Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22013A70613 January 2022Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G
ML20260H07218 June 2020IP-RPT-14-00013, Revision 3, Indian Point Nuclear Generating Units 2 and 3, Consequences of a Postulated Fire and Explosion Following the Release of Natural Gas from the New Aim 42 Pipeline Near IpecTornado Missile
Hydrostatic
Coatings
Met Tower
FLEX
Earthquake
ML20122A10527 May 2020Letter from Margaret M. Doane to John B. Rhodes, Chair and Executive Officer, Ny State Public Service Commission: Response to Ny State Public Service Commission Regarding Natural Gas Transmission Pipelines Near Indian Point Nuclear Power PlSafe Shutdown
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Earthquake
NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)22 October 2019Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Ultimate heat sink
Spent Fuel Pool Instrumentation
ML19252A3189 September 2019Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of Sept 2, 2019
NL-19-061, Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements13 June 2019Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements
ML19114A07422 April 2019Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of April 15, 2019
NL-19-012, Request for Approval of a Certified Fuel Handler Training and Retraining Program15 April 2019Request for Approval of a Certified Fuel Handler Training and Retraining ProgramJob Performance Measure
ML17279A2476 October 20172017 Annual Assessment Meeting Written Comments CompilationEarthquake
Chernobyl
ML17222A2394 October 2017NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding Hazard ReevaluationsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
Exemption Request
Earthquake
Backfit
NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan6 February 2017License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection PlanUnanalyzed Condition
Nondestructive Examination
Functionality Assessment
Condition Adverse to Quality
Aging Management
EVT-1
NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 31 August 2016Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3Post Accident Monitoring
NL-15-128, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update28 September 2015Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update
NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 33 September 2015Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3Post Accident Monitoring
NL-15-099, Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report30 July 2015Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report
NL-15-072, 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements18 June 20152015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and ReplacementsMoisture barrier
NL-15-030, Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project8 April 2015Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas ProjectSafe Shutdown
Tornado Missile
Hydrostatic
Coatings
Nondestructive Examination
FLEX
Earthquake
NL-15-013, Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval28 January 2015Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval
NL-14-152, Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...22 December 2014Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...Safe Shutdown Earthquake
Probabilistic Risk Assessment
Met Tower
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
Power Operated Valves
ML14329A1954 November 2014NET-300067-01, Rev. 0, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber PanelsBoric Acid
Coast down
NL-14-115, 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 201418 September 201410 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 2014Grab sample
Temporary Modification
ML15166A07031 August 2014Algonquin Incremental Market (Aim) Project, Phase 2 Acoustic Survey for Indiana Bats (Myotis Sodalis) and Northern Long-Eared Bats (Myotis Septentrionalis), August 2014
NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events27 August 2014Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsBoric Acid
High winds
Shutdown Margin
Internal Flooding
FLEX
ML14141A5409 May 2014Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentFukushima Dai-Ichi
ML14071A1831 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
NL-14-042, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi.31 March 2014Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi.Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
NL-14-043, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.31 March 2014Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.Safe Shutdown
Mission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Earthquake
ML14071A19820 March 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML14015A41730 January 2014Staff Summary of the Steam Generator Tube Inservice Inspections for the Spring 2013 Refueling Outage
ML14304A75113 December 2013Unit 3 Coastal Zone Management Act Consistency Certification, Vol. II of III, Supplemental Information Regarding NYSDEC Record, Part 8 of 9Fatality
NL-13-133, 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time2 October 201310 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time
ML13221A41726 July 2013LTR-13-0662 - Susan Lerner, Common Cause New York Ltr Provides a Copy of Generating Influence, Entergy'S Political Spending and the Battle Over the Indian Point Nuclear Power Plant.Earthquake
Chernobyl
Environmental Justice
ML14304A75231 December 2012Unit 3 Coastal Zone Management Act Consistency Certification, Vol. II of III, Supplemental Information Regarding NYSDEC Record, Part 9 of 9Biofouling
ML12346A34320 November 2012Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through EndBoric Acid
Earthquake
Scaffolding
ML12346A34220 November 2012Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 434Safe Shutdown
Unanalyzed Condition
Boric Acid
Safe Shutdown Earthquake
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
NL-12-167, Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 43420 November 2012Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 434Safe Shutdown
Unanalyzed Condition
Boric Acid
Safe Shutdown Earthquake
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
NL-12-167, Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through End20 November 2012Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through EndBoric Acid
Earthquake
Scaffolding
NL-12-136, 10 CFR 72.48(d)(2) Report, Listing and Summary of Changes, Tests and Experiments1 October 201210 CFR 72.48(d)(2) Report, Listing and Summary of Changes, Tests and Experiments
NL-14-002, Enclosure - NL-14-002, SAMA Engineering Project Cost Estimates Prepared by RCM Technologies20 September 2012Enclosure - NL-14-002, SAMA Engineering Project Cost Estimates Prepared by RCM Technologies
NL-12-009, Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 511 January 2012Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 5Boric Acid
High winds
High Radiation Area
Tornado Missile
Water Inventory Control
Time to boil
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Incorporated by reference
Design basis earthquake
Stress corrosion cracking
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Watch
Wrench tight
ML12040A31011 January 2012Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 5Boric Acid
High winds
High Radiation Area
Tornado Missile
Water Inventory Control
Time to boil
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Incorporated by reference
Design basis earthquake
Stress corrosion cracking
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Watch
Wrench tight
ML11280A12128 September 2011License Renewal Application - Completion of Commitment #30 Re Reactor Vessel Internals Inspection PlanFunctionality Assessment
Aging Management
EVT-1
NL-11-094, Request for Relief Request 14 - Code Case N-770-1 Weld Inspection Frequency Extension3 August 2011Request for Relief Request 14 - Code Case N-770-1 Weld Inspection Frequency Extension
NL-10-109, CFR 50.59(d) Report Listing and Summary Report of the Changes, Tests and Experiments Implemented Between 04/20/2008 and 04/12/201012 October 2010CFR 50.59(d) Report Listing and Summary Report of the Changes, Tests and Experiments Implemented Between 04/20/2008 and 04/12/2010Mission time
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML11299A1758 February 2010Lr Hearing - Indian Point Task I Report - Deliverable (Redacted Version)Probabilistic Risk Assessment
Chernobyl
ML09364109430 December 2009Preliminary Power Authority of the State of New York, Indian Point No. 3, Nuclear Power Plant, Systems Interaction Study. Volume II
ML09264017728 August 2009Environmental Science and Engineering
NL-09-095, Annual 10 CFR 50.46 Report for Calendar Year 2008 Emergency Core Cooling System Evaluation Changes21 July 2009Annual 10 CFR 50.46 Report for Calendar Year 2008 Emergency Core Cooling System Evaluation Changes
ML0905407049 January 2009American Radiation Services, Inc. Laboratory Analysis Report No. ARS1-08-02367, Revised 01/09/2009