php?id=7507 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lccc. Conservation Guide for Timber rattlesnake. http://www.acris.nynhp.org/guide.php?id=7536 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lddd. Conservation Guide for Fence Lizard.

www.acris.nynhp.org/report.php?id=7517 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 ieee. Conservation Guide for Worm Snake.

http://www.acris.nynhp.org/guide.php?id=7521 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lfff. Conservation Guide for Tiger Spiketail. http://www.acris.nynhp.org/guide.php?id=8179 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lggg. Conservation Guide for Arrowhead Spiketail. http://www.acris.nynhp.org/guide.php?id=8181 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 lhhh. Conservation Guide for Needham's Skimmer. http://www.acris.nynhp.org/guide.php?id=8275 (accessed October 8, 2012).

C-57

IPEC CZMA Consistency Certification December 2012 New York Natural Heritage Program (NYNHP). 2011 iii. Conservation Guide for Spatterdock Darner. http://www.acris.nynhp.org/guide.php?id=8214 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 201 ljjj. Conservation Guide for Mocha Emerald. http://www.acris.nynhp.org/guide.php?id=8250 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 kkk. Conservation Guide for Gray Petaltail. http://www.acris.nynhp.org/guide.php?id=8177 (accessed October 8, 2012).

New York Natural Heritage Program (NYNHP). 2011 ll. Conservation Guide for Woodland Agrimony. Available from: http://www.acris.nynhp.org/guide.php?id=9287 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 2011 mmm. Conservation Guide for Delmarva Beggars-ticks. Available from: http://www.acris.nynhp.org/guide.php?id=8750 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 2011 nnn. Conservation Guide for Riverbank Quillwort Available from: http://www.acris.nynhp.org/guide.php?id=9838 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 201 ooo. Conservation Guide. American Waterwort. Available from: http://www.acris.nynhp.org/guide.php?id=9004 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 201 lppp. Conservation Guide for Estuary Beggars-ticks. Available from: http://www.acris.nynhp.org/guide.php?id=8752 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 2011 qqq. Conservation Guide for Mexican Seaside Goldenrod. Available from: http://www.acris.nynhp.org/guide.php?id=8824 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 201 lrrr. Floodplain Forest. Available from:

http://www.acris.nynhp.org/guide.php?id=9897 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 201 lsss. Tidal River. Available from:

http://www.acris.nynhp.org/guide.php?id=9872 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 201 lttt. Conservation Guide for Appalachian Azure. Available from: http://www.acris.nynhp.org/guide.php?id=7871 (accessed November 27, 2012).

New York Natural Heritage Program (NYNHP). 2012. Significant Natural Communities Data Set. Available: http://gis.ny.gov/gisdata/inventories/details.cfm?DSID=1241 (accessed on November 26, 2012).

C-58

IPEC CZMA Consistency Certification December 2012 New York State Department of Environmental Conservation (NYSDEC). 1998a. Iona Island/Doodletown BCA Management Guidance Summary. Available:

http://www.dec.ny.gov/animals/2722 i.html (accessed October 8, 2012).

New York State Department of Environmental Conservation (NYSDEC). 1998b. Reptile and Amphibian Atlas Project. http://www.dec.ny.gov/animals/7140.html (accessed October 8, 2012)

New York State Department of Environmental Conservation (NYSDEC). 2007a. 2007 Press Releases: $1.4 Million Earmarked to Battle Milfoil, Phragmites and Other Aquatic Invasive Species. http://www.dec.ny.gov/press/40029.html New York State Department of Environmental Conservation (NYSDEC). 2007b. Summary of Federal Canada Goose Depredation and Control Orders as Implemented in New York State, Albany, NY. 2pp.

New York State Department of Environmental Conservation (NYSDEC). 2009. Natural Heritage Community Occurrences - NYNHP (NYSDEC). Vector digital data. Albany, NY. 2009.

New York State Department of Environmental Conservation (NYSDEC). 2012. New York Nature Explorer User Defined Results Report. Available:

http://www.dec.ny.gov/natureexplorer/ (accessed on November 26, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012a. 2012-13 Canada Goose Seasons. Available: http://www.dec.ny.gov/outdoor/28496.html (accessed October 8, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012b. 2012-13 Waterfowl Seasons. Available: http://www.dec.ny.gov/outdoor/28888.html (accessed October 8, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012c. 2012-13 New York Hunting and Trapping Guide. http://www.dec.ny.gov/outdoor/37136.html (accessed October 8, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012d. Bald Eagles in the Hudson River. Available: http://www.dec.ny.gov/animals/9382.html (accessed October 8, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012e. Mink Profile.

Available: http://www.dec.ny.gov/animals/9356.html (accessed October 8, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012f. Muskrat Profile. Available: http://www.dec.ny.gov/animals/57561.html (accessed October 8, 2012).

C-59

IPEC CZMA Consistency Certification December 2012 New York State Department of Environmental Conservation (NYSDEC). 2012g. New York State Amphibian and Reptile Atlas 1990-2007 Interim Report, Bog Turtle. Available:

http://www.dec.ny.gov/animals/44397.htmi (accessed October 9, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012h. New York State Amphibian and Reptile Atlas 1990-2007 Interim Report, Timber Rattlesnake.

Available: http://www.dec.ny.gov/animals/4464l.html (accessed October 9, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012i. New York State Amphibian and Reptile Atlas 1990-2007 Interim Report, Fence Lizard. Available:

http://www.dec.ny.gov/animals/44758.html (accessed October 9, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012j. New York State Amphibian and Reptile Atlas 1990-2007 Interim Report, Eastern Worm Snake.

Available: http://www.dec.ny.gov/animals/44664.html (accessed October 9, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012k. New York State Amphibian and Reptile Atlas 1990-2007 Interim Report, Green Frog. Available:

http://www.dec.ny.gov/animals/44588.html (accessed October 9, 2012).

New York State Department of Environmental Conservation (NYSDEC). 20121. New York State Amphibian and Reptile Atlas 1990-2007 Interim Report, Common Snapping Turtle.

Available: http://www.dec.ny.gov/animals/44380.html (accessed October 9, 2012).

New York State Department of Environmental Conservation (NYSDEC). 2012m. New York State Amphibian and Reptile Atlas 1990-2007 Interim Report, Northern Water Snake.

Available: http://www.dec.ny.gov/animals/44733.html (accessed October 9, 2012).

New York State Department of State (NYSDOS). 1987a. Coastal Fish and Wildlife Habitat Rating Form for Hudson River Mile 44-56. November 15, 1987.

New York State Department of State (NYSDOS). 1987b. Coastal Fish and Wildlife Habitat Rating Form for Iona Island Marsh. November 15, 1987.

New York State Department of State (NYSDOS). 1987c. Coastal Fish and Wildlife Habitat Rating Form for Haverstraw Bay. November 15, 1987.

New York State Department of State (NYSDOS). 1987d. Coastal Fish and Wildlife Habitat Rating Form for Fishkill Creek. November 15, 1987.

New York State Department of State (NYSDOS). 1987e. Coastal Fish and Wildlife Habitat Rating Form for Moodna Creek. November 15, 1987.

Nye, P. 2008. Osprey In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

C-60

IPEC CZMA Consistency Certification December 2012 Nye, P. 2009. New York State Bald Eagle Report. New York State Department of Environmental Conservation. 34pp.

Oring, L. W., E. M. Gray, and J. M. Reed. 1997. Spotted Sandpiper (Actitis macularius), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.comrell.edu.bnaproxy.birds.cornell .edu/bna/species/289 (accessed October 15, 2012).

Osborne, C. 2008. Swamp Sparrow In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY. Pp. 568-569.

Post, T. J. 2008. Northern Harrier In The Second Atlas of Breeding Birds in New York State, K.J. McGowan and K. Corwin, Eds. Comstock Publishing Associates, Ithaca, NY.

Robbins, C. S., D. K. Dawson, and B. A. Dowell. 1989. Habitat area requirements of breeding forest birds of the middle Atlantic states. Wildlife Monographs 103: 1-34.

Rosenberg, K. V. 2008. Kentucky Warbler In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

Salzman, E. 1998. Kentucky Warbler Oporornisformosus.In Bull's Birds of New York State, E.

Levine (Ed.). Ithaca: Comstock Publishing Associates. 489-90.

Salzman, E., and K. C. Parkes. 1998. Swamp Sparrow Melospiza Georgiana.In Bull's Birds of New York State, E. Levine (Ed.). Ithaca: Comstock Publishing Associates. 527-28.

Schneider, K. J. 2008. Short-eared Owl In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY.

Smith, C. R. 1998. Red-winged Blackbird Agelaius phoeniceus. In Bull's Birds of New York State, E. Levine (Ed.). Ithaca: Comstock Publishing Associates. 545-7.

Sweet, P. R. 1998. Green Heron Butorides virescens. In Bull's Birds of New York State, E.

Levine (Ed.). Ithaca: Comstock Publishing Associates. 131-132.

Swift, B. 2008a. Wood Duck In The Second Atlas of Breeding Birds in New York State, K.

McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY. pp 94-95.

Swift, B. 2008b. American Black Duck In The Second Atlas of Breeding Birds in New York State, K. McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY. pp 100-101.

Swift, B. 2008c. Mallard In The Second Atlas of Breeding Birds in New York State, K.

McGowan and K. Corwin, eds. Comstock Press, Ithaca, NY. pp. 102-103.

C-61

IPEC CZMA Consistency Certification December 2012 Tash, J. P., and J. A. Litvaitis. 2007. Characteristics of occupied habitats and identification of sites for restoration and translocation of New England cottontail populations. Biological Conservation 137: 584-598.

United States Department of Agriculture Natural Resources Conservation Service (USDA).

2012a. Plants Database County Distribution Ipomoeapandurata.

http://plants.usda.gov/java/county?statename=New York&statefips=36&symbol=IPPA (accessed October 8, 2012).

United States Department of Agriculture Natural Resources Conservation Service (USDA).

2012b. Plants Database County Distribution Pseudognaphaliumhelleri (Britton)Anderb.

ssp. micradenium (Weath.) Kartesz - Heller's cudweed PSHEM in the state of New York.

http://plants.usda.gov/j ava/county?statename=New York&statefips=36&symbol=PSHEM (accessed October 8, 2012).

United States Department of Agriculture Natural Resources Conservation Service (USDA).

2012c. Plants Database County Distribution Sabatia campanulata(L.) Torr. - slender rose gentian SACA26 in the state of New York.

http://plants.usda.gov/j ava/county?statename=New York&statefips=36&symbol=SACA26 (accessed October 8, 2012).

United States Fish and Wildlife Service (USFWS). 2006a. Endangered Species, Indiana Bat, Fact Sheet. Available:

http://www.fws.gov/Midwest/Endangered/mammals/inba/inbafctsht.html (accessed October 9, 2012).

United States Fish and Wildlife Service (USFWS). 2006b. New England Cottontail Sylvilagus transitionalis.Available: http://www.fws.gov/northeast/pdf/necotton.fs.pdf (accessed October 8, 2012).

United States Fish and Wildlife Service (USFWS). 2007. National bald eagle management guidelines. 23pp.

United States Fish and Wildlife Service (USFWS). 2012a. Species Reports.

http ://www.fws.gov/northeast/nyfo/es/CountyLists/RocklandDec2006.htm (accessed October 8, 2012).

United States Fish and Wildlife Service (USFWS). 2012b. Small Whorled Pogonia (Isotria medeoloides) Fact Sheet.

http://www.fws.gov/Midwest/endangered/plants/smallwhorledpogoniafs.html (accessed October 8, 2012).

Wells, A., C. Neider, B. Swift, K. O'Connor, and C. Weiss. 2008. Temporal Changes in the Breeding Bird Community at Four Hudson River Tidal Marshes. Journalof Coastal Research 55: 221-235.

C-62

IPEC CZMA Consistency Certification December 2012 Wenny, D. G., R. L. Clawson, J. Faaborg, and S. L. Sheriff. 1993. Population density, habitat selection, and minimum area requirements of three forest-interior warblers in central Missouri. Condor 95: 968-979.

Whitaker, Jr., J. 0., and W. J. Hamilton, Jr. 1998. Mammals of the eastern United States. Third Edition. Cornell Univ. Press, Ithaca, New York. 583 pp.

White, C. M.. N. J. Clum, T. J. Cade, and W. G. Hunt. 2002. Peregrine Falcon (Falco peregrinus), The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online.

http://bna.birds.cornell.edu.bnaproxy.birds.cornell.edu/bna/species/660 (accessed October 15, 2012).

White, Erin L., Jeffrey D. Corser, and Mathew D. Schlesinger. 2010. The New York Dragonfly and Damselfly Survey 2005-2009 Distribution and Status of the Odonates of New York prepared for the New York Heritage Program.

http://www.dec.ny.gov/animals/31061 .html (accessed October 8, 2012).

Winogrand, H. G., and E. Kiviat. 1997. Invasion of Phragmitesaustralisin the tidal marshes of the Hudson River. Section VI: 29 pp. In W.C. Nieder and J.R. Waldman (eds.), Final Reports of the Tibor T. Polgar Fellowship Program, 1996. Hudson River Foundation, NY.

Yasukawa, K., and W. A. Searcy. 1995. Red-winged Blackbird (Agelaiusphoeniceus),The Birds of North America Online (A. Poole, Ed.). Ithaca: Cornell Lab of Ornithology; Retrieved from the Birds of North America Online:

http://bna.birds.cornell.edu.bnaproxy.birds.cornell.edu/bna/species/184 (accessed October 15, 2012).

Young, S. M. 2010. New York Rare Plant Status Lists. New York Natural Heritage Program, Albany, NY. June 2010. 111 pp.

www.dec.ny.gov/docs/fish_marinepdf/201 Orareplantstatus.pdf (accessed October 8, 2012.

Zaremba, R. E. 2004. Sabatia campanulata(L.) Torrey (Slender marsh-pink) Conservation and Research Plan for New England. New England Wild Flower Society, Framingham, Massachusetts.

C-63

TABLES I

0 IPEC CZMA Consistency Certification December 2012 Table C-1 Relevant Terrestrial Plants Within the Vicinity of IPEC Iona RM RM Island Haverstra Orange Putnam Rockland Westchester State Listing, Federal Common Name Scientific Name 44-56 56-60 Marsh w Bay County County County County State/Global Rank Rank American X Waterwort Elatine americana S_1/G4 Narrow-leaved Cattail Typha angustifolia X N/A Woodland A nmony Agrmonia rostellata X S2/G5 Virginia Snakeroot Anstolochia serpentana $2/G4 Bolboschoenusnovae-Saltmarsh Bulrush angliae X X S1/G5 Midland Sedge Carex mesochorea X S2/G4G5 Straw Sedge Carex straminea X X1 S1/G5 Lined Sedge Carex stnatula X S1/G4G5 Water Pigmyweed Crassulaaquatica X X X S1/G5 Yellow Flatsedge Cyperus flavescens X S1/G5 Riverbank Quillwort Isoetes nparia X $1/G5?

Gypsy-wort Lycopus rubellus X X S1/G5 Virginia Pine Pinus virginiana X $1/G5 Pycnanthemum Basil Mountain-mint clinopodioides X S1/G2 Torrey's Mountain-mint Pycnanthemum torrei X S1/G2 Delmarva Beggar- X ticks Bidens bidentoides S3/G3G4 Estuary Beggar- Bidens hyperborean var. X ticks hyperborea S1/G4T2T4 Smooth Bur- X marigold Bidens laevis X $2/G5 Terrestrial Starwort Callitriche terrestris X X X $2S3/G5 Long's Bittercress Cardaminelongii X X X X $2/G3 Clustered Sedge Carex cumulata X X $2S3/G4?

Marsh Straw Sedge Carex hormathodes _ S2S3/G4G5 Salt-marsh Eleocharis uniglumis var.

Spikerush halophila _ S2/G4T4 C-I-i

IPEC CZMA Consistency Certification December 2012 Table C-1 (cont'd)

Relevant Terrestrial Plants Within the Vicinity of IPEC RM lona RM 56-60 Island Haverstra Orange Putnam Rockland Westchester State Listing, Federal Common Name Scientific Name 44-56 Marsh w Bay County County County County State/Global Rank Rank Violet Wood-sorrel Oxalis violacea X $2S3/G5 Small-flowered Crowfoot Ranunculus micranthus X $3/G5 Sagittariamontevidensis X Spongy Arrowhead var. spongiosa X X X X X S2/G5T4 Mexican Seaside Solidago sempervirens var. X Goldenrod mexicana S1/G5T5?

Symphyotrichum subulatum Saltmarsh Aster var. subulatum X X X X S2/G5T5 Wild Potato-vine Ipomoea pandurata X S1/G5 Large Twayblade Liparis h/lifolia X S1/G5 Virginia False Gromwell Onosmodium virginianum X S1/G4G5 Hooker's Orchid Platantherahooked X S1/G4G5 Pseudognaphaliumhellen Catfoot ssp. Micradenium X SH/ G4G5T3?

Slender Marsh-pink Sabatia campanulata X X Sl/G5 Puttyroot Aplectrum hymenale $X1/G5 Troublesome Sedge Carex molesta X S2S3/G4 Rough Avens Geum laciniatum $X2/G5 Eastern Grasswort Lilaeopsis chinensis I X $X S2/G5 Globe-fruited Ludwigia Ludwigia sphaerocarpa $X2/G5 Heartlead Plantain Plantagocordata X $X3/G4 Michaux's Blue-eyed-grass Sisyrinchium mucronatum X S1/G5 Small Whorled Pogonia Isotria medeoloides X E, SH/G2 T C-I-ii

IPEC CZMA Consistency Certification December 2012 Table C-2 NYNHP/New York State Rare Natural Communities Sp /CommunitiesRM 56-60 Dutchess Orange Putnam Westchester Rockland State/ Global Rank Species o uCounty County County County County Acidic talus slope woodland X X S3/G4?

Appalachian oak-hickory X forest _ X X S4/G4G5 Brackish intertidal mudflats X X X SiS2/G3G4 Brackish tidal marsh X X X S3S4/G4 Chestnut oak forest X X X X X S4/G5 Cliff community X S4/G5 Oak-tulip tree forest X X X X S2S3/G4 Pitch pine-oak-heath rocky X summit _ X X S3S4/G4 Red cedar rocky summit X X S3/G3G4 Rocky summit grassland X X X S3/G3G4 Floodplain Forest X S2/G3G4 Tidal River x X X X X X S3/G4 C-2-i

IPEC CZMA Consistency Certification December 2012 Table C-3 Relevant Terrestrial Wildlife Within the Vicinity of IPEC Hudson Hudson Iona State Listing, Common Scientific RM 44- RM 56- Island Haverstraw Orange Putnam Rockland Westchester StatelGlobal Federal Name Name 56 60 Marsh Bay County County County County Rank Rank Butorides Green Heron virescens X1 Ixobrychus Least Bittern exilis X_ T, S3B,S1N/G4 Canada Branta Goose canadensis X1 Game Anas Mallard platyrhynchos X_ Game American Black Duck Anas rubripes X_ Game Wood Duck Aix sponsa X_ Game Porzana Sora carolina X1 Game Common Gallinula Moorhen chloropus X_ Game Spotted Actitis Sandpiper macularia X_

Belted Megaceryle Kingfisher alcyon X_

Cistothorus Marsh Wren palustris X_

Red-winged Agelaius Blackbird phoeniceus X_

Swamp Melospiza Sparrow georgiana X_

Pandion Osprey haliaetus X1 X1 SC Waterbird Concentration Area X1 X_ L C-3-i 0 0

IPEC CZNIA Consistency Certification December 2012 Table C-3 (cont'd)

Relevant Terrestrial Wildlife Within the Vicinit, of IPEC Hudson Hudson Iona State Listing, Common Scientific RM 44- RM 56- Island Haverstraw Orange Putnam Rockland Westchester State/Global Federal Name Name 56 60 Marsh Bay Coun County County County Rank Rank Haliaeetus T, Bald Eagle leucocephalus X_ X X X X X X S2S3B,S2N/G5 Virginia Rail Rallus limicola X_ Game Peregrine Falcon Falcoperegrinus X X X X E, S3B/G4 Northern Harrier Circus cyaneus X T, S3B,S3N/G5 Short-eared Owl Asio flammeus X E, $2/G5 Kentucky Oporornis Warbler formosus X $2/G5 Ondatra Muskrat zibethicus X_

Mink Neovision vison X1 Indiana Bat Myotis sodalis X X X X E, $1/G2 E Eastern Small-footed Myotis Myotis leibii X $2/G3 Snapping Chelydra Turtle serpentina X1 X X X X Northern Water Snake Nerodia sipedon X1 X X X X Green Frog Rana clamitans X_ X X X X Glyptemys Bog Turtle muhlenbergii X X X X E, S2/G3 T Eastern Carphophis Wormsnake amoenus X X X SC, $2/G5 C-3-ii

IPEC CZMA Consistency Certification December 2012 Table C-3 (cont'd)

Relevant Terrestrial Wildlife Within the Vicinity of IPEC Hudson Hudson Iona State Listing, Common Scientific RM 44- RM 56- Island Haverstraw Orange Putnam Rockland Westchester State/Global Federal Name Name 56 60 Marsh Bay County County County County Rank Rank Timber Crotalus Rattlesnake adamanteus X X X X T, S3/G4 Sceloporus Fence Lizard undulatus H X H X T, S1/G5 Needham's Libellula Skimmer needhami X X S2S3/G5 Corduegaster Tiger Spiketail erronea X X S1/G4 Spatterdock Rhionaeschna Darner mutata X S2/G4 Arrowhead Cordulegaster Spiketail obliqua X S2S3/G4 Tachopteryx Gray Petaltail thoreyi X SC, $2/G4 Somatochlora Mocha Emerald linearis X X X X S2S3/G5 Appalachian Celastrina X Azure neglectamajor S 1S3/G4 I C-3-iii 0

FIGURES f

0 Colds prg I

f Y

-NYS DOS Coastal Zone Boundary IPEC CZMA r1.2 NYSDOS Significant Coastal Habitat Project Area F-L-River Mile Figure C-1 W 0 1 2

" NYS DOS Coastal Zone Boundary IPEC CZMA NYSDOS Significant Coastal Habitat IPEC Coastal Zone - River Mile 34 to 60 (Proposed)

JNYSDOS Proposed Significant Coastal Habitat Figure C-1A River Mile 0 1 2 3 4Mile MEOO_-__ Miles

STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and DEC No.: 3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC SPDES No.: NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s 3-5522-00105/00031 (IP3)

Joint Application for CWA § 401 Water Quality Certification PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.

IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.

CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTEFGY NUCLEAR INDIAN POINT Boston, Massachusetts 02109 Tel.: 617.570.1000 Fax: 617.523.1231 April 30, 2014

PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.

CLOSED CYCLE COOLING 1 Q: Please state your name, current position, and business address.

2 A: My name is Yan Kishinevsky. I am a Director for Nuclear Services and 3 Advanced Technology at Bums and Roe Enterprises ("Bums and Roe"), a 4 comprehensive engineering, procurement, construction, operations, and 5 maintenance organization with specialized expertise in technically complex 6 facilities. My business address is 800 Kinderkamack Road, Oradell, NJ 07649.

7 Q: Are you offering this testimony on behalf of Entergy in support of its 8 application for renewal of State Pollutant Discharge Elimination System 9 ("SPDES") Permit (DEC App. Nos. 3-5522-00011-00004 SPDES No.

10 NY0004472) for Indian Point Units 2 and 3 and the corresponding issue in 11 the associated Water Quality Certification ("WQC") proceeding, as it has 12 been consolidated by this Tribunal (collectively, the "Proceedings")?

13 A: Yes. I am offering my testimony with respect to Issue for Adjudication No. I as it 14 relates to the feasibility of constructing and operating closed-cycle cooling 15 ("CCC") towers as proposed by NYSDEC Staff at Indian Point Energy Center 16 ("IPEC"). I offer my expert testimony concerning whether, from an engineering 17 perspective, the proposed retrofits of Indian Point Units 2 and 3 with CCC (and 18 therefore cooling towers) can be successfully constructed and operated without 19 material detriment impacts to IPEC during the license-renewal period on a site-20 specific basis.

21 Q: Please describe your academic background.

22 A: I earned a M.S. in 1972 in Applied Physics and Thermodynamics from Moscow 23 State University, in what was then the USSR (now Russia). I am a Registered

PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.

CLOSED CYCLE COOLING I Professional Engineer in the State of New York. My most recent curriculum 2 vitae, including a list of my recent publications, is submitted as Entergy Exhibit 3 539.

4 Q: Please summarize your relevant specializations and work experience.

5 A: I have over 35 years of engineering experience working with nuclear power 6 plants. As Director of Nuclear Services and Advanced Technology at Bums and 7 Roe, I have been involved in the development and implementation of advanced 8 nuclear fuel and reactor technology. Prior to working at Bums and Roe, I was a 9 Special Projects Manager for the New York Power Authority ("NYPA") from 10 1980 to 2007. At NYPA, I was responsible for the design, engineering, 11 procurement, installation and testing of major capital modifications and 12 improvements for Indian Point Unit 3 and James A. Fitzpatrick Nuclear Power 13 Plant. For example, I was in charge of the condenser modifications to Indian 14 Point Unit 3, and involved in the modifications to the circulating water system, 15 including the installation of the current variable speed pumps. Finally, I also 16 worked on the decommissioning of the Shoreham Nuclear Power Plant.

17 Q: What was your role in evaluating potential alternative intake technologies for 18 IPEC?

19 A: I was responsible for the preparation of the Bums and Roe report entitled BREI 20 Independent Review of the Proposed ClearSky© Cooling Towers Impact on the 21 Indian Point Energy Center Main Condensers, which is Attachment 3 to the 22 Enercon report entitled ENERCON Response to Tetra Tech's Indian Point 23 Closed-Cycle Cooling System Retrofit Evaluation Report (Entergy Ex. 296(A)).

PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.

CLOSED CYCLE COOLING 1 In addition, and in preparation for my testimony in these Proceedings, I have also 2 reviewed various materials, including the following reports:

3

  • Economic and Environmental Impacts Associated with Conversion of Indian 4 Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water 5 Configuration,dated June 2003 (Entergy Ex. 7A);

6

  • EngineeringFeasibilityand Costs of Conversion ofIndian Point Units 2and 3 7 to a Closed-Loop Condenser Cooling Water Configuration, dated February 8 12, 2010 (Entergy Ex. 7);

9 0 Indian Point Closed-Cycle Cooling System Retrofit Evaluation, dated June 10 2013 (Staff Ex. 214); and 11 0 ENERCON Response to Tetra Tech's Indian Point Closed-Cycle Cooling 12 System Retrofit EvaluationReport, dated December 2013 (Entergy Ex. 296A).

13 Q: Have you reviewed the prefiled direct testimony of Sam Beaver, dated 14 February 28, 2014, and the prefiled rebuttal testimony of Sam Beaver, dated 15 March 28, 2014?

16 A: Yes.

17 Q: What was the nature of your review?

18 A: I reviewed the reports and Mr. Beaver's prefiled direct and rebuttal testimony, 19 focusing on aspects of Mr. Beaver's testimony that concerned the feasibility of 20 construction and operation of cooling towers at IPEC.

21 Q: Do you agree with Mr. Beaver's conclusion that the operation of cooling 22 towers at IPEC would adversely impact plant performance?

PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.

CLOSED CYCLE COOLING 1 A: Yes. As Mr. Beaver stated in his prefiled rebuttal, "[rietrofitting a nuclear plant 2 constructed in the 1970s with a once-through cooling system to a closed-cycle 3 cooling system will impact virtually every aspect of IPEC's circulating water 4 system." See Beaver CCC Rebuttal at 9:12-14; see also Beaver CCC Rebuttal at 5 3:8-6:8, 7:1-8:17, 8:19-10:10, 26:5-26:22, 28:22-29:8, 37:1-10, 38:4-39:2, with 6 which I agree and accept. I would also underscore three points: First, it took 7 nearly 40 years of engineering work to produce IPEC's consistent current 8 capacity factor of over 90 percent. That work will compromised by installing 9 cooling towers. Not only will a cooling tower retrofit project adversely impact 10 overall IPEC performance by reducing the flow rate of the circulating water and 11 increasing the temperature of the circulating water, but any cooling tower retrofit 12 will also necessarily change and disrupt many of the complex controls and 13 interlocks that assure the reliable and safe operation of the plant, including its 14 defense in depth systems. These impacts may extend to the Units' primary (or 15 nuclear) and secondary (or electricity generation) systems. Second, a feasibility 16 analysis would need to consider not only stable operations but also various 17 operational transients evaluated under the regulatory regime in which nuclear 18 power plants operate and under standard engineering practices. One of those 19 transients is identified in Mr. Beaver's testimony, but as Mr. Beaver indicated, 20 there are many others that would need to be identified and evaluated as a 21 precursor to reaching a feasibility determination. See Beaver CCC Direct at 11:5-22 17. Third, as Mr. Beaver indicates, an engineer operating consistent with standard 23 nuclear engineering practices could not reach a conclusion that retrofitting IPEC PREFILED TESTIMONY OF YAN KISHINEVSKY, P.E.

CLOSED CYCLE COOLING 1 with cooling towers is feasible to a reasonable degree of engineering certainty.

2 See Beaver CCC Rebuttal at 38:4-39:2.

3 Q: Please summarize the information that you relied on or considered for your 4 testimony.

5 A: In addition to the testimony and reports identified above, I have also reviewed the 6 prefiled direct, prefiled rebuttal, and live testimony of Tim Havey and Eduardo 7 Ortiz de Zarate.

END OF TESTIMONY STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and DEC No.: 3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC SPDES No.: NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s 3-5522-00105/00031 (IP3)

Joint Application for CWA § 401 Water Quality Certification PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.

IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.

CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGYNIJ CLEAR INDIAN POINT 3, LLC, AND LRGY NUCLEAR OPE 6J* -I W C.

02109 Tel.: 617.570.1000 Fax: 617.523.1231 April 30. 2014

PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.

CLOSED CYCLE COOLING I Q: Please state your name, current position, and business address.

2 A: My name is Richard Clubb. I am a Project Manager at Enercon Services, Inc.

3 ("Enercon"), an engineering, environmental, and technical management services 4 firm. My business address is 500 Townpark Lane, Kennesaw, Georgia 30144.

5 Q: Are you offering this testimony on behalf of Entergy in support of its 6 application for renewal of State Pollutant Discharge Elimination System 7 ("SPDES") Permit (DEC App. Nos. 3-5522-00011-00004 SPDES No.

8 NY0004472) for Indian Point Units 2 and 3 and the corresponding issue in 9 the associated Water Quality Certification ("WQC") proceeding, as it has 10 been consolidated by this Tribunal (collectively, the "Proceedings")?

11 A: Yes. I am offering my testimony with respect to Issue for Adjudication No. 1 as it 12 relates to the feasibility of constructing and operating closed-cycle cooling 13 ("CCC") towers as proposed by NYSDEC Staff at Indian Point Energy Center 14 ("IPEC"). I offer my expert testimony concerning whether, from an engineering 15 perspective, the proposed retrofits of Indian Point Units 2 and 3 with CCC (and 16 therefore cooling towers) can be successfully constructed and operated without 17 material detriment impacts to Indian Point during the license-renewal period on a 18 site-specific basis.

19 Q: Please describe your academic background.

20 A: I earned a B.S. in mechanical engineering and an MBA from the Georgia Institute 21 of Technology. My undergraduate degree focused on thermodynamics, fluids, 22 heat transfer, and failure analysis. I am a Registered Professional Engineer in the PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.

CLOSED CYCLE COOLING I State of Georgia. My most recent curriculum vitae, including a list of my recent 2 publications, is submitted as Entergy Exhibit 540.

3 Q: Please summarize your relevant specializations and work experience.

4 A: I have over eight years of experience in nuclear power plant modifications, 5 nuclear power plant circulating water system engineering, and nuclear power 6 plant licensing. I have particular expertise in engineering assessments of CCC at 7 various large-scale, base load, fossil fuel and nuclear electric-generating stations.

8 As set forth in my CV, in addition to the work performed in this proceeding, I 9 have worked on circulating water and service water systems and/or cooling tower 10 projects at the following nuclear facilities: James A. Fitzpatrick Nuclear Power 11 Plant; Pilgrim Nuclear Power Station; Quad Cities Nuclear Generating Station; 12 Pickering Nuclear Generating Station; Diablo Canyon Power Plant; Dresden 13 Generating Station; Robinson Nuclear Plant; and San Onofre Nuclear Generating 14 Station.

15 Q: What was your role in evaluating potential CCC configurations for IPEC?

16 A: I was a principal author and responsible for managing day-to-day activities related 17 to the development of the following reports: EngineeringFeasibilityand Costs of 18 Conversion of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling 19 Water Configuration, dated February 12, 2010 (Entergy Ex. 7); Analysis of 20 Closed-Loop Cooling Salinity Levels Indian Point Units 2 & 3, dated November 21 2010 (Entergy Ex. 310); and ENERCON Response to Tetra Tech's Indian Point 22 Closed-Cycle Cooling System Retrofit Evaluation Report, dated December 2013 23 (Entergy Ex. 296A). As part of my role preparing these reports, I worked hand-PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.

CLOSED CYCLE COOLING I in-hand with Mr. Beaver, who was the Technical Lead on each of these projects.

2 Q: Have you reviewed the prefiled direct testimony of Sam Beaver, dated 3 February 28, 2014, and the prefiled rebuttal testimony of Sam Beaver, dated 4 March 28, 2014?

5 A: Yes.

6 Q: Do you adopt that testimony?

7 A: Yes. I hereby adopt the prefiled direct and rebuttal testimony of Sam Beaver as 8 my own, and have attached both the prefiled direct and rebuttal testimony as 9 Exhibit A and Exhibit B, respectively.

10 Q: Please summarize the information that you relied on or considered for your 11 testimony.

12 A: I have reviewed and/or rely on a variety of information, including the following 13 reports, studies and other documents:

14

  • Enercon Services, Inc., ENERCON Response to Tetra Tech's Indian Point 15 Closed-Cycle Cooling System Retrofit Evaluation Report, dated December 2013 16 (Entergy Ex. 296A);

17 0 Enercon Services, Inc., Analysis of Closed-Loop Cooling Salinity Levels Indian 18 Point Units 2 & 3, November 2010 (Entergy Ex. 310);

19 9 Memorandum from John Sunda, SAIC and Kelly Meadows, to Paul Shriner and 20 Jan Matuszko, USEPA, Re: Cooling Tower Noise, Plume and Drift Abatement 21 Costs, dated June 11, 2010 (Entergy Ex. 346);

22 0 SPX, Entergy Indian Point Units 2 & 3, ClearSky Selection Summary (Entergy 23 Ex. 347);

PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.

CLOSED CYCLE COOLING I

  • Tetra Tech, Inc., Glenwood Main Power Station Technical Review (Entergy Ex.

2 348);

3 9 National Grid Generation LLC, Response to NYSDEC's Request for Additional 4 Information Regarding Cooling Towers, dated July 1, 2010 (Entergy Ex. 349);

5 0 Tetra Tech, Inc., Northport Generating Station Technical Review (Entergy Ex.

6 350, 354);

7 0 Aerial photograph of IPEC site (Entergy Ex. 351);

8 0 Mostafa H. Sharqawy, et al., On Thermal Performance of Seawater Cooling 9 Towers, Journal of Engineering for Gas Turbines and Power, April 2011 (Entergy 10 Ex. 352);

11 0 Letter from Timothy Curt, National Grid Environmental Management, to Ms.

12 Colleen Kimble, NYS Department of Environmental Conservation, dated July 1, 13 2010 (Entergy Ex. 353);

14 0 Memorandum from John Sunda, Steve Geil and Kelly Meadows (Tt), to Chuck 15 Nieder (NYSDEC) and Jamie Hurley (USEPA OWM), Re: Huntley Closed-Cycle 16 Cooling System Evaluation, dated Oct. 5, 2011 (Entergy Ex. 355);

17 0 Memorandum from Kelly Meadows, Tetra Tech, to Paul Shriner, EPA, Re: Space 18 Constraints for Cooling Tower Retrofits, dated February 28, 2011 (Entergy Ex.

19 356);

20 0 U.S. Department of Energy, Project Facts, Improvement to Air2Air Technology 21 to Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 22 Power Plants ProMIS/Project No.: DE-NT0005647 (Entergy Ex. 357);

23 0 Bob Cashner, American Electric Power, AEP's Experience with Polyester FRP PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.

CLOSED CYCLE COOLING 1 Structure Cooling Towers, dated Feb. 2011 (Entergy Ex. 358);

2 9 SPX Cooling Technologies, Inc., Improvement to Air2AirTM Technology to 3 Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 4 Power Plants, Final Report, dated June 30, 2012 (Entergy Ex. 359);

5 0 Overall Cost Summary for CWWS Installation Scenario Outlined in December 6 13, 2013 Memo to NERA (Entergy Ex. 372);

7

8

  • SPX Cooling Technologies, Use of Air2AirTM Technology to Recover Fresh-9 Waterfrom the Normal Evaporative Cooling Loss at Coal-Based Thermoelectric 10 Power Plants,Final Report, dated Sept. 30, 2009 (Entergy Ex. 383);

11

  • Florida Power & Light August 3, 2011 Response to NRC's request for additional 12 information (Turkey Point Nuclear Plant) (Entergy Ex. 390);

13 0 U.S. Nuclear Regulatory Commission, Standard Review Plan § 10.4.5 Circulating 14 Water System, NUREG-0800 (Entergy Ex. 391);

15 0 Levy Nuclear Plant - Supplement to Response to Request for Additional 16 Information (Entergy Ex. 463);

17

  • VC. Summer Nuclear Station, Units 2 and 3 COL Application Part 2, FSAR 18 (Chapter 10) (Entergy Ex. 465);

19 0 U.S. NRC letter regarding South Carolina Electric & Gas Co. response to request 20 for additional information (Entergy Ex. 475);

21 0 Technical Report: Operating Cooling Towers in Freezing Weather (Marley, April 22 2012) (Entergy Ex. 479);

23 0 Cooling Technology Institute, Common Industrial Cooling Tower Errors and PREFILED TESTIMONY OF RICHARD T. CLUBB, P.E.

CLOSED CYCLE COOLING 1 Omissions, dated Feb. 2009 (Entergy Ex. 481);

2 0 U.S. NRC: GEIS for Nuclear Plants (Entergy Ex. 486);

3 0 Cooling Tower Institute, Fill Fouling Control in Cooling Towers (1998) (Entergy 4 Ex. 532);

5 0 SPX PowerPoint: Seawater Cooling Tower - District Cooling Symposium (Oct.

6 14, 2009) (Entergy Ex. 535).

END OF TESTIMONY Exhibit A 0

STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and DEC No.: 3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC SPDES No.: NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s 3-5522-00105/00031 (IP3)

Joint Application for CWA § 401 Water Quality Certification PREFILED TESTIMONY OF SAM BEAVER IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3. LLC AND ENTERGY NUCLEAR OPERATIONS, INC.

CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC, AND ENTERGY NUCLEAR OPERATIONS, INC.

By its attorneys, kCi~ ~

Elise N. Zoli Kevin P. Martin John C. Englander Goodwin Procter LLP 53 State Street Boston, Massachusetts 02109 Tel.: 617.570.1000 Fax: 61.7.523.1231 February 28, 2014

Table of Contents PaIP" I. IN TR O D U C T IO N ................................................................................................................ 1 II.

SUMMARY

OF TETRA TECH'S CCC CONFIGURATIONS ................................... 4 III. ENERCON RESPONSE TO TETRA TECH'S CCC REPORT .................................... 6 IV. SALINITY REPORT AND CONCLUSIONS ............................................................ 13 V. QUALIFICATIONS AND SUFFICIENCY OF METHODS, DATA AND CONCLUSIONS ..................................................................................... 16 i

PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 I. INTRODUCTION 2 Q: Please state your name, current position, and business address.

3 A: My name is Sam Beaver. I am the Director of Project Management at Enercon 4 Services, Inc. ("Enercon"), an engineering, environmental, and technical 5 management services firm. My business address is 500 Townpark Lane, 6 Kennesaw, Georgia 30144.

7 Q: Are you offering this testimony on behalf of Entergy in support of its 8 application for renewal of State Pollutant Discharge Elimination System 9 ("SPDES") Permit (DEC App. Nos, 3-5522-00011-00004 SPDES No.

10 NY0004472) for Indian Point Units 2 and 3 and the corresponding issue in II the associated Water Quality Certification ("WQC") proceeding, as it has 12 been consolidated by this Tribunal (collectively, the "Proceedings")?

13 A: Yes. I am offering my testimony with respect to Issue for Adjudication No. 1 as it 14 relates to the feasibility of constructing and operating closed-cycle cooling 15 ("CCC") towers as proposed by NYSDEC Staff at Indian Point Energy Center 16 ("IPEC"). I offer my expert testimony concerning whether NYSDEC Staff's 17 proposed retrofits of Indian Point Units 2 and 3 with CCC towers can be 18 constructed and operated efficiently and without material detriment impacts to the 19 facilities' operation given the site specific constraints of IPEC.

20 Q: Have you previously submitted testimony in these Proceedings?

21 A: Yes. I previously submitted prefiled direct and rebuttal testimony in these 22 Proceedings on July 22, 2011; September 30, 2011; May 30, 2012; June 29, 2012; 23 May 31, 2013; and June 28, 2013. I testified in person before this Tribunal on 24 October 17-18, 2011; August 1, 2012; and July 15-16, 2013.

- I-

PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 Q: What is the purpose of this testimony?

2 A: This testimony describes the report prepared by Enercon entitled, ENERCON 3 Response to Tetra Tech's Indian Point Closed-Cycle Cooling System Retrofit 4 Evaluation Report ("2013 ENERCON CCC Response"), dated December 2013 5 (Entergy Ex. 296(A)), which is Appendix A to the TRC Environmental 6 Corporation ("TRC") report entitled, New York State Environmental Quality 7 Review Act, Entergy Response Document to the Tetra Tech Report and the 8 Powers Engineering Report (Entergy Ex. 296). In addition, this testimony 9 describes Enercon's report entitled, Analysis of Closed-Loop Cooling Salinity 10 Levels Indian Point Units 2 & 3, with Appendices A-F, dated November 2010 11 (Entergy Ex. 310) ("Salinity Report"). I understand that the 2013 ENERCON 12 CCC Response and the Salinity Report have been previously provided to the 13 parties to the Proceedings, and I adopt both reports as part of my prefiled 14 testimony.

15 Q: Please describe the purpose of the 2013 ENERCON CCC Response.

16 A: I understand that NYSDEC Staff has proposed the installation and operation of 17 CCC as the best technology available to minimize adverse environmental impacts 18 consistent with the requirements of 6 NYCRR § 704.5 and § 316(b) of the Clean 19 Water Act. The purpose of the 2013 ENERCON CCC Response was to review 20 the engineering feasibility of the CCC configurations selected by Tetra Tech in its 21 report entitled, Indian Point Closed-Cycle Cooling System Retrofit Evaluation, 22 dated June 2013 (the "Tetra Tech CCC Report"). The 2013 ENERCON CCC 23 Response also assesses CCC proposals submitted by Powers Engineering on PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I behalf of Riverkeeper, Inc., as presented in the Revised Closed Cycle Cooling 2 FeasibilityAssessment for Indian Point Energy Center Unit 2 and Unit 3for Best 3 Technology Available Report, dated October 24, 2012, and subsequently limited 4 by the November 22, 2013 letter from Mark Lucas to ALJs Villa and O'Connell 5 (the "Powers Report"). I understand that Riverkeeper has recently withdrawn the 6 Powers Report and, in an email from Riverkeeper's counsel dated February 24 at 7 8:45 pm, declined to specify what CCC proposal it actually will be advancing.

8 My testimony is therefore limited to addressing the Tetra Tech proposal. If 9 Riverkeeper in fact advances some other CCC proposal, then to the extent 10 necessary I will address such proposal in rebuttal.

11 Q: How did you go about preparing the 2013 ENERCON CCC Response?

12 A: I oversaw a team of engineers at Enercon that reviewed both reports submitted by 13 NYSDEC Staff and Riverkeeper. The Enercon team consisted of twenty 14 mechanical engineers, nuclear engineers, chemical engineers, civil engineers, and 15 electrical engineers that were responsible for reviewing various aspects of each 16 report within their specific area of expertise.

17 Under my supervision, the Enercon team conducted a thorough review of 18 the reports submitted by NYSDEC Staff and Riverkeeper to determine whether 19 those reports demonstrated the feasibility of retrofitting Unit 2 and Unit 3 with 20 CCC and in addition, whether there existed any potential problems, errors, or

21. omissions that (1) implicate essential equipment and/or nuclear station reliability; 22 (2) represent high risk assumptions or unknowns; and (3) would significantly 23 increase the estimated costs of construction or operation.

PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 In addition to our in-house experts, Alden Research Laboratory ("Alden")

2 was engaged by Entergy to conduct computational fluid dynamic ("CFD")

3 modeling of Tetra Tech's proposed mechanical draft cooling towers and Bums 4 and Roe Enterprises, Inc. ("Bums and Roe") was retained by Entergy to perform a 5 review of the impacts of Tetra Tech's proposed cooling tower design on the Unit 6 2 and Unit 3 condensers.

7 II.

SUMMARY

OF TETRA TECH'S CCC CONFIGURATIONS 8 Q: Please describe the key elements of Tetra Tech's proposed conceptual design 9 that were relevant to your review.

10 A: For its conceptual design, Tetra Tech has selected SPX ClearSkyTM ("ClearSky")

11 plume-abated cooling towers for use at IPEC based on the claim that the ClearSky 12 cooling towers were the only practical alternative for a CCC-retrofit apart from 13 circular hybrid cooling towers. See Tetra Tech CCC Report at 11. For each Unit, 14 Tetra Tech has proposed that the towers would operate at a flow rate of 700,000 15 gallons per minute, a design wet-bulb temperature of 77°F, and an approach to 16 wet-bulb temperature of 12TF. See id. at 13. Tetra Tech's cooling towers are 17 configured "back-to-back," meaning that towers for each unit would be 2 cells 18 wide and 22 cells long for a total of 44 cells per tower. Id. The overall 19 dimensions of each tower block would be 1,408 ft x 151 ft (or approximately 5 20 acres). Id. The locations that Tetra Tech proposes to site the cooling towers 21 would make the cooling water basins in the cooling towers 52.5 feet above mean 22 sea level. See id. at 15. Finally, Tetra Tech assumes that the cooling towers 23 would operate at three cycles of concentration, which means that the chemical or 24 biological constituents in the Hudson River water will be raised to three times PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 their initial levels in the close-cycle system, before being blown down or released 2 from the tower. See id at 13.

3 Q: What is a "design wet bulb temperature"?

4 A: The wet bulb temperature is a meteorological measurement which incorporates 5 both moisture content and the temperature of the ambient air (referred to as the 6 "dry bulb temperature"). Cooling tower performance depends on the wet bulb 7 temperature of the air entering the cooling tower inlets because it determines the 8 lowest temperature that the circulating water can be cooled using cooling towers, 9 which reject heat through evaporation. When selecting cooling towers at a 10 particular facility, the "design" wet bulb temperature should reflect the highest 11 wet bulb temperature experienced in the area where the cooling towers will be 12 sited allowing a small margin for infrequent exceedances (typically less than 1%).

13 Q: What is an "approach to wet bulb temperature"?

14 A: No cooling tower is capable of cooling water to the wet bulb temperature.

15 Therefore, the approach to wet bulb temperature describes the number of degrees 16 above the ambient wet bulb temperature by which the cooling tower can be 17 expected to reduce the temperature of the cooling water after it passes through the 18 condensers. It is a value based on the size and efficiency of the cooling towers 19 and it represents the cooling ability of the towers. For example, Tetra Tech's 20 selected cooling towers would be capable of cooling the CCC water to 89TF (77TF 21 design wet bulb + 12TF approach) when the amnbient wet bulb temperature at the 22 cooling towers is 77TF. To understand how the approach temperature changes 23 with changes to the wet bulb temperature, engineers use cooling tower PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 performance curves. A single point is not adequate to determine the operational 2 impacts of CCC over the entire range of expected wet bulb temperatures.

3 Q: How does the "approach to wet bulb temperature" affect cooling tower 4 design?

5 A: There is an inherent trade-off between the size of a cooling tower and its ability to 6 cool the circulating water. Increasing the approach to wet bulb temperature 7 decreases the cooling tower size, but results in greater circulating water 8 temperatures. Power plants operate less efficiently-that is, it will detrimentally 9 affect power plant performance-when the temperature of the circulating water is 10 increased, and indeed may result in a plant shut down if the temperatures exceed 11 the condenser's operational limits.

12 11. ENERCON RESPONSE TO TETRA TECH'S CCC REPORT 13 Q: What conclusion, if any, did Enercon reach in its review of Tetra Tech's 14 CCC Report?

15 A: There are two primary conclusions that Enercon reached after its review of the 16 Tetra Tech CCC Report and which are discussed in detail in the 2013 ENERCON 17 CCC Response. First, based on my and my team's experience and best 18 professional judgment, NYSDEC Staffs proposed configuration for a CCC 19 retrofit at IPEC as presented by Tetra Tech cannot be considered feasible. In 20 particular, it is my opinion that NYSDEC Staff's proposed cooling towers cannot 21 be installed and function efficiently within the operating constraints of IPEC.

22 Second, at a minimum, Tetra Tech's CCC Report does not contain fundamental 23 design detail that demonstrates that CCC are feasible at IPEC.

PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 Q: What is your understanding of what it means for a technology to be feasible?

2 A: A technology is feasible where it can be installed and operated at a particular site, 3 based on the relevant considerations. at that site, with a reasonable level of 4 engineering certainty.

5 Q: Please summarize the reasons for your conclusion that NYSDEC Staff's CCC 6 proposal cannot be considered feasible at IPEC.

7 A: As set forth in the 2013 ENERCON CCC Response, there are three primary 8 reasons Tetra Tech's proposal cannot be considered feasible from an engineering 9 perspective.

10 First, ClearSky cooling towers are not a demonstrated, available 11 technology for a large baseload nuclear power plant such as IPEC because there is 12 inadequate design, construction, and operational history for ClearSky towers-13 measured both in the total number of installations of ClearSky towers and the 14 diversity among the limited installations that do exist-to conclude they would be 15 viable with a reasonable level of confidence. No nuclear stations designed solely 16 for once-through cooling have been converted to closed-loop cooling, let alone 17 converted using ClearSky cooling towers. In fact, there is only one very small 18 ClearSky installation with any measurable operational experience (five years)-a 19 one test cell cooling tower in New Mexico. Nowhere does Tetra Tech provide 20 any operational history for that test cell operating in the New Mexico desert.

21 After the submission of the 2013 ENERCON CCC Report three additional 22 ClearSky cells became operational, two at a biomass facility in Wisconsin and 23 one "demo" tower in South Korea, There are no ClearSky cooling towers PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I operating at a nuclear power plant, and all three of the ClearSky configurations-2 in New Mexico, Wisconsin, and South Korea-are for in-line ClearSky cooling 3 towers, not the back-to-back configurations selected by Tetra Tech for use at 4 Units 2 and 3. Given the absence of any practical history of CCC retrofits at 5 nuclear facilities using ClearSky cooling towers, engineering observations and 6 conclusions regarding any such conversion are purely speculative and inherently 7 subject to unforeseen challenges during the detailed design phase and the 8 subsequent implementation. Indeed, the lack of installation and operational 9 history presents a large potential risk, and under these circumstances, should have 10 eliminated ClearSky cooling towers from serious consideration. Adding to the 11 inherent risk of the ClearSky towers is the fact that they are only available in 12 fiberglass and are therefore (1) susceptible to fire damage and (2) not necessarily 13 designed to withstand the wind loading requirements at a nuclear facility like 14 IPEC.

15 Second, there are several construction and siting issues that were not 16 addressed by Tetra Tech. Most notably, there are existing, essential plant 17 components and structures already located where Tetra Tech proposes siting the 18 cooling towers. Among the structures and components that would need to be 19 relocated are the Algonquin Natural Gas Pipeline, which is displaced by the 20 proposed Unit 3 cooling tower; components containing radionuclides (in the form 21 of spent nuclear fuel and low level radionuclide material); high voltage power 22 transmission lines; and various security towers, fencing and facilities. In fact, 23 with respect to radionuclide management, Tetra Tech acknowledged, "[i]f an PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I acceptable method cannot be identified, construction and excavation could not 2 proceed in this area, where the CT2 [Unit 2 cooling tower] pipe corridor would be 3 sited. In this case, the proposed Unit 2 retrofit would be infeasible." See Tetra 4 Tech CCC Report at 28. As set forth in the 2013 ENERCON CCC Response, 5 many of the structures that would need to be relocated are currently relied upon 6 for safe, secure and efficient power generation at IPEC. Taken together, the 7 essential structures and components that are impacted by the Tetra Tech 8 configuration represent major detrimental impacts to the. IPEC site and raise 9 serious concerns about the plant's ability to generate power in a safe and efficient 10 manner. Further, the overall cost and schedule impacts of relocating these 11 essential structures was not addressed by Tetra Tech, hence making its report 12 substantially lacking relative to overall impacts of the proposed conversion.

13 Third, operation of Tetra Tech's ClearSky cooling towers would have a 14 detrimental impact on plant operations. Tetra Tech's proposed ClearSky towers 15 will discharge saturated salt-laden mist that will be concentrated and localized at 16 ground levels rather than discharged and dispersed higher in the atmosphere, as is 17 the case with round hybrid cooling towers. This will lead to increased salt 18 deposition and moisture on the power blocks and electrical transmission facilities, 19 creating a known risk of electrical arcing (discharging of current through the air) 20 in the switchyard. The risk of electrical arcing is a workplace safety hazard, and 21 may lead to a shutdown of the nuclear reactor via a reactor scram, which is the 22 sudden shutting down of a nuclear reactor, usually by rapid insertion of control 23 rods. Unplanned reactor scrams upset plant stability and challenge critical safety PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 functions during power operations. In addition, the plume from Tetra Tech's 2 proposed ClearSky tower configuration would have an adverse impact on the 3 electrical switchyard, heating/ventilation/air conditioning (HVAC) systems, and 4 major outdoor equipment at IPEC that creates operability concerns. Finally, the 5 low level plume would create significant recirculation of the saturated air which 6 would increase operational power losses. In fact, operational and parasitic power 7 losses combined due to the ClearSky CCC conversion represent as much as a 6%

8 reduction in IPEC's net power output.

9 Q: Please summarize the basis for your conclusion that the Tetra Tech CCC 10 Report did not demonstrate the feasibility of CCC at IPEC.

11 A: In addition to the known problems and risks associated with Tetra Tech's 12 ClearSky proposal described above, important detail is missing from the Tetra 13 Tech CCC Report, without which Tetra Tech's proposal cannot be considered 14 feasible. Indeed, the missing information creates considerable uncertainty and 15 raises fundamental reliability concerns that are unacceptable for any large-scale 16 construction project in the nuclear industry. For example, the Tetra Tech CCC 17 Report acknowledges that "[a] massive volume of blasting spoils, approximately 18 2 million cubic yards, will need to be removed from the site" over the course of a 19 "3 to 4 year blasting and excavation period." See Tetra Tech CCC Report at 33.

20 The Tetra Tech CCC Report, however, did not include any blasting plans for rock 21 excavation, a detailed construction schedule, or a sufficiently robust assessment of 22 expected plant impacts associated with such blasting and excavation. And, 23 although Tetra Tech acknowledged that the Algonquin Pipeline would need to be S

PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 relocated before blasting could begin for the Unit 3 tower, it did not identify how 2 or where to relocate the pipeline. Without resolving this siting conflict, Tetra 3 Tech's proposed location for the Unit 3 cooling towers cannot be considered 4 feasible.

5 In addition, Tetra Tech failed to perform any transient or accident analysis 6 for IPEC post-CCC retrofit. A review of the transient and accident analysis is 7 necessary for any significant plant change to ensure that there are no potential 8 impacts to the operation of any nuclear power plant. In fact, as set forth in 2013 9 ENERCON CCC Response, Burns and Roe identified and analyzed one transient 10 condition-high pressure steam dump (50% load rejection) at Unit 3-that would 11 exceed the condenser's operational limits and would require either additional 12 ClearSky cells or other substantial means to reject additional heat load. The 13 transient condition analyzed by Bums and Roe is just one of several transient 14 conditions that must be evaluated prior to reaching a feasibility determination.

15 Without identifying and resolving potential transient and accident conditions, the 16 feasibility and operability of the Tetra Tech's CCC configuration has not been 17 demonstrated.

18 Further, Tetra Tech did not provide basic details needed to validate 19 whether its assumptions about the number of cells and size of its proposed cooling 20 towers are valid. Most notably, Tetra Tech did not identify the type of fill 21 material and/or address fill degradation impacts over time for the proposed 22 ClearSky towers. "Fill" is installed into the cooling towers themselves and is 23 used to increase the surface area and the contact time between the heated water PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 and the cooling air. In other words, fill is the medium that facilitates and 2 determines the heat transfer from the towers, and the selection and identification 3 of the proper fill is one of the most critical components in any cooling tower 4 design. In addition, the fill selected by Tetra Tech may be susceptible to fouling, 5 which will degrade cooling tower performance and potentially jeopardize the 6 structural integrity of the cooling towers. The potential for fill fouling is a 7 particular concern with Tetra Tech's proposal because, as I stated above, it 8 proposes to operate the cooling towers at three (3) cycles of concentration, which 9 means that the level of total dissolved solids ("TDS") in the cooling water will be 10 three times as high as the level in the Hudson River, thereby increasing the risk 11 for fouling and operational impacts. Without a cooling tower fill selection, it is 12 simply not possible to determine if the cooling towers proposed by Tetra Tech are 13 feasible for continuous operation at IPEC or if the size, performance, cost and 14 schedule information for the cooling towers is appropriate.

15 Finally, there is the potential for detrimental operational impacts on the 16 plant that were not adequately analyzed by Tetra Tech. Tetra Tech's report did 17 not include any Performance Evaluation of Power System Efficiency (PEPSE) 18 model results or Seasonal Annual Cooling Tower Impact (SACTI) model results.

19 PEPSE is the industry standard heat balancing and hydraulic modeling software 20 used at nuclear power plants to evaluate potential operational impacts associated 21 with changes to the design of the plant. SACTI is a modeling software used to 22 model where the cooling tower plume migrates after being exhausted from the 23 towers and therefore allows better understanding of the operational impacts of PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 that moist, hot plume. While other models can be employed, Tetra Tech used no 2 modeling to establish the scope and scale of operational impacts, a real concern-3 particularly at a nuclear facility-that must be addressed before feasibility can be 4 determined. Moreover, with respect to Tetra Tech's claim that the ClearSky 5 towers are "plume abated," ClearSky towers rely on novel and proprietary PVC 6 heat exchanger packs to re-condense moisture that would otherwise exit in the 7 exhaust. Tetra Tech failed to provide any information regarding the tower's heat 8 exchangers or associated maintenance history, and no corroborating information 9 has been provided that such plume-abatement technology would be an appropriate 10 choice at IPEC.

II IV. SALINITY REPORT AND CONCLUSIONS 12 Q: Please describe the purpose of the Salinity Report.

13 A: Generally speaking, the purpose of the Salinity Report was to evaluate how the 14 salt content of the Hudson River at IPEC would lead to exceedances of applicable 15 air quality limits based on the operation of the circular hybrid mechanical draft 16 cooling tower arrangement discussed in the reports entitled, Economic and 17 Environmental Impacts Associated with Conversion of Indian Point Units 2 and 3 18 to a Closed-Loop Condenser Cooling Water Configuration, dated June 2003 19 (Entergy Ex. 7A) and Engineering Feasibilityand Costs of Conversion of Indian 20 Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 21 dated February 12, 2010 (Entergy Ex. 7). 1 understand that no party to the 22 Proceedings is advancing the circular hybrid mechanical draft cooling towers 23 discussed in those reports. However, because no air quality impact analysis has 24 been conducted by Tetra Tech or provided by NYSDEC Staff, here I summarize PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 the conclusions in the Salinity Report that Enercon drew with respect the site-2 specific barriers to large-scale CCC conversion at IPEC based on the relevant, 3 available information concerning the salinity of the Hudson River.

4 Q: Why would the salt content of the Hudson River affect cooling tower 5 performance at IPEC?

6 A: Although conversion of Unit 2 and Unit 3 to CCC would reduce the water intake 7 currently required by the facilities, a continuous supply of water would still need 8 to be withdrawn from the Hudson River for CCC makeup and blowdown 9 requirements. I understand from Theodore Main at TRC that the salinity of the 10 makeup water in a CCC system is a primary contributing factor to air emissions, II which can lead to violations of national ambient air quality standards ("NAAQS")

12 and Significant Impact Levels ("SIL"). In addition, the manufacturer of the 13 cooling towers evaluated in Enercon's 2010 CCC report, SPX, recommends that 14 the TDS (i.e., salt) concentration remain below 5000 ppm, and notes that 15 concentrations above those levels can affect thermal performance of the cooling 16 towers. See Entergy Ex. 310 at 52.

17 Q: How was the concentration of salt in the Hudson River in the vicinity of 18 IPEC calculated in the Salinity Report?

19 A: As set forth in Appendix F to the Salinity Report, Applied Science Associates, 20 Inc. (now RPS ASA) ("ASA/RPS") provided a long-term data set of Hudson 21 River salinity in the vicinity of IPEC based upon 10 years of modeled Hudson 22 River salinity data for the period 2000 - 2009 in one hour increments. Because 23 direct measurements of salinity at IPEC are not made, ASA/RPS developed a PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 statistical analysis of data collected every 15 minutes by the U.S. Geological 2 Survey (USGS) at three locations: Hastings-on-Hudson, Tomkins Cove, and 3 West Point. The Hastings station is located 21 miles downstream of IPEC and 4 has been continuously operating since 1992. The West Point station is located 9 5 miles upstream of IPEC and has been operating since 1991. The Tomkins station 6 was located I mile downstream of IPEC, but was discontinued in 2001. Based on 7 that statistical analysis, a decadal (2000-2009) salinity time series at IPEC (which 8 was assumed to be equivalent to that at Tomkins) was generated to provide a 9 long-term estimate of salinity under a variety of environmental conditions.

10 Q: What did Enercon do with the results from ASA/RPS's salinity analysis?

11 A: First, Enercon determined that the most practical flow scenario for CCC would 12 utilize 1.5 cycles of concentration (not the three cycles of concentration selected 13 by Tetra Tech). Second, TRC calculated the maximum salt concentration of CCC 14 water that would allow cooling tower emissions at a drift rate of 0.001% to not 15 violate PM, 0 and PM 2 5 NAAQS and SILs. Enercon then used the information 16 provided by ASA/RPS and TRC to determine whether CCC could be operated in 17 a manner to keep the concentration of salinity in the cooling water below the 18 thresholds identified by TRC.

19 Q: Briefly summarize the conclusions of the Salinity Report.

20 A: Based on the salinity information provided by ASA/RPS and the emissions limits 21 provided by TRC, CCC cannot be operated year round at IPEC without violating 22 air emission limitations. For purposes of our analysis, we assumed that it would 23 be feasible to revert from closed-loop to once-through operation when salinity PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING 1 levels would lead to air quality exceedances and that such a determination could 2 be made on a weekly basis-although the Tetra Tech CCC Report does not 3 contemplate that type of switch-over mechanism and a weekly switch-over would 4 be impractical for actual station operation based on input from Entergy.

5 Nevertheless, and with those assumptions, the Salinity Report concluded that in 6 order to avoid exceeding the PM 2 .5 NAAQS and PM 2 .5 SIL, operation of closed-7 loop cooling would be expected to occur no more than 43% and 13% of the year, 8 respectively. Although it would be operationally and economically infeasible to 9 run a nuclear facility under such restrictions, Dr. Young has used this information 10 to update the estimated reductions in entrainment and impingement losses that II would be achievable under these scenarios, provided as Appendix D to the 12 Salinity Report.

13 V. QUALIFICATIONS AND 14 SUFFICIENCY OF METHODS, DATA AND CONCLUSIONS 15 Q: Please describe your educational and professional qualifications, including 16 relevant professional activities.

17 A: I previously described my academic background, relevant specializations and 18 work experience in prefiled direct testimony that I have submitted in these 19 Proceedings during administrative hearings in Albany, New York on October 17, 20 2011. I refer to and incorporate that testimony by reference in this prefiled 21 testimony. In addition, I have previously provided a copy of my curriculum vitae 22 (Entergy Ex. 49).

23 Q: In your professional opinion, did Enercon's review of Tetra Tech's proposed 24 CCC configuration reliably apply procedures and methodologies generally PREFILED TESTIMONY OF SAM BEAVER CLOSED CYCLE COOLING I accepted in the engineering community concerned with evaluating the ability 2 to.successfully install and operate a technology?

3 A: Yes, the engineering review performed by Enercon of Tetra Tech's proposal was 4 no different than numerous other engineering reviews Enercon has performed for 5 nuclear facilities in the past.

6 Q: In your professional opinion, did the Salinity Report reliably apply 7 scientifically accepted principles to estimate CCC operational limitations due to 8 air quality exceedances based on the salinity of the Hudson River?

9 A: Yes, as is typical in engineering projects, the Salinity Report relies on input from 10 specialized experts-TRC (air quality and regulations), ASA1RPS (salinity in the 11 Hudson River) and Enercon (operation of CCC)--to reach a conclusion 12 concerning the limitations with operating CCC due to Hudson River salinity and 13 air quality regulations.

14 Q: In your professional opinion, did the Salinity Report have sufficient data to 15 reach reliable and scientifically sound conclusions to estimate CCC 16 operational limitations due to air quality exceedances based on the salinity of the 17 Hudson River?

18 A: Yes.

19 Q: Do you hold your opinions to a reasonable degree of engineering certainty?

20 A: Yes.

END OF TESTIMONY Exhibit B 2

STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and DEC No.: 3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC SPDES No.: NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s 3-5522-00105/00031 (IP3)

Joint Application for CWA § 401 Water Quality Certification PREFILED REBUTTAL TESTIMONY OF SAM BEAVER IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.

CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC, AND ENTERGY NUCLEAR OPERATIONS, INC.

By its attorneys, L

IPý-4A Elise N. Zoli I

John C. Englander Kevin P. Martin Goodwin Procter LLP 53 State Street Boston, Massachusetts 02109 Tel.: 617.570.1000 Fax: 617.523.1231 March 28, 2014 I

Table of Contents I. INTRODUCTION ......................................................................................................... 1 II. BACKGROUND AND CONTEXT FOR RETROFITTING IPEC WITH CLOSED-CYCLE COOLING ....................................................................................... 3 III. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE FEASIBILITY OF RETROFITTING IPEC WITH CLEARSKY COOLING T O W ER S ........................................................................................................................... 13 IV. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE FEASIBILITY OF RETROFITTING IPEC WITH ROUND HYBRID COOLING TO W E R S ........................................................................................................................... 35 V. REBUTTAL TO CHARLES NIEDER ........................................................................ 41 VI. CONCLUSION ............................................................................................................ 43 0

i

1 I. INTRODUCTION 2 Q: Please state your name, current position, and business address.

3 A: My name is Sam Beaver. I am the Director of Project Management at Enercon 4 Services, Inc. ("Enercon"), an engineering, environmental, and technical 5 management services firm. My business address is 500 Townpark Lane, 6 Kennesaw, Georgia 30144.

7 Q: Are you the same Sam Beaver who provided prefiled direct testimony on 8 February 28, 2014 on behalf of Entergy in support of its application for 9 renewal of State Pollutant Discharge Elimination System ("SPDES") Permit 10 (DEC App. Nos. 3-5522-00011-00004 SPDES No. NY0004472) for Indian 11 Point Units 2 and 3 and the corresponding issue in the associated Water 12 Quality Certification ("WQC") proceeding, as it has been consolidated by 13 this Tribunal (collectively, the "Proceedings")?

14 A: Yes.

15 Q: Please state the purpose of your prefiled rebuttal testimony.

16 A: The purpose of my prefiled rebuttal testimony is to address certain portions of 17 the prefiled direct testimony of Eduardo Ortiz (Hatch) ("Ortiz Direct"), Tim 18 Havey (Tetra Tech) ("Havey Direct"), and William Charles Nieder (NYSDEC 19 Staff) ("Nieder Direct"). Specifically, my rebuttal testimony responds to the 20 prefiled direct testimony of Mr. Ortiz and Mr. Havey that relates to the 21 engineering feasibility of retrofitting either or both Indian Point Energy Center, 22 Unit 2 and Unit 3 (collectively, "IPEC"), with eighty-eight (88) back-to-back 23 ClearSky cooling towers, forty-four (44) cells at each of Unit 2 and Unit 3, as 24 described in the report prepared by Tetra Tech entitled Indian Point Closed-1 Cycle Cooling System Retrofit Evaluation, dated June 2013 (the "Tetra Tech 2 CCC Report"); and two (2) round hybrid cooling towers, one at Unit 2 and Unit 3 3 respectively, as described in the initial report prepared by Enercon entitled, 4 Economic and Environmental Impacts Associated with Conversion of Indian 5 Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 6 dated June 2003 (Entergy Ex. 7A) ("ENERCON 2003") and as more intensively 7 reviewed in the report entitled EngineeringFeasibility and Costs of Conversion 8 of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water 9 Configuration, dated February 12, 2010 (Entergy Ex. 7) ("ENERCON 2010";

10 collectively, the "ENERCON Closed-Loop Cooling Reports"). My rebuttal 11 testimony also responds to the portion of Mr. Nieder's testimony that discusses 12 the expected operational and maintenance ("O&M") costs of Entergy's 13 cylindrical wedgewire screen ("CWWS") proposal. I have reviewed the prefiled 14 direct testimony of each of these individuals, as well as the identified materials 15 on which each of these individuals relies (to the extent it was provided).

16 Q: How is your rebuttal testimony organized?

17 A: First, I provide some general background and context about how engineers 18 address feasibility questions at nuclear power plants, and how this context relates 19 to my conclusions regarding the inherent challenges to the feasibility of 20 retrofitting Unit 2 and Unit 3 with a closed-cycle cooling system during the 21 license renewal period. Second, I address specific statements in Messrs. Ortiz 22 and Havey's testimony concerning the feasibility of Tetra Tech's ClearSky 23 cooling tower configuration, with a focus on misimpressions and errors in that 0

1 testimony and therefore their respective conclusions. Third, I address Messrs.

2 Ortiz and Havey's testimony as it relates to the feasibility of retrofitting IPEC 3 with round hybrid cooling towers, with the same focus. Finally, I respond to Mr.

4 Nieder's argument that O&M costs for Entergy's proposed array of CWWS are 5 likely to be significant.

6 II. BACKGROUND AND CONTEXT FOR RETROFITTING IPEC WITH 7 CLOSED-CYCLE COOLING 8 Q: Please describe what engineering feasibility means in the context of 9 retrofitting a nuclear power plant with a new cooling water system?

10 A: The "feasibility" of retrofitting power plants with a new cooling water system 11 depends on two related considerations. First, the technology that is chosen for 12 the retrofit must be available. As I testified in October 2011, "availability" 13 means that technology is used in the industry for which it is intended on a regular 14 basis, with an adequate design, construction and operational history to allow an 15 engineering assessment with a reasonable level of confidence. The second 16 consideration is whether an otherwise "available" technology can be installed 17 and operated at a particular site, based on the relevant considerations at that site, 18 with a reasonable level of engineering certainty.

19 The need for a reasonable level of engineering certainty is particularly 20 acute in the nuclear industry for two reasons. First, nuclear powered electric 21 generating power plants-as baseload suppliers-are designed to operate (to 22 produce power in the form of electricity) on a consistent, reliable basis. Second, 23 the regulatory structure for nuclear power plants and the safety consciousness of 24 nuclear engineers and operators place a high priority on consistent operations in 1 accordance with design parameters. Excursions (that is, atypical operations),

2 including conditions that may increase the likelihood of excursions, are strongly 3 disfavored by NRC and plant personnel alike. This has two direct implications 4 for the major retrofit proposed by NYSDEC Staff for IPEC: (1) relevant, 5 demonstrated operational experience in a comparable dynamic is typically 6 necessary for a technology to be installed, particularly major equipment essential 7 for plant operation; and (2) actual retrofitting history is preferred before reaching 8 an "engineering feasibility" conclusion. At nuclear power plants, novel and 9 unproven technologies are generally not considered available.

10 As it is relevant to this phase of the Proceedings, to reach a conclusion 11 about the engineering feasibility of retrofitting IPEC with closed-cycle cooling, 12 an engineer with nuclear design and operational experience would have to 13 conclude that it is likely that the retrofit can be completed and function without 14 major adverse impacts within the remaining plant operational period (that is, the 15 twenty-year license renewal period). If, for instance, it is reasonably foreseeable 16 that construction will not be completed in a timeframe to allow operation of the 17 equipment for a substantial period of time before the end (respectively, in 2033 18 and 2035) of the license renewal period; that construction will result in unit shut-19 downs of substantial duration; that operation will result in measurable and 20 significant power losses; or that there is a heightened risk of incidence of 21 excursions, then an experienced nuclear engineer would not consider the closed-22 cycle cooling retrofit to be a practically feasible.

1 Q: To understand the implications of an engineering feasibility determination 2 for retrofitting IPEC with cooling towers, is it helpful to understand the 3 physical constraints of the IPEC site?

4 A: Yes. Background information is essential to understanding how disruptive and 5 intrusive it would be to retrofit the existing IPEC stations.

6 Both IPEC Units sit on a combined 239 acres, which represents one of the 7 most site-constrained nuclear power plants that I have worked on in my over 8 thirty years of experience. The site topography is challenging, spanning an 9 elevation from the River up to approximately 150 feet. As a result of the 10 topography challenges and the substantial subsurface rock shelf that rises 11 beneath and behind the Stations, within the 239 acre site only 128 acres is readily 12 usable for major structures, and that area already has been developed. Further, 13 all major structures and equipment representing the main power block are 14 contained in a central area of approximately 25 acres located along the 15 Riverfront. Because the two operating unit and one shut down unit share the 16 Riverfront area and given the number of plant systems located in this area, there 17 is a very high density of equipment and structures in this defined area - in fact, 18 the density is visible to even the casual observer. Entergy Ex. 351 is a recent 19 aerial photograph of the IPEC site. The Unit 2 and Unit 3 containment buildings 20 are the two tallest domed structures, with their respective power house unit 21 immediately in front of (closest to the River) the containment buildings. Unit 1 22 is the shorter domed-building between Unit 2 and Unit 3. What is not visible, 23 but is as important, is the substantial underground network of major piping, 1 ranging up to 8-feet in diameter, as well as numerous cabling duct banks and 2 conduits, that runs throughout the Riverfront area. What this means is that the 3 addition at IPEC of any new large-scale structures, particularly those involving 4 the addition of new underground piping, is a challenge from the outset. As a 5 result, any comparisons to "greenfield" design and construction projects for 6 similar components (i.e., usage of cooling towers for new nuclear units currently 7 under construction) would be inappropriate and misleading from an engineering 8 perspective.

9 In fact, even Tetra Tech has recognized the "important role" the size of the 10 property plays in determining whether a retrofit to cooling towers is feasible.

II See Memorandum from Kelly Meadows, Tetra Tech to Paul Shriner, EPA, dated 12 Feb. 28, 2011, at 1 (Entergy Ex. 356). In a memorandum from Tetra Tech to 13 EPA, dated February 28, 2011, Tetra Tech documented the approximately 73 14 sites visited by EPA in 2011 as part of the proposed § 316(b) rulemaking. Tetra 15 Tech noted that facilities that have a ratio of 160 acres per 1,000 MWs "should 16 have ample space to construct retrofit cooling towers." Id. at 1-2. Here, 17 assuming all of IPEC's 239 acres is available for a retrofit, IPEC's "ratio" is 110 18 acres per 1000 MW, which by EPA's and Tetra Tech's own definition would 19 make it among the most space-constrained site visited by in the Tetra Tech 20 review. As stated above, only 128 acres of the IPEC site is readily useable for 21 major structures, making the site even more constrained in Tetra Tech's terms 22 further lowering the sites effective acreage. See id. at 3 (discussing the "effective 23 acreage" of the McDonough Power Plant).

1 Q: Is there any additional background information that informs your analysis of 2 the feasibility of retrofitting IPEC with closed-cycle cooling?

3 A: Yes. It is also essential to consider the way nuclear units, such as IPEC, are 4 designed and operated. Nuclear power plants, like IPEC, generate electricity 5 through the use of two major categories of systems which convert heat generated 6 in the reactor core into electrical power for commercial use: (1) a closed, 7 pressurized "Reactor Coolant System" (primary systems), (2) and a "Steam and 8 Power Conversion System" (secondary systems). Figure 1.1 in Entergy Exhibit 9 7 (pg. 2) depicts the basic configuration of IPEC-type pressurized water reactors.

10 In the primary system, reactor coolant is heated by nuclear fission in the reactor.

11 The thermal energy generated in the reactor core is then transferred to steam 12 generators where steam is generated in the secondary system and utilized to drive 13 the turbine generator, where it is converted into electricity. The primary and 14 secondary systems are physically separated in the steam generator, minimizing 15 radioisotope transfer to the secondary system.

16 At IPEC, each unit has a multistage turbine comprised of one high-17 pressure turbine and three low-pressure turbines. After passing through the 18 turbines, the steam passes to the main condenser to allow it to be cooled and 19 condensed back into feedwater that can be pumped back through the steam-20 generators in what is effectively a closed loop system.

21 Importantly, the Unit 2 and Unit 3 main condensers are operated in a 22 vacuum in order to optimize plant performance by facilitating the flow of steam 23 through the low-pressure turbines. Even a slight increase in pressure in the 1 condensers, referred to as condenser "backpressure," can have an appreciable 2 impact on the efficiency of the plant and, in some instances, lead to excursions or 3 forced plant shutdowns.

4 Q: How do the Unit 2 and Unit 3 condensers convert the steam exhaust back 5 into feedwater?

6 A: The purpose of the main condenser is to absorb heat contained in the expanded 7 exhaust steam after exiting the low pressure turbines. Cold circulating water 8 flows through the condenser tubes to condense the steam back into water. Unit 2 9 and Unit 3 were designed and constructed with a once-through circulating water 10 system, and reflect a highly specialized design analysis, a "heat balance" that 11 accounted for the qualities of the existing cooling water source, here the Hudson 12 River, to accommodate the heat rejection of the main steam system for each 13 Unit. In other words, the turbines and condenser design rely on the low-14 temperature of the River water, as does efficient performance of the plant. The 15 design rate for each Unit's circulating water system is 840,000 gallons per 16 minute ("gpm"). For obvious reasons, the IPEC condenser cooling systems are 17 essential plant equipment. As I stated in my previous prefiled testimony, dated 18 July 22, 2011, which I fully incorporate by reference here, and by way of 19 analogy, if the reactor is the heart of IPEC, then the cooling system is its lungs-20 providing the necessary cooling for the system to function properly.

21 Given that IPEC's condensers and turbines were specifically designed and 22 constructed as a once-through cooling system utilizing cold River water, any 23 retrofit of IPEC to a closed-loop cooling system that results in higher circulating 1 water temperatures and/or lower flows will result in inherent impacts to the 2 plant. Here, it is unavoidable that a shift to closed-cycle cooling will result in 3 higher circulating water temperatures and lower flows that challenge plant 4 performance and operations. For this reason, any proposal for closed-cycle 5 cooling must rely on the requisite heat balance analysis to demonstrate that 6 performance and operational impacts are known, manageable and not too 7 significant The twin dynamic of higher circulating water temperature and lower 8 flows (as discussed below) represents a particular challenge to Station 9 performance and functionality.

10 Q: What are the inherent impacts with retrofitting IPEC to a closed-cycle 11 cooling system?

12 A: Retrofitting a nuclear plant constructed in the 1970s with a once-through cooling 13 system to a closed-cycle cooling system will impact virtually every aspect of 14 IPEC's circulating water system. First, less water will be available to run 15 through the condensers. The design of both the ClearSky and round hybrid 16 towers decrease the maximum available circulating water from 840,000 gpm to 17 700,000 gpm-a 16.7% reduction. Second, the temperature of the circulating 18 water entering the condensers to cool the steam will be higher at the most critical 19 times, namely during the summer when cooling need is the greatest. The 20 reduction in water and increase in circulating water inlet temperatures increase 21 condenser back pressure of both Unit 2 and Unit 3. See Entergy Ex. 7A at 20 22 (Figure 3.2 and 3.3). Third, the water pressure in the condenser tubing will be 23 measurably higher in a closed-cycle cooling configuration as compared to the 1 existing once-through cooling system. This is a particular concern with the Tetra 2 Tech proposal which, while within the technical design limits for the condenser, 3 calls for the circulating water to be at a materially higher pressure than the 4 Stations have ever operated under, which introduces additional uncertainty in 5 plant operations and equipment service life.

6 Finally, closed-cycle cooling creates significant and costly parasitic losses 7 that further affect the ability of the plant to generate power efficiently. These 8 losses are attributable to the extra energy required to pump the circulating water 9 to the elevated cooling towers and operate the fans in the cooling towers 10 themselves.

11 Q: Please briefly summarize what would be required in order to retrofit IPEC 12 with closed-cycle cooling.

13 A: In addition to the construction of the cooling towers themselves and the 14 extensive piping that would be needed to supply and return circulating water to 15 and from those towers, retrofitting IPEC to closed-cycle cooling will require 16 reconfiguring the current circulating water system to hold the considerable 17 volume of water necessary to ensure reliable operation of the cooling towers. In 18 the current once-through configuration, after the circulating water passes through 19 the condensers, it is discharged into a canal that runs along the shoreline in front 20 of the Unit 2 and Unit 3 power houses, eventually joining the River on south end 21 of the facility. The discharge canal extends from the Unit 2 power house, where 22 circulating water from the Unit 2 condenser and Unit 2 service water is 23 discharged. The Unit 2 discharged water flows past Unit 3 where the Unit 3 1 service and circulating water is discharged, and the combined flow is returned to 2 the River.

3 In order to retrofit IPEC to a closed-cycle cooling configuration and to 4 hold sufficient water to meet the Unit's combined flow rate of 1.4 million gpm 5 (assuming 700,000 gpm per Unit) of circulating water, the existing discharge 6 canal must be converted into a hot water reservoir that can hold approximately 7 10.7 million gallons of water. See Entergy Ex. 7 at 12. After modification, the 8 Unit 2 and Unit 3 reservoirs would hold over 4.2 million and 6.5 million gallons 9 of circulating water, respectively. Id. The makeup water source for the hot water 10 reservoir is the service water discharge, with Unit 2's service water discharged 11 into the Unit 2 reservoir, and Unit 3's service water discharged into the Unit 3 12 reservoir. New circulating water pumps would be installed in each reservoir that 13 would pump the hot water from each reservoir to its respective cooling tower. To 14 accommodate the additional capacity and to meet the new circulating pump 15 submergence requirements, the current discharge canal in front of Units 2 and 3 16 will need to be excavated. The excavation and construction of the new reservoirs 17 requires a 42 week concurrent construction outage for both IPEC units. As Tetra 18 Tech acknowledged in its July 6, 2010 memorandum, "[t]he obstacles presented 19 by reconfiguring the existing discharge canal to function as a main component of 20 the new cooling system are correctly cited by Enercon as unavoidable. There do 21 not appear to be any practical means to significantly decrease this estimate."

22 Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris I Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 3 2 (Staff Ex. 214, Appendix B).

3 As noted above, the discharge canal is also used by the service water 4 system, which serves a nuclear safety function, and which cannot be impacted by 5 the proposed retrofit. Because the design utilizes services water to provide 6 cooling tower makeup at IPEC, and the combined service water discharge will 7 likely exceed the cooling towers' make-up water needs, the reservoir weirs will 8 facilitate the overflow of excess water (that is, water not pumped to the cooling 9 towers) back to the River. The excess water that overflows the Unit 2 and Unit 3 10 reservoirs is in essence the cooling tower "blowdown," which is the intentional 11 release of circulating water used to control the cycles of concentration of the 12 system (i.e., the number of times suspended and dissolved sediment are 13 concentrated above ambient River levels). Thus, when the service water 14 discharge exceeds the makeup needs of the closed-cycle system, water will 15 overflow from the reservoirs, which will represent the blowdown of the system.

16 For both the round hybrid towers and Tetra Tech's ClearSky towers, there is no 17 method by which the blowdown rate (or content of the blowdown) can be 18 controlled. I understand that Tetra Tech has also included additional piping that 19 will siphon cooling water from the pipes running from the cooling towers to the 20 condensers and discharge it in the discharge canal beyond the Unit 3 weir.

21 Q: Are there any examples of operating nuclear power plants that were 22 designed for once-through cooling that were retrofitted as a closed-cycle 23 cooling?

1 A: No. No nuclear power plant that has been designed, constructed, and operated 2 with a once-through cooling system has ever been retrofitted into a closed-loop 3 cooling system. While certain individuals may occasionally reference Palisades 4 Nuclear Power Plant as a "retrofit," as Tetra Tech explains in its November 18, 5 2009 memorandum on page 5, the so-called retrofit was "planned and completed 6 before initial operation." See Memorandum from Tim Havey, Tetra Tech, Inc. to 7 Chris Hogan, NYS Department of Environmental Conservation, dated Nov. 18, 8 2009 at 5 (Staff Ex. 214, Appendix B). The importance of the absence of any 9 successful conversion from once-through to closed-cycle cooling to a feasibility 10 assessment cannot be overstated. Unless a given unit's condenser is specifically 11 designed to utilize cooling water temperatures as provided by cooling towers, 12 there will be a compromise in unit operating efficiency and hence performance.

13 The complete absence of any practical history of closed-loop cooling retrofits at 14 nuclear facilities and the associated impacts on the circulating water system and 15 condensers renders such a project subject to an unacceptably high degree of 16 uncertainty.

17 Il. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 18 FEASIBILITY OF RETROFITTING IPEC WITH CLEARSKY COOLING 19 TOWERS 20 Q: With that background, let us now discuss some of the specific challenges to 21 the Tetra Tech ClearSky cooling tower configuration discussed by Messrs.

22 Havey and Ortiz in their prefiled direct testimony. First, did Messrs. Havey 23 and Ortiz offer any opinion(s) concerning the feasibility of retrofitting IPEC 24 Units 2 and 3 with ClearSky cooling towers?

1 A: Yes. Mr. Havey testified that Tetra Tech's proposal to retrofit IPEC Units 2 and 2 3 with 44 ClearSky plume-abated cooling towers is a "practicalalternative for a 3 closed-cycle cooling retrofit at IPEC apart from the circular hybrid cooling 4 towers initially proposed by Enercon." Havey Direct at p. 13, 1. 9-13 (emphasis 5 added). Mr. Ortiz similarly testifies that "[b]ased on a preliminary review, and 6 subject to the limitations previously stated, the installation of a closed loop 7 system was determined to be technically feasible," Ortiz Direct at p. 6, 1. 17-19, 8 and "[b]ased on the conclusions of the Hatch 2012 Report and subject to the 9 limitations previously outlined, no major issues or deficiencies were identified by 10 Hatch with respect to the technical feasibility of transferring from a once-through 11 cooling system to a closed loop cooling system using the ClearSky TM cooling 12 tower system." Id. atp. 8,1.21 -p. 9 , 1. 2 .

13 Q: Do you agree with Mr. Havey that Tetra Tech's ClearSky cooling towers are 14 a "practical alternative" at IPEC?

15 A: No. Mr. Havey is not an engineer, and it does not appear that he has any relevant 16 engineering experience with large-scale modifications to power plants, let alone 17 nuclear power plants. His degree is in environmental science and public policy 18 and it appears the extent of his relevant experience consists of performing 19 reviews of similar "feasibility analys[e]s" in California. To an engineer, there is 20 nothing "practical" about retrofitting a forty-year-old baseload nuclear power 21 plant on a constrained site with challenging topography with closed-cycle 22 cooling. As I testified above, no nuclear facility originally designed for and 23 operated with once-through cooling has been retrofitted with a closed-loop 0

1 cooling system. Here, Unit 2 and Unit 3 were both designed and constructed in 2 the mid-1970s with turbines and condensers that were specifically designed for 3 cold Hudson River water that cannot be replicated with closed-cycle cooling 4 under maximum thermal load conditions.

5 Even more problematically, Tetra Tech has selected novel and unproven 6 ClearSky cooling towers as the centerpiece of its proposed retrofit. Mr. Havey 7 provides no performance data from the test cell that has operated approximately 8 seven (7) years in the New Mexico desert at the San Juan Generating Station. In 9 fact, the only study of ClearSky cooling towers is from a Department of Energy 10 ("DOE") grant for that single test cell, and even the DOE recognized, in 2009, 11 the unproven nature of the technology. At the time, the towers were referred to 12 as Air2Air:

13 SPX Cooling Technologies is presently investigating the 14 Air2Air( for evaporative cooling towers (Figure 1) under 15 the U.S. Department of Energy (DOE) Grant No. DE-16 FC26-06NT42725. The preliminary findings from the 17 research are encouraging in that the basic principles behind 18 the technology are sound and the water savings are 19 substantial. However, in the course of executing this 20 project, construction costs of the validation cell (Figure2) 21 exceeded expectations. To be economically viable, more 22 research is required to develop an efficient heat transfer 1 pack and redesign the overall geometry of the tower 2 includingpack orientationand superstructure.

3 U.S. Dept. of Energy, Improvement to Air2Air Technology to Reduce Fresh-4 Water Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants, 5 ProMIS/ProjectNo.: DE-NT0005647 (Jan. 2009) (Entergy Ex. 357) (emphasis 6 added). As evident from the title of the study, the experimental ClearSky 7 technology originally had a specific focus which was to promote cooling tower 8 applications in arid areas via reduction of fresh water evaporative cooling loss, 9 which is largely irrelevant to the IPEC application.

10 Accordingly, SPX undertook a second study under a DOE grant award 11 from October 1, 2008 through December 31, 2011 with the objective to "further 12 enable Air2Air becoming a commercially viable water savings and plume 13 abatement technology by researching a re-engineered pack, testing improvement 14 provided by modification, and prototyping the pack manufacture to improve pack 15 economy, as it relates to superstructure volume, cost, pack orientation, and 16 ducting details." See Final Report, Improvement to Air2AirTM Technology to 17 Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 18 Power Plants (June 30, 2012) (Entergy Ex. 359) at 5. The final report, dated 19 June 30, 2012, detailed SPX's efforts under the research grant to "prototype" and 20 "adjust our design and propose new experiments as we proceeded in the 21 program." Id. at 24, 30. Based on these adjustments, even SPX acknowledged 22 that its first commercial products were not available until 2012. See id. at 25-26.

1 As I stated in my prefiled direct, only two ClearSky installations recently (i.e.,

2 within the last six months) became operational.

3 Further, none of the small-scale operational ClearSky towers are 4 representative of the 44 back-to-back cells proposed for each Unit at IPEC.

5 Although no operational information has been provided by Tetra Tech for SPX's 6 test cell, it is apparent that the water quality and environmental conditions at the 7 location of the test cell in New Mexico are very different than water quality of the 8 Hudson River and environmental conditions in Buchanan, New York. In fact, as 9 far as I know, there is no operating brackish water application of a ClearSky 10 cooling tower. Tetra Tech, therefore, is not only proposing a modification that 11 has never been done at a nuclear facility before-converting from once-through to 12 closed-cycle cooling-but it proposes to do so using unproven cooling tower 13 technology.

14 Q: Do you agree with Mr. Ortiz's testimony that the ClearSky configuration 15 proposed by Tetra Tech "was determined to be technically feasible"?

16 A: It is not clear to me how Mr. Ortiz can offer this opinion. Mr. Ortiz does not 17 appear to have any relevant engineering experience performing modifications at 18 a nuclear power plant, much less modifications associated with cooling tower 19 applications. Rather, Mr. Ortiz is a "Piping Engineer" who has "worked in the 20 pulp and paper, petrochemical and mining industries." Staff Ex. 247 at 1.

21 Moreover, the basis for Mr. Ortiz's opinion is unclear in light of the admission in 22 the first page of his testimony that he "ha[d] no firsthand knowledge of this 23 project ....." Ortiz Direct at p. 1, 1. 19-23. As a result, all of his direct testimony 1 is "based on [his] personal observations and interpretations of the project files, 2 reports, and conversations with former members of this project." Id. Mr. Ortiz 3 never identifies any employees at Hatch that actually have firsthand knowledge 4 of Hatch's review of the ENERCON Closed-Loop Cooling Reports or the Tetra 5 Tech CCC Report, nor does he identify any of the "project files" other than the 6 four reports provided by the parties in this proceeding-ENERCON 2003, 7 ENERCON 2010, Tetra Tech CCC Report, and Hatch 2012. Throughout his 8 testimony, Mr. Ortiz offers opinions based upon his "review of ... report[s]

9 presented to [him]" or his "interpretation of the documents [he has] reviewed,"

10 and he acknowledges that "varying interpretations of [Hatch's] services may S1I exist." Id. Mr. Ortiz nevertheless goes on to say that, "based on [his] research 12 the direct testimony being provided is a reasonable interpretationof Hatch's 13 methods and findings." Id. at p. 1, 1.21-23 (emphasis added).

14 Accordingly, Mr. Ortiz does not appear to be offering his own opinion on 15 the feasibility of a closed-cycle cooling retrofit of IPEC, but his interpretation of 16 documents authored by and containing the opinions of unidentified Hatch 17 personnel. Further, Mr. Havey indicates that Hatch did not review ENERCON 18 2010 (SAIC did). See Havey Direct at p. 8, 1.20-22.

19 In addition, Mr. Ortiz's opinion and his review of the Tetra Tech proposal 20 is heavily caveated and "limited" in a manner that does not allow a reasonable 21 feasibility determination of the sort that represents the industry standard or 22 expectation. According to his testimony, Hatch expressly "did not analyze the 23 Algonquin pipeline feasibility assessment, nor did they review issues related to 0

1 potential groundwater radiological contamination, nor any visual assessment, 2 blasting, building or equipment relocations, the modification or addition of site 3 services, and air quality." Ortiz Direct at p. 6, 1. 6-10. These "limitations" 4 represent the majority of the most obvious and most significant challenges to the 5 feasibility of retrofitting IPEC with closed-cycle cooling. No reasonable 6 engineer could conclude that any closed-cycle cooling retrofit of IPEC is 7 technically feasible without addressing these items.

8 Q: You mentioned earlier that the ClearSky cooling towers represented a novel 9 and unproven technology. What response, if any, did Messrs. Havey and 10 Ortiz have to Enercon's concern about the novelty of Tetra Tech's ClearSky 11 cooling towers?

12 A: Neither Mr. Havey nor Mr. Ortiz address the fact that ClearSky cooling towers 13 employ novel technology with limited operating experience that presents a large 14 potential risk for a nuclear baseload facility, which should have eliminated the 15 ClearSky towers from consideration as a feasible technology. This lack of 16 response to a fundamental concern is unacceptable in the nuclear power industry, 17 which generally requires that technology choices be supported by demonstrated 18 and reliable operational experience.

19 In fact, Tetra Tech repeatedly and contemporaneously has rejected 20 ClearSky cooling towers as an unproven technology in reviews it has performed 21 for NYSDEC and the U.S. EPA for other non-nuclear power plants that operate 22 at a much smaller-scale than IPEC. For example:

23 0 Section 316(b) Rulemaking. As part of its § 316(b) rulemaking, EPA tasked 1 Tetra Tech and SAIC (who, according to Mr. Havey reviewed ENERCON 2 2010 in lieu of Hatch) with evaluating how costs for plume and drift 3 abatement technology, among other things, may be developed for a universe 4 of facilities potentially subject to CCC retrofits under the proposed existing 5 facility rulemaking. As part of that review, Tetra Tech evaluated ClearSky 6 cooling towers, and in its June 11, 2010 memorandum to EPA, concluded that 7 SPX ClearSky "technology has only been demonstrated on a full-scale basis at 8 a single location in New Mexico and remains a somewhat unproven 9 technology and may require time to develop acceptance within the industry."

10 Memorandum from John Sunda, SAIC, and Kelly Meadows, Tetra Tech to 11 Paul Shriner and Jan Matuszko, USEPA, dated June 11, 2010, at 8 (Entergy 12 Ex. 346) (emphasis added).

13 Glenwood Main Power Station. Tetra Tech was asked by NYSDEC to 14 conduct a technical review and evaluate the feasibility of various alternatives 15 at the Glenwood fossil fuel steam electric facility. In rejecting a cooling 16 tower configuration proposed by Powers Engineering (Riverkeeper's expert) 17 that would require only 12 ClearSky cells, Tetra Tech's technical review 18 repeated its EPA finding that ClearSky towers "ha[ve] only been 19 demonstrated on a full-scale basis at a single location in New Mexico and 20 remain[] an unproven technologyfor applicationssuch as this." Tetra Tech, 21 Inc., Glenwood Technical Review, at 4 (Entergy Ex. 348) (emphasis added).

22 Although the Tetra Tech's review of the Glenwood facility is undated, it 23 references documents there were published as late as 2010.

1 Northport Power Station. On January 28, 2010, NYSDEC requested 2 Northport's owner (National Grid) to provide "...an assessment of a back-to-3 back, linear array of towers, such as the SPX/Marley ClearSky TM tower 4 configuration for all four units." Washington Group International, Inc.,

5 National Grid Generation LLC, Response to NYSDEC's Request for 6 Additional Information Regarding Cooling Towers (July 1, 2010), at 1-1 7 (Entergy Ex. 349). In response, Washington Group International, a division 8 of URS Corporation, submitted a report concluding "the cooling tower 9 technology identified by NYSDEC for further study [ClearSky towers], is yet 10 unproven for application to generating stations such as Northport..." Id. at 2-11 1 ("[A] plume abatement cooling tower using an array of back-to-back cells, 12 such as the system referenced by the NYSDEC, is an unproven technology for 13 a generating station such as Northport. Therefore, there is a high degree of 14 uncertainty associated with its environmental impacts."); Letter from Timothy 15 Curt, National Grid Environmental Management to Colleen Kimble, NYS 16 Department of Environmental Conservation, dated July 1, 2010 at 4 (Entergy 17 Ex. 353) (same). The Washington Group went on to assert that "the tower 18 suggested by DEC is an unproven technology with no identified commercially 19 comparable installations to Northport." Entergy Ex. 349 at 2-6. Tetra Tech 20 performed the technical review of the Washington Group's report and 21 concluded, "[t]he report's conclusion that the Clear Sky Plume Abatement 22 System remains an unproven technology in this application has some merit, 23 but the analysis demonstrates that alternative cooling tower locations for

-21 -

1 towers arranged in a linear configuration could be found on-site albeit at 2 increased costs." Tetra Tech, Inc., Northport Technical Review at 3 (Entergy 3 Ex. 350) at 3.

4 Q: Earlier you mentioned site constraints at IPEC that would render retrofitting 5 the facility with closed-cycle cooling problematic. Did Messrs. Havey and 6 Ortiz address the site disruption of the Tetra Tech closed-cycle cooling 7 configuration?

8 A: No. Neither Mr. Havey nor Mr. Ortiz addressed how Tetra Tech or Hatch plans 9 to relocate the several existing essential structures that conflict with Tetra Tech's 10 proposed ClearSky towers. Mr. Havey testified that, with respect to siting 11 conflicts, the Tetra Tech CCC Report was "not intended to enumerate all 12 potential items that would be addressed in a final engineering and construction 13 plan. Their exclusion from the Tetra Tech 2013 report does not imply they are 14 immaterial or irrelevant for final design and cost estimates." Havey Direct at pg.

15 19, 1.20 - pg. 20, 1.3. Mr. Ortiz specifically testifies that Hatch did not analyze 16 "building or equipment relocations, [and] the modification or addition of site 17 services." Ortiz Direct at p. 6, 1.6-9. Mr. Ortiz went on to inexplicably assert 18 that such conflicts "cannot be studied in detail during the limited scope of a 19 feasibility report." Id. at p. 9, 1.21 - p. 10, 1.3.

20 Enercon has prepared Exhibit 373 which is an overhead aerial photograph 21 of the IPEC site showing the footprint of Tetra Tech's proposed cooling towers 22 for Unit 2 and Unit 3. As reflected on Exhibit 373, Tetra Tech proposes to locate 23 its cooling towers effectively on top of many essential buildings and structures.

1 Without these structures, IPEC would be unable to operate. By not 2 acknowledging these siting conflicts and developing a plan for relocating 3 essential structures, Tetra Tech's ClearSky towers cannot be considered feasible 4 at IPEC.

5 Q: I would like to focus on some of the specific site disruptions that were 6 identified by Enercon in the ENERCON 2013 CCC Response. First, how, if 7 at all, do Messrs. Havey and Ortiz propose resolving the potential issues with 8 groundwater contamination?

9 A: They do not address the issue. As I explained earlier, Tetra Tech's proposed 10 configuration calls for the existing discharge canal, which is parallel to the River 11 and the Unit 2 and Unit 3 power houses, to be converted into a hot water 12 reservoir and pump pit. In order for the reservoir to provide the necessary 13 submergence for proper operation of the new circulating water pumps, the 14 current Unit 2 discharge canal will need to be deepened considerably. As set 15 forth in the ENERCON 2013 CCC Response, this excavation is in the very 16 location where groundwater containing Tritium and Strontium has been 17 observed. See Entergy Ex. 42. To maintain dry conditions required for pipe 18 construction and backfilling, contaminated groundwater would need to be 19 continually pumped from the excavation area below the groundwater table (i.e.,

20 dewatering), which will have to be continued until completion of the excavation.

21 In fact, Mr. Havey admits that "the retrofit project for Unit 2 is heavily 22 dependent on finding an acceptable solution for dewatering the area during 23 excavation and construction" and "[i]t is my opinion that the plume area will 1 likely require sampling to determine what disposal and/or treatment methods, if 2 any, are most appropriate to manage dewatered groundwater and excavated 3 material." Havey Direct at p. 21, 1. 19 - p. 22, 1. 1 (emphasis added). Despite 4 Mr. Havey's acknowledgement that groundwater radiological contamination may 5 render the Unit 2 tower infeasible, both Tetra Tech and Hatch inexplicably 6 excluded "issues related to potential groundwater radiological contamination" 7 from their feasibility assessment. See, e.g., id at p 13, 1. 1-3. No feasibility 8 determination can be reached for retrofitting Unit 2 with closed-cycle cooling 9 unless and until Tetra Tech addresses impacts from the groundwater plume.

10 Q: Continuing with specific site disruptions discussed in the ENERCON 2013 11 CCC Response, how, if at all, does Tetra Tech's ClearSky configuration 12 proposed for Unit 2 account for IPEC's Independent Spent Fuel Storage 13 Installation ("ISFSI")?

14 A: It does not. One of the most apparent and problematic aspects of Tetra Tech's 15 proposal for Unit 2 is that the excavation for the Unit 2 towers and associated 16 piping interferes directly with IPEC's ISFSI. The ISFSI is a critical component 17 of the IPEC site for dry cask spent nuclear fuel storage. IPEC's ISFSI is a three-18 foot thick concrete pad that is approximately 100 ft by 200 ft designed to store 19 large, sealed casks containing spent fuel rods. Construction of the ISFSI lasted 20 three years and cost over $13 million dollars. As of February 2014, there were 21 twenty-six (26) casks contained within the ISFSI. The casks are made of steel 22 and concrete and are 18-20 feet high, 11 feet in diameter, and have 2 foot thick 23 concrete walls. Each cask weighs over 300,000 pounds when loaded.

1 IPEC's ISFSI and the spent-fuel casks that it stores are heavily regulated 2 and subject to intensive oversight by NRC. In order to construct the proposed 3 towers for Unit 2, the current ISFSI must be decommissioned and demolished.

4 Before that work can start, however, IPEC must obtain permits for and construct 5 an entirely new ISFSI at a different location to store the spent fuel casks. The 6 Tetra Tech CCC Report and the prefiled testimony of Messrs. Havey and Ortiz 7 completely fail to address the significant impact on the feasibility of the Unit 2 8 cooling towers, not to mention its schedule, of the need to: (1) identify a viable 9 location for, permit and construct a new ISFSI; (2) transfer the existing casks to 10 that new ISFSI; and (3) decommission and demolish the existing ISFSI, all 11 before commencing construction of the Unit 2 tower. In fact, Tetra Tech has 12 performed no analysis to determine if a new ISFSI can be built at IPEC. Another 13 significant obstacle is that the extremely heavy loads restrict what roads can be 14 used to transport the 300,000 pound spent fuel casks. Given these restrictions, 15 there is a risk that there will be no suitable right-of-way to transfer the spent fuel 16 from the reactors to the new ISFSI location. Without resolving this siting 17 conflict and others that may arise relative to the need for a new ISFSI, the Unit 2 18 towers cannot be considered feasible.

19 Q: Third, focusing now on Unit 3, how, if at all, do Messrs. Havey and Ortiz 20 address the feasibility issues associated with the Algonquin Pipeline?

21 A: They do not. Neither Hatch nor Tetra Tech "analyze[d] the Algonquin pipeline 22 feasibility assessment," see Ortiz Direct at p. 6, 1. 6-12; Havey Direct at p. 13, 1.

23 1-7, or provided any solution to resolve the conflict. In fact, the relocation of the

- 25 -

I Algonquin Pipeline and feasibility assessment was expressly excluded from both 2 Hatch and Tetra Tech's review. As I stated in my prefiled direct testimony, 3 Tetra Tech's closed-cycle cooling reconfiguration at Unit 3 cannot be considered 4 feasible without resolving the Algonquin pipeline conflict.

5 Q: Your testimony thus far has focused on site-specific challenges to the 6 feasibility of constructing Tetra Tech's ClearSky cooling towers at IPEC.

7 Assuming the towers can be constructed, have' Messrs. Havey and Ortiz 8 reasonably demonstrated that the towers will function efficiently at IPEC 9 without significantly degrading IPEC's performance?

10 A: No. Mr. Havey does not address the impacts associated with Tetra Tech's 11 proposal on the ability of IPEC's condensers to efficiently reject heat, nor does 12 he address the Bums and Roe condenser analysis described in the ENERCON 13 2013 CCC Response and my prefiled direct testimony that demonstrated that 14 additional capacity is likely needed to reduce the pressure in the condenser 15 during at least one of IPEC's transient conditions. For his part, Mr. Ortiz 16 concedes in his testimony that it "was impossible to accurately assess the impact 17 on condenser thermal performance with a higher inlet cooling water temperature 18 resulting from use of the cooling towers." Ortiz Direct at p. 10, 1. 20-22 19 (emphasis added). Based on what Tetra Tech has reported, however, there are 20 several known issues with the ClearSky towers that will detrimentally and 21 materially impact IPEC's performance, including its ability to generate 22 electricity reliably and efficiently.

1 Q: What are those known issues?

2 A: The current closed-cycle cooling retrofit alternatives at IPEC will both (1) reduce 3 the amount of available circulating available to cool the condensers and (2) 4 increase the temperature of the cooling water. These are both major operating 5 constraints that will mean that IPEC will not be able to generate as much 6 electricity as it does in the current once-through system, and in some cases, could 7 lead to excursions and unplanned outages.

8 Significantly, Tetra Tech has failed to address its decision to reduce 9 IPEC's maximum flow rate from 840,000 gpm to 700,000 gpm for each Unit. In 10 fact, one of Tetra Tech's criticisms of the ENERCON Closed-Loop Cooling 11 Reports was the decision to reduce maximum flow to 700,000 gpm for each 12 Unit. Tetra Tech stated:

13 This discussion not only implies that each condenser has a 14 throughput capacity of 840,000 gpm, but that the maximum 15 capacity is actually needed during peak summer periods.

16 Consequently, each unit's replacement cooling tower 17 should be designed to meet the most critical operating 18 conditions that would be expected during the year, i.e.,

19 840,000 rather than the 700,000 gpm used in the design 20 criteria.

21 Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris 22 Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 23 6 (Appendix B to Staff Ex. 214). Tetra Tech went on to note that "[i]f correct, 24 the tower as designed appears to be insufficiently sized to accommodate the 25 higher summertime volumes that are sometimes needed." Id. Enercon's 26 decision to reduce the maximum flow to 700,000 gpm was appropriate at the 27 time because it reflected a balance between the parasitic loss associated with 1 pumping the extra circulating water up to the cooling towers and additional fans 2 required to cool that water with the expected degradation in power performance 3 based on the then-current PEPSE models for IPEC Units 2 and 3. Because Tetra 4 Tech's proposal has a different pump and fan dynamics than the round hybrid 5 towers with less parasitic losses, Tetra Tech ought to have reanalyzed whether 6 700,000 gpm was an appropriate design choice for its towers. Instead, Tetra 7 Tech simply copied design decisions from the round hybrid towers described in 8 ENERCON 2010 without properly considering whether those design choices are 9 appropriate for the ClearSky towers.

10 As part of the preparation for this testimony, Enercon was informed by 11 Entergy that the PEPSE model used in ENERCON 2010 and the ENERCON 12 2013 CCC Response had been updated and re-benchmarked. Preliminary 13 analysis of the updated model shows higher power losses when the Units are run 14 at 700,000 gpm, particularly at Unit 2 and particularly during the critical summer 15 months, than what has been reported previously. Based on the results of this 16 preliminary analysis, it is clear that the ClearSky towers proposed by Tetra Tech 17 are significantly undersized. This analysis emphasizes why it was incumbent on 18 Tetra Tech to perform and include PEPSE modeling, as well as other critical 19 thermal performance data, such as cooling tower performance curves, in its 20 report in order to validate its design choices and establish post-modification 21 operating power losses.

22 Q: You also mentioned that in addition to reducing the maximum amount of 23 available water, closed-cycle cooling would also increase the temperature of 1 the circulating water used to cool the condensers. How will that affect plant 2 performance?

3 A: The increased temperature of the circulating water, combined with the reduced 4 flow, will lead to increased condenser backpressure that will reduce the facility's 5 ability to generate power. These effects will be felt most in the summer, when 6 the cooling need is the highest and the demand for electricity is the greatest. But 7 there are additional aspects of the ClearSky towers that amplify the inherent and 8 detrimental impact associated with a closed-cycle cooling retrofit at IPEC.

9 First, as I stated in my prefiled direct, the cooling towers are susceptible to 10 recirculation of the hot, humid exhaust back into the intake, which will increase 11 the entering wet-bulb temperature and reduce the towers' ability to cool the 12 water. Mr. Havey does not address Enercon's concern that the configuration and 13 orientation of the ClearSky towers will likely result in recirculation thereby 14 decreasing their performance and detrimentally affect plant operations. Mr.

15 Ortiz states only that "to better simulate recirculation effects created by different 16 wind conditions a more detailed analysis is required," but he defers this 17 important consideration to later in the "engineering phase of the project" where 18 "adjustments, if required can be implemented...." Ortiz Direct at p. 11, 1. 12-19.

19 This is not sufficient; the impact recirculation will have on cooling tower 20 performance affects threshold design decisions, such as the number of cooling 21 cells required and the size of those cells. It would be inappropriate to make a 22 "feasibility" determination of a configuration that calls for forty-four (44) cells 23 per unit, only to find out later in the process that, for example, fifty (50) or more I cells per unit were actually needed. By way of example, SPX has provided to 2 Enercon a "ClearSky Selection Summary" that proposes a different 3 configuration ClearSky towers for IPEC, consisting of sixty-two (62) smaller 4 ClearSky cells per Unit. The selection summary provided to Enercon explicitly 5 assumes recirculation would increase the inlet wet bulb temperature by 20 F 6 (changing the design wet-bulb temperature from 77OF to 790 F), and as much as 7 5°F "under certain wind conditions." See SPX, Entergy Indian Point Units 2 &

8 3, ClearSky Selection Summary (Entergy Ex. 347).

9 Second, Tetra Tech proposes aligning the ClearSky cooling towers in a 10 back-to-back configuration. It is well understood that linear, mechanical draft 11 cooling towers do not perform well in a back-to-back configuration. In fact, this 12 is a point that Tetra Tech has made in several other technical reviews it has 13 made. For example, in a review Tetra Tech performed for NYSDEC for the 14 Northport Generating Station, Tetra Tech noted that "[c]onventional hybrid 15 wet/dry mechanical draft cooling towers must be configured in an in-line (single 16 row) arrangement and cannot be placed in a back-to-back configuration because 17 of issues with poor mixing of the wet and dry section exhaust in the back-to-back 18 configuration." Tetra Tech, Inc., Northport Technical Review at 2 (Entergy Ex.

19 354). Tetra Tech made a similar statement in the review of the Huntley facility:

20 "[d]oubled-up towers are also referred to as back-to-back configurations and are 21 generally not compatible with hybrid wet/dry plume abatement cooling towers."

22 Memorandum from John Sunda, Steve Geil, and Kelly Meadows, to Chuck 23 Nieder, NYSDEC, and Jamie Hurley, USEPA, dated Oct. 5, 2011, at 6-7 1 (Entergy Ex. 355). I understand that SPX advertises that, conceptually, ClearSky 2 cooling towers can be designed and operated in a back-to-back configuration, but 3 there is no operational experience showing this to be the case. Indeed, the 4 Air2Air test cell at the San Juan Generating Station in New Mexico cannot be 5 used in a back-to-back configuration because it has air intakes on two sides, 6 which is another reason that it is not representative of NYSDEC's proposal to 7 construct two towers of 44 back-to-back ClearSky cells at IPEC.

8 Third, in addition to known operational problems associated with using 9 cooling towers in salt water applications (e.g., salt deposition, electric arcing, 10 etc.), the thermophysical properties of salt water degrades cooling tower 11 performance as compared to cooling towers that use freshwater. Recent studies 12 have shown that increased salt concentrations materially alter the efficiency of 13 cooling towers to a substantial degree. See Mostafa H. Sharqawy et al., On 14 Thermal Performanceof Seawater Cooling Towers, 133 J. Eng. Gas Turbines &

15 Power (Apr. 2011), at 6 (Entergy Ex. 352) ("It is found that an increase in 16 salinity decreases the air effectiveness by 5-20% relative to freshwater cooling 17 tower."). Here, Tetra Tech proposes concentrating the salt level in the Hudson 18 River three times in its closed-cycle system, which will amplify degradation of 19 thermal performance attributable to increased salinity. Although Mr. Havey 20 asserts in his prefiled testimony that Tetra Tech's proposed ClearSky towers are 21 designed to reject the maximum thermal load under the "most stringent 22 conditions," including "highest salinity" (Havey Direct at p. 29, 1. 10-13), Tetra 23 Tech does not identify the salinity levels that were provided to SPX or how (or 1 even whether) SPX adjusted the size of its cooling towers to account for the 2 increased salinity of the Hudson River. Without this information, there is a 3 substantial risk that Tetra Tech has further undersized its cooling towers.

4 Q: Aside fiom and in addition to the impacts that will reduce IPEC's ability to 5 generate power, are there any significant operational problems associated 6 with the proposed ClearSky towers that are not addressed by Messrs. Havey 7 and Ortiz and need to be to reach a feasibility determination?

8 A: Yes. Mr. Havey and Mr. Ortiz fail to address the potential site impacts that 9 could result from the localized plume of humid, salt-laden air that is exhausted 10 from Tetra Tech's ClearSky cooling towers. Importantly, the ClearSky towers 11 discharge at lower velocities, at a lower height, and with less thermal buoyancy 12 than the round hybrid towers described in the ENERCON Closed-Loop Cooling 13 Reports. As a result, the ClearSky towers have more concentrated and localized 14 plumes at ground level, which increases salt deposition and 15 temperature/humidity effects on electrical equipment and components in close 16 proximity to the towers. This creates a number of personnel and station safety-17 related issues, such as electrical arcing, icing during the winter, and fogging due 18 to the cooling tower plume on occasion. Ground level icing and salt deposition 19 poses serious workplace safety, maintenance, and environmental concerns, with 20 the potential to render certain areas of the site treacherous during winter months, 21 as well as creating substantial local vegetation impacts. Fogging that would lead 22 to reduce visibility creates associated security risks at the facility.

1 The risk of icing poses unique operational concerns for ClearSky towers, 2 which use proprietary "ClearSky heat exchangers" that are designed to condense 3 moisture from the cooling tower's exhaust in the form of "high purity water-4 approaching distilled water quality." Entergy Ex. 359 at 10. As SPX noted in its 5 2012 DOE Report, imperfect seals will cause leakage within the ClearSky heat 6 exchanger that will cause icing in the heat exchanger in cold weather. SPX 7 correctly acknowledged that "[t]his behavior is unacceptable in the commercial 8 market place." See id. at 19. Although SPX advertises that it has performed 9 laboratory testing on its condensing modules in "all four seasons," tellingly, the 10 test data it selected to include in its 2012 DOE Report only includes results for 11 spring and summer, not the cooler seasons of fall and winter. See id. at 14-15.

12 At this point, it is simply unknown whether SPX's ClearSky heat exchangers are 13 appropriate for the IPEC site conditions.

14 Another aspect of cooling tower operation not addressed by Mr. Havey or 15 Mr. Ortiz is the potential operational impacts associated with sedimentation in 16 the closed-cycle system. Evaporation of water and drift will elevate the 17 concentration of sediments in the closed-loop system above ambient Hudson 18 River conditions. In addition, it is well known that cooling towers act as air 19 scrubbers, which flush airborne contaminates into the closed loop system further 20 elevating sediment concentrations. It can be expected that this sediment will 21 settle and accumulate in the modified discharge canal and in the cooling tower 22 basins, and it will need to be periodically removed. Tetra Tech provides no

- 33 -

1 explanation for how it proposes to control and/or remove sedimentation in its 2 closed-system configuration.

3 Q: On the subject of security considerations, is IPEC required to utilize flood 4 lighting for security purposes that would illuminate any visible plume at 5 night?

6 A: Yes. IPEC's security procedures require the site to be fully lighted at night, 7 which would illuminate any visible plume.

8 Q: Finally, assuming they can be constructed, did Messrs. Havey and Ortiz 9 account for the inherent concerns with fiberglass towers?

10 A: No. Mr. Havey argues at page 20 of his prefiled testimony that fiberglass towers 11 generally are "structurally sound" and can be reinforced to "meet higher wind 12 load requirements." Havey Direct at p. 20, 1.4-20. There is evidence, however, 13 that raises serious concerns of fiberglass towers' structural integrity. Most 14 notably, in the 2011 Cooling Technology Institute Annual Conference, American 15 Electric Power presented a paper entitled, AEP's Experience with Polyester FRP 16 Structure Cooling Towers, that described significant structural failures with five 17 fiberglass towers constructed with pultruded fiberglass. Of the 15 hyperbolic 18 and 30 mechanical draft cooling towers on the AEP system, the five towers 19 constructed from 2008 through 2010 were AEP's first fiberglass towers. AEP's 20 experience is a cautionary tale insofar as four of the five towers experienced 21 failed or cracked fiberglass columns and surface blisters were noticed in two of 22 the new towers after 2 to 18 months of operation. See Bob Cashner, AEP's 23 Experience with Polyester FRP Structure Cooling Towers, Cooling Tower 1 Institute (Feb. 6-10, 2011), at 2 (Entergy Ex. 358). These failures caused AEP to 2 conduct additional testing of the fiberglass material in 2009. See id. at 11. The 3 testing involved repeated exposure to saturation and then freezing or drying or 4 both. In sum, a total of 83 defects were documented in all sixteen samples 5 representing the four different test conditions. Id.

6 IV. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 7 FEASIBILITY OF RETROFITTING IPEC WITH ROUND HYBRID COOLING 8 TOWERS 9 Q: Turning now to the round hybrid mechanical draft cooling towers described 10 in the ENERCON Closed-Loop Cooling Reports, as a preliminary matter, 11 has Enercon or Entergy proposed the circular hybrid cooling towers 12 described in the ENERCON Closed-Loop Cooling Reports as the best 13 technology available for IPEC under 7 NYCRR § 704.5 and § 316(b) of the 14 Clean Water Act?

15 A: No. Entergy was required by NYSDEC to evaluate the possible conversion of 16 the existing system to a closed-loop circulation water system configuration. In 17 response to that mandate, Enercon selected a closed-loop configuration utilizing 18 hybrid round towers, which are the only cooling towers that could "reasonably 19 be considered" at IPEC. As I stated in my prefiled testimony dated July 22, 20 2011:

21 In the Closed-Loop Cooling Report, ENERCON concluded that 22 the absence of a history of closed-cycle cooling retrofits and site-23 specific conditions at Indian Point would challenge the feasibility 24 of such an installation. The several reasons for the conclusion are 25 explained in detail in the Closed-Loop Cooling Report. Briefly, 1 conversion of Indian Point to closed-loop cooling would be an 2 unprecedented undertaking that would encounter numerous 3 significant identified siting and construction challenges, some of 4 which may not be successfully surmounted. Such a conversion is 5 unprecedented, because no nuclear stations designed solely for 6 once-through cooling have been converted to closed-loop cooling.

7 This nuclear experience is critical, because conversion of the 8 condenser cooling system of an existing plant presents 9 fundamental design problems that result in plant performance 10 impacts or require redesign of the essential plant equipment, e.g.,

11 the condenser. Moreover, absent any practical history of closed-12 loop cooling retrofits at nuclear facilities, engineering observations 13 and conclusions regarding any such conversion must be made on a 14 purely speculative basis and are inherently subject to unforeseen 15 challenges during the detailed design and the subsequent 16 construction phases. Only upon successful operation of a 17 completed closed-loop cooling retrofit at a representative number 18 of comparable facilities could this type of conversion be 19 conclusively considered feasible.

20 Prefiled Testimony of Sam Beaver in Support of Entergy Nuclear Indian Point 2, 21 LLC, Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations, 22 Inc. at 21:5-22, dated July 22, 2011.

1 Q: Are there any examples of round hybrid towers at nuclear facilities of the 2 size contemplated in the ENERCON Closed-Loop Cooling Reports?

3 A: There is only one round hybrid tower of a size that approaches what would be 4 required for each of IPEC Unit 2 and Unit 3, located at the Neckarwestheim 5 nuclear power plant (Unit 2) in Germany. There are, however, several important 6 differences between the Neckarwestheim facility and IPEC. Most significantly, 7 the Neckarwestheim Unit 2 cooling tower was constructed as part of a new 8 facility, not a retrofit of an existing facility. The Neckarwestheim Unit 2 cooling 9 tower is also subject to different environmental and water quality conditions than 10 what would be experienced at IPEC.

11 Q: Did Messrs. Ortiz and Havey offer any analysis concerning the feasibility of 12 retrofitting IPEC Units 2 and 3 with round hybrid cooling towers?

13 A: No. While Mr. Havey testifies that the circular hybrid cooling towers described 14 in ENERCON 2003 "could be constructed, installed, and operated at the Indian 15 Point nuclear facilities," Havey Direct at p. 3, 1. 19-21, and that "Enercon's 16 circular hybrid cooling tower proposal was available and generally feasible for 17 the IPEC facilities in order to satisfy the BTA requirements of 6 NYCRR 18 § 704.5," id. at p. 10, 1. 8-10, he offers no additional analysis. Likewise, Mr.

19 Ortiz offers no analysis nor justification. Further, Mr. Ortiz's opinion as to the 20 feasibility of retrofitting Units 2 and 3 with round hybrid towers is even less 21 clear. In response to a question as to whether the circular hybrid cooling tower 22 configuration described by Enercon in its 2003 and 2010 is "available and 23 generally feasible," Mr. Ortiz testifies that "[b]ased on the limited scope and 1 analysis of the study [the round hybrid towers] may be feasible, but a more in 2 depth study would be necessary to obtain afinalconclusion." Ortiz Direct at p.

3 5, 1. 1-2 (emphasis added).

4 Q: Do you agree with Mr. Havey's opinion that the circular hybrid cooling 5 towers described in the ENERCON Closed-Loop Cooling Reports "could be 6 constructed, installed, and operated at the Indian Point nuclear facilities" 7 and Mr. Ortiz's testimony that such a retrofit "may be feasible"?

8 A: No. While retrofitting IPEC Units 2 and 3 may be theoretically possible (and 9 cost over two billion dollars and take over eight years in construction time 10 alone), the ENERCON Closed-Loop Cooling Reports identified numerous 11 significant challenges to the feasibility of retrofitting IPEC Units 2 and 3 with 12 circular hybrid cooling tower. These include, but are not limited to, appreciable 13 elevation changes, a general lack of available space, a subsurface primarily 14 composed of solid rock, the location of a major interstate gas pipeline, local air 15 quality, archeological and aesthetic considerations, etc. Given the sizeable 16 challenges and level of unknowns, based upon my best professional judgment, I 17 could not in good conscience recommend round hybrid cooling towers for IPEC 18 as a practical or reasonable alternative for compliance with regulatory 19 requirements associated with the Clean Water Act.

20 To reach any other conclusion about the feasibility of round hybrid towers, 21 the challenges identified in the ENERCON Closed-Loop Cooling Report would 22 need to be fully addressed. Neither Mr. Havey nor Mr. Ortiz resolved any of the 23 uncertainties described in the ENERCON Closed-Loop Cooling Reports, and as 1 a result, are not in a position to conclude that round hybrid towers are feasible at 2 IPEC.

3 Q: Did Tetra Tech or Hatch materially dispute any of the conclusions of the 4 ENERCON Closed-Loop Cooling Reports?

5 A: No. According to Mr. Ortiz, Hatch's review of the Enercon Closed-Loop 6 Cooling Reports was limited to reviewing the reports by unidentified Hatch 7 employees and providing "comments" to Mr. Havey at Tetra Tech. Hatch's 8 review of ENERCON 2003 was reportedly limited to "challenging certain 9 assumptions on the prevailing winds, soil conditions, some contradictions on the 10 wet bulb temperatures used, and identified minor discrepancies." Ortiz Direct at 11 p. 3, 1. 17-19. Given this context, Mr. Ortiz's testimony that in Hatch's review of 12 ENERCON 2010, "no major issues or deficiencies were identified by Hatch with 13 respect to the technical feasibility of transferring from a once-through cooling 14 system to a closed loop cooling system" is not helpful to me as an engineer. See 15 id. at p. 4, 1. 15-28 (emphasis added). It is further complicated by the fact that 16 Mr. Havey states in his testimony that SAIC, not Hatch, reviewed ENERCON 17 2010. See Havey Direct, at p. 8, 1.20-22. Mr. Ortiz does not even discuss the 18 major issues and challenges identified by Enercon in its report.

19 There is nothing in Mr. Ortiz's testimony that shows a basis for any 20 engineering conclusions as to feasibility of round hybrid cooling towers at IPEC.

21 Similarly, Tetra Tech did not dispute and in fact, validated, many of the major 22 conclusions of the ENERCON Closed-Loop Cooling Reports. For example, 23 Tetra Tech agreed:

1 1. Enercon's estimate for direct capital costs of $1.19 billion and ongoing 2 operation and maintenance costs of $2.0 to $4.0 million per year per unit were 3 "well within the range of comparable project estimates developed for other 4 nuclear facilities when adjusted for the unique considerations at IPEC (found 5 hybrid towers, transmission pipeline relocation, etc.)." Memorandum from 6 Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris Hogan, NYS 7 Department of Environmental Conservation, dated July 6, 2010 at 3 (Staff Ex.

8 214, Appendix B).

9 2. Enercon's estimate of 12 to 13 years for construction was "not unreasonable 10 given the volume of blasting and spoils removal that would have to occur, and 11 the limitations placed on construction activities by local ordinances and 12 seasonal weather concerns." Id.

13 3. Enercon's estimate that construction of closed-cycle cooling would require 14 taking both IPEC units offline for up to 42 concurrent weeks was "reasonable 15 and acceptable." In fact, Tetra Tech concluded that "[t]he obstacles presented 16 by reconfiguring the existing discharge canal to function as a main component 17 of the new cooling system are correctly cited by Enercon as unavoidable.

18 There do not appear to be any practical means to significantly decrease this 19 estimate." Id.

20 4. Enercon's estimate of thermal efficiency losses were reasonable when 21 compared to other similar projects. Id.

-40 -

1 Q: Were there any limitations or caveats in the prefiled testimony of Messrs.

2 Havey and Ortiz with respect to Tetra Tech and Hatch's review of the 3 ENERCON Closed-Loop Cooling Reports?

4 A: Yes. Although both Mr. Havey and Mr. Ortiz suggest that hybrid round cooling 5 towers may be generally feasible, both Hatch and Tetra Tech again excluded 6 from consideration (1) the Algonquin pipeline relocation and feasibility 7 assessment and (2) "issues related to potential groundwater radiological 8 contamination." See Havey Direct at p. 8, 1. 10-17; see also Ortiz Direct at 4:11-9 18. In short, and for the same reasons I testified earlier, relocating the Algonquin 10 pipeline and issues related to potential groundwater radiological contamination 11 must be resolved prior to any feasibility determination being made.

12 V. REBUTTAL TO CHARLES NIEDER 13 Q: Have you had an opportunity to review Mr. Nieder's testimony regarding 14 capital costs of operating CWWS at IPEC?

15 A: Yes. Mr. Nieder suggests that Enercon did not provide enough detail to support 16 its estimate of the capital costs for constructing the proposed array of CWWS. I 17 have submitted as Entergy Exhibit 372 additional details that support Enercon's 18 estimate of capital costs which should address Mr. Nieder's concern.

19 Q: Have you had an opportunity to review Mr. Nieder's testimony regarding the 20 O&M costs of operating cylindrical wedgewire screens at IPEC?

21 A: Yes. Mr. Nieder contends that he was not able to calculate the proportional costs 22 of Entergy's proposed CWWS array because it did not include annual O&M 23 costs of the CWWS array. He further disputes NERA's conclusion that the 24 O&M costs for CWWS would be insignificant based on other estimates he had 1 received for CWWS O&M costs from other facilities because the "median O&M 2 costs represented 38 percent of the total costs for constructing and operating 3 CWWSs for 20 years. This percentage level of the overall costs for constructing 4 and operating CWWSs for 20 years is significant." Nieder Direct at p. 17, 1. 8-5 10.

6 Q: As a preliminary matter, is it appropriate to calculate O&M costs for the 7 CWWS for a 20 year life period?

8 A: No. CWWS will not be operating for the full twenty years of Entergy's renewed 9 license. Entergy's NRC renewed operating licenses for Unit 2 and Unit 3 would 10 expire in 2033 and 2035, respectively. We have estimated that the design phase 11 of the CWWS project would extend for approximately two years and in-river 12 construction activities would occur over three successive years, with the final tie-13 in occurring in the sixth year. Accordingly, assuming design and construction 14 begin after these proceedings and any associated court proceedings end, which I 15 understand NERA assumed would be 2018, construction would not be complete, 16 and therefore Entergy would not be incurring O&M costs for each Unit, until 17 roughly 2024. As a result, O&M costs would only be incurred for 9-11 years 18 until the operating license respectively expire, or an average of 10 years per unit.

19 That is only half the period assumed by Mr. Nieder.

20 Q: Do you agree with Mr. Nieder's estimate that potential O&M costs for 21 CWWS would render the overall costs significant?

22 A: No. As Mr. Nieder acknowledges, the principal O&M cost associated with any 23 CWWS proposal is the cost associated with cleaning the screens. Entergy has 1 specifically made design choices to minimize the risk of fouling and therefore 2 reduce the need for cleanings, including constructing the screens out of Johnson 3 Screen's Z-Alloy, which has been demonstrated to resist biofouling in the 4 Hudson River, and selecting a conservative through-slot velocity of 0.25 feet per 5 second. In addition to these design choices, during the summer months when the 6 potential for fouling is at its highest and when the biological need is the greatest, 7 Entergy can use divers to regularly-and even continually---clean the screens.

8 From Entergy's past experience with cleaning the Ristroph screens, the average 9 cost for a dive team at IPEC is $7,000 per day. There is no reason to conclude 10 that the per day cost of dive teams would be any different for CWWS than the 11 current intake structure. For the rest of the year (i.e., fall through spring), when 12 the risk of fouling is considerably lower, monitoring in the intake bays would 13 alert the operators of any potential fouling issues with the screens, and divers can 14 be deployed on an "as needed" basis.

15 VI. CONCLUSION 16 Q: Has anything that you have read in the testimonies of Messrs. Havey, Ortiz, 17 and Nieder or in the documentary exhibits attached to their testimony 18 affected the opinions you previously testified to in your February 28, 2014 19 prefiled testimony?

20 A: No. For the reasons detailed above, nothing that I have reviewed alters my 21 bottom-line conclusion that the given the numerous and significant site-specific 22 challenges associated with retrofitting IPEC with closed-cycle cooling 23 documented by Enercon, the considerable uncertainty inherent in such a retrofit 24 project, and the detrimental impact that a closed-cycle cooling retrofit would 1 have on the facility's ability to generate electricity, NYSDEC Staff has failed to 2 demonstrate that cooling towers are feasible at IPEC.

END OF TESTIMONY STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and DEC No.: 3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC SPDES No.: NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s 3-5522-00105/00031 (IP3)

Joint Application for CWA § 401 Water Quality Certification PREFILED REBUTTAL TESTIMONY OF SAM BEAVER IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.

CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POIN T 3, LLC, AND ENTERGY NUCLEAR OPERATIONS, INC.

By its attorneys, Elise N. Zoli John C. Englander Kevin P. Martin Goodwin Procter LLP 53 State Street Boston, Massachusetts 02109 Tel.: 617.570.1000 Fax: 617.523.1231 March 28, 2014 1

Table of Contents Pare I. INTRODUCTION .......................................................................................................... 1 II. BACKGROUND AND CONTEXT FOR RETROFITTING IPEC WITH CLOSED-CYCLE COOLING ........................................................................................ 3 III. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE FEASIBILITY OF RETROFITTING IPEC WITH CLEARSKY COOLING TO WE R S ........................................................................................................................... 13 IV. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE FEASIBILITY OF RETROFITTING IPEC WITH ROUND HYBRID COOLING TOW ER S ........................................................................................................................... 35 V. REBUTTAL TO CHARLES NIEDER ........................................................................ 41 VI. CONCLUSION ............................................................................................................ 43 i

1 I. INTRODUCTION 2 Q: Please state your name, current position, and business address.

3 A: My name is Sam Beaver. I am the Director of Project Management at Enercon 4 Services, Inc. ("Enercon"), an engineering, environmental, and technical 5 management services firm. My business address is 500 Townpark Lane, 6 Kennesaw, Georgia 30144.

7 Q: Are you the same Sam Beaver who provided prefiled direct testimony on 8 February 28, 2014 on behalf of Entergy in support of its application for 9 renewal of State Pollutant Discharge Elimination System ("SPDES") Permit 10 (DEC App. Nos. 3-5522-00011-00004 SPDES No. NY0004472) for Indian 11 Point Units 2 and 3 and the corresponding issue in the associated Water 12 Quality Certification ("WQC") proceeding, as it has been consolidated by 13 this Tribunal (collectively, the "Proceedings")?

14 A: Yes.

15 Q: Please state the purpose of your prefiled rebuttal testimony.

16 A: The purpose of my prefiled rebuttal testimony is to address certain portions of 17 the prefiled direct testimony of Eduardo Ortiz (Hatch) ("Ortiz Direct"), Tim 18 Havey (Tetra Tech) ("Havey Direct"), and William Charles Nieder (NYSDEC 19 Staff) ("Nieder Direct"). Specifically, my rebuttal testimony responds to the 20 prefiled direct testimony of Mr. Ortiz and Mr. Havey that relates to the 21 engineering feasibility of retrofitting either or both Indian Point Energy Center, 22 Unit 2 and Unit 3 (collectively, "IPEC"), with eighty-eight (88) back-to-back 23 ClearSky cooling towers, forty-four (44) cells at each of Unit 2 and Unit 3, as 24 described in the report prepared by Tetra Tech entitled Indian Point Closed-I Cycle Cooling System Retrofit Evaluation, dated June 2013 (the "Tetra Tech 2 CCC Report"); and two (2) round hybrid cooling towers, one at Unit 2 and Unit 3 3 respectively, as described in the initial report prepared by Enercon entitled, 4 Economic and Environmental Impacts Associated with Conversion of Indian 5 Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration, 6 dated June 2003 (Entergy Ex. 7A) ("ENERCON 2003") and as more intensively 7 reviewed in the report entitled EngineeringFeasibility and Costs of Conversion 8 of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water 9 Configuration, dated February 12, 2010 (Entergy Ex. 7) ("ENERCON 2010";

10 collectively, the "ENERCON Closed-Loop Cooling Reports"). My rebuttal II testimony also responds to the portion of Mr. Nieder's testimony that discusses 12 the expected operational and maintenance ("O&M") costs of Entergy's 13 cylindrical wedgewire screen ("CWWS") proposal. I have reviewed the prefiled 14 direct testimony of each of these individuals, as well as the identified materials 15 on which each of these individuals relies (to the extent it was provided).

16 Q: How is your rebuttal testimony organized?

17 A: First, I provide some general background and context about how engineers 18 address feasibility questions at nuclear power plants, and how this context relates 19 to my conclusions regarding the inherent challenges to the feasibility of 20 retrofitting Unit 2 and Unit 3 with a closed-cycle cooling system during the 21 license renewal period. Second, I address specific statements in Messrs. Ortiz 22 and Havey's testimony concerning the feasibility of Tetra Tech's ClearSky 23 cooling tower configuration, with a focus on misimpressions and errors in that 1 testimony and therefore their respective conclusions. Third, I address Messrs.

2 Ortiz and Havey's testimony as it relates to the feasibility of retrofitting IPEC 3 with round hybrid cooling towers, with the same focus. Finally, I respond to Mr.

4 Nieder's argument that O&M costs for Entergy's proposed array of CWWS are 5 likely to be significant.

6 II. BACKGROUND AND CONTEXT FOR RETROFITTING IPEC WITH 7 CLOSED-CYCLE COOLING 8 Q: Please describe what engineering feasibility means in the context of 9 retrofitting a nuclear power plant with a new cooling water system?

10 A: The "feasibility" of retrofitting power plants with a new cooling water system 11 depends on two related considerations. First, the technology that is chosen for 12 the retrofit must be available. As I testified in October 2011, "availability" 13 means that technology is used in the industry for which it is intended on a regular 14 basis, with an adequate design, construction and operational history to allow an 15 engineering assessment with a reasonable level of confidence. The second 16 consideration is whether an otherwise "available" technology can be installed 17 and operated at a particular site, based on the relevant considerations at that site, 18 with a reasonable level of engineering certainty.

19 The need for a reasonable level of engineering certainty is particularly 20 acute in the nuclear industry for two reasons. First, nuclear powered electric 21 generating power plants-as baseload suppliers-are designed to operate (to 22 produce power in the form of electricity) on a consistent, reliable basis. Second, 23 the regulatory structure for nuclear power plants and the safety consciousness of 24 nuclear engineers and operators place a high priority on consistent operations in 1 accordance with design parameters. Excursions (that is, atypical operations),

2 including conditions that may increase the likelihood of excursions, are strongly 3 disfavored by NRC and plant personnel alike. This has two direct implications 4 for the major retrofit proposed by NYSDEC Staff for IPEC: (1) relevant, 5 demonstrated operational experience in a comparable dynamic is typically 6 necessary for a technology to be installed, particularly major equipment essential 7 for plant operation; and (2) actual retrofitting history is preferred before reaching 8 an "engineering feasibility" conclusion. At nuclear power plants, novel and 9 unproven technologies are generally not considered available.

10 As it is relevant to this phase of the Proceedings, to reach a conclusion 11 about the engineering feasibility of retrofitting IPEC with closed-cycle cooling, 12 an engineer with nuclear design and operational experience would have to 13 conclude that it is likely that the retrofit can be completed and function without 14 major adverse impacts within the remaining plant operational period (that is, the 15 twenty-year license renewal period). If, for instance, it is reasonably foreseeable 16 that construction will not be completed in a timeframe to allow operation of the 17 equipment for a substantial period of time before the end (respectively, in 2033 18 and 2035) of the license renewal period; that construction will result in unit shut-19 downs of substantial duration; that operation will result in measurable and 20 significant power losses; or that there is a heightened risk of incidence of 21 excursions, then an experienced nuclear engineer would not consider the closed-22 cycle cooling retrofit to be a practically feasible.

1 Q: To understand the implications of an engineering feasibility determination 2 for retrofitting IPEC with cooling towers, is it helpful to understand the 3 physical constraints of the IPEC site?

4 A: Yes. Background information is essential to understanding how disruptive and 5 intrusive it would be to retrofit the existing IPEC stations.

6 Both IPEC Units sit on a combined 239 acres, which represents one of the 7 most site-constrained nuclear power plants that I have worked on in my over 8 thirty years of experience. The site topography is challenging, spanning an 9 elevation from the River up to approximately 150 feet. As a result of the 10 topography challenges and the substantial subsurface rock shelf that rises 11 beneath and behind the Stations, within the 239 acre site only 128 acres is readily 12 usable for major structures, and that area already has been developed. Further, 13 all major structures and equipment representing the main power block are 14 contained in a central area of approximately 25 acres located along the 15 Riverfront. Because the two operating unit and one shut down unit share the 16 Riverfront area and given the number of plant systems located in this area, there 17 is a very high density of equipment and structures in this defined area - in fact, 18 the density is visible to even the casual observer. Entergy Ex. 351 is a recent 19 aerial photograph of the IPEC site. The Unit 2 and Unit 3 containment buildings 20 are the two tallest domed structures, with their respective power house unit 21 immediately in front of (closest to the River) the containment buildings. Unit 1 22 is the shorter domed-building between Unit 2 and Unit 3. What is not visible, 23 but is as important, is the substantial underground network of major piping, 1 ranging up to 8-feet in diameter, as well as numerous cabling duct banks and 2 conduits, that runs throughout the Riverfront area. What this means is that the 3 addition at IPEC of any new large-scale structures, particularly those involving 4 the addition of new underground piping, is a challenge from the outset. As a 5 result, any comparisons to "greenfield" design and construction projects for 6 similar components (i.e., usage of cooling towers for new nuclear units currently 7 under construction) would be inappropriate and misleading from an engineering 8 perspective.

9 In fact, even Tetra Tech has recognized the "important role" the size of the 10 property plays in determining whether a retrofit to cooling towers is feasible.

11 See Memorandum from Kelly Meadows, Tetra Tech to Paul Shriner, EPA, dated 12 Feb. 28, 2011, at 1 (Entergy Ex. 356). In a memorandum from Tetra Tech to 13 EPA, dated February 28, 2011, Tetra Tech documented the approximately 73 14 sites visited by EPA in 2011 as part of the proposed § 316(b) rulemaking. Tetra 15 Tech noted that facilities that have a ratio of 160 acres per 1,000 MWs "should 16 have ample space to construct retrofit cooling towers." Id. at 1-2. Here, 17 assuming all of IPEC's 239 acres is available for a retrofit, IPEC's "ratio" is 110 18 acres per 1000 MW, which by EPA's and Tetra Tech's own definition would 19 make it among the most space-constrained site visited by in the Tetra Tech 20 review. As stated above, only 128 acres of the IPEC site is readily useable for 21 major structures, making the site even more constrained in Tetra Tech's terms 22 further lowering the sites effective acreage. See id. at 3 (discussing the "effective 23 acreage" of the McDonough Power Plant).

1 Q: Is there any additional background information that informs your analysis of 2 the feasibility of retrofitting IPEC with closed-cycle cooling?

3 A: Yes. It is also essential to consider the way nuclear units, such as [PEC, are 4 designed and operated. Nuclear power plants, like IPEC, generate electricity 5 through the use of two major categories of systems which convert heat generated 6 in the reactor core into electrical power for commercial use: (1) a closed, 7 pressurized "Reactor Coolant System" (primary systems), (2) and a "Steam and 8 Power Conversion System" (secondary systems). Figure 1.1 in Entergy Exhibit 9 7 (pg. 2) depicts the basic configuration of IPEC-type pressurized water reactors.

10 In the primary system, reactor coolant is heated by nuclear fission in the reactor.

11 The thermal energy generated in the reactor core is then transferred to steam 12 generators where steam is generated in the secondary system and utilized to drive 13 the turbine generator, where it is converted into electricity. The primary and 14 secondary systems are physically separated in the steam generator, minimizing 15 radioisotope transfer to the secondary system.

16 At IPEC, each unit has a multistage turbine comprised of one high-17 pressure turbine and three low-pressure turbines. After passing through the 18 turbines, the steam passes to the main condenser to allow it to be cooled and 19 condensed back into feedwater that can be pumped back through the steam-20 generators in what is effectively a closed loop system.

21 Importantly, the Unit 2 and Unit 3 main condensers are operated in a 22 vacuum in order to optimize plant performance by facilitating the flow of steam 23 through the low-pressure turbines. Even a slight increase in pressure in the 1 condensers, referred to as condenser "backpressure," can have an appreciable 2 impact on the efficiency of the plant and, in some instances, lead to excursions or 3 forced plant shutdowns.

4 Q: How do the Unit 2 and Unit 3 condensers convert the steam exhaust back 5 into feedwater?

6 A: The purpose of the main condenser is to absorb heat contained in the expanded 7 exhaust steam after exiting the low pressure turbines. Cold circulating water 8 flows through the condenser tubes to condense the steam back into water. Unit 2 9 and Unit 3 were designed and constructed with a once-through circulating water 10 system, and reflect a highly specialized design analysis, a "heat balance" that 11 accounted for the qualities of the existing cooling water source, here the Hudson 12 River, to accommodate the heat rejection of the main steam system for each 13 Unit. In other words, the turbines and condenser design rely on the low-14 temperature of the River water, as does efficient performance of the plant. The 15 design rate for each Unit's circulating water system is 840,000 gallons per 16 minute ("gpm"). For obvious reasons, the IPEC condenser cooling systems are 17 essential plant equipment. As I stated in my previous prefiled testimony, dated 18 July 22, 2011, which I fully incorporate by reference here, and by way of 19 analogy, if the reactor is the heart of IPEC, then the cooling system is its lungs-20 providing the necessary cooling for the system to function properly.

21 Given that IPEC's condensers and turbines were specifically designed and 22 constructed as a once-through cooling system utilizing cold River water, any 23 retrofit of IPEC to a closed-loop cooling system that results in higher circulating 1 water temperatures and/or lower flows will result in inherent impacts to the 2 plant. Here, it is unavoidable that a shift to closed-cycle cooling will result in 3 higher circulating water temperatures and lower flows that challenge plant 4 performance and operations. For this reason, any proposal for closed-cycle 5 cooling must rely on the requisite heat balance analysis to demonstrate that 6 performance and operational impacts are known, manageable and not too 7 significant. The twin dynamic of higher circulating water temperature and lower 8 flows (as discussed below) represents a particular challenge to Station 9 performance and functionality.

10 Q: What are the inherent impacts with retrofitting IPEC to a closed-cycle 11 cooling system?

12 A: Retrofitting a nuclear plant constructed in the 1970s with a once-through cooling 13 system to a closed-cycle cooling system will impact virtually every aspect of 14 IPEC's circulating water system. First, less water will be available to run 15 through the condensers. The design of both the ClearSky and round hybrid 16 towers decrease the maximum available circulating water from 840,000 gpm to 17 700,000 gpm-a 16.7% reduction. Second, the temperature of the circulating 18 water entering the condensers to cool the steam will be higher at the most critical 19 times, namely during the summer when cooling need is the greatest. The 20 reduction in water and increase in circulating water inlet temperatures increase 21 condenser back pressure of both Unit 2 and Unit 3. See Entergy Ex. 7A at 20 22 (Figure 3.2 and 3.3). Third, the water pressure in the condenser tubing will be 23 measurably higher in a closed-cycle cooling configuration as compared to the 1 existing once-through cooling system. This is a particular concern with the Tetra 2 Tech proposal which, while within the technical design limits for the condenser, 3 calls for the circulating water to be at a materially higher pressure than the 4 Stations have ever operated under, which introduces additional uncertainty in 5 plant operations and equipment service life.

6 Finally, closed-cycle cooling creates significant and costly parasitic losses 7 that further affect the ability of the plant to generate power efficiently. These 8 losses are attributable to the extra energy required to pump the circulating water 9 to the elevated cooling towers and operate the fans in the cooling towers 10 themselves.

11 Q: Please briefly summarize what would be required in order to retrofit IPEC 12 with closed-cycle cooling.

13 A: In addition to the construction of the cooling towers themselves and the 14 extensive piping that would be needed to supply and return circulating water to 15 and from those towers, retrofitting IPEC to closed-cycle cooling will require 16 reconfiguring the current circulating water system to hold the considerable 17 volume of water necessary to ensure reliable operation of the cooling towers. In 18 the current once-through configuration, after the circulating water passes through 19 the condensers, it is discharged into a canal that runs along the shoreline in front 20 of the Unit 2 and Unit 3 power houses, eventually joining the River on south end 21 of the facility. The discharge canal extends from the Unit 2 power house, where 22 circulating water from the Unit 2 condenser and Unit 2 service water is 23 discharged. The Unit 2 discharged water flows past Unit 3 where the Unit 3 1 service and circulating water is discharged, and the combined flow is returned to 2 the River.

3 In order to retrofit IPEC to a closed-cycle cooling configuration and to 4 hold sufficient water to meet the Unit's combined flow rate of 1.4 million gpm 5 (assuming 700,000 gpm per Unit) of circulating water, the existing discharge 6 canal must be converted into a hot water reservoir that can hold approximately 7 10.7 million gallons of water. See Entergy Ex. 7 at 12. After modification, the 8 Unit 2 and Unit 3 reservoirs would hold over 4.2 million and 6.5 million gallons 9 of circulating water, respectively. Id. The makeup water source for the hot water 10 reservoir is the service water discharge, with Unit 2's service water discharged 11 into the Unit 2 reservoir, and Unit 3's service water discharged into the Unit 3 12 reservoir. New circulating water pumps would be installed in each reservoir that 13 would pump the hot water from each reservoir to its respective cooling tower. To 14 accommodate the additional capacity and to meet the new circulating pump 15 submergence requirements, the current discharge canal in front of Units 2 and 3 16 will need to be excavated. The excavation and construction of the new reservoirs 17 requires a 42 week concurrent construction outage for both IPEC units. As Tetra 18 Tech acknowledged in its July 6, 2010 memorandum, "[t]he obstacles presented 19 by reconfiguring the existing discharge canal to function as a main component of 20 the new cooling system are correctly cited by Enercon as unavoidable. There do 21 not appear to be any practical means to significantly decrease this estimate."

22 Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris 1 Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 3 2 (Staff Ex. 214, Appendix B).

3 As noted above, the discharge canal is also used by the service water 4 system, which serves a nuclear safety function, and which cannot be impacted by 5 the proposed retrofit. Because the design utilizes services water to provide 6 cooling tower makeup at IPEC, and the combined service water discharge will 7 likely exceed the cooling towers' make-up water needs, the reservoir weirs will 8 facilitate the overflow of excess water (that is, water not pumped to the cooling 9 towers) back to the River. The excess water that overflows the Unit 2 and Unit 3 10 reservoirs is in essence the cooling tower "blowdown," which is the intentional 11 release of circulating water used to control the cycles of concentration of the 12 system (i.e., the number of times suspended and dissolved sediment are 13 concentrated above ambient River levels). Thus, when the service water 14 discharge exceeds the makeup needs of the closed-cycle system, water will 15 overflow from the reservoirs, which will represent the blowdown of the system.

16 For both the round hybrid towers and Tetra Tech's ClearSky towers, there is no 17 method by which the blowdown rate (or content of the blowdown) can be 18 controlled. I understand that Tetra Tech has also included additional piping that 19 will siphon cooling water from the pipes running from the cooling towers to the 20 condensers and discharge it in the discharge canal beyond the Unit 3 weir.

21 Q: Are there any examples of operating nuclear power plants that were 22 designed for once-through cooling that were retrofitted as a closed-cycle 23 cooling?

1 A: No. No nuclear power plant that has been designed, constructed, and operated 2 with a once-through cooling system has ever been retrofitted into a closed-loop 3 cooling system. While certain individuals may occasionally reference Palisades 4 Nuclear Power Plant as a "retrofit," as Tetra Tech explains in its November 18, 5 2009 memorandum on page 5, the so-called retrofit was "planned and completed 6 before initial operation." See Memorandum from Tim Havey, Tetra Tech, Inc. to 7 Chris Hogan, NYS Department of Environmental Conservation, dated Nov. 18, 8 2009 at 5 (Staff Ex. 214, Appendix B). The importance of the absence of any 9 successful conversion from once-through to closed-cycle cooling to a feasibility 10 assessment cannot be overstated. Unless a given unit's condenser is specifically 11 designed to utilize cooling water temperatures as provided by cooling towers, 12 there will be a compromise in unit operating efficiency and hence performance.

13 The complete absence of any practical history of closed-loop cooling retrofits at 14 nuclear facilities and the associated impacts on the circulating water system and 15 condensers renders such a project subject to an unacceptably high degree of 16 uncertainty.

17 II1. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 18 FEASIBILITY OF RETROFITTING IPEC WITH CLEARSKY COOLING 19 TOWERS 20 Q: With that background, let us now discuss some of the specific challenges to 21 the Tetra Tech ClearSky cooling tower configuration discussed by Messrs.

22 Havey and Ortiz in their prefiled direct testimony. First, did Messrs. Havey 23 and Ortiz offer any opinion(s) concerning the feasibility of retrofitting IPEC 24 Units 2 and 3 with ClearSky cooling towers?

1 A: Yes. Mr. Havey testified that Tetra Tech's proposal to retrofit IPEC Units 2 and 2 3 with 44 ClearSky plume-abated cooling towers is a "practicalalternative for a 3 closed-cycle cooling retrofit at IPEC apart from the circular hybrid cooling 4 towers initially proposed by Enercon." Havey Direct at p. 13, 1. 9-13 (emphasis 5 added). Mr. Ortiz similarly testifies that "[b]ased on a preliminary review, and 6 subject to the limitations previously stated, the installation of a closed loop 7 system was determined to be technically feasible," Ortiz Direct at p. 6, 1. 17-19, 8 and "[b]ased on the conclusions of the Hatch 2012 Report and subject to the 9 limitations previously outlined, no major issues or deficiencies were identified by 10 Hatch with respect to the technical feasibility of transferring from a once-through 11 cooling system to a closed loop cooling system using the ClearSkyTM cooling 12 tower system." Id. at p. 8, 1.21 - p. 9, 1.2.

13 Q: Do you agree with Mr. Havey that Tetra Tech's ClearSky cooling towers are 14 a "practical alternative" at IPEC?

15 A: No. Mr. Havey is not an engineer, and it does not appear that he has any relevant 16 engineering experience with large-scale modifications to power plants, let alone 17 nuclear power plants. His degree is in environmental science and public policy 18 and it appears the extent of his relevant experience consists of performing 19 reviews of similar "feasibility analys[e]s" in California. To an engineer, there is 20 nothing "practical" about retrofitting a forty-year-old baseload nuclear power 21 plant on a constrained site with challenging topography with closed-cycle 22 cooling. As I testified above, no nuclear facility originally designed for and 23 operated with once-through cooling has been retrofitted with a closed-loop 1 cooling system. Here, Unit 2 and Unit 3 were both designed and constructed in 2 the mid-1970s with turbines and condensers that were specifically designed for 3 cold Hudson River water that cannot be replicated with closed-cycle cooling 4 under maximum thermal load conditions.

5 Even more problematically, Tetra Tech has selected novel and unproven 6 ClearSky cooling towers as the centerpiece of its proposed retrofit. Mr. Havey 7 provides no performance data from the test cell that has operated approximately 8 seven (7) years in the New Mexico desert at the San Juan Generating Station. In 9 fact, the only study of ClearSky cooling towers is from a Department of Energy 10 ("DOE") grant for that single test cell, and even the DOE recognized, in 2009, 11 the unproven nature of the technology. At the time, the towers were referred to 12 as Air2Air:

13 SPX Cooling Technologies is presently investigating the 14 Air2Air for evaporative cooling towers (Figure 1) under 15 the U.S. Department of Energy (DOE) Grant No. DE-16 FC26-06NT42725. The preliminary findings from the 17 research are encouraging in that the basic principles behind 18 the technology are sound and the water savings are 19 substantial. However, in the course of executing this 20 project, construction costs of the validation cell (Figure2) 21 exceeded expectations. To be economically viable, more 22 research is required to develop an efficient heat transfer 1 pack and redesign the overall geometry of the tower 2 includingpack orientation and superstructure.

3 U.S. Dept. of Energy, Improvement to Air2Airg Technology to Reduce Fresh-4 Water Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants, 5 ProMIS/ProjectNo.: DE-NT0005647 (Jan. 2009) (Entergy Ex. 357) (emphasis 6 added). As evident from the title of the study, the experimental ClearSky 7 technology originally had a specific focus which was to promote cooling tower 8 applications in ard areas via reduction of fresh water evaporative cooling loss, 9 which is largely irrelevant to the IPEC application.

10 Accordingly, SPX undertook a second study under a DOE grant award 11 from October 1, 2008 through December 31, 2011 with the objective to "further 12 enable Air2Air becoming a commercially viable water savings and plume 13 abatement technology by researching a re-engineered pack, testing improvement 14 provided by modification, and prototyping the pack manufacture to improve pack 15 economy, as it relates to superstructure volume, cost, pack orientation, and 16 ducting details." See Final Report, Improvement to Air2AirTM Technology to 17 Reduce Fresh-Water Evaporative Cooling Loss at Coal-Based Thermoelectric 18 Power Plants (June 30, 2012) (Entergy Ex. 359) at 5. The final report, dated 19 June 30, 2012, detailed SPX's efforts under the research grant to "prototype" and 20 "adjust our design and propose new experiments as we proceeded in the 21 program." Id. at 24, 30. Based on these adjustments, even SPX acknowledged 22 that its first commercial products were not available until 2012. See id. at 25-26.

1 As I stated in my prefiled direct, only two ClearSky installations recently (i.e.,

2 within the last six months) became operational.

3 Further, none of the small-scale operational ClearSky towers are 4 representative of the 44 back-to-back cells proposed for each Unit at IPEC.

5 Although no operational information has been provided by Tetra Tech for SPX's 6 test cell, it is apparent that the water quality and environmental conditions at the 7 location of the test cell in New Mexico are very different than water quality of the 8 Hudson River and environmental conditions in Buchanan, New York. In fact, as 9 far as I know, there is no operating brackish water application of a ClearSky 10 cooling tower. Tetra Tech, therefore, is not only proposing a modification that 11 has never been done at a nuclear facility before-converting from once-through to 12 closed-cycle cooling-but it proposes to do so using unproven cooling tower 13 technology.

14 Q: Do you agree with Mr. Ortiz's testimony that the ClearSky configuration 15 proposed by Tetra Tech "was determined to be technically feasible"?

16 A: It is not clear to me how Mr. Ortiz can offer this opinion. Mr. Ortiz does not 17 appear to have any relevant engineering experience performing modifications at 18 a nuclear power plant, much less modifications associated with cooling tower 19 applications. Rather, Mr. Ortiz is a "Piping Engineer" who has "worked in the 20 pulp and paper, petrochemical and mining industries." Staff Ex. 247 at 1.

21 Moreover, the basis for Mr. Ortiz's opinion is unclear in light of the admission in 22 the first page of his testimony that he "ha[d] no firsthand knowledge of this 23 project...." Ortiz Direct at p. 1, 1. 19-23. As a result, all of his direct testimony 1 is "based on [his] personal observations and interpretations of the project files, 2 reports, and conversations with former members of this project." Id. Mr. Ortiz 3 never identifies any employees at Hatch that actually have firsthand knowledge 4 of Hatch's review of the ENERCON Closed-Loop Cooling Reports or the Tetra 5 Tech CCC Report, nor does he identify any of the "project files" other than the 6 four reports provided by the parties in this proceeding-ENERCON 2003, 7 ENERCON 2010, Tetra Tech CCC Report, and Hatch 2012. Throughout his 8 testimony, Mr. Ortiz offers opinions based upon his "review of ... report[s]

9 presented to [him]" or his "interpretation of the documents [he has] reviewed,"

10 and he acknowledges that "varying interpretations of [Hatch's] services may 11 exist." Id. Mr. Ortiz nevertheless goes on to say that, "based on [his] research 12 the direct testimony being provided is a reasonable interpretation of Hatch's 13 methods and findings." Id. at p. 1, 1.21-23 (emphasis added).

14 Accordingly, Mr. Ortiz does not appear to be offering his own opinion on 15 the feasibility of a closed-cycle cooling retrofit of IPEC, but his interpretation of 16 documents authored by and containing the opinions of unidentified Hatch 17 personnel. Further, Mr. Havey indicates that Hatch did not review ENERCON 18 2010 (SAIC did). See Havey Direct at p. 8, 1.20-22.

19 In addition, Mr. Ortiz's opinion and his review of the Tetra Tech proposal 20 is heavily caveated and "limited" in a manner that does not allow a reasonable 21 feasibility determination of the sort that represents the industry standard or 22 expectation. According to his testimony, Hatch expressly "did not analyze the 23 Algonquin pipeline feasibility assessment, nor did they review issues related to 1 potential groundwater radiological contamination, nor any visual assessment, 2 blasting, building or equipment relocations, the modification or addition of site 3 services, and air quality." Ortiz Direct at p. 6, 1. 6-10. These "limitations" 4 represent the majority of the most obvious and most significant challenges to the 5 feasibility of retrofitting IPEC with closed-cycle cooling. No reasonable 6 engineer could conclude that any closed-cycle cooling retrofit of IPEC is 7 technically feasible without addressing these items.

8 Q: You mentioned earlier that the ClearSky cooling towers represented a novel 9 and unproven technology. What response, if any, did Messrs. Havey and 10 Ortiz have to Enercon's concern about the novelty of Tetra Tech's ClearSky 11 cooling towers?

12 A: Neither Mr. Havey nor Mr. Ortiz address the fact that ClearSky cooling towers 13 employ novel technology with limited operating experience that presents a large 14 potential risk for a nuclear baseload facility, which should have eliminated the 15 ClearSky towers from consideration as a feasible technology. This lack of 16 response to a fundamental concern is unacceptable in the nuclear power industry, 17 which generally requires that technology choices be supported by demonstrated 18 and reliable operational experience.

19 In fact, Tetra Tech repeatedly and contemporaneously has rejected 20 ClearSky cooling towers as an unproven technology in reviews it has performed 21 for NYSDEC and the U.S. EPA for other non-nuclear power plants that operate 22 at a much smaller-scale than IPEC. For example:

23

  • Section 316(b) Rulemaking. As part of its § 316(b) rulemaking, EPA tasked 1 Tetra Tech and SAIC (who, according to Mr. Havey reviewed ENERCON 2 2010 in lieu of Hatch) with evaluating how costs for plume and drift 3 abatement technology, among other things, may be developed for a universe 4 of facilities potentially subject to CCC retrofits under the proposed existing 5 facility rulemaking. As part of that review, Tetra Tech evaluated ClearSky 6 cooling towers, and in its June 11, 2010 memorandum to EPA, concluded that 7 SPX ClearSky "technology has only been demonstrated on a full-scale basis at 8 a single location in New Mexico and remains a somewhat unproven 9 technology and may require time to develop acceptance within the industry."

10 Memorandum from John Sunda, SAIC, and Kelly Meadows, Tetra Tech to I1 Paul Shriner and Jan Matuszko, USEPA, dated June 11, 2010, at 8 (Entergy 12 Ex. 346) (emphasis added).

13 Glenwood Main Power Station. Tetra Tech was asked by NYSDEC to 14 conduct a technical review and evaluate the feasibility of various alternatives 15 at the Glenwood fossil fuel steam electric facility. In rejecting a cooling 16 tower configuration proposed by Powers Engineering (Riverkeeper's expert) 17 that would require only 12 ClearSky cells, Tetra Tech's technical review 18 repeated its EPA finding that ClearSky towers "halve] only been 19 demonstrated on a full-scale basis at a single location in New Mexico and 20 remain[]an unproven technologyfor applicationssuch as this." Tetra Tech, 21 Inc., Glenwood Technical Review, at 4 (Entergy Ex. 348) (emphasis added).

22 Although the Tetra Tech's review of the Glenwood facility is undated, it 23 references documents there were published as late as 2010.

1 Northport Power Station. On January 28, 2010, NYSDEC requested 2 Northport's owner (National Grid) to provide "...an assessment of a back-to-3 back, linear array of towers, such as the SPX/Marley ClearSkyTM tower 4 configuration for all four units." Washington Group International, Inc.,

5 National Grid Generation LLC, Response to NYSDEC's Request for 6 Additional Information Regarding Cooling Towers (July 1, 2010), at 1-1 7 (Entergy Ex. 349). In response, Washington Group International, a division 8 of URS Corporation, submitted a report concluding "the cooling tower 9 technology identified by NYSDEC for further study [ClearSky towers], is yet 10 unproven for application to generating stations such as Northport..." Id. at 2-11 1 ("[A] plume abatement cooling tower using an array of back-to-back cells, 12 such as the system referenced by the NYSDEC, is an unproven technology for 13 a generating station such as Northport. Therefore, there is a high degree of 14 uncertainty associated with its environmental impacts."); Letter from Timothy 15 Curt, National Grid Environmental Management to Colleen Kimble, NYS 16 Department of Environmental Conservation, dated July 1, 2010 at 4 (Entergy 17 Ex. 353) (same). The Washington Group went on to assert that "the tower 18 suggested by DEC is an unproven technology with no identified commercially 19 comparable installations to Northport." Entergy Ex. 349 at 2-6. Tetra Tech 20 performed the technical review of the Washington Group's report and 21 concluded, "[t]he report's conclusion that the Clear Sky Plume Abatement 22 System remains an unproven technology in this application has some merit, 23 but the analysis demonstrates that alternative cooling tower locations for I towers arranged in a linear configuration could be found on-site albeit at 2 increased costs." Tetra Tech, Inc., Northport Technical Review at 3 (Entergy 3 Ex. 350) at 3.

4 Q: Earlier you mentioned site constraints at IPEC that would render retrofitting 5 the facility with closed-cycle cooling problematic. Did Messrs. Havey and 6 Ortiz address the site disruption of the Tetra Tech closed-cycle cooling 7 configuration?

8 A: No. Neither Mr. Havey nor Mr. Ortiz addressed how Tetra Tech or Hatch plans 9 to relocate the several existing essential structures that conflict with Tetra Tech's 10 proposed ClearSky towers. Mr. Havey testified that, with respect to siting 11 conflicts, the Tetra Tech CCC Report was "not intended to enumerate all 12 potential items that would be addressed in a final engineering and construction 13 plan. Their exclusion from the Tetra Tech 2013 report does not imply they are 14 immaterial or irrelevant for final design and cost estimates." Havey Direct at pg.

15 19, 1.20 - pg. 20, 1.3. Mr. Ortiz specifically testifies that Hatch did not analyze 16 "building or equipment relocations, [and] the modification or addition of site 17 services." Ortiz Direct at p. 6, 1. 6-9. Mr. Ortiz went on to inexplicably assert 18 that such conflicts "cannot be studied in detail during the limited scope of a 19 feasibility report." Id. atp. 9 , 1. 2 1 -p. 10, 1.3.

20 Enercon has prepared Exhibit 373 which is an overhead aerial photograph 21 of the IPEC site showing the footprint of Tetra Tech's proposed cooling towers 22 for Unit 2 and Unit 3. As reflected on Exhibit 373, Tetra Tech proposes to locate 23 its cooling towers effectively on top of many essential buildings and structures.

I Without these structures, IPEC would be unable to operate. By not 2 acknowledging these siting conflicts and developing a plan for relocating 3 essential structures, Tetra Tech's ClearSky towers cannot be considered feasible 4 at IPEC.

5 Q: I would like to focus on some of the specific site disruptions that were 6 identified by Enercon in the ENERCON 2013 CCC Response. First, how, if 7 at all, do Messrs. Havey and Ortiz propose resolving the potential issues with 8 groundwater contamination?

9 A: They do not address the issue. As I explained earlier, Tetra Tech's proposed 10 configuration calls for the existing discharge canal, which is parallel to the River 11 and the Unit 2 and Unit 3 power houses, to be converted into a hot water

12. reservoir and pump pit. In order for the reservoir to provide the necessary 13 submergence for proper operation of the new circulating water pumps, the 14 current Unit 2 discharge canal will need to be deepened considerably. As set 15 forth in the ENERCON 2013 CCC Response, this excavation is in the very 16 location where groundwater containing Tritium and Strontium has been 17 observed. See Entergy Ex. 42. To maintain dry conditions required for pipe 18 construction and backfilling, contaminated groundwater would need to be 19 continually pumped from the excavation area below the groundwater table (i.e.,

20 dewatering), which will have to be continued until completion of the excavation.

21 In fact, Mr. Havey admits that "the retrofit project for Unit 2 is heavily 22 dependent on finding an acceptable solution for dewatering the area during 23 excavation and construction" and "[i]t is my opinion that the plume area will 1 likely require sampling to determine what disposal and/or treatment methods, if 2 any, are most appropriate to manage dewatered groundwater and excavated 3 material." Havey Direct at p. 21, 1. 19 - p. 22, 1. 1 (emphasis added). Despite 4 Mr. Havey's acknowledgement that groundwater radiological contamination may 5 render the Unit 2 tower infeasible, both Tetra Tech and Hatch inexplicably 6 excluded "issues related to potential groundwater radiological contamination" 7 from their feasibility assessment. See, e.g., id. at p 13, 1. 1-3. No feasibility 8 determination can be reached for retrofitting Unit 2 with closed-cycle cooling 9 unless and until Tetra Tech addresses impacts from the groundwater plume.

10 Q: Continuing with specific site disruptions discussed in the ENERCON 2013 11 CCC Response, how, if at all, does Tetra Tech's ClearSky configuration 12 proposed for Unit 2 account for IPEC's Independent Spent Fuel Storage 13 Installation ("ISFSr")?

14 A: It does not. One of the most apparent and problematic aspects of Tetra Tech's 15 proposal for Unit 2 is that the excavation for the Unit 2 towers and associated 16 piping interferes directly with IPEC's ISFSI. The ISFSI is a critical component 17 of the IPEC site for dry cask spent nuclear fuel storage. IPEC's ISFSI is a three-18 foot thick concrete pad that is approximately 100 ft by 200 ft designed to store 19 large, sealed casks containing spent fuel rods. Construction of the ISFSI lasted 20 three years and cost over $13 million dollars. As of February 2014, there were 21 twenty-six (26) casks contained within the ISFSI. The casks are made of steel 22 and concrete and are 18-20 feet high, 11 feet in diameter, and have 2 foot thick 23 concrete walls. Each cask weighs over 300,000 pounds when loaded.

1 IPEC's ISFSI and the spent-fuel casks that it stores are heavily regulated 2 and subject to intensive oversight by NRC. In order to construct the proposed 3 towers for Unit 2, the current ISFSI must be decommissioned and demolished.

4 Before that work can start, however, IPEC must obtain permits for and construct 5 an entirely new ISFSI at a different location to store the spent fuel casks. The 6 Tetra Tech CCC Report and the prefiled testimony of Messrs. Havey and Ortiz 7 completely fail to address the significant impact on the feasibility of the Unit 2 8 cooling towers, not to mention its schedule, of the need to: (1) identify a viable 9 location for, permit and construct a new ISFSI; (2) transfer the existing casks to 10 that new ISFSI; and (3) decommission and demolish the existing ISFSI, all 11 before commencing construction of the Unit 2 tower. In fact, Tetra Tech has 12 performed no analysis to determine if a new ISFSI can be built at IPEC. Another 13 significant obstacle is that the extremely heavy loads restrict what roads can be 14 used to transport the 300,000 pound spent fuel casks. Given these restrictions, 15 there is a risk that there will be no suitable right-of-way to transfer the spent fuel 16 from the reactors to the new ISFSI location. Without resolving this siting 17 conflict and others that may arise relative to the need for a new ISFSI, the Unit 2 18 towers cannot be considered feasible.

19 Q: Third, focusing now on Unit 3, how, if at all, do Messrs. Havey and Ortiz 20 address the feasibility issues associated with the Algonquin Pipeline?

21 A: They do not. Neither Hatch nor Tetra Tech "analyze[d] the Algonquin pipeline 22 feasibility assessment," see Ortiz Direct at p. 6, 1. 6-12; Havey Direct at p. 13, 1.

23 1-7, or provided any solution to resolve the conflict. In fact, the relocation of the

-25 -

I Algonquin Pipeline and feasibility assessment was expressly excluded from both 2 Hatch and Tetra Tech's review. As I stated in my prefiled direct testimony, 3 Tetra Tech's closed-cycle cooling reconfiguration at Unit 3 cannot be considered 4 feasible without resolving the Algonquin pipeline conflict.

5 Q: Your testimony thus far has focused on site-specific challenges to the 6 feasibility of constructing Tetra Tech's ClearSky cooling towers at IPEC.

7 Assuming the towers can be constructed, have- Messrs. Havey and Ortiz 8 reasonably demonstrated that the towers will function efficiently at IPEC 9 without significantly degrading IPEC's performance?

10 A: No. Mr. Havey does not address the impacts associated with Tetra Tech's 11 proposal on the ability of IPEC's condensers to efficiently reject heat, nor does 12 he address the Burns and Roe condenser analysis described in the ENERCON 13 2013 CCC Response and my prefiled direct testimony that demonstrated that 14 additional capacity is likely needed to reduce the pressure in the condenser 15 during at least one of IPEC's transient conditions. For his part, Mr. Ortiz 16 concedes in his testimony that it "was impossibleto accuratelyassess the impact 17 on condenser thermal performance with a higher inlet cooling water temperature 18 resulting from use of the cooling towers." Ortiz Direct at p. 10, 1. 20-22 19 (emphasis added). Based on what Tetra Tech has reported, however, there are 20 several known issues with the ClearSky towers that will detrimentally and 21 materially impact IPEC's performance, including its ability to generate 22 electricity reliably and efficiently.

1 Q: What are those known issues?

2 A: The current closed-cycle cooling retrofit alternatives at IPEC will both (1) reduce 3 the amount of available circulating available to cool the condensers and (2) 4 increase the temperature of the cooling water. These are both major operating 5 constraints that will mean that IPEC will not be able to generate as much 6 electricity as it does in the current once-through system, and in some cases, could 7 lead to excursions and unplanned outages.

8 Significantly, Tetra Tech has failed to address its decision to reduce 9 IPEC's maximum flow rate from 840,000 gpm to 700,000 gpm for each Unit. In 10 fact, one of Tetra Tech's criticisms of the ENERCON Closed-Loop Cooling 11 Reports was the decision to reduce maximum flow to 700,000 gpm for each 12 Unit. Tetra Tech stated:

13 This discussion not only implies that each condenser has a 14 throughput capacity of 840,000 gpm, but that the maximum 15 capacity is actually needed during peak summer periods.

16 Consequently, each unit's replacement cooling tower 17 should be designed to meet the most critical operating 18 conditions that would be expected during the year, i.e.,

19 840,000 rather than the 700,000 gpm used in the design 20 criteria.

21 Memorandum from Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris 22 Hogan, NYS Department of Environmental Conservation, dated July 6, 2010, at 23 6 (Appendix B to Staff Ex. 214). Tetra Tech went on to note that "[i]f correct, 24 the tower as designed appears to be insufficiently sized to accommodate the 25 higher summertime volumes that are sometimes needed." Id. Enercon's 26 decision to reduce the maximum flow to 700,000 gpm was appropriate at the 27 time because it reflected a balance between the parasitic loss associated with 1 pumping the extra circulating water up to the cooling towers and additional fans 2 required to cool that water with the expected degradation in power performance 3 based on the then-current PEPSE models for IPEC Units 2 and 3. Because Tetra 4 Tech's proposal has a different pump and fan dynamics than the round hybrid 5 towers with less parasitic losses, Tetra Tech ought to have reanalyzed whether 6 700,000 gpm was an appropriate design choice for its towers. Instead, Tetra 7 Tech simply copied design decisions from the round hybrid towers described in 8 ENERCON 2010 without properly considering whether those design choices are 9 appropriate for the ClearSky towers.

10 As part of the preparation for this testimony, Enercon was informed by 11 Entergy that the PEPSE model used in ENERCON 2010 and the ENERCON 12 2013 CCC Response had been updated and re-benchmarked. Preliminary 13 analysis of the updated model shows higher power losses when the Units are run 14 at 700,000 gpm, particularly at Unit 2 and particularly during the critical summer 15 months, than what has been reported previously. Based on the results of this 16 preliminary analysis, it is clear that the ClearSky towers proposed by Tetra Tech 17 are significantly undersized. This analysis emphasizes why it was incumbent on 18 Tetra Tech to perform and include PEPSE modeling, as well as other critical 19 thermal performance data, such as cooling tower performance curves, in its 20 report in order to validate its design choices and establish post-modification 21 operating power losses.

22 Q: You also mentioned that in addition to reducing the maximum amount of 23 available water, closed-cycle cooling would also increase the temperature of 1 the circulating water used to cool the condensers. How will that affect plant 2 performance?

3 A: The increased temperature of the circulating water, combined with the reduced 4 flow, will lead to increased condenser backpressure that will reduce the facility's 5 ability to generate power. These effects will be felt most in the summer, when 6 the cooling need is the highest and the demand for electricity is the greatest. But 7 there are additional aspects of the ClearSky towers that amplify the inherent and 8 detrimental impact associated with a closed-cycle cooling retrofit at IPEC.

9 First, as I stated in my prefiled direct, the cooling towers are susceptible to 10 recirculation of the hot, humid exhaust back into the intake, which will increase 11 the entering wet-bulb temperature and reduce the towers' ability to cool the 12 water. Mr. Havey does not address Enercon's concern that the configuration and 13 orientation of the ClearSky towers will likely result in recirculation thereby 14 decreasing their performance and detrimentally affect plant operations. Mr.

15 Ortiz states only that "to better simulate recirculation effects created by different 16 wind conditions a more detailed analysis is required," but he defers this 17 important consideration to later in the "engineering phase of the project" where 18 "adjustments, if required can be implemented ...." Ortiz Direct at p. 11, 1. 12-19.

19 This is not sufficient; the impact recirculation will have on cooling tower 20 performance affects threshold design decisions, such as the number of cooling 21 cells required and the size of those cells. It would be inappropriate to make a 22 "feasibility" determination of a configuration that calls for forty-four (44) cells 23 per unit, only to find out later in the process that, for example, fifty (50) or more 1 cells per unit were actually needed. By way of example, SPX has provided to 2 Enercon a "ClearSky Selection Summary" that proposes a different 3 configuration ClearSky towers for IPEC, consisting of sixty-two (62) smaller 4 ClearSky cells per Unit. The selection summary provided to Enercon explicitly 5 assumes recirculation would increase the inlet wet bulb temperature by 20F 6 (changing the design wet-bulb temperature from 77'F to 79 0F), and as much as 7 50F "under certain wind conditions." See SPX, Entergy Indian Point Units 2 &

8 3, ClearSky Selection Summary (Entergy Ex. 347).

9 Second, Tetra Tech proposes aligning the ClearSky cooling towers in a 10 back-to-back configuration. It is well understood that linear, mechanical draft 11 cooling towers do not perform well in a back-to-back configuration. In fact, this 12 is a point that Tetra Tech has made in several other technical reviews it has 13 made. For example, in a review Tetra Tech performed for NYSDEC for the 14 Northport Generating Station, Tetra Tech noted that "[c]onventional hybrid 15 wet/dry mechanical draft cooling towers must be configured in an in-line (single 16 row) arrangement and cannot be placed in a back-to-back configuration because 17 of issues with poor mixing of the wet and dry section exhaust in the back-to-back 18 configuration." Tetra Tech, Inc., Northport Technical Review at 2 (Entergy Ex.

19 354). Tetra Tech made a similar statement in the review of the Huntley facility:

20 "[d]oubled-up towers are also referred to as back-to-back configurations and are 21 generally not compatible with hybrid wet/dry plume abatement cooling towers."

22 Memorandum from John Sunda, Steve Geil, and Kelly Meadows, to Chuck 23 Nieder, NYSDEC, and Jamie Hurley, USEPA, dated Oct. 5, 2011, at 6-7 I (Entergy Ex. 355). I understand that SPX advertises that, conceptually, ClearSky 2 cooling towers can be designed and operated in a back-to-back configuration, but 3 there is no operational experience showing this to be the case. Indeed, the 4 Air2Air test cell at the San Juan Generating Station in New Mexico cannot be 5 used in a back-to-back configuration because it has air intakes on two sides, 6 which is another reason that it is not representative of NYSDEC's proposal to 7 construct two towers of 44 back-to-back ClearSky cells at IPEC.

8 Third, in addition to known operational problems associated with using 9 cooling towers in salt water applications (e.g., salt deposition, electric arcing, 10 etc.), the thermophysical properties of salt water degrades cooling tower 11 performance as compared to cooling towers that use freshwater. Recent studies 12 have shown that increased salt concentrations materially alter the efficiency of 13 cooling towers to a substantial degree. See Mostafa H. Sharqawy et al., On 14 Thermal Performanceof Seawater Cooling Towers, 133 J. Eng. Gas Turbines &

15 Power (Apr. 2011), at 6 (Entergy Ex. 352) ("It is found that an increase in 16 salinity decreases the air effectiveness by 5-20% relative to freshwater cooling 17 tower."). Here, Tetra Tech proposes concentrating the salt level in the Hudson 18 River three times in its closed-cycle system, which will amplify degradation of 19 thermal performance attributable to increased salinity. Although Mr. Havey 20 asserts in his prefiled testimony that Tetra Tech's proposed ClearSky towers are 21 designed to reject the maximum thermal load under the "most stringent 22 conditions," including "highest salinity" (Havey Direct at p. 29, 1. 10-13), Tetra 23 Tech does not identify the salinity levels that were provided to SPX or how (or I even whether) SPX adjusted the size of its cooling towers to account for the 2 increased salinity of the Hudson River. Without this information, there is a 3 substantial risk that Tetra Tech has further undersized its cooling towers.

4 Q: Aside from and in addition to the impacts that will reduce IPEC's ability to 5 generate power, are there any significant operational problems associated 6 with the proposed ClearSky towers that are not addressed by Messrs. Havey 7 and Ortiz and need to be to reach a feasibility determination?

8 A: Yes. Mr. Havey and Mr. Ortiz fail to address the potential site impacts that 9 could result from the localized plume of humid, salt-laden air that is exhausted 10 from Tetra Tech's ClearSky cooling towers. Importantly, the ClearSky towers 11 discharge at lower velocities, at a lower height, and with less thermal buoyancy 12 than the round hybrid towers described in the ENERCON Closed-Loop Cooling 13 Reports. As a result, the ClearSky towers have more concentrated and localized 14 plumes at ground level, which increases salt deposition and 15 temperature/humidity effects on electrical equipment and components in close 16 proximity to the towers. This creates a number of personnel and station safety-17 related issues, such as electrical arcing, icing during the winter, and fogging due 18 to the cooling tower plume on occasion. Ground level icing and salt deposition 19 poses serious workplace safety, maintenance, and environmental concerns, with 20 the potential to render certain areas of the site treacherous during winter months, 21 as well as creating substantial local vegetation impacts. Fogging that would lead 22 to reduce visibility creates associated security risks at the facility.

1 The risk of icing poses unique operational concerns for ClearSky towers, 2 which use proprietary "ClearSky heat exchangers" that are designed to condense 3 moisture from the cooling tower's exhaust in the form of "high purity water-4 approaching distilled water quality." Entergy Ex. 359 at 10. As SPX noted in its 5 2012 DOE Report, imperfect seals will cause leakage within the ClearSky heat 6 exchanger that will cause icing in the heat exchanger in cold weather. SPX 7 correctly acknowledged that "[t]his behavior is unacceptable in the commercial 8 market place." See id. at 19. Although SPX advertises that it has performed 9 laboratory testing on its condensing modules in "all four seasons," tellingly, the 10 test data it selected to include in its 2012 DOE Report only includes results for 11 spring and summer, not the cooler seasons of fall and winter. See id. at 14-15.

12 At this point, it is simply unknown whether SPX's ClearSky heat exchangers are 13 appropriate for the IPEC site conditions.

14 Another aspect of cooling tower operation not addressed by Mr. Havey or 15 Mr. Ortiz is the potential operational impacts associated with sedimentation in 16 the closed-cycle system. Evaporation of water and drift will elevate the 17 concentration of sediments in the closed-loop system above ambient Hudson 18 River conditions. In addition, it is well known that cooling towers act as air 19 scrubbers, which flush airborne contaminates into the closed loop system further 20 elevating sediment concentrations. It can be expected that this sediment will 21 settle and accumulate in the modified discharge canal and in the cooling tower 22 basins, and it will need to be periodically removed. Tetra Tech provides no

-33 -

1 explanation for how it proposes to control and/or remove sedimentation in its 2 closed-system configuration.

3 Q: On the subject of security considerations, is IPEC required to utilize flood 4 lighting for security purposes that would illuminate any visible plume at 5 night?

6 A: Yes. IPEC's security procedures require the site to be fully lighted at night, 7 which would illuminate any visible plume.

8 Q: Finally, assuming they can be constructed, did Messrs. Havey and Ortiz 9 account for the inherent concerns with fiberglass towers?

10 A: No. Mr. Havey argues at page 20 of his prefiled testimony that fiberglass towers II generally are "structurally sound" and can be reinforced to "meet higher wind 12 load requirements." Havey Direct at p. 20, 1.4-20. There is evidence, however, 13 that raises serious concerns of fiberglass towers' structural integrity. Most 0 14 notably, in the 2011 Cooling Technology Institute Annual Conference, American 15 Electric Power presented a paper entitled, AEP's Experience with Polyester FRP 16 Structure Cooling Towers, that described significant structural failures with five 17 fiberglass towers constructed with pultruded fiberglass. Of the 15 hyperbolic 18 and 30 mechanical draft cooling towers on the AEP system, the five towers 19 constructed from 2008 through 2010 were AEP's first fiberglass towers. AEP's 20 experience is a cautionary tale insofar as four of the five towers experienced 21 failed or cracked fiberglass columns and surface blisters were noticed in two of 22 the new towers after 2 to 18 months of operation. See Bob Cashner, AEP's 23 Experience with Polyester FRP Structure Cooling Towers, Cooling Tower 1 Institute (Feb. 6-10, 2011), at 2 (Entergy Ex. 358). These failures caused AEP to 2 conduct additional testing of the fiberglass material in 2009. See id. at 11. The 3 testing involved repeated exposure to saturation and then freezing or drying or 4 both. In sum, a total of 83 defects were documented in all sixteen samples 5 representing the four different test conditions. Id.

6 IV. REBUTTAL TO NYSDEC'S TESTIMONY CONCERNING THE 7 FEASIBILITY OF RETROFITTING IPEC WITH ROUND HYBRID COOLING 8 TOWERS 9 Q: Turning now to the round hybrid mechanical draft cooling towers described 10 in the ENERCON Closed-Loop Cooling Reports, as a preliminary matter, 11 has Enercon or Entergy proposed the circular hybrid cooling towers 12 described in the ENERCON Closed-Loop Cooling Reports as the best 13 technology available for IPEC under 7 NYCRR § 704.5 and § 316(b) of the 14 Clean Water Act?

15 A: No. Entergy was required by NYSDEC to evaluate the possible conversion of 16 the existing system to a closed-loop circulation water system configuration. In 17 response to that mandate, Enercon selected a closed-loop configuration utilizing 18 hybrid round towers, which are the only cooling towers that could "reasonably 19 be considered" at IPEC. As I stated in my prefiled testimony dated July 22, 20 2011:

21 In the Closed-Loop Cooling Report, ENERCON concluded that 22 the absence of a history of closed-cycle cooling retrofits and site-23 specific conditions at Indian Point would challenge the feasibility 24 of such an installation. The several reasons for the conclusion are 25 explained in detail in the Closed-Loop Cooling Report. Briefly, 1 conversion of Indian Point to closed-loop cooling would be an 2 unprecedented undertaking that would encounter numerous 3 significant identified siting and construction challenges, some of 4 which may not be successfully surmounted. Such a conversion is 5 unprecedented, because no nuclear stations designed solely for 6 once-through cooling have been converted to closed-loop cooling.

7 This nuclear experience is critical, because conversion of the 8 condenser cooling system of an existing plant presents 9 fundamental design problems that result in plant performance 10 impacts or require redesign of the essential plant equipment, e.g.,

11 the condenser. Moreover, absent any practical history of closed-12 loop cooling retrofits at nuclear facilities, engineering observations 13 and conclusions regarding any such conversion must be made on a 0 14 purely speculative basis and are inherently subject to unforeseen 15 challenges during the detailed design and the subsequent 16 construction phases. Only upon successful operation of a 17 completed closed-loop cooling retrofit at a representative number 18 of comparable facilities could this type of conversion be 19 conclusively considered feasible.

20 Prefiled Testimony of Sam Beaver in Support of Entergy Nuclear Indian Point 2, 21 LLC, Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations, 22 Inc. at 21:5-22, dated July 22, 2011.

1 Q: Are there any examples of round hybrid towers at nuclear facilities of the 2 size contemplated in the ENERCON Closed-Loop Cooling Reports?

3 A: There is only one round hybrid tower of a size that approaches what would be 4 required for each of IPEC Unit 2 and Unit 3, located at the Neckarwestheim 5 nuclear power plant (Unit 2) in Germany. There are, however, several important 6 differences between the Neckarwestheim facility and IPEC. Most significantly, 7 the Neckarwestheim Unit 2 cooling tower was constructed as part of a new 8 facility, not a retrofit of an existing facility. The Neckarwestheim Unit 2 cooling 9 tower is also subject to different environmental and water quality conditions than 10 what would be experienced at IPEC.

11 Q: Did Messrs. Ortiz and Havey offer any analysis concerning the feasibility of 12 retrofitting IPEC Units 2 and 3 with round hybrid cooling towers?

13 A: No. While Mr. Havey testifies that the circular hybrid cooling towers described 14 in ENERCON 2003 "could be constructed, installed, and operated at the Indian 15 Point nuclear facilities," Havey Direct at p. 3, 1. 19-21, and that "Enercon's 16 circular hybrid cooling tower proposal was available and generally feasible for 17 the IPEC facilities in order to satisfy the BTA requirements of 6 NYCRR 18 § 704.5," id. at p. 10, 1. 8-10, he offers no additional analysis. Likewise, Mr.

19 Ortiz offers no analysis nor justification. Further, Mr. Ortiz's opinion as to the 20 feasibility of retrofitting Units 2 and 3 with round hybrid towers is even less 21 clear. In response to a question as to whether the circular hybrid cooling tower 22 configuration described by Enercon in its 2003 and 2010 is "available and 23 generally feasible," Mr. Ortiz testifies that "[b]ased on the limited scope and I analysis of the study [the round hybrid towers] may be feasible, but a more in 2 depth study would be necessary to obtain afinalconclusion." Ortiz Direct at p.

3 5, 1. 1-2 (emphasis added).

4 Q: Do you agree with Mr. Havey's opinion that the circular hybrid cooling 5 towers described in the ENERCON Closed-Loop Cooling Reports "could be 6 constructed, installed, and operated at the Indian Point nuclear facilities" 7 and Mr. Ortiz's testimony that such a retrofit "may be feasible"?

8 A: No. While retrofitting IPEC Units 2 and 3 may be theoretically possible (and 9 cost over two billion dollars and take over eight years in construction time 10 alone), the ENERCON Closed-Loop Cooling Reports identified numerous 11 significant challenges to the feasibility of retrofitting IPEC Units 2 and 3 with 12 circular hybrid cooling tower. These include, but are not limited to, appreciable 13 elevation changes, a general lack of available space, a subsurface primarily 14 composed of solid rock, the location of a major interstate gas pipeline, local air 15 quality, archeological and aesthetic considerations, etc. Given the sizeable 16 challenges and level of unknowns, based upon my best professional judgment, I 17 could not in good conscience recommend round hybrid cooling towers for IPEC 18 as a practical or reasonable alternative for compliance with regulatory 19 requirements associated with the Clean Water Act.

20 To reach any other conclusion about the feasibility of round hybrid towers, 21 the challenges identified in the ENERCON Closed-Loop Cooling Report would 22 need to be fully addressed. Neither Mr. Havey nor Mr. Ortiz resolved any of the 23 uncertainties described in the ENERCON Closed-Loop Cooling Reports, and as I a result, are not in a position to conclude that round hybrid towers are feasible at 2 IPEC.

3 Q: Did Tetra Tech or Hatch materially dispute any of the conclusions of the 4 ENERCON Closed-Loop Cooling Reports?

5 A: No. According to Mr. Ortiz, Hatch's review of the Enercon Closed-Loop 6 Cooling Reports was limited to reviewing the reports by unidentified Hatch 7 employees and providing "comments" to Mr. Havey at Tetra Tech. Hatch's 8 review of ENERCON 2003 was reportedly limited to "challenging certain 9 assumptions on the prevailing winds, soil conditions, some contradictions on the 10 wet bulb temperatures used, and identified minor discrepancies." Ortiz Direct at 11 p. 3, 1.17-19. Given this context, Mr. Ortiz's testimony that in Hatch's review of 12 ENERCON 2010, "no major issues or deficiencies were identified by Hatch with 13 respect to the technical feasibility of transferring from a once-through cooling 14 system to a closed loop cooling system" is not helpful to me as an engineer. See 15 id. at p. 4, 1. 15-28 (emphasis added). It is further complicated by the fact that 16 Mr. Havey states in his testimony that SAIC, not Hatch, reviewed ENERCON 17 2010. See Havey Direct, at p. 8, 1. 20-22. Mr. Ortiz does not even discuss the 18 major issues and challenges identified by Enercon in its report.

19 There is nothing in Mr. Ortiz's testimony that shows a basis for any 20 engineering conclusions as to feasibility of round hybrid cooling towers at IPEC.

21 Similarly, Tetra Tech did not dispute and in fact, validated, many of the major 22 conclusions of the ENERCON Closed-Loop Cooling Reports. For example, 23 Tetra Tech agreed:

1 1. Enercon's estimate for direct capital costs of $1.19 billion and ongoing 2 operation and maintenance costs of $2.0 to $4.0 million per year per unit were 3 "well within the range of comparable project estimates developed for other 4 nuclear facilities when adjusted for the unique considerations at IPEC (found 5 hybrid towers, transmission pipeline relocation, etc.)." Memorandum from 6 Tim Havey, Tetra Tech, Inc. to Chuck Nieder and Chris Hogan, NYS 7 Department of Environmental Conservation, dated July 6, 2010 at 3 (Staff Ex.

8 214, Appendix B).

9 2. Enercon's estimate of 12 to 13 years for construction was "not unreasonable 10 given the volume of blasting and spoils removal that would have to occur, and 11 the limitations placed on construction activities by local ordinances and 12 seasonal weather concerns." Id.

13 3. Enercon's estimate that construction of closed-cycle cooling would require 14 taking both IPEC units offline for up to 42 concurrent weeks was "reasonable 15 and acceptable." In fact, Tetra Tech concluded that "[t]he obstacles presented 16 by reconfiguring the existing discharge canal to function as a main component 17 of the new cooling system are correctly cited by Enercon as unavoidable.

18 There do not appear to be any practical means to significantly decrease this 19 estimate." Id.

20 4. Enercon's estimate of thermal efficiency losses were reasonable when 21 compared to other similar projects. Id.

-40 -

1 Q: Were there any limitations or caveats in the prefiled testimony of Messrs.

2 Havey and Ortiz with respect to Tetra Tech and Hatch's review of the 3 ENERCON Closed-Loop Cooling Reports?

4 A: Yes. Although both Mr. Havey and Mr. Ortiz suggest that hybrid round cooling 5 towers may be generally feasible, both Hatch and Tetra Tech again excluded 6 from consideration (1) the Algonquin pipeline relocation and feasibility 7 assessment and (2) "issues related to potential groundwater radiological 8 contamination." See Havey Direct at p. 8, 1. 10-17; see also Ortiz Direct at 4:11-9 18. In short, and for the same reasons I testified earlier, relocating the Algonquin 10 pipeline and issues related to potential groundwater radiological contamination 11 must be resolved prior to any feasibility determination being made.

12 V. REBUTTAL TO CHARLES NIEDER 13 Q: Have you had an opportunity to review Mr. Nieder's testimony regarding 14 capital costs of operating CWWS at IPEC?

15 A: Yes. Mr. Nieder suggests that Enercon did not provide enough detail to support 16 its estimate of the capital costs for constructing the proposed array of CWWS. I 17 have submitted as Entergy Exhibit 372 additional details that support Enercon's 18 estimate of capital costs which should address Mr. Nieder's concern.

19 Q: Have you had an opportunity to review Mr. Nieder's testimony regarding the 20 O&M costs of operating cylindrical wedgewire screens at IPEC?

21 A: Yes. Mr. Nieder contends that he was not able to calculate the proportional costs 22 of Entergy's proposed CWWS array because it did not include annual O&M 23 costs of the CWWS array. He further disputes NERA's conclusion that the 24 O&M costs for CWWS would be insignificant based on other estimates he had 1 received for CWWS O&M costs from other facilities because the "median O&M 2 costs represented 38 percent of the total costs for constructing and operating 3 CWWSs for 20 years. This percentage level of the overall costs for constructing 4 and operating CWWSs for 20 years is significant." Nieder Direct at p. 17, 1. 8-5 10.

6 Q: As a preliminary matter, is it appropriate to calculate O&M costs for the 7 CWWS for a 20 year life period?

8 A: No. CWWS will not be operating for the full twenty years of Entergy's renewed 9 license. Entergy's NRC renewed operating licenses for Unit 2 and Unit 3 would 10 expire in 2033 and 2035, respectively. We have estimated that the design phase 11 of the CWWS project would extend for approximately two years and in-river 12 construction activities would occur over three successive years, with the final tie-13 in occurring in the sixth year. Accordingly, assuming design and construction 0 14 begin after these proceedings and any associated court proceedings end, which I 15 understand NERA assumed would be 2018, construction would not be complete, 16 and therefore Entergy would not be incurring O&M costs for each Unit, until 17 roughly 2024. As a result, O&M costs would only be incurred for 9-11 years 18 until the operating license respectively expire, or an average of 10 years per unit.

19 That is only half the period assumed by Mr. Nieder.

20 Q: Do you agree with Mr. Nieder's estimate that potential O&M costs for 21 CWWS would render the overall costs significant?

22 A: No. As Mr. Nieder acknowledges, the principal O&M cost associated with any 23 CWWS proposal is the cost associated with cleaning the screens. Entergy has

-42 -

1 specifically made design choices to minimize the risk of fouling and therefore 2 reduce the need for cleanings, including constructing the screens out of Johnson 3 Screen's Z-Alloy, which has been demonstrated to resist biofouling in the 4 Hudson River, and selecting a conservative through-slot velocity of 0.25 feet per 5 second. In addition to these design choices, during the summer months when the 6 potential for fouling is at its highest and when the biological need is the greatest, 7 Entergy can use divers to regularly-and even continually--clean the screens.

8 From Entergy's past experience with cleaning the Ristroph screens, the average 9 cost for a dive team at IPEC is $7,000 per day. There is no reason to conclude 10 that the per day cost of dive teams would be any different for CWWS than the 11 current intake structure. For the rest of the year (i.e., fall through spring), when 12 the risk of fouling is considerably lower, monitoring in the intake bays would 13 alert the operators of any potential fouling issues with the screens, and divers can 14 be deployed on an "as needed" basis.

15 VI. CONCLUSION 16 Q: Has anything that you have read in the testimonies of Messrs. Havey, Ortiz, 17 and Nieder or in the documentary exhibits attached to their testimony 18 affected the opinions you previously testified to in your February 28, 2014 19 prefiled testimony?

20 A: No. For the reasons detailed above, nothing that I have reviewed alters my 21 bottom-line conclusion that the given the numerous and significant site-specific 22 challenges associated with retrofitting IPEC with closed-cycle cooling 23 documented by Enercon, the considerable uncertainty inherent in such a retrofit 24 project, and the detrimental impact that a closed-cycle cooling retrofit would

-43 -

1 have on the facility's ability to generate electricity, NYSDEC Staff has failed to 2 demonstrate that cooling towers are feasible at IPEC.

END OF TESTIMONY STATE OF NEW YORK DEPARTMENT OF ENVIRONMENTAL CONSERVATION In the Matter of Entergy Nuclear Indian Point 2, LLC and DEC No.: 3-5522-00011/00004 Entergy Nuclear Indian Point 3, LLC SPDES No.: NY-0004472 For a State Pollutant Discharge Elimination System Permit Renewal and Modification In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, DEC App. Nos. 3-5522-00011/00030 (IP2) and Entergy Nuclear Operations Inc.'s 3-5522-00105/00031 (IP3)

Joint Application for CWA § 401 Water Quality Certification PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG IN SUPPORT OF ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3. LLC AND ENTERGY NUCLEAR OPERATIONS, INC.

CLOSED CYCLE COOLING ENTERGY NUCLEAR INDIAN POINT 2, LLC, ENTERGY NUCLEAR INDIAN POINT 3, LLC, AND ENTERGY NUCLEAR OPERATIONS, INC.

By its attorneys, Elis~e N. Zoli"",,

Kevin P. Martin John C. Englander Goodwin Procter LLP 53 State Street Boston, Massachusetts 02109 Tel.: 617.570.1000 March 28, 2014 Fax: 617.523.1231

TABLE OF CONTENTS I. IN TR O DU CTIO N ............................................................................................................... 1 II. CALCULATION OF THEORETICAL HARVEST IMPACTS DOES NOT INDICATE FISH POPULATION EFFECTS ............................................................... 2 III. MR. NIEDER UNDERSTATES THE BENEFITS (EFFICACY) OF THE PROPOSED CWWS ARRAY ........................................................................................ 4 IV. NYSDEC STAFF STILL PROVIDE NO ANALYSIS OF POTENTIAL IMPACTS OF THE PROPOSED CCC RETROFIT ON STURGEON ......................... 8 i

PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 1. INTRODUCTION 2 Q: Please identify yourself.

3 A: My name is John R. Young, Ph.D. I am a Senior Scientist and Vice President at 4 ASA Analysis & Communications, Inc. ("ASA"), an environmental consulting 5 firm based in Lemont, Pennsylvania. In this capacity, I provide technical 6 direction for ASA's applied statistics and environmental monitoring services. My 7 business address is 921 Pike Street, Lemont, PA 16851-0303.

8 Q: Are you the same John Young who provided prefiled direct testimony on 9 February 28, 2014, on behalf of Entergy in support of its application for 10 SPDES Permit Renewal (DEC No.: 3-5522-00011/00004, SPDES No.: NY-11 0004472) and a Water Quality Certification (DEC App. Nos. 3-5522-12 00011/00030 (IP2) and 3-5522-00105/00031 (IP3)) for Indian Point Units 2 13 and 3 (the "Proceedings")?

14 A: Yes.

15 Q: Please state the purpose of your prefiled rebuttal testimony.

16 A: The purpose of my prefiled rebuttal testimony is to address certain portions of the 17 prefiled direct testimony of New York State Department of Environmental 18 Conservation ("NYSDEC") Staff members Charles Nieder ("Nieder Direct") and 19 Christopher Hogan ("Hogan Direct") submitted as part of these Proceedings on 20 February 28, 2014. I have reviewed the prefiled testimony of these individuals 21 and the relevant materials on which each relies.

22 Q: How is your rebuttal testimony organized?

23 A: My testimony is organized into three sections. First, I respond to statements by 24 Mr. Hogan about CCC furthering recreational and commercial fishing and Mr.

PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 Nieder's testimony that the theoretical harvest impacts presented in the reports 2 produced by NERA Economic Consulting ("NERA") entitled "Wholly 3 Disproportionate" Assessments of Cylindrical Wedgewire Screens and Cooling 4 Towers at IPEC (December 2013) (Entergy Ex. 297) and Benefits and Costs of 5 Cylindrical Wedgewire Screens or Cooling Towers at IPEC (December 2013) 6 (Entergy Ex. 296D) (collectively, the "NERA Reports") are inconsistent with the 7 previous testimony of Entergy's biology team that reducing impingement and 8 entrainment mortality at Indian Point would not increase fish populations in the 9 Hudson River. Second, I respond to Mr. Nieder's testimony understating the 10 reductions in entrainment mortality, or efficacy, associated with Entergy's 11 proposed Cylindrical Wedgewire Screen ("CWWS") array. Third, I address 12 NYSDEC Staff's continued lack of analysis of potential impacts of its proposed 13 CCC retrofit on endangered sturgeon.

14 II. CALCULATION OF THEORETICAL HARVEST IMPACTS DOES NOT 15 INDICATE FISH POPULATION EFFECTS 16 Q: Let's begin with Mr. Hogan's testimony. On pages 36-39 of his prefiled 17 testimony, Mr. Hogan discusses the report he prepared entitled Indian Point 18 Energy Center Unit 2 and Unit 3 Cooling System RetrofitAlternative: State 19 Environmental Quality Review Act PreliminaryAssessment of Consistency 20 with Applicable State Coastal Policies(the "Hogan CMP Report"), Staff Ex.

21 243. Have you reviewed the Hogan CMP Report?

22 A: Yes. I have reviewed relevant portions of the Hogan CMP Report.

23 Q: On page 11 of the Hogan CMP Report, Mr. Hogan states that installing the 24 "closed cycle cooling retrofit alternative would restore the viability of habitat PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 in the water column" and "further commercial and recreational fishing 2 activities" in the Hudson River. Do you agree with his assessment?

3 A: No. As Entergy's Biology Team testified at length in the Best Usages portion of 4 these Proceedings, multiple lines of analysis of more than 30 years of Hudson 5 River fish population data have shown that Indian Point impingement and 6 entrainment have no effect on the populations (or the community) of fish in the 7 Hudson River. See, e.g., Hearing Tr. at 3379:7-86:4 (Heimbuch); 3386:5-92:14 8 (J. Young); 3393:15-3407:13 (Barnthouse); 3409:4-13:5 (J. Young); 3413:14-21 9 (J. Young, Barnthouse, Heimbuch). Therefore, installing a CCC retrofit, or any 10 other cooling water intake structure technology, at Indian Point would have no 11 impact on the "viability of habitat in the water column," nor would it "further 12 commercial and recreational fishing activities" in the Hudson River.

13 Q: Now let's turn to Mr. Nieder's testimony. On page 25 of his testimony, Mr.

14 Nieder states that "Entergy's experts have previously opined that no amount 15 of impingement mortality and entrainment reduction would increase the 16 abundance of any Hudson River fish population but in the December 2013 17 NERA reports, Entergy's biologists present a fisheries harvest benefit for 18 striped bass, American shad, white perch, and river herring as a result of 19 reducing impingement and entrainment at IPEC." Is the "fisheries harvest 20 benefit" presented in the NERA Reports inconsistent with the Biology 21 Team's conclusions that impingement and entrainment at Indian Point have 22 no effect on Hudson River fish populations?

23 A: The "fisheries harvest benefit" calculated in NERA's reports for both CWWS and PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 CCC technologies appears inconsistent with the Biology Team's conclusions that 2 impingement and entrainment at Indian Point have no effect on Hudson River fish 3 populations. However, as is stated in my reports providing biological inputs for 4 NERA's benefits and costs analyses (Entergy Exs. 185B, 300) and "wholly 5 disproportionate" analysis (Entergy Ex. 301), as well as in my prefiled testimony 6 regarding these reports (see J. Young May 31, 2013 Direct at 3-4; J. Young Feb.

7 28, 2014 Direct at 12-13), in calculating the theoretical increased harvests that 8 would result from installation of the proposed CWWS or CCC systems, we are 9 attempting to be highly conservative by maximizing our estimate of potential 10 benefits for both CWWS and for CCC. Accordingly, we give appropriate weight 11 to the impingement and entrainment losses on a theoretical basis consistent with 12 their expected contribution to the fishery, if we ignore the scientific evidence that 13 impingement and entrainment at Indian Point do not affect Hudson River fish 14 populations. Our doing so does not favor either of these two technology 15 alternatives - CWWS and CCC - over the other; rather, it favors both alternative 16 technologies over the no-action alternative, reflecting a conservative approach to 17 the issue. The Biology Team continues to believe there would be no positive 18 impacts from elimination of impingement and entrainment at Indian Point, but to 19 be very conservative in comparing the two proposed alternatives to the no-action 20 alternative, we present the potential increases in harvest that would be expected if 21 30+ years of empirical data were ignored.

22 III. MR. NIEDER UNDERSTATES THE BENEFITS (EFFICACY) 23 OF THE PROPOSED CWWS ARRAY 24 Q: In the fourth step of his best technology available ("BTA") analysis, Mr.

PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 Nieder presents the benefits associated with Entergy's proposed CWWS 2 system as an efficacy of 54%; do you agree with his estimate?

3 A: No. The 54% figure used by Mr. Nieder as an estimate of the efficacy of the 4 proposed CWWS in the fourth step of his BTA analysis significantly understates 5 the actual entrainment reduction associated with the proposed CWWS. Indeed, 6 the 54% figure Mr. Nieder presents in his most recent prefiled testimony on page 7 14 is even lower than the 60% figure NYSDEC Staff has advanced in previous 8 testimony in these Proceedings. See e.g., Nieder June 29, 2012 Rebuttal at 30 9 ("the results.., suggest that the T-12 2.0 mm slot-width CWWS tested in-river 10 from a barge resulted in approximately 60% reduction in entrainment density 11 from that measured by the control port."). Mr. Nieder does not address this 12 inconsistency between his prior testimony and his present testimony regarding 13 CWWS efficacy.

14 In addition to being inconsistent with his prior testimony, Mr. Nieder's 15 54% figure also is inconsistent with the scientific evidence, which Mr. Nieder 16 likewise has failed to address. Mr. Nieder, referring back to his August 3, 2012 17 live hearing testimony (Hearing Tr. at 5140-45), states that the "best estimate" of 18 the efficacy of the proposed CWWS array is 54% when accounting for actual 19 intake flows during the "entrainment season" (averaging 93.9% of design 20 capacity), which he describes as being from May 10 through August 10 each year.

21 See Nieder Direct at 14:6-19; 27:1-20; see also Staff Ex. 215 at 15, 16. While we 22 appreciate and agree with NYSDEC that most entrainment occurs within that May 23 10 to August 10 timeframe, we would note that some entrainment is known to PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 occur outside of that window when average flows may be less than 93.9% of full 2 flow, and that to the extent Mr. Nieder's entrainment reduction calculation does 3 not include entrainment reductions that occur outside the May 10 to August 10 4 time period, it under-represents the actual reduction.

5 Mr. Nieder's 54% estimate of efficacy is based on his interpretation of the 6 data in the report prepared by Entergy's Biology Team entitled Wedgewire Screen 7 In-River Efficacy Study at Indian Point Energy Center (January 2012) (the "In 8 River Study") (Entergy Ex. 163). See Nieder Direct at 14:8-11. However, Mr.

9 Nieder's estimate is based on a comparison of the density of ichthyoplankton 10 entrained through the In-River Study's 2.0 mm slot width T-12 test screen against 11 the control port used in the In-River Study, and not against ambient density 12 estimated via the Tucker trawl. See Hearing Tr. at 5140-5141. Entergy's Biology 13 Team has explained at length that the Tucker trawl provides a more accurate and 14 appropriate estimate of ambient ichthyoplankton density for the calculation of 15 efficacy because it less susceptible than a control port to avoidance by larval and 16 juvenile fish. See, e.g., June 29, 2012 Panel Prefiled Rebuttal at 4-33; Hearing Tr.

17 at 4871-88: Entergy Ex. 17. Thus, Mr. Nieder's assessment is understated.

18 Rather, as set forth in the 2011 Update, the proposed CWWS will reduce 19 the entrainment of all representative important species ("RIS") by an average of 20 75.4%, taking into account average annual intake water flows, and without taking 21 into account entrainment survival. See Entergy Exs. 21 at 3 (case 4.1); see also 22 Entergy Ex. 96C, case 4.1 (reporting average entrainment reductions for age-1 23 equivalents of 89.7% from regulatory baseline); July 22, 2011 Panel Direct PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 Prefiled at 67:11-15 (entrainment reductions for age-1 equivalents between 86%

2 and 93.2% from regulatory baseline). The In-River Study data, which formed the 3 entire basis for Mr. Nieder's estimate, in fact confirmed our 75.7% estimate based 4 on extensive laboratory studies (taking into account annual intake water flows and 5 sweeping velocity reductions among individual screens in the array). See May 30, 6 2012 Panel Prefiled Direct at 42 (case 4.1c); see also Entergy Ex. 180C. As the 7 Biology Team also has testified, the efficacy of the proposed CWWS increases to 8 82.2% when accounting for entrainment survival and 89.7% when expressed as 9 age-I equivalents, each of which approaches Mr. Nieder's 96% figure for CCC on 10 an annualized basis. See May 30, 2012 Panel Prefiled Direct at 42 (case 4.1a);

11 Entergy Ex. 180C.

12 In addition, Mr. Nieder's 54% figure does not account for the fact that, on 13 a cumulative basis - i.e., over the course of the remaining life of the facility upon 14 license renewal (until 2033 for Unit 2 and 2035 for Unit 3) and accounting for 15 differences in CWWS and CCC implementation schedules - the reductions in 16 entrainment losses attributable to installation of CWWS would be greater than for 17 either CCC proposal. What is more, even the 54% figure for CWWS used by Mr.

18 Nieder in his February 28, 2014 prefiled testimony is higher than the true efficacy 19 one would achieve with CCC on an annual basis, if CCC must be curtailed to 20 meet air quality requirements. Although Mr. Nieder contests whether air quality 21 requirements would limit the operation of CCC at Indian Point, he has not 22 disputed Entergy's estimates of the magnitude of entrainment reductions 23 associated with CCC, assuming air quality requirements do in fact limit its PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 operation.

2 IV. NYSDEC STAFF STILL PROVIDE NO ANALYSIS OF POTENTIAL 3 IMPACTS OF THE PROPOSED CCC RETROFIT ON STURGEON 4 Q: Does Mr. Nieder address potential impacts of NYSDEC's proposed CCC 5 retrofit on endangered sturgeon in the Hudson River?

6 A: No. Mr. Nieder does not address any potential impacts of NYSDEC's proposed 7 CCC retrofit on endangered sturgeon. Potential impacts to sturgeon are 8 mentioned briefly in Mr. Hogan's prefiled testimony. I understand, however, that 9 issues regarding the environmental impacts of NYSDEC's proposed CCC retrofit 10 on endangered species including shortnose and Atlantic sturgeon are supposed to 11 be addressed in later hearings that have yet to be scheduled; I respond to Mr.

12 Hogan's testimony regarding potential impacts on endangered sturgeon at this 13 time with the understanding that I may supplement my testimony in these 14 Proceedings regarding impacts to endangered species later at the appropriate 15 phase of the Proceedings, if necessary.

16 Q: Can you summarize Mr. Hogan's prefiled testimony regarding potential 17 effects of NYSDEC's proposed CCC retrofit on endangered sturgeon in the 18 Hudson River?

19 A: Yes. On page 15 of his prefiled testimony, Mr. Hogan states that NYSDEC Staff 20 have "considered impacts to shortnose and Atlantic sturgeon in evaluating which 21 BTA alternatives would accomplish acceptable reduction in entrainment and 22 impingement by the cooling water intake structure" and that "there is a sufficient 23 body of data developed and supplied to the record during the BTA portion of this 24 proceeding, with which to assess the impacts." Hogan Direct at 15:20-24. Mr.

PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 Hogan also states that after considering "appropriate facts and information" 2 NYSDEC staff "made a determination selecting a preferred closed cycle cooling 3 alternative as the BTA." Hogan Direct at 16:1-4.

4 Q: Does Mr. Hogan's testimony discuss any actual potential impacts of 5 NYSDEC's proposed CCC retrofit on sturgeon?

6 A: No. As I described above, Mr. Hogan's testimony merely states that NYSDEC 7 staff have considered the evidence in the record and have chosen CCC as BTA for 8 Indian Point; nowhere does Mr. Hogan actually discuss the evidence in the record 9 or any potential impacts, in particular construction impacts, of CCC to sturgeon.

10 As I stated in my prefiled direct testimony, no analysis of the potential impacts of 11 construction activities, including blasting of a "significant area of the IPEC site,"

12 or the loading and movement of more than 1,200 barges at the Unit 1 pier, was 13 included in the report Indian Point Closed-Cycle System Retrofit Evaluation 14 (Tetra Tech June 2013), and such an analysis also is absent from NYSDEC Staff's 15 testimony. Nor do NYSDEC Staff s witnesses' testimonies address the record 16 evidence that CWWS are more effective at reducing impingement mortality than 17 CCC would be (whereas entrainment of sturgeon is not an issue for either 18 technology). See, e.g., Nieder, Wholly DisproportionateTest Report, Feb. 28, 19 2014, at 14; NMFS, Biological Opinionfor Continued Operationsof Indian Point 20 Nuclear Generating Unit Nos. 2 and 3, Jan. 30, 2013 (Entergy Ex. 213), at 59-6 1, 21 64. As such, NYSDEC Staffs analysis and testimony continues to be inadequate 22 to make a State Environmental Quality Review Act ("SEQRA") determination for 23 the CCC retrofit proposed by NYSDEC staff.

PREFILED REBUTTAL TESTIMONY OF JOHN R. YOUNG 1 Moreover, Mr. Hogan's testimony addresses, if cursorily, only NYSDEC 2 Staff s BTA determination (Hogan Prefiled at 16:28-17:2), and therefore ignores 3 the issue of whether the proposed CCC system meets the requirements of the 4 SEQRA with respect to any aspects other than entrainment and impingement.

5 Therefore NYSDEC Staff still have not provided a complete analysis of potential 6 CCC impacts to endangered sturgeon sufficient to meet SEQRA requirements.

END OF TESTIMONY