NL-12-136, 10 CFR 72.48(d)(2) Report, Listing and Summary of Changes, Tests and Experiments
ML12285A226 | |
Person / Time | |
---|---|
Site: | Indian Point ![]() |
Issue date: | 10/01/2012 |
From: | Robert Walpole Entergy Nuclear Operations |
To: | Document Control Desk, NRC/FSME |
References | |
NL-12-136 | |
Download: ML12285A226 (6) | |
Similar Documents at Indian Point | |
---|---|
Category:Letter type:NL
MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021
[Table view]Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use NL-19-090, Registration of Unit 2 Spent Fuel Cask Use2019-10-0909 October 2019 Registration of Unit 2 Spent Fuel Cask Use NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments2019-09-26026 September 2019 50.59(d)(2) Summary Report of Changes, Tests and Experiments 2021-05-06 Category:Report MONTHYEARML22013A7062022-01-13013 January 2022
[Table view]Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G ML21056A0782021-04-0707 April 2021 Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Indian Point ISFSI (Docket: 72-51) NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement ML20259A2172020-09-14014 September 2020 Commitment Change Summary Report ML20260H0722020-06-18018 June 2020 IP-RPT-14-00013, Revision 3, Indian Point Nuclear Generating Units 2 and 3, Consequences of a Postulated Fire and Explosion Following the Release of Natural Gas from the New Aim 42 Pipeline Near Ipec ML20122A1052020-05-27027 May 2020 Letter from Margaret M. Doane to John B. Rhodes, Chair and Executive Officer, Ny State Public Service Commission: Response to Ny State Public Service Commission Regarding Natural Gas Transmission Pipelines Near Indian Point Nuclear Power Pl ML20100F6352020-04-0808 April 2020 Expert Team Final Report NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML19252A3182019-09-0909 September 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of Sept 2, 2019 NL-19-061, Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2019-06-13013 June 2019 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements ML19114A0742019-04-22022 April 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of April 15, 2019 NL-19-012, Request for Approval of a Certified Fuel Handler Training and Retraining Program2019-04-15015 April 2019 Request for Approval of a Certified Fuel Handler Training and Retraining Program ML18098A0882018-04-0606 April 2018 Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability NL-18-021, Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability2018-04-0606 April 2018 Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability NL-20-066, Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center2017-12-19019 December 2017 Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center ML17349A1562017-12-0808 December 2017 Risk Impact of One-Time Extending the ILRT Interval Associated with the Proposed Technical Specification Changes ML17279A2472017-10-0606 October 2017 2017 Annual Assessment Meeting Written Comments Compilation ML17222A2392017-10-0404 October 2017 NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding Hazard Reevaluations ML17289A6552017-10-0202 October 2017 Attachment 6 to NL-17-115, Revised HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Energy Center, Revision 9 NL-17-122, Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,20172017-09-28028 September 2017 Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,2017 ML17096A2122017-03-23023 March 2017 Entergy Engineering Report No. IP-RPT-16-00078, Indian Point RAI CLI-16-07 SAMA Cost-Benefit Sensitivities Rev. 1 (March 23, 2017) NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan2017-02-0606 February 2017 License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan ML17096A2112017-01-0404 January 2017 Entergy Engineering Report No. IP-RPT-16-00077, Indian Point RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan 4, 2017) ML16280A2282016-09-19019 September 2016 Indian Point 2 Technical Requirements Manual NL-16-109, Indian Point 2 Technical Requirements Manual2016-09-19019 September 2016 Indian Point 2 Technical Requirements Manual NL-16-109, HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center.2016-09-19019 September 2016 HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center. ML16250A2762016-09-13013 September 2016 Evaluation of Impacts to Proposed Critical Habitat for the Atlantic Sturgeon for Indian Point Nuclear Generating Units 2 and 3 Proposed License Renewal NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 32016-08-0101 August 2016 Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3 ML18115A0592016-06-28028 June 2016 After Action Report/Improvement Plan, Drill Date June 28, 2016 ML17052A2662015-10-0202 October 2015 Sturgeon Mobile Tracking for the New Ny Bridge at Tappan Zee NL-15-128, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update2015-09-28028 September 2015 Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 32015-09-0303 September 2015 Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 NL-15-099, Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2015-07-30030 July 2015 Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-15-072, 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2015-06-18018 June 2015 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements NL-15-030, Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project2015-04-0808 April 2015 Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project NL-15-029, Summary of Analysis Results Based on Corrected Format 2 Data Files Dated March 20152015-04-0606 April 2015 Summary of Analysis Results Based on Corrected Format 2 Data Files Dated March 2015 ML15062A2002015-02-19019 February 2015 NET-300067-01, Revision 1, Criticality Safety Analysis of the Indian Point, Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels. (Non-Proprietary) NL-15-013, Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval2015-01-28028 January 2015 Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval ML15061A2772014-12-31031 December 2014 WCAP-17954-NP, Revision 0, Indian Point Unit 3 Heatup and Cooldown Limit Curves for Normal Operation. NL-14-152, Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...2014-12-22022 December 2014 Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... ML14329A1952014-11-0404 November 2014 NET-300067-01, Rev. 0, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels NL-14-115, 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 20142014-09-18018 September 2014 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 2014 ML14304A7012014-09-16016 September 2014 Reliability Needs Assessment ML15166A0702014-08-31031 August 2014 Algonquin Incremental Market (Aim) Project, Phase 2 Acoustic Survey for Indiana Bats (Myotis Sodalis) and Northern Long-Eared Bats (Myotis Septentrionalis), August 2014 NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 ML14168A0592014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 1 of 5 ML14168A0602014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 ML14168A0612014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 2022-01-13 Category:Miscellaneous MONTHYEARML22013A7062022-01-13013 January 2022
[Table view]Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G ML20260H0722020-06-18018 June 2020 IP-RPT-14-00013, Revision 3, Indian Point Nuclear Generating Units 2 and 3, Consequences of a Postulated Fire and Explosion Following the Release of Natural Gas from the New Aim 42 Pipeline Near Ipec ML20122A1052020-05-27027 May 2020 Letter from Margaret M. Doane to John B. Rhodes, Chair and Executive Officer, Ny State Public Service Commission: Response to Ny State Public Service Commission Regarding Natural Gas Transmission Pipelines Near Indian Point Nuclear Power Pl NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML19252A3182019-09-0909 September 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of Sept 2, 2019 NL-19-061, Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2019-06-13013 June 2019 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements ML19114A0742019-04-22022 April 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of April 15, 2019 NL-19-012, Request for Approval of a Certified Fuel Handler Training and Retraining Program2019-04-15015 April 2019 Request for Approval of a Certified Fuel Handler Training and Retraining Program ML17279A2472017-10-0606 October 2017 2017 Annual Assessment Meeting Written Comments Compilation ML17222A2392017-10-0404 October 2017 NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding Hazard Reevaluations NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan2017-02-0606 February 2017 License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 32016-08-0101 August 2016 Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3 NL-15-128, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update2015-09-28028 September 2015 Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 32015-09-0303 September 2015 Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 NL-15-099, Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2015-07-30030 July 2015 Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-15-072, 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2015-06-18018 June 2015 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements NL-15-030, Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project2015-04-0808 April 2015 Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project NL-15-013, Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval2015-01-28028 January 2015 Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval NL-14-152, Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...2014-12-22022 December 2014 Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... ML14329A1952014-11-0404 November 2014 NET-300067-01, Rev. 0, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels NL-14-115, 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 20142014-09-18018 September 2014 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 2014 ML15166A0702014-08-31031 August 2014 Algonquin Incremental Market (Aim) Project, Phase 2 Acoustic Survey for Indiana Bats (Myotis Sodalis) and Northern Long-Eared Bats (Myotis Septentrionalis), August 2014 NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14141A5402014-05-0909 May 2014 Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14071A1832014-04-0101 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-042, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi. NL-14-043, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. ML14071A1982014-03-20020 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14015A4172014-01-30030 January 2014 Staff Summary of the Steam Generator Tube Inservice Inspections for the Spring 2013 Refueling Outage ML14304A7512013-12-13013 December 2013 Unit 3 Coastal Zone Management Act Consistency Certification, Vol. II of III, Supplemental Information Regarding NYSDEC Record, Part 8 of 9 NL-13-133, 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time2013-10-0202 October 2013 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time ML13221A4172013-07-26026 July 2013 LTR-13-0662 - Susan Lerner, Common Cause New York Ltr Provides a Copy of Generating Influence, Entergy'S Political Spending and the Battle Over the Indian Point Nuclear Power Plant. ML14304A7522012-12-31031 December 2012 Unit 3 Coastal Zone Management Act Consistency Certification, Vol. II of III, Supplemental Information Regarding NYSDEC Record, Part 9 of 9 ML12346A3432012-11-20020 November 2012 Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through End ML12346A3422012-11-20020 November 2012 Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 434 NL-12-167, Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 4342012-11-20020 November 2012 Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 434 NL-12-167, Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through End2012-11-20020 November 2012 Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through End NL-12-136, 10 CFR 72.48(d)(2) Report, Listing and Summary of Changes, Tests and Experiments2012-10-0101 October 2012 10 CFR 72.48(d)(2) Report, Listing and Summary of Changes, Tests and Experiments NL-14-002, Enclosure - NL-14-002, SAMA Engineering Project Cost Estimates Prepared by RCM Technologies2012-09-20020 September 2012 Enclosure - NL-14-002, SAMA Engineering Project Cost Estimates Prepared by RCM Technologies NL-12-009, Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 52012-01-11011 January 2012 Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 5 ML12040A3102012-01-11011 January 2012 Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 5 ML11280A1212011-09-28028 September 2011 License Renewal Application - Completion of Commitment #30 Re Reactor Vessel Internals Inspection Plan NL-11-094, Request for Relief Request 14 - Code Case N-770-1 Weld Inspection Frequency Extension2011-08-0303 August 2011 Request for Relief Request 14 - Code Case N-770-1 Weld Inspection Frequency Extension NL-10-109, CFR 50.59(d) Report Listing and Summary Report of the Changes, Tests and Experiments Implemented Between 04/20/2008 and 04/12/20102010-10-12012 October 2010 CFR 50.59(d) Report Listing and Summary Report of the Changes, Tests and Experiments Implemented Between 04/20/2008 and 04/12/2010 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML11299A1752010-02-0808 February 2010 Lr Hearing - Indian Point Task I Report - Deliverable (Redacted Version) ML0936410942009-12-30030 December 2009 Preliminary Power Authority of the State of New York, Indian Point No. 3, Nuclear Power Plant, Systems Interaction Study. Volume II ML0926401772009-08-28028 August 2009 Environmental Science and Engineering NL-09-095, Annual 10 CFR 50.46 Report for Calendar Year 2008 Emergency Core Cooling System Evaluation Changes2009-07-21021 July 2009 Annual 10 CFR 50.46 Report for Calendar Year 2008 Emergency Core Cooling System Evaluation Changes ML0905407042009-01-0909 January 2009 American Radiation Services, Inc. Laboratory Analysis Report No. ARS1-08-02367, Revised 01/09/2009 2022-01-13 |
Text
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, N.Y. 10511-0249
.Entergy Robert Walpole Manager, Licensing Tel 914 254 6710 NL-12-136 October 1,2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-P1-17 Washington, DC 20555-0001
Subject:
10 CFR 72.48(d)(2) Report for Indian Point Unit Nos. 1 and 2 Indian Point, Unit Nos. 1 & 2 Docket Nos.50-003 & 50-247 License Nos. DPR-5 & DPR-26 ISFSI License No. 72-0051
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. (Entergy), pursuant to 10 CFR 72.48(d)(2), hereby transmits a 72.48 report listing and summary report of the changes, tests and experiments implemented at Indian Point Units 1 and 2 between April 12, 2010, and April 1, 2012 or utilized in support of the CFSAR update. Attachment 1 provides a report listing and Attachment 2 provides a summary of the 72.48 evaluations changes in the facilities, changes in procedures, and tests and experiments implemented pursuant to 10 CFR 72.48.
There are no new commitments made by Entergy contained in this letter. If you have any questions, please contact Robert Walpole at (914) 254-6710.
RW/as Attachment 1 - 72.48 Report Listing Attachment 2 - 72.48 Summary of Changes, Tests and Experiments cc: see next page V-ý C-,D t")
Indian Point Units 1 & 2 Docket Nos.50-003 & 50-247 License Nos. DPR-5 & DPR-26 ISFSI License No. 72-0051 NL-12-136 Page 2 of 2 cc: NRC Resident Inspector's Office Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL Mr. William M. Dean, Regional Administrator, Region 1 Ms. Bridget Frymire, NYS Dept. of Public Service Commission Mr. Francis J. Murray Jr., President & CEO NYSERDA
ATTACHMENT 1 TO NL-12-136 72.48 REPORT LISTING ENTERGY NUCLEAR OPERATIONS, INC INDIAN POINT UNITS 1 & 2 DOCKET NOs.50-003 & 50-247 LICENSE NOs. DPR-5 & DPR-26 ISFSI LICENSE NO. 72-0051
Indian Point Units 1 & 2 Docket No.50-003 & 50-247 License No. DPR-5 & DPR-26 NL-12-136 Attachment 1 Page 1 of 1 72.48 REPORT LISTING 72.48 EVALUATION NUMBER Unit No. Rev. No. Unit 1 & 2 - 2012 Report 72.48 EVALUATION TITLE 07-C001-00-72.48Eval 1 &2 0 HOLTEC International HI-STORM FSAR, Report HI-2002444
ATTACHMENT 2 TO NL-12-136 72.48
SUMMARY
OF CHANGES, TESTS AND EXPERIMENTS ENTERGY NUCLEAR OPERATIONS, INC INDIAN POINT UNITS 1 & 2 DOCKET NOs.50-003 & 50-247 LICENSE NOs. DPR-5 & DPR-26 ISFSI LICENSE NO. 72-0051
Indian Point Units 1 & 2 Docket Nos.50-003 & 50-247 License Nos. DPR-5 & DPR-26 ISFSI License No. 72-0051 NL-12-136 Page 1 of 1 72.48 Summary of Changes, Tests and Experiments 72.48 Evaluation Rev. No. TITLE No.
07-CO01-00-72.48Eval 0 HOLTEC International HI-STORM FSAR, Report HI-2002444 Brief Description of the Chanqe, Test or Experiment:
The change would employ the Non-destructive Testing requirements of ANSI N14.6 (Section 6.5) in lieu of the annual load test requirements of the HI-TRAC lifting trunnions.
Summary of the associated 10 CFR 72.48 Evaluation Chapter 9.0 of the HOLTEC HI-STORM FSAR identifies the Maintenance requirements for the HI-STORM 100 system, including the HI-TRAC transfer cask. Section 9.1.2 discusses lifting trunnions design criteria, testing and inspection requirements. Section 9.2.1 requires an annual load test of the HI-TRAC lifting trunnions and a visual inspection of the accessible parts of the trunnions. The HI-TRAC lifting trunnions are considered "Special Lifting Devices" as defined by ANSI N14.6.
This change would employ the Non-destructive Testing requirements of ANSI N14.6 (Section 6.5) in lieu of the annual load test requirement of the HI-TRAC lifting trunnions.
Section 6.3, "Testing to Verify Continuing Compliance" of the ANSI standard requires a load test OR non-destructive testing of the trunnions. The non-destructive testing shall be in accordance with the requirements of Section 6.5. The requirements of ANSI N14.6, Section 6.5 are more rigorous than the visual inspection identified in the HI-STROM FSAR.
Performing the requirements of Section 6.3 and 6.5 of ANSI N14.6 in lieu of an annual load test of the HI-TRAC lifting trunnions is an acceptable means for testing to verify continuing compliance with the requirements of the Maintenance Chapter of the HOLTEC HI-STROM FSAR.